Centennial School District — Transcript

Friday, June 6, 2025

Facilities Projects Update

Outfield Fence Replacement at William Tenant High School

ADA Ramp Installation at Davis

Tennis Court Renovation Project

FCS Classroom Enhancements at Clinger and Log College

Log College Parking Refurbishment

District-wide Roof Assessments and Solar Energy Exploration

Warminster Symphony Orchestra Facility Use Exception

District-wide Security System Monitoring Contract

Votes (4)

Approving the Addition of an ADA Accessible Walkway at Davis

Consensus to present for board approval, with strong support noted.

The proposed walkway will address a significant accessibility issue at Davis where handicap buses drop off students far from the existing ramp, forcing movement over grass. The project involves extending the sidewalk to the drop-off circle and adding a new ramp access point. Philadelphia Concrete and Masonry is the vendor, with a cost of $12,250.

Facility Use Exception for Warminster Symphony Orchestra

Consensus to present for board approval, with noted anticipation for further discussion.

An annual request for a 35% reduction in facility fees for the Warminster Symphony Orchestra was discussed. Last year, the board increased the exception to 56.5% with a fixed fee of $2,000, which resulted in the district losing approximately $1,400 on labor costs alone. A board member suggested moving to offer facility use for free, indicating potential for continued debate on the level of subsidy.

Awarding Contract for William Tenant Baseball Field Outfield Fence Replacement

Consensus to present for board approval.

The contract for replacing the outfield fence at the William Tenant baseball field is recommended to be awarded to Five County Fencing for an amount not to exceed $19,799. The project includes installing an 8-foot tall, 630-foot-long commercial-grade black vinyl fence with a new bottom rail, which currently does not exist and is a key improvement. Seventeen existing posts will also be leveled and re-secured, or replaced if necessary. The commercial gauge of the fencing was highlighted for its durability and safety compared to residential options.

Awarding District-wide Security System Monitoring Contract

Consensus to present for board approval.

The district recommends awarding the security system monitoring contract for all buildings to Access Security Group. The cost is not to exceed $10,014, which is a rate similar to the previous year. Access Security Group has been providing monitoring services, including cameras, for the district for several years.

Notable Quotes (7)

the buses that are dropping off the children that need the ramp are doing so at that Circle at the bottom of that parking lot… not at the top of it where the ramp is so I think it's a a u the way the way we're organized and and they what they've been doing is is sort of moving the kids over the grass to get to the sidewalk so extending the sidewalk and the adding the ramp is is a great great idea.

Meeting Leader [23:00]
Approving the Addition of an ADA Accessible Walkway at Davis

The second is a facility use exception for a 35% reduction in fees for the Warminster Symphony Orchestra that has come back you that's an annual request.

Meeting Leader [12:00]
Facility Use Exception for Warminster Symphony Orchestra

absolutely put it on the agenda yep I'm going to make a mo to give it to him for free I'm just you can you can make that motion I just what what was done last year was the except a the board revised the motion uh to increase the exception from 35% to 56 a half% and make it a and make it a fixed fee at $2,000.

Mrs Brado [12:08]
Facility Use Exception for Warminster Symphony Orchestra

the actual labor cost just so we know right the actual labor cost just people uh was $3,379 right so they they didn't pay for the rent of the facility and this is actual labor out the door for $3,379.

Meeting Leader [12:35]
Facility Use Exception for Warminster Symphony Orchestra

the bottom rail doesn't exist today which is part of the problem and that was reuse any usable um post correct.

Meeting Leader [14:00]
Awarding Contract for William Tenant Baseball Field Outfield Fence Replacement

it's also a different gauge fencing excuse me it's also a different gauge fencing the black vinyl that they're using is a heavier gauge than a residential so it's it's more material and it and people can run into and it won't Bend or you know things can you know all that stuff it's safer for the baseball field and it's just it's a it's a cated fence yeah and it's heavier gug so it won't take damage.

Mrs Brado [15:20]
Awarding Contract for William Tenant Baseball Field Outfield Fence Replacement

awarding a districtwide security system monitoring contract uh uh with access Security Group not to exceed $10,14.

Meeting Leader [17:10]
Awarding District-wide Security System Monitoring Contract

Ordinances & Resolutions (2)

RFPOther

Request for Proposal for tennis court renovation.

RFPOther

Request for Proposal for Log College parking refurbishment, potentially with William Tenant lot as an alternate.

View Source
Centennial School District - Blaine Recorder