Agenda · Blaine City Council
Blaine City CouncilAgendaTuesday, August 25, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## City of Blaine
## Park Advisory Board
August 25, 2026 | 7:00 PM
## Blaine City Hall
## 10801 Town Square Drive NE
## Blaine, MN 55449
Park Board Members: Chair Jeff Lester, Chad Henderson, Tonya Lizakowski, Amanda Neubert, Paul
## Perez, Amanda Tschakert, Amanda Van Buren
The purpose of the park board is to provide a high quality of life for the city's residents through
protection of its natural resources, its scenic, historical and aesthetic values, and by development of
compatible facilities for public enjoyment. One of the board's functions as an advisory body is to hold
public meetings and make recommendations to the city council. For
each item, the board will receive reports prepared by city staff, provide the opportunity for public
response, conduct board discussions and make recommendations. The city council,
however, makes all final decisions on these matters.
## AGENDA
1. Call to Order
## 2. Roll Call
3. Approval of Minutes
3.1. 2026-422 Approval of the April 28, 2026 Park Board Meeting Minutes
## Sponsors: Jerome Krieger, Park and Recreation Director
## 4. Open Forum
Open Forum is an opportunity for the public to share comments, concerns, or input on other
items. While Open Forum is not intended to provide responses or discussion during the meeting,
city staff will contact the speaker(s) after the meeting if follow-up is needed. Each speaker is
limited to three minutes, with a maximum of 15 minutes set aside for Open Forum.
## 5. New Business
5.1. 2026-423 2050 Comp Plan
## Sponsors: Elizabeth Showalter, Housing Program Coordinator
## 5.2. 2026-448 Little League Park Playground Equipment
## Sponsors: Jerome Krieger, Park and Recreation Director
5.3. 2026-449 Park Updates
Page 1 of 23
## Sponsors: Jerome Krieger, Park and Recreation Director
6. Adjournment
Page 2 of 23
## City of Blaine
## Park Advisory Board
April 28, 2026 | 7:00 PM
## Blaine City Hall
## 10801 Town Square Drive NE
## Blaine, MN 55449
## MINUTES
1. Call to Order
The Blaine Park Advisory Board met in the Council Chambers of City Hall on Tuesday, April 28,
2026. Chair Lester called the meeting to order at 7:00PM.
## 2. Roll Call
Members Present: Boardmembers Neubert, Tschakert, VanBuren and Chair Lester.
Members Absent: Boardmembers Henderson, LIzakowski and Perez.
Staff Present: Jerome Krieger, Parks and Recreation Director.
Guest: None.
3. Approval of Minutes
3.1. 2026-219 Approval of the March 24, 2026 Park Board Meeting Minutes
## Sponsors: Jerome Krieger, Park and Recreation Director
Motion by Boardmember VanBuren to approve the minutes of March 24, 2026 as
presented. Motion seconded by Boardmember Neubert. Motion approved unanimously.
## 4. Open Forum
Open Forum is an opportunity for the public to share comments, concerns, or input on other
items. While Open Forum is not intended to provide responses or discussion during the meeting,
city staff will contact the speaker(s) after the meeting if follow-up is needed. Each speaker is
limited to three minutes, with a maximum of 15 minutes set aside for Open Forum.
Chair Lester opened the Open Forum at 7:02PM.
No one appeared to address the Board.
Page 3 of 23
Chair Lester closed Open Forum at 7:02PM.
## 5. New Business
## 5.1. 2026-220 Westwood Park Tennis/Basketball Court Cost Analysis
## Sponsors: Jerome Krieger, Park and Recreation Director
Park and Recreation Director Krieger stated following up from last month's meeting, city
staff did a preliminary cost analysis to project what the cost may be to construct a new half
basketball court and tennis/pickleball court at Westwood Park. Staff presented a layout and
a cost analysis for Westwood Park and requested feedback from the park board on how to
proceed.
Chair Lester questioned if there would be right of way concerns with where the lines are
buried in the park. Mr. Krieger indicated these were details he would have to work out with
Xcel Energy out prior to moving forward with the plans for this park.
Boardmember VanBuren asked if the power lines were not buried, would the city be able to
move forward with Option B. Mr. Krieger indicated the city would have to be 30 or 40 feet
away from the power lines, if the lines were not buried.
Boardmember Neubert recommended a gate be installed on the east and west side of the
courts.
Chair Lester requested further information regarding the lighting. Mr. Krieger reviewed the
location of the proposed park lighting.
Chair Lester requested staff review the preliminary cost estimates for Option A and Option
B. Mr. Krieger reviewed the proposed project costs for both options, noting Option A would
cost $309,174 and Option B would cost $400,000.
Boardmember Tschakert stated these estimates came in higher than she anticipated for a
basketball and tennis court. She asked if there were any items within the estimate that
could be reduced. Mr. Krieger indicated the basketball court could have a fence on one side
instead of all sides, or a shorter fence could be considered.
Chair Lester inquired if the City would be doing street work in this area in order to assist
with lowering the cost for this project. Mr. Krieger stated he could speak with engineering
staff regarding this matter.
Further discussion ensued regarding the life expectancy of playground structures.
Mr. Krieger asked which option the board supported at this time.
Chair Lester stated he believed Option A would be the better option for this park. The board
was in agreement.
Page 4 of 23
5.2. 2026-221 Park Updates
## Sponsors: Jerome Krieger, Park and Recreation Director
Mr. Krieger provided the board with an update on the following matters:
• Blaine Baseball Complex ADA Restrooms - The progress being made on the family
restrooms was reviewed with the board.
• Blaine Baseball Complex Scoreboards - The new scoreboards were now in place at
the Blaine Baseball Complex.
• Anoka County Grant - Staff applied for a grant through Anoka County and was
approved for funding for trail maintenance and playground equipment at Little
League Park.
• Ostmans Building Repair - Photos were shared of the old Ostmans building, along
with photos of how the building had been repaired. Staff was pleased to report this
project came in under budget.
• Jefferson Park - Work began at Jefferson Park today and the playground structure
should be completed by next week.
• Mary Ann Young Center - The city was seeing a lot of rentals at MAYC.
6. Adjournment
Boardmember Tschakert motioned to adjourn. Boardmember VanBuren seconded the motion.
Motion approved unanimously.
Chair Lester adjourned the meeting at 7:50PM.
Page 5 of 23
## City of Blaine
## Staff Report
## File Number: 2026-423
## Agenda Date
## Status
August 25, 2026
## In Control
## File Type
## Park Advisory Board
## Presentation
## New Business -
Agenda Item # 5.1
## 2050 Comp Plan
## Background
The City is required under state statute to update its comprehensive plan every 10 years. The 2050 plan
must be completed and submitted to the Metropolitan Council by the end of 2028. Staff will provide a
brief overview of the plan requirements and process for drafting the plan.
The City will be utilizing an advisory group for the Comprehensive Plan which will include
representatives from city commissions, members of the public, and city council members. Park Board
members will be asked to express interest in the advisory group either at the meeting, or by emailing
staff following the meeting. The advisory group will generally meet on the fourth Tuesday of the month
at 5:30, with a total of eight meetings expected between October 2026 and August 2027. Meetings may
occasionally be held on other Tuesdays.
## Recommendation
## Attachment List
## None
Page 6 of 23
## City of Blaine
## Staff Report
## File Number: 2026-448
## Agenda Date
## Status
August 25, 2026
## In Control
## File Type
## Park Advisory Board
## Action Item
## New Business -
Agenda Item # 5.2
## Little League Park Playground Equipment
## Background
Staff will present some possible playground equipment options to the Park Board for Little League Park.
This will be a 2027 project through the Parks and Trails.CIP.
## Recommendation
Give staff feedback on which option the park board prefers and any other changes they would like to
see with the renderings.
## Attachment List
## 1. _2026.08.13 Blaine_Little League Park Revised Concepts
Page 7 of 23
Page 8 of 23
Page 9 of 23
Page 10 of 23
Page 11 of 23
56'-6"
38'-4"
## SALES
## REPRESENTATIVE:
## EMILY MALONEY
## DESIGNED BY:
## AO
7/30/26
3/8" = 1'-0"
## FLAGSHIP RECREATION
## 11123 UPPER 33RD ST N
## LAKE ELMO, MN 55082
763-550-7860
## FLAGSHIPPLAY.COM
## THIS PLAY AREA AND PLAY EQUIPMENT
## IS DESIGNED FOR AGE RANGES AS
## NOTED ON PLAN.
## THIS DESIGN CONFORMS TO THE ADA
## ACCESSIBLITY GUIDELINES (ADAAG),
## ASSUMING THAT THE ENTIRE USE ZONE
## IS COVERED WITH AN ACCESSIBLE
## PROTECTIVE SURFACING, UNLESS
## OTHERWISE NOTED ON THE PLAN.
## SHEET
## LS101
C:\Users\AlexandraOlson\Flagship Recreation\Flagship Recreation - Documents\2026 Planning\Emily\Blaine - Little League Park\Design\2026.07.22 Revision\Opt 1\Blaine_LittleLeaguePark Opt 1 - 072226.dwg
## LITTLELEAGUE
## PARK PLAYGROUND
## OPTION 1
## 730 113TH AVE NE, BLAINE, MN 55434
## CONTAINER DETAILS
## TOTAL CONTAINER AREA2164 SF
## ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER
## TOTAL EWF AREA2164 SF
## TOTAL PERIMETER190 LF
## EDGING TYPE6"X12" CONCRETE CURB
## FINISH GRADETOP OF CURB
## MAX FALL HEIGHT (5-12 YR)
96"
## *SITE PREPARATION REQUIREMENTS:
## ·OWNER TO PROVIDE A MINIMUM 6' WIDE APPROVED SITE ACCESS PATH
## TO CONTAINER AND PROTECTION OF THIS ACCESS ROUTE
## ·PLAYGROUND PLAN IS BASED ON IDEAL SOIL CONDITIONS. IF THERE
## ARE CONCERNS ABOUT THE SOILS BEING SUITABLE, IT IS RECOMMEND
## THAT THE OWNER PROVIDE A GEOTECHNICAL REPORT OF THE SITE
## ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER
## ·OWNER INSTALLED DRAIN TILE TO BE WITHIN 4 FEET OF CONTAINER
## PERIMETER
## ·IF OWNER INSTALLED BORDER, DRAIN TILE STUB TO BE PROVIDED
## ·DRAIN TILE BY FLAGSHIP ACCOUNTS FOR WATER WITHIN THE
## CONTAINER AND DOES NOT INCLUDE RUN OFF FROM SURROUNDING
## FLATWORK, LANDSCAPING, BUILDINGS, ETC.
## ·OWNER TO PROVIDE ACCESSIBLE ROUTE TO CONTAINER
## ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB
## DIMENSION
Page 12 of 23
8/13/2026
## City of Blaine
## 10801 Town Square Drive NE
## Blaine, MN 55449
## Jerome Krieger, Parks and Recreation Director
## Labor Rate:Prevailing
## PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE
## QTY
## Preliminary
## Budget
## Possible
## Additions
## Possible
## ReductionsNotes
## Play Equipment
## Little League Park - Option 1,EM706LLP21644624769,742.002026 List Price
State Contract #2180916%(4,184.52)(6% discount under $80,000 & 8% discount $80,000 & above)
Sales Tax - if applicable 0.00ST3 Certificate of Exemption must be provided by owner.
## Playground Freight (Ships from Delano, MN)1,200.00
## Mobilization750.00
Mobilization of Installation Crew to Job Site (Trailer Skid Steer Augur, Tools, Mixer, Etc.)
Dumpster(s) - 30 Yard750.00
Disposal of packaging material
Site work
Excavation (new container) 00.00
BY OWNER - Desired final grade of play container to be set by excavating 12" below it
## Border Options
Concrete Border Straight (LF)19010,825.13Standard 6" W x 12" D.
## Playground Installation (Labor & Concrete for Footings)
18.75%14,167.02Full professional installation by Landscape Structures Certified Installers. Prevailing Labor Rate.
Shade/Tower Rental Equipment Allowance (Lull, Lift, etc.)1,618.59Rental - Req'd for Shade Fabric, Roofs, etc.
## Subgrade Prep & Engineered Wood Fiber Surfacing (EWF)
## EWF - Playground Safety Surfacing (CY)944,222.93
## IPEMA Certified Meets ASTM, ADA & CPSC
## EWF Freight 925.00
## Site Restoration (Sq.Ft.)
## 00.00BY OWNER
## LSI - Payment & Performance Bonds 0.00Included By Request
## Flagship - Payment & Performance Bonds0.00Included By Request
## Preliminary
## Total
## Additions
## Total
## Reductions
## Total
## Total w/ Additions & Reductions
109,996.850.00 0.00 109,996.85
Page 13 of 23
Page 14 of 23
Page 15 of 23
Page 16 of 23
Page 17 of 23
Page 18 of 23
Page 19 of 23
Page 20 of 23
56'-6"
38'-4"
## EXT.
## SALES
## REPRESENTATIVE:
## EMILY MALONEY
## DESIGNED BY:
## AO
7/22/26
3/8" = 1'-0"
## FLAGSHIP RECREATION
## 11123 UPPER 33RD ST N
## LAKE ELMO, MN 55082
763-550-7860
## FLAGSHIPPLAY.COM
## THIS PLAY AREA AND PLAY EQUIPMENT
## IS DESIGNED FOR AGE RANGES AS
## NOTED ON PLAN.
## THIS DESIGN CONFORMS TO THE ADA
## ACCESSIBLITY GUIDELINES (ADAAG),
## ASSUMING THAT THE ENTIRE USE ZONE
## IS COVERED WITH AN ACCESSIBLE
## PROTECTIVE SURFACING, UNLESS
## OTHERWISE NOTED ON THE PLAN.
## SHEET
## LS101
C:\Users\AlexandraOlson\Flagship Recreation\Flagship Recreation - Documents\2026 Planning\Emily\Blaine - Little League Park\Design\2026.07.22 Revision\Opt 2\Blaine_LittleLeaguePark Opt 2 - 072226.dwg
## CONTAINER DETAILS
## TOTAL CONTAINER AREA2164 SF
## ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER
## TOTAL EWF AREA2164 SF
## TOTAL PERIMETER190 LF
## EDGING TYPE6"X12" CONCRETE CURB
## FINISH GRADETOP OF CURB
## MAX FALL HEIGHT (5-12 YR)
96"
## *SITE PREPARATION REQUIREMENTS:
## ·OWNER TO PROVIDE A MINIMUM 6' WIDE APPROVED SITE ACCESS PATH
## TO CONTAINER AND PROTECTION OF THIS ACCESS ROUTE
## ·PLAYGROUND PLAN IS BASED ON IDEAL SOIL CONDITIONS. IF THERE
## ARE CONCERNS ABOUT THE SOILS BEING SUITABLE, IT IS RECOMMEND
## THAT THE OWNER PROVIDE A GEOTECHNICAL REPORT OF THE SITE
## ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER
## ·OWNER INSTALLED DRAIN TILE TO BE WITHIN 4 FEET OF CONTAINER
## PERIMETER
## ·IF OWNER INSTALLED BORDER, DRAIN TILE STUB TO BE PROVIDED
## ·DRAIN TILE BY FLAGSHIP ACCOUNTS FOR WATER WITHIN THE
## CONTAINER AND DOES NOT INCLUDE RUN OFF FROM SURROUNDING
## FLATWORK, LANDSCAPING, BUILDINGS, ETC.
## ·OWNER TO PROVIDE ACCESSIBLE ROUTE TO CONTAINER
## ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB
## DIMENSION
## LITTLELEAGUE
## PARK PLAYGROUND
## OPTION 2
## 730 113TH AVE NE, BLAINE, MN 55434
Page 21 of 23
8/13/2026
## City of Blaine
## 10801 Town Square Drive NE
## Blaine, MN 55449
## Jerome Krieger, Parks and Recreation Director
## Labor Rate:Prevailing
## PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE
## QTY
## Preliminary
## Budget
## Possible
## Additions
## Possible
## ReductionsNotes
## Play Equipment
## Little League Park - Option 2,EM706LLP21644624780,745.002026 List Price
State Contract #2180918%(6,459.60)(6% discount under $80,000 & 8% discount $80,000 & above)
Sales Tax - if applicable 0.00ST3 Certificate of Exemption must be provided by owner.
## Playground Freight (Ships from Delano, MN)1,200.00
## Mobilization750.00
Mobilization of Installation Crew to Job Site (Trailer Skid Steer Augur, Tools, Mixer, Etc.)
Dumpster(s) - 30 Yard750.00
Disposal of packaging material
Site work
Excavation (new container) 00.00
BY OWNER - Desired final grade of play container to be set by excavating 12" below it
## Border Options
Concrete Border Straight (LF)19010,825.13Standard 6" W x 12" D.
## Playground Installation (Labor & Concrete for Footings)
20.76%15,421.63Full professional installation by Landscape Structures Certified Installers. Prevailing Labor Rate.
Shade/Tower Rental Equipment Allowance (Lull, Lift, etc.)1,618.59Rental - Req'd for Shade Fabric, Roofs, etc.
## Subgrade Prep & Engineered Wood Fiber Surfacing (EWF)
## EWF - Playground Safety Surfacing (CY)944,222.93
## IPEMA Certified Meets ASTM, ADA & CPSC
## EWF Freight 925.00
## Site Restoration (Sq.Ft.)
## 00.00BY OWNER
## LSI - Payment & Performance Bonds 0.00Included By Request
## Flagship - Payment & Performance Bonds0.00Included By Request
## Preliminary
## Total
## Additions
## Total
## Reductions
## Total
## Total w/ Additions & Reductions
109,998.680.00 0.00 109,998.68
Page 22 of 23
## City of Blaine
## Staff Report
## File Number: 2026-449
## Agenda Date
## Status
August 25, 2026
## In Control
## File Type
## Park Advisory Board
## Report
## New Business -
Agenda Item # 5.3
## Park Updates
## Background
## Park Updates
Bark in the Park
## Safety Camp
## Community Garden
## Mary Ann Young Center Programs
## Jim Peterson Park Rink and Parking Lot Expansion
Trail work
## Recommendation
## Informational
## Attachment List
## None
Page 23 of 23