## LIME TOWNSHIP PLANNING COMMISSION
Regular Meeting June 29, 2026 - 5:00 p.m.
## Mankato Regional Airport
## 3030 North Airport Road, Mankato MN
****************************************
Any person speaking to the Commission shall give to the Secretary of the
Commission the NAME and HOME ADDRESS of such person prior to speaking.
****************************************
## 1.CALL TO ORDER
## 2.APPROVAL OF AGENDA
## 3.APPROVAL OF MINUTES
## 4.BUSINESS ITEMS
1.
## CYL-0007-26
Request of Brian Keenan, on behalf of MNCSG 2019-57 LLC, with permission of the property
owner, for an amendment of a current Interim Use Permit, IUP, to allow an extension of the
timeframe for an additional 12 months for the work to begin on the project. The Interim Use
permit allowed the construction of a one mega watt solar site and included a condition of approval
that stated, “This interim use permit shall become invalid unless a land development permit
authorizing the work has been issued within 12 months after the final approval by the Lime
## Township Board.” The previous IUP was approved by the Lime Township Board on September 10,
2024. The applicant has not yet obtained some of the necessary approvals for their project so they
have stated that an extension is necessary. Besides the extension of time, the applicant has
indicated that there are no other changes from the original approval associated with this current
## amendment request. 23759 3rd Ave, Mankato MN 56001, Lime Township, Blue Earth County (PID
## R400429200017).
The anticipated date of Lime Township Board action is July 14th, 2026 at 7:30p.m. at the Mankato
Regional Airport.
## 5.MISCELLANEOUS
## 6.ADJOURNMENT
## Lime Township Planning Commission
4. 1.
## Meeting Date:06/29/2026
## Title
## CYL-0007-26
Request of Brian Keenan, on behalf of MNCSG 2019-57 LLC, with permission of the property owner, for
an amendment of a current Interim Use Permit, IUP, to allow an extension of the timeframe for an
additional 12 months for the work to begin on the project. The Interim Use permit allowed the construction
of a one mega watt solar site and included a condition of approval that stated, “This interim use permit
shall become invalid unless a land development permit authorizing the work has been issued within 12
months after the final approval by the Lime Township Board.” The previous IUP was approved by the
Lime Township Board on September 10, 2024. The applicant has not yet obtained some of the necessary
approvals for their project so they have stated that an extension is necessary. Besides the extension of time,
the applicant has indicated that there are no other changes from the original approval associated with this
current amendment request. 23759 3rd Ave, Mankato MN 56001, Lime Township, Blue Earth County (PID
## R400429200017).
The anticipated date of Lime Township Board action is July 14th, 2026 at 7:30p.m. at the Mankato Regional
Airport.
## Applicant
The applicant, MNCSG 2019-57 LLC, with permission of the property owner John Bohrer.
## Request
Brian Keenan of MNCSG 2019-57 LLC has submitted an application seeking an extension to the time allowed to
make use of the previously approved Interim Use Permit, IUP, in Lime Township. The previous IUP was
approved by the Lime Township Board on September 10, 2024. Besides the extension of time, the applicant has
indicated that there are no other changes from the original approval associated with this current amendment
request.
## Location
The subject property is zoned Rural Conservation and is legally described as The Northeast Quarter of the
Northwest Quarter, except railroad right of ways, and the Northwest Quarter of the Northeast Quarter, both in
Section 29, Township 109, Range 26, excepting from said Northwest Quarter Northeast Quarter that part of said
Northwest Quarter Northeast Quarter described as, beginning at a point 1315.8 feet South of the Northeast corner
of Section 29-109-26, thence West 1808.8 feet to the East line of the Right of Way of the Chicago &
Northwestern Railway, thence southwesterly along the said Right of Way line, 1264.6 feet, thence East 1692.3
feet to the East line of said Section 29, thence North along the section line 1249.8 feet to the place of beginning. A
strip of land one (1) rod wide now used as a road, extending from East to West upon, over and across the North
side of the Northwest Quarter of the Northwest Quarter (NW1/4 NW1/4) of Section 29, Township 109 North of
Range 26 West, beginning at or near the Northeast corner of said NW1/4 NW1/4 of Sec. 29, and thence West
along or near the North line of said NW1/4 NW1/4 of said Sec. 29, to the public highway known as the Mankato
and St. Peter Road. The East 302.00 feet of the Northwest Quarter of the Northwest Quarter of Section 29,
Township 109, Range 26, Blue Earth County, Minnesota, except the South 16.5 feet thereof. Except therefrom:
Part of the Northwest Quarter of the Northwest Quarter and part of the Northeast Quarter of the Northwest
Quarter of Section 29, Township 109 North, Range 26 West, Blue Earth County, Minnesota described as:
Commencing at the Southeast corner of said Northwest Quarter of the Northwest Quarter; thence North 89
Commencing at the Southeast corner of said Northwest Quarter of the Northwest Quarter; thence North 89
degrees 41 minutes 42 seconds West (bearings are based on Blue Earth County Coordinates NAD83, 1996
Adjustment) on the south line of said Northwest Quarter of the Northwest Quarter, a distance of 78.00 feet;
thence North 12 degrees 41 minutes 56 seconds East, a distance of 16.89 feet to the north line of the south 16.5
feet of said Northwest Quarter of the Northwest Quarter and the point of beginning; thence North 12 degrees 41
minutes 56 seconds East, a distance of 589.95 feet to the westerly right of way of the abandoned Chicago,
Milwaukee, St. Paul and Pacific Railroad Company; thence South 05 degrees 40 minutes 37 seconds West on said
westerly right of way, a distance of 558.85 feet to the east line of said Northwest Quarter of the Northwest
Quarter; thence South 00 degrees 11 minutes 26 seconds West on said east line, a distance of 19.81 to the north
line of the south 16.5 feet of said Northwest Quarter of the Northwest Quarter; thence North 89 degrees 41
minutes 42 seconds West on said north line, a distance of 74.34 feet to the point of beginning. (23759 3rd
Avenue; Blue Earth County PID R400429200017).
## Existing Land Use
The parcel is made of 84.22 acre and is currently used for agricultural purposes.
## Zoning
The property is located in Lime Township and is zoned Rural Conservation.
## Environmentally Sensitive Areas
There are National wetland inventories located throughout the parcel containing a consistent stream within the
## NWI.
## City Code
## The Lime Township Ordinance can be found at this link: Lime Township Ordinances
## Review
Brian Keenan of MNCSG 2019-57 LLC has submitted an application seeking an extension to the time allowed to
make use of the previously approved Interim Use Permit, IUP, in Lime Township. The applicant has previously
requested a 12 month extension in August 2025 and was approved by the Lime Township Board on September
9, 2025. The Interim Use permit allowed the construction of a one mega watt solar site and included a condition
of approval that stated, “This interim use permit shall become invalid unless a land development permit
authorizing the work has been issued within 12 months after the final approval by the Lime Township Board.”
The previous IUP was approved by the Lime Township Board on September 10th, 2024 and the first extension
request was approved September 9th, 2025. The applicant has not yet obtained some of the necessary
approvals for their project, so they have stated that an extension is necessary.
The previous request that was approved in September 2024, was for a 1-megawatt solar garden that would
utilize 7.2 acres of said 84.22 acres. The approved site plans conform with the previous ordinance as well as the
recently amended Lime Township Solar Ordinance.
Besides the extension of time, the applicant has indicated that there are no other changes from the original
approval associated with this current amendment request.
## Findings
Staff respectfully submits the previously approved findings from the September 2024 report:
Staff respectfully submits the previously approved findings from the September 2024 report:
1. Use. - The proposed US Solar community solar is listed as an interim use located on Parcel Identification
Number R400429200017.
2. Prohibitions. - The property is not located in shoreland, floodplain, or habitat areas. The site does contain
wetlands, but a wetland delineation was conducted, and the project will not impact wetlands. The site is outside
of any areas identified as flight zones.
3. Maximum Size and Capacity. - The proposed community solar facility is a 1-megawatt facility. The site
encompasses approximately 7.2 acres.
4. Standards for Community Solar Energy Systems. - The site has access via 238th Street off of 3rd Avenue. The
applicant uses piles as the foundation. The report documents the use of steel and concrete piles. The applicant
conforms to the impervious standards of Lime Township. The submittal for the land development permit will
include documentation related to conformance with the building code. The applicant has submitted the appropriate
documentation to the Blue Earth County Technical Evaluation Panel and it has been approved.
5. Signage. - The applicant will only be utilizing signage required by the regulatory agency requirements.
6. Power and Communication Lines. - The applicant has an interconnection agreement with Xcel Energy.
7. Waste Disposal. - The applicant will be providing portable waste facilities during construction for contractors
and employees.
8. Interconnection. - The applicant has an interconnection agreement with Xcel Energy.
9. Decommissioning Plan. - The applicant has submitted a decommissioning plan. The plan addresses costs for
decommissioning totaling $293,916.93. The applicant will be submitting a cash escrow or irrevocable letter of
credit for the amount of approximately $367,396.16.
10. Noise. - The applicant will conform to the noise standards. Suspected violations will be forwarded to the
MPCA for enforcement.
11. Electrical Codes and Standards. - The applicant will work with the State of Minnesota on the enforcement
and/or compliance with the electrical code.
12. Minnesota State Building Code. - The applicant will submit documentation of this with the land
development permit.
13. Maximum Height. - The proposed modules will range between 8 feet and 12 feet in height.
14. Glare. - The applicant conducted a glare study. The assessment passed the Forge Solar FAA policy
adherence.
15. Setbacks. - The site conforms to the rear, side yard, and principal dwelling setback requirements.
16. Security Fencing. - The proposal will have an 8-foot fence with more than a five-inch separation from the
ground.
17. Screening. - The applicant is not proposing a vegetative screening due to the natural barrier of trees located
on the property.
18. Inspections and Reports. - The applicant will prepare the information for the boards and allow for inspections.
19. Tile Lines. – Tiles lines will be identified on the submittal for the land development permit.
20. Roads. - The applicant will be accessing the site via 3rd Avenue onto 238th Street. The applicant is currently
working with Union Pacific for a private road agreement.
21. Vegetation Requirements & Management. – The trees on the site will not be cleared. The proposal indicates
that a DNR approved pollinator seed mix will be used for the site.
22. Inspection Fees. - Inspection fees will be paid to the Lime Township Board per the standards in the
ordinance.
23. Natural Heritage Information System Review. - The applicant has submitted a review of the cultural features
of the site.
24. Utility Notification. - The utility companies were notified with the standard notification process for the
interim use permit.
## Recommendation
Staff recommends approval of the extension of an Interim Use Permit to allow for a community solar facility in
Lime Township with the previously approved conditions found in the September 2024 report.
## Attachments
## General Location Map
## Aerial Map
## Site Plan
## Project Narrative
This inf or ma ti o n is to be us ed f o r re fe re nce purpo se s o nly . The City o f Ma nka to do es no t gua rante e ac cura cy o f the ma ter ia l c o nta ine d he rei n a nd is no t res pons ible f o r mi sus e o r mis inte rpreta tio n.
%
Date: Februar y 2024
Author :
## General Location Map
This inf or ma ti o n is to be us ed f o r re fe re nce purpo se s o nly . The City o f Ma nka to do es no t gua rante e ac cura cy o f the ma ter ia l c o nta ine d he rei n a nd is no t res pons ible f o r mi sus e o r mis inte rpreta tio n.
%
Date: Februar y 2024
Author :
## Aerial Location Map
## 2670 Patton Road | Roseville, MN 55113
Main number: 651-789-5305
www.newenergyequity.com
May 26, 2026
## Lime Township Board
## 3030 N Airport Rd
## Mankato, MN 56001
MNCSG 2019-57 LLC is requesting to extend the time allowed to make use of the previously approved
IUP with Lime Township. We received approval for a 1MW community solar site as an interim use on
September 10, 2024. It includes condition number 27 that reads: "This interim use permit shall
become invalid unless a land development permit authorizing the work has been issued within 12
months after the final approval by the Lime Township Board." We requested and were granted a 12
month extension of that deadline on September 9, 2025. We are now asking for an additional 12
month extension to that condition.
There are two main reasons we are asking for this amendment.
1 The Xcel interconnection application for our solar project is behind the one that Sunvest Solar is
working to develop on the same parcel. The IUP application for the Sunvest project was denied by the
Lime Township Board. Sunvest is working to remedy the shortcomings of their permit application and
reapply but cannot do that for 12 months from the denial. Meanwhile their interconnection
application with Xcel is still ahead of ours with no forward progress. Our site can't move forward
without the approved interconnection, and we can't finalize construction plans without the final
approval from Xcel on our design. This makes it impossible for us to apply for a Land Development
Permit with Lime Township within the 12 month window.
2 We have negotiated with Union Pacific Railroad to secure the Private Road Crossing Agreement
required to satisfy Condition #1. This work took far longer than anticipated due to the slow response
of the railroad. UP is requiring that we pay to have them reconstruct the crossing. That work can only
be completed by UP and their crews. UP has not committed to a construction timeline but has said
that it’s doubtful they can start this work within 2026. We need that reconstruction completed before
we can cross the rail tracks with construction equipment. The Township requires that we start
construction work on our site within 120 days of receiving the Land Development Permit. If we make
use of the IUP and apply for the Land Development Permit too early the 120 day window will expire
before we can begin construction.
Extending the time allowed to make use of the IUP will allow us to fully comply with all conditions. All
other aspects of our application and the approved IUP remain unchanged. The amendment of the time
allowed to make use of the permit does not affect the Township in any material way. There are no
increased costs or burdens being put on the Township.
We are not requesting to make any other changes to the IUP as originally approved.
Thank you,
## Brian Keenan, Sr Project Developer
On behalf of MNCSG 2019-57 LLC