Carver County Board of Commissioners -- Board Meeting/Work Session - January 27th, 2026 Pt2

Tuesday, January 27, 2026

2011 Wastewater System infrastructure evaluation

Transition from septic tanks to full sanitary sewer system

Phase 1 and Phase 2 project timelines and design

Project funding structure, state/federal grants, and debt capacity

Infrastructure deterioration issues and lift station concerns

Inter-municipal coordination with Chaska, Victoria, and Waconia

Notable Quotes (3)

If these things start to break, what's going to happen there? There's so very much of them are so close to the lakes right now.

Pete Paris
System safetyDiscussing the risk of lift station failure near lakes.

The Senate chair of the bonding committee said want you split into two it'll be easier for us to fund it in two phases instead of one big appropriation.

Pete Paris
Funding StrategyExplaining the shift to a two-phase project plan.

It's not the tank because then you would kill the bacteria. Correct... it takes the treated water and just runs through the chlorine.

James Schilling
System MaintenanceDetailing the water treatment process.

People (3)

Katie GaylerEngineering Consultant

Provides engineering design and consulting for the wastewater facility plant evaluation.

Places Mentioned

Laketown TownshipCarver CountyWright's LakePearson LakeLake BavariaChaskaVictoriaWaconiaRolling MeadowsHighway 5

Events & Meetings (4)

  • March 11th, 1986 (Joint Powers Agreement execution)
  • July 15th, 1985 (Commencement of operation)
  • 2026-2027 (Phase 1 timeline)
  • 2027-2028 (Phase 2 timeline)