RecordingTranscript availableAnalysis ready96:19

Carver City Council Meeting 2019 02 04

Carver City CouncilTuesday, October 1, 2024
Watch on original source

City Hall construction update

2019 Street Improvement project (plans and specifications)

Commerce Drive infrastructure improvements (plans and specifications)

Southwest Prime service agreement

Full Document Analysis

Votes (4)

Approval of the agenda

PassUnanimous

Moved by Council Member Henry · Seconded by Council Member Mach

Adopt resolution 108-19 approving plans and specs (with boulevard)

Fail2-3 (Roll call)

Moved by Council Member Henry · Seconded by Council Member McNight

Adopt resolution 108-19 approving plans and specs (sidewalk adjacent to curb)

Pass4-1 (Roll call)

Moved by Mayor Johnson · Seconded by Council Member Se

Adopt resolution 9-19 approving plans and specs for Commerce Drive

PassUnanimous

Moved by Council Member Henry · Seconded by Council Member Mach

Notable Quotes (3)

I am also in favor of what Mayor Johnson said regarding having that area not have a Boulevard rather do the concrete the sidewalk right to the curb.

— Mayor Johnson
Sidewalk DesignDuring the discussion on sidewalk placement for the 2019 Street Improvement project.

I'm not in favor of the sidewalks as proposed tonight.

— Council Member Henry
2019 Street Improvement ProjectExpressing concern about uncontrolled intersections and lack of resident support for the initial boulevard design.

We're in good shape there.

— Dave Schultz
City Hall ConstructionConfirming the City Hall project remains within budget and contingency funds.

People (10)

Dave SchultzProject Manager

City Hall construction manager for financial and daily operations.

Bill BeretProject Superintendent

Manages daily construction on the City Hall job site.

Brianna KatelloArchitectural Staff/Designer

Provides design and architectural oversight for the City Hall project.

Andy DolquistProject Manager

Manages design and construction progression for the City Hall project.

Mr. LannisStaff/Engineer

Presenting the 2019 Street Improvement project details.

Michael KeysResident

703 Kiry Hill Drive; questioned the 3ft boulevard sidewalk requirement.

Kayy SwansonResident

77 Kiry Hill Drive; inquired about street widths and sidewalk placement.

Hannah DinklerResident

417 Dedri Drive; advocated for sidewalk continuity.

Mayor JohnsonMayor

Supported moving sidewalks adjacent to the curb for the street improvement project.

Council Member HenryCouncil Member

Supported street improvements but raised concerns regarding uncontrolled intersections and sidewalks.

Places Mentioned

City Hall (Project site)BroadwayDietr DriveKiry Hill DriveElm DriveSunny Ridge DriveLynwood Spring Creek Drive417 Dedri Drive703 Kiry Hill Drive77 Kiry Hill DriveSixth StreetFourth StreetHigh Street

Events & Meetings (2)

  • City Council Meeting (Date unspecified in text)
  • Open House for Street Improvement Project: January 31st

Ordinances & Resolutions (2)

108-19

Approval of plans and specs for 2019 infrastructure Improvement project.

9-19

Approval of plans and specs for Commerce Drive infrastructure project.

Transcript