Agenda · Meeting Calendar
Meeting CalendarAgendaWednesday, August 12, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## Agenda Page 1
## AGENDA
## CHASKA PLANNING COMMISSION
## CHASKA CITY HALL - COUNCIL CHAMBERS & ZOOM
Wednesday, August 12, 2026
## 7:00 PM
1. Call to Order
## 2. Roll Call
## 3. Adopt Agenda
## 4. Visitor Presentation
## 5. Approve Previous Meeting Minutes
5.A. Approve the July 8, 2026 Meeting Minutes
## 6. Consent Items
## 7. Action Items
## 7.A. PUBLIC HEARING: Recommend Approval of Rezoning SW Chaska Park
## parcels to P1, Open Space/ City of Chaska/ PC #2026-13
7.B. Recommend Approval of the Concept Plan for Scandvik Nordic Spa/
## Scandvik/ PC #2026-17
## 8. Other Business
9. Adjourn
Page 1 of 93
## CHASKA PLANNING COMMISSION
## MINUTES
## JULY 8, 2026
1. Call to Order
Chairperson Urbanski called the meeting to order at 7 pm.
## 2. Roll Call
Roll call was taken. Members present: Commissioners Aasen, Campbell, Sailer, Michaletz, and
Chairperson Urbanski.
## Members absent: Commissioner Baswa, Purdy, Rydberg, and Rostad
Also present: Nate Kabat, Community Development Director; Ashley Cauley, City Planner; and
Liz Hanson, City Planner.
3. Adopt the Agenda
Motion by Commissioner Aasen, second by Commissioner Michaletz, to adopt the agenda as
presented.
Motion carried.
## 4. Visitor Presentation
No one appeared under Visitor Presentation.
## 5. Approve Previous Meeting Minutes
a. Approve the June 10, 2026, Meeting Minutes
Motion by Commissioner Campbell, second by Commissioner Aasen, to approve the minutes of
the June 10, 2026, Planning Commission meeting.
Motion carried.
## 6. Consent Agenda
## 7. Action Items
a. PUBLIC HEARING: Recommend Approval of the Conditional Use Permit (CUP) for
outdoor storage at 3700 Chaska Blvd/Precision Yard Services/PC #2026-14
City Planner Hanson presented the item to the Commission.
Commissioner Aasen noted that he thought this looked like a great use of the property.
Commissioner Campbell asked if there had been any discussion related to security or high-
intensity lighting for the lots.
Page 2 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 2
City Planner Hanson stated that this was discussed with the applicant and noted that this site
lends itself to be more secure due to its topography. She stated that the applicant intends to
install security cameras, so they will also have visual surveillance of the site.
Chairperson Urbanski asked about the height and size of the black hill spruce trees.
City Planner Hanson stated that, at a minimum, they would need to be six feet tall.
Chairperson Urbanski opened the public hearing at 7:20 p.m.
Alex Young, MSP Commercial, representing the applicant, explained that they had no issues
with the conditions of approval recommended by staff. He noted that they have been working
with staff on these plans for a while and were on board with the long-range plan of high-
density residential, and this was an interim step to getting there.
Commissioner Campbell stated that his biggest concern was with the potential for high-intensity
lighting.
Mr. Young stated that they had been concerned about that when they leased the property to
Schram. He noted that they had security cameras and the new tenant would also have security
cameras, but clarified that there were no issues when Schram was the tenant. He stated that
the only time they have had issues has been when the building was vacant, so they were happy
the tenant had plans to move into the space in July. He explained that he thinks one of the
things that helps with this is that there is only one access in and out.
Commissioner Campbell asked if there would be a maintenance garage for the trucks.
Mr. Young explained that they would be focused on light landscaping, such as maintenance
activities like mowing and snow plowing. He noted that it would be much lighter than it was
when the County was using the building.
Chair Urbanski closed the public hearing at 7:23 p.m.
Motion by Commissioner Aasen, second by Commissioner Sailer, to recommend to the City
Council approval of the Conditional Use Permit (CUP) for open storage exceeding a 2:1
building-to-land ratio and totaling 75,000 square feet at 3700 Chaska Boulevard, (PC #2026-
14), subject to the following conditions:
1. Approvals shall be based on the following graphic exhibits:
a. Project Narrative (pgs. 1-4), prepared by MSP Commercial, dated June 24, 2026
b. Site Location (pgs. 1-2), prepared by MSP Commercial, dated June 2, 2026
c. Parcel Dimensions, prepared by MSP Commercial, dated June 2, 2026
d. Historic Aerials, prepared by MSP Commercial, dated June 2, 2026
e. Viewshed Analysis (pgs. 1-2), prepared by MSP Commercial, dated June 2, 2026
f. Landscape Plan, prepared by MSP Commercial, dated June 2, 2026
g. Elevations, prepared by MSP Commercial, dated June 2, 2026
h. Aerial with Topography, prepared by MSP Commercial, dated June 2, 2026
Page 3 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 3
i. Proposed Site Usage Square Feet, prepared by MSP Commercial, dated June 2,
2026
j. Proposed Site Usage, prepared by MSP Commercial, dated June 2, 2026
k. Existing Park Plan, prepared by MSP Commercial, dated June 2, 2026
2. Provision of any new exterior lighting to be reviewed and approved by the Planning
Department prior to installation.
3. Parking lot to be striped in accordance with the parking plan and to be completed prior
to the certificate of occupancy.
4. Provision of 8-10 black hill spruce to be installed on the northeast edge of the site
adjacent to the proposed ‘truck and trailer’ open storage.
5. Compliance with 14.7.4 ‘Standards for Granting Conditional Use Permits’ of the Zoning
Ordinance.
6. Provision of proposed signage to meet Section 15.32.080 of the zoning code.
7. Compliance with Section 15.28 (Special Regulations) of the Zoning Ordinance.
8. The applicant shall obtain a building permit prior to the commencement of any building
alterations.
Motion carried.
b. Recommend Approval of the Concept Plan for Vista Ridge/Johnson Reiland Homes/PC
#2026-12
City Planner Cauley presented the item to the Commission.
Commissioner Campbell asked if there was a requirement for new neighborhood developments
to incorporate a play area.
City Planner Cauley stated that there was a park dedication requirement and noted that there
are times when the City may take a fee in lieu of parkland dedication, if it was within a certain
distance of an existing park. She stated that in this case, that would be something to take a
look at as the development moves forward through the City’s process. She explained that
because of its proximity to the Southwest Chaska Park, she did not believe that staff would
advocate for a specific park for the neighborhood.
Commissioner Campbell stated that he liked that staff reviewed the 2040 bicycle and pedestrian
plans and incorporated the 8-foot path through this instead of just a 5-foot walkway.
Commissioner Sailer stated that he also appreciated staff’s review of the road options. He
noted that it was sad and disappointing to see the extent of the tree removal that is proposed
for this development.
Chairperson Urbanski noted that it was a challenging site due to grade changes, steep slopes,
and the last remnants of the big woods, which come together next to a gravel pit. He stated
that the one thing that concerned him about this project was the steepness of the road coming
down to Chaska Boulevard without having a second entrance into the development. He stated
that if there were ever an issue with the steep slope, they may not be able to get emergency
vehicles to the other side, which could be a problem. He stated that the road gets a little slick
in the winter at the bottom of Big Woods Boulevard and suggested that they try to flatten that
Page 4 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 4
out as much as possible so they have a bit of a cushion. He asked what the maximum grade
would be.
City Planner Cauley stated that the developer was proposing 14%, and the City’s maximum
standard for local streets was 8%.
Commissioner Michaletz stated that City Planner Cauley had indicated that the County had
evaluated the intersection and asked if they were planning a signalized intersection.
City Planner Cauley stated that the study showed that they would be full intersections, but
doesn’t believe it got to the level of detail of determining whether or not they would be
signalized.
Chairperson Urbanski stated that he would recommend that the City also make sure that there
is a possibility for a road connection going into the gravel pit at some point in the future. He
noted that overall, he likes the plan, but does feel it is a bit of a square box, round hole kind of
situation.
Commissioner Campbell noted that he felt it fit in well with the housing concept in the area and
would be a beautiful addition.
Matt Reiland stated that they were really excited to move forward with what they consider the
third phase of what they have already done in the area. He explained that they see it as a
continuation of what they have done, which was consistent, and would look very similar to the
other neighborhoods they have done.
A representative for the applicant briefly highlighted portions of their presentation. He
explained that he looks at this less granularly and referenced an aerial view of the entire area,
and noted that he felt this showed that the neighborhood was not isolated and would be
connected with the other neighborhoods in the area.
Motion by Commissioner Aasen, second by Commissioner Campbell, to recommend to the City
Council approval of the Concept Plan for 27 single/dwelling units on the site east of Carlson
Bluffs, encompassing Outlot A, Carlson Bluffs, Outlot H, Ensconced Woods, 3700 Chaska Blvd,
and the adjacent, unaddressed parcel east of Carlson Bluffs, subject to the following
conditions:
1. Approvals shall be based on the following plans and exhibits unless modified by the
conditions below:
a. Narrative and building concept plans received June 23, 2026
## b. Exhibit A: Concept Plan, received June 24, 2026
## c. Exhibit B: Location Map, received June 24, 2026
## d. Exhibit C: Drainage Map, received June 24, 2026
## e. Exhibit D: Existing Viewshed, received June 24, 2026
## f. Exhibit E: Existing Conditions, received June 24, 2026
## g. Exhibit F: Adjacent Property, received June 24, 2026
## h. Exhibit G: Street Profile, received June 24, 2026
i. Exhibit G-1: Brewery entrance and retaining wall, received June 24, 2026
Page 5 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 5
j. Exhibit H: Utility Concept Plan, received June 24, 2026
2. Continue coordination with:
a. City Engineer regarding roadway design and access, trail connections, utilities,
grading, steep slope impacts, drainage, easement, stormwater management, and
access.
b. Fire Marshall regarding access and turnaround requirements.
c. Carver County regarding access to CR 61.
## d. Electric Department
e. Minnesota State Historic Preservation Office (SHPO) regarding the historical
marker site west of the site access.
3. In addition to plans to illustrate compliance with City Code Sec. 15.28 (Special
Regulations), the following is required for a preliminary plat application to be considered
complete:
a. Application signed by the applicant/developer and property owners of all impacted
properties;
b. Survey;
c. Grading plan for the entire development site and impacted areas. In addition, the
plan should identify any lots with full, look-out, or walk-out basements;
d. Sidewalk and trail plan. This plan must include Five-foot sidewalks on both sides
## of Soaring Eagle Court;
i. 1 5-foot on the north side of Soaring Eagle Parkway
ii. A shared-use trail along the south side of Soaring Eagle Parkway; and
iii. A shared-use trail through the development consistent with the 2040
Comprehensive Plan and the 2040 Pedestrian and Bicycle Master Plan to
eventually connect Percheron Blvd and Savanna Way (west) to Big Woods
Blvd. (east)
e. Utility plan and profiles;
f. Stormwater management plan meeting City and Carver County WMO
requirements.
g. Tree inventory and tree preservation plan. In addition, this plan must:
i. Identify existing trees on the development site and impacted areas.
ii. Identify trees to be removed and protect significant trees.
iii. Identify preservation limits and construction protection methods.
iv. Be overlaid on a grading plan to illustrate the relationship between grading
activities and tree removals/preservation;
v. Identify crucial root zone impacts of 30 percent or greater.
h. Landscaping plans in conformance with City Code Sec. 15.28.070.
i. Architectural elevations, exterior materials, building height information, and
representative floor plans.
j. Any additional engineering information necessary to evaluate the feasibility of the
proposed street and utility alignments, confirm adequate maintenance access, and
to ensure compliance with City engineering standards.
4. The following plan changes are required:
a. All topography and elevations must be legible.
b. All plans must include the entire development site. This includes properties
impacted by the development.
c. All plans must include property lines and easements.
Page 6 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 6
d. Stream corridors and all required stream buffer areas shall be accurately
delineated and shown on all future grading and site plans.
e. Clarify and accurately depict the development boundary. This includes the
northern boundary as it relates to the existing Outlot H, Ensconced Woods.
f. Rear lot lines adjacent to the wooded steep slope shall be revised to the required
30-foot no-grade/no-mow setback.
g. The maximum street grades shall not exceed eight percent.
h. Evaluate the impacts and resulting lot configuration and property lines of the
former Schram Haus brewery property.
5. Adherence to the City Engineer memo and Carver County Public Works memos when
available.
6. All encroachments and impacts to the wooded steep slope require additional justification
and City approval.
7. Compliance with City Ordinance, including:
a. Sec. 15.28.290, Anti-monotony and Design requirements: including LP Smartside
on front elevations and 4-inch window trim on all windows.
b. Sec. 15.28.100, Setback from Steep Slopes: including 50 feet from the edge of the
18-percent slope and 30-foot “no grade/now” zone adjacent to the 18-percent
slope for purposes of erosion control.
c. Sec. 15-28-080, Subdivision Design Standards: including streets, right-of-way,
street trees, and sidewalk design.
8. Setbacks are as follows:
a. Front yard setback: 23 feet
b. Side yard setbacks:
i. Interior: 5 feet
ii. Corner: 15 feet
c. Rear yard setbacks: 25 feet
d. Wooded steep slopes: 50-foot building setback and 30 feet no grade/no mow
setback
e. County Road 61: 150 feet from centerline
9. Prior to final plat approval:
a. The developer shall enter into an agreement with the City for the provision of
necessary infrastructure and associated development costs, including but not
limited to park dedication fees.
10. Prior to the release of the final plat for recording:
a. Applicable easements, as identified by the Engineering Department, for the
extension of City utilities are secured prior to final plat recording.
11. Prior to the start of any construction, grading, or site work:
a. Tree protection measures shall be installed;
b. A construction management plan must be submitted. This plan must address work
hours, construction access and parking, haul routes, and overall compliance with
site maintenance.
12. The applicant/developer is responsible for:
a. Obtaining an access permit or necessary approvals from Carver County
b. Obtaining any necessary permits or approvals from SHPO, if applicable.
c. Obtaining permissions and any legal instruments necessary from affected property
owners for any off-site impacts.
Page 7 of 93
## MINUTES – CHASKA PLANNING COMMISSION
## JULY 8, 2026 PAGE 7
Motion carried.
## 8. Other Business
10. Adjourn
Motion by Commissioner Campbell, second by Commissioner Sailer, to adjourn the meeting at
8:01 pm.
Motion carried.
Page 8 of 93
## Subject: SW Chaska Park – Rezoning
## Applicant: City of Chaska
Location: Seven properties west of Percheron Blvd, south of Founders Path and east of the
## future Savanna Way
## Case No.: P.C. No. 2026-13
Synopsis: The applicant is requesting approval of Rezoning for the SW Chaska Park
properties
## Prepared By: Ashley Cauley
Staff Recommendation: Motion to recommend approval
## Introduction/ Background
For nearly 25 years, Chaska has envisioned a new large community park
1
and preservation of
## the Big Woods
2
in southwest Chaska through comprehensive plans
3
.
The following is intended to summarize the site’s
history:
• 2001 – The 2020 Comprehensive Plan was
adopted and generally identified two potential
areas for a community park in SW Chaska
and emphasized the importance of Big Woods
Protection. The site and surrounding area
were part of Chaska Township and not yet
annexed into the City limits. (See Fig. 1).
1
By the 2040 Comprehensive Plan, community parks have attractive natural qualities, such as a lake, bluff, or wooded area, and
have the capacity to serve in both passive and active recreational roles. Chaska’s community parks are typically located adjacent to
major natural features and distributed throughout the community and include the following parks: (1) Fireman’s Park; (2) Veterans
Park; (3) Chaska Community Center; (4) McKnight Park.
2
“Big Woods” refers to the historic temperate hardwood forest that was once covered approximately 5,000 square miles across
south-central Minnesota and western Wisconsin. Today, only small remnants remain due to agricultural and urban development. A
sizable remnant of Big Woods’ oak savanna exists in southwest Chaska. Preserving and providing public access to the Big Woods
has been a long-standing City goal.
3
Comprehensive plans serve as a community’s long-term vision for growth, recreation, and the protection of natural resources.
## REQUEST FOR ACTION
## CHASKA PLANNING COMMISSION
8/12/2026
## Site
Figure 1: 2020 Comp Plan - Parks Recreation Open Space Plan
Page 9 of 93
• 2004 and 2005 – The site and the remainder of
Chaska Township were annexed into the City and
zoned O, Open Development District.
• 2011 – The 2030 Comprehensive Plan was adopted
and generally identified the site as the area for the
future community park. (See Fig. 2).
• 2013 - The Southwest Chaska Plan was adopted to
guide development in southwest Chaska. It further
refined the 50-acre site as the preferred park
location, with a play field and connections to the
Big Woods.
• 2017 – Land was acquired for Savanna Way, the
community park, and the future school site.
• 2019 – The 2040 Comprehensive Plan formally
identified the site as a future community park,
with potential amenities such as ballfields, a
miracle field, mountain bike trails, and event
facilities. (See Fig. 3).
• 2024 – The preliminary plat and rezoning to PRD-
86 were approved for Highpoint Vistas.
(See. Fig. 4).
• 2025 – The Highpoint Vistas final plat was
approved. The city acquired two
properties to preserve Big Woods:
## 1. Outlot G – Parkland Dedication
## 2. Outlot H – Minnesota Department of
## Natural Resources (DNR)’s Natural and
Scenic Grant funding.
These properties will remain zoned PRD-
86 but will be incorporated into the park.
## Current Proposal
The City has been working with Confluence, a landscape architecture and urban design
consultant, to develop plans for SW Chaska Park. The current plan includes a variety of
recreational and community-oriented amenities. Final review and approval of the park concept
by the Parks and Recreation Commission and City Council is anticipated in Sept. 2026.
The five main park parcels (See Fig. 5 on the following page) are zoned O, Open Development,
which is a holding district intended for land waiting for development and future rezoning to an
## Outlot G –
## Parkland
## Dedication
## Outlot H –
## Acquired
with DNR
funds
## Figure 4: Highpoint Vistas Final Plat
Figure 2: 2030 Comp Plan - Parks, Recreation and
## Open Space Plan
## Site
Figure 3: 2040 Comp Plan - Parks and Open Space Map
## Big
## Woods
## Park
Page 10 of 93
appropriate zoning classification.
The current request is to rezone the five parcels from O,
## Open Development to P1, Open Space to accommodate the
park. The following uses are permitted within the P1 District
per CZO 15.12.170:
1. Public parks and recreation areas except for high
intensity use facilities such as hockey arenas;
2. Agriculture except for potentially offensive uses such
as hog and cattle feeding lots.
## Staff Analysis
Staff supports the request, as:
✓ The properties are currently O, Open Development.
The intent of this district is to serve as a “holding
zone” until a site redevelops.
✓ Chaska has envisioned a park in this area for nearly
25 years.
✓ The park use would be a permitted use within the
P1, Open Space zoning district.
✓ The park is anticipated to start construction in 2027.
✓ The proposed rezoning would align the zoning and
the 2040 Comprehensive Plan guidance for the park.
(See Fig. 6).
## Deadline for Agency Decisions
Application Received 60-day review * 120 – day **
7/7/2026 9/5/2026 11/4/2026
* MN State Statutes require the City to act on the request within 60-
days.
** If additional review is needed, the City may extend the review
period by an additional 60 days by providing written notice to the
applicant.
## Planning Commission Action Requested:
Motion to recommend the City Council approve the rezoning of five parcels from O, Open
Development to P1, Open Space for the Southwest Chaska Park.
## Figure 5: Park Site
## Figure 6: 2040 Comprehensive Plan - Land Use
Page 11 of 93
## CITY OF CHASKA
## ORDINANCE NO. XX
## MOTION BY COUNCILMEMBER _______, SECOND BY COUNCILMEMBER _________
## AN ORDINANCE REZONING CERTAIN REAL ESTATE WITHIN THE CITY OF
## CHASKA FOR THE SOUTHWEST CHASKA PARK
## THE CITY COUNCIL OF THE CITY OF CHASKA DO ORDAIN:
Section I. Rezoning. The boundaries of the Zoning District as established by
Ordinance No. 229 and as shown on the Zoning Map of Chaska,
Minnesota are hereby amended as follows:
The following described real estate is hereby removed from the O, Open
Development district and rezoned to P1, Open Space.
The five parcels are generally located south of Founders Path, west of
## Percheron Blvd, and east of Savanna Way:
## Parcel One:
## PID: 300070125
Legally described on Exhibit A and depicted on Exhibit B
## Parcel Two:
## PID: 300070121
Legally described on Exhibit A and depicted on Exhibit B
## Parcel Three:
## PID: 300070140
Legally described on Exhibit A and depicted on Exhibit B
## Parcel Four:
## PID: 300070150
Legally described on Exhibit A and depicted on Exhibit B
## Parcel Five:
## PID: 302020370
Legally described on Exhibit A and depicted on Exhibit B
Section II. Effective Date. This Ordinance shall be in full force and effect from and
after its date of passage, adoption, and publication according to law.
Passed and adopted by the City Council of the City of Chaska, Minnesota this 31st day of
August.
Page 12 of 93
## Taylor Hubbard, Mayor
## Attest:___________________________________
## Deputy Clerk
Page 13 of 93
## Exhibit A – Legal Descriptions
## Parcel One:
That part of the Northeast Quarter of Section 7, Township 115, Range 23, Carver
County, Minnesota, described as follows:
Beginning at the northwest corner of the South 1037.00 feet of the East 920.00 feet of
said Northeast Quarter; thence North 00 degrees 10 minutes 04 seconds East assumed
bearing along west line of said East 920.00 feet of the Northeast Quarter, 100.00 feet to
the north line of the South 1137.00 feet of said Northeast Quarter; thence North 89
degrees 48 minutes 03 seconds West along said north line of the South 1137.00 feet of
the Northeast Quarter, 484.65 feet to a line hereinafter referred to as LINE A; thence
North 20 degrees 06 minutes 37 seconds East along said LINE A, 264.50 feet; thence
northeasterly 386.63 feet along said LINE A and along a tangential curve concave to the
southeast having a radius of 1060.00 feet and central angle of 20 degrees 53 minutes
53 seconds; thence North 41 degrees 00 minute 30 seconds East along said LINE A,
tangent to last described curve 75.14 feet; thence northeasterly 95.35 feet along said
LINE A and along a tangential curve concave to the northwest having a radius of
1140.00 feet and central angle of 04 degrees 47 minutes 31 seconds; thence South 46
degrees 24 minutes 01 seconds East, not tangent to last described curve, a distance
of 43.15 feet; thence southeasterly 880.67 feet along a tangential curve concave to the
northeast having a radius of 1200.00 feet, and central angle of 42 degrees 02 minutes
56 seconds; thence South 01 degrees 25 minutes 56 seconds East not tangent to last
describe curve, 454.76 feet to the north line of said South 1037.00 feet of the Northeast
Quarter; thence North 89 degrees 48 minutes 03 seconds West along said north line of
the South 1037.00 feet of the Northeast Quarter, a distance of 748.54 feet to the point
of beginning.
Aforementioned LINE A is described as follows:
Commencing at the East quarter corner of said Section 7; thence North 89 degrees 48
minutes 03 seconds West assumed bearing along the south line of said Northeast
Quarter, a distance of 1151.12 feet; thence South 00 degrees 11 minutes 57 seconds
West, perpendicular to said south line of the Northeast Quarter, a distance of 233.00
feet to the south line of the North 233.00 feet of the Southeast Quarter of said Section
7; thence North 89 degrees 48 minutes 03 seconds West along said south line of the
North 233.00 feet, a distance of 441.32 feet; thence South 20 degrees 29 minutes
12 seconds East, 96.03 feet to the point of beginning; thence North 20 degrees 29
minutes 12 seconds West, 147.34 feet; thence northwesterly, northerly, and
northeasterly 804.24 feet along a tangential curve concave to the east having a radius
of 1060.00 feet and central angle of 43 degrees 28 minutes 17 seconds; thence North
20 degrees 06 minutes 37 seconds East tangent to last described curve 825.06 feet;
thence northeasterly 386.63 feet along a tangential curve concave to the southeast
having a radius of 1060.00 feet and central angle of 20 degrees 53 minutes 53 seconds;
thence North 41 degrees 00 minute 30 seconds East tangent to last described curve
75.14 feet; thence northeasterly and northerly 824.67 feet along a tangential curve
concave to the northwest having a radius of 1140.00 feet and central angle of 41
degrees 26 minutes 51 seconds; thence North 00 degrees 26 minutes 21 seconds West
Page 14 of 93
tangent to last described curve 82.60 feet to the southerly right of way of County Road
140 and said line there terminating.
## Parcel Two:
That part of the Northeast Quarter of Section 7, Township 115, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the East quarter corner of said Section 7; thence North 00 degrees 10
minutes 04 seconds East, assumed bearing along the east line of said Northeast
Quarter, 363.00 feet to the north line of the South 363.00 feet of said Northeast Quarter
and the point of beginning; thence North 89 degrees 48 minutes 03 seconds West along
said north line of the South 363.00 feet, a distance of 920.00 feet to the west line of the
East 920.00 feet of said Northeast Quarter; thence North 00 degrees 10 minutes 04
seconds East along said west line of the East 920.00 feet of the Northeast Quarter,
346.00 feet to the north line of the South 709.00 feet of said Northeast Quarter; thence
North 89 degrees 48 minutes 03 seconds West along said North line of the South 709.00
feet of the Northeast Quarter, a distance of 639.91 feet to a line hereinafter referred to
as LINE A; thence northeasterly along said LINE A, a distance of 455.21 feet to the
North line of the South 1137.00 feet of said Northeast Quarter; thence South 89 degrees
48 minutes 03 seconds East along said North line of the South 1137.00 feet, thereof, a
distance of 484.65 feet to said west line of the East 920.00 feet of the Northeast
Quarter; thence South 00 degrees 10 minutes 04 seconds West along said west line of
the East 920.00 feet of the Northeast Quarter, a distance of 100.00 feet to the North
line of the South 1037.00 feet of said Northeast Quarter, thereof; thence South 89
degrees 48 minutes 03 seconds East along said north line of the South 1037.00 feet, a
distance of 748.54 feet; thence South 01 degrees 25 minutes 56 seconds East, 293.82
feet; thence southeasterly 321.00 feet along a tangential curve concave to the northeast
having a radius of 300.00 feet and central angle of 61 degrees 18 minutes 25 seconds to
said east line of the Northeast Quarter; thence South 00 degrees 10 minutes 04 seconds
West along said east line, a distance of 121.68 feet to the point of beginning.
Aforementioned LINE A is described as follows:
Commencing at the East quarter corner of said Section 7; thence North 89 degrees 48
minutes 03 seconds West assumed bearing along the south line of said Northeast
Quarter, a distance of 1151.12 feet; thence South 00 degrees 11 minutes 57 seconds
West, perpendicular to said south line of the Northeast Quarter, a distance of 233.00
feet to the south line of the North 233.00 feet of the Southeast Quarter of said Section
7; thence North 89 degrees 48 minutes 03 seconds West along said south line of the
North 233.00 feet, a distance of 441.32 feet; thence South 20 degrees 29 minutes 12
seconds East, 96.03 feet to the point of beginning; thence North 20 degrees 29 minutes
12 seconds West, 147.34 feet; thence northwesterly, northerly, and northeasterly
804.24 feet along a tangential curve concave to the east having a radius of 1060.00 feet
and central angle of 43 degrees 28 minutes 17 seconds; thence North 20 degrees 06
minutes 37 seconds East tangent to last described curve 825.06 feet; thence
northeasterly 386.63 feet along a tangential curve concave to the southeast having a
radius of 1060.00 feet and central angle of 20 degrees 53 minutes 53 seconds; thence
North 41 degrees 00 minute 30 seconds East tangent to last described curve 75.14 feet;
thence northeasterly and northerly 824.67 feet along a tangential curve concave to the
Page 15 of 93
northwest having a radius of 1140.00 feet and central angle of 41 degrees 26 minutes
51 seconds; thence North 00 degrees 26 minutes 21 seconds West tangent to last
described curve 82.60 feet to the southerly right of way of County Road 140 and said
line there terminating.
## Parcel Three:
That part of the Northeast Quarter of Section 7, Township 115, Range 23, Carver
County, Minnesota described as follows:
Commencing at the East quarter corner of said Section 7; thence North 89 degrees 48
minutes 03 seconds West assumed bearing along the south line of said Northeast
Quarter, a distance of 1151.12 feet to the point of beginning; thence continuing North
89 degrees 48 minutes 03 seconds West along said south line of the Northeast Quarter
508.85 feet to a point of intersection with a line hereinafter referred to as LINE A;
thence northwesterly, northerly, and northeasterly 727.51 feet along said LINE A to the
north line of the South 709.00 feet of said Northeast Quarter; thence South 89 degrees
48 minutes 03 seconds East along said north line of the South 709.00 feet of the
Northeast Quarter, a distance of 639.91 feet to the west line of the East 920.00 feet of
said Northeast Quarter; thence South 00 degrees 10 minutes 04 seconds West along
said west line of the East 920.00 feet to said south line of the Northeast Quarter; thence
North 89 degrees 48 minutes 03 seconds West along said south line, 231.12 feet to the
point of beginning.
EXCEPTING that part of the Northeast Quarter of Section 7 Township 115, Range 23,
Carver County Minnesota, described as follows:
Commencing at the East quarter corner of said Section 7; thence North 89 degrees 48
minutes 03 seconds West assumed bearing along the south line of said Northeast
Quarter, a distance of 1151.12 feet to the point of beginning; thence continuing North
89 degrees 48 minutes 03 seconds West along said south line of the Northeast Quarter
508.85 feet to a point of intersection with LINE A; thence northwesterly, northerly, and
northeasterly 364.85 feet along said LINE A to the north line of the South 363.00 feet of
said Northeast Quarter; thence South 89 degrees 48 minutes 03 seconds East along said
north line of the South 363.00 feet of the Northeast Quarter, 237.59 feet; thence South
37 degrees 11 minutes 49 seconds East, 456.92 feet to the point of beginning.
Aforementioned LINE A is described as follows:
Commencing at the East quarter corner of said Section 7; thence North 89 degrees 48
minutes 03 seconds West assumed bearing along the south line of said Northeast
Quarter, a distance of 1151.12 feet; thence South 00 degrees 11 minutes 57 seconds
West, perpendicular to said south line of the Northeast Quarter, a distance of 233.00
feet to the south line of the North 233.00 feet of the Southeast Quarter of said Section
7; thence North 89 degrees 48 minutes 03 seconds West along said south line of the
North 233.00 feet, a distance of 441.32 feet; thence South 20 degrees 29 minutes 12
seconds East, 96.03 feet to the point of beginning; thence North 20 degrees 29 minutes
12 seconds West, 147.34 feet; thence northwesterly, northerly, and northeasterly
804.24 feet along a tangential curve concave to the east having a radius of 1060.00 feet
and central angle of 43 degrees 28 minutes 17 seconds; thence North 20 degrees 06
minutes 37 seconds East tangent to last described curve 825.06 feet; thence
Page 16 of 93
northeasterly 386.63 feet along a tangential curve concave to the southeast having a
radius of 1060.00 feet and central angle of 20 degrees 53 minutes 53 seconds; thence
North 41 degrees 00 minute 30 seconds East tangent to last described curve 75.14 feet;
thence northeasterly and northerly 824.67 feet along a tangential curve concave to the
northwest having a radius of 1140.00 feet and central angle of 41 degrees 26 minutes
51 seconds; thence North 00 degrees 26 minutes 21 seconds West tangent to last
described curve 82.60 feet to the southerly right of way of County Road 140 and said
line there terminating.
## Parcel Four:
The South 363.00 feet of the East 920.00 feet of the Northeast Quarter of Section 7,
Township 115, Range 23, Carver County, Minnesota.
## Parcel Five:
That part of the Northwest Quarter of Section 8, Township 115, Range 23, Carver
County, Minnesota, described as follows:
Beginning at the West quarter corner of said Section 8; thence North 00 degrees 10
minutes 04 seconds East, assumed bearing along the west line of said Northwest
Quarter, a distance of 363.00 feet; thence South 89 degrees 48 minutes 03 seconds
East, 237.64 feet; thence southeasterly 400.94 feet along a non-tangential curve
concave to the southwest having a radius of 400.00 feet, central angle of 57 degrees 25
minutes 51 seconds and having a chord bearing of South 18 degrees 54 minutes 33
seconds East; thence South 09 degrees 48 minutes 23 seconds West tangent to last
described curve, 4.36 feet to the south line of said Northwest Quarter; thence North 89
degrees 05 minutes 28 seconds West along said south line, 362.56 feet to the point of
beginning.
- and –
That part of the North half of the Northwest Quarter of the Southwest Quarter of
Section 8, Township 115, Range 23, Carver County, Minnesota described as follows:
Beginning at the West quarter corner of said Section 8; thence South 89 degrees 05
minutes 28 seconds East, assumed bearing along the north line of said Southwest
Quarter, a distance of 362.56 feet; thence South 09 degrees 48 minutes 23 seconds
West, 32.18 feet; thence southerly 263.90 feet along a tangential curve concave to the
east having a radius of 630.00 feet and central angle of 24 degrees 00 minutes 03
seconds; thence South 14 degrees 11 minutes 40 seconds East tangent to last described
curve, 119.52 feet; thence southeasterly 85.31 feet along a tangential curve concave to
the northeast having a radius of 630.00 feet and central angle of 07 degrees 45 minutes
31 seconds; thence South 21 degrees 57 minutes 12 seconds East tangent to last
described curve, 182.72 feet to the south line of said north half of the Northwest
Quarter of the Southwest Quarter; thence North 88 degrees 57 minutes 33 seconds
West along said south line of the North half of the Northwest Quarter of the Southwest
Quarter, 496.78 feet to the west line of said North half of the Northwest Quarter of the
Southwest Quarter; thence North 00 degrees 29 minutes 09 seconds East along said
west line, 656.63 feet to the point of beginning.
Page 17 of 93
## Exhibit B
Page 18 of 93
## ONE CITY HALL PLAZA / CHASKA, MN 55318-1962 / PH: (952) 448-9200 / FAX: (952) 448-9300
## City of Chaska
## One City Hall Plaza, Chaska, MN 55318
952-448-9200 chaskamn.gov
For nearly 25 years, the City of Chaska
has envisioned a new large community
park and preservation of Big Woods in
southwest Chaska through
comprehensive plans. The Southwest
Chaska Plan was adopted in 2013 to
guide development across the 1,800
acres in southwest Chaska. The plan
further refined the 50-acre site as the
preferred park location and identified
playfields and connections to the Big
Woods.
Several properties, including the five
northern properties, were acquired in
2017 for Savanna Way, the community
park, and the future school site.
The City acquired the two southernmost
properties through parkland dedication
and DNR funds in 2025.
The properties are currently zoned O,
Open District.
The City has been working with
Confluence, a landscape architecture and urban design consultant, to develop plans for
the SW Chaska Park. The current concept plan includes a variety of recreational and
community-oriented amenities, including a barrier-free (Miracle League) field, a
universally designed playground, a park shelter, athletic fields, sport courts, a
community garden, and disc golf amenities.
The request is to rezone the properties from O, Open District to P1, Open Space to allow
the park.
Page 19 of 93
## Carver County GIS
## CITY OF CHASKA
05001,0001,5002,000250
ft
Date: 5/4/2026
±
## City of Chaska
Page 20 of 93
## Subject: Scandvik – Concept Plan
## Applicant: Scandvik
Location: 1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
## Addition
## Case No.: 2026-17
Synopsis: The applicant is requesting Concept Plan approval for an outdoor spa area at the
## Oak Ridge Hotel & Conference Center
## Prepared By: Elizabeth Hanson
Staff Recommendation: Motion to recommend approval
## Background
The following exhibit below is intended to show the general site area and adjoining uses:
## Figure 1: Existing Site & Adjoining Uses
## REQUEST FOR ACTION
## CHASKA PLANNING COMMISSION
8/12/2026
Page 21 of 93
## Previous Approvals
In December 1987 the Concept Plan, Rezoning (PMD-4), Preliminary Plat and Final Plat for the
IDS Learning Center facility was approved. This approval showed the construction of a learning
center building totaling approximately 170,000 square feet in floor area, with a total build-out of
199,000 square feet. The conference center was set into the hillside along McKnight Lake to
take advantage of the lake views and to set the building back into a somewhat secluded area of
nature. The original intent of this development was to make this site a corporate retreat, so
seclusion was a key component in the original design. The conference center was designed to
look like an institutional facility as you approach the building from highway 41, but the lake side
of the building has stunning floor to ceiling glass walls to bring a part of the natural scenery into
the complex. The building ultimately shifted from the IDS Learning Center to its former use as
the Oak Ridge Hotel and Conference Center.
## Figure 2: 1987 Approved Plan
Page 22 of 93
In March 2020, a Concept Plan to develop the remaining Oak Ridge property was approved. The
concept plan proposed the preservation of the conference center, a new multi-family apartment
on the northwest portion of the site, a new senior housing campus on the south portion of the
site, and a new commercial building on the east side of the site. In August 2021, the Concept
Plan Amendment was approved, which included a revision to the senior campus site to be multi-
family residential, and a revision to the northwest multi-family apartment site to be a stormwater
pond. In December 2021, the Preliminary Site & Building Plan, Preliminary Plat and Rezoning
(PMD-22) were approved for the existing conference center, new multi-family residential, and the
new Costco. In June 2022, the Final Site & Building Plan and Final Plat were approved. The final
approvals included a new parking lot layout for the Oak Ridge Hotel and Conference Center.
Figure 3: 2022 Approved Site & Landscape Plan (Lot 1 - Oak Ridge Hotel & Conference Center)
Neighborhood Meeting – June 24, 2026
The applicant held a neighborhood meeting on Wednesday, June 24
th
. While no one attended
the Open House, Scandvik received follow-up communication from a neighboring property after
the meeting. The discussion focused on understanding the project and potential redevelopment.
No formal objections to the redevelopment project have been received by their team.
Page 23 of 93
## Concept Plan
The applicant is requesting approval of a Concept Plan. The following is intended to summarize
the applicant’s request:
• Existing Conditions.
The Oak Ridge Hotel & Conference Center site is comprised of 22 acres and is located
west of Highway 41. Access to the property comes from a private road Oak Ridge Drive.
The site currently encompasses the Oak Ridge Hotel & Conference Center, which is a
171,000 square foot building. The building “closed their doors” on September 23, 2020
and has been sitting vacant since. Wooded steep slopes encompass the west and north,
and east edges of the property.
## Figure 4: Existing Conditions
• Concept Plan. The concept plan contemplates redeveloping, repurposing, and
repositioning the Oak Ridge Hotel & Conference Center into a modern hotel, conference
center, hospitality facility, and Nordic Spa.
Page 24 of 93
## Figure 5: Proposed Concept Plan
Details of the project include:
• Modernization of the front façade (elevation) which will be designed to match
the re-branded operations and will create an approachable and welcoming experience
to the property.
• The existing hotel rooms on the north wing of the existing building will be remodeled
and reconfigured into approximately 130 hotel guest rooms and suites.
• Approximately 15,000 square feet of the existing conference and event spaces will
be remodeled and modernized to support corporate retreats, weddings, and
community gatherings.
• A destination restaurant and lounge will be created for guests, the surrounding
community and greater region. The dining and lounge areas are currently planned to
seat between 100 and 150 guests and will be designed and operated to reflect
the vibe of the Nordic Spa and wellness focused branding.
• Wellness-focused retail and guest amenities will be developed near compatible
public interior spaces.
• Traditional spa in 10-15 rooms are planned within the existing structure and
will transition to the outdoor Nordic Spa areas comprising approximately ~20-
25,000 square feet connected via an ADA accessible walkway near the south wing
of the building.
Page 25 of 93
• The surface parking lots will be constructed per the approved building and site
plan (Resolution 2022-75) that includes 306 total parking stalls across the site,
to be developed with landscape medians, landscape plant details and
pedestrian connections as shown in the approved plan set.
At the heart of the project is the creation of a Scandinavian-inspired outdoor Nordic Spa
that will feature outdoor thermal bathing experiences, saunas, steam facilities, relaxation
spaces and wellness programming. This area is proposed on the west side of the building
within the wooded area overlooking McKnight Lake.
## Figure 6: Proposed Outdoor Spa Layout and Rendering
Page 26 of 93
Goals: The applicant has identified the following goals for their project:
o To be a premier regional hospitality and wellness location. We share Chaska’s
vision for excellence. Our goal is to create a hospitality and wellness experience
not currently available in the region. Scandvik at Oak Ridge will be exceptional,
welcoming and a premier destination.
o To be Sustainable. Reimaging the existing 171,000 square foot hotel and
conference center is at the foundation of our approach. Without certain flexibilities,
the existing building location and footprint constrains opportunities to create
meaningful outdoor spaces; however, we still believe that redevelopment is the
most sustainable approach to repurpose the site. Redevelopment inherently is
more economically challenging, but it reduces impact on the landscape which is at
the heart of our vision.
o To be good stewards of the land. While we understand that our spa elements will
require variances from your standards, our design philosophy is to use the natural
features of the site as our foundation. A guiding tenet of our design approach is
to lightly touch grades and vegetation for placement of spa element, and to
minimize impervious surfaces and grading area to maintain and support slope
areas. Physical spa improvements are planned to incorporate pervious surfaces,
pier-supported pavilions connected via ADA accessible walking paths scaled below
the tree line, and revegetation to maintain the integrity of the City’s vision for the
wooded slope areas surrounding the site.
## Concept Plan - Staff Analysis
The applicant is requesting approval of a Concept Plan. The following is intended to summarize
the applicant’s request and staff’s analysis:
Zoning. The Oak Ridge Hotel & Conference Center building is located on Lot 1, Block 1,
## Oak Knoll 2
nd
Addition, and is zoned Planned Multi-Use District (PMD-22). The PMD-22
zoning states the following intent and permitted uses for the site:
Page 27 of 93
The proposal to repurpose the existing building as a hotel and conference center use is
consistent with the zoning. The outdoor Nordic spa is a new use and the PMD-22
district would need to be amended to include it. While staff is generally in support of
the proposed use, it will need to be evaluated in detail during the preliminary review and
meet the approved conditions of this Concept Plan.
The proposal to construct an outdoor Nordic spa into the existing wooded steep slope
area does not meet the intent of the zoning district, which seeks to preserve natural
amenities. More analysis of this is included in the ‘Wooded Steep Slopes & Outdoor Spa
Layout’ section of this report.
• Setbacks.
The following tables summarize the required setbacks for the site:
## BUILDING SETBACKS
## Direction Setback
Trunk Highway 41 150 feet from the centerline
From city land/trails 40 feet
## Interior Property Lines 10 feet
Wooded Steep Slopes 50 feet building & parking
setback and 30 feet no grade/no
mow setback
## McKnight Lake & Big Woods
## Lake
50 feet from OHW
The applicant will have to show in their preliminary submittal if they meet these setbacks.
Based on the proposed layout, the outdoor spa area is proposed to encroach into the
wooded steep slope areas and required setbacks. More analysis of this is included in the
‘Wooded Steep Slopes & Outdoor Spa Layout’ section of this report.
• Wooded Steep Slopes & Outdoor Spa Layout.
Wooded steep slopes exist on the west, north and east sides of the site – see Figure 7.
The site & building plan and zoning (PMD-4) approved in 1987 adopted Slope
Preservation requirements with certain exceptions:
Page 28 of 93
## Figure 7: Wooded Steep Slope & Setbacks
The proposed outdoor spa layout shows significant encroachment into the wooded steep
slopes and associated setbacks on the west side of the building – see Figure 8. The
applicant prefers Location #3 as it will create a private, tranquil, nature immersive space
for their guests. Additional explanation for this location is included in the applicant’s
narrative. Per the intent of the current zoning district (PMD-22) and the city’s wooded
steep slope ordinance (Section 15.28.100), the wooded steep slopes need to be
preserved. In short, staff would not be in support of the proposed outdoor spa
location as shown in Location #3 on their plans due to the wooded steep
slope impacts.
Page 29 of 93
## Figure 8: Proposed and Preferred Spa Location (Location #3)
The applicant also looked at two alternate locations on site (Locations #1 & 2) – see
Figure 9. Additional summaries of these alternates are included in the applicant’s
narrative. In short, Location #2 also shows encroachment into the wooded
steep slopes and setbacks and would not be supported by staff.
Page 30 of 93
## Figure 9: Alternate Locations for Outdoor Spa
Location #1 is the only alternate proposed that would not encroach into the wooded
steep slopes and its setbacks. Location #1 impacts the parking expansion area needed
to support the site. Staff would be supportive of this location if a parking expansion
alternative meeting parking requirements can be accommodated on site.
Figure 10: 2020 Aerial showing ‘disturbance limits’
Page 31 of 93
The 1987 approvals permitted the existing building and site to encroach into portions of
the wooded steep slope setbacks, and what we are going to identify as its ‘disturbance
limits’ – see Figure 10. The disturbance limits include portions of outdoor patios, mowed
grass, pathways and a fire pit. Most of the disturbance limits stay outside of the
wooded steep slopes except for the fire pit and pathway leading to the public trail. The
disturbance limits have been actively maintained since the construction of the building,
and since the building’s closing in 2020 there has been some overgrowth, but the area is
still generally intact.
Staff have advised the applicant to look at the existing disturbance limits for the outdoor
spa as a starting point, however, it’s likely it will require a variance request from the
wooded steep slope setbacks. The applicant has started to evaluate this area and how
their layout could fit within these disturbance limits. A preliminary submittal will need to
include revising the outdoor spa outside of the wooded steep slopes and explore a
layout within city approved ‘disturbance limits’ that does not disrupt the integrity of the
wooded steep slopes. Staff will also require a Slope Stability Analysis to ensure the
proposed project does not compromise the wooded steep slope.
• Parking.
In the 2022 approvals, it was determined that the parking required for the existing
hotel/conference center would be 294 parking stalls. The approved site plan showed
incorporating 306 parking stalls on site; 286 parking stalls from a reconstructed parking
lot north east of the building, and 20 parking stalls within the shared southern parking
lot see Figure 11.
## Figure 11: 2022 Approved Parking Plan
Page 32 of 93
The proposed user intends to repurpose the existing building and add approximately
25,000 square feet of outdoor spa space. Based on the conceptual uses the below table
is intended to summarize the parking requirements. The applicant will also need to
provide a parking analysis in their preliminary submittal to explain the parking needs for
their proposed uses and how the site and parking plan can accommodate.
Uses Approx. Size Code Req. Est. Parking Req.
Hotel 130 rooms 1ps/Guest Room
+ 1ps/employee
130 parking spaces + ?
## Conference
## Center
15,000sf 20 spaces +
1ps/300sf
70 parking spaces
Restaurant 100-150
seats
1ps/3 seats 50 parking spaces
## Outdoor
## Spa
25,000sf 20 spaces +
1ps/300sf
103 parking spaces
REQUIRED ~353 parking spaces
PROVIDED 306 parking spaces
• Building Design.
The proposal includes modification to the front (east) façade and inclusion of new
relaxation pavilions and sauna structures on the west side of the building. Modifications
and new buildings will require a couple items; meeting the city’s Building Design &
Materials ordinance for commercial buildings (Section 15.28.120), and providing cohesion
with the rest of the Oak Ridge development (existing Oak Ridge Hotel & Conference Center
building, Springs at McKnight Lake, and Costco). The applicant will have to show in their
preliminary submittal how they meet those requirements.
Figure 12: Front (east) Façade concept
## Figure 13: Proposed Relaxation Pavilions
Page 33 of 93
• Utilities & Stormwater.
Sewer and water utilities are currently extended to the site.
There is an existing stormwater pond on the north side of the site that was constructed
to support the overall development. With the addition of the outdoor spa space, the
stormwater requirements will need to be reviewed and met in the preliminary submittal.
• Landscaping & Tree Preservation.
Landscaping will need to show additional landscaping, shrubs, vegetation that intensify
and enhance the disturbance limits, parking lots, wooded steep slope, wooded steep
slope setbacks and erosion control methods on site. The applicant will have to provide a
Landscape Plan in the preliminary submittal that shows this.
Tree preservation will be an important piece of discussion, and staff would advise the
applicant to further evaluate the tree preservation opportunities within the project area.
The applicant will have to provide a tree inventory and preservation plan in their
preliminary submittal, and show how they can maximize preservation where possible
and specifically in the wooded steep slope and their associated setbacks.
• Project Schedule.
The following timeline reflects the anticipated progression of the project:
## Deadline for Agency Decisions
## Complete Application
## Received
60-day review * 120 – day **
July 31, 2026 September 29, 2026 November 28, 2026
* Pursuant to MN State Statutes the City must act on the request within 60-days.
** The city can provide the applicant with a written letter requesting an additional 60-day review period if further
review is needed.
## Planning Commission Action Requested:
Motion to recommend approval to the City Council approval of the Concept Plan for Scandvik at
Oak Ridge Hotel & Conference Center (1 Oak Ridge Drive), subject to the following conditions:
1. Approvals shall be based on the following graphic exhibits unless modified by the
conditions below:
Page 34 of 93
a. Concept Plan (pgs 1-33), prepared by Scandvik
2. Outdoor Spa Locations (#2 and #3) as shown on the Concept Plans, are not supported
or approved by city staff due to impacts to the wooded steep slope and setbacks.
3. Outdoor Spa Location (#1) is supported by city staff if a parking expansion alternative
meeting parking requirements and needs can be accommodated on site.
4. In addition to the items defined in the Preliminary Site & Building Plan (and Zoning
Ordinance Amendment) application submittal requirements, the following must be
submitted for an application to be complete:
a. Variance Application, if required;
## b. Zoning Ordinance Amendment Application, to include Outdoor Nordic Spa
c. Site Plan, showing exploration of the outdoor spa location within the ‘Disturbance
Limits’ and no additional impacts to wooded steep slopes and its setbacks;
d. Landscape Plan, showing additional landscaping, shrubs, vegetation that
intensify and enhance the disturbance limits, parking lots, wooded steep slope,
wooded steep slope setbacks and erosion control methods on site;
e. Tree Inventory and Preservation Plan for trees within the proposed improvement
areas, and to maximize preservation where possible;
f. Building Plans & Material Samples, for all new buildings and showing compliance
with Section 15.28.120 (Commercial Buildings) and cohesion with the existing
buildings within the Oak Ridge development;
g. Stormwater Plan and Report meeting city and county requirements;
h. Grading Plan, including wooded steep slopes and its setbacks;
i. Parking Analysis, including a parking need summary and how the proposed
parking plan is sufficient to meet needs and parking code;
j. Slope Stability Analysis.
5. Coordination with:
a. City Engineer regarding utilities, grading, stormwater and drainage.
## b. Carver County Watershed Management Organization (CCWMO) regarding
stormwater requirements.
c. Fire Marshal regarding Fire Department Connection (FDC) relocating near vehicle
circle at front of building.
6. Compliance with City Ordinances and Regulations, including:
## a. Section 15.28 Special Regulations
## b. Section 15.28.120 Building Design & Materials
## c. Sec. 15.28.100 Setback from Steep Slopes
7. Setbacks are as follows:
a. Wooded Steep Slopes: 50 feet building and parking setback and 30 feet no
grade/no mow setback
b. Internal Property Lines: 10 feet
c. Trunk Highway 41: 150 feet from the centerline
d. McKnight Lake and Big Woods Lake: 50 feet from OHW
8. Prior to certificate of occupancy, the following must be completed:
a. Improvements to the site based on the approved site exhibits
b. Developer shall enter into an agreement with the City for the provision of
necessary infrastructure and associated development costs, including but not
limited to park dedication fees, if applicable
Page 35 of 93
## SUPPORTING INFORMATION
Mailing Area: 11 addresses were included in the mailing list for the project:
Page 36 of 93
## Nordic Wellness Hospitality
## Wellness Repositioning | Marriott Tribute Portfolio
## CONFIDENTIAL
## OAK RIDGE HOTEL & CONFERENCE CENTER
## PROJECT NARRATIVE
## REV. 07.31.2026
Page 37 of 93
July 7, 2026
## City of Chaska
Transmitted via Email.
RE: Application for Concept Plan Review for Scandvik Hotel and Nordic Spa for property at
## 1 Oak Ridge Drive, Chaska, Minnesota
Dear Members of the Planning Commission, City Council, City Staff,,
On behalf of Scandvik Hotels & Nordic Spa, we are pleased to submit this Concept Plan Application for the redevelopment of the
Oak Ridge property located at 1 Oak Ridge Drive in Chaska, Minnesota. The Oak Ridge property occupies a unique place within the
community. For decades, it has served as a destination for visitors, conferences, celebrations, and shared experiences. Its natural setting,
mature woodland, lakefront character, and established hospitality infrastructure make it one of the most distinctive hospitality properties
in the region.
Our vision is to thoughtfully transform this legacy property into Scandvik at Oak Ridge, a wellness-focused destination hotel operating
under Marriott’s Tribute Portfolio brand. The redevelopment combines hospitality, wellness, dining, conferences, recreation, and
community engagement into a year-round destination designed to serve both residents and visitors. From the beginning of our planning
process, we have approached the property with a simple philosophy:
Work with the land, not against it.
The natural features of the site—including its woodland character, topography, shoreline environment, and existing development
framework—have guided every aspect of our planning efforts. Rather than viewing these features as obstacles, we believe they represent
the very qualities that make Oak Ridge special and worthy of preservation. This Concept Plan Application reflects months of collaboration
with planners, architects, engineers, hospitality professionals, wellness designers, environmental consultants, and community stakeholders.
It is intended not only to present a development proposal, but also to begin a constructive dialogue regarding how this property can
continue to serve the City of Chaska for generations to come.
The vision extends beyond the redevelopment of a hotel. We believe Oak Ridge has the opportunity to become a place where people gather,
reconnect with nature, improve their well-being, celebrate important milestones, conduct business, and build meaningful relationships.
Through wellness programming, community engagement, conferences, hospitality, and year-round experiences, we hope to create a
destination that contributes to both the economic vitality and quality of life of the community.
Page 38 of 93
The proposed redevelopment represents a significant long-term private investment in Chaska. It will generate employment opportunities,
attract visitors, support local businesses, expand tourism activity, and reposition an important hospitality asset while maintaining a strong
commitment to environmental stewardship and responsible site planning.
In advance of this submission, we held a neighborhood Open House to kick off our process. While no one attended, we have received
some follow up correspondence. The Scandvik team remains available to meet with surrounding property owners throughout this process.
Our team will continue to respond to any questions regarding the site planning, environmental protection, traffic and future operations
as the plans are refined.
We recognize that successful redevelopment requires partnership and we are committed to working collaboratively with City staff, Planning
Commission, City Council, neighboring property owners, and community stakeholders throughout the planning process. We welcome
feedback, value community input, and appreciate the opportunity to participate in shaping the future of this important property. Thank
you for your consideration of this Concept Plan Application. We look forward to continuing our dialogue with the City of Chaska and
working together to create a destination that reflects the values, character, and long-term vision of the community.
Respectfully submitted,
## Travis Batting
## Founder & President
## Scandvik Hotels & Nordic Spa
Page 39 of 93
4
## PROPOSED PROJECT
Scandvik Hotels is proposing to redevelop, repurpose and reposition the former Oak Ridge Hotel & Conference Center into a modern hospitality facility and Nordic
Spa. At the heart of our project is the creation of a Scandinavian-inspired outdoor Nordic Spa that will feature outdoor thermal bathing experiences, saunas, steam
facilities, relaxation spaces and wellness programming. To support opportunities for an immersive spa getaway, the existing hospitality infrastructure and facilities will
be repurposed and re-imagined within the existing hotel/conference center building footprint. The planned Nordic Spa and hospitality redevelopment will reinforce
Chaska’s Small Town, upscale character, and reflect Minnesota’s Scandinavian heritage. Our project includes:
## HOTEL/CONFERENCE CENTER IMPROVEMENTS
»Modernization of the front façade (elevation) which will be designed to match the re-branded operations and will create an approachable and welcoming
experience to the property.
»The existing hotel rooms on the north wing of the existing building will be remodeled and reconfigured into approximately 130 hotel guest rooms and suites.
»Approximately 15,000 square feet of the existing conference and event spaces will be remodeled and modernized to support corporate retreats, weddings, and
community gatherings.
»A destination restaurant and lounge will be created for guests, the surrounding community and greater region. The dining and lounge areas are currently
planned to seat between 100 and 150 guests and will be designed and operated to reflect the vibe of the Nordic Spa and wellness focused branding.
»Wellness-focused retail and guest amenities will be developed near compatible public interior spaces.
»Traditional spa in 10-15 rooms are planned within the existing structure and will transition to the outdoor Nordic Spa areas comprising approximately ~18,000
square feet connected via an ADA accessible walkway near the south wing of the building.
Page 40 of 93
5
## NORDIC SPA DEVELOPMENT
»The outdoor Nordic Spa is the heart of the redevelopment strategy. The Scandinavian
inspired Nordic Spa will be connected to the Hotel from the existing south wing by a
walkway to an entrance pavilion west of the existing building. The current footprint
shown on our concept plan comprises between 20,000 and 25,000 square feet. The
spa improvements are proposed west of the building and are designed to run parallel
to the existing structure lakeside to minimize impact to topography and grades while
providing an immersive private guest experience.
»Positioning the Nordic Spa in a private, natural environment is a critical tenet of the
spa experience. The selected location is nestled into the landscape with intention.
Protecting grades, preventing erosion and respecting McKnight Lake are foundational
to our development and design plans.
»The Nordic Spa will include a series of outdoor hot pools, cold pools, saunas and rest
areas to facilitate the wellness circuit. These spaces are proposed to be connected by
pervious walkways, landscaping and small pier-supported pavilion structures which
will all be designed to respect existing grades, surface water flows and vegetation to
ensure that the integrity of the wooded slope and lake are protected.
## ACCESSORY SITE IMPROVEMENTS
»Surface parking will be accessible to guests visiting the property but will be tucked
away from the outdoor experience spaces to ensure the Nordic Spa retains its privacy.
The surface parking lots will be constructed per the approved building and site
plan (Resolution 2022-75) that includes 306 total parking stalls across the site, to be
developed with landscape medians, landscape plant details and pedestrian connections
as shown in the approved plan set.
»Trail/sidewalk connections identified on the approved Plan Set will be respected and
incorporated into our design providing pedestrian access consistent with the City’s
goals and objectives for the approved planned development.
Page 41 of 93
6
»While we do not anticipate significant deviation from the approved plans,
if adjustments are necessary when we get into our full design plans, we
will clearly identify such modifications during subsequent steps of the
Planned Development process.
## RE-BRANDING, POSITIONING & ECONOMIC IMPACT
»The Scandinavian inspired Nordic Spa will provide a unique experience
not currently available within the region. The overall vision and master
plan is to create and bring a distinct hospitality experience to the
community.
»Re-branding the existing facilities will create a new identity for the
property and establish it as a destination for years to come. Scandvik
Hotels will operate under Marriott’s Tribute Portfolio which is a collection
of independent, upscale boutique hotels designed for travelers seeking
unique, character-driven properties that reflect the local community and
culture.
»Redevelopment of this legacy property, and introducing a new wellness-
focused destination, will bring new economic investment and vitality
back to the community.
»Scandvik is projecting more than $40 Million dollars in private
investment to give this property new life as the hospitality destination in
the community.
»We expect that is will create 150+ construction jobs, 100+ permanent
jobs once operational, with year round tourism activity and more than
$30M is projected visitor spending.
The goal is not simply to build
on the land.
The goal is to belong to it.
Page 42 of 93
7
## SCANDVIK AT OAK
## RIDGE VISION &
## PROJECT GOALS
Scandvik Hotels was founded on the belief that hospitality should do more than
provide accommodation. Great hospitality creates moments of connection,
restoration and belonging. The Oak Ridge property occupies one of the most
unique hospitality sites with the Twin Cities region, it just needs to be re-imagined,
repurposed and reinvented.
At the heart of our project is to create a regional wellness destination rooted in
the Nordic Spa experience inspired by Scandinavian wellness traditions. Guests
will move between hot and cold thermal experiences, outdoor relaxation spaces,
forested pathways, and wellness programming designed to encourage physical and
mental well-being. The Nordic Spa experience is best enjoyed when the spaces are
private, outdoors and integrated into picturesque landscapes. The Oak Ridge site
can offer such amenities with a little flexibility and a dash of innovation. Our vision
is to carefully nestle the spa spaces into the site between the existing hotel structure
and McKnight Lake, so that guests are immersed by lake views, rolling topography
and mature vegetation. The three-story hotel structure will serve as a buffer from
the nearby hustle and bustle of Costco shoppers, creating a tranquil private spa
environment lakeside for our guests.
The existing hotel and conference center will evolve into a new and modern
hospitality facility to complement the spa experience. Guest rooms, gathering spaces,
and conference areas will be modernized and reconfigured to provide unparalleled
guest and community experiences. To support our Vision, we have a set of goals and
principles to help guide us through our site design and development process.
Page 43 of 93
8
## SCANDVIK GOALS:
»To be a premier regional hospitality and wellness location. We share Chaska’s vision
for excellence. Our goal is to create a hospitality and wellness experience not
currently available in the region. Scandvik at Oak Ridge will be exceptional,
welcoming and a premier destination.
»To be Sustainable. Reimaging the existing 171,000 square foot hotel and
conference center is at the foundation of our approach. Without certain
flexibilities, the existing building location and footprint constrains
opportunities to create meaningful outdoor spaces; however, we still believe
that redevelopment is the most sustainable approach to repurpose the site.
Redevelopment inherently is more economically challenging, but it reduces
impact on the landscape which is at the heart of our vision.
»To be good stewards of the land. While we understand that our spa elements
will require variances from your standards, our design philosophy is to use
the natural features of the site as our foundation. A guiding tenet of our
design approach is to lightly touch grades and vegetation for placement
of spa element, and to minimize impervious surfaces and grading area to
maintain and support slope areas. Physical spa improvements are planned
to incorporate pervious surfaces, pier-supported pavilions connected via
ADA accessible walking paths scaled below the treeline, and revegetation
to maintain the integrity of the City’s vision for the wooded slope areas
surrounding the site.
To work with the land, not against it . . . the
site is the foundation of the experience.
Page 44 of 93
9
## SUPPORTING & ENHANCING CHASKA’S MISSION
## To be the Best Small Town in Minnesota
We fell in love with Chaska the first time we visited the Oak Ridge site and could
immediately see the potential for creating a unique hospitality asset in such a prime
location. Redeveloping such a large vacant asset like the Oak Ridge Conference
Center and Hotel is a daunting task, but we see the opportunity to create something
special that reinforces Chaska’s commitment to excellence.
## Chaska’s Core Strategies
To be the best, sometimes you have to think outside the box...this is especially true
for the Oak Ridge site. Because the Oak Ridge Hotel and Conference Center was
purpose built for a corporate retreat, redevelopment is challenging and expensive
which is why we believe repurposing it has been unsuccessful in the past.
To make this a viable hospitality site, it needs to have something compelling to draw
guests from the greater region. Our strategy is to add the Nordic Spa to the site to
create a wellness destination which we believe fits Chaska’s character, mission and
guiding core strategies. Repurposing the building and facilities is the sustainable
choice, and since the redevelopment retains the property’s established hospitality
use and leverages previously planned infrastructure, we anticipate that the roadway,
approved utility and stormwater systems are appropriately designed to support our
redevelopment plan, which we will verified through the detailed plan development
phase. The redevelopment is anticipated to generate substantial economic benefits
including increased tourism, new employment opportunities, expanded local spending,
enhanced tax revenues and renewed activity at an important gateway property within
the community.
## NEIGHBORHOOD MEETING SUMMARY
Representatives from the Scandvik team held an Open House on June 24, 2026 from
6:00 – 9:00 PM. Individual letters were sent to adjacent property owners using the
mailing list provided by the City. While no one attended the Open House, Scandvik
received follow-up communication for a neighboring property after the meeting. The
discussion focused on understanding the project and potential redevelopment. No
formal objections to the redevelopment project have been received by our team.
Page 45 of 93
10
## CONTEXTUALISM &
## UNDERSTANDING OF PLACE
The Scandvik team has completed extensive preliminary due diligence to explore and understand
the opportunities and challenges of the Oak Ridge site. Repositioning and redevelopment of the
subject property will take significant investment because the existing building and its position on
the site essentially prescribe where other exterior improvements can be constructed. To that end,
it is essential for us to not only understand and evaluate the existing improvements and natural
environmental characteristics, but also to evaluate the improvements in relation to the approved
Planned Development for the larger area including the multi-family residential and Costco
developments completed in recent years. The following analysis and supporting graphics describe
the site and how we believe we can unlock its potential to become a truly unique destination and
an upscale asset to the community and larger region.
## EXISTING CONDITIONS & SITE SNAPSHOT
## Owner
## RCS-RCA Oak Ridge LLC
## Land Use
## Mixed Residential
## Proposer
## Scandvik Hotels
## Zoning
## Planned Development
(Resolution 2022-75)
## Project Address
## 1 Oak Ridge Drive, Chaska,
## MN 55117
## Lake Frontage/
## Shoreland
## McKnight Lake
## Lot Description
## Lot 1, Block 1 Oak Knoll
## Second Addition
## Building Size
(gross)
171,000 SF on three floors
## PID
304730010
## Building
## Footprint Size
## 70,766 SF
## Gross Site Area
~ 22.05 Acres
## Stormwater
## Pond Area
116,465 SF (~2.67 Ac.)
Page 46 of 93
11
## EXISTING CONDITIONS (EXHIBITS 1 AND 2)
As referenced throughout this narrative, the existing site is developed with the Oak Ridge Hotel &
Conference Center. The structure was originally built as a corporate retreat and was constructed
on the west half of the site to leverage views and connections to McKnight Lake. The parcel is
irregular in shape and the west, north and portions of the northeast are bounded by McKnight
Lake and the City’s designated wooded steep slope areas. McKnight Lake and the adjacent wooded
slope areas provide a unique and partially secluded feeling particularly lakeside of the building and
improvement areas.
The existing building was constructed in 1989 and has a building footprint of approximately 70,766
square feet. The building is three-stories and is designed with a central core that divides the private
rooms (north wing) from the conference facilities (south wing). The building is accessed from a
central shared driveway that has a drop-off/check-in loop in front of the main entrance. Connected
to the driveway and located north of the building is a surface parking lot that has been partially
removed as part of the master development of the adjacent multi-family and Costco properties.
A new regional stormwater pond was recently constructed north of the building and comprises
approximately 116,465 square feet (~2.67 Acres) of the lot area. The stormwater pond size and
design were approved as a part of the 2022 Building and Site Plan approval process to manage
stormwater from the increased impervious surface coverage created by the Costco, internal road
network and surface parking lots. During the 2022 process, the Hotel and Conference Center were
vacated, and the building and site have remained vacant since. Because the operation ceased as the
planned development process commenced certain assumptions were made within the approved
design plan for the subject site.
Included in our exhibits is the 2022 approved Site Plan (Resolution No. 2022-75) for the subject
site which shows the improvements planned for immediate or future construction. As shown in
Exhibit 3, the stormwater pond has been constructed because it is treating stormwater from the
recent adjacent development as well as the subject site. While the new surface parking lot has not
been constructed, it has been designed with an adequate number of parking stalls to support the
building if used for a hotel and conference center, and the parking lot design was used for the
stormwater calculations that are the basis of the stormwater pond design.
Page 47 of 93
12
## SITE FORCES AND FEATURES (EXHIBIT 2)
Redevelopment of the Oak Ridge property is a complex undertaking given the various site
conditions as demonstrated by the existing conditions. As shown on Exhibit 2, we have categorized
the forces and features impacting the site and redevelopment potential into three main categories:
## Prominent Site Force 1: Natural Resources and Environment
»The project parcel is irregular and contains more than 3,000 feet of lake frontage on
## McKnight Lake
»Land side of the lake the topography slopes steeply upwards at grades in areas exceeding
18%.
»The area within the 18% steep slope area varies, but is generally within 150 to 300 feet of
the ordinary high water level per available data.
»At the top of the slope, the City’s steep slope ordinance (Section 15.28.100 subd. C.)
establishes a 30-foot no mow buffer and a 50-foot building structure setback.
## Prominent Site Force 2: Architecture and Scale of Existing Building
»The existing hotel and conference center building has an approximately 70,766 SF
footprint that is generally oriented north-south along the McKnight Lake frontage east
of the structure.
»Portions of the current building encroach into the City’s steep slope building setback.
»The mass and scaling of the aging building requires significant attention to effectively
reposition. Contemplated site improvements, including adequate surface parking to
support the building is essential to be cost effective and meet guest expectations.
»Adaptive reuse of the structure will have the smallest impact on the natural environment,
but comes with significant cost since the building location, size and to a certain extent use
are prescribed.
»The building was constructed in 1989, and the front elevation was designed to reflect an
institutional use rather than an upscale hospitality use.
Prominent Site Force 3: Surrounding Development, Infrastructure, and
## Utility Improvements
Page 48 of 93
13
»The parcel (Lot 1, Block 1) is a part of the Planned Development that includes the adjacent multi-family and Costco uses. Approved utility and
infrastructure plans were developed as a Master Plan and certain roadways, utilities and infrastructure cross parcel lines.
»The constructed stormwater pond is designed to support regional stormwater management including the subject site, adjacent roadways, Costco
and other impervious surfaces. Our final stormwater design will be completed as part of the next phase of the land use and development process
but we have completed initial due diligence with our civil engineer to ensure that our proposed improvements will comply with all required
stormwater rules and regulations. We are confident that by incorporating pervious/permeable materials and using pier-supported structures
throughout the spa area appropriate connections and stormwater improvements can be made to blend seamlessly into existing infrastructure.
»Storm sewer pipe and connections have been constructed and/or planned to connect the regional pond to adjacent development. The design of
the infrastructure impacts how, where and quantity of impervious surface coverage is permitted under the existing stormwater plan.
»While intend to leverage existing utility improvements and design where feasible, we also understand that upgrades and/or replacements of
existing utility infrastructure may be necessary. We have accounted for this expense in our planning and will complete evaluation of necessary
upgrades as part of the next phase of this process when full designs are prepared.
»An existing walkway cuts through the steep slope area which removed some of the vegetation and modified the slope.
View from front steps of Existing Conference Center
Page 49 of 93
14
## PROGRAMMING
## & PROJECT
## OPPORTUNITY
## DEVELOPMENT
Despite the inherent challenges of redevelopment, we believe that the
site holds significant opportunity if carefully repositioned. At the heart
of our vision is to develop the Scandinavian inspired Nordic Spa which
requires certain site characteristics that are unique to the subject property.
As previously described, the success of the Nordic Spa is dependent on the
ability to create outdoor, private, tranquil, nature immersive spaces for our
guests. Accomplishing these objectives in a populated environment is difficult
without the right site, and we believe that the Oak Ridge property can meet
our vision with the right site development master plan. The following sections
build on the existing conditions and site forces description provided above
and describe our Master Plan for the site which is shown in Exhibits 2 - 6. As
demonstrated through the following proposal, our intent is to use the existing
site facilities and infrastructure wherever possible, to enhance the existing site
improvements through redevelopment, and to create the outdoor Nordic Spa
to achieve an optimum guest experience.
Page 50 of 93
15
## MASTER PLAN
As demonstrated through our Exhibits, our intent is to utilize the existing infrastructure on the site wherever possible. By utilizing existing infrastructure,
the project minimizes the need for new disturbance elsewhere on the site and will maintain its relationship with the other parcels within the planned
development (multifamily and Costco parcels). By utilizing and tying into the approved Planned Development from 2022, we will reduce our infrastructure
costs while improving overall site efficiency.
The only exterior expansion not currently addressed within the PD is the proposed Nordic Spa. The Concept Plan for the Nordic Spa is summarized in
the following figure. A summary of conceptual interior programming is provided on the following pages (however, please note, interiors are subject to
change once we complete full building due diligence).
## The Buffers
At top of bank there are two buffers:
•30’ Treed buffer steep slope
buffer
•50’ Treed steep slope building
setback
## Light Touch Construction Strategy
•Pier Supported structures in
slope areas
•Reduced soil disturbance
•Lower long term erosion risk
Working with the Land, Not against it.
•Minimal cut & fill strategy
•Preserving natural slope integrity
•Distributed design vs single heavy
structure
## Locations
Areas (ft2)Perimeter (LF)
## Hot Pools
Pool 1
849148
Pool 2
513114
Pool 3
818143
## Total
2,180405
## Cold Pools
Pool 1
396
Pool 2
389
## Total
785
## Saunas
Sauna 1
280
Sauna 2
154
Sauna 3
280
Sauna 4
280
## Total
994
## Outdoor Rest
## Rest Area 1
238
## Rest Area 2
242
## Rest Area 3
531
## Rest Area 4
298
## Rest Area 5
755
## Total
2,064
## Buildings
## Building Footprint
## Entrance Pavillion
2,402
## Pavillion Bridge
304
## Mid Building
630
## Far Building
769
## Total
4,105
## Landscape
23,412Capacity
## Paths
6,324350
## See Exhibit 6. Nordic Spa Concept Plan (Attachments)
## LEGEND
## RELAXATION PAVILIONS
## WARM WATER POOLS
## COLD WATER POOLS
## SAUNA STRUCTURES
## FOOT PATH (PERMEABLE)
## FIRE PITS LOUNGE AREA
Page 51 of 93
16
## MASTER PLAN
## CONCEPT SPACE PROGRAM
»All spaces are within the existing building footprint except the proposed exterior spa area.
## LEGEND
## BACK OF HOUSE
## AMENITIES
## HOTEL SUITES
## MAIN LOBBY
## KITCHEN
## RESTAURANT
## ADMIN
## CONFERENCE/
## EVENT SPACE
## SPA FACILITY
## EXPANSION SPACE
2
## BASEMENT LEVEL
## LEVEL 1
## LOWER LEVEL
## LEVEL 2
## MAIN LEVEL
## LEVEL 3
## UPPER LEVEL
## LEVEL 4
Page 52 of 93
17
To that end, our intent is to:
## Leverage Existing Improvements and Entitlements
»Remodel and utilize the existing facility in its current footprint. By
utilizing the existing facility footprint, the intensity and capacity of the
building/site should remain consistent with the approvals granted to
the parcel through the Building and Site Plan approvals in Resolution
2022-75. As such, we plan to use the approved plans to minimize costly
re-engineering of this site including:
»Install and construct the approved surface parking per Building and
Site Plan approvals (Resolution 2022-75). If the plan is followed, 306
parking spaces will be constructed to support the new hotel, conference/
gathering spaces, restaurant and Nordic Spa uses.
»Connect into and use stormwater infrastructure as designed and planned
for within the Building and Site Plan approvals (Resolution 2022-75).
»Maintain existing driveways and access points to the site. Redeveloping
the site for a hospitality use is consistent with the use studied in the
traffic study, so we know that the access drives, intersections, and other
transportation improvements should perform adequately.
»Install trail/sidewalk connections per the approved plans. This will
provide a connected pedestrian network throughout the full planned
development area that includes the adjacent multi-family, Costco and
proposed project site.
## DS
## D
## S
## D
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## DS
## D
## S
## DS
## D
## S
## D
## S
## DS
## DS
## DS
## DS
## D
## S
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## D
## S
## D
## S
## D
## S
## D
## S
## ADA
## T
## OAK RIDGE COMMONS
## LEGEND:
## LANDSCAPE SCHEDULE:
## LANDSCAPE REQUIREMENTS:
## TREE CALCULATIONS:
## L-2.2
## LANDSCAPE PLAN - VIEW 2
Page 101 of...
7.J. Adopt Resolution 2022-75, Approving...Packet Page 399 of...
## LEGEND
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## See Exhibit 3. Approved Landscape/Site Plan
Page 53 of 93
18
Respect, but integrate Nordic Spa Improvements within
## the Open Space, Buffer and Slope Areas
»Development of the Nordic Spa is a critical component of our Project
and will drive the successful redevelopment of the site. As previously
described, it is essential for the spa areas to be integrated into the
lake side of the existing building given the surrounding suburban
development fabric and location of the existing building and approved
site improvements (see Site Forces Exhibit).
»The proposed concept plan is intended to preserve the functional
purpose of the City’s wooded steep slope ordinance by minimizing
grading, maintaining natural drainage patterns, reducing soil
disturbance, preserving existing vegetation where practicable and
healthy, and incorporating restoration and revegetation within
previously disturbed or degraded areas.
»The encroachment into the required setbacks will impact portions of
the buffer, however, the redevelopment also creates an opportunity
for a comprehensive landscape restoration strategy, including invasive
vegetation management, selective revegetation, erosion-control
improvements and long-term landscape stewardship that has not
occurred while the property has remained vacant.
»We understand that development within this area requires a variance
from the City’s steep slope ordinance and that full consideration of the
variance request will occur as part of subsequent steps for the Planned
Development process. However, we understand that for purposes of
evaluating this Concept Plan it is important to demonstrate how we
arrived at the proposed location to site the Nordic Spa within the
buffer and steep slope areas. The following analysis is provided to
demonstrate our evaluation:
## See Exhibit 1. Existing Conditions
Page 54 of 93
19
## Site Constraint Analysis
»The existing improvements, approved PD improvements and natural resource protection areas
constrain the developable areas. As shown in Exhibit 4, the existing site improvements including
the hotel/conference center facility, driveways and roadways, and the approved improvements
including surface parking lot and stormwater ponds are shown in gray and comprise approximately
80% of what would be considered “developable” areas. Further challenging the site, are site lines
and/or visual access to nearby improvements including multifamily uses and Costco which impact
potential spa locations.
»The City’s environmental ordinance requirements further exclude the protected steep slopes and
buffer areas from the buildable calculation. When the improvements and environmental protection
areas are combined, nearly 91% of the site is occupied or prohibited from development.
»The available, or undeveloped areas, are shown in Exhibit 5 in green. These areas are generally
small patches of green space interwoven with the surface parking lot or at the entrances and do
not provide adequate land area to site the Nordic Spa.
»The location of the existing building near, and in some areas within, the required buffer setbacks
essentially eliminates all potential for meaningful, private, outdoor improvements without a
variance. As such, instead of avoiding all potential encroachment our strategy became evaluating
and identifying potential spa areas that would have the least amount of adverse impact on the
environmental systems.
920
93 0
910
940
950
960
970
980
990
1000
980
93 0
980
960
940
970
940
920
950
920
920
950
950
950
960
93 0
970
93 0
940
950
940
950
920
93 0
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 55 of 93
20
## NORDIC SPA PLACEMENT EVALUATION
Our site constraint analysis demonstrated that there is no reasonable location on the property capable
of accommodating the proposed Nordic Spa facilities in an operational location without some level of
encroachment into the steep slope areas and required buffer. We evaluated several potential areas, and
selected three areas with the most potential.
»Location 1: Surface Parking Lot Area. We explored placement of the spa facilities where the approved
parking lot is located. The spa could meet portions of the environmental setback requirements,
however, would still encroach into the buffer setback areas. Spa placement would also require
reworking of the surface parking lot and stormwater management plans that have already been
approved. Structured parking in this location is cost-prohibited given the amount of investment
required to redevelop the existing building and a reduction in parking will not meet anticipated
parking demand. As shown in the site forces exhibit, siting the Nordic Spa in this location is near
the hotel guest rooms and visual access to parking from the spa improvements does not meet the
privacy requirements of our guests. For these reasons, this location was ruled out from our design
process.
»Location 2: Lake Side of Existing Building North Location. The first lake side area considered is adjacent
to the existing building, on the north end of the campus (See diagram). This area requires a
variance from the environmental ordinances, and our efforts in exploring any lake side potential
included focusing on:
• Areas adjacent to existing site development;
• Areas influenced by previous site improvements;
• Areas near existing infrastructure;
• Locations that would require lower levels of vegetation disturbance;
• Locations capable of supporting spa improvements with minimal grading;
• Areas where natural drainage characteristics could be maintained.
This location is connected north of the existing patio/gathering spaces on the campus and is
in an area that has some human disturbance, but slopes off more quickly than the southerly
location considered. It is near existing infrastructure, including water supply and the exterior patio
improvements. However, the setback to the lake is less than the southerly location explored and
based on the canopy identified in the aerial photography appears to be more heavily wooded. For
these reasons, this location was determined not to be the preferred location.
920
93 0
910
940
950
960
970
980
990
1000
980
93 0
980
960
940
970
940
920
950
920
920
950
950
950
960
93 0
970
93 0
940
950
940
950
920
93 0
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 56 of 93
21
»Location 3: Lake Side of Existing Building South Location. After evaluation, we determined that the
most viable location for the Nordic Spa improvements is lake side of the existing building towards
the southern end of the building. A key objective of the planning process was to identify portions
of the site that are capable of accommodating the spa development with the least environmental
impact. Additionally, we focused on finding an appropriate location where the Nordic Spa
improvements would be accessible, meet ADA standards and allow for the development of the
small pier-supported pavilions that would blend seamlessly into the surroundings. Based on the
above factors (adjacent to existing development, influenced by previous disturbance, near existing
infrastructure, etc.), we selected Location 3 as the most viable and we believe that with careful
development it can provide the immersive, natural experience our guests will expect. The proposed
location is mindful of:
• Mature tree canopy. We understand that any improvement lake side (west) of the existing
building will require a variance from the wooded steep slope ordinance, and will require
some tree removal. Preservation of the mature tree canopy to the greatest extent possible
is a key driver in our location selection.
• Protection, and Setback from Shoreland Area. The area selected for the spa has a great setback
from the Ordinary High Water Level (OHWL) than other potential lake side site areas.
Finding any area with the greatest setback was important to ensure that the water resource
is protected.
• Grades and Slope Integrity. We understand that development within the sloped area requires
flexibility from the City’s ordinance. Maintaining the integrity of the slope is key to our
development plan, and we intend to reintroduce vegetation once spa improvements are
constructed, to stabilize slope areas through various methods of retention and to develop
the spa improvements parallel to grades to reduce cut-and-fill required to develop the
Nordic Spa features.
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 57 of 93
22
## SUMMARY OF DEMONSTRATED PRACTICAL DIFFICULTIES
As previously noted, we understand that our proposed Nordic Spa location will require a variance from the City’s wooded steep slope ordinance. While this
Concept Plan application does not provide the full variance analysis that we expect to accompany the next phase of this process, we offer the following
summary to aid in your consideration of our request.
The Standards to demonstrate “Practical Difficulties” as established by the City’s Variance Application are provided below, with a brief summary of our
response:
»...means the property owner proposes to use the property in a reasonable manner not permitted by this Ordinance...”
• Scandvik’s Response: As demonstrated by Figures 4 and 5, and described within the site constraint analysis, because the site is developed
with existing and planned improvements there is not contiguous area available to site the proposed Nordic Spa and meet all required setbacks.
We believe that the Nordic Spa use is a reasonable use within the Planned Development, but without flexibility from the strict interpretation
of the ordinance there is no suitable location to site the outdoor spa improvements. Further, the outdoor spa improvements require a certain
level of privacy and positioning them in the least impactful way by incorporating permeable features, low-impact structures and revegetation
achieves the intent of the ordinance, despite the necessity to obtain a variance.
»“...the plight of the landowner is due to circumstances unique to the property not created by the landowner...”
• Scandvik’s Analysis: As previously described throughout this narrative, the existing hospitality structure was constructed in the 1980’s and
recent adjacent development associated with the approved Planned Development established the site conditions that now exist. This request
is different than any other request for variance given that redevelopment and repurposing of this large, obsolescent structure is dictating
the placement of any viable external improvements. The site characteristics are the definition of unique as there are no other similarly
positioned properties in the City...and the project Proposer did not create this conditions - yet we are trying to work with it.
»“...if granted, will not alter the essential character of the locality...”
• Scandvik’s Analysis: Our goal is to create an experience that not only respects the natural environment, but enhances it. Our whole concept
is to embrace, and full integrate the space improvements with the least amount of impact to the steeps slopes and natural site characteristics.
If we are permitted to develop our concept, we will enhance and support the essential character of surroundings - including the lakeside
experience.
»“...Economic considerations alone shall not constitute practical difficulties...”
• Scandvik’s Analysis: The practical difficulties associated with this request are tied most closely with the existing hospitality improvements,
planned improvements and surrounding development. The internal and external site forces are the main factor in establishing the practical
difficulties of following the strict application of the ordinances, which are not economic considerations alone.
Page 58 of 93
23
## SCANDVIK HOTEL, NORDIC SPA DESIGN & ARCHITECTURE
The architectural vision for Scandvik at Oak Ridge is centered on the belief that great hospitality begins with a
meaningful connection to place.
Through Scandinavian-inspired design, integration with nature, thoughtful material selection, and a strong
commitment to environmental stewardship, the project seeks to create a destination that feels both timeless and
uniquely connected to its surroundings. The result will be a hospitality and wellness destination where architecture,
landscape, and experience come together to create a place that reflects the values of both Scandvik and the City of
Chaska. A summary of our architectural vision is provided:
»Architecture Inspired by Place. The architectural vision for Scandvik at Oak Ridge is rooted in a simple
philosophy:
Great architecture should feel as though it belongs to the landscape in which it is built.
The proposed redevelopment seeks to create a hospitality destination that is timeless, welcoming, and
deeply connected to the natural character of the property. Rather than competing with the surrounding
woodland, shoreline, and topography, the architecture is intended to complement and enhance these natural
features. The result is an environment that feels authentic to the site, respectful of its setting, and reflective
of the Scandinavian-inspired wellness experience that defines the Scandvik brand.
»Scandinavian Design Principles. The design approach for the redevelopment and development draws inspiration
from contemporary Scandinavian architecture and hospitality traditions. These traditions include:
• Simplicity and clarity of form
• Natural materials
• Human-scale design
• Warm and welcoming spaces
• Strong indoor-outdoor connections
• Thoughtful use of natural light
• Connection to landscape and nature
• Timeless rather than trend-driven design
Page 59 of 93
24
The architectural language seeks to create spaces that feel comfortable, restorative, and enduring. The focus
is not on creating landmark structures, but environments that encourage people to slow down, connect,
and experience the surrounding landscape.
»Hospitality through Experience. The architecture of Scandvik at Oak Ridge is designed to support a philosophy
of experience hospitality. Every space should contribute to how guests feel not simply how the property
functions. The design seeks to create a series of memorable moments throughout the guest journey,
including:
• Arrival and first impressions
• Views toward nature and water
• Gathering around fire and wellness experiences
• Transitions between indoor and outdoor spaces
• Opportunities for quiet reflection
• Shared social experiences
• Seasonal engagement with the landscape
Rather than treating architecture as an isolated object, the project views architecture, landscape, and guest
experience as a single integrated system.
»Integration with the Landscape. One of the defining characteristics of the project is the intentional integration
of architecture with the property’s natural setting. Buildings and outdoor wellness amenities are positioned
to work with existing topography, mature vegetation, and natural views. Design objectives include:
• Preserving significant tree canopy
• Minimizing visual impact
• Maintaining natural sight lines
• Creating framed views toward McKnight Lake
• Utilizing natural grades wherever possible
• Reducing the appearance of building mass
• Blending architecture into the woodland setting
The goal is to ensure that visitors experience the landscape first and the architecture second.
Page 60 of 93
25
»Nordic Spa Architecture. The Nordic Spa is envisioned as a collection of smaller wellness experiences
integrated throughout the landscape. Rather than a single large facility, the concept utilizes a distributed
approach consisting of pools, pathways, pavilions, sauna structures, relaxation spaces, and gathering areas.
This approach provides several benefits:
• Reduced visual impact
• Reduced grading requirements
• Better integration with topography
• Stronger connection to nature
• Enhanced guest experience
• Preservation of existing site character
The architecture of these structures is intended to remain secondary to the landscape while providing
warmth, comfort, and shelter throughout all four seasons.
»Woodland Pavilions & Wellness Structures. Where appropriate, wellness structures may be designed as lightweight
pavilions integrated within the woodland environment. These structures are envisioned as extensions of the
landscape rather than conventional buildings. Design inspiration includes:
• Pier-supported wellness pavilions
• Scandinavian forest lodges
• Nature-integrated gathering spaces
• Elevated structures responding to existing grades
• Simple, natural forms and materials
While final design of these structure is not complete, they will fully comply with all building codes and
meet ADA accessibility requirements. The heights will be carefully determined to blend seamlessly with the
landscape and are planned to remain below the treeline. These smaller structures allow wellness experiences
to be distributed throughout the property while minimizing environmental disturbance and preserving the
character of the site.
Page 61 of 93
26
»Light Touch Construction Strategy. One of the defining characteristics of the proposed Nordic Spa concept is
its distributed and low-impact design approach to respect the surrounding landscape and natural resources.
Rather than constructing a single large building that would require extensive grading and site alteration, the
spa consists of a collection of smaller wellness elements integrated throughout the landscape. As shown
on our Concept Plan, elements include:
• Thermal pools
• Cold plunge pools
• Sauna facilities
• Wellness pavilions
• Relaxation spaces
• Woodland pathways
• Gathering areas
Where site conditions are acceptable, certain structures may utilize elevated or pier-supported construction
techniques that allow development to adapt to existing grades rather than requiring significant alteration
of the landscape. This approach will reduce soil disturbance, tree removal, retaining wall requirements,
extensive cut-and-fill, and it mitigates long-term erosion risk. Our design philosophy can be summarized
as adapting development to the land rather than adapting the land to the development.
»Material Palette. The architectural palette is intended to reflect the natural environment and create a timeless
aesthetic. Materials under consideration include:
• Natural wood
• Stone and textured masonry
• Glass
• Steel accents
• Natural landscape materials
• Warm interior finishes
The use of authentic materials helps create a strong connection between the built environment and the
surrounding landscape. Material selections will emphasize durability, sustainability, and long-term quality.
Page 62 of 93
27
»Lighting Strategy. Lighting is intended to enhance the guest experience while protecting the character of the site.
The lighting approach will focus on:
• Warm, low-level illumination
• Pedestrian-oriented lighting
• Dark-sky principles
• Wayfinding and safety
• Accent lighting for key gathering spaces
• Preservation of nighttime views
Lighting should support the experience of nature rather than overwhelm it. The goal is to create a welcoming
environment while respecting neighboring properties, wildlife habitat, and the natural setting.
»Four-Season Design. The architecture has been conceived as a true four-season destination. The experience
of the property will evolve throughout the year. Spring introduces renewal and outdoor activation. Summer
emphasizes landscape, recreation, and community gathering. Autumn celebrates the site’s woodland character
and changing colors. Winter transforms the property into a uniquely Nordic wellness experience where thermal
bathing, sauna culture, fire features, and snow-covered landscapes become part of the guest experience.
The architecture is intended to support and celebrate each season rather than resist it.
Page 63 of 93
28
## BRAND POSITIONING &
## DEVELOPMENT TIMELINE
## TRIBUTE PORTFOLIO POSITIONING
The redevelopment is envisioned as a Tribute Portfolio hotel within Marriott's collection of independent and
character-driven properties. This positioning allows the property to maintain its unique identity while benefiting
from the global reach and distribution capabilities of Marriott International.
The architectural vision aligns with the Tribute Portfolio philosophy by creating a destination that is distinctive,
authentic, and rooted in its local setting. Rather than feeling interchangeable with other hotels, Scandvik at Oak Ridge
seeks to create a sense of place that is uniquely connected to Chaska and the surrounding landscape.
## BRINGING OUR VISION TO REALITY
The redevelopment of Oak Ridge is envisioned as a collaborative process between the project team, City staff,
Planning Commission, City Council, consultants, and community stakeholders. The purpose of the Concept Plan
Application is to establish a framework for continued refinement of the project while obtaining feedback regarding
site planning, environmental considerations, infrastructure, parking, and entitlement requirements.
The project team recognizes that redevelopment of a property with significant environmental features requires a
thoughtful and deliberate review process.
The following timeline reflects the anticipated progression of the project through planning, entitlement, design,
permitting, and construction.
## »Summer 2026: Concept Plan Review
## »Fall 2026: Preliminary Planned Development Review & Variance Application
## »Winter 2026/2027: Final Planned Development and Development Agreement
»Spring/Summer 2027: Permitting & Contractor Procurement
»Summer 2027 – 2028: Construction /Development:
»2028: Opening & Stabilization
• Final permitting and
contractor procurement
## • Exterior Spa Construction
• Landscape + Integration
## • Hotel Opens
## • Full Nordic Spa Opens
## • Stabilized Operations
Page 64 of 93
## LONG-TERM COMMITMENT
The redevelopment of Oak Ridge represents a long-term investment in the City of Chaska. The project team is committed to working
collaboratively with City staff, elected officials, neighboring property owners, and community stakeholders throughout the planning and
development process.
Through thoughtful design, responsible environmental stewardship, and continued community engagement, Scandvik at Oak Ridge
seeks to create a destination that contributes lasting value to the community for generations to come.
Page 65 of 93
## EXHIBIT 1. EXISTING CONDITIONS
## Sources: Metropolitain Council, MNDNR
## LEGEND
## SITE
## CITY TRAIL
## PWI CLASSIFICATION
## PUBLIC WATERBASIN
## NO SHORELAND CLASS ASSIGNED
## PUBLIC WATERCOURSE
## 300FT PUBLIC
## WATERCOURSE BUFFER
## NWI CLASSIFICATION
## OPEN WATER
## EMERGENT WETLAND
930
920
940
950
910
960
970
980
980
950
960
920
950
940
950
950
930
920
960
970
Page 66 of 93
## EXHIBIT 2. SITE FORCES
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
## LEGEND
## PROPOSED SPA LOCATION
## PROPOSED/EXISTING STORM SEWER
## DIRECTION OF VIEW IN REFERENCE PHOTO
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
1
2
3
4
5
6
8
#
9
10
11
12
13
14
15
16
7
1
4
9
12
10
13
14
11
1516
56
78
23
## Sources: Metropolitain Council, MNDNR
Page 67 of 93
## EXHIBIT 3. APPROVED LANDSCAPE/SITE PLAN (RESO. 2022-75)
## DS
## DS
## D
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## ADA
## T
## OAK RIDGE COMMONS
## LEGEND:
## LANDSCAPE SCHEDULE:
## LANDSCAPE REQUIREMENTS:
## TREE CALCULATIONS:
## L-2.2
## LANDSCAPE PLAN - VIEW 2
Page 101 of...
7.J. Adopt Resolution 2022-75, Approving...Packet Page 399 of...
Page 68 of 93
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## IT
## Y
## T
## R
## A
## I
## L
## EXHIBIT 4. SITE CONSTRAINTS & PROPOSED SPA LOCATION
## LEGEND
## LOCATION #1
## LOCATION #2
## LOCATION #3: SELECTED
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
## Sources: Metropolitain Council, MNDNR
1
2
3
1
2
3
Page 69 of 93
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## IT
## Y
## T
## R
## A
## I
## L
1
2
3
## EXHIBIT 5. BUILDABLE AREAS + SPA LOCATIONS EVALUATED
## LEGEND
## LOCATION #1
## LOCATION #2
## LOCATION #3: SELECTED
## BUILDABLE AREAS
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
~125’
~200’
## Sources: Metropolitain Council, MNDNR
1
2
3
Page 70 of 93
## EXHIBIT 6. NORDIC SPA CONCEPT PLAN
Page 71 of 93
31 July 2026
## City of Chaska
## One City Hall Plaza,
## Chaska, MN 55318
## Att’n: Ms. Elizabeth Hanson, AICP
## City Planner
## Dear Ms. Hanson;
Re: Scandvik – 1 Oak Ridge Drive – Concept Plan –
## Incomplete Submittal Letter and Additional Items Needed
## Response
We are in receipt of your letter dated 21 July 2026 concerning your commentary on our proposed Concept Plan
submitted on July 7, 2026. In response to your preliminary review for completeness, we have addressed the items
as follows:
## Concept Site Plan
Wood steep slopes and setbacks are defined by the drawings contained at Exhibit 1.
We note that the only impermeable surfaces are the pools, which total approximately 2,803sf. All paths are
permeable, and all buildings are elevated above the natural grade. Storm water from the pools will be redirected
to the adjacent land and can contain water in case of heavy rainfall. Overflow is diverted into the wastewater
system associated with the existing building.
Setbacks from the water line is 200 feet.
## • Narrative/Concept Plan
• “Previous and existing projects elsewhere similar to what is proposed (completed or not
completed by applicant) – provide pictures if possible”
This information is contained at Exhibit 2. For convenience we are providing a summary of
precedent projects herein.
Page 72 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 2
## Tier I – Nordic Wellness Resorts
## · Everwild Nordic Spa & Hotel, Canmore, Alberta
## · Nordic Spa at Kananaskis, Kananaskis, Alberta
## · Nordic Spa at Alyeska, Girdwood, Alaska
## · Sparking Hills Resort – KurSpa, Vernon, British Columbia
## Tier II – Nordic Spas
## · Scandinave Spa Whistler, Whistler, British Columbia
## · Scandinave Spa Blue Mountain, Blue Mountain, Ontario
## · Thermea by Nordic Spa - Nature, Winnipeg, Manitoba
## · Vetta Nordic Spa, Oro Medonte, Ontario
## · Pacific Mist Spa at Kingfisher Resort, Courtenay, British Columbia
## · Havn Floating Nordic Spa, Victoria, British Columbia
## · SKA Thermal Spa, Calgary, Alberta
## · Embrace North, Minneapolis, Minnesota
## · Watershed Spa, Minneapolis, Minnesota
## · Portal Thermaculture, Minneapolis, Minnesota
## Tier III – Hotel Spas
## · Ivy Hotel and Anda Spa, Minneapolis, Minnesota
## · Hewing Hotel, Minneapolis, Minnesota
## · Four Seasons, Minneapolis, Minnesota
## · Westin Edina Galleria, Edina, Minnesota
## · Omni Viking Lakes Hotel, Eagan, Minnesota
• Site Location alternatives explored, specifically:
i. Location 1;
1. More explanation of why the structured parking does not work financially and
physically on site? What presume costs and/or physical detriments are known?
What views, amenities, layouts (etc.), cannot be achieved in Location 1 that the
preferred, Location 3 provides?
2. Show the proposed layout for Location 1.
1. The cost of parking is prohibitive ranging between $28,000 to $35,000 per stall.
It is anticipated that comprehensive design would require approximately 100
stalls to be placed in a structure, with a cost between $2.8mm to $3.5mm
making the overall economically challenging, and therefore no longer attractive.
While it is understood that “economic considerations alone shall not constitute
practical difficulties” the financing of this project is highly complex with limited
flexibility to increase the capital cost by a further 6% to 8%. Furthermore, the
construction of a new structure would block the view from the entrance to the
site which presently overlooks McKnight Lake.
2. The proposed layout for Location 1 is shown at Exhibit 3, however a portion of
that layout is provided here for convenience.
Page 73 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 3
ii. Location 2;
1. Show the proposed layout for Location 1.
1. The proposed layout for Location 2 is shown at Exhibit 3, however a portion of
that layout is provided here for convenience.
iii. Location 3;
1. How does the proposed encroachment meet ‘practical difficulties’ as defined in
Variance application?
2. How does the proposed encroachment differ from other encroachment requests,
and why should it be treated differently than other encroachment requests.
1. The “practical difficulties” are defined as: “....the property owner proposes to use
the property in a reasonable manner not permitted by this Ordinance, the plight
of the landowner is due to circumstances unique to the property not created by
the landowner, and the variance, if granted, will not alter the essential character
of the locality. Practical difficulties also include, but is not limited to, inadequate
access to direct sunlight for solar energy systems.
Economic considerations alone shall not constitute practical difficulties......”
The proposal is to locate an essential element of the Nordic Spa experience on
suitable lands. As noted above, three sites were reviewed, the first being on
lands which are not on the slope but intrude into the required parking. While
economic considerations alone do not constitute practical difficulties, the capital
cost of construction of the necessary parking structure would render the project
uneconomic and therefore abandoned. Reduction in parking would impact on
the economics of the potential turnover of visitors, thereby also rendering the
project uneconomic and therefore abandoned.
The second location created overview problems from the hotel rooms into the
spa, which relate to privacy issues. There is also less land area to develop
Location 2 into the spa and is closer to the water than Location 3 which create
other considerable problems.
This location is also in an area which has been disturbed by the construction of
the hotel as a portion of it is sited in the buffer zone, and there is infrastructure
(domestic waterlines) which are contained within the sloped area.
Page 74 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 4
The sloped area is developed to be accessed from the table lands. Active leisure
use is encouraged within the sloped area as evidenced by the existing stairs and
the pathway at the base of the slope.
2. We are not aware of other specific encroachments of this scale and nature
within the City of Chaska. This is a very specific encroachment request, based
on a unique use, on a site which was developed for a different use. In the
conversion, given the site constraints with parking and the new storm water
pond facility which benefits other portions of the original land holding, we bring
this request as a means by which an adaptive reuse of an abandoned site.
While there is no precedent within the City of Chaska, the City of Minnetonka
has positive guidance on the means of development on steep slopes and
encourages them as an alternative to “conventional flatland development
practices in areas of steep slopes, including the planning of development which
fits the existing topography.
## City of Minnetonka Precedent Guidance
As a precedent, the City of Minnetonka MN permits development on steep
slopes. The principles applied in the Minnetonka ordinance pertaining to such
development provides the following guidance by stating the following:
a) Purpose. The purposes of the standards governing the alteration of steep
slopes are to:
1) preserve steep slopes in essentially their natural state as part of a
comprehensive open- space plan;
2) encourage alternative approaches to conventional flatland
development practices in areas of steep slopes, including the planning of
development which fits the existing topography of the site;
3) minimize grading and cut-and-fill operations consistent with the
retention of the natural character of steep slopes;
4) minimize the short and long-term increase in stormwater water-runoff
and soil erosion problems incurred in the grading and development of
steep slopes;
5) preserve the predominant views, both from and of the steep slopes;
and
6) preserve the variety of topography which exists in the city and is an
integral part of this city’s identity.
The entire ordinance is excerpted and included at Exhibit 3.
• Summer operating hours – how does the outdoor use change during the summertime?
Summer operating hours will be 9:00AM to 9:00PM, and the outdoor use will not change during the
summertime.
Page 75 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 5
• Addressing city comments (in red) in the Concept Plan Project Narrative (attached)
1. Include the size of the proposed outdoor Nordic spa area. (Page 4)
The size of the proposed outdoor Nordic spa area paths, pools and buildings are located at Exhibit 1.
However for convenience, the total pool area is
2. Pier-supported pavilions; building code concerns? Need to be accessible – ADA compliance. How tall are
these structures? (page 8)
The pier supported pavilions will be constructed in accordance with the applicable codes contained within
the Minnesota State Building Code. Access across the entire outdoor space shall be designed in
conformity with the US Access Board guidelines and the Americans with Disabilities Act. The height of the
structures is indicated on the appended drawing at Exhibit 4, however for convenience, the maximum
height is 32.7 feet from the lowest grade point. The height is generated from the lowest grade; therefore,
the actual average grade is considerably less, and in the 25’ range. Except for the main entrance pavilion
the buildings are all one storey, well within the size of a small home.
We have carried out inquiry with a geotechnical engineer familiar with the site, and they have confirmed
that the geological conditions are assumed to be suitable for the construction of the pools, permeable
walkways and pier supported pavilions.
3. Are any utility upgrades contemplated with the new use? Please note that have been multiple watermain
breaks on site and watermain fixes will likely be needed if plans progress....(page 13)
Based on current information, the existing utilities are suitable except for the watermain breaks. A full
assessment of the watermain will be carried out and repairs or replacement effected to the satisfaction of
the authorities having jurisdiction.
4. How will connection to the existing SW pond be routed from the proposed impervious area? And is there
sufficient capacity in the existing pond for the new impervious areas? (page 13)
The connection to the existing Storm Water Pond appears to be on the east side of the site. Impervious
surfaces will be minimized, and water diverted to overland surfaces improved to accommodate the
additional flow of surface water. The pier supported structures will have a minimum impact on storm
water due to their elevated nature. A storm water management and drainage design will be submitted for
review to the satisfaction of the authorities having jurisdiction.
5. Provide additional master plan for inside the hotel conference center building. Colorize the areas and how
they will be programmed. (page 15)
The hotel and interior spa areas will be situated in the existing building. The purpose of this application is
to permit the work in the sloped area immediately outside of the existing building. There is a direct
relationship between the interior redesignation and the exterior spa. This is subject to change as the
design and development progress, but the general direction will not place additional program outside of
the existing building.
See attached drawings at Exhibit 5.
Page 76 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 6
6. Show layouts considered for Locations 1 & 2. (page 19)
Please see attached drawing for alternative layouts at Exhibit 3.
7. Pier-supported pavilions; Building code concerns? How tall are these structures? Will these structure and
Nordic Spa area be ADA compliant/accessible. (page 20)
Please refer to attached drawings for the master plan at Exhibit 7. As noted above, the new facilities shall
conform with the US Access Board guidelines and the Americans with Disabilities Act.
We trust this provides the necessary information as requested in response.
We are also providing a revised project narrative, which has been amended in accordance with the responses.
We look forward to working with the City of Chaska Council and staff to revive this site and bring investment and
tourism to Chaska.
Yours sincerely,
## Scandvik Hotels
## Travis Batting
## Travis Batting
## Founder and President
Page 77 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 7
## Exhibits
Page 78 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 8
Exhibit 1 – Concept Site Plan Related to Elevations and Grading
This drawing indicates the finished floor elevations relative to the terrace level of the existing building be EL 0. We
are therefore showing the elevational siting of the site – we note that the existing elevations have been
maintained.
Page 79 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 9
## Exhibit 1 – Concept Site Plan – Construction at Grade
This drawing indicates the actual sloped areas affected and contained in this application. The work is in areas
where there has been previous work carried out, such as the installation of the domestic watermains. We also
note that there is an existing stairway which provides access from the table lands to the recreational path at the
shore of the lake.
The overall land mass on the sloped lands which is under title is over 386,000 square feet.
The total pool constitutes a total of 2,064 square feet, as noted on page 15 of the original submission. These are
the only areas which truly involve construction with respect to the existing terrain and represents a very small
percentage of the overall land mass.
The permeable paving for rest areas and pathways constitute 6,298 square feet and are set with minimal impact to
the existing grade.
The pavilions are all presently conceptual and constitute 4,106 square feet and are designed not to rest on the
sloped surface but have piers to provide support.
Page 80 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 10
Exhibit 2 – Precedents
This is a list of precedents across North America. For convenience and brevity, the hyperlinks remain active.
## Tier I – Nordic Wellness Resorts
## · Everwild Nordic Spa & Hotel, Canmore, Alberta
## · Nordic Spa at Kananaskis, Kananaskis, Alberta
## · Nordic Spa at Alyeska, Girdwood, Alaska
## · Sparking Hills Resort – KurSpa, Vernon, British Columbia
## Tier II – Nordic Spas
## · Scandinave Spa Whistler, Whistler, British Columbia
## · Scandinave Spa Blue Mountain, Blue Mountain, Ontario
## · Thermea by Nordic Spa - Nature, Winnipeg, Manitoba
## · Vetta Nordic Spa, Oro Medonte, Ontario
## · Pacific Mist Spa at Kingfisher Resort, Courtenay, British Columbia
## · Havn Floating Nordic Spa, Victoria, British Columbia
## · SKA Thermal Spa, Calgary, Alberta
## · Embrace North, Minneapolis, Minnesota
## · Watershed Spa, Minneapolis, Minnesota
## · Portal Thermaculture, Minneapolis, Minnesota
## Tier III – Hotel Spas
## · Ivy Hotel and Anda Spa, Minneapolis, Minnesota
## · Hewing Hotel, Minneapolis, Minnesota
## · Four Seasons, Minneapolis, Minnesota
## · Westin Edina Galleria, Edina, Minnesota
## · Omni Viking Lakes Hotel, Eagan, Minnesota
## Tier 1 Nordic Wellness Resorts
## 1. Everwild Nordic Spa & Hotel (Canmore, Alberta)
## Website:
## Everwild Nordic Spa & Hotel
## 2. Kananaskis Nordic Spa (Kananaskis, Alberta)
## Website:
## Kananaskis Nordic Spa
## 3. Nordic Spa at Alyeska (Girdwood, Alaska)
## Website:
## Nordic Spa at Alyeska
## 4. Sparkling Hills KurSpa (Vernon, British Columbia)
## Website:
## Sparkling Hills Resort & KurSpa
Page 81 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 11
## Tier 2 Nordic Spas
## 5. Scandinave Spa Whistler
## Website:
## Scandinave Spa Whistler
## 6. Scandinave Spa Blue Mountain
## Website:
## Scandinave Spa Blue Mountain
7. Thermëa by Nordik Spa – Nature (Winnipeg)
## Website:
## Thermëa by Nordik Spa – Winnipeg
## 8. Vettä Nordic Spa (Oro-Medonte, Ontario)
## Website:
## Vettä Nordic Spa
Tier II spas are Nordic spas without hotel ownership as part of their business model
or ownership structure. For many of these properties, aspects of hydrotherapy and
thermotherapy are combined with high touch service and luxury facilities and
amenities. These properties range from extensive campus environments, where
guests select unlimited access for a day, to clubs with modest access fees, where
members and guests have access to the services similar to a fitness membership. In
the Nordic day-spa environments, some members avail themselves daily of the
contrast therapy. What all Tier II properties have in common is a primary focus on
programs and facilities that support contrast therapy.
Tier III spas consist of local hotel spas, some of which have added contrast therapy
elements to address market trends. Contrast therapy options are added in addition
to classic spa-treatment offerings, thus attracting a wider range of consumers who
are focused on the health and wellness benefits of a spa. In this category, savvy
hoteliers expand their offerings to attract a wider demographic of customers who
select spa treatments based not only on appearance but also on how they feel. The
emergence of contrast therapy, paired with the aesthetics of skin care, expand the
revenue for the property and the options for guests. To that end, the Four Seasons
in Minnesota has added rooftop Nordic spa treatments to its existing spa menu. The
Nordic Spa component of the operations is operated by a third-party entity, and the
bifurcation is seamless to the guest.
Information as provided for by CBRE.
Page 82 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 12
## Exhibit 3 – Alternate Siting Plans
Page 83 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 13
Exhibit 3 – City of Minnetonka MN Precedent Regarding Steep slopes
Excerpt from the City of Minnetonka, Minnesota Code of Ordinances Section 300.28 Performance Standards
“20. Performance Standards Regulating Steep Slopes.
a) Purpose. The purposes of the standards governing the alteration of steep slopes are to:
1) preserve steep slopes in essentially their natural state as part of a comprehensive open- space plan;
2) encourage alternative approaches to conventional flatland development practices in areas of steep slopes,
including the planning of development which fits the existing topography of the site;
3) minimize grading and cut-and-fill operations consistent with the retention of the natural character of steep
slopes;
4) minimize the short and long-term increase in stormwater water-runoff and soil erosion problems incurred in
the grading and development of steep slopes;
5) preserve the predominant views, both from and of the steep slopes; and
6) preserve the variety of topography which exists in the city and is an integral part of this city’s identity.
b) Standards.
1) The city may require that a property be rezoned and developed as a planned unit development to utilize
flexible development standards to preserve steep slopes.
2) Construction, development, grading, filling, and any other method of alteration may occur on a steep slope
only if they meet the standards of this ordinance and are approved by the city. City approval will be by the city
council, planning commission or city planner, depending on who is authorized to approve the associated
development application.
3) The city will approve steep slope development only if the city can make the findings specified below. In making
these findings, the city will evaluate the extent to which the development meets the design guidelines included
under each finding. It is the intent to require compliance with as many design guidelines as possible, but the city
may choose to not require compliance with every guideline, if the findings are still achieved.
Finding 1. The property is physically suitable for the design and siting of the proposed development. The proposed
development will preserve significant natural features by minimizing disturbance to existing topographical forms.
a. design developments into steep slopes, rather than making significant alterations to the slope to fit the
development:
1. avoid building pads that result in extensive grading outside the building footprint and driveway areas;
2. use retaining walls as an alternative to banks of cut-and-fill, and design and site such walls to avoid
adverse visual impact;
3. allow for clustering with different lot shapes and sizes, with the prime determinant being to maximize the
preservation of the natural terrain;
4. allow flag lots when appropriate to minimize grading;
5. avoid cuts and fills greater than 25 feet in depth; and
6. design grading to preserve the crest of prominent ridges. Buildings may be located on the prominent
ridges, as long as the requirements of this subdivision are met.
b. design streets and driveways that generally follow existing contours, except where necessary for public
safety or to minimize the adverse impacts from traffic:
1. use cul-de-sacs and common drives where practical and desirable to preserve slopes; and
2. avoid individual long driveways, unless necessary to locate the principal structure on a less sensitive area
of the site.
c. concentrate development on the least sensitive portion of the site to maximize the preservation of significant
trees and natural features:
1. preserve sensitive areas by clustering buildings or using other innovative approaches; and
2. maintain sufficient vegetation and design the scale of development so that it does not overwhelm the
natural character of the steep slope.
Page 84 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 14
d. preserve steep slopes that buffer residences from non-residential sources of light and noise.
Finding 2. The development will not result in soil erosion, flooding, severe scarring, reduced water quality,
inadequate drainage control, or other problems.
a. wherever practical, minimize the impervious surface area and maximize the use of the natural drainage
systems:
1. design any new drainage systems away from neighboring properties, away from cut faces or sloping
surfaces of a fill, and toward appropriate drainage facilities, whether artificial or natural. Drainage systems must
comply with the city’s water resources management plan; and
2. use the existing natural drainage system as much as possible in its unimproved state, if the natural system
adequately controls erosion.
b. avoid building on or creating steep slopes with an average grade of 30 percent or more. The city may
prohibit building on or creating such slopes in the following situations:
1. where the city determines that reasonable development can occur on the site without building on or
creating such slopes; or
2. development on such slopes would create real or potentially detrimental drainage or erosion problems.
c. design slopes to be in character with the surrounding natural terrain;
d. use benching, terracing, or other slope-stabilizing techniques for fill, as determined appropriate by the city
engineer;
e. install and maintain erosion control measures during construction in accordance with the current Minnesota
pollution control agency best management practices; and
f. revegetate disturbed slopes as soon as practical after grading to stabilize steep slopes and prevent erosion,
as required by the city.
Finding 3. The proposed development provides adequate measures to protect public safety.
a. limit the slopes of private driveways to not more than 10 percent, unless necessary to minimize excessive
grading. Where the grade exceeds 10 percent, the driveway should have sufficient flat areas at the top and toe to
provide vehicles a landing area and to avoid vehicles slipping onto the adjacent street during icy conditions. The city
may require a driveway turn-around; and
b. provide sufficient access for emergency vehicles to reach the proposed buildings.
4) The city may require that the applicant provide engineering certification, acceptable to the city, that no
excavation or fill will cause any steep slope to become unstable; impose loads that may affect the safety of
structures or steep slopes; interfere with adequate drainage for the site area and the area that drains directly to
the site; obstruct, damage, or adversely affect existing sewerage or drainage; adversely affect the quality of
stormwater runoff; adversely affect downstream properties, wetlands or bodies of water; or cause adverse erosion
or sedimentation.
5) The city may require that the applicant provide certification from a registered engineer that the final grading
was completed in compliance with the approved grading plan.
6) The city may require the applicant to prepare and record a declaration of covenants, conditions and
restrictions, in a form acceptable to the city attorney, providing for property owner maintenance of manufactured
slope areas, acceptance of all risks and liability associated with those areas, and release of the city from all
associated claims.
c) Applicability.
1) This subdivision does not apply to the expansion or reconstruction of an existing structure, where the footprint
of the completed building does not exceed 150 percent of the structure footprint existing on June 23, 1997. The
person wishing to qualify for this exception must:
a. show that the structure existed on June 23, 1997; and
b. undertake the construction pursuant to plans that are approved by the city planner and that provide
adequate surface water drainage, appropriate erosion control, and safe driveway access to adjacent streets.
Page 85 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 15
2) Lots existing on June 23, 1997, are subject to all of the standards in this subdivision, except:
a. the standards may not be applied to lot divisions or subdivisions preliminarily approved within one year, and
finally approved within two years, before June 23, 1997, to the extent that this is prohibited by Minn. Stat. §
462.358, subd. 3c; and
b. the standards may not be used to prohibit development of undeveloped lots finally approved between
December 31, 1991 and June 23, 1997, but the standards may be applied to regulate that development.”
Excerpted from the City of Minnetonka Code of Ordinances July 2026
Page 86 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 16
Exhibit 4 – Elevations
Page 87 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 17
## Exhibit 5 – Interior Diagram
Page 88 of 93
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 18
Page 89 of 93
6 August 2026
## City of Chaska
## One City Hall Plaza,
## Chaska, MN 55318
## Att’n: Mr. Nate Kabat
## Community Development Director
## Dear Nate;
## Re: Scandvik – 1 Oak Ridge Drive – Concept Plan
## Revision
Further to our meeting of July 28 on site, and our follow up meeting of August 5, we understand your concerns
related to the proposal as it stood and have accordingly revised it based on our most recent meeting.
A drawing which is excerpted below, was prepared to reflect the limits of development on the sloped slope lands
and is based on lands which are “disturbed” or to be more clear lands that were “actively maintained into the
wooded slope and buffer area”.
Page 90 of 93
## City of Chaska City Planning
## 1 Oak Ridge Drive – Revised Concept Plan
6 August 2026
Page 2
The revisions to the concept plan which is attached entail:
• The removal of the exisVng terrace to accommodate the pools;
• ModificaVons to the interior of the building to accommodate access to the exterior spa areas, which are
within the exisVng enVtlements;
• The pool areas and buildings are at elevaVons that are proximate to exisVng elevaVons;
• RelocaVon of some of the buildings previously proposed within the limits of the “disturbed” area that will
be saunas and relaxaVon areas, and will comply with the design as indicated in previously supported
material;
• RelocaVon of other relaxaVon areas into renovated areas within the exisVng building within the exisVng
enVtlements;
• Access across the enVre outdoor space shall be designed in conformity with the US Access Board
guidelines and the Americans with DisabiliVes Act;
• Walkways shall remain constructed of pervious materials to maintain exisVng drainage pa\erns and
minimize the impact on storm water management;
• Any exisVng retaining walls will be restored or alternaVve means to accommodate and maintain exisVng
grade differenVals;
• As noted previously, we have carried out inquiry with a geotechnical engineer familiar with the site, and
they have confirmed that the geological condiVons are assumed to be suitable for the construcVon of the
pools, permeable walkways and pier supported pavilions;
• Based on current informaVon, the exisVng uVliVes are suitable except for the watermain breaks. A full
assessment of the watermain will be carried out and repairs or replacement effected to the saVsfacVon of
the authoriVes having jurisdicVon. As the construcVon of the faciliVes may interfere with the exisVng
uVliVes, given the fact that there is documented breaks within the watermains, relocaVon of the
watermains will be carried out. Any relocaVon will be within the “disturbed” areas; however work may be
required within the sloped lands outside of the “disturbed” areas. Such work will not be relocated
without the saVsfacVon of the authoriVes having jurisdicVon.
We appreciate the efforts of staff to accommodate the request to maintain the timeline. Please advise if any
further information is required. We have appended, a revised concept plan and rendered image to replace
previously provided concepts.
We appreciate working and the process to date with the City of Chaska Council and staff to revive this site and
bring investment and tourism to Chaska.
Yours sincerely,
## Scandvik Hotels
## Travis Ba)ing
## Travis Baang
## Founder and President
## A\ach: Limits of Development
## Revised Concept Plan
Page 91 of 93
## City of Chaska City Planning
## 1 Oak Ridge Drive – Revised Concept Plan
6 August 2026
Page 3
## Figure 1 – Limit of Development Boundary
This image from the Carver County Property Information shows the areas of activity at 2020 at which time the
development was still in operation as a hospitality facility. The image was discussed with staff to identify those
areas which are “disturbed” which is defined as areas which are actively maintained in the wooded sloped area.
This identified area is consistent with current imagery taken at the site, which shows vegetation which is less
mature and developed presently and is a product of overgrowth reflective of the abandoned nature of the
building.
Page 92 of 93
## City of Chaska City Planning
## 1 Oak Ridge Drive – Revised Concept Plan
6 August 2026
Page 4
## Figure 2 – Concept Site Plan
This concept plan revises the original concept plan to restrict development and construction to within the
“disturbed” area. Small sauna buildings and one relaxation pavilion is constructed within the boundary area.
Alterations to the existing building to provide access from the existing lower level of the building to the spa pool
area. The existing building will not be expanded and primarily consists of redesignation and renovation of the
interior to support spa activities that were located outside on the previous submission.
In doing so, we have achieved better integration with the existing building, complimenting the spa function and
building only on lands that identified as disturbed when the building was last fully operational in 2020.
Page 93 of 93