## Agenda Page 1
## AGENDA
## CHASKA ECONOMIC DEVELOPMENT AUTHORITY
## CHASKA CITY HALL - COUNCIL CHAMBERS & ZOOM
Monday, July 20, 2026
## IMMEDIATELY FOLLOWING CITY COUNCIL MEETING
1. Call to Order
## 2. Roll Call
## 3. Adopt Agenda
## 4. Approve Previous Meeting Minutes
4.A. Meeting Minutes 06-15-2026
## 5. Discussion Items
5.A. Authorize Letter of Intent for TIF Assistance for the Proposed Big Woods
## Business Park Project
## 6. Other Business
7. Adjourn
Page 1 of 13
## DRAFT
## - MINUTES -
## CHASKA ECONOMIC DEVELOPMENT AUTHORITY
## JUNE 15, 2026
1. Call to Order
The meeting was called to order by President Hubbard at 9:50 p.m.
## 2. Roll Call
Roll call was taken. Present: President Hubbard and Commissioners Benesh, Hatfield, Grau, and
Sheveland.
## Absent: None
Also Present: Matt Podhradsky, Executive Director; Elise Durbin, Assistant Executive Director;
Nate Kabat, Community Development Director; and Noel Graczyk, Administrative Services
Director.
## 3. Adopt Agenda
Motion by Commissioner Benesh, second by Commissioner Hatfield to adopt the agenda as
presented.
Motion carried.
## 4. Approve Previous Meeting Minutes
4.A. Meeting Minutes 05/04/2026
Motion by Commissioner Sheveland, second by Commissioner Grau to approve the minutes from
May 4, 2026.
Motion carried.
## 5. Discussion Items
## 5.A. Approve Purchase Agreement with American Legion for Property
Executive Director Podhradsky introduced Community Development Director Nate Kabat to
present this item to the Economic Development Authority. Mr. Kabat presented this item to the
Economic Development Authority.
President Hubbard noted that she appreciates the work of City Staff, and the American Legion
has been wonderful to work with.
Motion by Commissioner Hatfield, second by Commissioner Benesh to authorize the President
and Executive Director to sign the Purchase Agreement between the City of Chaska and the
American Legion Post #57.
Motion carried.
Page 2 of 13
## MINUTES-CHASKA CITY COUNCIL
March 30, 2026 PAGE 2 DRAFT
5.B. Adopt Resolution EDA 2026-58, Ratifying the Sale of Chaska EDA Series 2026A Bonds
Motion by Commissioner Hatfield, second by Commissioner Benesh to adopt Resolution EDA
2026-58 Ratifying the Sale and Authorizing the Issuance of $55,765,000 Lease Revenue Bonds,
Series 206A, and Authorizing Execution of Related Documents.
Motion carried.
## 6. Other Business
7. Adjourn
Motion by Commissioner Benesh, second by Commissioner Sheveland to adjourn the meeting
at 9:58 p.m.
Motion carried.
Page 3 of 13
1
Subject: Authorize Letter of Intent for TIF Assistance to Proposed Big Woods
## Business Park (North) Phase I project
## Prepared By: Julie Grove, Economic Development Coordinator
## Background
On June 15, 2026, the City Council approved the Big Woods Business Park (North) Phase I
Preliminary Site & Building Plan, Preliminary Plat & Comprehensive Plan Amendment for a 218,000
square foot distribution center and Phase I public improvements including road infrastructure,
utilities, trails and grading for the entire north business park. The project is located in the SW
Chaska Business Park. The Council is expected to consider the final Site and Building Plan in August
or September 2026. Construction is anticipated to begin in the fall of 2026. To help make the
construction of the public improvements financially feasible, the developer, Scannell Properties,
has submitted an application requesting Tax Increment Financing (TIF) assistance.
## Figure 1: Existing Location & Context Map
Specifically, Phase I is anticipated to include:
• Construction of the Phase I facility and associated parking and site improvements.
• Public improvements to Big Woods Boulevard and construction of Public Road A
serving Big Woods Business Park North.
• Extension of sanitary sewer, water, and related public utilities from Chaska Creek
Boulevard south across the ravine and through the development area.
• Mass grading throughout Big Woods Business Park North to balance site elevations
and establish finished grades necessary to support future development parcels.
## REQUEST FOR ACTION
## CHAKSA ECONOMIC DEVELOPMENT AUTHORITY
7/20/26
Page 4 of 13
2
Figure 2: Phasing Map – Phase I =turquoise, green and pink.
Future Phases = purple
## Tax Increment Financing (TIF)
Tax Increment Financing (TIF) is a public financing tool that allows the City to support eligible
development and infrastructure projects by using the future increase in property tax revenue
generated by the development to reimburse approved eligible project costs.
Consistent with the City’s TIF Policy, assistance may be considered for industrial projects that
expand the tax base, create business opportunities, generate high-quality jobs, support public
infrastructure investment, and would not occur without public assistance.
In Chaska, the TIF process begins with a Letter of Intent, followed by negotiation of a TIF Plan
and TIF Agreement outlining the project scope, financing, and eligible costs. Upon approval by
the City Council and EDA, the TIF District may be established and certified, allowing the project
to proceed to grading and construction. Typically, the TIF review process runs simultaneously to
the planning review process.
## Letter of Intent
The proposed Phase I project is expected to provide significant benefits, including:
• Approximately 200 new full-time jobs with average annual wages of approximately
$60,000.
• An additional estimated 400 additional jobs related to distribution and delivery activities.
• Expansion and diversification of Chaska’s industrial employment base.
• Growth of commercial and industrial tax base benefiting the City, County, and School
District.
• Construction of public infrastructure, including roads and utilities, that will serve both the
Phase I development and future development areas within the north business park.
• Creation of development-ready industrial sites that can attract additional private
investment and future employers.
Page 5 of 13
3
In order, to construct the project, the developer must make significant upfront investments in
public infrastructure, including new roads, utility extensions, mass grading and site preparation.
These improvements are needed not only for the Phase I facility but also to prepare the entire
northern portion of the business park for future industrial development.
The project qualifies for TIF assistance under the City’s TIF policy as an eligible industrial
development and is eligible to be established as an eight-year Economic Development TIF District.
While the Phase I development would serve as the basis for creating the TIF district and
generating tax increment, the end user of Phase I is not requesting TIF assistance for construction
of the Phase I warehouse building or any associated private improvements. Instead, the
requested TIF assistance is being requested by the developer and would be used solely to
reimburse eligible public infrastructure and site development costs that support the overall Big
Woods Business Park North development.
Under the City’s policy, eligible industrial projects may receive TIF assistance in an amount up to
two times the amount of property taxes generated by the completed project, or up to three times
those taxes if the project reserves sufficient land to accommodate a future building expansion of
at least 50%.
The developer has requested TIF assistance equal to three times the property taxes generated
by the Phase I facility, along with any remaining increment generated within the district, to help
finance the extraordinary upfront costs of constructing the public infrastructure needed to develop
the entire business park.
This project differs from a typical industrial development because the public infrastructure needed
to serve the site is being constructed by the developer rather than the City. Usually, with industrial
development that has multiple phases, the City would construct the public roads, utilities, and
other infrastructure needed to support new development as projects move forward. In this case,
the end user has an accelerated construction schedule that cannot be accommodated through
the City's normal infrastructure installation timeframe. To meet that timeline, the developer has
agreed to design and construct the required public infrastructure to City standards, assume the
associated financial and construction risk, and complete improvements that will ultimately serve
not only the Phase I development but also future industrial development throughout the northern
portion of Big Woods Business Park.
As a result, the project includes extraordinary upfront public infrastructure costs that would not
typically be incurred as part of a single industrial development. After reviewing the project, City
staff and the City's financial consultant, Baker Tilly, concluded that these costs create a financing
hardship that would not otherwise exist under a more typical development scenario. Staff also
notes that the requested TIF assistance would be used solely to reimburse eligible public
infrastructure and site development costs that benefit the broader business park. No TIF
assistance would be used for construction of the Phase I building or other private building
improvements.
Based on this review, staff recommends the following TIF framework, outlined in the attached
Letter of Intent, for consideration:
• Establish an Economic Development TIF District for the Phase I project.
Page 6 of 13
4
• Provide TIF assistance equal to three (3) times the annual property taxes generated by
the Phase I development, plus any remaining excess tax increment generated within the
TIF District. The City would retain up to twenty percent (20%) of the tax increment for
statutory pooling and administrative costs (this percentage is still under negotiation),
and fiscal disparities will not be deducted from the total benefit. The final amount of TIF
assistance is still being negotiated and will be subject to final project costs, valuation,
tax capacity, financial analysis and City approval.
• Structure the assistance as a Pay-As-You-Go TIF Note.
• Assistance will include certification of final costs following the completion of Phase 1, and
a one-time "Lookback" review approximately one year after project stabilization and
completion of the public improvements to confirm the completed project is substantially
consistent with the assumptions used to evaluate the TIF request. The results of this
review may be used to adjust the final amount and terms of the TIF assistance as provided
in the TIF Agreement.
• Limit TIF reimbursements to eligible public infrastructure costs, including Public Road A,
utility extensions, grading, and other qualifying public improvements that benefit the
overall northern business park. No TIF proceeds may be used for construction of the Phase
I facility including the warehouse building or other private improvements.
• Require the developer to construct the Phase I project in accordance with the approved
plans and obtain a Certificate of Occupancy.
• The developer agrees to participate in the City's due diligence process, including an
independent review of project financials to determine the need for, and appropriate
amount of, TIF assistance.
Although the proposed Phase I TIF assistance exceeds the level typically contemplated under the
City’s TIF Policy, staff believes this approach is appropriate because the Phase I developer is
constructing public infrastructure that will directly benefit future development throughout Big
Woods Business Park North.
To ensure the overall development, beyond Phase I, remains consistent with the intent of the
City’s TIF Policy, staff recommends that any TIF assistance provided above the City's standard
policy for Phase I (i.e. 2 or 3 times amount of property taxes) be treated as an advance investment
in the future development of the business park. The amount of assistance provided above the
policy would be allocated proportionately among future development parcels under the
developers ownership. As those parcels develop and request TIF assistance, their allocated share
of the Phase I assistance beyond the policy would be deducted from any future TIF assistance
that may be approved.
This approach recognizes that the Phase I developer is advancing the cost of infrastructure that
benefits the entire business park while helping ensure that, when all development phases are
considered cumulatively, the total TIF assistance provided across Big Woods Business Park North
remains closely aligned with the City's TIF Policy.
## Future Development TIF Framework
• Chaska's objective is to apply its TIF Policy consistently across the entire Big Woods
Business Park North development area by evaluating TIF assistance on a cumulative basis
rather than by individual development phase.
Page 7 of 13
5
• Because the proposed Phase I TIF assistance exceeds the amount typically available under
the City's TIF Policy, the assistance provided above the policy level will be allocated among
future development parcels of the Big Wood Business Park North on a proportional square-
footage basis.
• As future development phases, under the control of the developer, request TIF assistance,
each phase's allocated share of the additional Phase I assistance will be deducted from
any TIF assistance that may otherwise be considered for that project (example 2x minus
the new lots Phase I share). This approach recognizes that the Phase I developer is
funding public infrastructure that benefits the entire business park while helping ensure
that total TIF assistance across all development phases remains generally consistent with
the City's TIF Policy.
• Future TIF districts may include eligible land acquisition, site development, and
infrastructure-related costs not previously constructed with Phase I.
• Each future development proposal will be evaluated independently based on the project,
financing gap, project economics, and anticipated public benefits. Nothing in this
framework guarantees the approval or availability of future TIF assistance.
The attached Letter of Intent (LOI), negotiated by city staff and the developer, outlines the
proposed TIF framework, key business terms as summarized in this report, and notes the
remaining items that are still under negotiation. While the parties have reached agreement on
the overall policy framework, some of the financial terms remain under negotiation. The final TIF
plan, TIF Agreement and financial terms, including the final amount of TIF assistance, will be
subject to completion of the required financial analysis, preparation of the TIF documents,
continued negotiations and review and approval by both the City Council and the EDA.
Approval of the LOI establishes the City’s intent to continue negotiating the proposed TIF
assistance under the framework outlined in the letter. The LOI is not a binding commitment to
provide TIF assistance or establish a TIF district. Any future TIF district and related TIF agreement
will be considered through separate public actions and approvals by the City Council and EDA.
## Recommendation
The proposed TIF district supports industrial development in the SW Chaska Business Park, which
has been planned for some time. City staff recommend that the EDA authorize the City EDA
Executive Director to execute the Letter of Intent with the developer and initiate the process to
establish a TIF District including the preparation of the necessary TIF Plan and TIF Agreement
Documents.
## EDA ACTION REQUESTED
Motion to authorize the EDA Executive Director to execute the Letter of Intent for TIF assistance
to the proposed Big Woods Business Park Project.
Page 8 of 13
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
Phone: 952-448-9200 Fax: 952-448-9300 www.chaskamn.gov
7/16/2026
## Scannell Properties
## Jake Kurth
## 294 Grove Lane, Ste 140
## Wayzata, MN 55391
RE: Letter of Intent – Tax Increment Financing Assistance for Big Woods Business Park Phase I
## Dear Mr. Kurth:
On behalf of the City of Chaska (the “City”) and the City of Chaska Economic Development
Authority (“EDA,” and both individually and collectively with the City, “Chaska”), we are pleased
to express the City's support for the proposed development of Big Woods Business Park Phase I
located within the Southwest Business Park area.
Based on the City Council's approval on June 15, 2026, of the Preliminary Plat, Site and Building
Plan, Rezoning, and Comprehensive Plan Amendment for Big Woods Business Park Phase I (PC
2026-08), Chaska recognizes the significant economic development opportunity represented by
this project and is supportive of moving forward with the proposed development.
Chaska's understanding of the Phase I development includes the construction of approximately
218,000 square feet of warehouse and distribution center (the “Phase I Facility”) together with
associated parking, site improvements, construction of a new public roadway including utility
extensions to support the entire business park beyond phase I, and site grading necessary to
support both the initial development and future industrial growth within Big Woods Business
Park North (as approved o in Preliminary Site plan casefile PC 2026-08).
Specifically, Phase I is anticipated to include:
• Construction of the Phase I Facility and associated parking and site improvements.
• Public improvements to Big Woods Boulevard and construction of Public Road A serving
Big Woods Business Park North.
• Extension of sanitary sewer, water, and related public utilities from Chaska Creek
Boulevard south across the ravine and through the development area.
• Mass grading throughout Big Woods Business Park North to balance site elevations and
establish finished grades necessary to support future development parcels.
Chaska believes the project will provide substantial public benefits, including:
• Creation of approximately 200 direct jobs with average annual wages estimated at
approximately $60,000.
Page 9 of 13
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
Phone: 952-448-9200 Fax: 952-448-9300 www.chaskamn.gov
• Support for an estimated 400 additional jobs associated with distribution and delivery
activities.
• Expansion and diversification of Chaska's industrial employment base.
• Significant public infrastructure investments, including roads, and utilities that will serve
both Phase I and future development areas.
• Increased commercial and industrial tax base for the City, County, and School District.
• Creation of development-ready sites that will attract additional private investment and
high-quality industrial users within the Southwest Business Park.
Chaska also recognizes that the project requires substantial upfront investment in public
infrastructure, including roadway construction, utility extensions across challenging
topography, and extensive site preparation activities necessary to make the property
developable. These improvements are intended to serve not only the Phase I Facility but also
future development of parcels throughout Big Woods Business Park North.
Based on information provided by Scannell Properties and Chaska and its financial consultants
review of the project, Chaska acknowledges that the extraordinary cost of these public
improvements creates a financing gap that would not otherwise exist under typical industrial
development conditions. Chaska further understands that requested Tax Increment Financing
(“TIF”) assistance would be utilized solely for eligible public infrastructure and site development
costs associated with the entire north industrial park and would not be used for the
construction of the Phase I warehouse building or its building components.
Subject to completion of Chaska’s underwriting, financial review, and approval of all required
TIF documentation, Chaska is prepared to consider the following TIF assistance framework for
## Phase I:
• Establishment of a TIF District for Phase I consistent with the development proposal
approved by the City Council on June 15, 2026.
• TIF assistance equal to three (3) times the annual property taxes generated by the Phase
I development, plus any remaining excess tax increment generated within the TIF
District. Chaska would retain up to twenty percent (20%) of the tax increment for
statutory pooling and administrative costs (this percentage is still under negotiation),
and fiscal disparities will not be deducted from the total benefit. The final amount of TIF
assistance is still being negotiated and will be subject to final project costs, valuation,
tax capacity, financial analysis and City approval.
• Assistance to be structured as a Pay-As-You-Go Tax Increment Financing Note.
• Retained pooling may be adjusted to accommodate needs of eligible project costs
outside of the immediate area of Phase I.
• Assistance will include certification of final costs following the completion of Phase 1,
and a one-time Lookback review approximately one year following stabilization of the
Page 10 of 13
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
Phone: 952-448-9200 Fax: 952-448-9300 www.chaskamn.gov
Phase I Development and completion of related infrastructure improvements to
evaluate whether the completed project is substantially consistent with the
development and financial assumptions made in evaluating the TIF request. The results
of such review may be considered by Chaska in determining the final amount and terms
of the TIF assistance, as set forth in the TIF Agreement.
• TIF proceeds to be used solely for reimbursement of eligible public infrastructure costs
related to the entire north industrial park, including construction of Public Road A, utility
extensions, grading, and related public improvements constructed by the developer and
dedicated or benefiting the public development area.
• The developer agrees to participate in the City's due diligence process, including an
independent review of project financials to determine the need for, and appropriate
amount of, TIF assistance.
• Developer agrees to build the Phase I Development according to the approved building
plans and successfully obtain a certificate of occupancy
• Negotiate a business subsidy agreement, if required.
• Pay the required $10,000 administrative fee for City economic development assistance.
## Future Development Phases
Recognizing that the infrastructure improvements constructed as part of the Phase I
Development will provide substantial benefit to future development parcels within Big Woods
Business Park North, Chaska intends to work collaboratively with the developer to evaluate TIF
assistance for future phases as development occurs.
Chaska's current intent is to establish separate TIF Districts for future development phases or
parcels within Big Woods Business Park North as individual development projects are proposed.
For future TIF requests, Chaska anticipates the following framework:
• The proportionate share of excess TIF assistance provided through Phase I will be
deducted from any future TIF assistance being considered for subsequent development
phases.
• The excess TIF assistance provided in the Phase I Development will be allocated among
future development parcels on a proportional square footage basis. As future parcels
develop, their allocated share of the Phase I Development excess assistance will be
repaid through a corresponding reduction in future TIF assistance.
• Eligible costs for future TIF districts may include land acquisition and related
development costs. In particular, future TIF assistance may be used to offset increased
land costs attributable to the public road, utility, grading, and infrastructure
improvements constructed as part of Phase I.
Page 11 of 13
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
Phone: 952-448-9200 Fax: 952-448-9300 www.chaskamn.gov
• Chaska's objective is to apply its TIF policy consistently across the overall Big Woods
Business Park North development area, with assistance levels evaluated on a cumulative
basis.
• Each future phase will be independently evaluated to determine whether additional TIF
assistance is warranted based upon the specific development proposal, project
economics, financing gap, and public benefits being provided. CHASKA DOES NOT
## GUARANTY THE APPROVAL OR AVAILABILITY OF FUTURE TIF ASSISTANCE.
Chaska appreciates the opportunity to partner with you on this significant economic
development project and recognizes the substantial benefits it is expected to provide the
community. The proposed investment will support the continued growth in Chaska’s industrial
and employment base, create quality jobs, expand the city’s commercial tax base, and expand
critical infrastructure that will facilitate future development opportunities within SW Chaska.
We look forward to working collaboratively with you as the project progresses and to establishing a
successful partnership that supports both the Phase I development and growth within the business
park.
Any assistance remains subject to completion of financial underwriting, negotiation and
execution of definitive TIF and development agreements, preparation of required TIF
documentation, public hearings, and approval by the City Council and Board of the EDA as well
as the remaining land use entitlements.
If you have any questions, please do not hesitate to contact me at 952-227-7529.
## Sincerely,
## Matt Podhradsky
## City Administrator
By signing this letter, I am in agreement with the above stated conditions being utilized to draft a TIF
Agreement for this project. I understand that signing this letter does not guaranty the approval or
availability of any TIF Assistance by Chaska.
Page 12 of 13
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
Phone: 952-448-9200 Fax: 952-448-9300 www.chaskamn.gov
__________________
## Jake Kurth
## Scannell Properties
Date: _____________
Page 13 of 13