Agenda · Meeting Calendar
Meeting CalendarAgendaMonday, May 4, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## Agenda Page 1
## AGENDA
## CHASKA CITY COUNCIL
## CHASKA CITY HALL - COUNCIL CHAMBERS & ZOOM
Monday, May 4, 2026
## 7:00 PM
1. Call to Order
2. Pledge of Allegiance
## 3. Roll Call
## 4. Adopt Agenda
## 5. Visitor Presentation
## 6. Approve Previous Meeting Minutes
6.A. Meeting Minutes 4-20-2026
## 7. Consent Items
## 7.A. Approve Temporary Cannabis Event Permit - Higher Place LLC
## 7.B. Approve Low-Potency Hemp Retail Registration
7.C. Adopt Resolution 2026-33 Awarding bid for 2026 314 Walnut St N. Roof
## Replacement
## 7.D. Adopt Resolution 2026-34 Scheduling Improvement Hearing for 2026
## Street & Utility Reconstruction Project
7.E. Adopt Resolutions 2026-35 and 2026-36 Authorizing Issuance and Sale of
Bonds for Series 2026A and Series 2026B
7.E.i. Resolution 2026-35 for Series 2026A
7.E.ii. Resolution 2026-36 for Series 2026B
7.F. Notice of Default on Memorandum of Understanding with Cain
## Development Group and RCS-RCA Oak Ridge, LLC for Temporary
Certificate of Occupancy at 1 Oak Ridge Dr.
## 7.G. Accept Public Improvements - Pioneer Vista
## 8. Action Items
8.A. Items Related to the Design for the Chaska Library
## 8.B. Initiate Downtown Master Plan Update Process
Page 1 of 185
## Agenda Page 2
9. Bills
## 9.A. Accounts Payable Claims Roster 05-04-2026
## 10. Other Business
## 10.A. City Administrator's Report
10.A.i. Biweekly 5/4/2026
11. Adjourn
## Chaska Economic Development Authority Meeting
## Immediately following City Council
Page 2 of 185
## - MINUTES -
## CHASKA CITY COUNCIL
## APRIL 20, 2026
1. Call to Order
The meeting was called to order by Mayor Hubbard at 7:00 p.m.
2. Pledge of Allegiance
## 3. Roll Call
Roll call was taken. Present: Mayor Hubbard and Councilmembers Sheveland, Grau, Benesh,
and Hatfield.
Also Present: Matt Podhradsky, City Administrator; Elise Durbin, Assistant City Administrator;
Krista Mark, Communications Coordinator; and Christophe Morschen, City Attorney.
4. Adopt the Agenda
Motion by Councilmember Hatfield, second by Councilmember Benesh to adopt the agenda as
presented. Motion carried.
## 5. Visitor Presentation
5.A. Recognition – Chaska High School Hawks Basketball Team – State Champions
Mayor Hubbard welcomed the Chaska High School basketball team to the meeting.
Coach Nick Hayes thanked the Council for inviting the team. He introduced the eight players
that were able to make it to the meeting as well as Assistant Coach Peyton Sanders and JV
Coach Nick Sabin. Coach Hayes noted the team had a record of 28-4, winning the last 25 games
in a row and ultimately winning the state championship. The team had an undefeated record
in conference, with several players getting honorable mentions in the conference.
Mayor Hubbard added that it was exciting to watch the team play throughout the season and
complimented the players on their mentorship of younger players.
Councilmember Hatfield congratulated the players and followed their journey to the state
championship on social media. She added that winning a state championship brings the
community together.
Councilmember Benesh congratulated the players and told them to continue being strong role
models for everyone in the community.
Councilmember Hatfield thanked the team for creating a legacy with this win and for working
with kids in the community.
Councilmember Grau added that he has two kids in the basketball program, has coached travel
basketball, and has gotten to know Coach Hayes through summer basketball camps. He
congratulated the team on their win and thanked the team for supporting younger kids in the
## DRAFT
Page 3 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 2
## DRAFT
program, building community, and being strong role models. The impact and influence of not
only the win, but their attitudes go way beyond performance and matter more in the long run.
He thanked the seniors on the team for the legacy they built.
City Administrator Podhradsky added that the team should not underestimate how many people
are going to remember the players and the impact this win has had on the community.
Mayor Hubbard wished the two seniors on the team luck in their future endeavors and expressed
excitement over watching the rest of the team continue to move forward.
5.B. Annual State of the Library Report – Jodi Edstrom and Kevin Spencer
Jodi Edstrom, Carver County Library Director, and Kevin Spencer, Chaska Library Branch
Manager, introduced themselves to the Council.
Ms. Edstrom noted that the library system aims to be more than just books, focusing on
community support, programs, and services. The library introduced extended access, allowing
adults to use libraries in the early mornings, evenings, and weekends with card access. Library
usage is strong and growing again, with over 1.5 million checkouts, and high community value
with partnerships, outreach, and volunteers having an important impact on the library for the
community. She added that she is looking forward to the planned expansion with extended
access at more branches, and a new library building in Chaska.
Mr. Spencer stated that the current Library space in Chaska is significantly smaller compared to
nearby Chanhassen, despite serving a larger population of over 40,000 people. This creates a
high demand for limited resources, with staffing levels also relatively low. Despite these
constraints, the library is performing exceptionally well and has checked out over 192,000 items,
with about 67% being children's materials, and continues to expand its collection. Library visits
have increased by 13% from the previous year, rebounding strongly after a pandemic-related
dip in 2021. He added that libraries now serve as community hubs and are not just places for
books, and the staff, though small, are highly engaged, increasing community connections by
nearly 15% through outreach and events. Some of these events include story time, whose
attendance has grown by nearly 64%, often exceeding space capacity in the library. Overall
program attendance has increased by 106%, and events are creatively managed despite the
lack of a dedicated meeting room. New initiatives such as a jigsaw puzzle competition and an
entrepreneurship class for Spanish-speaking residents show the library's adaptability and
commitment to serving community needs.
Mr. Spencer continued that he recently attended the Public Library Association conference in
Minneapolis, which is a national event with global participation, and gained inspiration and
practical ideas from innovative libraries across the country. He noted he went to a session during
the conference about the Missoula, Montana, library, which won the 2022 world's best library
award, and was inspired by how that library had a strong emphasis on community engagement
in its library design. The Missoula library incorporated a small science museum that is run in
collaboration with the local university, allowing them to share programming and resources in a
way that deeply enriches the community.
Page 4 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 3
## DRAFT
Mr. Spencer continued that he would love to have a maker’s space, teaching kitchen, and library
of things at the new Chaska library, and hoped all of those would come to fruition. He thanked
the Council for their support and the planning involved.
Mr. Spencer stated there is a large support crew, the Friends of the Library in Chaska, that sells
books, and the proceeds help with events and programs, such as teens making charcuterie
boards.
Mr. Spencer introduced Mary Kvitek, President of the Chaska Friends of the Library, to give some
insight into what they do. Ms. Kvitek stated that Friends of the Library is a 501 (c) nonprofit
organization with about 50 members, including Mayor Hubbard. The mission is people serving
people by expanding and strengthening the services of the Chaska library, which is done
primarily through book sales.
Mayor Hubbard added that there is an elevator in the library, but it does not go down to the
basement, so books have to be hauled up from the basement for book sales.
Mr. Spencer stated he is always happy to talk to the Council about any and all library dreams,
hopes, and wishes, and to reach out to him or Ms. Edstrom.
Councilmember Hatfield thanked Ms. Edstrom and Mr. Spencer for the presentation, thanked
the Friends of the Library, and noted she is very excited about the plans for the new Chaska
library.
Councilmember Hatfield noted her kids frequent the library and would love to schedule some
time to hear thoughts on Ms. Edstrom and Mr. Spencer’s ideas on the new library.
Mayor Hubbard stated the library is the lifeblood of the community and is much more than just
books. She added that she is excited for what the future holds with building a new library.
Councilmember Grau added that the library is a gathering space, and he is excited about helping
and seeing the plans for the library. He noted that maker space and a 3D printer are two things
he is excited to see, and now understands the importance of the library.
Mr. Spencer noted that librarians are evolvers and are constantly looking at what they can do
to help the public, and educators at heart.
Mayor Hubbard added that one of the librarians goes up to the Lodge and helps with technology,
which is an amazing resource for them.
City Administrator Podhradsky noted that tomorrow, the County Board is taking action to appoint
a representative to the design task force to kick off the process of getting an architect on board
for the new library.
Mayor Hubbard thanked Ms. Edstrom and Mr. Spencer for the presentation.
Page 5 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 4
## DRAFT
## 6. Approve Previous Meeting Minutes
## 6.A. Approve the March 30, 2026, City Council Meeting Minutes
Motion by Councilmember Hatfield, second by Councilmember Sheveland to approve the
minutes of the March 30, 2026, City Council meeting.
Motion carried.
## 7. CLOSED SESSION
7.A. Discussion of Initiation of Arbitration with Mueller Systems, LLC.
This portion of the meeting will be closed pursuant to Minnesota Statute 13D.05 subdivision
3(b).
Motion by Councilmember Grau, second by Councilmember Benesh, to recess the City Council
meeting at 7:44 p.m. to a Closed Session of the City Council to receive legal advice regarding
arbitration with Mueller Systems, LLC regarding the AMI contract.
Motion carried.
Motion by Councilmember Grau, second by Councilmember Hatfied to return to open session of
the City Council at 8:20 p.m.
Motion carried.
## 8. OPEN SESSION
## 9. Consent Agenda
Motion by Councilmember Hatfield, second by Councilmember Sheveland to approve the
## Consent Agenda Items A through M:
A. Resolution No. 2026-18 Adopting the 2025 Carver County Hazard Mitigation Plan
Motion to adopt Resolution No. 2026-18 adopting the 2025 Carver County Hazard Mitigation
Plan.
## B. Approve Low-Potency Hemp Retail Registrations
Motion to approve low-potency hemp edible retail registrations for Nothing But Hemp,
Schindler's Beverage Center DBA Chaser's, and Kwik Trip Inc., allowing them to sell low-potency
hemp edible-related products.
## C. Approve Transient Accommodations License – Hazeltine National Golf Club
Motion to approve the 2026-2027 transient accommodation license at a Level I effective May 1,
2026, through April 30, 2027, for Hazeltine National Golf Club.
## D. Approve Transient Accommodations License – Super 8
Motion to approve the 2026-2027 transient accommodation license at a Level II effective May
1, 2026, through April 30, 2027, for Prime Hotels Inc. DBA Super 8.
## E. Approve Transient Accommodations License – Townsquare Place
Motion to approve the 2026-2027 transient accommodation license at a Level I for TownSquare
Place, effective May 1, 2026, through April 30, 2027, for Chaska Lodging Management LLC DBA
TownSquare Place.
## F. Approve Temporary Liquor License – Chaska Lions Club
Motion to approve Temporary On-Sale Intoxicating License TW 26.03 for the Chaska Lions Club,
that allows them to serve intoxicating beverages at Chaska City River Days, on July 24th – 26th,
2026.
Page 6 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 5
## DRAFT
G. Approve Tobacco License – Excelsior Vintage DBA River Bend Cellars & Spirits
Motion to approve license to sell tobacco-related products for River Bend Cellars & Spirits,
located at 3115 Chaska Blvd., Chaska.
H. Approve On-Sale Liquor at a Community Event – Schram Haus Brewery
Motion to approve On-Sale Intoxicating License at a Community Event, Lic# OSCF26.01, for
Schram Haus Brewery, 8785 Airport Road, Waconia, MN, for Chaska Fire and Ice and Bonspiel
Festival, effective July 10
th
& July 11
th
, 2026.
I. Adopt Resolution No. 2026-28 approving the Annexation into Chaska of a portion of the
Raser property currently in Dahlgren Township
Motion to adopt Resolution No. 2026-28, approving the annexation of the Raser property into
Chaska from Dahlgren Township.
J. Adopt Resolution No. 2026-29 Approving the Final AUAR for Big Woods Business Park
Motion to adopt Resolution 2026-29, approving the final Alternative Urban Areawide
Review (AUAR) for Big Woods Business Park (PC #2025-20).
K. Adopt Resolution No. 2026-31 Authorize Initiation of Arbitration with Mueller Systems,
## LLC
Motion to adopt Resolution No. 2026-31 to authorize city staff and the City Attorney to initiate
a demand for arbitration with Mueller Systems, LLC regarding Mueller’s breaches of contract.
L. Adopt Resolution No. 2026-32 Authorizing use of Eminent Domain for Easements for
CSAH 61 Trunk Sewer Extensions for serving Highpoint Vistas and Fultonwood
## Development Utilities
Motion to adopt Resolution No. 2026-32 to authorize city staff to initiate eminent domain
proceedings for the affected properties for the CSAH 61 sanitary sewer utility project.
M. Addendum Chaska Community Center Meeting & Event Room Rental Agreement
## University of MN
Recommendation for City Council Approval of the University of Minnesota’s request for
rental space at the Community Center.
Councilmember Hatfield asked about the transient license for TownSquare, and if there was any
concern about going from a level three to a level one, and if things would spin back up again
and be back where they started. City Administrator Podhradsky noted that the answer is yes,
and there would be that concern with any of the City's facilities. The challenge is that it is the
City's Ordinance, and there has to be an opportunity for people to correct things, but Staff will
continually monitor things.
Mayor Hubbard asked City Administrator Podhradsky to explain what level one gets, versus level
two and three, and the parameters that have to be in place.
City Administrator Podhradsky explained that level three is the top level as far as enough calls
for service to that location to qualify. These calls for service are not related to medical issues,
but for other reasons. The level three requires that the location is responsible for having security
on duty, and staff available 24 hours a day.
Councilmember Sheveland noted that level two parameters include 10 to 19 calls for service
and one felony. City Administrator Podhradsky stated that it is due to not having security and
Page 7 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 6
## DRAFT
staff presence during all hours of operation. He added that level one means the location is not
of concern and can continue operating as is.
Councilmember Hatfield noted that the Council needs to keep a close eye on that and act quickly
if needed.
Mayor Hubbard shared that one of the transient accommodations is missing, and asked City
Administrator Podhradsky to talk about Oak Ridge. City Administrator Podhradsky noted that
Oak Ridge had a temporary occupancy permit and hotel license, and had specific milestones
that the owner had to meet in the process, but no action has been taken to do so, and
communication with the City has fallen off. He added that at the next meeting, he will be
recommending that the Council pull Oak Ridge’s temporary permit and its hotel license until the
owner can demonstrate that they can meet the City’s criteria.
Mayor Hubbard added that it is good to get this information to ensure that the Council is in the
know and on the same page.
Councilmember Grau asked what the repercussions are for not securing the Oak Ridge facility
because it is a nuisance to the police force and fire crews. City Administrator Podhradsky noted
this has become a real issue, and he will be looking at the ability to charge the owner for the
amount of calls for service and presence that is needed at that facility on a regular basis. He
added that this is a difficult situation because if the building were dilapidated, it would be
condemned, but that is not the case with Oak Ridge.
Councilmember Grau noted that there is still a safety risk in that building as well as the
environmental risk, and Oak Ridge is in a nice area, which causes concern for the residents who
live nearby. He added that he is frustrated because individuals came to the Council a while ago
and presented their plans, and stated that they were aware of the problems at the property.
When questioned by the Council, the individuals said they were ensuring the building was
properly secured, but that is clearly not true.
Mayor Hubbard added that those individuals blatantly disregarded what was discussed at that
meeting.
Councilmember Sheveland added that she also questioned those individuals about the parking
issues at their location, which were never resolved. Councilmember Grau stated that the
presentation given to the Council was all for show.
City Administrator Podhradsky stated that City Staff were told many things that have not come
to fruition at the property, but the City does have leverage if it can start charging back some of
the City’s services to the owner.
City Attorney Christophe Morschen agreed that it is something that cities do explore when there
are excessive calls for service for fire and police. Ultimately, if the problem becomes too great
a threat to the safety of citizens, hazardous building actions could be taken. If it is open to
trespass, statutes would be utilized to secure the building at the owner’s cost, and collection
Page 8 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 7
## DRAFT
mechanisms for that would be assessed against the building because collecting those costs from
the owner would likely be challenging.
City Administrator Podhradsky added that cancelling the temporary occupancy permit will send
a message.
Mayor Hubbard asked if the people who gave a presentation to the Council on the Oak Ridge
concept plans are not the building owners. City Administrator Podhradsky confirmed that it is
correct.
Mayor Hubbard asked if a meeting with the building owner could be scheduled. City
Administrator Podhradsky confirmed that he can get a meeting set up with the building owner.
Mayor Hubbard stated that her concern is that even after the Council revokes the licenses, the
message will not be heard by all parties involved. The message from the Council needs to be
clear that they care about safety around that building and the condition that it is currently in.
City Administrator Podhradsky reiterated that he would arrange a meeting with the building
owner.
## 10. Action Items
10.A. Awarding of Contracts for Outlot C of the Chaska Municipal Services Building
City Administrator Podhradsky introduced Assistant City Administrator Elise Durbin to present
this item. Ms. Durbin presented the item to the Council.
Motion by Councilmember Benesh, second by Councilmember Hatfield to approve the awarding
of the contracts for Outlot C of the Chaska Municipal Services Building, and authorize the Mayor
and City Administrator to execute the contracts.
Motion carried.
11. Bills
## 11.A. Accounts Payable Claims Roster 04-20-2026
Motion by Councilmember Grau, second by Councilmember Sheveland to approve the bills as
presented. Roll call was taken. Voting aye: Councilmembers Hatfield, Benesh, Sheveland, Grau,
## and Mayor Hubbard. Voting nay: None
Motion carried.
## 12. Other Business
## Councilmember Grau:
• Shared that he learns something new every year at the Strategic Planning meeting and
makes connections with City Staff. He noted it is important that residents understand
that Council does not just wing it and has to work through a process and make strategic
plans.
• Shared that Christmas in May is scheduled for May 2. He encouraged residents to come
out for that event.
• Encouraged residents to be careful while driving, as the weather gets nicer, there are
more pedestrians on the roadways.
Page 9 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 8
## DRAFT
## City Administrator Podhradsky:
• Shared that there are four single-family homes and one mobile home that will participate
in Christmas in May on May 2, with painting and landscaping being done. City Staff will
take on additional small projects for two other property owners.
## Councilmember Sheveland:
• Shared that she enjoyed the Strategic Planning meeting.
## Councilmember Benesh:
• Shared that six years ago, his paramedic partner was a victim of suicide. May is Mental
Health Awareness month, and he encouraged everybody to remember to check in on
people, especially those who are not vocal enough.
## Councilmember Hatfield:
• Shared that the Senior Expo (April 21) is at the Community Center at 9:00 a.m.
• Shared that the City Council Retreat was incredible and showed how much has been
achieved.
• Shared that seeing the Police Department and Fire Department move into their new
building was incredible to see, since it has been a long time coming.
• Shared that the Fire Department is looking for more firefighters, and applications are
available online.
## Sergeant Pesheck:
• Shared that neighborhood speed trailer season is near, and residents can reach out to
the Police Department to sign up for it and borrow it for their neighborhood.
• Shared that the new Public Safety building is incredible and has spent 19 years in the
same building, so moving out was emotional. He thanked the Council and noted the
new Public Safety building shows how much the City and the Council care about public
safety employees.
## Mayor Hubbard:
• Thanked Sergeant Pesheck for being there and for his community input. She noted how
important it is to get feedback and be valued by the Council.
• Shared that the City Council Retreat was great.
• Shared that seeing both the Fire Department and the Police Department move into their
new facility and expand their operations has been amazing, especially as calls for service
have almost doubled.
• Shared that there are job postings up for Mental Health Specialists for the Police
Department, which is a dream realized after conversations about the need for more
enhanced services to be available to better help the community.
• Shared that Christmas in May is on May 2 and kicks off at St. John's at 7:30 a.m. with
breakfast offered.
• Shared that there is a tree planting at McKnight Park at 8:00 a.m. this weekend with the
Rotary and the Lions Club.
Page 10 of 185
## MINUTES-CHASKA CITY COUNCIL
April 20, 2026 PAGE 9
## DRAFT
• Noted that there are no giant road construction projects inside Chaska, but will be
impacted by the surrounding communities' construction right outside Chaska, with lane
closures on Highway 5 and Highway 41.
• Noted that there are significant upcoming dates: International Firefighters Day (May 4),
National Police Week (May 10 through May 16), Peace Officers Memorial Day (May 15),
Municipal Clerks Week (May 3 through May 9), Armed Forces Day (May 16), and National
Military Appreciation Month through the whole month of May, and Memorial Day at the
end of May.
• Shared that the next Council meeting is on May 4.
## 12.A. City Administrator's Report
12.A.i. Bi-Weekly Report 04-20-2026
13. Adjourn
Motion by Councilmember Sheveland, second by Councilmember Benesh to adjourn the meeting
at 8:54 p.m.
Motion carried.
Page 11 of 185
## Subject: Temporary Cannabis Permit – Higher Place LLC
## Prepared By: Denise Beebe, Senior Clerk
## Background:
Boone Kneib, owner of Higher Place LLC, has applied for a Temporary Cannabis Event Permit
for their event “The Weather is Here” to be held at 103 W 2
nd
## St. Chaska on June 13
th
and 14
th
.
The event will take place on privately owned property under the control of the applicant.
Per City Ordinance, a Temporary Cannabis Event Permit is required prior to holding any such
event within city limits.
## Review:
Staff has reviewed the submitted application materials and determined that the application is
complete. The following items have been provided in accordance with City Code:
## • Completed Special Event Permit Application
• Required application fee
• Copy of the Office of Cannabis Management (OCM) event license application
• Applicant and property owner information
## Ordinance Compliance:
The proposed event must comply with all applicable provisions of the City Code, including but
not limited to:
• Event hours limited to 10:00 a.m. – 9:00 p.m.
• Event must not take place in a public place or place of public accommodation unless
properly licensed for on-site consumption
• Prohibition on cannabis use that violates local clean indoor air regulations (including
smoking, vaping, or aerosol use in restricted areas)
The event is proposed to be held on private property, which meets location requirements
outlined in the ordinance.
## CITY COUNCIL ACTION REQUESTED
Motion to approve Temporary Cannabis Event Permit TCEP 26.01 for Higher Place LLC, that allows
them to have their event at 103 W 2
nd
St, on June 13
th
& 14
th
, 2026.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 12 of 185
## Porta-PoƩy
## HPC
(No Sales)
10’ x 10 canopy
## EaƟng Area
2 x 5’ Tables
## Live Music
10’x10’ canopy
## Covered Listening Area
10’ x 10’ canopy + 2
sidewalls
## Entrance
## Food Vendor
Page 13 of 185
Page 1
## Subject: Approve Low-Potency Hemp Retail Registration
## Prepared By: Denise Beebe, Senior Clerk
## BACKGROUND
State law requires retailers selling low-potency hemp edible products to obtain a state-
issued Low-Potency Hemp Retail License. In addition to the state license, they are
required to register with the city and receive a local registration permit.
## SUMMARY
The below-listed business has obtained a state-issued low-potency hemp retail license
and has completed all local registration requirements. City Council approval is required
to finalize registration and authorize operation within the City.
• Target – 111 Pioneer Trail
## CITY COUNCIL ACTION REQUESTED
Motion to approve low-potency hemp edible retail registration for Target allowing
them to sell low-potency hemp edible related products.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 14 of 185
## Subject: 2026 314 Walnut St N Roof Replacement
## Prepared By: Brian Jung, Public Works Director
Specifications were prepared for 2026 314 Walnut St N Roof Replacement
Bids were opened on April 23
rd
1:00PM. The results were as follows:
• Hoffman Weber Construction $251,942.00
The low bid is below the budget amount. Hoffman Weber Construction is a reputable
local firm that has done work for the City of Chaska in the past.
Staff recommend awarding the bid for 2026 314 Walnut St N Roof Replacement to
Hoffman Weber Construction.
## CITY COUNCIL ACTION REQUESTED
Motion to approve Resolution 2026-33 awarding the bid for the 2026 314 Walnut St N
Roof Replacement to Hoffman Weber Construction in the low bid amount of
$251,942.00.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 15 of 185
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE: ___ 5/4/2026 RESOLUTION NO. ____2026-33___
_
## MOTION BY COUNCILMEMBER SECOND BY COUNCILMEMBER
A Resolution Awarding the 2026 Bid for the 2026 314 Walnut St N Roof
Replacement to Hoffman Weber Construction in the Low Bid Amount of $251,942.00
WHEREAS, on April 23rd, 2026 @ 1:00pm, bids were opened and tabulated for the 2026 314
## Walnut St N Roof Replacement according to State Statute: and
• Hoffman Weber Construction $251,942.00
NOW, THEREFORE, BE RESOLVED, that the City Council of the City of Chaska, Minnesota,
does hereby award the bid for the 2026 314 Walnut St N Roof Replacement to the low responsible
bidder, Hoffman Weber Construction, in the amount of $251,942.00.
Passed and adopted by the City Council of the City of Chaska, Minnesota, this 4th day of May,
2026.
_________________________________________
## Taylor Hubbard, Mayor
## Attest
## Deputy City Clerk
Page 16 of 185
## City of Chaska
## Municipal Services
## 660 Victoria Drive
## Chaska, MN 55318
Phone # 952-448-4335 Fax # 952-448-7356
## Proposal Contractor: Total Proposal:
Email.
Address: Telephone No.
City, State, Zip: Fax No.
## CITY OF CHASKA
## 2026 314 Walnut Street North - Roof Replacement
## PROPOSAL FORM
Project 26-
April 2nd, 2026
All proposals shall be securely sealed and shall be endorsed on the envelope with the statement “PROPOSAL
FOR 2026 314 Walnut St North - Roof Replacement” will be received by the City of Chaska on or before
1:00 o’clock p.m., local time, April 23rd.
Proposal shall be addressed to:
## City of Chaska
## c/o Nick Hartwig
## 660 Victoria Drive
## Chaska, MN 55318-1962
The undersigned, being familiar with the specifications for the work listed, and being familiar with all
factors, and other conditions affecting the work and cost thereof, hereby proposes to furnish all labor,
tools, skills, equipment, and all else necessary to completely construct the Project in accordance with
the Specifications, as follows:
## PART 1 GENERAL
## 1.01 SUMMARY
A. The intent of this specification is to provide for the removal down to the deck for the entire
roof, soffit, facia, and inlay gutter repair located at 314 Walnut St North, Chaska, MN 55318
B. Timing: No work to begin prior to July 1
st
, 2026
C. Work hours: Monday through Friday 7:00AM to 7:00PM
Saturday 9:00AM to 5:00PM
No work on Sundays or Holidays
D. Substantial completion on or before December 31
st
, 2026
Page 17 of 185
## 1.02 SCOPE OF WORK
A. Remove existing clay tiles.
B. Remove existing underlayment.
C. Remove all vents and pipe boot penetrations from current roof.
D. Remove and replace damaged plywood.
E. All garbage material will be lowered using lift and disposed of by contractor
F. Install new Ludowici clay tile (color determined by owner)
G. Install all accessories specific to Ludowici clay tile roof (206 ridge, French end band, 102 hip
roll, 152 hip starter, 405 terminal high bump)
H. Install new Grace Select underlayment.
I. Install Grace Ultra over EPDM that is wrapped up the roof line from the inlayed gutter
J. Install new pipe boots and vents.
K. Install Ludowici #8 2” and 2 ½ inch #305SS Bugle #2
L. Install new ridge venting, valley steel 24”, and all pipe jacks and vents
M. Remove and replace loose or rotten soffit
N. Remove and replace rotten purlins
O. Remove and replace rotten framing in areas open to plain view
P. Spot repairs of remaining soffit and facia to be done as needed
Q. Match and replace soffit moldings and details as needed during repairs (City approval needed
prior to installation)
R. Prime all new materials
S. Remove existing EPDM membrane in the inlaid gutter
T. Install new substrate where needed after removal of EPDM
U. Install new fully adhered 60mil EPDM in existing gutter framing
V. Install new drip edge flashing on gutter exterior (color determined by City)
## PART 2 PRODUCTS
## 2.01 PRODUCTS
A. Ludowici clay tile and accessories
B. All necessary flashings
## C. All fasteners
D. Grace Select underlayment.
E. 60mil EPDM roof membrane
F. All wood products required for soffit, facia, gutter repair
## G. New Pipe Boots and Vents
## H. Plywood
## PART 3 EXECUTION
## 3.01 PREPARATION
A. Pre job meeting to determine time frame, staging, installation, clean up and restoration.
B. Contractor to provide 40-yard dumpster.
C. Contractor to provide lift.
D. Contractor to get permit.
## 3.02 INSTALLATION
A. Remove existing clay tiles down to plywood roof sheeting.
Page 18 of 185
B. Remove existing underlayment.
C. Remove all vents and pipe boot penetrations from current roof.
D. Remove and replace damaged plywood.
E. Lift will be used for loading the roof with materials and tools.
F. All garbage material will be lowered using lift.
G. Install Grace Select underlayment.
H. Install new Ludowici clay tiles
I. Install new pipe boots and vents.
J. Perform soffit, facia, and gutter repair as described
K. All products are to be installed to manufacturers specifications.
L. Any unforeseen work that needs to completed will be addressed and approved by the city prior
to work being done with time and material basis of $75.00 per man per hour plus materials.
M. Parking spaces will need to be cleared during the entire project.
N. Completed time is expected 7 to 10 days from start to finish.
## PART 4 TERMS OF PAYMENT
## 4.01 PAYMENT
A. Payment of one hundred percent (100%) of the contract price, including all change orders,
will be made by the city within 35 days after receipt of payment request, provided that such
payment will not be deemed approval of the workmanship or materials. However, no payment
shall be due while Seller is in default in respect of any of the provisions of this proposal. The
City of Chaska MN is exempt from sales taxes.
B. If Proposal is over $175,000, the City may have to cover payment of materials.
PART 5 Contract Documents to be included in proposal.
## A. Proposal Form
## B. Contractor’s Performance Bond
## C. Certificate of Insurance
## D. State of Minnesota Responsible Contractor Certificate
## E. Affidavit of Ad
## Insurance
The Contractor shall not commence work under this contract until all insurance required under the
Contract Documents has been obtained and until copies of certificates thereof are submitted to the City;
the Contractor shall not allow any subcontractor to commence work until the insurance required of each
subcontractor has been obtained and copies of policies and certificates submitted to the City.
During the term of this contract, the Contractor shall maintain such insurance as will protect the firm from
claims as set forth below which may arise out of or from the Contractor's operations under the contract,
whether such operations be by himself or by a subcontractor or sub-subcontractor or anyone directly or
indirectly employed by any of them, or by anyone for whose acts any of them may be held liable.
Page 19 of 185
(a) For claims arising under any Workmen's Compensation, Employer's Liability or any similar
employee benefit.
(b) For claims because of bodily injury, sickness, disease, or death of any person or persons other
than his employees, and for claims because of damage to or destruction of property of others
resulting there from, including loss of use thereof.
Such insurance shall be written for amounts not less than the following as respects subparagraph (a)
above:
## Workmen's Compensation ...................................................Statutory
Employer's Liability ..................................$100,000 each occurrence
and as respects subparagraph (b):
## Bodily Injury and Property
## Damage with a Combined Single
## Limit of Liability of $1,000,000 Each Occurrence
of
## Bodily Injury
General & Automobile ....................................$500,000 each person
General & Automobile ...........................$1,000,000 each occurrence
## Property Damage
General & Automobile ..............................$500,000 each occurrence
General ..............................................................$500,000 aggregate
The insurance referred to in subparagraph (b) above shall be written under the Comprehensive General
and Comprehensive Automobile Liability policy forms, including coverage of all owned, hired, and non-
owned automobiles. The Contractor may at his option, provide the limits of liability as set out above by a
combination of the above-described policy forms and an Umbrella Excess Liability policy. All
responsibility for payment of any sums resulting from any deductible provision, corridors, or self-insured
retention conditions or the policy or policies shall remain with the Contractor.
It is a condition of the contract that the policy or policies waive any and all governmental immunity as a
defense in any action brought against the insured or any other party to the contract.
Approval of the insurance by the owner shall not in any way relieve or decrease the liability of the
Contractor hereunder, and it is expressly understood that the owner/engineer do not in any way represent
that the above specified insurance or limits of liability are sufficient or adequate to protect the Contractor's
interests or liabilities.
Evidence of the above required insurance shall be furnished on a Certificate of Insurance form satisfactory
to the owner.
Copies of all certificates evidencing such insurance shall be filed with the owner. The certificates shall
be executed by the insurer and shall expressly stipulate that the policies are non-cancelable prior to
Page 20 of 185
expiration of the contract period, unless ten (10) days’ notice in writing to the owner shall be filed with the
owner. Certificates for liability policies must show that the City and Engineer are the parties insured by
the respective policies.
Certificates of Insurance, including a separate Worker's Compensation and Employer's Liability form
certifying that the above insurance is in force with companies acceptable to the City, along with a
performance bond, shall be required as a part of the Contract Documents.
## Permits and Responsibility
The Contractor shall, without additional expense to the City, obtain all licenses and permits required for
the prosecution of work and shall be responsible for all damages to persons or property occurring as a
result of his fault or negligence in connection with the prosecution of the work. The Contractor shall also
be responsible for all materials delivered and work performed until completion and final acceptance except
for any completed unit that previously may have been finally accepted.
## Indemnification
The Contractor shall indemnify and hold harmless the City and Engineer and their agents and employees
from and against all claims, damages, losses and expenses including attorney's fees arising out of or
resulting from the performance of work, provided that any such claim, damage, loss of expense (a) is
attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property
(other than the work itself) including the loss resulting therefrom and (b) is caused in whole or in part by
any negligent act or omission of the Contractor, a subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable to the fullest extent permitted by law.
In any and all claims against the City or the Engineer or any of their agents or employees by any
employees of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or
anyone for whose acts any of them may be liable, the indemnification obligation under this Article shall
not be limited in any way by any limitation on the amount or type of damages, compensation or benefits
payable by or for the Contractor and subcontractor under Workmen's Compensation acts, disability
benefit acts or other employee benefit acts.
The obligations of the Contractor under this Article shall not extend to the liability of the Engineer, his
agents or employees arising out of (a) the preparation or approval of maps, drawings, opinions, reports,
surveys, change orders, designs or specifications, or (b) the giving of or the failure to give directions or
instructions by the Engineer, his agents or employees provided such giving or failure to give is the primary
cause of injury or damage.
## Warranty Bond
Prior to final payment and acceptance of work, the Contractor shall provide the City a warranty bond
agreeing to maintain the stability of all work and materials done, furnished and installed under this contract
for a period of one year after final acceptance.
Page 21 of 185
## PART 5 REQUIREMENTS
5.01
In submitting this Proposal, it is understood that the Owner retains the right to reject any and all
Proposals and to waive irregularities and informalities therein and to award the Project to the best
interest of the Owner.
Prior to a contract being awarded a separate performance and payment bond in the full
construction value of the submitted Proposal is to be required.
A one-year warranty will be included for all associated project work.
## State of Minnesota Responsible Contractor Certificate
In submitting this Proposal, it is understood that payment will be by cash or check.
The city will not make final payment to the contractor until IC134 form for sub-
contractor(s) is submitted.
Respectfully submitted,
## Company Name:______________________________________
## Signer:_______________________________________
## Title:_________________________________________
## Printed Name of Signer:_______________________________
## Phone Number:______________________________________
## Fax Number:________________________________________
Page 22 of 185
## CONSTRUCTION AGREEMENT
THIS AGREEMENT, made and signed this day of _________, 2026, by and between the
City of Chaska, hereinafter called the "Owner", and __________________________, hereinafter called
the "Contractor".
THIS AGREEMENT WITNESSETH, that the Owner and the Contractor, for the consideration
hereinafter stated, agree as follows:
ARTICLE 1. The Contractor hereby covenants and agrees to perform and execute all the
provisions of the plans and specifications as prepared by ____________ _____________________ of
Chaska, Minnesota, and indicated below under ARTICLE 8, as provided by the Owner for:
## 2026 314 Walnut St North - Roof Replacement
and to do everything required by this Agreement and the Contract Documents.
ARTICLE 2. The Contractor agrees that the Work contemplated by this Contract shall be fully
and satisfactorily completed on or before December 31, 2026..
ARTICLE 3. The Owner agrees to pay and the Contractor agrees to receive and accept payment
in accordance with the prices bid for the unit or lump sum items as set forth in the conformed copy of
Proposal Form hereto attached, which prices shall conform to those in the accepted Contractor's
Proposal on file in the Office of the City Public Works.
## ARTICLE 4. Payment Procedures and Retainage
4.01 The Contractor shall submit Applications for Payment to the City.
4.02 The Owner shall make 95% progress payments on account of the Contract Price
of the Work completed (with the balance being retainage) on the basis of Contractor’s
Application for Payment during performance of the Work.
Page 23 of 185
4.03 The Contractor agrees to make prompt payment to any Subcontractor according
to Minnesota State Statute and shall hold the Owner harmless from any disputed amount not
paid to the Subcontractor. The Owner will not make the final payment to the contractor until
IC134 form(s) for sub-contractor(s) is submitted.
4.04 Upon final completion and acceptance of the Work the Owner agrees to pay the
remainder of the Contract Price.
## ARTICLE 5. Contractor’s Representations
5.01 The Contractor agrees in being familiar with general and local conditions, having
made the field inspections and investigations deemed necessary, having studied the Drawings
and Specifications for the Work, and being familiar with all factors and other conditions affecting
the Work and costs thereof.
## ARTICLE 6. Bonds and Insurance
6.01 Certificates of Insurance
1) The Contractor shall obtain and submit a certificate of insurance meeting
requirements of the State of Minnesota, with a general liability minimum of $1,000,000,
which shall include completed operations and product liability coverages and exclusion
with respect to property under the care, custody and control of the Contractor.
## 6.02 Performance Bond
1) A separate performance and payment bond are required equaling the Contract
Price as security for the faithful performance and payment of all of the Contractor’s
obligations under the Contract. The Bond’s shall remain in effect until one year after the
date when final payment becomes due or until completion of any correction work
necessary, whichever is later.
## ARTICLE 7. Warranty
7.01 The Contractor guarantees to warranty all work and material associated within
two years of final completion. The Contractor shall be held responsible for any defects which
may occur and shall, upon property notice from the Owner, immediately repair or replace,
without costs to the Owner, any such portion of the work as mentioned in the Agreement.
Page 24 of 185
## ARTICLE 8. Contract Documents
8.01 Contract Documents shall consist of the following component parts:
## 1) Construction Agreement
2) Plan and Specification prepared by ___________________
3) Proposal Form dated ________________________
4) Certificate of Insurance
## 5) Performance and Payment Bond
## 6) Responsible Contractor Verification Form
7) Affidavit of Ad
THIS AGREEMENT, together with the documents hereinabove mentioned, form the Contract
and all documents are as fully a part of the Contract as if attached hereto or herein repeated.
IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands and seals
as of the day and year first above written.
## City of Chaska Contractor
_________________________________ _________________________________
## Matt Podhradsky
## City Administrator Title: ____________________________
Page 25 of 185
## STATE OF MINNESOTA - RESPONSIBLE CONTRACTOR CERTIFICATE
Applies to all prime contracts in excess of $50,000
A responsible contractor is defined in Minnesota Statutes §16C.285, subdivision 3.
Any prime contractor or subcontractor who does not meet the minimum criteria under Minnesota
Statutes §16C.285, subdivision 3, or who fails to verify that it meets those criteria, is not a
responsible contractor and is not eligible to be awarded a construction contract for the project or
to perform work on the project.
A false statement under oath verifying compliance with any of the minimum criteria shall render
the prime contractor or subcontractor that makes the false statement ineligible to be awarded a
construction contract for the project and may result in termination of a contract awarded to a
prime contractor or subcontractor that makes a false statement.
A prime contractor shall submit to the contracting authority upon request copies of the signed
verifications of compliance from all subcontractors of any tier pursuant to subdivision 3, clause 7.
By signing this statement, I,
_
________________________________________________(typed or printed name),
_________________________________
____(title)
certify that I am an owner or officer of the company and do
verify under oath that my company is in compliance with each of the minimum criteria listed in
the law.
_____________________________________________________________________
(name of the person, partnership or corporation submitting this proposal)
_____________________________________________________________________
(business address)
Signed: ____________________________________ __________________
(bidder or authorized representative) Date
Page 26 of 185
## Subject: Scheduling Public Improvement Hearing and Authorizing
Construction Documents for the 2026 Street & Utility
## Reconstruction Project
## Prepared By: Matt Clark, City Engineer
The feasibility report for this year’s downtown street and utility improvement project was
presented to Council in late March. Since that time, staff have held neighborhood meetings with
the properties being affected to discuss the project in more detail. At the meetings, the same
presentation shared with Council was presented along with the proposed draft assessments.
Separate from the neighborhood meetings, staff is coordinating times to meet with the various
property owners to discuss easements for the channel portion of the project.
This year’s streets selected include the blocks shown in red on the attached map. The planned
improvements are consistent with past projects in the downtown area that include replacement
of sanitary sewer, water main, utility services, storm sewer, concrete curb, street, sidewalk and
boulevard restoration. The nature and scope of this work always proves disruptive and a
challenge to staff in terms of managing that disruption at an acceptable level.
Although Council is not taking action at this time, the draft assessments were presented at the
neighborhood information meeting. The final assessment role will be presented later in early
June for consideration at a future hearing.
The action item this evening is for Council to schedule the improvement hearing and to authorize
the preparation of construction documents to keep the project on schedule for this summer.
## CITY COUNCIL ACTION REQUESTED
Motion to Approve Resolution No. 2026-34, Scheduling the Improvement Hearing to be held on
May 18
th
for the 2026 Street & Utility Reconstruction Project; directing the City Engineer to
prepare the project plans and specification documents.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 27 of 185
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE May 4, 2026 RESOLUTION NO. 2026-34
## MOTION BY COUNCILMEMBER SECOND BY COUNCILMEMBER _
A Resolution Scheduling a Public Improvement Hearing and Authorizing Plans and
## Specifications for the 2026 Downtown Street Reconstruction Project
WHEREAS, on December 15
th
, 2026, the Chaska City Council directed the City Engineer to
prepare a Feasibility Study for the 2026 Downtown Second Street Reconstruction Project;
WHEREAS, on March 30
th
, 2026, the Feasibility Study was accepted by the City Council , and
WHEREAS, the Feasibility Study has determined the project is feasible in terms of construction
and economics;
NOW THEREFORE BE IT RESOLVED, that the Chaska City Council establishes Monday, May
18th, 2026, as the date for a Public Improvement Hearing on said Improvement Project to be
held at 7:00 pm at the City Hall Council Chambers. The City Clerk is directed to mail and publish
notices in accordance with provisions of Minnesota statutes, and;
BE IT FURTHER RESOLVED, the City Council of the City of Chaska, Minnesota, that said
improvements are found to be necessary, cost-effective, and feasible and hereby authorizes the
City Engineer to prepare the project plans and specification documents
Passed and adopted by the City Council of the City of Chaska, Minnesota, this 5th day of May,
2026.
## Taylor Hubbard, Mayor
## Attest:
## Chaska Deputy Clerk
Page 28 of 185
## Report For
## 2026 Downtown Reconstruction Project
## Elm Street & 3rd Street
Prepared for:
## City of Chaska, Minnesota
March 30, 2026
## Stantec Project No. 193807606
Page 29 of 185
Stantec Consulting Services Inc.
## 733 Marquette Avenue Suite 1000
## Minneapolis. Mn 55402-2309
## Mar
ch 30, 2026
## Ho
## norable Mayor and City Council
## City of Chaska
## One City Hall Plaza
## Chaska, MN 55318
## Re
## : 2026 Downtown Street Reconstruction
## City of Chaska
## Stantec Project No. 193807606
## De
## ar Mayor and City Council:
## En
closed please find our report on the 2026 Downtown Reconstruction Project that will involve
## Elm Street, 3
rd
Street and drainage channel for your review and comments. This report discusses
the feasibility and economic impact of reconstruction of the streets and public utilities in this
downtown Chaska neighborhood area.
## We
will be pleased to review this report with staff and council at any mutually convenient time.
## Re
spectfully yours,
## Cit
y of Chaska Stantec Consulting Services Inc.
## Ma
tthew Clark, P.E. Nathan T. Drews, P.E.
## City Engineer Project Manager
## I
hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision, and that I am a duly Licensed
Professional Engineer under the laws of the State
of Minnesota.
_______
_________________________________
## Nathan T. Drews
## Da
te: March 30, 2026 License No.: 54837
Page 30 of 185
## 2026 Downtown Street Reconstruction Project Page i
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Table of Contents
Introduction ........................................................................................................................................................ 1
Figure A1 – Downtown project areas by year ........................................................................................ 2
Figure A2 – Downtown Chaska Master Street Layout ............................................................................ 3
Project Elements................................................................................................................................................. 4
Street Section ..................................................................................................................................................... 5
Figure B1 – Overview - Existing conditions and Street Removals .......................................................... 7
Figure C1 – Overview - Tree Removal ...................................................................................................... 9
Proposed Street Section Layout Improvements ....................................................................................... 10
Figure D1 – Overview - Street Improvements ........................................................................................ 12
Figure D2 – 3
rd
street – Street Improvements ......................................................................................... 13
Figure D3 – elm street – Street Improvements ....................................................................................... 14
Bridge Removal and Channel Improvements ............................................................................................. 15
Storm Sewer Improvements ............................................................................................................................ 17
Figure E-1 - Overview - Storm Sewer Improvements ............................................................................. 18
Water Main and Sanitary Sewer Improvements .......................................................................................... 19
Figure F-1 – Overview - Sanitary Sewer, Water Main Improvements .................................................. 20
Water and Sanitary Sewer Services ............................................................................................................... 21
Sump Line Installation ...................................................................................................................................... 22
Construction Phasing ...................................................................................................................................... 23
Project Schedule .............................................................................................................................................. 24
Project Costs ..................................................................................................................................................... 25
Figure g-1 – Overview – construction options ....................................................................................... 27
Recommendations and Conclusions ............................................................................................................ 29
## Appendix A – 2026 Reconstruction Project – Project Costs
## Appendix B – Typical Sections of Streets
Page 31 of 185
## 2026 Downtown Reconstruction Project Page 1
City of Chaska 193807606
## 2026 DOWNTOWN CHASKA RECONSTRUCTION PROJECT
## Introduction
The City Council of Chaska has chosen to investigate the feasibility of reconstructing streets located
in the northwest area of downtown. Further the report includes removal of the concrete bridge
located along 3
rd
street and the removal of the former drainage diversion channel extending
between 4
th
Street and Hickory. Figure A-1illustrates how the reconstruction program has progressed
to date along with what streets in the program remain to be constructed. Figure A-2 shows the
proposed streets to be improved as part of the 2026 Downtown Reconstruction Project. The streets
that are being evaluated in the report include the block of Elm Street between 3
rd
Street and 4
th
Street, 3
rd
Street between Hickory Street and Elm Street, and the bridge and drainage channel
between 4
th
Street and Hickory Street.
All streets selected have been identified in the City’s Street Reconstruction Program and Chaska’s
comprehensive pavement management program. From that process the streets in downtown
Chaska have been reconstructed in a multiyear reconstruction program. This will be the 14
th
year of
program that will have reconstructed over 5 miles of streets in the downtown area.
The 2026 reconstruction project continues the order of street selection for reconstruction in
downtown. Street Reconstruction projects follow the natural drainage patterns currently established
for storm water and sanitary sewer in downtown.
This year’s reconstruction project continues to build upon previous years’ street and utility
improvements projects. This report will focus on reconstructing Elm and Third streets to a local street
7-ton road design standard. In addition to street improvements, the report will discuss proposed
removal of the Third Street Bridge, Hickory Street Bridge, removing the channel, water main and
water service improvements, and sanitary sewer and sanitary service improvements. With the
completion of the Corps of Engineers Flood Control project, the existing “West Creek” (or drainage
channel) received much less drainage and therefore replacing the open channel with an
underground pipe is being explored. A section of the report further identifies and evaluates the
options and feasibility of eliminating segments of the channel along with the 3
rd
Street bridge.
Page 32 of 185
## Co.Rd.61
## ST
## ST
## ST
## ST
## ST
## ST
## CREEK RIDGE DR
## FOURTH
## THIRD
## PINE
## SECOND
## HICKORY
## LOCUST ST
## SPRUCE
## FIRST
## ST
## ST
## WALNUT
## FIFTH
## ST
## MAPLE
## ASH
## SEVENTH
## STOUGHTON
## BEECH
## BOLDT ST.
## SIXTH ST
## WILLOW
## YELLOW
## ST
## CASCADE
## DR.
## CASCADE
## PLACE
## WALNUT
## STREET
## TUPELO
## WAY
## SEVENTH
## CHASKA BOULEVARD
## CHASKA BOULEVARD
## ST
## WEST THIRD ST
## ELM
## ST
## CEDAR
## ST
## ST
## ST
## SIXTH ST
## Co.Rd.61
## ST
## FOURTH
## ST
## THIRD
## OAK
## OAK
## FIFTH
2011
2012
2013
2014
2015
2016
## DATE:
## PROJ. NO.:
Plot Date: 03/20/2026 - 11:57amDrawing name: \\US0291-PPFSS01\shared_projects\193807390\CAD\Dwg\2026 MasterPlan\Reconstruction-2026Eval.dwg
Xrefs:, 193800229XSNO-Master Street Lyt, 193804572 - XSPL, 193800229XSPL
## DOWNTOWN PROJECT AREAS BY YEAR
## CITY OF CHASKA
## 2026 DOWNTOWN RECONSTRUCTION
11/11/2025193807606
## FIGURE A-1
## Already Completed
## 2005 MCES Project
## State Highway
## Future Projects
2017
2018
2019
2020
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
2021
2022
2026
2027
## N
Page 33 of 185
719.90
90951
## FLAG
## FLAG
## FLAG
## FLAG
## FLAG
## FLAG
## FLAG
## FLAG
## P
## P
## U/C
## U/C
## U/C
## U/C
## U/C
734.77
## FLAG
## FLAGFLAG
## FLAG
## FLAG
45'
45'
## 12' SHOULDER
## 12' SHOULDER
12'12'12'14'
12'12'12'14'
11'
11'
11'
11'
313
503
## 313G
## SB-9
## ERNST
## HOUSE
## PORCH
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
## P
14.2'
## STREET LIGHTS
## STREET LIGHTS
9'
24'
18'
18'
## CHESTNUT
## (HWY 41)
## CHESTNUT
## (HWY 41)
## BEECH
## TH41 / CHESTNUT ST
Co.Rd.61 / CHASKA BLVD.
## ST
## ST
## ST
## ST
## ST
## ST
## FOURTH
## THIRD
## PINE
## SECOND
## HICKORY
## SPRUCE
## FIRST
## ST
## ST
## WALNUT
## FIFTH
## ST
## MAPLE
## ASH
## SEVENTH ST.
## STOUGHTON
## BEECH
## BOLDT ST.
## SIXTH ST
## WILLOW
## ST
## CHASKA BLVD.
## ST
## WEST THIRD ST
## ELM
## ST
## CEDAR
## ST
## ST
## ST
## FIFTH
## SIXTH ST
## Co.Rd.61
## ST
## FOURTH
## ST
## THIRD
## OAK
## ST
## MAPLE
## SIXTH ST
## FIFTH ST
27
23
115
28
22
29
15
21
30
14
1
20
31
13
19
12
1
2
105
113
401
101
606
407
401
408
313
407
3
412
561
112
417
102
415
424
508
112
503
414
511
415
416
3350
116
418
460
2
1
571
307
604
418
400
407
421
422
411
115
300
413
581
415
501
214
205
221
315
416
570
507
222
507
210
591
602
206
321
603
512
601
423
507
102
515
407
420
510
102
500
422
522
516
505
3330
500
3250
404
520
515
3260
510
507
500
408
503
513
306306
308308
616
511
419
401
515
611
421
3310
519
523
516
510
320
600
511
405
501
501
423
407
3270
403
601
503
401
500
3235
409
621
3115
500
319
321
323
631
612
610
509
620
3110
402
519
515
301
523
706
611
619
615
516
621
519
650
303
520
517
523
522
307
411
640
505
3050
618
616
3050
614
620
3050
634
528
3050
701
505
599
530
525
531
537
600
543
601
798
619
615
611
623
745
627
747
602
749
609
606
751
615
608
753
604
620
616
612
608
602
621
612
755
700
615
605
609
701
703
## 422G
## 309G
## 323G
## 322G
## 207G
## GARAGE
## GARAGE
## GARAGE
323
207
215
322
216
220
401
323
309
## GARAGE
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
120
## GARAGE
## GARAGE
## GARAGE
## GARAGE
## GARAGE
205
201
125
119
## GARAGE
112
103
600
599
## GARAGE
## GARAGE
520
516
512
## GARAGE
115
112
110
506
103
521
519
515
513
507
## GARAGE
## GARAGE
## GARAGE
501
## GARAGE
## GARAGE
115
111
112
108
115
## GARAGE
## GARAGE
422
416
105
423
415
411
## GARAGE
## GARAGE
403
110
118
122
113
107
## GARAGE
## GARAGE
## GARAGE
308
322
321
317
307
101
301
108
110
116
120
117
115
109
221
209
205
201
106
102
100
105
101
205
208
210
## GARAGE
113
112
212
105
107
106
309
100
302
308
## GARAGE
## GARAGE
316
105
111
108
## GARAGE
## GARAGE
## GARAGE
100
400
404
408
412
409
416
420
116
112
108
104
109
111
115
422
122
## 122G
512
209
507
202
423
411
322
215
107
114
109
116
121
500
101
11
10
108
116
120
124
128
## GARAGE
## GARAGE
## GARAGE
## GARAGE
## GARAGE
## GARAGE
119
115
111
107
504
508
512
518
206
204
212
216
222
221
219
217
207
323
120
408
420
407
116
113
115
316
120
116
112
110
115
117
125
214214
200
116
110
315
202
206
210
216
220
221
217
211
207
203
202
206
212
217
123
202 1/2
110
120
115
201
207
215
217
208
201
207
211
217
123
218
214
212
208
107
115
117
301
309
300
209
211
217
221
316
320
208
212
216
201
205
209
416
315
321
111
119
112
114
116
110
100
200
109
107
113115117
109
107105
103 1/2
103
101
113
117
119
121
123
114
112
110
106
104
207
302
221
301
315
403
407
501
509
511
523
223
510
508
500
416
416 1/2
217
215
209
207
220
216
108
114
122
218
319
307
306
215
220
408
217
215
211
306
310
314
322
311
309
315
317
321
320
308
## 302G
314
## 314G
## 321G
## 317G
## 315G
## 215G
## 221G
## 301G
## 315G
## 319G
## 407G
## 311G
## 322G
506
508
## 510G
## 506G
## 314G
## 310G
517
317
309
305
## 523G
## 309G
317
## SHED
## 317G
## 517G
## 508G
## 500G
## 217G
## 215G
## 507G
## 202G
## 423G
## 207G
## 209G
## 217G
## 222G
## 216G
216
## SHED
## 206G
## 204G
## 120G
## 323G
## 207G
## 217G
## 219G
## 221G
## 220G
## 216G
## 210G
## 206G
## 202G
## 125G
## 214G
## 221G
## 207G
## 203G
## 202G
## 206G
## 212G
## 123G
303
## 303G
215
## 205G
## 201G
## 316G
## 208G
## 212G
## 220G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
307
311
315
## 315G
## 311G
## 307G
316
312
## 312G
312
## SHED
308
## 308G
222
## 222G
## 217G
## 211G
## 209G
## 300G
## 221G
218
218
## SHED
218
## SHED
317
## 317G
311
## 311G
307
## 307G
200
223
## 223G
## 217G
300
301
311
## 301G
## 309G
105
115
222
218
214
212
210
208
206
102
123
111
107
103
## Walnut
107
## Walnut
101
102
106
108
111
107
103
115
111
207
211
## Chaska
## RECONSTRUCTED STREETS
## FUTURE STREET RECONSTRUCTION
## 2026 DOWNTOWN RECONSTRUCTION
## Date:PROJ. NO.:
Plot Date: 02/23/2026 - 3:12pmDrawing name: C:\Users\khemani\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\2026 MasterPlan\193800229XSNO-Master Street Lyt.dwg
Xrefs:, 193800229TOPO, 92address_numbers, 193800229XSPL
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## DOWNTOWN CHASKA MASTER STREET LAYOUT
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION
01/14/2026193807606
## FIGURE A-2
## N
Page 34 of 185
## 2026 Downtown Reconstruction Project Page 4
City of Chaska 193807606
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## Project Elements
As part of the reconstruction of the 2026 Downtown Reconstruction Project streets, there are some
key project elements that need to be addressed. The following items will be reviewed and
addressed in this report.
## Street Section/Layout
## Bridge Removal and Channel Abandonment
## Storm Sewer Improvements
## Water Main and Sanitary Sewer Improvements
## Water and Sanitary Sewer Service Improvements
## Sump Line Installation
Page 35 of 185
## 2026 Downtown Reconstruction Project Page 5
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Street Section
This section of the report will focus on upgrading the roadways from their existing condition to
Chaska's 7-ton street design section. The existing conditions and proposed improvements are
discussed in the following pages.
## EXISTING STREET AND UTILITY CONDITIONS
Figure-B- 1 shows the existing conditions of the project streets and utilities for this year’s project. The
two blocks of streets range from 50 to 38 feet in pavement width. Parallel street parking exists in the
project area. Behind the curb on both sides of the roadway are a variety of landscaping items,
including but not limited to trees, decorative landscaping, and carriage walks. Private driveways
vary in both condition and construction material used (concrete, asphalt).
No major street improvement projects have occurred on streets the project encompasses.
According to City Staff, the most significant street maintenance has included periodic seal coating
along with leveling/patching the existing bituminous as needed. With no major improvements
having occurred, the roadway is beyond its design life. This is evident in the amount and degree of
fatigue and transverse cracking in the bituminous surface.
Street improvements from the 2011 and 2014 projects have stubbed into Third and Elm Streets,
however the mid-block areas are well beyond their design life. The existing street profiles are very
inconsistent and contain locations where water does not drain. In these existing streets contain
many locations that have very flat street grades as well as limited curb along the corridor. The flat
grades and lack of curb have created locations where water does not drain very well and pools
along existing driveways and pavement edges. The slow moving and standing water were
attributed to the deterioration of the roadway and buildup of sediment along the roadway. The
stormwater drainage pools in the existing roadway and along pavement edges can be remedied
with the construction of a consistent roadway profile and new curb and gutter to direct and convey
storm water runoff.
Records do not indicate what type of street section was to be originally constructed for Elm or Third
Streets. Soil borings will be taken as a part of the project to verify the existing road section. It is
anticipated that the soft aggregates used to construct the roads originally have broken down over
time due to the repeated freeze-thaw cycles over the past 50 years. The gravel and the clay layer
below are likely to have begun mixing to become one. The likely lack of a base section, minimal
pavement drainage, and the overall age are likely the primary contributors to the street
deterioration.
Page 36 of 185
## 2026 Downtown Reconstruction Project Page 6
City of Chaska 193807606
The existing boulevards contain sidewalk on both sides of the Third street, but not along Elm Street.
The intersections at Hickory and Third Street; Third and Elm Street; and Elm and Fourth Street have all
been reconstructed as part of previous street improvement projects discussed above. However,
pedestrian ramp access at Hickory and Third Street; and Elm and Fourth Street intersections do not
meet current ADA standards. The sidewalk in many areas is uneven and cracked. This poses a safety
hazard for pedestrians as well as a maintenance problem for residents as they shovel.
Distressed pavement and poor drainage
## No Curb and Gutter
## Non-compliant Pedestrian Ramps
Page 37 of 185
## 309G
## 323G
309
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
120
205
201
500
504
508
216
205
209
416
## 303G
215
## 205G
## 201G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
311
315
## 315G
## 311G
## THIRD STREET W
## FOURTH STREET W
## HICKORY STREET
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## SS
## SS
## SS
## SS
## CO
## TR
## TR
## TR
## SS
## CO
## CO
## CO
## SS
## SS
## SS
## SS
## SS
## SS
## SS
## SS
## SS
## SS
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## S
## S
## S
## S
## S
## S
## 309G
## 323G
309
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
120
205
201
500
504
508
216
205
209
416
## 303G
215
## 205G
## 201G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
311
315
## 315G
## 311G
## ROCK
## CTV
## C
## CTV
## CTV
## G
## TRAN
## E
## E
## E
## Y
## Date:PROJ. NO.:
Plot Date: 02/27/2026 - 2:50pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\Figures\193807606-Removals.dwgXrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92STRM, 92SSWR, 92WATR, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSXU, 193807606-XSNO, 193807606-XSSS, 193807606-XSST, 193807606_XSXV-TEMP-DJR, 193807606_XSXZ-TEMP-DJR
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD & ELM STREET EXISTING UTILITIES AND STREET REMOVAL
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026
193807606
## B-1FIGURE
## N
## THIRD ST.
## HICKORY ST.
## ELM ST.
## FOURTH ST.
37'
50'
38'
38'
Page 38 of 185
## 2026 Downtown Reconstruction Project Page 8
City of Chaska 193807606
An evaluation of the trees will be performed. Figures C-1 illustrates the trees that will be impacted in
some form by construction as well as those that may remain. Following approval of the design, City
Staff will be working with residents and individually to identify the impacts of construction. Based on
the final design and tree impacts, residents will be provided options for their boulevard and tree
replacements. Trees to be removed with the channel improvements are identified on figure C-1 and
accounted for in the Engineer’s Estimate. Additional trees to be removed will be determined during
the evaluation, design and construction.
Trees impacted by utility services
Diseased trees
Page 39 of 185
## 309G
## 323G
309
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
120
205
201
500
504
508
216
205
209
416
## 303G
215
## 205G
## 201G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
311
315
## 315G
## 311G
## THIRD STREET W
## FOURTH STREET W
## CEDAR ST
## HICKORY STREET
## S
## S
## S
## S
## S
## S
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## 309G
## 323G
309
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
120
205
201
500
504
508
216
205
209
416
## 303G
215
## 205G
## 201G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
311
315
## 315G
## 311G
## C
## G
## Y
## Date:PROJ. NO.:
Plot Date: 02/27/2026 - 3:20pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\Figures\193807606-Removals.dwgXrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92STRM, 92SSWR, 92WATR, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSXU, 193807606-XSNO, 193807606-XSSS, 193807606-XSST, 193807606_XSXV-TEMP-DJR, 193807606_XSXZ-TEMP-DJR
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD & ELM TREE REMOVALS
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026
193807606
## C-1FIGURE
## N
## THIRD ST.
## ELM ST.
## FOURTH ST.
## LEGEND
## NEW SIDEWALK LOCATION
## TREE REMOVAL
## SIDEWALK / GRADING TREE
## REMOVAL TO BE REVIEWED
## IN FIELD
## SERVICE TREE REMOVAL
## STRUCTURAL / DISEASED
## TREE REMOVAL
## EXISTING TREES TO REMAIN
Page 40 of 185
## 2026 Downtown Reconstruction Project Page 10
City of Chaska 193807606
## PROPOSED STREET SECTION LAYOUT IMPROVEMENTS
The following figures D-1 through D-3 show overall layouts of the proposed street improvements for
the streets within the 2026 reconstruction area. Figure 1B, located in Appendix B at the end of the
report shows each planned street improvement in more detail. In general, th ere are two different
street sections being proposed in 2026 to adjust to the varying right of way conditions and
geographical features that surround project boundaries. The proposed street section has been
designed to fit within the existing right of way. As a result, no additional right of way is anticipated for
the street section of this project.
Along Third Street, between Hickory Street and Elm Street, it is proposed to continue a 38-foot -wide
roadway with an 11-foot drive lane in each direction with 8-foot parallel parking lanes. Along both
the north and south side of the roadway, in this area 5-foot sidewalks are proposed to be installed
between the new proposed curb and Right of Way, providing space for boulevard trees to be
planted.
Along Elm Street, from Third to Fourth Street, it is proposed to continue a 3 8-foot -wide roadway with
an 11-foot drive lane in each direction with 8-foot parallel parking lanes. Along both the east and
west side of the roadway in this area 5-foot sidewalks are proposed to be installed between the new
proposed curb and Right of Way, providing space for boulevard trees to be planted.
In general, the existing streets are being narrowed to a consistent width rather than a varied width
between 38 feet to 50 feet. The intent of the consistent width of 38 feet is to create a corridor that
matches the City’s standards for residential streets that still allows for street parking. The proposed
roadway location was designed to create as much new green space for residents as possible while
still providing room for sidewalks and pedestrian access. Keeping the street width consistent will also
help make matching into existing driveways and yards much more manageable, and at the same
time will decrease project costs by using less street construction materials.
The City’s standard 7-ton street section is proposed for streets. The resulting section would contain 24
inches of select granular borrow (sand), 8 inches of compacted class 5 aggregate base, and 3-1/2
inches of bituminous surfacing. All new street sections will also include a geotextile fabric. The fabric
will help keep the underlying subgrade separated from the new sand section. The fabric, along with
2 feet of sand, will help stabilize the sub grade material and help to convey drainage under the
road making it less susceptible to frost heaving.
Concrete curb is proposed for the edges of the streets. It will be barrier type, 6-inches tall, with the
back dropped down at driveway locations. The curb will be type B612 modified park board, which
contains an integral 12-inch -wide concrete gutter. This type of curb has a wider top section of
12 inches in lieu of a 6-inch wide top in standard curb. This type of curb has become the standard
for the downtown district.
Third Street currently has concrete sidewalks which will be replaced with 5-foot -wide concrete
sidewalks. The location of the new sidewalks shown on figure D-3 are planned to provide pedestrian
connectivity from this neighborhood and general area of downtown where possible while
minimizing impacts to properties where sidewalk do not exist today. At the upcoming
neighborhood meetings, staff propose discussing the final location of the new sidewalk along with
the few boulevard trees that need to be removed and replaced due to utility conflicts, age,
structural deficiencies and species issues. Regardless of the sidewalk placement, project costs will
not be impacted.
Page 41 of 185
## 2026 Downtown Reconstruction Project Page 11
City of Chaska 193807606
Subsurface drainpipes, referred to as drain tile, will be bedded in rock and placed in the sand layer
along the edges of the road throughout the length of the project. Each drain tile pipe will be
connected to the storm sewer system at a manhole or catch basin structure. The draintile promotes
improved subsurface drainage of the street bed and lowers the risk of frost movement. By helping to
minimize road movement due to frost, the addition of the draintile and sand section should
significantly reduce the likelihood and amount of fatigue and transverse cracking that exists in the
roads today. Consequently, this will extend the life of the proposed road section and help to
minimize maintenance costs over the life of the road.
Page 42 of 185
## 309G
## 323G
309
318
## 319G
319
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
## GARAGE
## GARAGE
## GARAGE
303
225
221
415
222
208
206
418
205
500
504
508
216
201
205
209
416
## 303G
215
## 205G
## 201G
## 209G
## 215G
## 219G
316
## 316G
## 308G
## 316G
307
311
315
## 315G
## 311G
## 307G
## 11' DRIVE LANE
## 11' DRIVE LANE
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 11' DRIVE LANE
## 11' DRIVE LANE
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## THIRD STREET W
## FOURTH STREET W
## CEDAR ST
## HICKORY STREET
## SS
## SS
## SS
## CO
## CO
## TR
## TR
## SS
## CO
## CO
## CO
## SS
## SS
## SS
## SS
## SS
## SS
## S
## CO
## S
## S
## S
## S
## Date:PROJ. NO.:
Plot Date: 03/12/2026 - 12:32pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSNO.dwgXrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSSS, 193807606-XSST, 193807606-XSXU
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD & ELM STREET IMPROVEMENTS
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026193807606
## D-1FIGURE
## N
## WEST THIRD ST.
## HICKORY ST.
## ELM ST.
## FOURTH ST.
40.0'
38.0'
80.0'
80.0'
## CENTERLINE OF ROAD 1'
## OFFSET SOUTH FROM
## CENTER OF ROW
Page 43 of 185
## 319G
319
316
310
308
## 400G
## 412G
400
316
## 308G
## 316G
## 11' DRIVE LANE
## 11' DRIVE LANE
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## THIRD STREET W
## FOURTH STREET W
## SS
## SS
## CO
## SS
## SS
## N
## THIRD ST.
## ELM ST.
## DATEPROJ. NO.
Plot Date: 03/12/2026 - 12:34pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSNO.dwg
Xrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSSS, 193807606-XSST, 193807606-XSXU
## ELM ST. STREET IMPROVEMENT
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026
## FIGURE: D-2
193807606
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## FOURTH ST.
8.4'
6.5'
7.3'
7.7'
39.1'
40.9'
Page 44 of 185
## 400G
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
## GARAGE
415
222
## 219G
## 11' DRIVE LANE11' DRIVE LANE
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## 8' PARALLEL PARKING
## 5' CONCRETE WALK
## SS
## SS
## N
## HICKORY ST.
## ELM ST.
41.1'38.9'
## DATE
## PROJ. NO.
Plot Date: 03/12/2026 - 12:37pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSNO.dwg
Xrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSSS, 193807606-XSST, 193807606-XSXU
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD STREET IMPROVEMENT
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026
## FIGURE: D-3
193807606
## CENTERLINE OF ROAD 1' OFFSET
## SOUTH FROM CENTER OF ROW
Page 45 of 185
## 2026 Downtown Reconstruction Project Page 15
City of Chaska 193807606
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## Bridge Removal and Channel Improvements
As part of the 2026 Downtown Reconstruction Project, the City evaluated the feasibility of retaining
or removing existing bridge structures and the former West Creek drainage channel located
between Fourth Street and Hickory Street. This evaluation considered the historical function of the
drainage system, the age and condition of existing bridge infrastructure, construction feasibility,
long -term maintenance obligations, funding eligibility, and overall lifecycle costs.
The Third Street Bridge, originally constructed in 1939, and the Hickory Street Bridge, constructed in
1981, span a drainage corridor that historically conveyed significant stormwater flows through
downtown Chaska. Prior to construction of the U.S. Army Corps of Engineers flood control diversion
channel, West Creek served as a primary conveyance for large upstream drainage areas. With
completion of the diversion project, the tributary area contributing to the channel within the project
limits has been significantly reduced, and the remaining drainage area is estimated to be
approximately 30 acres. Due to this reduction in flow, the open channel and bridge crossings are no
longer required to convey major stormwater volumes and can be replaced with underground storm
sewer infrastructure.
To evaluate feasibility and long-term implications, four alternatives were developed. These options
range from leaving both bridges and the channel in place to full removal of both bridges and
abandonment of the channel. Each option is technically feasible and may be implemented
independently; however, the alternatives differ substantially in construction approach, long-term
maintenance responsibilities, and lifecycle cost.
Option 1 retains both the Third Street Bridge (1939) and the Hickory Street Bridge (1981), as well as
the open channel. Under this option, street and utility reconstruction would proceed around the
existing bridge structures. Installation of water main and sanitary sewer beneath the Third Street
Bridge would require trenchless construction methods, which are more complex and less
cost -effective than open-cut installation. This option maintains the City’s responsibility for ongoing
inspection, maintenance, and eventual rehabilitation or replacement of both bridges, including a
structure that is well beyond its typical service life. The open channel would also remain, along with
associated maintenance challenges related to vegetation management, sediment accumulation,
limited access, and safety concerns for adjacent properties. While this option has the lowest level of
infrastructure modification, it does not address aging bridge infrastructure or long-term
maintenance inefficiencies.
Option 2 proposes the removal of the Third Street Bridge, originally constructed in 1939, while
preserving both the Hickory Street Bridge and the open channel. Upon removal of the Third Street
Bridge, stormwater would be routed beneath Third Street through a culvert crossing to ensure
continuous flow toward Hickory Street. Eliminating the Third Street Bridge enhances constructability
by facilitating utility installation via open-cut methods and removes future costs related to
inspection, maintenance, and rehabilitation of that structure. Nevertheless, both the Hickory Street
Bridge and the open channel would remain in place, thereby maintaining long-term maintenance
requirements and ongoing safety considerations. Additionally, the bridge removal could be
executed within the existing right of way, so no additional easements would be necessary for this
option.
Page 46 of 185
## 2026 Downtown Reconstruction Project Page 16
City of Chaska 193807606
Option 3 proposes removing the Third Street Bridge and closing the open channel between Fourth
and Hickory Streets but keeping the Hickory Street Bridge. Stormwater would be routed through a
new underground sewer from Fourth Street to just east of Hickory Street Bridge, where it would be
discharged beneath it. Removing the open channel enhances public safety and reduces
maintenance associated with vegetation and sediment. Compared to Options 1 and 2, this option
lowers long-term maintenance by eliminating both the channel and the oldest bridge, while still
preserving the Hickory Street Bridge. Some permanent and temporary easements along the existing
channel will be needed for this work.
Option 4 entails the removal of both the Third Street Bridge (1939) and the Hickory Street Bridge
(1981), as well as the complete abandonment of the open channel. Stormwater would be
managed via underground storm sewer piping, directly connected to the dual 48‑inch high‑flow
and low‑flow storm sewer system established during the 2011 Downtown Reconstruction Project. This
option effectively eliminates all bridge structures and the open channel within the project
boundaries, resulting in the lowest long‑term maintenance obligation for the City. While this
approach involves the highest initial construction expenditure, it delivers substantial long‑term
advantages by eliminating the need for future bridge inspections, rehabilitation, and replacements,
and streamlining infrastructure management. Permanent easement requirements align with those
outlined in Option 3; however, additional temporary easements will be necessary under this plan.
The age of the bridge structures plays a key role in funding eligibility and lifecycle cost
considerations. The Third Street Bridge, constructed in 1939, is more than 85 years old and well
beyond the typical design service life for a local roadway bridge. Removal of this bridge is eligible
for State Aid Bridge funding, providing an opportunity to offset a portion of demolition costs while
avoiding substantial future rehabilitation or replacement expenditures. Similarly, the Hickory Street
Bridge, constructed in 1981, is over 40 years old and approaching an age where increased
maintenance or replacement should reasonably be anticipated. Removal of the Hickory Street
Bridge is not currently eligible for State Aid Bridge funding.
Options 3 and 4 trend higher in initial construction cost primarily because they include
abandonment of the open channel and installation of new large-diameter underground storm
sewer infrastructure, along with associated excavation, embankment fill, and surface restoration.
Option 4 further increases upfront costs by including removal of the Hickory Street Bridge in addition
to the Third Street Bridge. These higher initial costs are offset by reduced long-term maintenance
obligations. Eliminating the open channel removes the need for ongoing vegetation management,
sediment removal, and safety monitoring, while removal of one or both bridges eliminates future
inspection, rehabilitation, and eventual replacement costs associated with aging bridge
infrastructure. In contrast, Options 1 and 2 have lower initial construction costs but retain aging
bridges and, in some cases, the open channel, resulting in continued maintenance responsibilities
and higher lifecycle costs.
Although all four options are viable, a review of engineering feasibility, bridge age, funding eligibility,
maintenance requirements, public safety, and lifecycle costs indicates that both Option 3 and
Option 4 are the best choices for long-term advantages. While demanding the largest initial
investment, both options eliminate aging infrastructure, reducing maintenance risks, enhance
stormwater management, and align with the City’s infrastructure objectives. If Options 3 and 4
cannot be pursued due to funding or easement constraints, Option 2 is the next preferred
alternative since it has similar costs to Option 1 but removes future maintenance issues by
eliminating the bridge.
Page 47 of 185
## 2026 Downtown Reconstruction Project Page 17
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Storm Sewer Improvements
The design of the 2026 reconstruction storm sewer system as shown on Figure E-1. The Elm Street and
Third Street existing storm sewer will be modified to collect drainage and discharge to the storm
system installed in 2014, ultimately discharging into the existing channel.
The existing storm sewer channel and the West Third Street and Hickory Street intersection are the
two areas on the project that contain underground storm sewer systems. The downstream end of
the channel consists of two 48-inch flared end inlets west of the Hickory Street Bridge. Currently
during normal operations, all drainage in the area is collected by the channel, routed into the two
48-inch flared ends and discharged downstream into West Creek diversion channel. During times of
high water from the Minnesota River, a large gate is closed on the 60-inch outlet pipe. The existing
pumping station is then activated to pump interior drainage collected in the ditch by the 60-inch
flared end and existing catch basin into the diversion channel.
As part of the downtown Spruce, Locust, West Third Street reconstruction project in 2011, a storm
sewer treatment system consisting of two large diameter manholes was placed in the ditch section
just north of the Spruce/Locust intersection. This treatment system provides water quality
improvements to the storm water during lower flows before being discharged through the existing
60-inch pipe system and into the Minnesota River. For this project the existing system will continue to
be used to provide treatment for this drainage area.
As previously mentioned, the construction of the Corps of Engineers flood control project has
reduced the drainage area of the channel to approximately 30 acres. The resulting low flow that
the channel now sees has caused it to be overgrown with weeds, brush, debris and sediment. There
is very limited access along the entire channel, which makes it expensive and ineffective for Public
Works staff to properly maintain. With this project, now is the time to consider eliminating the old
West Creek channel by filling it in and replacing it with a storm sewer collection system. This also
creates the opportunity to enhance the safety of the residents that are adjacent to the channel,
gain more usable space, even if it remains in a permanent easement.
For this project it is proposed to extend 60-inch storm sewer pipe up the current channel alignment
to the Elm Street and Fourth Street intersection. This is the second phase of the planned project to fill
and pipe the entire channel, following the first phase completed in 2011. The new internal
neighborhood storm sewer system would then be connected to the new 60-inch outfall pipe. Along
the channel alignment, catch basin manholes would be placed to collect surface water from the
adjacent drainage areas. The top surface area over the ditch is proposed to be finished as a grass
swale with small undulating areas that are sloped to collect local surface drainage into the catch
basin. It is anticipated that an additional sub cut will be required for a portion of the storm sewer
piping system that will be installed in the channel bottom. Poor soils along with a high groundwater
table are anticipated in areas in which the piping system is to be installed. Areas may need to be
over excavated below the pipe zone to account for pipe stability to achieve a uniform piping
system.
In addition to the proposed trunk storm sewer line being extended along the ditch bottom two tile
lines are proposed to be installed along side of the 60-inch storm sewer pipe (one on each side as
shown in Figure E-1). The tile lines would follow the trunk storm sewer pipe for its entire length to just
south of Fourth Street. The tile lines will collect ground water at the grade of the old channel bottom.
Page 48 of 185
## 319G
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
303
225
415
222
208
206
418
205
201
125
500
320
208
212
216
201
205
209
416
215
## 205G
## 201G
## 209G
## 215G
## 219G
>
>
>
>
>
>
>
>
>
>
>
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>>
>
>>
>>
>
>>
>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## SS
## SS
## SS
## SS
## SS
## CO
## SS
## CO
## SS
## CO
## CO
## CO
## SS
## SS
## SS
## SS
## SS
## SS
## SS
## SS
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
lll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## CONTROL
## CO
## CO
## CO
## S
## S
## CO
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
ll
ll
ll
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## 8"PVC DRAINTILE SDR 35 PERFORATED
## 8"PVC DRAINTILE
## 48" RCP
## GRANULAR
## BORROW
## VARIABLE DEPTH PIPE FOUNDATION.
## MINIMUM DEPTH 1 FOOT.
## OVERSIZE MATERIAL WIDTH 1/2 FOOT FOR
## EVERY 1 FOOT OF FOUNDATION MATERIAL
## DEPTH.
## BACKFILL - UTILIZE ON SITE
## MATERIAL IF POSSIBLE
## FABRIC LOCATION B
## FABRIC LOCATION A
## OVERLAND DRAINAGE
## TO STRUCTURE
## OVERLAND DRAINAGE
## TO STRUCTURE
## EXISTING GROUND
## EXISTING GROUND
## Date:PROJ. NO.:
Plot Date: 03/20/2026 - 10:12amDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSST.dwg
Xrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92STRM, 92SSWR, 92WATR, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSXU, 193807606-XSNO, 193807606-XSSS
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD & ELM STREET - STORM
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/20/2026193807606
## E-1FIGURE
## N
## HICKORY ST.
## ELM ST.
## SECOND ST.
## THIRD ST.
## FOURTH ST.
## W THIRD ST.
36"
24"
18"
48"
21"
48"
## TYPICAL SECTION OF STORM PIPING IN CHANNEL
Page 49 of 185
## 2026 Downtown Reconstruction Project Page 19
City of Chaska 193807606
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## Water Main and Sanitary Sewer Improvements
Currently the City's water main system in the project area consists mainly of 4 and 6-inch cast iron
pipes. It has reached the end of its service life. The pipe has corroded over time and is susceptible
to breaks. It can no longer reliably supply the needed water volume and pressure. The project being
considered proposes replacing all existing main with 8-inch PVC water main. The proposed water
main improvements are shown on Figure F-1. Water mains will be installed on every street creating a
grid system. This will provide redundant paths of the water to flow which will provide maximum
volume and pressure while also limiting the shutdown areas should a future problem arise. The new
water mains together with new hydrants and gate valves will greatly improve fire protection in the
area.
Most of the existing sanitary sewer lines located within the project limits are all vitrified clay piping
(VCP). The system pipes shown on Figure B-1 are approaching 100 years old. The City has evaluated
the existing sanitary sewer lines and has found various deficiencies in the piping system. The sanitary
system has infiltration through pipe joints, cracked pipe, and as well as through manholes. The City
has been required to clean and jet the existing piping to eliminate blockages due to inconsistent
pipe grades, pipe failures, and root growth inside the existing piping. The result of this has been very
high maintenance costs by having to continually service the sanitary sewer system in this area of
downtown Chaska. By replacing the sanitary sewer pipe and manholes the City will benefit by
reducing overall infiltration rates and maintenance costs.
Most sanitary sewer manholes that connect to the piping system in these streets are brick and
mortar structures and have reached their service life. These structures are especially susceptible to
infiltration due to the many joints in the manhole walls surrounding the perimeter of each brick. All
the sanitary manholes on the project will be removed and replaced with new precast concrete
manhole sections. Precast manholes sections are the current industry standard as they minimize the
amount of infiltration through having less joints and thus fewer entry points for groundwater.
To minimize sewer and water service disruption to the existing homes during construction, temporary
water and sewer systems will need to be implemented. The temporary systems will be built and
coordinated along with the progress of the new sewer and water installation.
Page 50 of 185
## 319G
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
## GARAGE
415
222
208
206
418
205
201
125
320
208
212
216
201
205
209
416
215
## 205G
## 201G
## 209G
## 215G
## 219G
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
l
l
ll
ll
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>
>>
>>
>>
>
>>
>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## SS
## SS
## SS
## SS
## SS
## CO
## SS
## CO
## SS
## CO
## CO
## CO
## SS
## SS
## SS
## SS
## SS
## SS
## SS
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
llll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## CO
## CO
## CO
## S
## S
## CO
## THIRD STREET W
## SECOND STREET W
## HICKORY STREET
>>
>>
>>
>>
>>
>>
>>
>>
>>
## Date:PROJ. NO.:
Plot Date: 03/12/2026 - 3:32pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSSS.dwg
Xrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92STRM, 92SSWR, 92WATR, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXU, 193807606-XSNO, 193807606-XSXT, 193807606-XSST
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## THIRD & ELM STREET - SANITARY & WATER
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026193807606
## F-1FIGURE
## N
## HICKORY ST.
## ELM ST.
## SECOND ST.
## FOURTH ST.
## W THIRD ST.
Page 51 of 185
## 2026 Downtown Reconstruction Project Page 21
City of Chaska 193807606
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## Water and Sanitary Sewer Services
With all main line sanitary sewer and water main piping being replaced, the condition of existing
utility services must also be addressed. For purposes of this report, sanitary sewer services impacted
by construction are proposed to be replaced from the sewer main in the street to the right-of-way in
front of each house. Consistent with previous downtown reconstruction projects, each homeowner
may elect to have their sanitary sewer replaced from the property line to their house. Additional
costs will be incurred by the property owner for service work beyond the right- of-way. The City along
with field construction staff will communicate to the homeowner what the condition of their sanitary
sewer service line is along with the recommendation to replace it or not. They will be given an
estimated cost and some time to decide whether to replace it or not. On the previous downtown
reconstruction projects the majority of sanitary sewer services lines were found to be in very poor
condition, and often either contained cracked/collapsed pipe or significant tree root damage.
Most homeowners have elected to replace their services. The older pipe was almost always clay,
cast iron, or Orangeburg. All new pipes installed are proposed to be PVC pipes that will match the
pipe size of the existing service size.
Standard open cut trench excavation will be used to install both sewer and water services from the
main that is installed in the street up to the property line location. If the homeowner elects to
replace their service from the property line to the building, the sanitary sewer services will be
replaced by one of two separate construction methods. The first method of sewer service
replacement will be a standard open cut excavation. Open cut excavation will be used when there
are minimal constraints with respect to trees, driveways, permanent landscaping, etc. Sanitary
sewer services that cannot be open cut may be replaced by directional drilling a new service up to
the exterior of the home where a connection can be made. The project proposes one sewer and
water service for each property. Where two properties share a common sanitary sewer or water
service, the costs to directional drill a new individual service have been included with this report.
Water services are proposed to be replaced from the main to the property line, unless they are
found to be a pipe material other than copper. Some of the more common pipe materials
encountered on the previous reconstruction project in downtown Chaska were lead and
galvanized steel. These products no longer meet current health and drinking water safety
requirements. If an existing water service contains a pipe material other than copper, the service
will be replaced with a trenchless installation technique from the main to the inside of the home at
the current water meter location.
Pre -project utility examinations of the homes were completed by City staff in 2012. There are no
known lead residential water services in this project area.
All work beyond public right-of-way is currently proposed to be a cost to the respective property
owner. It is, however, included in the overall project pricing in order to get the lowest effective cost
for the property owner as well as maximizing construction scheduling and project utility
coordination.
Page 52 of 185
## 2026 Downtown Reconstruction Project Page 22
City of Chaska 193807606
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## Sump Line Installation
The City of Chaska has implemented a sump pump drainage system policy as a part of their
reconstruction program. Sump lines that discharge into the street create two main problems. First,
they introduce more water to the existing street and curb, which can lead to more rapid
deterioration of the pavement and curb, specifically during the freeze/thaw cycles. Second, the
sump lines can also become a safety hazard. In the summer water from sump lines can produce a
green moss that can become extremely slippery. In the winter this same moisture can freeze and
become extremely slippery. Additionally, some private residences have sump systems that connect
to their sanitary sewer discharge lines. This results in additional drainage entering the sanitary sewer
system if the sump pumps are running, which ultimately leads to additional treatment costs for the
City.
Pre -project utility examinations of the homes were completed by City staff in 2012 in preparation for
the 2014 downtown reconstruction project. No structures were identified with active sump pumps at
that time. However, it is proposed to install sump line service for homes that have installed sump
pumps since those examinations.
Page 53 of 185
## 2026 Downtown Reconstruction Project Page 23
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Construction Phasing
During a street reconstruction project, it is common to have periods of time that certain residents are
not able to access the street directly in front of their homes. No formal phasing plan has been
proposed with this report. It is recommended that the City, engineer, and contractor work together
to develop a construction phasing plan that is mutually beneficial to the City and contractor that
limits disruption to the affected residents. The purpose of having a phasing plan in place is to help
ensure that the limited access time is minimized for residents, so that residents can park vehicles as
close as possible to their destinations during these time periods, and that the contractor is not
impeded from doing their work as expeditiously as possible.
Consistent with Chaska Guidelines, working hours on this project are proposed to be Monday
through Friday, 7 AM to 7 PM, and Saturday, 9 AM to 5 PM. Working on holidays and Sundays is not
permitted unless it is necessitated by an emergency and the contractor is given approval by City
staff. Additionally, the City and contractor would make every possible effort to provide residents
with access to their driveway every night from 7 PM to 7 AM and on weekends. It is important to
note that there are times when this will not be possible, especially during periods of concrete curb,
driveway and sidewalk placement. During construction of these items residents are typically unable
to drive vehicles over these areas for up to 7 days.
The City will remain in close contact with residents throughout the project duration with mailings,
handouts, and on-site resident meetings. An on -site meeting will be held prior to the start of
construction to allow impacted residents to meet the City construction personnel, learn more about
the upcoming phase of construction and specifically how they will be impacted, and ask questions
about the project. Residents will also be given contact information for individuals to contact as
questions or concerns come up during the course of the project.
Page 54 of 185
## 2026 Downtown Reconstruction Project Page 24
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Project Schedule
The following project schedule is recommended. The 2026 Reconstruction Project is proposed to be
constructed in 2026, with the exception of the final wear course paving and boulevard tree planting
which would be completed in 2027 along with any minor restoration work remaining. It is
recommended to begin constructing the project as soon as possible.
Upon acceptance of the Feasibility Study for the 2026 Street Reconstruction Project, a public
hearing will be scheduled to consider approval of the improvement project. A proposed schedule is
as follows:
## Council Accepts Feasibility Study March 30, 2026
## Staff and Engineer Hold Neighborhood Meetings April 8, 2026
## Council Orders Improvement Hearing/ Authorizes Preparation of
## Construction Documents
April 20, 2026
## Public Improvement Hearing / Council Authorize Preparation of
## Construction Documents / Order Assessment Hearing
May 18th, 2026
Council Approves Construction Documents / Authorizes Bidding May 18, 2026
## Public Assessment Hearing June 15, 2026
## Receive Bids June 18, 2026
## Award Bid June 29, 2026
## Start Construction July 2026
## Construction Completion November 2026
## Final Wear Course Paving Spring/Summer 2027
Page 55 of 185
## 2026 Downtown Reconstruction Project Page 25
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Project Costs
The following is a breakdown of estimated costs for various sections of the project proposed for
Council consideration. Options 1-4 are shown below and illustrated in Figure G-1:
## 2026 Street Reconstruction Project Costs
## OPTION 1 OPTION 2 OPTION 3 OPTION 4
## STREET IMPROVEMENTS $1,311,500 $1,256,000 $1,225,500 $1,193,000
## STORM SEWER
## IMPROVEMENTS
$79,000 $79,000 $79,000 $79,000
## WATER MAIN
## IMPROVEMENTS
$233,000 $150,500 $150,500 $150,500
## WATER SERVICES
## IMPROVEMENTS
$98,500 $98,500 $98,500 $98,500
## SANITARY SEWER
## IMPROVEMENTS
$244,000 $161,500 $161,500 $161,500
## SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500 $52,500 $52,500 $52,500
## CHANNEL
## IMPROVEMENTS*
$0.00 $247,000 $965,500 $1,348,500
__________ __________ __________ __________
## PROJECT COSTS SUMMARY $2,018,500 $2,045,000 $2,733,000 $3,083,500
*The removal of the Third Street Bridge qualifies for Bridge State Aid funding, with an estimated
reimbursement of $65,000, which has not been included in the above estimate.
## OPTION 1 – STREET AND UTILITY IMPROVEMENTS ONLY
The costs discussed relate to the complete reconstruction of both Third Street and Elm Street. In this
scenario, the Third Street Bridge would remain untouched, while water main and sanitary sewer
utilities would be installed by jacking beneath the bridge. However, this approach appears
impractical, as leaving the bridge in place and installing new utilities is likely to increase construction
expenses compared to option 2, especially considering the potential availability of funding for
removing the Third Street Bridge.
## OPTION 2 – REMOVE THIRD STREET BRIDGE
The Third Street Bridge will be removed and replaced with a storm culvert crossing to ensure
continued channel drainage from Fourth Street. This solution is considered feasible due to the
Page 56 of 185
## 2026 Downtown Reconstruction Project Page 26
City of Chaska 193807606
availability of state funding for bridge removal, and because no extra easements or right-of-way
acquisitions are required for its construction.
## OPTION 3 – REMOVE THIRD STREET BRIDGE AND CHANNEL
The channel is filled in, the Third Street bridge is taken out, and a storm sewer pipe is installed from
Fourth Street to just east of Hickory Street, where it discharges beneath the Hickory Street Bridge.
Completing this project option will require acquiring both permanent and temporary easements.
Although this approach is possible, it may be less practical than option four due to higher long-term
costs associated with greater maintenance requirements of the bridge.
## OPTION 4 – REMOVE THIRD STREET AND HICKORY STREET BRIDGES AND CHANNEL
The Hickory Street Bridge has been removed, and the channel storm sewer piping is now connected
to the dual 48-inch high and low flow storm sewer pipes installed during the 2011 Downtown
Reconstruction Project. Although all four options are practical, a review based on engineering
feasibility, bridge age, funding eligibility, maintenance needs, public safety, and lifecycle costs
shows that Option 4 offers the greatest long-term benefits. While this option requires the highest initial
investment, it removes outdated infrastructure, reduces maintenance risks, improves stormwater
management, and supports the City’s infrastructure goals.
Page 57 of 185
## 319G
316
310
308
## 400G
220
219
223
## 223G
## 412G
## 414G
## 420G
400
412
414
420
305
## GARAGE
303
225
221
415
222
208
206
418
205
201
125
500
320
208
212
216
201
205
209
416
215
## 205G
## 201G
## 209G
## 215G
## 219G
## CONTROL
## CO
## CO
## CO
## S
## S
## CO
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>
>
>
>
>
>
ll
ll
ll
l
l
l
l
l
l
l
l
l
l
>
>
>
>
>
>
>
>
>>
>
>
>
>
>
>
>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## Date:PROJ. NO.:
Plot Date: 03/11/2026 - 4:46pmDrawing name: C:\Users\khemani\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-XSST.dwgXrefs:, 193800229XSPL, 193800229TOPO, 92CURB_GUTTER, 92STRM, 92SSWR, 92WATR, 92address_numbers, 193802530_TOPO, 193802530XSXT-WEST, TOPOGRAPHY-2017, 193807606-XSXT, 193807606-XSXU, 193807606-XSNO, 193807606-XSSS
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## CONSTRUCTION OPTIONS
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
3/11/2026193807606
## G-1FIGURE
## N
## HICKORY ST.
## ELM ST.
## SECOND ST.
## THIRD ST.
## FOURTH ST.
## W THIRD ST.
48"48"
## OPTION 1: BRIDGE & CHANNEL REMAIN IN PLACE.
## OPTION 2: REMOVE THIRD STREET BRIDGE
## OPTION 3: REMOVE THIRD STREET BRIDGE & FILL CHANNEL
## OPTION 4: REMOVE THIRD AND HICKORY STREET BRIDGES
## & FILL CHANNEL
## HICKORY STREET BRIDGE
## THIRD STREET BRIDGE
Page 58 of 185
## 2026 Downtown Reconstruction Project Page 28
City of Chaska 193807606
The estimated costs of the work presented in this report have been itemized in Appendix A. The cost
estimates include construction, contingencies, design, inspection, and administration. No costs have
been added for any acquisitions of right-of-way. The cost estimate is based on a bid date in spring
of 2026 and the majority of construction occurring in 2026. Chaska proposes to finance a portion of
the project cost consistent with the City’s policy for direct assessment benefiting property owners for
a local street. Utility trunk funds will be utilized to cover any utility oversizing costs. A separate
assessment report, prepared by City Staff, will be added as a supplement to this report.
Page 59 of 185
## 2026 Downtown Reconstruction Project Page 29
City of Chaska 193807606
## 202 6 DOWNTOWN RECONSTRUCTION PROJECT
## Recommendations and Conclusions
The work outlined in this report is feasible relative to engineering matters and is necessary and cost
effective in addressing the utility needs and street reconstruction issues for the 2026 Downtown
Street Reconstruction. Project financing will be handled by City Staff in a supplemental report. The
following comments and recommendations are presented for consideration:
It is recommended that the improvements include a Chaska Standard Street section that
incorporates an urban 7-ton design with drain tile as outlined in this report.
It is recommended that the Hickory Street Bridge and Third Street Bridge be removed as a part of
the project to eliminate the future maintenance costs.
It is recommended that the channel between Fourth Street and Hickory Street be abandoned.
It is recommended that all sanitary sewer facilities, water main facilities, and related
appurtenances be replaced due to the overall age and service life of the existing utilities.
It is recommended to replace all the existing residential sewer and water services as outlined in
the report.
It is recommended to begin constructing the project as soon as possible after the project award.
It is proposed to place specific construction requirements on the construction of the downtown
streets to allow for the best access possible for residents and businesses.
The total estimated cost of the recommended improvements is $3,083,380.00 This is based on a bid
date in the spring of 2026 and the majority of construction being completed in 2026.
Page 60 of 185
## Appendix A
## 2026 Downtown Reconstruction Project
## Construction and Project Costs
Page 61 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## 1 MOBILIZATIONLS1$71,200.00$71,200.00
## 2 TRAFFIC CONTROLLS1$20,000.00$20,000.00
## 3 TEMPORARY MAILBOXEA8$250.00$2,000.00
## 4 STREET SWEEPER WITH PICK UP BROOM WITH OPERATORHR120$175.00$21,000.00
## 5 CLEAR AND GRUBTREE16$750.00$12,000.00
## 6 TREE TRIMMINGHR5$250.00$1,250.00
## 7 SAWING BITUMINOUS PAVEMENTLF375$6.00$2,250.00
## 8 SAWING CONCRETE PAVEMENTLF144$10.00$1,440.00
## 9 REMOVE BITUMINOUS PAVEMENTSY3650$7.00$25,550.00
## 10 REMOVE BITUMINOUS DRIVEWAYSY100$12.00$1,200.00
## 11 REMOVE CONCRETE DRIVEWAY PAVEMENTSY260$12.00$3,120.00
## 12 REMOVE CONCRETE SIDEWALKSY500$8.00$4,000.00
## 13 REMOVE CONCRETE CURB AND GUTTERLF705$6.00$4,230.00
## 14 REMOVE STORM SEWER PIPELF225$25.00$5,625.00
## 15 REMOVE WATER MAINLF660$15.00$9,900.00
## 16 REMOVE SANITARY SEWER PIPELF425$15.00$6,375.00
## 17 REMOVE SIGNEA6$100.00$600.00
## 18 ABANDON WATERMAIN PIPELF75$25.00$1,875.00
## 19 REMOVE STORM SEWER MANHOLE OR CATCH BASINEA7$1,000.00$7,000.00
## 20 REMOVE SANITARY SEWER MANHOLEEA2$1,500.00$3,000.00
## 21 TEMPORARY ROCK CONSTRUCTION ENTERANCEEA4$1,500.00$6,000.00
## 22 SALVAGE HYDRANTEA2$1,000.00$2,000.00
## 23 SALVAGE EXISTING LANDSCAPE BOULDERSLS1$500.00$500.00
## 24 SALVAGE WOODEN FENCELF100$50.00$5,000.00
## 25 ADJUST FRAME AND RING CASTINGEA3$1,200.00$3,600.00
## 26 FURNISH AND INSTALL NEW CASTING FOR CURB BOX IN DRIVEWAYEA4$1,000.00$4,000.00
## 27 COMMON EXCAVATION (EV)CY4000$40.00$160,000.00
## 28 SUBGRADE EXCAVATION (EV)CY175$40.00$7,000.00
## 29 ROCK EXCAVATIONCY50$25.00$1,250.00
## 30 HAUL AND STOCK PILE ROCKCY50$20.00$1,000.00
## 31 SELECT GRANULAR BORROW (CV)CY2180$25.00$54,500.00
## 32 SELECT TOP SOIL BORROW (LV)CY450$45.00$20,250.00
## 33 GEOTEXTILE FABRIC, TYPE VSY3025$3.00$9,075.00
## 34 GEOGRIDSY500$5.00$2,500.00
## 35 AGGREGATE BASE, CLASS 5, 100% CRUSHEDTN1350$30.00$40,500.00
## ENGINEERS ESTIMATE
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## PROJECT NO. 193807606
2026
## OPTION 1
## PART 1 - STREET IMPROVEMENTS
## ENGINEER ESTIMATE.xlsx
Page 62 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## 36 3'' MINUSTN150$30.00$4,500.00
## 37 WATER FOR DUST CONTROL1000 GAL50$100.00$5,000.00
## 38 MILL BITUMINOUS PAVEMENT (VARIABLE DEPTH)SY125$25.00$3,125.00
## 39 TYPE SP 9.5 WEARING COURSE (2,C)TN595$100.00$59,500.00
## 40 BITUMINOUS DRIVEWAY REPAIRSF820$7.50$6,150.00
## 41 BITUMINOUS WEDGE FOR PLOW PROTECTIONTN40$250.00$10,000.00
## 42 BITUMINOUS MATERIAL FOR TACK COATGAL320$7.00$2,240.00
## 43 4" PERFORATED POLYETHYLENE PIPELF1290$10.00$12,900.00
## 44 4" PERFORATED PVC DRAIN TILE, SCHEDULE SDR 26LF150$25.00$3,750.00
## 45 CONNECT TO EXISTING DRAIN TILEEA7$250.00$1,750.00
## 46 CONNECT DRAIN TILE TO EXISTING STORM STRUCTUREEA6$500.00$3,000.00
## 47 INSTALL 4" UTILITY CONDUITLF90$25.00$2,250.00
## 48 INSTALL 2" UTILITY CONDUITLF90$25.00$2,250.00
## 49 POTHOLE EXISTING UTILITYEA5$600.00$3,000.00
## 50 4" CONCRETE SIDEWALKSF5823$12.00$69,876.00
## 51 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF1325$32.00$42,400.00
## 52 V-CURBLF50$45.00$2,250.00
## 53 REMOVE AND REPLACE CURB AND GUTTERLF100$65.00$6,500.00
## 54 CONCRETE STEPSEA4$1,000.00$4,000.00
## 55 6" CONCRETE DRIVEWAY REPAIRSF3075$16.00$49,200.00
## 56 CONCRETE PEDESTRIAN CURB RAMPSF890$20.00$17,800.00
## 57 TRUNCATED DOME PANELSF140$120.00$16,800.00
## 58 JOINT SEALINGLF250$10.00$2,500.00
## 59 BRIDGE SIDEWALK RETROFITLS1$5,000.00$5,000.00
## 60 KENTUCKY COFFEETREE, 2" CAL. B&BEA7$800.00$5,600.00
## 61 SWAMP WHITE OAK, 2" CAL. B&BEA7$800.00$5,600.00
## 62 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA7$800.00$5,600.00
## 63 SIENNA GLEN MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 64 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 65 SIGN PANELS, TYPE CSF60$90.00$5,400.00
## 66 PROTECTION OF CATCH BASIN IN STREET (BEFORE CURB)EA25$150.00$3,750.00
## 67 PROTECTION OF CATCH BASIN IN STREET (AFTER CURB)EA5$150.00$750.00
## 68 SODDING, LAWN TYPESY2000$10.00$20,000.00
## 69 HYDRAULIC SOIL STABILIZER TYPE 6SY900$2.00$1,800.00
## 70 WATER FOR TURF ESTABLISHMENTMGAL250$75.00$18,750.00
## 71 SILT FENCELF100$5.00$500.00
## 72 BIOLOGLF1325$5.00$6,625.00
## 73 LANDSCAPE RESTORATIONLS1$10,000.00$10,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 1 - STREET IMPROVEMENTS
$953,706.00
10% Contingency $95,370.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$1,049,076.60
## 25% Engineering, Administration, Legal$262,269.15
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,311,500.00
## ENGINEER ESTIMATE.xlsx
Page 63 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## PART 2 - STORM SEWER IMPROVEMENTS
## 74 15" RCP STORM SEWER, CLASS 5LF100$100.00$10,000.00
## 75 18" RCP STORM SEWER, CLASS 5LF50$115.00$5,750.00
## 76 24" RCP STORM SEWER, CLASS 3LF50$150.00$7,500.00
## 77 2' X 3' CB, INCL R-3067-V CSTG AND CONC ADJ RINGSEA3$3,200.00$9,600.00
## 78 4' DIA STORM SEWER CBMH, INCLUDING R-3067-V CSTG AND CONC ADJ
## RINGS
## EA2$5,000.00$10,000.00
## 79 CONNECT TO EXISTING STORM SEWEREA2$2,000.00$4,000.00
## CONNECT TO EXISTING STORM MANHOLEEA3$3,500.00$10,500.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 2 - STORM SEWER IMPROVEMENTS
$57,350.00
10% Contingency $5,735.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## 25% Engineering, Administration, Legal$15,771.25
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## PART 3 - WATER MAIN IMPROVEMENTS
## 80 INSTALL HYDRANTEA2$7,500.00$15,000.00
## 81 INSTALL TEMPORARY HYDRANTEA1$5,000.00$5,000.00
## 82 INSTALL TEMPORARY GATE VALVEEA1$2,500.00$2,500.00
## 83 CONNECT TO EXISTING WATER MAINEA5$600.00$3,000.00
## 84 6" GATE VALVE AND BOXEA2$3,200.00$6,400.00
## 85 8" GATE VALVE AND BOXEA4$4,000.00$16,000.00
## 86 6" PVC WATER MAIN, DR-18LF35$60.00$2,100.00
## 87 8" PVC WATER MAIN, DR-18LF625$70.00$43,750.00
## 88 18'' CASING JACKEDLF75$800.00$60,000.00
## 89 INSULATION, 4" THICKSY20$50.00$1,000.00
## 90 DUCTILE IRON FITTINGSLB665$15.00$9,975.00
## 91 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF700$7.00$4,900.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 3 - WATER MAIN IMPROVEMENTS
$169,625.00
10% Contingency $16,962.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$186,587.50
## 25% Engineering, Administration, Legal$46,646.88
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$233,000.00
## ENGINEER ESTIMATE.xlsx
Page 64 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## PART 4 - WATER SERVICES
## 92 TEMPORARY WATER MAINLS1$15,000.00$15,000.00
## 93 CONNECT TO EXISTING WATER SERVICEEA6$1,000.00$6,000.00
## 94 1" CURB STOP AND BOXEA6$1,500.00$9,000.00
## 95 1" CORPORATION STOP WITH 8" SADDLEEA6$1,500.00$9,000.00
## 96 1" POLY WATER SERVICELF250$50.00$12,500.00
## 97 1'' POLY WATER SERVICE DIRECTIONALLY DRILLEDLF100$150.00$15,000.00
## 98 PLUMBED CONNECTIONEA2$2,500.00$5,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 4 - WATER SERVICES IMPROVEMENTS
$71,500.00
10% Contingency $7,150.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## 25% Engineering, Administration, Legal$19,662.50
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## PART 5 - SANITARY SEWER IMPROVEMENTS
## 99 CONNECT TO EXISTING SANITARY SEWER PIPEEA1$5,000.00$5,000.00
## 100 CONNECT TO EXISTING SANITARY SEWER MANHOLEEA2$10,000.00$20,000.00
## 101 BYPASS PUMPINGLS1$10,000.00$10,000.00
## 102 4' DIAMETER SANITARY MH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA2$10,000.00$20,000.00
## 103 4' DIAMETER SANITARY MANHOLE OVERDEPTHLF5$800.00$4,000.00
## 104 8" PVC SANITARY SEWER, SDR 26LF450$90.00$40,500.00
## 105 18'' CASING JACKEDLF75$800.00$60,000.00
## 106 8'' X 4'' WYEEA5$750.00$3,750.00
## 107 8'' X 6'' WYEEA1$750.00$750.00
## 108 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF1700$8.00$13,600.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 5 - SANITARY SEWER IMPROVEMENTS
$177,600.00
10% Contingency $17,760.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$195,360.00
## 25% Engineering, Administration, Legal$48,840.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$244,000.00
## ENGINEER ESTIMATE.xlsx
Page 65 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## PART 6 - SANITARY SEWER SERVICES
## 109 RECONNECT SANITARY SEWER SERVICEEA6$1,250.00$7,500.00
## 110 CLEANOUTEA4$500.00$2,000.00
## 111 4" PVC, SCH. 40 SERVICE PIPELF265$60.00$15,900.00
## 112 4" PVC, SCH. 40 RISER PIPELF18$75.00$1,350.00
## 113 4" PVC, SCH.40 - ROW TO HOUSE OPEN CUTLF75$150.00$11,250.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 6 - SANITARY SEWER SERVICES IMPROVEMENTS
$38,000.00
10% Contingency $3,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## 25% Engineering, Administration, Legal$10,450.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## PART 7 - CHANNEL IMPROVEMENTS
## 114 CLEAR AND GRUBLS0$26,000.00$0.00
115 REMOVE 3rd STREET BRIDGE (L4966)LS0$50,000.00$0.00
## 116 REMOVE HICKORY STREET BRIDGE (10522)LS0$60,000.00$0.00
## 117 REMOVE STORM SEWER PIPELF0$25.00$0.00
## 118 REMOVE RETAINING WALLSF0$30.00$0.00
## 119 REMOVE FENCELF0$20.00$0.00
## 120 REMOVE AND REPLACE FENCELF0$50.00$0.00
## 121 REMOVE CURB AND GUTTERLF0$10.00$0.00
## 122 REMOVE CONCRETE SIDEWALKSY0$10.00$0.00
## 123 REMOVE BITUMINOUS PAVEMENTSY0$20.00$0.00
## 124 REMOVE CONCRETE DRIVEWAYSY0$20.00$0.00
## 125 REMOVE BITUMINOUS DRIVEWAYSY0$10.00$0.00
## 126 REMOVE SIGNEA0$100.00$0.00
## 127 SAW CUT BITUMINOUS PAVEMENTLF0$6.00$0.00
## 128 SAW CUT CONCRETE PAVEMENTLF0$10.00$0.00
## 129 ADJUST SANITARY SEWER CASTINGEA0$1,000.00$0.00
## 130 SALVAGE AND REINSTALL STORM PIPELF0$30.00$0.00
## 131 MUCK/RIP RAP EXCAVATION (EV)CY0$30.00$0.00
## 132 COMMON EMBANKMENT (CV)CY0$10.00$0.00
## 133 GRANULAR BORROW (CV)CY0$45.00$0.00
## 134 SELECT GRANULAR BORROWCY0$25.00$0.00
## 135 CLASS 5, 100% CRUSHEDTN0$35.00$0.00
## 136 IMPROVED PIPE FOUNDATIONCY0$50.00$0.00
## 137 48" FLARED END SECTIONEA0$7,500.00$0.00
## 138 60'' FLARED END SECTIONEA0$10,000.00$0.00
## 139 18'' RCP STORM SEWER, CLASS 3LF 0$100.00$0.00
## 140 21'' RCP STORM SEWER, CLASS 3LF0$120.00$0.00
## 141 24" RCP STORM SEWER, CLASS 3LF0$150.00$0.00
## 142 36'' RCP STORM SEWER, CLASS 3LF0$200.00$0.00
## 143 48" RCP STORM SEWER, CLASS 3LF0$275.00$0.00
## 144 60'' RCP STORM SEWER, CLASS 3LF0$500.00$0.00
## ENGINEER ESTIMATE.xlsx
Page 66 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## 145 8" PERFORATED PVC DRAIN TILE, SDR 35LF0$35.00$0.00
## 146 8'' CLEAN OUTEA0$800.00$0.00
147 4'' PE DraintileEA0$25.00$0.00
## 148 CONNECT TO EXISTING DRAINTILEEA0$250.00$0.00
## 149 DRAIN TILE HEADWALLEA0$1,000.00$0.00
## 150 4' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$5,000.00$0.00
## 151 5' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$7,500.00$0.00
## 152 7' DIA STORM CBMH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA0$10,000.00$0.00
## 153 8' DIA STORM SEWER CBMH, INC R-4341-A, CSTG AND CONC ADJ RINGSEA0$12,000.00$0.00
## 154 9' DIA STORM SEWER CBMH, INC R-3290-VB, CSTG AND CONC ADJ RINGSEA0$15,000.00$0.00
## 155 10' DIA STORM MH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$17,000.00$0.00
## 156 CONNECT TO EXISTING STORM SEWEREA0$2,500.00$0.00
## 157 GEOTEXTILE FABRIC-RIP RAPSY0$5.00$0.00
## 158 GEOTEXTILE FABRIC-PIPE BEDDINGSY0$5.00$0.00
## 159 GEOTEXTILE FABRIC-ROADWAYSY0$5.00$0.00
## 160 CLASS IV RANDOM RIPRAPCY0$75.00$0.00
## 161 TYPE SP 9.5 WEARING COURSE (2,C)TN0$180.00$0.00
## 162 BITUMINOUS DRIVEWAY REPAIRSF0$7.50$0.00
## 163 TACK COATGAL0$0.00$0.00
## 164 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF0$35.00$0.00
## 165 4'' WALKSF0$12.00$0.00
## 166 6" CONCRETE DRIVEWAY REPAIRSF0$16.00$0.00
## 167 CONCRETE PEDESTRIAN CURB RAMPSF0$20.00$0.00
## 168 TRUNCATED DOMESSF0$120.00$0.00
## 169 SILT FENCE, MACHINE SLICEDLF0$2.50$0.00
## 170 ROCK DITCH CHECKEA0$450.00$0.00
## 171 BIOROLLLF0$3.50$0.00
## 172 PROTECTION OF CATCH BASIN, NON-STREETEA0$150.00$0.00
## 173 COMMON TOPSOIL BORROW (LV)CY0$55.00$0.00
## 174 TEMPORARY SEDIMENT TRAPEA0$1,500.00$0.00
## 175 TEMPORARY CONSTRUCTION ENTRANCEEA0$1,500.00$0.00
## 176 SEEDINGAC0$1,000.00$0.00
## 177 SOUTHERN BOULEVARD SEED MIXLB0$1,800.00$0.00
## 178 EROSION CONTROL BLANKETS,CATEGORY 20SY0$3.00$0.00
## 179 TRMSY0$30.00$0.00
## 180 HYDRAULIC SOIL STABILIZER SFMSY0$4.00$0.00
## 181 WATER FOR TURF ESTABLISHMENT1000 GAL0$75.00$0.00
## 182 KENTUCKY COFFEETREE, 2" CAL. B&BEA0$800.00$0.00
## ENGINEER ESTIMATE.xlsx
Page 67 of 185
No.ItemUnits Option 1 Qty Option 1 EE Unit Price Option 1 EE Total Price
## 183 SWAMP WHITE OAK, 2" CAL. B&BEA0$800.00$0.00
## 184 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA0$800.00$0.00
## 185 SIENNA GLEN MAPLE, 2" CAL. B&BEA0$800.00$0.00
## 186 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA0$800.00$0.00
$0.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 7 - CHANNEL IMPROVEMENTS
$0.00
10% Contingency $0.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$0.00
## 25% Engineering, Administration, Legal$0.00
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$0.00
## TOTAL ESTIMATED CONSTRUCTION COSTS
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$1,049,076.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$186,587.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$195,360.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$0.00
## TOTAL ESTIMATED CONSTRUCTION COSTSOPTION 1$1,614,559.10
## ESTIMATED PROJECT COSTS SUMMARY
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,311,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$233,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$244,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$0.00
## TOTAL ESTIMATED PROJECT COSTS SUMMARYOPTION 1$2,018,500.00
## ENGINEER ESTIMATE.xlsx
Page 68 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## 1 MOBILIZATIONLS1$71,400.00$71,400.00
## 2 TRAFFIC CONTROLLS1$20,000.00$20,000.00
## 3 TEMPORARY MAILBOXEA8$250.00$2,000.00
## 4 STREET SWEEPER WITH PICK UP BROOM WITH OPERATORHR120$175.00$21,000.00
## 5 CLEAR AND GRUBTREE16$750.00$12,000.00
## 6 TREE TRIMMINGHR5$250.00$1,250.00
## 7 SAWING BITUMINOUS PAVEMENTLF375$6.00$2,250.00
## 8 SAWING CONCRETE PAVEMENTLF144$10.00$1,440.00
## 9 REMOVE BITUMINOUS PAVEMENTSY3650$7.00$25,550.00
## 10 REMOVE BITUMINOUS DRIVEWAYSY100$12.00$1,200.00
## 11 REMOVE CONCRETE DRIVEWAY PAVEMENTSY260$12.00$3,120.00
## 12 REMOVE CONCRETE SIDEWALKSY500$8.00$4,000.00
## 13 REMOVE CONCRETE CURB AND GUTTERLF705$6.00$4,230.00
## 14 REMOVE STORM SEWER PIPELF225$25.00$5,625.00
## 15 REMOVE WATER MAINLF660$15.00$9,900.00
## 16 REMOVE SANITARY SEWER PIPELF425$15.00$6,375.00
## 17 REMOVE SIGNEA6$100.00$600.00
## 18 ABANDON WATERMAIN PIPELF75$25.00$1,875.00
## 19 REMOVE STORM SEWER MANHOLE OR CATCH BASINEA7$1,000.00$7,000.00
## 20 REMOVE SANITARY SEWER MANHOLEEA2$1,500.00$3,000.00
## 21 TEMPORARY ROCK CONSTRUCTION ENTERANCEEA4$1,500.00$6,000.00
## 22 SALVAGE HYDRANTEA2$1,000.00$2,000.00
## 23 SALVAGE EXISTING LANDSCAPE BOULDERSLS1$500.00$500.00
## 24 SALVAGE WOODEN FENCELF100$50.00$5,000.00
## 25 ADJUST FRAME AND RING CASTINGEA3$1,200.00$3,600.00
## 26 FURNISH AND INSTALL NEW CASTING FOR CURB BOX IN DRIVEWAYEA4$1,000.00$4,000.00
## 27 COMMON EXCAVATION (EV)CY3115$40.00$124,600.00
## 28 SUBGRADE EXCAVATION (EV)CY175$40.00$7,000.00
## 29 ROCK EXCAVATIONCY50$25.00$1,250.00
## 30 HAUL AND STOCK PILE ROCKCY50$20.00$1,000.00
## 31 SELECT GRANULAR BORROW (CV)CY2180$25.00$54,500.00
## 32 SELECT TOP SOIL BORROW (LV)CY450$45.00$20,250.00
## 33 GEOTEXTILE FABRIC, TYPE VSY3025$3.00$9,075.00
## 34 GEOGRIDSY500$5.00$2,500.00
## 35 AGGREGATE BASE, CLASS 5, 100% CRUSHEDTN1350$30.00$40,500.00
## ENGINEERS ESTIMATE
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## PROJECT NO. 193807606
2026
## OPTION 2
## PART 1 - STREET IMPROVEMENTS
## ENGINEER ESTIMATE.xlsx
Page 69 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## 36 3'' MINUSTN150$30.00$4,500.00
## 37 WATER FOR DUST CONTROL1000 GAL50$100.00$5,000.00
## 38 MILL BITUMINOUS PAVEMENT (VARIABLE DEPTH)SY125$25.00$3,125.00
## 39 TYPE SP 9.5 WEARING COURSE (2,C)TN595$100.00$59,500.00
## 40 BITUMINOUS DRIVEWAY REPAIRSF820$7.50$6,150.00
## 41 BITUMINOUS WEDGE FOR PLOW PROTECTIONTN40$250.00$10,000.00
## 42 BITUMINOUS MATERIAL FOR TACK COATGAL320$7.00$2,240.00
## 43 4" PERFORATED POLYETHYLENE PIPELF1290$10.00$12,900.00
## 44 4" PERFORATED PVC DRAIN TILE, SCHEDULE SDR 26LF150$25.00$3,750.00
## 45 CONNECT TO EXISTING DRAIN TILEEA7$250.00$1,750.00
## 46 CONNECT DRAIN TILE TO EXISTING STORM STRUCTUREEA6$500.00$3,000.00
## 47 INSTALL 4" UTILITY CONDUITLF90$25.00$2,250.00
## 48 INSTALL 2" UTILITY CONDUITLF90$25.00$2,250.00
## 49 POTHOLE EXISTING UTILITYEA5$600.00$3,000.00
## 50 4" CONCRETE SIDEWALKSF5823$12.00$69,876.00
## 51 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF1325$32.00$42,400.00
## 52 V-CURBLF50$45.00$2,250.00
## 53 REMOVE AND REPLACE CURB AND GUTTERLF100$65.00$6,500.00
## 54 CONCRETE STEPSEA4$1,000.00$4,000.00
## 55 6" CONCRETE DRIVEWAY REPAIRSF3075$16.00$49,200.00
## 56 CONCRETE PEDESTRIAN CURB RAMPSF890$20.00$17,800.00
## 57 TRUNCATED DOME PANELSF140$120.00$16,800.00
## 58 JOINT SEALINGLF250$10.00$2,500.00
## 59 BRIDGE SIDEWALK RETROFITLS0$15,000.00$0.00
## 60 KENTUCKY COFFEETREE, 2" CAL. B&BEA7$800.00$5,600.00
## 61 SWAMP WHITE OAK, 2" CAL. B&BEA7$800.00$5,600.00
## 62 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA7$800.00$5,600.00
## 63 SIENNA GLEN MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 64 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 65 SIGN PANELS, TYPE CSF60$90.00$5,400.00
## 66 PROTECTION OF CATCH BASIN IN STREET (BEFORE CURB)EA25$150.00$3,750.00
## 67 PROTECTION OF CATCH BASIN IN STREET (AFTER CURB)EA5$150.00$750.00
## 68 SODDING, LAWN TYPESY2000$10.00$20,000.00
## 69 HYDRAULIC SOIL STABILIZER TYPE 6SY900$2.00$1,800.00
## 70 WATER FOR TURF ESTABLISHMENTMGAL250$75.00$18,750.00
## 71 SILT FENCELF100$5.00$500.00
## 72 BIOLOGLF1325$5.00$6,625.00
## 73 LANDSCAPE RESTORATIONLS1$10,000.00$10,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 1 - STREET IMPROVEMENTS
$913,506.00
10% Contingency $91,350.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$1,004,856.60
## 25% Engineering, Administration, Legal$251,214.15
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,256,000.00
## ENGINEER ESTIMATE.xlsx
Page 70 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## PART 2 - STORM SEWER IMPROVEMENTS
## 74 15" RCP STORM SEWER, CLASS 5LF100$100.00$10,000.00
## 75 18" RCP STORM SEWER, CLASS 5LF50$115.00$5,750.00
## 76 24" RCP STORM SEWER, CLASS 3LF50$150.00$7,500.00
## 77 2' X 3' CB, INCL R-3067-V CSTG AND CONC ADJ RINGSEA3$3,200.00$9,600.00
## 78 4' DIA STORM SEWER CBMH, INCLUDING R-3067-V CSTG AND CONC ADJ
## RINGS
## EA2$5,000.00$10,000.00
## 79 CONNECT TO EXISTING STORM SEWEREA2$2,000.00$4,000.00
## CONNECT TO EXISTING STORM MANHOLEEA3$3,500.00$10,500.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 2 - STORM SEWER IMPROVEMENTS
$57,350.00
10% Contingency $5,735.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## 25% Engineering, Administration, Legal$15,771.25
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## PART 3 - WATER MAIN IMPROVEMENTS
## 80 INSTALL HYDRANTEA2$7,500.00$15,000.00
## 81 INSTALL TEMPORARY HYDRANTEA1$5,000.00$5,000.00
## 82 INSTALL TEMPORARY GATE VALVEEA1$2,500.00$2,500.00
## 83 CONNECT TO EXISTING WATER MAINEA5$600.00$3,000.00
## 84 6" GATE VALVE AND BOXEA2$3,200.00$6,400.00
## 85 8" GATE VALVE AND BOXEA4$4,000.00$16,000.00
## 86 6" PVC WATER MAIN, DR-18LF35$60.00$2,100.00
## 87 8" PVC WATER MAIN, DR-18LF625$70.00$43,750.00
## 88 18'' CASING JACKEDLF0$800.00$0.00
## 89 INSULATION, 4" THICKSY20$50.00$1,000.00
## 90 DUCTILE IRON FITTINGSLB665$15.00$9,975.00
## 91 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF700$7.00$4,900.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 3 - WATER MAIN IMPROVEMENTS
$109,625.00
10% Contingency $10,962.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## 25% Engineering, Administration, Legal$30,146.88
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## ENGINEER ESTIMATE.xlsx
Page 71 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## PART 4 - WATER SERVICES
## 92 TEMPORARY WATER MAINLS1$15,000.00$15,000.00
## 93 CONNECT TO EXISTING WATER SERVICEEA6$1,000.00$6,000.00
## 94 1" CURB STOP AND BOXEA6$1,500.00$9,000.00
## 95 1" CORPORATION STOP WITH 8" SADDLEEA6$1,500.00$9,000.00
## 96 1" POLY WATER SERVICELF250$50.00$12,500.00
## 97 1'' POLY WATER SERVICE DIRECTIONALLY DRILLEDLF100$150.00$15,000.00
## 98 PLUMBED CONNECTIONEA2$2,500.00$5,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 4 - WATER SERVICES IMPROVEMENTS
$71,500.00
10% Contingency $7,150.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## 25% Engineering, Administration, Legal$19,662.50
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## PART 5 - SANITARY SEWER IMPROVEMENTS
## 99 CONNECT TO EXISTING SANITARY SEWER PIPEEA1$5,000.00$5,000.00
## 100 CONNECT TO EXISTING SANITARY SEWER MANHOLEEA2$10,000.00$20,000.00
## 101 BYPASS PUMPINGLS1$10,000.00$10,000.00
## 102 4' DIAMETER SANITARY MH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA2$10,000.00$20,000.00
## 103 4' DIAMETER SANITARY MANHOLE OVERDEPTHLF5$800.00$4,000.00
## 104 8" PVC SANITARY SEWER, SDR 26LF450$90.00$40,500.00
## 105 18'' CASING JACKEDLF0$800.00$0.00
## 106 8'' X 4'' WYEEA5$750.00$3,750.00
## 107 8'' X 6'' WYEEA1$750.00$750.00
## 108 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF1700$8.00$13,600.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 5 - SANITARY SEWER IMPROVEMENTS
$117,600.00
10% Contingency $11,760.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## 25% Engineering, Administration, Legal$32,340.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## ENGINEER ESTIMATE.xlsx
Page 72 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## PART 6 - SANITARY SEWER SERVICES
## 109 RECONNECT SANITARY SEWER SERVICEEA6$1,250.00$7,500.00
## 110 CLEANOUTEA4$500.00$2,000.00
## 111 4" PVC, SCH. 40 SERVICE PIPELF265$60.00$15,900.00
## 112 4" PVC, SCH. 40 RISER PIPELF18$75.00$1,350.00
## 113 4" PVC, SCH.40 - ROW TO HOUSE OPEN CUTLF75$150.00$11,250.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 6 - SANITARY SEWER SERVICES IMPROVEMENTS
$38,000.00
10% Contingency $3,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## 25% Engineering, Administration, Legal$10,450.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## PART 7 - CHANNEL IMPROVEMENTS
## 114 CLEAR AND GRUBLS0.2$26,000.00$5,200.00
115 REMOVE 3rd STREET BRIDGE (L4966)LS1$50,000.00$50,000.00
## 116 REMOVE HICKORY STREET BRIDGE (10522)LS0$60,000.00$0.00
## 117 REMOVE STORM SEWER PIPELF8$25.00$200.00
## 118 REMOVE RETAINING WALLSF100$30.00$3,000.00
## 119 REMOVE FENCELF0$20.00$0.00
## 120 REMOVE AND REPLACE FENCELF0$50.00$0.00
## 121 REMOVE CURB AND GUTTERLF0$10.00$0.00
## 122 REMOVE CONCRETE SIDEWALKSY0$10.00$0.00
## 123 REMOVE BITUMINOUS PAVEMENTSY0$20.00$0.00
## 124 REMOVE CONCRETE DRIVEWAYSY0$20.00$0.00
## 125 REMOVE BITUMINOUS DRIVEWAYSY0$10.00$0.00
## 126 REMOVE SIGNEA0$100.00$0.00
## 127 SAW CUT BITUMINOUS PAVEMENTLF0$6.00$0.00
## 128 SAW CUT CONCRETE PAVEMENTLF0$10.00$0.00
## 129 ADJUST SANITARY SEWER CASTINGEA0$1,000.00$0.00
## 130 SALVAGE AND REINSTALL STORM PIPELF40$30.00$1,200.00
## 131 MUCK/RIP RAP EXCAVATION (EV)CY225$30.00$6,750.00
## 132 COMMON EMBANKMENT (CV)CY885$10.00$8,850.00
## 133 GRANULAR BORROW (CV)CY75$45.00$3,375.00
## 134 SELECT GRANULAR BORROWCY0$25.00$0.00
## 135 CLASS 5, 100% CRUSHEDTN0$35.00$0.00
## 136 IMPROVED PIPE FOUNDATIONCY75$50.00$3,750.00
## 137 48" FLARED END SECTIONEA2$7,500.00$15,000.00
## 138 60'' FLARED END SECTIONEA0$10,000.00$0.00
## 139 18'' RCP STORM SEWER, CLASS 3LF 0$100.00$0.00
## 140 21'' RCP STORM SEWER, CLASS 3LF0$120.00$0.00
## 141 24" RCP STORM SEWER, CLASS 3LF8$150.00$1,200.00
## 142 36'' RCP STORM SEWER, CLASS 3LF0$200.00$0.00
## 143 48" RCP STORM SEWER, CLASS 3LF140$275.00$38,500.00
## 144 60'' RCP STORM SEWER, CLASS 3LF0$500.00$0.00
## ENGINEER ESTIMATE.xlsx
Page 73 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## 145 8" PERFORATED PVC DRAIN TILE, SDR 35LF280$35.00$9,800.00
## 146 8'' CLEAN OUTEA2$800.00$1,600.00
147 4'' PE DraintileEA0$25.00$0.00
## 148 CONNECT TO EXISTING DRAINTILEEA0$250.00$0.00
## 149 DRAIN TILE HEADWALLEA2$1,000.00$2,000.00
## 150 4' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$5,000.00$0.00
## 151 5' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$7,500.00$0.00
## 152 7' DIA STORM CBMH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA0$10,000.00$0.00
## 153 8' DIA STORM SEWER CBMH, INC R-4341-A, CSTG AND CONC ADJ RINGSEA0$12,000.00$0.00
## 154 9' DIA STORM SEWER CBMH, INC R-3290-VB, CSTG AND CONC ADJ RINGSEA1$15,000.00$15,000.00
## 155 10' DIA STORM MH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$17,000.00$0.00
## 156 CONNECT TO EXISTING STORM SEWEREA1$2,500.00$2,500.00
## 157 GEOTEXTILE FABRIC-RIP RAPSY40$5.00$200.00
## 158 GEOTEXTILE FABRIC-PIPE BEDDINGSY125$5.00$625.00
## 159 GEOTEXTILE FABRIC-ROADWAYSY0$5.00$0.00
## 160 CLASS IV RANDOM RIPRAPCY20$75.00$1,500.00
## 161 TYPE SP 9.5 WEARING COURSE (2,C)TN0$180.00$0.00
## 162 BITUMINOUS DRIVEWAY REPAIRSF0$7.50$0.00
## 163 TACK COATGAL0$0.00$0.00
## 164 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF0$35.00$0.00
## 165 4'' WALKSF0$12.00$0.00
## 166 6" CONCRETE DRIVEWAY REPAIRSF0$16.00$0.00
## 167 CONCRETE PEDESTRIAN CURB RAMPSF0$20.00$0.00
## 168 TRUNCATED DOMESSF0$120.00$0.00
## 169 SILT FENCE, MACHINE SLICEDLF50$5.00$250.00
## 170 ROCK DITCH CHECKEA1$1,000.00$1,000.00
## 171 BIOROLLLF200$5.00$1,000.00
## 172 PROTECTION OF CATCH BASIN, NON-STREETEA0$150.00$0.00
## 173 COMMON TOPSOIL BORROW (LV)CY50$55.00$2,750.00
## 174 TEMPORARY SEDIMENT TRAPEA1$1,500.00$1,500.00
## 175 TEMPORARY CONSTRUCTION ENTRANCEEA0$1,500.00$0.00
## 176 SEEDINGAC0.1$1,000.00$100.00
## 177 SOUTHERN BOULEVARD SEED MIXLB50$5.00$250.00
## 178 EROSION CONTROL BLANKETS,CATEGORY 20SY100$3.00$300.00
## 179 TRMSY25$30.00$750.00
## 180 HYDRAULIC SOIL STABILIZER SFMSY0$4.00$0.00
## 181 WATER FOR TURF ESTABLISHMENT1000 GAL20$75.00$1,500.00
## 182 KENTUCKY COFFEETREE, 2" CAL. B&BEA0$800.00$0.00
## ENGINEER ESTIMATE.xlsx
Page 74 of 185
No.ItemUnits Option 2 Qty Option 2 EE Unit Price Option 2 EE Total Price
## 183 SWAMP WHITE OAK, 2" CAL. B&BEA0$800.00$0.00
## 184 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA0$800.00$0.00
## 185 SIENNA GLEN MAPLE, 2" CAL. B&BEA0$800.00$0.00
## 186 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA0$800.00$0.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 7 - CHANNEL IMPROVEMENTS
$179,650.00
10% Contingency $17,965.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$197,615.00
## 25% Engineering, Administration, Legal$49,403.75
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$247,000.00
## TOTAL ESTIMATED CONSTRUCTION COSTS
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$1,004,856.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$197,615.00
## TOTAL ESTIMATED CONSTRUCTION COSTSOPTION 2$1,635,954.10
## ESTIMATED PROJECT COSTS SUMMARY
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,256,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$247,000.00
## TOTAL ESTIMATED PROJECT COSTS SUMMARYOPTION 2$2,045,000.00
## ENGINEER ESTIMATE.xlsx
Page 75 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## 1 MOBILIZATIONLS1$95,200.00$95,200.00
## 2 TRAFFIC CONTROLLS1$20,000.00$20,000.00
## 3 TEMPORARY MAILBOXEA8$250.00$2,000.00
## 4 STREET SWEEPER WITH PICK UP BROOM WITH OPERATORHR120$175.00$21,000.00
## 5 CLEAR AND GRUBTREE16$750.00$12,000.00
## 6 TREE TRIMMINGHR5$250.00$1,250.00
## 7 SAWING BITUMINOUS PAVEMENTLF375$6.00$2,250.00
## 8 SAWING CONCRETE PAVEMENTLF144$10.00$1,440.00
## 9 REMOVE BITUMINOUS PAVEMENTSY3650$7.00$25,550.00
## 10 REMOVE BITUMINOUS DRIVEWAYSY100$12.00$1,200.00
## 11 REMOVE CONCRETE DRIVEWAY PAVEMENTSY260$12.00$3,120.00
## 12 REMOVE CONCRETE SIDEWALKSY500$8.00$4,000.00
## 13 REMOVE CONCRETE CURB AND GUTTERLF705$6.00$4,230.00
## 14 REMOVE STORM SEWER PIPELF225$25.00$5,625.00
## 15 REMOVE WATER MAINLF660$15.00$9,900.00
## 16 REMOVE SANITARY SEWER PIPELF425$15.00$6,375.00
## 17 REMOVE SIGNEA6$100.00$600.00
## 18 ABANDON WATERMAIN PIPELF75$25.00$1,875.00
## 19 REMOVE STORM SEWER MANHOLE OR CATCH BASINEA7$1,000.00$7,000.00
## 20 REMOVE SANITARY SEWER MANHOLEEA2$1,500.00$3,000.00
## 21 TEMPORARY ROCK CONSTRUCTION ENTERANCEEA4$1,500.00$6,000.00
## 22 SALVAGE HYDRANTEA2$1,000.00$2,000.00
## 23 SALVAGE EXISTING LANDSCAPE BOULDERSLS1$500.00$500.00
## 24 SALVAGE WOODEN FENCELF100$50.00$5,000.00
## 25 ADJUST FRAME AND RING CASTINGEA3$1,200.00$3,600.00
## 26 FURNISH AND INSTALL NEW CASTING FOR CURB BOX IN DRIVEWAYEA4$1,000.00$4,000.00
## 27 COMMON EXCAVATION (EV)CY1960$40.00$78,400.00
## 28 SUBGRADE EXCAVATION (EV)CY175$40.00$7,000.00
## 29 ROCK EXCAVATIONCY50$25.00$1,250.00
## 30 HAUL AND STOCK PILE ROCKCY50$20.00$1,000.00
## 31 SELECT GRANULAR BORROW (CV)CY2180$25.00$54,500.00
## 32 SELECT TOP SOIL BORROW (LV)CY450$45.00$20,250.00
## 33 GEOTEXTILE FABRIC, TYPE VSY3025$3.00$9,075.00
## 34 GEOGRIDSY500$5.00$2,500.00
## 35 AGGREGATE BASE, CLASS 5, 100% CRUSHEDTN1350$30.00$40,500.00
## ENGINEERS ESTIMATE
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## PROJECT NO. 193807606
2026
## OPTION 3
## PART 1 - STREET IMPROVEMENTS
## ENGINEER ESTIMATE.xlsx
Page 76 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## 36 3'' MINUSTN150$30.00$4,500.00
## 37 WATER FOR DUST CONTROL1000 GAL50$100.00$5,000.00
## 38 MILL BITUMINOUS PAVEMENT (VARIABLE DEPTH)SY125$25.00$3,125.00
## 39 TYPE SP 9.5 WEARING COURSE (2,C)TN595$100.00$59,500.00
## 40 BITUMINOUS DRIVEWAY REPAIRSF820$7.50$6,150.00
## 41 BITUMINOUS WEDGE FOR PLOW PROTECTIONTN40$250.00$10,000.00
## 42 BITUMINOUS MATERIAL FOR TACK COATGAL320$7.00$2,240.00
## 43 4" PERFORATED POLYETHYLENE PIPELF1290$10.00$12,900.00
## 44 4" PERFORATED PVC DRAIN TILE, SCHEDULE SDR 26LF150$25.00$3,750.00
## 45 CONNECT TO EXISTING DRAIN TILEEA7$250.00$1,750.00
## 46 CONNECT DRAIN TILE TO EXISTING STORM STRUCTUREEA6$500.00$3,000.00
## 47 INSTALL 4" UTILITY CONDUITLF90$25.00$2,250.00
## 48 INSTALL 2" UTILITY CONDUITLF90$25.00$2,250.00
## 49 POTHOLE EXISTING UTILITYEA5$600.00$3,000.00
## 50 4" CONCRETE SIDEWALKSF5823$12.00$69,876.00
## 51 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF1325$32.00$42,400.00
## 52 V-CURBLF50$45.00$2,250.00
## 53 REMOVE AND REPLACE CURB AND GUTTERLF100$65.00$6,500.00
## 54 CONCRETE STEPSEA4$1,000.00$4,000.00
## 55 6" CONCRETE DRIVEWAY REPAIRSF3075$16.00$49,200.00
## 56 CONCRETE PEDESTRIAN CURB RAMPSF890$20.00$17,800.00
## 57 TRUNCATED DOME PANELSF140$120.00$16,800.00
## 58 JOINT SEALINGLF250$10.00$2,500.00
## 59 BRIDGE SIDEWALK RETROFITLS0$15,000.00$0.00
## 60 KENTUCKY COFFEETREE, 2" CAL. B&BEA7$800.00$5,600.00
## 61 SWAMP WHITE OAK, 2" CAL. B&BEA7$800.00$5,600.00
## 62 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA7$800.00$5,600.00
## 63 SIENNA GLEN MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 64 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 65 SIGN PANELS, TYPE CSF60$90.00$5,400.00
## 66 PROTECTION OF CATCH BASIN IN STREET (BEFORE CURB)EA25$150.00$3,750.00
## 67 PROTECTION OF CATCH BASIN IN STREET (AFTER CURB)EA5$150.00$750.00
## 68 SODDING, LAWN TYPESY2000$10.00$20,000.00
## 69 HYDRAULIC SOIL STABILIZER TYPE 6SY900$2.00$1,800.00
## 70 WATER FOR TURF ESTABLISHMENTMGAL250$75.00$18,750.00
## 71 SILT FENCELF100$5.00$500.00
## 72 BIOLOGLF1325$5.00$6,625.00
## 73 LANDSCAPE RESTORATIONLS1$10,000.00$10,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 1 - STREET IMPROVEMENTS
$891,106.00
10% Contingency $89,110.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$980,216.60
## 25% Engineering, Administration, Legal$245,054.15
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,225,500.00
## ENGINEER ESTIMATE.xlsx
Page 77 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## PART 2 - STORM SEWER IMPROVEMENTS
## 74 15" RCP STORM SEWER, CLASS 5LF100$100.00$10,000.00
## 75 18" RCP STORM SEWER, CLASS 5LF50$115.00$5,750.00
## 76 24" RCP STORM SEWER, CLASS 3LF50$150.00$7,500.00
## 77 2' X 3' CB, INCL R-3067-V CSTG AND CONC ADJ RINGSEA3$3,200.00$9,600.00
## 78 4' DIA STORM SEWER CBMH, INCLUDING R-3067-V CSTG AND CONC ADJ
## RINGS
## EA2$5,000.00$10,000.00
## 79 CONNECT TO EXISTING STORM SEWEREA2$2,000.00$4,000.00
## CONNECT TO EXISTING STORM MANHOLEEA3$3,500.00$10,500.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 2 - STORM SEWER IMPROVEMENTS
$57,350.00
10% Contingency $5,735.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## 25% Engineering, Administration, Legal$15,771.25
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## PART 3 - WATER MAIN IMPROVEMENTS
## 80 INSTALL HYDRANTEA2$7,500.00$15,000.00
## 81 INSTALL TEMPORARY HYDRANTEA1$5,000.00$5,000.00
## 82 INSTALL TEMPORARY GATE VALVEEA1$2,500.00$2,500.00
## 83 CONNECT TO EXISTING WATER MAINEA5$600.00$3,000.00
## 84 6" GATE VALVE AND BOXEA2$3,200.00$6,400.00
## 85 8" GATE VALVE AND BOXEA4$4,000.00$16,000.00
## 86 6" PVC WATER MAIN, DR-18LF35$60.00$2,100.00
## 87 8" PVC WATER MAIN, DR-18LF625$70.00$43,750.00
## 88 18'' CASING JACKEDLF0$800.00$0.00
## 89 INSULATION, 4" THICKSY20$50.00$1,000.00
## 90 DUCTILE IRON FITTINGSLB665$15.00$9,975.00
## 91 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF700$7.00$4,900.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 3 - WATER MAIN IMPROVEMENTS
$109,625.00
10% Contingency $10,962.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## 25% Engineering, Administration, Legal$30,146.88
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## ENGINEER ESTIMATE.xlsx
Page 78 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## PART 4 - WATER SERVICES
## 92 TEMPORARY WATER MAINLS1$15,000.00$15,000.00
## 93 CONNECT TO EXISTING WATER SERVICEEA6$1,000.00$6,000.00
## 94 1" CURB STOP AND BOXEA6$1,500.00$9,000.00
## 95 1" CORPORATION STOP WITH 8" SADDLEEA6$1,500.00$9,000.00
## 96 1" POLY WATER SERVICELF250$50.00$12,500.00
## 97 1'' POLY WATER SERVICE DIRECTIONALLY DRILLEDLF100$150.00$15,000.00
## 98 PLUMBED CONNECTIONEA2$2,500.00$5,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 4 - WATER SERVICES IMPROVEMENTS
$71,500.00
10% Contingency $7,150.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## 25% Engineering, Administration, Legal$19,662.50
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## PART 5 - SANITARY SEWER IMPROVEMENTS
## 99 CONNECT TO EXISTING SANITARY SEWER PIPEEA1$5,000.00$5,000.00
## 100 CONNECT TO EXISTING SANITARY SEWER MANHOLEEA2$10,000.00$20,000.00
## 101 BYPASS PUMPINGLS1$10,000.00$10,000.00
## 102 4' DIAMETER SANITARY MH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA2$10,000.00$20,000.00
## 103 4' DIAMETER SANITARY MANHOLE OVERDEPTHLF5$800.00$4,000.00
## 104 8" PVC SANITARY SEWER, SDR 26LF450$90.00$40,500.00
## 105 18'' CASING JACKEDLF0$800.00$0.00
## 106 8'' X 4'' WYEEA5$750.00$3,750.00
## 107 8'' X 6'' WYEEA1$750.00$750.00
## 108 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF1700$8.00$13,600.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 5 - SANITARY SEWER IMPROVEMENTS
$117,600.00
10% Contingency $11,760.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## 25% Engineering, Administration, Legal$32,340.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## ENGINEER ESTIMATE.xlsx
Page 79 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## PART 6 - SANITARY SEWER SERVICES
## 109 RECONNECT SANITARY SEWER SERVICEEA6$1,250.00$7,500.00
## 110 CLEANOUTEA4$500.00$2,000.00
## 111 4" PVC, SCH. 40 SERVICE PIPELF265$60.00$15,900.00
## 112 4" PVC, SCH. 40 RISER PIPELF18$75.00$1,350.00
## 113 4" PVC, SCH.40 - ROW TO HOUSE OPEN CUTLF75$150.00$11,250.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 6 - SANITARY SEWER SERVICES IMPROVEMENTS
$38,000.00
10% Contingency $3,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## 25% Engineering, Administration, Legal$10,450.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## PART 7 - CHANNEL IMPROVEMENTS
## 114 CLEAR AND GRUBLS0.8$26,000.00$20,800.00
115 REMOVE 3rd STREET BRIDGE (L4966)LS1$50,000.00$50,000.00
## 116 REMOVE HICKORY STREET BRIDGE (10522)LS0$60,000.00$0.00
## 117 REMOVE STORM SEWER PIPELF20$25.00$500.00
## 118 REMOVE RETAINING WALLSF920$30.00$27,600.00
## 119 REMOVE FENCELF0$20.00$0.00
## 120 REMOVE AND REPLACE FENCELF0$50.00$0.00
## 121 REMOVE CURB AND GUTTERLF0$10.00$0.00
## 122 REMOVE CONCRETE SIDEWALKSY0$10.00$0.00
## 123 REMOVE BITUMINOUS PAVEMENTSY0$20.00$0.00
## 124 REMOVE CONCRETE DRIVEWAYSY0$20.00$0.00
## 125 REMOVE BITUMINOUS DRIVEWAYSY0$10.00$0.00
## 126 REMOVE SIGNEA0$100.00$0.00
## 127 SAW CUT BITUMINOUS PAVEMENTLF0$6.00$0.00
## 128 SAW CUT CONCRETE PAVEMENTLF0$10.00$0.00
## 129 ADJUST SANITARY SEWER CASTINGEA0$1,000.00$0.00
## 130 SALVAGE AND REINSTALL STORM PIPELF40$30.00$1,200.00
## 131 MUCK/RIP RAP EXCAVATION (EV)CY850$30.00$25,500.00
## 132 COMMON EMBANKMENT (CV)CY2040$10.00$20,400.00
## 133 GRANULAR BORROW (CV)CY305$45.00$13,725.00
## 134 SELECT GRANULAR BORROWCY0$25.00$0.00
## 135 CLASS 5, 100% CRUSHEDTN0$35.00$0.00
## 136 IMPROVED PIPE FOUNDATIONCY300$50.00$15,000.00
## 137 48" FLARED END SECTIONEA0$2,500.00$0.00
## 138 60'' FLARED END SECTIONEA1$10,000.00$10,000.00
## 139 18'' RCP STORM SEWER, CLASS 3LF 0$100.00$0.00
## 140 21'' RCP STORM SEWER, CLASS 3LF0$120.00$0.00
## 141 24" RCP STORM SEWER, CLASS 3LF8$34.00$272.00
## 142 36'' RCP STORM SEWER, CLASS 3LF210$200.00$42,000.00
## 143 48" RCP STORM SEWER, CLASS 3LF125$275.00$34,375.00
## 144 60'' RCP STORM SEWER, CLASS 3LF215$500.00$107,500.00
## ENGINEER ESTIMATE.xlsx
Page 80 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## 145 8" PERFORATED PVC DRAIN TILE, SDR 35LF1050$35.00$36,750.00
## 146 8'' CLEAN OUTEA6$800.00$4,800.00
147 4'' PE DraintileEA0$25.00$0.00
## 148 CONNECT TO EXISTING DRAINTILEEA0$250.00$0.00
## 149 DRAIN TILE HEADWALLEA2$1,000.00$2,000.00
## 150 4' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$5,000.00$0.00
## 151 5' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA1$7,500.00$7,500.00
## 152 7' DIA STORM CBMH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA1$10,000.00$10,000.00
## 153 8' DIA STORM SEWER CBMH, INC R-4341-A, CSTG AND CONC ADJ RINGSEA1$12,000.00$12,000.00
## 154 9' DIA STORM SEWER CBMH, INC R-3290-VB, CSTG AND CONC ADJ RINGSEA1$15,000.00$15,000.00
## 155 10' DIA STORM MH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$17,000.00$0.00
## 156 CONNECT TO EXISTING STORM SEWEREA2$2,500.00$5,000.00
## 157 GEOTEXTILE FABRIC-RIP RAPSY40$5.00$200.00
## 158 GEOTEXTILE FABRIC-PIPE BEDDINGSY500$5.00$2,500.00
## 159 GEOTEXTILE FABRIC-ROADWAYSY0$5.00$0.00
## 160 CLASS IV RANDOM RIPRAPCY40$75.00$3,000.00
## 161 TYPE SP 9.5 WEARING COURSE (2,C)TN0$180.00$0.00
## 162 BITUMINOUS DRIVEWAY REPAIRSF0$7.50$0.00
## 163 TACK COATGAL0$0.00$0.00
## 164 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF0$35.00$0.00
## 165 4'' WALKSF0$12.00$0.00
## 166 6" CONCRETE DRIVEWAY REPAIRSF0$16.00$0.00
## 167 CONCRETE PEDESTRIAN CURB RAMPSF0$20.00$0.00
## 168 TRUNCATED DOMESSF0$120.00$0.00
## 169 SILT FENCE, MACHINE SLICEDLF500$5.00$2,500.00
## 170 ROCK DITCH CHECKEA1$1,000.00$1,000.00
## 171 BIOROLLLF200$5.00$1,000.00
## 172 PROTECTION OF CATCH BASIN, NON-STREETEA0$150.00$0.00
## 173 COMMON TOPSOIL BORROW (LV)CY305$55.00$16,775.00
## 174 TEMPORARY SEDIMENT TRAPEA1$1,500.00$1,500.00
## 175 TEMPORARY CONSTRUCTION ENTRANCEEA1$1,500.00$1,500.00
## 176 SEEDINGAC0.3$1,000.00$300.00
## 177 SOUTHERN BOULEVARD SEED MIXLB100$1,800.00$180,000.00
## 178 EROSION CONTROL BLANKETS,CATEGORY 20SY475$3.00$1,425.00
## 179 TRMSY0$30.00$0.00
## 180 HYDRAULIC SOIL STABILIZER SFMSY1300$4.00$5,200.00
## 181 WATER FOR TURF ESTABLISHMENT1000 GAL100$75.00$7,500.00
## 182 KENTUCKY COFFEETREE, 2" CAL. B&BEA4$800.00$3,200.00
## ENGINEER ESTIMATE.xlsx
Page 81 of 185
No.ItemUnitsOption 3 QtyOption 3 EE Unit Price Option 3 EE Total Price
## 183 SWAMP WHITE OAK, 2" CAL. B&BEA4$800.00$3,200.00
## 184 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA4$800.00$3,200.00
## 185 SIENNA GLEN MAPLE, 2" CAL. B&BEA4$800.00$3,200.00
## 186 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA4$800.00$3,200.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 7 - CHANNEL IMPROVEMENTS
$702,322.00
10% Contingency $70,232.20
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$772,554.20
## 25% Engineering, Administration, Legal$193,138.55
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$965,500.00
## TOTAL ESTIMATED CONSTRUCTION COSTS
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$980,216.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$772,554.20
## TOTAL ESTIMATED CONSTRUCTION COSTSOPTION 3$2,186,253.30
## ESTIMATED PROJECT COSTS SUMMARY
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,225,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$965,500.00
## TOTAL ESTIMATED PROJECT COSTS SUMMARYOPTION 3$2,733,000.00
## ENGINEER ESTIMATE.xlsx
Page 82 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## 1 MOBILIZATIONLS1$106,200.00$106,200.00
## 2 TRAFFIC CONTROLLS1$20,000.00$20,000.00
## 3 TEMPORARY MAILBOXEA8$250.00$2,000.00
## 4 STREET SWEEPER WITH PICK UP BROOM WITH OPERATORHR120$175.00$21,000.00
## 5 CLEAR AND GRUBTREE16$750.00$12,000.00
## 6 TREE TRIMMINGHR5$250.00$1,250.00
## 7 SAWING BITUMINOUS PAVEMENTLF375$6.00$2,250.00
## 8 SAWING CONCRETE PAVEMENTLF144$10.00$1,440.00
## 9 REMOVE BITUMINOUS PAVEMENTSY3650$7.00$25,550.00
## 10 REMOVE BITUMINOUS DRIVEWAYSY100$12.00$1,200.00
## 11 REMOVE CONCRETE DRIVEWAY PAVEMENTSY260$12.00$3,120.00
## 12 REMOVE CONCRETE SIDEWALKSY500$8.00$4,000.00
## 13 REMOVE CONCRETE CURB AND GUTTERLF705$6.00$4,230.00
## 14 REMOVE STORM SEWER PIPELF225$25.00$5,625.00
## 15 REMOVE WATER MAINLF660$15.00$9,900.00
## 16 REMOVE SANITARY SEWER PIPELF425$15.00$6,375.00
## 17 REMOVE SIGNEA6$100.00$600.00
## 18 ABANDON WATERMAIN PIPELF75$25.00$1,875.00
## 19 REMOVE STORM SEWER MANHOLE OR CATCH BASINEA7$1,000.00$7,000.00
## 20 REMOVE SANITARY SEWER MANHOLEEA2$1,500.00$3,000.00
## 21 TEMPORARY ROCK CONSTRUCTION ENTERANCEEA4$1,500.00$6,000.00
## 22 SALVAGE HYDRANTEA2$1,000.00$2,000.00
## 23 SALVAGE EXISTING LANDSCAPE BOULDERSLS1$500.00$500.00
## 24 SALVAGE WOODEN FENCELF100$50.00$5,000.00
## 25 ADJUST FRAME AND RING CASTINGEA3$1,200.00$3,600.00
## 26 FURNISH AND INSTALL NEW CASTING FOR CURB BOX IN DRIVEWAYEA4$1,000.00$4,000.00
## 27 COMMON EXCAVATION (EV)CY1100$40.00$44,000.00
## 28 SUBGRADE EXCAVATION (EV)CY175$40.00$7,000.00
## 29 ROCK EXCAVATIONCY50$25.00$1,250.00
## 30 HAUL AND STOCK PILE ROCKCY50$20.00$1,000.00
## 31 SELECT GRANULAR BORROW (CV)CY2180$25.00$54,500.00
## 32 SELECT TOP SOIL BORROW (LV)CY450$45.00$20,250.00
## 33 GEOTEXTILE FABRIC, TYPE VSY3025$3.00$9,075.00
## 34 GEOGRIDSY500$5.00$2,500.00
## 35 AGGREGATE BASE, CLASS 5, 100% CRUSHEDTN1350$30.00$40,500.00
## ENGINEERS ESTIMATE
## 2026 DOWNTOWN RECONSTRUCTION PROJECT
## PROJECT NO. 193807606
2026
## OPTION 4
## PART 1 - STREET IMPROVEMENTS
## ENGINEER ESTIMATE.xlsx
Page 83 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## 36 3'' MINUSTN150$30.00$4,500.00
## 37 WATER FOR DUST CONTROL1000 GAL50$100.00$5,000.00
## 38 MILL BITUMINOUS PAVEMENT (VARIABLE DEPTH)SY125$25.00$3,125.00
## 39 TYPE SP 9.5 WEARING COURSE (2,C)TN595$100.00$59,500.00
## 40 BITUMINOUS DRIVEWAY REPAIRSF820$7.50$6,150.00
## 41 BITUMINOUS WEDGE FOR PLOW PROTECTIONTN40$250.00$10,000.00
## 42 BITUMINOUS MATERIAL FOR TACK COATGAL320$7.00$2,240.00
## 43 4" PERFORATED POLYETHYLENE PIPELF1290$10.00$12,900.00
## 44 4" PERFORATED PVC DRAIN TILE, SCHEDULE SDR 26LF150$25.00$3,750.00
## 45 CONNECT TO EXISTING DRAIN TILEEA7$250.00$1,750.00
## 46 CONNECT DRAIN TILE TO EXISTING STORM STRUCTUREEA6$500.00$3,000.00
## 47 INSTALL 4" UTILITY CONDUITLF90$25.00$2,250.00
## 48 INSTALL 2" UTILITY CONDUITLF90$25.00$2,250.00
## 49 POTHOLE EXISTING UTILITYEA5$600.00$3,000.00
## 50 4" CONCRETE SIDEWALKSF5823$12.00$69,876.00
## 51 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF1325$32.00$42,400.00
## 52 V-CURBLF50$45.00$2,250.00
## 53 REMOVE AND REPLACE CURB AND GUTTERLF100$65.00$6,500.00
## 54 CONCRETE STEPSEA4$1,000.00$4,000.00
## 55 6" CONCRETE DRIVEWAY REPAIRSF3075$16.00$49,200.00
## 56 CONCRETE PEDESTRIAN CURB RAMPSF890$20.00$17,800.00
## 57 TRUNCATED DOME PANELSF140$120.00$16,800.00
## 58 JOINT SEALINGLF250$10.00$2,500.00
## 59 BRIDGE SIDEWALK RETROFITLS0$15,000.00$0.00
## 60 KENTUCKY COFFEETREE, 2" CAL. B&BEA7$800.00$5,600.00
## 61 SWAMP WHITE OAK, 2" CAL. B&BEA7$800.00$5,600.00
## 62 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA7$800.00$5,600.00
## 63 SIENNA GLEN MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 64 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA8$800.00$6,400.00
## 65 SIGN PANELS, TYPE CSF60$90.00$5,400.00
## 66 PROTECTION OF CATCH BASIN IN STREET (BEFORE CURB)EA25$150.00$3,750.00
## 67 PROTECTION OF CATCH BASIN IN STREET (AFTER CURB)EA5$150.00$750.00
## 68 SODDING, LAWN TYPESY2000$10.00$20,000.00
## 69 HYDRAULIC SOIL STABILIZER TYPE 6SY900$2.00$1,800.00
## 70 WATER FOR TURF ESTABLISHMENTMGAL250$75.00$18,750.00
## 71 SILT FENCELF100$5.00$500.00
## 72 BIOLOGLF1325$5.00$6,625.00
## 73 LANDSCAPE RESTORATIONLS1$10,000.00$10,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 1 - STREET IMPROVEMENTS
$867,706.00
10% Contingency $86,770.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$954,476.60
## 25% Engineering, Administration, Legal$238,619.15
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,193,000.00
## ENGINEER ESTIMATE.xlsx
Page 84 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## PART 2 - STORM SEWER IMPROVEMENTS
## 74 15" RCP STORM SEWER, CLASS 5LF100$100.00$10,000.00
## 75 18" RCP STORM SEWER, CLASS 5LF50$115.00$5,750.00
## 76 24" RCP STORM SEWER, CLASS 3LF50$150.00$7,500.00
## 77 2' X 3' CB, INCL R-3067-V CSTG AND CONC ADJ RINGSEA3$3,200.00$9,600.00
## 78 4' DIA STORM SEWER CBMH, INCLUDING R-3067-V CSTG AND CONC ADJ
## RINGS
## EA2$5,000.00$10,000.00
## 79 CONNECT TO EXISTING STORM SEWEREA2$2,000.00$4,000.00
## CONNECT TO EXISTING STORM MANHOLEEA3$3,500.00$10,500.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 2 - STORM SEWER IMPROVEMENTS
$57,350.00
10% Contingency $5,735.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## 25% Engineering, Administration, Legal$15,771.25
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## PART 3 - WATER MAIN IMPROVEMENTS
## 80 INSTALL HYDRANTEA2$7,500.00$15,000.00
## 81 INSTALL TEMPORARY HYDRANTEA1$5,000.00$5,000.00
## 82 INSTALL TEMPORARY GATE VALVEEA1$2,500.00$2,500.00
## 83 CONNECT TO EXISTING WATER MAINEA5$600.00$3,000.00
## 84 6" GATE VALVE AND BOXEA2$3,200.00$6,400.00
## 85 8" GATE VALVE AND BOXEA4$4,000.00$16,000.00
## 86 6" PVC WATER MAIN, DR-18LF35$60.00$2,100.00
## 87 8" PVC WATER MAIN, DR-18LF625$70.00$43,750.00
## 88 18'' CASING JACKEDLF0$800.00$0.00
## 89 INSULATION, 4" THICKSY20$50.00$1,000.00
## 90 DUCTILE IRON FITTINGSLB665$15.00$9,975.00
## 91 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF700$7.00$4,900.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 3 - WATER MAIN IMPROVEMENTS
$109,625.00
10% Contingency $10,962.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## 25% Engineering, Administration, Legal$30,146.88
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## ENGINEER ESTIMATE.xlsx
Page 85 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## PART 4 - WATER SERVICES
## 92 TEMPORARY WATER MAINLS1$15,000.00$15,000.00
## 93 CONNECT TO EXISTING WATER SERVICEEA6$1,000.00$6,000.00
## 94 1" CURB STOP AND BOXEA6$1,500.00$9,000.00
## 95 1" CORPORATION STOP WITH 8" SADDLEEA6$1,500.00$9,000.00
## 96 1" POLY WATER SERVICELF250$50.00$12,500.00
## 97 1'' POLY WATER SERVICE DIRECTIONALLY DRILLEDLF100$150.00$15,000.00
## 98 PLUMBED CONNECTIONEA2$2,500.00$5,000.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 4 - WATER SERVICES IMPROVEMENTS
$71,500.00
10% Contingency $7,150.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## 25% Engineering, Administration, Legal$19,662.50
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## PART 5 - SANITARY SEWER IMPROVEMENTS
## 99 CONNECT TO EXISTING SANITARY SEWER PIPEEA1$5,000.00$5,000.00
## 100 CONNECT TO EXISTING SANITARY SEWER MANHOLEEA2$10,000.00$20,000.00
## 101 BYPASS PUMPINGLS1$10,000.00$10,000.00
## 102 4' DIAMETER SANITARY MH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA2$10,000.00$20,000.00
## 103 4' DIAMETER SANITARY MANHOLE OVERDEPTHLF5$800.00$4,000.00
## 104 8" PVC SANITARY SEWER, SDR 26LF450$90.00$40,500.00
## 105 18'' CASING JACKEDLF0$800.00$0.00
## 106 8'' X 4'' WYEEA5$750.00$3,750.00
## 107 8'' X 6'' WYEEA1$750.00$750.00
## 108 IMPROVED PIPE FOUNDATION, PER 6" INCREMENTLF1700$8.00$13,600.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 5 - SANITARY SEWER IMPROVEMENTS
$117,600.00
10% Contingency $11,760.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## 25% Engineering, Administration, Legal$32,340.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## ENGINEER ESTIMATE.xlsx
Page 86 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## PART 6 - SANITARY SEWER SERVICES
## 109 RECONNECT SANITARY SEWER SERVICEEA6$1,250.00$7,500.00
## 110 CLEANOUTEA4$500.00$2,000.00
## 111 4" PVC, SCH. 40 SERVICE PIPELF265$60.00$15,900.00
## 112 4" PVC, SCH. 40 RISER PIPELF18$75.00$1,350.00
## 113 4" PVC, SCH.40 - ROW TO HOUSE OPEN CUTLF75$150.00$11,250.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 6 - SANITARY SEWER SERVICES IMPROVEMENTS
$38,000.00
10% Contingency $3,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## 25% Engineering, Administration, Legal$10,450.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## PART 7 - CHANNEL IMPROVEMENTS
## 114 CLEAR AND GRUBLS1$26,000.00$26,000.00
115 REMOVE 3rd STREET BRIDGE (L4966)LS1$50,000.00$50,000.00
## 116 REMOVE HICKORY STREET BRIDGE (10522)LS1$60,000.00$60,000.00
## 117 REMOVE STORM SEWER PIPELF60$25.00$1,500.00
## 118 REMOVE RETAINING WALLSF960$30.00$28,800.00
## 119 REMOVE FENCELF75$20.00$1,500.00
## 120 REMOVE AND REPLACE FENCELF60$50.00$3,000.00
## 121 REMOVE CURB AND GUTTERLF80$10.00$800.00
## 122 REMOVE CONCRETE SIDEWALKSY45$10.00$450.00
## 123 REMOVE BITUMINOUS PAVEMENTSY125$20.00$2,500.00
## 124 REMOVE CONCRETE DRIVEWAYSY15$20.00$300.00
## 125 REMOVE BITUMINOUS DRIVEWAYSY25$10.00$250.00
## 126 REMOVE SIGNEA1$100.00$100.00
## 127 SAW CUT BITUMINOUS PAVEMENTLF140$6.00$840.00
## 128 SAW CUT CONCRETE PAVEMENTLF25$10.00$250.00
## 129 ADJUST SANITARY SEWER CASTINGEA2$1,000.00$2,000.00
## 130 SALVAGE AND REINSTALL STORM PIPELF120$30.00$3,600.00
## 131 MUCK/RIP RAP EXCAVATION (EV)CY900$30.00$27,000.00
## 132 COMMON EMBANKMENT (CV)CY2900$10.00$29,000.00
## 133 GRANULAR BORROW (CV)CY410$45.00$18,450.00
## 134 SELECT GRANULAR BORROWCY150$25.00$3,750.00
## 135 CLASS 5, 100% CRUSHEDTN100$35.00$3,500.00
## 136 IMPROVED PIPE FOUNDATIONCY375$50.00$18,750.00
## 137 48" FLARED END SECTIONEA0$2,500.00$0.00
## 138 60'' FLARED END SECTIONEA0$10,000.00$0.00
## 139 18'' RCP STORM SEWER, CLASS 3LF 20$100.00$2,000.00
## 140 21'' RCP STORM SEWER, CLASS 3LF20$120.00$2,400.00
## 141 24" RCP STORM SEWER, CLASS 3LF0$34.00$0.00
## 142 36'' RCP STORM SEWER, CLASS 3LF240$200.00$48,000.00
## 143 48" RCP STORM SEWER, CLASS 3LF165$275.00$45,375.00
## 144 60'' RCP STORM SEWER, CLASS 3LF305$500.00$152,500.00
## ENGINEER ESTIMATE.xlsx
Page 87 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## 145 8" PERFORATED PVC DRAIN TILE, SDR 35LF1210$35.00$42,350.00
## 146 8'' CLEAN OUTEA8$800.00$6,400.00
147 4'' PE DraintileEA120$25.00$3,000.00
## 148 CONNECT TO EXISTING DRAINTILEEA4$250.00$1,000.00
## 149 DRAIN TILE HEADWALLEA0$1,000.00$0.00
## 150 4' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA1$5,000.00$5,000.00
## 151 5' DIA STORM CBMH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA0$7,500.00$0.00
## 152 7' DIA STORM CBMH, INCL R-1642-B CSTG AND CONC ADJ RINGSEA2$10,000.00$20,000.00
## 153 8' DIA STORM SEWER CBMH, INC R-4341-A, CSTG AND CONC ADJ RINGSEA0$12,000.00$0.00
## 154 9' DIA STORM SEWER CBMH, INC R-3290-VB, CSTG AND CONC ADJ RINGSEA2$15,000.00$30,000.00
## 155 10' DIA STORM MH, INC R-1642-B, CSTG AND CONC ADJ RINGSEA1$17,000.00$17,000.00
## 156 CONNECT TO EXISTING STORM SEWEREA6$2,500.00$15,000.00
## 157 GEOTEXTILE FABRIC-RIP RAPSY0$2.00$0.00
## 158 GEOTEXTILE FABRIC-PIPE BEDDINGSY0$2.30$0.00
## 159 GEOTEXTILE FABRIC-ROADWAYSY340$5.00$1,700.00
## 160 CLASS IV RANDOM RIPRAPCY0$75.00$0.00
## 161 TYPE SP 9.5 WEARING COURSE (2,C)TN75$180.00$13,500.00
## 162 BITUMINOUS DRIVEWAY REPAIRSF225$7.50$1,687.50
## 163 TACK COATGAL25$10.00$250.00
## 164 B612 MODIFIED PARK BOARD CONCRETE CURB AND GUTTERLF80$35.00$2,800.00
## 165 4'' WALKSF300$12.00$3,600.00
## 166 6" CONCRETE DRIVEWAY REPAIRSF225$16.00$3,600.00
## 167 CONCRETE PEDESTRIAN CURB RAMPSF100$20.00$2,000.00
## 168 TRUNCATED DOMESSF15$120.00$1,800.00
## 169 SILT FENCE, MACHINE SLICEDLF500$5.00$2,500.00
## 170 ROCK DITCH CHECKEA1$1,000.00$1,000.00
## 171 BIOROLLLF200$5.00$1,000.00
## 172 PROTECTION OF CATCH BASIN, NON-STREETEA4$150.00$600.00
## 173 COMMON TOPSOIL BORROW (LV)CY340$55.00$18,700.00
## 174 TEMPORARY SEDIMENT TRAPEA0$1,500.00$0.00
## 175 TEMPORARY CONSTRUCTION ENTRANCEEA2$1,500.00$3,000.00
## 176 SEEDINGAC0.4$1,000.00$400.00
## 177 SOUTHERN BOULEVARD SEED MIXLB120$1,800.00$216,000.00
## 178 EROSION CONTROL BLANKETS,CATEGORY 20SY525$3.00$1,575.00
## 179 TRMSY0$30.00$0.00
## 180 HYDRAULIC SOIL STABILIZER SFMSY1500$4.00$6,000.00
## 181 WATER FOR TURF ESTABLISHMENT1000 GAL120$75.00$9,000.00
## 182 KENTUCKY COFFEETREE, 2" CAL. B&BEA4$800.00$3,200.00
## ENGINEER ESTIMATE.xlsx
Page 88 of 185
No.ItemUnits Option 4 Qty Option 4 EE Unit Price Option 4 EE Total Price
## 183 SWAMP WHITE OAK, 2" CAL. B&BEA5$800.00$4,000.00
## 184 AMERICAN SENTRY LINDEN, 2" CAL. B&BEA5$800.00$4,000.00
## 185 SIENNA GLEN MAPLE, 2" CAL. B&BEA4$800.00$3,200.00
## 186 AUTUMN BLAZE MAPLE, 2" CAL. B&BEA4$800.00$3,200.00
## SUBTOTAL ESTIMATED CONSTRUCTION COSTS
## PART 7 - CHANNEL IMPROVEMENTS
$980,677.50
10% Contingency $98,067.75
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$1,078,745.25
## 25% Engineering, Administration, Legal$269,686.31
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$1,348,500.00
## TOTAL ESTIMATED CONSTRUCTION COSTS
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 1 - STREET IMPROVEMENTS$954,476.60
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 2 - STORM SEWER
## IMPROVEMENTS
$63,085.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 3 - WATER MAIN
## IMPROVEMENTS
$120,587.50
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 4 - WATER SERVICES
## IMPROVEMENTS
$78,650.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 5 - SANITARY SEWER
## IMPROVEMENTS
$129,360.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 6 - SANITARY SEWER SERVICES
## IMPROVEMENTS
$41,800.00
## TOTAL ESTIMATED CONSTRUCTION COSTS PART 7 - CHANNEL IMPROVEMENTS$1,078,745.25
## TOTAL ESTIMATED CONSTRUCTION COSTSOPTION 4$2,466,704.35
## ESTIMATED PROJECT COSTS SUMMARY
## TOTAL ESTIMATED PROJECT COSTS PART 1 - STREET IMPROVEMENTS$1,193,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 2 - STORM SEWER IMPROVEMENTS$79,000.00
## TOTAL ESTIMATED PROJECT COSTS PART 3 - WATER MAIN IMPROVEMENTS$150,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 4 - WATER SERVICES IMPROVEMENTS$98,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 5 - SANITARY SEWER IMPROVEMENTS$161,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 6 - SANITARY SEWER SERVICE
## IMPROVEMENTS
$52,500.00
## TOTAL ESTIMATED PROJECT COSTS PART 7 - CHANNEL IMPROVEMENTS$1,348,500.00
## TOTAL ESTIMATED PROJECT COSTS SUMMARYOPTION 4$3,083,500.00
## ENGINEER ESTIMATE.xlsx
Page 89 of 185
## Appendix B
## 2026 Downtown Reconstruction Project
## Typical Sections of Streets
Page 90 of 185
2%2%
11.0'8.0'11.0'8.0'8.5'
5.0'
## VARIES
40.00'40.00'
## WEST ROWEAST ROW
## TYPICAL SECTION
## ELM STREET (THIRD TO FOURTH)
## C PROFILE
## SLOPE*
## L
## MATCH INTO GRADE
## AT PROPERTY LINE
## MATCH INTO GRADE
## AT PROPERTY LINE
## B612 MODIFIED PARKBOARD
## VERTICAL CONCRETE CURB
## AND GUTTER
## 1.5" TYPE SP 9.5 WEARING COURSE (2,C) [SPWEA240C]
## 2" TYPE SP 9.5 WEARING COURSE (2,C) [SPWEA240C]
## 8" AGGREGATE BASE, CLASS 5 100% CRUSHED
## 24" SELECT GRANULAR BORROW
## SUBGRADE STABILIZATION FABRIC
## (RP)(DL)(DL)(RP)
## (DP) = DIAGONAL PARKING
## (RP) = RESIDENT PARKING
## (DL) = DRIVING LANE
## * SLOPES VARY
## SEE CROSS SECTIONS
## 4" CONCRETE SIDEWALK
## 6" AGGREGATE BASE, CLASS 5 100% CRUSHED
## 4" CONCRETE SIDEWALK
## 6" AGGREGATE BASE, CLASS 5 100% CRUSHED
## PE PERFORATED PIPE DRAIN
## SEE DETAIL STO-12
℄
## BLVD.
8.5'
5.0'
## VARIES
## BLVD.
2%2%
11.0'8.0'11.0'
8.0'
12.0'
5.0'
## VARIES
40.0'40.0'
## TYPICAL SECTION
## THIRD STREET (ELM TO HICKORY)
## C CROWN
## SLOPE*
## L
## MATCH INTO GRADE
## AT PROPERTY LINE
## MATCH INTO GRADE
## AT PROPERTY LINE
## 4" CONCRETE SIDEWALK
## 6" AGGREGATE BASE, CLASS 5 100% CRUSHED
## B612 MODIFIED PARKBOARD
## VERTICAL CONCRETE CURB
## AND GUTTER
## 1.5" TYPE SP 9.5 WEARING COURSE (2,C) [SPWEA240C]
## 2" TYPE SP 9.5 WEARING COURSE (2,C) [SPWEA240C]
## 8" AGGREGATE BASE, CLASS 5 100% CRUSHED
## 24" SELECT GRANULAR BORROW
## SUBGRADE STABILIZATION FABRIC
## (RP)(DL)(DL)(RP)
## (DP) = DIAGONAL PARKING
## (RP) = RESIDENT PARKING
## (DL) = DRIVING LANE
## * SLOPES VARY
## SEE CROSS SECTIONS
## 4" CONCRETE SIDEWALK
## 6" AGGREGATE BASE, CLASS 5 100% CRUSHED
8.0'
5.0'
## VARIES
## SOUTH ROWNORTH ROW
1.50'
## PE PERFORATED PIPE DRAIN
## SEE DETAIL STO-12
℄
## BLVD.BLVD.
Plot Date: 02/23/2026 - 3:52pmDrawing name: C:\Users\ndrews\DC\ACCDocs\Stantec Consulting\193807606_Chaska_2026_Downtown_Recon\Project Files\Dwg\Feasibility\193807606-TypSecFig.dwg
## Xrefs:
## DATE:PROJ. NO.:
2335 Highway 36 W
## St. Paul, MN 55113
www.stantec.com
## TYPICAL SECTIONS
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION
193807606
No. 1BFIGURE:
2/23/26
Page 91 of 185
318
319
310
308
309
219
223
400
206
412
414
420
305
303
225
221
208
500
209
208
212
216
205
209
215
## 208G
## 212G
316
## 217G
## 211G
## 209G
## 221G
311
## THIRD STREET
## ELM STREET
## HICKORY STREET
## THIRD STREET
## FOURTH STREET
220
415
222
316
## 2026 DOWNTOWN RECONSTRUCTION
## 2026 RESIDENTIAL ASSESSMENT
## 2026 CHANNEL IMPROVEMENTS
## 2026 ASSESSMENT
7,500
## CITY OF CHASKA
## N
## DATEPROJ. NO.
Plot Date: 03/31/2026 - 9:26amDrawing name: 193800229XSNO-Chaska Special-Benefits.dwg
## 733 Marquette Avenue, Suite 1000
## Minneapolis, MN 55402
www.stantec.com
## 2026 DOWNTOWN SPECIAL ASSESSMENTS EXHIBIT
## CHASKA, MINNESOTA
## 2026 DOWNTOWN RECONSTRUCTION
3/26/2026
## FIGURE:1
193807606
7,5007,5007,500
7,5007,500
7,500
7,500
7,500
7,500
## CITY OF
## CHASKA EDA
$471,600
Page 92 of 185
Subject: Adopt Resolutions Authorizing Issuance and Sale of Bonds:
## Chaska EDA Lease Revenue Bonds, Series 2026A
## G.O. Water Utility Revenue Bonds, Series 2026B
## Prepared By: Noel Graczyk, Administrative Services Director
## Erica Mattice, Finance Division Director
## Overview
Baker Tilly Municipal Advisors, LLC (BTMA), Municipal Advisor to the city , and city staff have
together structured two proposed series of bonds for issuance. The first series with an
estimated issuance size at $55,380,000 will be issued by the Chaska Economic Development
Authority (EDA) as limited obligation EDA Lease Revenue Bonds, Series 2026A. This series of
bonds is issued at the request of the city and will be supported by an annual appropriation by
the city to be paid annually as a lease payment to the Chaska EDA.
The second series with an estimated issuance size of $24,710,000 will be issued by the City of
Chaska as General Obligation (G.O.) Water Utility Revenue Bonds, Series 2026B. This series of
bonds will be supported primarily by revenues from both the Water Utility and Water Trunk
funds. The G.O. pledge provides bondholders with additional repayment assurance which
results in a lower interest rate on the bonds.
Attached are two draft resolutions as prepared by Dorsey and Whitney, LLP., Bond Counsel to
the city , that establishes Wednesday June 10 , 2026, as the date of sale for Series 2026A and
Wednesday July 22, 2026, as the date of sale for Series 2026B. The following is a discussion of
each proposed series.
## $55,380,000 EDA Lease Revenue Bonds, Series 2026A
This series of bonds will finance construction by the city of a new Municipal Services Building
(MSB2), refunds temporary financing issued in 2025 to acquire the site for MSB2, and finance
improvements in 2026 for the City Hall Plaza project. Attached separately, is a “Pre-issuance
report...” for Series 2026A prepared by BTMA that provides details on issuance authority,
proposed project sources and uses for each project, and estimated debt-service schedules for
this series.
## $24,710,000 G.O. Water Utility Revenue Bonds, Series 2026B
Proceeds from this series will finance construction of a second water filtration plant and other
water utility improvements. Attached to the proposed resolution 2026-36 is a “Pre-issuance
report...” for Series 2026B prepared by BTMA that provides details on issuance authority,
proposed project sources and uses for each project, and estimated debt-service schedules for
this series.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 93 of 185
## General Obligation (G.O.) Pledge
Issuance of Series 2026A does not include a G.O. pledge of the full faith and taxing authority of
the City of Chaska towards repayment of debt service. Instead of a G.O. pledge, the city will
establish annual appropriations for lease payments as part of each annually adopted budget
over the thirty-year term of the bonds. When all bonds have been paid in full, ownership of the
site will be transferred from the Chaska EDA back to the city.
Issuance of Series 2026B does include a G.O. pledge of the full faith and taxing authority of the
City of Chaska towards the repayment debt service on these bonds.
## Public Sale Date
Series 2026A will be sold at a competitive public sale on Wednesday June 10 , 20 26, and the
winning bid will be determined in compliance with parameters as established in the resolution.
Results from the sale of Series 2026A will be ratified by both the city and EDA at the next
regular meeting on Monday June 15, 2026.
Series 2026B will be sold at a competitive public sale on Wednesday July 22, 20 26, and the
winning bid will be determined in compliance with parameters as established in the resolution.
Results from the sale of Series 2026B will be ratified by just the city at the next regular meeting
on Monday August 3, 2026.
## Recommendation
It is the recommendation by city staff that the City Council adopt each of the two proposed
resolutions establishing parameters for issuance of bonds for both Series 2026A and Series
## 2026B.
## CITY COUNCIL ACTION REQUESTED
Motion to adopt Resolution No. 2026-35 requesting that the Chaska EDA issue Chaska EDA Lease
Revenue Bonds, Series 2026A.
Motion to adopt Resolution No. 2026-36 authorizing issuance of G.O. Water Utility Revenue
Bonds, Series 2026B.
Page 94 of 185
1
*Preliminary, subject to change
April 28, 2026
Pre-issuance report for
## Economic Development Authority of the City
of Chaska, Minnesota (the “Authority”)
$55,380,000* Lease Revenue Bonds, Series 2026A (City of Chaska, Minnesota, Lease
Obligation) (the “Series 2026A Bonds”)
## PRE-ISSUANCE REPORT
## PREPARED BY
## Baker Tilly Municipal Advisors, LLC
## 30 East Seventh Street, Ste. 3025,
## St. Paul, MN 55101
## ADVISOR
## Chris Hogan | Director
651-223-3034
chris.hogan@bakertilly.com
Page 95 of 185
2
## Issue Summary
## PURPOSE OF ISSUE
The Authority Board has under consideration the issuance of the Series 2026A Bonds along with available
Authority funds in the amount of $2,000,0000 to finance (i) the construction and equipping of a new
municipal service building (MSB) located in the City of Chaska, Minnesota (the “City”); (ii) repayment of the
City’s Lease-Purchase Agreement dated January 16, 2025, between Security Bank & Trust Co. and the
City (the “2025 Lease Purchase Agreement”); (iii) improvements to City Hall Plaza, and, together with items
(i) and (ii), (the “Project”); (iv) capitalized interest; and (v) costs of issuance of the Series 2026A Bonds.
This document provides information relative to the proposed issuance.
The 2025 Lease-Purchase Agreement was originally issued in the principal amount of $3,972,000 to finance
the acquisition of land compromising 12.96 acres of vacant land for the location of the municipal service
building. The current outstanding principal is $3,678,000. On August 1, 2026, the Authority will apply the
rental payment received from the City in the amount of $217,200 and proceeds of the Series 2026A bonds
in the amount of $3,645,000 to redeem the 2025 Lease-Purchase Agreement.
## AUTHORITY
The Series 2026A Bonds are being issued pursuant to Minnesota Statutes, Sections 465.71, 471.64,
469.012 subdivision 1(h), Sections 469.033 and 469.034, and Chapter 475. The Series 2026A Bonds are
further issued pursuant to a Trust Indenture between the Authority and U.S. Bank National Association, St.
Paul, Minnesota (the “Trustee”) dated July 1, 2026 (the “Indenture”); a Lease Agreement between the
Authority and the City (the “Lease”) dated July 1, 2026; resolutions by the Authority and the City dated May
4, 2026 (the “Authorizing Resolutions”); and resolutions by the Authority and the City dated June 15, 2026
(the “Ratifying Resolutions”).
The Authorizing Resolutions to be considered on May 4, 2026, will designate the President and Executive
Director of the Authority (the “Pricing Committee”) to award the sale of the Series 2026A Bonds pursuant
to the following parameters:
• the total par amount of the Bonds will not exceed $57,700,000
• the maximum True Interest Cost (TIC) will not exceed 6.00%
## SECURITY/SOURCE OF PAYMENT
The Series 2026A Bonds will be special, limited obligations of the Authority payable from rental payments
to be received by the Authority from the City pursuant to the Lease. The City’s obligation under the lease is
subject to annual appropriation.
The City expects to levy taxes to pay the lease payments. The City will make their first levy in 2026 for
collection in 2027. The February 1, 2027 interest payment is being funded in part by capitalized interest
included in the par amount of the Series 2026A Bonds.
## FINANCING STRUCTURE
In consultation with City and Authority staff, the Series 2026A Bonds have been structured as three
purposes by project. The following describes the structure of each individual purpose and their prospective
costs:
Page 96 of 185
3
Municipal service building:
Structured to be repaid over a term of thirty (30) years, to provide for approximately level annual debt
service payments and will fund a deposit to the Project Construction Fund in the amount of $47,240,000.
City hall plaza:
Structured to be repaid over a term of fifteen (15) years, to provide for approximately level annual debt
service payments and will fund a deposit to the Project Construction Fund in the amount of $3,500,000.
## 2025 Lease-Purchase Refinancing:
Structured to be repaid over a term of thirty (30) years, to provide for approximately level annual debt
service payments. The final maturity of this portion has been extended from the original financing to match
the final maturity of the MSB portion of the Bonds and will fund a deposit to the Current Refunding Fund in
the amount of $3,645,000 to redeem the City’s Lease-Purchase Agreement dated January 16, 2025,
between Security Bank & Trust Co. and the City.
## Issue Terms
## BANK QUALIFICATION
The Authority debt counts towards the City’s bank qualification limit and since this issue exceeds the $10
million limit for tax-exempt obligations in 2026; the Series 2026A Bonds are not designated as bank
qualified.
## VARIABILITY OF ISSUE SIZE
A specific provision in the sale terms permits modifications to the issue size and/or maturity structure to
customize the issue once the price and interest rates are set on the day of sale.
## RISKS / SPECIAL CONSIDERATIONS
The outcome of this financing will rely on the market conditions at the time of the sale. Any projections
included herein are estimates based on current market conditions.
Estimated interest rates applied in the structuring of the Series 2026A Bonds are based on current market
conditions and assume a reoffering premium. The underwriter will take their compensation from the
reoffering premium and any remaining premium can be used to downsize the issue, applied to additional
project needs or deposited to the debt service fund. Our preliminary bond structure has applied the
estimated premium to financing project needs thereby reducing the principal amount of the Series 2026A
Bonds. Determination of the use of premium, if received, will be made by the Authority prior to or on the
day of sale.
## OPTIONAL REDEMPTION
The Authority may elect on February 1, 2036 and on any date thereafter, to redeem the Series 2026A
Bonds on or after February 1, 2037, at a price of par plus accrued interest.
## Rating
An application will be made to S&P Global Ratings (S&P) for a rating on the Series 2026A Bonds. The
City’s general obligation debt is currently rated “AA” by S&P. The Authority’s lease revenue bonds
supported by annual appropriation are currently rated “AA-” by S&P.
Page 97 of 185
4
## Issuance Timeline
## EVENT DATE
## City Council considers Parameters Resolution requesting the EDA
issue the Series 2026A Bonds and setting certain parameters
May 4, 2026
## Authority Board considers Parameters Resolution setting certain
parameters for the Series 2026A Bonds and establishing a pricing
committee
May 4, 2026
Rating visit is conducted May 4, 2026
Competitive bids are received June 10, 2026, 10:30 a.m.
Pricing Committee considers award on the sale of the Series
2026A Bonds (Following the receipt of bids)
June 10, 2026
City Council and Authority Board ratify sale results June 15, 2026
Receipt of proceeds and settlement of the Series 2026A Bonds. July 6, 2026
## Post Issuance
## ARBITRAGE / REBATE
The issuance of the Series 2026A Bonds will result in post-issuance compliance responsibilities related to
compliance with federal arbitrage requirements compliance..
Federal arbitrage requirements include a wide range of implications that have been considered as this issue
has been structured. Post-issuance compliance responsibilities for this tax-exempt issue include both
rebate and yield restriction provisions of the IRS Code. In general terms the arbitrage requirements control
the earnings on unexpended bond proceeds, including investment earnings, moneys held for debt service
payments (which are considered to be proceeds under the IRS regulations), and/or reserves. Under certain
circumstances any “excess earnings” will need to be paid to the IRS to maintain the tax-exempt status of
the Bonds. Any interest earnings on gross bond proceeds or debt service funds should not be spent until it
has been determined based on actual facts that they are not “excess earnings” as defined by the IRS Code.
The arbitrage rules provide for spending exceptions for proceeds that are spent within 6-month, 18-month
or, for certain construction issues, a 24-month period each in accordance with certain spending criteria.
Proceeds that qualify for an exception will be exempt from rebate. These exceptions are based on actual
expenditures and not based on reasonable expectations, and expenditures, including any investment
proceeds will have to meet the spending criteria to qualify for the exclusion. The City and the Authority
expect to meet the 24-month spending exception.
Regardless of whether the Series 2026A Bonds qualifies for an exemption from the rebate provisions, yield
restriction provisions will apply to bond proceeds (including interest earnings) unspent after three years and
the debt service fund throughout the term of the Series 2026A Bonds. These moneys should be monitored
until the Series 2026A Bonds are retired.
Page 98 of 185
5
Baker Tilly Municipal Advisors, LLC is a registered municipal advisor and controlled subsidiary of Baker Tilly Advisory Group, LP. Baker Tilly Advisory
Group, LP and Baker Tilly US, LLP, trading as Baker Tilly, operate under an alternative practice structure and are members of the global network of
Baker Tilly International Ltd., the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm and
provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their
clients and are not licensed CPA firms. ©2026 Baker Tilly Municipal Advisors, LLC
Baker Tilly Municipal Advisors, LLC (Baker Tilly MA) and the City have entered into an Agreement for
Municipal Advisor Services under which Baker Tilly will provide arbitrage compliance services on the Series
2026A Bonds.
## CONTINUING DISCLOSURE
The issuance of the Series 2026A Bonds will result in post-issuance compliance responsibilities related to
continuing disclosure.
Secondary disclosure requirements result from the U.S. Securities and Exchange Commission (SEC)
requirement that underwriters provide ongoing disclosure information to investors. The City, as the
obligated person, will commit to providing the information needed to comply under a continuing disclosure
agreement.
Baker Tilly Municipal Advisors, LLC (Baker Tilly MA) and the City have entered into an Agreement for
Municipal Advisor Services under which Baker Tilly will provide continuing disclosure services on the Series
2026A Bonds.
## Finance Team
The issuance of the Series 2026A Bonds will require the work of various other public finance professionals.
Fees for these professionals shall be paid by proceeds of this issuance unless directed otherwise by the
City. The following professionals and their role have been identified below:
## Bond Counsel: Dorsey & Whitney LLP
## Municipal Advisor: Baker Tilly Municipal Advisors, LLC
## Attachments
Schedules attached for the Series 2026A Bonds include:
## I. Bond Buyer Index
## II. Bond Schedules
Page 99 of 185
6
## I. Bond Buyer Index
Performance of the tax-exempt market is often measured by the Bond Buyer’s Index (“BBI”) which
measures the yield of high grade municipal bonds in the 20th year for general obligation bonds rated Aa2
by Moody’s or AA by S&P (the BBI 20-Bond GO Index) and the 30th year for revenue bonds rated A1 by
Moody’s or A+ by S&P (the BBI 25-Bond Revenue Index). The following chart illustrates these two indices
over the past five years:
Page 100 of 185
7
## II. Bond Schedules
$55,380,000
## Economic Development Authority of the City of Chaska, MN
## Lease Revenue Bonds, Series 2026A
## Issue Summary
## Total Issue Sources And Uses
Dated 07/09/2026 | Delivered 07/09/2026
## MSB
## City Hall
## Plaza
2025 Lease-
## Purchase
## Refinancing
## Issue
## Summary
## Sources Of Funds
Par Amount of Bonds $48,405,000.00 $3,380,000.00 $3,595,000.00 $55,380,000.00
FF&E Cash Source 2,000,000.00 - - 2,000,000.00
Reoffering Premium 1,438,063.15 267,540.10 106,344.90 1,811,948.15
Total Sources $51,843,063.15 $3,647,540.10 $3,701,344.90 $59,191,948.15
## Uses Of Funds
Deposit to Project Construction Fund 47,240,000.00 3,500,000.00 - 50,740,000.00
Deposit to Current Refunding Fund - - 3,645,000.00 3,645,000.00
## FF&E 2,500,000.00 - - 2,500,000.00
Deposit to Capitalized Interest (CIF) Fund 1,347,815.60 94,827.78 - 1,442,643.38
Total Underwriter's Discount (1.200%) 580,860.00 40,560.00 43,140.00 664,560.00
Costs of Issuance 171,620.11 11,983.79 12,746.10 196,350.00
Rounding Amount 2,767.44 168.53 458.80 3,394.77
Total Uses $51,843,063.15 $3,647,540.10 $3,701,344.90 $59,191,948.15
Page 101 of 185
8
$55,380,000
## Economic Development Authority of the City of Chaska, MN
## Lease Revenue Bonds, Series 2026A
## Issue Summary
## Net Debt Service Schedule
Dat ePrincipalC
ouponInterestTotal P+ICIFNe t Ne w D/S
02/01/2027--1,
542,742.971,542,742.97 (1,442,643.38)100,099.59
02/01/20281,010,000.005.000%2,749,442.903,759,442.90-3,759,442.90
02/01/20291,060,000.005.000%2,698,942.903,758,942.90-3,758,942.90
02/01/20301,115,000.005.000%2,645,942.903,760,942.90-3,760,942.90
02/01/20311,170,000.005.000%2,590,192.903,760,192.90-3,760,192.90
02/01/20321,230,000.005.000%2,531,692.903,761,692.90-3,761,692.90
02/01/20331,290,000.005.000%2,470,192.903,760,192.90-3,760,192.90
02/01/20341,350,000.005.000%2,405,692.903,755,692.90-3,755,692.90
02/01/20351,425,000.005.000%2,338,192.903,763,192.90-3,763,192.90
02/01/20361,495,000.005.000%2,266,942.903,761,942.90-3,761,942.90
02/01/20371,570,000.005.000%2,192,192.903,762,192.90-3,762,192.90
02/01/20381,645,000.005.000%2,113,692.903,758,692.90-3,758,692.90
02/01/20391,730,000.005.000%2,031,442.903,761,442.90-3,761,442.90
02/01/20401,815,000.005.000%1,944,942.903,759,942.90-3,759,942.90
02/01/20411,910,000.005.000%1,854,192.903,764,192.90-3,764,192.90
02/01/20421,660,000.005.000%1,758,692.903,418,692.90-3,418,692.90
02/01/20431,745,000.005.000%1,675,692.903,420,692.90-3,420,692.90
02/01/20441,830,000.005.000%1,588,442.903,418,442.90-3,418,442.90
02/01/20451,920,000.005.000%1,496,942.903,416,942.90-3,416,942.90
02/01/20462,020,000.004.702%1,400,942.903,420,942.90-3,420,942.90
02/01/20472,110,000.004.750%1,305,962.503,415,962.50-3,415,962.50
02/01/20482,215,000.004.750%1,205,737.503,420,737.50-3,420,737.50
02/01/20492,320,000.004.800%1,100,525.003,420,525.00-3,420,525.00
02/01/20502,430,000.004.850%989,165.003,419,165.00-3,419,165.00
02/01/20512,545,000.004.900%871,310.003,416,310.00-3,416,310.00
02/01/20522,675,000.004.950%746,605.003,421,605.00-3,421,605.00
02/01/20532,805,000.005.000%614,192.503,419,192.50-3,419,192.50
02/01/20542,945,000.005.050%473,942.503,418,942.50-3,418,942.50
02/01/20553,095,000.005.100%325,220.003,420,220.00-3,420,220.00
02/01/20563,250,000.005.150%167,375.003,417,375.00-3,417,375.00
Total$55,380,000.00-$50,097,193.07 $105,477,193.07 (1,442,643.38) $104,034,549.69
## SIGNIFIC A NT DA T ES
## Dated Date 7/09/2026
## Delivery Date 7/09/2026
## First Coupon Date 2/01/2027
Yie ld Statis tics
## Bond Year Dollars $1,009,139.33
## Average Lif e 18.222 Years
## Average Coupon 4.9643485%
## Net Interest Cost (NIC) 4.8506488%
## True Interest Cost (TIC) 4.7789949%
## Bond Yield f or Arbitrage Purposes 4.6522613%
A ll Inc lus iv e Cos t (A IC) 4.8097540%
## IRS Form 8038
Net Interest Cost 4.
6996867%
## Weighted Average Maturity 17.964 Years
Page 102 of 185
9
$48,405,000
## Economic Development Authority of the City of Chaska, MN
## Lease Revenue Bonds, Series 2026A
## MSB
## Net Debt Service Schedule
## Dat ePrincipalCouponInterestTotal P+ICIFNe t Ne w D/S
02/01/2027--1,347,815.601,347,815.60(1,347,815.60)-
02/01/2028780,000.005.000%2,402,047.603,182,047.60-3,182,047.60
02/01/2029820,000.005.000%2,363,047.603,183,047.60-3,183,047.60
02/01/2030860,000.005.000%2,322,047.603,182,047.60-3,182,047.60
02/01/2031905,000.005.000%2,279,047.603,184,047.60-3,184,047.60
02/01/2032950,000.005.000%2,233,797.603,183,797.60-3,183,797.60
02/01/2033995,000.005.000%2,186,297.603,181,297.60-3,181,297.60
02/01/20341,045,000.005.000%2,136,547.603,181,547.60-3,181,547.60
02/01/20351,100,000.005.000%2,084,297.603,184,297.60-3,184,297.60
02/01/20361,155,000.005.000%2,029,297.603,184,297.60-3,184,297.60
02/01/20371,210,000.005.000%1,971,547.603,181,547.60-3,181,547.60
02/01/20381,270,000.005.000%1,911,047.603,181,047.60-3,181,047.60
02/01/20391,335,000.005.000%1,847,547.603,182,547.60-3,182,547.60
02/01/20401,400,000.005.000%1,780,797.603,180,797.60-3,180,797.60
02/01/20411,475,000.005.000%1,710,797.603,185,797.60-3,185,797.60
02/01/20421,545,000.005.000%1,637,047.603,182,047.60-3,182,047.60
02/01/20431,625,000.005.000%1,559,797.603,184,797.60-3,184,797.60
02/01/20441,705,000.005.000%1,478,547.603,183,547.60-3,183,547.60
02/01/20451,790,000.005.000%1,393,297.603,183,297.60-3,183,297.60
02/01/20461,880,000.004.702%1,303,797.603,183,797.60-3,183,797.60
02/01/20471,965,000.004.750%1,215,400.003,180,400.00-3,180,400.00
02/01/20482,060,000.004.750%1,122,062.503,182,062.50-3,182,062.50
02/01/20492,160,000.004.800%1,024,212.503,184,212.50-3,184,212.50
02/01/20502,260,000.004.850%920,532.503,180,532.50-3,180,532.50
02/01/20512,370,000.004.900%810,922.503,180,922.50-3,180,922.50
02/01/20522,490,000.004.950%694,792.503,184,792.50-3,184,792.50
02/01/20532,610,000.005.000%571,537.503,181,537.50-3,181,537.50
02/01/20542,740,000.005.050%441,037.503,181,037.50-3,181,037.50
02/01/20552,880,000.005.100%302,667.503,182,667.50-3,182,667.50
02/01/20563,025,000.005.150%155,787.503,180,787.50-3,180,787.50
## Total$48,405,000.00-$45,237,422.50$93,642,422.50(1,347,815.60)$92,294,606.90
## SIGNIFIC A NT DA T ES
## Dated Date 7/09/2026
## Delivery Date 7/09/2026
## First Coupon Date 2/01/2027
Yie ld Statis tics
## Bond Year Dollars $911,445.58
## Average Lif e 18.830 Years
## Average Coupon 4.9632609%
## Net Interest Cost (NIC) 4.8692122%
## True Interest Cost (TIC) 4.8074647%
## Bond Yield f or Arbitrage Purposes 4.6522613%
A ll Inc lus iv e Cos t (A IC) 4.8376028%
## IRS Form 8038
## Net Interest Cost 4.7288568%
## Weighted Average Maturity 18.583 Years
Page 103 of 185
10
$3,380,000
## Economic Development Authority of the City of Chaska, MN
## Lease Revenue Bonds, Series 2026A
## City Hall Plaza
## Net Debt Service Schedule
## Dat ePrincipalCouponInterestTotal P+ICIFNe t Ne w D/S
02/01/2027--94,827.7894,827.78(94,827.78)-
02/01/2028170,000.005.000%169,000.00339,000.00-339,000.00
02/01/2029180,000.005.000%160,500.00340,500.00-340,500.00
02/01/2030190,000.005.000%151,500.00341,500.00-341,500.00
02/01/2031200,000.005.000%142,000.00342,000.00-342,000.00
02/01/2032210,000.005.000%132,000.00342,000.00-342,000.00
02/01/2033220,000.005.000%121,500.00341,500.00-341,500.00
02/01/2034230,000.005.000%110,500.00340,500.00-340,500.00
02/01/2035245,000.005.000%99,000.00344,000.00-344,000.00
02/01/2036255,000.005.000%86,750.00341,750.00-341,750.00
02/01/2037270,000.005.000%74,000.00344,000.00-344,000.00
02/01/2038280,000.005.000%60,500.00340,500.00-340,500.00
02/01/2039295,000.005.000%46,500.00341,500.00-341,500.00
02/01/2040310,000.005.000%31,750.00341,750.00-341,750.00
02/01/2041325,000.005.000%16,250.00341,250.00-341,250.00
## Total$3,380,000.00-$1,496,577.78$4,876,577.78(94,827.78)$4,781,750.00
## SIGNIFIC A NT DA T ES
## Dated Date 7/09/2026
## Delivery Date 7/09/2026
## First Coupon Date 2/01/2027
Yie ld Statis tics
## Bond Year Dollars $29,931.56
## Average Lif e 8.855 Years
## Average Coupon 5.0000000%
## Net Interest Cost (NIC) 4.2416696%
## True Interest Cost (TIC) 4.0605582%
## Bond Yield f or Arbitrage Purposes 4.6522613%
A ll Inc lus iv e Cos t (A IC) 4.1080289%
## IRS Form 8038
## Net Interest Cost 3.7998160%
## Weighted Average Maturity 8.868 Years
Page 104 of 185
11
$3,595,000
## Economic Development Authority of the City of Chaska, MN
## Lease Revenue Bonds, Series 2026A
2025 Leas
e-Purchase Refinancing
## Debt Service Schedule
## Dat ePrincipalCouponInterestTotal P+I
02/01/2027--100,099.59100,099.59
02/01/202860,000.005.000%178,395.30238,395.30
02/01/202960,000.005.000%175,395.30235,395.30
02/01/203065,000.005.000%172,395.30237,395.30
02/01/203165,000.005.000%169,145.30234,145.30
02/01/203270,000.005.000%165,895.30235,895.30
02/01/203375,000.005.000%162,395.30237,395.30
02/01/203475,000.005.000%158,645.30233,645.30
02/01/203580,000.005.000%154,895.30234,895.30
02/01/203685,000.005.000%150,895.30235,895.30
02/01/203790,000.005.000%146,645.30236,645.30
02/01/203895,000.005.000%142,145.30237,145.30
02/01/2039100,000.005.000%137,395.30237,395.30
02/01/2040105,000.005.000%132,395.30237,395.30
02/01/2041110,000.005.000%127,145.30237,145.30
02/01/2042115,000.005.000%121,645.30236,645.30
02/01/2043120,000.005.000%115,895.30235,895.30
02/01/2044125,000.005.000%109,895.30234,895.30
02/01/2045130,000.005.000%103,645.30233,645.30
02/01/2046140,000.004.702%97,145.30237,145.30
02/01/2047145,000.004.750%90,562.50235,562.50
02/01/2048155,000.004.750%83,675.00238,675.00
02/01/2049160,000.004.800%76,312.50236,312.50
02/01/2050170,000.004.850%68,632.50238,632.50
02/01/2051175,000.004.900%60,387.50235,387.50
02/01/2052185,000.004.950%51,812.50236,812.50
02/01/2053195,000.005.000%42,655.00237,655.00
02/01/2054205,000.005.050%32,905.00237,905.00
02/01/2055215,000.005.100%22,552.50237,552.50
02/01/2056225,000.005.150%11,587.50236,587.50
## Total$3,595,000.00-$3,363,192.79$6,958,192.79
Yie ld Statis tics
## Bond Year Dollars$67,762.19
Average Lif e18.
849 Years
## Average Coupon4.9632289%
## DV01 4,003.70
## Net Interest Cost (NIC)4.8699543%
True Interest Cost (TIC)4.
8085904%
## Bond Yield f or Arbitrage Purposes4.6522613%
A ll Inc lus iv e Cos t (A IC)4.8387147%
## IRS Form 8038
## Net Interest Cost4.7300157%
## W
## eighted Average Maturity18.603 Years
Page 105 of 185
4917-5187-8562\2
## CERTIFICATION OF MINUTES RELATING TO
## CITY OF CHASKA ECONOMIC DEVELOPMENT AUTHORITY
## LEASE REVENUE BONDS, SERIES 2026A
## Public Body: City of Chaska, Minnesota
## Governing Body: City Council
Kind, date, time and place of meeting: A regular meeting held on May 4, 2026, at 7:00 p.m., at the City
Hall.
## Members Present:
## Members Absent:
## Documents Attached:
Minutes of said meeting, including:
## RESOLUTION NO. 2026- 35
## RESOLUTION REQUESTING THAT THE CITY ECONOMIC
## DEVELOPMENT AUTHORITY ISSUE ITS LEASE REVENUE
## BONDS, SERIES 2026A; AUTHORIZING THE CONVEYANCE OF
## CERTAIN PROPERTY OF THE CITY TO THE EDA;
## AUTHORIZING THE EXECUTION OF A LEASE-PURCHASE
## AGREEMENT AND RELATED DOCUMENTS
I, the undersigned, being the duly qualified and acting recording officer of the public corporation
referred to in the title of this certificate, certify that the documents attached hereto, as described above,
have been carefully compared with the original records of the corporation in my legal custody, from
which they have been transcribed; that the documents are a correct and complete transcript of the minutes
of a meeting of the governing body of the corporation, and correct and complete copies of all resolutions
and other actions taken and of all documents approved by the governing body at the meeting; and that the
meeting was duly held by the governing body at the time and place and was attended throughout by the
members indicated above, pursuant to call and notice of such meeting given as required by law.
WITNESS my hand officially as such recording officer on __________________, 2026.
__________________________________
## City Administrator
Page 106 of 185
4917-5187-8562\2
Councilmember __________________ introduced the following resolution and moved its
adoption, which motion was seconded by Councilmember _________________.
## RESOLUTION NO. 2026-35
## RESOLUTION REQUESTING THAT THE CITY ECONOMIC
## DEVELOPMENT AUTHORITY ISSUE ITS LEASE REVENUE
## BONDS, SERIES 2026A; AUTHORIZING THE CONVEYANCE OF
## CERTAIN PROPERTY OF THE CITY TO THE EDA;
## AUTHORIZING THE EXECUTION OF A LEASE-PURCHASE
## AGREEMENT AND RELATED DOCUMENTS
WHEREAS, it is hereby determined to be in the best interests of the City of Chaska, Minnesota (the
“City”) that the Economic Development Authority of the City of Chaska, Minnesota (the “Authority”)
issue its Lease Revenue Bonds, Series 2026A (the “Bonds”), pursuant to Minnesota Statutes, Sections
469.033, 469.034, and Chapter 475, to finance:
(i) the purchase of a site for the City’s municipal service building;
(ii) construction of a municipal service building for the City;
(iii) improvements to the City Hall Plaza in the City; and
(iv) the costs of issuance of the Bonds (collectively, the “Projects”); and
WHEREAS, title to certain real property comprising a portion of the Project (the “Real Property”) is
currently in the City, and the City intends to convey fee simple title of the Real Property to the Authority;
and
WHEREAS, the Authority is authorized by law to issue lease revenue bonds to finance the costs of such
projects, construct such projects, and lease all or a portion of the completed Project to the City; and
WHEREAS, pursuant to a resolution of the Authority to be adopted on the date hereon (the “Authority
Resolution”), the Authority will authorize the issuance of its Lease Revenue Bonds, Series 2026A (the
“Bonds”) to finance the Project.
NOW, THEREFORE, BE IT RESOLVED by the City Council (the “Council”) of the City of Chaska,
Minnesota as follows:
1. EDA Request. The Council hereby requests that the Authority authorize and issue the
Bonds, in a principal amount not to exceed $57,700,000 and a true interest cost not to exceed 6.0% per
annum, for the purpose of financing the Project.
2. Transfer of Title. It is hereby found, determined and declared to be necessary and
desirable and in the best interest of the City to transfer all of the title of the City in and to the Real
Property to the Authority. Such transfer and any and all action required by officers of the City to
accomplish the same is hereby authorized.
3. Lease Authorization. The City is authorized by Minnesota Statutes, Sections 465.71 and
471.64 to lease real and personal property with an option to purchase under a lease-purchase agreement,
provided that the City retains the right to terminate said lease-purchase agreement at the end of any fiscal
year during its term. It is hereby found, determined and declared to be necessary and desirable and in the
best interest of the City to enter into a Lease-Purchase Agreement (the “Lease”) with the Authority in
order to provide for the construction of the Project by the Authority and the lease of the Project to the
Page 107 of 185
- 2 -
4917-5187-8562\2
City. The obligation created by the Lease in excess of $1,000,000 shall, as provided in Minnesota
Statutes, Section 465.71, be included in the calculation of net debt of the City for purposes of Minnesota
Statutes, Section 475.53, and such obligation does not cause the net debt of the City to exceed its debt
limit. The Mayor and City Administrator are authorized and directed to execute, attest and deliver the
Lease on behalf of the City.
4. Further Authorizations. The Mayor, the City Administrator, and any other officers and
employees of the City are hereby further authorized to take any actions on behalf of the City as are
needed to consummate the Lease and the financing transaction therein described and herein authorized,
including any actions related to real property of the City. The City Council hereby expressly authorizes
the execution of any bond or real estate instruments deemed necessary by counsel to the City. For the
avoidance of doubt, this authorization includes but is not limited to the authority to acquire, dispose of
and encumber any real property related to or necessary for the Project.
5. Ratification. Upon approval of the sale of the Bonds by the Authority, this Council will
take action at a regularly scheduled or special meeting thereafter to adopt a resolution prepared by the
EDA’s bond counsel ratifying the sale of the Bonds and approving the forms of the Lease and any
operative bond documentation relating thereto to be executed by the City.
Adopted this 4
th
day of May, 2026.
## Mayor
## Attest:
## City Administrator
Page 108 of 185
4917-5187-8562\2
Upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon the resolution was declared duly passed and adopted.
Page 109 of 185
4915-1266-3714\2
## CERTIFICATION OF MINUTES RELATING TO
## GENERAL OBLIGATION WATER UTILITY REVENUE BONDS, SERIES 2026B
## Issuer: City of Chaska, Minnesota
## Governing Body: City Council
Kind, date, time and place of meeting: A regular meeting held May 4, 2026, at 7:00 p.m., at City Hall.
Members present:
Members absent:
## Documents Attached:
Minutes of said meeting (including):
## RESOLUTION NO. 2026-36
## RESOLUTION AUTHORIZING ISSUANCE AND ESTABLISHING
## PRICING COMMITTEE TO AWARD SALE OF GENERAL
## OBLIGATION WATER UTILITY REVENUE BONDS, SERIES 2026B
I, the undersigned, being the duly qualified and acting recording officer of the public corporation
issuing the Bonds referred to in the title of this certificate, certify that the documents attached hereto, as
described above, have been carefully compared with the original records of said corporation in my legal
custody, from which they have been transcribed; that said documents are a correct and complete transcript
of the minutes of a meeting of the governing body of said corporation, and correct and complete copies of
all resolutions and other actions taken and of all documents approved by the governing body at said meeting,
so far as they relate to said Bonds; and that said meeting was duly held by the governing body at the time
and place and was attended throughout by the members indicated above, pursuant to call and notice of such
meeting given as required by law.
WITNESS my hand officially as such recording officer May ___, 2026.
## City Administrator
Page 110 of 185
4915-1266-3714\2
Councilmember ________ introduced the following resolution and moved its adoption, which motion was
seconded by Councilmember __________:
## RESOLUTION NO. 2026-36
## RESOLUTION AUTHORIZING ISSUANCE AND ESTABLISHING
## PRICING COMMITTEE TO AWARD SALE OF GENERAL
## OBLIGATION WATER UTILITY REVENUE BONDS, SERIES 2026B
BE IT RESOLVED by the City Council (the “Council”), of the City of Chaska, Minnesota (the
“City”), as follows:
## SECTION 1. PURPOSE; PRICING COMMITTEE.
To finance certain improvements to the City’s water utility system, it is hereby determined
to be in the best interests of the City to issue its General Obligation Water Utility Revenue Bonds,
Series 2026B (the “Bonds”), pursuant to Minnesota Statutes, Chapters 444 and 475.
This Council hereby establishes a pricing committee (the “Pricing Committee,” as further
described below), which Pricing Committee shall meet on July 22, 2026, or such other date as the
Pricing Committee shall approve, up to and including December 31, 2026, for the purpose of
considering proposals for and awarding the sale of the Bonds based on the Terms of Proposal
prepared by Baker Tilly Municipal Advisors, LLC (the “Municipal Advisor”) attached hereto as
EXHIBIT A (“Terms of Proposal”) and the following parameters:
• The total principal amount of the Bonds shall not exceed $27,500,000;
• The true interest cost of the Bonds shall not exceed 5.50%.
The Mayor (or any Councilmember designated by the Mayor) and the City Administrator
(the “Pricing Committee”) are hereby authorized and directed to agree with a purchaser of the
Bonds (the “Purchaser”) upon the exact purchase price, principal amount, maturities, redemption
provisions and interest rate or rates for the Bonds, within the parameters set forth in this Section.
The Mayor and/or City Administrator are hereby authorized to execute a contract on behalf of the
City for the sale of the Bonds and such execution shall be conclusive evidence of such agreement
and shall be binding upon the City. In the absence or unavailability of any member of the Pricing
Committee, the acting Mayor or City Administrator may act in place of such member, and a
purchase contract may be signed by such acting Mayor or City Administrator.
The Bonds are authorized to be issued without authorization by the electors, and shall not
be included in the net debt of the City for the purpose of any statutory or charter limitation on
indebtedness.
SECTION 2. TERMS OF PROPOSAL. The Municipal Advisor has presented to this Council the
Terms of Proposal for the Bonds. The Terms of Proposal are hereby approved and shall be placed on file
by the City Administrator. Each and all of the provisions of the Terms of Proposal attached hereto are
hereby adopted as the terms and conditions of the Bonds and of the sale thereof. The Municipal Advisor is
hereby authorized, pursuant to Minnesota Statutes, Section 475.60, Subdivision 2, paragraph (9), to solicit
proposals for the Bonds on behalf of the City on a competitive basis.
SECTION 3. RELATED MATTERS. The Municipal Advisor, on behalf of the City, and
employees and officers of the City, are hereby authorized to prepare and distribute a preliminary official
statement (the “Preliminary Official Statement”) and any addenda or supplements to the Preliminary
Official Statement which are useful or necessary in connection with the marketing and sale of the Bonds.
Page 111 of 185
- 2 -
4915-1266-3714\2
The City Administrator or any other City employee designated by the City Administrator shall deem the
Preliminary Official Statement substantially final in accordance with applicable federal securities laws. The
City Administrator is hereby authorized to engage Dorsey & Whitney LLP (“Dorsey”) and direct them to
prepare legal agreements, documents, instruments and certificates as may be necessary or appropriate in
connection with the sale and issuance of the Bonds. The Municipal Advisor, Dorsey, and employees and
officers of the District are hereby authorized to take any additional actions that may be useful or necessary
in connection with the Bonds.
SECTION 4. RATIFICATION OF SALE. Upon approval of the sale of the Bonds by the Pricing
Committee, the Council will take action at a regularly scheduled or special meeting thereafter to adopt bond
resolutions prepared by Dorsey ratifying the sale of the Bonds and incorporating the terms and conditions
with respect thereto.
Adopted this 4
th
day of May, 2026.
## Mayor
## Attest:
## City Administrator
Upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon the resolution was declared duly passed and adopted.
Page 112 of 185
4915-1266-3714\2
## Exhibit A
## TERMS OF PROPOSAL
## [TO BE ATTACHED]
Page 113 of 185
1
*Preliminary, subject to change
April 28, 2026
Pre-issuance report for
City of Chaska, Minnesota (the “City”)
$24,710,000* General Obligation Water Utility Revenue Bonds, Series 2026B (the “Series
2026B Bonds”)
## PRE-ISSUANCE REPORT
## PREPARED BY
## Baker Tilly Municipal Advisors, LLC
## 30 East Seventh Street, Ste. 3025,
## St. Paul, MN 55101
## ADVISOR
## Chris Hogan | Director
651-223-3034
chris.hogan@bakertilly.com
Page 114 of 185
2
## Issue Summary
## PURPOSE OF ISSUE
The City has under consideration the issuance of the Series 2026B Bonds to finance (i) various water utility
improvements; (ii) construction of the North Water Treatment Plant; and (iii) costs of issuance. This
document provides information relative to the proposed issuance. The sources and uses of funds as shown
in Attachment II, provide project details.
The par amount of the Series 2026B Bonds is an estimate based in part on a preliminary financing amount
for the Water Treatment Plant. The City Council will be awarding the construction bid for the water treatment
plant on July 6
th
which could result in a higher or lower borrowing amount for that project than what is
currently shown in this Pre-issue report. Based on the construction bid amount, Baker Tilly will revise the
bond structure and update the Preliminary Official Statement as necessary.
## AUTHORITY
The Series 2026B Bonds are being issued pursuant to Minnesota Statutes, Chapters 444 and 475.
Additionally, on May 4, 2026, the City will consider a Parameters Resolution authorizing the issuance of the
Series 2026B Bonds, establishing a Pricing Committee and setting certain parameters. The Mayor and the
City Administrator are designated as the Pricing Committee and have the authority to award the sale of the
Series 2026B Bonds pursuant to the following parameters:
• the total par amount of the Bonds will not exceed $27,500,000;
• the maximum True Interest Cost (TIC) will not exceed 5.50%; and
## SECURITY/SOURCE OF PAYMENT
The Series 2026B Bonds will be general obligations of the City for which the City will pledge its full faith and
credit and power to levy direct general ad valorem taxes. In addition, the City will pledge net revenues of
the City’s Water Utility for repayment of the Series 2026B Bonds. The City does not anticipate the need to
levy taxes for repayment of the Series 2026B Bonds.
Pursuant to Minnesota Statutes, Chapter 444, and the resolution ratifying the sale of the Series 2026B
Bonds, the City will covenant to impose and collect charges for the service, use, availability and connection
to the water utility to produce net revenues in amounts sufficient to support the operation of the Water Utility
and to pay 105% of the debt service due on obligations to which it has pledged its Water Utility revenues,
including the Series 2026B Bonds. The City is required to annually review the budget of the Water Utility to
determine whether current rates and charges are sufficient and to adjust such rates and charges as
necessary.
Attachment III shows current outstanding debt and coverage based on net revenues available to pay debt
service from the City’s utility funds, including the Water Utility based on fiscal year ended December 31,
2024 (the City’s audited financial statements for fiscal year ended December 31, 2025 are not yet available)
including the projected debt service payable from the Bonds.
## FINANCING STRUCTURE
In consultation with City staff, the Series 2026B Bonds have been structured with a twenty-five-year term
with approximately level annual payments of principal and interest.
Page 115 of 185
3
## Issue Terms
## BANK QUALIFICATION
The City is issuing more than $10 million in tax-exempt obligations in 2026; therefore, the Series 2026B
Bonds are not designated as bank qualified.
## VARIABILITY OF ISSUE SIZE
A specific provision in the sale terms permits modifications to the issue size and/or maturity structure to
customize the issue once the price and interest rates are set on the day of sale.
## RISKS / SPECIAL CONSIDERATIONS
The outcome of this financing will rely on the market conditions at the time of the sale. Any projections
included herein are estimates based on current market conditions.
Estimated interest rates applied in the structuring of the Series 2026B Bonds are based on current market
conditions and assume a reoffering premium. The underwriter will take their compensation from the
reoffering premium and any remaining premium can be used to downsize the issue, applied to additional
project needs or deposited to the debt service fund. Our preliminary bond structure has applied the
estimated premium to finance project needs thereby reducing the principal amount of the Series 2026B
Bonds. Determination of the use of premium, if received, will be made by the City prior to or on the day of
sale.
## OPTIONAL REDEMPTION
The City may elect on February 1, 2036, and on any day thereafter, to redeem the Series 2026B Bonds
due on or after February 1, 2037, at a price of par plus accrued interest.
## Rating
An application will be made to S&P Global Ratings (S&P) for a rating on the Series 2026B Bonds. The
City’s general obligation debt is currently rated “AA” by S&P.
## Issuance Timeline
## EVENT DATE
## City Council considers Parameters Resolution May 4, 2026
Rating visit is conducted May 4, 2026
Competitive bids are received July 22, 2026, 10:00 a.m.
Pricing Committee considers award on the sale of the Series
2026B Bonds (Following the receipt of bids)
July 22, 2026
City Council ratifies sale results August 3, 2026
Page 116 of 185
4
Receipt of proceeds and settlement of the Series 2026B Bonds. August 20, 2026
## Post Issuance
## ARBITRAGE / REBATE
The issuance of the Series 2026B Bonds will result in post-issuance compliance responsibilities related to
compliance with federal arbitrage requirements.
Federal arbitrage requirements include a wide range of implications that have been considered as this issue
has been structured. Post-issuance compliance responsibilities for this tax-exempt issue include both
rebate and yield restriction provisions of the IRS Code. In general terms the arbitrage requirements control
the earnings on unexpended bond proceeds, including investment earnings, moneys held for debt service
payments (which are considered to be proceeds under the IRS regulations), and/or reserves. Under certain
circumstances any “excess earnings” will need to be paid to the IRS to maintain the tax-exempt status of
the Bonds. Any interest earnings on gross bond proceeds or debt service funds should not be spent until it
has been determined based on actual facts that they are not “excess earnings” as defined by the IRS Code.
The arbitrage rules provide for spending exceptions for proceeds that are spent within 6-month, 18-month
or, for certain construction issues, a 24-month period each in accordance with certain spending criteria.
Proceeds that qualify for an exception will be exempt from rebate. These exceptions are based on actual
expenditures and not based on reasonable expectations, and expenditures, including any investment
proceeds will have to meet the spending criteria to qualify for the exclusion. The City expects to meet the
24-month spending exception.
Regardless of whether the issue qualifies for an exemption from the rebate provisions, yield restriction
provisions will apply to bond proceeds (including interest earnings) unspent after three years and the debt
service fund throughout the term of the Series 2026B Bonds. These moneys should be monitored until the
Series 2026B Bonds are retired.
Baker Tilly Municipal Advisors, LLC (Baker Tilly MA) and the City have entered into an Agreement for
Municipal Advisor Services under which Baker Tilly will provide arbitrage compliance services on the Series
2026B Bonds.
## CONTINUING DISCLOSURE
The issuance of the Series 2026B Bonds will result in post-issuance compliance responsibilities related to
continuing disclosure.
Secondary disclosure requirements result from the U.S. Securities and Exchange Commission (SEC)
requirement that underwriters provide ongoing disclosure information to investors. To meet this
requirement, any prospective underwriter will require the City to commit to providing the information needed
to comply under a continuing disclosure agreement.
Baker Tilly Municipal Advisors, LLC (Baker Tilly MA) and the City have entered into an Agreement for
Municipal Advisor Services under which Baker Tilly will provide continuing disclosure services on the Series
2026B Bonds.
Page 117 of 185
5
Baker Tilly Municipal Advisors, LLC is a registered municipal advisor and controlled subsidiary of Baker Tilly Advisory Group, LP. Baker Tilly Advisory
Group, LP and Baker Tilly US, LLP, trading as Baker Tilly, operate under an alternative practice structure and are members of the global network of
Baker Tilly International Ltd., the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm and
provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their
clients and are not licensed CPA firms. ©2026 Baker Tilly Municipal Advisors, LLC
## Finance Team
The issuance of the Series 2026B Bonds will require the work of various other public finance professionals.
Fees for these professionals shall be paid by proceeds of this issuance unless directed otherwise by the
City. The following professionals and their roles have been identified below:
## Bond Counsel: Dorsey & Whitney LLP
## Municipal Advisor: Baker Tilly Municipal Advisors, LLC
## Attachments
Schedules attached for the Series 2026B Bond include:
## I. Bond Buyer Index
## II. Bond Schedules
## III. Aggregate Utility Debt and Coverage
Page 118 of 185
6
## I. Bond Buyer Index
Performance of the tax-exempt market is often measured by the Bond Buyer’s Index (“BBI”) which
measures the yield of high grade municipal bonds in the 20th year for general obligation bonds rated Aa2
by Moody’s or AA by S&P (the BBI 20-Bond GO Index) and the 30th year for revenue bonds rated A1 by
Moody’s or A+ by S&P (the BBI 25-Bond Revenue Index). The following chart illustrates these two indices
over the past five years:
Page 119 of 185
7
## II. Bond Schedules
Page 120 of 185
8
Page 121 of 185
9
## Debt Service Schedule
## Dat ePrincipalCouponInterestTotal P+I105% Le vyFis cal Total
08/20/2026------
02/01/2027--506,372.95506,372.95531,691.60531,691.60
08/01/2027--566,131.25566,131.25594,437.81-
02/01/2028535,000.005.000%566,131.251,101,131.251,156,187.811,750,625.63
08/01/2028--552,756.25552,756.25580,394.06-
02/01/2029560,000.005.000%552,756.251,112,756.251,168,394.061,748,788.13
08/01/2029--538,756.25538,756.25565,694.06-
02/01/2030590,000.005.000%538,756.251,128,756.251,185,194.061,750,888.13
08/01/2030--524,006.25524,006.25550,206.56-
02/01/2031620,000.005.000%524,006.251,144,006.251,201,206.561,751,413.13
08/01/2031--508,506.25508,506.25533,931.56-
02/01/2032650,000.005.000%508,506.251,158,506.251,216,431.561,750,363.13
08/01/2032--492,256.25492,256.25516,869.06-
02/01/2033680,000.005.000%492,256.251,172,256.251,230,869.061,747,738.13
08/01/2033--475,256.25475,256.25499,019.06-
02/01/2034715,000.005.000%475,256.251,190,256.251,249,769.061,748,788.13
08/01/2034--457,381.25457,381.25480,250.31-
02/01/2035750,000.005.000%457,381.251,207,381.251,267,750.311,748,000.63
08/01/2035--438,631.25438,631.25460,562.81-
02/01/2036790,000.005.000%438,631.251,228,631.251,290,062.811,750,625.63
08/01/2036--418,881.25418,881.25439,825.31-
02/01/2037830,000.005.000%418,881.251,248,881.251,311,325.311,751,150.63
08/01/2037--398,131.25398,131.25418,037.81-
02/01/2038870,000.005.000%398,131.251,268,131.251,331,537.811,749,575.63
08/01/2038--376,381.25376,381.25395,200.31-
02/01/2039915,000.005.000%376,381.251,291,381.251,355,950.311,751,150.63
08/01/2039--353,506.25353,506.25371,181.56-
02/01/2040960,000.004.000%353,506.251,313,506.251,379,181.561,750,363.13
08/01/2040--334,306.25334,306.25351,021.56-
02/01/20411,000,000.004.000%334,306.251,334,306.251,401,021.561,752,043.13
08/01/2041--314,306.25314,306.25330,021.56-
02/01/20421,040,000.004.125%314,306.251,354,306.251,422,021.561,752,043.13
08/01/2042--292,856.25292,856.25307,499.06-
02/01/20431,080,000.004.250%292,856.251,372,856.251,441,499.061,748,998.13
08/01/2043--269,906.25269,906.25283,401.56-
02/01/20441,125,000.004.250%269,906.251,394,906.251,464,651.561,748,053.13
08/01/2044--246,000.00246,000.00258,300.00-
02/01/20451,175,000.004.375%246,000.001,421,000.001,492,050.001,750,350.00
08/01/2045--220,296.88220,296.88231,311.72-
02/01/20461,225,000.004.375%220,296.881,445,296.881,517,561.721,748,873.45
08/01/2046--193,500.00193,500.00203,175.00-
02/01/20471,280,000.004.500%193,500.001,473,500.001,547,175.001,750,350.00
08/01/2047--164,700.00164,700.00172,935.00-
02/01/20481,340,000.004.500%164,700.001,504,700.001,579,935.001,752,870.00
08/01/2048--134,550.00134,550.00141,277.50-
02/01/20491,400,000.004.500%134,550.001,534,550.001,611,277.501,752,555.00
08/01/2049--103,050.00103,050.00108,202.50-
02/01/20501,460,000.004.500%103,050.001,563,050.001,641,202.501,749,405.00
08/01/2050--70,200.0070,200.0073,710.00-
02/01/20511,525,000.004.500%70,200.001,595,200.001,674,960.001,748,670.00
08/01/2051--35,887.5035,887.5037,681.88-
02/01/20521,595,000.004.500%35,887.501,630,887.501,712,431.881,750,113.75
## Total$24,710,000.00-$17,466,654.21$42,176,654.21$44,285,486.92-
## SIGNIFIC A NT DA T ES
Dated 8/20/2026
## Delivery Date 8/20/2026
## First Coupon Date 2/01/2027
Yie ld Statis tics
## Bond Year Dollars $388,755.86
## Average Lif e 15.733 Years
## Average Coupon 4.4929623%
## Net Interest Cost (NIC) 4.3852672%
## True Interest Cost (TIC) 4.3477177%
## Bond Yield f or Arbitrage Purposes 4.2286470%
A ll Inc lus iv e Cos t (A IC) 4.3913180%
## IRS Form 8038
## Net Interest Cost 4.2545963%
## Weighted Average Maturity 15.486 Years
Page 122 of 185
10
Cale ndar Ye ar2012B Bonds2015C Bonds2017B Bonds2019C Bonds2019D Bonds2020C Bonds2020D BondsEst. Series 2026BTotal
202692,405.25358,010.6356,109.38190,975.3195,143.13163,800.00794,164.88- 1,750,608.56
202795,586.75360,635.6354,271.88186,407.8192,623.13162,618.75799,556.631,126,129.412,877,829.97
2028356,409.3852,434.38181,840.3195,274.38161,175.00808,274.251,736,581.883,391,989.57
2029357,196.8856,293.13187,615.3192,797.69164,587.50831,458.251,734,088.133,424,036.88
2030359,034.3854,980.63182,732.8195,704.88162,356.25837,758.251,735,400.633,427,967.82
2031355,385.6353,300.63189,059.06160,650.00843,066.001,735,138.133,336,599.44
2032361,921.8857,001.88185,485.79852,600.001,733,300.633,190,310.17
2033362,814.3855,584.38186,886.881,729,888.132,335,173.76
2034358,013.9254,166.88188,061.561,730,019.382,330,261.74
2035358,013.9252,749.3895,622.191,728,313.132,234,698.61
2036357,465.9456,503.131,729,888.132,143,857.19
203754,928.131,729,363.131,784,291.26
203853,320.311,726,738.131,780,058.44
20391,727,131.881,727,131.88
20401,730,203.131,730,203.13
20411,731,043.131,731,043.13
20421,729,520.631,729,520.63
20431,724,900.631,724,900.63
20441,722,951.561,722,951.56
20451,723,361.721,723,361.72
20461,720,736.721,720,736.72
20471,720,110.001,720,110.00
20481,721,212.501,721,212.50
20491,719,480.001,719,480.00
20501,714,912.501,714,912.50
20511,712,641.881,712,641.88
20521,712,431.881,712,431.88
187,992.00$ 3,944,902.53$ 711,644.06$ 1,774,687.04$ 471,543.19$ 975,187.50$ 5,766,878.25$ 44,285,487.00$ 58,118,321.57$
All issuances shown at 105% debt service.
## 2024 Net Revenues Sewer
## Storm WaterWater Utility To t a l
## Operating Revenues7,822,8472,243,4325,074,00515,140,284
Operating Expenses(7,407,400) (2,242,459) (4,382,084) (14,031,943)
## Operating Income415,447973691,9211,108,341
## Add: Depreciation1,413,0001,037,4191,792,7774,243,196
## Interest Earnings 149,389210,571205,652565,612
## Net Revenues Available for Debt Service1,977,8361,248,9632,690,3505,917,149
## Maximum Projected Debt Service 3,427,967.82
## Remaining Capacity
2,489,181.2
Co ve rage1.73x
## III. Aggregate Utility Debt and Coverage
Page 123 of 185
## Subject: Notice of Default on Memorandum of Understanding with Cain
## Development Group and RCS-RCA Oak Ridge, LLC for Temporary
Certificate of Occupancy at 1 Oak Ridge Dr.
## Prepared by: Nate Kabat
## Background
On December 1, 2025, the City Council entered into a memorandum of understanding (MOU)
with Cain Development Group (“Operator”) and RCS-RCA Oak Ridge, LLC (“Owner”) for a
temporary certificate of occupancy (TCO). The MOU set conditions for the operator, working with
the owner, to meet in order to occupy the facility which has been vacant since 2020.
To date, the provisions of the MOU have not been implemented. The required parking lot
improvements have not been completed, nor have the Owner or Operator applied for permits.
Operator has never demonstrated compliance with the requirements of the conditional transient
accommodation license, and as a result the phased parking plan and reopening plan in the MOU
have not been implemented, and any conditional transient accommodations license expired on
April 30 of this year.
More than the Owner and Operator’s failure to implement the MOU reopening plan, Operator and
Owner are in material default. The MOU defines multiple obligations that the Operator must
achieve in order to obtain a Temporary Certificate of Occupancy (TCO). Since entering into the
MOU, the Operator has either not pursued or has fallen into non-compliance with those
obligations.
The letter attached to this memo serves as a notice of noncompliance and default to Cain
Development Group (“Operator”) and RCS-RCA Oak Ridge, LLC (“Owner”) under the
Memorandum of Understanding dated December 2, 2025 (“MOU”) which the City, the Owner,
and the Operator each executed. The letter details the areas of default which include life safety
compliance and enhanced security protocols. Based on these areas of default, and the terms of
the MOU, the letter provides notice of default, provides the Operator 10 days after receipt of
the letter to remedy the default, and notices that the MOU will be terminated if the areas of
default are not remedied within the 10 days.
## City Council Action Requested
Motion to authorize the City Administrator to sign the letter of notice of default on
the memorandum of understanding with Cain Development Group and RCS-RCA Oak
Ridge, LLC for temporary certificate of occupancy at 1 Oak Ridge Dr.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 124 of 185
## Chaska PD
## Trespassing and Burglary Related Calls for Service
## 1 Oak Ridge
From 1/1/2026 to 4/27/2026
Date Time Call Type/Summary: Method of Entry/Damage Arrest/Citation?
## Y/N
2-27-2026 9:08 PM Burglary:
Juvenile arrest, unlawful entry and damage
Suspects reportedly entered
through an open door. Heavy
Damage noted inside.
## Yes
3-04-2026 10:21 AM Damage to Property/Vandalism:
Spray Paint and garbage found throughout.
## UNK No
3-15-2026 9:17 PM Trespassing:
Juvenile arrest, unlawful entry.
Suspects entered through open
window. Unable to determine
new damage from old.
## Yes
3-24-2026 4:10 PM Trespassing:
Suspected juveniles entered through a broken
window. Left prior to arrival of security/police.
Suspects reportedly entered
through an open/broken window.
## No
3-30-2026 10:21 PM Trespassing:
Juvenile arrest, unlawful entry
Suspects entered through an
open door.
## Yes
4-13-2026 7:29 PM Burglary:
Adult arrest, unlawful entry and tampering
Suspects entered through an
unlocked window, removing a
screen.
## Yes
4-17-2026 7:12PM Trespassing/Damage to Property:
Juvenile arrest, exterior damage to the property,
alcohol related offenses.
Suspects damaged a window,
unconfirmed if entry occurred.
## Yes
## 4-19-2026 7:50 PM Trespassing/Possession of Burglary Tools:
Adult and juvenile arrest, unlawful entry and
burglary tools possession.
Suspects entered through an
open window.
## Yes
Page 125 of 185
Page 126 of 185
Page 127 of 185
## CITY OF CHASKA
## ONE CITY HALL PLAZA / CHASKA MN 55318-1962
May 4, 2026
## RCS-RCA Oak Ridge LLC
## 1959 Sloan Pl. Ste. 220
## Saint Paul, MN 55117CC
## Cain Development Group
## 1849 Landry Ln
## Rock Hill, SC 29732
RE: Memorandum of Understanding dated December 2, 2025 regarding Temporary
Certificate of Occupancy for Oak Ridge Hotel located at 1 Oak Ridge Drive, Chaska
## To Whom it May Concern,
I am writing on behalf of the City of Chaska regarding the property located at 1 Oak Ridge
Drive, Chaska, commonly known as the Oak Ridge Conference Center (“Oak Ridge”). This letter
serves as a notice of noncompliance to Cain Development Group (“Operator”) and RCS-RCA Oak
Ridge, LLC (“Owner”) under the Memorandum of Understanding dated December 2, 2025 (“MOU”)
which the City, the Owner, and the Operator each executed. To date, the provisions of the MOU have
not been implemented. The required parking lot improvements have not been completed, nor have
the Owner or Operator applied for permits. Operator has never demonstrated compliance with the
requirements of the conditional transient accommodation license, and as a result the phased
parking plan and reopening plan in the MOU have not been implemented, and any conditional license
would have expired on April 30 of this year.
More than the Owner and Operator’s failure to implement the MOU reopening plan, Operator
and Owner are in material default. The MOU defines multiple obligations that the Operator must
achieve in order to obtain a Temporary Certificate of Occupancy (TCO). Since entering into the MOU,
the Operator has either not pursued or has fallen into non-compliance with those obligations. The
following summarizes the Operator’s current status relative to the defined obligations.
• 2.a. Life Safety Compliance. Since entering into the MOU, multiple break-ins have
occurred on the property and damage to the facility has been recorded by Chaska Police,
including notably on February 27 of 2026 and March 15 of 2026, when the Chaska Police
Department first noted extensive damage in Oak Ridge. The Chaska Fire Department also
responded to a fire suppression system alarm, and noted damage to the facility’s
Page 128 of 185
sprinkler system and tampering with other fire safety systems. Neither the Owner nor the
Operator has scheduled inspections to demonstrate that necessary repairs have been
made. As a result, fire, life-safety, ADA, and building code requirements are
noncompliant and compliance must be demonstrated by successful building and fire
inspections.
• 2.g. Enhanced Security Protocols. Security previously provided by the Operator is no
longer operating at the site. A transition to a security firm provided by the Owner
apparently occurred, but is clearly insufficient to address the ongoing security concerns
at Oak Ridge. Chaska Police have continued to respond to and arrest trespassers on the
property with incidents recorded as recently as April 18 and April 19, 2026. Owner and
Operator must demonstrate that the security measures in place at least meet the
requirements of Section 2.g of the MOU.
Independently of the obligations of the MOU, the City reminds Owner and Operator of their
obligations under Minnesota law to take any necessary action to secure the building and prevent Oak
Ridge from remaining an attractive nuisance and a hazard to public health and safety. The City
ordered the Owner to secure Oak Ridge against trespass, pursuant to Minnesota Statutes § 463.251
in Resolution 2025-55 on September 8, 2025. This remains a standing obligation regardless of the
terms of the MOU.
Based on the violations listed in this letter, the City of Chaska is hereby notifying the Owner
and Operator of 1 Oak Ridge Drive that they are in default of the terms of the MOU. As defined by the
MOU, the Operator has a reasonable time period, not to exceed 10 days after receipt of this notice
to cure the defaults. If the Operator fails to obtain compliance, the City will revoke any approvals
granted pursuant to the MOU including the Temporary Certificate of Occupancy and the conditional
transient accommodations license.
Please feel free to call me if you have any questions about this matter.
## Sincerely,
## Matt Podhradsky
## City Administrator
Page 129 of 185
Subject: Public Improvements – Pioneer Vista
## Prepared By: Denise Beebe, Senior Clerk
## Reviewed By: Matt Clark, City Engineer
Installation of public improvements is completed in Pioneer Vista. Consistent with terms of the
Development Agreement, Chaska is in a position to formally accept said improvements as public
facilities and release the letter of credit in its entirety.
## CITY COUNCIL ACTION REQUESTED
Accept public improvements in Pioneer Vista as municipal facilities and release the letter of credit
in its entirety.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 130 of 185
## Subject: Items Related to the Design for the Chaska Library
## Prepared By: Elise Durbin, Assistant City Administrator
## Background
In the fall of 2021, the City Council developed their Strategic Plan (2021-2025) and
identified six strategic visions. One of these visions is “In 2025 Chaska has quality City
facilities”. From these visions, strategic directions were set. Strategic Direction Two is
“Reinvesting in Core Assets: Facilities are adequate to meet growth and reflect community
pride.” This vision and strategic direction were identified as city facilities are over 30 years
old with little reinvestment put into them, and no longer are able to accommodate the
growth in the community since they were built.
The Public Safety Facility was identified as the first facility to be updated—construction is
now complete and operations are now being conducted out of the facility. The Municipal
Services Building (MSB), which includes the Public Works (Streets, Parks, Storm Water,
Mechanics, Building Maintenance divisions), Electric, and Water & Sewer departments is the
second facility and will be under construction by the end of May.
With construction beginning on MSB, the next building to begin design on is the Library.
Funding for the library construction was secured with the adoption of the 2026 budget and
is anticipated to begin in spring 2028.
The City of Chaska is responsible for the capital costs related to the construction and
maintenance of the building, while Carver County is responsible for the operation of the library
in the building. With this approach, it is important that both entities participate in the design
process. Additionally, because of the public use of the building, there should be engagement
opportunities for the community to provide ideas and feedback.
## Committees
Staff is recommending the library design process will consist of two committees—a library task
force made up of elected officials and the public, and a staff design group.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 131 of 185
## Library Task Force
The Library Task Force will consist of eight elected and appointed members who will meet four
times throughout design process with the architect and staff design group. Their role is to
review the design work, and they will provide recommendations to the City Council. The
makeup will include:
## • County Commissioner (1) – Commissioner Lisa Anderson
• City Council member (1)
• Library Board member (1) – Amber Barker
• Friends of the Library member (1) –Jim Weygand
• At large (4)
Staff is recommending the City Council appoint the Councilmember who will serve on the task
force at the May 4 meeting.
Additionally, staff is requesting the City Council call for applications from the community for four
members to serve on the task force. If Council approves, applications will be available on the
city’s website. Staff plans to coordinate the application process for the library task force as well
as the downtown master plan task force. Council will interview candidates for both task forces
at a work session in June.
## Staff Design Group
The Staff Design Group will consist of nine city and county staff members who will meet
regularly throughout the design process. Their role is to have regular interactions with the
architect on the design and bring back recommendations to the Library Task Force and the City
Council. The make up of the group is as follows:
• Carver County/Chaska Library staff (2)
## • Carver County Administration (1)
• City of Chaska Administration (2)
## • City of Chaska Building Maintenance (2)
## • City of Chaska Community Development (1)
• RJM Representative as the Construction Manager (1)
## Architectural and Engineering Services
Staff has developed a Request for Proposals (RFP) for Architectural and Engineering Services
to provide design and construction services for the new Library. The project scope includes
providing planning and design services for the following areas of the project, including but
not limited to architectural, engineering (civil, structural, electrical, mechanical), space
programming, schematic design, and construction documents.
The RFP timeline is as follows:
• Design RFP issued – May 5, 2026
• RFP submittals due – May 26, 2026
• Staff interviews with selected firms – Week of June 8, 2026
• City Council selection of firm – June 15, 2026
Page 132 of 185
The project schedule is as follows:
• Space programming/concept design – July-December 2026
• Schematic design phase – January -April 2027
• Design development phase – April-September, 2027
• Construction documents phase – October, 2027-January, 2028
• Bidding and contract award – February-March, 2028
• Construction phase - May, 2028 – Fall 2029
The Staff Design Group will work through the RFP process, including touring other facilities,
reviewing the proposals, and interviewing the finalists. This group will make the
recommendation to City Council in mid-June on an architect.
## Recommendation
Throughout the Building Improvement Program, the Library was identified as the third building
that would move forward for improvements. To ensure construction begins in spring 2028,
design of the building should begin now. Staff is recommending three items to begin that
design process:
• Issuing a Request for Proposals for Architectural and Engineering Services for a new
Chaska Library Building.
• Appointment of one City Councilmember to the Library Task Force.
• Authorization to advertise for applications from community members to serve on the
## Library Task Force
## CITY COUNCIL ACTION REQUESTED
Motion to approve issuing a Request for Proposals for Architectural and Engineering Services for
a new Municipal Services Building, appoint Councilmember ____________ to the Library Task
Force, and authorize staff to advertise for applications from community members to serve on
the Library Task Force.
Page 133 of 185
## Subject: Initiate Downtown Master Plan Update Process
## Prepared by: Nate Kabat
## Background
The City Council adopted Chaska’s first Downtown Master Plan in February, 2012. The intent for
the master plan is to provide a coordinated roadmap for policy application and investment by
the City and key partners towards a common vision for Historic Downtown Chaska. The plan
establishes a vision to “Revitalize downtown Chaska as the hub of community destinations and
gathering places that reflect and celebrate our historic character, traditional small town
atmosphere and values.”
In its 2025 Strategic Plan, the Council directed staff to revisit and review the 2012 Downtown
Master Plan to provide a progress update in fall of 2025 and possibly update the plan in 2026.
Accordingly, an update was provided in an August 2025 work session. The presentation
provided to Council noted that many of the key implementation strategies identified by the 2012
Downtown Master Plan have been implemented or are well underway. Examples include
Fireman’s Park, the Landings redevelopment, the rebuild of TH 41 and implementation of the
Paseo, and the downtown street reconstruction program. The presentation noted new
opportunities are emerging like the process to build a new library, redevelopment sites such as
the bus barn, and programmatic partnerships to activate spaces like the Paseo and the soon to
be rebuilt City Hall Plaza among others. While Council felt the current vision downtown
continues to feel relevant, Council also believes that implementation strategies need to be
reviewed and renewed to continue positive momentum downtown.
Based on the direction received at the August work session, staff have worked with Jeff Miller at
HKGI to develop a scope of work to update the Downtown Master Plan. Jeff and HKGI led the
process for the current plan and has had involvement in multiple Chaska Comprehensive Plans,
the Downtown Master Plan, downtown streetscape program, and many other Chaska projects in
addition to his work in communities throughout the Midwest. Staff believes continuing to work
with HKGI for this update enables us to build on this shared knowledge and established
relationship.
The scope of work is attached to this staff report. Broadly, the timeline is to begin the project in
June of this year and complete the plan in early 2027. The scope includes a review of the
current plan, a downtown market study, identifying current challenges and opportunities,
establishing concepts for key redevelopment sites, and identifying and clarifying implementation
roles and goals for the city and key partners. The process includes multiple community
engagement opportunities that will tap into key community events and will be guided by a task
force.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
5/4/2026
Page 134 of 185
The Downtown Master Plan Task Force will provide feedback and direction to Chaska city staff
and consultants on the update of the Downtown Master Plan. The task force is planned to meet
approximately four times from June 2026 to early 2027. These meetings will be held in the
evening and are anticipated to last two hours long each meeting.
Staff recommend the task force should consist of the following:
## • Two Chaska City Councilmembers,
• One member of the Heritage Preservation Commission
• One member of the Planning Commission
• One member of the Parks & Recreation Commission
• Up to two downtown residents
• Up to two at-large residents
## • Two members of the Chaska Downtown Business Alliance
## • The Chair of the SW Metro Chamber of Commerce
• A representative of SW Transit
• One representative from Carver County
• One representative from School District 112
• One representative from St. John’s
• One representative from Guardian Angels
Recruiting task force members will require three strategies. First, staff requests Council to appoint
its two representatives this evening. Second, staff requests Council to call for applications from
community members to serve on the task force. With this direction, applications will be made
available on the City’s website, and the opportunity will be advertised. Staff plan to coordinate
the application process for the downtown task force and the library task for congruently. Third,
staff will coordinate directly with the organizations identified in the previous list to determine their
representatives.
## Staff Recommendation
To initiate the Downtown Master Plan update, staff recommends Council take the following
actions this evening:
1. Approve and authorize the City Administrator to sign the scope of work.
2. Appoint two council members to the Downtown Master Plan Task Force.
3. Approve the task force membership list and authorize staff to advertise for applications
from community members to serve on the task force.
## City Council Action Requested
Motion to approve and authorize the City Administrator to sign the scope of work,
appoint Councilmember ___________ and ____________ to the Downtown Master
Plan Task Force, and approve the task force membership list and authorize staff to
advertise for applications from community members to serve on the task force.
Page 135 of 185
2026
## Proposed Project Schedule
## JUN
## JUL
## AUG
## SEP
## OCT
## NOV
## DEC
## JAN
## FEB
## MAR
Task 1
## Evaluate Downtown Plan
Recommendations &
## Future Influences
“Where are we today?”
Task 2
## Update Downtown
## Market Positioning
“What is the
## Market Demand?”
Task 3
## Identify Issues
& Opportunities
“Where could we go?”
Task 4
## Explore Ideas &
## Concepts to Establish
## Priority Initiaives/
## Recommentations
“Where do we want to go?”
Task 5
## Prepare Draft Plan
## Document & Identiy
## Implementation
## Strategies/Actions
“How will we get there?”
Task 6
## Prepare Final Plan
## Document & Gain
## Approvals
## CHASKA DOWNTOWN PLAN UPDATE
## Meeting with Task ForceJoint MeetingDesign CharretteProject Milestone
## Window of Time to Conduct Community Engagement
## SCHEDULE KEY
## Existing Conditions Updated
## Kick-Off Mtg
## Market Positioning Report Completed
## Draft Plan
## Final Plan
## Vision & Guiding Principles Updated
Draft reinvestment/
redevelopment ideas
& concepts
## CE #1 River City Days + Online
## CE #2 Latin Festival & Halloween + Online
CE #3 State of the City + Online
Page 136 of 185
Collaborate. Listen.
Explore. Create.
## 800 Washington Avenue North, Suite 103
## Minneapolis, MN 55401
April 30, 2026
## TO: NATE KABAT
## COMMUNITY DEVELOPMENT DIRECTOR | CITY OF CHASKA
## ONE CITY HALL PLAZA, CHASKA, MN, 55318
## RE: Chaska Downtown Plan Update - Proposed Work Scope,
## Schedule, and Estimated Costs
## Project Approach
City staff has requested that HKGi provide a project work scope, estimated costs, and a
schedule for updating the Chaska Downtown Plan. The work scope includes a downtown
market analysis (task 2). We propose LOCi Consulting as a sub-consultant for this work. We
have teamed with LOCi Consulting on a number of market and housing analyses at the
downtown, city, and county level.
Our proposed work scope includes 6 tasks beginning with an evaluation of downtown’s current
context, “Where Are We Today”, and an update of the downtown’s market position, "What is the
Market Demand" (tasks 1 and 2). This upfront evaluation will include identifying changes that
have occurred since the last plan, current and future influences on the downtown, and revisiting
the downtown vision and guiding principles. This will include an evaluation of downtown through
the lens of the downtown districts/neighborhoods and updating the Potential Revitalization
Opportunities map.
Tasks 3 and 4 will address the downtown’s issues and opportunities, "Where Could We Go",
and then explore potential ideas and concepts to identify "Where Do We Want to Go." We will
identify downtown catalyst projects, which may include sites for reinvestment or redevelopment,
downtown activation initiatives, and programs to support the downtown business environment.
The plan will be updated with design guidance for the downtown overall and specific sites to
inspire downtown redevelopment, e.g. wayfinding, ped/bike facilities, public amenities,
landscaping, stormwater, awnings, signage.
The work scope includes meetings with a project task force, staff, and joint meetings including
the Council and appropriate commissions. We are proposing three community engagement
opportunities, both in-person events and online input. If the timing works, we are proposing
community engagement at River City Days in July, Downtown Halloween and/or Latin Festival
in the fall, and the State of the City in January.
We envision that the plan update document will be a shorter document than the original
downtown plan using a more streamlined and graphic format, e.g. use of bullets and illustrations
rather than descriptive paragraphs. The plan will have a focus on identifying implementation
strategies. Building upon all of the progress that has been made downtown, the plan update
Page 137 of 185
April 30, 2026
## Downtown Plan Update
## City of Chaska
## Collaborate. Listen. Explore. Create. 2
document will focus on the next phase of downtown physical improvements through
reinvestment and redevelopment, including new catalyst projects/sites; activation of the
downtown environment; strengthening and growing business opportunities; downtown
programs, partnerships, and funding; and generally improving the downtown for businesses,
residents, employees, and visitors.
## PROPOSED WORK SCOPE
Task 1 - Evaluate the Downtown Plan Recommendations and Future Influences “Where Are We
## Today”
1.1 Project kickoff meeting with staff
1.2 Review and identify findings from related plans, e.g. Chaska 2040 Pedestrian
and Bicycle Master Plan, Downtown Chaska Activation Plan, Pathways to Place:
## Activating Downtown Chaska’s Paseo Network, Chaska Wayfinding Signage
## Master Plan
1.3 Update background mapping and information (chapter 3)
1.4 Identify downtown changes since last plan, planned downtown projects, and
future influences
1.5 Audit progress on current plan's implementation strategies and actions
1.6 Revisit Vision and Guiding Principles (chapter 4)
1.7 Meeting with project task force and staff
Meetings: Staff (1 or 2)
Project task force
Task 2 - Update Downtown Market Positioning "What is the Market Demand"
2.1 Site analysis
2.2 Demographic review
2.3 Review Carver County housing study (2024)
2.4 Residential review
i) Market data (rents, vacancy, absorption)
ii) Profile and discuss newer competitive higher-density residential properties in and
near the market area
2.5 Retail review
i) Overview of existing retail in the market area
ii) Market data (lease rates, vacancy, absorption)
iii) Discuss newer competitive downtown retail properties in and near the market area
2.6 Mixed use review
i) Identify and discuss mixed-use properties developed in and near the market area
2.7 Identify conclusions and findings and prepare report
2.8 Meetings and presentation to staff
2.9 Presentation to task force
Page 138 of 185
April 30, 2026
## Downtown Plan Update
## City of Chaska
## Collaborate. Listen. Explore. Create. 3
Meetings: Staff (1 or 2)
Project task force
Task 3 - Identify Issues & Opportunities "Where Could We Go"
3.1 Analysis of issues and opportunities by district and neighborhood
3.2 Revisit Potential Revitalization Opportunities map and identify catalyst projects
3.3 Meetings with staff
3.4 Conduct visioning engagement - online vision survey and community event
3.5 Summarize community input
3.6 Meeting with project task force
3.7 Identify preliminary sites and initiatives for exploring concepts
3.8 Update Vision and Guiding Principles (chapter 4)
Meetings: Staff (1 or 2)
Project task force
## Community engagement event, e.g. River City Days
Task 4 - Explore Ideas & Concepts to Establish Priority Initiatives / Recommendations "Where
## Do We Want to Go"
4.1 HKGi prepares high-level concepts for preliminary sites and initiatives
4.2 Conduct design charrette with City staff
4.3 Meeting with project task force to present draft concepts
4.4 Narrow preliminary sites/initiatives to catalysts and advance concepts
4.5 Refine ideas and concepts with staff
4.6 Conduct community engagement on draft vision and concepts - open house and
online input opportunity
4.7 Summarize and incorporate community input
4.8 Joint work session (project task force & CC) to present draft concepts
## Meetings: Staff (1)
Project task force
Joint work session
## Community engagement event, e.g. Latin Food & Music Festival
Task 5 - Prepare Draft Plan Document and Identify Implementation Strategies / Actions "How
## Will We Get There"
5.1 Prepare draft plan document
5.2 Identify implementation strategies
5.3 Meeting with staff
5.4 Revise draft plan document
5.5 Meeting with project task force
Page 139 of 185
April 30, 2026
## Downtown Plan Update
## City of Chaska
## Collaborate. Listen. Explore. Create. 4
5.6 Incorporate task force feedback into plan document
## Meetings: Staff (1)
Project task force
Task 6 - Prepare Final Plan Document and Gain Approvals
6.1 Conduct community engagement on the draft plan - open house and online
input opportunity
6.2 Summarize and incorporate community input
6.3 Facilitate staff and task force review and revisions
6.4 Complete final plan document
6.5 Joint meeting (project task force and CC) to present final plan document
6.6 Package final deliverables
## Meetings: Staff (1)
Project task force
Joint meeting
## PROJECT SCHEDULE
HKGi has the capacity to begin this project in May/June and we anticipate completion in
approximately 9 months. The proposed schedule is attached.
## ESTIMATED COSTS
Task 1: ......................$10,000
Task 2: ......................$15,000
Task 3: ......................$16,200
Task 4: ......................$24,400
Task 5: ......................$20,100
Task 6:.....................$12,600
Reimbursables: ...........$1,600
## Total:.....................$100,000
If you find this proposal acceptable, please sign and email us a copy. We will consider your
signature below as your authorization for us to proceed. Thanks for inviting HKGi to assist the
City with the Chaska Downtown Plan Update. We look forward to working with you on this
project.
Page 140 of 185
April 30, 2026
## Downtown Plan Update
## City of Chaska
## Collaborate. Listen. Explore. Create. 5
## SINCERELY,
## BRYAN HARJES, PLA, LEED AP JEFF MILLER, AICP
## PRESIDENT SENIOR ASSOCIATE
## BRYAN@HKGI.CO JEFF.MILLER@HKGI.CO
612-310-2419 612-720-8311
## SIGNATURE OF ACCEPTANCE:
## CITY OF CHASKA DATE
## __MATT PODHRADSKY, CITY ADMINISTRATOR_________
## PRINTED NAME
Page 141 of 185
Page 142 of 185
Page 143 of 185
Page 144 of 185
Page 145 of 185
Page 146 of 185
Page 147 of 185
Page 148 of 185
Page 149 of 185
Page 150 of 185
Page 151 of 185
Page 152 of 185
Page 153 of 185
Page 154 of 185
Page 155 of 185
Page 156 of 185
Page 157 of 185
Page 158 of 185
Page 159 of 185
Page 160 of 185
Page 161 of 185
Page 162 of 185
Page 163 of 185
Page 164 of 185
Page 165 of 185
Page 166 of 185
Page 167 of 185
Page 168 of 185
Page 169 of 185
Page 170 of 185
Page 171 of 185
Page 172 of 185
Page 173 of 185
Page 174 of 185
Page 175 of 185
Page 176 of 185
Page 177 of 185
Page 178 of 185
Page 179 of 185
Page 180 of 185
Page 181 of 185
Page 182 of 185
## COUNCIL MEETING/WORK SESSION SCHEDULE
Below is a list of the upcoming Council Meetings and Work Sessions to plan for:
May 4
th
: We will not be having a Work Session on Monday night. We will, however, have a
regular meeting of the City Council where we will have some “house cleaning” items to address
as well as to have the Council start the official process of authorizing Staff to go out and start
the Library design process, as well a solicit members of the public for both our Library Design
Task Force and for our Downtown Masterplan Revision.
May 18
th
: We are not planning currently to have a Work Session prior to the meeting. If that
changes, we will let you know. We will, however, have a regular Council meeting with the main
items being discussed being the items coming out of the Planning Commission.
June 1
st
: We are planning on having a Work Session on that night for the Council to complete
the interviews for residents to be placed on both the Library and Downtown Master Plan Update
Taskforces. Our hope will be to complete them before this meeting and then have the Council
formally appoint at the June 15
th
meeting-the same night we will be asking the Council to
choose the architect for the Library project.
June 15
th
and June 29
th
: We do plan on having meetings on both the 3
rd
and 5
th
Mondays of
the month with the idea that we could then forgo having the meeting on July 6
th
, as some
people may be gone for a long weekend with 4
th
of July falling on a Saturday this year. It is
likely that we will have a work session at one of these two meetings, with our topic being the
SW Chaska Park. We have been working on getting final estimates of the improvements in SW
Park and will be presenting to you with a recommendation on what improvements to move
forward with given the pricing and the budget we have allocated for this project. We will let you
know more about this as we get closer to these dates.
If you are unable to make it to either one of these meetings, please just let me know.
## LEGISLATIVE UPDATE
With only about 3 weeks left in session, we have been keeping close track of the bills that will
have the most direct impact on Chaska. First, last Tuesday, the Mayor was able to testify on
the TIF Extension requestion for the City Square West project. That bill has now been heard in
both the House and the Senate, with it needing to be included in a tax bill if it is to go
## Biweekly Report
May 4, 2026
## By:
## Matt Podhradsky
## Matt Podhradsky
Page 183 of 185
anywhere. We have been given no indication whether this is a possibility or not. As for the
Bonding Bill, we have been in contact with both the House and Senate Capital Investment
Committees over the past week, responding to inquiries they have and discussing whether we
would be willing to accept less than we requested, and what that number would need to be. At
this point it is still unclear whether there will be a bonding bill, but it is good that we are still
being asked these questions as that means that we are at least still being considered. This
would likely be the last bill completed prior to Session ending if it were to occur. Finally, we
have been helping in testimony with Hazeltine seeking assistance from the State for the costs of
putting on the major golf events on the course. The PGA has indicated that if this bill were to
pass that they would commit to 3 major events between 2030-2040. The dollars would come
through the City; we would pay for our costs in the tournaments and support any other costs
eligible for State assistance. We are currently unclear whether this will pass or not.
If you have any questions about this, please let me know.
## UPDATE ON MSB
With us now back on our regular schedule for this project, we are gearing up to start
construction on the MSB the third week of May. At this time the contractors will mobilize on the
site and start the mass grading work needed for the entire project. This past Monday, Staff
was able to hold a “pre-construction” meeting with the neighbors surrounding this project both
to let them know what to expect with schedule, but to also get them introduced to the main
people RJM will have on site should any issues arise. From that meeting, we did not hear any
significant concerns, and we are convinced that we will be able to move forward with
construction without having any major inconveniences to the neighbors. Starting the project
the 3
rd
week of May will put us on a schedule to have the project completed by around
Thanksgiving of 2027. If you have any questions about this, please let me know.
## FIREWORKS THIS SUMMER
As you are likely aware, there are a few fireworks events we have during the course of the
summer. The first is a smaller show we have done on the 4
th
of July for several years. The
second shows are on both nights of Fire and Ice and are by far our most popular fireworks.
The last show we do is during the Latin Food and Music Festival in the late summer to help
bring significance to this program.
With the 250
th
birthday of the United States this year, you can imagine that Fireworks
companies are busy-especially around the 4
th
of July. Because companies are busy on this
date, and we have traditionally held a smaller fireworks display on this night to not compete
with Chanhassen’s main town celebration, we were informed this year that our Fireworks
company will not have the capacity to provide a show on the 4
th
because they have other major
shows they have committed to. Because we have been a customer for a long time, they did
indicate that they would do a show on the 4
th
, but it would have to be significantly bigger, and
therefore much more expensive.
To look for an alternative to this, we did work with the Fireworks company to come up with an
alternative time to hold our normal show while still keeping the same price. What we came up
with was to have our show on the evening of Wednesday, July 1
st
. Our rationale behind that is
that because the 4
th
falls on a Saturday this year, there are likely many that are going to add
days both to the front and back half of the weekend. We felt that if we could have it on July
Page 184 of 185
1
st,
we would be able to catch more people still at home and hopefully get a good turnout. As
we get closer to this date, we will be advertising this so our residents are aware and hopefully
still have a fun event people can enjoy. It should be noted that Fire and Ice is only one week
beyond this, so we will also have two large shows the following weekend.
If you have any questions about this, please do not hesitate to ask.
## STANDARDS AND POOR TO DO RATING VISIT
With us now being within weeks of issuing debt for both our MSB and Water Treatment Plant
projects, as well as our City Hall Plaza project, we will be hosting S and P for a meeting this
upcoming Monday, May 4
th
. The purpose of these visits is to give the rating agency employees
the ability to see firsthand the type of growth we are seeing in the community, and to help
them feel comfortable with the overall rating that we will receive for our financing. The rating
we receive directly impacts the costs of the financing that we receive on projects, with the City
receiving favorable financing in the past by keeping a relatively high credit rating for a
developing community. While we do not necessarily expect that we will increase our rating as
there is still a lot of financing we have to undertake to complete infrastructure needed for a
growing City, it would be our hope the we can maintain our current rating to keep access to the
most favorable interest rates we can for sale of debt. To help us prepare for this rating call, we
are working with our financial advisors at Baker Tilley, who help to make sure that we are
highlighting the things we should during this visit.
We will let you know how this visit turns out after we get our latest rating. If you have any
questions on this, please do not hesitate to ask.
## Upcoming Activities
## Saturday May 2
nd
: Annual Christmas in May Event- 7:30 am at St. John’s Church
Wednesday May 13: Taste of Chaska Event- 5-9 pm at Fireman’s Park
Page 185 of 185