## Agenda Page 1
## WORK SESSION
## SW Community Park
## 5:30-7:00 PM
## AGENDA
## CHASKA CITY COUNCIL
## CHASKA CITY HALL - COUNCIL CHAMBERS & ZOOM
Monday, August 17, 2026
## 7:00 PM
1. Call to Order
2. Pledge of Allegiance
## 3. Roll Call
## 4. Adopt Agenda
## 5. Visitor Presentation
## 5.A. GTO Graduation — Connor Klaysmat and Kayla Rademacher
## 6. Approve Previous Meeting Minutes
6.A. Meeting Minutes 08-03-2026
## 7. Consent Items
7.A. Settlement Agreement and Release related to property at 424 Chestnut
Blvd.
## 7.B. Approve On-Sale Liquor License for Community Event Series- Downtown
## Business Alliance
## 7.C. Adopt Resolution No. 2026-72 Authorizing Execution of Agreement
## 7.D. Adopt Resolution No. 2026-73 Approving Local Bridge Replacement
## Program Grant for Third Street East
7.E. Approve Massage Therapy Business License and Individual License - Shiloh
## Therapeutic Massage and Stretch Studio LLC/Skyler Johnson
7.F. Adopt Resolution No. 2026-75 Authorizing the Financing of Tax Exempt
## Fitness Equipment
## 7.G. Adopt Resolution No. 2026-76 Denying Massage Therapy Registration
## Application – Yun Liu
## 8. Action Items
Page 1 of 188
## Agenda Page 2
8.A. Adopt Resolution No. 2026-74 Approving the Concept Plan for Scandvik
## Nordic Spa/ Scandvik/ PC #2026-17
9. Bills
## 9.A. Accounts Payable Claims Roster 08-17-2026
## 10. Other Business
## 10.A. City Administrator's Report
10.B. Memo Rescheduling of Public Hearing for TIF No. 26 (Big Woods Business
## Park)
10.C. Financial Reports as of 06/30/26
11. Adjourn
Page 2 of 188
## DRAFT
## - MINUTES -
## CHASKA CITY COUNCIL
## AUGUST 3, 2026
1. Call to Order
The meeting was called to order by Mayor Hubbard at 7:00 p.m.
2. Pledge of Allegiance
## 3. Roll Call
Roll call was taken. Present: Mayor Hubbard and Councilmembers Sheveland, Grau, and
Hatfield.
Also Present: Matt Podhradsky, City Administrator; Noel Graczyk, Administrative Services
## Director; Elise Durbin, Assistant City Administrator; Krista Mark, Communications Coordinator;
and Christophe Morschen, City Attorney.
Absent: Councilmember Benesh.
4. Adopt the Agenda
Motion by Councilmember Hatfield, second by Councilmember Sheveland to adopt the agenda
as presented.
Motion carried.
## 5. Visitor Presentation
No one wished to address the Council.
## 6. Approve Previous Meeting Minutes
## 6.A. Approve the July 20, 2026 City Council Meeting Minutes
Motion by Councilmember Grau, second by Councilmember Hatfield to approve the minutes of
the July 20, 2026, City Council meeting.
Motion carried.
## 7. Consent Agenda
Motion by Councilmember Sheveland, second by Mayor Hubbard to approve the Consent Agenda
## Items A through C:
## A. Designate Depositories and Investment Institutions for 2026
Motion to designate the following official depositories and investment institutions. Depositories:
Bank Vista; Center National Bank; Chase Bank; Nicolet National Bank; Old National Bank;
Security Bank; U.S. Bank; Wells Fargo Bank; and Wings Financial Credit Union. Financial
Institutions: Computershare Corporate Trust; League of Minnesota Cities and PTMA Financial
Network, Inc. (4M Fund); Northland Securities, Inc; Oppenheimer & Co, Inc; Piper Sandler
Companies; PFM Asset Management, a division of U.S. Bancorp Asset Management, Inc; RBC
Capital Markets, Inc; UBS Financial Services, Inc.; Moreton Capital Markets, LLC; and, U.S. Bank
Investment Services, Inc.
Page 3 of 188
## MINUTES-CHASKA CITY COUNCIL
August 3, 2026 PAGE 2 DRAFT
B. Adopt Resolution No. 2026-70 Calling for a Public Hearing on the Establishment of TIF
## District No. 26 (Big Woods Business Park)
Motion to adopt Resolution 2026-70 calling for a public hearing on August 31, 2026, to consider
the establishment of TIF District No. 26 and subsequent business subsidy
## C. Massage Therapist – Yun Liu DOB 05-04-1983 license approval
Motion to approve Massage Therapy Registration No. MTR-26-15 to allow Yun Liu to practice
Therapeutic Massage out of Day Massage, 150 Pioneer Trail, Chaska, MN 55318
Motion carried.
## 8. Action Items
8.A. Adopt Resolution No. 2026-69 Ratifying the Sale of Series 2026B Bonds
City Administrator Podhradsky introduced Administrative Services Director Noel Graczyk to
discuss this item. Mr. Graczyk introduced this item to the Council, and Chris Hogan from Baker
Tilly to discuss the bond sale.
Chris Hogan from Baker Tilly introduced herself. She noted she would talk about the sale results
of the City’s $27.5 million general obligation mutual utility revenue funds that sold on July 22.
Proceeds of the bonds will finance water utility improvements, construction, and costs of
issuance. The bonds have a repayment term of 25 years and will be paid by the City’s water
utility.
Mayor Hubbard asked if the additional work to be done is on Peavey Road near Crown
Extrusions. City Administrator Podhradsky confirmed it is behind Apex, and a section of the
water main is terrible. The premium from the bond will be used to pay to replace that section
of pipe. Mayor Hubbard stated she wanted to make sure that was noted.
Ms. Hogan continued that the City was also in the market on the 2026A lease revenue bonds
that sold in June with a 29-year term. The City hosted representatives from S&P for a site visit
to showcase the community and discuss economic and financial metrics to support the City's
credit profile. As a result, S&P provided a rating of "AA" for the bonds. A bond sale rating
provides an independent analysis of the City's financial strength and ability to repay the debt. A
strong credit rating can attract more bidders and lower borrowing costs.
Mayor Hubbard stated the Council always appreciates the explanation for bond sales.
Councilmember Sheveland moved, Councilmember Hatfield seconded to adopt Resolution 2026-
69.
Motion carried.
9. Bills
## 9.A. Accounts Payable Claims Roster 08-03-2026
Councilmember Hatfield asked about the bill on page 6 for Crysteel Manufacturing.
Mayor Hubbard asked about the bill on page 12 for Locality Media, Inc.
Page 4 of 188
## MINUTES-CHASKA CITY COUNCIL
August 3, 2026 PAGE 3 DRAFT
Motion by Councilmember Hatfield, second by Councilmember Grau to approve the accounts
payable claims roster for August 3, 2026.
Motion carried.
## 10. Other Business
## Councilmember Sheveland:
• Recapped her attendance at River City Days, and noted Southwest Transit provided
transportation to River City Days and let her dog ride the bus.
• Shared that Public Works recently took down two big trees in her neighborhood and did
a great job.
## Councilmember Hatfield:
• Recapped her attendance at River City Days and the parade.
• Congratulated Southern Social on celebrating their one-year business anniversary this
week.
• Shared that downtown businesses have been very busy with patrons, especially on the
weekends.
• Shared upcoming events: The Farmer’s Market will have Middle School garage bands
playing in the park, the Carver County Fair (August 12 through August 16), Southwest
Transit is celebrating 40 years and winners of the bus art contest will be driving around
with art on the side, and photos will be taken at East Creek, the Public Safety Open
House (September 14), Touch a Truck (August 20) at Chaska High School from 5:00
p.m. to 7:00 p.m.
• Shared that several residents brought up the walkability along Autumn Woods because
there are no sidewalks as part of the park.
## City Administrator Podhradksy:
• Shared that Autumn Woods is on the City’s radar, and plans were made back when the
development was put in to address the walkability around the park.
## Mayor Hubbard:
• Recapped her attendance at River City Days.
• Recapped her attendance at the Chaska Cubs game against the Watertown Red Devils,
and noted that Chaska won.
• Shared that the Fire Department won a softball tournament for the first time in 20 years.
• Shared that she received a letter from St. Louis Park thanking the Chaska Fire
Department for their mutual aid at a large fire at the Helix Apartments on July 17.
• Shared that there was a residential fire in Chaska yesterday, and the Fire Department
recently changed to a 24-hour duty crew, so response time has quickened by more than
five minutes, and the fire was contained to the storage unit. She thanked Chanhassen
and Carver Fire Departments, who also assisted.
• Recapped the Farmer’s Market and thanked all the staff for their hard work every week.
• Shared that Police Officers Martine and Rodriguez participated in the Teen Academy and
put on the first annual Youth Fishing Contest.
Page 5 of 188
## MINUTES-CHASKA CITY COUNCIL
August 3, 2026 PAGE 4 DRAFT
• Shared that National Night Out is (August 4) with neighborhood parties, and a food shelf
competition to raise the most to donate to Bountiful Basket.
• Shared that Public Works recently cleaned up some glass in the Clover Ridge
neighborhood, and thanked them for doing it so quickly.
• Shared that primaries are Tuesday (August 11), and locally that includes the Sheriff’s
election.
• Shared that the City received a $3 million grant for a new park in the southwest area,
and congratulated Staff who worked hard on that grant application, particularly City
Planner Ashley Cauley.
• Shared that construction at City Hall has begun, and drivers should plan accordingly.
• Shared that the next meeting is August 17.
## 10.A. City Administrator's Report
10.A.i. Bi-Weekly Report 08-03-2026
10.B. Financial Reports as of 05-31-2026
11. Adjourn
Motion by Councilmember Hatfield, second by Councilmember Grau to adjourn the meeting at
7:35 p.m.
Motion carried.
Page 6 of 188
Subject: Settlement Agreement and Release related to property at 424 Chestnut
Blvd.
## Prepared By: Nate Kabat, Community Development Director
As part of the Highway 41 project, the sidewalk on Chestnut Boulevard was replaced as
designed by lead design engineer, Bolton & Menk, Inc. Following sidewalk installation, water
flows toward the building at 424 Chestnut Blvd and the slab in front of the building’s entry door
freezes and heaves. As a result Zebu Ventures 424 LLC filed a claim against the city and design
engineer. While the City and Engineer deny that the work was designed or installed in a manner
which violates the law or creates any threat to public health, safety, or welfare, all parties wish
to resolve the dispute through the attached settlement agreement.
The settlement agreement defines an amount of $12,500 to be paid to the claimant by Bolton &
Menk, Inc. In addition, the City of Chaska agrees to facilitate permitting and waive permit fees
for work that that property owner may choose to purse connected to addressing the dispute.
## CITY COUNCIL ACTION REQUESTED
Motion authorizing the City Administrator to sign Settlement Agreement and Release by and
between Zebu Ventures 424 LLC, Bolton & Menk, Inc., and the City of Chaska.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
8/17/2026
Page 7 of 188
Page 8 of 188
Page 9 of 188
Page 10 of 188
Page 11 of 188
Page 12 of 188
## Subject: On-Sale Liquor at Community Event –
## Chaska Downtown Business Alliance-Community Event Series
## Prepared By: Julie Grove, Economic Development Coordinator
The Chaska Downtown Business Alliance has applied for multiple On-Sale Liquor Permits in
connection with a series of upcoming community events planned through the end of the year.
These events are part of a strategic effort to activate the downtown core and enhance its role as
the social and economic heart of the city.
Over the past year, the Business Alliance has focused on leveraging existing community assets to
transform downtown into a thriving, dynamic hub for residents and visitors alike. As part of the
implementation of the Downtown Activation Plan developed by the Musicant Group, the Business
Alliance launched a recurring series of community event designed to increase activity and create
consistent reasons for people to visit downtown. These events encourage residents and visitors
to gather, shop, dine, and explore local businesses, while fostering a stronger sense of place and
community pride.
The event series supports the Activation Plan goals and will offer a number of community benefits,
including:
• Boosting Local Businesses: Increased foot traffic and coordinated programming
opportunities.
• Attracting Visitors: A recurring event series creates momentum and broadens regional
awareness.
• Fostering Community Interaction: Events provide space for socializing, networking, and
community building.
• Improving Perception of Downtown: Consistent activity enhances the vibrancy and appeal
of the area, even beyond event hours.
By supporting the goals of the Activation Plan, the event series strengthens downtown as a
community gathering place and provides meaningful economic and social benefits. These efforts
contribute to a more active, connected, and economically resilient downtown.
Boundaries for the event are Pine and Walnut for the west/east boundary and Hwy 61 and 1
st
Street as the north/south boundary. This will allow visitors to purchase alcohol at licensed
downtown businesses and restaurants, within the designated area, and walk to other shops
located within those boundaries with alcohol. The events are proposed to be held Saturdays,
except for the first two which will be on Thursdays during the Farmers Market, beginning
September 10th and running through Saturday December 5
th
. Each of the following events are
included under this unified request for approval:
• September 10 – Farmers Market
• September 17 – Farmers Market
• September 26 – Fall Market
• October 3 -Fall Market
## • October 10- Fall Market
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
08/17/2026
Page 13 of 188
• October 17-Fall Market
• October 24 – Trick or Treat Downtown/Halloween
## • November 7 – Deer Opener Celebration
• November 14 – Holiday Market
• November 21 – Holiday Market
• November 28 –Small Business Saturday
• December 5 – Hometown Holiday
The required paperwork is on file, and the fee has been paid. Public Safety personnel have been
notified and are coordinating as needed for each event.
Staff recommends approval of the license for the full event series as outlined above. This
consolidated approval streamlines the process and supports the shared goal of downtown
activation.
## CITY COUNCIL ACTION REQUESTED
Motion to approve On-Sale Intoxicating License at the downtown Community Events,
Lic#OSCF26-04 for Chaska Downtown Business Alliance Event Series on Saturdays between
September 10-December 5, 2026
Page 14 of 188
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
August 17, 2026
## Subject: Adopt Resolution No. 2026-72 Authorizing Execution of
## Agreement
## Prepared By: Noel Graczyk
## Background
In prior years, the Chaska Police Department partnered with Carver County to participate in the
Towards Zero Deaths Enforcement grant. For the 2026-2027 grant period, the city must now
apply directly to the Minnesota Department of Public Safety.
## Update
Officer Kyle Hance has prepared the required grant application for this Federal Dollar pass-
through grant for the period from October 1, 2026, through September 30, 2027. As part of the
application process, the city must designate who is authorized to sign and administer the
grant. The attached proposed resolution designates Matt Podhradsky, City Administrator, and
Elise Durbin, Assistant City Administrator to sign the grant agreement.
## Recommendation
Staff recommends adoption of the proposed resolution
## CITY COUNCIL ACTION REQUESTED
Motion to adopt Resolution 2026-72 Authorizing Execution of Agreement.
Page 15 of 188
## CERTIFICATION OF MINUTES RELATING TO
## RESOLUTION AUTHORIZING EXECUTION OF AGREEMNET
## Grant Recipient: City of Chaska, Minnesota
## Governing Body: City Council
Kind, date, time and place of meeting: A regular meeting held on August 17, 2026, at 7:00 p.m.
at the Chaska City Hall.
Members present:
Members absent:
## Documents Attached:
Minutes of said meeting (including):
## RESOLUTION NO. 2026- 72
## RESOLUTION AUTHORIZING EXECUTION OF AGREEMENT
I, the undersigned, being the duly qualified and acting recording officer of the public
corporation issuing the bonds referred to in the title of this certificate, certify that the documents
attached hereto, as described above, have been carefully compared with the original records of
said corporation in my legal custody, from which they have been transcribed; that said
documents are a correct and complete transcript of the minutes of a meeting of the governing
body of said corporation, and correct and complete copies of all resolutions and other actions
taken and of all documents approved by the governing body at said meeting, so far as they relate
to said bonds; and that said meeting was duly held by the governing body at the time and place
and was attended throughout by the members indicated above, pursuant to call and notice of such
meeting given as required by law.
WITNESS my hand officially as such recording officer this ___ day of August 2026.
## City Administrator
Page 16 of 188
Councilmember ____________________ introduced the following resolution and moved its
adoption, which motion was seconded by Councilmember ___________________:
## RESOLUTION NO. 2026- 72
## RESOLUTION AUTHORIZING EXECUTION OF AGREEMENT
BE IT RESOLVED by the City Council (the “Council”), City of Chaska, Minnesota (the
“City”), as follows:
1.) That the City of Chaska, Minnesota enters into a grant agreement with the Minnesota
Department of Public Safety, for traffic safety enforcement projects during the period
from October 1, 2026, through September 30, 2027.
2.) That both Matt Podhradsky as City Administrator and Elsie Durbin as Assistant City
Administrator are hereby authorized to execute such agreements and amendments as
necessary to implement the project on behalf of the City of Chaska, Minnesota and to
be the fiscal agent and administer of the grant.
3.) This resolution shall be in full force and effect from and after its passage.
Upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon the Resolution was declared duly passed and adopted.
Page 17 of 188
Subject: City Bridge L4966 Removal for Third Street East – Local Bridge
## Replacement Program Grant Agreement
## Reviewed By: Matt Clark, City Engineer
## Prepared By: Denise Beebe, City Clerk
Public bids for the 2026 Downtown Street Reconstruction Project were opened on August 6th,
2026. The scope of the project includes the removal of Bridge 10J52, located within the block of
Third Street East in Downtown between Hickory Street and Elm Street.
The lowest bid indicates that the bridge removal component is eligible for state bridge funds
totaling $230,339.02. To secure these state funds (bridge bonds) and qualify for
reimbursement, the City must enter into a formal agreement. Execution of the Local Bridge
Replacement Program agreement requires signatures from the Mayor, City Engineer, and
Administrator.
## CITY COUNCIL ACTION REQUESTED
Motion to adopt Resolution No. 2026-73, approving the Local Bridge Replacement Program Grant
Agreement and authorizing the Mayor, City Engineer, and Administrator to execute.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
8/17/2026
Page 18 of 188
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE 8/17/2026 RESOLUTION NO. 2026- 73
## MOTION BY COUNCILMEMBER SECOND BY COUNCILMEMBER
## Local Bridge Replacement Program Grant Agreement
## Grant Terms and Conditions
## SAP 196-597-001
8/17/2026
## 2026 Downtown Street Improvement Project – Bridge Removal L4966
WHEREAS, the City of Chaska has applied to the Commissioner of Transportation for a grant
from the Minnesota State Transportation Fund related to Bridge No. L4966; and
WHEREAS, the Commissioner of Transportation has given notice that funding for this project is
available; and
WHEREAS, the amount of the grant has been determined to be $230,339.02 by reason of the
lowest responsible bid;
NOW THEREFORE, be it resolved that the City of Chaska does hereby agree to the terms
and conditions of the grant consistent with Minnesota Statutes, section 174.50, and will pay any
additional amount by which the cost exceeds the estimate, and will return to the Minnesota
State Transportation Fund any amount appropriated for the project but not required. The
proper city officers are authorized to execute a grant agreement and any amendments thereto
with the Commissioner of Transportation concerning the above-referenced grant.
Passed and adopted by the City Council of the City of Chaska, Minnesota, this 17
th
day of August
2026.
No data No da No data
No data No data No data
No data
## Taylor Hubbard, Mayor
No data
No data No data No data
## ATTEST: No data No data
No data
## Denise Beebe, City Clerk
Page 19 of 188
## CERTIFICATION
I hereby certify that the above is a true and correct copy of a Resolution duly passed, adopted
and approved by the City Council of said City on August 17, 2026.
Blank space intentional
## Seal
___________________________
## Denise Beebe, City Clerk
## City of Chaska
Page 20 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
1
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## STATE OF MINNESOTA
## LOCAL BRIDGE REPLACEMENT PROGRAM
## GRANT AGREEMENT
This Grant Agreement (the “Agreement”) is between the State of Minnesota, acting through its Commissioner of
Transportation ("State"), and ("Grantee"):
Public Entity (Grantee) name, address and contact person:
## Matt Clark, City Engineer
## City of Chaska
## One City Hall Plaza
## Chaska, MN 55318-1962
## Phone: 952-448-9200, MClark@chaskamn.com
## RECITALS
1. Minn. Stat. § 297A.815, subd. 3(d) and § 174.50, subd. 6-7 authorize State to enter into this Agreement.
2. Grantee has been awarded Local Bridge Replacement Program (LBRP) funds under Minn. Stat. § 174.50, subd. 6-7.
3. Grantee represents that it is duly qualified and agrees to perform all services described in this Agreement to the
satisfaction of State. Pursuant to Minn. Stat. § 16B.98, Subd. 1, Grantee agrees that administrative costs must be
necessary and reasonable as a condition of this Agreement.
## AGREEMENT TERMS
1 Term of Agreement, Survival of Terms, and Incorporation of Exhibits
Effective Date. This agreement will be effective on the date the State obtains all required signatures under Minn.
Stat.§16B.98, Subd. 5. As required by Minn.Stat.§16B.98 Subd. 7, no payments will be made to Grantee until this
agreement is fully executed. Grantee must not begin work under this agreement until this agreement is fully executed
and Grantee has been notified by the State’s Authorized Representative to begin the work.
Expiration Date. This agreement will expire on December 31, 2030, or when all obligations have been
satisfactorily fulfilled, whichever occurs first.
Survival of Terms. All clauses which impose obligations continuing in their nature and which must survive in
order to give effect to their meaning will survive the expiration or termination of this agreement, including, without
limitation, the following clauses: 8. Liability; 9. State Audits; 10. Government Data Practices; 11. Workers
Compensation; 12. Governing Law, Jurisdiction, and Venue; and 14. Data Disclosure.
Exhibits. Exhibit A: Sources and Uses of Funds Schedule; Exhibit B: Grant Application; and Exhibit C: Grantee
Resolution Approving Grant Agreement are attached and incorporated into this agreement.
## 2 Grantee’s Duties
Grantee will conduct one or more of the following activities in accordance with its grant application, or in the case
of legislatively selected projects, in accordance with the enabling session law, which is attached to this Agreement
as Exhibit B: (i) constructing or reconstructing a bridge, (ii) abandoning an existing bridge that is deficient and in
need of replacement, but where no replacement will be made, or (iii) constructing a road to facilitate the
abandonment or removal of an existing bridge determined to be deficient.
Grantee will comply with all required grants management policies and procedures set forth through
Minn.Stat.§16B.97, Subd. 4 (a) (1).
Asset Monitoring. If Grantee uses funds obtained by this agreement to acquire a capital asset, the Grantee is
required to use that asset for a public purpose for the normal useful life of the asset. Grantee may not sell or change
the purpose of use for the capital asset(s) obtained with grant funds under this agreement without the prior written
consent of the State and an a greement executed and approved by the same parties who executed and approved this
agreement, or their successors in office.
3 Time
Page 21 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
2
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
Grantee must comply with all the time requirements described in this Agreement. In the performance of this grant
Agreement, time is of the essence.
4 Consideration and Payment
Consideration. State will pay for all services performed by Grantee under this Agreement as follows:
4.1.1 Compensation. Grantee will be reimbursed for actual, incurred costs that are eligible under Minn. Stat.
§ 174.38. Grantee shall use this grant solely to reimburse itself for expenditures it has already made to pay for
the costs of one or more of the activities listed under section 2.1.
4.1.2 Sources and Uses of Funds. Grantee represents to State that the Sources and Uses of Funds Schedule attached
as Exhibit A accurately shows the total cost of the Project and all of the funds that are available for the
completion of the Project. Grantee agrees that it will pay for any costs that are ineligible for reimbursement
and for any amount by which the costs exceed State’s total obligation in section 4.1.3. Grantee will return to
State any amount appropriated but not required.
4.1.3 Total Obligation. The total obligation of State for all compensation and reimbursements to Grantee under
this Agreement will not exceed $230,339.02.
## Payment
4.2.1 Invoices. Grantee will submit state aid pay requests for reimbursements requested under this Agreement. State
will promptly pay Grantee after Grantee presents an itemized invoice for the services actually performed and
State's Authorized Representative accepts the invoiced services.
4.2.2 All Invoices Subject to Audit. All invoices are subject to audit, at State’s discretion.
4.2.3 State’s Payment Requirements. State will promptly pay all valid obligations under this Agreement as
required by Minn. Stat. § 16A.124. State will make undisputed payments no later than thirty (30) days after
receiving Grantee’s invoices and progress reports for services performed. If an invoice is incorrect, defective
or otherwise improper, State will notify Grantee within ten (10) days of discovering the error. After State
receives the corrected invoice, State will pay Grantee within thirty (30) days of receipt of such invoice.
4.2.4 Grant Monitoring Visit and Financial Reconciliation. During the period of performance, State will make
at least annual monitoring visits and conduct annual financial reconciliations of Grantee’s expenditures.
4.2.4.1 State’s Authorized Representative will notify Grantee’s Authorized Representative where and when
any monitoring visit and financial reconciliation will take place, which State employees and/or
contractors will participate, and which Grantee staff members should be present. Grantee will be
provided with at least seven (7) calendar days of notice prior to any monitoring visit or financial
reconciliation.
4.2.4.2 Following a monitoring visit or financial reconciliation, Grantee will take timely and appropriate
action on all deficiencies identified by State.
4.2.4.3 At least one monitoring visit and one financial reconciliation must be completed prior to final
payment being made to Grantee.
4.2.5 Unexpended Funds. Grantee must promptly return to State at grant closeout any unexpended funds that have
not been accounted for in a financial report submitted to State.
4.2.6 Closeout. State will determine, at its sole discretion, whether a closeout audit is required prior to final payment
approval. If a closeout audit is required, final payment will be held until the audit has been completed.
Monitoring of any capital assets acquired with grant funds will continue following grant closeout.
Contracting and Bidding Requirements. If Grantee is a municipality as defined by Minn. Stat. § 471.345, Subd.
1, then Grantee shall comply with the requirements of Minn. Stat. § 471.345 for all procurement under this
Agreement.
5 Conditions of Payment
All services provided by Grantee under this Agreement must be performed to State’s satisfaction, as determined at the
sole discretion of State’s Authorized Representative and in accordance with all applicable federal, state, and local laws,
ordinances, rules, and regulations. Grantee will not receive payment for work found by State to be unsatisfactory or
performed in violation of federal, state, or local law.
## 6 Authorized Representatives
## State's Authorized Representative is:
Page 22 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
3
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## Marc Briese,
## Programs Manager,
## MnDOT State Aid Office
## 395 John Ireland Boulevard, MS 500
## St. Paul, MN 55155
Office: 651-366-3802
marc.briese@state.mn.us
or his/her successor. State’s Authorized Representative has the responsibility to monitor Grantee’s performance and
the authority to accept the services provided under this agreement. If the services are satisfactory, State's Authorized
Representative will certify acceptance on each invoice submitted for payment.
## Grantee’s Authorized Representative is:
## Matt Clark
## City Engineer
## City of Chaska
## One City Hall Plaza
## Chaska, MN 55318-1962
Phone: 952-448-9200
## MClark@chaskamn.com
If Grantee’s Authorized Representative changes at any time during this Agreement, Grantee will immediately notify
State.
## 7 Assignment Amendments, Waiver, and Grant Agreement Complete
Assignment. Grantee may neither assign nor transfer any rights or obligations under this Agreement without the
prior written consent of State and a fully executed Assignment Agreement, executed and approved by the same
parties who executed and approved this Agreement, or their successors in office.
Amendments. Any amendments to this Agreement must be in writing and will not be effective until it has been
executed and approved by the same parties who executed and approved the original agreement, or their successors
in office.
Waiver. If State fails to enforce any provision of this Agreement, that failure does not waive the provision or State’s
right to subsequently enforce it.
Grant Agreement Complete. This Agreement contains all negotiations and agreements between State and Grantee.
No other understanding regarding this Agreement, whether written or oral, may be used to bind either party.
7.5 Electronic Records and Signatures. The parties agree to contract by electronic means. This includes using
electronic signatures and converting original documents to electronic records.
7.6 Certification. By signing this Agreement, Grantee certifies that it is not suspended or debarred from receiving
federal or state awards.
8 Liability
Grantee and State agree that each will be responsible for its own acts and the results thereof to the extent authorized by
law, and neither shall be responsible for the acts of the other party and the results thereof. The liability of State is
governed by the provisions of Minn. Stat. § 3.736. If Grantee is a “municipality” as that term is used in Minn. Stat.
Chapter 466, then the liability of Grantee is governed by the provisions of Chapter 466. Grantee’s liability hereunder
shall not be limited to the extent of insurance carried by or provided by Grantee, or subject to any exclusion from
coverage in any insurance policy.
## 9 State Audits
Under Minn. Stat. § 16B.98, Subd.8, the Grantee’s books, records, documents, and accounting procedures and practices
of Grantee, or other party relevant to this Agreement or transaction, are subject to examination by State and/or the State
Page 23 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
4
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
Auditor or Legislative Auditor, the Attorney General, as appropriate, for a minimum of six (6) years from the end of
this Agreement, receipt and approval of all final reports, or the required period of time to satisfy all state and program
retention requirements, whichever is later. Grantee will take timely and appropriate action on all deficiencies identified
by an audit.
## 10 Government Date Practices
Grantee and State must comply with the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, as it applies to
all data provided by State under this Agreement, and as it applies to all data created, collected, received, stored, used,
maintained, or disseminated by Grantee under this agreement. The civil remedies of Minn. Stat. § 13.08 apply to the
release of the data referred to in this clause by either Grantee or State.
## 11 Workers’ Compensation
Grantee certifies that it is in compliance with Minn. Stat. § 176.181, Subd. 2, pertaining to workers’ compensation
insurance coverage. Grantee’s employees and agents will not be considered State employees. Any claims that may arise
under the Minnesota Workers’ Compensation Act on behalf of these employees and any claims made by any third party
as a consequence of any act or omission on the part of these employees are in no way State’s obligation or responsibility.
## 12 Governing Law, Jurisdiction, and Venue
Minnesota law, without regard to its choice-of-law provisions, governs this Agreement. Venue for all legal proceedings
out of this Agreement, or its breach, must be in the appropriate state or federal court with competent jurisdiction in
Ramsey County, Minnesota.
## 13 Termination; Suspension
Termination by the State. State may terminate this Agreement with or without cause, upon thirty (30) days’
written notice to Grantee. Upon termination, Grantee will be entitled to payment, determined on a pro rata basis,
for services satisfactorily performed. If funding is canceled, withdrawn, or terminated, State may suspend its
performance until funding is restored. Suspension of performance does not release State from its obligations under
the agreement.
Termination for Cause. State may immediately terminate this grant Agreement if State finds that there has been
a failure to comply with the provisions of this Agreement, that reasonable progress has not been made, that
fraudulent or wasteful activity has occurred, that Grantee has been convicted of a criminal offense relating to a
state grant agreement, or that the purposes for which the funds were granted have not been or will not be fulfilled.
State may take action to protect the interests of the State of Minnesota, including the refusal to disburse additional
funds and requiring the return of all or part of the funds already disbursed.
Termination for Insufficient Funding. State may immediately terminate this Agreement if:
13.3.1 It does not obtain funding from the Minnesota Legislature; or
13.3.2 If funding cannot be continued at a level sufficient to allow for the payment of the services covered here.
Termination must be by written or fax notice to Grantee. State is not obligated to pay for any services
that are provided after notice and effective date of termination. However, Grantee will be entitled to
payment, determined on a pro rata basis, for services satisfactorily performed to the extent that funds are
available. State will not be assessed any penalty if the Agreement is terminated because of the decision
of the Minnesota Legislature, or other funding source, not to appropriate funds. State will provide the
Grantee notice of the lack of funding within a reasonable time of State’s receiving that notice.
Suspension. State may immediately suspend this Agreement in the event of a total or partial government
shutdown due to the failure to have an approved budget by the legal deadline. Work performed by Grantee during
a period of suspension will be deemed unauthorized and undertaken at risk of non-payment.
## 14 Data Disclosure
Under Minn. Stat. § 270C.65, Subd. 3, and other applicable law, Grantee consents to disclosure of its social security
number, federal employer tax identification number, and/or Minnesota tax identification number, already provided to
the State, to federal and state tax agencies and state personnel involved in the payment of state obligations. These
identification numbers may be used in the enforcement of federal and state tax laws which could result in action
requiring Grantee to file state tax returns and pay delinquent state tax liabilities, if any.
Page 24 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
5
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
15 Fund Use Prohibited. Grantee will not utilize any funds received pursuant to this Agreement to compensate, either
directly or indirectly, any contractor, corporation, partnership, or business, however organized, which is disqualified or
debarred from entering into or receiving a State contract. This restriction applies regardless of whether the disqualified
or debarred party acts in the capacity of a general contractor, a subcontractor, or as an equipment or material supplier.
This restriction does not prevent Grantee from utilizing these funds to pay any party who might be disqualified or
debarred after Grantee’s contract award on this Project.
16 Discrimination Prohibited by Minnesota Statutes § 181.59. Grantee will comply with the provisions of Minn. Stat.
§ 181.59 which requires that every contract for or on behalf of the State of Minnesota, or any county, city, town,
township, school, school district or any other district in the state, for materials, supplies or construction will contain
provisions by which Contractor agrees: 1) That, in the hiring of common or skilled labor for the performance of any
work under any contract, or any subcontract, no Contractor, material supplier or vendor, will, by reason of race, creed
or color, discriminate against the person or persons who are citizens of the United States or resident aliens who are
qualified and available to perform the work to which the employment relates; 2) That no Contractor, material supplier,
or vendor, will, in any manner, discriminate against, or intimidate, or prevent the employment of any person or persons
identified in clause 1 of this section, or on being hired, prevent or conspire to prevent, the person or persons from the
performance of work under any contract on account of race, creed or color; 3) That a violation of this section is a
misdemeanor; and 4) That this contract may be canceled or terminated by the state of Minnesota, or any county, city,
town, township, school, school district or any other person authorized to grant contracts for employment, and all money
due, or to become due under the contract, may be forfeited for a second or any subsequent violation of the terms or
conditions of this Agreement.
17 Limitation. Under this Agreement, State is only responsible for receiving and disbursing funds. Nothing in this
Agreement will be construed to make State a principal, co-principal, partner, or joint venturer with respect to the
Project(s) covered herein. State may provide technical advice and assistance as requested by Grantee, however, Grantee
will remain responsible for providing direction to its contractors and consultants and for administering its contracts with
such entities. Grantee’s consultants and contractors are not intended to be third party beneficiaries of this Agreement.
## 18 Additional Provisions
Prevailing Wages. Grantee agrees to comply with all of the applicable provisions contained in Minn. Stat. Chapter
177, and specifically those provisions contained in Minn. Stat. § 177.41 through 177.435 as they may be amended or
replaced from time to time with respect to the Project. By agreeing to this provision, Grantee is not acknowledging or
agreeing that the cited provisions apply to the Project.
E-Verification. Grantee agrees and acknowledges that it is aware of Minn. Stat. § 16C.075 regarding e-verification
of employment of all newly hired employees to confirm that such employees are legally entitled to work in the United
States, and that it will, if and when applicable, fully comply with such order.
Telecommunications Certification. If federal funds are included in Exhibit A, by signing this Agreement,
Grantee certifies that, consistent with Section 889 of the John S. McCain National Defense Authorization Act for Fiscal
Year 2019, Pub. L. 115-232 (Aug. 13, 2018), Grantee does not and will not use any equipment, system, or service that
uses “covered telecommunications equipment or services” (as that term is defined in Section 889 of the Act) as a
substantial or essential component of any system or as critical technology as part of any system. Grantee will include
this certification as a flow down clause in any contract related to this Agreement.
Title VI/Non-discrimination Assurances. Grantee agrees to comply with all applicable US DOT Standard Title
VI/Non-Discrimination Assurances contained in DOT Order No. 1050.2A, and in particular Appendices A and E, which
can be found at:
https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=11149035. If federal
funds are included in Exhibit A, Grantee will ensure the appendices and solicitation language within the assurances are
inserted into contracts as required. State may conduct a review of the Grantee’s compliance with this provision. Grantee
must cooperate with State throughout the review process by supplying all requested information and documentation to
State, making Grantee staff and officials available for meetings as requested, and correcting any areas of non-
Page 25 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
6
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
compliance as determined by State.
Use, Maintenance, Repair and Alterations. The Grantee shall not, without the written consent of the State and
the Commissioner, (i) permit or allow the use of any of the property improved with these grants funds (the “Real
Property”) for any purpose other than in conjunction with or for the operation of a county highway, county state-aid
highway, town road, or city street or for other uses customarily associated therewith, such as trails and utility
corridors, (ii) substantially alter any of the Real Property except such alterations as may be required by laws,
ordinances or regulations, or such other alterations as may improve the Real Property by increasing its value or which
improve its ability to be used for the purposes set forth in section (i), (iii) take any action which would unduly impair
or depreciate the value of the Real Property, (iv) abandon the Real Property, or (v) commit or permit any act to be
done in or on the Real Property in violation of any law, ordinance or regulation.
If Grantee fails to maintain the Real Property in accordance with this Section, State may perform whatever acts and
expend whatever funds necessary to so maintain the Real Property, and Grantee irrevocably authorizes State to enter
upon the Real Property to perform such acts as may be necessary to so maintain the Real Property. Any actions taken
or funds expended by State shall be at its sole discretion, and nothing contained herein shall require State to take any
action or incur any expense and State shall not be responsible, or liable to Grantee or any other entity, for any such acts
that are performed in good faith and not in a negligent manner. Any funds expended by State pursuant to this Section
shall be due and payable on demand by State and will bear interest from the date of payment by State at a rate equal to
the lesser of the maximum interest rate allowed by law or 18% per year based upon a 365-day year.
Grant Administrator and Organizational Leadership Contact Information. Pursuant to Minn. Stat. § 16B.98,
Subd. 5(d), if grantee has a website, the names and contact information for the grant administrator(s) and organization’s
leadership must be clearly published.
[The remainder of this page has intentionally been left blank.]
Page 26 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
7
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## GRANTEE
The Grantee certifies that the appropriate person(s) have
executed the grant agreement on behalf of the Grantee as
required by applicable articles, bylaws, resolutions, or
ordinances.
## By:
## Title:
## Date:
## By:
## Title:
## Date:
## By:
## Title:
## Date:
## DEPARTMENT OF TRANSPORTATION
Approval and Certifying Encumbrance as required by
Minnesota Statutes § 16A.15 and 16C.05
By: __________________________________
## State Aid Programs Manager
(with delegated authority)
Date: ________________________________
## DEPARTMENT OF TRANSPORTATION
## CONTRACT MANAGEMENT
## By:
## Date:
Page 27 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
8
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## EXHIBIT A
## SOURCES AND USES OF FUNDS SCHEDULE
## SOURCES OF FUNDS USES OF FUNDS
## Entity Supplying Funds Amount Expenses Amount
## State Funds: Items Paid for with LBRP
## MVLST LBRP Funds
(SAAS Acct 431)
## $230,339.02 MVLST Grant Funds:
## Other: Bridge Removal $230,339.02
Subtotal $230,339.02 Subtotal $230,339.02
## Public Entity Funds: Items paid for with Non-
## Matching Funds LBRP General Fund
## Local Match $1,403,636.65 Grant Funds:
## Bridge Removal $1,403,636.65
## Other:
Subtotal $1,403,636.65 Subtotal $1,403,636.65
## TOTAL FUNDS $1,633,975.67 = TOTAL PROJECT
## COSTS
$1,633,975.67
Page 28 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
9
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## EXHIBIT B
## GRANT APPLICATION
Attach the grant application for the project
Page 29 of 188
Page 30 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
10
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## EXHIBIT C
## GRANTEE RESOLUTION APPROVING GRANT AGREEMENT
Page 31 of 188
## MnDOT Agreement No. 1063904
## SAP No. 196-597-001
11
## CM State Aid LBRP Grant Agreement (Rev. August 2025)
## RESOLUTION
## Local Bridge Replacement Program Grant Agreement
## Grant Terms and Conditions
## SAP No. 196-597-001
## Date:
WHEREAS, the City of Chaska has applied to the Commissioner of Transportation for a grant from the
## Minnesota State Transportation Fund related to Bridge No. L4966; and
WHEREAS, the Commissioner of Transportation has given notice that funding for this project is available; and
WHEREAS, the amount of the grant has been determined to be $ 230,339.02 by reason of the lowest responsible
bid;
NOW THEREFORE, be it resolved that the City of Chaska does hereby agree to the terms and conditions of the
grant consistent with Minnesota Statutes, section 174.50, and will pay any additional amount by which the cost
exceeds the estimate and will return to the Minnesota State Transportation Fund any amount appropriated for the
project but not required. The proper City officers are authorized to execute a grant agreement and any amendments
thereto with the Commissioner of Transportation concerning the above-referenced grant.
## Signatures
Page 32 of 188
## Subject: Massage Therapy Registration
## Prepared By: Denise Beebe, Senior Clerk
## Background:
Skyler Johnson has submitted an application to the City of Chaska for an individual Massage
Therapist License. Ms. Johnson is also opening a new business, Shiloh Therapeutic Massage and
Stretch Studio, located at 3740 N. Chestnut Street, Unit #111, Chaska, Minnesota.
The individual Massage Therapist License will allow Ms. Johnson to provide massage therapy
services at Shiloh Therapeutic Massage and Stretch Studio. The business will be owned and
operated by Ms. Johnson.
Ms. Johnson has submitted the required documentation for both the individual Massage
Therapist License and Massage Business License, paid the applicable fees. A background check
was conducted by Chaska PD.
## Recommendation:
Staff recommends approval of both the Massage Therapist License for Skyler Johnson and
business licensed for Shiloh Therapeutic Massage and Stretch Studio, 3740 N. Chestnut Street,
Unit #111, Chaska, Minnesota.
## CITY COUNCIL ACTION REQUESTED
Motion to approve a Massage Therapy Business License for Shiloh Therapeutic Massage and
Stretch Studio, located at 3740 N. Chestnut Street, Unit #111, Chaska, Minnesota, and an
Individual Massage Therapist License for Skyler Johnson to provide massage therapy services at
that location.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
8/17/2026
Page 33 of 188
Subject: The Financing of Tax Exempt Fitness Equipment
## Prepared By: Marshall Grange, Parks & Recreation Director
## Noel Graczyk, Administrative Services Director
In 2021, the City purchased cardiovascular fitness equipment that is currently located at the
Chaska Community Center using lease-purchase financing. Currently this agreement from 2021
is nearing the end of the lease term and the City has three options:
1. Return the equipment.
2. Pay the buy-out option and retain the equipment.
3. Return the equipment and enter into a new lease-purchase agreement.
During the week of August 24
th
, the Community Center is shut down, and the City
would like to exercise option number three to acquire new cardiovascular equipment to
be installed during the shutdown.
The enclosed proposed resolution establishes compliance with lease-purchasing regulations and
provides for execution of the proposed new lease-purchase financing.
Staff recommend adoption of the resolution.
## CITY COUNCIL ACTION REQUESTED
Motion to adopt Resolution No. 2026-75, relating to the financing of equipment; authorizing the
execution and delivery of a tax-exempt lease-purchase agreement and related documents.
Page 34 of 188
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE August 17, 2026 RESOLUTION NO. 2026-75
## MOTION BY COUNCILMEMBER SECOND BY COUNCILMEMBER
## RESOLUTION RELATING TO THE FINANCING OF EQUIPMENT; AUTHORIZING THE
## EXECUTION AND DELIVERY OF A TAX-EXEMPT LEASE/PURCHASE AGREEMENT AND
## RELATED DOCUMENTS
BE IT RESOLVED by the City Council (the "Council") of the City of Chaska, Minnesota (the
"City"), as follows:
Section 1. Authority; Purpose. The City is authorized by Minnesota Statutes, Section 465.71
to enter into lease-purchase agreements for the purpose of financing real and personal
property. This Council hereby finds it in the best interest of the City to enter into a Tax-Exempt
Lease/Purchase Agreement dated August 17, 2026, and the property schedule incorporated
therein by reference (together, the "Lease") for the purpose of financing the acquisition of
certain fitness equipment (the "Property").
Section 2. Authorization of Financing. In order to finance the Property, the Council desires to
enter into the Lease with Municipal Asset Management, Inc., as lessor, Golden, Colorado (the
"Lessor"). The Lessor offered to enter into the Lease to provide a loan to the City in the
aggregate principal amount of $441,971.33, on the terms set forth in the Lease. Such
proposal of the Lessor is hereby accepted and the Lease is hereby authorized to be executed
and delivered as hereinafter set forth. Pursuant to Minnesota Statutes, Section 475.60, the
requirements as to public sale do not apply to the award or sale of the Lease to the Lessor.
All action heretofore taken by the Parks and Recreation Director, the Administrative Services
Director, the Mayor, the City Administrator or any other City officer or employee with respect
to the Lease is hereby ratified and confirmed in all respects.
Section 3. Documents. The Lease and such other operative and closing documents as are
necessary to accomplish the financing of the Property (the "Documents") will hereafter be
finally negotiated with the Lessor, all in accordance with this resolution. Such documents shall
be placed on file in the office of the City Clerk.
Section 4. Execution. Upon completion of the Documents and the execution thereof by the
other parties thereto, the City Administrator and any one of the Mayor, the Assistant City
Administrator, the City Clerk, or any other employee of the City acting under their direction and
designated by them to act on behalf of the City, are hereby authorized individually and
collectively to execute and deliver the Documents on behalf of the City. The same are hereby
further authorized to execute, on behalf of the City, such other contracts, certifications,
Page 35 of 188
documents or instruments as Lessor or counsel to the City shall require, including but not
limited to IRS Form 8038-G, and all certifications, recitals, warranties and representations
therein and in the Documents shall constitute the certifications, recitals, warranties and
representations of the City. Execution of any contract, certification, document or instrument
by one or more appropriate officers of the City will constitute and be deemed conclusive
evidence of the approval and authorization by the City and the Council of the contract,
certification, document or instrument so executed.
Section 5. Payment of Lease Payments: No General Obligation. Subject to the provisions of
the Lease, the City shall pay promptly when due, all of the Lease Payments (as defined in the
Lease) and other amounts required by the Lease. The Lease and the obligations of the City
thereunder will be special, limited obligations of the City payable in each fiscal year solely from
funds of the City legally appropriated for such purpose in the annual budget of the City;
provided, however, that the City shall not be obligated to make any such appropriation. The
full faith and credit and ability of the City to levy ad valorem taxes without limitation as to rate
or amount are not pledged to the payment of the Lease or any obligation of the City
thereunder.
Section 6. Tax Covenant: and Useful Life.
(a) Covenant. The City covenants and agrees that it will not take, or permit to be taken by
any of its officers, employees or agents, any action which would cause the interest
component of the Lease Payments payable under the Lease to become subject to
taxation under the Internal Revenue Code of 1986 (the "Code") and any regulations
issued thereunder (the "Regulations"), in effect at the time of such action, and that it
will take, or it will cause its officers, employees or agents to take, all affirmative actions
within their powers which may be necessary to ensure that the interest component of
the Lease Payments payable under the Lease will not become subject to taxation under
the Code and the Regulations, as presently existing or as hereafter amended and made
applicable to the Lease. So long as the Lease is outstanding, the City will not enter
into any lease, use agreement or other contract or agreement respecting the Property
which would cause the Lease to be considered a "private activity bond" or "private loan
bond" pursuant to the provisions of Section 141 of the Code.
(b) Useful Life. The economic useful life of the Property is substantially greater than the
Lease Term (as defined in the Lease).
Passed and adopted by the City Council of the City of Chaska, Minnesota, this 17
th
day of
August 2026.
## Taylor Hubbard, Mayor
## Attest:
## Denise Beebe, Deputy Clerk
Page 36 of 188
## 25288 FOOTHILLS DRIVE NORTH • GOLDEN COLORADO • 80401
## Phone: 303-273-9496 • EMAIL: JTIEMEYER@MAMGT.COM
August 12, 2026
## City of Chaska, Minnesota
## One City Hall Plaza
## Chaska, MN 55318
## Re: Tax-Exempt Lease/Purchase Agreement
Enclosed you will find the lease financing documents for your review and execution. Please
complete the documents and have a duly authorized officer sign the documents where indicated.
## PLEASE HAVE THE DOCUMENTS EXECUTED WITH BLUE INK.
Once executed, please e-mail a copy of the documents to me at jtiemeyer@mamgt.com. Please
return the original documents to me at Municipal Asset Management, Inc., 25288 Foothills Drive
North, Golden, CO 80401. Please contact me at 303-273-9496 with any questions.
## Sincerely,
## Jamie Tiemeyer
## MU N I C I PA L AS S E T MA N A G E M E N T, IN C.
Page 37 of 188
## DOCUMENTATION CHECKLIST
## Tax-Exempt Lease/Purchase Agreement *
## Property Schedule*
## Exhibit A Property Description
## Exhibit B Acceptance Certificate
The date of Acceptance will need to be filled in with the date the equipment is installed and accepted
## Exhibit C Certificate of Authorization
The Certificate of Authorization should be executed by the Secretary, Board Chairman or other member of the Governing
## Body
Request for Certificate of Insurance
The Insurance Certificate is required prior to funding.
## 8038-G
The purpose of this form is to report to the IRS that we have completed a tax-exempt financing.
Invoicing Instructions – The information you provide allows us to invoice you properly.
*The items above marked with an asterisk require a signature in the presence of a witness/attestor. The attesting of the
signature does not require a notary, but the signature of a person present at the time the document is signed.
Page 38 of 188
## Tax-Exempt Lease/Purchase Agreement, Dated August 17, 2026
## Accepted by Lessor: Agreed to by Lessee:
Municipal Asset Management, Inc.
## 25288 Foothills Drive North
## Golden, CO 80401
## City of Chaska, Minnesota
## One City Hall Plaza
## Chaska, MN 55318
## By:
## By:
## Name: Paul E. Collings
## Name: Matt Podhradsky
## Title: President
## Title: City Manager
## Date:
## Date:
AGREEMENT: Lessor hereby leases to Lessee and Lessee hereby rents from Lessor all the Property described in Property Schedule incorporated herein
by reference, upon the terms and conditions set forth herein and as supplemented by the terms and conditions set forth in the Property Schedule. This
Tax-Exempt Lease / Purchase Agreement together with the Property Schedule shall be defined as the Agreement.
LEASE TERM: The Lease Term of the Property listed in the Property Schedule shall commence upon the date of acceptance of the Property by Lessee
and continue for the time period set forth in the Property Schedule. This Agreement cannot be canceled or terminated by Lessee except as expressly
provided herein. This Agreement is a triple net lease.
LEASE PAYMENTS: Lessee shall pay rent to Lessor for the Property in the amounts, and on the dates specified, in the Property Schedule. Lessor and
Lessee intend that the obligation of Lessee to pay Lease Payments hereunder shall not in any way be construed to be a debt of Lessee in contravention of
any applicable constitutional or statutory limitations or requirements concerning the creation of indebtedness by Lessee, nor shall anything contained
herein constitute a pledge of the general tax revenues, funds or monies of Lessee.
NO OFFSET: SUBJECT TO THE RIGHT TO NON-APPROPRIATE, THE OBLIGATIONS OF LESSEE TO PAY THE LEASE PAYMENTS DUE UNDER THE
PROPERTY SCHEDULE AND TO PERFORM AND OBSERVE THE OTHER COVENANTS AND AGREEMENTS CONTAINED IN THIS AGREEMENT
SHALL BE ABSOLUTE AND UNCONDITIONAL IN ALL EVENTS WITHOUT ABATEMENT, DIMINUTION, DEDUCTION, SET-OFF OR DEFENSE, FOR
ANY REASON, INCLUDING WITHOUT LIMITATION, ANY DEFECTS, MALFUNCTIONS, BREAKDOWNS OR INFIRMITIES IN THE PROPERTY OR ANY
ACCIDENT, CONDEMNATION OR UNFORESEEN CIRCUMSTANCES. THIS PROVISION SHALL NOT LIMIT LESSEE'S RIGHTS OR ACTIONS AGAINST
ANY VENDOR. Lessee shall pay when due all taxes and governmental charges assessed or levied against or with respect to the Property.
LATE CHARGES: Should Lessee fail to duly pay any part of any Lease Payment or other sum to be paid to Lessor under this Agreement on the date on
which such amount is due hereunder, then Lessee shall pay late charges on such delinquent payment from the due date thereof until paid at the rate of
12% per annum or the highest rate permitted by law, whichever is less.
MAINTENANCE OF PROPERTY: At all times during the Lease Term, Lessee shall, at Lessee’s own cost and expense, maintain, preserve, and keep the
Property in good working order, and condition, and from time to time make or cause to be made all necessary and proper repairs, replacements, and
renewals to the Property, which shall become part of the Property. The Property is and will remain personal property.
INSURANCE OF PROPERTY: All risk of loss to the Property shall be borne by the Lessee. At all times during the Lease Term, Lessee shall, at Lessee’s
own cost and expense, cause casualty, public liability, and property damage insurance to be carried and maintained (or shall provide Lessor with a
certificate stating that adequate self-insurance has been provided) with respect to the Property, sufficient to protect the full replacement value of the
Property and to protect from liability in all events for which insurance is customarily available. Lessee shall furnish to Lessor certificates evidencing such
coverage throughout the Lease Term. Any insurance policy to be carried and maintained pursuant to this Agreement shall be so written or endorsed as to
make losses, if any, payable to Lessee and Lessor as their respective interests may appear. All such liability insurance shall name Lessor as an additional
insured. Each insurance policy carried and maintained pursuant to this Agreement shall contain a provision to the effect that the insurance company shall
not cancel the policy or modify it materially or adversely to the interest of the Lessor without first giving written notice thereof to Lessor at least 30 days in
advance of such change of status.
QUIET ENJOYMENT AND TERMINATION OF LESSOR'S INTEREST: Provided there does not exist an Event of Default as defined herein, the Lessee
shall have the right of quiet enjoyment of the Property throughout the Lease Term. During the Lease Term, title to the Property, including all substitutions,
repairs, replacements and renewals, and the proceeds thereof shall be in the name of Lessor. If Lessee shall have performed all of its obligations and no
default shall have occurred and be continuing under this Agreement, and this Agreement shall not have been earlier terminated with respect to the
Property, then, at the end of the Lease Term, title to the Property shall pass to the Lessee, the Lessor’s interests in the Property shall terminate and the
Lessor shall execute such documents and instruments as are required or requested by the Lessee to convey to and vest in the Lessee full, unencumbered
legal title to the Property. Thereafter the Lessor shall have no further interests in the Property. Notwithstanding the foregoing, Lessee hereby authorizes
Lessor to file, for information and notice purposes only during the Lease Term, one or more financing statements under the Uniform Commercial Code as
enacted in the State.
TAX EXEMPTION: The parties contemplate that interest payable under this Agreement will be excluded from gross income for federal income tax
purposes under Section 103 of the Internal Revenue Code of 1986, as amended (the "Code"). The tax-exempt status of this Agreement provides the
inducement for the Lessor to offer financing at the interest rate set forth herein. Therefore, should this Agreement be deemed by any taxing authority not to
be exempt from taxation, Lessee agrees that the interest rate shall be adjusted, as of the date of loss of tax exemption, to an interest rate calculated to
provide Lessor or its assignee an after tax yield equivalent to the tax exempt rate and Lessor shall notify Lessee of the taxable rate. Provided, however,
that the provision of the preceding sentence shall apply only upon a final determination that the interest payments are not excludable from gross income
under Section 103(a) of the Code, and shall not apply if the determination is based upon the individual tax circumstances of the Lessor, or a finding that
the party seeking to exclude such payments from gross income is not the owner and holder of the obligation under the Code.
REPRESENTATIONS AND WARRANTIES OF LESSEE: Lessee hereby represents and warrants to Lessor that: (a) Lessee is a State, possession of the
United States, the District of Columbia, or political subdivision thereof as defined in Section 103 of the Code and Treasury Regulations and Rulings related
thereto. If Lessee is incorporated, it is duly organized and existing under the Constitution and laws of its jurisdiction of incorporation and will do or cause to
be done all things necessary to preserve and keep such organization and existence in full force and effect. (b) Lessee has been duly authorized by the
Constitution and laws of the applicable jurisdiction and by a resolution of its governing body (which resolution, if requested by Lessor, is attached hereto),
to execute and deliver this Agreement and to carry out its obligations hereunder. (c) All legal requirements have been met, and procedures have been
followed, including public bidding, in order to ensure the enforceability of this Agreement. (d) The Property will be used by Lessee only for essential
Page 39 of 188
governmental or proprietary functions of Lessee consistent with the scope of Lessee's authority and will not be used in a trade or business of any person
or entity, by the federal government or for any personal, family or household use. Lessee’s need for the Property is not expected to diminish during the
term of the Agreement. (e) Lessee has funds available to pay Lease Payments until the end of its current appropriation period, and it intends to request
funds to make Lease Payments in each appropriation period, from now until the end of the term of this Agreement. (f) The Lessee shall comply at all times
with all applicable requirements of the Code, including but not limited to the registration and reporting requirements of Section 149, to maintain the federal
tax-exempt status of the Agreement. The Lessee shall maintain a system with respect to this Agreement, which tracks the name, and ownership interest of
each assignee who has both the responsibility for administration of, and ownership interest in this Agreement. (g) Lessee's exact legal name is as set forth
on the first page of this Agreement. Lessee will not change its legal name in any respect without giving thirty (30) days prior written notice to Lessor.
INDEMNIFICATION OF LESSOR: To the extent permitted by law, Lessee shall indemnify and save Lessor harmless from and against all claims, losses,
costs, expenses, liability and damages, including legal fees and expenses, arising out of (a) the use, maintenance, condition or management of, the
Property by Lessee, (b) any breach or default on the part of Lessee in the performance of any of its obligations under this Agreement or any other
agreement made and entered in connection with the lease of the Property, (c) any act of negligence of Lessee, or its successors or assigns, or any of its
agents, contractors, servants, employees, or licensees with respect to the Property, (d) the acquisition, delivery, and acceptance of the Property, (e) the
actions of any other party including, but not limited to, the ownership, operation, or use of the Property by Lessee, or (f) Lessor's exercise and performance
of its powers and duties hereunder. No indemnification will be made for negligence or breach of duty under this Agreement by Lessor, its directors,
officers, agents, employees, successors, or assignees. Lessee's obligations under this Section shall remain valid and binding notwithstanding termination
or assignment of this Agreement.
NON-APPROPRIATION: If sufficient funds are not appropriated to make Lease Payments under this Agreement, this Agreement shall terminate, and
Lessee shall not be obligated to make Lease Payments under this Agreement beyond the then current fiscal year for which funds have been appropriated.
Upon such an event, Lessee shall, no later than the end of the fiscal year for which Lease Payments have been appropriated, deliver possession of the
Property to Lessor. If Lessee fails to deliver possession of the Property to Lessor, the termination shall nevertheless be effective but Lessee shall be
responsible for the payment of damages in an amount equal to the portion of Lease Payments thereafter coming due that is attributable to the number of
days after the termination during which the Lessee fails to deliver possession and for any other loss suffered by Lessor as a result of Lessee's failure to
deliver possession as required. Lessee shall notify Lessor in writing within seven (7) days after the failure of the Lessee to appropriate funds sufficient for
the payment of the Lease Payments, but failure to provide such notice shall not operate to extend the Lease Term or result in any liability to Lessee.
ASSIGNMENT BY LESSEE: Without Lessor's prior written consent, Lessee may not, by operation of law or otherwise, assign, transfer, pledge,
hypothecate or otherwise dispose of the Property, this Agreement or any interest therein.
ASSIGNMENT BY LESSOR: Lessor may assign, sell or encumber all or any part of this Agreement, the Lease Payments and any other rights or interests
of Lessor hereunder. Such assignees may include trust agents for the benefit of holders of certificates of participation.
EVENTS OF DEFAULT: Lessee shall be in default under this Agreement upon the occurrence of any of the following events or conditions ("Events of
Default"), unless such Event of Default shall have been specifically waived by Lessor in writing: (a) Default by Lessee in payment of any Lease Payment or
any other indebtedness or obligation now or hereafter owed by Lessee to Lessor under this Agreement or in the performance of any obligation, covenant
or liability contained in this Agreement and the continuance of such default for ten (10) consecutive days after written notice thereof by Lessor to Lessee,
or (b) any warranty, representation or statement made or furnished to Lessor by or on behalf of Lessee proves to have been false in any material respect
when made or furnished, or (c) actual or attempted sale, lease or encumbrance of any of the Property, or the making of any levy, seizure or attachment
thereof or thereon, or (d) dissolution, termination of existence, discontinuance of the Lessee, insolvency, business failure, failure to pay debts as they
mature, or appointment of a receiver of any part of the property of, or assignment for the benefit of creditors by the Lessee, or the commencement of any
proceedings under any bankruptcy, reorganization or arrangement laws by or against the Lessee.
REMEDIES OF LESSOR: Upon the occurrence of any Event of Default and at any time thereafter, Lessor may, without any further notice, exercise one or
more of the following remedies as Lessor in its sole discretion shall elect: (a) terminate the Agreement and all of Lessee's rights hereunder as to any or all
items of Property; (b) proceed by appropriate court action to personally, or by its agents, take possession from Lessee of any or all items of Property
wherever found and for this purpose enter upon Lessee's premises where any item of Property is located and remove such item of Property free from all
claims of any nature whatsoever by Lessee and Lessor may thereafter dispose of the Property; provided, however, that any proceeds from the disposition
of the Property in excess of the sum required to (i) pay to Lessor an amount equal to the total unpaid principal component of Lease Payments under the
Property Schedule, including principal component not otherwise due until future fiscal years, (ii) pay any other amounts then due under the Property
Schedule and this Agreement, and (iii) pay Lessor's costs and expenses associated with the disposition of the Property and the Event of Default (including
attorneys fees), shall be paid to Lessee or such other creditor of Lessee as may be entitled thereto, and further provided that no deficiency shall be
allowed against Lessee; (c) proceed by appropriate court action or actions to enforce performance by Lessee of its obligations hereunder or to recover
damages for the breach hereof or pursue any other remedy available to Lessor at law or in equity or otherwise; (d) declare all unpaid Lease Payments and
other sums payable hereunder during the current fiscal year of the Lease Term to be immediately due and payable without any presentment, demand or
protest and / or take any and all actions to which Lessor shall be entitled under applicable law. No right or remedy herein conferred upon or reserved to
Lessor is exclusive of any right or remedy herein or at law or in equity or otherwise provided or permitted, but each shall be cumulative of every other right
or remedy given hereunder or now or hereafter existing at law or in equity or by statute or otherwise, and may be enforced concurrently therewith or from
time to time. Lessee agrees to pay to Lessor or reimburse Lessor for, in addition to all other amounts due hereunder, all of Lessor's costs of collection,
including reasonable attorney fees, whether or not suit or action is filed thereon. Lessee and Lessor hereby irrevocably waive all right to trial by jury in any
action, proceeding or counterclaim (whether based on contract, tort or otherwise) arising out of or relating to this Agreement.
NOTICES: All notices, and other communications provided for herein shall be deemed given when delivered or mailed by certified mail, postage prepaid,
addressed to Lessor or Lessee at their respective addresses set forth herein or such other addresses as either of the parties hereto may designate in
writing to the other from time to time for such purpose.
AMENDMENTS AND WAIVERS: This Agreement and the Property Schedule executed by Lessor and Lessee constitute the entire agreement between
Lessor and Lessee with respect to the Property and this Agreement may not be amended except in writing signed by both parties.
CONSTRUCTION: This Agreement shall be governed by and construed in accordance with the laws of the Lessee’s State. Titles of sections of this
Agreement are for convenience only and shall not define or limit the terms or provisions hereof. Time is of the essence under this Agreement. This
Agreement shall inure to the benefit of and shall be binding upon Lessor and Lessee and their respective successors and assigns. This Agreement may be
simultaneously executed in counterparts, each shall be an original with all being the same instrument.
Page 40 of 188
## Property Schedule 1 to Tax-Exempt Lease/Purchase Agreement
This Property Schedule is entered into pursuant to Tax-Exempt Lease/Purchase Agreement dated as of August 17, 2026 between
Lessor and Lessee.
1. Interpretation. The terms and conditions of the Tax-Exempt Lease/Purchase Agreement (the "Agreement") are incorporated herein.
2. Property Description. The Property subject to this Property Schedule is described in Exhibit A, attached hereto.
3. Term and Payments. Lease Term and Lease Payments are per the table below. Lessee shall have the option to prepay the Lease
Payments due under this Property Schedule on any Payment Date by paying the Purchase Price shown in the table below, plus any
other amounts due and owing at the time of prepayment.
4. Property Cost. The total acquisition cost of the Property is $441,971.33
## Pmt Payment Principal Total Interest Principal Purchase
## # Date Balance Payment Portion Portion Price*
441,971.33
1 1-Dec-26 441,424.01 8,360.56 7,813.24 547.32 Not Available
2 1-Jan-27 435,649.46 8,360.56 2,586.01 5,774.55 Not Available
3 1-Feb-27 429,841.08 8,360.56 2,552.18 5,808.38 Not Available
4 1-Mar-27 423,998.67 8,360.56 2,518.15 5,842.41 Not Available
5 1-Apr-27 418,122.04 8,360.56 2,483.93 5,876.63 Not Available
6 1-May-27 412,210.98 8,360.56 2,449.50 5,911.06 Not Available
7 1-Jun-27 406,265.29 8,360.56 2,414.87 5,945.69 435,599.35
8 1-Jul-27 400,284.77 8,360.56 2,380.04 5,980.52 428,690.79
9 1-Aug-27 394,269.21 8,360.56 2,345.00 6,015.56 421,759.20
10 1-Sep-27 388,218.41 8,360.56 2,309.76 6,050.80 414,804.51
11 1-Oct-27 382,132.16 8,360.56 2,274.31 6,086.25 407,826.63
12 1-Nov-27 376,010.26 8,360.56 2,238.66 6,121.90 400,825.49
13 1-Dec-27 369,852.49 8,360.56 2,202.79 6,157.77 393,801.01
14 1-Jan-28 363,658.65 8,360.56 2,166.72 6,193.84 386,753.12
15 1-Feb-28 357,428.52 8,360.56 2,130.43 6,230.13 379,681.74
16 1-Mar-28 351,161.90 8,360.56 2,093.94 6,266.62 372,586.79
17 1-Apr-28 344,858.56 8,360.56 2,057.22 6,303.34 365,468.18
18 1-May-28 338,518.30 8,360.56 2,020.30 6,340.26 358,325.85
19 1-Jun-28 332,140.89 8,360.56 1,983.15 6,377.41 351,159.71
20 1-Jul-28 325,726.12 8,360.56 1,945.79 6,414.77 343,969.68
21 1-Aug-28 319,273.77 8,360.56 1,908.21 6,452.35 336,755.69
22 1-Sep-28 312,783.62 8,360.56 1,870.41 6,490.15 329,517.65
23 1-Oct-28 306,255.45 8,360.56 1,832.39 6,528.17 322,255.48
24 1-Nov-28 299,689.04 8,360.56 1,794.15 6,566.41 314,969.10
25 1-Dec-28 293,084.16 8,360.56 1,755.68 6,604.88 307,658.44
26 1-Jan-29 286,440.58 8,360.56 1,716.98 6,643.58 300,323.41
27 1-Feb-29 279,758.08 8,360.56 1,678.06 6,682.50 292,963.93
28 1-Mar-29 273,036.44 8,360.56 1,638.92 6,721.64 285,579.91
29 1-Apr-29 266,275.42 8,360.56 1,599.54 6,761.02 278,171.29
30 1-May-29 259,474.79 8,360.56 1,559.93 6,800.63 270,737.96
31 1-Jun-29 252,634.32 8,360.56 1,520.09 6,840.47 263,279.86
32 1-Jul-29 245,753.78 8,360.56 1,480.02 6,880.54 255,796.90
33 1-Aug-29 238,832.93 8,360.56 1,439.71 6,920.85 248,289.00
34 1-Sep-29 231,871.53 8,360.56 1,399.16 6,961.40 240,756.07
35 1-Oct-29 224,869.35 8,360.56 1,358.38 7,002.18 233,198.03
36 1-Nov-29 217,826.15 8,360.56 1,317.36 7,043.20 225,614.80
37 1-Dec-29 210,741.69 8,360.56 1,276.10 7,084.46 218,006.29
38 1-Jan-30 203,615.73 8,360.56 1,234.60 7,125.96 210,372.41
Page 41 of 188
39 1-Feb-30 196,448.02 8,360.56 1,192.85 7,167.71 202,713.10
40 1-Mar-30 189,238.32 8,360.56 1,150.86 7,209.70 195,028.25
41 1-Apr-30 181,986.38 8,360.56 1,108.62 7,251.94 187,317.78
42 1-May-30 174,691.96 8,360.56 1,066.14 7,294.42 179,581.61
43 1-Jun-30 167,354.80 8,360.56 1,023.40 7,337.16 171,819.66
44 1-Jul-30 159,974.66 8,360.56 980.42 7,380.14 164,031.83
45 1-Aug-30 152,551.28 8,360.56 937.18 7,423.38 156,218.04
46 1-Sep-30 145,084.42 8,360.56 893.70 7,466.86 148,378.21
47 1-Oct-30 137,573.81 8,360.56 849.95 7,510.61 140,512.24
48 1-Nov-30 130,019.20 8,360.56 805.95 7,554.61 132,620.06
49 1-Dec-30 122,420.34 8,360.56 761.70 7,598.86 124,701.57
50 1-Jan-31 114,776.96 8,360.56 717.18 7,643.38 116,756.68
51 1-Feb-31 107,088.80 8,360.56 672.40 7,688.16 108,785.31
52 1-Mar-31 99,355.60 8,360.56 627.36 7,733.20 100,787.36
53 1-Apr-31 91,577.10 8,360.56 582.06 7,778.50 92,762.76
54 1-May-31 83,753.03 8,360.56 536.49 7,824.07 84,711.41
55 1-Jun-31 75,883.12 8,360.56 490.65 7,869.91 76,633.22
56 1-Jul-31 67,967.11 8,360.56 444.55 7,916.01 68,528.11
57 1-Aug-31 60,004.72 8,360.56 398.17 7,962.39 60,395.97
58 1-Sep-31 51,995.69 8,360.56 351.53 8,009.03 52,236.73
59 1-Oct-31 43,939.74 8,360.56 304.61 8,055.95 44,050.30
60 1-Nov-31 0.00 44,197.13 257.39 43,939.74 0.00
## TOTALS
537,470.17 95,498.84 441,971.33
* Purchase Price after the current lease payment has been made.
IN WITNESS WHEREOF, Lessor and Lessee have caused this Property Schedule to be executed in their names by their duly authorized
representatives.
Lessor: Municipal Asset Management, Inc. Lessee: City of Chaska, Minnesota
## By:
## By:
## Name: Paul E. Collings
## Name: Matt Podhradsky
## Title: President
## Title: City Manager
## Attest:
## By
## Name:
## Title:
Page 42 of 188
## EXHIBIT A
## Property Description
New Fitness Equipment, per the attached Quote 22-074333. This Exhibit A Property Description will be updated and
completed with full serial numbers and provided to the City upon final delivery of all Equipment.
## NuStep T6 with Touchscreen
## One (1) Nustep T6 Pro Recumbent Cross Trainer
swivel seat & step-through design
Reclining backrest - up to 12 degree recline
Warranty: 5yrs parts & 1yr labor
## Spin Bikes
## Eighteen (18) Matrix CXM Indoor Cycle w/Backlit LCD Console
## One (1) Torque Skier Relentless Ripper - wall mount
## One (1) Lateral X - UNITE 16"TOUCHSCREEN
## Three (3) X-Ride APEX Seated Elliptical - UNITE 16" Touchscreen
## Natural Elliptical Pedal Motion
## Tiltiing Back Rest & Adjustable Seat
## Moving Arms for Total and Upper Body Only Option
## 3-Speed User Fan
## Five (5) XT-ONE Crosstrainer - UNITE 16"Touchscreen
## Adjustable Incline: 10 Levels
## Adjustable Stride; 20-28"
## Pedal Angle & Spacing Mimic NaturalGait & Movement
## 3-Speed User Fan
## Six (6) Matrix Performance Ascent Trainer Ellipt-16"Touch
Incline: 20 settings, Stride Range: 20-24"
## Pedal Angle & Spacing Mimic NaturalGait & Movement
## 3-Speed User Fan
Suspended Design (No wheels or tracks)
## Three (3) Matrix Endurance Recumbent Bike
16"TOUCH Console
## 60 Virtual Video Courses, WiFi/Apps
## StepThru Design for Easy Access
1-handed seat adjustment
## 3-Speed User Fan
Factory Warranty: 3yrs parts & 3yrs Labor
## Slat Belt Treadmill
## Five (5) Matrix Performance Plus Touch Treadmill
## 5HP AC Dynamic Response Motor: .5 - 16mph Speed
## Pure Stride Cushioning System
## 24"x62" Slat Belt
## MultiGrip Handles & Speed+Incline Controls
12mph Treadmill
## Seven (7) Matrix Endurance Treadmill - 16"TOUCH Console
## 60 Virtual Video Courses, WiFi, APPs
4.2HP AC Motor: .5 - 12mph Speed, 0-15% incline
## Dynamic Response Drive For Natural Footstrike Feel
## 22"Wx60"L Full Width Running Belt
Page 43 of 188
## 3-Speed User Fan
## Quick Speed Changes & Quiet Motor
## Hand Controls for Speed & Incline
Warranty: Lifetime Motor, 3yrs parts & 3yrs Labor
## Four (4) Matrix Endurance Climbmill - 16" Touch Console
## 60 Virtual Video Courses, WiFi, APPs
## 10" Full Step for Full Foot Placement on each Step
## EZ Access HandGrip Mounted Controls for Speed
## Ergonomic Rail Encourages Proper Posture
## Moisture Management Design Protects Inside & Out
## 3-Speed User Fan
Factory Warranty: 3yrs parts & 3yrs Labor
## Four (4) Matrix Endurance Upright Bike 16"TOUCH Console
## 60 Virtual Video Courses, WiFi, APPs
## 3-Speed User Fan
## ErgoFrom Seat & Low Step over height for EZ Entry
1-handed seat adjustment
molded handlebars w/forearm supports
Warranty: 5yrs Generator, 3yrs parts & 3yrs labor
## One (1) Matrix RowerX with Magnetic Resistance
## Magnetic Resistance w/10 Level Dial Control
Magnetic Resistance is silent, smooth, & durable
## No Chain or Water Noise or Maintenance
## Factory Warranty: 3yrs Parts & 3yrs Labor
1 Factory Freight $42,803.48 $42,803.48 $42,803.48
warranty upgrades
Warranties: 5yrs parts & 5yrs Labor
Ten (10) 5yr Parts & Labor Wy: XT1, Lat X, XRide,Nustep
## One (1) 5yr Parts & Labor Warranty: Rowers
## Seventeen (17) 5yr Parts & Labor WTY: Ascent, EndurTread Climb
Seven (7) 5yr Pars & Labor Warranty: Upright & Recumbent bike
## Eighteen (18) Spin Bike Warranty: 5yrs parts & Labor
## Five (5) 5yr Warranty: Performance PLUS Slat Belt Treadmill
Preventative Maintenance (including spin bikes)
Preventative Maintenance: 2x per year x 5yrs
## Ten (10) Commercial PM - Trip Charge
## (580) Commercial PM-Equipment Piece
More fully described in the invoice(s) attached hereto and made a part hereof, including all present and future
attachments, accessions, additions, substitutions and all proceeds thereof.
Page 44 of 188
## EXHIBIT B
## Certificate of Acceptance to Tax-Exempt Lease/Purchase Agreement
This Certificate of Acceptance is pursuant to Tax-Exempt Lease/Purchase Agreement dated as of August 17, 2026 and the related
Property Schedule, between Lessor and Lessee (the "Agreement").
1. Property Acceptance. Lessee hereby certifies and represents to Lessor that the Property referenced in the Agreement has been
acquired, made, delivered, installed and accepted as of the date indicated below. Lessee has conducted such inspection and/or
testing of the Property as it deems necessary and appropriate and hereby acknowledges that it accepts the Property for all purposes.
Lessee will immediately begin making Lease Payments in accordance with the times and amounts specified herein. LESSOR
MAKES NO (AND SHALL NOT BE DEEMED TO HAVE MADE ANY) WARRANTIES, EXPRESS OR IMPLIED, AS TO ANY MATTER
WHATSOEVER, INCLUDING, WITHOUT LIMITATION, THE DESIGN, OPERATION OR CONDITION OF, OR THE QUALITY OF THE
MATERIAL, EQUIPMENT OR WORKMANSHIP IN, THE PROPERTY, ITS MERCHANTABILITY OR ITS FITNESS FOR ANY
## PARTICULAR PURPOSE, THE STATE OF TITLE THERETO OR ANY COMPONENT THEREOF, THE ABSENCE OF LATENT OR
OTHER DEFECTS (WHETHER OR NOT DISCOVERABLE), AND LESSOR HEREBY DISCLAIMS THE SAME; IT BEING
UNDERSTOOD THAT THE PROPERTY IS LEASED TO LESSEE "AS IS" ON THE DATE OF THIS AGREEMENT OR THE DATE OF
## DELIVERY, WHICHEVER IS LATER, AND ALL SUCH RISKS, IF ANY, ARE TO BE BORNE BY LESSEE.
## Acceptance Date:
## Lessee: City of Chaska, Minnesota
## By:
## Name:
## Title:
Page 45 of 188
## EXHIBIT C
## Certificate of Authorization
This Certificate of Authorization is pursuant to Tax-Exempt Lease Purchase Agreement dated as of August 17, 2026 and the related
Property Schedule, between Lessor and Lessee (the "Agreement").
1. Approval and Authorization. The Governing Body of Lessee, either through direct board action or indirectly through its officers,
officials or other authorized representatives has determined that it is in the best interest of the Lessee to enter into a lease purchase
agreement substantially in the form of the Agreement to finance the purchase of the Equipment described on Exhibit A of the
Agreement. The Governing Body of Lessee has duly authorized the individuals listed below to execute the Agreement and all
documents related thereto on behalf of the Lessee. Such authorization derives from either direct board action or indirectly through
established policies and procedures or bylaws all as allowed by law.
## Authorized Individual(s):
(Signature of individual(s) authorized to execute the Agreement)
## Matt Podhradsky, City Administrator
(Printed Name and Title of individual(s) authorized to execute the Agreement)
*To be executed by Secretary, Board Chairman or other member of the Governing Body.
## Lessee: City of Chaska, Minnesota
*By:
## Name:
## Title:
.
Page 46 of 188
## Request for Certificate of Insurance
(Please fill out this form and fax it to your insurance company)
## TO:
## Insurance Company: _______________________________
_______________________________
_______________________________
## Contact Name: _______________________________
## Telephone Number: _______________________________
E-mail: _______________________________
## FROM:
## Customer/Lessee Name: City of Chaska, Minnesota
## Contact Name: Melissa Goff
## Telephone Number: 952-448-9200
E-mail: mgoff@chaskamn.gov
City of Chaska, Minnesota is in the process of financing certain equipment from Municipal Asset Management, Inc. In
order to facilitate this transaction, please submit a Certificate of Insurance to:
## Municipal Asset Management, Inc. and its Assigns
## 25288 Foothills Drive North
## Golden, CO 80401
City of Chaska, Minnesota requests that Municipal Asset Management, Inc. be listed as: "Municipal Asset Management,
Inc. and its Assigns" and named ADDITIONAL INSURED as to public liability coverage and CO-LOSS PAYEE as to
property coverage. A copy of said certificate should be forwarded to Municipal Asset Management, Inc. as described
below.
NOTE: Coverage is to include (1) insurance against all risks of physical loss or damage to the Equipment (including theft and
collision for Equipment consisting of motor vehicles) and (2) commercial general liability insurance (including blanket
contractual liability coverage and products liability coverage) for personal and bodily injury and property damage. In addition,
Municipal Asset Management, Inc. is to receive 30 days' prior written notice of cancellation or material change in coverage.
Please e-mail this completed information to:
Municipal Asset Management, Inc.
## Attention: Documents Administration
E-mail: jtiemeyer@mamgt.com
## Phone Number: 303-273-9496
Please contact the person above if you have any questions. Thank you!
Page 47 of 188
## Notification of Tax Treatment
Municipal Asset Management, Inc. is required to collect and remit sales/use tax in the taxing jurisdiction where your
equipment will be located. In the event we do not receive a valid sales tax exemption certificate prior to the date your lease
commences, you will be charged sales/use tax.
Personal property tax returns will be filed as required by local law. In the event that any tax abatements or special
exemptions are available on the equipment you will be leasing from us, please notify us as soon as possible and forward
the related documentation to us. This will ensure that your leased equipment will be reported correctly.
Please indicate below if you feel that your lease is subject to tax or whether a valid exemption exists.
_______ I agree that my lease is subject to sales/use tax.
_______ I am exempt from sales/use tax and I have attached a completed exemption certificate to Municipal Asset
Management, Inc.
_______ I have previously provided a completed exemption certificate to Municipal Asset Management, Inc. which is
valid for this transaction.
_______ I am exempt from state tax but subject to local tax. I have attached a completed exemption certificate.
_______ I have a valid abatement or property tax exemption (documentation attached).
If applicable to the tax rates in your state, are you outside the city limits or in an unincorporated area? _______
Additional comments:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
## Lessee: City of Chaska, Minnesota
## By:
## Name: Matt Podhradsky
## Title: City Manager
Page 48 of 188
## INVOICE INSTRUCTIONS
(This information enables us to invoice you correctly.)
## City of Chaska, Minnesota
## BILL TO ADDRESS: One City Hall Plaza
## Chaska, MN 55318
## BILLING CONTACT:
## First, M.I. and Last Name:
## Title:
## Phone Number:
## Fax Number:
## E-Mail Address:
## PURCHASE ORDER NUMBER:
Invoices require purchase order numbers: YES _________ NO _________
## Purchase Order Number:
## FEDERAL TAX ID NUMBER: 41-6005041
## EQUIPMENT LOCATION (If different from Billing Address): Chaska Community Center
## ADDITIONAL INFORMATION NEEDED ON INVOICE:
Page 49 of 188
Page 50 of 188
Page 51 of 188
## Subject: Massage Therapy Registration Application – Yun Liu
## Prepared By: Denise Beebe, Senior Clerk
## BACKGROUND
The City received a massage license application from Yun Liu (DOB 10/24/1971).
The City's massage license ordinance requires applicants to have a massage therapy
degree from an accredited school demonstrating at least 400 hours of class credits.
As part of the City’s background check, Chaska Police Department investigated the
educational certificate submitted by Ms. Liu. The certificate was issued by ELM Health
Institute LLC in Hurst, Texas.
Chaska PD determined that, as of the date of the application, ELM Health Institute LLC
was not accredited and was not licensed to provide the qualifying education required by
the City's ordinance. In 2026, the Texas Department of Licensing and Regulation
revoked the school's educational license for violations involving falsification of student
education and training records, including reported credit hours.
## FINDINGS
Based on the investigation, the Applicant has not demonstrated that she meets the
City's required educational qualifications for a massage license.
The proposed resolution establishes written findings that the Applicant's educational
credentials do not satisfy the City's ordinance and that the license application should
therefore be denied.
## RECOMMENDATION
Staff recommends that the City Council adopt the proposed resolution denying Yun Liu's
massage license application for failure to meet the educational requirements of the
City's massage license ordinance.
## MOTION
Motion to adopt Resolution No. 2026-76, denying the massage license application of
Yun Liu for failure to meet the educational requirements of the City of Chaska's
massage license ordinance.
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
8/17/2026
Page 52 of 188
Page 1 of 1
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE: 8/17/2026 RESOLUTION NO.: 2026-76
## MOTION BY: COUNCILMEMBER SECOND BY: COUNCILMEMBER
## A RESOLUTION DENYING A MASSAGE LICENSE
WHEREAS, the City of Chaska (the “City”) licenses massage therapists working in the City; and
WHEREAS, the City received an application for a massage license from Yun Liu (the “Applicant”);
and
WHEREAS, the City’s massage license ordinance requires licensees hold a massage therapy
degree from an accredited school of massage therapy demonstrating at least four hundred (400)
hours of class credits; and
WHEREAS, as part of its background check, the City investigated the Applicant’s educational
credentials; and
WHEREAS, the Applicant’s educational certificate was issued by ELM Health Institute LLC in Hurst,
that is not accredited and which has had its educational license revoked by the Texas Department
of Licensing and Registration in 2026 for falsifying education and training records of its students,
including falsified reports of total credit hours completed by its students; and
WHEREAS, it is in the interest of public health and safety to ensure massage therapists are
properly trained and educated before allowing them to perform massage therapy in the City.
## NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CHASKA,
## MINNESOTA:
1. The massage license application of Yun Liu (DOB 10/24/1971) is DENIED for lack
of qualifying educational credentials required by the City’s ordinance.
Passed and adopted by the City Council of the City of Chaska this 17
th
day of August, 2026.
## Presiding Officer
## Taylor Hubbard, Mayor
## ATTEST:
## Denise Beebe, City Clerk
Page 53 of 188
## Subject: Scandvik – Concept Plan
## Applicant: Scandvik
Location: 1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
## Addition
## Case No.: 2026-17
Synopsis: The applicant is requesting Concept Plan approval for an outdoor spa area at the
## Oak Ridge Hotel & Conference Center
## Prepared By: Elizabeth Hanson
Staff Recommendation: Motion to adopt resolution
## Background
The following exhibit below is intended to show the general site area and adjoining uses:
## Figure 1: Existing Site & Adjoining Uses
## REQUEST FOR ACTION
## CHASKA CITY COUNCIL
8/17/2026
Page 54 of 188
## Previous Approvals
In December 1987 the Concept Plan, Rezoning (PMD-4), Preliminary Plat and Final Plat for the
IDS Learning Center facility was approved. This approval showed the construction of a learning
center building totaling approximately 170,000 square feet in floor area, with a total build-out of
199,000 square feet. The conference center was set into the hillside along McKnight Lake to
take advantage of the lake views and to set the building back into a somewhat secluded area of
nature. The original intent of this development was to make this site a corporate retreat, so
seclusion was a key component in the original design. The conference center was designed to
look like an institutional facility as you approach the building from highway 41, but the lake side
of the building has stunning floor to ceiling glass walls to bring a part of the natural scenery into
the complex. The building ultimately shifted from the IDS Learning Center to its former use as
the Oak Ridge Hotel and Conference Center.
## Figure 2: 1987 Approved Plan
Page 55 of 188
In March 2020, a Concept Plan to develop the remaining Oak Ridge property was approved. The
concept plan proposed the preservation of the conference center, a new multi-family apartment
on the northwest portion of the site, a new senior housing campus on the south portion of the
site, and a new commercial building on the east side of the site. In August 2021, the Concept
Plan Amendment was approved, which included a revision to the senior campus site to be multi-
family residential, and a revision to the northwest multi-family apartment site to be a stormwater
pond. In December 2021, the Preliminary Site & Building Plan, Preliminary Plat and Rezoning
(PMD-22) were approved for the existing conference center, new multi-family residential, and the
new Costco. In June 2022, the Final Site & Building Plan and Final Plat were approved. The final
approvals included a new parking lot layout for the Oak Ridge Hotel and Conference Center.
Figure 3: 2022 Approved Site & Landscape Plan (Lot 1 - Oak Ridge Hotel & Conference Center)
Neighborhood Meeting – June 24, 2026
The applicant held a neighborhood meeting on Wednesday, June 24
th
. While no one attended
the Open House, Scandvik received follow-up communication from a neighboring property after
the meeting. The discussion focused on understanding the project and potential redevelopment.
No formal objections to the redevelopment project have been received by their team.
Page 56 of 188
## Concept Plan
The applicant is requesting approval of a Concept Plan. The following is intended to summarize
the applicant’s request:
• Existing Conditions.
The Oak Ridge Hotel & Conference Center site is comprised of 22 acres and is located
west of Highway 41. Access to the property comes from a private road Oak Ridge Drive.
The site currently encompasses the Oak Ridge Hotel & Conference Center, which is a
171,000 square foot building. The building “closed their doors” on September 23, 2020
and has been sitting vacant since. Wooded steep slopes encompass the west and north,
and east edges of the property.
## Figure 4: Existing Conditions
• Concept Plan. The concept plan contemplates redeveloping, repurposing, and
repositioning the Oak Ridge Hotel & Conference Center into a modern hotel, conference
center, hospitality facility, and Nordic Spa.
Page 57 of 188
## Figure 5: Proposed Concept Plan
Details of the project include:
• Modernization of the front façade (elevation) which will be designed to match
the re-branded operations and will create an approachable and welcoming experience
to the property.
• The existing hotel rooms on the north wing of the existing building will be remodeled
and reconfigured into approximately 130 hotel guest rooms and suites.
• Approximately 15,000 square feet of the existing conference and event spaces will
be remodeled and modernized to support corporate retreats, weddings, and
community gatherings.
• A destination restaurant and lounge will be created for guests, the surrounding
community and greater region. The dining and lounge areas are currently planned to
seat between 100 and 150 guests and will be designed and operated to reflect
the vibe of the Nordic Spa and wellness focused branding.
• Wellness-focused retail and guest amenities will be developed near compatible
public interior spaces.
• Traditional spa in 10-15 rooms are planned within the existing structure and
will transition to the outdoor Nordic Spa areas comprising approximately ~20-
25,000 square feet connected via an ADA accessible walkway near the south wing
of the building.
Page 58 of 188
• The surface parking lots will be constructed per the approved building and site
plan (Resolution 2022-75) that includes 306 total parking stalls across the site,
to be developed with landscape medians, landscape plant details and
pedestrian connections as shown in the approved plan set.
At the heart of the project is the creation of a Scandinavian-inspired outdoor Nordic Spa
that will feature outdoor thermal bathing experiences, saunas, steam facilities, relaxation
spaces and wellness programming. This area is proposed on the west side of the building
within the wooded area overlooking McKnight Lake.
## Figure 6: Proposed Outdoor Spa Layout and Rendering
Page 59 of 188
Goals: The applicant has identified the following goals for their project:
o To be a premier regional hospitality and wellness location. We share Chaska’s
vision for excellence. Our goal is to create a hospitality and wellness experience
not currently available in the region. Scandvik at Oak Ridge will be exceptional,
welcoming and a premier destination.
o To be Sustainable. Reimaging the existing 171,000 square foot hotel and
conference center is at the foundation of our approach. Without certain flexibilities,
the existing building location and footprint constrains opportunities to create
meaningful outdoor spaces; however, we still believe that redevelopment is the
most sustainable approach to repurpose the site. Redevelopment inherently is
more economically challenging, but it reduces impact on the landscape which is at
the heart of our vision.
o To be good stewards of the land. While we understand that our spa elements will
require variances from your standards, our design philosophy is to use the natural
features of the site as our foundation. A guiding tenet of our design approach is
to lightly touch grades and vegetation for placement of spa element, and to
minimize impervious surfaces and grading area to maintain and support slope
areas. Physical spa improvements are planned to incorporate pervious surfaces,
pier-supported pavilions connected via ADA accessible walking paths scaled below
the tree line, and revegetation to maintain the integrity of the City’s vision for the
wooded slope areas surrounding the site.
## Concept Plan - Staff Analysis
The applicant is requesting approval of a Concept Plan. The following is intended to summarize
the applicant’s request and staff’s analysis:
Zoning. The Oak Ridge Hotel & Conference Center building is located on Lot 1, Block 1,
## Oak Knoll 2
nd
Addition, and is zoned Planned Multi-Use District (PMD-22). The PMD-22
zoning states the following intent and permitted uses for the site:
Page 60 of 188
The proposal to repurpose the existing building as a hotel and conference center use is
consistent with the zoning. The outdoor Nordic spa is a new use and the PMD-22
district would need to be amended to include it. While staff is generally in support of
the proposed use, it will need to be evaluated in detail during the preliminary review and
meet the approved conditions of this Concept Plan.
The proposal to construct an outdoor Nordic spa into the existing wooded steep slope
area does not meet the intent of the zoning district, which seeks to preserve natural
amenities. More analysis of this is included in the ‘Wooded Steep Slopes & Outdoor Spa
Layout’ section of this report.
• Setbacks.
The following tables summarize the required setbacks for the site:
## BUILDING SETBACKS
## Direction Setback
Trunk Highway 41 150 feet from the centerline
From city land/trails 40 feet
## Interior Property Lines 10 feet
Wooded Steep Slopes 50 feet building & parking
setback and 30 feet no grade/no
mow setback
## McKnight Lake & Big Woods
## Lake
50 feet from OHW
The applicant will have to show in their preliminary submittal if they meet these setbacks.
Based on the proposed layout, the outdoor spa area is proposed to encroach into the
wooded steep slope areas and required setbacks. More analysis of this is included in the
‘Wooded Steep Slopes & Outdoor Spa Layout’ section of this report.
• Wooded Steep Slopes & Outdoor Spa Layout.
Wooded steep slopes exist on the west, north and east sides of the site – see Figure 7.
The site & building plan and zoning (PMD-4) approved in 1987 adopted Slope
Preservation requirements with certain exceptions:
Page 61 of 188
## Figure 7: Wooded Steep Slope & Setbacks
The proposed outdoor spa layout shows significant encroachment into the wooded steep
slopes and associated setbacks on the west side of the building – see Figure 8. The
applicant prefers Location #3 as it will create a private, tranquil, nature immersive space
for their guests. Additional explanation for this location is included in the applicant’s
narrative. Per the intent of the current zoning district (PMD-22) and the city’s wooded
steep slope ordinance (Section 15.28.100), the wooded steep slopes need to be
preserved. In short, staff would not be in support of the proposed outdoor spa
location as shown in Location #3 on their plans due to the wooded steep
slope impacts.
Page 62 of 188
## Figure 8: Proposed and Preferred Spa Location (Location #3)
The applicant also looked at two alternate locations on site (Locations #1 & 2) – see
Figure 9. Additional summaries of these alternates are included in the applicant’s
narrative. In short, Location #2 also shows encroachment into the wooded
steep slopes and setbacks and would not be supported by staff.
Page 63 of 188
## Figure 9: Alternate Locations for Outdoor Spa
Location #1 is the only alternate proposed that would not encroach into the wooded
steep slopes and its setbacks. Location #1 impacts the parking expansion area needed
to support the site. Staff would be supportive of this location if a parking expansion
alternative meeting parking requirements can be accommodated on site.
Figure 10: 2020 Aerial showing ‘disturbance limits’
Page 64 of 188
The 1987 approvals permitted the existing building and site to encroach into portions of
the wooded steep slope setbacks, and what we are going to identify as its ‘disturbance
limits’ – see Figure 10. The disturbance limits include portions of outdoor patios, mowed
grass, pathways and a fire pit. Most of the disturbance limits stay outside of the
wooded steep slopes except for the fire pit and pathway leading to the public trail. The
disturbance limits have been actively maintained since the construction of the building,
and since the building’s closing in 2020 there has been some overgrowth, but the area is
still generally intact.
Staff have advised the applicant to look at the existing disturbance limits for the outdoor
spa as a starting point, however, it’s likely it will require a variance request from the
wooded steep slope setbacks. The applicant has started to evaluate this area and how
their layout could fit within these disturbance limits. A preliminary submittal will need to
include revising the outdoor spa outside of the wooded steep slopes and explore a
layout within city approved ‘disturbance limits’ that does not disrupt the integrity of the
wooded steep slopes. Staff will also require a Slope Stability Analysis to ensure the
proposed project does not compromise the wooded steep slope.
• Parking.
In the 2022 approvals, it was determined that the parking required for the existing
hotel/conference center would be 294 parking stalls. The approved site plan showed
incorporating 306 parking stalls on site; 286 parking stalls from a reconstructed parking
lot north east of the building, and 20 parking stalls within the shared southern parking
lot see Figure 11.
## Figure 11: 2022 Approved Parking Plan
Page 65 of 188
The proposed user intends to repurpose the existing building and add approximately
25,000 square feet of outdoor spa space. Based on the conceptual uses the below table
is intended to summarize the parking requirements. The applicant will also need to
provide a parking analysis in their preliminary submittal to explain the parking needs for
their proposed uses and how the site and parking plan can accommodate.
Uses Approx. Size Code Req. Est. Parking Req.
Hotel 130 rooms 1ps/Guest Room
+ 1ps/employee
130 parking spaces + ?
## Conference
## Center
15,000sf 20 spaces +
1ps/300sf
70 parking spaces
Restaurant 100-150
seats
1ps/3 seats 50 parking spaces
## Outdoor
## Spa
25,000sf 20 spaces +
1ps/300sf
103 parking spaces
REQUIRED ~353 parking spaces
PROVIDED 306 parking spaces
• Building Design.
The proposal includes modification to the front (east) façade and inclusion of new
relaxation pavilions and sauna structures on the west side of the building. Modifications
and new buildings will require a couple items; meeting the city’s Building Design &
Materials ordinance for commercial buildings (Section 15.28.120), and providing cohesion
with the rest of the Oak Ridge development (existing Oak Ridge Hotel & Conference Center
building, Springs at McKnight Lake, and Costco). The applicant will have to show in their
preliminary submittal how they meet those requirements.
Figure 12: Front (east) Façade concept
## Figure 13: Proposed Relaxation Pavilions
Page 66 of 188
• Utilities & Stormwater.
Sewer and water utilities are currently extended to the site.
There is an existing stormwater pond on the north side of the site that was constructed
to support the overall development. With the addition of the outdoor spa space, the
stormwater requirements will need to be reviewed and met in the preliminary submittal.
• Landscaping & Tree Preservation.
Landscaping will need to show additional landscaping, shrubs, vegetation that intensify
and enhance the disturbance limits, parking lots, wooded steep slope, wooded steep
slope setbacks and erosion control methods on site. The applicant will have to provide a
Landscape Plan in the preliminary submittal that shows this.
Tree preservation will be an important piece of discussion, and staff would advise the
applicant to further evaluate the tree preservation opportunities within the project area.
The applicant will have to provide a tree inventory and preservation plan in their
preliminary submittal, and show how they can maximize preservation where possible
and specifically in the wooded steep slope and their associated setbacks.
• Project Schedule.
The following timeline reflects the anticipated progression of the project:
## Deadline for Agency Decisions
## Complete Application
## Received
60-day review * 120 – day **
July 31, 2026 September 29, 2026 November 28, 2026
* Pursuant to MN State Statutes the City must act on the request within 60-days.
** The city can provide the applicant with a written letter requesting an additional 60-day review period if further
review is needed.
## Planning Commission Action Taken 8/12/2026:
Motion to recommend approval to the City Council approval of the Concept Plan for Scandvik at
Oak Ridge Hotel & Conference Center (1 Oak Ridge Drive), subject to the following conditions:
1. Approvals shall be based on the following graphic exhibits unless modified by the
conditions below:
a. Concept Plan (pgs 1-33), prepared by Scandvik
2. Outdoor Spa Locations (#2 and #3) as shown on the Concept Plans, are not supported
or approved by city staff due to impacts to the wooded steep slope and setbacks.
Page 67 of 188
3. Outdoor Spa Location (#1) is supported by city staff if a parking expansion alternative
meeting parking requirements and needs can be accommodated on site.
4. In addition to the items defined in the Preliminary Site & Building Plan (and Zoning
Ordinance Amendment) application submittal requirements, the following must be
submitted for an application to be complete:
a. Variance Application, if required;
## b. Zoning Ordinance Amendment Application, to include Outdoor Nordic Spa
c. Site Plan, showing exploration of the outdoor spa location within the ‘Disturbance
Limits’ and no additional impacts to wooded steep slopes and its setbacks;
d. Landscape Plan, showing additional landscaping, shrubs, vegetation that
intensify and enhance the disturbance limits, parking lots, wooded steep slope,
wooded steep slope setbacks and erosion control methods on site;
e. Tree Inventory and Preservation Plan for trees within the proposed improvement
areas, and to maximize preservation where possible;
f. Building Plans & Material Samples, for all new buildings and showing compliance
with Section 15.28.120 (Commercial Buildings) and cohesion with the existing
buildings within the Oak Ridge development;
g. Stormwater Plan and Report meeting city and county requirements;
h. Grading Plan, including wooded steep slopes and its setbacks;
i. Parking Analysis, including a parking need summary and how the proposed
parking plan is sufficient to meet needs and parking code;
j. Slope Stability Analysis.
5. Coordination with:
a. City Engineer regarding utilities, grading, stormwater and drainage.
## b. Carver County Watershed Management Organization (CCWMO) regarding
stormwater requirements.
c. Fire Marshal regarding Fire Department Connection (FDC) relocating near vehicle
circle at front of building.
6. Compliance with City Ordinances and Regulations, including:
## a. Section 15.28 Special Regulations
## b. Section 15.28.120 Building Design & Materials
## c. Sec. 15.28.100 Setback from Steep Slopes
7. Setbacks are as follows:
a. Wooded Steep Slopes: 50 feet building and parking setback and 30 feet no
grade/no mow setback
b. Internal Property Lines: 10 feet
c. Trunk Highway 41: 150 feet from the centerline
d. McKnight Lake and Big Woods Lake: 50 feet from OHW
8. Prior to certificate of occupancy, the following must be completed:
a. Improvements to the site based on the approved site exhibits
b. Developer shall enter into an agreement with the City for the provision of
necessary infrastructure and associated development costs, including but not
limited to park dedication fees, if applicable
## CITY COUNCIL ACTION REQUESTED
Motion to adopt Resolution No. 2026-74 approving the Concept Plan for Scandvik at
Oak Ridge Hotel & Conference Center (1 Oak Ridge Drive) (PC #2026-17).
Page 68 of 188
## SUPPORTING INFORMATION
Mailing Area: 11 addresses were included in the mailing list for the project:
Page 69 of 188
## CITY OF CHASKA
## CARVER COUNTY, MINNESOTA
## RESOLUTION
## DATE AUGUST 17, 2026 RESOLUTION NO. 2026-74
## MOTION BY COUNCILMEMBER SECOND BY COUNCILMEMBER
Resolution approving the Concept Plan for Scandvik at Oak Ridge Hotel & Conference
## Center (1 Oak Ridge Drive)/Scandvik Hotels/P.C. No. 2026-17
WHEREAS, the concept plan contemplates redeveloping, repurposing, and repositioning the Oak
Ridge Hotel & Conference Center into a modern hotel, conference center, hospitality facility, and
## Nordic Spa; and
WHEREAS, Details of the project include:
• Modernization of the front façade (elevation) which will be designed to match
the re-branded operations and will create an approachable and welcoming experience
to the property.
• The existing hotel rooms on the north wing of the existing building will be remodeled
and reconfigured into approximately 130 hotel guest rooms and suites.
• Approximately 15,000 square feet of the existing conference and event spaces will
be remodeled and modernized to support corporate retreats, weddings, and
community gatherings.
• A destination restaurant and lounge will be created for guests, the surrounding
community and greater region. The dining and lounge areas are currently planned to
seat between 100 and 150 guests and will be designed and operated to reflect
the vibe of the Nordic Spa and wellness focused branding.
• Wellness-focused retail and guest amenities will be developed near compatible
public interior spaces.
• Traditional spa in 10-15 rooms are planned within the existing structure and
will transition to the outdoor Nordic Spa areas comprising approximately ~20-
25,000 square feet connected via an ADA accessible walkway near the south wing
of the building.
• The surface parking lots will be constructed per the approved building and site
plan (Resolution 2022-75) that includes 306 total parking stalls across the site,
to be developed with landscape medians, landscape plant details and
pedestrian connections as shown in the approved plan set; and
WHEREAS, at the heart of the project is the creation of a Scandinavian-inspired outdoor Nordic
Spa that will feature outdoor thermal bathing experiences, saunas, steam facilities, relaxation
spaces and wellness programming; and
WHEREAS, the outdoor Nordic spa is a new use and the PMD-22 district would need to be
amended to include it; and
Page 70 of 188
WHEREAS, the proposal to construct an outdoor Nordic spa into the existing wooded steep slope
area does not meet the intent of the zoning district, which seeks to preserve natural amenities;
and
WHEREAS, wooded steep slopes exist on the west, north and east sides of the site; and
WHEREAS, staff would not be in support of the proposed outdoor spa location as shown in
Location #3 on their plans due to the wooded steep slope impacts; and
WHEREAS, Location #2 also shows encroachment into the wooded steep slopes and setbacks
and would not be supported by staff; and
WHEREAS, staff would be supportive of Location #1 if a parking expansion alternative meeting
parking requirements can be accommodated on site; and
WHEREAS, the 1987 approvals permitted the existing building and site to encroach into portions
of the wooded steep slope setbacks, and what we are going to identify as its ‘disturbance limits’;
and
WHEREAS, staff have advised the applicant to look at the existing disturbance limits for the
outdoor spa as a starting point, however, it’s likely it will require a variance request from the
wooded steep slope setbacks; and
WHEREAS, a preliminary submittal will need to include revising the outdoor spa outside of the
wooded steep slopes and explore a layout within city approved ‘disturbance limits’ that does not
disrupt the integrity of the wooded steep slopes; and
WHEREAS, staff will also require a Slope Stability Analysis to ensure the proposed project does
not compromise the wooded steep slope; and
WHEREAS, the approved 2022 site plan showed incorporating 306 parking stalls on site; 286
parking stalls from a reconstructed parking lot north east of the building, and 20 parking stalls
within the shared southern parking lot; and
WHEREAS, the applicant will also need to provide a parking analysis in their preliminary
submittal to explain the parking needs for their proposed uses and how the site and parking plan
can accommodate; and
WHEREAS, modifications and new buildings will require a couple items; meeting the city’s
Building Design & Materials ordinance for commercial buildings (Section 15.28.120), and
providing cohesion with the rest of the Oak Ridge development (existing Oak Ridge Hotel &
## Conference Center building, Springs at McKnight Lake, and Costco); and
WHEREAS, with the addition of the outdoor spa space, the stormwater requirements will need to
be reviewed and met in the preliminary submittal; and
Page 71 of 188
WHEREAS, landscaping will need to show additional landscaping, shrubs, vegetation that
intensify and enhance the disturbance limits, parking lots, wooded steep slope, wooded steep
slope setbacks and erosion control methods on site; and
WHEREAS, the applicant will have to provide a tree inventory and preservation plan in their
preliminary submittal, and show how they can maximize preservation where possible and
specifically in the wooded steep slope and their associated setbacks; and
WHEREAS, on August 12, 2026 the Planning Commission recommended approval to the City
Council of the Concept Plan for Scandvik at Oak Ridge Hotel & Conference Center (1 Oak Ridge
Drive) (PC#2026-17); and
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Chaska, Minnesota,
hereby approves the Concept Plan for Scandvik at Oak Ridge Hotel & Conference Center (1 Oak
Ridge Drive) (PC#2026-17), subject to the aforementioned stipulations and following conditions:
1. Approvals shall be based on the following graphic exhibits unless modified by the
conditions below:
a. Concept Plan (pgs 1-33), prepared by Scandvik
2. Outdoor Spa Locations (#2 and #3) as shown on the Concept Plans, are not supported
or approved by city staff due to impacts to the wooded steep slope and setbacks.
3. Outdoor Spa Location (#1) is supported by city staff if a parking expansion alternative
meeting parking requirements and needs can be accommodated on site.
4. In addition to the items defined in the Preliminary Site & Building Plan (and Zoning
Ordinance Amendment) application submittal requirements, the following must be
submitted for an application to be complete:
a. Variance Application, if required;
## b. Zoning Ordinance Amendment Application, to include Outdoor Nordic Spa
c. Site Plan, showing exploration of the outdoor spa location within the ‘Disturbance
Limits’ and no additional impacts to wooded steep slopes and its setbacks;
d. Landscape Plan, showing additional landscaping, shrubs, vegetation that intensify
and enhance the disturbance limits, parking lots, wooded steep slope, wooded
steep slope setbacks and erosion control methods on site;
e. Tree Inventory and Preservation Plan for trees within the proposed improvement
areas, and to maximize preservation where possible;
f. Building Plans & Material Samples, for all new buildings and showing compliance
with Section 15.28.120 (Commercial Buildings) and cohesion with the existing
buildings within the Oak Ridge development;
g. Stormwater Plan and Report meeting city and county requirements;
h. Grading Plan, including wooded steep slopes and its setbacks;
i. Parking Analysis, including a parking need summary and how the proposed
parking plan is sufficient to meet needs and parking code;
j. Slope Stability Analysis.
5. Coordination with:
a. City Engineer regarding utilities, grading, stormwater and drainage.
## b. Carver County Watershed Management Organization (CCWMO) regarding
stormwater requirements.
Page 72 of 188
c. Fire Marshal regarding Fire Department Connection (FDC) relocating near vehicle
circle at front of building.
6. Compliance with City Ordinances and Regulations, including:
## a. Section 15.28 Special Regulations
## b. Section 15.28.120 Building Design & Materials
## c. Sec. 15.28.100 Setback from Steep Slopes
7. Setbacks are as follows:
a. Wooded Steep Slopes: 50 feet building and parking setback and 30 feet no
grade/no mow setback
b. Internal Property Lines: 10 feet
c. Trunk Highway 41: 150 feet from the centerline
d. McKnight Lake and Big Woods Lake: 50 feet from OHW
8. Prior to certificate of occupancy, the following must be completed:
a. Improvements to the site based on the approved site exhibits
b. Any outstanding items in the Developer’s Agreement for Lot 1, Block 1
## Oak Knoll 2
nd
## Addition
Passed and adopted by the City Council of the City of Chaska, Minnesota, this 17
th
day of
August, 2026.
## Taylor Hubbard, Mayor
__________________________________
## Chaska Deputy Clerk
Page 73 of 188
## Nordic Wellness Hospitality
## Wellness Repositioning | Marriott Tribute Portfolio
## CONFIDENTIAL
## OAK RIDGE HOTEL & CONFERENCE CENTER
## PROJECT NARRATIVE
## REV. 07.31.2026
Page 74 of 188
July 7, 2026
## City of Chaska
Transmitted via Email.
RE: Application for Concept Plan Review for Scandvik Hotel and Nordic Spa for property at
## 1 Oak Ridge Drive, Chaska, Minnesota
Dear Members of the Planning Commission, City Council, City Staff,,
On behalf of Scandvik Hotels & Nordic Spa, we are pleased to submit this Concept Plan Application for the redevelopment of the
Oak Ridge property located at 1 Oak Ridge Drive in Chaska, Minnesota. The Oak Ridge property occupies a unique place within the
community. For decades, it has served as a destination for visitors, conferences, celebrations, and shared experiences. Its natural setting,
mature woodland, lakefront character, and established hospitality infrastructure make it one of the most distinctive hospitality properties
in the region.
Our vision is to thoughtfully transform this legacy property into Scandvik at Oak Ridge, a wellness-focused destination hotel operating
under Marriott’s Tribute Portfolio brand. The redevelopment combines hospitality, wellness, dining, conferences, recreation, and
community engagement into a year-round destination designed to serve both residents and visitors. From the beginning of our planning
process, we have approached the property with a simple philosophy:
Work with the land, not against it.
The natural features of the site—including its woodland character, topography, shoreline environment, and existing development
framework—have guided every aspect of our planning efforts. Rather than viewing these features as obstacles, we believe they represent
the very qualities that make Oak Ridge special and worthy of preservation. This Concept Plan Application reflects months of collaboration
with planners, architects, engineers, hospitality professionals, wellness designers, environmental consultants, and community stakeholders.
It is intended not only to present a development proposal, but also to begin a constructive dialogue regarding how this property can
continue to serve the City of Chaska for generations to come.
The vision extends beyond the redevelopment of a hotel. We believe Oak Ridge has the opportunity to become a place where people gather,
reconnect with nature, improve their well-being, celebrate important milestones, conduct business, and build meaningful relationships.
Through wellness programming, community engagement, conferences, hospitality, and year-round experiences, we hope to create a
destination that contributes to both the economic vitality and quality of life of the community.
Page 75 of 188
The proposed redevelopment represents a significant long-term private investment in Chaska. It will generate employment opportunities,
attract visitors, support local businesses, expand tourism activity, and reposition an important hospitality asset while maintaining a strong
commitment to environmental stewardship and responsible site planning.
In advance of this submission, we held a neighborhood Open House to kick off our process. While no one attended, we have received
some follow up correspondence. The Scandvik team remains available to meet with surrounding property owners throughout this process.
Our team will continue to respond to any questions regarding the site planning, environmental protection, traffic and future operations
as the plans are refined.
We recognize that successful redevelopment requires partnership and we are committed to working collaboratively with City staff, Planning
Commission, City Council, neighboring property owners, and community stakeholders throughout the planning process. We welcome
feedback, value community input, and appreciate the opportunity to participate in shaping the future of this important property. Thank
you for your consideration of this Concept Plan Application. We look forward to continuing our dialogue with the City of Chaska and
working together to create a destination that reflects the values, character, and long-term vision of the community.
Respectfully submitted,
## Travis Batting
## Founder & President
## Scandvik Hotels & Nordic Spa
Page 76 of 188
4
## PROPOSED PROJECT
Scandvik Hotels is proposing to redevelop, repurpose and reposition the former Oak Ridge Hotel & Conference Center into a modern hospitality facility and Nordic
Spa. At the heart of our project is the creation of a Scandinavian-inspired outdoor Nordic Spa that will feature outdoor thermal bathing experiences, saunas, steam
facilities, relaxation spaces and wellness programming. To support opportunities for an immersive spa getaway, the existing hospitality infrastructure and facilities will
be repurposed and re-imagined within the existing hotel/conference center building footprint. The planned Nordic Spa and hospitality redevelopment will reinforce
Chaska’s Small Town, upscale character, and reflect Minnesota’s Scandinavian heritage. Our project includes:
## HOTEL/CONFERENCE CENTER IMPROVEMENTS
»Modernization of the front façade (elevation) which will be designed to match the re-branded operations and will create an approachable and welcoming
experience to the property.
»The existing hotel rooms on the north wing of the existing building will be remodeled and reconfigured into approximately 130 hotel guest rooms and suites.
»Approximately 15,000 square feet of the existing conference and event spaces will be remodeled and modernized to support corporate retreats, weddings, and
community gatherings.
»A destination restaurant and lounge will be created for guests, the surrounding community and greater region. The dining and lounge areas are currently
planned to seat between 100 and 150 guests and will be designed and operated to reflect the vibe of the Nordic Spa and wellness focused branding.
»Wellness-focused retail and guest amenities will be developed near compatible public interior spaces.
»Traditional spa in 10-15 rooms are planned within the existing structure and will transition to the outdoor Nordic Spa areas comprising approximately ~18,000
square feet connected via an ADA accessible walkway near the south wing of the building.
Page 77 of 188
5
## NORDIC SPA DEVELOPMENT
»The outdoor Nordic Spa is the heart of the redevelopment strategy. The Scandinavian
inspired Nordic Spa will be connected to the Hotel from the existing south wing by a
walkway to an entrance pavilion west of the existing building. The current footprint
shown on our concept plan comprises between 20,000 and 25,000 square feet. The
spa improvements are proposed west of the building and are designed to run parallel
to the existing structure lakeside to minimize impact to topography and grades while
providing an immersive private guest experience.
»Positioning the Nordic Spa in a private, natural environment is a critical tenet of the
spa experience. The selected location is nestled into the landscape with intention.
Protecting grades, preventing erosion and respecting McKnight Lake are foundational
to our development and design plans.
»The Nordic Spa will include a series of outdoor hot pools, cold pools, saunas and rest
areas to facilitate the wellness circuit. These spaces are proposed to be connected by
pervious walkways, landscaping and small pier-supported pavilion structures which
will all be designed to respect existing grades, surface water flows and vegetation to
ensure that the integrity of the wooded slope and lake are protected.
## ACCESSORY SITE IMPROVEMENTS
»Surface parking will be accessible to guests visiting the property but will be tucked
away from the outdoor experience spaces to ensure the Nordic Spa retains its privacy.
The surface parking lots will be constructed per the approved building and site
plan (Resolution 2022-75) that includes 306 total parking stalls across the site, to be
developed with landscape medians, landscape plant details and pedestrian connections
as shown in the approved plan set.
»Trail/sidewalk connections identified on the approved Plan Set will be respected and
incorporated into our design providing pedestrian access consistent with the City’s
goals and objectives for the approved planned development.
Page 78 of 188
6
»While we do not anticipate significant deviation from the approved plans,
if adjustments are necessary when we get into our full design plans, we
will clearly identify such modifications during subsequent steps of the
Planned Development process.
## RE-BRANDING, POSITIONING & ECONOMIC IMPACT
»The Scandinavian inspired Nordic Spa will provide a unique experience
not currently available within the region. The overall vision and master
plan is to create and bring a distinct hospitality experience to the
community.
»Re-branding the existing facilities will create a new identity for the
property and establish it as a destination for years to come. Scandvik
Hotels will operate under Marriott’s Tribute Portfolio which is a collection
of independent, upscale boutique hotels designed for travelers seeking
unique, character-driven properties that reflect the local community and
culture.
»Redevelopment of this legacy property, and introducing a new wellness-
focused destination, will bring new economic investment and vitality
back to the community.
»Scandvik is projecting more than $40 Million dollars in private
investment to give this property new life as the hospitality destination in
the community.
»We expect that is will create 150+ construction jobs, 100+ permanent
jobs once operational, with year round tourism activity and more than
$30M is projected visitor spending.
The goal is not simply to build
on the land.
The goal is to belong to it.
Page 79 of 188
7
## SCANDVIK AT OAK
## RIDGE VISION &
## PROJECT GOALS
Scandvik Hotels was founded on the belief that hospitality should do more than
provide accommodation. Great hospitality creates moments of connection,
restoration and belonging. The Oak Ridge property occupies one of the most
unique hospitality sites with the Twin Cities region, it just needs to be re-imagined,
repurposed and reinvented.
At the heart of our project is to create a regional wellness destination rooted in
the Nordic Spa experience inspired by Scandinavian wellness traditions. Guests
will move between hot and cold thermal experiences, outdoor relaxation spaces,
forested pathways, and wellness programming designed to encourage physical and
mental well-being. The Nordic Spa experience is best enjoyed when the spaces are
private, outdoors and integrated into picturesque landscapes. The Oak Ridge site
can offer such amenities with a little flexibility and a dash of innovation. Our vision
is to carefully nestle the spa spaces into the site between the existing hotel structure
and McKnight Lake, so that guests are immersed by lake views, rolling topography
and mature vegetation. The three-story hotel structure will serve as a buffer from
the nearby hustle and bustle of Costco shoppers, creating a tranquil private spa
environment lakeside for our guests.
The existing hotel and conference center will evolve into a new and modern
hospitality facility to complement the spa experience. Guest rooms, gathering spaces,
and conference areas will be modernized and reconfigured to provide unparalleled
guest and community experiences. To support our Vision, we have a set of goals and
principles to help guide us through our site design and development process.
Page 80 of 188
8
## SCANDVIK GOALS:
»To be a premier regional hospitality and wellness location. We share Chaska’s vision
for excellence. Our goal is to create a hospitality and wellness experience not
currently available in the region. Scandvik at Oak Ridge will be exceptional,
welcoming and a premier destination.
»To be Sustainable. Reimaging the existing 171,000 square foot hotel and
conference center is at the foundation of our approach. Without certain
flexibilities, the existing building location and footprint constrains
opportunities to create meaningful outdoor spaces; however, we still believe
that redevelopment is the most sustainable approach to repurpose the site.
Redevelopment inherently is more economically challenging, but it reduces
impact on the landscape which is at the heart of our vision.
»To be good stewards of the land. While we understand that our spa elements
will require variances from your standards, our design philosophy is to use
the natural features of the site as our foundation. A guiding tenet of our
design approach is to lightly touch grades and vegetation for placement
of spa element, and to minimize impervious surfaces and grading area to
maintain and support slope areas. Physical spa improvements are planned
to incorporate pervious surfaces, pier-supported pavilions connected via
ADA accessible walking paths scaled below the treeline, and revegetation
to maintain the integrity of the City’s vision for the wooded slope areas
surrounding the site.
To work with the land, not against it . . . the
site is the foundation of the experience.
Page 81 of 188
9
## SUPPORTING & ENHANCING CHASKA’S MISSION
## To be the Best Small Town in Minnesota
We fell in love with Chaska the first time we visited the Oak Ridge site and could
immediately see the potential for creating a unique hospitality asset in such a prime
location. Redeveloping such a large vacant asset like the Oak Ridge Conference
Center and Hotel is a daunting task, but we see the opportunity to create something
special that reinforces Chaska’s commitment to excellence.
## Chaska’s Core Strategies
To be the best, sometimes you have to think outside the box...this is especially true
for the Oak Ridge site. Because the Oak Ridge Hotel and Conference Center was
purpose built for a corporate retreat, redevelopment is challenging and expensive
which is why we believe repurposing it has been unsuccessful in the past.
To make this a viable hospitality site, it needs to have something compelling to draw
guests from the greater region. Our strategy is to add the Nordic Spa to the site to
create a wellness destination which we believe fits Chaska’s character, mission and
guiding core strategies. Repurposing the building and facilities is the sustainable
choice, and since the redevelopment retains the property’s established hospitality
use and leverages previously planned infrastructure, we anticipate that the roadway,
approved utility and stormwater systems are appropriately designed to support our
redevelopment plan, which we will verified through the detailed plan development
phase. The redevelopment is anticipated to generate substantial economic benefits
including increased tourism, new employment opportunities, expanded local spending,
enhanced tax revenues and renewed activity at an important gateway property within
the community.
## NEIGHBORHOOD MEETING SUMMARY
Representatives from the Scandvik team held an Open House on June 24, 2026 from
6:00 – 9:00 PM. Individual letters were sent to adjacent property owners using the
mailing list provided by the City. While no one attended the Open House, Scandvik
received follow-up communication for a neighboring property after the meeting. The
discussion focused on understanding the project and potential redevelopment. No
formal objections to the redevelopment project have been received by our team.
Page 82 of 188
10
## CONTEXTUALISM &
## UNDERSTANDING OF PLACE
The Scandvik team has completed extensive preliminary due diligence to explore and understand
the opportunities and challenges of the Oak Ridge site. Repositioning and redevelopment of the
subject property will take significant investment because the existing building and its position on
the site essentially prescribe where other exterior improvements can be constructed. To that end,
it is essential for us to not only understand and evaluate the existing improvements and natural
environmental characteristics, but also to evaluate the improvements in relation to the approved
Planned Development for the larger area including the multi-family residential and Costco
developments completed in recent years. The following analysis and supporting graphics describe
the site and how we believe we can unlock its potential to become a truly unique destination and
an upscale asset to the community and larger region.
## EXISTING CONDITIONS & SITE SNAPSHOT
## Owner
## RCS-RCA Oak Ridge LLC
## Land Use
## Mixed Residential
## Proposer
## Scandvik Hotels
## Zoning
## Planned Development
(Resolution 2022-75)
## Project Address
## 1 Oak Ridge Drive, Chaska,
## MN 55117
## Lake Frontage/
## Shoreland
## McKnight Lake
## Lot Description
## Lot 1, Block 1 Oak Knoll
## Second Addition
## Building Size
(gross)
171,000 SF on three floors
## PID
304730010
## Building
## Footprint Size
## 70,766 SF
## Gross Site Area
~ 22.05 Acres
## Stormwater
## Pond Area
116,465 SF (~2.67 Ac.)
Page 83 of 188
11
## EXISTING CONDITIONS (EXHIBITS 1 AND 2)
As referenced throughout this narrative, the existing site is developed with the Oak Ridge Hotel &
Conference Center. The structure was originally built as a corporate retreat and was constructed
on the west half of the site to leverage views and connections to McKnight Lake. The parcel is
irregular in shape and the west, north and portions of the northeast are bounded by McKnight
Lake and the City’s designated wooded steep slope areas. McKnight Lake and the adjacent wooded
slope areas provide a unique and partially secluded feeling particularly lakeside of the building and
improvement areas.
The existing building was constructed in 1989 and has a building footprint of approximately 70,766
square feet. The building is three-stories and is designed with a central core that divides the private
rooms (north wing) from the conference facilities (south wing). The building is accessed from a
central shared driveway that has a drop-off/check-in loop in front of the main entrance. Connected
to the driveway and located north of the building is a surface parking lot that has been partially
removed as part of the master development of the adjacent multi-family and Costco properties.
A new regional stormwater pond was recently constructed north of the building and comprises
approximately 116,465 square feet (~2.67 Acres) of the lot area. The stormwater pond size and
design were approved as a part of the 2022 Building and Site Plan approval process to manage
stormwater from the increased impervious surface coverage created by the Costco, internal road
network and surface parking lots. During the 2022 process, the Hotel and Conference Center were
vacated, and the building and site have remained vacant since. Because the operation ceased as the
planned development process commenced certain assumptions were made within the approved
design plan for the subject site.
Included in our exhibits is the 2022 approved Site Plan (Resolution No. 2022-75) for the subject
site which shows the improvements planned for immediate or future construction. As shown in
Exhibit 3, the stormwater pond has been constructed because it is treating stormwater from the
recent adjacent development as well as the subject site. While the new surface parking lot has not
been constructed, it has been designed with an adequate number of parking stalls to support the
building if used for a hotel and conference center, and the parking lot design was used for the
stormwater calculations that are the basis of the stormwater pond design.
Page 84 of 188
12
## SITE FORCES AND FEATURES (EXHIBIT 2)
Redevelopment of the Oak Ridge property is a complex undertaking given the various site
conditions as demonstrated by the existing conditions. As shown on Exhibit 2, we have categorized
the forces and features impacting the site and redevelopment potential into three main categories:
## Prominent Site Force 1: Natural Resources and Environment
»The project parcel is irregular and contains more than 3,000 feet of lake frontage on
## McKnight Lake
»Land side of the lake the topography slopes steeply upwards at grades in areas exceeding
18%.
»The area within the 18% steep slope area varies, but is generally within 150 to 300 feet of
the ordinary high water level per available data.
»At the top of the slope, the City’s steep slope ordinance (Section 15.28.100 subd. C.)
establishes a 30-foot no mow buffer and a 50-foot building structure setback.
## Prominent Site Force 2: Architecture and Scale of Existing Building
»The existing hotel and conference center building has an approximately 70,766 SF
footprint that is generally oriented north-south along the McKnight Lake frontage east
of the structure.
»Portions of the current building encroach into the City’s steep slope building setback.
»The mass and scaling of the aging building requires significant attention to effectively
reposition. Contemplated site improvements, including adequate surface parking to
support the building is essential to be cost effective and meet guest expectations.
»Adaptive reuse of the structure will have the smallest impact on the natural environment,
but comes with significant cost since the building location, size and to a certain extent use
are prescribed.
»The building was constructed in 1989, and the front elevation was designed to reflect an
institutional use rather than an upscale hospitality use.
Prominent Site Force 3: Surrounding Development, Infrastructure, and
## Utility Improvements
Page 85 of 188
13
»The parcel (Lot 1, Block 1) is a part of the Planned Development that includes the adjacent multi-family and Costco uses. Approved utility and
infrastructure plans were developed as a Master Plan and certain roadways, utilities and infrastructure cross parcel lines.
»The constructed stormwater pond is designed to support regional stormwater management including the subject site, adjacent roadways, Costco
and other impervious surfaces. Our final stormwater design will be completed as part of the next phase of the land use and development process
but we have completed initial due diligence with our civil engineer to ensure that our proposed improvements will comply with all required
stormwater rules and regulations. We are confident that by incorporating pervious/permeable materials and using pier-supported structures
throughout the spa area appropriate connections and stormwater improvements can be made to blend seamlessly into existing infrastructure.
»Storm sewer pipe and connections have been constructed and/or planned to connect the regional pond to adjacent development. The design of
the infrastructure impacts how, where and quantity of impervious surface coverage is permitted under the existing stormwater plan.
»While intend to leverage existing utility improvements and design where feasible, we also understand that upgrades and/or replacements of
existing utility infrastructure may be necessary. We have accounted for this expense in our planning and will complete evaluation of necessary
upgrades as part of the next phase of this process when full designs are prepared.
»An existing walkway cuts through the steep slope area which removed some of the vegetation and modified the slope.
View from front steps of Existing Conference Center
Page 86 of 188
14
## PROGRAMMING
## & PROJECT
## OPPORTUNITY
## DEVELOPMENT
Despite the inherent challenges of redevelopment, we believe that the
site holds significant opportunity if carefully repositioned. At the heart
of our vision is to develop the Scandinavian inspired Nordic Spa which
requires certain site characteristics that are unique to the subject property.
As previously described, the success of the Nordic Spa is dependent on the
ability to create outdoor, private, tranquil, nature immersive spaces for our
guests. Accomplishing these objectives in a populated environment is difficult
without the right site, and we believe that the Oak Ridge property can meet
our vision with the right site development master plan. The following sections
build on the existing conditions and site forces description provided above
and describe our Master Plan for the site which is shown in Exhibits 2 - 6. As
demonstrated through the following proposal, our intent is to use the existing
site facilities and infrastructure wherever possible, to enhance the existing site
improvements through redevelopment, and to create the outdoor Nordic Spa
to achieve an optimum guest experience.
Page 87 of 188
15
## MASTER PLAN
As demonstrated through our Exhibits, our intent is to utilize the existing infrastructure on the site wherever possible. By utilizing existing infrastructure,
the project minimizes the need for new disturbance elsewhere on the site and will maintain its relationship with the other parcels within the planned
development (multifamily and Costco parcels). By utilizing and tying into the approved Planned Development from 2022, we will reduce our infrastructure
costs while improving overall site efficiency.
The only exterior expansion not currently addressed within the PD is the proposed Nordic Spa. The Concept Plan for the Nordic Spa is summarized in
the following figure. A summary of conceptual interior programming is provided on the following pages (however, please note, interiors are subject to
change once we complete full building due diligence).
## The Buffers
At top of bank there are two buffers:
•30’ Treed buffer steep slope
buffer
•50’ Treed steep slope building
setback
## Light Touch Construction Strategy
•Pier Supported structures in
slope areas
•Reduced soil disturbance
•Lower long term erosion risk
Working with the Land, Not against it.
•Minimal cut & fill strategy
•Preserving natural slope integrity
•Distributed design vs single heavy
structure
## Locations
Areas (ft2)Perimeter (LF)
## Hot Pools
Pool 1
849148
Pool 2
513114
Pool 3
818143
## Total
2,180405
## Cold Pools
Pool 1
396
Pool 2
389
## Total
785
## Saunas
Sauna 1
280
Sauna 2
154
Sauna 3
280
Sauna 4
280
## Total
994
## Outdoor Rest
## Rest Area 1
238
## Rest Area 2
242
## Rest Area 3
531
## Rest Area 4
298
## Rest Area 5
755
## Total
2,064
## Buildings
## Building Footprint
## Entrance Pavillion
2,402
## Pavillion Bridge
304
## Mid Building
630
## Far Building
769
## Total
4,105
## Landscape
23,412Capacity
## Paths
6,324350
## See Exhibit 6. Nordic Spa Concept Plan (Attachments)
## LEGEND
## RELAXATION PAVILIONS
## WARM WATER POOLS
## COLD WATER POOLS
## SAUNA STRUCTURES
## FOOT PATH (PERMEABLE)
## FIRE PITS LOUNGE AREA
Page 88 of 188
16
## MASTER PLAN
## CONCEPT SPACE PROGRAM
»All spaces are within the existing building footprint except the proposed exterior spa area.
## LEGEND
## BACK OF HOUSE
## AMENITIES
## HOTEL SUITES
## MAIN LOBBY
## KITCHEN
## RESTAURANT
## ADMIN
## CONFERENCE/
## EVENT SPACE
## SPA FACILITY
## EXPANSION SPACE
2
## BASEMENT LEVEL
## LEVEL 1
## LOWER LEVEL
## LEVEL 2
## MAIN LEVEL
## LEVEL 3
## UPPER LEVEL
## LEVEL 4
Page 89 of 188
17
To that end, our intent is to:
## Leverage Existing Improvements and Entitlements
»Remodel and utilize the existing facility in its current footprint. By
utilizing the existing facility footprint, the intensity and capacity of the
building/site should remain consistent with the approvals granted to
the parcel through the Building and Site Plan approvals in Resolution
2022-75. As such, we plan to use the approved plans to minimize costly
re-engineering of this site including:
»Install and construct the approved surface parking per Building and
Site Plan approvals (Resolution 2022-75). If the plan is followed, 306
parking spaces will be constructed to support the new hotel, conference/
gathering spaces, restaurant and Nordic Spa uses.
»Connect into and use stormwater infrastructure as designed and planned
for within the Building and Site Plan approvals (Resolution 2022-75).
»Maintain existing driveways and access points to the site. Redeveloping
the site for a hospitality use is consistent with the use studied in the
traffic study, so we know that the access drives, intersections, and other
transportation improvements should perform adequately.
»Install trail/sidewalk connections per the approved plans. This will
provide a connected pedestrian network throughout the full planned
development area that includes the adjacent multi-family, Costco and
proposed project site.
## DS
## D
## S
## D
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## D
## S
## DS
## D
## S
## DS
## D
## S
## D
## S
## DS
## DS
## DS
## DS
## D
## S
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## D
## S
## D
## S
## D
## S
## D
## S
## ADA
## T
## OAK RIDGE COMMONS
## LEGEND:
## LANDSCAPE SCHEDULE:
## LANDSCAPE REQUIREMENTS:
## TREE CALCULATIONS:
## L-2.2
## LANDSCAPE PLAN - VIEW 2
Page 101 of...
7.J. Adopt Resolution 2022-75, Approving...Packet Page 399 of...
## LEGEND
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## See Exhibit 3. Approved Landscape/Site Plan
Page 90 of 188
18
Respect, but integrate Nordic Spa Improvements within
## the Open Space, Buffer and Slope Areas
»Development of the Nordic Spa is a critical component of our Project
and will drive the successful redevelopment of the site. As previously
described, it is essential for the spa areas to be integrated into the
lake side of the existing building given the surrounding suburban
development fabric and location of the existing building and approved
site improvements (see Site Forces Exhibit).
»The proposed concept plan is intended to preserve the functional
purpose of the City’s wooded steep slope ordinance by minimizing
grading, maintaining natural drainage patterns, reducing soil
disturbance, preserving existing vegetation where practicable and
healthy, and incorporating restoration and revegetation within
previously disturbed or degraded areas.
»The encroachment into the required setbacks will impact portions of
the buffer, however, the redevelopment also creates an opportunity
for a comprehensive landscape restoration strategy, including invasive
vegetation management, selective revegetation, erosion-control
improvements and long-term landscape stewardship that has not
occurred while the property has remained vacant.
»We understand that development within this area requires a variance
from the City’s steep slope ordinance and that full consideration of the
variance request will occur as part of subsequent steps for the Planned
Development process. However, we understand that for purposes of
evaluating this Concept Plan it is important to demonstrate how we
arrived at the proposed location to site the Nordic Spa within the
buffer and steep slope areas. The following analysis is provided to
demonstrate our evaluation:
## See Exhibit 1. Existing Conditions
Page 91 of 188
19
## Site Constraint Analysis
»The existing improvements, approved PD improvements and natural resource protection areas
constrain the developable areas. As shown in Exhibit 4, the existing site improvements including
the hotel/conference center facility, driveways and roadways, and the approved improvements
including surface parking lot and stormwater ponds are shown in gray and comprise approximately
80% of what would be considered “developable” areas. Further challenging the site, are site lines
and/or visual access to nearby improvements including multifamily uses and Costco which impact
potential spa locations.
»The City’s environmental ordinance requirements further exclude the protected steep slopes and
buffer areas from the buildable calculation. When the improvements and environmental protection
areas are combined, nearly 91% of the site is occupied or prohibited from development.
»The available, or undeveloped areas, are shown in Exhibit 5 in green. These areas are generally
small patches of green space interwoven with the surface parking lot or at the entrances and do
not provide adequate land area to site the Nordic Spa.
»The location of the existing building near, and in some areas within, the required buffer setbacks
essentially eliminates all potential for meaningful, private, outdoor improvements without a
variance. As such, instead of avoiding all potential encroachment our strategy became evaluating
and identifying potential spa areas that would have the least amount of adverse impact on the
environmental systems.
920
93 0
910
940
950
960
970
980
990
1000
980
93 0
980
960
940
970
940
920
950
920
920
950
950
950
960
93 0
970
93 0
940
950
940
950
920
93 0
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 92 of 188
20
## NORDIC SPA PLACEMENT EVALUATION
Our site constraint analysis demonstrated that there is no reasonable location on the property capable
of accommodating the proposed Nordic Spa facilities in an operational location without some level of
encroachment into the steep slope areas and required buffer. We evaluated several potential areas, and
selected three areas with the most potential.
»Location 1: Surface Parking Lot Area. We explored placement of the spa facilities where the approved
parking lot is located. The spa could meet portions of the environmental setback requirements,
however, would still encroach into the buffer setback areas. Spa placement would also require
reworking of the surface parking lot and stormwater management plans that have already been
approved. Structured parking in this location is cost-prohibited given the amount of investment
required to redevelop the existing building and a reduction in parking will not meet anticipated
parking demand. As shown in the site forces exhibit, siting the Nordic Spa in this location is near
the hotel guest rooms and visual access to parking from the spa improvements does not meet the
privacy requirements of our guests. For these reasons, this location was ruled out from our design
process.
»Location 2: Lake Side of Existing Building North Location. The first lake side area considered is adjacent
to the existing building, on the north end of the campus (See diagram). This area requires a
variance from the environmental ordinances, and our efforts in exploring any lake side potential
included focusing on:
• Areas adjacent to existing site development;
• Areas influenced by previous site improvements;
• Areas near existing infrastructure;
• Locations that would require lower levels of vegetation disturbance;
• Locations capable of supporting spa improvements with minimal grading;
• Areas where natural drainage characteristics could be maintained.
This location is connected north of the existing patio/gathering spaces on the campus and is
in an area that has some human disturbance, but slopes off more quickly than the southerly
location considered. It is near existing infrastructure, including water supply and the exterior patio
improvements. However, the setback to the lake is less than the southerly location explored and
based on the canopy identified in the aerial photography appears to be more heavily wooded. For
these reasons, this location was determined not to be the preferred location.
920
93 0
910
940
950
960
970
980
990
1000
980
93 0
980
960
940
970
940
920
950
920
920
950
950
950
960
93 0
970
93 0
940
950
940
950
920
93 0
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 93 of 188
21
»Location 3: Lake Side of Existing Building South Location. After evaluation, we determined that the
most viable location for the Nordic Spa improvements is lake side of the existing building towards
the southern end of the building. A key objective of the planning process was to identify portions
of the site that are capable of accommodating the spa development with the least environmental
impact. Additionally, we focused on finding an appropriate location where the Nordic Spa
improvements would be accessible, meet ADA standards and allow for the development of the
small pier-supported pavilions that would blend seamlessly into the surroundings. Based on the
above factors (adjacent to existing development, influenced by previous disturbance, near existing
infrastructure, etc.), we selected Location 3 as the most viable and we believe that with careful
development it can provide the immersive, natural experience our guests will expect. The proposed
location is mindful of:
• Mature tree canopy. We understand that any improvement lake side (west) of the existing
building will require a variance from the wooded steep slope ordinance, and will require
some tree removal. Preservation of the mature tree canopy to the greatest extent possible
is a key driver in our location selection.
• Protection, and Setback from Shoreland Area. The area selected for the spa has a great setback
from the Ordinary High Water Level (OHWL) than other potential lake side site areas.
Finding any area with the greatest setback was important to ensure that the water resource
is protected.
• Grades and Slope Integrity. We understand that development within the sloped area requires
flexibility from the City’s ordinance. Maintaining the integrity of the slope is key to our
development plan, and we intend to reintroduce vegetation once spa improvements are
constructed, to stabilize slope areas through various methods of retention and to develop
the spa improvements parallel to grades to reduce cut-and-fill required to develop the
Nordic Spa features.
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
1
2
3
Page 94 of 188
22
## SUMMARY OF DEMONSTRATED PRACTICAL DIFFICULTIES
As previously noted, we understand that our proposed Nordic Spa location will require a variance from the City’s wooded steep slope ordinance. While this
Concept Plan application does not provide the full variance analysis that we expect to accompany the next phase of this process, we offer the following
summary to aid in your consideration of our request.
The Standards to demonstrate “Practical Difficulties” as established by the City’s Variance Application are provided below, with a brief summary of our
response:
»...means the property owner proposes to use the property in a reasonable manner not permitted by this Ordinance...”
• Scandvik’s Response: As demonstrated by Figures 4 and 5, and described within the site constraint analysis, because the site is developed
with existing and planned improvements there is not contiguous area available to site the proposed Nordic Spa and meet all required setbacks.
We believe that the Nordic Spa use is a reasonable use within the Planned Development, but without flexibility from the strict interpretation
of the ordinance there is no suitable location to site the outdoor spa improvements. Further, the outdoor spa improvements require a certain
level of privacy and positioning them in the least impactful way by incorporating permeable features, low-impact structures and revegetation
achieves the intent of the ordinance, despite the necessity to obtain a variance.
»“...the plight of the landowner is due to circumstances unique to the property not created by the landowner...”
• Scandvik’s Analysis: As previously described throughout this narrative, the existing hospitality structure was constructed in the 1980’s and
recent adjacent development associated with the approved Planned Development established the site conditions that now exist. This request
is different than any other request for variance given that redevelopment and repurposing of this large, obsolescent structure is dictating
the placement of any viable external improvements. The site characteristics are the definition of unique as there are no other similarly
positioned properties in the City...and the project Proposer did not create this conditions - yet we are trying to work with it.
»“...if granted, will not alter the essential character of the locality...”
• Scandvik’s Analysis: Our goal is to create an experience that not only respects the natural environment, but enhances it. Our whole concept
is to embrace, and full integrate the space improvements with the least amount of impact to the steeps slopes and natural site characteristics.
If we are permitted to develop our concept, we will enhance and support the essential character of surroundings - including the lakeside
experience.
»“...Economic considerations alone shall not constitute practical difficulties...”
• Scandvik’s Analysis: The practical difficulties associated with this request are tied most closely with the existing hospitality improvements,
planned improvements and surrounding development. The internal and external site forces are the main factor in establishing the practical
difficulties of following the strict application of the ordinances, which are not economic considerations alone.
Page 95 of 188
23
## SCANDVIK HOTEL, NORDIC SPA DESIGN & ARCHITECTURE
The architectural vision for Scandvik at Oak Ridge is centered on the belief that great hospitality begins with a
meaningful connection to place.
Through Scandinavian-inspired design, integration with nature, thoughtful material selection, and a strong
commitment to environmental stewardship, the project seeks to create a destination that feels both timeless and
uniquely connected to its surroundings. The result will be a hospitality and wellness destination where architecture,
landscape, and experience come together to create a place that reflects the values of both Scandvik and the City of
Chaska. A summary of our architectural vision is provided:
»Architecture Inspired by Place. The architectural vision for Scandvik at Oak Ridge is rooted in a simple
philosophy:
Great architecture should feel as though it belongs to the landscape in which it is built.
The proposed redevelopment seeks to create a hospitality destination that is timeless, welcoming, and
deeply connected to the natural character of the property. Rather than competing with the surrounding
woodland, shoreline, and topography, the architecture is intended to complement and enhance these natural
features. The result is an environment that feels authentic to the site, respectful of its setting, and reflective
of the Scandinavian-inspired wellness experience that defines the Scandvik brand.
»Scandinavian Design Principles. The design approach for the redevelopment and development draws inspiration
from contemporary Scandinavian architecture and hospitality traditions. These traditions include:
• Simplicity and clarity of form
• Natural materials
• Human-scale design
• Warm and welcoming spaces
• Strong indoor-outdoor connections
• Thoughtful use of natural light
• Connection to landscape and nature
• Timeless rather than trend-driven design
Page 96 of 188
24
The architectural language seeks to create spaces that feel comfortable, restorative, and enduring. The focus
is not on creating landmark structures, but environments that encourage people to slow down, connect,
and experience the surrounding landscape.
»Hospitality through Experience. The architecture of Scandvik at Oak Ridge is designed to support a philosophy
of experience hospitality. Every space should contribute to how guests feel not simply how the property
functions. The design seeks to create a series of memorable moments throughout the guest journey,
including:
• Arrival and first impressions
• Views toward nature and water
• Gathering around fire and wellness experiences
• Transitions between indoor and outdoor spaces
• Opportunities for quiet reflection
• Shared social experiences
• Seasonal engagement with the landscape
Rather than treating architecture as an isolated object, the project views architecture, landscape, and guest
experience as a single integrated system.
»Integration with the Landscape. One of the defining characteristics of the project is the intentional integration
of architecture with the property’s natural setting. Buildings and outdoor wellness amenities are positioned
to work with existing topography, mature vegetation, and natural views. Design objectives include:
• Preserving significant tree canopy
• Minimizing visual impact
• Maintaining natural sight lines
• Creating framed views toward McKnight Lake
• Utilizing natural grades wherever possible
• Reducing the appearance of building mass
• Blending architecture into the woodland setting
The goal is to ensure that visitors experience the landscape first and the architecture second.
Page 97 of 188
25
»Nordic Spa Architecture. The Nordic Spa is envisioned as a collection of smaller wellness experiences
integrated throughout the landscape. Rather than a single large facility, the concept utilizes a distributed
approach consisting of pools, pathways, pavilions, sauna structures, relaxation spaces, and gathering areas.
This approach provides several benefits:
• Reduced visual impact
• Reduced grading requirements
• Better integration with topography
• Stronger connection to nature
• Enhanced guest experience
• Preservation of existing site character
The architecture of these structures is intended to remain secondary to the landscape while providing
warmth, comfort, and shelter throughout all four seasons.
»Woodland Pavilions & Wellness Structures. Where appropriate, wellness structures may be designed as lightweight
pavilions integrated within the woodland environment. These structures are envisioned as extensions of the
landscape rather than conventional buildings. Design inspiration includes:
• Pier-supported wellness pavilions
• Scandinavian forest lodges
• Nature-integrated gathering spaces
• Elevated structures responding to existing grades
• Simple, natural forms and materials
While final design of these structure is not complete, they will fully comply with all building codes and
meet ADA accessibility requirements. The heights will be carefully determined to blend seamlessly with the
landscape and are planned to remain below the treeline. These smaller structures allow wellness experiences
to be distributed throughout the property while minimizing environmental disturbance and preserving the
character of the site.
Page 98 of 188
26
»Light Touch Construction Strategy. One of the defining characteristics of the proposed Nordic Spa concept is
its distributed and low-impact design approach to respect the surrounding landscape and natural resources.
Rather than constructing a single large building that would require extensive grading and site alteration, the
spa consists of a collection of smaller wellness elements integrated throughout the landscape. As shown
on our Concept Plan, elements include:
• Thermal pools
• Cold plunge pools
• Sauna facilities
• Wellness pavilions
• Relaxation spaces
• Woodland pathways
• Gathering areas
Where site conditions are acceptable, certain structures may utilize elevated or pier-supported construction
techniques that allow development to adapt to existing grades rather than requiring significant alteration
of the landscape. This approach will reduce soil disturbance, tree removal, retaining wall requirements,
extensive cut-and-fill, and it mitigates long-term erosion risk. Our design philosophy can be summarized
as adapting development to the land rather than adapting the land to the development.
»Material Palette. The architectural palette is intended to reflect the natural environment and create a timeless
aesthetic. Materials under consideration include:
• Natural wood
• Stone and textured masonry
• Glass
• Steel accents
• Natural landscape materials
• Warm interior finishes
The use of authentic materials helps create a strong connection between the built environment and the
surrounding landscape. Material selections will emphasize durability, sustainability, and long-term quality.
Page 99 of 188
27
»Lighting Strategy. Lighting is intended to enhance the guest experience while protecting the character of the site.
The lighting approach will focus on:
• Warm, low-level illumination
• Pedestrian-oriented lighting
• Dark-sky principles
• Wayfinding and safety
• Accent lighting for key gathering spaces
• Preservation of nighttime views
Lighting should support the experience of nature rather than overwhelm it. The goal is to create a welcoming
environment while respecting neighboring properties, wildlife habitat, and the natural setting.
»Four-Season Design. The architecture has been conceived as a true four-season destination. The experience
of the property will evolve throughout the year. Spring introduces renewal and outdoor activation. Summer
emphasizes landscape, recreation, and community gathering. Autumn celebrates the site’s woodland character
and changing colors. Winter transforms the property into a uniquely Nordic wellness experience where thermal
bathing, sauna culture, fire features, and snow-covered landscapes become part of the guest experience.
The architecture is intended to support and celebrate each season rather than resist it.
Page 100 of 188
28
## BRAND POSITIONING &
## DEVELOPMENT TIMELINE
## TRIBUTE PORTFOLIO POSITIONING
The redevelopment is envisioned as a Tribute Portfolio hotel within Marriott's collection of independent and
character-driven properties. This positioning allows the property to maintain its unique identity while benefiting
from the global reach and distribution capabilities of Marriott International.
The architectural vision aligns with the Tribute Portfolio philosophy by creating a destination that is distinctive,
authentic, and rooted in its local setting. Rather than feeling interchangeable with other hotels, Scandvik at Oak Ridge
seeks to create a sense of place that is uniquely connected to Chaska and the surrounding landscape.
## BRINGING OUR VISION TO REALITY
The redevelopment of Oak Ridge is envisioned as a collaborative process between the project team, City staff,
Planning Commission, City Council, consultants, and community stakeholders. The purpose of the Concept Plan
Application is to establish a framework for continued refinement of the project while obtaining feedback regarding
site planning, environmental considerations, infrastructure, parking, and entitlement requirements.
The project team recognizes that redevelopment of a property with significant environmental features requires a
thoughtful and deliberate review process.
The following timeline reflects the anticipated progression of the project through planning, entitlement, design,
permitting, and construction.
## »Summer 2026: Concept Plan Review
## »Fall 2026: Preliminary Planned Development Review & Variance Application
## »Winter 2026/2027: Final Planned Development and Development Agreement
»Spring/Summer 2027: Permitting & Contractor Procurement
»Summer 2027 – 2028: Construction /Development:
»2028: Opening & Stabilization
• Final permitting and
contractor procurement
## • Exterior Spa Construction
• Landscape + Integration
## • Hotel Opens
## • Full Nordic Spa Opens
## • Stabilized Operations
Page 101 of 188
## LONG-TERM COMMITMENT
The redevelopment of Oak Ridge represents a long-term investment in the City of Chaska. The project team is committed to working
collaboratively with City staff, elected officials, neighboring property owners, and community stakeholders throughout the planning and
development process.
Through thoughtful design, responsible environmental stewardship, and continued community engagement, Scandvik at Oak Ridge
seeks to create a destination that contributes lasting value to the community for generations to come.
Page 102 of 188
## EXHIBIT 1. EXISTING CONDITIONS
## Sources: Metropolitain Council, MNDNR
## LEGEND
## SITE
## CITY TRAIL
## PWI CLASSIFICATION
## PUBLIC WATERBASIN
## NO SHORELAND CLASS ASSIGNED
## PUBLIC WATERCOURSE
## 300FT PUBLIC
## WATERCOURSE BUFFER
## NWI CLASSIFICATION
## OPEN WATER
## EMERGENT WETLAND
930
920
940
950
910
960
970
980
980
950
960
920
950
940
950
950
930
920
960
970
Page 103 of 188
## EXHIBIT 2. SITE FORCES
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## I
## T
## Y
## T
## R
## A
## I
## L
## LEGEND
## PROPOSED SPA LOCATION
## PROPOSED/EXISTING STORM SEWER
## DIRECTION OF VIEW IN REFERENCE PHOTO
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
1
2
3
4
5
6
8
#
9
10
11
12
13
14
15
16
7
1
4
9
12
10
13
14
11
1516
56
78
23
## Sources: Metropolitain Council, MNDNR
Page 104 of 188
## EXHIBIT 3. APPROVED LANDSCAPE/SITE PLAN (RESO. 2022-75)
## DS
## DS
## D
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## DS
## ADA
## T
## OAK RIDGE COMMONS
## LEGEND:
## LANDSCAPE SCHEDULE:
## LANDSCAPE REQUIREMENTS:
## TREE CALCULATIONS:
## L-2.2
## LANDSCAPE PLAN - VIEW 2
Page 101 of...
7.J. Adopt Resolution 2022-75, Approving...Packet Page 399 of...
Page 105 of 188
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## IT
## Y
## T
## R
## A
## I
## L
## EXHIBIT 4. SITE CONSTRAINTS & PROPOSED SPA LOCATION
## LEGEND
## LOCATION #1
## LOCATION #2
## LOCATION #3: SELECTED
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
## Sources: Metropolitain Council, MNDNR
1
2
3
1
2
3
Page 106 of 188
920
930
910
940
950
960
970
980
990
1000
980
930
980
960
940
970
940
920
950
920
920
950
950
950
960
930
970
930
940
950
940
950
920
930
960
970
v
## 164,545 S.F.
## MCKNIGHT
## LAKE
## BIG WOODS
## LAKE
## EXISTING
## BUILDING
## REQUIRED
## PARKING
## EXISTING
## STORMWATER
## POND
## PROPOSED SPA
## LOCATION
## E
## XIS
## T
## I
## N
## G
## C
## IT
## Y
## T
## R
## A
## I
## L
1
2
3
## EXHIBIT 5. BUILDABLE AREAS + SPA LOCATIONS EVALUATED
## LEGEND
## LOCATION #1
## LOCATION #2
## LOCATION #3: SELECTED
## BUILDABLE AREAS
## UNBUILDABLE AREAS
## STEEP SLOPES
## STEEP SLOPE BUFFER AREA
## STEEP SLOPE BUILDING SETBACK
## EXISTING + REQUIRED FEATURES
~125’
~200’
## Sources: Metropolitain Council, MNDNR
1
2
3
Page 107 of 188
## EXHIBIT 6. NORDIC SPA CONCEPT PLAN
Page 108 of 188
31 July 2026
## City of Chaska
## One City Hall Plaza,
## Chaska, MN 55318
## Att’n: Ms. Elizabeth Hanson, AICP
## City Planner
## Dear Ms. Hanson;
Re: Scandvik – 1 Oak Ridge Drive – Concept Plan –
## Incomplete Submittal Letter and Additional Items Needed
## Response
We are in receipt of your letter dated 21 July 2026 concerning your commentary on our proposed Concept Plan
submitted on July 7, 2026. In response to your preliminary review for completeness, we have addressed the items
as follows:
## Concept Site Plan
Wood steep slopes and setbacks are defined by the drawings contained at Exhibit 1.
We note that the only impermeable surfaces are the pools, which total approximately 2,803sf. All paths are
permeable, and all buildings are elevated above the natural grade. Storm water from the pools will be redirected
to the adjacent land and can contain water in case of heavy rainfall. Overflow is diverted into the wastewater
system associated with the existing building.
Setbacks from the water line is 200 feet.
## • Narrative/Concept Plan
• “Previous and existing projects elsewhere similar to what is proposed (completed or not
completed by applicant) – provide pictures if possible”
This information is contained at Exhibit 2. For convenience we are providing a summary of
precedent projects herein.
Page 109 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 2
## Tier I – Nordic Wellness Resorts
## · Everwild Nordic Spa & Hotel, Canmore, Alberta
## · Nordic Spa at Kananaskis, Kananaskis, Alberta
## · Nordic Spa at Alyeska, Girdwood, Alaska
## · Sparking Hills Resort – KurSpa, Vernon, British Columbia
## Tier II – Nordic Spas
## · Scandinave Spa Whistler, Whistler, British Columbia
## · Scandinave Spa Blue Mountain, Blue Mountain, Ontario
## · Thermea by Nordic Spa - Nature, Winnipeg, Manitoba
## · Vetta Nordic Spa, Oro Medonte, Ontario
## · Pacific Mist Spa at Kingfisher Resort, Courtenay, British Columbia
## · Havn Floating Nordic Spa, Victoria, British Columbia
## · SKA Thermal Spa, Calgary, Alberta
## · Embrace North, Minneapolis, Minnesota
## · Watershed Spa, Minneapolis, Minnesota
## · Portal Thermaculture, Minneapolis, Minnesota
## Tier III – Hotel Spas
## · Ivy Hotel and Anda Spa, Minneapolis, Minnesota
## · Hewing Hotel, Minneapolis, Minnesota
## · Four Seasons, Minneapolis, Minnesota
## · Westin Edina Galleria, Edina, Minnesota
## · Omni Viking Lakes Hotel, Eagan, Minnesota
• Site Location alternatives explored, specifically:
i. Location 1;
1. More explanation of why the structured parking does not work financially and
physically on site? What presume costs and/or physical detriments are known?
What views, amenities, layouts (etc.), cannot be achieved in Location 1 that the
preferred, Location 3 provides?
2. Show the proposed layout for Location 1.
1. The cost of parking is prohibitive ranging between $28,000 to $35,000 per stall.
It is anticipated that comprehensive design would require approximately 100
stalls to be placed in a structure, with a cost between $2.8mm to $3.5mm
making the overall economically challenging, and therefore no longer attractive.
While it is understood that “economic considerations alone shall not constitute
practical difficulties” the financing of this project is highly complex with limited
flexibility to increase the capital cost by a further 6% to 8%. Furthermore, the
construction of a new structure would block the view from the entrance to the
site which presently overlooks McKnight Lake.
2. The proposed layout for Location 1 is shown at Exhibit 3, however a portion of
that layout is provided here for convenience.
Page 110 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 3
ii. Location 2;
1. Show the proposed layout for Location 1.
1. The proposed layout for Location 2 is shown at Exhibit 3, however a portion of
that layout is provided here for convenience.
iii. Location 3;
1. How does the proposed encroachment meet ‘practical difficulties’ as defined in
Variance application?
2. How does the proposed encroachment differ from other encroachment requests,
and why should it be treated differently than other encroachment requests.
1. The “practical difficulties” are defined as: “....the property owner proposes to use
the property in a reasonable manner not permitted by this Ordinance, the plight
of the landowner is due to circumstances unique to the property not created by
the landowner, and the variance, if granted, will not alter the essential character
of the locality. Practical difficulties also include, but is not limited to, inadequate
access to direct sunlight for solar energy systems.
Economic considerations alone shall not constitute practical difficulties......”
The proposal is to locate an essential element of the Nordic Spa experience on
suitable lands. As noted above, three sites were reviewed, the first being on
lands which are not on the slope but intrude into the required parking. While
economic considerations alone do not constitute practical difficulties, the capital
cost of construction of the necessary parking structure would render the project
uneconomic and therefore abandoned. Reduction in parking would impact on
the economics of the potential turnover of visitors, thereby also rendering the
project uneconomic and therefore abandoned.
The second location created overview problems from the hotel rooms into the
spa, which relate to privacy issues. There is also less land area to develop
Location 2 into the spa and is closer to the water than Location 3 which create
other considerable problems.
This location is also in an area which has been disturbed by the construction of
the hotel as a portion of it is sited in the buffer zone, and there is infrastructure
(domestic waterlines) which are contained within the sloped area.
Page 111 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 4
The sloped area is developed to be accessed from the table lands. Active leisure
use is encouraged within the sloped area as evidenced by the existing stairs and
the pathway at the base of the slope.
2. We are not aware of other specific encroachments of this scale and nature
within the City of Chaska. This is a very specific encroachment request, based
on a unique use, on a site which was developed for a different use. In the
conversion, given the site constraints with parking and the new storm water
pond facility which benefits other portions of the original land holding, we bring
this request as a means by which an adaptive reuse of an abandoned site.
While there is no precedent within the City of Chaska, the City of Minnetonka
has positive guidance on the means of development on steep slopes and
encourages them as an alternative to “conventional flatland development
practices in areas of steep slopes, including the planning of development which
fits the existing topography.
## City of Minnetonka Precedent Guidance
As a precedent, the City of Minnetonka MN permits development on steep
slopes. The principles applied in the Minnetonka ordinance pertaining to such
development provides the following guidance by stating the following:
a) Purpose. The purposes of the standards governing the alteration of steep
slopes are to:
1) preserve steep slopes in essentially their natural state as part of a
comprehensive open- space plan;
2) encourage alternative approaches to conventional flatland
development practices in areas of steep slopes, including the planning of
development which fits the existing topography of the site;
3) minimize grading and cut-and-fill operations consistent with the
retention of the natural character of steep slopes;
4) minimize the short and long-term increase in stormwater water-runoff
and soil erosion problems incurred in the grading and development of
steep slopes;
5) preserve the predominant views, both from and of the steep slopes;
and
6) preserve the variety of topography which exists in the city and is an
integral part of this city’s identity.
The entire ordinance is excerpted and included at Exhibit 3.
• Summer operating hours – how does the outdoor use change during the summertime?
Summer operating hours will be 9:00AM to 9:00PM, and the outdoor use will not change during the
summertime.
Page 112 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 5
• Addressing city comments (in red) in the Concept Plan Project Narrative (attached)
1. Include the size of the proposed outdoor Nordic spa area. (Page 4)
The size of the proposed outdoor Nordic spa area paths, pools and buildings are located at Exhibit 1.
However for convenience, the total pool area is
2. Pier-supported pavilions; building code concerns? Need to be accessible – ADA compliance. How tall are
these structures? (page 8)
The pier supported pavilions will be constructed in accordance with the applicable codes contained within
the Minnesota State Building Code. Access across the entire outdoor space shall be designed in
conformity with the US Access Board guidelines and the Americans with Disabilities Act. The height of the
structures is indicated on the appended drawing at Exhibit 4, however for convenience, the maximum
height is 32.7 feet from the lowest grade point. The height is generated from the lowest grade; therefore,
the actual average grade is considerably less, and in the 25’ range. Except for the main entrance pavilion
the buildings are all one storey, well within the size of a small home.
We have carried out inquiry with a geotechnical engineer familiar with the site, and they have confirmed
that the geological conditions are assumed to be suitable for the construction of the pools, permeable
walkways and pier supported pavilions.
3. Are any utility upgrades contemplated with the new use? Please note that have been multiple watermain
breaks on site and watermain fixes will likely be needed if plans progress....(page 13)
Based on current information, the existing utilities are suitable except for the watermain breaks. A full
assessment of the watermain will be carried out and repairs or replacement effected to the satisfaction of
the authorities having jurisdiction.
4. How will connection to the existing SW pond be routed from the proposed impervious area? And is there
sufficient capacity in the existing pond for the new impervious areas? (page 13)
The connection to the existing Storm Water Pond appears to be on the east side of the site. Impervious
surfaces will be minimized, and water diverted to overland surfaces improved to accommodate the
additional flow of surface water. The pier supported structures will have a minimum impact on storm
water due to their elevated nature. A storm water management and drainage design will be submitted for
review to the satisfaction of the authorities having jurisdiction.
5. Provide additional master plan for inside the hotel conference center building. Colorize the areas and how
they will be programmed. (page 15)
The hotel and interior spa areas will be situated in the existing building. The purpose of this application is
to permit the work in the sloped area immediately outside of the existing building. There is a direct
relationship between the interior redesignation and the exterior spa. This is subject to change as the
design and development progress, but the general direction will not place additional program outside of
the existing building.
See attached drawings at Exhibit 5.
Page 113 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 6
6. Show layouts considered for Locations 1 & 2. (page 19)
Please see attached drawing for alternative layouts at Exhibit 3.
7. Pier-supported pavilions; Building code concerns? How tall are these structures? Will these structure and
Nordic Spa area be ADA compliant/accessible. (page 20)
Please refer to attached drawings for the master plan at Exhibit 7. As noted above, the new facilities shall
conform with the US Access Board guidelines and the Americans with Disabilities Act.
We trust this provides the necessary information as requested in response.
We are also providing a revised project narrative, which has been amended in accordance with the responses.
We look forward to working with the City of Chaska Council and staff to revive this site and bring investment and
tourism to Chaska.
Yours sincerely,
## Scandvik Hotels
## Travis Batting
## Travis Batting
## Founder and President
Page 114 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 7
## Exhibits
Page 115 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 8
Exhibit 1 – Concept Site Plan Related to Elevations and Grading
This drawing indicates the finished floor elevations relative to the terrace level of the existing building be EL 0. We
are therefore showing the elevational siting of the site – we note that the existing elevations have been
maintained.
Page 116 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 9
## Exhibit 1 – Concept Site Plan – Construction at Grade
This drawing indicates the actual sloped areas affected and contained in this application. The work is in areas
where there has been previous work carried out, such as the installation of the domestic watermains. We also
note that there is an existing stairway which provides access from the table lands to the recreational path at the
shore of the lake.
The overall land mass on the sloped lands which is under title is over 386,000 square feet.
The total pool constitutes a total of 2,064 square feet, as noted on page 15 of the original submission. These are
the only areas which truly involve construction with respect to the existing terrain and represents a very small
percentage of the overall land mass.
The permeable paving for rest areas and pathways constitute 6,298 square feet and are set with minimal impact to
the existing grade.
The pavilions are all presently conceptual and constitute 4,106 square feet and are designed not to rest on the
sloped surface but have piers to provide support.
Page 117 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 10
Exhibit 2 – Precedents
This is a list of precedents across North America. For convenience and brevity, the hyperlinks remain active.
## Tier I – Nordic Wellness Resorts
## · Everwild Nordic Spa & Hotel, Canmore, Alberta
## · Nordic Spa at Kananaskis, Kananaskis, Alberta
## · Nordic Spa at Alyeska, Girdwood, Alaska
## · Sparking Hills Resort – KurSpa, Vernon, British Columbia
## Tier II – Nordic Spas
## · Scandinave Spa Whistler, Whistler, British Columbia
## · Scandinave Spa Blue Mountain, Blue Mountain, Ontario
## · Thermea by Nordic Spa - Nature, Winnipeg, Manitoba
## · Vetta Nordic Spa, Oro Medonte, Ontario
## · Pacific Mist Spa at Kingfisher Resort, Courtenay, British Columbia
## · Havn Floating Nordic Spa, Victoria, British Columbia
## · SKA Thermal Spa, Calgary, Alberta
## · Embrace North, Minneapolis, Minnesota
## · Watershed Spa, Minneapolis, Minnesota
## · Portal Thermaculture, Minneapolis, Minnesota
## Tier III – Hotel Spas
## · Ivy Hotel and Anda Spa, Minneapolis, Minnesota
## · Hewing Hotel, Minneapolis, Minnesota
## · Four Seasons, Minneapolis, Minnesota
## · Westin Edina Galleria, Edina, Minnesota
## · Omni Viking Lakes Hotel, Eagan, Minnesota
## Tier 1 Nordic Wellness Resorts
## 1. Everwild Nordic Spa & Hotel (Canmore, Alberta)
## Website:
## Everwild Nordic Spa & Hotel
## 2. Kananaskis Nordic Spa (Kananaskis, Alberta)
## Website:
## Kananaskis Nordic Spa
## 3. Nordic Spa at Alyeska (Girdwood, Alaska)
## Website:
## Nordic Spa at Alyeska
## 4. Sparkling Hills KurSpa (Vernon, British Columbia)
## Website:
## Sparkling Hills Resort & KurSpa
Page 118 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 11
## Tier 2 Nordic Spas
## 5. Scandinave Spa Whistler
## Website:
## Scandinave Spa Whistler
## 6. Scandinave Spa Blue Mountain
## Website:
## Scandinave Spa Blue Mountain
7. Thermëa by Nordik Spa – Nature (Winnipeg)
## Website:
## Thermëa by Nordik Spa – Winnipeg
## 8. Vettä Nordic Spa (Oro-Medonte, Ontario)
## Website:
## Vettä Nordic Spa
Tier II spas are Nordic spas without hotel ownership as part of their business model
or ownership structure. For many of these properties, aspects of hydrotherapy and
thermotherapy are combined with high touch service and luxury facilities and
amenities. These properties range from extensive campus environments, where
guests select unlimited access for a day, to clubs with modest access fees, where
members and guests have access to the services similar to a fitness membership. In
the Nordic day-spa environments, some members avail themselves daily of the
contrast therapy. What all Tier II properties have in common is a primary focus on
programs and facilities that support contrast therapy.
Tier III spas consist of local hotel spas, some of which have added contrast therapy
elements to address market trends. Contrast therapy options are added in addition
to classic spa-treatment offerings, thus attracting a wider range of consumers who
are focused on the health and wellness benefits of a spa. In this category, savvy
hoteliers expand their offerings to attract a wider demographic of customers who
select spa treatments based not only on appearance but also on how they feel. The
emergence of contrast therapy, paired with the aesthetics of skin care, expand the
revenue for the property and the options for guests. To that end, the Four Seasons
in Minnesota has added rooftop Nordic spa treatments to its existing spa menu. The
Nordic Spa component of the operations is operated by a third-party entity, and the
bifurcation is seamless to the guest.
Information as provided for by CBRE.
Page 119 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 12
## Exhibit 3 – Alternate Siting Plans
Page 120 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 13
Exhibit 3 – City of Minnetonka MN Precedent Regarding Steep slopes
Excerpt from the City of Minnetonka, Minnesota Code of Ordinances Section 300.28 Performance Standards
“20. Performance Standards Regulating Steep Slopes.
a) Purpose. The purposes of the standards governing the alteration of steep slopes are to:
1) preserve steep slopes in essentially their natural state as part of a comprehensive open- space plan;
2) encourage alternative approaches to conventional flatland development practices in areas of steep slopes,
including the planning of development which fits the existing topography of the site;
3) minimize grading and cut-and-fill operations consistent with the retention of the natural character of steep
slopes;
4) minimize the short and long-term increase in stormwater water-runoff and soil erosion problems incurred in
the grading and development of steep slopes;
5) preserve the predominant views, both from and of the steep slopes; and
6) preserve the variety of topography which exists in the city and is an integral part of this city’s identity.
b) Standards.
1) The city may require that a property be rezoned and developed as a planned unit development to utilize
flexible development standards to preserve steep slopes.
2) Construction, development, grading, filling, and any other method of alteration may occur on a steep slope
only if they meet the standards of this ordinance and are approved by the city. City approval will be by the city
council, planning commission or city planner, depending on who is authorized to approve the associated
development application.
3) The city will approve steep slope development only if the city can make the findings specified below. In making
these findings, the city will evaluate the extent to which the development meets the design guidelines included
under each finding. It is the intent to require compliance with as many design guidelines as possible, but the city
may choose to not require compliance with every guideline, if the findings are still achieved.
Finding 1. The property is physically suitable for the design and siting of the proposed development. The proposed
development will preserve significant natural features by minimizing disturbance to existing topographical forms.
a. design developments into steep slopes, rather than making significant alterations to the slope to fit the
development:
1. avoid building pads that result in extensive grading outside the building footprint and driveway areas;
2. use retaining walls as an alternative to banks of cut-and-fill, and design and site such walls to avoid
adverse visual impact;
3. allow for clustering with different lot shapes and sizes, with the prime determinant being to maximize the
preservation of the natural terrain;
4. allow flag lots when appropriate to minimize grading;
5. avoid cuts and fills greater than 25 feet in depth; and
6. design grading to preserve the crest of prominent ridges. Buildings may be located on the prominent
ridges, as long as the requirements of this subdivision are met.
b. design streets and driveways that generally follow existing contours, except where necessary for public
safety or to minimize the adverse impacts from traffic:
1. use cul-de-sacs and common drives where practical and desirable to preserve slopes; and
2. avoid individual long driveways, unless necessary to locate the principal structure on a less sensitive area
of the site.
c. concentrate development on the least sensitive portion of the site to maximize the preservation of significant
trees and natural features:
1. preserve sensitive areas by clustering buildings or using other innovative approaches; and
2. maintain sufficient vegetation and design the scale of development so that it does not overwhelm the
natural character of the steep slope.
Page 121 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 14
d. preserve steep slopes that buffer residences from non-residential sources of light and noise.
Finding 2. The development will not result in soil erosion, flooding, severe scarring, reduced water quality,
inadequate drainage control, or other problems.
a. wherever practical, minimize the impervious surface area and maximize the use of the natural drainage
systems:
1. design any new drainage systems away from neighboring properties, away from cut faces or sloping
surfaces of a fill, and toward appropriate drainage facilities, whether artificial or natural. Drainage systems must
comply with the city’s water resources management plan; and
2. use the existing natural drainage system as much as possible in its unimproved state, if the natural system
adequately controls erosion.
b. avoid building on or creating steep slopes with an average grade of 30 percent or more. The city may
prohibit building on or creating such slopes in the following situations:
1. where the city determines that reasonable development can occur on the site without building on or
creating such slopes; or
2. development on such slopes would create real or potentially detrimental drainage or erosion problems.
c. design slopes to be in character with the surrounding natural terrain;
d. use benching, terracing, or other slope-stabilizing techniques for fill, as determined appropriate by the city
engineer;
e. install and maintain erosion control measures during construction in accordance with the current Minnesota
pollution control agency best management practices; and
f. revegetate disturbed slopes as soon as practical after grading to stabilize steep slopes and prevent erosion,
as required by the city.
Finding 3. The proposed development provides adequate measures to protect public safety.
a. limit the slopes of private driveways to not more than 10 percent, unless necessary to minimize excessive
grading. Where the grade exceeds 10 percent, the driveway should have sufficient flat areas at the top and toe to
provide vehicles a landing area and to avoid vehicles slipping onto the adjacent street during icy conditions. The city
may require a driveway turn-around; and
b. provide sufficient access for emergency vehicles to reach the proposed buildings.
4) The city may require that the applicant provide engineering certification, acceptable to the city, that no
excavation or fill will cause any steep slope to become unstable; impose loads that may affect the safety of
structures or steep slopes; interfere with adequate drainage for the site area and the area that drains directly to
the site; obstruct, damage, or adversely affect existing sewerage or drainage; adversely affect the quality of
stormwater runoff; adversely affect downstream properties, wetlands or bodies of water; or cause adverse erosion
or sedimentation.
5) The city may require that the applicant provide certification from a registered engineer that the final grading
was completed in compliance with the approved grading plan.
6) The city may require the applicant to prepare and record a declaration of covenants, conditions and
restrictions, in a form acceptable to the city attorney, providing for property owner maintenance of manufactured
slope areas, acceptance of all risks and liability associated with those areas, and release of the city from all
associated claims.
c) Applicability.
1) This subdivision does not apply to the expansion or reconstruction of an existing structure, where the footprint
of the completed building does not exceed 150 percent of the structure footprint existing on June 23, 1997. The
person wishing to qualify for this exception must:
a. show that the structure existed on June 23, 1997; and
b. undertake the construction pursuant to plans that are approved by the city planner and that provide
adequate surface water drainage, appropriate erosion control, and safe driveway access to adjacent streets.
Page 122 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 15
2) Lots existing on June 23, 1997, are subject to all of the standards in this subdivision, except:
a. the standards may not be applied to lot divisions or subdivisions preliminarily approved within one year, and
finally approved within two years, before June 23, 1997, to the extent that this is prohibited by Minn. Stat. §
462.358, subd. 3c; and
b. the standards may not be used to prohibit development of undeveloped lots finally approved between
December 31, 1991 and June 23, 1997, but the standards may be applied to regulate that development.”
Excerpted from the City of Minnetonka Code of Ordinances July 2026
Page 123 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 16
Exhibit 4 – Elevations
Page 124 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 17
## Exhibit 5 – Interior Diagram
Page 125 of 188
## City of Chaska City Planning
Response to 1 Oak Ridge Drive – Concept Plan – Incomplete Submittal Letter and Additional Items Needed
29 July 2026
Page 18
Page 126 of 188
11 August 2026
## City of Chaska
## Chaska Planning Commission
## One City Hall Plaza,
## Chaska, MN 55318
## Dear Members;
Re: Scandvik – 1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
Addition – Case No. 2026- 17
## Revision
Further to the staff report dated prepared by City Staff for the Chaska Planning Commission meeting of August 12,
2026, we have reviewed in detail the concerns raised by staff. We have carried out the requested exploration of a
revised concept plan which contains the Nordic Spa to eliminate impact to the wooded steep slopes.
We had also reviewed the parking requirements established by staff and will carry out a parking analysis but it is
not anticipated that any reduction in parking would be the result of the analysis. To accommodate the proposed
306 parking spaces, and locate the outdoor spa on Location 1, it would require the construction of a substantial
parking structure. The capital required to construct this facility would render the project uneconomic, and we
would be forced to abandon the proposed conversion.
In lieu we have developed a revised concept plan sets the outdoor spa outside of the wooded steep slopes and
contained within the city approved “disturbance limits”’ that does not disrupt the integrity of the wooded steep
slop es. We will also provide a Slope Stability Analysis to ensure that the proposed construction does not
compromise the wooded steep slope. As we are contained within the existing disturbed area, and from our
discussion with geotechnical engineers familiar with the site, we do not anticipate any compromise of the wooded
steep slope area in the revised location.
The current area of the outdoor space is 14,144 sf, and a drawing showing the area which comprises this is
appended on the following page as Figure 1.
We intend to carry out improvements to the existing rear façade of the building to provide more privacy to the spa
guests and creating areas within the existing building which will provide support an access to the outdoor spa.
Page 127 of 188
## Chaska Planning Commission
1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
Addition – Case No. 2026- 17
11 August 2026
Page 2
Figure 1 – Area of Spa
As noted above, we have revised our concept plan to contain all of the area of the outdoor spa within the
boundaries of what the city has defined as the disturbed area. These are areas which are defined encroachments
into the wooded steep slope setbacks in 1987. The revised concept plan fully confines the outdoor spa within the
“disturbance limits” which are established by Figure 2 below.
Figure 2 – Disturbed Limits as Established by City of Chaska
Page 128 of 188
## Chaska Planning Commission
1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
Addition – Case No. 2026- 17
11 August 2026
Page 3
## Figure 3 – Sketch – Revised Concept Plan
As directed by the conditions in the staff report to this commission, we have explored an outdoor spa location
with in the “Disturbance Limits” which is defined by the red dashed line above. As noted all wooded steep slopes
and its setbacks remain intact.
The revisions to the concept plan from the original submission, which is identified as Location 3 below, with the
limit of the development area applied.
## Figure 4 – Origi nal Concept Plan
Page 129 of 188
## Chaska Planning Commission
1 Oak Ridge Drive – Lot 1, Block 1 Oak Knoll 2
nd
Addition – Case No. 2026- 17
11 August 2026
Page 4
The changes from the original concept plan entail:
• The removal of the exisang terrace to accommodate the pools;
• Modificaaons to the interior of the building to accommodate access to the exterior spa areas, which are
within the exisang enatlements;
• The pool areas and buildings are at elevaaons that are proximate to exisang elevaaons;
• Relocaaon of some of the buildings previously proposed within the limits of the “disturbed” area that will
be saunas and relaxaaon areas, and will comply with the design as indicated in previously supported
material;
• Relocaaon of other relaxaaon areas into renovated areas within the exisang building within the exisang
enatlements;
• Access across the enare outdoor space shall be designed in conformity with the US Access Board
guidelines and the Americans with Disabiliaes Act;
• Walkways shall remain constructed of pervious materials to maintain exisang drainage paderns and
minimize the impact on storm water management;
• Any exisang retaining walls will be restored or alternaave means to accommodate and maintain exisang
grade differenaals.
We appreciate the efforts of staff to accommodate the request to maintain the timeline. We also appreciate the
efforts of this Commission and the City in providing their support to this project.
We appreciate working and the process to date with the City of Chaska Council and staff to revive this site and
bring investment and tourism to Chaska.
Yours sincerely,
## Scandvik Hotels
## Travis Ba)ing
## Travis Bagng
## Founder and President
## C: Mr. Nate Kabat, Community Development Director
## Ms. Elizabeth Hanson, Community Development Planner
Page 130 of 188
## CLAIMS ROSTER REPORT
## FOR COUNCIL MEETING:August 17, 2026
## Paid and Unpaid Invoices:
Check #'s 362039-362218$2,533,622.47
## Paid Electronic Invoices:
Wire #'s 5389-5412$2,576,771.70
## Amount for Approval-Council Meeting:
August 17, 2026$5,110,394.17
Page 131 of 188
Page 132 of 188
Page 133 of 188
Page 134 of 188
Page 135 of 188
Page 136 of 188
Page 137 of 188
Page 138 of 188
Page 139 of 188
Page 140 of 188
Page 141 of 188
Page 142 of 188
Page 143 of 188
Page 144 of 188
Page 145 of 188
Page 146 of 188
Page 147 of 188
Page 148 of 188
Page 149 of 188
Page 150 of 188
Page 151 of 188
Page 152 of 188
Page 153 of 188
Page 154 of 188
Page 155 of 188
Page 156 of 188
Page 157 of 188
Page 158 of 188
Page 159 of 188
Page 160 of 188
Page 161 of 188
Page 162 of 188
Page 163 of 188
Page 164 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## ADMINISTRATION
06/12/2026
## COSTCO WHOLESALE
## 149.88 Pride Celebration Treats 2026
## ADMINISTRATION
06/14/2026
## OPENAI
## 20.00 ChatGPT Plus
## ADMINISTRATION
06/15/2026
## TIMESAVER OFF SITE SE
178.00 Council minutes 6/1/2026
## ADMINISTRATION
06/19/2026
## SOUTHWEST RENTAL AND SALE
## 47.03 Rental of Chairs for Chaska Rocks Music Event
## ADMINISTRATION
06/20/2026
## COSTCO WHOLESALE
## 44.85 Ice for Chaska Rocks Music Event
## ADMINISTRATION
06/20/2026
## COSTCO WHOLESALE
## 83.72 Ice for Chaska Rocks Music Event
## ADMINISTRATION
06/26/2026
## TARGET T-1356
## 12.00 2026 Pride Event Supplies
## ADMINISTRATION
06/27/2026
## CIRCLE K
## 12.37 Pride Event Supplies 2026
## ADMINISTRATION
06/28/2026
## MASSACHUSETTS BAY TRAVEL
## 22.50 Train Pass for APPA Conference
## ADMINISTRATION
06/29/2026
## COUNSELORS OF REAL ESTATE
## 341.38 MOOD MEDIA-MUSIC SOFTWARE SUBSCRIPTION
## ADMINISTRATION
06/30/2026
## AMAZON.COM
## 42.00 Coffee for Breakroom at City Hall
## ADMINISTRATION
06/30/2026
## TIMESAVER OFF SITE SE
## 178.00 Human Rights Minutes 6/25/26
## ADMINISTRATION
06/30/2026
## TIMESAVER OFF SITE SE
347.25 Council and EDA minutes 6/15/26
## ADMINISTRATION
06/30/2026
## TIMESAVER OFF SITE SE
206.25 Planning minutes 6/10/26
## ADMINISTRATION
07/01/2026
## MSP AIRPORT
## 130.23 Parking at Airport for APPA Conference
## ADMINISTRATION
07/01/2026
## MARRIOTT
## 1,023.69 Matt P - Stay for MMPA Conference
## ADMINISTRATION
07/01/2026
## MARRIOTT
## 331.90 Craige Schmieg stay for MMPA Conference
## ADMINISTRATION
07/06/2026
## AMAZON.COM
## 9.78 Coffee Creamers for Elections
## ADMINISTRATION
07/07/2026
## B & H PHOTO-VIDEO
## 52.46 VINYL ADHESIVE PLOTTER PAPER
## ADMINISTRATION
07/07/2026
## AMAZON.COM
22.84 Sticky notes for workroom and foil for breakroom at City Hall
## ADMINISTRATION
07/10/2026
## MN ASSOC OF GOV COMMS
## 171.90 MEMBERSHIP DUES - WRIGHT & MARK
## CCC
06/12/2026
## NIHCA
## 15.25 NIHCA Rewards
## CCC
06/12/2026
## OFFICE MAX
28.68 No bridge jumping Signage
## CCC
06/12/2026
## HOME DEPOT
23.33 Key copies
## CCC
06/15/2026
## GERBER COLLISION & GLASS
## 600.00 Zamboni #44 Front Panel & Bumper Repaint Work
## CCC
06/16/2026
## AMAZON.COM
## 32.99 Weighted base for Ice Cream Swooper Banner
## CCC
06/17/2026
## W.W. GRAINGER
90.00 Cable ties and plumbing parts.
## CCC
06/18/2026
## AMERICAN RED CROSS
## 232.00 Cert Fees
## CCC
06/18/2026
## AMERICAN RED CROSS
261.00 Cert fees
## CCC
06/19/2026
## GOOGLE
## 6.49 Fitness Monthly Subcrpition
## CCC
06/19/2026
## AMAZON.COM
## 35.94 Replacement Resistance Bands for Fitness Classes
## CCC
06/19/2026
## HOME DEPOT
123.80 Construction Glue-CCC maint
## CCC
06/22/2026
## CINTAS
94.91 CCC rug service.
## CCC
06/23/2026
## CITY OF BLMGTN FINANC
## 120.00 Clayhole Beach Water Testing - May 2026
## CCC
06/23/2026
## CINTAS
97.75 CCC rug service.
## CCC
06/24/2026
## W.W. GRAINGER
709.87 Cleaning supplies and steel toe boots.
## CCC
06/24/2026
## AMERICAN RED CROSS
## 375.00 Cert Fees
## CCC
06/24/2026
## OFFICESUPPLY.COM
72.48 Napkins
## CCC
06/25/2026
## W.W. GRAINGER
26.30 Drill bits.
## CCC
06/25/2026
## ULINE SHIP SUPPLIES
237.60 Styrofoam cups
## CCC
06/25/2026
## AMAZON.COM
97.84 Cleaning Supplies (CLR)
## CCC
06/26/2026
## AMAZON.COM
## 56.95 CPR Masks
## CCC
06/26/2026
## AMAZON.COM
## 10.99 Quarter Storage Tube Holders
## CCC
06/27/2026
## SAMS CLUB
## 226.12 Chips & Concessions Supplies
## CCC
06/30/2026
## PETCO
31.99 Minor equipment
## CCC
07/01/2026
## CM2 SUPPLY -
210.70 CO2 for Hot Spa.
## CCC
07/01/2026
## CINTAS
690.00 AED Maintenance.
## CCC
07/01/2026
## CINTAS
97.75 CCC Rug Service.
## CCC
07/01/2026
## W.W. GRAINGER
9.92 Batteries.
## CCC
07/02/2026
## AMERICAN RED CROSS
## 288.00 Cert Fees
## CCC
07/06/2026
## COMCAST
304.34 Equipment fee's
## CCC
07/06/2026
## COMCAST
42.40 Outlet fee's
## CCC
07/07/2026
## SAMS CLUB
62.27 Supplies-water, clementines, napkins, detergent
## CCC
07/07/2026
## SAMS CLUB
314.80 Supplies-soda, water, snacks, juice, spoons
## CCC
07/07/2026
## AMAZON.COM
## 16.62 Sanitizer Solution Test Strips
## CCC
07/08/2026
## W.W. GRAINGER
55.08 Wheels for trash cart.
## CCC
07/08/2026
## AMAZON.COM
## 25.64 Chip Rack for Ice Arena Concessions
## CCC
07/09/2026
## TAHO SPORTSWEAR
## 515.84 Fire & Ice Family Fun Run T-shirts
## CCC
07/09/2026
## SAMS CLUB
43.74 2 half sheet cakes for birthday/America 250
## CCC
07/09/2026
## AMAZON.COM
72.97 Gloves, Spray Bottles, Tongs, Salt Shaker, & Cleaning Buckets for Ice Arena Conc
## CCC
07/10/2026
## MINNESOTA TWINS
1,481.00 Partial payment for Twins Tickets Game 7.30.26
## CCC
07/12/2026
## SAMS CLUB
29.92 Clementines & cookies (box lunch bingo 7.13.26)
## CCC
07/12/2026
## MINNESOTA TWINS
1,121.00 Balance payment for 72 twins ticket (Game 7.30.26)
## COMMUNITY DEVELOPMENT
06/20/2026
## CANVA INC
## 50.00 CANVA SUBSCRIPTION
## COMMUNITY DEVELOPMENT
07/06/2026
## NAPC FORUM* THE NATION
## 1,145.00 HERITAGE PRESERVATION CONFERENCE
## CURLING CENTER
06/12/2026
## HOME DEPOT
## 201.92 STRING TRIMMER/PRUNER/WBG/TRASH NABBERS
## CURLING CENTER
06/15/2026
## SCHILLING SUPPLY COMPANY
## 1,052.80 OPERATING/CLEANING SUPPLIES
## CURLING CENTER
06/16/2026
## KLINGSPORS WOODWORKING
## 723.20 SANDPAPER FOR ROCKS
## CURLING CENTER
06/16/2026
## AJ SCHAAKE COMPANY-CLVR
## 24.00 ENGRAVING FOR CLUB CHAMP PLAQUE
## CURLING CENTER
06/19/2026
## SCHILLING SUPPLY COMPANY
## 120.61 OPERATING/CLEANING SUPPLIES
## CURLING CENTER
06/22/2026
## PENSKE TRUCK RENTAL
## 409.37 TRUCK RENTAL TO HAUL BORROWED ROCKS
## CURLING CENTER
06/22/2026
## PENSKE TRUCK RENTAL
## 25.61 TRUCK RENTAL TO HAUL BORROWED ROCKS
## CURLING CENTER
06/24/2026
## MICHAELS ARTS AND CRAFT S
## 21.96 YARN FOR ICE LINE INSTALL
## CURLING CENTER
06/24/2026
## OFFICE MAX
## 45.97 FOLDERS FOR EC INFO
## CURLING CENTER
06/26/2026
## KRISS PREMIUM PRODUCTS
## 583.21 CHEMICALS TO CLEAN CONDENSER WATER
Page 1 of 7
Page 165 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## CURLING CENTER
06/28/2026
## AMAZON.COM
## 58.68 FILE FOLDERS / MICROPHONE CASES
## CURLING CENTER
06/29/2026
## SCHILLING SUPPLY COMPANY
## 1,414.86 CLEANING SUPPLIES
## CURLING CENTER
07/01/2026
## WASTE CONNECTIONS
## 1,269.87 GARBAGE/RECYCLING SERVICE
## CURLING CENTER
07/09/2026
## CINTAS
## 8.03 FIRST AID CABINET
## CURLING CENTER
07/09/2026
## HUMERATECH
## 990.00 REPLACED BAD ROUTER FOR BLDG CONTROL SYS
## CURLING CENTER
07/09/2026
## COSTCO WHOLESALE
## 247.02 BATTERIES FOR CCC/F & I - BONSPIEL SNACKS
## ELECTRIC
06/12/2026
## DIGITAL CONTROL INCORPORA
## 295.00 BORING MACHINE SOFTWARE-ANNUAL
## ELECTRIC
06/12/2026
## PY *NORTHLAND FENCE
## 380.00 1550 SKYVIEW FENCE DAMAGE-BORING
## ELECTRIC
06/12/2026
## AMAZON.COM
## 38.50 IPAD CHARGE CABLES & TRUCK ADAPTERS
## ELECTRIC
06/12/2026
## ZORO TOOLS
## 53.70 #730 TOOL SETUP
## ELECTRIC
06/13/2026
## RS GROUP
## 553.71 SUBSTATION REPAIRS BLC-LTG
## ELECTRIC
06/15/2026
## HOME DEPOT
## 16.22 LOCKING PLUG-EXTENSION CORD END
## ELECTRIC
06/15/2026
## EATON CORPORATION
## 950.00 EATON SCHOOL
## ELECTRIC
06/15/2026
## ANDREW ECKERT CONSTRU
## 267.80 SIDING REPAIR OH TO UG
## ELECTRIC
06/15/2026
## ANDREW ECKERT CONSTRU
## 135.96 SIDING REPAIR OH TO UG
## ELECTRIC
06/15/2026
## EATON CORPORATION
## 950.00 EATON SCHOOL
## ELECTRIC
06/15/2026
## HOME DEPOT
## 52.56 SANDY ACRES CONCRETE
## ELECTRIC
06/16/2026
## POWERTYE MFG
## 299.40 #730 TIE DOWNS
## ELECTRIC
06/16/2026
## MENARDS
## 654.99 ELECTRIC OP SUPPLIES
## ELECTRIC
06/17/2026
## THE HOME DEPOT INC
## 54.15 HAMMER DRILL & TOOL SETS
## ELECTRIC
06/17/2026
## THE HOME DEPOT #2825
## 502.71 HAMMER DRILL & TOOL SETS
## ELECTRIC
06/17/2026
## HOMEDEPOT.COM
## 1,133.43 HAMMER DRILL & TOOLS SETS
## ELECTRIC
06/18/2026
## CARVER COUNTY ENVIRONMENT
## 1,794.00 MINODE DISPOSAL
## ELECTRIC
06/18/2026
## ULINE SHIP SUPPLIES
## 259.61 PALLET BAGS
## ELECTRIC
06/22/2026
## ZORO TOOLS
## 1,494.01 TOOL SETS
## ELECTRIC
06/23/2026
## AMAZON.COM
## 148.85 BOOT COVERS
## ELECTRIC
06/23/2026
## MCMASTER-CARR SUPPLY
## 37.43 SLEEVE
## ELECTRIC
06/25/2026
## HOME DEPOT
## -54.19 XMAS IN MAY RETURN
## ELECTRIC
06/25/2026
## HOME DEPOT
## -97.50 1227 PARALLEL XMAS IN MAY RETURN
## ELECTRIC
06/25/2026
## HOME DEPOT
## 153.05 1227 PARALLEL XMAS IN MAY
## ELECTRIC
06/25/2026
## HOME DEPOT
## 113.78 1429 CREST XMAS IN MAY
## ELECTRIC
06/25/2026
## HOME DEPOT
## 1,011.10 162 RIVERVIEW XMAS IN MAY
## ELECTRIC
06/25/2026
## CARGO EQUIPMENT COM
## 484.09 #733 FITTINGS & RINGS
## ELECTRIC
06/26/2026
## HOME DEPOT
## -54.19 XMAS IN MAY RETURN
## ELECTRIC
06/28/2026
## MASSACHUSETTS BAY TRAVEL
## 22.50 APPA CONF SUBWAY TRANSPORTATION
## ELECTRIC
06/29/2026
## MARRIOTT
## 331.90 APPA CONFERENCE LODGING
## ELECTRIC
06/30/2026
## MARRIOTT
## 40.77 APPA CONFERENCE LODGING
## ELECTRIC
06/30/2026
## MENARDS
## 205.89 ELEC SMALL TOOLS
## ELECTRIC
06/30/2026
## MENARDS
## 237.39 #733 SETUP-STORAGE CRATE & RUNNER
## ELECTRIC
06/30/2026
## MCMASTER-CARR SUPPLY
## 89.08 #733 SETUP
## ELECTRIC
07/01/2026
## GREAT NORTHERN EQUIPMENT
## 652.96 #177 CARBIDE DISK CUTTERS
## ELECTRIC
07/02/2026
## ELECTRIC MOTOR REPAIR
## 277.36 BLUFF CREEK SUB LTC REPAIR
## ELECTRIC
07/02/2026
## MENARDS
## 65.77 CLEANING WIPES
## ELECTRIC
07/02/2026
## MENARDS
## 54.60 DRIVER SET & SOCKET SET
## ELECTRIC
07/02/2026
## MENARDS
## 117.11 STRAWMAX
## ELECTRIC
07/03/2026
## ULINE SHIP SUPPLIES
## 192.91 #733 BINS
## ELECTRIC
07/07/2026
## AMAZON.COM
## 14.99 MAGNETS FOR MAPS
## ELECTRIC
07/07/2026
## ILLINOIS TOLLWAY
## 3.20 TOLL FEES
## ELECTRIC
07/07/2026
## HOME DEPOT
## 9.48 AIR FRESHENERS
## ELECTRIC
07/08/2026
## HOME DEPOT
## 104.94 RAKES
## ELECTRIC
07/08/2026
## AG PARTNERS TOWN & COU
## 130.00 PROPANE REFILLS
## ELECTRIC
07/09/2026
## AMAZON.COM
## 27.99 HEAT SHRINK FOR FLAGS
## ELECTRIC
07/09/2026
## AMAZON.COM
## 196.68 MARKING PAINT STICKS
## ELECTRIC
07/12/2026
## AMAZON.COM
## 100.31 CHARGERS FOR IPADS
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 80.00 MEMBER DUES - RINGDAHL
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 ANNUAL CONFERENCE REGISTRATION - RINGDAHL
## FINANCE
06/15/2026
## CRAGUNS-PMS
## 277.02 MN GFOA CONFERENCE HOTEL - RINGDAHL
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 CONFERENCE REGISTRATION - O'SELL
## FINANCE
06/15/2026
## CRAGUNS-PMS
## 277.02 MN GFOA CONF HOTEL - O'SELL
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 CONFERENCE REGISTRATION - MATTICE
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 80.00 MEMBERSHIP DUES - ANDRIE
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 CONFERENCE REGISTRATION - ANDRIE
## FINANCE
06/15/2026
## CRAGUNS-PMS
## 277.02 MN GFOA CONFERENCE LODGING - MATTICE
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 2026 MNGFOA Conference Registration-Hecksel
## FINANCE
06/15/2026
## CRAGUNS-PMS
## 415.53 MN GFOA LODGING - GRACZYK
## FINANCE
06/15/2026
## MN GOVT FINANCE OFFIC
## 300.00 CONFERENCE REGISTRATION - NELSON
## FINANCE
06/15/2026
## CRAGUNS-PMS
## 277.02 MN GFOA CONFERENCE LODGING - NELSON
## FINANCE
06/23/2026
## CRAGUNS-PMS
277.02 2026 MNGFOA Cragun's Resort Room - Zach H.
## FINANCE
06/23/2026
## CRAGUNS-PMS
## 277.02 2026 MNGFOA Cragun's Resort Room - Nayrobi
## FINANCE
06/30/2026
## GOVERNMENT FINANCE OFF
## 590.00 GFOA CERT OF ACHIEVEMENT REVIEW FEE
## FINANCE
06/30/2026
## AMAZON.COM
## 14.94 OFFICE SUPPLIES
## FINANCE
06/30/2026
## PAYROLL LEARNING CENTER,
## 312.00 MEMBERSHIP - TOKACH
## FINANCE
07/01/2026
## NIC
## 692.81 PAYROLL TAXES
## FINANCE
07/01/2026
## MSP AIRPORT
136.74 2026 GFOA Conference - MSP Parking for flight to Chicago-Hecksel
## FINANCE
07/01/2026
## HYATT REGENCY
1,279.28 2026 GFOA Conference - Hotel in Chicago-Hecksel
Page 2 of 7
Page 166 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## FINANCE
07/01/2026
## HYATT REGENCY
## 959.46 GFOA CONFERENCE HOTEL - GRACZYK
## FINANCE
07/02/2026
## MN GOVT FINANCE OFFIC
## 10.00 MN GFOA DAY TO UNITE - MATTICE
## FINANCE
07/06/2026
## MET COUNCIL ACCTS REC WEB
## 20,000.00 MET COUNCIL PAYMENT
## FINANCE
07/06/2026
## UPS
## 43.55 CITY HALL PLAZA PROJECTS DEEDS TO DORSEY
## FINANCE
07/09/2026
## GOVERNMENT FINANCE OFF
## 500.00 GFOA DUES - CHASKA TO 07/31/27
## FIRE
06/12/2026
## AMAZON.COM
## 335.99 WHITE BOARDS AND STORAGE RACKS
## FIRE
06/12/2026
## BOUND TREE MEDICAL LLC
## 352.25 MEDICAL EQUIPMENT SUPPLY REPLACEMENT
## FIRE
06/12/2026
## BOUND TREE MEDICAL LLC
## 80.37 MEDICAL EQUIPMENT REPLACEMENT
## FIRE
06/16/2026
## AMAZON.COM
## 241.66 STATION SUPPLIES
## FIRE
06/16/2026
## AMAZON.COM
## 21.99 CERTIFICATE HOLDERS FOR GTO PROGRAM
## FIRE
06/16/2026
## AMAZON.COM
## 165.90 WATER EXTINGUISHER FOR KPMG CARTS
## FIRE
06/16/2026
## BOUND TREE MEDICAL LLC
## 203.40 MEDICAL EQUIPMENT SUPPLY REPLACEMENT
## FIRE
06/17/2026
## AMAZON.COM
## 9.49 PAPER TOWEL HOLDER FOR KITCHEN
## FIRE
06/17/2026
0
## 35.15 UNIFORM CLEANING
## FIRE
06/17/2026
0
## 39.38 DRY CLEANING
## FIRE
06/17/2026
## SARPINO'S PIZZERIA
## 104.96 DINNER FOR INTERVIEW PANEL
## FIRE
06/17/2026
## POSITIVE PROMOTIONS, IN
## 287.88 PENCILS FOR GIVEAWAYS
## FIRE
06/17/2026
## AMAZON.COM
## 19.99 PIZZA PAN FOR KITCHEN
## FIRE
06/17/2026
## AMAZON.COM
## 25.99 BINDERS FOR KPMG SOP/SOG
## FIRE
06/17/2026
## AMAZON.COM
## 87.36 METAL CLIPBOARDS FOR CALL REPORTS FROM KPMG
## FIRE
06/17/2026
## AMAZON.COM
## 5.78 SUPPLIES FOR KPMG BINDERS
## FIRE
06/17/2026
## AMAZON.COM
## 38.95 RADIO EARPIECES
## FIRE
06/17/2026
## AMAZON.COM
## 247.70 RADIO EARPIECE AND MICS FOR KPMG
## FIRE
06/17/2026
## BOUND TREE MEDICAL LLC
## 177.09 MEDICAL EQUIPMENT SUPPLY REPLACEMENT
## FIRE
06/18/2026
## HOME DEPOT
## 360.00 WOOD FOR STORAGE SHELVES
## FIRE
06/19/2026
## ZOLL
## 782.80 MEDICAL EQUIPMENT SUPPLY REPLACEMENT
## FIRE
06/19/2026
## KWIK TRIP
## 57.65 FUEL FOR UTILITY #323 FOR WISCONSIN INSPECTION
## FIRE
06/22/2026
## COSTCO WHOLESALE
## 10.78 PIZZA TO FEED THE CREWS WORKING AT THE KPMG
## FIRE
06/23/2026
## CUB FOODS
## 7.00 WATER FOR DEPARTMENT
## FIRE
06/24/2026
## JIMMY JOHNS
## 50.69 FOOD FOR STAFF WORKING KPMG-FOOD NOT PROVIDED THIS DAY
## FIRE
06/24/2026
## DVS MNLARS SERVICE FEE
## 75.00 FF LICENSE RENEWAL - BONNEMA
## FIRE
06/24/2026
## DVS MNLARS SERVICE FEE
## 150.00 FF LICENSE RENEWAL - LEMBRICH & DECKER
## FIRE
06/26/2026
## COSTCO WHOLESALE
## 23.94 WATER FOR DEPARTMENT
## FIRE
06/26/2026
## BOUND TREE MEDICAL LLC
## 37.48 MEDICAL EQUIPMENT SUPPLY REPLACEMENT
## FIRE
06/28/2026
## AMAZON.COM
## 25.61 DOOR BELL FOR FRONT OFFICE
## FIRE
06/30/2026
## BLUE CARD COMMAND
## 1,155.00 BLUE CARD SUBSCRIPTION
## FIRE
07/01/2026
## AMAZON.COM
## 189.99 VACUUM FOR UPSTAIRS
## FIRE
07/01/2026
## OFFICE DEPOT
## 50.97 OFFICE SUPPLIES
## FIRE
07/02/2026
## COMCAST
## 6.90 MONTHLY CABLE BILL
## FIRE
07/02/2026
## OFFICE DEPOT
## 48.99 OFFICE SUPPLIES
## FIRE
07/04/2026
## AMAZON.COM
## 184.75 BUSINESS CARD HOLDER/VACUUM/FANS
## FIRE
07/06/2026
## HOME DEPOT
## 285.71 CONSUMABLE TRAINING SUPPLIES
## FIRE
07/07/2026
## AMAZON.COM
## 35.99 CLEANING SUPPLY FOR DORM BATHROOMS
## FIRE
07/07/2026
## AMAZON.COM
## 35.91 CLEANING SUPPLIES FOR STATION
## FIRE
07/07/2026
## AMAZON.COM
## 6.49 KEY HOLDER FOR SPARE BATHROOM KEYS
## FIRE
07/07/2026
## HOME DEPOT
## 175.92 FANS FOR DORM ROOMS
## FIRE
07/07/2026
## MEYERFIRE UNIVERSITY
## 560.00 PROGRAM FOR INSPECTIONS
## FIRE
07/08/2026
## POSITIVE PROMOTIONS, IN
## 238.82 BAGS FOR FPW
## FIRE
07/08/2026
## AMAZON.COM
## 49.98 OFFICE SUPPLIES FOR ASST CHIEF
## FIRE
07/08/2026
## AMAZON.COM
## 57.56 BED SHEETS
## FIRE
07/08/2026
## AMAZON.COM
## 269.99 DIP/PULL UP MACHINE FOR WORKOUT ROOM
## FIRE
07/08/2026
## HOME DEPOT
## 50.71 COMPRESSOR PARTS/INSPECTOR TOOLS
## FIRE
07/09/2026
## OFFICE MAX
## 26.97 STAPLERS FOR OFFICES
## FIRE
07/09/2026
## AMAZON.COM
## 935.00 TEMP AC UNITS FOR UPSTAIRS
## FIRE
07/10/2026
## AMAZON.COM
## 16.99 ITEMS FOR HISTORY DISPLAY AT CURLING CENTER
## FIRE
07/10/2026
## HOME DEPOT
## 74.89 ITEMS TO SEAL OFF HOLE IN FLOOR FROM FIRE POLE
## FIRE
07/10/2026
## MINNESOTA STATE
## 775.00 CLASS FOR NEW FIRE INSPECTOR - LEMBRICH
## HUMAN RESOURCES
06/15/2026
## SARPINO'S PIZZERIA
## 46.42 FIRE DEPT INTERVIEW MEAL
## HUMAN RESOURCES
06/20/2026
## SPARK HIRE
## 299.00 INTERVIEW SUPPORT SERVICES
## HUMAN RESOURCES
06/24/2026
## FEDERAL MEDIATION & CONCI
## 125.00 DOL CLEARINGHOUSE QUERIES
## HUMAN RESOURCES
06/30/2026
## SARPINO'S PIZZERIA
## 54.15 FIRE DEPT INTERVIEW MEALS
## HUMAN RESOURCES
06/30/2026
## OPENAI
## 50.00 CHAT GPT SUBSCRIPTION
## HUMAN RESOURCES
07/05/2026
## CHECKR, INC.
## 732.38 BACKGROUND CHECKS
## HUMAN RESOURCES
07/06/2026
## SARPINO'S PIZZERIA
## 34.11 FIRE DEPT INTERVIEW MEAL
## INFORMATION TECHNOLOGY
06/16/2026
## AMAZON.COM
## 95.23 Public Works Equipment Purchase
## INFORMATION TECHNOLOGY
06/16/2026
## HOME DEPOT
## 14.88 IT Equipment Purchase
## INFORMATION TECHNOLOGY
06/16/2026
## DNS MADE EASY
## 96.00 DNS MADE EASY Yearly Renewal
## INFORMATION TECHNOLOGY
06/17/2026
## AMAZON.COM
## 53.99 Solar Panel for Town Course
## INFORMATION TECHNOLOGY
06/18/2026
## AMAZON.COM
## -53.99 Solar Panel Order For Town Course
## INFORMATION TECHNOLOGY
06/18/2026
## AMAZON.COM
## 319.84 iPad Cases For WS/PW/Golf Maintenance
## INFORMATION TECHNOLOGY
06/19/2026
## CVS
## -7.65 CREDIT FOR PERSONAL USE IN ERROR
## INFORMATION TECHNOLOGY
06/19/2026
## CVS
## 7.65 PERSONAL USE IN ERROR-SEE CREDIT
## INFORMATION TECHNOLOGY
06/23/2026
## AMAZON.COM
## 74.98 Equipment Cases For Planning Commission
## INFORMATION TECHNOLOGY
06/24/2026
## AMAZON.COM
119.00 Headset for Police
## INFORMATION TECHNOLOGY
06/24/2026
## PORKBUN.COM
12.52 Chaska.net Domain Name yearly renewal
Page 3 of 7
Page 167 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## INFORMATION TECHNOLOGY
06/25/2026
## AMAZON.COM
## 374.90 iPad Cases For Fire Department
## INFORMATION TECHNOLOGY
06/26/2026
## AMAZON.COM
## 10.45 Finance WFH Purchase
## INFORMATION TECHNOLOGY
06/30/2026
## AMAZON.COM
## 28.99 CTC Solar Panel Purchase
## INFORMATION TECHNOLOGY
07/01/2026
## AMAZON.COM
## 149.97 Water Sewer iPad Cases
## INFORMATION TECHNOLOGY
07/05/2026
## AMAZON.COM
## 49.99 Water Sewer iPad Purchase
## INFORMATION TECHNOLOGY
07/07/2026
## AMAZON.COM
## 140.49 Mouse and Headset for Allison Kampbell
## INFORMATION TECHNOLOGY
07/09/2026
## AMAZON.COM
211.46 IT on hand devices
## INFORMATION TECHNOLOGY
07/13/2026
## PORKBUN.COM
11.08 chaskaparksandrec.com domain name yearly renewal
## MSB
06/23/2026
## AMAZON.COM
## 104.58 #530 ENGINE WATER PUMP
## MSB
06/24/2026
## KIBBLE BELLE PLAINE
## 1,728.39 #226 FUEL TANK
## MSB
06/27/2026
## AMAZON.COM
## 75.98 #225 HYD COUPLERS
## MSB
06/28/2026
## AMAZON.COM
## 17.21 SPARE EQUIPMENT KEYS
## MSB
06/29/2026
## FLASHERS
## 130.00 #2099 TRANSMISSION FLASH/PROG
## MSB
06/29/2026
## AMAZON.COM
## 19.54 #141 VALVE STEM ADAPTERS
## MSB
07/01/2026
## WASTE CONNECTIONS
## 2,138.35 MSB-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 285.20 FIRE STATION-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 789.95 CITY HALL-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 359.20 ATHLETIC PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 184.78 LION'S PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 236.78 VETERAN'S PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 307.58 COMMUNITY PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 167.18 MCKNIGHT PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 167.24 SUNSET PARK-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 862.84 TOWN COURSE-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 185.82 THE LOOP-GARBAGE
## MSB
07/01/2026
## WASTE CONNECTIONS
## 349.03 TOWN COURSE MAINTENANCE-GARBAGE
## MSB
07/01/2026
## PLUNKETT'S PEST CONTROL
## 54.08 BLUFF CREEK SUBSTATION
## MSB
07/01/2026
## PLUNKETT'S PEST CONTROL
## 54.08 LAKE HAZELTINE SUBSTATION
## MSB
07/01/2026
## PLUNKETT'S PEST CONTROL
## 54.08 WEST CREEK SUBSTATION
## MSB
07/01/2026
## FLASHERS
## 250.00 #2099 FLASH PRG PERFORM SETUP
## MSB
07/01/2026
## CHASKA DRIVER LICENSE EXA
## 6,279.02 #144 NEW SWEEPER
## MSB
07/01/2026
## CHASKA DRIVER LICENSE EXA
## 3,542.39 NEW UNIT #732
## MSB
07/01/2026
## CHASKA DRIVER LICENSE EXA
## 37.00 NEW UNIT #324
## MSB
07/01/2026
## CHASKA LICENSE CENTER FEE
## 76.16 NEW UNIT #732 LIC FEE
## MSB
07/01/2026
## CHASKA LICENSE CENTER FEE
## 135.00 NEW UNIT #144 LIC FEE
## MSB
07/01/2026
## CHASKA LICENSE CENTER FEE
## 0.80 NEW UNIT #324 LIC FEE
## MSB
07/02/2026
## FARM & FLEET
## 129.99 HYD CYLINDER FOR TREE GRABBER
## MSB
07/03/2026
## AMAZON.COM
## 7.19 SPARE EQUIPMENT KEYS
## MSB
07/09/2026
## PSN*MINNESOTA RWA MN
## 900.00 WATER EXPO-WACONIA
## MSB
07/10/2026
## USPS
## 21.55 SHIPPING
## MSB
07/10/2026
## ULINE *SHIP SUPPLIES
## 1,407.98 ELECTION CAGE
## PARK & REC
06/11/2026
## SHAKOPEE BOWL
680.00 Extreme Kids Week 1 field trip
## PARK & REC
06/12/2026
## MICHAELS ARTS AND CRAFT S
## 13.19 Parents Night Out Craft
## PARK & REC
06/12/2026
## MICHAELS ARTS AND CRAFT S
## 6.59 Parents Night Out Craft
## PARK & REC
06/12/2026
## MICHAELS ARTS AND CRAFT S
## 6.59 Parents Night Out Craft
## PARK & REC
06/15/2026
## TARGET T-1272
44.00 Extreme Kids Week 2 supply
## PARK & REC
06/15/2026
## TARGET T-1352
143.11 Extreme Kids Week 2 supply
## PARK & REC
06/15/2026
## TARGET T-1352
## 12.00 Pickleball League - Storage
## PARK & REC
06/16/2026
## SAMS CLUB
186.44 Extreme Kids snacks
## PARK & REC
06/16/2026
## AMAZON.COM
## 7.99 Office Supplies
## PARK & REC
06/16/2026
## AMAZON.COM
## 29.44 Office Supplies
## PARK & REC
06/16/2026
## FACEBOOK
## 10.00 Chaska Rocks FB AD
## PARK & REC
06/17/2026
## BIOGRAPHYAPPAREL
187.50 Part time staff uniforms
## PARK & REC
06/17/2026
## DOLLAR TREE
## 17.50 Supplies for Open Art
## PARK & REC
06/17/2026
## LAVA ISLAND EDEN PRAI
## -118.92 Tax Refund Extreme Kids Week 2 Field Trip
## PARK & REC
06/17/2026
## TARGET T-1352
## 18.45 Extreme Kids Week 2 Supply
## PARK & REC
06/17/2026
## LAVA ISLAND EDEN PRAI
## 1,513.92 Extreme Kids Week 2 Field Trip
## PARK & REC
06/18/2026
## AMAZON.COM
## 19.98 Extreme Kids Tablecloth
## PARK & REC
06/18/2026
## FACEBOOK
## 1.53 Chaska Rocks FB AD
## PARK & REC
06/19/2026
## AMAZON.COM
## 154.77 Extreme Kids Wristbands and Tot Time Adventure Tablecloths
## PARK & REC
06/20/2026
## AMAZON.COM
## 68.91 Extreme Kids Week 3 Supply
## PARK & REC
06/22/2026
## WWW.GSDIRECT.NET
## 580.17 Plotter Paper
## PARK & REC
06/22/2026
## KERFOOT CANOPY TOUR
## 310.03 Teen Field Trip- High Ropes
## PARK & REC
06/22/2026
## TARGET
## 128.05 Extreme Kids Week 3 Supplies
## PARK & REC
06/23/2026
## COSTCO WHOLESALE
29.78 cookies & juice for art display
## PARK & REC
06/23/2026
## AMAZON.COM
## 37.98 Parents Night Out Tablecloth
## PARK & REC
06/23/2026
## BIOGRAPHYAPPAREL
## 112.50 Extreme Kids Staff Tshirts
## PARK & REC
06/23/2026
## FUN EXPRESS
## 273.48 Touch a Truck Construction Hats
## PARK & REC
06/23/2026
## TARGET
## 34.96 Extreme Kids Week 3 Supplies
## PARK & REC
06/24/2026
## LITTLE CAESARS PIZZA
## 117.00 Extreme Kids Pizza Lunch
## PARK & REC
06/25/2026
## SCIENCE MUSEUM OF MN
760.00 Extreme Kids Week 5 field trip
## PARK & REC
06/25/2026
## AMAZON.COM
88.17 Extreme Kids Umbrellas for outside
## PARK & REC
06/25/2026
## AMAZON.COM
203.98 Poster Boards & Coolers for Special events
## PARK & REC
06/25/2026
## AMAZON.COM
201.10 21 plus wrist bands for fire and ice
## PARK & REC
06/25/2026
## HOME DEPOT
104.24 Supplies for hanging fire and ice banner
Page 4 of 7
Page 168 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## PARK & REC
06/25/2026
## TARGET
## 24.92 Extreme Kids Week 3 Supplies
## PARK & REC
06/26/2026
## SAMS CLUB
## 180.76 Extreme Kids Snacks
## PARK & REC
06/26/2026
## AMAZON.COM
232.99 Farmers' Market- bags
## PARK & REC
06/26/2026
## LITTLE CAESARS PIZZA
## 39.00 Parents Night Out Pizza Dinner
## PARK & REC
06/27/2026
## HOLIDAY INN
## 1,049.00 Storybook Theatre June 2026
## PARK & REC
06/28/2026
## HOLIDAY INN
## 1,403.00 Storybook Theatre June 2026
## PARK & REC
06/29/2026
## COSTCO WHOLESALE
## 44.17 Coffee & Creamer for The Lodge
## PARK & REC
06/29/2026
## MINNESOTA TRANSPORTATION
## 370.00 Extreme Kids Week 3 Field Trip
## PARK & REC
06/29/2026
## SIDEKICK THEATRE
729.00 Extreme Kids Week 4 field trip
## PARK & REC
06/29/2026
## AMAZON.COM
## 177.82 Tent Weights
## PARK & REC
06/29/2026
## TARGET
## 55.60 Extreme Kids Week 4 Supplies
## PARK & REC
06/30/2026
## AMAZON.COM
15.98 Extreme Kids Week 4 supply
## PARK & REC
06/30/2026
## TARGET
## 6.98 Extreme Kids Milk
## PARK & REC
06/30/2026
## DOMINO FUEL
## 79.93 Staff Meeting- FinnlySport
## PARK & REC
07/01/2026
## COGNITO-PRO
9.50 Cognito subscription
## PARK & REC
07/01/2026
## AMAZON.COM
8.99 Standoffs for CCC signs
## PARK & REC
07/01/2026
## AMAZON.COM
## 191.65 Extreme Kids Cereal
## PARK & REC
07/01/2026
## TARGET
## 21.01 Extreme Kids and Daycare Supplies
## PARK & REC
07/01/2026
## LITTLE CAESARS PIZZA
## 130.00 Extreme Kids Pizza Lunch
## PARK & REC
07/02/2026
## IDENTISYS INCORPORATED
301.72 Card printer ribbons/cleaner
## PARK & REC
07/02/2026
## AMAZON.COM
## 33.59 Extreme Kids Art Supply
## PARK & REC
07/03/2026
## AMAZON.COM
## 116.74 Extreme Kids Cereal
## PARK & REC
07/03/2026
## AMAZON.COM
## 8.06 Extreme Kids Bead Organizer
## PARK & REC
07/03/2026
## AMAZON.COM
## 52.96 Extreme Kids Art Supply & Game
## PARK & REC
07/03/2026
## SKYWAY CLASSIC EVENTS
950.05 Tent rental for Fire and ice
## PARK & REC
07/04/2026
## AMAZON.COM
## 92.94 Extreme Kids Art Supply
## PARK & REC
07/06/2026
## AMAZON.COM
18.88 Socks for CCC
## PARK & REC
07/06/2026
## MICHAELS ARTS AND CRAFT S
## 32.60 Extreme Kids Craft Supply
## PARK & REC
07/06/2026
## TARGET
## 35.91 Extreme Kids Week 5 Supplies
## PARK & REC
07/06/2026
## ETSY
## -22.86 Pickleball League - Medals - Refund
## PARK & REC
07/06/2026
## ETSY
## 295.86 Pickleball League - Medals
## PARK & REC
07/07/2026
## AMAZON.COM
## 26.99 Extreme Kids Art Supply
## PARK & REC
07/07/2026
## AMAZON.COM
## 40.04 Extreme Kids Week 5 Supply
## PARK & REC
07/07/2026
## SAMS CLUB
## 307.64 Extreme Kids Snacks
## PARK & REC
07/07/2026
## AMAZON.COM
## 155.38 Pickleball League - Prizes
## PARK & REC
07/08/2026
## AMAZON.COM
## 20.98 Extreme Kids Art Supply
## PARK & REC
07/08/2026
## JUMP CITY
287.56 Inflatables Fire and ice remaining balance
## PARK & REC
07/08/2026
## TOTAL ENTERTAINMENT K
## 600.00 Kids Dance DJ
## PARK & REC
07/08/2026
## TOTAL ENTERTAINMENT K
## 500.00 Kids Dance DJ
## PARK & REC
07/08/2026
## LITTLE CAESARS PIZZA
## 123.50 Extreme Kids Pizza Lunch
## PARK & REC
07/09/2026
## AMAZON.COM
6.99 Socks for CCC
## PARK & REC
07/09/2026
## AMAZON.COM
## 14.59 Coffee Filters for The Lodge
## PARK & REC
07/09/2026
## DOLLAR TREE
## 36.50 Supplies for Open Art & Prizes for BINGO
## PARK & REC
07/09/2026
## AMAZON.COM
## -20.98 Extreme Kids Art Supply Refund
## PARK & REC
07/09/2026
## AMAZON.COM
## -26.99 Extreme Kids Art Supply Refund
## PARK & REC
07/09/2026
## AMAZON.COM
## -31.98 Extreme Kids Art Supply Refund
## PARK & REC
07/09/2026
## AMAZON.COM
## -26.08 Extreme Kids Art Supply Refund
## PARK & REC
07/10/2026
## AMAZON.COM
## 6.82 Supplies for Open Art
## PARK & REC
07/10/2026
## AMAZON.COM
## 64.99 Coffee Carafes for The Lodge
## PARK & REC
07/10/2026
## CUB FOODS
## 164.82 Fire and Ice- Staff Food
## PARK & REC
07/10/2026
## LITTLE CAESARS PIZZA
## 45.50 Parents Night Out Pizza Dinner
## PARK & REC
07/10/2026
## AMAZON.COM
## -16.95 Pickleball League - Prizes - Refund
## PARK & REC
07/11/2026
## AMAZON.COM
## 42.18 Extreme Kids Week 6 Supply
## PARK & REC
07/11/2026
## AMAZON.COM
## 5.68 Extreme Kids Week 6 Supply
## PARK & REC
07/11/2026
## JUMP CITY
## -287.56 Refund From F & I Festival Inflatables
## PARK & REC
07/11/2026
## JUMP CITY
## -974.51 Fire and Ice Refund Inflatables
## PARK & REC
07/12/2026
## AMAZON.COM
## 11.89 Extreme Kids Week 6 Supply
## PARK & REC
07/12/2026
## CUB FOODS
## 21.50 Extreme Kids Week 6 Pizza
## PARK & REC
07/12/2026
## CUB FOODS
## 5.00 Extreme Kids Week 6 Pizza
## PARK & REC
07/12/2026
## TARGET
## 90.83 Extreme Kids Week 6 Supply
## PARK & REC
07/12/2026
## AMAZON.COM
## 341.94 Youth Sports - Nets & Balls
## POLICE
06/15/2026
## AMAZON.COM
## 15.99 USB C to HDMI Adapter
## POLICE
06/15/2026
## AMAZON.COM
## 23.99 Laminating Pouches
## POLICE
06/16/2026
## AMAZON.COM
22.93 Batteries
## POLICE
06/16/2026
## AMAZON.COM
## 39.74 Paper Towels
## POLICE
06/16/2026
## KWIK TRIP
## 18.00 Fishing Bait - Fishing with a Cop Event
## POLICE
06/17/2026
## U HAUL INTERNATIONAL
84.11 Evidence Room move from old PD to new PD
## POLICE
06/19/2026
## AMAZON.COM
23.89 Brinkhaus Uniform - Radio holder clip
## POLICE
06/19/2026
## AMAZON.COM
34.48 Batteries
## POLICE
06/22/2026
## COSTCO WHOLESALE
32.35 Food for staff working KPMG Tournament
## POLICE
06/22/2026
## TARGET
9.98 Water - KPMG
## POLICE
06/23/2026
## AMAZON.COM
## 15.99 Sticky Notes
## POLICE
06/23/2026
## JERSEY MIKE'S
## 70.71 Lunch for Staff - KPMG Tournament
## POLICE
06/24/2026
## HOME DEPOT
67.62 Batteries
## POLICE
06/24/2026
## JERSEY MIKE'S
60.71 Lunch for staff working KPMG Tournament
Page 5 of 7
Page 169 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## POLICE
06/24/2026
## JERSEY MIKE'S
14.01 Lunch for staff working KPMG Tournament
## POLICE
06/24/2026
## JERSEY MIKE'S
## 37.62 VIPS Meeting - Lunch
## POLICE
06/26/2026
## SPYPOINT
## 30.00 Trail Camera Subscription - Oak Ridge Property
## POLICE
06/29/2026
## BORE TECH INC
## 231.44 Supplies for SWAT Sniper Training #410
## POLICE
06/29/2026
## TARGET
2.49 Supplies for SWAT Sniper Training - #410
## POLICE
06/29/2026
## HOME DEPOT
## 78.90 Training Supplies for SWAT Sniper Training - #410
## POLICE
06/30/2026
## LYMAN PRODUCTS
## 43.22 Training Supplies for SWAT Sniper Training - #410
## POLICE
07/01/2026
## MARIE RIDGEWAY LICSW
## 1,620.00 June Wellness/Mandatory Officer Check-Ins
## POLICE
07/02/2026
## ULINE SHIP SUPPLIES
## 282.61 Paper Bags - Evidence Processing
## POLICE
07/02/2026
## TRANSUNION
## 100.00 Data Processing
## POLICE
07/02/2026
## ADOBE CATERING
## 21.66 Adobe Subscription
## POLICE
07/06/2026
## CIRCLE K
135.00 Fleet car wash
## POLICE
07/06/2026
## AMAZON.COM
74.97 Binders
## POLICE
07/07/2026
## CUB FOODS
14.99 GTO - Welcoming - Bakery items
## POLICE
07/08/2026
## COSTCO WHOLESALE
-68.67 Refund of tax - Shelving - FF&E
## POLICE
07/10/2026
## AMAZON.COM
34.17 USB c to HDMI Cabels for Drones
## POLICE
07/10/2026
## 4 IMPRINT
915.32 CPD Badge stickers
## PUBLIC WORKS
06/12/2026
## HOME DEPOT
## 40.94 CORDS
## PUBLIC WORKS
06/15/2026
## HOME DEPOT
## 63.96 CONCRETE SUPPLIES
## PUBLIC WORKS
06/15/2026
## HOME DEPOT
## 61.96 TARP & STRAPS FOR COND TOWER
## PUBLIC WORKS
06/15/2026
## HOME DEPOT
## 5.98 FOAM
## PUBLIC WORKS
06/15/2026
## HOME DEPOT
## 178.83 TOOLS-SAWS & CLAWS
## PUBLIC WORKS
06/16/2026
## HOME DEPOT
## 60.27 HWY 41 FENCE REPAIRS
## PUBLIC WORKS
06/16/2026
## NORTHERN TOOL EQUIP
## 145.32 #322 RESCUE BOAT TRAILER LEAF SPRINGS
## PUBLIC WORKS
06/16/2026
## HOME DEPOT
## 647.43 STORMWATER OPERATING SUPPLIES
## PUBLIC WORKS
06/16/2026
## HOME DEPOT
## 86.00 PLEXIGLASS FOR PLAYGROUND REPAIRS
## PUBLIC WORKS
06/16/2026
## HOME DEPOT
## 87.55 CONCRETE FORMING & POURING SUPPLIES
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 49.98 GARDEN HOSE
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 238.00 AIR MOVERS
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 74.87 SEALANT FOR COND TOWER
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 306.98 ELECTIONS STORAGE ROOM
## PUBLIC WORKS
06/17/2026
## UNIVERSITY OF MINNESOTA
## 145.00 B. LENZEN PESTICIDE SAFETY RECERT
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 73.88 STREET OPERATING-CHAIN & SPRAYER
## PUBLIC WORKS
06/17/2026
## HOME DEPOT
## 35.26 BREAKERS FOR POWER CARTS
## PUBLIC WORKS
06/18/2026
## HOME DEPOT
## 89.94 SEALANT
## PUBLIC WORKS
06/22/2026
## HOME DEPOT
## 8.98 CLEANING GLOVES
## PUBLIC WORKS
06/22/2026
## MENARDS
## 234.94 BOARDWALK REPAIR
## PUBLIC WORKS
06/23/2026
## SHERWIN WILLIAMS
## 348.42 CITY HALL PAINT & SUPPLIES
## PUBLIC WORKS
06/23/2026
## HOME DEPOT
## 712.22 ATHLETIC PK DOUGOUT/IMPACT & RAFTER SQ
## PUBLIC WORKS
06/23/2026
## HOME DEPOT
## 83.80 CAULKING, CAULKING GUNS AND FOLDING KNIFE
## PUBLIC WORKS
06/23/2026
## SHERWIN WILLIAMS
## 880.14 MARKING PAINT
## PUBLIC WORKS
06/24/2026
## HOME DEPOT
## 28.40 IRRIGATION SUPPLIES
## PUBLIC WORKS
06/24/2026
## HOME DEPOT
## 34.65 CONCRETE ANCHORS
## PUBLIC WORKS
06/24/2026
## AMAZON.COM
## 617.94 BOARDWALK REPAIR-SCREWS
## PUBLIC WORKS
06/25/2026
## HOME DEPOT
## 31.93 PAINTING SUPPLIES
## PUBLIC WORKS
06/26/2026
## BACKFLOW SUPPLY
## 294.32 WATER TOWER RPZ REPAIRS
## PUBLIC WORKS
06/28/2026
## AMAZON.COM
## 22.98 PAVER REPAIR PARTS
## PUBLIC WORKS
06/29/2026
## SHERWIN WILLIAMS
## 126.45 PRIMER & MAGNETIC STUD FINDER
## PUBLIC WORKS
06/29/2026
## HOME DEPOT
## 38.03 SCREWS
## PUBLIC WORKS
06/29/2026
## WINSUPPLY EDEN PRAIRIE MN
## 417.00 BULB REPLACEMENT
## PUBLIC WORKS
06/30/2026
## AMAZON.COM
## 227.82 BULBS FOR LIBRARY LIGHTS
## PUBLIC WORKS
07/01/2026
## HOME DEPOT
## 324.19 OLD PD REMODEL
## PUBLIC WORKS
07/01/2026
## HOME DEPOT
## 4.20 DOOR CLOSER REPAIR
## PUBLIC WORKS
07/02/2026
## HOME DEPOT
## 37.27 RAGS & PAIL
## PUBLIC WORKS
07/02/2026
## HOME DEPOT
## 29.87 PLUMBING SUPPLIES
## PUBLIC WORKS
07/03/2026
## AMAZON.COM
## 251.93 TOOLS/BLADES
## PUBLIC WORKS
07/03/2026
## AMAZON.COM
## 94.98 PD REMODEL-CEILING REGISTER
## PUBLIC WORKS
07/04/2026
## AMAZON.COM
## 56.98 PD REMODEL-BATHROOM MIRROR
## PUBLIC WORKS
07/06/2026
## FARM & FLEET
## 26.98 ALARM BACKUP BATTERIES
## PUBLIC WORKS
07/06/2026
## HOME DEPOT
## 49.48 SCREWS FOR PARK PROJECTS
## PUBLIC WORKS
07/07/2026
## HOME DEPOT
## 153.40 LUMBER FOR CONCRETE FORMS
## PUBLIC WORKS
07/07/2026
## WARNING LITES OF MN
## 465.00 RIVER CITY DAYS TRAFFIC SAFETY
## PUBLIC WORKS
07/07/2026
## HOME DEPOT
## 26.94 BOOT TRAY
## PUBLIC WORKS
07/08/2026
## FARM & FLEET
## 577.72 WADERS AND HAMMERS
## PUBLIC WORKS
07/08/2026
## HOME DEPOT
## -53.98 FLAT WHITE STEEL RETURN
## PUBLIC WORKS
07/08/2026
## HOME DEPOT
## 71.25 DOOR GRATE REPAIR
## PUBLIC WORKS
07/08/2026
## HOME DEPOT
## 32.98 FLAT WHITE STEEL
## PUBLIC WORKS
07/08/2026
## HOME DEPOT
## 149.94 PLASTIC SHEETING
## PUBLIC WORKS
07/09/2026
## HOME DEPOT
## 170.76 ELECTION ROOM BUILD
## PUBLIC WORKS
07/10/2026
## FARM & FLEET
## 10.38 CLEANING SUPPLIES
## PUBLIC WORKS
07/10/2026
## HOME DEPOT
## 60.88 CLEANING SUPPLIES
## PUBLIC WORKS
07/10/2026
## ACE HARDWARE
## 29.95 KEYS
## PUBLIC WORKS
07/10/2026
## GPRS
## 550.00 PS CONCRETE SCANNING
## THE LOOP
06/29/2026
## COSTCO WHOLESALE
## 305.17 LOOP RESALE
## TOWN COURSE
06/12/2026
## OFFICE DEPOT
## 650.22 RECEIPT PAPER
Page 6 of 7
Page 170 of 188
## PURCHASE CARD TRANSACTIONS
## JULY 2026 STATEMENT
DepartmentTransaction Date Merchant DBA NameAmount Charge Desc.
## TOWN COURSE
06/13/2026
## GOOGLE
## 5.40 OAK 19 TV
## TOWN COURSE
06/15/2026
## COSTCO WHOLESALE
## 47.66 SUNSCREEN
## TOWN COURSE
06/16/2026
## MOTOROLA
## 175.00 COURSE RADIOS
## TOWN COURSE
06/17/2026
## HOME DEPOT
## 60.78 PVC & FITTINGS
## TOWN COURSE
06/18/2026
## UPS
## 33.78 SHIPPING
## TOWN COURSE
06/20/2026
## CULLIGAN WATER
## 47.32 H2O LOOP MAINTENANCE
## TOWN COURSE
06/20/2026
## CULLIGAN WATER
## 66.52 H2O CTC MAINTENANCE
## TOWN COURSE
06/22/2026
## KWIK TRIP
## 62.40 STAMPS
## TOWN COURSE
06/22/2026
## HOME DEPOT
## 195.14 USA FLAGS / GLOVES
## TOWN COURSE
06/24/2026
## HOME DEPOT
## 129.96 SHOVELS
## TOWN COURSE
06/24/2026
## AMAZON.COM
## 9.98 EYE DROPS / FIRST AID
## TOWN COURSE
06/25/2026
## MENARDS
## 36.25 GROUND ROD
## TOWN COURSE
06/25/2026
## HOME DEPOT
## 15.65 CLAMP
## TOWN COURSE
06/25/2026
## AMAZON.COM
## 370.37 AIR HORNS
## TOWN COURSE
06/26/2026
## P2 GOLF PRO
## 780.00 P2 GOLF PRODUCTS - RANGE BALL PICKER
## TOWN COURSE
06/27/2026
## GOOGLE
## 59.59 OAK 19 TV
## TOWN COURSE
06/29/2026
## COSTCO WHOLESALE
## 173.39 GOLF SHOP FAN
## TOWN COURSE
06/29/2026
## HOME DEPOT
## 321.83 COOLING FAN FOR STARTER SHACK
## TOWN COURSE
06/30/2026
## HOME DEPOT
## 10.82 EXTENSION CORD/FAN
## TOWN COURSE
07/01/2026
## SEWER SERVICES, INC
## 504.00 HOLDING TANK PUMPING
## TOWN COURSE
07/01/2026
## HOME DEPOT
## 120.18 LIGHT BULBS & RAKES
## TOWN COURSE
07/01/2026
## PAR WEST TURF SERVICES,
## 227.06 SAFE-TEE COOLER SPIGOTS
## TOWN COURSE
07/05/2026
## PST
## 858.00 POS SOFTWARE
## TOWN COURSE
07/06/2026
## OFFICE DEPOT
## 30.88 BATTERIES
## TOWN COURSE
07/06/2026
## OFFICE MAX
## 26.00 CLIPBOARDS
## TOWN COURSE
07/08/2026
## HOME DEPOT
## 163.95 CLEANING SUPPLIES
## TOWN COURSE
07/11/2026
## PST
## 858.00 POS SOFTWARE
## TOWN COURSE
07/11/2026
## COSTCO WHOLESALE
## 54.18 FAN FOR CART BARN
## WATER/SEWER
06/11/2026
## HOME DEPOT
## 10.96 LIGHT BULBS
## WATER/SEWER
06/12/2026
## HOME DEPOT
## 33.93 ROUNDUP FOR LIFT STATION WEEDS
## WATER/SEWER
06/15/2026
## AMAZON.COM
## -44.99 SAFETY CLOTHING RETURN
## WATER/SEWER
06/16/2026
## FARM & FLEET
## 59.17 WATERMAIN BREAK GLASS REPAIR-EITEL CIRCLE
## WATER/SEWER
06/16/2026
## HOME DEPOT
## 24.66 CURB STOP EXT PIPE
## WATER/SEWER
06/18/2026
## LOWES
## 58.96 WTP-THERMOSTATS
## WATER/SEWER
06/29/2026
## BRAINTREE
## 551.18 AWWA ANNUAL CONFERENCE
## WATER/SEWER
06/30/2026
0
## 360.00 AWWA ANNUAL CONFERENCE
## WATER/SEWER
06/30/2026
## EASTGATE SUPPLY
## 28,237.78 ENCLOSURES FOR WELLS 11 & 12
## WATER/SEWER
07/06/2026
## AMAZON.COM
## 75.96 IPAD SCREEN PROTECTORS
## WATER/SEWER
07/09/2026
## FARM & FLEET
## 151.06 ROUNDUP SPRAY
## PARK & REC
07/14/2026
## SQUARE INV
## -686.96 CREDIT AFTER STATEMENT DATE
## POLICE
07/14/2026
## WALGREEN CO
## -6.77 CREDIT AFTER STATEMENT DATE
160,435.77
Page 7 of 7
Page 171 of 188
1
## COUNCIL MEETING/WORK SESSION SCHEDULE
Below is a list of the upcoming Council Meetings and Work Sessions to plan for:
August 17
th
: There will be a Work Session on the 17
th
## to continue the SW Chaska Park Master
Plan discussion from July 20. The purpose is to allow additional time for the Council to discuss
and ask questions about the recommended plan. Additionally, there is new information for the
Council to consider based upon some of the feedback received previously. The work session
will begin at 5:30 p.m.
The Council meeting will begin at 7:00 p.m., where there will be items coming from the
Planning Commission, including a concept plan review for a new use at Oakridge.
August 31
st
: Prior to this Council meeting, from 5:45-7:00 p.m. in the City Council Chambers,
there will be a work session. The work session will continue the budget discussion, both
reviewing what was discussed at the August 3
rd
meeting, with more focus on what has been
budgeted to change with expenditures for the 2027 General Fund Budget. This work session is
to prepare for September when the Preliminary Tax Levy for 2027 is established. The
Preliminary Tax Levy is tentatively scheduled to be established at the September 14 City Council
meeting, but may move to September 21 if more time is needed. A Council meeting will follow
at 7:00 p.m., but is expected to be a lighter meeting.
September meetings: Labor Day is the first Monday of September (September 7), so there is
no meeting that night. The other two meetings are September 14 and September 21.
Please let staff know if you are unable to attend any meetings.
## CITY HALL PLAZA
Work continues on City Hall Plaza. Most of the demolition in the plaza and the parking lot has
now been complete. Access to City Hall remains from the north along the west side of the
parking lot, while the businesses are accessible from the north along the east side of the
parking lot. Library access at this time remains from the north as well, but is anticipated to
change soon. When it changes, access to the library will be from the staff entrance along 4
th
Street.
## Biweekly Report
August 17, 2026
## By:
## Elise Durbin
## Matt Podhradsky
Page 172 of 188
2
In addition to this work, the Electric Department has also been installing new electric feeder
lines from Pine Street/4
th
Street intersection into the project area. Additional work in City Hall
basement is also happening to prepare to install the boiler that will provide the hot water to the
snowmelt system.
As access changes occur, the businesses and public will remain informed.
## MSB CONSTRUCTION
Construction at the MSB site continues. Earthwork, footings, and utilities are the primary work
being completed on site at this time. The precast walls are expected to arrive in early October
and prior to winter, the plan is to complete the first lift of asphalt for the parking lot to make
the site more usable during the winter.
Photo of the site looking north (July 29, 2026).
Staff is working with RJM to take a tour of the site once the precast walls arrive and are up,
which is anticipated to be mid-November.
## LIBRARY DESIGN
The Staff group has met a few times regarding the library design, including taking a tour of the
Chanhassen Library. Over the next month, community engagement will begin at various
community events including Touch a Truck, the Farmers Market, and Latin Food & Music
Festival. Additionally, the first Library Task Force meeting has been scheduled for mid-
September. Staff anticipates a first update with the City Council at the October 5 work session.
Page 173 of 188
3
## DOWNTOWN MASTER PLAN UPDATE
Community Engagement for the Downtown Master Plan continues. On August 11 an online
survey was released to the community seeking input and feedback that will help to inform the
Downtown Master Plan update. The survey is ten questions and asks for feedback on places
people go to in downtown, what services/amenities are visited when they come downtown,
strengths of downtown, what services/amenities respondents would like more of, and what
improvements can be made. The survey is open until Monday, August 24.
## UKRAINIAN STUDENTS
For the past several years, Richard and Irina Fursman (our Strategic Planning facilitators) have
brought over a group of teenage students and chaperones from Ukraine to Minnesota for
leadership training and cultural experiences. The students will be visiting Chaska on August 18
and making stops at the Public Safety Facility and the Chaska Curling Center for a Learn to Curl
event. The experience is always a learning experience for both the students who visit, but also
for staff who participate and spend the day with them.
## UPCOMING ACTIVITIES
Touch a Truck: Touch a Truck is back! This year it will be held on Thursday, August 20 from
5:00-7:00 p.m. at Chaska High School.
Farmer’s Market and Music in the Park: The Farmers Market continues every Thursday until
September 17. Most weeks there are over 40 vendors selling produce, breads, treats, art,
jewelry, and a lot more. Also, through August 27, there is music in the park at City Square.
Public Safety Open House: The first ever combined Chaska Fire and Police Open House is
Monday, September 14 from 5:00-8:00 p.m. There will be station tours, food, demonstrations,
and more. SW Transit will be providing transportation from East Creek Transit Station that
evening. This will be a great chance for the public to see the new Public Safety Facility and the
updated Meadow Park.
Latin Food & Music Festival: On Friday, September 18, Latin Food and Music Fest returns. The
event will be from 6:00-10:00 p.m. at Firemen’s Park. There will be music, food, and fireworks.
Page 174 of 188
## ONE CITY HALL PLAZA/CHASKA, MN 55318-1962/PH: (952) 448-2851/ FX: (952) 448-9300
## City of Chaska
## Memorandum
## To: City Council and Economic Development Authority
## From: Julie Grove, Economic Development Coordinator
Date: August 17, 2026
Subject: TIF No. 26 (Big Woods Business Park) - Rescheduling of Public
## Hearing
## Background
On June 15, 2026, the City Council approved the Big Woods Business Park (North)
Phase I Preliminary Site and Building Plan, Preliminary Plat, and Comprehensive Plan
Amendment for a 218,000-square-foot distribution center and associated public
improvements.
Scannell Properties (the developer) has requested Tax Increment Financing (TIF)
assistance for public infrastructure improvements needed to support the project and
future development within the northern portion of the business park. On July 20, 2026,
the City Council and Economic Development Authority (EDA) approved a Letter of Intent
outlining the general terms of the proposed TIF assistance and authorized the next
steps in the process.
State statute requires a public hearing before the City Council and EDA prior to
establishment of the TIF district and approval of the TIF Plan and TIF Agreement. The
public hearing was previously scheduled for August 31, 2026.
Staff has determined that the final planning approvals for the project, including the Final
Site and Building Plan and Final Plat, will not be ready for City Council consideration until
September 21, 2026.
Typically, the EDA and City Council hold the public hearing and establish the TIF district
after all final planning approvals have been completed. Because the final planning
approvals have been delayed, staff recommends recalling the August 31 TIF public
hearing and rescheduling it for September 21, 2026. This will allow both the final
planning approvals and TIF-related items to be considered on the same night.
## Next Steps
Following the anticipated final planning approvals on Sept 21, 2026, the City Council and
EDA will be asked to hold the required public hearing and consider establishing TIF District
No.26. and approving the associated TIF Plan and TIF Agreement.
Please reach out to staff with any questions.
Page 175 of 188
## City of Chaska
## Memorandum
## To: Administration, Mayor, and City Council
## From: Lisa Nelson, Controller
Date: August 14, 2026
RE: Financial Reports – Ye a r-To-Date (YTD) as of June 30, 2026
## FINACIAL REPORTS
Atached are year-to-date financial reports as of June 30, 2026.
Each fund includes the adopted budget compared to YTD actuals and the resul�ng variance.
Prior year revenue s and expenditures/expenses are reported to allow compar isons of current year and
prior year ac�vity.
These dra� reports include the following revenues and expenditures/expenses as of the report date:
• YTD revenue receipted by the City.
• YTD revenue from invoices issued by the City.
• YTD payroll expenditures.
• YTD vendor payments that:
1) were previously approved by the City Council, or
2) are pending approval by the Council at the August 17th mee�ng.
These dra� reports do not include the following revenues and expenditures/expenses:
• General investment earnings revenue
• Deprecia�on and amor�za�on expense (recorded at year-end)
Page 176 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE WITHRECEIVED/ACTUAL AS OF
## BUDGET6/30/2026BUDGETEXPENDED6/30/2025
## REVENUES:
Property Taxes *18,635,272$ 7,246,213$ (11,389,059)$ 39%6,222,697$
Franchise Fees 1,030,000 495,777 (534,223) 48%193,377
Licenses225,812 207,694 (18,118) 92%197,244
## Permits:
Building1,800,282 645,277 (1,155,005) 36%864,967
Other Permits59,380 113,721 54,341 192%161,383
## Intergovernmental:
Federal- - - 4,983
State789,801 134,652 (655,149) 17%132,546
Regional, County, School & Local 173,160 110,038 (63,122) 64%120,356
## Charges For Services:
General Government6,851,754 3,413,834 (3,437,920) 50%3,215,604
Public Safety43,062 138,112 95,050 321%33,391
Public Works, Admin and Streets17,174 31,784 14,610 185%26,310
Parks & Recreation and Park Maint.761,261 353,023 (408,238) 46%359,305
Fines And Forfeitures43,860 32,004 (11,856) 73%29,453
Investment Earnings25,000 - (25,000) 0%-
Other Revenue303,232 193,154 (110,078) 64%107,346
## TOTAL REVENUES30,759,050 13,115,283 (17,643,767) 43%11,668,962
## EXPENDITURES:
## General Government:
Mayor & Council167,483 98,436 69,047 59%89,395
Communications448,049 220,844 227,205 49%156,987
Administration 1,212,972 590,486 622,486 49%518,431
Human Resources619,151 352,508 266,643 57%283,104
Elections48,335 21,198 27,137 44%7,635
Finance/Admin Services2,213,041 1,315,084 897,957 59%1,173,355
Information Services & Fiber Sys.1,550,461 533,692 1,016,769 34%699,053
Legal - City Attorney145,725 55,012 90,713 38%89,136
Community Development725,215 302,447 422,768 42%291,822
Engineering739,453 374,139 365,314 51%346,489
Government Buildings242,231 134,281 107,950 55%118,072
Facility Maintenance864,175 406,752
457,423 47%380,751
Total General Government8,976,291 4,404,879 4,571,412 49%4,154,230
## Public Safety:
Police7,834,036 3,837,818 3,996,218 49%3,535,087
Fire 3,759,164 1,504,139 2,255,025 40%1,452,767
Public Safety Facility185,000 166,205 18,795 90%-
Building Inspections (Comm.Dev)893,697 487,018 406,679 54%426,787
Civil Defense5,901 5,359 542 91%5,307
Total Public Safety12,677,798 6,000,539 6,677,259 47%5,419,948
## Public Works:
Administration497,672 258,585 239,087 52%251,761
Streets & Alleys3,159,679 790,516 2,369,163 25%712,550
Snow Removal383,418 297,891 85,527 78%139,434
Signs13,070 6,107 6,963 47%13,201
Municipal Services/Building409,882 120,308 289,574 29%261,136
Tree Maintenance102,289 88,452 13,837 86%69,423
Total Public Works4,566,010 1,561,859 3,004,151 34%1,447,505
## Parks & Recreation:
Administration842,075 320,227 521,848 38%349,326
Community Events222,125 93,928 128,197 42%73,177
Programs (Youth/Teen/Adult/Sr.) 889,401 388,882 500,519 44%370,871
Beach/Firemen's Park113,094 37,156 75,938 33%26,952
Hockey & Skating Rinks7,391 3,643 3,748 49%7,197
Park Maintenance1,883,810 934,697 949,113 50%892,218
Total Parks & Recreation3,957,896 1,778,533 2,179,363 45%1,719,741
Unallocated685,000 - 685,000 0%-
Debt Service 281,055 102,151 178,904 36%80,538
## TOTAL EXPENDITURES31,144,050 13,847,961 17,296,089 44%12,821,962
## OTHER FINANCING SOURCES (USES):
Transfers In 5,806,000 2,289,540 (3,516,460) 39%2,316,050
Transfers Out(5,421,000) (355,000) 5,066,000 7%(355,000)
## NET TRANSFERS385,000 1,934,540 1,549,540 1,961,050
NET CHANGE IN FUND BALANCES-$ 1,201,862$ 1,201,862$ 808,050$
*Tax settlements are received from Carver County in June/July and December.
Property taxes as of 6/30 are an early distribution (70%) of first half taxes. The remainder of first half taxes is received in July.
## GENERAL FUND
## REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCES
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2025
2026
Page 177 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## REVENUES:
Property Taxes *6,000$ 2,100$ (3,900)$ 35%2,100$
Charges For Services/Lot Sales2,400 1,500 (900) 63%1,400
Investment Earnings300 - (300) 0%-
## TOTAL REVENUES8,700 3,600 (5,100) 41%3,500
## EXPENDITURES:
## Current:
## Public Works:
Professional Services And Charges13,500 8,629 4,871 64%4,674
NET CHANGE IN FUND BALANCES(4,800)$ (5,029)$ (229)$ (1,174)$
*Tax settlements are received from Carver County in June/July and December.
Property taxes as of 6/30 are an early distribution (70%) of first half taxes. The remainder of first half taxes is received in July.
## MOUNT PLEASANT MAINTENANCE FUND
## REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCES
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2025
2026
Page 178 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE % RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## REVENUES:
Property Taxes *249,217$ 82,013$ (167,204)$ 33%75,192$
Charges For Services355,705 181,344 (174,361) 51%172,673
Investment Earnings15,000 - (15,000) 0%-
Other Revenue34,800 - (34,800) -
## TOTAL REVENUES654,722 263,357 (391,365) 40%247,865
## EXPENDITURES:
## Current:
## Administration:
Professional Services31,537 16,853 14,684 53%4,233
Other Charges and Special Events471,074 234,435 236,639 50%221,850
## Economic Development Projects/Programs:
Supplies- 198 (198) -
Professional Services62,230 29,222 33,008 47%29,050
Other Charges and Special Events219,970 114,651 105,319 52%9,657
## TOTAL EXPENDITURES784,811 395,359 389,452 50%264,790
## EXCESS (DEFICIENCY) OF REVENUES
OVER (UNDER) EXPENDITURES(130,089) (132,002) (1,913) (16,925)
## OTHER FINANCING SOURCES (USES):
Transfers In / (Out)200,000 - (200,000) -
NET CHANGE IN FUND BALANCES69,911$ (132,002)$ (201,913)$ (16,925)$
*Tax settlements are received from Carver County in June/July and December.
Property taxes as of 6/30 are an early distribution (70%) of first half taxes. The remainder of first half taxes is received in July.
## ECONOMIC DEVELOPMENT AUTHORITY (EDA) FUND
## REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCES
## FOR THE PERIODS ENDING 06/30/26 AND 06/30/25
2026
Page 179 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED /ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Residential & Senior Sales12,091,000$ 5,064,233$ (7,026,767)$ 42%4,740,815$
Commercial Sales1,430,000 632,625 (797,375) 44%624,226
Industrial Sales37,729,000 14,766,643 (22,962,357) 39%14,989,013
Other Charges and Sales3,365,350 6,173,797 2,808,447 183%6,920,362
TOTAL OPERATING REVENUES54,615,350 26,637,298 (27,978,052) 49%27,274,416
## OPERATING EXPENSES:
Purchased Power31,384,000 17,659,263 13,724,737 56%17,924,288
## Distribution:
Personnel Services2,853,045 1,272,985 1,580,060 45%1,216,469
Supplies, Services & Other Charges1,189,031 509,136 679,895 43%540,254
## Administration:
Personnel Services585,674 251,225 334,449 43%229,405
Supplies, Services & Other Charges4,121,965 2,065,805 2,056,160 50%1,981,882
## Utility Billing:
Personnel Services405,746 196,758 208,988 48%203,948
Supplies, Services & Other Charges426,395 193,680 232,715 45%166,292
Conservation Programs342,690 123,575 219,115 36%220,917
Capital Outlay4,679,000 885,467 3,793,533 19%1,339,257
TOTAL OPERATING EXPENSES45,987,546 23,157,894 22,829,652 50%23,822,712
## OPERATING INCOME8,627,804 3,479,404 (5,148,400) 3,451,704
## NON-OPERATING REVENUES:
Investment Earnings 26,900 13,579 (13,321) 50%1,758
Intergovernmental- 103 103 118
Gain on Disposal of Capital Assets- 6,750 6,750 -
TOTAL NON-OPERATING REVENUES26,900 20,432 (6,468) 1,876
## NON-OPERATING EXPENSES:
Debt Service720,050 97,888 622,162 14%107,587
Debt Service - Agent Fees1,000 1,700 (700) 170%-
TOTAL NON-OPERATING EXPENSES721,050 99,588 621,462 14%107,587
## INCOME (LOSS) BEFORE CONTRIBUTIONS
## AND TRANSFERS7,933,654 3,400,248 (4,533,406) 3,345,993
## CAPITAL CONTRIBUTIONS2,277,200 94,664 (2,182,536) 532,502
## TRANSFERS IN (OUT):
Transfers Out(9,458,100) (3,289,540) 6,168,560 35%(3,315,440)
## CHANGE IN NET POSITION752,754$ 205,372$ (547,382)$ 563,055$
2026
## ELECTRIC FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/25
Page 180 of 188
## PERCENT
## OF BUDGET 2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Residential Sales1,907,000$ 793,735$ (1,113,265)$ 42%751,298$
Commercial Sales1,522,000 592,053 (929,947) 39%494,530
Industrial Sales1,041,000 485,570 (555,430) 47%362,724
Other Sales & Charges1,252,040 623,956 (628,084) 50%601,444
TOTAL OPERATING REVENUES5,722,040 2,495,314 (3,226,726) 44%2,209,996
## OPERATING EXPENSES:
Pumping422,611 207,724 214,887 49%184,010
Treatment584,643 251,797 332,846 43%233,147
## Distribution:
Personnel Services815,741 407,818 407,923 50%378,765
Supplies, Services & Other Charges373,849 167,014 206,835 45%127,987
## Administration:
Personnel Services182,678 80,918 101,760 44%76,561
Supplies, Services & Other Charges843,815 455,502 388,313 54%395,822
## Utility Billing:
Personnel Services72,456 35,131 37,325 48%36,419
Supplies, Services & Other Charges92,310 34,653 57,657 38%32,594
Capital Outlay *355,000 1,817,090 (1,462,090) 512%782,504
TOTAL OPERATING EXPENSES3,743,103 3,457,647 285,456 92%2,247,809
OPERATING INCOME (LOSS)1,978,937 (962,333) (2,941,270) -49%(37,813)
## NON-OPERATING REVENUES:
Investment Earnings17,700 - (17,700) 0%-
Lease - Bountiful Basket32,800 - (32,800) 0%-
TOTAL NON-OPERATING REVENUES50,500 - (50,500) 0%-
## NON-OPERATING EXPENSES:
Debt Service 2,216,375 284,347 1,932,028 13%283,123
Issuance Costs & Fiscal Agent Fees1,000 378 622 38%-
Old Wtr Trmt Plant/Bountiful Basket1,952 1,338 614 69%710
TOTAL NON-OPERATING EXPENSES2,219,327 286,063 1,933,264 13%283,833
INCOME (LOSS) BEFORE TRANSFERS(189,890) (1,248,396) (1,058,506) (321,646)
## TRANSFERS IN (OUT):
Transfers In938,000 - (938,000) 0%-
Transfers (Out)(391,900) - 391,900 0%-
## NET TRANSFERS IN (OUT)546,100 - (546,100) -
## CHANGE IN NET POSITION356,210
$ (1,248,396)$ (1,604,606)$ (321,646)$
*Capital outly includes the project for Wells 11 & 12
2026
## WATER FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIOD ENDED 06/30/2026 AND 06/30/2025
Page 181 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Residential Sales2,904,100$ 1,351,938$ (1,552,162)$ 47%1,259,667$
Commercial Sales1,936,500 994,740 (941,760) 51%866,263
Industrial Sales2,207,300 1,042,205 (1,165,095) 47%954,505
Other Sales & Charges2,057,050 1,045,381 (1,011,669) 51%934,464
## TOTAL OPERATING REVENUE9,104,950 4,434,264 (4,670,686) 49%4,014,899
## OPERATING EXPENSES:
Pumping33,503 15,636 17,867 47%13,528
Treatment (Met Council)4,365,618 2,546,610 1,819,008 58%2,317,961
## Collection:
Personnel Services815,745 403,875 411,870 50%375,784
Supplies, Services & Other Charges164,597 94,645 69,952 58%88,645
## Administration:
Personnel Services182,674 80,919 101,755 44%76,561
Supplies, Services & Other Charges824,159 461,471 362,688 56%391,776
## Utility Billing:
Personnel Services72,456 35,131 37,325 48%36,419
Supplies, Services & Other Charges72,561 34,208 38,353 47%32,296
Capital Outlay825,000 250,809 574,191 30%428,002
## TOTAL OPERATING EXPENSES7,356,313 3,923,304 3,433,009 53%3,760,972
## OPERATING INCOME (LOSS)1,748,637 510,960 (1,237,677) 253,927
## NON-OPERATING REVENUES:
Investment Earnings6,700 - (6,700) 0%-
Intergovernmental- 121 121 92
TOTAL NON-OPERATING REVENUES6,700 121 (6,579) 2%92
## NON-OPERATING EXPENSES:
Debt Service571,400 383,848 187,552 67%378,521
Issuance Costs & Fiscal Agent Fees1,000 245 755 25%-
TOTAL NON-OPERATING EXPENSES572,400 384,093 188,307 67%378,521
INCOME (LOSS) BEFORE TRANSFERS1,182,937 126,988 (1,055,949) (124,502)
## TRANSFERS IN (OUT):
Transfers In55,000 - (55,000) 0%-
Transfers (Out)(484,900) - 484,900 0%-
## TOTAL TRANSFERS IN (OUT)(429,900) - 429,900 -
## CHANGE IN NET POSITION753,037$ 126,988$ (626,049)$ (124,502)$
2026
## SEWER FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2026
Page 182 of 188
## PERCENT
## OF BUDGET
2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Admissions442,200$ 247,202$ (194,998)$ 56%197,781$
Memberships1,389,199 634,845 (754,354) 46%709,785
Rentals1,127,622 632,606 (495,016) 56%600,173
Charges for Services/Lessons408,024 196,463 (211,561) 48%176,044
Other Revenue363,539 32,728 (330,811) 9%34,011
TOTAL OPERATING REVENUE3,730,584 1,743,844 (1,986,740) 47%1,717,794
## OPERATING EXPENSES:
Personnel Services2,821,830 1,428,639 1,393,191 51%1,306,279
Operating Supplies252,998 145,144 107,854 57%130,334
Professional & Other Services1,012,039 473,472 538,567 47%469,651
Other Charges230,577 275,347 (44,770) 119%266,493
Capital Outlay270,000 54,043 215,957 20%103,110
TOTAL OPERATING EXPENSES4,587,444 2,376,645 2,210,799 52%2,275,867
OPERATING INCOME (LOSS)(856,860) (632,801) 224,059 (558,073)
## NON-OPERATING REVENUES:
Investment Earnings (Charges)(52,324) 3,833 56,157 -7%4,707
## NON-OPERATING EXPENSES:
Debt Service 564,783 39,758 525,025 7%49,609
Issuance Costs & Fiscal Agent Fees4,000 532 3,468 13%-
TOTAL NON-OPERATING EXPENSES568,783 40,290 528,493 7%49,609
INCOME (LOSS) BEFORE TRANSFERS(1,477,967) (669,258) 808,709 (602,975)
## TRANSFERS IN (OUT):
Transfers In1,491,000 390,000 (1,101,000) 26%353,665
CHANGE IN NET POSITION13,033$ (279,258)$ (292,291)$ (249,310)$
## CHASKA COMMUNITY CENTER FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2025
2026
Page 183 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET 6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Green Fees474,350$ 218,189$ (256,161)$ 46%189,641$
Cart Rental16,480 8,184 (8,296) 50%7,791
Merchandise & Other Sales37,914 14,683 (23,231) 39%9,435
## TOTAL OPERATING REVENUES528,744 241,056 (287,688) 46%206,867
## OPERATING EXPENSES:
## Golf - Maintenance Dept:
Personnel Services234,975 93,858 141,117 40%104,376
Supplies, Services & Other Charges50,868 42,949 7,919 84%31,845
## Golf - Club House:
Personnel Services158,216 67,615 90,601 43%66,024
Supplies, Services & Other Charges54,192 32,416 21,776 60%38,670
Merchandise for Resale15,075 7,433 7,642 49%9,729
Capital Outlay 10,000 - 10,000 0%4,622
## TOTAL OPERATING EXPENSES523,326 244,271 279,055 47%255,266
## OPERATING INCOME (LOSS)5,418 (3,215) (8,633) (48,399)
## NON-OPERATING REVENUES:
Investment Earnings515 - (515) 0%-
## NON-OPERATING EXPENSES:
Debt Service249,933 45,795 204,138 18%57,289
INCOME (LOSS) BEFORE TRANSFERS(244,000) (49,010) 194,990 (105,688)
## TRANSFERS IN (OUT):
Transfers In244,000 - (244,000) 0%-
## CHANGE IN NET POSITION-$ (49,010)$ (49,010)$ (105,688)$
2026
## THE LOOP AT CHASKA
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIOD ENDED 06/30/2026 AND 06/30/25
Page 184 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Green Fees2,031,000$ 1,069,914$ (961,086)$ 53%994,571$
Driving Range190,550 100,260 (90,290) 53%99,949
Golf Rentals386,000 184,968 (201,032) 48%173,299
Merchandise412,000 171,615 (240,385) 42%173,902
Other Sales225,570 125,779 (99,791) 56%132,106
TOTAL OPERATING REVENUE3,245,120 1,652,536 (1,592,584) 51%1,573,827
## OPERATING EXPENSES:
## Golf - Maintenance Dept:
Personnel Services887,261 384,003 503,258 43%377,459
Supplies, Services & Other Charges384,081 250,030 134,051 65%226,813
## Golf - Club House:
Personnel Services787,593 374,561 413,032 48%344,292
Supplies, Services & Other Charges563,996 346,854 217,142 61%295,749
Merchandise for Resale300,000 321,633 (21,633) 107%306,631
Capital Outlay320,000 155,554 164,446 49%155,542
TOTAL OPERATING EXPENSES3,242,931 1,832,635 1,410,296 57%1,706,486
OPERATING INCOME (LOSS)2,189 (180,099) (182,288) (132,659)
## NON-OPERATING REVENUES:
Investment Earnings 6,180 - (6,180) 0%-
Gain on Disposal of Capital Assets- 6,536 6,536 -
Bond Proceeds117,000 - (117,000) 0%-
TOTAL NON-OPERATING REVENUES123,180 6,536 (116,644) -
## NON-OPERATING EXPENSES:
Debt Service 312,800 50,013 262,787 16%263,913
TOTAL NON-OPERATING EXPENSES312,800 50,013 262,787 16%263,913
CHANGE IN NET POSITION(187,431)$ (223,576)$ (36,145)$ (396,572)$
## CHASKA TOWN COURSE FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIOD ENDED 06/30/2026 AND 06/30/2025
2026
Page 185 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Lease Revenue *2,486,184$ 1,274,190$ (1,211,994)$ 51%1,274,190$
## OPERATING EXPENSES:
Professional Services **108,000 6,723,313 (6,615,313) 6225%163,040
Other Charges229,895 114,946 114,949 50%113,448
TOTAL OPERATING EXPENSES337,895 6,838,259 (6,500,364) 2024%276,488
## OPERATING INCOME2,148,289 (5,564,069) (7,712,358) 997,702
## NON-OPERATING REVENUES:
Investment Earnings- 7,499 7,499 7,574
Lease interest- - - 4,815
Interfund Loan Payments104,219 - (104,219) 0%-
Insurance Claim Proceeds- 5,956,180 5,956,180 -
TOTAL NON-OPERATING REVENUES104,219 5,963,679 5,859,460 5722%12,389
## NON-OPERATING EXPENSES:
Debt Service2,074,250 224,625 1,849,625 11%263,375
Issuance Costs & Fiscal Agent Fees4,500 - 4,500 0%-
TOTAL NON-OPERATING EXPENSES2,078,750 224,625 1,854,125 11%263,375
## CHANGE IN NET POSITION173,758$ 174,985$ 1,227$ 746,716$
*Lease Revenue includes payments applied to lease receivable
**Includes insurance claims of $6.5 million
2026
## TURBINE GENERATOR FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIOD ENDED 06/30/2026 AND 06/30/2025
Page 186 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Residential Sales1,389,000$ 736,636$ (652,364)$ 53%702,539$
Industrial Sales976,000 505,347 (470,653) 52%483,291
All Other Receipts3,000 3,701 701 123%3,122
TOTAL OPERATING REVENUE2,368,000 1,245,684 (1,122,316) 53%1,188,952
## OPERATING EXPENSES:
## Collections:
Personnel Services389,354 146,274 243,080 38%187,920
Supplies, Services & Other Charges278,574 72,996 205,578 26%159,683
## Administration:
Personnel Services264,632 129,716 134,916 49%123,007
Supplies, Services & Other Charges495,107 250,113 244,994 51%240,219
## Utility Billing:
Personnel Services28,982 14,053 14,929 48%14,564
Supplies, Services & Other Charges87,955 35,898 52,057 41%34,050
Capital Outlay 788,000 896,881 (108,881) 114%93,944
TOTAL OPERATING EXPENSES2,332,604 1,545,931 786,673 66%853,387
## OPERATING INCOME35,396 (300,247) (335,643) 335,565
## NON-OPERATING REVENUES:
Investment Earnings 50,000 - (50,000) 0%-
Intergovernmental- 386,627 386,627 198,267
Bond Proceeds475,000 - (475,000) -
TOTAL NON-OPERATING REVENUES525,000 386,627 (138,373) 198,267
## NON-OPERATING EXPENSES:
Debt Service394,200 240,455 153,745 61%235,581
Issuance Costs & Fiscal Agent Fees500 264 236 53%-
TOTAL NON-OPERATING EXPENSES394,700 240,719 153,981 61%235,581
## INCOME BEFORE TRANSFERS165,696 (154,339) (320,035) 298,251
## TRANSFERS IN (OUT):
Transfers In299,600 - (299,600) 0%-
Transfers (Out)(411,000) - 411,000 0%-
## NET TRANSFERS IN (OUT)(111,400) - 111,400 -
## CHANGE IN NET POSITION54,296$ (154,339)$ (208,635)$ 298,251$
2026
## STORM WATER FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2025
Page 187 of 188
## PERCENT
## OF BUDGET2025
## ACTUAL AS OFVARIANCE RECEIVED/ACTUAL AS OF
## BUDGET6/30/2026WITH BUDGETEXPENDED6/30/2025
## OPERATING REVENUES:
Memberships161,710$ 90,504$ (71,206)$ 56%82,149$
Rentals237,385 127,891 (109,494) 54%110,040
Lessons230,000 131,885 89,550 57%108,309
Leagues190,962 13,785 (177,177) 7%16,003
Leases326,200 109,972 (216,228) 34%168,339
Other Revenue51,635 13,620 (38,015) 26%12,145
TOTAL OPERATING REVENUES1,197,892 487,657 (522,570) 41%496,985
## OPERATING EXPENSES:
## Administration:
Personnel Services476,213 241,983 234,230 51%217,195
Supplies, Services & Other Charges498,099 228,518 269,581 46%238,810
## Event Center:
Personnel Services29,123 15,051 14,072 52%11,886
Supplies, Services & Other Charges29,989 27,718 2,271 92%23,576
## Curling Center:
Personnel Services236,008 129,890 106,118 55%118,591
Supplies, Services & Other Charges108,311 43,645 64,666 40%58,221
Crooked Pint62,135 36,920 25,215 59%37,110
Capital Outlay *294,500 853,603 (559,103) 290%4,861
TOTAL OPERATING EXPENSES1,734,378 1,577,328 157,050 91%710,250
OPERATING INCOME (LOSS)(536,486) (1,089,671) (365,520) (213,265)
## NON-OPERATING REVENUES:
Investment Earnings (Charges)(50,000) 19,737 69,737 25,552
## NON-OPERATING EXPENSES:
Debt Service1,081,111 836,016 245,095 77%1,321,584
Issuance Costs & Fiscal Agent Fees1,600 4,332 (2,732) 271%3,400
TOTAL NON-OPERATING EXPENSES1,082,711 840,348 242,363 78%1,324,984
INCOME (LOSS) BEFORE TRANSFERS(1,669,197) (1,910,282) (53,420) (1,512,697)
## TRANSFERS IN (OUT):
Transfers In1,677,500 840,000 (837,500) 50%1,320,500
CHANGE IN NET POSITION8,303$ (1,070,282)$ (890,920)$ (192,197)$
*Capital Outlay includes restaurant renovation costs
## CHASKA CURLING AND EVENT CENTER FUND
## REVENUES, EXPENSES AND CHANGES IN NET POSITION
## FOR THE PERIODS ENDING 06/30/2026 AND 06/30/2025
2026
Page 188 of 188