title: Construction Update - May 11, 2026
---
## Construction Update
## Presented By:
## Pam Carman / Tim Bisek
May 11, 2026
## WACONIA PUBLIC SCHOOLS | ISD110
Items to Complete under $25,000
## WACONIA PUBLIC SCHOOLS | ISD110
●Change the District Office heating system from ethylene glycol
(EG) to propylene glycol (PC) which is considered “food grade” or
lower toxicity — estimated cost: $7,500
○This change would align all district buildings with a
consistent food-safe glycol standard.
●Repair wrestling room wall damage that occurred during
construction — estimated cost: $7,500
●Complete commissioning for additional air handlers being
integrated into the CAM system — estimated cost: $5,000
●Miscellaneous project-related items and contingencies —
estimated cost: $15,000
Items to Complete over $25,000
## WACONIA PUBLIC SCHOOLS | ISD110
●High School fire alarm panel relocation and system updates —
estimated cost: $125,000–$150,000
○Relocate the fire alarm panel from the pool area to a
non-corrosive environment and complete necessary
updates to ensure system compatibility and compliance
with current code and safety standards.
●Air Handler #26 replacement/upgrade serving the High School
guidance area — estimated cost: $65,000
## Financial Outcome - IAQ and Parking Lots
## WACONIA PUBLIC SCHOOLS | ISD110
NIC-Owner Provided includes interest earnings.
Questions?