CompletedSchool Board
May 11, 2026 at 7:00 PM - ISD 110 School Board Work Session
School Board
Date: Monday, May 11, 2026 at 12:00 AMActual: Monday, May 11, 2026 at 12:00 AM
Documents (1)
Show document text
---
title: Microsoft PowerPoint - 20260402_Waconia_Finance Committee 2026 Update
## author: Michael Smith
date: D:20260402130212-05'00'
---
877.938.7059
## Facility
Funding &
## Long-Term
## Plans
877.938.7059
## Facility
## Assessment
## Building
## Assessment
## ASSESSMENT HEADLINES - 2023
•6 months of targeted assessments
•960,000 SQFT of facilities reviewed
•425 different types of assets logged
•Visualizations created for all major systems
•Created digital repository for all assets and systems
With the objective being:
Give the district the information required to make sure that all re-
investment into buildings is justifiable, quantifiable, planned, and of the
upmost priority
## 16 CATEGORIES OF FACILITY ASSESSMENT
## Accessibility
## Pathogen
## Mitigation
## Life Safety
## Systems
## Security
## Systems
## Exterior
## Envelope
## Grounds
## Hazardous
## Materials
## Interior Finishes
## Mechanical
## Systems
## Electrical
## Systems
## Plumbing
## Systems
Controls and
## Energy
## Management
## Capital
## Equipment
## Technology
## Systems
## Utility Service
## Improvements
## Programming
& Space
## Utilization
•System report cards, predicted remaining life
•Replacement / upgrade cost estimates
•Advanced prioritization
## Comprehensive Asset AssessmentComprehensive Asset Assessment
•Indoor air quality, light, sound, temperature, humidity
assessments
## Indoor Environment Assessment
•Identification of utility and operational cost savings
opportunities
## Facility Optimization
## DISTRICT WIDE FACILITY ASSESSMENT - 2023
## BUILDING DASHBOARD SUMMARY
## ASSESSMENTS CONTINUE
•Reassessment started in January 2026
•Updated High School and District Office from 2025/6 projects
•Continuing to collect athletic information
With the objective being:
Give the district the information required to make sure that all re-
investment into buildings is justifiable, quantifiable, planned, and of the
upmost priority
## WHAT DO THE ASSESSMENTS DO?
The comprehensive nature of the assessments allow the district
to prioritize projects by:
•Asset life expectancy
•Current asset condition
•Building location
•Interconnectivity to other systems
•Educational impact
•Community perception
•Project cost
•Project funding source
## YOUR ASSETS 2026
## YOUR ASSETS 2026
## Solutions
Development -
2023
## SOLUTIONS PRIORITIZATION
All assets in Caution, Alert, and Alarm have had potential
design solutions and estimates created
Working with the district and PMA, all these assets have been
cataloged by potential project year, funding type and cost,
and risk to building operation.
•2001 condensing
unit failures
•Challenges with
dated steam boiler
and distribution
systems
•Leaking at entrance
canopy
•Gym floor
resurfacing
•Original boiler
burner replacement
## High SchoolSouthview
## Middle School
## BayviewLaketown
•Aging HVAC air
handling units
•Aging HVAC
terminal equipment
•Aging air-cooled
chillers with old
refrigerant
•Re-roofing
considerations and
opportunities
…
No minutes document found yet. Refresh ingestion to check for newly published minutes, or analyze the agenda packet alone.
No analysis yet. Analyze the agenda packet to extract topics and supporting context — then generate focused stories. Minutes will be folded in when they appear.