RecordingTranscript available
Planning Commission - 12 Jan 2026
Burnsville-Eagan-Savage School DistrictTuesday, January 13, 2026
Watch on original sourceDocument Analysis
Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.
Transcript
[0:47] All right. Good evening, everybody. I am
[0:50] calling the Monday, January 12th, 2026
[0:54] planning commission meeting to order at
[0:57] 6:30 p.m.
[0:59] Tonight's meeting is being conducted
[1:01] both in person and online. Members of
[1:04] the public may attend in person or the
[1:07] public may also watch this meeting
[1:08] online at burnsvillemn.gov/meings
[1:15] or view us on comcast channel 16 or 859.
[1:20] The public can also join us on Zoom by
[1:24] going to zoom. usjoin.
[1:27] More information is available on our
[1:29] meetings web page and in the agenda.
[1:33] Cruising along, our first order of
[1:36] business is adoption of the agenda.
[1:41] Can I get a motion to adopt the agenda?
[1:43] Commissioners,
[1:45] >> motion to adopt. Second.
[1:46] >> All right. All those in favor say I.
[1:48] >> I.
[1:49] >> I.
[1:49] >> Oppose. Say n. Motion is carried.
[1:54] Second order of business is approval of
[1:57] the minutes from our December 8th, 2025
[1:59] meeting.
[2:02] >> Can I get a motion?
[2:03] >> Make a motion to uh approve the minutes
[2:05] of the last meeting.
[2:07] >> Second.
[2:08] >> All right. All those in favor say I.
[2:10] >> I.
[2:10] >> Oppose say nay.
[2:12] >> All right, we're rolling.
[2:16] All right. Our first topic of the night
[2:19] is an application of Great Northern
[2:22] Greens LLC for a conditional use permit
[2:25] to allow a cannabis micro business at
[2:28] 1100 Riverwood Drive being presented by
[2:32] Kier Chapman, our associate planner.
[2:34] Thank you for that introduction, chair.
[2:36] Today we're going to talk about the
[2:37] application of Great Northern Greens LLC
[2:40] for a conditional use permit to allow a
[2:41] cannabis micro business at 1100
[2:43] Riverwood Drive.
[2:47] The lefth hand picture is an aerial
[2:48] image of the subject site and the right
[2:50] hand is a zoning map. Um the zoning for
[2:52] the subject property and neighboring
[2:54] properties abudding the property is
[2:56] zoned I1 industrial park and is guided
[3:00] as uh IND industrial office in the 20
[3:04] 240 comprehensive plan. Um on the very
[3:07] west side is um and highlighted in a
[3:10] tanner color is the R1 single family
[3:12] residential zoning district and that is
[3:15] the Burnsville High School which is
[3:16] approximately uh 280 ft um from their uh
[3:20] property line to the subject property
[3:22] line. Um and that uh property is uh
[3:26] guided as lower density um lower density
[3:30] residential.
[3:33] some background uh information on the
[3:35] subject property. Um Great Northern
[3:37] Greens LLC is requesting a cannabis
[3:39] micro business at 1100 Riverwood Drive
[3:42] um through a conditional use permit. Um
[3:45] it is a use request since much of
[3:47] cannabis is regulated by the state. Um
[3:50] and they are not proposing any
[3:51] alterations to their building, exterior
[3:54] alterations to their building. Um micro
[3:57] business is required as a conditional
[3:59] use permit in this district. Um, micro
[4:02] businesses are defined as an entity that
[4:04] cultivates, manufactures, and sells
[4:06] products containing cannabis through a
[4:08] cannabis micro business license under
[4:11] under Minnesota statute chapter 342.
[4:14] That is a definition from our city code.
[4:16] Um, and what we'll be applying to this
[4:19] application, um, the subject site is a
[4:22] multi-tenant building. Um, there are
[4:23] currently two tenants within that site.
[4:26] um Eaglestone MN LLC and Hometown
[4:28] Autoare, which is a granite tile store,
[4:32] and then also an auto repair company.
[4:35] The subject site or the tenant, the
[4:37] proposed applicant would be occupying
[4:39] 3,500 square ft of the far west tenant
[4:42] space. Um the applicant would intend to
[4:46] use the property in which um as
[4:48] mentioned earlier for retail,
[4:50] manufacturing, and cultivation. The
[4:52] front portion of the building would be
[4:54] used for retail space, office and
[4:56] security. The central portion of the
[4:58] building would be used for manufacturing
[5:00] and the rear would be used for
[5:01] cultivation.
[5:03] Um, and any cannabis that is produced on
[5:05] site will be only exclusively sold at
[5:07] the site and will not be sold at other
[5:09] facilities. Um, and all operations will
[5:12] occur indoors and no exterior storage
[5:15] will happen at the site. Um, as
[5:17] mentioned previously, I did mention that
[5:19] it was the Burnsville High School is 280
[5:22] ft um, away from the subject property.
[5:25] Staff has spoken with the school
[5:26] district um, and began uh, discussions
[5:29] and met with them prior to receiving uh,
[5:31] public notification of this application.
[5:34] Um, and that is where we talked to them
[5:36] to be a good neighbor and also to
[5:38] address any concerns or comments that
[5:39] they had for this application before
[5:41] bringing it here to you tonight.
[5:45] uh some general history on the can uh
[5:48] the subject of cannabis and the specific
[5:50] applicant. Um in 2023, Minnesota passed
[5:53] a legislation, specifically statute 342
[5:57] and amended it in 2024 to allow adult
[5:59] cannabis. Um thus creating the Office of
[6:02] Cannabis Management, also known as OCM,
[6:05] which governs and overlooks cannabis
[6:06] licensing and and enforcement.
[6:09] Uh cities were given an opportunity
[6:11] after this um ordinance was put into
[6:14] place to create um restrictions on
[6:17] cannabis through local regulations. Uh
[6:19] compliance creating caps and buffers for
[6:22] can excuse me for cannabis. Um these
[6:25] buffers could be from school districts
[6:27] um daycarees or parks that had a feature
[6:30] tailored towards children. Um and cities
[6:33] could also dictate uh place, manner, and
[6:35] time restrictions. Um, in 2024, the city
[6:39] council um adopted an ordinance number
[6:41] 1619 in which they decided not to
[6:44] initiate any caps or buffers on
[6:46] cannabis, but they did adopt um zoning
[6:49] ordinance regulations on cannabis
[6:52] um which can be found um in 10753 of
[6:56] their zoning ordinance. Um, Great
[6:59] Northern Greens received notification in
[7:01] May or June May and June of 2025 and is
[7:04] one of many businesses that received
[7:06] preliminary license approval. Um, they
[7:09] have 18 months to secure location and
[7:11] complete all state requirements.
[7:16] Specifically for this conditional use
[7:18] permit, as mentioned earlier, it is a
[7:20] use uh permit. U much of it is regulated
[7:23] by the state. Um, but I'm just going to
[7:26] briefly kind of go over what the
[7:27] applicant is proposing to do at the
[7:29] site. Um, as mentioned previously, I did
[7:32] mention that uh the front area of the
[7:34] building would be used for retail
[7:35] security and office purposes. Um, in
[7:38] that retail space, they would display
[7:40] cannabis flour, edibles, topicals,
[7:42] vaporizers, and accessories for
[7:44] purchase. Whereas the central portion
[7:46] would be used for the production and
[7:48] packaging of edibles, concentrates, and
[7:50] topicals. and the rear portion will be
[7:52] used for cultivation. They intend to
[7:55] have 8 to 10 employees on site and
[7:57] operate from 9:00 a.m. to 9:00 p.m. 7
[8:00] days a week. Um they did supply odor
[8:03] suppression plans with their application
[8:05] and it indicates that they will have
[8:06] carbon filtration and negative air
[8:08] systems in all cultivation and
[8:10] manufacturing areas. Um, they did also
[8:13] mention in their project narrative that
[8:14] they would have regular maintenance for
[8:17] odor control equipment and growrooms
[8:19] will have automatic controls for
[8:20] temperature and humidity. They also
[8:22] mentioned that they would have 247 HD
[8:25] video surveillance for access points.
[8:27] Um, and I'd also like to mention that
[8:29] the applicant mentioned they would have
[8:31] um employees verify age before entry
[8:33] into the building. Uh with state statute
[8:36] um it is required to verify that they
[8:38] are 21 or older um before the purchase
[8:41] of the product. So they can do that
[8:43] either before they enter the building or
[8:45] before they purchase the product. But
[8:46] regardless, it has to be before the sale
[8:48] of the product.
[8:51] Um here's just a site plan the applicant
[8:53] submitted um is much like I explained
[8:55] before. The front portion would be for
[8:57] retail, office and security. And then
[8:59] the middle central section would be for
[9:01] production and manufacturing whereas the
[9:03] rear would be for cultivation.
[9:07] Uh specifically for this tenant, they
[9:09] would be required to have a minimum of
[9:11] 12 parking stalls. Um Great Northern
[9:13] Greens would receive deliveries in the
[9:15] rear loading area and will not have any
[9:16] dedicated company vehicles on site. Um
[9:20] and taking into account the other
[9:21] attendants on site, um they would be
[9:23] required to have a total of 34 parking
[9:25] stalls. And um based on the submitted
[9:29] site plans that they provided, there are
[9:31] 37 stalls at the site, therefore meeting
[9:34] the ordinance. Um they have 27 stalls in
[9:37] the front of the property and 10 to the
[9:39] far west side. Um what is abuing their
[9:42] tenant space. Um specifically, city code
[9:45] 10726
[9:47] notes that there are two different
[9:48] calculations for warehousing. Um, if the
[9:50] warehousing space is above 15,000 square
[9:53] feet, we calculate it by one space per
[9:55] 2,000. Whereas, if it is a warehousing
[9:58] space less than 15,000 square ft, we
[10:00] calculate it by one space per 500 square
[10:03] ft of floor area.
[10:05] Uh, staff used uh the warehousing
[10:07] calculation of one per 2,000. Uh, we use
[10:12] this even though it is technically a
[10:14] space less than 15,000 square ft. um
[10:16] just to provide consistency in review
[10:18] and comparable projects and I believe
[10:20] staff discussed that this is something
[10:22] we would change in the zoning ordinance
[10:24] rewrite.
[10:27] Uh there is a sign master plan from 1979
[10:31] um that is more restrictive than our
[10:32] current zoning ordinance. Um, and
[10:35] specifically, uh, that sign master plan
[10:38] indicated there are specific
[10:39] requirements, um, stating that the sign
[10:43] must be 2 by4 with a white background
[10:46] and that it must be non- illuminated,
[10:47] have one sign per bay, and limited to
[10:50] name and address. Um, any deviations for
[10:52] this would require a sign a
[10:54] comprehensive sign plan amendment. Um,
[10:57] and if the applicant intends to provide
[11:00] any new signage on the site, they would
[11:02] need to submit a signed permit. um in
[11:04] which staff would review and make sure
[11:06] it is compliant with the sign master
[11:07] plan.
[11:09] Some things to consider with this
[11:11] application. The proposal is a use
[11:12] request and since much of it is
[11:14] regulated by the state, um we are just
[11:17] reviewing it to make sure it's meeting
[11:18] our zoning ordinance requirements. The
[11:21] project meets the findings for approval
[11:22] of the CUP. The proposal meets the
[11:24] intent of the zoning ordinance and
[11:26] comprehensive plan and meets
[11:28] Burnsville's ordinance number 1619, city
[11:31] code 10-7-53.
[11:35] Staff recommends that the planning
[11:36] commission recommend the city council to
[11:38] approve the COP to allow cannabis micro
[11:40] business at 1100 Riverwood Drive subject
[11:43] to the nine conditions of approval.
[11:46] The project must be completed in
[11:48] accordance with the submitted plans and
[11:49] as amended by the conditions of
[11:51] approval. Any significant changes to the
[11:53] plans as determined by the planning
[11:55] staff shall require review and approval
[11:57] by the planning commission and city
[11:58] council.
[12:00] Conditional use permit approval shall
[12:01] expire one year from the date of the
[12:03] city council approval unless a building
[12:05] permit has been requested or a time
[12:07] extension has been granted by the city
[12:08] council. The city council may extend the
[12:10] expiration date of such approval upon
[12:12] written application by the person to
[12:14] whom the approval was granted.
[12:18] The applicant shall complete pre-lic
[12:20] inspections and other necessary step
[12:22] steps with the state of Minnesota's
[12:23] office of cannabis management to obtain
[12:25] a fully issued cannabis business
[12:27] license. The conditional use permit
[12:29] approval is contingent upon submitt of
[12:31] proof of valid preliminary and final
[12:32] license from the Minnesota Office of
[12:34] Cannabis Cannib Cannabis Management
[12:36] prior to operation.
[12:39] The business shall maintain all required
[12:41] state licenses throughout the life of
[12:42] the conditional use permit. All cannabis
[12:44] cultivation, manufacturing, and retail
[12:46] activities shall be fully contained
[12:48] within the principal structure. No
[12:50] outdoor activities or storage is
[12:52] permitted.
[12:53] Failure of the business to operate in
[12:55] compliance with Minnesota statutes and
[12:57] rules governing cannabis micro
[12:59] businesses shall be grounds of for
[13:00] termination of the conditional use
[13:02] permit. The business shall implement
[13:04] odor suppression measures, including but
[13:06] not limited to HVAC filtration or carbon
[13:09] scrubbers to prevent detectable odors
[13:10] beyond the property line. Security
[13:13] measures shall be installed and m
[13:15] maintained consistent with OCM's
[13:16] requirements and city code, including
[13:19] controlled access, exterior lighting,
[13:20] and surveillance cameras. With that, I
[13:23] will put it back to the conditions or
[13:25] the recommendation. Um, I will turn it
[13:27] to planning commission for any questions
[13:28] or comments that you may have.
[13:30] >> Thank you, Miss Chapman. All right,
[13:32] commissioners. Do you have any questions
[13:34] for staff? Commissioner Anderson,
[13:37] >> there seems to be a conflict of
[13:40] scheduling between when the state has to
[13:42] approve it with a year and a half and
[13:45] they only have a year to use the cup
[13:47] here. Shouldn't we just make it approved
[13:51] for a year and a half to match up with
[13:52] the state?
[13:54] >> You referring to the 18 months,
[13:56] >> right?
[13:57] >> So 18 months from when they have to
[14:00] receive all the approvals. So that's for
[14:02] uh approval from the local ordinance.
[14:04] So, our local governing body and then
[14:07] also they need to make make sure they
[14:09] meet building codes as well. Um, and
[14:11] meet whatever the requirements are for
[14:13] OCM. Um, that is specifically required
[14:16] by the state. That is not something we
[14:18] have control over. Um, and so we just
[14:21] follow the direction that OCM provides
[14:23] us. But if the cup says they have to be
[14:27] done in the year
[14:30] that you've got six months there,
[14:32] shouldn't the cup just go to a year and
[14:34] a half to start out with?
[14:37] So I can answer that question. Our um
[14:40] city code allows for one year. So
[14:42] anything over one year um they can they
[14:45] can request for an extension at one year
[14:48] if they're not in compliance with the
[14:50] OMC standards at that time yet. So to
[14:52] get us to the 18month
[14:54] per the state statute
[14:58] >> commissioner
[15:00] >> um I think they're their license was
[15:02] approved in May or June.
[15:04] >> Yeah, May and June.
[15:05] >> So they're already six months into it.
[15:06] So the COP and the you know our timeline
[15:09] and the state timeline I think are going
[15:11] to
[15:13] >> end at about the same time.
[15:14] >> Good planning.
[15:18] >> Great. Any other questions for staff
[15:21] commissioners?
[15:22] >> Uh consideration around like waste
[15:24] management and also on like the fire
[15:26] side. I know that the application said
[15:28] it's fine on fire, but I'm curious like
[15:30] what kind of background did they look
[15:31] into or concerns?
[15:34] >> Yeah, so this the anytime we receive
[15:36] applications, it gets reviewed by all
[15:38] our departments. Um which means it would
[15:40] be reviewed by our fire department. They
[15:42] did not have any comments or concerns on
[15:44] the application. U the applicant
[15:46] provided uh project narrative uh proof
[15:48] of OCM lensure um the odor suppression
[15:52] plans and the site plans. Um and once if
[15:55] this is approved there is a building
[15:57] permit that they would need to submit.
[15:59] Um and at that point if there are
[16:01] concerns they can also address it in
[16:02] that building permit as well.
[16:04] >> Okay.
[16:06] >> Commissioner
[16:07] two I have two questions. The first is
[16:09] on signage. Mhm.
[16:10] >> Am I understanding it now that there is
[16:13] no signage that they won't have a sign?
[16:16] >> So, I guess I'm not sure what signage
[16:18] they currently have on site, but the
[16:20] tenant those specific requirements from
[16:22] 1979 for that sign master plan, that
[16:24] applicant would have to meet those
[16:26] requirements that are outlined in that
[16:28] sign master plan.
[16:30] >> Okay. And we're within 285
[16:34] was it yards from the high school? Um
[16:37] the subject property is about 280 ft
[16:39] away from that that property. Okay.
[16:43] >> Did the school have any concerns about
[16:46] the signage facing their school or maybe
[16:49] this being that close to the school
[16:51] advertising cannabis?
[16:53] >> I can't remember specific concerns on
[16:56] signage. I know we talked about it. Um,
[16:58] but since it is more restrictive than
[17:00] our existing sign ordinance, I don't
[17:03] think it's going to be a huge concern,
[17:05] especially since it's limiting it to
[17:07] only one sign on like dedicated for that
[17:10] tenant. They can only have one sign. If
[17:12] >> I can add to that, council um
[17:14] commissioner, state statute does highly
[17:16] regulate the signage on there. Um, they
[17:18] cannot have any descriptions or images
[17:21] of cannabis. It has to be they have a
[17:24] lot of standards around that. So, I
[17:26] think as part of the OMC's OCM's
[17:30] um permitting process, they do review
[17:32] that as well. I could be wrong on that,
[17:33] but I'm pretty sure they do because
[17:35] looking at the standards within state
[17:36] statute, I have a feeling they would
[17:37] review it as long as the city will too.
[17:40] So, this
[17:42] facility where they're proposing to
[17:43] locate does have a very strict comp
[17:46] sign. Um they can't even have signs
[17:49] illuminated at this time. So, um, like
[17:52] associate planner Chapman said, if they
[17:54] want to change that, they would have to
[17:56] go through a process. It's
[17:57] administrative, but they would have to
[17:59] amend that.
[18:00] >> And the second question I had was um,
[18:04] the security and compliance, which I
[18:06] applaud. I think it's fantastic. It's
[18:07] just a question. It says that no minors
[18:10] are permitted on site at any time and
[18:13] that they will ID people before they
[18:15] come in. Can a an adult uh 18, 19, 20
[18:21] enter accompanied by a 21-year-old?
[18:24] >> I'm not familiar with that off the top
[18:26] of my head, but from my understanding, I
[18:28] you couldn't enter unless you were 21
[18:30] years or older, even if you were
[18:32] accompanied. That's my understanding.
[18:34] >> Okay, thank you.
[18:35] >> Yeah, Commissioner,
[18:38] >> um I have a question about uh condition
[18:41] number eight, the odor suppression
[18:43] measures.
[18:45] uh which are to prevent detectable
[18:47] orders beyond the property line. Is that
[18:49] the line of the property or is it the
[18:51] line of the tenants space within the
[18:54] building?
[18:57] >> Is that
[18:57] >> based on what the code says here or what
[19:00] this condition says here? That would be
[19:01] the property line itself.
[19:03] >> So it's the property line, not the not
[19:05] the common wall. Okay. Thank you.
[19:07] >> Yep.
[19:10] >> Any other questions, commissioners or
[19:12] staff? All right. Actually, before I
[19:14] open the public hearing, um if the
[19:16] applicant is in the room and wants to
[19:18] just step to the the podium and say a
[19:21] few words and then commissioners, if you
[19:24] have any questions for the applicant.
[19:26] >> Hi, my name is Patrick Reynolds. This is
[19:28] one of my partners, Rachel Teal. Thanks
[19:30] for uh considering our application
[19:32] tonight.
[19:33] >> Of course. Commissioners, did you have
[19:35] any questions for the applicant yet?
[19:40] >> No. All right. Thanks again.
[19:42] >> Yeah. And with that, I am going to open
[19:45] the public hearing at 6:49
[19:48] p.m. Anyone who wishes to speak to this
[19:51] can step up to the podium and you can
[19:53] say your name and address for the
[19:55] record. Come on down.
[20:02] >> Hello, Jesus Sandoval. Um, address
[20:06] >> of the school of my residence.
[20:08] >> Your residence?
[20:09] >> Yes. So, 8952 Ivy Road, St. Cloud,
[20:13] Minnesota 56301.
[20:16] Um, my name is Jesus Sanaval and I am
[20:18] the principal of Burnsville High School.
[20:20] I'm here to share perspective regarding
[20:23] uh the pending application for cannabis
[20:25] micro business near our school. Uh as
[20:27] principal of Burnsville High School, my
[20:29] goal is to ensure uh that the committee
[20:31] and the applicant are fully aware of our
[20:33] unique position as a neighboring
[20:35] educational institution.
[20:37] Along with student academic success, the
[20:40] safety and security of our school
[20:42] community continues to be a high
[20:43] priority. Our campus serves a little
[20:46] less than 2,000 students in grades 9
[20:49] through 12, aged 14 through 18. This is
[20:53] a pivotal age group and is essential
[20:54] that any new development in our
[20:56] immediate vicinity respects the sanctity
[20:59] of learning of the learning environment
[21:01] and the well-being of our teenagers.
[21:04] As you deliberate on the conditions of
[21:06] this permit, we ask that you prioritize
[21:07] the following safety and security
[21:10] considerations.
[21:12] um strict security protocols, which
[21:14] certainly there has been uh some that
[21:16] has been presented, but want to
[21:18] reiterate, it's important that the
[21:20] applicant maintain rigorous security
[21:22] measures uh inside and outside of the
[21:24] business to prevent students from
[21:26] entering, people from loitering, and it
[21:29] does not create an environment that
[21:30] attracts unauthorized individuals to the
[21:33] perimeter of our school.
[21:36] operational discretion. Given that our
[21:39] students ages 14 through 18 are
[21:42] frequently outside for physical
[21:43] education,
[21:45] sports transitions, uh we advocate uh
[21:49] for strict regulations regarding
[21:51] signage, odor control, and visibility to
[21:54] ensure the businesses remains in
[21:56] obtrusive as possible. My focus in being
[21:59] here is to ensure that the safety and
[22:00] security of our students and our entire
[22:02] school community is at the forefront
[22:04] when decisions are being made.
[22:06] I trust that the committee and our city
[22:10] hold this applicant to the highest
[22:11] possible standards to ensure that our
[22:13] school remains a safe, focused, and
[22:15] secure place for our young people to
[22:17] learn. Thank you.
[22:19] >> Thank you so much,
[22:23] >> Commissioner.
[22:23] >> I have a question for the applicant. I
[22:25] have two questions.
[22:27] Is there a limitation to how much a
[22:32] customer can buy?
[22:35] Yes, there is.
[22:37] >> Can you Can you step to the podium?
[22:42] >> There is. I'm not going to be able to
[22:44] accurately answer that and I can get
[22:46] back to you, but typically it's like one
[22:48] ounce of flour that you're able to
[22:50] purchase in one visit.
[22:54] >> Okay.
[22:55] >> So, it's strictly and it's that's going
[22:56] to be a state regulation. And second
[23:00] question,
[23:01] >> when someone comes in to purchase, do
[23:03] they
[23:05] can they just walk in off the street or
[23:07] they need some type of lack of better
[23:10] words, a prescription or anything like
[23:12] that?
[23:13] >> So the vision for the security would be
[23:15] that they'd have to have a
[23:16] governmentissued ID before they can
[23:18] enter the pro property or the premises.
[23:20] they'd have to iss that would have to be
[23:23] uh seen and approved as valid for
[23:26] someone 21 years of age or older. Then
[23:28] they'd be allowed in and then upon
[23:30] purchase they would also be rechecked on
[23:32] that. Uh we intend to scan IDs to make
[23:35] sure they're valid as well as part of a
[23:37] security measure.
[23:39] >> Okay.
[23:41] >> Only other thing I just wanted to say is
[23:42] I did grow up in Burnsville. Actually
[23:44] went to Burnsville High School and both
[23:46] my parents were educators. actually one
[23:48] of them was in the district and I would
[23:50] respect everything that the principal
[23:52] said. Uh we intend to be uh good
[23:54] neighbors and good partners and in it
[23:56] for the long run and we wholeheartedly
[23:58] stand behind everything you had
[24:00] mentioned. So thank you for bringing
[24:01] your um concerns and your information.
[24:04] So
[24:05] >> I do have a question before you step
[24:07] away.
[24:07] >> That's okay. That's okay.
[24:08] >> I've never done this before. So
[24:10] >> it's all right. Um is there any waste
[24:13] produced during your process that you're
[24:15] going to have in your facility? So, we
[24:17] are really have been focusing mostly on
[24:19] our retail side um because that we
[24:22] believe can fund everything else right
[24:24] away. We're kind of we are wellunded,
[24:26] but at the same time, we're kind of this
[24:28] combination between wellunded and
[24:30] bootstrapping some stuff. And so, we
[24:32] intend to have retail um help with the
[24:34] the growth side of it. So, with the
[24:36] retail, we really don't anticipate a lot
[24:38] of waste. Um, we would with in terms of
[24:42] growing have things like um maybe soil.
[24:45] Um, we maybe have to remove that or
[24:47] regenerate it or somehow uh move it down
[24:49] and compost. Uh, for lack of a better
[24:51] way to say, we'd have to get fresh soil,
[24:54] maybe take the old stuff down to the
[24:56] mulch store in Burnsville and go that
[24:58] way. Um, apart from that, no, there I
[25:01] don't foresee anything in terms of
[25:03] hazardous waste that we would encounter.
[25:05] So,
[25:06] >> thank you. Mhm.
[25:07] >> Just to add on to that, state statute
[25:08] does have pretty clear regulations on
[25:10] how they have to handle waste. It has to
[25:12] be stored indoors, can't be outdoors, it
[25:14] has to be secure and all that as well.
[25:16] >> So the the state statute is very clear
[25:19] on how the applicant has to handle their
[25:22] cannabis wa waste produced from the
[25:24] cannabis operations.
[25:26] And I also like to meet mention too,
[25:28] sorry, um we share the same um city. you
[25:33] know, we've met with the school
[25:34] district. We have worked with our city
[25:36] attorney on this application to make
[25:37] sure that we can add conditions that are
[25:40] within the limits of state statute and
[25:42] all that as well. So, we are work
[25:45] together as a group on this application
[25:48] with the school district. Um, the
[25:50] principal we met with and the applicant
[25:52] was made very aware of the state statute
[25:55] and the city's uh registration process.
[25:58] Just want to add that to it as well.
[26:00] >> Thank you.
[26:02] All right.
[26:04] Any other questions for the applicant
[26:06] commissioners? No.
[26:08] >> Thanks again.
[26:09] >> Yeah. If anyone else doesn't wish to
[26:12] speak to this, then I will close the
[26:14] public hearing
[26:16] at 6:55 p.m. All right. Turning it over
[26:20] to you, commissioners. Any discussion or
[26:23] a motion?
[26:28] >> Go ahead.
[26:35] Uh,
[26:37] >> Commissioner Howard.
[26:39] >> Uh, seeing no further discussion, I will
[26:42] I'll make the motion
[26:44] and, uh, bear with me while I Okay. So,
[26:48] I move that we recommend to the city
[26:51] council approval of the conditional use
[26:53] permit to allow a cannabis micro
[26:55] business at 1100 RI Riverwood Drive
[26:58] subject to the nine conditions that were
[27:01] listed.
[27:03] >> All right, a motion is on the table.
[27:05] >> Second.
[27:06] >> Seconded by Commissioner Hamilton. All
[27:08] those in favor say I.
[27:10] >> I. Oppos. All right. Motion is carried.
[27:14] What a beautiful collaboration.
[27:17] All right. And that will be on the next
[27:19] city council.
[27:21] >> Yeah.
[27:22] >> February
[27:24] 2nd meeting. Apologies here.
[27:26] >> The third February 3rd agenda.
[27:30] >> Yeah. Congratulations.
[27:32] >> All right.
[27:34] Um, our next topic is an application of
[27:38] JNL Design Group on behalf of Costco
[27:41] Wholesale Corporation for a preliminary
[27:44] plat, final platzoning,
[27:48] conditional use permit, and planned unit
[27:50] development amendment at 911 140th
[27:54] Street West and 14001
[27:57] Burnhaven Drive and 1450 Burnhaven Drive
[28:02] being presented. by our associate
[28:03] planner, Mr. Connor Jinx.
[28:06] >> Yeah. Good evening, commissioners. Um,
[28:08] thanks, Madam Chair. Uh, the application
[28:11] before you again is from Costco
[28:12] Wholesale. As uh, Miss Chair outlined.
[28:15] The subject site before you consists of
[28:18] three individual parcels. The first and
[28:20] largest being the Costco Wholesale site
[28:22] west of Burn Haven Drive. And to the
[28:25] east of Burn Haven Drive are two sites.
[28:27] the former Pumpkin Patch Childare site
[28:29] on the corner and to the east of that
[28:31] the former fire station one site um
[28:34] which is located off of 140th Street
[28:37] West. We'll note um the Costco um
[28:40] wholesale site and the pumpkin patch
[28:42] site are both zoned mixeduse currently
[28:44] and guided mixed use in the 2040
[28:46] comprehensive plan. The former fire
[28:48] station one site is currently zoned park
[28:50] and is guided mixed use in the 2040
[28:53] comprehensive plan. Before discussing
[28:56] the applications before you, I think
[28:58] it's beneficial to walk through a little
[28:59] background and history on all three of
[29:01] the sites. I have it hopefully
[29:03] streamlined through a little bit of the
[29:04] Costco site history and then the pumpkin
[29:06] patch and the fire station site history
[29:08] as well. So, first um the former pumpkin
[29:10] patch site and former fire station one
[29:12] site were originally part of a larger 25
[29:15] acre parcel in um the 1970s and they
[29:18] were platted in 1976.
[29:20] Following that, in 1991, there was an
[29:23] approval of a planned unit development,
[29:24] a comprehensive plan amendment, and a
[29:26] resoning for an overall development of
[29:29] that entire 25 acres for a townhouse and
[29:31] commercial development. Um, that 1991
[29:35] PUD is still in effect today for the
[29:37] parcels that were included, um, which
[29:39] does include the pumpkin patch parcel,
[29:41] which will come into play as we talk
[29:42] through the zoning applications. Um,
[29:44] only parts of that PUD were developed in
[29:45] accordance with that 1991 approval. um
[29:48] although it remains in effect of all the
[29:50] sites that were within that um larger
[29:52] area. The pumpkin patch site was
[29:54] developed in 1981. Um the site is now
[29:57] owned by Costco. It's recently been
[29:59] utilized for employee parking during
[30:01] peak demand or need um which is mostly
[30:03] during the holiday season of Christmas
[30:05] and New Year's. Uh the fire station one
[30:08] site was developed in the 1970s. Um the
[30:10] building was demoed in 2022 in
[30:13] accordance or in uh correlation with the
[30:16] new fire station and the site was um
[30:18] then infilled for future development.
[30:19] And this application represents the
[30:21] first development application since the
[30:23] demo of the um previous fire station 1
[30:28] for the Costco warehouse site
[30:29] specifically. Um I'll kind of skip ahead
[30:31] to 2010. Um the site was approved with
[30:34] the plan unit development in 2010 for
[30:35] the development of the Costco site.
[30:37] They've received two amendments to their
[30:39] PUD, one in 2012 for a vehicle display
[30:41] and one in 2015 for site expansions um
[30:44] in the form of fuel pumps, fuel canopy,
[30:46] and the liquor store.
[30:49] Moving forward with um the most recent
[30:51] history on the fire station one site. Um
[30:53] the city did um release a solicitation
[30:55] of offers in October of 2024 for
[30:58] development proposals for the site. The
[31:00] council reviewed those proposals and did
[31:02] select Costco Wholesale as the preferred
[31:05] um applicant or proposal um developer.
[31:08] Following that, um council directed
[31:11] staff to enter purchase agreement
[31:12] negotiations with Costco. And in 2025,
[31:15] uh May of 2025, a purchase agreement was
[31:17] signed between the city and Costco.
[31:20] Costco and the city did hold a
[31:22] neighborhood meeting on April 10th,
[31:24] 2025. There were five people that
[31:26] attended. Um, three main concerns were
[31:29] brought up were related to fuel vapors,
[31:30] screening, and traffic um due to the
[31:34] potential for a motor fuel station to be
[31:36] constructed um on the parcel. We'll talk
[31:39] about how the applicants um mitigated
[31:41] those concerns as we go through the
[31:42] presentation. Most recently, in August
[31:44] of 2025, the applicant um submitted a
[31:47] sketch plan review to go before council.
[31:49] Um, a sketch plan review again is an
[31:51] informal process that the applicant can
[31:53] apply for to go before council in a work
[31:55] session to receive feedback and further
[31:57] direction on the project. Council was
[31:59] supportive of the project and the
[32:01] application presented was very similar
[32:03] to the one before you this evening with
[32:05] minor improvements.
[32:07] So, there are four different zoning
[32:09] applications with five actions requested
[32:11] this evening. Um, two are related to
[32:13] reszoning. There's a preliminary and
[32:15] final plat, a plan unit development
[32:17] amendment specifically for the Costco
[32:18] site and a conditional use permit for
[32:20] motor fuel station for the pumpkin patch
[32:23] and former fire station one site.
[32:26] Firstly, the reszoning that's proposed
[32:28] um there are again two actions. The
[32:30] first is to reszone the former fire
[32:32] station one parcel shown in green which
[32:35] is currently zoned as park. proposal is
[32:37] to reszone that to mixed use shown on
[32:40] the right side of the screen which is in
[32:42] accordance with the 2040 comprehensive
[32:43] plan. The second action requested is to
[32:46] reszone the pumpkin patch site from
[32:48] mixed use with a PUD overlay to mixeduse
[32:52] zoning. Um again that PUD that's being
[32:55] resended proposed to be removed is that
[32:56] 1991 PUD that's remaining in effect of
[32:59] the site. Um however the applicant is
[33:01] proposing to meet all standards of the
[33:02] zoning district not requesting any PUD
[33:04] flexibilities. Therefore, uh PUD is not
[33:08] required and the removal of that PD
[33:10] allows for uh consistent zoning
[33:12] standards on both parcels instead of
[33:14] having specific requirements for the
[33:16] western half of the parcel versus the
[33:17] eastern half. As the applicant's
[33:20] proposing a preliminary and final plat
[33:21] to combine those two lots together for
[33:24] the construction of a new motor fuel
[33:26] station with the plat, um the applicant
[33:28] would be required to dedicate rightaway
[33:30] on 140th Street, uh shown on gray on
[33:33] screen before you. And then there's
[33:34] various um perimeter lot easements that
[33:36] exist that would need to be vacated and
[33:38] cleaned up. So the applicant um is
[33:40] proposing to complete that as well. And
[33:42] then new perimeter lot easements would
[33:43] be um recorded with the new plat.
[33:48] Just to talk through the overall site
[33:50] plan um which is shown on screen before
[33:53] you um on the Costco site specifically
[33:56] um in the north side of the site is
[33:58] where the existing fuel station is
[33:59] located. The applicant would propo is
[34:01] proposing to demo that facility, remove
[34:03] the underground tanks, and then install
[34:05] um additional parking stalls. The next
[34:08] improvement the applicant is proposing
[34:10] is a traffic signal at the intersection
[34:11] of Burnhaven Drive and 140th Street
[34:14] West. Along with that signal would be
[34:15] improvements to the um entrance drive
[34:17] aisle with an extension that allows for
[34:20] ample stacking for the signal as well as
[34:22] um a longer decision-making point for um
[34:25] vehicular traffic. on the eastern side
[34:27] of Burnhaven Drive. The applicant would
[34:30] propose to demo the existing pumpkin
[34:32] patch childc care building, replace that
[34:34] with parking stalls, and then develop
[34:35] the fire station site with the fuel
[34:38] pumps, fuel canopy, and then underground
[34:40] tanks.
[34:44] The first application that would be
[34:46] required in order to um see this plan to
[34:48] come come to fruition would be a planned
[34:50] unit development amendment for the
[34:51] Costco site. This amendment would be
[34:53] required to memorialize site plan
[34:55] changes. Um again, deviations are not
[34:57] requested for the Costco site. Um as the
[35:00] proposal would meet zoning district
[35:02] standards as well as um meet the PUD
[35:04] standards that are currently in effect
[35:05] of the site. There's various benefits um
[35:08] which are listed on screen before you.
[35:11] We'll note um the applicant in the city
[35:14] did work with a third-party traffic
[35:16] consultant to conduct a traffic study of
[35:19] the intersection of Burnhaven Drive and
[35:21] 140th Street West.
[35:23] The traffic consultant um went out did
[35:27] um uh research on the warrants and uh
[35:30] counted the vehicles through the
[35:31] intersection and did find that current
[35:33] demand does meet requirements for
[35:34] improved traffic measures and noted a
[35:36] signal would provide satisfactory levels
[35:38] of service which is why a signal is
[35:40] proposed before you this evening. Um
[35:43] again at this intersection here which is
[35:44] Burnhaven and 140th Street. um Costco
[35:48] would be responsible for um the cost of
[35:51] the installation and design work and
[35:53] then the city would own that signal um
[35:55] long-term into the future.
[36:00] The second application um related to the
[36:02] development of the parcels, more
[36:04] specifically the eastern side of
[36:05] Burnhaven would be a conditional use
[36:07] permit which is required for any new
[36:09] motor fuel station within the mixeduse
[36:10] zoning district. The proposal is for uh
[36:13] 20 fuel pumps which would be 40 fueling
[36:15] positions. Currently at the Costco site,
[36:18] there's 16 pumps and 32 positions. So
[36:20] proposing to increase the amount of
[36:22] fueling positions. The applicant's
[36:25] proposing a parking stall count of 50
[36:27] stalls, which is in that western half.
[36:29] And just to reiterate, a cup ensures the
[36:32] proposed use is compatible with the
[36:33] surrounding uses and no adverse impacts
[36:35] to adjacent properties.
[36:38] The site plan for the fuel station is
[36:39] shown on screen. Just to talk through um
[36:41] how the site would flow. Traffic was
[36:44] really intended to flow from west to
[36:45] east through the site. There are three
[36:47] accesses proposed with the site plan.
[36:50] The first is the westerly rightin access
[36:52] off of Burnhaven Drive.
[36:54] The second is a right in right out on
[36:57] the northern part of the site. And the
[37:00] final access would be a left out and a
[37:02] right out um after you complete your
[37:05] refueling at the fuel station. Related
[37:08] specifically to the Burnhaven drive
[37:09] access. I will note um you might have
[37:12] noticed in the conditions of approval,
[37:13] there is a condition that um talks about
[37:16] if two or more police reported incidents
[37:18] occur within a 12-month period, the city
[37:20] may require a third party review of this
[37:22] specific access
[37:24] and um require improvements or removal
[37:27] of the access or such um if those
[37:30] incidents are recorded. This is really
[37:32] intended to be a safeguard for the city
[37:34] given its proximity to the signal as
[37:36] well as um no dedicated right turn lane.
[37:39] So really just providing that safeguard
[37:41] for the city to review that and make
[37:43] improvements if necessary and if there
[37:44] are potential incidents or um uh yeah
[37:49] accidents I guess related to that
[37:50] engineering of the access specifically.
[37:54] Um, continuing with the site design, um,
[37:56] we mentioned adverse impacts and, um,
[37:58] negating those, um, brought up at the
[38:01] neighborhood meeting to reiterate were
[38:02] traffic, which is being mitigated
[38:03] through the, um, installation of a
[38:05] traffic signal. And then, um, screening
[38:08] was also brought up at that neighborhood
[38:10] meeting. The applicant has mitigated
[38:12] those concerns by intentionally locating
[38:14] the detention pond on the southern part
[38:15] of the property um, to further push the
[38:19] fueling uh, or refueling, I guess, away
[38:21] from the property line. They've proposed
[38:23] additional landscaping around that
[38:25] southern property line and then the
[38:26] installation of a six-foot vinyl fence
[38:28] to provide screening as well from the
[38:29] adjacent property owners.
[38:33] Terms of architecture, um the zoning
[38:34] ordinance does not establish specific
[38:36] requirements for fuel canopies and
[38:38] utility structures. The applicant's um
[38:40] proposing materials in accordance with
[38:42] the existing materials on the um
[38:44] existing fuel station. The one thing I
[38:46] will note um is the applicant is
[38:48] proposing fully brricked rack brick
[38:50] wrapped structural columns for the fuel
[38:52] canopy.
[38:55] Terms of parking and loading for the
[38:57] Costco site, the existing Costco site,
[38:59] um it does meet all ex uh parking
[39:01] requirements per the PUD as well as the
[39:03] zoning code currently existing are 661
[39:06] stalls. The applicants proposing a total
[39:08] of 792 stalls between both sites.
[39:11] There'd be an increase of 93 stalls on
[39:13] the Costco site specifically. 81 stalls
[39:16] would be located in this northern area
[39:19] where the fuel station would be removed
[39:20] and then 12 stalls would be located
[39:23] related to that entrance drive
[39:24] extension.
[39:27] Terms of parking for the motor fuel
[39:29] station um code does require a minimum
[39:30] of 21 stalls. The applicant's proposing
[39:33] a total of 90. 50 via the parking lot
[39:35] and then 40 via the fueling positions as
[39:38] code allows you to count fueling
[39:40] position stalls. Um towards the parking
[39:42] count. There's a total of 30 stacking
[39:45] positions for the fuel station and um
[39:47] just to touch briefly, the applicant
[39:49] currently operates a shuttle bus
[39:50] operation for um busing employees from
[39:54] the current pumpkin patch daycare site
[39:56] to the Costco warehouse. so employees
[39:58] don't have to walk across the street um
[40:00] that distance to the warehouse. So that
[40:02] shuttle bus comes when shift changes
[40:04] occur or there's a number of employees
[40:05] that are needing to be transported um
[40:08] from the lot to the warehouse. Generally
[40:11] pickup occurs um within the drive aisle.
[40:13] It's very quick um you know it's
[40:15] obviously in groups and people are
[40:17] waiting for that shuttle bus. They hop
[40:18] on and then um that shuttle bus would
[40:20] bring the employees to the warehouse.
[40:26] terms of landscaping, um the proposal
[40:27] does meet all requirements of the
[40:29] ordinance. The one thing I'll highlight
[40:31] is that the mixeduse zoning district um
[40:33] specifically requires aesthetic design
[40:35] elements be incorporated. The applicant
[40:37] was satisfying that through um the
[40:39] addition of an entry plaza, which would
[40:42] be on the northwest corner of the motor
[40:44] fuel station site along with bike racks
[40:46] and perennial planting beds to frame
[40:48] that entrance.
[40:51] And then just to talk through um
[40:52] screening and landscaping around the
[40:54] Costco site, they're proposing
[40:55] additional landscaping around the
[40:57] perimeter of the parking lot in
[40:58] accordance with code requirements and
[41:00] then um additional plantings within the
[41:02] landscaped islands and the entrance
[41:04] drive.
[41:06] specific to the motor fuel station site.
[41:08] Um the applicants proposed a number of
[41:10] shrubs and trees and plantings
[41:11] throughout the perimeter of the parking
[41:13] lot to screen the site again along that
[41:15] southern property line again um to
[41:18] negate visual impact from the adjacent
[41:20] properties.
[41:21] And then the last thing I'll note is
[41:23] there is an existing cell tower or
[41:25] monopole tower on site um that's
[41:27] proposed to remain. However, staff did
[41:29] direct the applicant to produce a final
[41:33] landscape plan if that cell tower would
[41:35] ever be removed. So, there's a condition
[41:37] that if the cell tower is removed, the
[41:38] applicant would have to install those
[41:39] plantings within a 12-month period.
[41:43] Terms of planning considerations, um,
[41:45] the proposal does meet the requirements
[41:46] of the city code. Motor fuel stations
[41:48] are allowed with the conditional use
[41:49] permit. The proposed reasonzoning
[41:51] actions do align with the comprehensive
[41:53] plan and the adjacent parcels, and the
[41:55] proposals meets the intent of the zoning
[41:57] ordinance and comprehensive plan.
[42:00] Uh, staff is recommending approval of
[42:02] the actions that are on screen before
[42:04] you.
[42:06] In terms of conditions of approval, uh,
[42:08] uses listed in the underlying zoning
[42:10] district as permitted and/or accessory
[42:12] uses are allowed in addition to the
[42:14] specific use or uses in the approved PUB
[42:17] in effect of the existing Costco
[42:18] warehouse site at 14050 Burnhaven Drive.
[42:22] Condition two, all conditions of
[42:24] previously approved PUDS for the
[42:25] existing Costco warehouse site at 14050
[42:28] Burnhaven Drive shall remain in full
[42:30] force in effect prior to the release of
[42:33] the final plat for recording. The
[42:35] applicant shall pay applicable
[42:36] development fees, including but not
[42:37] limited to topo mapping. The proposed
[42:40] motor fuel station site shall be platted
[42:42] with the Dakota County Recorders Office
[42:44] prior to the issuance of any permits on
[42:46] the specific site. All applicable
[42:49] permits and a commercial plan review
[42:51] packet shall be completed, submitted,
[42:52] and approved by the city prior to the
[42:54] commencement of on-site activities.
[42:56] Prior to the issuance of a building
[42:58] permit, the applicant shall provide
[42:59] required securities for landscaping,
[43:01] batuminous, paving, and concrete curb
[43:03] and gutter. Prior to the issuance of a
[43:05] building permit on the proposed motor
[43:07] fuel station site, all outstanding items
[43:09] from the December 23rd, 2025 city
[43:12] engineer review memo shall be addressed
[43:13] to the satisfaction of the city
[43:15] engineer. Prior to the issuance of a
[43:17] building permit, a final landscape plan
[43:19] shall be approved by planning staff in
[43:20] writing. Prior to the issuance of a
[43:22] building permit, a phototric plan shall
[43:24] be approved by planning staff in
[43:25] writing.
[43:27] Prior to the release of the final
[43:28] platform recording, all easement
[43:30] vacations shall be completed. Prior to
[43:33] the issuance of a building permit, the
[43:34] applicant shall enter into a development
[43:36] agreement with the city. The DA shall be
[43:38] approved by the council, recorded with
[43:40] the Dakota County Recorders Office, and
[43:41] remain enforceable upon ownership
[43:43] changes. The applicant shall construct a
[43:46] traffic signal at the intersection of
[43:47] Burnhaven Drive and 140th Street West,
[43:50] meeting all applicable standards and to
[43:51] the satisfaction of the city engineer.
[43:54] If two documented police reported
[43:56] traffic or safety incidents occur within
[43:58] a 12-month period at the Western site
[44:00] access from Burnhaven Drive, the city
[44:02] may require a third party traffic
[44:04] consultant mutually agreed upon by
[44:06] Costco and the city to review site
[44:09] access operations and recommend
[44:10] corrective actions. Costco shall be
[44:12] responsible for funding the consultant
[44:13] and for implementing any improvements
[44:15] required by the city engineer based on
[44:17] the consultant's findings. All required
[44:19] improvements shall be completed within
[44:20] one year of the study's completion.
[44:23] The motor fuel um station shall be
[44:25] limited to the sale of gasoline for
[44:26] passenger vehicles only. The sale of
[44:28] diesel fuel is prohibited. The applicant
[44:31] shall maintain to the edge of curb on
[44:32] adjacent public rights of way if the
[44:35] existing monopole tower is removed.
[44:36] Landscaping as shown on plan sheet L2.3
[44:39] landscape plan final condition exhibit
[44:41] dated January 6th, 2026 shall be
[44:44] installed within 12 months following
[44:45] removal of the tower. A sign permit
[44:47] shall be obtained prior to the
[44:48] installation of any new on-site signage
[44:51] and the PUD agreement for the existing
[44:53] Costco warehouse site and the CUP for
[44:55] the proposed motor fuel station are
[44:56] subject to minor modifications as
[44:58] determined and made by the city
[45:00] attorney.
[45:02] With that, I'll leave the recommendation
[45:03] on screen before you. staff's available
[45:05] and the applicant is in attendance as
[45:07] well.
[45:08] >> All right. Thank you, Mr. Jinx. A big
[45:11] one. All right, commissioners.
[45:14] Like you said, open for questions for
[45:16] staff.
[45:17] >> I'm assuming the signal maintenance and
[45:21] ongoing repairs and stuff like that are
[45:24] the city's responsibility.
[45:26] >> That's correct, Commissioner.
[45:28] Yep. Costco would fund the design and
[45:30] installation and then the city would
[45:32] take over that um ongoing maintenance
[45:34] and um operations from that point.
[45:40] >> Commissioner,
[45:42] >> the the condition 13 involving that
[45:45] right turn into um the the parking lot
[45:49] and gas station off of Burnhaven. Is it
[45:52] the traffic independent traffic engineer
[45:55] that was hired that suggested
[45:58] that right turn in off of Burn Haven? Uh
[46:01] my concerns are several. Um if there's
[46:04] an accident, it blocks entry completely.
[46:08] Um
[46:09] and the the second is looking at the
[46:12] stacking that already occurs at the
[46:13] current gas station and that stoplight.
[46:17] I'm just curious how that came about. I
[46:20] I love condition 13 and it won't stop me
[46:22] from voting yes, but I'm I'm kind of
[46:23] curious on it seems like a disaster
[46:26] waiting to happen.
[46:28] >> Yeah, Commissioner, I'll maybe start to
[46:30] answer that and then um send it over to
[46:32] our planning manager because I was out
[46:33] of the office for a period of time while
[46:35] discussions occurred, but um firstly,
[46:37] there was a lot of discussions between
[46:39] Costco and the city engineer. Costco um
[46:41] and they can speak to this as well, but
[46:43] is adamant that that site access remain
[46:45] for um kind of just the fluidity of the
[46:49] site and uh regular site operations. Um
[46:52] the city engineer did express concerns
[46:54] which is where kind of the agreement of
[46:55] the condition came from. Um the main
[46:58] concern I believe from the city engineer
[46:59] is related to the lack of a dedicated
[47:02] right turn lane. Um the applicant did
[47:05] work to kind of angle that turn lane.
[47:07] Originally it started as a right in
[47:09] right out. Um and then it changed to
[47:11] write in only. Um but I'll maybe ask if
[47:15] uh planning manager Morosa has anything
[47:17] to add.
[47:17] >> Yes, thank you. Um Connor did summarize
[47:20] it pretty well there. So the city
[47:22] engineer did have concerns about it. We
[47:24] did work with the applicant to address
[47:25] that. There was a three was a half
[47:27] access. They could take a right in right
[47:29] out onto Burn Haven. Um over discussions
[47:32] the applicant did modify it just to a
[47:34] right in. The primary concern as um
[47:37] associate planner Jake's referenced is
[47:39] that no um dedicated right turn lane. So
[47:43] we figured it' be a good compromise in
[47:45] the meantime to study it um kind of keep
[47:48] it open and you know as the kitchen says
[47:50] may require um a traffic say that may is
[47:54] in there because it depends on the
[47:56] significance of the accident or what
[47:58] happened what caused it. We someone was
[48:00] on their phone and it's a fender bender.
[48:02] Okay, the accident didn't cause it. But
[48:04] if it's a something that happens that
[48:06] that the way it's designed did relate to
[48:09] the accident, we want to have that
[48:10] ability to work with the applicant to
[48:12] either close that access or make
[48:14] modifications to it. Um
[48:17] so that is the primary concern. In
[48:19] conversations with the applicant, we do
[48:21] believe the majority of access will
[48:22] become off 140th Street.
[48:25] Um that' be the primary access to the
[48:27] site. Um there is ample stacking in
[48:30] front of the
[48:32] um fuel bays. So we don't think there'll
[48:36] be stacking on it. That was a concern of
[48:37] staff was the stacking onto that access
[48:39] road onto Burn Haven, but upon
[48:42] discussion with their engineer and our
[48:44] engineer and the traffic engineer, we
[48:46] believe that there's an ample stacking
[48:47] on site. It should not be an issue on
[48:49] that. Again, the primary reason for that
[48:52] access on Burnhaven is for um employee
[48:56] access mainly too is fuel delivery. That
[48:59] straight shot into the site
[49:01] >> less right-hand turns. So if they come
[49:03] up Burn Haven, they can take that right
[49:04] hand turn, they can pull straight into
[49:06] where the fuel the fuel um Connor can
[49:08] pipe point to where the fuel yeah
[49:10] storage is. So that makes for ease of
[49:12] access for the fuel delivery there. Less
[49:14] turning movements and the applicant
[49:16] probably can discuss it as well. But
[49:18] again, we want to put that in there. We
[49:20] put two in there, but we have that may
[49:22] clause, right? So, if there's just two
[49:24] accidents and there's nothing to it, we
[49:26] got to use our we work with our law
[49:28] enforcement, our um the police
[49:30] department to determine the seriousness
[49:32] of the accident and of the applicant to
[49:33] determine if we want to proceed with
[49:35] that. Any kind of additional study?
[49:38] >> Thank you.
[49:40] >> Uh, Commissioner Long. Uh yeah, just to
[49:42] kind of tailor off of that, you talked
[49:44] about the neighbors being discussed with
[49:46] around it and traffic studies. Like
[49:48] >> probably the biggest one I see is TCO
[49:50] and people trying to go eastbound. Is
[49:52] there like are they able to cross that?
[49:54] Is that another point of contention
[49:56] coming out of the south? Because that's
[49:58] the only entrance I think they have is
[50:00] on the south side for TCO.
[50:08] I think it's that first one right there.
[50:09] And that that's all they have. And I
[50:10] don't know if there's concern about the
[50:12] backup because I mean there's a ton of
[50:13] traffic that comes through here, right?
[50:15] Um maybe there's none, but I see that as
[50:18] being a a point of contention, but
[50:21] >> yeah, Commissioner, I think we would
[50:22] monitor that and work with them. Um
[50:24] staff has monthly traffic committee
[50:26] review meetings where we would kind of
[50:27] reach out to surrounding property owners
[50:29] as the project commences and then after
[50:31] it. Um but as far as the neighborhood
[50:33] meeting um there wasn't a representative
[50:35] of TCO or any properties um to the north
[50:38] of 140th Street. Um so we haven't heard
[50:41] any concerns um from property owners
[50:43] there. We don't anticipate any issues
[50:45] but something we would uh monitor of
[50:48] course as the project commences.
[50:49] >> Okay. And if I can add on to that uh
[50:52] associate planner Jake's there. There is
[50:53] a primary access to TCO straight across
[50:56] from the primary access into the fuel
[50:58] station here. Actually, it's right north
[51:00] of 140th there. There is a secondary
[51:02] access directly to the right there to
[51:05] TCO site, but there you're correct,
[51:07] Commissioner, that is the primary access
[51:09] up to the main entrance into the
[51:10] facility at TCO. Um I we do believe that
[51:14] traffic signal would help with that a
[51:16] little bit because it'll stop the policy
[51:17] a little bit with the signal changes,
[51:19] but that's something we'll have to
[51:20] probably keep a little bit of an eye on.
[51:22] >> And another thing too, we did offset
[51:23] work the applicant to offset the
[51:25] accesses or line them up with the axises
[51:27] across there. to work on that maneuver.
[51:30] So, that's another thing we did, our
[51:31] city engineer did work with the
[51:32] applicant on is aligning the axises to
[51:35] so there's not uh they can maneuver
[51:37] appropriately.
[51:40] >> Thank you,
[51:41] >> Commissioner Hamilton.
[51:42] >> Just to clarify, the parking spaces
[51:47] where Pumpkin Patch is currently
[51:50] located, those parking places are for
[51:54] employees.
[51:56] >> That's correct, Commissioner. Um the
[51:58] applicant's currently utilizing that
[51:59] site during only peak times for employee
[52:02] parking. And then with this proposal,
[52:04] the primary the primary use of these 50
[52:07] stalls would be for employee parking um
[52:09] as is currently occurring on the site.
[52:13] >> Okay. Second question. So, customers
[52:17] leaving Costco,
[52:20] if they want to go get gas, what is
[52:23] their options to get into the
[52:27] gas station?
[52:31] >> Yeah, Commissioner, um, leaving Costco,
[52:33] I think generally most of the traffic
[52:35] comes off this entrance drive here. So,
[52:38] I would and the applicant can speak to
[52:40] this as well as they've studied kind of
[52:42] the traffic patterns of the site, but I
[52:44] would envision um customers traveling um
[52:46] to this intersection on 140th Street,
[52:49] taking this right turn in and then
[52:51] flowing into the fuel station um
[52:54] refueling areas here. So customers would
[52:56] likely either come straight across this
[52:57] intersection um come here, take a left,
[53:00] or take a right um likely and come in
[53:03] here is what staff envisions, but I'd
[53:06] let the applicant kind of speak more to
[53:07] that based off their kind of traffic
[53:09] pattern studying.
[53:16] >> Any other questions for staff?
[53:18] Otherwise, before I open the public
[53:20] hearing, I will invite the applicant to
[53:21] the podium. Yeah. And then
[53:24] commissioners, you're welcome to ask
[53:26] questions. State your name and address
[53:27] for the record.
[53:28] >> Sure. Good evening, Madam Chair, members
[53:30] of the plan commission. My name is Larry
[53:32] Gerjek. I'm a Costco real estate
[53:34] manager. Um, my address is 1955 Raymond
[53:39] Drive in North Brook, Illinois 60062.
[53:43] Um, well, let me start by saying that
[53:47] we're really excited to be here tonight.
[53:49] Um, this has been a process. So, we've
[53:51] been working on this property and the
[53:54] pumpkin patch daycare property for
[53:57] probably about three years, possibly a
[53:58] little bit more. Um, so to get to this
[54:01] point, um, Costco and, um, including the
[54:05] CEO of Costco is really excited that
[54:07] we're moving forward and that we are
[54:09] under contract with the city and that we
[54:11] have a great plan in place. Um, so I
[54:15] could answer a couple questions that I I
[54:18] caught, Commissioner Hamilton. Um and
[54:21] the right in um it's it's important for
[54:24] Costco. We wanted two points of access
[54:26] to the property. So not only off of
[54:28] 140th, but we wanted another access
[54:31] point off of Burnhaven. We're utilizing
[54:33] the existing drive that's there today.
[54:36] Um and so we worked with staff, and by
[54:39] the way, this has been a very
[54:40] collaborative effort working with Mike
[54:42] and his team, uh the third party traffic
[54:44] consultant, um to develop the plan.
[54:48] We've made several changes from our
[54:50] neighborhood meeting. I wanted to
[54:52] address a couple things about the
[54:53] neighborhood meeting, but um so it is a
[54:54] writein. We did have it as a right in
[54:56] right out. So um our traffic consultants
[54:59] here tonight um we don't have any issues
[55:02] any safety issues with that. Um it's
[55:04] it's a four-lane street, Burnhaven. It's
[55:07] uphill. It's a low speed. Um we believe
[55:12] uh people will be able to make that turn
[55:14] uh no problem. um getting to the point
[55:17] of backups on the gas. Uh this is a
[55:20] larger fuel facility and one of the
[55:22] reasons why we're doing this is to take
[55:24] cars that would be in queue today and
[55:27] put them in front of a pump and we've
[55:30] been doing this throughout the Midwest.
[55:32] Um uh this 20 pump facility is our
[55:35] newest and uh latest uh pump. We have
[55:38] two other built that we just completed
[55:40] in Michigan and they're working
[55:42] absolutely wonderfully. So, uh, we
[55:44] expect the same here. So, any congestion
[55:48] or backup or cues onto 140th or I'm
[55:51] sorry, on Burnhaven that you experienced
[55:53] today will be eliminated. Um, just
[55:57] touching on the neighborhood meeting, I
[55:58] was there. I presented um I think there
[56:01] were five in attendance. Um, four were
[56:04] residents that lived north of McAdrews
[56:07] and they were all very supportive of the
[56:08] project. So, there they were lived in
[56:10] single family homes. no businesses were
[56:12] there except the property owner to the
[56:14] south and I've spoken to him several
[56:16] times and his concerns were um security
[56:19] and screening and so we've addressed
[56:22] that with the fence. I told him we would
[56:23] put up a fence and we've we've put
[56:25] additional landscaping and um as Connor
[56:28] mentioned that we're above and beyond
[56:29] the landscape requirements uh for the
[56:32] site. It's heavily landscaped. I I think
[56:34] uh it's going to be a great uh a great
[56:36] landscape installation when it's uh when
[56:38] it's complete. Um, I would be happy to
[56:40] answer any other questions. And my civil
[56:43] engineer is here today and my traffic
[56:44] engineer.
[56:46] >> You commissioner.
[56:48] >> Um, I couldn't tell from the drawing,
[56:50] but I assume with the added parking lots
[56:53] where the gas station sits. Now, um,
[56:57] speaking just from my own experience as
[56:58] a customer of Costco, I always try to
[57:00] park where I can get to that sidewalk so
[57:03] I don't have to deal with cars backing
[57:04] in and out. That's a long ways from the
[57:06] front doors. Is there any parking lot
[57:08] improvements, uh, crosswalks, anything
[57:11] added to help get people from where the
[57:12] gas station is now to the front door?
[57:14] >> Well, it's when we're extending the the
[57:16] main drive going down the slope into the
[57:19] site. So, we've extended it. We've
[57:20] provided some new crosswalks at that
[57:22] intersection. Right.
[57:24] >> Perfect.
[57:24] >> Yeah. Um, we expect some employees to
[57:28] park in that new area where the gas is
[57:29] today. So, we're expecting the employees
[57:31] to park there to alleviate some of the
[57:34] parking spaces and um and provide them
[57:37] um provide our members ample spaces
[57:41] closer to the front of the store. Right
[57:42] now, we have too many employees parking
[57:44] close to the store. So, um if I could
[57:47] address that, the 50 car lot that's
[57:49] going to be for only um employees only,
[57:52] not members. Um that is a um
[57:57] as Connor mentioned that's during the
[57:59] holidays and it's during high peak times
[58:02] which occur throughout this throughout
[58:03] this year. It's not only from
[58:05] Thanksgiving to New Year's but it could
[58:06] be Fourth of July weekend or Memorial
[58:08] Day or Labor Day weekends. Um, but those
[58:10] are set times. So, the warehouse manager
[58:13] knows how many employees will be parking
[58:14] there and the shuttle bus comes at a
[58:16] certain time so everybody is there at
[58:18] the same time and it's it's all
[58:20] organized and it's not people are just
[58:22] waiting there for a bus to to it's all
[58:25] um all scheduled beforehand and and as
[58:28] Connor mentioned, she's been using it
[58:29] for the last year and a half, possibly
[58:31] two years now. Um, and it and she said
[58:34] there's been no issues whatsoever and it
[58:36] really helps during those high peak
[58:37] periods. So,
[58:40] >> all right, commissioners. Any other
[58:42] questions for the applicant?
[58:44] All right, then with that, I can open
[58:47] the public hearing at 7:28 p.m. If
[58:52] anyone in the room would like to speak
[58:54] to this agenda topic, you can approach
[58:56] the podium.
[59:00] Is there anyone on Zoom?
[59:06] All right.
[59:08] If no one wishes to speak to the topic,
[59:11] then I will close the public hearing
[59:14] also at 7:28 p.m.
[59:18] All right, commissioners, I'm opening it
[59:20] to you for discussion.
[59:23] Commissioner Long,
[59:24] >> I just want to make a comment. I think
[59:26] having a project this big and having
[59:29] virtually no public comment is uh a
[59:31] great thing for city staff and Costco,
[59:33] showing that you really did your
[59:35] homework and and made this right. So,
[59:37] thank you to staff and Costco.
[59:42] >> All right. If no no no discussion, I
[59:44] will also entertain a motion.
[59:47] >> Make a motion.
[59:48] >> Thank you, Commissioner Low. A motion is
[59:50] on the table.
[59:51] >> Motion that we recommend to the city
[59:53] council the approval of the following
[59:55] actions subject to the conditions of
[59:56] approval. There's 19
[60:01] 18 of the 18 noted on file.
[60:06] >> All right. Can I add a second?
[60:07] >> Second that.
[60:08] >> Beautiful. All those in favor say I.
[60:10] >> I.
[60:10] >> I. Oppose say nay. And the motion
[60:14] carries. Congratulations.
[60:16] >> That will also be Absolutely. Thank you.
[60:19] >> It will be on the
[60:20] >> It'll be next week actually.
[60:22] >> Oh, really? Yeah. That will be on the
[60:24] council
[60:25] >> 20th.
[60:25] >> 20th. Yep.
[60:27] >> Yeah. Thank you so much.
[60:29] >> Another negotiation.
[60:33] >> All right. Our last agenda topic is the
[60:37] zoning code reorganization and update.
[60:40] Um being presented by our very own
[60:42] planning manager, Mr. Mike Morosula.
[60:54] Oh, it's the real good stuff. I'm
[60:55] kidding. Um thank you, chair. Good
[60:58] evening, commissioners.
[61:01] Conor open this already. Nice. All
[61:03] right. Thank you. All right. So, over
[61:05] the last couple months, um staff's been
[61:08] really looking at the zoning code,
[61:09] trying to reorganize it, update it.
[61:11] Again, the goals of this update are to
[61:13] improve organization and consolidation,
[61:14] enhance usability, modernize and use
[61:17] plain language, and up to date to bring
[61:18] into compliance of current laws. Now, as
[61:21] part of this update, I think it's very
[61:23] clear to make um
[61:27] to
[61:28] state what we're doing. We're not doing
[61:30] substantive updates as part of this.
[61:32] We're trying to, you know, there will be
[61:34] some substantive updates as part of this
[61:36] and I'll talk about those, but the
[61:37] intent here is to provide clear language
[61:40] and trying to reorganize to make it more
[61:42] user friendly. After the comprehensive
[61:44] plans adopted the 2050, then we'll go in
[61:47] there and do more of these larger
[61:48] amendments to zoning districts. The
[61:51] whole intent here is to clean it up,
[61:53] simpler language, and to simplify. I
[61:56] also should stay tuned. This is kind of
[61:58] a workshop here. So, you have questions,
[61:59] please ask throughout the conversation.
[62:01] So um this is intended here to provide
[62:04] update to you of what we're proposing to
[62:06] do to um three sections of the code. Um
[62:10] the administrative section
[62:13] and then right here the introductory and
[62:15] then there is the um zoning maps and
[62:18] districts and then the residential
[62:20] district. So the first one is 101
[62:22] introductory provisions. Um Connor that
[62:27] was up here a minute ago did a lot of
[62:28] the work on this part. Um, so a lot of
[62:31] the language that's currently in there
[62:33] was from 1982. And what we did was we
[62:36] combined titles 101 through 103 into one
[62:40] 101 section with this. These red lines
[62:42] are included in your packets. As we
[62:44] continue to go, we'll provide you the
[62:45] cleaned up versions. Um, as you notice
[62:47] as you're looking through your packets,
[62:48] there is in the red lines highlighted
[62:50] sections in there. That's just reference
[62:52] notes for us to go back and make sure we
[62:54] tie it all together. So this is more of
[62:56] an administrative thing. So I just want
[62:58] to point that out now. Um so when Connor
[63:01] was looking at these sections, he did um
[63:04] mainly focus on um communities have
[63:07] recently updated their codes. Um for
[63:08] example, both Connor and I worked on the
[63:10] Cottage Grove city code update. So we
[63:12] use language from them. Uh Rosemont,
[63:15] Plymouth, and I believe he used uh Maple
[63:18] Grove. So we used those languages from
[63:20] these more modern codes to bring it to
[63:22] ours to update the verbiage in our lang
[63:25] in our city code or zoning code. Um, one
[63:28] big thing we did, we did add a
[63:30] connection to the zoning code to the
[63:31] comprehensive plan which is required via
[63:33] state statute.
[63:35] We did legislative authority and
[63:37] replaceive effective date and authority
[63:39] to adopt. Pretty much the same thing
[63:41] just different words legislative
[63:42] authority under the current code gives
[63:44] us tells you why we can do this. And now
[63:46] we just put that change the title to
[63:49] authority. Then we also deleted 1031
[63:52] interpretation and replace it with a new
[63:54] section. of interpretational application
[63:56] pretty much the same language just
[63:57] updated to modern times. Oops.
[64:01] So that's very quick overview of the
[64:03] introductory again we didn't change a
[64:05] lot it looks like we changed a lot the
[64:07] red lines but just updating the language
[64:08] to current modern language for zoning
[64:11] codes. Then on 104 zoning districts and
[64:14] maps the we did update some of the
[64:18] districts Texas nations as you'll see
[64:19] when we get to the um residential
[64:22] districts we are proposing to change
[64:24] them right now we have like the R3B R3A
[64:28] R3D
[64:30] uh R
[64:32] 1A instead of that we're going to
[64:34] simplify it to like RR residential one
[64:38] and then instead of R3A we're just going
[64:41] to
[64:42] R3 medium density. So simplifying those
[64:46] terms.
[64:47] Um we did delete the annexation
[64:50] territory section. Um that's from living
[64:52] from 1982. We don't believe we'll be
[64:54] annexing anybody anybody soon. Um so
[64:57] there's a lot of other hurdles you have
[64:59] to go through to do that. Uh again, we
[65:01] did do modern uh language and
[65:04] interpretation of district boundaries as
[65:06] well that we use language from other
[65:08] communities that have more modern
[65:09] language than we previously did had. Um
[65:12] the language spoke about railroad
[65:14] boundaries and other things. So, we just
[65:16] kind of cleaned it up to make it um
[65:19] easier to read. This keyboard's touchy
[65:22] today. All right. So, title title 105,
[65:24] the residential districts. Um these
[65:27] sections have been updated to use the
[65:28] new zoning district formatting. I'll
[65:30] show you here in a second. We eliminated
[65:31] unnecessary uses. All the districts
[65:33] previously had bus benches in there.
[65:35] That is not a use. That's a bench. So,
[65:40] we removed that and we did some other
[65:42] cleanup work along those lines. Um, we
[65:45] included um incorporate standards that
[65:48] have previously been referenced in by
[65:50] citation. So, a lot of the districts did
[65:52] reference back. They all go back to the
[65:54] R1 district precurrenly. We eliminated
[65:57] that and just listed off the uses within
[66:00] the zoning district instead of going
[66:01] back to the R1. Everything's underneath
[66:04] that one
[66:06] underneath that district. So if we go
[66:08] into here, here's the proposed
[66:09] formatting which we include on all of
[66:11] them. The first section is always a
[66:12] purpose and intent. We add a purpose and
[66:14] intent to every zoning district. Uh the
[66:18] second is the permitted uses. Third is
[66:20] the permitted accessory uses,
[66:22] conditional uses, interim uses or
[66:24] development standards. It depends on the
[66:25] section that kind of switches. We did
[66:27] delete the intram use permit um from a
[66:31] couple sections just as it it makes
[66:33] sense. And then um there's either
[66:36] development standards or supplemental
[66:37] standards that were um the supplemental
[66:40] standards were a bunch of standards that
[66:42] were in these districts that were kind
[66:43] of all over. We want to put those in one
[66:45] area and categorize them. So that's the
[66:47] intent be behind that supplemental
[66:49] standards. So the first district here is
[66:52] the R one or R R1 as I like to call it.
[66:57] Um this is the one family uh rural
[67:00] residential district. So we did change
[67:02] the designation from
[67:05] um R1A to RR1. Um we did add a purpose
[67:10] and intent section. We did add a new
[67:12] use. There is some agricultural uses
[67:14] down there in relay buildings. We added
[67:16] that to the code. Um, we will also when
[67:19] we get to it add a definition for that
[67:21] within the definition section. Um, in
[67:24] all the residential districts besides
[67:26] like the high density and the
[67:28] manufacturer homes, we did add a
[67:29] conditional use permit for state state
[67:32] license residential facilities serving 7
[67:34] to 16 persons or licensed daycare
[67:37] facilities serving 16 to 13. This is
[67:39] required by state statute. Our code's
[67:41] currently silent on it now in all
[67:43] districts besides I believe it's the R
[67:47] three. That's the only one that has that
[67:49] condition in there currently or
[67:50] standard. But per state statute, all
[67:52] residential districts have to have it
[67:54] besides your higher density and um the
[67:57] manufactured housing.
[68:02] So we also removed the requirement for
[68:04] an um intram use permit for
[68:07] um park facilities. We have a park
[68:09] zoning district. We'll clean that up. We
[68:10] don't need an intram use permit for a
[68:12] park. Um, we also combined all
[68:15] development standards into one table.
[68:17] Right now, there's a couple two tables
[68:18] in that section. We combined it all into
[68:20] one. And then we also added additional
[68:23] standards. We're relocating into that
[68:24] supplemental standard subsection for
[68:27] clarity.
[68:29] Um, now we're going to go to the R1,
[68:31] which is the one family residential
[68:33] district. This is the the largest
[68:36] district in the community. Uh again
[68:38] added a purpose and intent section. We
[68:40] added the CUP for statelicicensed
[68:42] residential care facilities as required
[68:43] by state statute. We did add a new
[68:46] intram use here temporary classrooms. A
[68:49] lot of times we get these requests for
[68:50] these trailer like classrooms to come in
[68:52] when they're doing remodeling projects
[68:54] even sometimes at churches. We want to
[68:56] put something in there to require that
[68:57] they need an intram use permit. So we
[68:59] have a start and end date. They can't
[69:00] keep it there permanently. So we added
[69:03] that to it. We also cleaned up some of
[69:05] the interim uses about parks as well. Um
[69:09] there it is right there. And then we
[69:10] added a new one. Um in the communities
[69:14] I've worked for previously they have a
[69:16] lot of PUDS and a lot of
[69:20] um we have I've noticed that sometimes
[69:22] they
[69:24] allow for different setbacks and
[69:25] different subdivisions
[69:26] >> and so to ease staff assist staff we add
[69:30] this condition here. So where existing
[69:32] principal building have greater or
[69:34] reduced setback than the minimum setback
[69:36] required herein the front yard setback
[69:38] the new principal structure shall not be
[69:40] less than the average front yard setback
[69:42] the two adjacent lots. So here's an
[69:45] example on the screen here. Let's just
[69:47] say for example the underlying zoning
[69:49] district has a 35 ft setback. The PUD
[69:52] approvals or something approved at the
[69:54] time they're set back 25 ft.
[69:57] this here. So technically the house in
[69:58] the middle could add on to the front of
[70:00] their house because the setback's 30,
[70:02] you know, it's set back um the houses
[70:06] are set back 35 ft, but the underlying
[70:08] zoning district is 25. Yeah, that's what
[70:12] I meant to say. Underlying zoning
[70:13] district's 25, houses are set back 35.
[70:16] These people want to put a 10-ft
[70:17] addition into the front of the house
[70:18] meet setback. Well, that doesn't conform
[70:21] with the rest of the neighborhood. So
[70:22] this here would state if you go out
[70:24] there you look at the houses adjacent to
[70:25] you. You cannot go more forward than the
[70:27] houses next to you. So a lot of times
[70:29] this is very common on lakefront
[70:31] properties. We see it very common there.
[70:34] DNR has a similar regulation for their
[70:36] shoreland district. So it's kind of the
[70:37] same implement implementing it here.
[70:39] Kind of takes the leg work out of staff
[70:41] having to dig up old PUDS and
[70:42] everything. You kind of say you can't go
[70:43] more forward than the houses next to
[70:45] you. So just kind of a a different
[70:48] approach to it. That's very common in
[70:51] other cities, Minneapolis, St. Paul.
[70:53] It's a lot of people have this. So,
[70:56] >> Arn Hills is where I saw it first time
[70:57] and I liked it. So,
[70:59] >> and I noticed here a couple projects we
[71:00] worked on, we kind of ran into it. So, I
[71:02] thought it'd be a nice nice um piece to
[71:04] add, especially with the lakes. That's
[71:06] where you usually see it.
[71:08] >> All right. There are two districts. It's
[71:09] a very small district. Um these are um
[71:13] two family dwellings.
[71:16] Um, again, add a purpose intent, add the
[71:18] state, the CUP for state licensed
[71:20] residential care facilities. We removed
[71:22] intram use permits from this district.
[71:24] It's such a small district. There's
[71:25] really no need for intramuse permits.
[71:27] And again, it reverts back to the R1
[71:29] district, which allows for more intense
[71:32] um intram uses. There's no need for it
[71:35] in these smaller districts. So, we
[71:37] remove that. Um, that's R2 is simple.
[71:42] R3. Again, we did reclassify or redesate
[71:45] it from R3A to now strictly just R3. Um,
[71:50] added purpose intent, added the CUP,
[71:53] but we did do more changes here to the
[71:55] lot area, the table there, the lot
[71:57] standards. So, the current lot area
[72:00] standard is 20,000 square feet plus
[72:02] 5,000 square feet for every dwelling
[72:05] over four. So, when you do the math, one
[72:08] acre is 43,560
[72:10] square feet. divide by 5,000 gives you
[72:13] 8.7 units per acre. However, the 2040
[72:16] comprehensive plan requires 4 to 18
[72:18] units per acre. So, that standard
[72:20] doesn't work. It doesn't. It's not in
[72:21] compliance with the comprehensive plan.
[72:24] You are the comprehensive plan requires
[72:26] 4 to 18. With this here, you can build a
[72:29] max of eight units with this standard.
[72:32] >> So, what we did is we're proposing to
[72:34] change it to say maximum residential
[72:36] density should not exceed 18 units per
[72:38] acre. then it captures the comprehensive
[72:41] plan and or meets the intent of the
[72:44] comprehensive plan. And we'll see this
[72:46] again in the R4 districts. It's a very
[72:47] similar language. We update it so they
[72:49] could complement the the comprehensive
[72:51] plan as required by state statute. Uh
[72:55] again, removed intro use permits. There
[72:57] isn't really one in the R3 district. Um
[73:00] and then we combine all development
[73:01] standards into one table. Um, and when I
[73:04] say that before, there's little notes at
[73:06] the bottom there that had additional
[73:08] standards for adjacent to residential.
[73:10] We just combined that into the table.
[73:12] So, it says your current setback and
[73:14] when you're adjacent to res existing
[73:16] residential dwellings all into one
[73:17] table.
[73:19] Our four district um this was this now
[73:22] is our medium density, right? I think
[73:25] I'm getting myself confused. No, high
[73:26] density. I lied. Um, this is our high
[73:29] density. formally was R3B added purpose
[73:33] tent. We did add multif family dwellings
[73:35] and apartments and canominiums as
[73:37] permitted uses. Currently, they're
[73:39] conditional uses. It's high density
[73:40] district. They should be permitted. Um
[73:43] we're trying to again remove the need
[73:45] for a PUD and less um
[73:51] less requirements.
[73:53] So then we in response we did remove
[73:55] apartments and multifamily attached
[73:58] units from requiring CUP again. Oh,
[74:01] sorry. Um, so historically, at least in
[74:04] the last few years that I've been here,
[74:06] every single apartment building has to
[74:08] come through us no matter what. And this
[74:11] change in a area that's zoned for
[74:13] apartment buildings, they would not have
[74:15] to come through the planning commission
[74:16] or get approval by the city council.
[74:17] They're just approved administratively
[74:20] because they're following the zoning
[74:22] rules. Is that right?
[74:23] >> They could be. However, there's other
[74:25] standards in there they have to meet.
[74:26] And we are actually working on language
[74:28] right now that we were going to bring to
[74:30] you, but I got nervous. I haven't talked
[74:33] to our attorney yet. That would require
[74:34] some site plan review.
[74:35] >> Okay.
[74:36] >> So, if the staff feels like the it's too
[74:38] close to the permitted use or there
[74:40] needs additional review, we have the
[74:42] right to say, "Nope, this needs to go to
[74:43] plan commission. You can't do this by
[74:45] right." There's something in there that
[74:47] built into it. So, we're working on that
[74:49] language right now. Currently, in the
[74:51] heart of the city, you can go buy right
[74:53] development.
[74:54] >> Um, there's other areas community too.
[74:56] We do allow for buy, but here we feel
[74:59] that there is going to be some need for
[75:02] these apartment complexes that you do
[75:04] need to go through at least a site plan
[75:06] review. So, we can get in there and take
[75:08] a look and make sure you have
[75:09] appropriate egress access and all that
[75:11] stuff. So, that's something we are
[75:12] currently working on.
[75:14] Um, that was a good question because I
[75:16] did think the same thing. We pondered it
[75:18] for quite some time. Um, Kevin's
[75:21] probably seen me s my desk doing a stare
[75:22] at the screen going, "What am I doing?"
[75:24] Um, or how does this work? Um, again,
[75:27] um, this has the same issue as the last
[75:30] district. The current lot area standard
[75:32] requires 18,000 ft plus 3,000 square
[75:35] feet for every dwelling unit over six.
[75:38] The units per acre calculation here
[75:40] would max out at 14.52. M
[75:43] >> so the comprehensive plan requires 8 to
[75:45] 30 units per acre. So in response uh we
[75:48] keep the base 18,000 square feet per
[75:51] acre or um the 18,000 square feet plus
[75:56] there's a typo there. That 3,000 should
[75:58] not be there. We're going to fix it
[76:00] quick on the spot fix. There we go.
[76:04] That's better. Um it should be 1500 to
[76:07] 2,000. that math maths. It works out to
[76:10] get you to that 30 units per acre as
[76:12] required by the comprehensive plan. Um,
[76:15] also too, it's worth noting if you did
[76:17] implement the previous standard, you
[76:19] need a minimum of eight acres for an
[76:21] apartment building.
[76:22] >> As we saw at the writer Walton project
[76:23] earlier this year or late last year,
[76:25] that was on four acres.
[76:28] So, that was one of the areas they
[76:30] requested PUD flexibility from. So in
[76:33] order to facilitate more redevelopment
[76:36] um of blight properties and stuff like
[76:39] that, we want to reduce that standard to
[76:41] make that so we could implement it more.
[76:44] Um
[76:46] we did combine all the development
[76:48] standards into one table. Again we did
[76:50] increase the building height. It was 35
[76:52] ft to 55 ft. So 55 is a current practice
[76:56] for apartment buildings. And we also
[76:58] looked at other apartment buildings in
[77:00] the community. We did realize there is a
[77:01] most of them are over 35 ft. So um we
[77:05] thought that was a
[77:07] >> a good change. And then we did modify
[77:09] the setback standards for structures
[77:10] when adjacent to low density residential
[77:12] requiring a greater setback. For
[77:15] example, the writer Walton project we
[77:16] did bump it back over further to require
[77:19] that um greater setback between the
[77:22] single family and the higher density.
[77:27] All right. Right. And then the last one
[77:28] here is the one family manufacturer
[77:30] housing district. We did not do a lot of
[77:33] changes here. We did redesate it. This
[77:35] was recently um updated too, I believe
[77:38] in 2019. Um we did add a purpose intent,
[77:41] remove intram use permits again
[77:43] reference back to parks. And then we
[77:45] remove the language for shed and replace
[77:48] it with accessory structure for
[77:49] consistency with the accessory structure
[77:54] um
[77:55] ordinance. So, next steps is a huge
[78:00] lift. Um, we're going to bring business
[78:01] and industrial. Again, what we're doing
[78:04] there is simplifying the district's
[78:06] uses. Right now, there is a lot of uses
[78:09] like in the B3 district. I believe
[78:11] there's over 70 uses when you go to the
[78:12] B3, B2, and B1 because it back
[78:15] references them. Simplifying them down
[78:18] to like Kevin right now is going through
[78:19] the B2 district. And there's photography
[78:23] shop, there's pet store, there's all
[78:26] these things that could be reclassified
[78:28] as retail and then personal service. And
[78:31] one other thing I want to mention too,
[78:33] and I didn't do this, um, underneath all
[78:36] the districts and the residential, we
[78:38] put essential essential services as
[78:40] permitted. We're a developed community.
[78:42] There's not going to be a lot of
[78:43] essential services coming in. That's
[78:45] your like Excel Energy, um, Center Point
[78:49] and stuff like that. So just simplified
[78:51] it so that they don't have to go through
[78:53] unnecessary process to improve
[78:56] infrastructure within the community. Um
[78:59] and then February 9th um we'll be back
[79:02] again with administrative general
[79:04] performance standards and a final
[79:06] review. That's when we get the clean
[79:07] documents and everything. March um the
[79:10] goal is to have it till the city council
[79:12] on March 3rd. We do have one more
[79:13] meeting date in there for planning
[79:15] commission if we have to. second meeting
[79:16] in February um if we need to spread it
[79:19] out a little bit more. But um I think in
[79:22] the end this will be a very useful
[79:25] document, easy to read and then set the
[79:28] stage up for a larger lift once the
[79:30] comprehensive plan is adopted in 2029
[79:35] and then we will jump into more of that
[79:36] larger lift associated with the
[79:39] comprehensive plan. I can tell you right
[79:40] now, um, there's changes we could have
[79:44] made now, but pensive plans here require
[79:46] us to make them either way. So, we don't
[79:49] want to do that now anyways. So, that's
[79:51] a quick run through um of where we're at
[79:55] and um any questions? Again, not a lot
[79:58] of substantive stuff there.
[80:02] So, as planning commission, is it
[80:06] >> how can we help or what do we provide
[80:08] for value to you?
[80:10] >> Um, provide comment, feedback. Um, you
[80:13] know, do you support these changes? You
[80:14] know, I take no comment as we're doing
[80:16] the right approach. So, if I came in
[80:18] here today and you guys had a bunch of
[80:20] comments, I'll be really concerned
[80:21] saying, I don't think we're doing the
[80:23] appropriate
[80:24] um doing it the right way. But the goal
[80:26] here is we're not really doing
[80:28] substantive substantive changes that
[80:30] require a lot of discussion. But we get
[80:32] to these other districts, I believe
[80:34] there probably will be some.
[80:36] >> Um it's really difficult the commercial
[80:38] and the business and industrial to fit
[80:41] them into categories. There's some very
[80:43] unique uses in there and they also exist
[80:46] in the community to put them into a
[80:48] simple bucket. So they'll be there. They
[80:51] will be making some changes to the
[80:52] parking like we talked about tonight on
[80:53] the warehousing. Um minor things. Um but
[80:59] simple questions and uh just let us know
[81:02] if you like, hey, there was a good point
[81:03] on the conditional use permit for the
[81:04] apartment buildings. You know, how are
[81:06] we going to see them then? How are you
[81:07] going to make sure they're regulated? So
[81:09] questions like that.
[81:14] >> Nice work. Thank you.
[81:15] >> Thank you. I lost some more hair for
[81:17] this.
[81:18] >> So I appreciate it. Thank you very much.
[81:20] And thank you everyone. Hope you had a
[81:21] wonderful holiday season and a happy new
[81:23] year. And uh we got some excited cases
[81:26] coming up this year.
[81:28] >> Thank you.
[81:29] >> Unless you got any more questions.
[81:31] So
[81:34] >> thanks.
[81:35] >> All right. As you make your way back,
[81:38] our next agenda topic is updates. Any
[81:42] updates from planning commissioners?
[81:45] Seeing none, any updates from staff?
[81:49] Oh, I wasn't prepared for that one. Um,
[81:54] at the last city council meeting, we did
[81:55] have some items approved. Uh, one
[81:57] second. I locked my computer. Um, they
[82:00] were the items on the um, December
[82:03] meeting. Schmidian and Suns was approved
[82:05] by the city council at the last meeting.
[82:07] Um, that's it for the only updates. Now,
[82:10] we will be holding
[82:13] some other applications for the January
[82:14] 26th meeting that's uh, kind of follow
[82:17] the theme of tonight.
[82:19] So, we will um have those for you guys
[82:21] at that meeting.
[82:24] >> All right. With that, can I get a motion
[82:27] to adjourn the meeting?
[82:30] >> All right. Commissioner Hamilton.
[82:33] >> Second.
[82:34] >> All those in favor say I.
[82:35] >> I. Post say nay.
[82:38] That's a
[82:40] >> nice job. You guys did a great job.