Hastings Public Schools — Transcript

Monday, November 23, 2026

Pleasant Valley Farm Development (Reszoning, Plats, Environmental Review, Infrastructure, Park Dedication)

Ancillary Property Reszonings (10979 140th Street & Oakwood Cemetery)

Votes (2)

Approval of Preliminary and Final Plats for Pleasant Valley Farm Development

Motion carries (unanimous)

Moved by Commissioner Mo [1:05:40] · Seconded by Commissioner Montgomery [1:05:58]

The Planning Commission discussed the multi-phase nature of the development, with Phase 1 comprising 118 single-family lots and a private amenity lot. Key concerns included emergency access for Phase 1 via Featherstone Road, the timeline for connecting General Seban Drive to County Road 42 (estimated 4-6 years into a 10-year buildout), and the deferred construction of the public park until a later phase due to accessibility and grading issues. The developer confirmed that the private amenity lot (clubhouse/pool) would be built in Phase 1. The Traffic Impact Analysis and the provision of sidewalks and trails were also highlighted as integral to the plat approval.

Approval of Reszonings for Pleasant Valley Farm, 10979 140th Street, and Oakwood Cemetery

Motion carries (unanimous)

Moved by Commissioner Depala [1:06:59] · Seconded by Commissioner Montgomery [1:07:33]

The reszoning of Pleasant Valley Farm to R3 (medium-high density planned residential development) was discussed in detail, with staff confirming its consistency with the Comprehensive Plan's low-density residential designation (3.6 units/acre falls within the 3-6 units/acre guideline). The Planned Residential Development (PRD) mechanism was explained as allowing flexibility for value-added amenities like open space and an extensive trail network. Separate reszonings for 10979 140th Street to R1 (low-density residential) and Oakwood Cemetery to Public Institution (PI) were also reviewed, noted as necessary due to annexation and suitable for their existing uses, with the understanding that municipal utility connections would be required for the residential property.

Notable Quotes (6)

is Featherstone the only access point for emergency and is that typical for a size or community or neighborhood that size?

Approval of Preliminary and Final Plats for Pleasant Valley Farm Development

we look at this development being roughly occurring over a 10-year period of time beginning in 2028. Um actually building homes. Um we would expect that connection to happen somewhere within that four to six year period out to Hollywood 42.

— Todd Stuts, Tradition Development Corporation [36:31]
Approval of Preliminary and Final Plats for Pleasant Valley Farm Development

As part of the approval, we'll be entering into a development agreement with the applicant which would memorialize the conditions and obligations and that that being one of them. So yes, we would do that.

Approval of Preliminary and Final Plats for Pleasant Valley Farm Development

Under our comprehensive plan states three units to six units. This unit, this property altogether comes in at about 3.6 six units an acre altogether. So certainly consistent with that. So the R3 zoning that is being proposed here is uh is consistent with our comprehensive plan.

Approval of Reszonings for Pleasant Valley Farm, 10979 140th Street, and Oakwood Cemetery

What a plan residential development does is it allows for some relaxation of some of the strict zoning standards in exchange for other value added items for the development itself.

Approval of Reszonings for Pleasant Valley Farm, 10979 140th Street, and Oakwood Cemetery

Cemeteries don't really fit well in any zoning district, but we looked at the requirements of the of the PI district and thought that that was probably the best use from it.

Approval of Reszonings for Pleasant Valley Farm, 10979 140th Street, and Oakwood Cemetery

Ordinances & Resolutions (16)

ReszoningOrdinance

Process for changing the zoning classification of properties.

Preliminary PlatPlan

Overall plan for the entire property including street system, grading, utilities, and stormwater.

Final PlatPlan

Physical dedication and subdivision of land, typically done in phases.

Comprehensive PlanPlan

City's long-range plan for land use, designates areas for specific development types.

Environmental Assessment Worksheet (EAW)Environmental Analysis

State-required analysis of environmental, transportation, and historical impacts for large residential developments.

Negative DeclarationEAW Determination

City Council's determination that the environmental assessment is complete and no further analysis is needed.

Park Dedication RequirementsPolicy

Requirement for new subdivisions to dedicate land or cash-in-lieu for public parks.

Traffic Impact AnalysisStudy

Analysis of existing and future traffic impacts due to the development.

Site Plan ReviewProcess

Required review for multi-unit developments (three units or larger), including the private amenity lot.

Development AgreementContract

Agreement between the city and developer memorializing conditions and obligations.

Stormwater Management AgreementContract

Agreement related to the management of stormwater on the site.

Tree Preservation PolicyPolicy

City policy requiring identification of impacted trees and mitigation efforts.

Ordinance AmendmentOrdinance

Change to city ordinances, such as zoning classifications, requiring council readings.

ResolutionsResolution

Formal decisions or expressions of intent by the council, used for plat approvals.

Homeowner Association DocumentsLegal Documents

Documents recorded against the property outlining rules, including fencing restrictions.

Subassociations DocumentsLegal Documents

Specific documents for subsections of the development with their own rules.

View Source
Hastings Public Schools - Hastings Recorder