Inver Grove Heights City Council — Transcript

Tuesday, December 8, 2020

Delaney Circle and Delaney Court Pavement Management Program Improvements

Votes (1)

Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

No official action, informational meeting only

The open house provided an overview of the proposed street improvements, including a project history, existing conditions, geotechnical findings, and recommended reconstruction approaches. Key discussions centered on the 'partial reconstruction' approach, keeping the existing rural section without curb/gutter, and the absence of new city utilities (sewer/water). Financial aspects were detailed, covering preliminary costs, funding sources, and the city's assessment policy, which includes a special benefit cap. A detailed project schedule was presented, outlining upcoming council meetings, design phases, bidding, and construction timelines. A significant portion of the meeting was dedicated to answering resident questions regarding past maintenance, project duration, access during construction, long-term maintenance, speed control, driveway changes, and warranty for the work.

Notable Quotes (8)

this is part of the 2021 pavement management program city project number 2020-09 d delaney circle and delaney court improvements

Jake Moser, Staff Civil Engineer [0:00]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

this project was initiated from a neighborhood petition that was dated and received by council in june there was 29 single-family property owners who signed the petition so very strong support for a street improvement project

Jake Moser, Staff Civil Engineer [1:42]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

the recommendation recommended reconstruction approaches for delaney circle is a full depth pavement reclamation which was what the neighborhood petition had requested specifically... delaney court due to the poor quality base had a geotechnical recommendation for full payment and base replacement

Jake Moser, Staff Civil Engineer [8:35]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

the city assessment policy for a neighborhood of single-family lots is that all single-family lots will pay the same assessment amount... the city assessment policy is to assess 55 percent of the street and stormwater project costs to benefiting property owners

Jake Moser, Staff Civil Engineer [15:07]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

the maximum benefit that uh any the properties could receive from this project is ninety six hundred dollars so the assessment amount is based on the lower of the cap and the policy amount in this case that would be the capped amount of nine thousand six hundred dollars

Jake Moser, Staff Civil Engineer [16:21]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

the city's had a payment management program i believe since the 90s which has involved generally the seal coat the crack seal and seal coat maintenance which would certainly be um with the you know as you noticed earlier in the presentation we haven't done sealcoats in 20 years now but we definitely do crack seal and seal coats on the newer streets that is preventative maintenance that benefits the road do it done early

Jake Moser, Staff Civil Engineer [33:14]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

what you have out there right now is two and a half to three inches of pavement and the reason for the four inches of pavement is so that we can come back and do a milling overlay and do some of the payment management strategies that jake is talking about so we expect the uh the life of the road to be longer than the pavement that you've had to date

Steve Dodge [34:28]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

the city does include a two-year warranty requirement as a part of their projects so certainly after the work is constructed by the contractor there is a a period of time where it will continue to be to be reviewed and if issues that are warranting addressing due to errors on the contractor's end or material issue that that came up that can't be accepted as a part of the contract the city will have with the contractor they will be required to address that under that warranty

Luke Morin, Kimberly Horn & Associates [47:11]
Virtual Open House: 2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

Ordinances & Resolutions (17)

2021 Pavement Management ProgramCity Program

Overarching program funding the street improvements

City Project Number 2020-09DOther

Specific project ID for Delaney Circle and Court improvements

Neighborhood petitionOther

Document signed by 29 property owners that initiated the project

Feasibility studyOther

First step in the project, ordered by city council in September 2020

Feasibility reportOther

Current phase of documentation, to be completed and brought to council in December

Geotechnical investigationReport

Completed by Element Materials Technology in 2019, providing reconstruction recommendations

Soil boringsReport

Tests performed as part of the geotechnical investigation

Pavement coresReport

Tests performed as part of the geotechnical investigation

QuestionnairesOther

Resident input mechanism, with 17 households providing responses on project issues

City assessment policyPolicy

Guidelines for determining special assessments to benefiting property owners

Independent appraiser reportReport

Provides a special benefit cap amount for property assessments

Plans and specificationsPlan

Detailed design documents for construction, requiring council approval in March 2021

Bid documentsOther

Used to solicit contractor proposals, scheduled for late March/early April 2021

Stormwater analysisReport

Part of the feasibility report, reviewing regional and local drainage issues

Standard plate for rural mailbox installationCity Standard

City guideline for widening pavement at mailboxes in rural sections

Driveway restoration programCity Program

Program offering credits to homeowners who opt to replace their entire driveway

Two-year warranty requirementOther

Contractual provision for contractor work quality after construction

View Source
Inver Grove Heights City Council - Inver Grove Heights Recorder