Inver Grove Heights City Council — Transcript
Monday, January 18, 2021
Delaney Circle and Delaney Court Improvements Project Overview
Construction Details and Roadway Maintenance
Stormwater Management and Infrastructure
Project Costs, Funding, and Resident Assessments
Resident Feedback and Q&A
Votes (1)
Delaney Circle and Delaney Court Improvements Project Informational Meeting
Dissent: Some residents raised concerns about potential changes to stormwater flow, although staff clarified no such changes were intended. Disagreement was also noted regarding a specific culvert assessment and the overall concept of the property line swale for stormwater control.
The meeting provided a detailed project overview, including scope, construction methods (full depth reclamation, gravel base replacement), stormwater management plans (culvert replacements, ditch grading), and project financing through Pavement Management Program funds and special assessments. Key policy details on assessment calculations and the $9,600 per parcel cap were explained. The session included a Q&A where staff addressed resident concerns about past resurfacing, construction logistics, ongoing maintenance, and specific stormwater flow impacts, reiterating the project's intent not to change existing flow patterns.
Notable Quotes (5)
tonight's meeting is just a information meeting it's the virtual improvement hearing informational meeting to prepare residents give you information prior to the january 25th city council meeting where we'll be asking council to authorize final design for this project and by ordering the plans and specifications
city policy is to assess for 55 of the street and roadway and storm sewer storm water project costs to benefiting property owners
you would not pay anything more than 9600.
there is no intent to change any flow patterns
if you're interested in replacing your driveway if you've got an old driveway feel free to reach out to me frankly the the sooner the better
Ordinances & Resolutions (7)
The broader city program under which this project is being conducted.
The official identifier for the Delaney Circle and Delaney Court Improvements project.
A comprehensive document detailing project specifics, stormwater analysis, and available on the city website.
Technical documents to be authorized by the City Council for the final design and construction.
The program dictating ongoing roadway maintenance for streets after construction.
A visual representation of proposed stormwater-related work, including culvert replacements and grading areas.
Correspondence sent to residents detailing meeting information and contact details.