[0:05] hi I'm John Muma with the city of
[0:07] Lakeville and the construction services
[0:09] division i'm here to talk about the
[0:10] street reconstruction
[0:12] projects the city of Lakeville
[0:15] reconstructs aging sections of city
[0:17] roadway and underground infrastructure
[0:19] each year but what does that mean for
[0:22] residents or business owners in the
[0:23] affected area what will your
[0:25] neighborhood look like during
[0:27] construction what can you expect how
[0:29] will it affect your daily routine and
[0:31] how will you stay informed throughout
[0:33] the project the city street
[0:35] reconstruction process begins several
[0:36] years before any work takes place the
[0:39] city of Lakeville uses a pavement
[0:40] management plan to rate the conditions
[0:43] and useful life of the streets and
[0:45] utility this data is used to form a
[0:47] capital improvement plan that map out 5
[0:51] years of road and utility reconstruction
[0:53] to begin the process residents and
[0:55] businesses are invited to a neighborhood
[0:57] meeting at the meetings city staff
[0:59] introduce the project and ask for
[1:01] feedback from property owners following
[1:03] the meeting a feasibility report is
[1:05] generated and given to the city council
[1:08] if the city council approves the project
[1:10] survey crews begin the collection of
[1:12] preconstruction data in early spring the
[1:14] project is bid on by contractors which
[1:16] allows the city to determine assessment
[1:19] rates for the project after these
[1:20] assessment rates are generated property
[1:22] owners are invited to a second
[1:24] neighborhood meeting and an assessment
[1:26] hearing with the city council upon
[1:28] approval of the assessment hearing the
[1:30] city sends out preliminary construction
[1:33] schedules to all affected property
[1:35] owners as construction begins the first
[1:37] items you will notice will be flagging
[1:39] and marking from private utility
[1:41] companies as well as marking for spot
[1:43] curb and gutter removal and replacement
[1:45] during the construction mail services
[1:48] will be delivered to temporary mailboxes
[1:51] located just outside the working area
[1:52] while the United States Post Office
[1:54] determines that specific date and
[1:56] location of the move city staff will
[1:58] post this information by placing door
[2:00] hangers on your front door next utility
[2:02] crews move into the area with excavation
[2:05] equipment to begin rebolting valves and
[2:07] hydrants as well as making repairs and
[2:10] improvements to the existing storm sewer
[2:12] system spot curb and gutter replacement
[2:14] may also take place this means removing
[2:16] damaged sections of the curb that
[2:18] doesn't allow the proper flow of storm
[2:20] water down the curb line example of this
[2:22] would be settled curb excess damage or
[2:25] back pitched curb panels concrete
[2:28] sidewalk and pedestrian ramps will also
[2:30] be inspected for damage and replacement
[2:32] if needed concrete curbing or sidewalk
[2:35] that are removed in front of an asphalt
[2:37] driveway typically trigger an asphalt
[2:39] patch behind the curb or walk after new
[2:42] concrete cures concrete driveways that
[2:44] are in good condition typically do not
[2:46] require a patch behind the new curbing
[2:48] concrete driveways typically can support
[2:50] themselves when the damaged curbing is
[2:52] removed while asphalt driveways need to
[2:54] be supported by the concrete to maintain
[2:56] its
[2:57] integrity access to driveways will be
[2:59] maintained during construction however
[3:02] driveways will be inaccessible if curb
[3:04] panels or sidewalk directly in front of
[3:06] the path of your driveway are required
[3:08] to be removed and replaced after
[3:10] replacement the concrete needs to cure
[3:12] for 5 days street parking will be
[3:15] required during this time city staff
[3:17] will communicate with you during the
[3:19] entire process the next step is
[3:22] reclaiming the street's existing asphalt
[3:24] surface the asphalt material is ground
[3:27] and mixed in with the existing gravel
[3:29] base to produce a new base for new
[3:31] asphalt surface crews will work to
[3:34] reshape the profile of the streets by
[3:36] reestablishing a centerline or crown for
[3:38] shredding water during storm events
[3:41] roadways may be a little bumpy and dusty
[3:43] during this process the road shaping
[3:45] process creates a 3-in step from the
[3:48] curb to the gravel this bump requires
[3:50] caution as you enter your driveways to
[3:53] keep dust down during the construction
[3:54] period water trucks will periodically be
[3:57] used on the exposed gravel surface after
[4:00] the initial phase of constructions are
[4:02] complete the first layer of asphalt
[4:04] paving is placed roads remain open to
[4:07] traffic during the paving process paving
[4:09] crews will direct traffic during the
[4:11] paving and rolling operation once the
[4:13] first layer of paving is installed the
[4:15] contractor will begin restoration of
[4:17] areas behind the curb this restoration
[4:19] will include driveway patches dog fences
[4:22] irrigation systems landscape features
[4:25] mailbox reinstallation top soil seating
[4:28] and blanketing the last step of the
[4:30] construction process happens in the fall
[4:31] once all the phases of the project have
[4:33] received the first layer of asphalt and
[4:36] restoration activities this includes
[4:38] adjusting manholes and gate valves in
[4:40] the street to the proper height prior to
[4:43] installation of the second and final
[4:45] layer of asphalt roads will remain open
[4:47] to traffic during the final paving
[4:49] phases to stay informed each street
[4:51] reconstruction projects page on the city
[4:54] of Lakeville's website will continue to
[4:56] be updated on the project's page you can
[4:58] also sign up for a weekly email update
[5:01] from the city staff updates cover each
[5:03] phase of the project and describe what
[5:05] happened during the week and what to
[5:07] expect in the coming weeks of the
[5:08] project time-sensitive notices will be
[5:11] delivered as door hangers on your front
[5:13] door we appreciate your patience during
[5:15] this process and if you have any
[5:17] questions or concerns you can contact
[5:19] the city of Lakeville's construction
[5:21] services team for more information about
[5:23] the project visit lakevillemn.gov