Curb and Gutter Replacement in Lakeville

Lakeville Area Public SchoolsTuesday, April 8, 2025
Watch on original source

Document Analysis

Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.

Transcript
[0:00] hi I'm John Mumo with the city of [0:01] Lakeville and the construction services [0:03] division i would like to highlight a few [0:06] things that take place during a street [0:07] project spot curb and gutter replacement [0:10] is one of those things examples of spot [0:13] curb and gutter that will be replaced [0:15] are areas that are severely damaged or [0:17] broken and curb that does not allow the [0:20] flow of water during storm events [0:22] examples of curb and gutter that would [0:24] not be replaced include minor or [0:27] moderate cracking and any chipped curb [0:30] as these are just cosmetic [0:32] damages removal and damaged curb and [0:35] gutter may impact driveways this would [0:38] typically occur in asphalt driveways [0:40] where sections up to 5 ft from the back [0:42] of curb may need to be [0:45] replaced typically in concrete driveways [0:48] this area would not have to be replaced [0:50] however if city staff mark concrete [0:53] driveways for replacement it would [0:55] typically be up to that first joint [0:58] other instances of driveway removals may [1:00] be due to utility improvements such as [1:03] fire hydrants water valves and storm [1:06] sewer systems the removal limits vary [1:09] depending on proximity and scope of work [1:12] to be completed during a street project [1:16] there's potential for limited access to [1:18] your property typically this only occurs [1:20] if concrete work is needed across the [1:23] full width of your driveway city staff [1:25] will deliver door hangers a minimum of [1:28] 24 hours in advance if access is limited [1:32] for any reason during this process areas [1:34] in the lawn that may be disturbed to [1:36] facilitate constructions include areas [1:39] behind curb and gutter that are marked [1:41] for removal areas surrounding driveways [1:44] marked for removal around storm sewer [1:47] catch basins and grates and around some [1:49] fire hydrants for instance with concrete [1:52] curb and gutter 1 ft either side of the [1:56] marked curb and 4T behind it may be [1:58] impacted due to construction with [2:01] driveways impact limits may be two feet [2:04] either side of the driveway and one foot [2:07] beyond the removal [2:09] limits the impact limits around fire [2:12] hydrants may be up to 4 ft behind the [2:14] fire hydrant and 8 ft either side [2:17] special attention in these areas may be [2:20] needed for private features located [2:22] within the city right away if you would [2:25] like to protect your private features [2:27] from damage during construction such as [2:30] irrigation or sprinkler systems pet [2:32] containment systems and landscaping [2:34] please temporarily remove them from the [2:36] city right away in areas that will be [2:39] impacted by construction your [2:41] cooperation is greatly appreciated for [2:44] more information about the street [2:45] projects please visit the city of [2:47] Lakeville's website at lakevillemn.gov [2:52] [Music]