December 4, 2025 Bloomington Planning Commission Meeting

Thursday, December 4, 2025

Bloomington Ferry Road Corridor study results and recommendations

Proposed concept C for corridor design (two-way bikeway with sidewalks)

Interim safety improvements for Bloomington Ferry Road intersections

Fence standards review and code update objectives

Areas of Interest (5)

  • Bloomington Planning Commission approves moving forward with a radical redesign of the 70-year-old Bloomington Ferry Road, eliminating two vehicle lanes.
  • Corridor study concludes that historical traffic data no longer justifies a four-lane configuration on a major West Bloomington arterial road.
  • City staff push to prioritize 'Concept C' design for future reconstruction, featuring a two-way bike path and enhanced pedestrian safety features.
  • Interim safety fixes—including potential mini-roundabouts and curb bumpouts—slated for problematic intersections before full reconstruction.
  • Planning department initiates overhaul of 2008-era fence codes to address resident concerns regarding material, opacity, and privacy.

Votes (1)

Recommend to city council the adoption of the Bloomington Ferry Technical Advisory Committee corridor vision, specifically Concept C.

Passed5-0

Moved by Commissioner Cunningham · Seconded by Unknown

Notable Quotes (2)

Based on the traffic numbers that are out there today based on looking at historical data for the past 20 years we're not really seeing the need for four lanes of traffic.

— Phil Collins
Bloomington Ferry Road Corridor StudyExplaining the proposal to reduce Bloomington Ferry Road to one lane in each direction.

The amount of public testimony in the packet is I think something to be admired.

— Commissioner Cunningham
Public EngagementPraising the public engagement process for the corridor study.

People (6)

CooktonChair

Planning Commission Chair, managing the meeting flow and public hearing.

Amy MaroneStaff

Presented the Bloomington Ferry Road Corridor study staff report.

Phil CollinsConsultant

SRF Consulting representative detailing the corridor analysis and concepts.

1 quote

“Based on the traffic numbers that are out there today based on looking at historical data for the past 20 years we're not really seeing the need for four lanes of traffic.”

Explaining the proposal to reduce Bloomington Ferry Road to one lane in each direction.

Commissioner CunninghamCommissioner

Planning Commissioner who expressed support for the project and public outreach.

1 quote

“The amount of public testimony in the packet is I think something to be admired.”

Praising the public engagement process for the corridor study.

Dylan PalmerStaff

Planning division staff presenting the fence standards review study item.

KareemStaff

Staff member facilitating the online component of the meeting.

Places Mentioned

Bloomington City HallBloomington Ferry Road Corridor169 (Highway)Sunrise ParkLindstöm AvenueVaness RoadYukon Avenue102nd Street

Events & Meetings (4)

  • December 4th meeting of the Bloomington Planning Commission
  • City Council public hearing on December 22, 2025
  • Fence code public hearing scheduled for January (2026)
  • City Council presentation for fence code in February 2026
View Source
December 4, 2025 Bloomington Planning Commission Meeting - Bloomington Recorder