The history of the McAfee Mill and dam along Nine Mile Creek

Bloomington City CouncilWednesday, September 18, 2024
Watch on original source

Document Analysis

Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.

Transcript
[0:04] THE NINE-MILE CREEK VALLEY GIVES  THE IMPRESSION OF AN UNTOUCHED,   [0:08] NATURAL REMNANT. BUT THE TRUTH IS HUMAN INFLUENCE  IS A PART OF ITS LONG HISTORY. ONE MORE RECENT   [0:15] STORY OF PEOPLE LIVING AND WORKING ALONGSIDE  THIS INDELIBLE STREAM BEGINS IN THE 1870S.  [0:21] RIGHT HERE IN THIS SPOT IN THE LOWER NINE MILE CREEK VALLEY, [0:24] JUST WEST  OF 104TH STREET AND HUMBOLDT, [0:27] WILLIAM MCAFEE BUILT A MILL AND IN ORDER  TO POWER IT [0:30] HE BUILT A LARGE EARTHEN DAM ACROSS NINE MILE CREEK, JUST UPSTREAM. [0:35] THE MILL WAS THREE STORIES TALL AND IT GROUND WHEAT,  RYE, GRAHAM, AND BUCKWHEAT FOR FLOUR AND FODDER.  [0:41] THE EARTHEN DAM STRETCHED FROM VALLEY WALL TO  VALLEY WALL. A BYPASS PIPE WAS USED TO PUSH WATER   [0:48] THROUGH THE MILL AND POWER ITS MACHINERY.  THE MILL POND CREATED BY THIS DAM WAS BIG.  [0:55] IT STRETCHED AT LEAST A HALF OF A MILE  UPSTREAM AND IT LEFT A SCAR ON THE   [1:00] LANDSCAPE THAT LASTED FOR DECADES AFTER  THE DAM AND MILL WERE BOTH LONG GONE.  [1:04] THE MILL PROVIDED GRIST AND FLOUR UP UNTIL  1905. THAT YEAR, THE DAM WASHED OUT. NOT THE   [1:10] FIRST TIME THAT HAD HAPPENED, BUT WITH INCREASED  COMPETITION FROM THE MINNEAPOLIS MILL DISTRICT,  [1:15] IT WAS NEVER REBUILT AND THE MILL, AFTER  41 YEARS OF OPERATION, CLOSED FOR GOOD.  [1:22] BY THE 1930S THE MILL AND ITS  EQUIPMENT HAD ALL BEEN CLEARED AWAY.  [1:26] THE STORY DOES NOT END THERE. A FAMILY HOME WAS  BUILT IN THIS SPOT IN THE 1950S. PEOPLE LIVED   [1:33] IN THE VALLEY ALL THE WAY UP UNTIL 1987. THAT WAS THE YEAR OF A GREAT FLOOD WHICH   [1:39] WASHED OUT THE PROPERTY AND THE  ACCESS BRIDGE. AT THAT POINT,   [1:43] THE CITY BOUGHT OUT THE PROPERTY AND THE  BUILDINGS WERE FULLY DEMOLISHED IN 1989   [1:47] USING A TEST FIRE FOR FIREFIGHTER TRAINING. NOW-A-DAYS, IF YOU LOOK CLOSELY,   [1:52] YOU CAN STILL SEE THE REMNANTS OF THE OLD EARTHEN DAMS THAT WERE BUILT TO POWER THE MILL, [1:58] AND YOU CAN STILL SEE THE OLD ROAD THAT CAME DOWN FROM HUBOLDT TO GET ACCESS TO SITE. [2:03] PEOPLE ARE STILL A PART OF THIS LAND. FROM PARK VISITORS [2:07] TO CITY STAFF WORKING AS CARETAKERS TO  THE LOCAL ECOSYSTEMS AND PARK INFRASTRUCTURE. [2:12] THROUGHOUT ALL OF THIS, NINE MILE CREEK KEEPS  CARVING ITS WAY TO ITS CONFLUENCE WITH THE MINNESOTA RIVER, [2:18] READY TO BEAR WITNESS TO  FUTURE STORIES THAT ARE YET TO BE TOLD.