Agenda · Brooklyn Center City Council
Brooklyn Center City CouncilAgendaMonday, August 24, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## CITY COUNCIL
## MEETING
## City Hall Council Chambers
August 24, 2026
## AGENDA
1. Call to Order - 7:00 p.m.
Attendees please turn off cell phones and pagers during the meeting. A copy of the
full meeting packet is available in the binder at the entrance to the Council
Chambers.
## 2. Roll Call
3. Pledge of Allegiance
## 4. Informal Open Forum
This is an opportunity for the public to address the City Council on items that are
not on the agenda. It is limited to 15 minutes. It may not be used to make personal
attacks, air personal grievances, make political endorsements, or for political
campaign purposes. Council Members will not enter into a dialogue with the
presenter. Questions from the Council will be for clarification purposes only. It will
not be used as a time for problem-solving or reacting to the comments made but
for hearing the presenter for informational purposes only. The first call will be for
those that have notified the Clerk that they would like to speak during the open
forum and then ask if anyone connected to this meeting would like to speak. When
called upon, please indicate your name and then proceed. Please be sure to state
your name before speaking.
## a. Meeting Decorum
5. Invocation - Anderson
## 6. Approval of Agenda and Consent Agenda
These items are considered to be routine by the City Council and will be enacted
by one motion. There isn't a separate discussion for these items unless a
Councilmember so requests, then it is moved to the end of the Council
Consideration Items.
a. Approval of Minutes
- Motion to approve the following minutes:
• August 10, 2026, Study Session
• August 10, 2026, Regular Session
b. Approval of Licenses
-Motion to accept licenses as presented.
c. A Resolution Re-approving the Preliminary and Final Plat for Shingle Creek
## Crossing 7th Addition and Authorizing Final Plat Recording
- Motion to adopt a resolution re-approving the preliminary and final plat for
Page 1 of 169
## Shingle Creek Crossing 7th Addition, as contemplated under Planning
Commission Application No. 2025-006, and authorizing final plat recording.
## d. Resolution Accepting Feasibility Report for Improvement Project No. 2027-08,
Humboldt Avenue and 65
th
## Avenue Improvement Project
- Motion to approve a resolution accepting feasibility report for Improvement
Project 2027-08, Humboldt Avenue and 65
th
## Avenue Improvement Project
e. Resolution Requesting Approval for an Amendment to the Brooklyn Center
## Fire Relief Association By-Laws
- Motion to approve a Resolution Requesting Approval for an Amendment to
## the Brooklyn Center Fire Relief Association By-Laws
7. Presentations/Proclamations/Recognitions/Donations
## 8. Public Hearings
## 9. Planning Commission Items
a. Planning Commission Application No. 2026-007 for Approval of a Site and
Building Plan (Major) and Conditional Use Permit for 4801 63rd Ave N (Unity
## Temple Church of God in Christ)
- Motion to adopt a resolution approving Planning Commission Application No.
2026-007 for (1) issuance of a conditional use permit for a “Place for Religious
Assembly” and (2) a major site and building plan for construction of an
approximately 3,893-square foot building expansion and certain site
improvements at the Subject Property located at 4801 63
rd
## Avenue
North, based on the findings of fact and submitted documentation.
## 10. Council Consideration Items
## a. 2026 Primary Election Results
- Motion to approve the Resolution Regarding the Re-Canvass of the August
## 11, 2026, Municipal Primary Election
## b. Investment Management Services Agreement with Ehlers Investment Partners
- Motion to authorize the Interim City Manager and Finance Director to enter
into an agreement with Ehlers Investment Partners to provide investment
management services for the City of Brooklyn Center, subject to the review of
the City Attorney.
## 11. Council Report
12. Adjournment
Page 2 of 169
## COUNCIL MEETING DECORUM FOR THE PUBLIC
To ensure meetings are conducted in a professional and courteous manner which enables the orderly
conduct of business, all persons in attendance or who participate in such meetings shall conduct themselves
in a manner that does not interfere with the ability of others to observe and, when allowed, to participate
without disruption or fear of intimidation.
A. Decorum. Persons who attend meetings must avoid conduct that disrupts, interferes with,
or disturbs the orderly conduct of the meeting or the ability of other attendees to observe
and participate as appropriate. To that end, persons who attend meetings are subject to the
following:
(1) Members of the public may only speak during meetings when allowed under Council
Rules and only after being recognized by the presiding officer. The City Council has
established time limits for the acceptance of public comments or testimony.
(2) Public comments or testimony must be addressed to the presiding officer and not to
other Council Members, staff, or others in attendance.
(3) All elected officials shall be referred to by their proper title and surname.
(4) Public comments should avoid personal accusations, profanity, or other improper
content for a public meeting.
(5) Intimidating behaviors, threats of hostility, or actual violence are disallowed.
B. The presiding officer shall request any person(s) who disrupt, interfere with or disturb the
orderly conduct of a meeting to cease the conduct and, as necessary, shall issue an oral
warning to the individual(s) found to be in violation. If the individual(s) persists in disrupting,
interfering with, or disturbing the meeting, the presiding officer may have the individual(s)
removed or, under appropriate circumstances, temporarily clear the gallery. If for any reason
the presiding officer fails to take such action, a majority vote may be substituted for action
by the presiding officer to maintain order and decorum over the proceedings.
C. The Council Chambers capacity is 76 persons per fire code.
Page 3 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM:
## THROUGH:
## BY: Senye Amenti, Administrative Assistant
## SUBJECT: Approval of Minutes
## Requested Council Action:
- Motion to approve the following minutes:
• August 10, 2026, Study Session
• August 10, 2026, Regular Session
## Background:
## Budget Issues:
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
## 1. 2026.08.10 SS
## 2. 2026.08.10 CC
Page 4 of 169
08/10/26 -1- DRAFT
## MINUTES OF THE PROCEEDINGS OF THE CITY COUNCIL
## OF THE CITY OF BROOKLYN CENTER IN THE COUNTY
## OF HENNEPIN AND THE STATE OF MINNESOTA
## STUDY SESSION
## AUGUST 10, 2026
## CITY HALL – COUNCIL CHAMBERS
## CALL TO ORDER
(00:31) The Brooklyn Center City Council met in Study Session, called to order by Mayor Pro
Tem Teneshia Kragness at 6:31 p.m.
## ROLL CALL
Mayor Pro Tem Teneshia Kragness and Councilmembers Dan Jerzak, Kris Lawrence-Anderson,
and Laurie Ann Moore. Also present were Interim City Manager Daren Nyquist, Interim Deputy
City Manager & Public Works Director Liz Heyman, Community Development Assistant Director
Ginny McIntosh, City Clerk Shannon Pettit, and City Attorney Siobhan Tolar.
Mayor April Graves was absent and excused.
## CITY COUNCIL MISCELLANEOUS DISCUSSION ITEMS
Councilmember Moore noted that she had two items but would start with the first and defer to
other Councilmembers. She noted that she attended the Brooklyn Center Health Fair on Saturday
and, after her attendance, she sent an email to both Interim City Manager Daren Nyquist and City
Attorney Siobhan Tolar and would read it now in its entirety. She read aloud, “I would like to
make a formal inquiry into the participation of two candidates, Councilmember Teneshia Kragness
and Nahid Khan, in the Brooklyn Center-sponsored Health Fair on August 8, 2026. I know that I
did not receive an invitation to take part in the event. Both candidates had designated tables,
campaign literature, flyers, and other materials I could not identify. Both candidates were actively
campaigning with potential voters. A voter might surmise this as an endorsement of these two
candidates by the City of Brooklyn Center. This could be a violation of campaign finance law and
opens the City up to potential liability. I am concerned as a Councilmember about the
repercussions for the City; the appearance of a political endorsement by the City could tarnish the
City's reputation, damage trust, and have a negative financial impact. I would like to request a
formal response to this decision to allow these two candidates to participate, who made the decision,
and when the decision was made and why. I would like this inquiry to be shared immediately with
the City Council before Monday's Council meeting. I request that the result of this inquiry be
shared with the City Council with all due haste. Thank you for your attention to this matter,
## Councilmember Laurie-Ann Moore."
Mayor Pro Tem Kragness asked if anyone had any comments regarding Councilmember Moore’s
statement.
Page 5 of 169
08/10/26 -2- DRAFT
Councilmember Jerzak asked if he could poll the Council to see if there was consensus to give this
issue back to the Administration and the City Attorney to have them look at it and report back, as
this is an administrative matter.
Mayor Pro Tem Kragness stated she is confused, and maybe it is twofold. She stated maybe the
question is whether Councilmember Moore was not invited to something, or if that kind of booth
was not allowed.
Councilmember Moore stated she would not respond to questions and would have Mr. Nyquist
respond.
Mayor Pro Tem Kragness stated that was okay and asked if Councilmember Moore could also read
the email about not being invited to the Juneteenth event with a booth there. She asked
Councilmember Moore again if there was an email sent about that.
Councilmember Moore noted that it was a co-sponsored event. Mayor Pro Tem Kragness stated
that Councilmember Moore was correct, but Juneteenth allowed booths, and she had a booth there
as well and was curious if there were questions regarding that, but it does not sound like
Councilmember Moore minded missing that event.
Councilmember Lawrence-Anderson stated she would like to comment. She noted that in her very
first term, she went to a City event with campaign signs and the former Director of Community
Development stopped her as she was approaching Centennial Park and told her there was no
campaigning on City property. She stated that campaigning on City property at a City event is not
allowed.
Mayor Pro Tem Kragness stated she had a flyer for the event where it did not state that it was not
allowed.
Councilmember Jerzak asked if Mayor Pro Tem Kragness would poll the Council, stop this
conversation, and send it to the administration.
Mayor Pro Tem Kragness stated she believed this was administrative, and this is not a Council
decision because the Council did not create the flyer and the Council did not have any involvement.
She reiterated that this does sound like an administrative issue.
Councilmember Jerzak stated that he agreed and does not want the Council to get into taking sides.
It should be sent to Administration and the City Attorney and have them handle it, and if there is
no consensus to do that, then the Council can go on and discuss it.
Mayor Pro Tem Kragness noted it sounded like it was already sent to the City Attorney and
Administration but has no issue doing that.
Page 6 of 169
08/10/26 -3- DRAFT
Councilmember Moore stated she thought Mr. Nyquist had some comments and it would be turned
over to Administration.
Mr. Nyquist stated if the Council would like this issue to be looked at Administratively, it is worth
a look at, especially given the context of it being at a City-sponsored event. He added that he and
the City Attorney would look into it and get back to the Council.
Councilmember Moore added that she received an email and it was posted on Brooklyn Center's
social media page that the City's newsletter was delayed, which included important dates such as
the Health Fair, which already occurred, as well as the Primary election that is occurring tomorrow.
There have been some delays and errors in communication, and she wondered if this is a situation
where there are not enough Staff resources, the timing was off, or someone did not get things out
on time. She stated there are a limited number of City-sponsored events and a primary election
day that would not have gotten away, at least in this venue through the City newsletter.
Mr. Nyquist stated he had a conversation with Staff about this after hearing the news late last week,
and this is a pure capacity issue by the printer not getting to the City’s items in time. He added
that he has given direction to get quotes from other printers that may have more capacity.
Councilmember Jerzak stated he would like to mention the two grand openings happening
tomorrow. Community Development Staff will be joined by LC Coffeehouse at 6826 Humboldt,
and the New Horizon Academy at 7100 Brooklyn Boulevard will be the second ribbon cutting.
Planning Manager Ginny McIntosh noted the first ribbon cutting at LC Coffeehouse will start at
12:00 p.m. at the Humboldt Shopping Center, and the second ribbon cutting is at 2:30 p.m.
Councilmember Jerzak stated he forwarded an email he received because it has become a hot topic,
but a Work Session might be necessary to discuss Flock cameras and the information given to the
Council because other communities around them are taking action. He noted that there are several
things the Council has already done, but they should get ahead of it and be sure that the correct
information is getting out there. He asked if there was any interest from the Council to have a
Work Session about it, because it is coming up more and more in the news.
Councilmember Lawrence-Anderson stated she was interested in discussing it.
Mayor Pro Tem Kragness asked if Councilmember Moore had an opinion. Councilmember Moore
stated she would defer on that, and if there is a Work Session, it depends on what the content of
the Work Session would be, and if Chief Flesland has any information that he thinks the Council
needs to know about it.
Councilmember Jerzak stated he is not asking for a special session, but information could be put
in the update so the Council could pass that information on to constituents because the Police
Department has done several things already to address this. He added that if it is a Work Session,
or however Administration wants to address this, there are certain things with Flock cameras with
Page 7 of 169
08/10/26 -4- DRAFT
the software that the Council may not know that other cities have not done. There have been
inquiry answers, and the Council had an update already, but not everyone gets to see Friday's
update, so it would benefit the public if the Council had a Work Session to address it.
Mayor Pro Tem Kragness noted that instead of a Work Session, Chief Flesland could come back
and provide an update to the Council. Councilmember Jerzak stated he is not opposed to that idea
either.
Councilmember Moore stated she is not disagreeing, but the Council has been provided updates.
Mayor Pro Tem Kragness asked if Mr. Nyquist had a comment on that. Mr. Nyquist stated it
would not be a big lift to put something together for a Study Session. After Operation Metro
Surge, Staff learned a lot about the back end of Flock, and some insight into how that operates
could be discussed with the Council. He noted that Staff has also put together some publicly
available dashboards to allow the City to be as transparent as the system allows it to be, and how
that information is being used. He added that it would be a good idea to get that information out
because it is available now.
Mayor Pro Tem Kragness stated that any opportunity to push the dashboard out is important
because it is really underutilized.
Councilmember Lawrence-Anderson stated she would defer to Staff to determine the best way to
convey that information to the Council.
Mayor Pro Tem Kragness stated there were two spelling errors in the minutes that she would report
to the City Clerk, but on the Council Report, Officer Kaitlin’s name was spelled wrong, as well as
Zanewood Recreational Center was spelled wrong.
Councilmember Lawrence-Anderson stated she had a typo on page 23, item 10b. The sentence
reads out, but it should be ought. The sentence read that the state auditor, OSA, opined that the
City ought to maintain a reserve. Mayor Pro Tem Kragness asked what paragraph that correction
was in. Councilmember Lawrence-Anderson stated it was the big paragraph midway from the
bottom of the page.
Councilmember Lawrence-Anderson stated to the City Clerk that there was a page number
difference on the minutes, with a 23 listed and a 33 listed on the same page.
## CITY MANAGER MISCELLANEOUS DISCUSSION ITEMS
Mr. Nyquist noted that before going into the Administrative Fines update, he thought the Council
needed to amend the language in the Consent Agenda for the Arts and Beautification and Cultural
Commission, as the word cultural was omitted. He noted that the Council could note that change,
to read Arts, Beautification and Cultural Commission.
Page 8 of 169
08/10/26 -5- DRAFT
Mayor Pro Tem Kragness asked Mr. Nyquist to repeat that so it can be changed. Mr. Nyquist
reiterated that item 6d. Resolution Amending Resolution No. 2024-47, the Brooklyn Center
Cultural and Public Arts Commission, to rename the Commission to Arts & Beautification
Commission, should read Arts, Beautification and Cultural Commission to have the ABC acronym.
## ADMINISTRATIVE FINES UPDATE
Mr. Nyquist introduced Community Development Assistant Director Ginny McIntosh to discuss
this item. He noted that the amounts were changed for administrative fines last year, and this
conversation was planned to evaluate how some of those decisions have affected the budget, or if
it has at all.
Ms. McIntosh stated she would keep this presentation abbreviated due to the time. She noted that
Community Development Staff have been regularly meeting with Finance to track budget line
items against actual performance of those items. The City did make some changes for 2026 with
the 2026 fee schedule, which went into effect in early January. Those changes included a $2,000
annual cap per property on the total amount of Administrative Fines issued, and the assessment
period is September through September of each year. Changes were also made to limit the
frequency of administrative fines issuance, and they can no longer be issued daily. Administrative
Fines for vehicle storage violations went from $100 to $50, fines for level three violations were
decreased by as much as half, and ongoing code violation fines can no longer be doubled. In
previous years, a $100 first fine would have doubled for the second fine, doubled again to $400
for the third fine, doubled again to $800 for the fourth fine, and doubled again to $1,600 for the
fifth fine, for a total of $3,100 in fines. Under the new structure, the fine of $100 would have to
be issued 20 times in order to reach that max total of $2,000.
Ms. McIntosh noted the significant variation in the budget report is the revenue coming in through
Administrative Fines. In 2024, the City budgeted $20,000 and received $51,675 in payments and
had $169,390 specially assessed. In 2025, that budget amount was raised to $37,000 and received
$48,110 in payments and specially assessed $201,610. She noted that for 2026, the budget was
kept at $37,000, and payments received through June have totaled $4,450, and as of now there are
129 pending special assessments through June that total $52,200. She noted that the caseload has
not really changed; in 2025, the same time frame from January 1 through June 30, there were 2,383
cases, and from January 1, 2026 to June 30, 2026 there have been 2,228 cases. As of now, current
revenue for Administrative Fines would probably be at 24 percent by the end of the 2026 budget
year, whereas in 2024 and 2025, Administrative Fines exceeded the budgeted amounts. As
mentioned before, there are currently 129 citations pending special assessments totaling $52,200;
this is tracking at 50 percent of prior years assessed. Under the 2025 fee schedule, the total pending
special assessments would have been $91,975 through June 2026, which is a difference of $39,275.
Ms. McIntosh noted that, as of now, while working on the 2027 budget, including this lower
projected revenue will require additional levy support to maintain current service levels. The rate
of achieving compliance is essentially unchanged under the revised fee structure, but is more labor
intensive for Staff due to the inability to upscale or double fines, which means more notices and
Page 9 of 169
08/10/26 -6- DRAFT
inspections up to 20 times until compliance is achieved. She noted that if compliance cannot be
achieved with capped fines, sending cases to formal complaints would be the next step, which has
not happened yet, but may carry additional costs to the City for legal services like a prosecuting
attorney, and the Council may need to consider raising the legal services budget to do so. She
noted that there is no way to recoup fees that have been charged for legal services, and the City
will be paying for it. This process may also lead to criminal records for property owners.
Ms. McIntosh noted that she will stand for questions, and due to the time constraints, will follow
up afterwards if necessary.
Councilmember Jerzak stated it is 7:00 p.m. and there are several things he would like to discuss
regarding this, and asked if this can be moved to the end of the Regular Session.
Mayor Pro Tem Kragness agreed that it should be moved to the end of the Regular Session to
allow for more discussion.
Mayor Pro Tem Kragness adjourned the Study Session at 6:59 p.m.
Mayor Pro Tem Kragness reconvened the Study Session at 7:56 p.m.
Mayor Pro Tem Kragness continued conversation on the Administrative Fines Update.
Councilmember Jerzak stated there was an unspoken aspect that if the City budgets for a certain
amount of dollars, there is a perception not only that the City has to make that budget number, but
also that citations are a revenue source and they cannot ever be used as a revenue source. He noted
that this is very problematic that citations are even perceived that way. He continued that this
initial system was based on punitive force, and there are not a lot of tools that code enforcement
has, and if citations are taken away, that is one less tool. If every year, the City is generating a
certain amount of dollars and the cases do not change, the City has to look at whether this is an
effective system. He noted that the Council needs to ask if this is the best way to accomplish the
purpose of compliance and having an orderly City with ordinances that the Council has enacted.
Many ordinances need to be revisited; for example, there has been a long-standing ordinance about
expired license tabs. It can sit in a driveway for any number of reasons, like the owner forgot to
put them on the vehicle, the owner did not have the money, or was deployed, but whatever the
reason may be, the resident does not have to answer questions when an Inspector knocks on the
door and asks about it. One of the problems with this ordinance is that if it is an operable vehicle,
then it is a law enforcement issue, and law enforcement may or may not deal with it if there are a
thousand calls in the queue, but this is one of the many things that the City needs to look at for
efficiencies. He stated the City needs to look at the ultimate harm, and if these are just fines,
equitable, and if they work.
Councilmember Jerzak continued that he wanted his colleagues to explore the idea that fines
should be one dollar, and any money that comes in can go into the General Fund, and wanted the
Council to really consider that. He stated he wanted to respond to Ms. McIntosh's comment, which
Page 10 of 169
08/10/26 -7- DRAFT
he takes opposition to about formal complaints because there have not been any, and those are
used for the most extreme cases. He added that abatements are mostly for foreclosures, and those
are obviously serious cases and should be assessed to the property, and he is not taking that into
effect. He stated he wanted to go back to the money that comes in, and consider using it for
education rather than punitively, and the person that lives next to it should not have to deal with
it, but there needs to be ways that the City can do better than giving a third notice and running up
a fine. He noted that most of the time people are not really clear on what they have done, and get
a notice from the City, and it is really long, and it scares them; then it includes a fine, and residents
do not know what to do. He added that the Council heard testimony last year from people who
understood they received fines, but did not have the money to pay them. He stated one possibility
to consider is a fund to have some help for residents. The Housing Commission could sit and hear
an appeal where they find out from residents what happened, not interpreting the ordinance
because if the resident was in violation, that is different, but rather finding other options or
assistance for residents that cannot pay the fine, which is a more equitable system.
Councilmember Jerzak continued that the Council needs to re-explore this issue, and City Staff
feels the pressure when there are residents calling to complain, but punitive fines do not work
because it has been five years, 10,000 cases later, and hundreds of thousands of dollars, and there
are still cases that happen over and over again. He stated he is just putting this out here for
discussion, not blame, because the only people that pass ordinances are the Council, so they are
the only ones that can fix this. He apologized for the long response, but feels very passionate about
this.
Mayor Pro Tem Kragness stated she appreciates that the fines were reduced, which makes it more
realistic to what is collectible. There was a previous case that under the 2025 fee structure would
have had a $17,200 fine, and under the new structure it was $2,200. Ms. McIntosh added that the
property was a rental property.
Mayor Pro Tem Kragness noted that this reminds her of looking at a balance sheet, and the
percentage of accounts that will actually produce a collectable amount to the City, based on the
history. She stated she thinks of fines as a revenue source, but that is because of the way it is
presented, because it is not a revenue source that the City is dependent on, and that is what the
City needs to reiterate. She noted that Staff has to position fines as a percentage of how much is
actually collectible based on the history versus residents thinking the City is fining them because
it needs the money. She added that is how it needs to be presented, that it is a revenue source
because it is money coming into the City, but it is not a revenue source that the City is dependent
on as if it were property taxes. She noted that she does think the fine amount should be smaller to
make it more realistic to how much the City can actually collect.
Councilmember Moore stated she wanted to reiterate what Councilmember Jerzak said, and this
should not be a revenue stream, and the current service level needed should be a line item under
Community Development under Code Enforcement. She noted that if it costs $34,000 to do Code
Enforcement border to border, then it should be a line item for Code Enforcement. The City still
has the fine structure, but it has not increased compliance even when the fine was doubled, and
Page 11 of 169
08/10/26 -8- DRAFT
now that it has been reduced, there still is no compliance. She added that fines could go into a
designated fund for assistance for individuals that meet certain thresholds, not unlike minimums
for Water for Seniors. This should be presented to the Council as a line item for the budget to do
Code Enforcement border to border, and then with the new fee structure that money could go
towards education and to help fund those that meet certain requirements. She added that there are
some eyesores in the City, and Councilmember Jerzak probably saw them five years ago in Code
Enforcement and might still be eyesores today if they are still not in compliance. She reiterated
that whatever service level is needed, City Staff should be it on as a line item, not as a revenue
stream.
Councilmember Jerzak stated it starts with an internal conversation with those who do this every
day, and ask them what, if any, ordinance they would like to see the Council address because they
are unfair, unenforceable, or outdated, and bring some of those recommendations to the Council.
He stated Code Enforcement should also answer what they feel is effective and what is not. He
continued that he thinks of the resident that is barely making ends meet, and the Council certifies
the fine and now the resident is charged, and the mortgage company increases the payment, and
all of it is unintended consequences. If a resident cannot pay a $50 fine, they are not going to pay
a $500 fine. He added that the Council has to be very careful, and yes, expect compliance with
ordinances, but if the ordinance is at fault or unachievable and does not work, then the answer is
not more fines. He stated that he also appreciates that Staff brought this ordinance back to the
Council and was very transparent about it.
Councilmember Jerzak stated he appreciated Ms. McIntosh talking about the cost of abatements,
but nobody can determine when there is going to be an abatement need or when someone is going
to go into violation. He added that he understands Mr. Nyquist needs a line item for certain things,
but there also has to be some type of flexibility. He stated he thought it was a consensus, and there
have not been any prosecutions because they are extraordinary circumstances, but the worst thing
that could happen is getting a supplement. In the past, for extraordinary cases, there had to be a
Supervisor or Director that gave permission for those extraordinary cases so everybody was on
board so they were not abused.
Mayor Pro Tem Kragness stated that there was a consensus that the Council was happy that the
fines were reduced. She noted she did not see any action for this item at this time.
Ms. McIntosh asked if the City’s representation from Ehlers or the Finance Director wanted to
speak to the revenue question, or setting the fines at one dollar. Mayor Pro Tem Kragness noted
that any time money is coming in, it is considered revenue.
Jason Aarsvold from Ehlers noted that if it was shown as revenue to show a balanced budget, the
City would need to show a higher levy amount to fill that gap and part of reason to right-size this
is to make sure the levy number is right for the year which is early what they are trying to
accomplish, and setting a fine at a dollar would show a higher levy need than would be necessary.
Page 12 of 169
08/10/26 -9- DRAFT
Councilmember Jerzak noted that when a $20,000 revenue number comes in at $48,000, there is a
huge discrepancy, and every year it will come in higher, so it is really a deceitful performance
revenue number. Mr. Aarsvold stated the intent this year is to have a number that reflects what
Staff thinks reality will be. The caseloads vary from year to year, and sometimes, just like building
permits, there may be higher revenues or lower, but Finance Staff are doing their best to make that
look correct.
Mr. Nyquist added that the Council will see in the upcoming budget meeting some historical
averages in those different areas, like Administrative Fines and what that would look like and have
an impact on the levy number. He noted that budget decisions should be made based on
performance in the real world rather than trying to make the books balanced. He stated he
appreciates the effort that could be made to look at these funds being used in other ways, but that
is going to be a longer-term conversation that will not be cracked this budget year.
Mayor Pro Tem Kragness reiterated that she appreciated that Staff is making the numbers more
realistic, and that makes it easier for staff to be able to project what the estimate would be going
forward, and without these numbers the levy would have to be changed based on that number
anyway, so the council is just trying to keep the levy as low as possible but also be realistic.
Councilmember Jerzak stated he appreciates the council looking at this and tackling it, and it is
not going to be solved overnight. This is the beginning of a longer-term discussion, but
incrementally the council has made positive steps. The takeaway is taking the pressure off of this
as a revenue source and having a realistic line item to reflect that, and that has to come organically.
Mayor Pro Tem Kragness explained that it is a revenue source; any money coming in is revenue;
however, it is not a revenue source that the city is dependent on, so that is the distinction.
Councilmember Jerzak added that it is not a quota system. Mayor Pro Tem Kragness stated that
is correct, and the City does not have to fine so many people in order to meet their budget, and the
Council wants to make sure that is not the statement that is out there.
Councilmember Moore stated that ultimately the Council is not talking about revenue but about
the amount of money a year it takes to do enforcement, and the budget has been $37,000 and
$20,000; that budget should reflect the actual cost of doing code enforcement. This is about what
the budget should actually say, and it should cover what it costs to do Code Enforcement activity.
Mayor Pro Tem Kragness noted that to help with that, when looking at the budget, the revenue can
equal the exact amount of the expense so then it will tie out to zero. Councilmember Moore agreed
and confirmed that is what she was trying to say too.
Mr. Aarsvold stated that when Ehler’s and the Finance Department build out that budget on the
expenditure side, the Council will see that there is a cost to run the Department, especially the
Code Enforcement function. The budget that is set is based on the cost of Staff, and other things,
and separately and independently from that, Staff try to estimate what the revenues might be from
Page 13 of 169
08/10/26 -10- DRAFT
that activity, and the Council will see those two things separately. He added that the Ehlers team
spent an hour and a half today with the Finance Department to discuss how to set that revenue
number, as it is totally independent from what it costs to provide the service.
## ADJOURNMENT
Councilmember Jerzak moved and Mayor Pro Tem Kragness seconded to adjourn the Study
Session at 8:18 p.m.
Motion passed unanimously.
Page 14 of 169
## 08/10/26 -1- DRAFT
## MINUTES OF THE PROCEEDINGS OF THE CITY COUNCIL
## OF THE CITY OF BROOKLYN CENTER IN THE COUNTY
## OF HENNEPIN AND THE STATE OF MINNESOTA
## REGULAR SESSION
## AUGUST 10, 2026
## CITY HALL – COUNCIL CHAMBERS
## 1. INFORMAL OPEN FORUM WITH CITY COUNCIL
The Brooklyn Center City Council met in Informal Open Forum, called to order by Mayor Pro
Tem Teneshia Kragness at 7:00 p.m.
## 2. ROLL CALL
Mayor Pro Tem Teneshia Kragness, Councilmembers Dan Jerzak, Kris Lawrence-Anderson, and
Laurie Ann Moore. Also present were Interim City Manager Daren Nyquist, Interim Deputy City
and Public Works Director Liz Heyman, Office of Community Prevention Health and Safety
Director LaToya Turk, Associate Planner Krystin Eldridge, Planning Manager Ginny McIntosh,
Public Works Planner Kory Anderson Wagner, Interim Finance Director Dan Tienter, City Clerk
Shannon Pettit, and City Attorney Siobhan Tolar.
Mayor April Graves was absent and excused.
## 3. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited.
## 4. INFORMAL OPEN FORUM
Mayor Pro Tem Teneshia Kragness opened the meeting for the purpose of Informal Open Forum
and reviewed the Rules of Decorum.
Lori B. stated she wanted to take a moment to recognize LaToya Turk. She stated when Ms. Turk
first came on board, she was not entirely sure about her, but sometimes the greatest respect is the
respect that is earned, and Ms. Turk has earned hers. Through hard work, consistency, and
willingness to listen, Ms. Turk has proven time and time again that she is here for the community.
She noted that Ms. Turk has helped bring safety to Brooklyn Center, and recognized that safety is
not only about policing but also mental health, prevention, resources, opportunity, inclusion, and
giving people a voice in the decisions that affect their lives. She noted that Ms. Turk has helped
move Brooklyn Center forward while making space at the table for people who historically have
not always had one, and this work is not easy. It requires navigating different perspectives,
difficult conversations, competing priorities, and criticism and still showing up and doing the
work. There is still so much work ahead in Brooklyn Center, but it is a stronger and better
community because Ms. Turk is doing the work alongside the community. She added that Ms.
Page 15 of 169
## 08/10/26 -2- DRAFT
Turk's dedication has not gone unnoticed, congratulated Ms. Turk on the well-deserved
recognition, and thanked her for everything Ms. Turk continues to give to Brooklyn Center.
Julie B. stated she was there to share her insight and experience, which is typically appreciated
when speaking about things. She noted that she is a children's mental health Case Manager and
has been in her position for 16 years, and is a senior leader in her field and team. She stated she
sees more complex cases because of her experience, and has worked to help families move into
better spaces that are more stable. Julie B. continued that she has worked in multiple jurisdictions
and neighboring counties, and every type of scope of response in the duration of her work. She
added that depending on what happens with an individual she serves, she can be engaged multiple
times a day. She continued that she has removed weapons from people, negotiated hostage
situations, talked people off of bridges, and put her body between her client and first responders
when her client has been safe in that space. She stated that the Council should understand that the
number of services that are available now versus when she started 16 years ago is significant, and
she has horror stories from trauma of the sites she responded to 16 years ago that she had to clean
up herself and carry, as well as the trauma that her clients carry due to not having what they needed.
She stated that COPE is engaged by calling their line; their number is 612-596-1223, and they can
provide crisis response and immediate phone availability; however, they tend to take half an hour
to 45 minutes to respond along with Nexus FRSS. She stated she wants it noted that COPE can
be called and they will come, but it takes 45 minutes.
Councilmember Lawrence-Anderson moved and Councilmember Jerzak seconded to close the
Informal Open Forum.
Motion passed unanimously.
## 5. INVOCATION
Councilmember Jerzak quoted Henry Ford, “Don’t find fault, find a remedy.” He also quoted
Benjamin Franklin, “Remember not only to say the right thing in the right place, but far more
difficult still, to leave unsaid the wrong thing at the tempting moment.”
Councilmember Lawrence-Anderson requested Staff provide an update regarding Kyle B.’s
garden that was mentioned in Informal Open Forum last week. Mayor Pro Tem Kragness noted
she did not see any information regarding that garden in the weekly update either, and asked if
Staff had addressed that.
Mr. Nyquist noted that Kyle B. is present in the audience. Councilmember Lawrence-Anderson
stated she did not need the update now.
Mayor Pro Tem Kragness stated that the question was whether Staff had addressed those issues.
Mr. Nyquist stated that Staff can talk to Kyle B. after the meeting, or sometime this week, and will
provide a follow-up in the weekly update.
## 6. APPROVAL OF AGENDA AND CONSENT AGENDA
Page 16 of 169
## 08/10/26 -3- DRAFT
Councilmember Jerzak moved and Councilmember Lawrence-Anderson seconded to approve the
Agenda and Consent Agenda, as amended, with amendments to the minutes as stated during the
Study Session, and the following consent items were approved:
## 6a. APPROVAL OF MINUTES
1. July 27, 2026 – Study Session
2. July 27, 2026 -- Regular Session
6b. LICENSES
## GARBAGE HAULERS
## Midwest Grease P.O. Box 319
## Redwood Falls, MN 56283
Holiday Stationstores LLC 420 66
th
## Avenue North
## Brooklyn Center, MN 55430
## 6c. RESOLUTION APPROVING AMENDMENT NO. 3 TO THE
## COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY FOR THE
## JOINT COMMUNITY POLICE PARTNERSHIP AND AUTHORIZING
## EXECUTION
## 6d. RESOLUTION AMENDING RESOLUTION NO. 2024-47, THE
## BROOKLYN CENTER CULTURAL AND PUBLIC ARTS COMMISSION,
## TO RENAME THE COMMISSION TO ARTS & BEAUTIFICATION
## COMMISSION
6e. RESOLUTION AUTHORIZING THE ACCEPTANCE AND EXECUTION
## OF AGREEMENT FOR THE FARM TO FOOD SECURITY GRANT
## 6f. AN ORDINANCE ADDING NEW SECTION 35-5609 TO THE BROOKLYN
## CENTER CITY CODE OF ORDINANCES REGARDING FENCE
## REGULATIONS — SECOND READING
## 6g. CODE OF RESPECT FORMAL REPRIMAND
## 7. PRESENTATIONS/PROCLAMATIONS/RECOGNITIONS/DONATIONS
7a. RESOLUTION HONORING LATOYA TURK AS A 2025 TOP
## INFLUENCER IN LOCAL GOVERNMENT
Mayor Pro Tem Kragness read aloud for the record that OCPHS Director LaToya Turk was named
a 2025 top influencer in local government by Engaging Local Government Leaders (ELGL) of
only 100 professionals recognized nationwide, selected through peer nomination. Ms. Turk was
cited for directing City funds toward an unarmed mental health first responder partnership and for
Page 17 of 169
## 08/10/26 -4- DRAFT
centering community voices. That same model earned Brooklyn Center a seat among several
panelists at the National League of Cities 2025 convening on people-centered public safety, where
Ms. Turk presented how the City structured and rolled out its Expanded Response Team.
Mayor Pro Tem Kragness noted this is why the Council is acknowledging Ms. Turk.
Mayor Pro Tem read aloud a resolution honoring LaToya Turk as a 2025 Top Influencer in Local
Government.
Mayor Pro Tem Kragness called for a recess at 7:16 p.m.
Mayor Pro Tem Kragness reconvened the meeting at 7:22 p.m.
Mayor Pro Tem Kragness moved and Councilmember Moore seconded to adopt the
RESOLUTION honoring LaToya Turk as a 2025 Top Influencer in Local Government.
Motion passed unanimously.
7b. ROBBINSDALE AREA SCHOOLS BOND REFERENDUM FOR
## NOVEMBER BALLOT
Mr. Nyquist introduced Dr. Teri Staloch, Superintendent of Robbinsdale Area Public Schools, to
present this item.
Dr. Staloch noted the purpose of the presentation is to educate the Council and the community at
large about the facts of the referendum, and ensure a continued strong partnership based on trust
and transparency between the City and the School District. By the end of the presentation, the
Council will be aware of the School District's current reality, the work it has been engaged in, and
the way the bond request gets the District to a better and sustainable future. The purpose of the
District is to ensure students are inspired and to educate all learners to develop their unique
potential and positively contribute to the community. The District exists within seven cities,
including Brooklyn Center, and operates at 18 sites, including 13 schools and five buildings. Last
year, the District operated 22 sites depending on whether the ESC is counted separately from the
bus garage or not.
Dr. Staloch noted that as part of the statutory operating debt reductions at the end of last year, three
schools were closed and middle school programming was eliminated at another school, and the
District is in the process of moving and preparing to close the District Service Center. The closer
the District gets to operating 13 buildings, given the student population, the more responsible and
efficient the District will be.
Dr. Staloch explained that the previous slide showed the buildings that house the District's 9,831
students each day. The District has the privilege and the responsibility of serving the needs of a
very diverse group of students representing a wide array of racial, cultural, and ethnic backgrounds,
with 92 different languages spoken in the homes of students and throughout the District. She noted
Page 18 of 169
## 08/10/26 -5- DRAFT
that there are 1,594 staff across the District that support the students each day, and over the last
few years there have been significant reductions in staff as the District aligns the staffing model
with its enrollment. The community is being asked to consider a future-focused plan. This plan is
designed to right-size the number of buildings to ensure that students have the learning spaces and
opportunities that will strengthen their experiences and prepare them for their future. The plan
was created based on what the District heard from the community, staff, and students to learn in
inclusive and safe spaces with equitable opportunities across the District.
Dr. Staloch continued that the District has experienced a decline in student enrollment for years,
with a peak number of students in the 1970’s of 28,000 to just shy of 10,000 students now. The
challenges the District faces today did not happen overnight and are the result of long-term trends,
not a single decision in time. Financial concerns for the District are not new, and the District was
close to being in statutory operating debt right before COVID-19 and the ESSER Funds, which
were the federal funding that the District reserved, provided temporary relief. As issues have been
uncovered, like the statutory operating debt, the District has owned the challenges and sought
solutions to move toward fiscal responsibility and sustainability. These changes included reduced
spending, reorganized programs, consolidated schools, and significant operational changes.
Planning for the future requires the District to look at both the financial situation and the
programming and opportunities that set Robbinsdale up to be a District of choice for families. She
added that Robbinsdale does not have some of the programming that other schools have, and it is
clear that some of the programming that students and families have grown to love is not accessible
to all students. District families want art and innovation for all no matter what school their children
are assigned to. The reality of the District's facility limitations impacts the quality of education
the District can provide, and the classrooms were designed in an era where students sat passively
and teachers educated. Today's students are engaged and learn best when they are active
participants through hands-on, student-centered learning, which helps them connect concepts to
real-world experiences. Many of the District's neighboring schools have graduates who leave high
school with certifications in high-paying trades and have a chance to explore careers of interest
with opportunities that are not available with the current classrooms and facilities that Robbinsdale
has. Many of the District’s buildings were constructed in an era where there was no understanding
of the importance of natural light, for both academic learning and student and staff well-being.
Today's new construction in schools creates secure entrances with automated access control and
the ability to section off different areas of the school, in case there were isolated incidents. New
construction also includes increased passive supervision through glass that allows views into
corridors and stairways, and hallways are wider to allow for less congestion during passing time
to reduce anxiety and conflict. The District's students have also identified the need for single-user
bathrooms as a safety, privacy, and ADA accessibility need.
Dr. Staloch explained that the District has been intentional over the past two years, digging into
issues and past decisions behind the current reality with internal assessments and evidence-based
practices; the District has developed annual strategic plan priority work to help advance academic
achievement, student wellness and well-being, collaboration partnerships, and staff investment. A
new demographic study was also completed to help ensure accuracy in enrollment projections.
The District engaged in robust community engagement to learn what the community values and to
hear recommendations, and completed a comprehensive facility need assessment to better
Page 19 of 169
## 08/10/26 -6- DRAFT
understand the needs of the buildings. The District has also reduced over $26 million from the
budget in the past three years. Despite all of these efforts, the District is at a crossroads. The bond
referendum is an opportunity to build a predictable, intentional path forward, and if approved,
would create a single unified High School, transform outdated classrooms into dynamic learning
spaces, expand opportunities and academics, career and technical education, arts and athletics, and
improve accessibility and safety features and better utilize existing facilities together. Those
investments are intended to create stronger learning environments while reducing the long-term
cost of operating more buildings than the District needs. This means repurposing existing spaces
that support hands-on learning, and educators having the flexible learning spaces for large group
instruction in the ways that work best for their curriculum and students. This referendum is an
investment that reduces daily operational overhead, protects taxpayer dollars through efficient
space management, and ensures that schools remain safe, vibrant, learning communities as
students remain the priority. Alternatively, without a bond, the District will need to make hard
decisions and cuts that will impact programming, transportation, activities, and staffing. Budget
decisions will be guided by efficiencies, deep cuts to programming and opportunities that will lead
to further enrollment decline. Lower enrollment means less revenue, forcing more budget cuts
and a mounting debt cycle.
Dr. Staloch noted that there are three questions on the ballots that the District wants to ensure
people understand; questions one and two together represent the totality of the original plan. After
surveying the community, the tax tolerance came back at a lower threshold than the cost, so items
will be removed from the original plan that allowed the District to keep a sustainable and controlled
path for reaching the vision. She noted that question one creates a unified world-class high school
for future learning at the current Cooper High School and New Hope Learning Center site and
allows Robbinsdale Spanish Immersion to move to the Armstrong site. This option would keep
the middle schools at their current sites, and expand the Plymouth Middle School pool to an eight-
lane competition pool with correct diving well length, and the Sandburg Middle School pool would
become additional multi-purpose space. She noted this is important because the District’s pools
are not used for instruction purposes and are really expensive to maintain. Additionally, question
one provides neighborhood schools to better meet the needs of elementary schools with high-
quality learning spaces that are designed to support the demands of teaching and learning practices.
These renovated spaces will allow the District to improve the career pathways programming to
ensure that students are college and career ready to successfully contribute to a robust workforce.
She noted that question one also delivers the single, private use restrooms that provide comfort
and dignity for all. It also reorganizes elementary schools into more equitable neighborhood
schools with upgrades to arts, innovation, and special education. Five of the schools will be
expanded into four-section schools, meaning there are four classrooms at each grade level, and
another elementary school will be expanded to accommodate more pre-kindergarten and Special
Education classes, and the Fair School Crystal building will be converted to an elementary school.
She noted that the District would additionally be embedding some District programming into
existing facilities, and would no longer be leasing some of the spaces that the District is currently
leasing; as projects are completed, the District would sell off any unused surplus facilities.
Dr. Staloch explained that question number two on the bill asks voters to decide whether the
District should complete that entire original vision, and that means there would be changes made
Page 20 of 169
## 08/10/26 -7- DRAFT
to the move to Armstrong High School because additional dollars provide for remodeling at the
Plymouth Middle School site, so essentially Armstrong High School would be utilized as the
Plymouth Middle School. In addition to other District programming, Plymouth Middle School
would have an auditorium, and Sandburg Middle School would also get an approximately 400-
seat auditorium in place of that multi-purpose space that was part of question one. The
Robbinsdale Spanish Immersion would relocate to Plymouth Middle School to better serve the
needs of students, and the elementary remodeling stays the same, but both question one and two
allow the District to reduce its footprint and operate remaining buildings more efficiently.
Dr. Staloch explained question number three, which continues to provide a new neighborhood
school within the boundaries of the Robbinsdale community. If this referendum were to pass, the
Board would also determine the best location for district-wide services and programming. The
bond referendum is ultimately a voter decision on the direction voters want for the District and the
students it serves. The total increase for community members with an average valued home in the
District, if all three questions were to be approved, is approximately $25 a month, on a voter-
approved $413 million bond. If the bond is approved by voters, the District will be able to
implement many of the community-created, Board-directed vision to reimagine Robbinsdale area
schools and will grow student opportunities, build stability, and sustain the District for the future.
This bond would also allow alignment of the facilities to enrollment, to lower operational costs
and eliminate spending on underutilized spaces. This bond provides efficiencies and cost savings;
strong schools mean strong property values for homeowners. The space envisioned supports active
learners and allows for collaboration and small group intervention and outdoor learning. Flexible
learning spaces remove barriers so teachers can innovate, and students can thrive. The plan
provides programming for students that includes art and innovation, comprehensive pathways, and
specialized supports for Special Education. The bond referendum would also allow the District to
build on the work already done to make the buildings more secure.
Dr. Staloch noted that if the referendum were to fail, the School Board Administration would need
to make difficult decisions. Those decisions would be based on efficiency of dollars, rather than
expanding opportunities for students. Expenditures for any school district come primarily in four
areas: staffing, building, transportation, and student programming. The District has already
reduced many staffing positions, several buildings, and transportation services. To date, the
District has not had to make significant cuts to student programming; however, those will be some
of the decisions in front of the District if it cannot get savings from reducing and consolidating
buildings and will need to reduce from other areas. She noted that there are some potential cost-
cutting measures as the District looks to maximize building capacity to gain efficiencies. There
are some additional possible impacts if the bond is not approved; some of the costliest courses and
activities are electives rather than state requirements. She added that while the community's vision
was something better for its students, if the bond is not approved, the District will make decisions
based on efficiencies.
Dr. Staloch stated that the District is committed to transparency and building trust, and has shared
the facts of the District's current reality, how the District has engaged with the community, and the
options in front of the community. The bond referendum provides a predictable path forward that
includes the desired State of Educational programming and opportunities identified by the
Page 21 of 169
## 08/10/26 -8- DRAFT
community. She noted that the bond is about more than just a strategic decision; it is a shared
commitment to putting students first, building together for kids, staff, families, and community.
She thanked the Council for the time, and stated the District wants to ensure the community is well
aware of where they are on this journey and what the bond referendum is about.
Councilmember Jerzak thanked Dr. Staloch for her presentation. He asked how many students
from Brooklyn Center attend Robbinsdale School District.
Dr. Staloch introduced the District’s Chief Financial Officer Kristen Hoheisel to discuss those
numbers with the Council. Ms. Hoheisel noted that Brooklyn Center residents would mainly use
the Northport building, and there are students who make alternative decisions, but the student
population at Northport is in the 500s. Ms. Hoheisel added that Robbinsdale is one of the six
precincts that are represented by Brooklyn Center.
Councilmember Jerzak stated this is often confusing, and constituents often ask what this
referendum would do to Brooklyn Center residents' taxes. He asked Dr. Staloch to display the
map that better shows who is eligible and where to vote and noted the importance of this
information so there is clarity, because if voters come to Brooklyn Center's precincts, this
referendum will not be on there.
Ms. Hoheisel noted that precincts one through five would not be impacted or have these questions
in front of them. Precinct six, which is Northport Elementary and is being proposed to be
remodeled, would be the precinct voting on the three referendum questions.
Councilmember Jerzak stated that he also gets questions from constituents regarding Northport
because it was remodeled substantially just a few years ago, and in the event the Council receives
questions about it, he asked if Dr. Staloch and Ms. Hoheisel could leave their contact information
with City Staff. He stated that when asked the question, he thought the first remodel was focused
on safety issues such as smoke detectors because he was a City Inspector at the time, and he
recalled that.
Ms. Hoheisel added that she was happy to leave contact information and can provide a follow-up
on what the differentiation is. Councilmember Jerzak noted she could leave her information with
Mr. Nyquist, but those were his questions because the referendum is confusing.
Mayor Pro Tem Kragness stated that she would like to implement meetings with the School Board
and the City Council to make sure there is an ongoing partnership. In the past, the City Council
was more involved with the School Board, and she would like to see that continued. She noted
that Dr. Staloch mentioned a demographics study for enrollment estimates and the buildings, but
did not see if there were any plans made to increase enrollment.
Dr. Staloch stated that is correct, and looking across the state, there is a decline in enrollment in
many areas. Public school education dropped by two percent after COVID-19, and there are
simply not the birth rates that there used to be, especially in Hennepin County, so there is no plan
to grow exponentially in terms of the District. The way to ensure that resident families choose this
Page 22 of 169
## 08/10/26 -9- DRAFT
District rather than opting out and going to other districts is through excellence in education,
opportunities, and facilities, and how the District spends its dollars to ensure it goes to the students.
She noted that Mayor Pro Tem Kragness is right; the focus is on right-sizing the District, and the
District is operating too many buildings at this point, with Northport as an example, which needs
to be as efficient as possible.
Mayor Pro Tem Kragness asked how there is a referendum to maintain pools, but not a referendum
to maintain staff. Dr. Staloch noted that is the difference between a building bond, which Ms.
Hoheisel will also discuss.
Ms. Hoheisel stated there are two different types of mechanisms that Districts can use to go to the
voters. One is an operating referendum, which means it is addressing daily operating costs. The
Robbinsdale School District is almost at the cap of what the state allows the District to ask the
community members, which is around $60 per student. She added that there is no room within
that operating referendum to go to the voters to help address the needs that the District has. The
other request the District can go for is a building bond referendum where there is no cap given,
and it has been 50 years since the District last went for one. There has been work done on the
facilities, but it has been long-term facility maintenance, which means it can only be maintained
but not remodeled with new walls, doors, or single-stall bathrooms. The building bond referendum
does invest in the facilities, but by reducing the number of facilities being run or making them
more efficient, it can free up those operational dollars to then help with programming and staffing.
Mayor Pro Tem Kragness asked Ms. Hoheisel to explain what it means if voters leave this option
blank, because that is a vote. Ms. Hoheisel noted that if the circle is not filled in, that is a no vote.
Councilmember Jerzak noted that Dr. Staloch clearly stated there is a lack of enrollment in
Hennepin County, but he fears that there will be competition harvesting other students from other
school districts without ever solving the problem. He noted that these are real concerns and are
long-term problems that will have to be addressed.
Dr. Staloch thanked Councilmember Jerzak for his comment, and noted that Minnesota allows
open enrollment in and out, and people have choices for a lot of reasons; sometimes it is based on
where they live, other times it is the programming that the schools offer. She stated that is why
the District is looking at doing multiple things to get themselves to a better place fiscally, with a
sustainable path forward, and provide better opportunities and education for its students. She
added that since COVID-19, she has seen more collaboration with school districts, but that is never
going to prevent people from shopping, and the best way to maintain resident families is to offer
an excellent product.
Councilmember Moore stated she moved to this area 33 years ago with her daughter, and never
really knew which suburb she was in, and she feels the same way about how the District lines were
drawn. She noted that her daughter is a 2009 Cooper graduate, went to Northport Elementary, and
went to TLC Middle School at that time, but a lot has changed since then. The District has to be
innovative and look outside the box, and it is a sad place for that District to be in, but she
appreciated that Dr. Staloch explained what the impact would be on precinct six voters. She added
Page 23 of 169
## 08/10/26 -10- DRAFT
that she wished the state did a better job with District boundaries, and there was more collaboration
so that all students had excellent experiences with a lot of opportunities.
Mayor Pro Tem Kragness stated she appreciated that Robbinsdale kept the Spanish programming,
as her daughter is bilingual and is fluent in Spanish, so even though the school shifted things
around, it is being offered at Sandburg as well as Plymouth Middle School. Dr. Staloch stated part
of the decision behind that was to ensure that there was equitable programming in both of those
middle schools.
Councilmember Jerzak moved and Councilmember Moore seconded to accept the presentation.
Motion passed unanimously.
Mayor Pro Tem Kragness noted that they could now discuss the Administration Fees. City
Attorney Siobhan Tolar asked if this was added as an agenda item, or if the Council was continuing
the Study Session.
Ms. Tolar noted that the Regular Session would have to be adjourned first.
Mayor Pro Tem Kragness stated they could revisit it after finishing the Regular Session.
## 8. PUBLIC HEARINGS
## 9. PLANNING COMMISSION ITEMS
## 10. COUNCIL CONSIDERATION ITEMS
## 11. COUNCIL REPORT
Councilmember Moore reported on her attendance at the following events and provided
information on the following upcoming events:
• Shared that she attended the Health Fair on Saturday, and noted City Staff did an incredible
job.
• Shared that she participated in finger painting, and helped pick a name for the mural that
is going on the Community Center, and thanked all Staff involved with that project.
• Shared that she attended the Metro City's Revenue and Policy meeting last week, and the
common theme was unfunded mandates for federal, state, and county, and how that hits
cities in the Metro area. There was also discussion about water supply, with PFAS and
transportation grants.
• Shared that she met with two constituents about some concerns and questions.
Councilmember Jerzak reported on his attendance at the following events and provided
information on the following upcoming events:
• Shared that he attended the Health Fair.
• Shared that he attended Night to Unite and met with several constituents.
Page 24 of 169
## 08/10/26 -11- DRAFT
• Shared that Luther's end-of-the-season soccer had over 347 attendees and was well
attended. Mayor Pro Tem Kragness added that there were 325 youth who attended.
Councilmember Lawrence-Anderson reported on her attendance at the following events and
provided information on the following upcoming events:
• Shared that this is an election year for Council, Senate, and federal positions and
encouraged residents to do their research and make an educated vote.
Mayor Pro Tem Kragness reported on her attendance at the following events and provided
information on the following upcoming events:
• Shared that she attended Night to Unite and was invited to a lot of parties but was only able
to make it to six of them.
• Shared that she attended a meeting with the Attorney General and Congresswoman Omar.
• Shared that she attended the end-of-season summer soccer party at Centennial Park.
• Shared that she attended the Health Fair at the Community Center, and there was a large
turnout with a lot in attendance who were not residents of Brooklyn Center.
• Shared that she attended her one-on-one meeting with Mr. Nyquist.
• Shared that the Brooklyn Center Tree Giveaway is coming up, where residents can adopt
a tree at Great River Greening's website, and the deadline is August 11.
• Shared that there are two ribbon cuttings tomorrow with the new Coffee Lounge and New
Horizon.
• Shared that Gus Macker’s tournament is this weekend in Brooklyn Park.
• Shared that Music at the Farm and the BrookLynk Summer Celebration are coming up this
weekend, which can all be found on the Brooklyn Center website on the calendar.
## 12. ADJOURNMENT
Councilmember Lawrence-Anderson moved and Councilmember Moore seconded adjournment
of the City Council meeting at 7:56 p.m.
Motion passed unanimously.
Page 25 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM: Ginny McIntosh, Planning Manager
## THROUGH: Daren Nyquist, Interim City Manager
## BY: Krystin Eldridge, Associate Planner
SUBJECT: A Resolution Re-approving the Preliminary and Final Plat for Shingle
## Creek Crossing 7th Addition and Authorizing Final Plat Recording
## Requested Council Action:
- Motion to adopt a resolution re-approving the preliminary and final plat for Shingle
## Creek Crossing 7th Addition, as contemplated under Planning Commission Application
No. 2025-006, and authorizing final plat recording.
## Background:
In 2025, Kimley-Horn (“the Applicant”) requested approval of a preliminary and final plat
## under Planning Commission Application No. 2025-006 for SHINGLE CREEK
## CROSSING 7
## TH
ADDITION and on behalf of Shingle Creek LLC (“the Property Owner”).
The requested re-platting allowed the existing property lines for the identified parcels to
be adjusted and straightened to better align with the layout of the proposed buildings for
Building Sites L, M, O, Q, S, and N within the Shingle Creek Crossing Planned Unit
Development (PUD).
The identified Building Sites are commonly addressed as 1000, 1020, 1050, 1100, and
1150 Shingle Creek Crossing and are situated on approximately 7.94 acres.
Since the original Planned Unit Development and plat approvals for Shingle Creek
Crossing in 2011, subsequent subdivision approvals and numerous amendments to the
Planned Unit Development have been approved to accommodate market conditions.
The plat requests noted existing drainage and utility easements on SHINGLE CREEK
## CROSSING 7
## TH
ADDITION, which would be maintained.
A public hearing was held at the Planning Commission on August 14, 2025, and the
Planning Commission ultimately recommended approval of the preliminary and final
plats. The City Council reviewed the submitted plats and materials at their meeting on
August 25, 2025, and approved the requests under City Council Resolution No. 2025-
130.
Section 35-8107 (Final Plat) of the City Code of Ordinances for the City of Brooklyn
Center indicates that a final plat must be recorded with the Hennepin County Registrar
of Titles within one (1) year after the date of approval or the approval of the final plat
Page 26 of 169
shall be considered void.
The Applicant was delayed in recording the plat and is requesting an extension so that
the mylar (final plat) can be recorded with Hennepin County. As there have been no
changes to the preliminary or final plat, and it would not be in the public interest to bring
the application back through the full City process, City staff are requesting City Council
re-approve the preliminary and plat approvals for SHINGLE CREEK CROSSING 7
## TH
ADDITION and authorize recording of the final plat.
It should be noted that the conditions established in the original approvals and as
outlined under City Council Resolution No. 2025-130 still remain in effect and prior to
recording the plat, the Applicant will need to provide evidence of title satisfactory to the
City Attorney. The Attorney representing the Property Owner emailed an updated title
commitment to City staff on August 20, 2026.
A copy of the Planning Commission Report dated August 14, 2025, City Council
Resolution No. 2025-130, and a resolution requesting re-approval of the preliminary and
final plat for SHINGLE CREEK CROSSING 7
## TH
ADDITION and authorizing final plat
recording are included with this memo for Council’s review and consideration.
## Budget Issues:
None to consider at this time.
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
1. Resolution — Re-approving Preliminary and Final Plat for Shingle Creek Crossing
## 7th Addition and Authorizing Final Plat Recording
## 2. City Council Resolution No. 2025-130
3. Staff Report with Exhibits — Planning Commission Application No. 2025-006
Page 27 of 169
Member introduced the following resolution and
moved its adoption:
## RESOLUTION NO.
## A RESOLUTION RE-APPROVING THE PRELIMINARY AND FINAL PLAT FOR
## SHINGLE CREEK CROSSING 7
## TH
## ADDITION AND AUTHORIZING FINAL PLAT
## RECORDING
WHEREAS, Kimley-Horn (“the Applicant”), on behalf of Property Owner Shingle Creek
LLC, submitted Planning Commission Application No. 2025-006 for approval of the preliminary
and final plats for SHINGLE CREEK CROSSING 7
## TH
ADDITION, which encompasses
properties commonly addressed as 1000, 1020, 1050, 1100, and 1150 Shingle Creek Crossing;
and
WHEREAS, the aforementioned properties are located within the Shingle Creek Crossing
Planned Unit Development, and the original filed plat was approved in 2011 and contemplated
the re-platting of the former Brookdale Mall properties into 19 lots and one outlot to facilitate
phased improvements and development within the shopping center; and
WHEREAS, since the original Planned Unit Development and plat approvals in 2011,
subsequent subdivision approvals and numerous amendments to the Planned Unit Development
have been approved to accommodate market conditions; and
WHEREAS, the requested re-plat allows for the re-alignment and straightening of five
existing parcels located on approximately 7.94 acres known as Building Sites L, M, O, Q, S, and
## N within the Shingle Creek Crossing Planned Unit Development; and
WHEREAS, these lots, which are identified as Lots 14 and 15, Block 1 of SHINGLE
CREEK CROSSING ADDITION, and Lots 1, 2, and 3, Block 2 of SHINGLE CREEK
## CROSSING 2
## ND
ADDITION, would be re-platted into Lots 1, 2, 3, 4, and 5, Block 1 of
## SHINGLE CREEK CROSSING 7
## TH
ADDITION; and
WHEREAS, existing drainage and utility easements, as identified on the provided
## SHINGLE CREEK CROSSING 7
## TH
ADDITION preliminary and final plats, would remain; and
WHEREAS, a public hearing was held at the August 14, 2025, Planning Commission
meeting, whereby this item was given due consideration, a staff report was presented, and a
public hearing was opened to allow for public testimony regarding the plat requests for
## SHINGLE CREEK CROSSING 7
## TH
ADDITION, which were received and noted for the record;
and
WHEREAS, the City Council reviewed the submitted plat and materials submitted with
Planning Commission Application No. 2025-006 at their meeting on August 25, 2025, and
determined that the plat is in general conformance with the City of Brooklyn Center’s City Code
Page 28 of 169
of Ordinances, and specifically Sections 35-8106 (Preliminary Plat) and 35-8107 (Final Plat);
and
WHEREAS, the City Council adopted City Council Resolution No. 2025-130 to approve
Planning Commission Application No. 2025-006 and its requests for a preliminary and final plat,
subject to certain conditions; and
WHEREAS, Section 35-8107 (Final Plat) of the City Code of Ordinances for the City of
Brooklyn Center indicates that a final plat must be recorded with the Hennepin County Registrar
of Titles within one (1) year after the date of approval or the approval of the final plat shall be
considered void; and
WHEREAS, the recording of SHINGLE CREEK CROSSING 7
## TH
ADDITION was
delayed and in working the Property Owner and Applicant, the Applicant requests additional
time to work through any remaining updates to the plat as necessary, have the City Attorney
conduct a review, and submit the plat to Hennepin County for their review and recording; and
WHEREAS, the City Council determines that requiring the Applicant to go through the
entire plat approval process when there have been no changes to the approved plat and it is not in
the public interest and the City Council is willing to re-approve the plat and allow the plat to be
recorded without further process, subject to the Applicant complying with all conditions as
outlined under City Council Resolution No. 2025-130.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Brooklyn Center,
Minnesota that approval of the preliminary and final plat for SHINGLE CREEK CROSSING
7
## TH
ADDITION is hereby re-approved, and authorization to record the final plat may occur
subject to the following conditions:
1. The conditions established in the original approvals as outlined under City Council
Resolution No. 2025-130 remain in effect; and
2. Prior to recording, the Applicant shall provide the City updated evidence of title
satisfactory to the City Attorney.
August 24, 2026
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member and upon
vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Page 29 of 169
Member Moore introduced the following resolution and moved its adoption:
## RESOLUTION NO. 2025-130
## RESOLUTION REGARDING PLANNING COMMISSION APPLICATION NO.
## 2025-006 FOR APPROVAL OF A PRELIMINARY AND FINAL PLAT FOR
## SHINGLE CREEK CROSSING 7
## TH
ADDITION (1000, 1020, 1050, 1100, and
## 1150 SHINGLE CREEK CROSSING)
WHEREAS, Planning Commission Application No. 2025-006 was submitted by
Applicant Kimley-Horn on behalf of Property Owner Shingle Creek LLC and encompassing certain
properties commonly addressed as 1000, 1020, 1050, 1100, and 1150 Shingle Creek Crossing; and
WHEREAS, the aforementioned properties are located within the Shingle Creek
Crossing Planned Unit Development, and the original final plat was approved in 2011 and
contemplated the re-platting of the former Brookdale Mall properties into 19 lots and one outlot to
facilitate phased improvements and development within the shopping center; and
WHEREAS, since the original Planned Unit Development ad plat approvals in 2011,
subsequent subdivision approvals and numerous amendments to the Planned Unit Development have
been approved to accommodate market conditions; and
WHEREAS, the requested re-plat would allow for the re-alignment and straightening
of five existing parcels located on approximately 7.94 acres and known as Building Sites L, M, O,
Q, S, and N within the Shingle Creek Crossing Planned Unit Development; and
WHEREAS, these lots, which are currently identified as Lots 14 and 15, Block 1 of
the SHINGLE CREEK CROSSING ADDITION, and Lots 1, 2, and 3, Block 2 of the SHINGLE
## CREEK CROSSING 2
## ND
ADDITION, would be re-platted into Lots 1, 2, 3, 4, and 5, Block 1 of the
## SHINGLE CREEK CROSSING 7
## TH
ADDITION; and
WHEREAS, existing drainage and utility easements, as identified on the provided
## SHINGLE CREEK CROSSING 7
## TH
ADDITION preliminary and final plats, would remain; and
WHEREAS, on August 14, 2025, the Planning Commission of the City of Brooklyn
Center, Minnesota, held a duly called public hearing, whereby this item was given due consideration,
a staff report was presented, and a public hearing was opened to allow for public testimony regarding
the plat requests for SHINGLE CREEK CROSSING 7
## TH
ADDITION, which were received and
noted for the record; and
WHEREAS, the City Council has determined in its review of the plat and materials
submitted with Planning Commission Application No. 2025-006, that said plat is in general
conformance with the City of Brooklyn Center’s City Code of Ordinances, and specifically Sections
35-8106 (Preliminary Plat) and 35-8107 (Final Plat).
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Page 30 of 169
## RESOLUTION NO. 2025-130
Brooklyn Center, Minnesota, that Planning Commission Application No. 2025-006, as submitted by
Kimley-Horn and requesting approval of the preliminary and final plat for SHINGLE CREEK 7
## TH
ADDITION be approved based upon the findings of fact in the Planning Commission staff report
dated August 14, 2025, submitted documentation and plans, and as amended by the following
conditions of approval:
1. Approval of the preliminary plat, final plat, and mylar for SHINGLE CREEK CROSSING
7
## TH
ADDITION shall be subject to the provisions as outlined under Chapter 35 (Unified
Development Ordinance), including, but not limited to Sections 35-8106 (Preliminary
Plat) and 35-8107 (Final Plat).
a. All requested revisions as outlined in the Planning Commission report prepared for
Planning Commission Application No. 2025-006 and dated for the August 14,
2025, Planning Commission meeting shall be addressed.
b. Any comments and/or requirements from the City Attorney’s office. The Property
Owner shall submit an up-to-date certified abstract of title or registered property
report and such other evidence as the City Attorney may require showing title or
control.
2. Any comments and/or requirements as provided by Hennepin County.
3. The successful recording of said plat (mylar) with Hennepin County within one (1) year
following date of City Council approval; otherwise, the final plat shall be considered void.
4. Any development on the Subject Properties shall be subject to separate City consideration
and approval of a site and building plan and amendments to the Shingle Creek Crossing
Planned Unit Development plans and documents, as contemplated within Sections 35-
2103.e (Existing Planned Unit Developments) and 35-8300 (Planned Unit Developments),
and to reflect the Subject Properties as identified within the SHINGLE CREEK
## CROSSING 7
## TH
## ADDITION.
August 25, 2025
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
## Jerzak
and upon vote being taken thereon, the following voted in favor thereof:
## Graves, Jerzak, Kragness, Moore
and the following voted against the same: none
whereupon said resolution was declared duly passed and adopted.
Page 31 of 169
## App. No. 2025-006
## PC 08/14/2025
Page 1
## Planning Commission Report
## Meeting Date: August 14, 2025
## Application No. 2025-006
## Applicant | Property Owner: Kimley-Horn | Shingle Creek LLC
Addresses | PIDs: 1000, 1020, 1050, 1100, and 1150 Shingle Creek Crossing, Brooklyn
Center, MN 55430 | 02-118-21-31-0065, 02-118-21-31-0063, 02-118-21-
32-0029, 02-118-21-32-0024, 02-118-21-32-0025, 02-118-21-31-0058, 02-
118-21-32-0030, 02-118-21-32-0031, and 02-118-21-31-0064
Requests: Preliminary and Final Plats — SHINGLE CREEK CROSSING 7
## TH
## ADDITION
Map 1. Subject Properties Proposed for Re-plat to SHINGLE CREEK CROSSING 7
## TH
## ADDITION.
## REQUESTED ACTION
Kimley-Horn (“the Applicant”) is requesting approval of a preliminary and final plat for SHINGLE CREEK
## CROSSING 7
## TH
ADDITION on behalf of Shingle Creek LLC (“the Property Owner”)—refer to Exhibit A. The
requested re-platting would allow for the existing property lines for the identified parcels in Map 1
above to be adjusted and straightened to better align with the layout of the proposed buildings for
Building Sites L, M, O, Q, S, and N within the Shingle Creek Crossing Planned Unit Development (PUD).
• Application Filed: 07/15/2025
• Review Period (60-day) Deadline: 09/13/2025
## • Extension Declared: No
## • Extended Review Period Deadline:
Page 32 of 169
## App. No. 2025-006
## PC 08/14/2025
Page 2
Due to the nature of the requests, a public hearing notice was published in the Brooklyn Center Sun Post
on July 31, 2025 (Exhibit B). Mail notifications were sent to those property owners and residents located
in vicinity of the Subject Property, and a public hearing notice uploaded to the City’s website.
The majority of properties located in vicinity to the Subject Property are owned by the same Property
Owner who submitted the application request as outlined in this report (Planning Commission
Application No. 2025-006), and include the following addresses: 1000, 1020, 1050, 1100, and 1150
Shingle Creek Crossing (“the Subject Properties”). Other neighboring property owners include the City of
Brooklyn Center Economic Development Authority, KKMBA Brooklyn Center LLC (HOM Furniture), Carol
Blum Rev Trust (Bank of America), and MJ Pro Enterprise Inc (Pop! Car Wash).
## Site Data
## 2040 Land Use Plan: Transit-Oriented Development (TOD)
## Neighborhood: Centennial
## Current Zoning: Planned Unit Development/Commerce District (PUD/C2)
## Site Area: Approximately 7.94 acres
## Surrounding Area
## Direction 2040 Land Use Plan Zoning Existing Land Use
## North Transit-Oriented
Development (TOD)
## Planned Unit
## Development/Commerce
District (PUD/C2)
## Commercial (Domino’s, Aspen
## Dental, Pop! Car Wash)
South ROW (Highway 100) (ROW/Highway 100) Major Highway (Highway 100)
## East Transit-Oriented
Development (TOD)
## Planned Unit
## Development/Commerce
District (PUD/C2)
Commercial (Bank of America,
## HOM Furniture)
## West Transit-Oriented
Development (TOD)
## Planned Unit
## Development/Commerce
District (PUD/C2)
## Commercial (Empire Foods)
## PRELIMINARY AND FINAL PLAT
The originally approved final plat for Shingle Creek Crossing was approved on May 23, 2011, and created
a series of lots for almost the entirety of the former Brookdale Mall area. The Subject Properties, as they
exist today, were approved through the creation of the overall Shingle Creek Crossing Planned Unit
Development (PUD). The original preliminary plat approval for Shingle Creek Crossing contemplated the
re-platting of the former Brookdale Mall properties, and excluding the former Sears parcel, into 19 lots
and one outlot to facilitate phased improvements and development within what is today known as
Shingle Creek Crossing shopping center. At that time, Building Site L was contemplated as an
approximately 10,920-square foot retail use, Building Site M as an approximately 7,475-square foot
restaurant use, Building Site Q as an approximately 35,680-square foot retail use, and Building Site N as
an approximately 21,515-square foot retail use.
Since the original PUD and plat approvals in 2011, the Applicant has received subsequent approvals for
numerous amendments to the Planned Unit Development, as well as subdivision re-plats.
The eastern portion of the Shingle Creek Crossing Planned Unit Development, which includes the
identified Subject Properties, was originally envisioned for retail uses and sit-down restaurants, with
Page 33 of 169
## App. No. 2025-006
## PC 08/14/2025
Page 3
outdoor patios overlooking a partially daylit Shingle Creek. In 2012, under City Council Resolution No.
2012-129, the Planned Unit Development was amended following a re-plat of certain lots, which
resulted in an amendment to Building Site Q from an approximately 35,660-square-foot junior box retail
store to two new mixed retail/restaurant pad sites and identified as new Building Sites O and Q. Despite
years of the Property Owner seeking potential users, Building Sites L, M, O, Q, S, and N remain vacant.
Parking standards within the Planned Unit Development for Shingle Creek Crossing were set to a
minimum 4.5 parking stalls per 1,000-square feet of gross floor area for retail uses and a minimum
parking ratio of 10 parking stalls per 1,000-square feet for restaurant pad sites. As proposed, all five (5)
lots would meet the minimum requirements for commercial or retail uses.
The 2009 Daylighting of Shingle Creek Framework Plan presented conceptual plans, cost estimates, and
a financial strategy through cooperative efforts of Hennepin County, the City of Brooklyn Center, and
developer Gatlin Development Company. At the time, a proposal had been to replace the designated
FEMA (Federal Emergency Management Agency) floodplain on “Lot 16” (also known as old Building Site
Q, which are now Building Sites O and Q), through the identified flood storage area within the partial
daylighting of Shingle Creek. A full daylighting of Shingle Creek was explored back in 2011; however, the
costs associated within removal of two box culverts to maximize the Creek as an amenity for economic
development were not supported at that time.
Image 1. Aerial Image Showing Subject Properties with Proposed New Property Lines and Building Footprints.
Page 34 of 169
## App. No. 2025-006
## PC 08/14/2025
Page 4
Image 2. Existing Subject Property parcels for Building Sites L, M, O, Q, S, and N.
This past year, City staff, in coordination with the Applicant and the Shingle Creek and West Mississippi
Watershed Commission (Consultant Stantec) had a feasibility report prepared for the potential full
daylighting of Shingle Creek where the Subject Properties are located. Although an application for grant
funding was successfully submitted to the Minnesota DNR Environment and Natural Resources Trust,
the application request was ultimately not successful.
As proposed, no new lots would be created as part of the requested preliminary and final plat requests
## for SHINGLE CREEK CROSSING 7
## TH
ADDITION. The Applicant identifies a 57-foot-wide drainage and utility
easement and a 20-foot-wide drainage and utility easement on the plat. Both easements are in
existence today and there are no plans to alter or vacate them.
City staff reviewed the preliminary and final plat requests against Section 35-8100 (Subdivisions and
Planned Unit Developments) and specifically Sections 35-8106 (Preliminary Plat), 35-8107 (Final Plat),
and 35-8108 (Combined Preliminary and Final Plat Approval). Following staff review, requested revisions
were provided to the Applicant in a follow-up meeting and sent via email for incorporation into the
revised preliminary and final plats.
Requested revisions to the preliminary plat for SHINGLE CREEK CROSSING 7
## TH
ADDITION include:
1. Provision of surveyor name on preliminary plat and to match final plat;
2. Spelling error for “Brooklyn Center” in right-hand corner of preliminary plat;
3. Clarify legend symbology and clearly identify property line with thicker line;
4. Spell out zoning classification information (i.e. “Planned Unit Development/Commerce
## District”);
5. Rename building sites on preliminary plat and in identified Site Data Table to reflect the
approved building site names under the Shingle Creek Crossing Master PUD plans (i.e. L, M,
O, Q, S, and N as opposed to A, B, C, D, E, and F);
6. Clearly identify building setbacks per City approvals and any variances granted under the
## Shingle Creek Crossing Planned Unit Development plans and documents;
7. Ensure building footprint sizes for each identified building site match the last approved
footprint sizes for the Shingle Creek Crossing Master PUD Plans and documents and any
footprints are located outside any identified building setbacks;
8. Identify any existing sewer, water, culvert, and other underground facility connections and
to a distance of 100 feet beyond tracts with grades, invert elevations, and locations of catch
basins, any manholes, and hydrants, unless otherwise waived by City Engineer; and
9. Label identified contours at vertical intervals of not more than two feet, except that contour
lines shall be no more than 100 feet apart.
Page 35 of 169
## App. No. 2025-006
## PC 08/14/2025
Page 5
Requested revisions to the final plat for SHINGLE CREEK CROSSING 7
## TH
ADDITION include:
1. Revise the City of Brooklyn Center signature block to reflect signature lines for the City of
Brooklyn Center “Mayor” and “City Clerk” per Section 35-8107.b.2 (Final Plat).
## CONDITIONS OF APPROVAL
City Staff recommend the following conditions be attached to any positive recommendation on the
approval of Planning Commission Application No. 2025-006 for SHINGLE CREEK CROSSING 7
## TH
## ADDITION:
1. Approval of the preliminary plat, final plat, and mylar for SHINGLE CREEK CROSSING 7
## TH
ADDITION shall be subject to the provisions as outlined under Chapter 35 (Unified Development
Ordinance), including, but not limited to Sections 35-8106 (Preliminary Plat) and 35-8107 (Final
Plat).
a. All requested revisions as outlined in the Planning Commission report prepared for
Planning Commission Application No. 2025-006 and dated for the August 14, 2025,
Planning Commission meeting shall be addressed.
b. Any comments and/or requirements from the City Attorney’s office. The Property
Owner shall submit an up-to-date certified abstract of title or registered property report
and such other evidence as the City Attorney may require showing title or control.
2. Any comments and/or requirements as provided by Hennepin County.
3. The successful recording of said plat (mylar) with Hennepin County within one (1) year following
date of City Council approval; otherwise, the final plat shall be considered void.
4. Any development on the Subject Properties shall be subject to separate City consideration and
approval of amendments to the Shingle Creek Crossing Planned Unit Development plans and
documents, and to reflect the Subject Properties as identified within the SHINGLE CREEK
## CROSSING 7
## TH
ADDITION, as contemplated within Sections 35-2103.e (Existing Planned Unit
Developments) and 35-8300 (Planned Unit Developments).
## RECOMMENDATION
City staff recommends the Planning Commission recommend City Council approval of Planning
## Commission Application No. 2025-006 for the SHINGLE CREEK CROSSING 7
## TH
ADDITION preliminary and
final plats, based on the findings of fact and subject to the Applicant complying with the Conditions of
Approval as noted above.
## Attachments
Exhibit A — Planning Commission Application No. 2025-006 documentation, prepared by Gatlin
Development Company, Kimley-Horn, and Sunde Land Surveying.
Exhibit B — Public Hearing Notice, as published in the Brooklyn Center Sun Post, and dated July 31,
2025.
Page 36 of 169
## From: Jose A. Baella, Vice President of Architecture & Planning
## Gatlin Development Co., Inc
## To: Ginny McIntosh, Planning Manager
## City of Brooklyn Center, MN
## Su
## mmary/ Reasoning for Proposed Replat:
The purpose of the re-plat is to adjust and straighten the property lines, so they better
align with the layout of the proposed buildings. Each parcel will still provide adequate
parking to meet code requirements for its intended use.
## Exhibit A
Page 37 of 169
## A
## B
## C
## D
## E
## F
## LOT 1,
## BLOCK 1
## LOT 2,
## BLOCK 1
## LOT 3,
## BLOCK 1
## LOT 5,
## BLOCK 1
## LOT 4,
## BLOCK 1
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
## SHEET NUMBER
K:\TWC_LDEV\GATLIN DEVELOPMENT\Shingle Creek\3 Design\CAD\PlanSheets\C1.0-PRELIM PLAT.dwg July 29, 2025 - 12:46pm
## BY
## REVISIONS
No.
## DATE
## 2025 KIMLEY-HORN AND ASSOCIATES, INC.
## 11995 SINGLETREE LN, SUITE 225, EDEN PRAIRIE, MN 55344
## PHONE: 612-315-1272
## WWW.KIMLEY-HORN.COM
## PREPARED FOR
## PRELIMINARY PLAT
## SHINGLE CREEK
## CROSSING 7TH
## ADDITION
## EX 1
## SHINGLE CREEK
## CROSSING
## GATLIN DEVELOPMENT
## BROOKLIN CENTER
## MINNESOTA
## DATE
## CHECKED BYSCALEDESIGNED BYDRAWN BY
## KHA PROJECT
16063300507/29/2025
## AS SHOWN
## SJSSJS
## BMW
## NORTH
## SITE DATA TABLE
## BUILDING
## DESIGNATION
## PLATLOT AREABUILDING
## PARKING
## PROVIDED
## RATIO
## A
## LOT 1, BLOCK 1
## 1.438 AC
## 9,800 SQ. FT.
## 85 SPACES
8.67
## B
## LOT 2, BLOCK 1
## 1.003 AC
## 7,700 SQ. FT.
## 60 SPACES
7.79
## C
## LOT 3, BLOCK 1
## 0.776 AC
## 7,000 SQ. FT.
## 45 SPACES
6.43
## D
## LOT 4, BLOCK 1
## 1.476 AC
## 10,500 SQ. FT.
## 68 SPACES
6.48
## E
## LOT 4, BLOCK 1
## 3.238 AC
## 11,400 SQ. FT.
## 161 SPACES6.91
## F
## LOT 5, BLOCK 111,900 SQ. FT.
## TOTAL7.94 AC
## 58,300 SQ. FT.
## BENCHMARKS
TOP OF NUT OF FIRE HYDRANT 85 FEET +/- NORTH OF NORTHEAST BUILDING CORNER OF OLD WALMART IN EMPTY LOT.
## ELEVATION: 853.22 FT
TOP OF NUT OF FIRE HYDRANT 85 FEET +/- NORTH OF NORTHWEST BUILDING CORNER OF OLD WALMART IN EMPTY LOT.
## ELEVATION: 853.32 FT
TOP OF TOP NUT OF FIRE HYDRANT ON THE NORTH SIDE OF PRIVATE DRIVE, SOUTH OF VERIZON AND DOMINO'S BUILDING
## ELEVATION: 852.11 FT
## TOP OF TOP NUT OF FIRE HYDRANT ON THE NORTH SIDE OF PRIVATE DRIVE, SOUTH OF POP CAR WASH.
## ELEVATION: 849.82 FT
## VICINITY MAP
## NOT TO SCALE
## EXISTING PLAT DESCRIPTION
(PER FIRST AMERICAN TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE COMMITMENT NO. NCS-1249505-MPLS, COMMITMENT DATE
## FEBRUARY 02, 2025)
REAL PROPERTY IN THE CITY OF BROOKLYN CENTER, COUNTY OF HENNEPIN, STATE OF MINNESOTA, DESCRIBED AS FOLLOWS:
## PARCEL 1:
## LOTS 14 AND 15, BLOCK 1, SHINGLE CREEK CROSSING, HENNEPIN COUNTY, MINNESOTA.
## (TORRENS PROPERTY - CERTIFICATE OF TITLE NO. 1459103)
## PARCEL 2:
## LOTS 1, 2, 3, BLOCK 2, SHINGLE CREEK CROSSING 2ND ADDITION, HENNEPIN COUNTY, MINNESOTA.
## (TORRENS PROPERTY - CERTIFICATE OF TITLE NOS. 1419929, 1419930 AND 1419931)
## PARCEL 3:
## NONEXCLUSIVE APPURTENANT EASEMENTS IN FAVOR OF PARCELS 1 AND 2 CREATED IN DOCUMENT ENTITLED
"EASEMENTS WITH COVENANTS AND RESTRICTIONS AFFECTING LAND" DATED JUNE 28, 2011, RECORDED JUNE 30, 2011, AS DOCUMENT NO. 4868197,
AS AMENDED BY FIRST AMENDMENT TO EASEMENTS WITH COVENANTS AND RESTRICTIONS AFFECTING LAND, DATED AUGUST 22, 2014, RECORDED
SEPTEMBER 9, 2014, AS DOCUMENT NO. 5198198, AS AMENDED BY THIRD AMENDMENT TO EASEMENTS WITH COVENANTS AND RESTRICTIONS
## AFFECTING LAND, DATED NOVEMBER 2, 2020, RECORDED DECEMBER 2, 2020, AS DOCUMENT NO. 5775962.
## DEVELOPER/ OWNER
## GATLIN DEVELPMENT CO., INC.
## 1301 RIVERPLACE BLVD SUITE 1900
## JACKSONVILLE, FL 32207
(904) 379-4774
## CITY OF BROOKLYN CENTER
## GINNY MCINTOSH
## CITY OF BROOKLYN CENTER
## PLANNING DEPARTMENT
## 6301 SHINGLE CREEK PKWY
## BROOKLYN CENTER, MN 55430
(763) 569-3330
## ENGINEER & PREPARER
## KIMLEY-HORN AND ASSOCIATES, INC.
## 11995 SINGLETREE LANE SUITE 225
## EDEN PRAIRIE, MN 55344
(612) 315-1272
## CURRENT ZONING
## PUD/C2
## FINAL PLAT DESCRIPTION
## SHINGLE CREEK CROSSING 7TH ADDITION
## SHINGLE CREEK CROSSING 7TH ADDITION
## PRELIMINARY PLAT
## SECTION 2-T118N-R21W
## BROOKLYN CENTER, HENNEPIN COUNTY, MINNESOTA
## PROPERTY LINE
## EXISTING OVERHEAD POWER LINE
## EXISTING CHAINLINK FENCE
## EXISTING J-BARRIER
## EXISTING RETAINING WALL
## EXISTING SANITARY SEWER
## EXISTING STORM SEWER
## EXISTING WATERMAIN
## EXISTING GAS MAIN
## EXISTING UNDERGROUND TELEPHONE
## EXISTING UNDERGROUND CABLE
## EXISTING CONTOUR
## EXISTING SIGN
## EXISTING FLARED END SECTION
## EXISTING STORM MANHOLE
## EXISTING STORM CATCHBASIN
## EXISTING GAS METER
## EXISTING POST INDICATOR VALVE
## EXISTING WELL
## EXISTING AUTOMATIC SPRINKLER
## EXISTING ROOF DRAIN
## EXISTING GATE VALVE
## EXISTING HYDRANT
## EXISTING METAL COVER
## EXISTING ELECTRICAL METER
## EXISTING AIR CONDITIONER
## EXISTING TELEPHONE MANHOLE
## EXISTING CABLE BOX
## EXISTING GUY WIRE
## EXISTING POWER POLE
## EXISTING LIGHT POLE
## EXISTING TREE
## EXISTING TREE LINE
## EXISTING CURB & GUTTER
## LEGEND
Page 38 of 169
Page 39 of 169
Page 40 of 169
850.83
850.83
846.43
846.50
845.57
850.06
850
846
847
848
849
845
850
846
846
846
847
848
849
845
843
844
846
847
848
849
845
850
843
844
846
847
848
849
847
848
## COUNTY RD NO 10
## BASS LAKE RD
## SHINGLE
## CRK PKWY
## STATE HIGHWAY NO. 100
## XERXES AVENUE NORTH
## 55TH
## AVE N
## 56TH
## AVE N
## SHINGLE CREEK |
## Brooklyn Center, MN
May 13, 2025
## 2025 KIMLEY-HORN AND ASSOCIATES, INC.
## VICINITY MAP
## NOT TO SCALE
## NORTH
## PRELIMINARY SITE AND GRADING
## EXISTING PROPERTY LINE
## EXISTING LOT LINE
## LEGEND
## EXISTING EASEMENT
## PROPOSED LOT LINE
## PROPOSED BUILDINGS
## PRELIMINARY PROPOSED FINISHED FLOOR
100.00
Page 41 of 169
## CITY OF BROOKLYN CENTER NOTICE OF PUBLIC
## HEARING
## Details for CITY OF BROOKLYN CENTER NOTICE OF PUBLIC
## HEARING
Jul 31,2025
## CITY OFBROOKLYN CENTER NOTICE OFPUBLICHEARING TOWHOM ITMAY
CONCERN: Please takenoticethat the Planning Commission of theCityof
Brooklyn Center will hold an in-person public hearingonThursday, August 14,
2025 at approximately7:00 p.m.Meetingmaterials can beaccessedbyvisiting
the City of Brooklyn Center's website at: https://www.brooklyncentermn.gov/. A
definite timefor this application to be considered cannot begiven as itwill
depend on the progression of the agenda items. TYPEOFREQUEST:
## Preliminaryand Final Plat APPLICANT --PROPERTYOWNER: Kimley-Horn--
## Shingle Creek LLCADDRESSES-- PIDS: 1000,1020, 1050, 1100,and1150 Shingle
## Creek Crossing, Brooklyn Center, MN 55430 --02-118-21-31-0065, 02-118-21-31-
0063, 02-118-21-32-0029,02-118-21-32-0024, 02-118-21-32-0025,02-118-21-31-0058,
02-118-21-32-0030,02-118-21-32-0031, and 02-118-21-31-0064BRIEF STATEMENT
## OFCONTENTS OF PETITION:The Applicant requestsreview and consideration
of a request tore-plat certain vacantlandslocated withintheShingle Creek
Crossing shopping center and currentlylocated withinSHINGLECREEK
## CROSSING ADDITION and SHINGLECREEK CROSSING 2NDADDITION,
Hennepin County, Minnesota. Commentsandquestions may be forwarded to
gmcintosh@brooklyncentermn.govup until 4:30 pm on the dayofthe
meeting,or bycontacting GinnyMcIntosh at (763) 569-3319. Your comments
will be included in the recordand addressed as part of the meeting.
## SaveShare
8/10/25, 10:02 PMCITY OF BROOKLYN CENTER NOTICE OF PUBLIC HEARING | Notice Of Public Hearing | hometownsource.com
https://www.hometownsource.com/classifieds/sun_post/community/announcements/legal/notice_of_public_hearing/city-of-brooklyn-center-notice-of-pu...1/2
## Exhibit B
Page 42 of 169
Alternatively, you may participate in the Planning Commission meeting via
Webex at: logis.webex.com Meeting Number (Access Code): 2862 602 8156
## Password: BCPC08142025 By Phone: 1 (312) 535-8110 (Enter Access Code)
Auxiliary aids for persons with disabilities are available upon request at least 96
hours in advance. Please contact the City Clerk at (763) 569-3300 to make
## arrangements. Ginny McIntosh Planning Manager Published in the Sun Post
July 31, 2025 1483472
8/10/25, 10:02 PMCITY OF BROOKLYN CENTER NOTICE OF PUBLIC HEARING | Notice Of Public Hearing | hometownsource.com
https://www.hometownsource.com/classifieds/sun_post/community/announcements/legal/notice_of_public_hearing/city-of-brooklyn-center-notice-of-pu...2/2
Page 43 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM: Lydia Ener, City Engineer
## THROUGH: Elizabeth Heyman, Director of Public Works
## BY: Lydia Ener, City Engineer
SUBJECT: Resolution Accepting Feasibility Report for Improvement Project No.
2027-08, Humboldt Avenue and 65
th
## Avenue Improvement Project
## Requested Council Action:
- Motion to approve a resolution accepting feasibility report for Improvement Project
2027-08, Humboldt Avenue and 65
th
## Avenue Improvement Project
## Background:
## The Humboldt Avenue and 65
th
Avenue Improvement Project is identified in the Capital
Improvement Program (CIP) and is slated for improvements during the 2027 and 2028
construction season. The attached feasibility report provides a summary of the project
evaluation process and preliminary street and utility improvements.
The Humboldt Area Improvement Project has been presented to the Brooklyn Center
City Council and the public at multiple stages of development. On April 28, 2025, staff
presented on the project at a public City Council meeting. Staff also held public open
houses at Brooklyn Center High School on April 2 and September 17, 2025, to share
project information and gather feedback from residents and other stakeholders.
## Budget Issues:
The total project cost for the Humboldt Avenue and 65
th
## Avenue Improvement Project is
estimated to be $11,602,000. Funding sources for the project are proposed from a
variety of sources as described in the feasibility report. The Draft Special Assessment
Levy Roll for Improvement Project No. 2027-08 is included in Appendix A of the
feasibility report.
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
## 1. Humboldt 65th Feasibility and Calling for Imp PH Resolution
Page 44 of 169
2. _Combined_2026-08-24_Humboldt Avenue 65th Ave Improvements - Feasibility
## Report
Page 45 of 169
Member introduced the following resolution and moved its
adoption:
## RESOLUTION NO._______________
## RESOLUTION ACCEPTING FEASIBILITY REPORT FOR IMPROVEMENT
## PROJECT NO. 2027-08, HUMBOLDT AVENUE AND 65TH AVENUE
## IMPROVEMENT PROJECT
WHEREAS, a feasibility report outlining the proposed improvements to the
streets, storm drainage system and public utilities in the Humboldt Avenue and 65th Avenue
Improvement Project area has been prepared; and
WHEREAS, the City Engineer has prepared said report and recommends that the
proposed improvements be considered; and
WHEREAS, a portion of the cost of street improvements for said project is
proposed to be assessed against properties within the project area; and
WHEREAS, the total project cost for the Humboldt Avenue and 65th Avenue
Improvement Project is estimated to be $11,602,000; the total cost of the street improvement
portion of said project is estimated to be $6,112,000 and the project funding sources are currently
estimated to be:
Special Assessments $ 584,210.90
Sanitary Sewer Utility Fund $ 896,000.00
## Water Utility Fund $ 1,157,000.00
Street Light Utility Fund $ 333,000.00
Street Reconstruction Fund $ 900,000.00
MSA (City) $ 7,732,789.10
Total $11,602,000.00
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
## Brooklyn Center, Minnesota, that:
1. The Engineer’s Feasibility Report for the Humboldt Avenue and 65th Avenue
Improvement Project is received and accepted.
August 24, 2026
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
Page 46 of 169
## RESOLUTION NO. _______________
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Page 47 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 1
## Public Works Dept
## Engineering Division
Phone: 763-585-7100
## FEASIBILITY REPORT
## HUMBOLDT AVENUE AND 65
## TH
## AVENUE NORTH
## IMPROVEMENT PROJECT
## IMPROVEMENT PROJECT NO. 2027-08
## SAP 109-111-015, SP 2755-144
## CITY OF BROOKLYN CENTER, MINNESOTA
July 27, 2026
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Engineer under the laws of the
## State of Minnesota
## DRAFT
_____________________________
Lydia Ener, P.E.
## Reg. No. 57221
August 24, 2026
Page 48 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 2
## I. BACKGROUND
The project area includes approximately 1.5 miles of improvements in the Humboldt Avenue and 65th
Avenue area, including Humboldt Avenue, 65th Avenue, 67th Avenue, and related local street and
pedestrian crossing locations. The project area is primarily composed of R1 properties along 65th
Avenue, R5 properties along Humboldt Avenue and the proposed sidewalk improvements on 67th
Avenue, commercial C2 properties along Humboldt Avenue and near the intersection of 69th Avenue
and Humboldt Avenue, and one R3 parcel near the eastern end of 65th/66th Avenue. The project
includes roadways, pedestrian, accessibility, utility, drainage, lighting, signing, striping, and intersection
improvements, including three roundabouts and associated pedestrian crossing systems.
## II. STREET IMPROVEMENTS
## A. EXISTING CONDITIONS
Humboldt Avenue and 65th Avenue area are designated as Municipal State Aid (MSA) Routes. The
roadways within the project area were last reconstructed in 1999, 2006, 2007, and 2018. Humboldt
Avenue ranges from 50 to 70 feet, and 65th Avenue ranges from 40 to 66 feet in width. Humboldt Avenue
and 65th Avenue are designated MSA routes. The roadway shows signs of deterioration, especially near
the roadways edges due to age and poor storm water drainage. The existing street section includes 11-foot
drive lanes and 7-foot parking lanes on each side.
A geotechnical investigation was performed within the project area to obtain and analyze soil samples
below the street pavement. These measurements revealed that the existing pavement sections within
project area consist of 4 inches to approximately 13 inches of bituminous pavement and aggregate base to
a depth of 8 inches to 15 inches. Perched groundwater depths were found to be between 5 feet and 7 feet
below ground surface, seasonal fluctuation of groundwater table is expected.
## B. PROPOSED STREET IMPROVEMENTS
Based on the age, condition, and maintenance needs of the existing bituminous asphalt pavement surface,
the recommended pavement improvements consist of full-depth pavement reclamation, 2-inch mill and
overlay, local and frontage road pavement construction, driveway pavement replacement, curb and gutter
replacement, concrete walk/trail/median construction, ADA pedestrian curb ramps, and three
roundabouts. The estimate also includes associated removals, signing, striping, roundabout lighting, signal
removals, and pedestrian flasher systems.
Other improvements include the repair of concrete driveway aprons, and the replacement of trees,
landscaping elements, and irrigation systems that are impacted by the construction. Disturbed boulevard
areas will be restored with topsoil and sod.
## III. STORM DRAINAGE AND TREATMENT SYSTEM
## A. EXISTING CONDITIONS
The storm sewer in the project area flows to trunk lines on 65th Avenue and 69th Avenue. The pipe
consists of 15-inch high-density polyethylene (HDPE) and 15-inch to 66-inch reinforced concrete pipe
(RCP). Approximately 33 percent of the storm sewer is relatively new, installed between 1999 and 2006.
The remaining storm sewer was installed between 1960 and 1973.
Page 49 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 3
## B. PROPOSED DRAINAGE IMPROVEMENTS
Due to the age of the storm and the depth of storm sewer, no storm pipe improvements are proposed with
this project. All castings will be replaced.
## IV. SANITARY SEWER SYSTEM
## A. EXISTING CONDITIONS
Approximately 53 percent of the sanitary sewer in the project area is polyvinyl chloride pipe (PVC) or has
a cured-in-place lining (CIPP) installed in 1968 and 2006. The remaining sanitary sewer consists of 8-
inch and 10-inch vitrified clay pipe (VCP) installed in 1960, 1965, and 1968. There is no history of root
intrusion in this area.
## B. PROPOSED SANITARY SEWER IMPROVEMENTS
The recommended sanitary sewer improvements will include CIPP lining of all VCP within the existing
system and replacement of all castings.
## V. WATER SYSTEM
## A. EXISTING CONDITIONS
Approximately 40 percent of the water main in the project area is 6-inch ductile iron pipe (DIP) installed
in 2006. The remaining water main in the project area consists of 6-inch and 8-inch cast iron pipe (CIP)
installed in 1960 and 1968. Water records show seven water main breaks have occurred on the CIP
water main, and one property has experienced a frozen service.
## B. PROPOSED WATER MAIN IMPROVEMENTS
Due to the age of the infrastructure and its potential vulnerability to future service issues, the proposed
improvements include approximately 6,698 linear feet of watermain replacement, three hydrants, 10
valves, and associated casting and curb stop work.
## VI. STREET LIGHTING, SIGNALS, AND PEDESTRIAN CROSSINGS
The existing streetlight system is a combination of overhead and underground power, with wood and
fiber glass poles and cobra head LED light fixtures. The current estimate includes removal of two
signals, lighting for three roundabouts, one wired advanced flasher system, two solar rectangular rapid
flashing beacons (RRFB) systems associated with roundabouts, one solar RRFB crossing system, one
wired RRFB system at the Fremont Avenue crossing, and one wired RRFB system associated with the
65th Avenue and Dupont Avenue roundabout.
## VII. RIGHT-OF-WAY AND EASEMENTS
Generally, all public infrastructure of the project area that is owned, maintained, and operated by the City
is located within City easements and/or right-of-way. However, in the locations adjacent to the proposed
roundabouts, property acquisition is anticipated and in progress to accommodate the large intersection
footprint. Where acquisition is necessary, easement needs will be finalized as the design progresses and
Page 50 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 4
will be further coordinated with the City Attorney and the respective property owners.
## VII. PROPERTY OWNER ENGAGEMENT
The Humboldt Area Improvement Project has been presented to the Brooklyn Center City Council and
the public at multiple stages of development. On April 28, 2025, staff presented on the project at a public
City Council meeting. Staff also held public open houses at Brooklyn Center High School on April 2 and
September 17, 2025, to share project information and gather feedback from residents and other
stakeholders.
## IX. ESTIMATED COSTS AND FUNDING CONSIDERATIONS
The total estimated cost of the proposed project is $11,602,000. Table 1 provides a summary of the
estimated project costs and recommended funding amounts from the various sources as indicated. Funding
for the project is further described below.
## A. FUNDING FOR STREET IMPROVEMENTS
The estimated total project cost of roadway improvements for all streets in this project area is $6,112,000.
This preliminary estimate includes the cost for project administration, legal, engineering, and construction
contingency.
City owned properties are not proposed to be assessed. A total estimated special assessment amount of $
$584,210.90 would be levied for street improvements. The remaining street construction costs would be
funded from the Street Reconstruction Fund and Municipal State Aid (MSA) Fund. A summary of the
proposed special assessments for street improvements is provided in Appendix D.
Special assessments for street improvements are proposed in accordance with the 2027 rates which are
expected to be considered for adoption by the City Council in November 2026. The standard 2027
residential street assessment rate is estimated to be $4,590 per R1 zoned residential property. This rate
would be assessed to all benefiting single family residential properties within the project area. The R2
zoned residential property would be assessed based on the frontage rate, multiplied by the total feet of
frontage. The R4 multi-family property (apartments) will be assessed based on an area basis. An “A”
zone benefit includes the area abutting the street to be improved, extended to the depth of 200-feet and a
“B” zone of lesser benefit for the remainder of the property area. The “A” zone rate is based on assessing
70 percent of the total street project cost deemed to benefit the property and the “B” zone rate is based on
30 percent. Based on cost estimates for full street reconstruction, the full unit rate has been determined to
be “A” zone rate of $0.41 per square foot and a “B” zone rate of $0.17 per square foot. It should be noted
that historically the assessments have been levied based on estimated costs rather than actual costs,
understanding that the project costs are levied at a reduced percentage (70 and 30 percents as indicated
above).
## B. FUNDING FOR UTILITY IMPROVEMENTS
The estimated cost of storm drainage improvements is $3,105,000, the estimated cost of sanitary sewer
improvements is $896,000 and the estimated cost for water main improvements is $1,157,000. As
previously noted, these total cost estimates include the costs for project administration, legal, engineering,
and construction contingency. All costs for storm, water, and sanitary sewer improvements will be funded
by their respective utility funds in accordance with established policy for such improvements.
Page 51 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 5
## C. FUNDING FOR STREET LIGHT IMPROVEMENTS
The estimated cost of street light improvements is $333,000. This total cost estimate includes the costs for
estimated construction. The street light improvements will be funded by the street light utility fund.
## Table 1: Cost and Funding
## Storm Sanitary Water Street Estimated
## Streets Drainage Sewer Main
## Lights
## Total
## Estimated Expenditures
## Estimated Construction
## Cost
$4,831,423.61 $2,454,498.10 $707,890.95 $914,620.42 $263,094.42 $9,171,527.50
Contingencies (15%)
$724,713.54 $368,174.72 $106,183.64 $137,193.06 $39,464.16 $1,375,729.13
## Admin., Eng., Legal (10%)
$555,613.72
$282,267.28 $81,407.46 $105,181.35 $30,255.86 $1,054,725.66
## Total Estimated Costs
$6,112,000.00 $3,105,000.00 $896,000.00 $1,157,000.00 $333,000.00 $11,602,000.00
## Estimated Revenue
## Street Special Assessment
$584,210.90
$584,210.90
## Sanitary Sewer Utility Fund
$896,000.00
$896,000.00
## Water Utility Fund
$1,157,000.00 $1,157,000.00
## Storm Drainage Utility Fund
$0.00
$0.00
## Street Light Utility Fund
$333,000.00 $333,000.00
## Street Reconstruction Fund
$900,000.00 $900,000.00
## MSA Fund (City)
$4,627,789.10 $3,105,000.00 $7,732,789.10
## Total Estimated Costs
$6,112,000.00 $3,105,000.00 $896,000.00 $1,157,000.00 $333,000.00 $11,602,000.00
Page 52 of 169
## Feasibility Report Humboldt Avenue and 65
th
## Avenue Improvements Page 6
## X. RECOMMENDED PROJECT SCHEDULE
The proposed project is anticipated to have final design continue during the fall and winter of 2026/2027,
with construction occurring during the 2027 and 2028 construction seasons, the preliminary schedule for
the project can be found in Table 2.
## Table 2: Anticipated Project Schedule
## Action Target Date
## City Council Receives Feasibility Report, Declares Cost to be
## Assessed and Calls for Public Hearings
August 24, 2026
## City Council Authorizes the Project and Orders Preparation of
## Plans and Specifications
November 2026
## City Council Approves Plans and Specs and Authorizes
## Advertisement for Bids
January 2027
## City Receives and Opens Project Bids February 2027
## City Council Considers Award of Contract February 2027
## Start Project Construction March-April 2027
## Construction Substantially Complete October 2028
## XI. CONCLUSIONS AND RECOMMENDATIONS
The overall condition of the City's street and utility infrastructure systems is critical to the operation,
safety, welfare, and economic health of the entire community. As a result of the infrastructure needs,
proposed solutions, and estimated costs provided in this report, the proposed project is necessary, cost
effective, and feasible.
Page 53 of 169
!
## R
!
## R
!
## R
## 69TH AVE N
## 65TH AVE N
## 67THAVEN
## D
## U
## P
## O
## N
## T
## A
## V
## E
## N
## B
## R
## Y
## A
## N
## T
## A
## V
## E
## N
## C
## A
## M
## D
## E
## N
## A
## V
## E
## N
## G
## I
## R
## A
## R
## D
## A
## V
## E
## N
## F
## R
## E
## M
## O
## N
## T
## A
## V
## E
## N
## E
## M
## E
## R
## S
## O
## N
## A
## V
## E
## N
## C
## O
## L
## F
## A
## X
## A
## V
## E
## N
6
## 4T
## HA
## VE
## N
## H
## U
## M
## B
## O
## L
## D
## T
## A
## V
## E
## N
6
6
## T
## H
## A
## V
## E
## N
£
¤
252
§
̈
¦
694
§
̈
¦
94
£
¤
100
## Humboldt Avenue and 65th Avenue
## Area Improvements
## Ü
6/10/2026
## Legend
!
## R
## Proposed Roundabout
Page 54 of 169
## Feasibility Report Humboldt Avenue Reconstruction
## Appendix A
## DRAFT Proposed Pending Assessment Roll
## DRAFT Proposed Assessment Map
Page 55 of 169
## PROPERTY ID HOUSE STREET NAME
## R1
## PROPERTIES
## FRONT
## FOOTAGE
## PROJECT
## ZONE A (SF)
## PROJECT
## ZONE B (SF)
## STREETLEVY#NOTES
3511921110002 6737Humboldt Avenue North327631605216,098.10$
## R5
3511921110005 150569th Avenue North3790615,393.63$
## MX-N2
2611921440069 150069th Avenue North2947211,968.58$
## MX-N2
2511921330049 6900Humboldt Avenue North224949,134.81$
## MX-N2
2511921330047 6910Humboldt Avenue North14110152358,380.96$
## MX-N1
3511921110017 6753Humboldt Avenue North32831605.81,612.64$
## R5
3511921110018 6749Humboldt Avenue North32831605.81,612.64$
## R5
3511921110019 6757Humboldt Avenue North32831605.81,612.64$
## R5
3511921110020 6761Humboldt Avenue North32831605.81,612.64$
## R5
3511921110021 6769Humboldt Avenue North32831605.81,612.64$
## R5
3511921110022 6765Humboldt Avenue North32831605.81,612.64$
## R5
3511921110023 6773Humboldt Avenue North32831605.81,612.64$
## R5
3511921110024 6777Humboldt Avenue North32831605.81,612.64$
## R5
3511921110026 1537Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110027 1543Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110028 1549Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110029 1555Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110030 1531Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110031 1525Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110032 1519Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110033 1513Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110034 1507Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921110035 1501Humboldt Avenue North3281.91610.11,612.94$
## R5
3511921140009 6511Humboldt Avenue North1770059951289,196.82$
## R5
3511921140010 6501Humboldt Avenue North4002216,252.93$
## C
3511921140013 6625Humboldt Avenue North418,360.00$
## R1
3611921220036 6840Humboldt Avenue North2594410,535.86$
## MX-N2
3611921220038 6700Humboldt Avenue North2583110,489.97$
## R5
3611921220043 6640Humboldt Avenue North2551010,359.61$
## R5
3611921220047 6800Humboldt Avenue North1072362290747,534.36$
## MX-N2
3611921230001 6500Humboldt Avenue North30137,700.00$
## R1
3611921310041 100765th Avenue North14,590.00$
## R1
3611921320082 110165th Avenue North313,770.00$
## R1
3511921410020 1501Freeway Blvd970427511852,479.29$
## MX-B
3511921110063 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110064 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110065 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110066 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110067 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110068 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110069 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110070 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110071 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110072 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110073 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110074 6819Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110075 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110076 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110077 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110078 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110079 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110080 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110081 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110082 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110083 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110084 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110085 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110086 6813Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110087 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110088 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110089 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110090 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110091 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110092 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110093 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110094 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110095 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110096 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110097 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3511921110098 6807Humboldt Avenue North1639.4372.4730.56$
## MX-N1
3611921240046 6507Camden Avenue North3366913,672.98$
## R5
3611921240047 70066th Avenue North347.19,361.29$
## R3
3611921310045 6305Camden Avenue North641654335533,601.18$
## R5
## Total Assessments584,210.90$
## Mill and Overlay
## Full Depth Reclamation
## CITY OF BROOKLYN CENTER PROPOSED PENDING ASSESSMENT ROLL
August 24, 2026
## HUMBOLDT AVENUE AND 65TH AVENUE AREA IMPROVEMENTS
## IMPROVEMENT PROJECT NO. 2027-08, 09, 10, 11, & 12
1
Page 56 of 169
694
252
6737
1555
1549
1543
1537
1531
6645
6819
6813
6807
6511
6625
6305
1525
1519
1513
1507
1501
6501
6700
6507
1001
6440
1101
1207
6761
6757
6753
6749
6769
6777
6775
6773
6800
6449
1301
6443
1505
6840
6640
6500
6535
700
6442
1007
1307
1501
6900
1500
6910
## D
## U
## P
## O
## N
## T
## A
## V
## E
## N
## IRVING PL
## L
## I
## L
## A
## C
## D
## R
## N
6
5
## T
## H
## A
## V
## E
## N
6
7
## T
## H
## A
## V
## E
## N
## C
## A
## M
## D
## E
## N
## C
## T
6
6
## T
## H
## A
## V
## E
## N
6
9
## T
## H
## A
## V
## E
## N
## IRVING AVE N
## H
## U
## M
## B
## O
## L
## D
## T
## A
## V
## E
## N
## F
## R
## E
## M
## O
## N
## T
## P
## L
## N
## FREEWAY BLVD
## B
## R
## Y
## A
## N
## T
## A
## V
## E
## N
## F
## R
## E
## M
## O
## N
## T
## A
## V
## E
## N
6
2
## N
## D
## A
## V
## E
## N
6
7
## T
## H
## L
## N
## N
## G
## I
## R
## A
## R
## D
## A
## V
## E
## N
6
8
## T
## H
## L
## N
6
8
## T
## H
## A
## V
## E
## N
6
4
## T
## H
## A
## V
## E
## N
## 68TH LN N
## HUMBOLDT PL N
## A
## L
## D
## R
## I
## C
## H
## A
## V
## E
## N
## EMERSON LN N
## C
## A
## M
## D
## E
## N
## A
## V
## E
## N
## JAMES CIR N
## C
## O
## L
## F
## A
## X
## A
## V
## E
## N
## C
## A
## M
## D
## E
## N
## D
## R
## IRVING LN N
6
3
## R
## D
## L
## N
## N
## WEST RIVER RD
## 5TH ST N
## E
## M
## E
## R
## S
## O
## N
## A
## V
## E
## N
## E
## A
## R
## L
## E
## B
## R
## O
## W
## N
## D
## R
## J
## A
## M
## E
## S
## A
## V
## E
## N
́
8/10/2026
## Draft Assessment Map
## Humboldt Ave. and 65th Ave. Improvement Area
## Legend
## Proposed R1 Assessment
## Proposed Multiple R1
## Assessments
## Proposed R3 Assessment
## Proposed R5 Assessment
## Proposed Commerce
## Assessment
## Proposed Business Mixed
## Use Assessment
## Proposed Neighborhood
## Mixed Use 1 Assessment
## Proposed Neighborhood
## Mixed Use 2 Assessment
## City Owned Property
## Previously Assessed
Page 57 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM: Todd Berg, Fire Chief
## THROUGH: Daren Nyquist, Interim City Manager
## BY: Todd Berg, Fire Chief
## SUBJECT: Resolution Requesting Approval for an Amendment to the Brooklyn
## Center Fire Relief Association By-Laws
## Requested Council Action:
- Motion to approve a Resolution Requesting Approval for an Amendment to the
## Brooklyn Center Fire Relief Association By-Laws
## Background:
Relief associations are governmental entities that receive and manage public money to
provide retirement benefits for individuals providing the governmental services of
firefighting and emergency first response. Relief associations are required under
Minnesota Statutes, chapters 356 and 424A, to report annually financial, investment,
and plan administration information to the Office of the State Auditor (OSA), and the
State Auditor is required to provide a detailed report to the Legislature under Minnesota
Statutes, sections 6.72 and 356.219.
The BCFRA is made up of the active paid-on-call members of the Brooklyn Center Fire
Department. The purpose of the association is to provide retirement, disability and
death benefits to the members or beneficiaries of members of the department. The
pension benefit is not only a recruitment tool, but also a way to encourage the part-
time/paid-on-call members to "stay on the job" and supports retention.
The State of Minnesota has provided the source of funding for the association through
distribution of the money collected from a gross earnings tax on fire insurance
premiums sold in the state, also known as "2% Money". The funds are allocated back to
the relief association based on the population and property values in the area served by
that department. There is a strong relationship between state fire aid and the number of
fire-related calls a fire department responds to each year. The state fire aid was
established in 1885 and has been the most stable source of funding.
State law requires that a relief association be governed by a nine-member board of
trustees. The BCFRA is directed by six trustees elected by members of the relief
association, the fire chief, the city Finance Director, and the mayor.
The relief association's assets are invested through The Parr-McKnight Wealth
Management Group. The relief association has adopted an Investment Policy
Statement for the investment in our pension fund. Our target investment allocation is
sixty percent in stocks, thirty-five percent in bonds and five percent in cash. We
rebalance our target allocation annually. The BCFRA Board believes in long-term
Page 58 of 169
investing and has resisted attempting to time market moves.
The relief association has discovered a section of their by-laws has not been in
alignment with the state law. This alignment would remedy that oversight.
The BCFDRA is requesting city council approval for a change to Appendix B, section
4.2 Return to Service; section of the by-laws. This recommendation was approved by
the BCFDRA membership at their April 20, 2026, meeting. According to the Secretary of
State, council approval is required before any by-law amendment which increases or
otherwise affects the retirement coverage provided by or the service pensions or
retirement benefits payable from the special fund of the relief association becomes
effective.
## Budget Issues:
There is no budget issue as these payments are made from the BCFDRA retirement
account and not connected to the general fund of the city. BCFDRA bylaw amendments
and benefit payouts are very rare, and any benefit payout is covered by the retirement
account fund.
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
1. 2026 BCFDRA Amendment to by-laws Resolution
Page 59 of 169
Member introduced the following resolution and moved its
adoption:
## RESOLUTION NO._______________
## RESOLUTION REQUESTING APPROVAL FOR AN AMMENDMENT TO THE
## BROOKLYN CENTER FIRE RELIEF ASSOCIATION BY-LAWS
WHEREAS, the Brooklyn Center Fire Relief Association (BCFRA) is a governmental entity
made up of active paid-on-call members of the Brooklyn Center Fire Department; and
WHEREAS, State law requires BCFRA be governed by a nine-member board of trustees, and
the BCFRA is directed by six trustees (the city Fire Chief, Finance Director, and Mayor among
others) who are elected by members of the relief association; and
WHEREAS, the BCFRA receives and manages public money to provide retirement, disability,
and death benefits to the members providing firefighting and emergency first response services
or beneficiaries of those members of the department; and
WHEREAS, the Brooklyn Center Fire Department Relief Association requests City Council
approval of an Amendment Change to Appendix B, Section 4.2 of the Brooklyn Center Fire
## Relief Association By-Laws; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center,
Minnesota, hereby approves an amendment to Appendix B, Section 4.2 of the By-laws of the
City of Brooklyn Center Fire Department Relief Association.
August 24, 2026
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Page 60 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM: Krystin Eldridge, Associate Planner
## THROUGH: Ginny McIntosh, Planning Manager
## BY: Krystin Eldridge, Associate Planner
SUBJECT: Planning Commission Application No. 2026-007 for Approval of a Site and
Building Plan (Major) and Conditional Use Permit for 4801 63rd Ave N
## (Unity Temple Church of God in Christ)
## Requested Council Action:
- Motion to adopt a resolution approving Planning Commission Application No. 2026-
007 for (1) issuance of a conditional use permit for a “Place for Religious Assembly” and
(2) a major site and building plan for construction of an approximately 3,893-square foot
building expansion and certain site improvements at the Subject Property located at
4801 63
rd
Avenue North, based on the findings of fact and submitted documentation.
## Background:
Unity Temple Church of God in Christ (“the Applicant”) is requesting review and
consideration of a proposal that would renovate and expand their existing 7,230 square
church by an additional 3,893 square feet, for a total of 11,123 square feet, to
accommodate a growing congregation at 4801 63
rd
## Avenue North (“the Subject
Property”). The renovation contemplates an addition to the existing sanctuary space, a
new drive-up to address accessibility issues, a new elevator, Sunday school
classrooms, and office and support space. The Applicant further intends to expand their
existing parking lot to accommodate growth in their congregation and install stormwater
improvements to facilitate these investments.
A public hearing notice for the requests was published in the Brooklyn Center Sun Post
on July 30, 2026, and a notice was posted to the City website.Mail notifications were
mailed to all physical addresses and taxpayers within 350 feet of the Subject Property
and the Applicant indicated two neighborhood meetings were held with the neighbors
located in proximity to the property to inform them of their expansion plans.
A public hearing was held at the Planning Commission meeting on August 13, 2026,
where staff provided a presentation of the requests. No public comments were provided
before or during the hearing; however, City staff did receive commentary from a resident
following the meeting that noted the Applicant has been noncommittal with the resident
regarding any changes to the proposed plans and support for replacing the resident's
fencing, which would need to be relocated as part of the project. This is due to a
temporary easement that was granted in 1976 that will need to be terminated in order to
forward the Applicant's project.
The easement allowed certain residents along Perry Avenue North the option to install
Page 61 of 169
their fences on the Applicant's property, but did not grant permanent rights. A condition
of approval requires the Applicant to provide formal notification to those residents as
outlined in the recorded easement document so adequate time can be provided for the
relocation of fencing and other accessory structures that have since been installed
within the easement.
The Commissioners asked various questions of the Applicant regarding the temporary
easement and impacts to the residential properties, their need to expand the sanctuary
space, and the proposed secondary curb cut onto Perry Avenue North and parking lot
realignment, which is attended to address slope issues that require members to walk a
long distance along the sidewalk to the front door, provide ADA parking near the main
door, and accommodate a new drop-off area.
The Applicant indicated that no new services (e.g. daycare, school) would be offered as
part of the expansion. City staff indicated the conditional use permit is to bring the
Subject Property and use into conformance with the City's requirements as the church
use predates the issuance of special use permits and conditional use permits and the
requested expansion triggers the need for a conditional use permit or amendment.
Following close of the public hearing and consideration of the application and
documentation, the Planning Commission elected to unanimously (4-0) recommend City
Council approval of Planning Commission Application No. 2026-007.
A copy of the August 13, 2026, Planning Commission report and Council resolution are
included with this memorandum for Council’s review and consideration.
## Budget Issues:
None to consider at this time.
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
## 1. PowerPoint Presentation — Planning Commission Application No. 2026-007
## 2. City Council Resolution — Planning Commission Application No. 2026-007
3. Staff Report with Exhibits — Planning Commission Application No. 2026-007
Page 62 of 169
## City Council Meeting| August 24, 2026
## Krystin Eldridge, Planner
## REQUESTS:
## Unity Temple Church of God in Christ
## Major Site and Building Plan
## Conditional Use Permit
Page 63 of 169
2
## Requested Action
Unity Temple Church of God in Christ (“the Applicant”) is requesting review and consideration of a proposal
that would renovate and expand their existing 7,230 square church by an additional 3,893 square feet, for a
total of 11,123 square feet, to accommodate a growing congregation at 4801 63rd Avenue North (“the
Subject Property”). The renovation contemplates an addition to the existing sanctuary space, a new drive-
up to address accessibility issues, a new elevator, Sunday school classrooms, office and support space. The
Applicant further intends to expand their existing parking lot to accommodate growth in their
congregation.
•Property Owner: Unity Temple Church of God in Christ (2006)
•Subject Property (Acres): 3.16
## •Zoning District: R1 - Low Density Residential
## •2040 Comprehensive Plan Future Land Use Designation: PSP/Institutional
Page 64 of 169
3
Page 65 of 169
4
## Background
•The Applicant approached City Staff in February of this y e a r, after discussing plans to expand the church and
parking lot and install a secondary curb cut off Perry Avenue North. The Applicant expressed a desire to
double the sanctuary space to accommodate 450 to 500 members from its current 200-member capacity.
•A private temporary easement agreement was granted in 1976 to allow the installation of fences on the
Subject Property for certain residential properties along Perry Avenue North; h o w e v e r, this easement will
require termination to further develop the Subject Property and its expanded parking lot.
•The grantor of the easement reserves the right to terminate the easement and to require removal of any
fences placed thereon by giving 180 days to the property owners.
•While not required, City Staff noted the importance of meeting with adjacent neighbors to explain the
possibility of increased traffic at the proposed new curb cut off Perry Avenue North, and a temporary
easement agreement that would need to be terminated. The Applicant hosted at least two neighborhood
meetings in advance of the Planning Commission meeting.
Page 66 of 169
## Site and Building Plan
5
Site and Building Plan approval is required to, “construct or erect a new
building or add on to an existing building that would result in an increase
in gross floor area of all buildings on the lot by more than 25 percent” or
“more than a 20 percent change in the number of parking spaces
provided or required.”
•Approximately 1, 500-square feet of added sanctuary and entryway
space. An additional 600-square feet would be added along the
southernmost portion of the building for clergy seating.
•The lower level would have additional office and support spaces and
added storage. A newly expanded parking lot and curb cut would be
located along the western and southern portions of the parcel and
fronting Perry Avenue North.
Page 67 of 169
6
## Site and Building Plan
Page 68 of 169
## Site and Building Plan
## Architectural Materials
•The existing building is majority comprised of face brick and glazing (glass). As proposed, the development
team intends to continue the use of brick to match the existing façade
•Installation of a dormer will allow additional light into the building with prefinished metal siding on the
north/south elevations.
•The west elevation of the building, which faces Perry Ave North, would provide additional windows.
•The maximum primary structure height allowed within the R1 District is no more than 32 feet. As proposed,
the Applicant intends to maintain the existing height of approximately 22.6 feet in height. The Applicant
proposes to install a new steeple approximately 15 feet above the ridge of the roof for a total height of 37.6
feet in height; however, R LUI PA (Religious Land Use and Institutionalized Persons Act) provides certain
protections.
7
Page 69 of 169
## Site and Building Plan
8
•City staff reviewed the steeple and cross against other portions of the code, including: amateur radio antennas,
which must be located in the rear setback but do not specify a height; roof-mounted satellite receive only
antennas (SROAs), which cannot be positioned higher than the maximum building height in the R1 District; and
the Mississippi Corridor Critical Area (MRCCA) overlay district provisions, which exempt “chimneys, church
spires, flag poles, public monuments, and mechanical stacks and similar mechanical equipment” from the
maximum height provisions.
•Subject Property is also located within the Crystal Airport Overlay District- “Zone 2”
•The construction of the addition shall conform to the maximum construction height provisions without a
permit. No use shall be made of any land in any of the Land Use Zones that causes interference with the
operations of radio or electronic facilities at the Airport and aircraft, makes it difficult for pilots to
distinguish between Airport lights and other lights, results in glare in the eyes of pilots using the Airport,
impairs visibility in the vicinity of the Airport, is deemed a “hazard” to air navigation by FAA or MNDOT as
part of an FAA 7460 Obstruction Evaluation, or otherwise endangers the landing, taking off, or maneuvering
of aircraft per Section V.B.1 (Land Use Zoning).
Page 70 of 169
9
## Site and Building Plan
Traffic | Access |Circulation | Connection
•Full access will be gained through the current curb cut located on 63
rd
Avenue North and a new curb cut would be
installed on Perry Avenue North. Primary access will continue to be 63
rd
Avenue North, with Perry Avenue North
serving as additional relief before and after service times and new ADA spaces on the western portion. A new rear
parking lot will be added as well.
•The new portions of parking lot would be constructed to meet the minimum 24-foot drive aisle for two-way traffic.
•The Applicant denotes a sidewalk connection for pedestrians off the trail on 63
rd
Avenue onto an internal crosswalk
onto the church.
Ea sement
•The temporary easement allowed construction of residential fences on Subject Property. Given the Applicant and
Property Owner ’s plans to improve the property, they have indicated plans to terminate
the agreement.
•The Agreement does provide a minimum notification to those affected properties of 180 days. In reviewing aerial
imagery of the westerly portions of the Subject Property, it appears some residents have installed accessory
structures on the Subject Property, which were not considered as part of the temporary easement. The Applicant
and Property Owner would need to work with the affected property owners regarding the relocation of any fencing,
accessory structures, etc.
Page 71 of 169
10
## Site and Building Plan
## Parking
•City staff reviewed Section 35-5506 (Required Parking Spaces) and determined the Subject Property’s use is that of,
“Places of public assembly such as a houses of worship, theatres, auditoriums (other than school auditoriums),
mortuaries, stadiums, arenas, dance halls.”
•This use requires a minimum of one (1) parking space for every (3) seats or persons.
•The Applicant is proposing 153 stalls.
•The breakdown provides 145 standard and 8 accessible spaces. The Applicant should verify number of ADA
parking spaces needed. A new “drop off only” area would also be installed along the main entrance to the
building.
•The Subject Property notes approximately 0. 45 acres of Zone A (100-year) floodplain. Under Section 35-3101 (FP—
Floodplain), this is considered the City ’s “General Floodplain District,” which allows for parking areas as a permitted
use. The C ity ’s Assistant City Engineer, determined that this project will not be required to provide compensatory
storage as the adjacent project to the east was also not required to provide compensatory storage.
## Trash and Screening
•A new trash enclosure would be constructed along the Easterly property line within the parking lot.
Page 72 of 169
11
## Site and Building Plan
## Lighting
•A photometric plan was submitted; however, it will require revisions as it does
not provide the proper fixtures or proper illumination necessary to determine
whether it meets the code provisions as outlined under Section 35-5400
(Exterior Lighting). The fixtures provided are “wall packs” which are only
permitted in loading and service zones.
•The Applicant should provide illumination levels of at least 10-foot candles
within 5 feet of the primary entrances and exits, and along pedestrian ways
(e.g. sidewalks).
## Landscaping
•Landscaping would be concentrated along the westerly portions of the Subject
Property along Perry Avenue North providing additional screening. This is a
requirement under Sections 35-5513 (Parking Lot Landscaping) and 35-5514
(Parking Lot Screening).
•The Applicant notes that no more than 39% of the trees are of the same
species—City Code caps at 40% of the same species to promote species
diversity and resilience.
Page 73 of 169
12
## Conditional Use Permit
Conditional use permits, as outlined under Section 35-7700, are those uses which have been identified, because of
their nature, operation, location, special requirements or characteristics, and may only be allowed in a particular
zoning district after submittal of an application, review, and recommendation by the Planning Commission, and
approval by the City Council.
•The conditional use permit process regulates: the location, magnitude, and design of conditional uses consistent
with the 2040 Comprehensive Plan, and the regulations, purposes, and procedures of this Unified Development
Ordinance (UDO).
•As identified in the provided project narrative by the Applicant, the church was constructed in the 1960s—before
conditional use permits or their precursor (special use permits) were required for this use in the residential district.
During discussions with the Applicant and development team, and with the anticipated plans for expansion, City
staff indicated that now would be the time to bring the property up to code by working through issuance of a
conditional use permit as part of the Planning Commission application request.
•In reviewing records, the Subject Property has a long history in serving as a place of worship, and served as a former
home to Brook Park Baptist Church. There are no plans to offer any new services, such as a daycare or charter school
at this site. Instead, the Applicant’s request is forward-focused in anticipating growth within their congregation and
the space needs to accommodate the growth.
Page 74 of 169
13
## Summary
•A public hearing notice was published in the Brooklyn Center Sun Post on July 30, 2026, and notices mailed to
surrounding properties located within 350 feet. Public hearing notice was published on the City website as well.
•No comments received from the general public in advance of or at the public hearing other than commentary
during neighborhood meetings held by the Applicant.
•City staff received commentary from a resident following the public hearing that noted the Applicant has been
noncommittal with the resident regarding any changes to the proposed plans and support for replacing the
resident’s fencing, which would need to be relocated as part of the project.
•This is due to the temporary easement granted in 1976 that would need to be terminated in order to
forward the project.
•Commissioners asked questions of the Applicant regarding the temporary easement, reasons around
sanctuary space expansion, proposed secondary curb cut on Perry Avenue North and parking lot realignment,
etc.
•Planning Commissioners elected to unanimously (4-0) recommend City Council approval of Planning
Commission Application No. 2026-007.
Page 75 of 169
14
## Requested Council Action
Motion to adopt a resolution approving Planning Commission Application No.
2026-007 for (1) issuance of a conditional use permit for a “Place for Religious
Assembly” and (2) a major site and building plan for construction of an
approximately 3,893-square foot building expansion and certain site
improvements at the Subject Property located at 4801 63
rd
## Avenue
North,based on the findings of fact and submitted documentation.
Page 76 of 169
Member introduced the following resolution and
moved its adoption:
## RESOLUTION NO.
## PLANNING COMMISSION APPLICATION NO. 2026-007 FOR A MAJOR SITE
## AND BUILDING PLAN AMENDMENT FOR AN APPROXIMATELY 3,893-
## SQUARE FOOT BUILDING EXPANSION, CERTAIN SITE IMPROVEMENTS,
## AND ISSUANCE OF A CONDITIONAL USE PERMIT TO UNITY TEMPLE
## CHURCH OF GOD IN CHRIST (4801 63
## RD
## AVENUE NORTH)
WHEREAS, Planning Commission Application No. 2026- 007, submitted by Unity
Temple Church of God in Christ (“the Applicant”) requests review and consideration of an application
for approval of a major site and building plan amendment to expand an existing church by
approximately 3,893-square feet, for a total of approximately 11,123-square feet, certain site
improvements, and issuance of a conditional use permit for a “Place for Religious Assembly” at 4801
63
rd
Avenue North (“the Subject Property”), as legally described hereto in Exhibit A attached hereto,
which would allow for the expansion of the church’s congregation; and
WHEREAS, the Subject Property sits on approximately 3.16 acres and is located
within the R1 (Low Density Residential) District and allows for Places for Religious Assembly
through issuance of a conditional use permit, as identified within Section 35-4103 (Allowed Use
Table); and
WHEREAS, Section 35-7605 (Amendments) provides that a major amendment to an
approved site and building plan shall be triggered under certain outlined scenarios, including but not
limited to a 20 percent or greater change in the number of parking spaces provided or required, or a
25 percent or greater change in the floor area use of any one structure, and City staff determined this
threshold had been met; and
WHEREAS, a public hearing notice was published in the Brooklyn Center Sun Post
on July 30, 2026, mail notifications were sent to adjacent property owners and physical properties,
and notices were provided for on the City’s website; and
WHEREAS, the Planning Commission of the City of Brooklyn Center, Minnesota
held a duly noticed and called public hearing on August 13, 2026, whereby a planning staff report
was presented and public testimony regarding the proposed building and site modifications and
conditional use permit were received; and
WHEREAS, the Planning Commission of the City of Brooklyn Center, Minnesota
considered the major site and building plan amendment and conditional use permit requests in light
of all testimony received, the guidelines and standards for evaluating the conditional use permit
contained in Sections 35-7600 (Site & Building Plan Approval) and 35-7700 (Conditional Use
Permit), the City’s 2040 Comprehensive Plan, as well as information provided by the Applicant with
respect to the proposed use’s operations and any potential impacts, and the request generally satisfies
the criteria as outlined within the above Sections; and
Page 77 of 169
## RESOLUTION NO.
WHEREAS, the City Council finds as follows regarding Planning Commission
Application No. 2026-007, as submitted by Unity Temple Church of God in Christ:
a) The conditional use, as proposed, will be in accordance with the general objectives
of the City’s 2040 Comprehensive Plan and the City’s Unified Development
Ordinance given the Subject Property’s future land use designation under the 2040
Comprehensive Plan is “Public/Semi-Public and Institutional (PSP/Institutional)”
and the Subject Property’s zoning designation of R1 (Low Density Residential)
District allows for Places for Religious Assembly through issuance of a
conditional use permit;
b) The establishment, maintenance, or operation of the conditional use will promote
or enhance the general public welfare and will not be detrimental to or endanger
the public health, safety, morals, or comfort in that the Subject Property has a long
history of operating as a Place for Religious Assembly and will maintain similar
service and programming times with no new ancillary uses introduced to the site;
c) The conditional use will not be injurious to the use and enjoyment of other
property in the immediate vicinity for the purposes already permitted, nor
substantially diminish and impair property values within the neighborhood as the
use of the Subject Property is not changing and the Applicant’s proposed
secondary curb cut access off Perry Avenue is located off existing frontage under
ownership by the Subject Property;
d) The establishment of the conditional use will not impede the normal and orderly
development and improvement of surrounding property for uses permitted in the
district as the surrounding property is generally developed and the request for
issuance of a conditional use permit is to comply with the City’s code
requirements for a Place for Religious Assembly given the requested use
expansion, and when the use was originally established on the Subject Property,
churches were considered a permitted use in the R1 District;
e) Although the Applicant has requested an expansion of the designated parking
areas and installation of a secondary curb cut on Perry Avenue North, the
identified service and program times for the Applicant would generally be in the
off hours of use for Twin Lakes STEM Academy (6201 Noble Avenue North),
and access onto Perry Avenue North would be near the northern terminus of the
street, which ensures minimal disruption to the surrounding residential
neighborhood;
f) Impacts such as noise, hours of activity, and exterior light have been either
sufficiently addressed to mitigate impacts on nearby uses, or will be addressed as
an identified condition of approval; and
g) The conditional use will conform to the applicable regulations of the district in
which it is located.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota that it hereby approves Planning Commission Application No. 2026-
Page 78 of 169
## RESOLUTION NO.
007 for approval of a major site and building plan amendment for expansion of Unity Temple Church
of God in Christ located at 4801 63
rd
Avenue North to allow for an approximately 3,893-square foot
building expansion, certain site improvements, and issuance of a conditional use and conditioned on
compliance with all of the following:
1. The Applicant shall adhere to the provisions as outlined under Section 35-7700
(Conditional Use Permits) and coordinate with City staff to file a copy of the City
Council resolution approving the requested conditional use permit, along with a
legal description of the Subject Property for which the permit was issued, and list of
any conditions set forth by City Council as a condition of said conditional use permit.
A certified resolution shall be recorded by the Applicant with the Hennepin County
Recorder—Registrar of Titles pending approval of the related application.
2. Any major changes or modifications made to this Site and Building Plan, and as
outlined within the City Code, can only be made by an amendment to the approved
Site and Building Plan as approved by the City Council.
a. The Applicant shall revise the provided photometric plan to meet City
lighting provisions under Section 35-5400 (Exterior Lighting) and provide
revised fixture specifications for all new site and wall lighting.
3. The building plans are subject to review and approval by the Building Official with
respect to applicable codes prior to the issuance of permits, and with respect to the
cursory review comments provided in the Building Official’s memorandum dated
August 12, 2026.
4. A SAC Determination shall be submitted by the Applicant and Property Owner to
the Metropolitan Council and any associated fees paid at time of any permit issuance
for the proposed development.
5. A Performance Agreement with supporting financial guarantee approved by the City
shall be executed upon any approval of the to-be submitted building permit for site
improvements, which ensures the Subject Property will be constructed, developed,
and maintained in conformance with the provided plans, specifications, and
standards.
6. The Applicant and Property Owner shall notify affected property owners of its intent
to terminate the Temporary Grant Easement identified as Document No. 4253115
and dated June 1, 1976, and per the minimum notification requirements.
7. The Applicant and Property Owner shall ensure the proposed building expansion is
constructed to comply with maximum construction height requirements for Zone 2
of the Crystal Airport Overlay District, ensure safety, and minimize interference
with the operations of the Airport.
8. Any outside trash disposal facilities and rooftop or ground mechanical equipment
shall be appropriately screened from view per City Code requirements and a detail
sheet provided.
9. The Applicant and Property Owner agree to comply with all conditions or provisions
noted in the Assistant City Engineer’s review memorandum, originally dated August
3, 2026.
Page 79 of 169
## RESOLUTION NO.
10. The Applicant and Property Owner shall submit a Sign Permit Application for any
proposed signage (e.g., wall, freestanding) and receive issuance of a permit prior to
any installation. All signage shall conform to City requirements.
August 24, 2026
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
s
Page 80 of 169
## EXHIBIT A
## Legal Description of Subject Property
Lot 3, Block 2, Waite’s Addition, Hennepin County, Minnesota.
## Property ID No.: 33-119-21-44-0025
## Torrens
Page 81 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 1
## Planning Commission Report
## Meeting Date: August 13, 2026
## Application No. 2026-007
Applicant | Property Owner: Unity Temple Church of God in Christ
Location: 4801 63
rd
## Avenue North
Requests: Site and Building Plan (Major) and Conditional Use Permit (CUP)
Map 1. Subject Property Location.
## Requested Action
Unity Temple Church of God in Christ (“the Applicant”) is requesting review and consideration of a
proposal that would renovate and expand their existing 7,230 square church by an additional 3,893 square
feet, for a total of 11,123 square feet, to accommodate a growing congregation at 4801 63
rd
## Avenue North
(“the Subject Property”). The renovation contemplates an addition to the existing sanctuary space, a new
drive-up to address accessibility issues, a new elevator, Sunday school classrooms, and office and support
space. The Applicant further intends to expand their existing parking lot to accommodate growth in their
congregation and install stormwater improvements to facilitate these investments—Refer to Exhibit A.
A public hearing notice for the requests was published in the Brooklyn Center Sun Post on July 30, 2026,
and a notice was posted to the City website—Refer to Exhibit B.
• Application Filed: 07/14/2026
• Review Period (60-day) Deadline: 10/07/2026
## • Extension Declared: No
## • Extended Review Period Deadline:
Page 82 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 2
## Existing Conditions
Image 1. Existing Site Conditions at Subject Property.
## Background
The Applicant approached City Staff in February of this year and engaged in conversations around the
proposed expansion of the church and parking lot and installation of a secondary curb cut off Perry Avenue
North. The Applicant expressed a desire to double the existing sanctuary space to accommodate 450 to
500 members from its current 200-member capacity. While not required, City staff noted the importance
of meeting with adjacent neighbors to explain the possibility of increased traffic at the proposed new curb
cut off Perry Avenue North, and a private temporary easement agreement that would need to be
terminated. This temporary easement agreement was granted in 1976 to allow the installation of fences
Page 83 of 169
App. No. 2026- 007
## PC 08/13/2026
Page 3
on the Subject Property for select residential properties along Perry Avenue North; however, this
easement will require termination to further develop the Subject Property and its expanded parking lot—
Refer to Exhibit C. Hennepin County records indicate Unity Temple Church of God in Christ has owned the
Subject Property since March 2006.
As proposed, the church’s busiest day would be on Sundays, with its morning service time at 11:15 a.m.
Sunday activities also include prayer services and Sunday School at 9 a.m. as well as an evening Bible Study
and night service. Tuesdays and Fridays offer a noon prayer and evening prayer, with additional services
on Friday evenings at 8 p.m.
## Site Data:
## 2040 Land Use Plan: Public/Semi-Public and Institutional (PSP/Institutional)
## Neighborhood: Kylawn
## Current Zoning: R1 – Low Density Residential
## Site Area: Approximately 3.16 acres
## Crystal Airport Overlay Yes - Zone 2
## Surro
unding Area:
## Direction 2040 Land Use Plan Zoning Existing Land Use
## North Low Density Residential R1 – Low Density
## Residential
## R1 – Low Density Residential
## South Low Density Residential R1 – Low Density
## Residential
## R1 – Low Density Residential —
## Twin Lakes STEM Academy
## East PSP/InstitutionalR1 – Low Density
## Residential
## R1 – Low Density Residential —
## Twin Lakes STEM Academy
## West Low Density Residential R1 – Low Density
## Residential
## R1 – Low Density Residential
## Site and Building Plan (Major)
As was noted in the Background, the Applicant is requesting consideration for construction of new
building additions and certain site improvements. These improvements include a proposed expansion of
the parking lot, alterations to the front entrance to address accessibility, installation of a new elevator,
and additional Sunday School classroom, office, and support spaces.
The n
ew sanctuary would accommodate 430 members with a 2,272 square foot addition on the main level
and 1,621-square feet in additional space on the lower level. The Applicant is expanding the parking lot
from 65 to 153 on-site spaces.
This request would trigger the need for approval of a major site and building plan under Section 35-7600
(Site & Building Plan Approval). Site and Building Plan approval is required in order to, “construct or erect
a new building or add on to an existing building that would result in an increase in gross floor area of all
buildings on the lot by more than ten percent.” Assuming an existing, approximately 7,230-square foot
church, the 10 percent threshold is passed with a 723-square foot addition, and the proposed addition is
substantially larger at approximately 3,893-square feet.
In re
viewing the Subject Property, the Applicant discovered a permanent temporary easement recorded
with Hennepin County. This easement was executed in 1976 between then Brook Park Baptist Church and
Page 84 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 4
the certain property owners along Perry Avenue North. According to this easement, the grantor reserves
the right to terminate the easement grant and to require removal of any fences placed thereon by giving
180 days notice to the grantees, their heirs or assigns, by certified mail to the addressed identified in the
agreement. As this is a private agreement the Applicant and Property Owner would need to work with the
adjacent affected properties prior to any construction.
Image 2. Site Plan for Subject Property.
Page 85 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 5
Image 3. Interior Layout of Unity Temple Church of God in Christ on Subject Property.
As proposed, the primary portion of the addition would extend along the northernmost portion of the
church on the upper level, with approximately 1,500-square feet of added sanctuary and entryway space.
An additional 600-square feet would be added along the southernmost portion of the building for clergy
seating. The lower level would have additional office and support spaces and added storage. A newly
expanded parking lot would be located along the western portion of the parcel and fronting along Perry
Avenue North, with a new secondary curb cut. The new curb cut is intended to improve circulation on the
site. Additional parking would also extend toward the south end of the Subject Property. These portions
would be landscaped in order to provide screening for those residential properties located adjacent to
the Subject Property and to comply with Section 35 -5514 (Parking Lot Screening). This section requires
all open off-street parking areas with more than six (6) parking spaces and all off-street loading and
unloading spaces to be effectively screened from any abutting residential lots.
The Subject Property parcel is unique in that it contains frontages along 63
rd
## Avenue North and Perry
Avenue North, but it is not a corner lot. The building expansion would be located at the following proposed
building setbacks in the R1 (Low Residential District):
Front Setback (Minimum Required): 35 ft Rear Setback (Minimum Required): 25 ft
Front Setback (Proposed): 134 ft Rear Setback (Proposed): 446 ft
Interior Side Yard Setback (Minimum Required): 10 ft Note: Setback along Perry Avenue
Interior Side Yard Setback (Proposed): 11.5 feet | 110.4 ft North is at ~104 feet
Page 86 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 6
Image 4. Interior Layout of Unity Temple on Subject Property.
## Architectural Materials
The existing building is majority comprised of face brick and glazing (glass). As proposed, the development
team intends to continue the use of face brick to match the existing façade on all elevations.
The north elevation facing 63
rd
Avenue North contains the main entrance with aluminum storefront
windows at the pedestrian level to orient visitors and members into the main entrance and foyer. The
north and south elevations will retain secondary and tertiary access on the western corner of the building.
Additionally, there will be direct visibility to a new steeple on top of a dormer that allows additional light
into the building. The dormer will have a prefinished metal siding on the north and south elevations.
The west elevation of the building, which faces Perry Ave North, would provide utilize composite windows.
The maximum primary structure height allowed within the R1 District is no more than 32 feet. As
proposed, the Applicant intends to maintain the existing height of approximately 22.6 feet in height. The
Applicant proposes to install a new steeple approximately 15 feet above the ridge of the roof for a total
height of 37.6 feet in height; however, RLUIPA (Religious Land Use and Institutionalized Persons Act)
provides certain protections for the religious freedom of persons, places of worship, religious schools, and
other religious assemblies. These protections include but are not limited to provisions against the
Page 87 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 7
substantial burdens on religious exercises and unreasonable limitations of religious assemblies. As the
proposed steeple would be considered accessory to the building, and not part of the primary structure,
City staff reviewed the steeple and cross against other portions of the code, including: amateur radio
antennas, which must be located in the rear setback but do not specify a height; roof-mounted satellite
receive only antennas (SROAs), which cannot be positioned higher than the maximum building height in
the R1 District; and the Mississippi Corridor Critical Area (MRCCA) overlay district provisions, which
exempt “chimneys, church spires, flag poles, public monuments, and mechanical stacks and similar
mechanical equipment” from the maximum height provisions.
As the Subject Property is also located within the Crystal Airport Overlay District, City staff reviewed the
provisions for properties located in “Zone 2” of the Overlay District. The construction of the addition shall
conform to the maximum construction height provisions without a permit. Further, no use shall be made
of any land in any of the Land Use Zones that creates or causes interference with the operations of radio
or electronic facilities at the Airport and aircraft, makes it difficult for pilots to distinguish between Airport
lights and other lights, results in glare in the eyes of pilots using the Airport, impairs visibility in the vicinity
of the Airport, is deemed a “hazard” to air navigation by FAA or MNDOT as part of an FAA 7460 Obstruction
Evaluation, or otherwise endangers the landing, taking off, or maneuvering of aircraft per Section V.B.1
(Land Use Zoning).
Image 5. Exterior Architectural Rendering of Unity Temple—North Elevation.
Traffic | Access |Circulation | Connection
## Access
As proposed, full access will be gained through the current curb cut located on the south side of 63
rd
Avenue North and a new curb cut would be installed along Perry Avenue North. It is assumed the primary
access will continue to be 63
rd
Avenue North, with Perry Avenue North serving as additional relief before
and after service times. The Applicant is proposing a new rear (south) parking lot that intends for traffic
Page 88 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 8
to keep right and leave the parking lot as it curves around the lot. The area on the western side of the
church building will have designated accessible parking spaces.
The existing drive aisle in the main lot is approximately 23.1 feet, but with the expansion, new portions of
parking lot would be constructed to meet the minimum 24-foot drive aisle for two-way traffic. The
Applicant denotes a sidewalk connection for pedestrians off the trail on 63
rd
Avenue North with an internal
crosswalk that leads pedestrians to the church building.
As mentioned previously, there is a temporary easement that allowed certain residential properties along
Perry Avenue North to construct fences on the Subject Property. Given the Applicant and Property
Owner’s plans to improve the property, they have indicated plans to terminate the agreement. The
Agreement does provide for certain minimum notification to those affected properties, and City staff
reiterated those provisions to the Applicant and Property Owner. In reviewing aerial imagery of the
westerly portions of the Subject Property, it appears some residents have installed accessory structures
(e.g. sheds) on the Subject Property, which were not considered as part of the temporary easement. The
Applicant and Property Owner would need to work with the affected property owners regarding the
relocation of any fencing, accessory structures, etc.
City staff consulted with the City Attorney who determined the temporary easement to be a private
matter. A notice of termination should be provided per the Agreement but would not hold up plans for
development on the site.
## Parking
For the purposes of calculating parking needs, City staff reviewed Section 35-5506 (Required Parking
Spaces) and determined the Subject Property’s use is that of, “Places of public assembly such as a houses
of worship, theatres, auditoriums (other than school auditoriums), mortuaries, stadiums, arenas, dance
halls.” This use requires a minimum of one (1) parking space for every (3) seats or persons.
The sanctuary space is identified as the highest occupancy space, and the other identified areas within
the building are likely ancillary to or spaces used by individuals or staff already utilizing the sanctuary
space (e.g. office spaces, children and staff at Sunday School).
The Applicant originally provided an occupancy load breakdown for the proposed sanctuary as 430
occupants noted on the Image 4 (above) and that implies a minimum need of 143 parking spaces;
however, the Applicant is proposing 153 stalls. The breakdown provides 145 standard and 8 accessible
spaces. The Applicant should verify the total number of ADA parking spaces required as the 2020
Minnesota Accessibility Code identifies a minimum requirement of six (6) accessible spaces for between
151 and 200 parking spaces. As proposed, a new “drop off only” area would also be installed along the
main entrance to the building.
A review of the Subject Property notes approximately 0.45 acres of Zone A (100-year) floodplain on the
Subject Property. In reviewing the City’s provisions for allowable uses within this floodplain district under
Section 35-3101 (FP—Floodplain), it was determined that Zone A is considered the City’s “General
Floodplain District.” This district allows for parking areas as a permitted use. The development team, in
conversation with the City’s Assistant City Engineer, determined that this project will not be required to
provide compensatory storage as the adjacent project to the east was also not required to provide
compensatory storage.
Page 89 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 9
## Lighting
A photometric plan was submitted with the application submittal; however, the provided plan will require
revisions as it does not provide the proper fixtures or proper illumination necessary to determine whether
it meets the code provisions as outlined under Section 35-5400 (Exterior Lighting). The Applicant shall
revise the photometric plan to provide fixture specifications and proper foot candle measurements.
The Applicant did provide fixture specifications for the building; however, the fixtures provided are
considered “wall packs.” These types of fixtures are only permitted in identified loading and service zones.
Additionally, there are uneven spots of illumination in the parking lots. The Applicant should provide
illumination levels of at least 10-foot candles within 5 feet of the primary entrances and exits, and along
pedestrian ways (e.g. sidewalks). Detail sheets are also requested of the Applicant to demonstrate
enhanced illumination over all primary building entrances/exits and any pedestrian pathways as outlined
under Section 35-5401. m.2 (Lighting Standards). This is particularly important with the expanded parking
lot and evening service times. Any photometric plan provided shall clearly demonstrate consistent levels
of illumination across the existing open-air parking lot and avoid pockets of very low or high levels of
illumination.
Image 6. Submitted Photometric Plan for the Subject Property.
## Trash | Screening
As proposed, a new trash enclosure would be constructed along the Easterly property line within the
parking lot. The enclosure would be approximately 11 feet by 6 feet in size and comprised of synthetic
lumber or cedar board panels on a metal frame. City Code requires all trash, recycling, and dumpsters to
be wholly screened within the enclosure with opaque materials.
The Applicant submitted vehicle turning movement diagrams to the city (Sheet C2.0), demonstrating the
Page 90 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 10
ability for a standard garbage truck to navigate the drive aisle to the trash enclosure and its ability to exit.
Image 7. Proposed Trash Enclosure for Subject Property.
All ground-mounted equipment over 30 inches in height or greater than 12 cubic feet (e.g., transformers,
mechanical) shall be effectively screened from public view.
## Landscaping
Detailed landscape plans (Sheets L1.0, L1.1, L1.2, and L1.3) were provided by the Applicant. As proposed,
a mix of deciduous trees, evergreen trees, and shrubs are proposed for installation on the Subject
Property.
Page 91 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 11
Image 8. Provided Landscape Plan and Plant Schedule for the Subject Property.
As proposed, landscaping would be concentrated along the westerly portions of the Subject Property that
are adjacent to those residential properties located along Perry Avenue North. These portions contain
new areas of parking lot and would serve a dual purpose of providing additional screening. This is a
requirement under Sections 35-5513 (Parking Lot Landscaping) and 35-5514 (Parking Lot Screening). It
appears the Applicant will retain some existing plantings, where possible, as part of the proposed project.
The Applicant notes that no more than 39% of the trees are of the same species—City Code requirements
provide a cap of no more than 40% of the same species to promote species diversity and resilience. The
provided plant schedule further breaks down those plantings that are pollinator friendly. It should be
noted that an irrigation system is to be installed and maintained at all times per City Code requirements.
The Applicant will need to work with City Engineering to ensure plantings (e.g. trees) are kept away from
any dedicated utility easements or utility lines.
For parking lot islands, a minimum of one (1) deciduous tree shall be provided per island. As proposed,
the plans provide for the installation of a Northwood Red Maple, Skyline Thornless Honey Locust, or an
Espresso Kentucky Coffeetree.
## Signs
No specific signage requests were made as part of the Application submittal; however, the submitted
plans note plans to salvage the existing sign for re-installation along 63
rd
## Avenue North. The Applicant
would need to pull any necessary electrical and sign permits as needed and depending on the scope of
work. The signage would also need to comply with the City’s sign regulations as outlined under Section
Page 92 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 12
35-6000 (Signs).
## Building Review
Building Official Dan Grinsteinner conducted a cursory review of the proposal in a memorandum dated
August 12, 2026 — Refer to Exhibit D.
A fire sprinkler and monitoring system is required for installation and is to be maintained at all times in
the existing building and building additions per Chapter 3.101B (2) of the City Code of Ordinances, and
sufficient fire hydrants shall be provided.
The Applicant will also need to meet any minimum ADA requirements with regard to the building and site
improvements, and prior to issuance of any building permits, a SAC determination shall be submitted to
the Metropolitan Council, and any associated fees shall be paid at time of permit issuance.
The parking lot extension along the south portion of the Subject Property will require the installation of
drains to the storm sewer system. Review and approval of the drainage methods shall be completed by
the City Engineering and Building divisions.
Ultimately, building plans are subject to review and approval by the Building Official with respect to
applicable codes prior to the issuance of permits.
## Engineering Review
Assistant City Engineer, Touyia Lee, conducted an initial review of the submitted site plan and
documentation and provided a memorandum dated August 3, 2026 — refer to Exhibit E. The Assistant
City Engineer indicates a Construction Management Plan and Agreement will be required, as well as an
overall Easement Agreement for any private utilities and storm drainage areas to inspect and enforce
proper utility service and maintenance for the entire site. An as-built survey shall be submitted at project
completion.
A review of the submitted Stormwater Management Report by CivilSite Group dated July 7, 2026, was
conducted and found to be generally acceptable. As proposed, more than one (1) acre would be disturbed
as part of the project, so a NPDES permit is required as well as SWPP implementation. The proposed
stormwater strategy for this project would be to direct the site’s stormwater runoff via surface drainage
and storm sewer piping to an aboveground filtration basin located at the south end of the Subject
Property.
## CONDITIONAL USE PERMIT
Conditional use permits, as outlined under Section 35-7700, are those uses which have been identified,
because of their nature, operation, location, special requirements or characteristics, and may only be
allowed in a particular zoning district after submittal of an application, review, and recommendation by
the Planning Commission, and approval by the City Council.
The conditional use permit process regulates: the location, magnitude, and design of conditional uses
consistent with the 2040 Comprehensive Plan, and the regulations, purposes, and procedures of this
Unified Development Ordinance (UDO).
A conditional use permit may not be granted by the City Council unless the following criteria have been
satisfied (Note: Applicant responses are transcribed from the submitted narrative—Exhibit A):
Page 93 of 169
App. No. 2026- 007
## PC 08/13/2026
Page 13
a. The conditional use will be in accordance with the general objectives, or with any specific
objective, of the City’s Comprehensive Plan and this UDO.
Applicant Response: No response given.
b. The establishment, maintenance, or operation of the conditional use will promote and enhance
the general public welfare and will not be detrimental to or endanger the public health, safety,
morals or comfort.
Applicant Response: The property has been used as a church for many years. The increase in the
use will further foster community and wellbeing in the neighborhood and city as the church is a
welcoming and respectful neighbor.
c. The conditional use will not be injurious to the use and enjoyment of other property in the
immediate vicinity for the purposes already permitted, nor substantially diminish and impair
property values within the neighborhood.
Applicant Response: The church will not be injurious to others or affect their enjoyment of their
own properties. It has continued to operate responsibly, and the application has allowed it to
connect to its near neighbors and hear their concerns and work to address them.
d. The establishment of the conditional use will not impede the normal and orderly development
and improvement of surrounding property for uses permitted in the district.
Applicant Response: No response given.
e. Adequate measures have been or will be taken to provide ingress, egress, and parking so designed
as to minimize traffic congestion in the public streets.
Applicant Response: The project has introduced another street connection at Perry Avenue with
the expanded parking lot to provide alternate routes to the site for ingress and egress.
f. Impacts such as noise, hours of activity, and exterior lighting have been sufficiently addressed to
mitigate negative impacts on nearby uses.
Applicant Response: We have listened to neighborhood concerns and addressed the lighting by
limiting the impacts to the property line or less per the zoning requirements. In addition, we’re
planting landscaping along the property to further lessen any impacts. The project is also installing
a gate to the south parking to limit access on non-church function times, so after hours access is
restricted.
g. The conditional use shall, in all other respects, conform to the applicable regulations of the district
in which it is located.
Applicant Response: The project being proposed follows all building and parking setbacks and
other zoning requirements, preserves existing trees and exceeds the landscaping requirements.
The Subject Property is generally in conformance with the general objectives of the City’s 2040
Page 94 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 14
Comprehensive Plan and Unified Development Ordinance (UDO). This property is future guided for
“Public-Semi Public/Institutional “under the 2040 Comprehensive Plan and the R1 zoning district allows
for “Places for Religious Assembly” as a conditional use.
As identified in the project narrative provided by the Applicant, the church was constructed in the 1960s—
before conditional use permits or their precursor (special use permits) were required for this use in the
residential district. Per County records, the church was constructed in 1962, which also predates the
establishment of Brooklyn Center as a charter city (1966). During discussions with the Applicant and
development team, and with the anticipated plans for expansion, City staff indicated that now would be
the time to bring the property up to code by working through issuance of a conditional use permit as part
of the Planning Commission application request.
In reviewing records, the Subject Property has a long history in serving as a place of worship and served
as a former home to Brook Park Baptist Church. There are no plans to offer any new services, such as
daycare or a charter school at this site. Instead, the Applicant’s request is forward focused in anticipating
growth within their congregation and the space needs that come with that. The area surrounding the
Subject Property is heavily residential with a charter school (Twin Lakes STEM Academy) located to the
east of the Subject Property, the Crystal Airport and MAC Preserve located to the south of the Subject
Property.
City staff engaged in conversations with the Applicant regarding their plans to install a secondary curb cut
access off Perry Avenue North to offer relief before and after service times. City staff noted that this is a
residential street and encouraged the Applicant and development team to meet with the neighborhood
in advance of the application review at Planning Commission and City Council. To City staff knowledge,
there have been two neighborhood meetings to date. City staff was available at the first neighborhood
meeting on June 24, 2026, to provide information on the City process. Based on the development team’s
engagement with the neighborhood, the Applicant notes certain alterations were taken into account
based on feedback from the residents (e.g. site lighting).
The Applicant indicated the highest levels of traffic would take place on Sunday mornings and afternoons,
which is unlike that of the school that operates to the east. They further indicate the installation of a
stormwater filtration area, which is not currently present on-site, and plans to install a gate at the north
end of the entrance to the south parking lot to discourage loitering and after-hours activity. The Applicant
should coordinate with the City’s Fire Department for emergency access options, if ever required.
## ANTICIPATED PERMITTING AND CONDITIONS OF APPROVAL
Following a review of the submittal materials and the requests, approval of the major site and building
plan and conditional use permit are both required to forward the application for the Subject Property
located at 4801 63
rd
Avenue North. City staff recommends the following conditions be attached to any
positive recommendation on the approval of Planning Commission Application No. 2026-007 for the
Subject Property, which contemplates approval of an approximately 3,893-square foot expansion to Unity
Temple Church of God in Christ and certain site improvements:
1. Any major changes or modifications made to this Site and Building Plan, and as outlined
within the City Code, can only be made by an amendment to the approved Site and
Building Plan as approved by the City Council.
a. The Applicant shall revise the provided photometric plan to meet City lighting
provisions under Section 35-5400 (Exterior Lighting) and provide revised fixture
Page 95 of 169
## App. No. 2026-007
## PC 08/13/2026
Page 15
specifications for all new site and wall lighting.
2. The building plans are subject to review and approval by the Building Official with respect
to applicable codes prior to the issuance of permits, and with respect to the cursory
review comments provided in the Building Official’s memorandum dated August 12, 2026.
3. A SAC Determination shall be submitted by the Applicant and Property Owner to the
Metropolitan Council and any associated fees paid at time of any permit issuance for the
proposed development.
4. A Performance Agreement with supporting financial guarantee approved by the City shall
be executed upon any approval of the to-be submitted building permit for site
improvements, which ensures the Subject Property will be constructed, developed, and
maintained in conformance with the provided plans, specifications, and standards.
5. The Applicant and Property Owner shall notify affected property owners of its intent to
terminate the Temporary Grant Easement identified as Document No. 4253115 and dated
June 1, 1976, and per the minimum notification requirements.
6. The Applicant and Property Owner shall ensure the proposed building expansion is
constructed to comply with maximum construction height requirements for Zone 2 of the
Crystal Airport Overlay District, ensure safety, and minimize interference with the
operations of the Airport.
7. Any outside trash disposal facilities and rooftop or ground mechanical equipment shall be
appropriately screened from view per City Code requirements and a detail sheet
provided.
8. The Applicant and Property Owner agree to comply with all conditions or provisions noted
in the Assistant City Engineer’s review memorandum, originally dated August 3, 2026.
9. The Applicant and Property Owner shall submit a Sign Permit Application for any
proposed signage (e.g., wall, freestanding) and receive issuance of a permit prior to any
installation. All signage shall conform to City requirements.
## RECOMMENDATION
Based on the submitted plans and above-noted findings, City staff recommend Planning Commission
recommend City Council approval of Planning Commission Application No. 2026-007 for (1) issuance of a
conditional use permit for a “Place for Religious Assembly” and (2) a major site and building plan for
construction of an approximately 3,893-square foot building expansion and certain site improvements at
the Subject Property located at 4801 63
rd
Avenue North, as amended by the anticipated permitting and
conditions of approval in the August 13, 2026 Planning Commission report.
## ATTACHMENTS
Exhibit A —Planning Commission Application No. 2026-007 Plans and Documents.
Exhibit B —Public Hearing Notice, submitted for publication in the Brooklyn Center Sun Post, and dated
July 30, 2026
Exhibit C — Temporary Grant Easement (Document Number: 4253115), dated June 1, 1976.
Exhibit D — Review Memorandum, prepared by Building Official Dan Grinsteinner, and dated August 12,
2026.
Exhibit E — Review Memorandum, prepared by Assistant City Engineer Touyia Lee, and dated August 3,
2026.
Page 96 of 169
July 13, 2026
Project Narrative – Unity Temple Church of God in Christ - Addition and Site Improvements
The proposed project is a 3,893 SF addition to the existing 7,230 SF church and includes site improvements and is
located at 4801 63
rd
Avenue North. The church congregation is outgrowing their current space and looking to
ex
pand the sanctuary and support spaces to accommodate the growth. The project is proposing a new addition to
the north and south of their current sanctuary with support spaces below and including a new drive-up entry for
accessibility. The current church and parking area is divided by steps and a long sloping walk, making access more
difficult for older members. The other improvements include an elevator, Sunday school classrooms, office and
support spaces.
The site will be improved by adding parking to the south and north with a new street connection to Perry Avenue
to accommodate new accessible parking spaces and drop off at the front entry. The new impervious parking area
is balanced with stormwater improvements on the south part of the site as well as landscaping screening
between the new parking and residential homes to the west and north.
The church leadership and design team held a neighborhood meeting on June 24
th
attended by four households
an
d approximately 10 people. The topics discussed were traffic, parking lot noise and lighting and loss of natural
landscape.
In response to these comments, it was discussed that almost all of the significant traffic would be occurring on
Sunday morning and afternoon, unlike the school building to the south. The increased parking on site is both a
city requirement and being a good neighbor to ensure church parking happens on site rather than using up on-
street parking. The inclusion of a stormwater filtration area will improve the runoff from the new and existing
parking field, where no treatment exists for the current parking area.
Following the meeting, the site lighting has been designed to have virtually no spill over to the neighbors and well
under the city code requirements. The parking area will be screened via coniferous plantings rather than a fence.
To limit any after-hours activity in the south parking area, a gate is proposed at the north side of the parking lot
extension to bar vehicular access when not being used for church activities.
The church leadership and design team plan a follow up meeting to review the improvements and ways the
project is addressing their concerns prior to the planning commission meeting.
## Exhibit A
Page 97 of 169
July 13, 2026
Project Narrative – Unity Temple Addition - Conditional Use Permit Request Reponses
The conditional use permit is requested as the church was built in the 1960’s before conditional use permits or
their precursor were required for the use in residential districts. As the addition is expanding this use, the CUP is
requested.
•
The establishment, maintenance or operation of the conditional use will promote and
enhance the general public welfare and will not be detrimental to or endanger the public health, safety,
morals or comfort.
Response: The property has been used as a church for many years. The increase in the use will
further foster community and wellbeing in the neighborhood and city as the church is a welcoming and
respectful neighbor.
•
The conditional use will not be injurious to the use and enjoyment of other property in the immediate
vicinity for the purposes already permitted, nor substantially diminish and impair property values within
the neighborhood.
Response: The church will not be injurious to others or affect their enjoyment of their own
properties. It has continued to operate responsibly, and the application has allowed it to connect
to its near neighbors and hear their concerns and work to address them.
•
The establishment of the conditional use will not impede the normal and orderly development and
improvement of surrounding property for permitted uses.
Response: The project will continue in its current use and will not impede the normal and orderly
development of the surrounding properties. The project is wholly self-contained on the site and
still modest use of the lot including traffic, which will only be fully utilized on Sundays when
general traffic is lighter.
•
Adequate measures have been or will be taken to provide ingress, egress and parking so designed as to
minimize traffic congestion in the public streets.
Response: The project has introduced another street connection at Perry Avenue with the
expanded parking to provide alternate routes to the site for ingress and egress.
•
Impacts such as noise, hours of activity, and exterior lighting have been sufficiently addressed to mitigate
negative impacts on nearby uses; and
Response: We have listened to neighborhood concerns and addressed the lighting by limiting the
impacts to the property line or less per the zoning requirements. In addition, we’re planting landscaping
along the property to further lessen any impacts. The project is also installing a gate to the south parking
are to limit access on non-church function times, so after hours access is restricted.
•
The conditional use shall, in all other respects, conform to the applicable regulations of the district in
which it is located.
Response: The project being proposed follows all building and parking setbacks and other zoning
requirements, preserves existing trees and exceeds the landscaping requirements.
Page 98 of 169
## CHURCH
## ADDITION
## UNIT Y TEMPLE
## SITE AND BUILDING
## PL AN REVIEW
## APPLICATION
## ©2026 DJR
25-101.00
07.13.2026
4801 63rd Ave. N,
## Minneapolis, Minnesota
## A000
## COVER SHEET
The proposed project is a 3,893 square feet addition to an
existing church building and associated site improvements
including additional parking and landscaping.
## TOTAL SITE AREA3.16 ACRES OR 137,502 SF
## CURRENT ZONING:R-1 (LOW DENSIT Y RESIDENTIAL)
## PARCLE ID
511821420032
## SF
137,502
## ACRES
3.16
## ADDRESS
4801 63rd AVE.
## MINNEAPOLIS, MN
55429
## UNIT Y TEMPLE CHURCH OF
## GOD IN CHRIST, PO BOX 29035
## BROOKLYN CENTER, MN 55429
## A000
## G001
## G002
## G003
## G004
-----
## C0.0
## C1.0
## C2.0
## C2.1
## C2.2
## C3.0
## C3.1
## C3.2
## C4.0
## C4.1
## C4.2
## C5.0
## C5.1
## C5.2
## L1.0
## L1.1
## L1.2
## L1.3
## SW1.0
## SW1.1
## SW1.2
## SW1.3
## SW1.4
## SW1.5
-----
## A1.0
## A6.0
## A7.0
## A7.1
## A7.2
## COVER SHEET
## SITE ANALYSIS - SITE AERIALS
## SITE ANALYSIS - ZONING & ADJACENT USES
## SITE ANALYSIS - SURROUNDING BUILDINGS
## CIRCUL ATION DIAGRAM
## TITLE SHEET
## REMOVALS PL AN
## SITE PL AN - OVERALL
## SITE PL AN - NORTH
## SITE PL AN - SOUTH
## GRADING PL AN - OVERALL
## GRADING PL AN - NORTH
## GRADING PL AN - SOUTH
## UTILIT Y PL AN - OVERALL
## UTILIT Y PL AN - NORTH
## UTILIT Y PL AN - SOUTH
## CIVIC DETAILS
## CIVIC DETAILS
## CIVIC DETAILS
## L ANDSCAPE PL AN - OVERALL
## L ANDSCAPE PL AN - NORTH
## L ANDSCAPE PL AN - SOUTH
## L ANDSCAPE PL AN NOTES & DETAILS
## SWPPP - EXISTING CONDITIONS
## SWPPP - PROPOSED CONDITIONS
## SWPPP - DETAILS
## SWPPP - NARRATIVE
## SWPPP - ATTACHMENTS
## SWPPP - ATTACHMENTS
## SITE LIGHTING
## PROPOSED BUILDING PL ANS
## PROPOSED BUILDING ELEVATIONS
## EXTERIOR - NORTHWEST VIEW
## EXTERIOR - NORTHEAST VIEW
## EXTERIOR - SOUTHEAST VIEW
## DJR ARCHITECTURE
## 333 WASHINGTON AVENUE N.
## UNION PL A ZA, SUITE 210
## MINNEAPOLIS, MN 55401
## CIVIL SITE GROUP
## 5000 GLENWOOD AVE,
## GOLDEN VALLEY, MN 55422
## ALLOWABLE
## PROPOSED
## NA
## 11,123 SF
## PARKING REQUIRED
## PARKING PROVIDED
## PARKING REQUIRED
## 143 STALLS
## 153 STALLS
## 145 STANDARD
## 8 ADA
## LOWER LEVEL
## UPPER LEVEL
## TOTAL
## EXISTING
## 3,615 SF
## 3,615 SF
## 7,230 SF
## ADDITION
## 1,621 SF
## 2,272 SF
## 3,893 SF
## OVERALL AFTER ADDITIONS
## 5,236 SF
## 5,887 SF
## 11,123 SF
## TABLE OF CONTENTS
## PROJECT DESCRIPTION AND BACKGROUND
## PROJECT TEAM
## PROJECT DATA SUMMARY
## SITE AREA
## ZONING
## OWNERSHIP
## SHEET
## NO.
## DESCRIPTION
## ARCHITECT
## CIVIL/L ANDSCAPE/SURVEY
## FAR
## VEHICUL AR PARKING
## BUILDING AREA
Page 99 of 169
## CHURCH
## ADDITION
## UNIT Y TEMPLE
## SITE AND BUILDING
## PL AN REVIEW
## APPLICATION
## ©2026 DJR
25-101.00
07.13.2026
4801 63rd Ave. N,
## Minneapolis, Minnesota
## G001
## SITE AERIALS
## SITE ANALYSIS
## SITE ANALYSIS - EXISTING
## AERIAL PHOTO LOOKING SOUTHWEST
Page 100 of 169
## CHURCH
## ADDITION
## UNIT Y TEMPLE
## SITE AND BUILDING
## PL AN REVIEW
## APPLICATION
## ©2026 DJR
25-101.00
07.13.2026
4801 63rd Ave. N,
## Minneapolis, Minnesota
## G002
## ZONING & ADJACENT USES
## SITE ANALYSIS
## SITE ANALYSIS - ZONING AND USES
## CURRENT ZONING: R1 (LOW-DENSIT Y ESIDENTIAL)
## PRIMARY ZONING MAP
## SITE (R1)
## (R2) MEDIUM LOW DENSIT Y RESIDENTIAL
## (R3) MEDIUM DENSIT Y RESIDENTIAL
## (R4) MEDIUM HIGH DENSIT Y RESIDENTIAL
## (R5) HIGH DENSIT Y RESIDENTIAL
## (PUD/C2) PL ANNED UNIIT DEV. / COMMERCE 2
## (R1) LOW-DENSIT Y RESIDENTIAL
## (MX-N1) NEIGHBORHOOD MIXED USE
## (O) PUBLIC OPEN SPACE
## (MX-N2) NEIGHBORHOOD MIXED USE
## KEY
Page 101 of 169
## CHURCH
## ADDITION
## UNIT Y TEMPLE
## SITE AND BUILDING
## PL AN REVIEW
## APPLICATION
## ©2026 DJR
25-101.00
07.13.2026
4801 63rd Ave. N,
## Minneapolis, Minnesota
## SITE ANALYSIS
## SURROUNDING BUILDINGS
## G003
## SITE ANALYSIS - SURROUNDING BUILDINGS
The proposed project site is located on the north side
of the Kylawn neighborhood, to the immediate south
of the Orchard Lane Neighborhood.
## K YL AWN NEIGHBORHOOD
3.
1.
2.
## Reference Map
Page 102 of 169
## CHURCH
## ADDITION
## UNIT Y TEMPLE
## SITE AND BUILDING
## PL AN REVIEW
## APPLICATION
## ©2026 DJR
25-101.00
07.13.2026
4801 63rd Ave. N,
## Minneapolis, Minnesota
## CIRCUL ATION
## DIAGRAM
## G004
## CIRCUL ATION DIAGRAM
## 63rd AVE N
## PERRY AVE N
Page 103 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C0.0
## TITLE SHEET
## UNITY TEMPLE CHURCH ADDITION
## BROOKLYN CENTER, MINNESOTA
## ISSUED FOR:
## CITY SUBMITTAL
## PROJECT CONTACTS
## NAME & ADDRESS
## CONTACT
## CIVIL ENGINEER
## CIVIL SITE GROUP
## 5000 GLENWOOD AVE
## GOLDEN VALLEY, MN 55422
## DAVID KNAEBLE
612-615-0060
## DKNAEBLE@CIVILSITEGROUP.COM
## LANDSCAPE
## ARCHITECT
## CIVIL SITE GROUP
## 5000 GLENWOOD AVE
## GOLDEN VALLEY, MN 55422
## PATRICK SARVER
612-615-0060
## PSARVER@CIVILSITEGROUP.COM
## PROPERTY OWNER
## ARCHITECT
## DJR ARCHITECTS
## 333 WASHINGTON AVE N #210
## MINNEAPOLIS, MN 55101
## CHRIS WHITEHOUSE
612-676-2736
## CWHITEHOUSE@DJR-INC.COM
## SURVEYOR
## CIVIL SITE GROUP
## 5000 GLENWOOD AVE
## GOLDEN VALLEY, MN 55422
## RORY SYNSTELIEN
## 612-615-0060 X 712
## RORY@CIVILSITEGROUP.COM
## GEOTECHNICAL
## ENGINEER
## COMPANY NAME
## ADDRESS LINE 1ADDRESS LINE 2
## CONTACT NAME
## PHONE NUMBER
## EMAIL
## REVISION SUMMARY
## DATE
## DESCRIPTION
Know what's
below.
before you dig.
## Call
## R
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 29035BROOKLYN CENTER, MN 55429
763-537-6996
## INFO@UNITYTEMPLECOGIC.ORG
## SHEET INDEX
## SHEET NUMBER
## SHEET TITLE
## C0.0
## TITLE SHEET
## C1.0
## REMOVALS PLAN
## C2.0
## SITE PLAN - OVERALL & TURNING
## MOVEMENTS
## C2.1
## SITE PLAN - NORTH
## C2.2
## SITE PLAN - SOUTH
## C3.0
## GRADING PLAN - OVERALL
## C3.1
## GRADING PLAN - NORTH
## C3.2
## GRADING PLAN - SOUTH
## C4.0
## UTILITY PLAN - OVERALL
## C4.1
## UTILITY PLAN - NORTH
## C4.2
## UTILITY PLAN - SOUTH
## C5.0
## CIVIL DETAILS
## C5.1
## CIVIL DETAILS
## C5.2
## CIVIL DETAILS
## L1.0
## LANDSCAPE PLAN - OVERALL
## L1.1
## LANDSCAPE PLAN - NORTH
## L1.2
## LANDSCAPE PLAN - SOUTH
## L1.3
## LANDSCAPE PLAN NOTES & DETAILS
## SW1.0
## SWPPP - EXISTING CONDITIONS
## SW1.1
## SWPPP - PROPOSED CONDITIONS
## SW1.2
## SWPPP - DETAILS
## SW1.3
## SWPPP - NARRATIVE
## SW1.4
## SWPPP - ATTACHMENTS
## SW1.5
## SWPPP - ATTACHMENTS
1.
## ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE
CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TOCONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE
## DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.
CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH WHAT ISSHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION.
3.
## ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY
## SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION
## AND THE FINAL CONNECTION OF SERVICES.
4.
## ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL
## GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS.
5.
CIVIL SITE GROUP SHALL HAVE NO LIABILITY WHATSOEVER FOR ANY COSTS ARISING OUT OF THECLIENTS DECISION TO OBTAIN BIDS OR PROCEED WITH CONSTRUCTION BEFORE CIVIL SITE
## GROUP HAS ISSUED FINAL, FULLY-APPROVED AND STAMPED PLANS AND SPECIFICATIONS. THE
CLIENT ACKNOWLEDGES THAT ALL PLANS ARE SUBJECT TO SUBSTANTIAL REVISION.CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE MOST RECENT ISSUANCE OF PLANS FORCONSTRUCTION PURPOSES.
6.
## PLAN SET IS NOT USABLE FOR CONSTRUCTION UNTIL PLANS HAVE BEEN FULLY APPROVED AND
## STAMPED BY THE REQUIRED REVIEWING AUTHORITIES AND NO ADDITIONAL REVIEWS ARE
## REQUIRED.
## SITE LOCATION
## SITE LOCATION MAP
## N
Page 104 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## Gate
## Gate
## Gate
## Gate
## Gate
## Shed
## Concrete Walkway
## Concrete Step
## Concrete Steps
w/ Railing
## Concrete
## Landscaping Rock
## Landscaping Rock
## Overhang
## Overhang
## Keystone
## Retaining Wall
## Concrete
## Retaining Wall
## Wood
## Retaining Wall
## Chain Link Fence
## Chain Link Fence
## Chain Link Fence
## Bituminous
## Parking Lot
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
19.2
10.0
10.1
3
1
1
5
23
35
## Snow Pile
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 5' PARKING SETBACK
## EXISTING TREES TO
## REMAIN, PROVIDE
## TREE PROTECTION
## FENCING, TYP.
## EXISTING TREES TOREMAIN, PROVIDE
## TREE PROTECTION
## FENCING, TYP.
## REMOVE EXISTING
## TREES AND ROOT
## BALLS, TYP.
## EXISTING BILLBOARD
## SIGN AND FOOTING TO
## REMAIN, PROTECT
## DURING CONSTUCTION
## REMOVE EXISTING
## CURB AND
## GUTTER, TYP.
## REMOVE EXISTINGPAVEMENT, BASEMATERIALS, ANDPARKING SIGNS,
## SAWCUT FULL DEPTH
## REMOVE EXISTINGPAVEMENT, BASEMATERIALS, AND
## SAWCUT FULL DEPTH
## REMOVE EXISTING
## CURB AND
## GUTTER, TYP.
## REMOVE EXISTING
## PAVEMENT AND
## SAWCUT FULL DEPTH
## REMOVE EXISTING
## CONC. WALK AND
## BASE MATERIALS
## REMOVE EXISTING CONC.
## STEPS W/ RAILING, BASE
## MATERIAL, AND KEYSTONE
## WALL
## REMOVE/DISCONNECT
## EXISTING AIR CONDITIONING
## UNITS, PER STANDARDS
## REMOVE EX.
## LANDSCAPING ROCK
## REMOVE EXISTING
## LANDSCAPING ROCK
## REMOVE EXISTSING
## CHAIN LINK FENCE,GATES, AND
## FOOTINGS, TYP.
## EX. CONC. STEPS, WALK,
## AND KEYSTONE WALL TO
## REMAIN, PROTECT DURING
## CONSTUCTION
## EX. CONC. STEP AND WALK
## TO REMAIN, PROTECT
## DURING CONSTUCTION
## EX. CHAIN LINK FENCE
## TO REMAIN, PROTECT
## DURING CONSTUCTION
## REMOVE EXISTING
## TREES AND ROOT
## BALLS, TYP.
## SALVAGE
## EXISTING SIGN
## EX. CONC. WALK TO
## REMAIN, PROTECT
## DURING CONSTUCTION
## EXISTING PAVEMENT TOREMAIN, PROTECT
## DURING CONSTUCTION
## REMOVE EXISTINGPAVEMENT STRIPING, TYP.
## REMOVE EXISTINGPAVEMENT STRIPING, TYP.
## REMOVE EXISTING CHAIN
## LINK FENCE, GATES, AND
## FOOTINGS, TYP.
## REMOVE EXISTING WOODRETAINING WALL
## RELOCATE EX. UTILITY MH,
## COORD. W/ UTILITY COMPANY
## RELOCATE EX. UTILITY MH,
## COORD. W/ UTILITY COMPANY
## EXISTING CHAIN LINK FENCE
## TO REMAIN, PROTECT
## DURING CONSTUCTION
## EX. POWER POLE TO
## REMAIN, PROTECTDURING CONSTUCTION
## SALVAGE EXISTING SIGNS
## REMOVE EXISTING
## CURB AND
## GUTTER, TYP.
## REMOVE EXISTING
## CONC. WALK AND
## BASE MATERIALS
## EXISTING TREES TO
## REMAIN, PROVIDE
## TREE PROTECTION
## FENCING, TYP.
## RELOCATE EXIST. GAS
## METER, COORD. WITH
## UTILITY COMPANY. SEE
## SITE PLAN FOR NEW
## LOCATION
## ALL CONSTRUCTION HERE
## TO BE REMOVED BY
## HOMEOWNERS
## REMOVALS PLAN LEGEND:
## TREE PROTECTION
## REMOVAL OF PAVEMENT AND ALL BASE MATERIAL,
## INCLUDING BIT., CONC., AND GRAVEL PVMTS.
## REMOVAL OF STRUCTURE INCLUDING ALL
## FOOTINGS AND FOUNDATIONS.
## TREE REMOVAL - INCLUDING ROOTS AND STUMPS
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C1.0
## REMOVALS PLAN
## REMOVE CURB AND GUTTER. IF IN RIGHT-OF-WAY,
## COORDINATE WITH LOCAL GOVERNING UNIT.
## REMOVAL NOTES:
## CITY OF
## BROOKLYN CENTER
## REMOVAL NOTES:
1.
## RESERVED FOR CITY SPECIFIC REMOVAL NOTES.
1.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166)
FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT
## ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.
SEE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PLAN FOR CONSTRUCTION STORM WATER MANAGEMENT PLAN.
3.
REMOVAL OF MATERIALS NOTED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH MNDOT, STATE AND LOCAL REGULATIONS.
4.
REMOVAL OF PRIVATE UTILITIES SHALL BE COORDINATED WITH UTILITY OWNER PRIOR TO CONSTRUCTION ACTIVITIES.
5.
EXISTING PAVEMENTS SHALL BE SAWCUT IN LOCATIONS AS SHOWN ON THE DRAWINGS OR THE NEAREST JOINT FOR PROPOSED
## PAVEMENT CONNECTIONS.
6.
REMOVED MATERIALS SHALL BE DISPOSED OF TO A LEGAL OFF-SITE LOCATION AND IN ACCORDANCE WITH STATE AND LOCALREGULATIONS.
7.
ABANDON, REMOVAL, CONNECTION, AND PROTECTION NOTES SHOWN ON THE DRAWINGS ARE APPROXIMATE. COORDINATE WITH
## PROPOSED PLANS.
8.
EXISTING ON-SITE FEATURES NOT NOTED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE CONTRACT.
9.
PROPERTY LINES SHALL BE CONSIDERED GENERAL CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED ON THE DRAWINGS. WORK
WITHIN THE GENERAL CONSTRUCTION LIMITS SHALL INCLUDE STAGING, DEMOLITION AND CLEAN-UP OPERATIONS AS WELL AS
## CONSTRUCTION SHOWN ON THE DRAWINGS.
10.
MINOR WORK OUTSIDE OF THE GENERAL CONSTRUCTION LIMITS SHALL BE ALLOWED AS SHOWN ON THE PLAN AND PER CITY
REQUIREMENTS. FOR ANY WORK ON ADJACENT PRIVATE PROPERTY, THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM
## THE ADJACENT PROPERTY OWNER PRIOR TO ANY WORK.
11.
DAMAGE BEYOND THE PROPERTY LIMITS CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED IN A MANNER APPROVED BY THE
## ENGINEER/LANDSCAPE ARCHITECT OR IN ACCORDANCE WITH THE CITY.
12.
PROPOSED WORK (BUILDING AND CIVIL) SHALL NOT DISTURB EXISTING UTILITIES UNLESS OTHERWISE SHOWN ON THE DRAWINGS AND
## APPROVED BY THE CITY PRIOR TO CONSTRUCTION.
13.
SITE SECURITY MAY BE NECESSARY AND PROVIDED IN A MANNER TO PROHIBIT VANDALISM, AND THEFT, DURING AND AFTER NORMAL
WORK HOURS, THROUGHOUT THE DURATION OF THE CONTRACT. SECURITY MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY.
14.
VEHICULAR ACCESS TO THE SITE SHALL BE MAINTAINED FOR DELIVERY AND INSPECTION ACCESS DURING NORMAL OPERATING
HOURS. AT NO POINT THROUGHOUT THE DURATION OF THE CONTRACT SHALL CIRCULATION OF ADJACENT STREETS BE BLOCKED
## WITHOUT APPROVAL BY THE CITY PRIOR TO CONSTRUCTION ACTIVITIES.
15.
ALL TRAFFIC CONTROLS SHALL BE PROVIDED AND ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, SIGNAGE, BARRICADES,
FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES
## SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY.
16.
SHORING FOR BUILDING EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR AND AS APPROVED BY THE OWNERS
## REPRESENTATIVE AND THE CITY PRIOR TO CONSTRUCTION ACTIVITIES.
17.
STAGING, DEMOLITION, AND CLEAN-UP AREAS SHALL BE WITHIN THE PROPERTY LIMITS AS SHOWN ON THE DRAWINGS AND
## MAINTAINED IN A MANNER AS REQUIRED BY THE CITY.
18.
ALL EXISTING SITE TRAFFIC/REGULATORY SIGNAGE TO BE INVENTORIED AND IF REMOVED FOR CONSTRUCTION SHALL BE RETURNED
## TO LGU.
19.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166)
FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT
## ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
## SEE SWPPP ON SHEETS SW1.0 -
## SW1.5
## EROSION CONTROL NOTES:
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
## PROPERTY LINE
0
1" = 40'-0"
40'-0"
20'-0"
## N
Know what's
below.
before you dig.
## Call
## R
## OWNER INFORMATION
## UNITY TEMPLE CHURCH OF GODPO BOX 29035
## BROOKLYN CENTER, MN 55429
763-537-6996
## INFO@UNITYTEMPLECOGIC.ORG
## TREE PROTECTION
## N T S
25'
## DL
## DRIPLINE WIDTH
## FURNISH AND INSTALL TEMPORARY FENCE AT THE TREE'S DRIP LINE OR CONSTRUCTION LIMITS AS SHOWN ON
PLAN, PRIOR TO ANY CONSTRUCTION. WHERE POSSIBLE PLACE FENCE 25' BEYOND DRIP LINE. PLACE TREEPROTECTION SIGN ON POSTS, ONE PER INDIVIDUAL TREE (FACING CONSTRUCTION ACTIVITY), OR ONE EVERY
## 100' LF ALONG A GROVE OR MULTI-TREE PROTECTION AREA.
## POSTS AND FENCING
## EXTEND FENCE 25'
## BEYOND DRIPLINE
## WHERE POSSIBLE
## TREE PROTECTION SIGN, TYP.
## TREE DRIPLINE, OR
## CONSTRUCTION LIMITS
1
Page 105 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## EXISTING
## 100-YR
## HWL=858.39
## SITE DATA
## ZONING SUMMARY
## EXISTING ZONING
## R1 - RESIDENTIAL FAMILY
## PROPOSED ZONING
## R1 - RESIDENTIAL FAMILY
## REQUIRED
## PROVIDED
## BUILDING SETBACKS
## FRONT
## 35 FT
## 60 FT
## REAR
## 25 FT
## 462 FT
## SIDE
## 10 FT
## 11 FT
## PARKING SETBACKS
## FRONT
## 5 FT
## 12 FT
## REAR
## 5 FT
## 7 FT
## SIDE
## 5 FT
## 13 FT
## REQUIRED
## PROVIDED
## PARKING SUMMARY
## PARKING STALLDIMENSIONS
9 FT x 18 FT
9 FT x 18 FT
## COMPACT PARKING
## STALL DIMENSIONS
8 FT x 16 FT
## N/A
## DRIVE AISLEDIMENSIONS
## 24 FT
## 24 FT
## FIRE ACCESS ROAD
## DIMENSIONS
## 20 FT
## 24 FT
## REQUIRED
## PROVIDED
## PARKING STALLS -
## SURFACE
## 143 EA
## 153 EA
## PARKING STALLS -
## GARAGE
## N/A
## N/A
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SITE LAYOUT NOTES:
## SITE PLAN LEGEND:
## SIGN AND POST ASSEMBLY. SHOP DRAWINGS REQUIRED.
## HC = ACCESSIBLE SIGN
## PROPERTY LINE
## CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE
## APPLICABLE-SEE PLAN
## LIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL
## REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL.
## CONSTRUCTION LIMITS
## TO
## CITY OF
## BROOKLYN CENTER
## SITE SPECIFIC NOTES:
1.
## RESERVED FOR CITY SPECIFIC SITE NOTES.
1.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.
CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED
PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THE SITE. ANY REVISIONSREQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE
APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL.
3.
THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY AND STREET OPENING PERMIT.
4.
THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS.
5.
CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR
## TO INSTALLATION OF FOOTING MATERIALS.
6.
LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW
## AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT.
7.
CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION. LOCATION OF BUILDING IS TO BUILDING FOUNDATION AND SHALL BE AS SHOWNON THE DRAWINGS.
8.
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO FABRICATION FOR ALL
PREFABRICATED SITE IMPROVEMENT MATERIALS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS, RAILINGS, BENCHES, FLAGPOLES, LANDING PADS FOR CURBRAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS NOT PREVIOUSLY APPROVED.
9.
PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A. REQUIREMENTS-SEE DETAIL.
10.
CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OF TRAFFIC. WIDTH OF CROSSWALK SHALL BE 5' WIDE. ALL OTHER PAVEMENT
MARKINGS SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES.
11.
## SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL.
12.
## ALL CURB RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED.
13.
CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITE IMPROVEMENTS.
14.
## FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS.
15.
## PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE.
16.
## ALL PARKING LOT PAINT STRIPING TO BE WHITE, 4" WIDE TYP.
17.
BITUMINOUS PAVING TO BE "LIGHT DUTY" UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS FOR PAVEMENT SECTIONS.
18.
ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE.
## SEE LANDSCAPE DOCUMENTS.
19.
CONTRACTOR IS RESPONSIBLE TO INSTALL ANY SIDEWALK AND CURBING PER DESIGN PLAN. CONTRACTOR TO VERIFY ALL CURBS AND SIDEWALKS WILL DRAIN PROPERLY IN FIELD CONDITIONS.CONTRACTOR MUST CONTACT THE CIVIL ENGINEER 24-HOURS PRIOR TO ANY CURB AND/OR SIDEWALK INSTALLATION TO REVIEW AND INSPECT CURB STAKES. CONTRACTOR IS RESPONSIBLE FOR
## ANY CURB OR SIDEWALK REPLACEMENT IF THIS PROCEDURE IS NOT FOLLOWED.
20.
FINISH GRADING FOR HARDSCAPE AREAS IE. PARKING LOTS, CURBS, SIDEWALKS SHALL BE WITHIN 0.05 FEET. ADA AREAS MUST COMPLY WITH REQUIREMENTS ON PLANS AND ADA REGULATIONS.
TOLERANCE WITHIN ADA AREAS IS 0.00 FEET DISCUSS ANY DEVIATIONS WITH ENGINEER PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY CURB, SIDEWALK AND/OR PAVEMENT
## REPLACEMENT THAT DOES NOT MEET TOLERANCE/ADA REQUIREMENTS.
## CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE
## GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS,
## WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL
## OPERATIONAL NOTES
## SNOW REMOVAL
## ALL SNOW SHALL BE STORED ON-SITE OUTSIDE
## PARKING LOT. WHEN FULL, REMOVAL CO. SHALLREMOVE EXCESS OFF-SITE.
## TRASH REMOVAL
## TRASH SHALL BE PLACED IN EXTERIOR TRASH
## AREA AND REMOVED BY COMMERCIAL CO.
## WEEKLY.
## DELIVERIES
## DELIVERIES SHALL OCCUR AT THE FRONT DOOR
## VIA STANDARD COMMERCIAL DELIVERYVEHICLES (UPS, FED-EX, USPS).
## REVISION SUMMARY
## DATE
## DESCRIPTION
## C2.0
## SITE PLAN - OVERALL
## & TURNING
## MOVEMENTS
0
1" = 40'-0"
40'-0"
20'-0"
## N
Know what's
below.
before you dig.
## Call
## R
## OWNER INFORMATION
## UNITY TEMPLE CHURCH OF GODPO BOX 29035
## BROOKLYN CENTER, MN 55429
763-537-6996
## INFO@UNITYTEMPLECOGIC.ORG
## CURB TAPER
Page 106 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
8
6
4
10
21
21
16
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
32
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## R3.0
## R3.0
## R3.0
## R8.0
## R8.0
## R3.0
## R3.0
## R3.0
## R3.0
## R3.0
## R162.0
## R39.0
## R15.0
## R39.0
## R15.0
## R8.0
## R8.0
## R3.0
## R3.0
## R10.0
5.7
18.0
24.0
18.0
30.6
5.7
18.0
24.0
18.0
12.6
11.5
60.2
121.8
5.0
24.0
9.0
9.0
## TYP.
27.1
18.0
23.1
18.0
24.2
5.0
24.0
8.6 +/-
6.3
6.0
9.4
135.4
4.2
8.0
9.0
## TYP.
9.0
## TYP.
4.0
8.0
9.0
## TYP.
4.4
5.7
9.0
9.0
9.0
9.0
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
5.0
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
18.0
24.0
9.0
## TYP.
18.0
## ACCESSIBLE
## ROUTE ARROW.DO NOT PAINT,
## FOR CODE
## REVIEW ONLY,
## TYP.
## ACCESSIBLE
## PARKING SPACE,
## INCL. SIGNAGE,
## STRIPING AND
## RAMPS
## B612 CURB &
## GUTTER, TYP.
## PVMT. STRIPING,
## TYP.
## MATCH EXISTING
## SIDEWALK, TYP.
## MATCH EXISTING
## CURB AND GUTTER,
## TYP.
## B612 CURB &
## GUTTER, TYP.
## CROSSWALK
## STRIPING,
## TYP.
## MATCH
## EXISTING
## CURB AND
## GUTTER,
## TYP.
## CONCRETE
## DRIVEWAY
## APRON
## PER CITY
## STANDARDS,
## TYP.
## BIT. PVMT., TYP, SEE
## FINAL GEOTECH FOR
## THICKNESS
## MATCHEXISTING
## MATCH EXISTING
## CURB AND GUTTER
## MATCH EXISTING
## CURB AND GUTTER
## MATCH EXISTING
## CURB AND GUTTER
## MATCH EXISTING
## CURB AND GUTTER
## MATCH
## EXISTING
## CONC. STEPS,
## INCLUDE HANDRAIL,
## SEE DETAILS, TYP
## CONC.
## WALK, TYP
## CONC. WALK, TYP
## CONC. PAVEMENT
## INSTALL SALVAGED
## SIGN
## PVMT. STRIPING,
## TYP.
## PED RAMP,
## SEE DETAILS,
## TYP.
## CONC. STOOP AND
## STAIRS WITH PIPE
## HANDRAILS.SEE
## GRADING PLAN
## FOR HEIGHT, SEE
## ARCH PLAN FOR
## DETAILS
## CONC. WALK, TYP
## CONC. CURB
## STOPS, TYP.
## R16.0
## R10.0
## R10.0
## R162.0
## 8.0, TYP.
## (8) VEHICULAR
## BOLLARD, SEE
## DETAIL
## NO PARKING, DROP OFF
## ONLY STRIPING, TYP.
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
7.5
7.0
2.5
2.5
## 2.5, TYP.
## CONC. PVMT., TYP
## G
## RELOCATE UTILITY SERVICE
## PER UTILITY CO. STANDARD,
## COORD. W/ MECHANICAL PLANS
## FENCE/GUARDRAIL
## STRUCTURE
## VEHICULAR GATE
## (2) VEHICULAR
## GATE(S)
## R8.0
12.0
## R3.0
## R20.0
## R20.0
## 6' VINYL SCREENING
## FENCE, FOR COLOR
## AND STYLE COORD.
## WITH OWNER
## TRASH ENCLOSURE,
## SEE ARCH'L PLANS
## FOR DETAILS
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SITE PLAN LEGEND:
## SIGN AND POST ASSEMBLY. SHOP DRAWINGS REQUIRED.
## HC = ACCESSIBLE SIGNNP = NO PARKING FIRE LANE
## ST = STOP
## CP = COMPACT CAR PARKING ONLY
## PROPERTY LINE
## CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE
## APPLICABLE-SEE PLAN
## LIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL
## REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL.
## CONSTRUCTION LIMITS
## TO
## ACCESSIBILITY ROUTE ARROW (IF APPLICABLE) DO NOT PAINT.
## CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE
## GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS,
## WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
## C2.1
## SITE PLAN - NORTH
## CURB TAPER
Page 107 of 169
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
21
13
13
9
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## R3.0
## R10.0
## R3.0
## R3.0
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
23.6
18.0
24.0
19.5
19.5
24.0
18.0
24.2
9.0
## TYP.
24.0
18.0
18.0
24.0
9.0
## TYP.
## B612 CURB &
## GUTTER, TYP.
## B612 CURB &
## GUTTER, TYP.
## MATCH EXISTING
## CURB AND GUTTER
## MATCH
## EXISTING
## PVMT. STRIPING,
## TYP.
## PED RAMP,
## SEE DETAILS,
## TYP.
## FILTRATION BASIN #1
## 8' WIDE OVERFLOW. INSTALL
## MNDOT CATEGORY 74 TURF
## REINFORCEMENT MAT AND
## MNDOT CATEGORY 30
## EROSION CONTROL BLANKET.
## TURF REINFORCEMENT MAT
## SHALL BE SOIL FILLED
## EXISTING
## 100-YR
## HWL=858.39
## R8.0
## R8.0
12.0
12.0
## R3.0
## R3.0
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SITE PLAN LEGEND:
## PROPERTY LINE
## CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE
## APPLICABLE-SEE PLAN
## LIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL
## REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL.
## CONSTRUCTION LIMITS
## TO
## CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE
## GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS,
## WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
## C2.2
## SITE PLAN - SOUTH
## CURB TAPER
Page 108 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## Overhang
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## PID: 3311921440010
## Address: 4801 63rd Avenue North
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## EXISTING
## 100-YR
## HWL=858.39
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C3.0
## GRADING PLAN -
## OVERALL
## GENERAL GRADING NOTES:
## 1.0' CONTOUR ELEVATION INTERVAL
## GRADING PLAN LEGEND:
SPOT GRADE ELEVATION GUTTERSPOT GRADE ELEVATION TOP OF CURBSPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS
## CITY OF
## BROOKLYN CENTER
## GRADING NOTES:
1.
## RESERVED FOR CITY SPECIFIC GRADING NOTES.
## EX. 1' CONTOUR ELEVATION INTERVAL
## SPOT GRADE ELEVATION (GUTTER/FLOW LINE UNLESS
## OTHERWISE NOTED)CURB AND GUTTER (T.O = TIP OUT)
## EMERGENCY OVERFLOW
41.26
1125
## 891.00 G
## 891.00 TC
## 891.00 BS/TS
1137
## EOF=1135.52
## TO
## SPOT GRADE ELEVATION MATCH EXISTING
## 891.00 ME
## GB
## GRADE BREAK - HIGH POINTS
1.
CONTRACTOR SHALL VERIFY ALL BUILDING ELEVATIONS, (FFE, LFE, GFE), PRIOR TO CONSTRUCTION BY CROSS CHECKING WITH ARCHITECTURAL, STRUCTURAL AND CIVIL ELEVATIONS FOR
EQUIVALENT "100" ELEVATIONS. THIS MUST BE DONE PRIOR TO EXCAVATION AND INSTALLATION OF ANY FOOTING MATERIALS. VERIFICATION OF THIS COORDINATION SHALL BE CONFIRMED IN
## WRITING BY CIVIL, SURVEYOR, ARCHITECTURAL, STRUCTURAL AND CONTRACTOR PRIOR TO CONSTRUCTION.
2.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
3.
## SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES.
4.
THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITE PREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN
ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE
## RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.
5.
ANY ELEMENTS OF AN EARTH RETENTION SYSTEM AND RELATED EXCAVATIONS THAT FALL WITHIN THE PUBLIC RIGHT OF WAY WILL REQUIRE A “RIGHT OF WAY EXCAVATION PERMIT”. CONTRACTOR
## IS RESPONSIBLE FOR AQUIRING THIS PERMIT PRIOR TO CONSTRUCTION IF APPLICABLE
6.
GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT
## REQUIREMENTS OF THE CITY.
7.
## PROPOSED SPOT GRADES ARE FLOW-LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED.
8.
GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS SLOPE, UNLESS OTHERWISE NOTED.
9.
PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES IN MAINTAINED AREAS IS 4:1.
10.
PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN HEIGHT SHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALLENGINEER. DESIGN DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.
11.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION OF CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL
ALSO BE RESPONSIBLE FOR A FINAL FIELD CHECK OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDING ACTIVITIES.
12.
IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT
## SUITABLE MATERIAL TO THE SITE.
13.
EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FORRESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL
SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES.
14.
FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTHFINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES.
AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY
TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN
## ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK.
15.
PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE
TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER.THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE SOILS ENGINEER. NO TEST ROLL SHALL OCCUR WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTION SYSTEMS.
16.
AN OSHA-APPROVED QUALIFIED PERSON SHOULD REVIEW THE SOIL CLASSIFICATION PRESENTED IN THE GEOTECHNICAL REPORT IN THE FIELD. EXCAVATIONS MUST COMPLY WITH CURRENT OSHA
REQUIREMENTS IN THE CODE OF FEDERAL REGULATIONS PERTAINING TO EXCAVATIONS AND TRENCHES. EXCAVATION SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.
17.
## TOLERANCES
17.1.
THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE
## MEASUREMENT IS MADE.
17.2.
THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY
## POINT WHERE MEASUREMENT IS MADE.
17.3.
AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
17.4.
## TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
17.5.
FINISH GRADING FOR HARDSCAPE AREAS IE. PARKING LOTS, CURBS, SIDEWALKS SHALL BE WITHIN 0.05 FEET. ADA AREAS MUST COMPLY WITH REQUIREMENTS ON PLANS AND ADAREGULATIONS. TOLERANCE WITHIN ADA AREAS IS 0.00 FEET DISCUSS ANY DEVIATIONS WITH ENGINEER PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY CURB, SIDEWALK
## AND/OR PAVEMENT REPLACEMENT THAT DOES NOT MEET TOLERANCE/ADA REQUIREMENTS.
18.
## MAINTENANCE
18.1.
THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA FREE OF TRASH AND DEBRIS.
18.2.
CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO SPECIFIED TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE
## WARRANTY PERIOD, ERODED AREAS WHERE TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED.
18.3.
WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND
## COMPACT TO REQUIRED DENSITY PRIOR TO FURTHER CONSTRUCTION.
## SEE SWPPP ON SHEETS SW1.0 -
## SW1.5
## EROSION CONTROL NOTES:
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 40'-0"
40'-0"
20'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 109 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## Bituminous
## Parking Lot
## Access
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
88.9
49.0
40.7
16.0
48.0
9.9
2.4
13.2
2.4
10.0
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C3.1
## GRADING PLAN - NORTH
## 1.0' CONTOUR ELEVATION INTERVAL
## GRADING PLAN LEGEND:
SPOT GRADE ELEVATION GUTTERSPOT GRADE ELEVATION TOP OF CURBSPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS
## EX. 1' CONTOUR ELEVATION INTERVAL
## SPOT GRADE ELEVATION (GUTTER/FLOW LINE UNLESS
## OTHERWISE NOTED)CURB AND GUTTER (T.O = TIP OUT)
## EMERGENCY OVERFLOW
41.26
1125
## 891.00 G
## 891.00 TC
## 891.00 BS/TS
1137
## EOF=1135.52
## TO
## SPOT GRADE ELEVATION MATCH EXISTING
## 891.00 ME
## GB
## GRADE BREAK - HIGH POINTS
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 110 of 169
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## 8' WIDE OVERFLOW. INSTALL
## MNDOT CATEGORY 74 TURF
## REINFORCEMENT MAT AND
## MNDOT CATEGORY 30
## EROSION CONTROL BLANKET.
## TURF REINFORCEMENT MAT
## SHALL BE SOIL FILLED
## EOF=858.50
## EXISTING
## 100-YR
## HWL=858.39
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C3.2
## GRADING PLAN - SOUTH
## 1.0' CONTOUR ELEVATION INTERVAL
## GRADING PLAN LEGEND:
SPOT GRADE ELEVATION GUTTERSPOT GRADE ELEVATION TOP OF CURBSPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS
## EX. 1' CONTOUR ELEVATION INTERVAL
## SPOT GRADE ELEVATION (GUTTER/FLOW LINE UNLESS
## OTHERWISE NOTED)CURB AND GUTTER (T.O = TIP OUT)
## EMERGENCY OVERFLOW
41.26
1125
## 891.00 G
## 891.00 TC
## 891.00 BS/TS
1137
## EOF=1135.52
## TO
## SPOT GRADE ELEVATION MATCH EXISTING
## 891.00 ME
## GB
## GRADE BREAK - HIGH POINTS
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 111 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## EXISTING
## 100-YR
## HWL=858.39
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## GENERAL UTILITY NOTES:
## UTILITY PLAN LEGEND:
## CITY OF
## BROOKLYN CENTER
## UTILITY NOTES:
1.
## RESERVED FOR CITY SPECIFIC UTILITY NOTES.
## CATCH BASIN
## GATE VALVE AND VALVE BOX
## SANITARY SEWERSTORM SEWER
## WATER MAIN
## PROPOSED FIRE HYDRANTMANHOLE
## FES AND RIP RAP
## CONSTRUCTION LIMITS
## DRAINTILE
## REVISION SUMMARY
## DATE
## DESCRIPTION
## C4.0
## UTILITY PLAN -
## OVERALL
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
1.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY
LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING
## CONSTRUCTION AT NO COST TO THE OWNER.
2.
## SEE SITE PLAN FOR HORIZONTAL DIMENSIONS AND LAYOUT.
3.
CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF DISCREPANCIES OR VARIATIONS FROM THE PLANS.
4.
CASTINGS SHALL BE SALVAGED FROM STRUCTURE REMOVALS AND RE-USED OR PLACED AT THE DIRECTION OF THE OWNER.
5.
## PIPE LENGTHS SHOWN ARE FROM CENTER TO CENTER OF STRUCTURE OR TO END OF FLARED END SECTION.
6.
UTILITIES CONNECTIONS ON THE PLAN ARE SHOWN TO WITHIN 5' OF THE BUILDING FOOTPRINT. THE CONTRACTOR IS ULTIMATELYRESPONSIBLE FOR THE FINAL CONNECTION TO BUILDING LINES. COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS.
7.
CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE SUMPED 0.15 FEET
## PER DETAILS. RIM ELEVATIONS SHOWN ON THIS PLAN DO NOT REFLECT SUMPED ELEVATIONS.
8.
## ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB UNLESS OTHERWISE NOTED.
9.
HYDRANT TYPE, VALVE, AND CONNECTION SHALL BE IN ACCORDANCE WITH CITY REQUIREMENTS. HYDRANT EXTENSIONS ARE INCIDENTAL.
10.
A MINIMUM OF 8 FEET OF COVER IS REQUIRED OVER ALL WATERMAIN, UNLESS OTHERWISE NOTED. EXTRA DEPTH MAY BE REQUIRED TO
MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION TO SANITARY OR STORM SEWER LINES. EXTRA DEPTH WATERMAIN IS INCIDENTAL.
11.
A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FOR ALL UTILITIES, UNLESS
## OTHERWISE NOTED.
12.
ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND COORDINATED WITH THE CITY PRIOR TO
## CONSTRUCTION.
13.
## CONNECTIONS TO EXISTING STRUCTURES SHALL BE CORE-DRILLED.
14.
## COORDINATE LOCATIONS AND SIZES OF SERVICE CONNECTIONS WITH THE MECHANICAL DRAWINGS.
15.
COORDINATE INSTALLATION AND SCHEDULING OF THE INSTALLATION OF UTILITIES WITH ADJACENT CONTRACTORS AND CITY STAFF.
16.
ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL PAVEMENT CONNECTIONS SHALL BE
SAWCUT. ALL TRAFFIC CONTROLS SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE
MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE BUT NOT BE LIMITED TO
SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD
## CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY.
17.
ALL STRUCTURES, PUBLIC AND PRIVATE, SHALL BE ADJUSTED TO PROPOSED GRADES WHERE REQUIRED. THE REQUIREMENTS OF ALL OWNERS
MUST BE COMPLIED WITH. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING.
18.
## CONTRACTOR SHALL COORDINATE ALL WORK WITH PRIVATE UTILITY COMPANIES.
19.
CONTRACTOR SHALL COORDINATE CONNECTION OF IRRIGATION SERVICE TO UTILITIES. COORDINATE THE INSTALLATION OF IRRIGATION
## SLEEVES NECESSARY AS TO NOT IMPACT INSTALLATION OF UTILITIES.
20.
CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT THESE PLANS TO ENGINEER UPON COMPLETIONOF WORK.
21.
FOR ALL SITES LOCATED IN CLAY SOIL AREAS, DRAIN TILE MUST BE INSTALLED AT ALL LOW POINT CATCH BASINS 25' IN EACH DIRECTION. SEE
PLAN AND DETAIL. INSTALL LOW POINT DRAIN TILE PER PLANS AND GEOTECHNICAL REPORT RECOMMENDATIONS AND REQUIREMENTS.
22.
AN OSHA-APPROVED QUALIFIED PERSON SHOULD REVIEW THE SOIL CLASSIFICATION PRESENTED IN THE GEOTECHNICAL REPORT IN THE FIELD.
EXCAVATIONS MUST COMPLY WITH CURRENT OSHA REQUIREMENTS IN THE CODE OF FEDERAL REGULATIONS PERTAINING TO EXCAVATIONS
## AND TRENCHES. EXCAVATION SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.
Page 112 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## MH
13
## RIM=
861.58
## IE=
858.26
## MH
14
## RIM=
865.79
## IE=
859.09
165
## LF
12
"
## HDPE
## STORM @
0.50
%
56
## LF
12
"
## HDPE
## STORM @
0.50
%
30
## LF
12
"
## HDPE
## STORM @
0.50
%
## CBMH
## 14A
## RIM=
865.55
## IE=
859.37
## CB
## 14B
## RIM=
864.29
## IE=
859.52
210
## LF
12
"
## HDPE
## STORM @
0.50
%
24
## LF
12
"
## HDPE
## STORM @
0.50
%
43
## LF
12
"
## HDPE
## STORM @
0.50
%
## CB
## 15A
## RIM=
864.92
## IE=
860.026
## CBMH
15
## RIM=
865.18
## IE=
860.14
## CB
## 15B
## RIM=
864.77
## IE=
860.36
## CONTRACTOR SHALL SAWCUT &
## REMOVE PUBLIC PVMTS., CURBS,
## AND WALKS FOR INSTALLATION OF
## UTILITIES. UPON COMPLETION OF
## UTILITY WORK, REPLACE ALL
## MATERIAL, IN KIND, AND TO CITY
## STANDARD AND APPROVAL
## CONTRACTOR SHALL COORDINATE
## ALL THE UTILITY SERVICES WITH
## BOTH THE CIVIL AND MECHANICAL
## PLANS PRIOR TO CONSTRUCTION.
## SEE DEMO PLAN FOR
## ALL EXISTING UTILITY
## REMOVAL INFORMATION
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## UTILITY PLAN LEGEND:
## CATCH BASIN
## GATE VALVE AND VALVE BOX
## SANITARY SEWERSTORM SEWER
## WATER MAIN
## PROPOSED FIRE HYDRANTMANHOLE
## FES AND RIP RAP
## CONSTRUCTION LIMITS
## DRAINTILE
## REVISION SUMMARY
## DATE
## DESCRIPTION
## C4.1
## UTILITY PLAN - NORTH
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 113 of 169
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## EXISTING
## 100-YR
## HWL=858.39
## FES
11
## IE=
857.00
## W/ RIP RAP
14
## LF
12
"
## HDPE
## STORM @
0.93
%
## MH
12
## RIM=
860.00
## IE=
857.13
225
## LF
12
"
## HDPE
## STORM @
0.50
%
## MH
13
## RIM=
861.58
## IE=
858.26
20
## LF
12
"
## HDPE
## STORM @
0.50
%
## MH
2-48Ø
## RIM=
859.00
## IE(N)=
856.90
## IE(S)=
854.71
## IE(N-DT)=854.90
6
## LF
12
"
## HDPE
## STORM @
10.00
%
## FES
1
## IE=
854.61
## W/ TRASH GUARD
## AND CLASS III RIP RAP
## FES
3
## IE=
857.50
## 6" SCH40 PVC
## DRAINTILE
## IE=854.90
## CLEANOUT, TYP.
## DT IE=854.90
## CONTRACTOR SHALL SAWCUT &
## REMOVE PUBLIC PVMTS., CURBS,
## AND WALKS FOR INSTALLATION OF
## UTILITIES. UPON COMPLETION OF
## UTILITY WORK, REPLACE ALL
## MATERIAL, IN KIND, AND TO CITY
## STANDARD AND APPROVAL
## CONTRACTOR SHALL COORDINATE
## ALL THE UTILITY SERVICES WITH
## BOTH THE CIVIL AND MECHANICAL
## PLANS PRIOR TO CONSTRUCTION.
## SEE DEMO PLAN FOR
## ALL EXISTING UTILITY
## REMOVAL INFORMATION
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## UTILITY PLAN LEGEND:
## CATCH BASIN
## GATE VALVE AND VALVE BOX
## SANITARY SEWERSTORM SEWER
## WATER MAIN
## PROPOSED FIRE HYDRANTMANHOLE
## FES AND RIP RAP
## CONSTRUCTION LIMITS
## DRAINTILE
## REVISION SUMMARY
## DATE
## DESCRIPTION
## C4.2
## UTILITY PLAN - SOUTH
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 114 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C5.0
## CIVIL DETAILS
## REVISION SUMMARY
## DATE
## DESCRIPTION
6"
3'-6"
3'-6"
60"-66"
## FROM PAVEMENT TO
## BOTTOM OF SIGN
## ACCESSIBLE SIGN & CHANNEL POST - LOT LOCATION
## N T S
1'-6"
## NOTE:
## 1. SIGN SHALL BE AS SPECIFIED.
## 2. BOTTOM OF SIGNS TO BE MOUNTED 60"-66" FROM PARKING GRADE, SEE SIGN POST
## INSTALLATION DETAIL
## 3. VERIFY POST PAINT C0LOR WITH LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
1
4
## " METAL PLATE WELDED TO BOTTOM OF 6” PIPE
## GROUT INSIDE OF INNER PIPE ANNULAR SPACE TO 1"
## FROM TOP
## ADJACENT PVMT. - MATERIALVARIES, SEE PLAN & DETAILS
## SLOPE TOP
## OF FOOTING
## AWAY FROM
## BASE, TYP.
## 1" SILICONE RUBBER OR
## ASPHALTIC CAULKING
## COMPOUND
6"
## OUTSIDE DIA.
## GALVANIZED STEEL PIPE PAINT 1
## COAT ANTI-RUST PRIMER PRIMER
## 3-3/16", 2 LBS./FT., COMMERCIAL GRADE,
## GALVANIZED STEEL "CHANNEL" STYLE SIGN POST
## METAL SIGN(S) ACCORDING TO MN STATE
## CODE, PROVIDE SHOP DRAWING OF SIGN
## MODEL
## GALVANIZED STEEL FASTENER (TYP. OF 2), INCLUDE
## REINFORCING PLATE AT EACH BOLT LOCATION (3"X3")
## TRIM POST TO
## BELOW TOP OF
## SIGN
6"
1
4
## " THICK, COMMERCIAL GRADE THERMOPLASTIC
## POLYETHYLENE PROTECTIVE SLEEVE, PER IDEAL
## SHIELD OR SIMILAR. SHOP DRAWINGS REQUIRED.
## PROVIDE COLOR SELECTION OPTIONS
## CUT TOP OF POLYETHYLENE SLEEVE TO
## ACCOMMODATE CHANNEL POST (ON-SITE)
## COMMERCIAL GRADE CONSPICUITY MARKINGS
## (TAPE), 3M DIAMOND GRADE SERIES 973, OR
## SIMILAR
## COMPACTED AGG., TYP.
6"
## INSIDE DIA.
## GALVANIZED STEEL PIPE PAINT WITH
## ANTI-RUST PRIMER
## CONC. FOOTING, SONOTUBE
®
## FORM RECOMMENDED
## NO PARKING TO BE
## USED IN FRONT OF
## STRIPED ACCESS
## AISLE
3
## BITUMINOUS PAVEMENT - ALL TYPES
## N T S
## "A" WEAR COURSE (MNDOT
## 2360 - SPWEA340B)
## TACK COAT (MNDOT 2357)
## "B" BASE COURSE (MNDOT
## 2360 - SPNWB330B)
## "C" CLASS 5 AGGREGATESUBBASE (MNDOT 3138)
## COMPACTED SUBGRADE
## (100% OF STANDARD
## PROCTOR MAX. DRYDENSITY)
## PAVEMENT DESIGN
## TYPE
## WEAR (A)
## BASE (B)
## AGG.(C)
## NOTE:
## IF NO DESIGN IS DEFINED IN ABOVE CHART, SEE
## GEOTECH REPORT FOR FINAL PAVEMENT SECTION.
## IF DESIGN IS DEFINED IN ABOVE CHART, IT SHOULD BE
## CONSIDERED FOR BIDDING PURPOSES ONLY. REFER TOGEOTECH FOR FINAL PAVEMENT SECTION.
1
## LIGHT DUTY
## X"
## X"
## X"
## HEAVY DUTY
## X"
## X"
## X"
## FINISHED GRADE
## NOTES:
1.
## INSTALLATION SHALL BE CERTIFIED AND IN ACCORDANCE TO AN ON-SITE A.C.I. TECHNICIAN AS SPECIFIED.
2.
## SEE GEO-TECHNICAL RECOMMENDATIONS FOR GROSS WEIGHT REQUIREMENTS.
3.
## IF NO DESIGN IS DEFINED IN CHART, SEE GEOTECH REPORT FOR FINAL PAVEMENT SECTION.
4.
IF DESIGN IS DEFINED IN CHART, IT SHOULD BE CONSIDERED FOR BIDDING PURPOSES ONLY. REFER TO GEOTECH FOR
## FINAL PAVEMENT SECTION.
## CONCRETE PVMT./WALK/PAD- NO FIBER
## N T S (PRIVATE PROPERTY)
## SAW CUT JOINT,SEE DETAIL (TYP.)
## LIGHT BROOM FINISHPERPENDICULAR TO
## TRAFFIC
## "A" CONCRETE ASSPECIFIED
## "B" CLASS 5 AGGREGATE
## BASE
## COMPACTED SUBGRADE
## THIS OCCURS ONLY WHERE
## MULCH MEETS EDGE OF WALK
## LEAVE TOP OF MULCH DOWN
## 1" FROM TOP OF WALK
## PAVEMENT DESIGN
## TYPE
## CONC. (A)
## AGG.(B)
## CURING:
## 1. APPLY CURING COMPOUNDS IMMEDIATELY UPON FINAL FINISHING OF CONC. SURFACE IN ACCORDANCE WITH
## MANUFACTURER'S INSTRUCTION AND THE SPECIFICATIONS BELOW.
## 2. ALL CONC. SURFACES SHALL HAVE CURING COMPOUNDS ALLIED PER ASTM C-1315. AT 200 S.F. PER GAL.
3. ALL CURING COMPOUNDS SHALL BE TYPE 1 (CLEAR) AND CONTAIN ACRYLIC BASED CLASS B RESTRICTED RESIN SOLIDS.
## JOINT DEPTH T/4
2
## WALKS
5"
6"
## CONC. PVMT.
## X"
## X"
## ACCESSIBLE PARKING PAVEMENT MARKING
## N T S
## NO
## PARKING
## NOTE:
1.
## ADHERE TO ALL STATE & FEDERAL ADA
## STANDARDS FOR PARKING, PAINT & SIGNAGE.
2.
## VERIFY AND LAYOUT ALL PAINTED FORMS &
## STRIPING PRIOR TO INSTALLATION
3.
## SEE PLAN FOR ACTUAL PARKING SPACES LAYOUT
4.
## ALL PAINT COLORS MUST CONFORM TO STATEAND FEDERAL ADA STANDARDS
## NO
## PARKING
## NO
## PARKING
## 4" WIDE PAINTED STRIPING, 45°
## CROSS STRIPE PATTERN AT 2'O.C. AT ACCESS AISLE
## CURB TAPER (VARYING
## LENGTH), SEE SITE AND
## GRADING PLAN
## ADJ. SIDEWALK
## HANDICAP PARKING ACCESS
## AISLE WITH PAINTED 12" HIGH
## LETTERING OF "NO PARKING"
## CENTERED TOWARD DRIVE
## AISLE
## NO PARKING
## SIGN CENTERED
## AT HEAD OF
## SPACE ONCENTER STRIPE
## HANDICAP PARKING SPACE
## WITH PAINTED
## INTERNATIONAL SYMBOL OF
## ACCESSIBILITY WITH
## CONTRASTING SQUARE
## BACKGROUND, CENTERED
## TOWARD DRIVE AISLE
## NOTE: FOR REFERENCE ONLY, USE
## STANDARD ADA PVMT. PAINT
## TEMPLATE
## 6" RADIUS
## 12" DIAMETER
## 6" LINE WIDTH FOR FIGURE
## 6" LINE WIDTH OUTSIDE BORDER
## 5'-6" SQUARE OVERALL
## 18" RADIUS "WHEEL" SHAPE
## PAINTED SYMBOL DIAGRAM
8'
## MIN.
8'
## MIN.
8'
## MIN.
## PER CITY CODE
## TRUNCATED
## DOMES
## SEE SITE PLAN
## FOR REQUIRED
## DIMENSIONS
## DIRECTIONAL SLOPE
## ARROW, SEE
## GRADING PLAN
## SLOPED
## WALK/RAMP,
## SEE SITE AND
## GRADING PLAN
## HANDICAP SIGN, CENTERED AT HEAD
## OF PARKING SPACE AND ACCESS
## AISLE 6" MIN. AND 8' MAX. FROM FACE
## OF CURB, TYP. ENSURE MIN. 36" WALK
## AREA BEHIND AND AROUND SIGN
## LOCATION
## ACCESSIBLE CURB RAMP-
## SEE SITE, GRADING &
## DETAILS
4
## MAINTENANCE FREE VINYL FENCE - 6' HT.
## NTS
## STD. 8'-0" (NOM.) SECTION
10"
## 3-3/4" SPACE TYP
14"
5'
4'-6"
## FENCE SECTION ELEVATION
## 6" FENCE BOARD
## (1" (NOM.) VINYL)
2'-3"10"2'-3"
## PLAN
6'
## NOTES:
1.
## INSTALL FENCE POSTS & FOOTINGS BASED ON STANDARD 8' (NOM.) PRE-MADE FENCE PANELS.
2.
## PROVIDE SAMPLES AND ILLUSTRATIONS OF AVAILABLE FENCE STYLES FOR OWNER APPROVAL
3.
## ENSURE ALL STYLES PROVIDE MIN. 90% OPACITY
4.
## CONTRACTOR SHALL PROVIDE COLOR SAMPLES FOR APPROVAL PRIOR TO INSTALLATION
5.
## GATES, AS SHOWN ON PLAN, SHALL INCLUDE REINFORCED GATE PANELS, GATE HARDWARE,
## LATCHES AND ALL APPURTENANCES SHALL BE PROVIDED AND BE WITHIN SAMEMANUFACTURED SYSTEM OF FENCING.
6.
## GATES TO BE LOCATED PER PLAN - MIN. 3'-6" WIDE, OPENING MIN. 150°
7.
## FOOTING DIAMETER TO BE 14". MINIMUM DEPTH 60".
8.
## DIMENSIONS SHOWN ARE NOMINAL FOR FENCING COMPONENTS
## 1-1/2" CHAMFER
## 6X6 TREATED LUMBER POST W/ VINYL SLEEVE,
## PER MANUF. SPEC., TYP
## 2X4 FENCE RAIL
## INSTALL PER MANUF. RECOMMENDATIONS
## CAP, TYP.
5
Page 115 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C5.1
## CIVIL DETAILS
## REVISION SUMMARY
## DATE
## DESCRIPTION
Page 116 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## C5.2
## CIVIL DETAILS
## REVISION SUMMARY
## DATE
## DESCRIPTION
## D
18"
## 3H:1V MAX.
1.
## INSTALL SILT FENCE AND/OR OTHER APPROPRIATE TEMPORARY EROSION CONTROL
## DEVICES TO PREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DURING
## CONSTRUCTION.
2.
ALL DOWN-GRADIENT PERIMETER SEDIMENT CONTROL BMP'S MUST BE IN PLACE BEFOREANY UP-GRADIENT LAND DISTURBING ACTIVITY BEGINS.
3.
## PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL PRACTICES.
4.
## INSTALL UTILITIES (WATER, SANITARY SEWER, ELECTRIC, PHONE, FIBER OPTIC, ETC) PRIOR
## TO THE STORMWATER SYSTEM.
5.
## ROUGH GRADE THE SITE. IF BIORETENTION AREAS ARE BEING USED AS TEMPORARY
## SEDIMENT BASINS, LEAVE A MINIMUM OF 3 FEET OF COVER OVER THE PRACTICE TO
## PROTECT THE UNDERLYING SOILS FROM CLOGGING.
6.
## PERFORM ALL OTHER SITE IMPROVEMENTS.
7.
## PLANT ALL AREAS AFTER DISTURBANCE.
8.
## CONSTRUCT BIORETENTION DEVICE UPON STABILIZATION OF CONTRIBUTING DRAINAGE
## AREA.
9.
## IMPLEMENT TEMPORARY AND PERMANENT EROSION CONTROL PRACTICES.
10.
## PLANT AND/OR ROCK MULCH BIORETENTION DEVICE.
11.
## REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE
## AREA IS ADEQUATELY VEGETATED.
## GENERAL NOTES
1.
## IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY
## FOLLOWING EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR
## TO CONTINUING CONSTRUCTION.
2.
## GRADING OF BIORETENTION DEVICES SHALL BE ACCOMPLISHED USING LOW-COMPACTION
## EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS.
3.
## ALL SUB MATERIALS BELOW THE SPECIFIED BIORETENTION DEPTH (ELEVATION) SHALL BE
## UNDISTURBED, UNLESS OTHERWISE NOTED.
4.
## SEE UTILITY PLAN / SHOP DRAWINGS FOR SYSTEM LAYOUT.
## ADJACENT PVMT.
## RIBBON CURB OR CURB CUT,
## SEE SITE AND GRADING PLANS
## GRASS PRETREATMENT STRIP OR
## PRETREATMENT STRUCTURE, SEEUTILITY AND LANDSCAPE PLANS
## UNDISTURBED,
## UNCOMPACTED IN-SITU SOIL
## NETLESS EROSION BLANKET IN BOTTOM OF BASIN.
## SLIT BLANKET TO ALLOW PLANT MATERIAL SURFACE
## IF PLUG PLANTING IS TO BE USED,
## SEE GRADING AND LANDSCAPE PLANS
## MIN. PLANTING MEDIUM DEPTH 18"
## WITH A WELL BLENDED MIXTURE (BY VOLUME):
## 65% SAND, 25% TOPSOIL, AND 10% COMPOST
## PER MN STORMWATER MANUAL SOIL MIX D.
4"
1.5'
## UNDERDRAIN GRAVEL BLANKET
## 1-1.5" DOUBLE WASHED STONE
## (NON LIMESTONE OR CONCRETE MATERIAL)
## NON-WOVEN GEOTEXTILE
(MnDOT 3733, TYPE 1 - HIGH FLOW RATE)
## AROUND GRAVEL BLANKET - EXTENDING 1.5'
## FROM SIDES OF UNDERDRAIN PIPE
## 6" PVC PERF. DRAIN TILE PIPE WITH 4
## ROWS OF PERFORATIONS ON
## BOTTOM PER MNDOT 3245.
## LOCATION AS SHOWN ON THE PLANS
## SEE GRADING PLAN FOR DEPTH
## PLANT MATERIAL, SEE LANDSCAPE PLAN
## SIDE SLOPE TREATMENTS, SEE GRADING OR LANDSCAPE PLANS
## BIO-FILTRATION BASIN
## N T S
## CONSTRUCTION SEQUENCING
## INSTALL 30-MIL IMPERMEABLE PVC LINER OR CLAY LINER
## PER RECOMMENDATIONS FROM GEOTECH ENGNIEER*
## BELOW BASIN DUE TO NOT HAVING 3' SEPARATION FROM
## GROUNDWATER
Page 117 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## EXISTING
## 100-YR
## HWL=858.39
## CODE
## QTY
## COMMON / BOTANICAL NAME
## CONT
## NATIVE PLANTS
## POLLINATOR FRIENDLY
## TREES
## AN
2
## Northwood Red Maple / Acer rubrum `Northwood`
## 2.5" Cal. B&B
## NATIVE CULTIVAR
## Y
## SH
2
## Skyline Thornless Honey Locust / Gleditsia triacanthos inermis `Skycole` TM
## 2.5" Cal. B&B
## NATIVE CULTIVAR
## N
## EK
2
## Espresso Kentucky Coffeetree / Gymnocladus dioica `Espresso`
## 2.5" Cal. B&B
## NATIVE CULTIVAR
## N
6
## SUBTOTAL:
## DECIDUOUS TREES
## AJ2
6
## Autumn Fest® Sugar Maple / Acer saccharum 'JFS-KW8'
## 2.5" CAL. B&B
## NATIVE CULTIVAR
## Y
6
## SUBTOTAL:
## EVERGREEN TREES
## AC
2
## Candicans White Fir / Abies concolor `Candicans`
## #15 CONT
## NOT NATIVE
## PD
9
## Whiskey Blue Hills Spruce / Picea glauca `Whiskey Blue Hills`
## 6` HT. B&B
## NATIVE CULTIVAR
11
## SUBTOTAL:
## CODE
## QTY
## COMMON / BOTANICAL NAME
## SIZE
## NATIVE PLANTS
## POLLINATOR FRIENDLY
## SHRUBS
## Ab3
25
Low Scape Hedger Black Chokeberry / Aronia melanocarpa 'UCONNAM166' TM
## #5 CONT
## NATIVE CULTIVAR
## Y
## Cm
25
## Muskingham Gray Dogwood / Cornus racemosa `Muskingham`
## #2 CONT
## NATIVE CULTIVAR
## Y
## Dl
21
## Dwarf Bush Honeysuckle / Diervilla lonicera
## #5 CONT
## NATIVE
## Y
## Sgj
24
## Sea Green Juniper / Juniperus chinensis `Sea Green`
## #5 CONT
## NOT NATIVE
## N
95
## SUBTOTAL:
## PLANT SCHEDULE
## SYMBOL
## CODE
## QTY
## COMMON / BOTANICAL NAME
## SIZE
## MAINTENANCE STRIP
## Rms
225 sf
## ROCK MAINTENANCE STRIP / ROCK MAINTENANCE STRIP
## 1.5" DECORATIVE SCREENED ROCK/STONE INSTALLED 3" DEEP OVER GEOTEXTILE FABRIC.
## PROVIDE EDGING AS SHOWN ON LANDSCAPE PLAN.
## Mulch
## MNDOT - SEED MIXES
## Dpg
25,394 sf
## MN SEED MIX #35-221 DRY PRAIRIE GENERAL, / MNDOT - GENERAL RESTORATION SEED MIX
## SEEDING RATE: 36.5 LB/ACRE (98.7 SEEDS/SF). MNDOT TYPE1 MULCH W/STRAW, EROSION
## CONTROL BLANKET, OR HYDROMULCH. REFERENCE MNDOT SEEDING MANUAL
## SPECIFICATIONS (2023).
## Seed Mix
## MULCH - ROCK
## Rm
1,042 sf
4-6" SCREENED ROCK/STONE, 3" DEEP / ROCK MULCH4-6" SCREENED DECORATIVE ROCK/STONE MULCH 3" DEEP OVER GEOTEXTILE FABRIC,
## PROVIDE SAMPLES. INSTALL W/EDGING AS SHOWN ON LANDSCAPE PLAN.
## Mulch
## MULCH - WOOD
## Sm
2,368 sf
## SHREDDED HARDWOOD MULCH 4" DEEP / SHREDDED HARDWOOD MULCH
DOUBLE SHREDDED HARDWOOD MULCH INSTALLED 4" DEEP ON GRADED, WEED FREE, &PREPARED SOIL. PROVIDE EDGING AS REQ. ON LANDSCAPE PLAN.
## Mulch
## SOD
## Bg
25,510 sf
## BLUE GRASS SOD / SODBLUE GRASS SOD W/IMPROVED VARIATIES, INSTALLED ON PREPARED SOIL, CONTAINING 6"
## OF TOPSOIL W/MINIMUM 4% ORGANICS BY WEIGHT. SCARIFIED AND EVENLY GRADED. BIG
## ROLL PREFERRED FOR LARGER AREAS.
## Sod
## PLANT SCHEDULE
## L1.0
## LANDSCAPE PLAN -
## OVERALL
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED LANDSCAPE ARCHITECT UNDER
## THE LAWS OF THE STATE OF MINNESOTA.
25821
## Robert L. Binder
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
1.
## THE CONTRACTOR SHALL PROVIDE ONLY PLANT MATERIAL FREE OF
## NEONICOTINOID BASED INSECTICIDES AND/OR TREATMENTS OF ANY KIND,
## INCLUDING BY NOT LIMITED TO IMIDACLOPRID (CONFIDOR, ADMIRE, GAUCHO,
## ADVOCATE), THIAMETHOXAM (ACTARA, PLATINUM, CRUISER), CLOTHIANIDIN
## (PONCHO, DANTOSU, DANTOP), ACETAMIPRID (MOSPILAN, ASSAIL, CHIPCOTRISTAR),
## THIACLOPRID (CALYPSO), DINOTEFURAN (STARKLE, SAFARI, VENOM), AND
## NITENPYRAM (CAPSTAR, GUARDIAN).
2.
## CONTRACTOR SHALL CERTIFY, THROUGH SUPPLIERS POLICY STATEMENT OR
## AFFIDAVIT, THAT NO NEONICOTINOID BASED INSECTICIDES HAVE BEEN USED ON
SITE OR DIRECTLY ADJACENT TO THE GROWING OR STORAGE PLOTS OF THESUPPLIED PLANT MATERIAL, INCLUDING THE PLANTING OF AGRICULTURAL (OROTHER) SEED TREATED WITH NEONICS
..
## POLLINATOR SAFE PLANT MATERIAL:
## LANDSCAPE NOTES:
## PROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANT
## SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZESPROPOSED EVERGREEN TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZES
## PROPOSED CANOPY TREE SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES
## AND PLANTING SIZES
## LANDSCAPE PLAN LEGEND:
EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM, BLACK ORDARK GREEN IN COLOR, INCLUDE ALL CONNECTORS, STAKES, & ALL
## APPURTENANCES PER MANUF. INSTALL PER MANUF. INSTRUC./SPECS.
## PLANTING SEASON SCHEDULE
## SEASON
## CONIFEROUS
## DECIDUOUS
## REMARKS
## SPRING PLANTING
## APRIL 15 - JUNE 15
## APRIL 15 - JUNE 15
## FALL PLANTING
## AUGUST 21 - SEPTEMBER 30
## AUGUST 15 - NOVEMBER 15
## NOTE: ADJUSTMENTS TO PLANTING DATES MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 40'-0"
40'-0"
20'-0"
## N
Know what's
below.
before you dig.
## Call
## R
## MULCH SCHEDULE
## AREA
## MULCH TYPE
## EDGING
## FABRIC
## REMARKS
## TREE RINGS
## 4" DEPTH, SHREDDED HARDWOOD
## YES
## NO
## SEE DETAIL SHT. L1.1
## PLANTING BEDS
## 4" DEPTH, SHREDDED HARDWOOD
## YES
## NO
## MAINT. STRIP AT BUILDING FOUNDATION
## YES
## NO
## NATIVE SEED AREAS
## YES
## NO
## NO
## INSTALL PER BWSR RECOMMENDATIONS
NOTE: COORDINATE ALL MULCH AND PLANTING BED MATERIAL PRIOR TO INSTALLATION, PROVIDE SAMPLES AND SHOP DRAWINGS/PHOTOS/DATA SHEETS OF ALL
## MATERIALS
1.
ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS,
48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST
## TO THE OWNER.
2.
## REFERENCE MULCH SCHEDULE FOR MULCH MATERIALS AND LOCATIONS.
3.
## ALL TREES SHALL BE MULCHED WITH
## SHREDDED HARDWOOD MULCH
## TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ALL MULCH
## SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK.
4.
IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE BOULDER SAMPLES
## PRIOR TO INSTALLATION.
5.
PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE FROM DISEASE,DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE PERIOD.
6.
UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE PLAN, THE PLAN
## SHALL GOVERN.
7.
CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. LANDSCAPE MATERIALS
PART OF THE CONTRACT SHALL BE WARRANTED FOR TWO (2) FULL GROWING SEASONS FROM SUBSTANTIAL COMPLETION DATE.
8.
## ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 6" LAYER
## TOPSOIL
## AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED ON THE
## DRAWINGS.
9.
COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. CONTRACTOR SHALL
STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
10.
## ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE.
11.
## REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES.
12.
SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'S ACTIVITIES.
13.
PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE DATE
WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK.
## SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB.
14.
CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INCLUDING PRICING FROM OWNER, PRIOR TO INSTALLATION.
Page 118 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## LANDSCAPE
## EDGING, TYP.
## LANDSCAPE
## EDGING, TYP.
## ROCKMULCH, TYP.
## 18" MAINTENANCE
## STRIP, MATCH EXIST.
## MATERIAL
## SOD, TYP.
## SOD, TYP.
## 6 - AJ2
## 3 - PD
## 2 - SH
7 - Ab3
5 - Cm
5 - Dl
5 - Cm
5 - Cm
5 - Dl
5 - Sgj
5 - Sgj
5 - Sgj
3 - Sgj
6 - Ab3
6 - Ab3
6 - Ab3
## 2 - EK
6 - Sgj
## L1.1
## LANDSCAPE PLAN -
## NORTH
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED LANDSCAPE ARCHITECT UNDER
## THE LAWS OF THE STATE OF MINNESOTA.
25821
## Robert L. Binder
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## PROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANT
## SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZESPROPOSED EVERGREEN TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZES
## PROPOSED CANOPY TREE SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES
## AND PLANTING SIZES
## LANDSCAPE PLAN LEGEND:
EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM, BLACK ORDARK GREEN IN COLOR, INCLUDE ALL CONNECTORS, STAKES, & ALL
## APPURTENANCES PER MANUF. INSTALL PER MANUF. INSTRUC./SPECS.
## SEE SHEET L1.0 FOR PLANTING SCHEDULE
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 119 of 169
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## EXISTING
## 100-YR
## HWL=858.39
## SOD, TYP.
## ROCK
## MULCH, TYP.
## LANDSCAPE
## EDGING, TYP.
## 6 - AJ2
## 2 - AC
## 3 - PD
## 3 - PD
## 3 - PD
## 2 - EK
## 2 - AN
5 - Cm
7 - Dl
5 - Cm
4 - Dl
## PROTECT EXIST. TURF
## AREAS, TYP.
## L1.2
## LANDSCAPE PLAN -
## SOUTH
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED LANDSCAPE ARCHITECT UNDER
## THE LAWS OF THE STATE OF MINNESOTA.
25821
## Robert L. Binder
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## PROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANT
## SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZESPROPOSED EVERGREEN TREE SYMBOLS - SEE PLANT SCHEDULE ANDPLAN FOR SPECIES AND PLANTING SIZES
## PROPOSED CANOPY TREE SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES
## AND PLANTING SIZES
## LANDSCAPE PLAN LEGEND:
EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM, BLACK ORDARK GREEN IN COLOR, INCLUDE ALL CONNECTORS, STAKES, & ALL
## APPURTENANCES PER MANUF. INSTALL PER MANUF. INSTRUC./SPECS.
## CONSTRUCTION LIMITS
## REVISION SUMMARY
## DATE
## DESCRIPTION
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 120 of 169
## L1.3
## LANDSCAPE PLAN
## NOTES & DETAILS
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED LANDSCAPE ARCHITECT UNDER
## THE LAWS OF THE STATE OF MINNESOTA.
25821
## Robert L. Binder
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
1.
ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGSFOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
2.
PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLYPROGRAMMABLE AND CAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TOHEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK.
## SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB.
3.
CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROMOWNER, PRIOR TO INSTALLATION.
4.
## SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND
## POWER CONNECTIONS.
5.
## CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY
EXCAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THERESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE
## BORNE ENTIRELY BY THE CONTRACTOR.
6.
## SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL
## BE PER NATIONAL AND LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE
## COORDINATED WITH THE LANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE.
7.
## CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL
## SERVICE AND METERING FACILITIES.
8.
## IRRIGATION WATER LINE CONNECTION SIZE IS 1-
1
2
## " AT BUILDING. VERIFY WITH MECHANICAL PLANS.
9.
## ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE.
10.
## ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE.
11.
## ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR.
12.
CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOPOF PAVEMENT. EXTEND SLEEVES TO 2'-0" BEYOND PAVEMENT.
13.
## CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL
## "ELLED" TO 2'-0" ABOVE FINISHED GRADE AND CAPPED.
14.
## FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE
## QUALITY GRADE PRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION.
15.
## BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS.
16.
## ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR.
17.
## GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS
## WHENEVER POSSIBLE.
18.
## IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE.
19.
## CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE.
## USE MOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND
COMMON WIRE TO EACH VALVE AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROMCONTROLLER. LABEL OR COLOR CODE ALL WIRES.
20.
## AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING
## RADIUS OR ARC ON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE.
21.
## ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE.
22.
## USE SCREENS ON ALL HEADS.
23.
## A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION.
24.
## ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN.
25.
## ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL
## UNDERNEATH VALVE AND VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX.
26.
## THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE
## STRUCTURE.
## IRRIGATION NOTES:
## REVISION SUMMARY
## DATE
## DESCRIPTION
## SEE SHEET L1.0 FOR GENERAL
## LANDSCAPE NOTES & LEGEND
Know what's
below.
before you dig.
## Call
## R
## DECIDUOUS & CONIFEROUS SHRUB PLANTING
## N T S
## PRUNE AS FIELD DIRECTED BY THE LANDSCAPE
## ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL
## SHAPE FOR SPECIES)
## PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE
## SURROUNDING GRADE
## ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TOENSURE PROPER BACKFILL-TO-ROOT CONTACT
## SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF
PLANTING BEDEXISTING GRADEROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPENOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCHMIN. 2" FROM PLANT TRUNKBACKFILL AS PER SPECIFICATIONDO NOT EXCAVATE BELOW ROOTBALL.
## THREE TIMES WIDTH
## OF ROOTBALL
## RULE OF THUMB - MODIFY EXCAVATION BASED ONLOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR
## OVERALL PLANT PLACEMENT
1
## THREE TIMES WIDTH
## OF ROOTBALL
## DECIDUOUS & CONIFEROUS TREE PLANTING
## N T S
## PRUNE AS FIELD DIRECTED BY THE LANDSCAPE
## ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL
TREE SHAPE)THREE 2"X4"X8' WOODEN STAKES, STAINED BROWN WITHTWO STRANDS OF WIRE TWISTED TOGETHER. STAKES
## SHALL BE PLACED AT 120° TO ONE ANOTHER. WIRE SHALL
## BE THREADED THROUGH NYLON STRAPPING WITH
## GROMMETS. ALTERNATE STABILIZING METHODS MAY BE
## PROPOSED BY CONTRACTOR.
## TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVE
## EXISTING GRADE
## MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF
## PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH,
## SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR
## MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK
## EXISTING GRADE
## CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF
## NON-BIODEGRADABLE, REMOVE COMPLETELY
## SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF
## PLANTING BED
## BACKFILL AS SPECIFIED
## COMPACT BOTTOM OF PIT, TYP.
## RULE OF THUMB - MODIFY EXCAVATION BASED ON
## LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR
## OVERALL PLANT PLACEMENT
2
## FINISHED GRADE
## 18" - SEE PLAN
DRAWN @ ? size
## AGGREGATE MAINTENANCE STRIP
## N T S
## SLOPE - MIN. 2%, MAX. 5:1
## VERIFY W/ GRADING PLAN
## FACE OF BUILDING, WALL, OR STRUCTURE
## MIN. 3" LAYER OF ROCK MULCH AS SPECIFIED. PROVIDE
## SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR
## TO INSTALLATION
## STAKED LANDSCAPE EDGER AS SPECIFIED, SEE
## MANUFACTURER'S INSTRUCTIONS AND SPECS. FOR
## INSTALLATION AND PLACEMENT
## WATER PERMEABLE GEOTEXTILE FABRIC AS SPECIFIED
## COMPACTED SUBGRADE
3
Page 121 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
## Gate
## Gate
## Gate
## Gate
## Gate
## Shed
## Concrete Walkway
## Concrete Step
## Concrete Steps
w/ Railing
## Concrete
## Landscaping Rock
## Landscaping Rock
## Overhang
## Overhang
## Keystone
## Retaining Wall
## Concrete
## Retaining Wall
## Wood
## Retaining Wall
## Chain Link Fence
## Chain Link Fence
## Chain Link Fence
## Bituminous
## Parking Lot
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
19.2
10.0
10.1
3
1
1
5
23
35
## Snow Pile
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## CONSTRUCTION
## ENTRANCE
## PERIMETEREROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## CONSTRUCTION
## ENTRANCE
## PERIMETER
## EROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## INLET PROTECTION
## AT EXISTING FES
## TO REMAIN
## CONTRACTOR TO PROVIDE
## INLET PROTECTION AT ALL
## DOWNSTREAM CATCHBASINS.
## PERIMETEREROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## PERIMETER
## EROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SW1.0
## SWPPP - EXISTING
## CONDITIONS
## 1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES.
## CITY OF
## BROOKLYN CENTER
## EROSION CONTROL NOTES:
## SWPPP LEGEND:
## EX. 1' CONTOUR ELEVATION INTERVAL
## INLET PROTECTION
## STABILIZED CONSTRUCTION ENTRANCE
## DRAINAGE ARROW
## SILT FENCE / BIOROLL - GRADING LIMIT
1125
## ALL SPECIFIED EROSION AND SEDIMENT CONTROL
## PRACTICES, AND MEASURES CONTAINED IN THIS
## SWPPP ARE THE MINIMUM REQUIREMENTS.
## ADDITIONAL PRACTICES MAY BE REQUIRED DURING
## THE COURSE OF CONSTRUCTION.
## REVISION SUMMARY
## DATE
## DESCRIPTION
1.
## ALL EXISTING UTILITY LOCATIONS SHOWN AREAPPROXIMATE. CONTACT "GOPHER STATE ONE CALL"
## (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALLREPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGEDDURING CONSTRUCTION AT NO COST TO THE OWNER.
2.
## THIS PROJECT IS
## GREATER THAN ONE ACRE AND WILL
## REQUIRE AN MPCA NPDES PERMIT
## . CONTRACTOR IS
## RESPONSIBLE FOR OBTAINING ANY EROSION CONTROLPERMITS REQUIRED BY THE CITY.
3.
## SEE SHEETS
## SW1.0 - SW1.5
## FOR ALL EROSION CONTROL
## NOTES, DESCRIPTIONS, AND PRACTICES.
4.
## SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSIONCONTROL NOTES.
5.
## CONTRACTOR IS RESPONSIBLE FOR SWPPP
## IMPLEMENTATION, INSPECTIONS, MAINTENANCE AND
## COMPLIANCE WITH THE PERMIT.
## SWPPP NOTES:
0
1" = 40'-0"
40'-0"
20'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 122 of 169
## 63RD AVENUE NORTH
## (A Public R/W)
## PERRY AVENUE NORTH
## (A Public R/W)
## ORCHARD
## AVENUE
## NORTH
## (A Public R/W)
10" DIP (Per Rec.)
10" DIP (Per Rec.)
## 8" PVC
8" PVC (Per Rec.)
## 10" PVC
(Per Rec.)
18" RCP (Per Rec.)
## 18" RCP
(Per Rec.)
## Wat. Serv. (Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
## San. Serv. (Per Rec.)
Wat. Serv.
(Per Rec.)
6" DIP (Per Rec.)
8" VCP (Per Rec.)
## 15" HDPE
## 12" RCP
12"
## RCP
## Storm Sewer (Per Rec.)
## Storm Sewer (Per Rec.)
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## NO
## PARKING
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## CONSTRUCTION
## LIMITS
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 35' BUILDING SETBACK
## 15' PARKING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## 25' BUILDING SETBACK
## 5' PARKING SETBACK
## 10' BUILDING SETBACK
## 5' PARKING SETBACK
## FILTRATION BASIN #1
## EOF=858.50
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## D
## R
## O
## P
-
## O
## F
## F
## O
## N
## L
## Y
## G
## EXISTING
## 100-YR
## HWL=858.39
## CONSTRUCTION
## ENTRANCE
## PERIMETEREROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## CONSTRUCTION
## ENTRANCE
## PERIMETEREROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## INLET PROTECTION
## AT EXISTING FES
## TO REMAIN
## CONTRACTOR TO PROVIDE
## INLET PROTECTION AT ALL
## DOWNSTREAM CATCH
## BASINS.
## PERIMETER
## EROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## PERIMETER
## EROSION CONTROL
## AT CONSTRUCTION
## LIMITS, TYP.
## INLET PROTECTION AT
## PROPOSED CATCH
## BASIN, TYP.
## INLET PROTECTION AT
## PROPOSED CATCH
## BASINS, TYP.
## INSTALL DOUBLE
## EROSION CONTROL
## ALONG EDGE OF
## FILTRATION BASINS,
## AS SHOWN, TYP.
## PLACE EROSION
## CONTROL BLANKET ON
## ALL SLOPES 4:1 OR
## STEEPER, TYP. (MNDOT
## CATEGORY 30)
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SW1.1
## SWPPP - PROPOSED
## CONDITIONS
## 1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES.
## CITY OF
## BROOKLYN CENTER
## EROSION CONTROL NOTES:
## SWPPP LEGEND:
## INLET PROTECTION
## STABILIZED CONSTRUCTION ENTRANCE
## DRAINAGE ARROW
## 1.0' CONTOUR ELEVATION INTERVAL
## SILT FENCE / BIOROLL - GRADING LIMIT
## EROSION CONTROL BLANKET
1137
## REVISION SUMMARY
## DATE
## DESCRIPTION
1.
## ALL EXISTING UTILITY LOCATIONS SHOWN AREAPPROXIMATE. CONTACT "GOPHER STATE ONE CALL"
## (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
## HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALLREPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED
## DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.
## THIS PROJECT IS
## GREATER THAN ONE ACRE AND WILL
## REQUIRE AN MPCA NPDES PERMIT
## . CONTRACTOR IS
## RESPONSIBLE FOR OBTAINING ANY EROSION CONTROL
## PERMITS REQUIRED BY THE CITY.
3.
## SEE SHEETS
## SW1.0 - SW1.5
## FOR ALL EROSION CONTROL
## NOTES, DESCRIPTIONS, AND PRACTICES.
4.
## SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION
## CONTROL NOTES.
5.
## CONTRACTOR IS RESPONSIBLE FOR SWPPP
## IMPLEMENTATION, INSPECTIONS, MAINTENANCE AND
## COMPLIANCE WITH THE PERMIT.
## SWPPP NOTES:
## ALL SPECIFIED EROSION AND SEDIMENT CONTROL
## PRACTICES, AND MEASURES CONTAINED IN THIS
## SWPPP ARE THE MINIMUM REQUIREMENTS.
## ADDITIONAL PRACTICES MAY BE REQUIRED DURING
## THE COURSE OF CONSTRUCTION.
## EX. 1' CONTOUR ELEVATION INTERVAL
1125
0
1" = 20'-0"
20'-0"
10'-0"
## N
Know what's
below.
before you dig.
## Call
## R
Page 123 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SW1.2
## SWPPP - DETAILS
## REVISION SUMMARY
## DATE
## DESCRIPTION
## NOTES:
## 1. REPLACE INLET GRATE UPON COMPLETE INSTALLATION OF INLET PROTECTION FABRIC.
2. CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM THE SURFACE OF THE SYSTEM AFTER EACH
STORM EVENT AND AT THE COMPLETION OF THE CONTRACT.3. CONTRACTOR SHALL USE DANDY SACK OR APPROVED EQUIVALENT FOR STRUCTURES WITHOUT CURBING.
## CURB INLET SACKN T S
## OVERFLOW IS
1
2
## OF THE CURB BOX HEIGHT
## OVERFLOW AT TOP OF FILTER ASSEMBLY
## EXISTING CURB, PLATE, BOX,
## AND GRATE
## DANDY CURB SACK OR
## APPROVED EQUIVALENT
## HIGH-FLOW FABRIC
1
## FLOW
24"
24"
24"
## MIN.
6"
6"
## SEDIMENT FENCE
## N T S
## FILTER FABRIC WITH
## WIRE SUPPORT NET
## AS SPECIFIED.
## METAL POST
## AS SPECIFIED.
## SUPPORT NET: 12 GAUGE
## 4"X4" WIRE HOOKED ONTO
## PERFORMED CHANNELS
## ON POSTS AS SPECIFIED.
## EXISTING GROUND
## SURFACE
## METAL POSTS
## 8'-0" O.C. MAX.
## CARRY WIRE
## SUPPORT NET
## DOWN INTO
## TRENCH
## ANCHOR FABRIC
## WITH SOIL, TAMP
## BACKFILL
## FILTER FABRIC AS
## SPECIFIED SECURE
## TO WIRE SUPPORT
## NET WITH METAL
## CLIPS 12" O.C.
4
## TYPICAL STAPLE #8
## GAUGE WIRE
1 1/2"
10"
## NOTE:
## 1. PLACE STAPLES 2 FEET APART TO KEEP MATTING FIRMLY PRESSED TO SOIL.
## EROSION BLANKET
## N T S
## PLACE STAPLES 2 FEET APART TO KEEP
## MATTING FIRMLY PRESSED TO SOIL.
## 'D' EROSION STOP: FOLD OF MATTING
## BURIED IN SILT TRENCH AND TAMPED.
## DOUBLE ROW OF STAPLES
## 'C' OVERLAP: BURY UPPER
## END OF LOWER STRIP AS IN 'A'
## AND 'B'. OVERLAP END OF TOP
## STRIP 4" AND STAPLE
## 'B' TAMP THE TRENCH FULL OF SOIL.
## SECURE WITH ROW OF STAPLES, 10"
## SPACING, 4" DOWN FROM TRENCH
## 'A' BURY THE TOP END OF THE MATTING
## IN A TRENCH 4" OR MORE IN DEPTH
## 'E' OVERFALL
2
## PROFILE
## PLAN
## TO CONSTRUCTION AREA
## N T S
## STABILIZED CONSTRUCTION ACCESS
## 24' (MIN)
## NOTES:
1.
## PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND UNDISTURBED ROADWAY.
2.
THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
UNDISTURBED ROADWAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE OR ADDING STONE TO
## THE LENGTH OF THE ENTRANCE.
3.
## REPAIR AND CLEANOUT MEASURES USED TO TRAP SEDIMENT.
4.
## ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO UNDISTURBED ROADWAY SHALL BE REMOVED AS
## DIRECTED BY THE ENGINEER.
5.
FINAL LOCATION AND INSTALLATION SHALL BE COORDINATED WITH THE CITY PRIOR TO CONSTRUCTION ACTIVITIES.
6.
## CRUSHED STONE SHALL BE 1-1/2" DIA. CLOSE GRADED, AND IN ACCORDANCE TO MNDOT SECTION 2118.
## EXISTING UNDISTURBED ROADWAY
## GEOTEXTILE FILTER FABRIC
## 6" MIN. CRUSHED STONE
## 75' MINIMUM
## EXISTING
## UNDISTURBED
## ROADWAY
## TO CONSTRUCTION AREA
## 30' FROM EDGE OF ROAD
## TO FRONT OF SPEED BUMP
## 35' R.
## 35' R.
## 4" HIGH, 18"WIDE SPEED
## BUMP
## FINISHED
## GRADE
5
## FLOW
## SEDIMENT BIO-ROLL / COMPOST FILTER LOG
## N T S
## NOTE:
## 1. COMPOST FILTER LOGS (BIO ROLLS) SHALL BE FILTREXX EROSION CONTROL SOXX OR APPROVED EQUAL.
## 2. COMPOST FILLER TO BE MADE FROM A COMPOST BLEND 30%-40% GRADE 2 (SPEC 3890) AND 60%-70% PARTIALLY
## DECOMPOSED WOOD CHIPS, PER MNDOT SPEC 3897.
## 3. FILTER FABRIC SHALL BE GEOTEXTILE KNITTED MATERIAL WITH MAX. OPENINGS OF 3/8".
## 4. IF MULTIPLE ROLLS NEEDED, OVERLAP BY MIN. 12" AT ENDS AND STAKE.
5. SILT SHALL BE REMOVED ONCE IT REACHES 80% OF THE HEIGHT OF THE ROLL OR AS DEEMED NECESSARY BY SITE
## CONTRACTOR TO MAINTAIN PROPER FUNCTION.
## 8" MIN.
## EXISTING GROUND SURFACE
## WOODEN STAKES 1/2"X2"X16" MIN. PLACED 10' O.C. WHEN
## INSTALLED ON GROUND. IF INSTALLED ON PVMT. PROVIDE
## SANDBAGS BEHIND AND ON TOP AT MIN. 10' O.C.
## FILTER FABRIC AS SPECIFIED
## FILLER AS SPECIFIED
## FILL UPSTREAM BASE EDGE
## WITH 2" OF DIRT OR COMPOST
## TO EMBED ROLL.
3
## = DIRECTION OF SURFACE FLOW
## PLAN
## INLET PROTECTION ROCK FILTER
## N T S
## PROPOSED FUTURE CURB
## AGGREGATE
## BASE
1
1
2
## " WASHED
## GRAVEL FILTER
## AGGREGATE BACKFILL
## STEEL PLATE
## IN PLACE
## CATCHBASIN
## 8-12" MINIMUM
## DEPTH
6
Page 124 of 169
## SW1.3
## SWPPP - NARRATIVE
## OWNER INFORMATION
## TRAINING SECTION 21
## PARTY RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OFPERMANENT STORM WATER MANAGEMENT SYSTEM
## PERMANENT STORMWATER MANAGEMENT IS
## REQUIRED AS PART OF THIS PROJECT TO MEET NPDES PERMIT
## REQUIREMENTS. THE PROPERTY OWNER IS RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE
## PROPOSED STORMWATER SYSTEM.
## AREAS AND QUANTITIES:
## SWPPP CONTACT PERSON
## CONTRACTOR:
## SWPPP INSPECTOR TRAINING:
## ALL SWPPP INSPECTIONS MUST BE PERFORMED BY A
## PERSON THAT MEETS THE TRAINING REQUIREMENTS
## OF THE NPDES CONSTRUCTION SITE PERMIT.
## TRAINING CREDENTIALS SHALL BE PROVIDED BY THE
## CONTRACTOR AND KEPT ON SITE WITH THE SWPPP
NOTE: QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALLDETERMINE FOR THEMSELVES THE EXACT QUANTITIES FOR BIDDING AND CONSTRUCTION.
## SUPPLEMENTARY SITE SPECIFIC EROSION CONTROL NOTES:
## THESE NOTES SUPERCEDE ANY GENERAL SWPPP NOTES.THIS PROJECT IS
## GREATER THAN 1.0 ACRES
## SO AN NPDES PERMIT IS REQUIRED AND NEEDS TO BE SUBMITTED TO THE
## MPCA. THE CONTRACTOR IS REQUIRED TO FOLLOW THE GUIDELINES IN THE NPDES PERMIT THROUGHOUT
## CONSTRUCTION.
## SWPPP ATTACHMENTS (ONLY APPLICABLE IF SITE IS 1 ACRE OR GREATER):
## CONTRACTOR SHALL OBTAIN A COPY OF THE FOLLOWING SWPPP ATTACHMENTS WHICH ARE A PART OF THE OVERALL
## SWPPP PACKAGE:
ATTACHMENT A. CONSTRUCTION SWPPP TEMPLATE - SITE SPECIFIC SWPPP DOCUMENTATTACHMENT B. CONSTRUCTION STORMWATER INSPECTION CHECKLISTATTACHMENT C. MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMSATTACHMENT D: STORMWATER MANAGEMENT REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.ATTACHMENT E: GEOTECHNICAL EVALUATION REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.
## THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH A CONSTRUCTION ACTIVITY THAT DISTURBS SITE
## SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL MEASURE IDENTIFIED IN THE STORM WATER POLLUTION
## PREVENTION PLAN (SWPPP) MUST COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTION DISCHARGE
ELIMINATION SYSTEM (NPDES) GENERAL PERMIT (DATED AUGUST 1, 2018 # MNR100001) AND ANY LOCAL GOVERNING
## AGENCY HAVING JURISDICTION CONCERNING EROSION AND SEDIMENTATION CONTROL.
## STORMWATER DISCHARGE DESIGN REQUIREMENTS
## SWPPP
## THE NATURE OF THIS PROJECT WILL BE CONSISTENT WITH WHAT IS REPRESENTED IN THIS SET OF CONSTRUCTION
## PLANS AND SPECIFICATIONS. SEE THE SWPPP PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A:
## CONSTRUCTION SWPPP TEMPLATE) FOR ADDITIONAL SITE SPECIFIC SWPPP INFORMATION. THE PLANS SHOW
LOCATIONS AND TYPES OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROLBMP'S. STANDARD DETAILS ARE ATTACHED TO THIS SWPPP DOCUMENT.
## THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS:
## 1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
## 2. INSTALLATION OF SILT FENCE AROUND SITE
## 3. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS
## 4. INSTALL INLET PROTECTION AT ALL ADJACENT AND DOWNSTREAM CATCH BASINS
5. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN / POND INSTALL6. CONSTRUCT TEMPORARY SEDIMENT BASIN / POND (SECTION 14)
## 7. CLEAR AND GRUB REMAINDER OF SITE
## 8. STRIP AND STOCKPILE TOPSOIL9. ROUGH GRADING OF SITE
10. STABILIZE DENUDED AREAS AND STOCKPILES11. INSTALL SANITARY SEWER, WATER MAIN STORM SEWER AND SERVICES12. INSTALL SILT FENCE / INLET PROTECTION AROUND CB'S13. INSTALL STREET SECTION14. INSTALL CURB AND GUTTER15. BITUMINOUS ON STREETS16. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH17. REMOVE ACCUMULATED SEDIMENT FROM BASIN / POND18. FINAL GRADE POND / INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.)19. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
## SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
## RECORDS RETENTION:
## THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE
## RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEE WHO HAS OPERATIONAL
CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN AN ON SITE
## VEHICLE DURING NORMAL WORKING HOURS.
## ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL RECORDS, ON FILE FOR THREE
## (3) YEARS AFTER SUBMITTAL OF THE NOT AS OUTLINED IN SECTION 4. THIS DOES NOT INCLUDE ANY RECORDS
## AFTER SUBMITTAL OF THE NOT.
1.
## THE FINAL SWPPP;
2.
## ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT;
3.
## RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (SEE SECTION 11,
## INSPECTIONS AND MAINTENANCE);
4.
ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDINGALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL
## MAINTENANCE; AND
5.
## ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER
## MANAGEMENT SYSTEMS.
## SWPPP IMPLEMENTATION RESPONSIBILITIES:
1.
## THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT.
2.
## CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE
## ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS.
3.
## CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF
## EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE OF
## BMPS AND IMPLEMENTATION OF THE SWPPP.
4.
CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT TOCONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS IN
## ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE AVAILABLE
## FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL PROVIDE
## TRAINING DOCUMENTATION FOR THESE INDIVIDUAL(S) AS REQUIRED BY THE NPDES PERMIT. THIS TRAINING
## DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF CONSTRUCTION OR AS
## SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED. DOCUMENTATION SHALL INCLUDE:
4.1.
## NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER
## SECTION 21 OF THE PERMIT.
4.2.
## DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING.
4.3.
## CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING.
5.
## FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE OWNER
## IS EXPECTED TO FURNISH LONG TERM OPERATION AND MAINTENANCE (O & M) OF THE PERMANENT STORM
## WATER MANAGEMENT SYSTEM.
## CONSTRUCTION ACTIVITY REQUIREMENTS
## SWPPP AMENDMENTS (SECTION 6):
1.
## ONE OF THE INDIVIDUALS DESCRIBED IN ITEM 21.2.A OR ITEM 21.2.B OR ANOTHER QUALIFIED INDIVIDUAL MUST
## COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A
## JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS.
2.
## PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO
CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN,CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVING A SIGNIFICANT
## EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER.
3.
## PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO
## CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY
## THE SITE OWNER OR OPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN
## ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR
## GROUNDWATER OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES (E.G.,
## NUISANCE CONDITIONS AS DEFINED IN MINN. R. 7050.0210, SUBP. 2) OR THE SWPPP IS NOT CONSISTENT WITH
## THE OBJECTIVES OF A USEPA APPROVED TMDL.
## BMP SELECTION AND INSTALLATION (SECTION 7):
1.
## PERMITTEES MUST SELECT, INSTALL, AND MAINTAIN THE BMPS IDENTIFIED IN THE SWPPP AND IN THIS PERMIT
## IN AN APPROPRIATE AND FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT MANUFACTURER
## SPECIFICATIONS AND ACCEPTED ENGINEERING PRACTICES.
## EROSION PREVENTION (SECTION 8):
1.
## BEFORE WORK BEGINS, PERMITTEES MUST DELINEATE THE LOCATION OF AREAS NOT TO BE DISTURBED.
2.
## PERMITTEES MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT WITH STEEP
## SLOPES. WHEN STEEP SLOPES MUST BE DISTURBED, PERMITTEES MUST USE TECHNIQUES SUCH AS PHASING
## AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES (E.G., SLOPE DRAINING AND TERRACING).
3.
## PERMITTEES MUST STABILIZE ALL EXPOSED SOIL AREAS, INCLUDING STOCKPILES. STABILIZATION MUST BE
## INITIATED IMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION ACTIVITY HAS PERMANENTLY OR
## TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING
14
## CALENDAR DAYS. STABILIZATION MUST BE COMPLETED NO LATER THAN
14
## CALENDAR DAYS AFTER THE
CONSTRUCTION ACTIVITY HAS CEASED. STABILIZATION IS NOT REQUIRED ON CONSTRUCTED BASECOMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES. STABILIZATION IS NOT REQUIRED ON
## TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., CLEAN
## AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) BUT PERMITTEES MUST
## PROVIDE SEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE.
4.
## FOR PUBLIC WATERS THAT THE MINNESOTA DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS" DURING
## SPECIFIED FISH SPAWNING TIME FRAMES, PERMITTEES MUST COMPLETE STABILIZATION OF ALL EXPOSED SOIL
## AREAS WITHIN 200 FEET OF THE WATER'S EDGE, AND THAT DRAIN TO THESE WATERS, WITHIN 24 HOURS
## DURING THE RESTRICTION PERIOD.
5.
## PERMITTEES MUST STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAR FEET OF
## TEMPORARY OR PERMANENT DRAINAGE DITCHES OR SWALES THAT DRAIN WATER FROM THE SITE WITHIN 24
## HOURS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE. PERMITTEES MUST COMPLETE
## STABILIZATION OF REMAINING PORTIONS OF TEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN
14
## CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE AND CONSTRUCTION IN
## THAT PORTION OF THE DITCH TEMPORARILY OR PERMANENTLY CEASES.
6.
## TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM
## DURING CONSTRUCTION (WITH PROPERLY DESIGNED ROCK-DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO
## NOT NEED TO BE STABILIZED. PERMITTEES MUST STABILIZE THESE AREAS WITHIN 24 HOURS AFTER THEIR USE
## AS A SEDIMENT CONTAINMENT SYSTEM CEASES
7.
PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSIONPREVENTION PRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY ORPERMANENT DRAINAGE DITCH OR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2 PERCENT.
8.
## PERMITTEES MUST PROVIDE TEMPORARY OR PERMANENT ENERGY DISSIPATION AT ALL PIPE OUTLETS WITHIN
## 24 HOURS AFTER CONNECTION TO A SURFACE WATER OR PERMANENT STORMWATER TREATMENT SYSTEM.
9.
## PERMITTEES MUST NOT DISTURB MORE LAND (I.E., PHASING) THAN CAN BE EFFECTIVELY INSPECTED AND
## MAINTAINED IN ACCORDANCE WITH SECTION 11.
## SEDIMENT CONTROL (SECTION 9):
1.
## PERMITTEES MUST ESTABLISH SEDIMENT CONTROL BMPS ON ALL DOWNGRADIENT PERIMETERS OF THE SITE
## AND DOWNGRADIENT AREAS OF THE SITE THAT DRAIN TO ANY SURFACE WATER, INCLUDING CURB AND
## GUTTER SYSTEMS. PERMITTEES MUST LOCATE SEDIMENT CONTROL PRACTICES UPGRADIENT OF ANY BUFFER
## ZONES. PERMITTEES MUST INSTALL SEDIMENT CONTROL PRACTICES BEFORE ANY UPGRADIENT
## LAND-DISTURBING ACTIVITIES BEGIN AND MUST KEEP THE SEDIMENT CONTROL PRACTICES IN PLACE UNTIL
## THEY ESTABLISH PERMANENT COVER.
2.
## IF DOWNGRADIENT SEDIMENT CONTROLS ARE OVERLOADED, BASED ON FREQUENT FAILURE OR EXCESSIVE
MAINTENANCE REQUIREMENTS, PERMITTEES MUST INSTALL ADDITIONAL UPGRADIENT SEDIMENT CONTROLPRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND AMEND THE SWPPP TO IDENTIFY
## THESE ADDITIONAL PRACTICES AS REQUIRED IN ITEM 6.3.
3.
## TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS DESIGNED AS PART OF A SEDIMENT
CONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK-CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICESONLY AS APPROPRIATE FOR SITE CONDITIONS.
4.
## A FLOATING SILT CURTAIN PLACED IN THE WATER IS NOT A SEDIMENT CONTROL BMP TO SATISFY ITEM 9.2
## EXCEPT WHEN WORKING ON A SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE SHORT TERM
CONSTRUCTION ACTIVITY (E.G., INSTALLATION OF RIP RAP ALONG THE SHORELINE) IN THAT AREA ISCOMPLETE, PERMITTEES MUST INSTALL AN UPLAND PERIMETER CONTROL PRACTICE IF EXPOSED SOILS STILL
## DRAIN TO A SURFACE WATER.
5.
## PERMITTEES MUST RE-INSTALL ALL SEDIMENT CONTROL PRACTICES ADJUSTED OR REMOVED TO
## ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES,
## IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY IS COMPLETED. PERMITTEES MUST RE-INSTALL SEDIMENT
CONTROL PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOTCOMPLETE.
6.
PERMITTEES MUST PROTECT ALL STORM DRAIN INLETS USING APPROPRIATE BMPS DURING CONSTRUCTIONUNTIL THEY ESTABLISH PERMANENT COVER ON ALL AREAS WITH POTENTIAL FOR DISCHARGING TO THE INLET.
7.
## PERMITTEES MAY REMOVE INLET PROTECTION FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (E.G.
STREET FLOODING/FREEZING) IS IDENTIFIED BY THE PERMITTEES OR THE JURISDICTIONAL AUTHORITY (E.G.,CITY/COUNTY/TOWNSHIP/MINNESOTA DEPARTMENT OF TRANSPORTATION ENGINEER). PERMITTEES MUST
## DOCUMENT THE NEED FOR REMOVAL IN THE SWPPP.
8.
## PERMITTEES MUST PROVIDE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AT THE BASE OF
## STOCKPILES ON THE DOWNGRADIENT PERIMETER.
9.
## PERMITTEES MUST LOCATE STOCKPILES OUTSIDE OF NATURAL BUFFERS OR SURFACE WATERS, INCLUDING
## STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS UNLESS THERE IS A BYPASS IN PLACE
## FOR THE STORMWATER.
## 10. PERMITTEES MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF SEDIMENT FROM THE
## CONSTRUCTION SITE OR ONTO PAVED ROADS WITHIN THE SITE.
## 11. PERMITTEES MUST USE STREET SWEEPING IF VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO PREVENT
## SEDIMENT TRACKING ONTO THE STREET.
12. PERMITTEES MUST INSTALL TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 14. 13. IN ANY AREAS OF THE SITE WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PERMITTEES MUST
## RESTRICT VEHICLE AND EQUIPMENT USE TO MINIMIZE SOIL COMPACTION.
14. PERMITTEES MUST PRESERVE TOPSOIL ON THE SITE, UNLESS INFEASIBLE. 15. PERMITTEES MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS UNLESS INFEASIBLE. 16. PERMITTEES MUST PRESERVE A 50 FOOT NATURAL BUFFER OR, IF A BUFFER IS INFEASIBLE ON THE SITE,
## PROVIDE REDUNDANT (DOUBLE) PERIMETER SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED
WITHIN 50 FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACEWATER. PERMITTEES MUST INSTALL PERIMETER SEDIMENT CONTROLS AT LEAST 5 FEET APART UNLESS
## LIMITED BY LACK OF AVAILABLE SPACE. NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES,
## JUDICIAL DITCHES, COUNTY DITCHES, STORMWATER CONVEYANCE CHANNELS, STORM DRAIN INLETS, AND
## SEDIMENT BASINS. IF PRESERVING THE BUFFER IS INFEASIBLE, PERMITTEES MUST DOCUMENT THE REASONS
## IN THE SWPPP. SHEET PILING IS A REDUNDANT PERIMETER CONTROL IF INSTALLED IN A MANNER THAT RETAINS
## ALL STORMWATER.
## 17. PERMITTEES MUST USE POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS IN
## ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, DOSING SPECIFICATIONS AND SEDIMENT REMOVAL
## DESIGN SPECIFICATIONS PROVIDED BY THE MANUFACTURER OR SUPPLIER. THE PERMITTEES MUST USE
## CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO CHEMICAL ADDITION AND MUST DIRECT
## TREATED STORMWATER TO A SEDIMENT CONTROL SYSTEM FOR FILTRATION OR SETTLEMENT OF THE FLOC
## PRIOR TO DISCHARGE.
## DEWATERING AND BASIN DRAINING (SECTION 10):
1.
PERMITTEES MUST DISCHARGE TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASINDRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY ORPERMANENT SEDIMENT BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. PERMITTEES MAY DEWATER TO
## SURFACE WATERS IF THEY VISUALLY CHECK TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED AND
NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IFPERMITTEES CANNOT DISCHARGE THE WATER TO A SEDIMENTATION BASIN PRIOR TO ENTERING A SURFACE
## WATER, PERMITTEES MUST TREAT IT WITH APPROPRIATE BMPS SUCH THAT THE DISCHARGE DOES NOT
## ADVERSELY AFFECT THE SURFACE WATER OR DOWNSTREAM PROPERTIES.
2.
## IF PERMITTEES MUST DISCHARGE WATER CONTAINING OIL OR GREASE, THEY MUST USE AN OIL-WATER
## SEPARATOR OR SUITABLE FILTRATION DEVICE (E.G., CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO
## DISCHARGE.
3.
## PERMITTEES MUST DISCHARGE ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES IN A MANNER
## THAT DOES NOT CAUSE EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR
## INUNDATION OF WETLANDS IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS THAT CAUSES SIGNIFICANT
## ADVERSE IMPACT TO THE WETLAND.
4.
## IF PERMITTEES USE FILTERS WITH BACKWASH WATER, THEY MUST HAUL THE BACKWASH WATER AWAY FOR
## DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR
## INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION.
## INSPECTIONS AND MAINTENANCE (SECTION 11):
1.
## PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRE
## CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24
## HOURS AFTER A RAINFALL EVENT GREATER THAN 1/2 INCH IN 24 HOURS.
2.
## PERMITTEES MUST INSPECT AND MAINTAIN ALL PERMANENT STORMWATER TREATMENT BMPS.
3.
PERMITTEES MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTIONPREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS. PERMITTEES MUSTREPAIR, REPLACE OR SUPPLEMENT ALL NONFUNCTIONAL BMPS WITH FUNCTIONAL BMPS BY THE END OF THENEXT BUSINESS DAY AFTER DISCOVERY UNLESS ANOTHER TIME FRAME IS SPECIFIED IN ITEM 11.5 OR 11.6.PERMITTEES MAY TAKE ADDITIONAL TIME IF FIELD CONDITIONS PREVENT ACCESS TO THE AREA.
4.
## DURING EACH INSPECTION, PERMITTEES MUST INSPECT SURFACE WATERS, INCLUDING DRAINAGE DITCHES
## AND CONVEYANCE SYSTEMS BUT NOT CURB AND GUTTER SYSTEMS, FOR EVIDENCE OF EROSION AND
## SEDIMENT DEPOSITION. PERMITTEES MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE
## WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABILIZE THE
## AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. PERMITTEES MUST COMPLETE REMOVAL AND
## STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL,
## REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. PERMITTEES MUST USE ALL REASONABLE EFFORTS TO
OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OFOBTAINING ACCESS. PERMITTEES ARE RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND
## FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN
## SURFACE WATERS.
5.
## PERMITTEES MUST INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS AND CURB AND GUTTER
SYSTEMS WITHIN AND ADJACENT TO THE PROJECT FOR SEDIMENTATION FROM EROSION OR TRACKEDSEDIMENT FROM VEHICLES. PERMITTEES MUST REMOVE SEDIMENT FROM ALL PAVED SURFACES WITHIN ONE
## (1) CALENDAR DAY OF DISCOVERY OR, IF APPLICABLE, WITHIN A SHORTER TIME TO AVOID A SAFETY HAZARD TO
## USERS OF PUBLIC STREETS.
6.
PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEYBECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE DEVICE.
7.
## PERMITTEES MUST DRAIN TEMPORARY AND PERMANENT SEDIMENTATION BASINS AND REMOVE THE SEDIMENT
## WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME.
8.
PERMITTEES MUST ENSURE THAT AT LEAST ONE INDIVIDUAL PRESENT ON THE SITE (OR AVAILABLE TO THEPROJECT SITE IN THREE (3) CALENDAR DAYS) IS TRAINED IN THE JOB DUTIES DESCRIBED IN ITEM 21.2.B.
9.
## PERMITTEES MAY ADJUST THE INSPECTION SCHEDULE DESCRIBED IN ITEM 11.2 AS FOLLOWS:
a.
## INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF
## CONSTRUCTION ACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE; OR
b.
## WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS
## OCCURRING ANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND, AFTER 12
MONTHS, MAY BE SUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE MPCA MAYREQUIRE INSPECTIONS TO RESUME IF CONDITIONS WARRANT; OR
c.
## WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS,
## INSPECTIONS MAY BE SUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING,
## OR UPON RESUMING CONSTRUCTION, WHICHEVER COMES FIRST.
## 10. PERMITTEES MUST RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES WITHIN 24 HOURS OF BEING
## CONDUCTED AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP. THESE RECORDS MUST INCLUDE:
a.
## DATE AND TIME OF INSPECTIONS; AND
b.
## NAME OF PERSONS CONDUCTING INSPECTIONS; AND
c.
ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONSARE NEEDED; AND
d.
## CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE
## ACTIVITIES); AND
e.
## DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCHES IN 24 HOURS, AND THE AMOUNT OF RAINFALL
## FOR EACH EVENT. PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY MAINTAINED
## RAIN GAUGE INSTALLED ONSITE, A WEATHER STATION THAT IS WITHIN ONE (1) MILE OF YOUR LOCATION, OR
## A WEATHER REPORTING SYSTEM THAT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES;AND
f.
## IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD
## PHOTOGRAPH AND DESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR
## SUSPENDED SOLIDS, OIL SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS); AND
g.
## ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE DOCUMENTED AS
## REQUIRED IN SECTION 6 WITHIN SEVEN (7) CALENDAR DAYS.
## POLLUTION PREVENTION MANAGEMENT (SECTION 12):
1.
## PERMITTEES MUST PLACE BUILDING PRODUCTS AND LANDSCAPE MATERIALS UNDER COVER (E.G., PLASTIC
## SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO
## MINIMIZE CONTACT WITH STORMWATER. PERMITTEES ARE NOT REQUIRED TO COVER OR PROTECT PRODUCTS
## WHICH ARE EITHER NOT A SOURCE OF CONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED
## TO STORMWATER.
2.
PERMITTEES MUST PLACE PESTICIDES, FERTILIZERS AND TREATMENT CHEMICALS UNDER COVER (E.G.,PLASTIC SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED
## TO MINIMIZE CONTACT WITH STORMWATER.
3.
## PERMITTEES MUST STORE HAZARDOUS MATERIALS AND TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL,
## GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES,
## ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR OTHER
DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MATERIALS MUST BE IN COMPLIANCE WITH MINN.R. CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE.
4.
## PERMITTEES MUST PROPERLY STORE, COLLECT AND DISPOSE SOLID WASTE IN COMPLIANCE WITH MINN. R. CH.
7035.
5.
## PERMITTEES MUST POSITION PORTABLE TOILETS SO THEY ARE SECURE AND WILL NOT TIP OR BE KNOCKED
## OVER. PERMITTEES MUST PROPERLY DISPOSE SANITARY WASTE IN ACCORDANCE WITH MINN. R. CH. 7041.
6.
## PERMITTEES MUST TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED
## CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED
## INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. PERMITTEES MUST ENSURE
ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT ANAPPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. PERMITTEES MUST
## REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. 115.061, USING DRY CLEAN UP
## MEASURES WHERE POSSIBLE.
7.
PERMITTEES MUST LIMIT VEHICLE EXTERIOR WASHING AND EQUIPMENT TO A DEFINED AREA OF THE SITE.PERMITTEES MUST CONTAIN RUNOFF FROM THE WASHING AREA IN A SEDIMENT BASIN OR OTHER SIMILARLYEFFECTIVE CONTROLS AND MUST DISPOSE WASTE FROM THE WASHING ACTIVITY PROPERLY. PERMITTEES
## MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS.
8.
## PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY
## WASHOUT OPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND
## OTHER CONSTRUCTION MATERIALS) RELATED TO THE CONSTRUCTION ACTIVITY. PERMITTEES MUST PREVENT
## LIQUID AND SOLID WASHOUT WASTES FROM CONTACTING THE GROUND AND MUST DESIGN THE CONTAINMENT
## SO IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS. PERMITTEES MUST
## PROPERLY DISPOSE LIQUID AND SOLID WASTES IN COMPLIANCE WITH MPCA RULES. PERMITTEES MUST
## INSTALL A SIGN INDICATING THE LOCATION OF THE WASHOUT FACILITY.
## PERMIT TERMINATION (SECTION 4 AND SECTION 13):
1.
## PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ALL TERMINATION CONDITIONS LISTED IN SECTION 13
## ARE COMPLETE.
2.
## PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER SELLING OR OTHERWISE LEGALLY TRANSFERRING
## THE ENTIRE SITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS (E.G., STREET SWEEPING) AND
## STORMWATER INFRASTRUCTURE FINAL CLEAN OUT, OR TRANSFERRING PORTIONS OF A SITE TO ANOTHER
PARTY. THE PERMITTEES' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSIONDATE OF THE NOT.
3.
## PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER OVER ALL
AREAS PRIOR TO SUBMITTING THE NOT. VEGETATIVE COVER MUST CONSIST OF A UNIFORM PERENNIALVEGETATION WITH A DENSITY OF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION IS NOT
## REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA DICTATES NO VEGETATION, SUCH AS IMPERVIOUS
## SURFACES OR THE BASE OF A SAND FILTER.
4.
## PERMITTEES MUST CLEAN THE PERMANENT STORMWATER TREATMENT SYSTEM OF ANY ACCUMULATED
## SEDIMENT AND MUST ENSURE THE SYSTEM MEETS ALL APPLICABLE REQUIREMENTS IN SECTION 15 THROUGH
## 19 AND IS OPERATING AS DESIGNED.
5.
## PERMITTEES MUST REMOVE ALL SEDIMENT FROM CONVEYANCE SYSTEMS PRIOR TO SUBMITTING THE NOT.
6.
## PERMITTEES MUST REMOVE ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL
## BMPS PRIOR TO SUBMITTING THE NOT. PERMITTEES MAY LEAVE BMPS DESIGNED TO DECOMPOSE ON-SITE IN
## PLACE.
7.
## FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE
## STRUCTURES ARE FINISHED AND TEMPORARY EROSION PREVENTION AND DOWNGRADIENT PERIMETER
## CONTROL IS COMPLETE, THE RESIDENCE SELLS TO THE HOMEOWNER, AND THE PERMITTEE DISTRIBUTES THE
## MPCA'S "HOMEOWNER FACT SHEET" TO THE HOMEOWNER.
8.
## FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROPLAND), PERMITTEES
## MUST RETURN THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE PRIOR TO SUBMITTING
## THE NOT.
## SEED NOTES:
## ALL SEED MIXES AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MNDOT SEEDING MANUAL.
## GENERAL RECOMMENDATIONS:
## THE CONTRACTOR IS RESPONSIBLE TO SALVAGE AND PRESERVE EXISTING TOPSOIL NECESSARY FOR FINAL
## STABILIZATION AND TO ALSO MINIMIZE COMPACTION IN ALL LANDSCAPE AREAS. IMMEDIATELY BEFORE SEEDING
## THE SOIL SHALL BE TILLED TO A MINIMUM DEPTH OF 3 INCHES.
## TEMPORARY EROSION CONTROL SEEDING, MULCHING & BLANKET.
## SEED
·
## TEMPORARY SEED SHALL BE MNDOT SEED MIX 21-112 (WINTER WHEAT COVER CROP) FOR WINTER AND 21-111
## (OATS COVER CROP) FOR SPRING/SUMMER APPLICATIONS. BOTH SEED MIXES SHALL BE APPLIED AT A SEEDING
## RATE OF 100 LBS/ACRE.
## MULCH
·
## IMMEDIATELY AFTER SEEDING, WITHIN 24 HOURS, MNDOT TYPE 1 MULCH SHOULD BE APPLIED TO PROTECT
## AND ENHANCE SEED GERMINATION. MULCH SHALL BE APPLIED AT 90% COVERAGE (2 TONS PER ACRE OF
## STRAW MULCH)
## SLOPES
·
## 3:1 (HORIZ/VERT.) OR FLATTER MUCH SHALL BE COVERED WITH MULCH
·
## SLOPES STEEPER THAN 3:1 OR DITCH BOTTOMS SHALL BE COVERED WITH EROSION CONTROL BLANKET.
·
## SEE PLAN FOR MORE DETAILED DITCH AND STEEP SLOPE EROSION CONTROL TREATMENTS.
## REVISION SUMMARY
## DATE
## DESCRIPTION
## UNITY TEMPLE CHURCH OF GODPO BOX 29035
## BROOKLYN CENTER, MN 55429
763-537-6996
## INFO@UNITYTEMPLECOGIC.ORG
## PROJECT NARRATIVE:
## PROJECT IS A PROPOSED CHURCH ADDITION.
## SITE, GRADING, UTILITY AND LANDSCAPE
## IMPROVEMENTS WILL OCCUR.
## INFILTRATION NARRATIVE:
## INFILTRATION
## IS
## PROVIDED AS PART OF THE PROJECTS PERMANENT STORM WATER MANAGEMENT SYSTEM
.
## SOIL CONTAMINATION NARRATIVE:
## SOILS ONSITE
## HAVE NOT BEEN
## IDENTIFIED AS CONTAMINATED.
## SPECIAL TMDL BMP REQUIREMENTS SITE SPECIFIC (IF REQUIRED):
## THIS PROJECT IS WITHIN ONE MILE AND DISCHARGES TO
## UPPER TWIN LAKE - UPPER TWIN LAKE
## IS IDENTIFIED AS
## AN IMPAIRED WATER BODY PER THE MPCA'S 303(D) IMPAIRED WATERS LIST.
## UPPER TWIN LAKE
## IS IMPAIRED FOR
NUTRIENT EUTROPHICATION BIOLOGICAL INDICATORS. BECAUSE THIS WATER BODY IS LOCATED WITHIN ONEMILE OF THE SITE, BMPS AS DEFINED IN THE NPDES PERMIT ITEMS 23.9 AND 23.10 APPLY. THESE ARE AS
## FOLLOWS:
1.
## DURING CONSTRUCTION:
## A.
## STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION
## BUT IN NO CASE COMPLETED LATER THAN
## SEVEN (7)
## DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT
## PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.B.
## TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN SECTION 14. MUST BE USED FOR
## COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE
## TIME.
## PERMANENT STABILIZATION NOTES SITE SPECIFIC:
## PERMANENT SEED MIX
·
## FOR THIS PROJECT ALL AREAS THAT ARE NOT TO BE SODDED OR LANDSCAPED SHALL RECEIVE A NATIVE
## PERMANENT SEED MIX.
··
## AREAS IN BUFFERS AND ADJACENT TO OR IN WET AREAS MNDOT SEED MIX 33-261 (STORMWATER
## SOUTH AND WEST) AT 35 LBS PER ACRE.
··
## DRY AREAS MNDOT SEED MIX 35-221 (DRY PRAIRIE GENERAL) AT 40 LBS PER ACRE.
·
## MAINTENANCE SHALL BE IN ACCORDANCE TO THE MNDOT SEEDING MANUAL.
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## NATIVE BUFFER NARRATIVE:
## PRESERVING A 50 FOOT NATURAL BUFFER AROUND WATER BODIES
## IS NOT
## REQUIRED OF THIS
## PROJECT BECAUSE WATER BODIES ARE NOT LOCATED ON SITE.
## DESIGN ENGINEER: DAVID J. KNAEBLE P.E.
## TRAINING COURSE: DESIGN OF SWPPPTRAINING ENTITY: UNIVERSITY OF MINNESOTA
## INSTRUCTOR: JOHN CHAPMAN
## DATES OF TRAINING COURSE: 8/22/2012- 8/23/2012
## TOTAL TRAINING HOURS: 12
## DATE OF RECERTIFICATION: 1/3/2025EXPIRATION: 5/31/2028
Page 125 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SW1.4
## SWPPP - ATTACHMENTS
## ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT
## SOILS INFORMATION
## GENERAL SITE INFORMATION (5.1)
1. DESCRIBE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP'S). INCLUDE THE TIMING FOR INSTALLATION AND PROCEDURES USED TO ESTABLISH ADDITIONAL
TEMPORARY BMP'S AS NECESSARY. (5.5)THE PROJECT IS PROTECTED BY TWO (W) MAIN BMP'S, SILT FENCE AND INLET PROTECTION DEVICES. THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE AND MONITORED AS NECESSARY. INLET PROTECTION DEVICES WILL BE
INSTALLED IN ALL CATCH BASINS ON THE SITE AND ANY OFF SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES ADDITIONAL BMP'S SUCH AS EROSION CONTROL BLANKET MAY BE UTILIZED.
2. ATTACH TO THIS SWPPP A TABLE WITH THE ANTICIPATED QUANTITIES FOR THE LIFE OF THE PROJECT FOR ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S (5.7).
## SEE PAGE SW1.3
## 3. ATTACH TO THIS SWPPP A SITE MAP THAT INCLUDES THE FOLLOWING FEATURES (5.9):
EXIST AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN THE PROJECT LIMITS.
## LOCATIONS OF IMPERVIOUS SURFACES AND SOIL TYPES.
·
EXISTING AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN PROJECT LIMITS.
·
## LOCATIONS OF AREAS NOT TO BE DISTURBED.
·
## LOCATION OF AREAS OF PHASED CONSTRUCTION.
·
ALL SURFACE WATERS AND EXISTING WETLANDS WITHIN ONE MILE FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER RUNOFF FROM THE SITE (IDENTIFIABLE ON MAPS SUCH AS USGS 7.5 MINUTE QUADRANGLE MAPS OR EQUIVALENT.
WHERE SURFACE WATERS RECEIVING RUNOFF ASSOCIATED WITH CONSTRUCTION ACTIVITY WILL NOT FIT ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW, INDICATING BOTH DIRECTION AND DISTANCE TO THE SURFACE WATER.
·
## METHODS TO BE USED FOR FINAL STABILIZATION OF ALL EXPOSED SOIL AREA
4. WERE STORMWATER MITIGATION MEASURES REQUIRED AS THE RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR OTHER REQUIRED LOCAL, STATE OR FEDERAL REVIEW OF THE PROJECT?
## NO
## IF YES, DESCRIBE HOW THESE MEASURES WERE ADDRESSED IN THE SWPPP. (5.16)
## N/A
5. IS THE PROJECT LOCATED IN A KARST AREA SUCH THAT ADDITIONAL MEASURES WOULD BE NECESSARY TO PROJECT DRINKING WATER SUPPLY MANAGEMENT AREAS AS DESCRIBED IN MINN. R. CHAPTERS 7050 AND 7060?
## NO
## IF YES, DESCRIBE THE ADDITIONAL MEASURES TO BE USED. (SECTION 23)
## N/A
## 6. DOES THE SITE DISCHARGE TO A CALCEREOUS FEN LISTED IN MINN. R. 7050.0180, SUBP. 6.B?
## NO
IF YES, A LETTER OF APPROVAL FROM THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES MUST BE OBTAINED PRIOR TO APPLICATION FOR THIS PERMIT.
7. DOES THE SITE DISCHARGE TO A WATER THAT IS LISTED AS IMPAIRED FOR THE FOLLOWING POLLUTANT(S) OR STRESSOR(S): PHOSPHORUS, TURBIDITY, DISSOLVED OXYGEN OR BIOTIC IMPAIRMENT? USE THE SPECIAL AND IMPAIRED WATERS SEARCH TOOL AT:
## WWW.PCA.STATE.MN.US/WATER/STORMWATER/STORMWATER-C.HTML
## YES
## IF NO, SKIP TO TRAINING
DOES THE IMPAIRED WATER HAVE AN APPROVED TOTAL MAXIMUM DAILY LOADS (TMDL) WITH AN APPROVED WASTE LOAD ALLOCATION FOR CONSTRUCTION ACTIVITY?
## YES
## IF YES:
A. LIST THE RECEIVING WATER, THE AREAS OF THE SITE DISCHARGING TO IT, AND THE POLLUTANT(S) IDENTIFIED IN THE TMDL.
B. LIST THE BMP'S AND ANY OTHER SPECIFIC CONSTRUCTION STORMWATER RELATED IMPLEMENTATION ACTIVITIES IDENTIFIED IN THE TMDL.
IF THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF THE IMPAIRED WATER AND THE WATER FLOWS TO THE IMPAIRED WATER BUT NO SPECIFIC BMPS FOR CONSTRUCTION ARE IDENTIFIED IN THE TMDL, THE ADDITIONAL BMPS IN SECTION 23 MUST BE ADDED
TO THE SWPPP AND IMPLEMENTED (15.19). THE ADDITIONAL BMPS ONLY APPLY TO THOSE PORTIONS OF THE PROJECT THAT DRAIN TO ONE OF THE IDENTIFIED DISCHARGE POINTS.
## N/A
8. IDENTIFY ADJACENT PUBLIC WATERS WHERE THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES (DNR) HAS DECLARED “WORK IN WATER RESTRICTIONS” DURING FISH SPAWNING TIMEFRAMES
## N/A
## SELECTION OF A PERMANENT STORMWATER MANAGEMENT SYSTEM (SECTION 15)
## 1. WILL THE PROJECT CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE?
## YES
IF YES, A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF FROM THE CUMULATIVE NEW IMPERVIOUS SURFACES MUST BE RETAINED ON SITE (SEE 16.7 OF THE PERMIT) THROUGH INFILTRATION UNLESS PROHIBITED DUE TO ONE OF THE REASONS IN ITEMS 16.4
THROUGH 16.21. IF INFILTRATION IS PROHIBITED IDENTIFY OTHER METHOD OF MEETING WATER QUALITY REQUIREMENTS (E.G., FILTRATION SYSTEM, WET SEDIMENTATION BASIN, REGIONAL PONDING OR EQUIVALENT METHOD
2. DESCRIBE WHICH METHOD WILL BE USED TO TREAT RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE PROJECT:
INCLUDE ALL CALCULATIONS AND DESIGN INFORMATION FOR THE METHOD SELECTED. SEE SECTION 23 OF THE PERMIT FOR SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH METHOD.INFILTRATION / REGIONAL PONDING
CALCULATIONS ARE WITHIN THE SITE STORM WATER MANAGEMENT REPORT AND PART OF THIS SWPPP AS ATTACHMENT D.
3. IF IT IS NOT FEASIBLE TO MEET THE TREATMENT REQUIREMENT FOR THE WATER QUALITY VOLUME, DESCRIBE WHY. THIS CAN INCLUDE PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY
PERMANENT STORMWATER MANAGEMENT PRACTICES. DESCRIBE WHAT OTHER TREATMENT, SUCH AS GRASS SWALES, SMALLER PONDS, OR GRIT CHAMBERS, WILL BE IMPLEMENTED TO TREAT RUNOFF PRIOR TO DISCHARGE TO SURFACE WATERS. (15.8)
## IT IS NOT FEASIBLE TO MEET REQUIREMENT FOR WATER QUALITY VOLUME.
4. FOR PROJECTS THAT DISCHARGE TO TROUT STREAMS, INCLUDING TRIBUTARIES TO TROUT STREAMS, IDENTIFY METHOD OF INCORPORATING TEMPERATURE CONTROLS INTO THE PERMANENT STORMWATER MANAGEMENT SYSTEM.
## N/A
## EROSION PREVENTION PRACTICES (SECTION 8.1)
DESCRIBE THE TYPES OF TEMPORARY EROSION PREVENTION BMP'S EXPECTED TO BE IMPLEMENTED ON THIS SITE DURING CONSTRUCTION:
1. DESCRIBE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES TO MINIMIZE EROSION. DELINEATE AREAS NOT TO BE DISTURBED (E.G.,
## WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) BEFORE WORK BEGINS.
## SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE.
2. DESCRIBE METHODS OF TEMPORARILY STABILIZING SOILS AND SOIL STOCKPILES (E.G., MULCHES, HYDRAULIC TACKIFIERS, EROSION BLANKETS, ETC.):
TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, WITH PERMANENT COVER BEING EITHER SOD OR LANDSCAPE FEATURES.
3. DESCRIBE METHODS OF DISSIPATING VELOCITY ALONG STORMWATER CONVEYANCE CHANNELS AND AT CHANNEL OUTLETS (E.G., CHECK DAMS, SEDIMENT TRAPS, RIP RAP, ETC.):
## SOD WILL BE UTILIZED ALONG CHANNELS AND RIP RAP AT CHANNEL.
4. DESCRIBE METHODS TO BE USED FOR STABILIZATION OF DITCH AND SWALE WETTED PERIMETERS (NOTE THAT MULCH, HYDRAULIC SOIL TACKIFIERS, HYDROMULCHES, ETC. ARE NOT ACCEPTABLE SOIL
## STABILIZATION METHODS FOR ANY PART OF A DRAINAGE DITCH OR SWALE)
## FINAL STABILIZATION OF SWALES WILL BE SOD
5. DESCRIBE METHODS TO BE USED FOR ENERGY DISSIPATION AT PIPE OUTLETS (E.G., RIP RAP, SPLASH PADS, GABIONS, ETC.)
## RIP RAP WILL BE UTILIZED AT PIPE OUTLETS
6. DESCRIBE METHODS TO BE USED TO PROMOTE INFILTRATION AND SEDIMENT REMOVAL ON THE SITE PRIOR TO OFFSITE DISCHARGE, UNLESS INFEASIBLE (E.G., DIRECT STORMWATER FLOW TO VEGETATED AREAS):
## DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILIZED
7. FOR DRAINAGE OR DIVERSION DITCHES, DESCRIBE PRACTICES TO STABILIZE THE NORMAL WETTED PERIMETER WITHIN 200 LINEAL FEET OF THE PROPERTY EDGE OR POINT OF DISCHARGE TO SURFACE WATER.
## THE LAST 200 LINEAL FEET MUST BE STABILIZED WITHIN
## 24 HOURS
AFTER CONNECTING TO SURFACE WATERS AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED
FOR ALL DISCHARGES TO SPECIAL, IMPAIRED OR “WORK IN WATER RESTRICTIONS”. ALL OTHER REMAINING PORTIONS OF THE TEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 14 CALENDAR DAYS AFTER
CONNECTING TO A SURFACE WATER, PROPERTY EDGE AND CONSTRUCTION IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED.
## N/A, NO DITCHES ON SITE
8. DESCRIBE ADDITIONAL EROSION PREVENTION MEASURES THAT WILL BE IMPLEMENTED AT THE SITE DURING CONSTRUCTION (E.G., CONSTRUCTION PHASING, MINIMIZING SOIL DISTURBANCE, VEGETATIVE BUFFERS,
## HORIZONTAL SLOPE GRADING, SLOPE DRAINING/TERRACING, ETC.):
OTHER EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO; MINIMIZING SITE EXPOSURE WHEN POSSIBLE.
9. IF APPLICABLE, INCLUDE ADDITIONAL REQUIREMENTS IN APPENDIX A PART C.3 REGARDING MAINTAINING A 100-FOOT BUFFER ZONE OR INSTALLING REDUNDANT BMPS FOR PORTIONS OF THE SITE THAT DRAIN TO
## SPECIAL WATERS).
## N/A
10. IF APPLICABLE, DESCRIBE ADDITIONAL EROSION PREVENTION BMPS TO BE IMPLEMENTED AT THE SITE TO PROTECT PLANNED FILTRATION AREAS
## MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO FILTRATION AREAS.
## SEDIMENT CONTROL PRACTICES (SECTION 9.1)
DESCRIBE THE METHODS OF SEDIMENT CONTROL BMPS TO BE IMPLEMENTED AT THIS SITE DURING CONSTRUCTION TO MINIMIZE SEDIMENT IMPACTS TO SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS
## 1. DESCRIBE METHODS TO BE USED FOR DOWN GRADIENT PERIMETER CONTROL:
## SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE
## 2. DESCRIBE METHODS TO BE USED TO CONTAIN SOIL STOCKPILES:
## SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY
## 3. DESCRIBE METHODS TO BE USED FOR STORM DRAIN INLET PROTECTION:
## SEE INLET PROTECTION DETAILS
4. DESCRIBE METHODS TO MINIMIZE VEHICLE TRACKING AT CONSTRUCTION EXITS AND STREET SWEEPING ACTIVITIES:
## THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE.
5. DESCRIBE METHODS, IF APPLICABLE, ADDITIONAL SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO BE INSTALLED TO KEEP RUNOFF AWAY FROM PLANNED INFILTRATION AREAS WHEN EXCAVATED PRIOR TO FINAL
STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA:SILT FENCE TO BE INSTALLED IMMEDIATELY AFTER GRADING TO PROTECT INFILTRATION AREAS.
6. DESCRIBE METHODS TO BE USED TO MINIMIZE SOIL COMPACTION AND PRESERVE TOP SOIL (UNLESS INFEASIBLE) AT THIS SITE:
## LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED
7. DESCRIBE PLANS TO PRESERVE A 50-FOOT NATURAL BUFFER BETWEEN THE PROJECT'S SOIL DISTURBANCE AND A SURFACE WATER OR PLANS FOR REDUNDANT SEDIMENT CONTROLS IF A BUFFER IS INFEASIBLE:
DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. PROJECT WILL NOT DISTURB WITHIN 200 FEET OF WETLAND.
8. DESCRIBE PLANS FOR USE OF SEDIMENTATION TREATMENT CHEMICALS (E.G., POLYMERS, FLOCCULANTS, ETC.) SEE PART 9.18 OF THE PERMIT:
## N/A
9. IS THE PROJECT REQUIRED TO INSTALL A TEMPORARY SEDIMENT BASIN DUE TO 10 OR MORE ACRES DRAINING TO A COMMON LOCATION OR 5 ACRES OR MORE IF THE SITE IS WITHIN 1 MILE OF A SPECIAL OR
## IMPAIRED WATER?
## NO
IF YES, DESCRIBE (OR ATTACH PLANS ) SHOWING HOW THE BASIN WILL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH SECTION 14.
PROPOSED FILTRATION BASINS WILL SERVE AS TEMPORARY SEDIMENTS BASINS THAT WILL THEN BE CONVERTED TO PERMANENT FILTRATIONS BASINS.
## DEWATERING AND BASIN DRAINING (SECTION 10.1)
## 1. WILL THE PROJECT INCLUDE DEWATERING OR BASIN DRAINING?
## NO
IF YES, DESCRIBE MEASURES TO BE USED TO TREAT/DISPOSE OF TURBID OR SEDIMENT-LADEN WATER AND METHOD TO PREVENT EROSION OR SCOUR OF DISCHARGE POINTS (SEE 10.2 THROUGH 10.5 OF THE
## PERMIT):N/A
## 2. WILL THE PROJECT INCLUDE USE OF FILTERS FOR BACKWASH WATER?
## NO
## IF YES, DESCRIBE HOW FILTER BACKWASH WATER WILL BE MANAGED ON THE SITE OR PROPERLY DISPOSED (10.6):
## N/A
## ADDITIONAL BMP'S FOR SPECIAL WATERS AND DISCHARGES TO WETLANDS (SECTION 23.1)
## 1. SPECIAL WATERS. DOES YOUR PROJECT DISCHARGE TO SPECIAL WATERS?
## YES
2. IF PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATER MANAGEMENT PRACTICES, THEN OTHER
TREATMENT SUCH AS GRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS IS REQUIRED PRIOR TO DISCHARGE TO SURFACE WATERS. DESCRIBE WHAT OTHER TREATMENT WILL BE PROVIDED.
## N/A
3. DESCRIBE EROSION AND SEDIMENT CONTROLS FOR EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE TO A SPECIAL WATERS, AND TEMPORARY SEDIMENT BASINS FOR AREAS THAT DRAIN FIVE
## OR MORE ACRES DISTURBED AT ONE TIME.
## N/A
4. DESCRIBE THE UNDISTURBED BUFFER ZONE TO BE USED (NOT LESS THAN 100 LINEAR FEET FROM THE SPECIAL WATER).
## N/A
5. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL ENSURE THAT THE PRE AND POST PROJECT RUNOFF RATE AND VOLUME FROM THE 1, AND 2-YEAR 24-HOUR PRECIPITATION
## EVENTS REMAINS THE SAME.N/A
6. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL MINIMIZE ANY INCREASE IN THE TEMPERATURE OF TROUT STREAM RECEIVING WATERS RESULTING IN THE 1, AND 2-YEAR
## 24-HOUR PRECIPITATION EVENTS.
## N/A
7.
## WETLANDS.
DOES YOUR PROJECT DISCHARGE STORMWATER WITH THE POTENTIAL FOR SIGNIFICANT ADVERSE IMPACTS TO A WETLAND (E.G., CONVERSION OF A NATURAL WETLAND TO A STORMWATER
## POND)?NO
IF YES, DESCRIBE THE WETLAND MITIGATION SEQUENCE THAT WILL BE FOLLOWED IN ACCORDANCE WITH SECTION 22 OF THE PERMIT.
## N/A
## INSPECTIONS AND MAINTENANCE (SECTION 11.1)
## DESCRIBE PROCEDURES TO ROUTINELY INSPECT THE CONSTRUCTION SITE:
·
## ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND
·
WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN (7) DAYS AFTER THAT
INSPECTIONS MUST INCLUDE STABILIZED AREAS, EROSION PREVENTION,AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS.INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION STORMWATER INSPECTION CHECKLIST"
1. DESCRIBE PRACTICES FOR STORAGE OF BUILDING PRODUCTS WITH A POTENTIAL TO LEACH POLLUTANTS TO MINIMIZE EXPOSURE TO STORMWATER:
## ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE
2.
DESCRIBE PRACTICES FOR STORAGE OF PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICAL, AND LANDSCAPE MATERIALS:
## ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZED EXPOSURE
3. DESCRIBE PRACTICES FOR STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS OR TOXIC WASTE (E.G., OIL, FUEL, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD
PRESERVATIVE, ADDITIVES, CURING COMPOUNDS, AND ACIDS) ACCORDING TO MINN. R. CH. 7045, INCLUDING RESTRICTED ACCESS AND SECONDARY CONTAINMENT:
## ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS.
## 4. DESCRIBE COLLECTION, STORAGE AND DISPOSAL OF SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035:
ALL CONSTRUCTION DEBRIS AND SOLID WASTER WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS
5. DESCRIBE MANAGEMENT OF PORTABLE TOILETS TO PREVENT TIPPING AND DISPOSAL OF SANITARY WASTES IN ACCORDANCE WITH MINN. R. CH. 7040:SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS NEEDED BY THE PROVIDER.
## 6. DESCRIBE SPILL PREVENTION AND RESPONSE FOR FUELING AND EQUIPMENT OR VEHICLE MAINTENANCE:
EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT SHALL BE CHECKED FOR LEAKS.
7. DESCRIBE CONTAINMENT AND DISPOSAL OF VEHICLE AND EQUIPMENT WASH WATER AND PROHIBITING ENGINE DEGREASING ON THE SITE:
## ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE
8. DESCRIBE STORAGE AND DISPOSAL OF CONCRETE AND OTHER WASHOUT WASTES SO THAT WASTES DO NOT CONTACT THE GROUND:
## ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE.
## FINAL STABILIZATION (25.22)
## 1. DESCRIBE METHOD OF FINAL STABILIZATION (PERMANENT COVER) OF ALL DISTURBED AREAS:
## FINAL STABILIZATION WILL BE ACCOMPLISHED WITH PAVEMENT, SOD AND LANDSCAPE MATERIALS.
2. DESCRIBE METHODS USED TO CLEAN ALL STORMWATER TREATMENT SYSTEMS AND STORMWATER CONVEYANCE SYSTEMS OF ACCUMULATED SEDIMENT (25.22):
## CLEANING OF STORMWATER TREATMENT SYSTEMS SHALL BE DONE BY HAND SUCH AS THE USE OF A SHOVEL.
3. DESCRIBE METHODS FOR REMOVING ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S:
REMOVAL OF TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S CAN BE DONE BY HAND AND PROPERLY DISPOSED OF.
## REVISION SUMMARY
## DATE
## DESCRIPTION
## PROJECT LOCATION
## ADDRESS
## 4801 63RD AVE N
## CITY/TOWNSHIP
## BROOKLYN CENTER
## STATE
## MN
## COUNTY
## HENNEPIN
## ZIP CODE
55429
## PROJECT SIZE
## 2.3 ACRES
## LATTITUDE/LONGITUDE OF APPROX.
## CENTROID OF PROJECT
45.06869670704361, -93.34172798672704
## METHOD OF LAT/LONG COLLECTION
## ONLINE TOOL
## PROJECT TYPE
## OTHER
## IMPERVIOUS SURFACES (ACRES)
## EXISTING
0.6
## PROPOSED
1.5
## DIFFERENCE
0.9
## ESTIMATED CONSTRUCTION TIMELINE
## START
## JUNE 2027
## END
## NOVEMBER 2028
## CONSTRUCTION ACTIVITY
## CHURCH ADDITION
## SOIL TYPES
## MAP UNIT SYMBOL
## MAP UNIT NAME
## D64B
## URBAN LAND-HUBBARD COMPLEX, MISSISSIPPIRIVER VALLEY, 0 TO 8 PERCENT SLOPES
## U2A
## UDORTHENTS, WET SUBSTRATUM, 0 TO 2 PERCENT
## SLOPES
## RECEIVING WATER BODIES
## WATER BODY ID
## NAME OF WATER BODY
## WATER BODY TYPE
## SPECIAL WATER (Y/N)
## IMPAIRED WATER (Y/N)
1
27-0042-01
## UPPER TWIN
## LAKE
## N
## Y
2
3
4
## SITE LOCATION MAP
-
Page 126 of 169
## COPYRIGHT CIVIL SITE GROUP INC.
c
## PROJECT
## PRELIMINARY:
## NOT FOR
## CONSTRUCTION
2026
## ISSUE/SUBMITTAL SUMMARY
## DATE
## DESCRIPTION
7/7/26
## CITY SUBMITTAL
## PROJECT MANAGER
## DAVID KNAEBLE
## CONTACT NUMBER
## 612-615-0060 X
703
## DRAWN BY
## BN
## REVIEWED BY
## DK
## PROJECT NUMBER
25538
## UNITY TEMPLE CHURCH ADD
## 4801 63RD AVE N, BROOKLYN CENTER, MN 55429
## UNITY TEMPLE CHURCH OF GOD
## PO BOX 2935, BROOKLYN CENTER, MN 55429
48776
## David J. Knaeble
## LICENSE NO.
## DATE
## I HEREBY CERTIFY THAT THIS PLAN,
## SPECIFICATION, OR REPORT WAS
## PREPARED BY ME OR UNDER MY DIRECT
## SUPERVISION AND THAT I AM A DULY
## LICENSED PROFESSIONAL ENGINEER
## UNDER THE LAWS OF THE STATE OF
## MINNESOTA.
7/7/2026
## Civil Engineering ° Surveying ° Landscape
## Architecture
## 5000 Glenwood Avenue
## Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
## OWNER
## SW1.5
## SWPPP - ATTACHMENTS
## ATTACHMENT C - ABOVE-GROUND
## FACILITY MANAGEMENT SCHEDULE
1.
## ALL STORMWATER RETENTION, DETENTION AND TREATMENT BASINS MUST BE INSPECTED AT LEAST ONCE A YEAR TO
DETERMINE THAT BASIN RETENTION AND TREATMENT CHARACTERISTICS ARE ADEQUATE. A STORAGE TREATMENT BASIN
## WILL BE CONSIDERED INADEQUATE IF SEDIMENT HAS DECREASED THE WET STORAGE VOLUME BY 50 PERCENT OR DRY
STORAGE VOLUME BY 25 PERCENT OF ITS ORIGINAL DESIGN VOLUME. BASED ON THIS INSPECTION, IF A STORMWATER BASIN
REQUIRES SEDIMENT CLEANOUT, THE BASIN WILL BE RESTORED TO ITS ORIGINAL DESIGN CONTOURS AND VEGETATED
## STATE WITHIN ONE YEAR OF THE INSPECTION DATE.
2.
## ALL OUTLET STRUCTURES, CULVERTS, OUTFALL STRUCTURES AND OTHER STORMWATER FACILITIES FOR WHICH
MAINTENANCE REQUIREMENTS ARE NOT OTHERWISE SPECIFIED HEREIN MUST BE INSPECTED IN THE SPRING, SUMMER AND
FALL OF EACH YEAR. WITHIN 30 DAYS OF THE INSPECTION DATE, ALL ACCUMULATED SEDIMENT AND DEBRIS MUST BEREMOVED SUCH THAT EACH STORMWATER FACILITY OPERATES AS DESIGNED AND PERMITTED. CONTRIBUTING DRAINAGE
AREAS MUST BE KEPT CLEAR OF LITTER AND VEGETATIVE DEBRIS, INFLOW PIPES AND OVERFLOW SPILLWAYS KEPT CLEAR,
INLET AREAS KEPT CLEAN, AND UNDESIRABLE VEGETATION REMOVED. EROSION IMPAIRING THE FUNCTION OR INTEGRITY OF
THE FACILITIES, IF ANY, WILL BE CORRECTED, AND ANY STRUCTURAL DAMAGE IMPAIRING OR THREATENING TO IMPAIR THE
## FUNCTION OF THE FACILITIES MUST BE REPAIRED.
3.
VOLUME CONTROL FACILITIES AND CONTRIBUTING DRAINAGE AREAS MUST BE INSPECTED EVERY THREE MONTHS DURING
## THE OPERATIONAL PERIOD (BETWEEN SPRING SNOWMELT AND FIRST SUBSTANTIAL SNOWFALL) AND MONITORED AFTER
RAINFALL EVENTS OF 1 INCH OR MORE TO ENSURE THAT THE CONTRIBUTING DRAINAGE AREA IS CLEAR OF LITTER AND
DEBRIS, INFLOW PIPES AND OVERFLOW SPILLWAYS ARE CLEAR, INLET AREAS ARE CLEAN, UNDESIRABLE VEGETATION IS
REMOVED AND THERE IS NO EROSION IMPAIRING OR THREATENING TO IMPAIR THE FUNCTION OF A FACILITY. IF SEDIMENTHAS ACCUMULATED IN A INFILTRATION FEATURE, WITHIN 30 DAYS OF INSPECTION DEPOSITED SEDIMENTS MUST BEREMOVED, THE INFILTRATION CAPACITY OF THE UNDERLYING SOILS MUST BE RESTORED, AND ANY SURFACE DISTURBANCE
MUST BE STABILIZED. INSPECTION MUST ENSURE THAT SEDIMENT TRAPS AND FOREBAYS ARE TRAPPING SEDIMENT AND
THAT MORE THAN 50 PERCENT OF THE STORAGE VOLUME REMAINS, THE CONTRIBUTING DRAINAGE AREA IS STABLE (I.E., NO
EROSION IS OBSERVED), AND INLETS AND OUTLET/OVERFLOW SPILLWAYS ARE IN GOOD CONDITIONS WITH NO EROSION.
## MAINTENANCE TECHNIQUES USED MUST PROTECT THE INFILTRATION CAPACITY OF THE PRACTICE BY LIMITING SOIL
## COMPACTION TO THE GREATEST EXTENT POSSIBLE (E.G., BY USING LOW-IMPACT EARTH-MOVING EQUIPMENT).
## ATTACHMENT B: SWPPP INSPECTION FORM
## ATTACHMENT C: MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEM
NOTE: THIS INSPECTION REPORT DOES NOT ADDRESS ALL ASPECTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS)
CONSTRUCTION STORMWATER PERMIT (PERMIT) ISSUED ON AUGUST 1, 2018. THE COMPLETION OF THIS CHECKLIST DOES NOT GUARANTEE THAT ALL PERMIT REQUIREMENTS ARE
IN COMPLIANCE; IT IS THE RESPONSIBILITY OF THE PERMITTEE(S) TO READ AND UNDERSTAND THE PERMIT REQUIREMENTS.
## FACILITY INFORMATION
## SITE NAME: SITE ADDRESS:
## PERMIT NUMBER:
## CITY:
## STATE:
## ZIP CODE:
## INSPECTION INFORMATION
## INSPECTOR NAME: _______________________ PHONE NUMBER: _________________________
## ORGANIZATION/COMPANY MAN: _____________________________________________________
## DATE (MM/DD/YYYY): _____________________
## TIME: ____________ AM / PM
IS THE INSPECTOR CERTIFIED IN SEDIMENT AND EROSION CONTROL AND IS IT DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP)?IS THIS INSPECTION ROUTINE OR IN RESPONSE TO A STORM EVENT:
## RAINFALL AMOUNT (IF APPLICABLE): ____________
IS SITE WITHIN ONE AERIAL MILE OF SPECIAL OR IMPAIRED WATER THAT CAN POTENTIALLY RECEIVE DISCHARGE FROM THE SITE?IF YES, FOLLOW SECTION 23 AND OTHER APPLICABLE PERMIT REQUIREMENTS
## NOTE:
## IF N/A IS SELECTED AT ANY TIME, SPECIFY WHY IN THE COMMENT AREA FOR THAT SECTION.
## EROSION CONTROL REQUIREMENT (SECTION 8.1)
1.
ARE SOILS STABILIZED WHERE NO CONSTRUCTION ACTIVITY HAS OCCURRED FOR 14 DAYS (INCLUDING STOCKPILES)?
## (7 DAYS WHERE APPLICABLE, OR 24 HOURS DURING MINNESOTA DEPARTMENT OF NATURAL RESOURCES [DNR] FISH
## SPAWNING RESTRICTIONS)
2.
## HAS THE NEED TO DISTURB STEEP SLOPES BEEN MINIMIZED?
3.
## IF STEEP SLOPES ARE DISTURBED, ARE STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES USED?
4.
ALL DITCHES/SWALES STABILIZED 200' BACK FROM POINT OF DISCHARGE OR PROPERTY EDGE WITHIN 24 HOURS? (MULCH,
HYDROMULCH, TACKIFIER, OR SIMILAR BEST MANAGEMENT PRACTICES [BMPS] ARE NOT ACCEPTABLE IN DITCHES/SWALES
## IF THE SLOPE IS GREATER THAN 2%)ARE APPROPRIATE BMP'S INSTALLED PROTECTING INLETS/OUTLETS?
5.
## DO PIPE OUTLETS HAVE ENERGY DISSIPATION (WITHIN 24 HOURS OF CONNECTION)?
6.
## IS CONSTRUCTION PHASING BEING FOLLOWED IN ACCORDANCE WITH THE SWPPP?
7.
## ARE AREAS NOT TO BE DISTURBED MARKED OFF (FLAGS, SIGNS, ETC.)?
## COMMENTS:
## SEDIMENT CONTROL REQUIREMENTS (SECTION 9.1)
1.
## ARE PERIMETER SEDIMENT CONTROLS INSTALLED PROPERLY ON ALL DOWN GRADIENT PERIMETERS?
2.
## ARE APPROPRIATE BMPS INSTALLED PROTECTING INLETS, CATCH BASINS, AND CULVERT INLETS?
3.
## IS A 50 FOOT NATURAL BUFFER PRESERVED AROUND ALL SURFACE WATERS DURING CONSTRUCTION?
3.1.
## IF NO, HAVE REDUNDANT SEDIMENT CONTROLS BEEN INSTALLED?
4.
## DO ALL ERODIBLE STOCKPILES HAVE PERIMETER CONTROL IN PLACE?
5.
IS THERE A TEMPORARY SEDIMENT BASIN ON SITE, AND IS IT BUILT AS REQUIRED IN SECTION 14 OF THE PERMIT?
6.
## IS SOIL COMPACTION BEING MINIMIZED WHERE NOT DESIGNED FOR COMPACTION?
7.
## IS TOPSOIL BEING PRESERVED UNLESS INFEASIBLE?
8.
## IF CHEMICAL FLOCCULANTS ARE USED, IS THERE A CHEMICAL FLOCCULANT PLAN IN PLACE?
## COMMENTS:
## DISCLOSURES:
·
AFTER DISCOVERY, THE PERMIT REQUIRES MANY OF THE DEFICIENCIES THAT MAY BE FOUND ON SITE BE CORRECTED WITHIN A SPECIFIED PERIOD OF TIME. SEE PERMIT FOR
## MORE DETAILS.
·
THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS AS WELL AS
EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT ACCORDING TO SECTION 3, OR THEPROJECT HAS MET THE TERMINATION CONDITIONS OF THE PERMIT AND A NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MINNESOTA POLLUTION CONTROL AGENCY.
## Y
## N
## N/A
## Y
## N
## N/A
## 7 DAY
## RAIN
## Y
## N
## MAINTENANCE AND INSPECTIONS (SECTION 11)
1.
## ARE ALL PREVIOUSLY STABILIZED AREAS MAINTAINING GROUND COVER?
2.
## ARE PERIMETER CONTROLS MAINTAINED AND FUNCTIONING PROPERLY, SEDIMENT REMOVED WHEN ONE-HALF FULL?
3.
## ARE INLET PROTECTION DEVICES MAINTAINED AND ADEQUATELY PROTECTING INLETS?
4.
## ARE THE TEMPORARY SEDIMENT BASINS BEING MAINTAINED AND FUNCTIONING PROPERLY?
5.
## ARE VEHICLE TRACKING BMPS AT SITE EXISTS IN PLACE AND MAINTAINED AND FUNCTIONING PROPERLY?
6.
## IS ALL TRACKED SEDIMENT BEING REMOVED WITHIN 24 HOURS?
7.
## HAVE ALL SURFACE WATERS, DITCHES, CONVEYANCES, AND DISCHARGE POINTS BEEN INSPECTED?
8.
## WERE ANY DISCHARGES SEEN DURING THIS INSPECTION (I.E., SEDIMENT, TURBID WATER, OR OTHERWISE)?
IF YES, RECORD THE LOCATION OF ALL POINTS OF DISCHARGE. PHOTOGRAPH AND DESCRIBE THE DISCHARGE (SIZE, COLOR, ODOR, FOAM, OIL SHEEN, TIME, ETC.).
DESCRIBE HOW THE DISCHARGE WILL BE ADDRESSED. WAS THE DISCHARGE A SEDIMENT DELTA? IF YES, WILL THE DELTA BE RECOVERED WITHIN SEVEN DAYS AND
## IN ACCORDANCE WITH ITEM 11.5 OF THE PERMIT?
## COMMENTS:
## Y
## N
## N/A
## POLLUTION PREVENTION (SECTION 12)
1.
## ARE ALL CONSTRUCTION MATERIALS THAT CAN LEACH POLLUTANTS UNDER COVER OR PROTECTED?
2.
## ARE HAZARDOUS MATERIALS BEING PROPERLY STORED?
3.
## ARE APPROPRIATE BMPS BEING USED TO PREVENT DISCHARGES ASSOCIATED WITH FUELING AND MAINTENANCE OF
## EQUIPMENT OR VEHICLES?
4.
## ARE ALL SOLID WASTES BEING PROPERLY CONTAINED AND DISPOSED OF?
5.
## IS THERE A CONCRETE/OTHER MATERIAL WASHOUT AREA ON SITE AND IS IT BEING USED?
6.
## IS THE CONCRETE WASHOUT AREA MARKED WITH A SIGN?
7.
## ARE THE CONCRETE/OTHER MATERIAL WASHOUT AREAS PROPERLY MAINTAINED?
## COMMENTS:
## Y
## N
## N/A
## OTHER
1.
## IS A COPY OF THE SWPPP, INSPECTION RECORDS, AND TRAINING DOCUMENTATION LOCATED ON THE CONSTRUCTION
## SITE, OR CAN IT BE MADE AVAILABLE WITHIN 72 HOURS?
2.
## HAS THE SWPPP BEEN FOLLOWED AND IMPLEMENTED ON SITE, AND AMENDED AS NEEDED?
3.
IS ANY DEWATERING OCCURRING ON SITE?IF YES, WHAT BMPS ARE BEING USED TO ENSURE THAT CLEAN WATER IS LEAVING THE SITE AND THE DISCHARGE IS NOT
## CAUSING EROSION OR SCOUR?
4.
## WILL A PERMANENT STORMWATER MANAGEMENT SYSTEM BE CREATED FOR THIS PROJECT IF REQUIRED AND IN
## ACCORDANCE WITH SECTION 15 OF THE PERMIT (IF ADDING AN ACRE OR MORE OF NEW IMPERVIOUS SURFACE)?
## IF YES, DESCRIBE:
5.
## IF INFILTRATION/FILTRATION SYSTEMS ARE BEING CONSTRUCTED, ARE THEY MARKED AND PROTECTED FROM
## COMPACTION AND SEDIMENTATION?
6.
DESCRIPTION OF AREAS OF NON-COMPLIANCE NOTED DURING THE INSPECTION, REQUIRED CORRECTIVE ACTIONS, AND RECOMMENDED DATE OF COMPLETION OF
## CORRECTIVE ACTIONS:
7.
## PROPOSED AMENDMENTS TO THE SWPPP:
8.
## POTENTIAL AREAS OF FUTURE CONCERN:
9.
## ADDITIONAL COMMENTS
## Y
## N
## N/A
## Y
## N
## REVISION SUMMARY
## DATE
## DESCRIPTION
Page 127 of 169
## Project:
## Details:
## Luma Sales: Steve Hahn
## Layout By: Joe Frey
## Date:7/13/2026
## Filename: LS952-4421 UNITY TEMPLE CHURCH - SITE.AGI
## Page Size:
36 x 44
## IPA-d.com
Project #
These drawings are for conceptual use only and are not
intended for construction. Fixture runs and quantities
should be verified prior to order. Values represented
are an approximation generated from manufacturers
photometric inhouse or independent lab tests with data
supplied by lamp manufacturers.
## Unity Temple Church-Site
## Site Lighting
## LS952-4421-1
## Luminaire ScheduleSymbol
## Calculation SummaryLabel
## CalcType
## Units
## Avg
## Qty
## Label
## Arrangement
## Lum. Lumens
## LLF
## Description
## Lum. Watts
## Arr. Watts
## Max
## Total Watts
## Tag
## Min
3
## WP10
## Single
## Avg/Min
## Max/Min
## Site
## Illuminance
18.0
3174
0.900
## SSW-LED-03L-3-UNV-DIM-40
## Fc
0.8
7.9
0.0
## N.A.
## N.A.
23
23
69
MH = 10ft
## Parking and Drive
## Illuminance
## Fc
7
## P
## Single
9900
0.900
## MRS-LED-15L-SIL-FT-40-70CRI-IL
111
111
777
MH = 16ft
4
## P1
## Single
15297
0.900
## MRS-LED-15L-SIL-FT-40-70CRI
111
111
444
MH + 16ft
1.5
3.6
0.2
7.6
Scale: 1 inch= 20 Ft.
## N
## O
## P
## A
## R
## K
## I
## N
## G
## N
## O
## P
## A
## R
## K
## I
## N
## G
## N
## O
## P
## A
## R
## K
## I
## N
## G
## N
## O
## P
## A
## R
## K
## I
## N
## G
## N
## O
## P
## A
## R
## K
## I
## N
## G
## N
## O
## P
## A
## R
## K
## I
## N
## G
## G
## U
## P
5
5
5
1
1
1
1
1
2
2
2
2
## P1
MH + 16ft
.5
.5
.5
.5
.5
.5
1
1
1
1
1
2
2
2
2
## P1
MH + 16ft
.5
.5
.5
.5
.5
.5
1
1
1
1
1
2
2
2
2
## P1
MH + 16ft
.5
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
## P
MH = 16ft
.5
.5
.5
.5
.5
1
1
1
1
1
2
2
2
2
## P1
MH + 16ft
.5
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
MH = 16ft
## P
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
MH = 16ft
## P
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
## P
MH = 16ft
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
MH = 16ft
## P
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
MH = 16ft
## P
.5
.5
.5
.5
.5
1
1
1
1
2
2
2
## P
MH = 16ft
.5
.5
.5
.5
.5
## WP10
MH = 10ft
1
1
2
.5
.5
.5
MH = 10ft
## WP10
1
1
2
.5
.5
.5
MH = 10ft
## WP10
1
1
2
.5
.5
.5
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
2
0
.
2
0
.
1
0
.
1
0
.
1
0
.
2
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
2
0
.
3
0
.
4
0
.
4
0
.
3
0
.
2
0
.
2
0
.
2
0
.
3
0
.
4
0
.
4
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
5
0
.
8
0
.
9
0
.
8
0
.
6
0
.
3
0
.
2
0
.
3
0
.
6
0
.
8
0
.
9
0
.
7
0
.
3
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
1
.
0
1
.
8
2
.
1
1
.
6
0
.
8
0
.
3
0
.
2
0
.
4
1
.
0
1
.
7
1
.
9
1
.
6
0
.
7
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
7
3
.
0
3
.
1
2
.
2
1
.
0
0
.
3
0
.
2
0
.
4
1
.
2
2
.
4
3
.
2
2
.
7
1
.
2
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
2
1
.
8
3
.
3
3
.
2
2
.
3
1
.
0
0
.
3
0
.
2
0
.
4
1
.
3
2
.
6
3
.
3
3
.
2
1
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
4
1
.
4
2
.
9
3
.
2
2
.
3
0
.
9
1
.
2
2
.
6
3
.
2
2
.
9
1
.
1
0
.
2
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
2
1
.
7
3
.
3
3
.
3
2
.
4
1
.
0
0
.
3
0
.
2
0
.
4
1
.
3
2
.
6
3
.
3
3
.
2
1
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
6
3
.
0
3
.
2
2
.
3
1
.
0
0
.
4
0
.
3
0
.
4
1
.
3
2
.
5
3
.
3
2
.
8
1
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
1
.
0
1
.
8
2
.
1
1
.
7
0
.
9
0
.
4
0
.
3
0
.
5
1
.
1
1
.
9
2
.
2
1
.
8
0
.
8
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
5
0
.
9
1
.
1
1
.
0
0
.
7
0
.
4
0
.
3
0
.
5
0
.
8
1
.
1
1
.
1
0
.
9
0
.
5
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
3
0
.
6
0
.
7
0
.
8
0
.
6
0
.
4
0
.
3
0
.
4
0
.
7
0
.
8
0
.
8
0
.
7
0
.
4
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
5
0
.
9
1
.
1
1
.
0
0
.
7
0
.
4
0
.
3
0
.
4
0
.
8
1
.
1
1
.
2
1
.
0
0
.
5
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
9
1
.
8
2
.
1
1
.
7
1
.
0
0
.
4
0
.
3
0
.
4
1
.
0
1
.
8
2
.
3
2
.
0
1
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
5
2
.
9
3
.
2
2
.
3
1
.
1
0
.
4
0
.
2
0
.
4
1
.
1
2
.
3
3
.
2
3
.
0
1
.
6
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
5
3
.
3
3
.
3
2
.
5
1
.
1
0
.
3
0
.
2
0
.
3
1
.
0
2
.
4
3
.
3
3
.
3
1
.
7
0
.
2
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
3
1
.
3
2
.
9
3
.
2
2
.
4
1
.
1
0
.
3
0
.
2
0
.
3
1
.
0
2
.
4
3
.
2
2
.
9
1
.
4
0
.
4
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
5
3
.
3
3
.
3
2
.
5
1
.
1
0
.
3
0
.
2
0
.
3
1
.
0
2
.
4
3
.
3
3
.
3
1
.
7
0
.
2
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
1
.
4
2
.
9
3
.
2
2
.
3
1
.
1
0
.
4
0
.
2
0
.
4
1
.
0
2
.
2
3
.
1
2
.
9
1
.
6
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
9
1
.
8
2
.
1
1
.
7
1
.
0
0
.
9
1
.
6
1
.
9
1
.
7
0
.
9
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
4
0
.
8
1
.
0
0
.
9
0
.
6
0
.
4
0
.
3
0
.
4
0
.
6
0
.
9
1
.
0
0
.
8
0
.
5
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
2
0
.
3
0
.
4
0
.
4
0
.
4
0
.
3
0
.
4
0
.
4
0
.
6
0
.
7
0
.
6
0
.
5
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
2
0
.
3
0
.
3
0
.
4
0
.
6
0
.
7
0
.
8
0
.
8
0
.
7
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
2
0
.
3
0
.
7
1
.
1
1
.
3
1
.
4
1
.
2
0
.
8
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
5
1
.
1
1
.
9
2
.
2
2
.
2
1
.
7
1
.
0
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
5
0
.
9
1
.
6
2
.
8
3
.
0
2
.
8
2
.
1
1
.
2
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
3
0
.
8
1
.
5
2
.
3
3
.
5
3
.
2
2
.
8
2
.
3
1
.
2
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
3
0
.
8
1
.
9
2
.
5
3
.
7
3
.
2
2
.
8
2
.
3
1
.
3
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
3
0
.
3
0
.
2
0
.
2
0
.
2
0
.
2
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
7
1
.
2
1
.
8
3
.
1
3
.
1
2
.
8
2
.
3
1
.
3
0
.
6
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
5
0
.
6
0
.
6
0
.
6
0
.
5
0
.
7
1
.
2
1
.
6
2
.
4
1
.
6
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
4
0
.
6
1
.
3
2
.
2
2
.
5
2
.
5
2
.
0
1
.
2
0
.
6
0
.
3
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
4
0
.
8
1
.
1
1
.
2
1
.
2
1
.
1
0
.
9
1
.
4
3
.
1
7
.
9
2
.
8
0
.
1
0
.
2
0
.
3
0
.
8
1
.
4
1
.
7
1
.
8
1
.
5
1
.
0
0
.
6
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
0
1
.
7
2
.
1
2
.
1
1
.
8
1
.
1
0
.
5
0
.
3
0
.
2
0
.
5
0
.
8
1
.
0
1
.
1
1
.
1
0
.
9
0
.
6
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
1
2
.
1
2
.
7
3
.
0
2
.
8
1
.
6
0
.
9
0
.
6
0
.
2
0
.
5
0
.
7
0
.
9
1
.
0
1
.
1
0
.
9
0
.
6
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
2
2
.
2
2
.
8
3
.
2
3
.
5
2
.
3
1
.
7
0
.
9
0
.
3
0
.
6
1
.
1
1
.
3
1
.
5
1
.
3
1
.
0
0
.
6
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
5
1
.
2
2
.
2
2
.
8
3
.
2
3
.
8
2
.
9
3
.
1
3
.
4
6
.
8
3
.
1
0
.
4
0
.
9
1
.
8
2
.
2
2
.
3
1
.
9
1
.
2
0
.
7
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
5
1
.
1
2
.
1
2
.
8
3
.
2
3
.
3
2
.
3
2
.
0
1
.
7
1
.
5
1
.
0
0
.
5
0
.
9
1
.
5
2
.
7
3
.
0
2
.
8
2
.
3
1
.
4
0
.
7
0
.
3
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
3
0
.
6
1
.
1
2
.
0
2
.
6
2
.
7
2
.
5
1
.
7
0
.
8
0
.
6
0
.
4
0
.
3
0
.
7
1
.
6
2
.
3
3
.
6
3
.
3
2
.
8
2
.
5
1
.
4
0
.
7
0
.
3
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
1
0
.
2
0
.
3
0
.
4
0
.
5
0
.
7
1
.
1
1
.
7
2
.
1
2
.
0
1
.
8
1
.
2
0
.
6
0
.
6
0
.
5
0
.
5
1
.
8
5
.
0
7
.
0
2
.
7
2
.
6
2
.
7
3
.
7
3
.
3
2
.
8
2
.
5
1
.
4
0
.
7
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
1
0
.
1
0
.
3
0
.
5
0
.
9
1
.
2
1
.
5
1
.
7
2
.
0
2
.
1
2
.
0
1
.
5
1
.
0
0
.
8
1
.
0
1
.
3
1
.
4
1
.
4
1
.
5
2
.
0
2
.
6
3
.
1
3
.
2
2
.
2
2
.
0
2
.
0
3
.
1
3
.
2
2
.
9
2
.
5
1
.
5
0
.
8
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
1
0
.
1
0
.
3
0
.
7
1
.
5
2
.
3
2
.
7
2
.
8
2
.
9
2
.
9
2
.
4
1
.
5
0
.
9
0
.
9
1
.
3
2
.
2
2
.
6
2
.
7
2
.
7
2
.
9
2
.
5
1
.
6
0
.
9
0
.
7
0
.
8
1
.
3
2
.
2
2
.
6
2
.
7
2
.
3
1
.
5
1
.
0
0
.
6
0
.
3
0
.
2
0
.
1
0
.
0
0
.
1
0
.
1
0
.
3
0
.
7
1
.
7
3
.
0
3
.
4
3
.
3
3
.
4
3
.
5
2
.
7
1
.
4
0
.
8
0
.
8
1
.
4
2
.
7
3
.
4
3
.
3
3
.
2
3
.
4
2
.
9
1
.
6
0
.
8
0
.
5
0
.
4
0
.
8
1
.
4
1
.
9
2
.
2
2
.
1
1
.
7
1
.
2
0
.
8
0
.
4
0
.
2
0
.
1
0
.
0
0
.
0
0
.
1
0
.
3
0
.
6
1
.
4
2
.
7
3
.
3
3
.
1
3
.
3
3
.
1
2
.
2
1
.
1
0
.
6
0
.
6
1
.
1
2
.
2
2
.
9
3
.
1
3
.
0
3
.
0
2
.
4
1
.
3
0
.
6
0
.
4
0
.
3
0
.
5
0
.
9
1
.
5
2
.
0
2
.
2
2
.
1
1
.
6
1
.
0
0
.
5
0
.
3
0
.
1
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
7
1
.
4
1
.
5
1
.
3
1
.
4
1
.
4
1
.
0
0
.
5
0
.
3
0
.
3
0
.
5
1
.
0
1
.
2
1
.
1
1
.
0
1
.
1
1
.
0
0
.
5
0
.
3
0
.
2
0
.
3
0
.
4
0
.
7
1
.
5
2
.
3
2
.
7
2
.
7
2
.
1
1
.
2
0
.
6
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
0
0
.
1
0
.
1
0
.
2
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
1
0
.
1
0
.
1
0
.
1
0
.
2
0
.
3
0
.
5
0
.
9
1
.
7
3
.
0
3
.
2
3
.
0
2
.
3
1
.
3
0
.
6
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
8
1
.
5
2
.
3
3
.
6
3
.
3
2
.
9
2
.
5
1
.
3
0
.
6
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
7
1
.
9
2
.
5
3
.
6
3
.
3
2
.
8
2
.
5
1
.
4
0
.
6
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
6
1
.
1
1
.
7
3
.
0
3
.
1
2
.
8
2
.
4
1
.
4
0
.
7
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
4
0
.
6
1
.
0
2
.
0
2
.
4
2
.
4
2
.
0
1
.
3
0
.
7
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
6
1
.
1
1
.
4
1
.
5
1
.
3
1
.
0
0
.
6
0
.
3
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
3
0
.
5
0
.
7
0
.
8
0
.
7
0
.
6
0
.
4
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
3
0
.
3
0
.
3
0
.
3
0
.
2
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
Page 128 of 169
## UP
## UP
## UP
## UP
## DN
## DN
## UP
1
## B
4
## D
## C
3
## E
## A
2
## X
16'-6"31'-7"40'-8"
88'-9"
48'-1"40'-8"
10'-0"
33'-0"
16'-1"
20'-0"
49'-1"
## EXISTING
## LOWER LEVEL
## PROPOSED NORTH
## ADDITION
## PROPOSED SOUTH
## ADDITION
## STORAGE
## ADDITION
## PASTOR'S
## OFFICE
## EXISTING
## KITCHEN
## MECHANICAL
1
## B
4
## D
## C
3
48'-1"40'-8"
10'-0"
33'-0"
16'-1"
20'-0"
49'-1"
88'-9"
## E
## A
2
5'-8"
6'-0"
## APPROX 430
## EXISTING
## UPPER LEVEL
## PROPOSED NORTH
## ADDITION
## PROPOSED SOUTH
## ADDITION
## EXIT
## SOUND
16'-6"31'-7"
Copyright 2026 DJR Architecture, Inc.
## A1.0
## PROPOSED BUILDING
## PLANS
## BROOKLYN CENTER, MN
## UNITY TEMPLE
## CHURCH
25-101
07.13.2026
## SITE AND BUILDING PLAN
## REVIEW APPLICATION
## N
1/8" = 1'-0"
1
## PROPOSED PLAN -LOWER LEVEL
1/8" = 1'-0"
2
## PROPOSED PLAN -UPPER LEVEL
Page 129 of 169
## NORTH ADDITION
## SOUTH ADDITIONNORTH ADDITION
## SOUTH ADDITION
## NORTH ADDITIONSOUTH ADDITION
11'-0"
6'-0"
17'-0"
6'-0"
Copyright 2026 DJR Architecture, Inc.
## A6.0
## PROPOSED BUILDING
## ELEVATIONS
## BROOKLYN CENTER, MN
## UNITY TEMPLE
## CHURCH
25-101
07.13.2026
## SITE AND BUILDING PLAN
## REVIEW APPLICATION
1/8" = 1'-0"
1
## EXTERIOR ELEVATION -NORTH
1/8" = 1'-0"
2
## EXTERIOR ELEVATION -EAST
1/8" = 1'-0"
3
## EXTERIOR ELEVATION -SOUTH
1/8" = 1'-0"
4
## EXTERIOR ELEVATION -WEST
1/4" = 1'-0"
5
## TRASH ENCLOSURE -SOUTH
1/4" = 1'-0"
6
## TRASH ENCLOSURE -WEST
## CEDAR BOARD ON METAL FRAME
Page 130 of 169
Copyright 2026 DJR Architecture, Inc.
## A7.0
## EXTERIOR VIEW -
## NORTHWEST
## BROOKLYN CENTER, MN
## UNITY TEMPLE
## CHURCH
25-101
07.13.2026
## SITE AND BUILDING PLAN
## REVIEW APPLICATION
Page 131 of 169
Copyright 2026 DJR Architecture, Inc.
## A7.1
## EXTERIOR VIEW -
## NORTHEAST
## BROOKLYN CENTER, MN
## UNITY TEMPLE
## CHURCH
25-101
07.13.2026
## SITE AND BUILDING PLAN
## REVIEW APPLICATION
Page 132 of 169
Copyright 2026 DJR Architecture, Inc.
## A7.2
## EXTERIOR VIEW -
## SOUTHEAST
## BROOKLYN CENTER, MN
## UNITY TEMPLE
## CHURCH
25-101
07.13.2026
## SITE AND BUILDING PLAN
## REVIEW APPLICATION
Page 133 of 169
## CITY OF BROOKLYN CENTER NOTICE OF PUBLIC
## HEARING
## Details for CITY OF BROOKLYN CENTER NOTICE OF PUBLIC
## HEARING
Jul 30,2026
## CITY OFBROOKLYN CENTER NOTICE OFPUBLICHEARING TOWHOM ITMAY
CONCERN: Please takenoticethat the Planning Commission of theCityof
Brooklyn Center will hold an in-person public hearingonThursday, August 13,
2026at approximately7:00 p.m.Meetingmaterials can beaccessed byvisiting
the City of Brooklyn Center's website at: https://www.brooklyncentermn.gov/. A
definite timefor this application to be considered cannot begiven as itwill
depend on the progression of the agenda items. TYPEOFREQUEST(S): Site
## and Building Plan and Conditional Use PermitAPPLICANT--PROPERTY
## OWNER:Unity Temple ChurchofGod in Christ PROPERTYADDRESS --PID:
4801 63rdAve N, Brooklyn Center, MN 55429 --33-119-21-44-0010BRIEF
## STATEMENT OF CONTENTSOFPETITION: The Applicant isrequestingreview
and consideration of a request toconstruct an approximately3,896squarefoot
addition and completecertain site improvements, including a parkinglot
expansion with anewsecondarycurb cut access off Perry Avenue North.The
Applicant will requiresite and buildingplan approval as wellas issuanceof a
conditional use permitfor the proposed expansion within the R1(Low Density
Residential) District. Commentsand questions may beforwarded to
gmcintosh@brooklyncentermn.govup until 4:30 pm on the dayofthe
meeting,or bycontacting GinnyMcIntosh at (763) 569-3319. Your comments
will be included in the recordand addressed as part of the meeting.
## SaveShare
CITY OF BROOKLYN CENTER NOTICE OF PUBLIC HEARING | Notice Of Public Hearing | hometownsource.com
https://www.hometownsource.com/classifieds/sun_post/community/announcements/legal/notice_of_public_hearing/city-of-brooklyn-center-notice-of-pu...1/2
Exhibit %
Page 134 of 169
Alternatively, you may participateinthePlanningCommissionmeeting via
Webex at: logis.webex.com Meeting Number (Access Code): 2866 413 9464
## Password: BCPC08132026ByPhone:1 (312) 535-8110 (Enter Access Code)
Auxiliaryaids for persons with disabilitiesareavailable upon requestat least 96
hoursin advance. Please contact the City Clerkat (763) 569-3300 tomake
## arrangements. Respectfully, GinnyMcIntosh Interim Deputy Community
## Development Director and PlanningManager Published inthe Sun PostJuly
30,20261548930
CITY OF BROOKLYN CENTER NOTICE OF PUBLIC HEARING | Notice Of Public Hearing | hometownsource.com
https://www.hometownsource.com/classifieds/sun_post/community/announcements/legal/notice_of_public_hearing/city-of-brooklyn-center-notice-of-pu...2/2
Page 135 of 169
Exhibit &
Page 136 of 169
Page 137 of 169
Page 138 of 169
City of Brooklyn Center | 6301 Shingle Creek Pkwy | Brooklyn Center, MN 55430-2199 | (763) 569-3300 |
www.cityofbrooklyncenter.org
## Co
mmunity Development
763-569-3300
August 12, 2026
## Uni
## ty Temple Church Addition
Building review comments for the Addition proposed for Unity Temple Church to be located at 4801 63
rd
Ave N.
1.Prior to a Building permit being issued. A SAC determination for the new building will need to be done
by Met Council and SAC determination letter received.
2.Separate permits and signed plans required for Building, Mechanical, Plumbing & Electrical. A Fire
sprinkler permit with plans is required to be submitted to the Building Department for this building review.
## The Community Development department
must be contacted on all proposed signage for this building.
Permits are required for all exterior signage.
3.The addition and existing building will be required to have a sprinkler system installed if not already
installed. City of Brooklyn Center zoning ordinance 3-101 B. (2) as adopted by the Minnesota State
Building code 1306 Special Fire Protection system 1306.0020 Subp. 2, Existing and New buildings.
4.Hennepin County Health Department shall approve any kitchen and
food related areas. An approval
letter from them shall be received by the City of Brooklyn Center prior to any City permits being issued.
5.Pending if any plumbing is to be installed in the addition. Plumbing plans shall be reviewed by the
Department of Labor and Industry Plumbing Department or may be reviewed by the city
of Brooklyn
Center pending fixtures to be installed. All submitted documents shall be signed as required by
Minnesota state statues.
6.Where parking in provided, accessible parking spaces shall be provided per MN Accessibility table
1106.1. At least one (1) accessible route within the site shall be provided from accessible parking
to the
accessible building entrance served.
7.Outdoor trash enclosure shall be screened from view by an opaque fence or wall high enough to
completely screen the trash per city ordinance 12-308.
## Exhibit D
Page 139 of 169
City of Brooklyn Center | 6301 Shingle Creek Pkwy | Brooklyn Center, MN 55430-2199 | (763) 569-3300 |
www.cityofbrooklyncenter.org
8. Building plans to be submitted to the City Building Department for review. If any items need to be
addressed, comments will be provided in a plan review letter addressed to the architect of record.
## 9. S
outh parking lot paved areas shall be provided with drains that into a storm sewer system. Review
and approval of the drainage shall be completed by the City Engineering department and Buildin
g
department.
## S
incerely,
## D
an Grinsteinner
## Building Official
## City of Brooklyn Center
763-569-3313
Page 140 of 169
## M E M O R A N D U M
DATE: August 3, 2026
## TO: Ginny McIntosh, Interim Deputy Community Development Director & Planning
## Manager
## FROM: Touyia Lee, Assistant City Engineer
## SUBJECT: Public Works – Preliminary Site Plan
4801 63
rd
## Ave N, Unity Temple Church Addition
Public Works staff reviewed the following documents submitted for review for the proposed 4801 63
rd
Ave N development known as Unity Temple Church.
## •2026-07-15 City Submittal
This document included the following:
oPreliminary Plans
## Subj
ect to final staff Site Plan approval, the referenced plans must be revised in accordance with the
following comments/revisions and approved prior to issuance of any permits.
## G
eneral Items
1.The total disturbed area is greater than one acre, a NPDES permit is required along with a SW
## PPP
pl
an to be implemented. The total disturbed area is less than five acres; the City of Brooklyn Center
has reviewed the plans per the Shingle Creek Watershed Commission rules. From preliminary
review the applicant has met watershed’s rule requirements.
2.The applicant shall be responsible for coordinating site development plans with all private utility
companies (Xcel Energy, CenterPoint Energy, Qwest Communications, Comcast, etc. ) Applicant
shall be responsible for verifying all utilities are absent from the easement proposed to be vacated.
## A
greements
3. During construction of the site improvements, and until the permanent turf and plantings are
established, the developer will be required to reimburse the City for the administration a
nd
e
ngineering inspection efforts. Please submit a deposit of $5,000 that the City can draw upon on
a
m
onthly basis.
4. A Construction Management Plan and Agreement is required that addresses general constructi
on
a
ctivities and management provisions, traffic control provisions, emergency management provisions
,
s
torm water pollution prevention plan provisions, tree protection provisions, general public welfare
and safety provisions, definition of responsibility provisions, temporary parking provisions, overall
site condition provisions and non-compliance provisions. A $5,000 deposit will be required as part of
the non-compliance provisi
on.
## 5. A
n overall Easement Agreement is required that will provide the City perpetual accessibility to all
## Exhibit E
Page 141 of 169
private utilities and storm drainage areas to inspect and enforce proper utility service and
maintenance for the entire site. This easement agreement also includes private inspection,
maintenance, and reporting responsibilities. Easements to provide utility service to the development
should be dedicated as necessary.
6. Upon project completion, the applicant must submit an as-built survey of the property, improvements
and utility service lines and structures, and provide certified record drawings for any associated
private and/or public improvements prior to issuance of the certificate of occupancy. The survey must
also verify that all property corners have been established and are in place at the completion of the
project as determined and directed by the City Engineer.
7. Inspection for the private site improvements must be performed by the developer’s design/project
engineer. Upon project completion, the design/project engineer must formally certify through a letter
that the project was built in conformance with the approved plans and under the design/project
engineer’s immediate and direct supervision. The engineer must be certified in the State of Minnesota
and must certify all required as-built drawings (which are separate from the as-built survey).
## Anticipated Permitting
8. A City of Brooklyn Center land disturbance permit is required.
9. A Water and Sewer Permit is required.
10. A Minnesota Pollution Control Agency NPDES storm water construction permit is required.
11. Other permits not listed herein may be required. It is the responsibility of the applicant to obtain such
permits as warranted.
## Prior to Issuance of Land Alteration
12. Copies of all required permits must be provided to the City.
13. Final construction plans and specification must be submitted and approved by the City Engineer. The
final construction plans must be certified by a licensed engineer in the state of Minnesota.
14. The Construction Management Plan and Agreement has been executed and the associated separate
cash escrow has been deposited with the City.
15. A preconstruction conference is scheduled and held with City staff and other entities designated by
the City.
All aforementioned items, comments and recommendations are provided based on the information
submitted by the applicant at the time of this review. Subsequent approval of the final plan may require
additional modifications based on engineering requirements associated with final design as established
by the City Engineer and other public officials having jurisdiction over approval of the final site plans.
Page 142 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM:
## THROUGH:
## BY: Shannon Pettit, City Clerk
## SUBJECT: 2026 Primary Election Results
## Requested Council Action:
- Motion to approve the Resolution Regarding the Re-Canvass of the August 11, 2026,
## Municipal Primary Election
## Background:
The Primary Election was held on Tuesday, August 11, 2026. Tonight we are here to re-
canvass the results of the Mayoral candidates who will move on to the November 3,
2026, General Election.
After a recount on August 19, 2026, our Election Judges identified two ballots where
voter intent was clear, but we believe the ballots were counted as overvotes on Election
Day. This resulted in one additional vote for Alexander Koenig and one additional vote
for Laurie Ann Moore. The difference between the candidates remains seven votes.
The final totals are:
## Alexander Koenig: 684
## Laurie Ann Moore: 677
## Budget Issues:
## Inclusive Community Engagement:
## Antiracist/Equity Policy Effect:
## Strategic Priorities and Values:
## ATTACHMENTS:
1. ReCanvass_Primary_Election_2026
Page 143 of 169
Member introduced the following resolution and moved its adoption:
## RESOLUTION NO. 2026-
## RESOLUTION REGARDING THE RE-CANVASS OF AUGUST 11, 2026,
## MUNICIPAL PRIMARY ELECTION
WHEREAS, the City Council has met for the purpose of canvassing the election
returns of the municipal primary election for the offices of Mayor and Council Member.
BE IT RESOLVED by the City Council of the City of Brooklyn Center that it is
hereby determined that after a recount and by official canvass that Teneshia Kragness and
Alexander Koenig received the highest number of votes in the August 11, 2026, Municipal Primary
Election and are declared to be the nominees for the office of Mayor of the City of Brooklyn
Center.
BE IT FURTHER RESOLVED by the City Council of the City of Brooklyn Center
that the City Clerk is directed to place the names of the nominees on the General Election ballot.
August 24, 2026
## Date Mayor
## ATTEST:
## City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Page 144 of 169
## Council Regular Meeting
## DATE: 8/24/2026
## TO: City Council
## FROM: Daren Nyquist, Interim City Manager
## THROUGH:
## BY: Shannon Pettit, City Clerk
## SUBJECT: Investment Management Services Agreement with Ehlers Investment
## Partners
## Requested Council Action:
- Motion to authorize the Interim City Manager and Finance Director to enter into an
agreement with Ehlers Investment Partners to provide investment management
services for the City of Brooklyn Center, subject to the review of the City Attorney.
## Background:
Earlier this year, staff discussed the benefits of engaging a qualified investment advisor
to manage, under the direction of the Finance Director, the investment portfolio currently
maintained by the City. Staff deferred further consideration until a new Finance Director
joined the organization.
Shortly before the appointment of a new Finance Director, staff revisited the issue due
to the overall size of the investment portfolio and the desire to better monitor market
dynamics. While the City maintains adequate liquidity through certain short-term
investments, it may improve investment earnings through a more strategic approach to
managing funds that are not otherwise needed for regular cash flow.
In addition, the new Finance Director will assume several significant responsibilities,
including development of the Proposed 2027 Budget, completion of the 2025 audit,
review of internal financial processes and policies as well as hiring and training various
staff. By working with a qualified investment advisor, the City can focus on these various
priorities while also increasing the potential investment earnings compared to the
current investment portfolio performance.
Given these benefits, staff considered whether to issue a formal Request for Proposals
(RFP) or to move forward through a more informal process by simply contacting
qualified investment advisors for proposals. With the current staffing challenges, the
various competing projects and the opportunity cost related to suboptimal investment
portfolio performance, the City decided to opt for the informal process. In total, the
Finance Department contacted three qualified investment management firms and
requested information regarding their services, experience, and fees, resulting in two
proposals.
Based on public-sector experience, understanding of the investment need for local
governments, reporting capabilities, service philosophy and competitive fee structure,
Page 145 of 169
staff determined that Ehlers Investment Partners (EIP) provided the best overall value
for the City. Staff also considered the existing relationship with Ehlers and benefits
provided by their familiarity with City operations, financial objectives, and strategic
priorities.
Given the process to date, staff recommend the City Council authorize the Interim City
Manager and Finance Director to execute an agreement with EIP, subject to the review
of the City Attorney.
## Budget Issues:
These services do not require an additional property tax levy or budget amendment. EIP
will receive compensation through the following asset-based management fee paid
directly from investment earnings.
## Assets Under
## Management
## Annualized
## Fee
First $15 Million 0.11%
Next $15 Million 0.10%
Over $30 Million 0.09%
For a portfolio of approximately $38 million, the annual management fee is estimated at
approximately $38,700. Staff anticipate that enhanced portfolio management will
increase investment income and generate net financial benefit to the City, inclusive of
the additional management fee. The actual portfolio performance will depend on market
conditions, current portfolio structure, available investment opportunities, staff direction,
and cash flow requirements.
## Inclusive Community Engagement:
None. The action will be administrative in effect.
## Antiracist/Equity Policy Effect:
None. The action will be administrative in effect.
## Strategic Priorities and Values:
## ATTACHMENTS:
## 1. Investment Mgmt City of Brooklyn Center_8.24.26
2. City of Brooklyn Center Investment memo 7.20.26-1
## 3. Brooklyn Center Proposal - Ehlers
Page 146 of 169
## Investment Strategy & Overview
## City of Brooklyn Center, Minnesota
Page 147 of 169
2
Our Approach: It’s How We Work.
Fiercely Independent. Fully Integrated.
Working as one team for your benefit...
Page 148 of 169
3
•Oversees more than $3.7 billion in Assets Under Management (AUM)
•Serving 320 clients (including tax-exempt & taxable bond proceeds)
•Provide arbitrage consulting services to 420+ clients with more than 1,750
issues under current monitoring
•Focused on client-centric fixed income solutions
## About Ehlers: Investments & Arbitrage Consulting
## Bond Proceeds &
## Arbitrage Rebate
## Management
## General Fund
## Assets
## Banking Services
## Evaluations & RFPs
Page 149 of 169
4
## Seamless Client Onboarding
## Investment Policy
## Review & Update
## Recommend Best Practices
## Cash Forecast
## Identify Core & Liquid Funds
## Complete Monthly Investment Cash
## Forecast
## Investment Plan
## Establish Portfolio Recommendations
## Produce Predictable Income
## Banking & Treasury
## Management
## Analyze Current
## Recommend Updates
Page 150 of 169
5
## Our Client Experience: Investments Administration
## Money Movement
Access funds via ACH
or wire
Disbursements to
pre-approved
vendors
## Ease of Access
Withdrawals made
via client portal
Direct contact with
## Ehlers Investments
## Team
## Reporting Suite
Clients maintain
access to reports
Reporting solutions
tailored to governing
bodies
Page 151 of 169
6
## City of Brooklyn Center: Portfolio Considerations
## Investment Policy & Cash Flow Review
•Ehlers Investments to perform in-depth cash flow and Investment Policy Statement review
## Initial Portfolio Considerations
•Utilize cash flow information to diversity investment mix among permissible sectors to take advantage of
steepening yield curve
•Perform breakeven analysis on current holdings to determine any swap candidates
•Actively manage overall portfolio to maintain cash flow and liquidity targets
## Benchmark Considerations
## •ICE BofA 0–3-year U.S Treasury Index
## •ICE BofA 1–3-year U.S. Treasury Index
•Laddered strategy
Page 152 of 169
7
Page 153 of 169
8
## Important Disclosure
Ehlers is the joint marketing name of the following affiliated businesses (collectively, the “Affiliates”): Ehlers & Associates, Inc.
(“EA”), a municipal advisor registered with the Municipal Securities Rulemaking Board (“MSRB”) and the Securities and Exchange
Commission (“SEC”); Ehlers Investment Partners, LLC (“EIP”), an SEC registered investment adviser; and Bond Trust Services
Corporation (“BTS”), a holder of a limited banking charter issued by the State of Minnesota.
Where an activity requires registration as a municipal advisor pursuant to Section 15B of the Exchange Act of 1934 (Financial
Management Planning and Debt Issuance & Management), such activity is or will be performed by EA; where an activity requires
registration as an investment adviser pursuant to the Investment Advisers Act of 1940 (Investments and Treasury Management),
such activity is or will be performed by EIP; and where an activity requires licensing as a bank pursuant to applicable state law
(paying agent services shown under Debt Issuance & Management), such activity is or will be performed by BTS. Activities not
requiring registration may be performed by any Affiliate.
This communication does not constitute an offer or solicitation for the purchase or sale of any investment (including without
limitation, any municipal financial product, municipal security, or other security) or agreement with respect to any investment
strategy or program. This communication is offered without charge to clients, friends, and prospective clients of the Affiliates as a
source of general information about the services Ehlers provides. This communication is neither advice nor a recommendation by
any Affiliate to any person with respect to any municipal financial product, municipal security, or other security, as such terms are
defined pursuant to Section 15B of the Exchange Act of 1934 and rules of the MSRB. This communication does not constitute
investment advice by any Affiliate that purports to meet the objectives or needs of any person pursuant to the Investment Advisers
Act of 1940 or applicable state law.
Page 154 of 169
July 20, 2026
## Daren Nyquist
## Interim City Manager
## The City of Brooklyn Center
## 118 Central Avenue North
## Brooklyn Center, Minnesota 56071
## Dear Mr. Nyquist,
On behalf of Ehlers Investment Partners, thank you for the opportunity to serve as the City of
Brooklyn Center's investment adviser. We appreciate the confidence the City has placed in our
team and are excited about the opportunity to become a long-term partner in managing and
safeguarding the City's public funds.
Following our recent discussions, Ehlers is pleased to offer a revised fee proposal that reflects our
commitment to building a strong relationship with the City while continuing to provide the high
level of service, expertise, and fiduciary oversight that has made Ehlers a trusted adviser to
governmental entities throughout Minnesota and the Midwest.
## Revised Fee Schedule
## Assets Under Management Annualized Fee
First $15 Million 0.11%
Next $15 Million 0.10%
Over $30 Million 0.09%
This revised schedule lowers our initial fee tier while preserving the comprehensive investment
management services, customized reporting, policy support, active portfolio management, and
fiduciary oversight outlined in our proposal. The fee can be deducted monthly from portfolio
earnings, and Ehlers receives no commissions, transaction-based compensation, or compensation
from proprietary investment products.
## Why Ehlers
While investment management fees are an important consideration, the value of a trusted adviser
is measured by far more than basis points, the value of experienced fiduciary oversight, active
management, and public-sector expertise can have a materially greater impact on investment
outcomes.
• Exclusive public-sector focus – Ehlers serves governmental and public-sector clients and
understands the statutory, liquidity, reporting, and stewardship requirements associated with
investing public funds.
Page 155 of 169
• Independent fiduciary advice – We do not sell proprietary products, receive commissions, or
have competing business interests that could influence our recommendations.
• Active portfolio management – Our team balances safety, liquidity, and yield while adapting to
changing market conditions and the City's evolving cash flow needs.
• Integrated public finance platform – The City benefits from investment professionals working
alongside municipal advisors, treasury consultants, and public finance experts.
Requested Action: We respectfully request that the City formally engage Ehlers
Investment Partners as its investment adviser under the revised fee schedule so we can
begin onboarding the portfolio, implementing our investment strategy, and delivering value
to Brooklyn Center immediately.
We appreciate the opportunity to earn your business and look forward to serving the City for
many years to come.
## Sincerely,
Page 156 of 169
## PROPOSAL TO PROVIDE INVESTMENT MANAGEMENT
## SERVICES TO:
## Ehlers Investment Partners
## 3001 Broadway Street NE, Ste. 320
## Minneapolis, MN 55413
## SEC#: 801-69849
## CRD#: 146385
ehlers-inc.com
## The City of Brooklyn
## Center, Minnesota
## JULY 9, 2026
## EHLERS’ ADVISERS:
## Ryan Miles, CPIFM: Primary Contact
## Senior Investment Adviser | Managing Director
rmiles@ehlers-inc.com
651-697-8590
## Brian Johnson
## Director of Investment Services
bjohnson@ehlers-inc.com
651-697-547
Page 157 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
2
July 9, 2026
## Daren Nyquist
## Interim City Manager
## The City of Brooklyn Center
## 118 Central Avenue North
## Brooklyn Center, Minnesota 56071
## Dear Mr. Nyquist,
Thank you for the opportunity to present the City of Brooklyn Center (the “City”) an overview of
our approach to cash management and investing. Since Ehlers Investments focuses exclusively on
serving public sector entities like the City, we have a firm grasp of the expertise you’re looking for,
and stand committed to delivering our services within the requested parameters. We believe the
following factors set us apart from other firms:
## Public Sector Focus
Our only clients are governmental and closely affiliated public sector organizations like the City of
Brooklyn Center. Ehlers’ exclusive focus within the public sector uniquely positions us to provide a
level of service that is unsurpassed in the markets we serve. Our investment advisers and
consultants regularly engage with our municipal advisors on investment management, with
decades of experience in both areas. We have an extensive understanding of our clients’
operations, which allows us to speak to best practices and specifically tailor our advice to meet
your needs and surpass your expectations.
## Fiercely Independent
Ehlers is an independent advisory firm with a fiduciary duty to our clients. We will always place
your best interests above our own, delivering investment management advice that fulfills your
needs as cost-effectively as possible and seek to provide maximum benefit to the City. We adhere
strictly to the prioritized principles of safety, liquidity, and yield. We will look at the overall
investment program holistically and offer solutions that provide enhancement from a cash flow,
security selection, and overall best practices perspective.
## Fully Integrated
Using a collaborative approach in advising our clients, Ehlers offers a fully integrated suite of
services designed to help clients navigate every facet of public finance, including investments and
treasury management consulting. We believe this approach delivers the greatest insight, highest
value and most reasonable cost to our clients. Our investment advisers would work in concert with
your staff and other professionals, seamlessly integrating with your entire finance team. No other
firm can offer a comparable level of value-added services to the City, all of which have been
crafted to meet the specific needs of our public sector clients.
## COVER LETTER
Page 158 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
3
## Fee Only
Ehlers’ advisory fee represents the only fees we would receive for this engagement. We receive no
additional compensation or commission on securities or other transactions. Further, we do not
offer any proprietary investment vehicle or other form of liquidity product from which an
administrative or other fee is derived.
We appreciate the opportunity to partner with the City of Brooklyn Center in this capacity and
look forward to discussing this proposal with you in greater detail.
## Sincerely,
## Ryan Miles, CPFIM
## Senior Investment Adviser | Managing Director
rmiles@ehlers-inc.com
651-697-8590
## Brian Johnson
## Director of Investment Services
bjohnson@ehlers-inc.com
651-697-8547
## COVER LETTER
Page 159 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
4
## Proposed Scope of Services
## Investment Management
Ehlers Investments would propose offering the City of Brooklyn Center its experienced personnel
to manage its investment portfolio as a fiduciary. We would utilize our integrated advisory
platform, with our team of experienced professionals across all areas of public finance, to deliver a
holistic, customized portfolio management solution specific to the City.
We would actively manage the portfolio and consistently engage with key personnel to
understand changes in cash flow needs or to convey market changes that may warrant a shift in
portfolio construction. We take a “hands on” approach to client relationships which we believe
adds value to portfolios over long periods of time and through various business and economic
cycles.
Our investment advisers, traders, and portfolio managers have extensive experience navigating the
complexities of the fixed income marketplace and would also be available to help answer any
questions as needed to City finance staff.
In addition, our knowledgeable staff would also assist with reviewing the City’s investment policy
as needed and suggest any updates or edits required.
## Investment Reporting
If engaged to work with the City, we would meet with you and other key stakeholders to gain a
better understanding of the information needed for your desired investment reporting. Our reports
are not simply “off the shelf” investment reports, but rather highly customizable for each client’s
specific needs. After we gain a better understanding of the information the City would like to see
as a part of its reporting package, we will put together the desired reports, and you will be able to
access the reports on a monthly and quarterly basis through the Ehlers Investment Portal.
Examples of our sample reports can be found in Appendix A.
## Fee Structure
Ehlers Investments proposes a tiered fee structure based on assets under management. This fee
shall be deducted monthly from interest earnings, in arrears, and the City would have the flexibility
to end the proposed agreement at any time and have the remainder of the fee prorated. Ehlers
Investments proposes the following fee structure to provide investment services to the City of
## Brooklyn Center:
## Assets Under Management Annualized Fee
## First $15 Million0.12%
## Next $15 Million0.10%
## Over $30 Million0.09%
## PROPOSED SCOPE OF SERVICES
Page 160 of 169
## APPENDIX A:
## SAMPLE CLIENT
## REPORTING
Page 161 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
6
## SAMPLE CLIENT REPORTING
## MonthlyÊPortfolioÊSummaryÊ
_____________________________Ê
## Sample PortfolioÊ
## ForÊtheÊPeriodÊEnding:Ê6/30/2026Ê
www.ehlers-inc.comÊ
## Monthly Summary
6/30/2026
## Account Overview Asset Class Allocation
## MunicipalÊBondÊ
## TreasuryÊBondÊ
## AgencyÊBondÊ
## PrincipalÊPaydownÊ
## CDÊ
## MoneyÊMarket-TaxableÊ
## Accounts Overview
## Account Market Value Allocation
## General Fund
$41,366,951.55 100.00 %
## TableÊTotalÊ
$41,366,951.55 100.00 %
## Asset Class Allocation
## Asset Class Market Value Allocation
## Municipal Bond
$21,028,783.70 50.83 %
## Treasury Bond
$9,467,875.33 22.89 %
## Agency Bond
$9,028,914.05 21.83 %
## Principal Paydown
$946,422.19 2.29 %
## CD
$734,728.19 1.78 %
## Money Market-Taxable
$160,228.09 0.39 %
## TableÊTotalÊ
$41,366,951.55 100.00 %
1
Page 162 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
7
## SAMPLE CLIENT REPORTING
## Maturity Period
## Portfolio Detail
## Market Value $41,366,951.55
Accrued In terest $300,077.81
Market Value with A ccrued In terest $41,667,029.36
Average M aturity 2.42
Duration 2.28 %
## Avg. Moody Ra tin g Aa1
Average Coupon 3.06 %
## Maturity Year
## Maturity Year Number o f
Secu rities
## Maturity Amou nt Allocation
2026 8 4,074,004.25 9.86 %
2027 19 12,430,212.26 29.79 %
2028 13 9,662,000.00 22.81 %
2029 15 7,751,000.00 17.95 %
2030 7 4,980,000.00 11.93 %
2031 1 799.63 0.00 %
2033 2 500,177.46 1.17 %
2034 2 215,102.46 0.50 %
2035 2 2,500,000.00 5.99 %
Total: 42,113,296.06 100.00 %
## Value
0 - 6 0 D ays60 - 1 20 D ays120 - 3 60 D ays1 - 2 Years2 - 3 Years3 - 4 Years4 - 5 Years5 - 7 Years7 - 10 Years
$0
$2,500,000
$5,000,000
$7,500,000
$10 ,000,000
$12,500,000
$15,000,000
2
## Projected Income
## Projected Cash Flows Ne xt 12 Mo nths
MonthÊProjectedÊPrincipalÊ(ToÊMaturity)ÊProjectedÊInterestÊ(ToÊMaturity)ÊProjectedÊPrincipalÊ+ÊInterestÊ(ToÊMaturity)Ê
## JulyÊ2026Ê$1,310,000.00Ê$94,251.06Ê$1,404,251.06Ê
## AugÊ2026Ê$1,249,000.00Ê$118,889.94Ê$1,367,889.94Ê
## SeptÊ2026Ê$4.25Ê$100,584.01Ê$100,588.26Ê
## OctÊ2026Ê$0.00Ê$94,886.41Ê$94,886.41Ê
## NovÊ2026Ê$0.00Ê$93,194.78Ê$93,194.78Ê
## DecÊ2026Ê$1,515,000.00Ê$139,899.61Ê$1,654,899.61Ê
## JanÊ2027Ê$540,000.00Ê$79,308.56Ê$619,308.56Ê
## FebÊ2027Ê$450,000.00Ê$97,759.94Ê$547,759.94Ê
## MarÊ2027Ê$1,932,000.00Ê$100,584.01Ê$2,032,584.01Ê
## AprÊ2027Ê$1,004,000.00Ê$94,886.41Ê$1,098,886.41Ê
## MayÊ2027Ê$0.00Ê$93,194.78Ê$93,194.78Ê
JuneÊ2027Ê$1,1 16,000.00Ê$120,166.31Ê$1,236,166.31Ê
July 2026Aug 2 026Sept 2026Oct 2026Nov 2026Dec 2 026Jan 2027Feb 2 027Mar 2 027Apr 2 027May 2027June 2027
$ 0.00
$ 50000.00
$ 10 0000.00
$ 150000.00
3
Page 163 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
8
## SAMPLE CLIENT REPORTING
## Disclaimer & Terms
EhlersÊInvestmentÊPartnersÊ("Ehlers")ÊisÊanÊSECÊregisteredÊinvestmentÊadviser.ÊForÊadditionalÊinformationÊaboutÊourÊfirm,ÊpleaseÊseeÊourÊcurrentÊdisclosuresÊ(FormÊADV)ÊonÊourÊwebsiteÊatÊwww.ehlers⯑inc.com/disclosures.Ê
InformationÊcontainedÊinÊthisÊperformanceÊsummaryÊisÊconfidentialÊandÊforÊinformationalÊpurposesÊonlyÊandÊshouldÊnotÊbeÊconstruedÊasÊspecificÊinvestmentÊorÊlegalÊadvice.ÊTheÊinformationÊcontainedÊhereinÊwasÊobtainedÊfromÊsourcesÊ
believedÊtoÊbeÊreliableÊasÊofÊtheÊdateÊofÊthisÊsummaryÊbutÊmayÊbecomeÊoutdatedÊorÊsupersededÊatÊanyÊtimeÊwithoutÊnotice.Ê
Custody:ÊYourÊqualifiedÊcustodianÊbank/brokerageÊmaintainsÊcontrolÊofÊallÊassetsÊreflectedÊinÊthisÊsummaryÊandÊweÊurgeÊyouÊtoÊcompareÊthisÊsummaryÊtoÊtheÊoneÊyouÊreceiveÊfromÊyourÊqualifiedÊcustodian.ÊEhlersÊdoesÊnotÊhaveÊanyÊ
authorityÊtoÊwithdrawÊorÊdepositÊfundsÊfrom/toÊtheÊcustodianÊaccount.Ê
Valuation:ÊPricesÊareÊprovidedÊbyÊIDC,ÊanÊindependentÊpricingÊsource.ÊInÊtheÊeventÊIDCÊdoesÊnotÊprovideÊaÊpriceÊorÊifÊtheÊpriceÊprovidedÊisÊnotÊreflectiveÊofÊfairÊmarketÊvalue,ÊEhlersÊwillÊobtainÊpricingÊfromÊanÊalternativeÊapprovedÊthird-
partyÊpricingÊsourceÊinÊaccordanceÊwithÊourÊwrittenÊvaluationÊpolicyÊandÊprocedures.ÊOurÊvaluationÊproceduresÊareÊalsoÊdisclosedÊonÊourÊFormÊADVÊPartÊ2A.Ê
Performance:ÊPerformanceÊresultsÊareÊpresentedÊgross-of-advisoryÊfeesÊandÊrepresentÊtheÊclient'sÊTotalÊReturn.ÊTheÊdeductionÊofÊadvisoryÊfeesÊlowersÊperformanceÊresults.ÊTheseÊresultsÊincludeÊtheÊreinvestmentÊofÊdividendsÊandÊ
otherÊearnings.ÊPastÊperformanceÊmayÊnotÊbeÊindicativeÊofÊfutureÊresults.ÊTherefore,ÊclientsÊshouldÊnotÊassumeÊthatÊfutureÊperformanceÊofÊanyÊspecificÊinvestmentÊorÊinvestmentÊstrategyÊwillÊbeÊprofitableÊorÊequalÊtoÊpastÊperformanceÊ
levels.ÊAllÊinvestmentÊstrategiesÊhaveÊtheÊpotentialÊforÊprofitÊorÊloss.ÊEconomicÊfactors,ÊmarketÊconditionsÊorÊchangesÊinÊinvestmentÊstrategies,ÊcontributionsÊorÊwithdrawalsÊmayÊmateriallyÊalterÊtheÊperformanceÊandÊresultsÊofÊyourÊ
portfolio.Ê
SourceÊiceÊDataÊIndices,ÊLLCÊ("ICE"),ÊusedÊwithÊpermission.ÊICEÊPERMITSÊUSEÊOFÊTHEÊICEÊINDICESÊANDÊRELATEDÊDATAÊONÊANÊ"ASÊIS"ÊBASIS;ÊICE,ÊITSÊAFFILIATESÊANDÊTHEIRÊRESPECTIVEÊTHIRDÊPARTYÊSUPPLIERSÊ
DISCLAIMÊANYÊANDÊALLÊWARRANTIESÊANDÊREPRESENTATIONS,ÊEXPRESSÊAND/ORÊIMPLIED,ÊINCLUDINGÊANYÊWARRANTIESÊOFÊMERCHANTABILITYÊORÊFITNESSÊFORÊAÊPARTICULARÊPURPOSEÊORÊUSE,ÊINCLUDINGÊ
THEÊINDICES,ÊINDEXÊDATAÊANDÊANYÊDATAÊINCLUDEDÊIN,ÊRELATEDÊT O,ÊORÊDERIVEDÊTHEREFROM.ÊNEITHERÊICEÊDATA,ÊITSÊAFFILIATESÊORÊTHEIRÊRESPECTIVEÊTHIRDÊPARTYÊPROVIDERSÊGUARANTEEÊTHEÊQUALITY,Ê
ADEQUACY,ÊACCURACY,ÊTIMELINESSÊORÊCOMPLETENESSÊOFÊTHEÊINDICESÊORÊTHEÊINDEXÊDATAÊORÊANYÊCOMPONENTÊTHEREOF,ÊANDÊTHEÊINDICESÊANDÊINDEXÊDATAÊANDÊALLÊCOMPONENTSÊTHEREOFÊAREÊ
PROVIDEDÊONÊANÊ"ASÊIS"ÊBASISÊANDÊLICENSEE'SÊUSEÊISÊATÊLICENSEE'SÊOWNÊRISK.ÊICEÊDATA,ÊITSÊAFFILIATESÊANDÊTHEIRÊRESPECTIVEÊTHIRDÊPARTYÊDOÊNOTÊSPONSOR,ÊENDORSE,ÊORÊRECOMMENDÊEHLERS,ÊORÊ
## ANYÊOFÊITSÊPRODUCTSÊORÊSERVICES.Ê
IndexÊreturnsÊassumeÊreinvestmentÊofÊallÊdistributions.ÊHistoricalÊperformanceÊresultsÊforÊinvestmentÊindexesÊgenerallyÊdoÊnotÊreflectÊtheÊdeductionÊofÊtransactionÊand/orÊcustodialÊchargesÊorÊtheÊdeductionÊofÊanÊinvestmentÊ
managementÊfee,ÊtheÊincurrenceÊofÊwhichÊwouldÊhaveÊtheÊeffectÊofÊdecreasingÊhistoricalÊperformanceÊresults.ÊItÊisÊnotÊpossibleÊtoÊinvestÊdirectlyÊinÊanÊindex.Ê
Ratings:ÊRatingsÊinformationÊhaveÊbeenÊprovidedÊbyÊS&P,ÊMoody's,ÊandÊFitchÊthroughÊdataÊfeedsÊweÊbelieveÊtoÊbeÊreliableÊasÊofÊtheÊdateÊofÊthisÊstatement,ÊhoweverÊweÊcannotÊguaranteeÊitsÊaccuracy.Ê
SecurityÊlevelÊratingsÊforÊU.S.ÊAgencyÊissuedÊmortgage-backedÊsecuritiesÊ("MBS")ÊreflectÊtheÊissuerÊratingÊbecauseÊtheÊsecuritiesÊthemselvesÊareÊnotÊrated.ÊTheÊissuingÊU.S.ÊAgencyÊguaranteesÊtheÊfullÊandÊtimelyÊpaymentÊofÊbothÊ
principalÊandÊinterestÊandÊcarriesÊaÊAA+/Aaa/AAAÊbyÊS&P,ÊMoody'sÊandÊFitchÊrespectively.Ê
4
Page 164 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
9
## SAMPLE CLIENT REPORTING
6/30/2026
## Sample Portfolio - General Fund
## ForthePeriodEnding:
www.ehlers-inc.com
## Cash & Fixed Income Allocation
## Total Bond Par Value$42,247,454.01
## Total Market Value$41,632,679.85
## Accrued Interest$281,357.72
## Total Portfolio Value$41,632,679.85
## Estimate Annual Income
$1,754,544.67
## Average Maturity2.38
## Average Duration1.95
## Portfolio Summary
## Average YTM4.24%
## Average YTW4.24%
## Average Credit RatingAA+
## Total Number of Positions70
## Average Book Yield (ex-cash)3.85%
## Rating BandsMarket Value ($)% of Assets
## AAA$5,055,189.8712.14%
## AA+$25,426,004.4561.07%
## AA$5,592,816.0413.43%
## AA-$4,321,133.8410.38%
## NR$1,237,535.642.97%
## Total:$41,632,679.85100.00%
## Security TypeMarket Value ($)% of Assets
■
## Municipal
$21,199,471.4350.92%
■
## Treasury
$9,511,709.2322.85%
■
## Agency
$9,100,188.7521.86%
■
## Securitized
$922,130.612.21%
■
## Corporate
$738,951.751.77%
■
## Fund
$160,228.090.38%
## Total:$41,632,679.85100.00%
Municipal: 50.92%
Treasury: 22.85%
Agency: 21.86%
Securitized: 2.21%
Corporate: 1.77%
Fund: 0.38%
## Rating Distributions
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20262
Page 165 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
10
## SAMPLE CLIENT REPORTING
## Maturity Schedule
## JULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUN
## Month
0
50,000
100,000
150,000
## Coupon Income by Month ($)
## Coupon Income by Month
202620272028202920302031203320342035
## Maturity Year
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
## Par Value (000s)
## FundTreasurySecuritizedAgencyMunicipalCorporate
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20263
## Distribution by Maturity
## Maturity
## Bucket
# of
## Bonds
## Market ValueAvg. YTMAvg. CpnAvg. Dur
0-1 yrs16$8,791,9244.07% 2.97%0.47
1-2 yrs16$11,262,9074.24% 2.96%1.31
2-3 yrs18$10,302,5274.22% 2.75%2.28
3-5 yrs13$7,373,9624.30% 3.35%3.03
5-7 yrs2$1,402,6564.27% 2.24%2.09
7-10 yrs2$2,497,5864.80% 4.63%5.35
10+ yrs2$2804.65% 3.84%0.09
## TOTAL71$41,632,6804.24% 3.05%1.95
## Distribution by Duration
## Duration
## Bucket
# of
## Bonds
## Market ValueAvg. YTMAvg. CpnAvg. Dur
0-1 yrs20$9,284,1344.07% 2.98%0.50
1-3 yrs39$23,937,4164.23% 2.85%1.78
3-5 yrs10$5,913,5434.34% 3.31%3.44
5-7 yrs2$2,497,5864.80% 4.63%5.35
7-11 yrs0- ---
11+ yrs0- ---
## TOTAL71$41,632,6804.24% 3.05%1.95
## Distribution by Duration
0.4%
21.9%
35.3%
22.1%
13.1%
1.2%
6.0%
-1-00-11-22-33-44-55-6
0%
10%
20%
30%
40%
## Distribution by Maturity
0.0%
0.4%
21.9%
28.2%
22.4%
12.4%
5.3%
3.4%
4.8%
1.1%
0.0% 0.0%
-1-0 0-1 1-2 2-3 3-44-5 6-7 8-9 9-10 29-30 30-31
0%
10%
20%
30%
## FIXEDINCOMEREPORT
Page 166 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
11
## SAMPLE CLIENT REPORTING
## Maturity Schedule
3.6%
3.0%
3.6%
12.1%
28.3%
22.3%
12.4%
5.3%
3.4%
6.0%
0.0%0.0%
Under 30 Days 31-60 Days 91-180 Days 181 Days to 1
## Yr
1 to 2 Yrs2 to 3 Yrs3 to 4 Yrs4 to 5 Yrs5 to 7 Yrs7 to 10 Yrs10+ YrsUnknown
$0
$2
$4
$6
$8
$10
$12
## Millions
## Maturity Distribution
## Weighted Average Maturity: 1,124 Days
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20265
## Holdings
## Original
## Cost
## Market
## Price
($)
## Market
## Value
($)
## Unrealized
## G/L
($)
## YTM (%)
## YTW
(%)
## Moody's
## Rating
## S&P
## Rating
## Fixed Income
## Corporate
## Financials737,000
## Nicolet National Bank654062LT3243,000
3/20/2028
## Amerant Bank, National Association02357QCQ8245,000
2/6/2029
## BrightStar Credit Union10947MAC0249,000
8/28/2026
## Municipal
Double barrel1,205,000
## City of Blaine, Minnesota092765ND4500,000
2/1/2029
## Orland Park Illinois686356SX5705,000
12/1/2029
General obligation15,690,000
## County of Montgomery, Maryland61334PDE0200,000
11/1/2028
## Beaverton School District938429V95200,000
6/15/2028
## Madison Wisconsin Area Technical College District55844PVK1215,000
3/1/2027
## San Bernardino Community College District796720NU0245,000
8/1/2028
## City of New York, New York64966SEZ5265,000
8/1/2029
## Will County Community Unit School District No. 365-U,
## Illinois
## 969078QM9360,000
11/1/2027
## State of Hawaii419792D78395,000
10/1/2028
## Middletown City School District597137HE1435,000
12/1/2026
## St Clair Madison Monroe Etc Counties Community College
## District No. 522, Illinois
## 85227XDQ5500,000
12/1/2026
## State Of Washington93974FGR8520,000
2/1/2029
The School District of the City of Independence District No.
30
## 453722PC8550,000
3/1/2029
## City of Racine, Wisconsin750022FZ3580,000
12/1/2026
## Security DetailsCUSIPQuantityMaturity
738,952-1,9094.184.18
## 243,000100.26243,9746084.204.20NANA
## 244,75598.90246,001-2,4814.264.26NANA
## 249,00099.98248,976-354.094.09NANA
1,140,028-12,4274.314.31
## 498,65599.04498,584-3,5494.404.40NANA
## 640,88790.87641,444-8,8794.254.25NAAA+
15,456,855-91,4914.264.26
186,44093.66187,7363784.134.13AaaAAA
189,99695.10190,342-2264.234.23Aa1AA+
## 210,93998.58213,387-5754.174.17NAAAA
232,96195.12234,878-1,2294.274.27Aa1AA
246,06392.16246,124-3,4474.474.47Aa2AA
329,36794.37339,739-4,3754.394.39Aa1AA
372,58094.34374,330-2,1574.384.38Aa2AA+
## 432,60399.57434,210-6904.094.09NAAA+
500,00099.96501,527-1824.234.23Aa1NA
519,55898.58519,314-7,0044.254.25AaaAA+
## 546,67898.31547,418-6,4004.344.34NAAA+
## 565,99998.66572,702-8674.214.21NAAA-
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20266
Page 167 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
12
## Original
## Cost
## Market
## Price
($)
## Market
## Value
($)
## Unrealized
## G/L
($)
## YTM (%)
## YTW
(%)
## Moody's
## Rating
## S&P
## Rating
## Village of Skokie830728VG3605,000
12/1/2029
## County of Webb, Texas947440H71740,000
2/15/2029
## Little Elm Independent School District5370963A5725,000
8/15/2027
## Pasadena California Unified School District702282QF41,000,000
5/1/2028
## City of New York, New York64966SQH2975,000
8/1/2027
## Texas Public Finance Authority8827237U71,000,000
10/1/2030
## City of New York, New York64966SQG41,000,000
8/1/2026
## The Village of Menomonee Falls, Wisconsin587057X701,135,000
9/1/2027
## State Of Minnesota60412AR471,250,000
8/1/2027
## City of Oakland, California672240UY22,795,000
1/15/2028
## Pre-refunded940,000
## Mukwonago Area School District Waukesha & Walworth
## Counties, Wisconsin
## 625070KQ9215,000
4/1/2028
## Virginia Port Authority928075HN3250,000
7/1/2028
## Dormitory Authority of the State of New York64990FB37475,000
3/15/2027
## Revenue3,710,000
## Town of Erie, Boulder and Weld Counties Colorado29502MBE2230,000
12/1/2029
## Columbia, South Carolina198504A77300,000
2/1/2029
## South Dakota State Building Authority83755LP91410,000
9/1/2028
## Minnesota Housing Finance Agency60416TSJ8480,000
7/1/2030
## Indiana Housing & Community Development Authority.45505WDN1540,000
1/1/2027
## Massachusetts Housing Finance Agency57587GZ99750,000
12/1/2030
## Connecticut Housing Finance Authority20775JJX81,000,000
5/15/2030
## Agency
## Financials9,165,000
## Federal Home Loan Banks3130AKKY1100,000
12/29/2027
## Federal Farm Credit Banks Funding Corporation3133EKUX2250,000
7/12/2029
## Federal Home Loan Banks3130AR7E5250,000
3/25/2027
## Security DetailsCUSIPQuantityMaturity
## 573,37193.82568,804-9,4074.364.36NAAA
## 697,15493.90699,806-8,0334.264.26NAAA
## 698,70895.40691,614-29,4364.254.25NAAAA
952,01096.58969,618-4,7904.284.28Aa3AA
975,00099.66987,680-3,2694.254.25Aa2AA
978,95097.65985,523-3,0744.234.23AaaAAA
1,000,00099.971,016,657-2054.304.30Aa2AA
1,117,41998.231,124,798-6,5254.164.16Aa2NA
1,254,811100.051,271,835-1,1704.024.02AaaAAA
2,688,79098.012,778,8141,1934.404.40Aa2AA-
924,280-1,3364.254.25
## 207,31496.19207,993-8394.494.49NAAA+
247,47098.96247,404-1634.244.24Aa1AA+
## 465,95198.24468,883-3334.164.16NAAA+
3,678,308-12,7394.324.32
230,00098.26226,765-3,9964.504.50Aa1NA
288,61295.44289,362-4,2994.324.32Aa1AA+
387,47594.57389,967-2,0974.284.28Aa1AA+
479,79499.76478,870-9544.394.39Aa1AA+
539,32599.82539,001-6124.074.07AaaNA
750,00099.44748,477-4,2324.454.45Aa1AA+
1,000,000100.341,005,8673,4514.284.28AaaAAA
9,100,189-104,5404.324.32
95,25595.2395,231-9014.204.20Aa1AA+
240,64495.45241,688-2,7884.214.21Aa1AA+
246,97598.98249,178-6314.024.02Aa1AA+
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20267
## Original
## Cost
## Market
## Price
($)
## Market
## Value
($)
## Unrealized
## G/L
($)
## YTM (%)
## YTW
(%)
## Moody's
## Rating
## S&P
## Rating
## Federal Home Loan Banks3130ATUS4285,000
12/10/2027
## Federal Farm Credit Banks Funding Corporation3133EL6D1330,000
9/10/2029
## Federal Home Loan Banks3130AL5A8450,000
2/26/2027
## Federal Home Loan Banks3130ATHX8450,000
9/14/2029
## Federal Home Loan Banks3130ANDH0500,000
7/28/2026
## Federal Home Loan Banks3130AHX40500,000
1/28/2030
## Federal Home Loan Banks3130AEH78500,000
6/28/2033
## Federal Home Loan Banks3130AEYE4500,000
9/27/2035
## Federal Farm Credit Banks Funding Corporation3133ERJZ5620,000
6/28/2027
## Federal Home Loan Banks3130AXQK7620,000
12/8/2028
## Federal Home Loan Banks3130ANBG4810,000
7/29/2026
## Federal Home Loan Mortgage Corporation3134HBQY01,000,000
5/29/2030
## Federal Farm Credit Banks Funding Corporation3133ETBM82,000,000
4/2/2035
## Securitized
## MBS948,226
## G2 6.50% 04/3136202DMR9800
4/20/2031
## GNR 04-86 4.00% 09/3438374JYR1102
9/20/2034
## GN 7.50% 09/2636225APN44
9/15/2026
## FNR 03-35 3.75% 05/3331393BL86177
5/25/2033
## FHMS 739 1.34% 09/273137F64P9947,142
9/25/2027
## Treasury
## US Treasury9,692,000
## United States91282CPE5399,000
10/31/2027
## United States91282CEW7496,000
6/30/2027
## United States91282CCY5525,000
9/30/2028
## United States91282CMB41,186,000
12/15/2027
## United States91282CES61,017,000
5/31/2029
## Security DetailsCUSIPQuantityMaturity
285,891100.09285,959-5824.184.18Aa1AA+
302,19891.00301,535-4,0994.284.28Aa1AA+
416,77297.99442,366-1444.054.05Aa1AA+
455,43299.74454,327-6,1754.214.21Aa1AA+
500,00099.86503,558-6923.823.82Aa1AA+
504,28593.90474,615-30,4854.264.26Aa1AA+
522,31596.30481,644-18,5204.564.56Aa1AA+
532,72593.72473,851-31,4104.884.88Aa1AA+
619,907100.42622,8402,6424.064.06Aa1AA+
628,741101.31630,0223,6544.184.18Aa1AA+
810,00099.93819,717-5433.823.82Aa1AA+
995,00099.62999,9242664.254.25Aa1AA+
2,018,626100.012,023,734-14,1324.784.78Aa1AA+
922,1312,4564.124.12
103.96835334.064.06Aa1AA+
99.4310204.084.08Aa1AA+
100.06444.944.94Aa1AA+
99.62177-14.984.98Aa1AA+
97.13921,0112,4204.124.12Aa1AA+
9,511,709-88,6544.134.13
399,17299.15397,953-3,5344.164.16Aa1AA+
492,45599.17491,927-7604.114.11Aa1AA+
496,65893.80494,102-7,8024.174.17Aa1AA+
1,185,67099.781,185,429-2,3244.164.16Aa1AA+
986,53096.17980,453-13,5584.164.16Aa1AA+
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20268
## SAMPLE CLIENT REPORTING
Page 168 of 169
## Proposal to The City of Brooklyn Center
Submitted by Ehlers - July 9, 2026
13
## Cash & Equivalents160,2281.00160,2283.603.60AaaAAA
## Original
## Cost
## Market
## Price
($)
## Market
## Value
($)
## Unrealized
## G/L
($)
## YTM (%)
## YTW
(%)
## Moody's
## Rating
## S&P
## Rating
## United States91282CEB31,044,000
2/28/2029
## United States91282CNY31,000,000
9/15/2028
## United States91282CCH21,056,000
6/30/2028
## United States91282CEN71,004,000
4/30/2027
## United States91282CMV0992,000
3/31/2027
## United States91282CJN2973,000
11/30/2028
## Security DetailsCUSIPQuantityMaturity
992,69894.28990,852-16,1154.164.16Aa1AA+
## 993,55598.35993,355-11,4664.174.17NAAA+
994,41494.48997,745-10,9684.164.16Aa1AA+
994,62798.94997,999-4,7514.064.06Aa1AA+
994,75199.901,000,695-2,4544.004.00Aa1AA+
996,375100.47981,198-14,9214.174.17Aa1AA+
## Totals41,632,680-310,639
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/20269
## Disclosures
Ehlers Investment Partners ("Ehlers") is an SEC registered investment adviser. For additional information about our firm, please see our current disclosures (Form ADV) on our website at
www.ehlers-inc.com/disclosures.
Information contained in this performance summary is confidential and for informational purposes only and should not be construed as specific investment or legal advice. The information
contained herein was obtained from sources believed to be reliable as of the date of this summary but may become outdated or superseded at any time without notice.
Custody: Your qualified custodian bank/brokerage maintains control of all assets reflected in this summary and we urge you to compare this summary to the one you receive from your qualified
custodian. Ehlers does not have any authority to withdraw or deposit funds from/to the custodian account.
Valuation: Prices are provided by IDC, an independent pricing source. In the event IDC does not provide a price or if the price provided is not reflective of fair market value, Ehlers will obtain
pricing from an alternative approved third-party pricing source in accordance with our written valuation policy and procedures. Our valuation procedures are also disclosed on our Form ADV
Part 2A.
Performance: Performance results are presented gross-of-advisory fees and represent the client's Total Return. The deduction of advisory fees lowers performance results. These results include
the reinvestment of dividends and other earnings. Past performance may not be indicative of future results. Therefore, clients should not assume that future performance of any specific
investment or investment strategy will be profitable or equal to past performance levels. All investment strategies have the potential for profit or loss. Economic factors, market conditions or
changes in investment strategies, contributions or withdrawals may materially alter the performance and results of your portfolio.
Source ice Data Indices, LLC ("ICE"), used with permission. ICE PERMITS USE OF THE ICE INDICES AND RELATED DATA ON AN "AS IS" BASIS; ICE, ITS AFFILIATES AND THEIR RESPECTIVE THIRD
PARTY SUPPLIERS DISCLAIM ANY AND ALL WARRANTIES AND REPRESENTATIONS, EXPRESS AND/OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A
PARTICULAR PURPOSE OR USE, INCLUDING THE INDICES, INDEX DATA AND ANY DATA INCLUDED IN, RELATED TO, OR DERIVED THEREFROM. NEITHER ICE DATA, ITS AFFILIATES OR THEIR
RESPECTIVE THIRD PARTY PROVIDERS GUARANTEE THE QUALITY, ADEQUACY, ACCURACY, TIMELINESS OR COMPLETENESS OF THE INDICES OR THE INDEX DATA OR ANY COMPONENT
THEREOF, AND THE INDICES AND INDEX DATA AND ALL COMPONENTS THEREOF ARE PROVIDED ON AN "AS IS" BASIS AND LICENSEE'S USE IS AT LICENSEE'S OWN RISK. ICE DATA, ITS
AFFILIATES AND THEIR RESPECTIVE THIRD PARTY DO NOT SPONSOR, ENDORSE, OR RECOMMEND EHLERS, OR ANY OF ITS PRODUCTS OR SERVICES.
Index returns assume reinvestment of all distributions. Historical performance results for investment indexes generally do not reflect the deduction of transaction and/or custodial charges or the
deduction of an investment management fee, the incurrence of which would have the effect of decreasing historical performance results. It is not possible to invest directly in an index.
Ratings: Ratings information have been provided by S&P, Moody's, and Fitch through data feeds we believe to be reliable as of the date of this statement, however we cannot guarantee its
accuracy.
Security level ratings for U.S. Agency issued mortgage-backed securities ("MBS") reflect the issuer rating because the securities themselves are not rated. The issuing U.S. Agency guarantees the
full and timely payment of both principal and interest and carries a AA+/Aaa/AAA by S&P, Moody's and Fitch respectively.
## FIXEDINCOMEREPORT
Data provided by IMTC6/30/202610
## SAMPLE CLIENT REPORTING
Page 169 of 169