Civic Campus Schematic Design and Cost Analysis
Long-Term Financial Planning and Economic Development
Votes (1)
Civic Campus Schematic Design Presentation and Discussion
Dissent: Council members expressed varying levels of concern regarding project cost, funding certainty, and long-term financial implications, but no formal dissent was recorded as no vote was taken on the project itself.
BKB and Cross Anderson presented the schematic design for the civic campus, which is 30% complete, outlining the proposed 78,000 square foot facility for city hall, police, and utilities, including a gun range and shared fitness area. The preliminary cost estimate is $47.6 million, projected to start construction in spring 2028, with a potential reduction to $33 million for taxpayers with external funding. Council members raised questions regarding the exact square footage, the currency of the cost estimate, the impact of potential project delays on cost and funding, and the feasibility of building a facility of this scale given the city's population. Staff emphasized the project's adherence to space needs studies, the risks of deferring maintenance, and the strategic importance of external funding tied to specific functions within the building. No decision on moving forward was made, as the project is contingent on a public hearing for geo-bonding on September 24th, which will initiate a 30-day reverse referendum period.
Notable Quotes (6)
This is the the final on schematic design. Uh and again just a reminder this this is 30% of design.
our current design as you see it today on the floor plans represent about 78,000 square feet. So, uh, that was developed based on, uh, some in-depth discussions with staff and our design team to try to find as much efficiencies and flexibility and multi-purposing space as much as possible.
Right now, at a culinary SD level, uh that gives an overall budget of just north of 47.6 million.
So presently with 47 million as a projection today which I would anticipate would go down as we bring the square footage down but that what came before us today was 47,646595. I want to remind council that presently we have external funding of 14,550,000 projected. Uh which how much that's confirmed?
I don't think anyone is against the building, okay? I think they're against a $50 million price tag on a on a city that has 10,000 residents. That's what I think the the issue is. I don't think it's wow, we need something better. We we know that. Do we need, you know, do we need a $50 million facility? I don't think we do.
It's a space needs deal and and the design and the space need everything has been done. public works, everything. We've required experts to look at what's needed for functionality. Uh we trust the experts and the feedback that they provided.
Ordinances & Resolutions (13)
Presentation materials for the civic campus schematic design.
Preliminary cost estimate based on 20-25% design.
Report used for inflation and cost escalation indexes.
Index used for inflation and cost escalation.
Architectural industry standard for construction contingency.
Analysis of current and future space requirements for city departments.
Upcoming review to consider staffing and facility maintenance.
Mentioned as lacking for current facilities, needed for future ones.
Upcoming plan to detail financial impacts of projects and growth.
A plan being put together to diversify the tax base.
City's plan guiding growth and development.
Recent plan to address transportation needs.
Report providing data on the current building's state.