Highway 100 ramp closure planned through late fall
Votes (1)
Construction Progress Report: Vernon Avenue Interchange
Informational Update Only
Dissent: None
The update focused on the logistical impacts of the 50th Street ramp closure and the specific traffic maneuvers required for the detour. A significant portion of the report addressed public safety concerns regarding the lack of driver yielding at midblock crosswalks and roundabouts.
Notable Quotes (1)
We're seeing a lack of yielding to pedestrians using crosswalks midblock and crosswalks around the roundabouts.