Agenda · Edina City Council
Edina City CouncilAgendaTuesday, June 2, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## City Council Meeting Agenda
June 2, 2026, 7:00 PM
Edina City Hall, Council Chambers, 4801 W. 50th St.
Participate in the meeting:
Watch the meeting on cable TV or YouTube.com/EdinaTV.
Provide feedback during Community Comment by calling 312-535-8110. Enter access code 2630 199
5168. Password is 5454. Press *3 on your telephone keypad when you would like to get in the queue to
speak. A staff member will unmute you when it is your turn to speak.
## Accessibility Support:
The City of Edina wants all residents to be comfortable being part of the public process. If you need
assistance in the way of hearing amplification, an interpreter, large-print documents or something
else, please call 952-927-8861 at least 72 hours in advance of the meeting.
1. Call to Order
## 2. Roll Call
3. Pledge of Allegiance
## 4. Approval of Meeting Agenda
## 5. Community Comment
During "Community Comment," the Mayor will invite residents to share issues or concerns that are not scheduled
for a future public hearing. Items that are on tonight's agenda may not be addressed during Community
Comment. Individuals must limit their comments to three minutes. The Mayor may limit the number of speakers
on the same issue in the interest of time and topic. Individuals should not expect the Mayor or Council to respond
to their comments tonight. The City Manager will respond to questions raised during Community Comments at
the next meeting.
## 5.1. City Manager's Response to Community Comments
## 6. Adoption of Consent Agenda
All agenda items listed on the Consent Agenda will be approved by one motion. There will be no separate
discussion of items unless requested to be removed by a Council Member. If removed the item will be considered
immediately following the adoption of the Consent Agenda. (Favorable roll call vote of majority of Council
Members present to approve, unless otherwise noted in consent item.)
## 6.1. Minutes: Work Session and Regular, May 5, 2026
Page 1 of 175
6.2. Payment of Claims
6.3. Purchase Request: DriSteem Electric Humidifier for City Hall and Police
## 6.4. Purchase Request: City Owned Parking Ramp Condition Assessments
## 6.5. Sustainable Building Policy Amendment #2
## 6.6. Bag Fee Policy Report
6.7. Purchase Request: Change Order for Professional Services for Wooddale Avenue Bridge
## 6.8. Purchase Request: 50th & France Paver Replacement
6.9. Purchase Request: Change Orders #1-4 Construction Services for Hennepin County Library
## and Senior Center Exterior Improvements
## 6.10. Purchase Request: Streetlights for Woodland Road & Brookview Avenue
6.11. Receive Petition for Stop Controls at Garrison Lane/Ashcroft Lane and St. Johns Avenue
## 6.12. Purchase Request: Braemar Golf Dome Parking Lot Expansion Construction
6.13. Purchase Request: Braemar Golf Dome Parking Lot Expansion Construction Oversight
6.14. Purchase Request: Braemar Park EV Charging Stations at Braemar Golf Dome
6.15. Waive Permit Fees Braemar Park Braemar Golf Dome Parking Lot Expansion
## 6.16. Purchase Request: Yorktown Master Planning
## 6.17. Purchase Request: Recreation Enterprise Digital Advertising Services
6.18. Purchase Request: Change Order to Braemar Ice Arena Pre-construction Services
## 6.19. Purchase Request: Braemar Ice Arena Phase 2 Rink Improvements
6.20. Waive Permit Fees for Braemar Ice Arena Phase 2 Rink Improvements
## 6.21. Purchase Request: Institution Community Work Crew Contract
Page 2 of 175
6.22. Cancellation of the Scheduled TEFRA Public Hearing for the 2026B Sales Tax Revenue Bonds
## 6.23. Purchase Request: Microsoft Enterprise Agreement Change Order
## 6.24. Purchase Request: Fiber Expansion at Centennial Lakes Park
## 6.25. Purchase Request: 2026 Toyota Grand Highlander Hybrid
## 6.26. Purchase Request: 2026 Kia Sorento Hybrid
6.27. Special Use Permit to Serve Alcohol on City Property at the Edina Art Fair, June 5-7
## 7. Special Recognitions and Presentations
7.1. League of Minnesota Cities to Recognize City Manager Scott Neal
## 8. Public Hearings
During "Public Hearings," the Mayor will ask for public testimony after staff and/or applicants make their
presentations. The following guidelines are in place to ensure an efficient, fair, and respectful hearing; limit your
testimony to three minutes and to the matter under consideration; the Mayor may modify times, as deemed
necessary; avoid repeating remarks or points of view made by previous speakers. The use of signs, clapping,
cheering or booing or any other form of verbal or nonverbal communication is not allowed.
8.1.
Zoning Ordinance Amendment, Preliminary Rezoning & Site Plan for 4200 76
th
## Street West
(Salvation Army)
A. Ordinance 2026-8: Amending Chapter 36, Article VIII, Division 8, Section 36-609
## B. Resolution 2026-27: Rezoning & Site Plan
8.2.
Comprehensive Plan Amendment, Site Plan and Variances for 6016 Vernon Ave, EV Charging
## Station
## A. Resolution 2026-28: Comprehensive Plan Amendment
## B. Resolution 2026-29: Site Plan and Variances
9. Reports/Recommendations
## 9.1. Resolution 2026-30: Accepting Donations
Page 3 of 175
9.2. Recommendation to Limit In-Person Primary Election Voting to the 18-Day Early Voting
## Period
## 10. Manager's Comments
10.1. Quarterly Financial Report and Strategic Plan Updates – Q1 2026
## 11. Mayor and Council Comments
12. Adjournment
Page 4 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 5.1 Department: Administration
## Item Activity: Information Prepared By: Sharon Allison, City Clerk
## Item Title: City Manager's Response to Community Comments
## Action Requested:
None, information only.
## Information/Background:
Responses to questions posed during Community Comment at the last meeting were posted on the
City's website (URL). City Manager Neal will provide summaries of those responses during the meeting.
## Supporting Documentation:
## None
Page 5 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.2 Department: Finance
## Item Activity: Action Prepared By: Pa Thao, Finance Director
## Item Title: Payment of Claims
## Action Requested:
Approve claims for payment
## Information/Background:
For security purposes and to meet ADA Web Content Accessibility Guidelines (URL), the detailed claims
reports are not included in the public packet but they are available to City Council through a secure
Board Portal. To request the claims reports, please submit a data request (URL).
## List of Payment Claims:
## 1. Check Register Claims Pre-List Dated 2026.04.30 Total $666,616.00 (1011)
## 2. Check Register Claims Pre-List Dated 2026.05.01 Total $3,151,286.54
## 3. Check Register Claims Pre-List Dated 2026.05.08 Total $1,576,666.88
## 4. Check Register Claims Pre-List Dated 2026.05.15 Total $1,268,917.77
## 5. Check Register Claims Pre-List Dated 2026.05.22 Total $1,133,439.44 pdf
Page 6 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.3 Department: Public Works
## Item Activity: Action Prepared By: Noah Silver, Electrical Supervisor
Item Title: Purchase Request: DriSteem Electric Humidifier for City Hall and Police
## Action Requested:
Approve Purchase Request for DriSteem Electric Humidifier for City Hall and Police from Gilbert
Mechanical for $39,268.00.
## Requisition Number: 12600143
## Vendor: Gilbert Mechanical
## Equipment Status: Replacement
## Funding Source: Building Operations Budget and Sustainability Fund
Cost: $39,268.00
## Information/Background:
The existing building humidifier is past its service life. The humidifier maintains proper humidity levels
throughout the City Hall and Police building. Proper humidity levels prevent static electricity from
developing, affecting electronic equipment. In addition, the building occupant's comfort and
respiratory health are improved. The new electric humidifier will replace an existing natural gas unit,
supporting the City's sustainability goals of reducing greenhouse gas emissions.
## Resources/Financial Impacts:
This replacement is within the City Hall operations budget and the Sustainability fund. The City of
Edina will operate and maintain the new humidifier unit.
## Relationship to City Policies/Plans/Budget Pillars:
This aligns with the Comprehensive Plan and Edina's Climate Action Plan.
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
## Health
Proper humidity levels promote respiratory health and ensures building
occupants are comfortable.
## Sustainability
This replacement supports Edina's Climate Action Plan to reduce community-
wide greenhouse gas emissions by 45% by 2030.
## Stewardship
Capital assets and infrastructure systems are managed to minimize risk and
sustain service levels to be safe and reliable.
Page 7 of 175
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 8 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.4 Department: Public Works
## Item Activity: Action Prepared By: Derik Otten, Facility Manager
## Item Title: Purchase Request: City Owned Parking Ramp Condition Assessments
## Action Requested:
Approve Purchase Request for City Owned Parking Ramp Condition Assessments with Kimley-Horn
Associates for $27,500.
## Requisition Number: 12600139
## Vendor: Kimley-Horn Associates
## Equipment Status: NA
## Funding Source: Operating Budget
Cost: $27,500
## Information/Background:
This is required for parking ramp operating permits for the 3 City-Owned Parking Ramps.
## Resources/Financial Impacts:
This work is funded from the operating budget.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation Reliable Service
## Values Impact:
## Stewardship
Conducting periodic condition assessments of City-owned facilities
allows staff to plan and budget for long-term maintenance projects and
eliminates for emergency repairs.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 9 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.5 Department: Public Works
## Item Activity: Action Prepared By: Marisa Bayer, Sustainability Manager
## Item Title: Sustainable Building Policy Amendment #2
## Action Requested:
Approve amendment #2 to the Sustainable Building Policy.
## Information/Background:
Edina's Sustainable Building Policy was adopted in 2021, creating sustainable building requirements for
private developments that seek city funding or land use incentives, and for City projects.
To alleviate confusion on certain policy aspects, staff drafted an amended policy to:
• Create a new Definitions section for key terms.
• Update the term "Edina Overlay" to "Edina Universal Requirements" to avoid confusion with the
use of "overlay" in the zoning code.
• Establish a process for how fractional EV-installed and EV-ready spaces are calculated, and
how exceeding EV-installed requirements will count toward EV-ready compliance.
• Update the name of the US Department of Energy's Efficient New Homes Program, formerly
known as "Zero Energy Ready Homes."
• Update Enterprise Green Communities section numbers to reflect 2026 criteria numbering for
energy efficiency standards.
• Update LEED's bird collision deterrence point references.
• Add clarification that parking facilities not included in the scope of the project do not have to
comply with EV requirements if documentation is submitted to the Sustainability Division.
Staff believe these changes provide necessary clarification in the document for policy compliance
and resolve areas of confusion brought up by development teams. There are no changes to the policy
requirements or applicability. This is the second amendment to the policy.
## Resources/Financial Impacts:
None.
## Relationship to City Policies/Plans/Budget Pillars:
The Sustainable Building Policy was adopted in 2021 to advance Edina's Climate Action Plan goals and
strategies. Sustainable investments in our built environment result in a strong foundation and livable
city.
## Strong Foundation
## Livable City
Page 10 of 175
## Values Impact:
## Sustainability
This policy is an action from the Climate Action Plan. Sustainable
building standards reduce greenhouse gas emissions, increase energy
efficiency, leverage renewable energy, conserve water, and use
sustainable building materials.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Sustainable Building Policy, Amendment #2
Page 11 of 175
Page | 1
## City of Edina Policy
☒City Council Approved: 11/16/2021
☐ City-Wide Revised: 06/02/2026
☐ Department
## Sustainable Building Policy
Edina is dedicated to building a sustainable environment where current and future generations benefit from
clean air and water, climate and community resiliency, and access to nature. In particular, the City
recognizes the risks of climate change and has set a goal to reduce greenhouse gas emissions 45% by 2030.
Since the built environment is a significant contributor to Edina’s greenhouse gas footprint, it is important
that new developments are built to minimize emissions and environmental impact during construction, as
well as the operation of buildings. Developments that seek City funding or land use incentives can join the
City in these goals and meet set established sustainable building requirements. As such, the City of Edina
adopts the following Sustainable Building Policy:
## DEFINITIONS
Affordable unit means housing serving residents at or below 60% AMI for rental buildings and at or below
80% AMI for for-sale buildings.
Edina Universal Requirements mean specific measurable standards that New Construction and Major
Renovations must meet regardless of sustainable building rating system.
EV Installed means a designated parking space with installed electric vehicle supply equipment that at a
minimum provides Level 2 charging.
EV Ready means a designated parking space that has sufficient electrical capacity installed in the space with a
branch circuit or other means as permitted by Minnesota Electrical Code and can support the installation of
an electric vehicle charging station providing at a minimum Level 2 charging at a later date.
Level 2 Charging means charging equipment supplied by 208/240 volts electric service.
Major renovation means renovation work performed on an existing building or portion thereof consisting of
at least 10,000 square feet (gross) for non-municipal buildings and 2,500 square feet (gross) for municipal
buildings, and requiring installation of new mechanical, ventilation, or cooling systems, or the replacement of
such systems.
New construction means the planning, design, construction, and commissioning of a new building; or an
addition of at least 10,000 square feet to an existing building if such addition requires installation of new
mechanical, ventilation, or cooling systems.
Parking Facilities means parking lots, garages, ramps, or decks within or adjacent to the building that are used
for parking motor vehicles.
Page 12 of 175
Page | 2
Sustainable Building Rating System means any of the following:
1. US Green Building Council’s LEED building construction or operations; Certified Silver, Gold or
Platinum.
a. US Green Building Council’s SITES Certification can be used in tandem with LEED for
suitable public facilities.
2. State of Minnesota’s B3 Guidelines; Certified Compliant.
3. Enterprise’s Green Communities; Certified.
4. Green Business Certification Inc.’s Parksmart; Certified Silver or Gold.
5. US Department of Energy’s Efficient New Homes Program.
## POLICY REQUIREMENTS
New Construction or Major Renovations to which this policy applies are required to 1) be certified under
one of the eligible Sustainable Building Rating Systems, and 2) meet the standards set forth in the Edina
Universal Requirements. Applicable versions of the Sustainable Rating Systems and Edina Universal
Requirements include the most recent or current iteration of a rating system in existence at the time of
development application.
1. Be certified under an eligible Sustainable Building Rating System at the listed level.
2. Meet the Edina Universal Requirements.
a. Building greenhouse gas emission predictions.
i. Calculate and report to Sustainability Division using agreed upon methodology.
b. Electric vehicle charging capability.
i. A minimum of 5% of total parking stalls must be EV Installed.
1. EV Installed stalls that exceed the minimum requirement will count toward satisfying
the requirements for EV Ready stalls.
ii. A minimum of 10% of total parking stalls must be EV Ready.
iii. When the calculation of percent of parking stalls results in a fractional parking space, it shall
be rounded up to the next whole number.
c. Energy efficiency standard.
i. For 1–4-unit residential projects: Follow US Department of Energy’s Efficient New
Homes Program.
ii. For all other residential and commercial projects: Follow B3 Sustainable Building
2030 Energy Standard.
iii. For residential projects with at least one affordable unit, equivalent credits in
Enterprise Green Communities may be permitted: Achieve a combination of 5.2a and
5.3 for New Construction, or 5.2b and 5.3 for Major Renovation.
d. Bird-safe glazing.
i. For projects seeking certification under a sustainable rating system other than LEED:
1. Complete and submit B3 Bird Safe Calculator Worksheet based on building
design to determine nearness to compliance.
2. Submit a memo cataloging threats and quantifying the cost of mitigation
using B3’s Bird-Safe Case Study Narrative Report Template.
Page 13 of 175
Page | 3
3. Follow MN B3 Part S.5.E, Lights Out Management Procedure, including
registering your building with MN Audubon’s free Lights Out Program.
4. At 12-month review, report bird strikes using B3’s Bird Monitoring
Worksheet.
ii. For projects seeking LEED certification: Achieve the Innovation Bird Collision
Deterrence point for New Construction, or Light Pollution and Bird Collision
Reduction point for Major Renovation.
1. LEED projects can choose to meet the requirements under 2.d.i as an
alternative pathway to complying with the bird-safe glazing universal
requirement.
## APPLICABILITY
This Policy applies to N ew Construction and Major Renovation projects, including:
1. Public facilities owned or operated by the City of Edina or the Edina Housing and Redevelopment
Authority (HRA), and facilities of which the City or HRA are, or will become, the sole tenant.
2. Private or other public facilities that meet at least one of the following conditions:
a. Are rezoned with Planned Unit Development (PUD) District zoning.
b. Receive financial assistance from the City of Edina or the HRA, including:
## i. Tax Increment Financing (TIF);
## ii. HRA Funds;
## iii. Metropolitan Council Livable Communities Grant;
## iv. Housing Improvement Area;
## v. Affordable Housing Trust Fund;
## vi. Conduit Bonds;
vii. Land write-downs below market value; and
viii. Other funds that are available to the City of Edina and Edina HRA.
Notwithstanding the above, financial assistance does not include environmental remediation
funds, such as the following:
i. Department of Employment and Economic Development (DEED) Cleanup and
## Investigation Grants;
## ii. Met Council Tax Base Revitalization Account (TBRA) Contamination Cleanup
Grants; and
iii. Met Council TBRA Site Investigation Grants.
For New Construction projects not building parking facilities or Major Renovation projects not modifying
the existing parking facilities or disturbing the ground where parking facilities are located, the Edina
Universal Requirement for electric vehicle charging capability is automatically waived. Documentation must
be submitted to the Sustainability Division during policy compliance checks demonstrating that parking
facilities are not in scope or part of the development and permit application. If parking facilities come into
project scope, projects will be required to comply with the electric vehicle charging capability requirement.
Page 14 of 175
Page | 4
## COMPLIANCE
1. For any project to which this policy applies, compliance is a condition of receipt of Financial Assistance
or Planned Unit Development approval.
2. Buildings will demonstrate ongoing compliance with this Policy to advance to the next stage of
construction or operation, including necessary permit issuance.
3. Equivalent substitute standards may be utilized at the discretion of the Sustainability Division.
4. Applicable portions of this Policy are contingent upon availability of programs at utility companies,
sustainable rating system organizations, and rating system compliance verification organizations.
5. The requirements of this Policy may be waived, in whole or in part, by the City Council after
consideration of the advantages and disadvantages of a waiver, and upon demonstration by the
Sustainability Division of a compelling public purpose.
6. This Policy may be amended or discontinued without prior notice.
Amendment approved: June 02, 2026
Effective date: June 02, 2026
Originally adopted: November 16, 2021; Amendment #1: April 1, 2022
Page 15 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.6 Department: Public Works
## Item Activity: Information Prepared By: Marisa Bayer, Sustainability Manager
## Item Title: Bag Fee Policy Report
## Action Requested:
Receive report.
## Information/Background:
The Edina City Council adopted Ordinance 2023-18 to establish a 5 cent carryout bag fee for most
retail merchants, which applies to plastic bags, compostable plastic bags, paper bags and reusable
bags. Businesses are required to self-report both the total number of bags distributed and the total
value of the bag fees collected. There is no penalty for not reporting.
The ordinance has been effective since July 1, 2024, and the City currently has 18 months worth of
reporting data from 74 unique businesses. Forty-three businesses submitted data both years.
At the April 7, 2026, Council meeting, Council members requested additional analysis on the bag fee
reporting data to determine if there is a decrease in the total number of bags being distributed in
Edina. Staff completed a comparison analysis focused on 34 businesses who submitted data both
years to provide a more representative sample of year-to-year changes and observations of
operational and customer behavior changes.
## Resources/Financial Impacts:
No fiscal or capacity impact. Information only.
## Relationship to City Policies/Plans/Budget Pillars:
The carryout bag fee ordinance is one action supporting the Climate Action Plan goal to reduce
waste.
## Values Impact:
## Sustainability
Reducing waste and adopting sustainable behavior changes like
bringing your own bag while shopping, supports Edina's Climate Action
Plan.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Bag Fee Analysis Staff Report
## 2. Bag Fee Data Business List
Page 16 of 175
Page 17 of 175
## Staff Report
Date: 06/02/2026
## To: Mayor and City Council
## From: Marisa Bayer, Sustainability Manager
## Subject: Carryout Bag Fee Analysis
## Introduction & Overview
To understand the impact of the carryout bag fee, a comparison analysis focused on 34 businesses (three grocery stores
and 31 retail stores) who submitted data both years to provide a more representative sample of year-to-year changes
and observations of operational and customer behavior changes.
For the grocery stores and retail stores in the analyzed data set, the estimated total monthly number of bags and
average monthly number of bags distributed per store decreased from 2024 to 2025. These decreases demonstrate
there is likely some change in store operations (e.g., prompting customers if they would like a bag) and customer
behaviors (e.g., bringing a bag).
Assuming the data is directionally accurate, there is a high variability in the reporting data and low confidence in the
accuracy and completeness of the data:
• The accuracy of the reporting data is affected by the data being self-reported. Self-reported data lacks reliability
and can be impacted by reporting biases like social desirability, where a business submits data because they are
expected to even if inaccurate, or submits data that shows a decrease in bags distributed assuming that’s the
desired outcome of the reporting. Examples of unreliable data in the data set include businesses reporting
distributing zero or one bag, reporting the same value both years or reporting values that show almost a 100%
decrease in bags distributed.
• The accuracy of the reporting data is also affected by the lack of ordinance enforcement, where businesses
might not consistently adhere to the ordinance (i.e., tracking and charging for each carryout bag), so may be
under-reporting the actual number of bags distributed. This has been observed in anecdotal conversations with
City staff, City commissioners and residents who have shared that businesses did not charge for their carryout
bag(s) during a transaction, either because they were never prompted to or were advised that the policy did not
apply to their transaction (e.g, thinking the fee does not apply to paper bags).
• The completeness of the reporting data is affected by the low number of businesses reporting. Several retailers
who are assumed to distribute a high number of carryout bags did not submit data, such as Target and
Walgreens, which would influence the monthly bag distribution numbers. In addition, most retailers at Southdale
Mall and the Galleria did not submit data. Of the estimated 300 retailers in Edina, only 69 submitted data (23%
reported).
Page 18 of 175
## Data Analysis
To understand the impact of the carryout bag fee, the analysis focused on 34 of 43 businesses who submitted data both
years to provide a more accurate year-to-year change and observation of operational and customer behavior changes.
Because of anomalies in the self-reported data, such as reporting the same value each year or a 100% increase in bags
distributed, nine retail businesses who submitted data for both years were not included in this analysis.
## Grocery Store Trends
Three grocery stores submitted data both years, providing a more consistent look at changes to in-store operations and
customer behaviors. Both the total monthly bags distributed and the average monthly bags distributed per store
decreased from 2024 to 2025. Looking at each individual store, two grocery stores saw a decrease from 2024 to 2025
for monthly bags distributed, and one saw an increase from 2024 to 2025.
Table 1. Bag Fee Reporting Data and Comparison for Grocery Stores with 18 Months of Data (n=3)
Grocery Stores 2024 2025
2024 to 2025
## Change
## Total Monthly Bags Distributed 166,526 150,506 -10%
## Average Monthly Bags Distributed per
## Business
55,509 50,169 -10%
## Retail Store Trends
Thirty-one retail stores submitted data both years in the analyzed data set. Similar to grocery stores, both the total
monthly bags distributed and the average monthly bags distributed per store decreased from 2024 to 2025, but at a
higher rate than grocery stores.
Table 2. Bag Fee Reporting Data and Comparison for Retail Stores with 18 Months of Data (n=31)
Retail Stores 2024 2025
2024 to 2025
## Change
## Total Monthly Bags Distributed 13,333 8,412 -37%
## Average Monthly Bags Distributed per
## Business
430 271 -37%
Staff completed an additional task to scrub the data for retail stores because of the range of values and annual changes in
the dataset of 31. Staff removed retail businesses whose monthly estimated bags distributed increased or decreased
more than 25% from 2024 to 2025. This resulted in 17 retail businesses being removed. This smaller dataset (Table 3)
still shows a decrease from 2024 to 2025 in the monthly bags distributed, but at a smaller rate than the dataset with 31
stores (Table 2) that is more consistent with the grocery store sector (Table 1).
Page 19 of 175
Table 3. Bag Fee Reporting Data and Comparison for Retail Stores with 18 Months of Data, Scrubbed (n=14)
Retail Stores 2024 2025
2024 to 2025
## Change
## Total Monthly Bags Distributed 5,096 4,641 -9%
## Average Monthly Bags Distributed per
## Business
364 331 -9%
Page 20 of 175
## Submitted Carryout Bag Fee Data
This list includes all businesses who self-reported bag distribution data.
“2024 Bags” represents July 1–December 31, 2024, and “2025 bags” represents January 1–December 31, 2025. To estimate the count of monthly
bags distributed, the 2024 values were divided by 6 and the 2025 values were divided by 12. The monthly change was only calculated for businesses
who submitted data for both reporting cycles.
“Yes” in the “Included in Analysis” column indicates a business was included in the comparison analysis summarized in the June 2, 2026 Staff
Report. An asterisk (*) denotes businesses removed during the secondary scrub for retail stores with a 25% or higher increase or decrease in
monthly bags.
## Business Name Business Address
## Business
## Classification
2024
## Bags
2025
## Bags
## Monthly
## Estimate,
2024
## Monthly
## Estimate,
2025
2024 to
2025
## Monthly
## Change
Included in
## Analysis
Advanced Skin Therapeutics 6525 Barrie Road Retail 83 149 14 12 -10%
## Allure Intimate Apparel
## 3400 Galleria Edina
## MN
Retail 5,000 - 833 - -
## Anderson Dentalcare
## 3925 W 50th St, Suite
104
Retail 124 - 21 - -
Art Frame of Edina MN 5111 Gus Young Lane Retail - 250 - 21 -
## Aveda
1855 Southdale
## Center
Retail - 2,553 - 213 -
Bean Plus Ro, LLC 4506 Valley View Rd Retail 1,200 - 200 - -
Blick Art Materials 3867 Gallagher Drive Retail 6,341 12,764 1,057 1,064 1% Yes
bluebird boutique 3909 W 50th Street Retail 500 1,000 83 83 0%
Chuck & Don's 6821 York Avenue S Retail - 2,635 - 220 -
Coccinella 4946 France Ave S Retail - 1,701 - 142 -
Cos Bar Edina 3905 W 50th St Retail - 4,184 - 349 -
Cub Foods Southdale 6775 York Avenue S Grocery 380,162 651,560 63,360 54,297 -14% Yes
CVS Pharmacy 6905 York Avenue S Retail - 35,500 2,958 -
Dalana Space, LLC 6804 Cheyenne Trail Retail 20 - 3 - -
## Dermatology Specialists
3316 West 66th
## Street
Retail 147 69 25 6 -76%
## Droolin' Moose
4545 77th Street
## West
Retail - 1,560 - 130 -
DUGO 3939 Market St Retail 839 1,773 140 148 6% Yes
Page 21 of 175
## Business Name Business Address
## Business
## Classification
2024
## Bags
2025
## Bags
## Monthly
## Estimate,
2024
## Monthly
## Estimate,
2025
2024 to
2025
## Monthly
## Change
Included in
## Analysis
East West Girl 3933 Market St Retail 1,936 2,970 323 248 -23% Yes
## Edina Skin Care Specialists
## 7450 France Ave,
Suite 230
Retail 130 - 22 - -
## Evereve Incorporated
## 6800 France Ave S,
Suite 700
Retail 3,450 1,232 575 103 -82% Yes*
Faribault Mill 3922 W 50th Street Retail - 1 - 0 -
Fashion Avenue 4936 France Ave S Retail 1,762 3,563 294 297 1% Yes
Fawbush's 3585 Galleria Retail 2,047 4,533 341 378 11% Yes
## Finish Line
2120 Southdale
Center #A
Retail - 9,505 - 792 -
Flirt Boutique 3927 Market Street Retail 1,800 1,600 300 133 -56% Yes*
## Games by James
1930 Southdale
## Center
Retail 3,167 5,252 528 438 -17% Yes
GEAR Running Store 4406 France Ave S Retail 127 - 21 - -
goGLOW 7493 France Ave S Retail 200 200 33 17 -50%
Goodnight Moon 4388 France Avenue S Retail - 1,000 - 83 -
Great Clips 5125 Gus Young Lane Retail 158 126 26 11 -60% Yes*
grethen house 4930 France Avenue S Retail 4,786 4,556 798 380 -52% Yes*
Harriet and Alice 3922 W 50th St Retail 762 1,470 127 123 -4% Yes
Hobo 3490 Galleria Retail 838 1,450 140 121 -14% Yes
## J Crew
1150 Southdale
## Center
Retail 2,677 5,154 446 430 -4% Yes
JB Hudson 3555 Galleria Retail 2,520 3,000 420 250 -40% Yes*
## Jerry's Do It Best Hardware
## 5115 Vernon Avenue
## S
Retail - 6,060 - 505 -
## Jerry's Foods Edina
## 5101 Vernon Avenue
## S
Grocery 469,730 822,100 78,288 68,508 -12% Yes
## Jett Beauty
3940 West 50th
## Street
Retail 23 61 4 5 34%
Jos A. Bank 6380 Rogerdale Road Retail 3,750 2,420 625 202 -68% Yes*
Kowalski's Edina Market 324 Southdale Center Grocery 149,263 332,408 24,877 27,701 11% Yes
lululemon
## 10 Southdale Center,
Suite 2585B
Retail - 70,000 - 5,833 -
lululemon 50th & France 3914 W 50th St Retail 4,800 5,000 800 417 -48% Yes*
Page 22 of 175
## Business Name Business Address
## Business
## Classification
2024
## Bags
2025
## Bags
## Monthly
## Estimate,
2024
## Monthly
## Estimate,
2025
2024 to
2025
## Monthly
## Change
Included in
## Analysis
## LUNDS & BYERLYS (LUND
## FOOD HOLDINGS, INC.)
7171 France Ave S Grocery 172,777 - 28,796 - -
## LUNDS & BYERLYS (LUND
## FOOD HOLDINGS, INC.)
3945 W 50th St Grocery 180,457 - 30,076 - -
Lush Handmade Cosmetics 3915 W 50th Street Retail 1,490 2,787 248 232 -6% Yes
## Madewell
1562 Southdale
## Center
Retail 2,114 7,636 352 636 81% Yes*
## MADEWELL
## 3510 Galleria, Space
3464
Retail 7,052 7,838 1,175 653 -44% Yes*
Mainstream Boutique of Edina 7523 France Ave S Retail 322 654 54 55 1% Yes
Massage Envy 7101 France Ave S Retail 1,080 75 180 6 -97%
Melly 3327 Galleria Retail 1,000 7,000 167 583 250%
## Oliver Taylor & Company
## 3939 W 69th St, Suite
#28
Retail 5 - 1 - -
Pacifier 4942 France Ave S Retail 1,050 3,462 175 289 65% Yes*
PARACHUTE HOME INC 3165 Galleria Retail 138 - 23 - -
## Pathway Books and Music
6901 Normandale
## Road
Retail 264 326 44 27 -38% Yes*
Pumpz 3511 Galleria Retail 326 - 54 - -
## PXG
## 10 Southdale Center,
Suite 2180C
Retail - 0 - 0 -
## Ragstock
## 10 Southdale Center,
#2015
Retail - 485 - 40 -
## SENTi
3922 West 50th
## Street
Retail 756 1,296 126 108 -14% Yes
Serge + Jane 4532 France Ave S Retail 750 700 125 58 -53% Yes*
shop in the city 3921 Market St. Retail - 39 - 3 -
Sloane's on 44th
## 4388 France Avenue
## S, #100
Retail 318 202 53 17 -68% Yes*
Spalon Montage 3909 Market Street Retail 6 2,200 1 183 1,8230%
Talbots 3936 W. 50th Street Retail 1,748 - 291 - -
The Men's Wearhouse 6380 Rogerdale Road Retail 12,500 2,491 2,083 208 -90% Yes*
The Metropolitan Clinic 7300 France Ave S Retail 161 212 27 18 -34% Yes*
## Tiffany and Company
## 10 Southdale Center,
Suite 2754
Retail - 791 - 66 -
Page 23 of 175
## Business Name Business Address
## Business
## Classification
2024
## Bags
2025
## Bags
## Monthly
## Estimate,
2024
## Monthly
## Estimate,
2025
2024 to
2025
## Monthly
## Change
Included in
## Analysis
## TimeScape USA LLC
## 6800 France Ave S,
Suite 173
Retail 150 - 25 - -
Trail Mark 3265 Galleria Retail 4,380 7,072 730 589 -19% Yes
Twill, Inc 3295 Galleria Retail 3,257 4,950 543 413 -24% Yes
Vernon Avenue BP 5209 Vernon Avenue Retail 100 100 17 8 -50%
Victoria's Secret 10 Southdale Center Retail - 11,777 - 981 -
Vivront 4948 France Ave S Retail 2,153 2,179 359 182 -49% Yes*
Walgreens 4916 France Ave S Retail 5,400 - 900 - -
Whole Foods Market 7401 France Ave S Grocery - 427,200 - 35,600 -
Yeti Coolers 3510 Galleria Retail 1,800 2,273 300 189 -37% Yes*
Page 24 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.7 Department: Public Works
Item Activity: Action Prepared By: Chad Millner, Director of Public Works and City
## Engineer
Item Title: Purchase Request: Change Order for Professional Services for Wooddale Avenue Bridge
## Action Requested:
Approve Purchase Request for a Change Order for Professional Services for Wooddale Avenue Bridge
with SEH for $48,500.
## Requisition Number: 12400273
## Vendor: Short Elliot Hendrickson
## Equipment Status: NA
Funding Source: Municipal State Aid, PACS, Water, Storm and Sanitary Utility Funds.
Cost: $48,500
## Information/Background:
Discussions on rehabilitation or replacement of this bridge started in 2020. It took many years to get
approval to fully replace this bridge with the state historical regulators. We have approval to replace
this bridge with a newer, wider bridge that provides more space for cyclists and pedestrians. This
change order covers changes to the scope of work for the final design because of the historical
bridge. Final plans are in for signature with the state. This change order also covers the cost of
applying for grant funding. Grant funding success will determine when this project will occur. If grant
applications are successful, a replacement is tentatively scheduled for 2029 in the CIP.
## Resources/Financial Impacts:
This project is funded from a variety of sources including Municipal State Aid, PACS, Water, Storm and
Sanitary Utility Funds.
## Original Contract $278,574
## Change Order $48,500
## Revised Contract $327,074
## Relationship to City Policies/Plans/Budget Pillars:
This project aligns with the Comprehensive Plan, Pedestrian & Bicycle Master Plan and Climate Action
Plan and is included in the Capital Improvement Plan.
## Strong Foundation
## Better Together
Page 25 of 175
## Values Impact:
## Engagement
Community members have provided opinions as the design process
continued.
## Stewardship
Replacing aging infrastructure at the appropriate time is sound asset
management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 26 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.8 Department: Public Works
## Item Activity: Action Prepared By: Jon Darsow, Facilities Project Manager
## Item Title: Purchase Request: 50th & France Paver Replacement
## Action Requested:
Approve Purchase Request for paver and concrete replacement at 50th & France District with All
Around Concrete for $58,895.00
## Requisition Number: 12600161
## Vendor: All Around Concrete
## Equipment Status: N/A
## Funding Source: General Fund
Cost: $58,895.00
## Information/Background:
This project is to replace pavers that are past their useful life and make walkways safer for foot traffic
in the district.
## Resources/Financial Impacts:
This project will be funded by special assessments to the 50th and France District.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation
## Livable City
## Better Together
## Values Impact:
Engagement The 50th and France District support infrastructure replacements.
## Stewardship
Replacing aging infrastructure at the appropriate time is sound asset
management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 27 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.9 Department: Public Works
## Item Activity: Action Prepared By: Jon Darsow, Facilities Project Manager
Item Title: Purchase Request: Change Orders #1-4 Construction Services for Hennepin County Library
## and Senior Center Exterior Improvements
## Action Requested:
Approve Purchase Request for Change Orders #1-4 for Construction Services at Hennepin County
Library and Senior Center Exterior Improvements with ACME Tuckpointing Restoration for $10,408.
## Requisition Number: 12600035
## Vendor: Acme Tuckpointing Restoration
## Equipment Status: N/A
## Funding Source: CIP
Cost: $10,408.00
## Information/Background:
There have been water intrusion issues at this facility in recent years. The city has made corrections to
resolve those issues and this work will continue the efforts to maintain this building, and its exterior
envelope. This change order covers coping stone head joints with backer rod and sealants. Removal
and replacement of additional brick, and removal of the HC flag pole and concrete base.
## Resources/Financial Impacts:
## Original Contract $95,320.00
## Change Orders $10,408.00
## Revised Contract $105,728.00
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
## Equity
These repairs on the exterior of the building will provide a sound water
tight structure and prolong the life of this facility.
## Stewardship
Providing preventative maintenance to aging infrastructure is sound
asset management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
Page 28 of 175
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 29 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.10 Department: Public Works
## Item Activity: Action Prepared By: Noah Silver, Electrical Supervisor
Item Title: Purchase Request: Streetlights for Woodland Road & Brookview Avenue
## Action Requested:
Approve Purchase Request for Streetlights for Woodland Road & Brookview Avenue from Xcel Energy
for $22,138.39.
## Requisition Number: 12600154
## Vendor: Xcel Energy
## Equipment Status: Replacement
## Funding Source: Street Lighting Regular Professional and Contracted Services
Cost: $22,138.39
## Information/Background:
The existing streetlights on Woodland Rd. and Brookview Ave. are past their service life. The seven (7)
new Xcel Energy streetlights will be installed and maintained by Xcel Energy.
## Resources/Financial Impacts:
This replacement is within the streetlight operations budget and part of the City's street lighting
replacement plan. Xcel Energy will operate and maintain the new streetlights.
## Relationship to City Policies/Plans/Budget Pillars:
This aligns with the Comprehensive Plan and the City's street lighting replacement plan.
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
## Stewardship
Capital assets and infrastructure systems are managed to minimize risk
and sustain service levels to be safe and reliable.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 30 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.11 Department: Public Works
## Item Activity: Action Prepared By: Andrew Scipioni, Transportation Planner
Item Title: Receive Petition for Stop Controls at Garrison Lane/Ashcroft Lane and St. Johns Avenue
## Action Requested:
Receive the petition and refer to the Engineering Division for consideration.
## Information/Background:
See attached petition.
## Supporting Documentation:
1. Petition Received May 6, 2026
Page 31 of 175
q
## WATER MAIN
q
## STREET LIGHTING
## OTHER:
## S
1/4‘
This 'petition was circulated by:
## A
## City of Edina, Minnesota
## CITY COUNCIL
4801 West 50th Street • Edina, Minnesota 55424
## (952) 927-8861 • (952) 927-7645 FAX • (612) 927-5461 TDD
## DATE RECEIVED:
## PETITION TO THE CITY COUNCIL
## SIDEWALK
## q ALLEY PAVING
## STORM SEWER
q
## SANITARY SEWER
## To the Mayor and City Council:
## C CURB AND GUTTER ONLY
## q PERMANENT STREET
## SURFACING WITH
## CURB AND GUTTER
The persons who have signed this petition ask the City Council to consider the improvements listed above to the
locations listed below.
(7- e
between
and
## LOCATION OF IMPROVEMENT BY STREET NAME
## ADDRESS
## ADDRESS
between
and
## LOCATION OF IMPROVEMENT BY STREET NAME
between
## LOCATION OF IMPROVEMENT BY STREET NAME
between
## ADDRESS
and
## ADDRESS
## ADDRESS
and
## ADDRESS
## LOCATION OF IMPROVEMENT BY STREET NAME
## ADDRESS
## ADDRESS
## IMPORTANT NOTE: THE PERSONS WHO HAVE SIGNED THIS PETITION UNDERSTAND
## THAT THE CITY COUNCIL MAY ASSESS THE COSTS OF THESE IMPROVEMENTS AGAINST
## THE PROPERTIES BENEFITING FROM THE IMPROVEMENTS IN AMOUNTS DETERMINED
## BY THE COUNCIL AS AUTHORIZED BY CHAPTER 429, MINNESOTA STATUTES.
## PROPERTY OWNER'S
## SIGNATURE
## OWNER'S NAME
## (PRINTED)
## PROPERTY ADDRESS
## (PRINTED)
## :23 LI
## NAME
## ADDRESS
## PHONE
There is space for more signatures on the back.
## APRIL 2008
5/6/2026
Page 32 of 175
(
## ROPERTY OWNER'S OWNER'S NAME
## SIGNATURE (PRINTED)
## PROPERTY ADDRESS
## (PRINTED)
1) (
## A
L-oco-- \At 04'-\
## G305 Cmc
07d A
ve_
## PP)
## Cance Ave,
&)Ovi
(1Ohn5 A
j
tVe
Gio si. low/As Aye
## G
-AAry'\-
sek
,
## IAA .
## C/
4/7
## 45M
4-1-
7 /d/0
## L,1.
4
5Cci 0
)
422.st
-30
1-.965
ct.i
bxf
1
566arrisdii tc
## 1M_
## .171A-11/
n
1\J i7A/-4
## YW\ A\t/C••
## Mkc1AtAk Tukk
dooli
## K.-€-
ccurairvt, Kiwy
## Loukint
//dr
## -A.4
1
/
4-,
e0/JAri C
k) 0
## IKV,4040
15ortm
*Ism
.;
may More
)44
.J0 (4 4-04,.) M0.Ke
(03 13
St.
-1-
4264s
/iik
## Ct,
lSQLIDt
deo
,
es-f- i-f
-
cyft
v
ta ,
e7
## Q,( :
(0:g
johricaoe
izegu
## CSA
This petition was circulated by:
The Minnesota Data Practices Act requires that we inform you of your rights about the private data we are requesting on this form.
Under the law, your telephone number is private data. This petition when submitted will become public information. There is no
consequence for refusing to supply this information.
You may attach extra pages with signatures.
## APRIL 2008
01)
t' 7
## PHONE
## ADDRESS
## NAME
Page 33 of 175
(valkercoA
## NAME
(03N SI jouos by t
70-
259
-
64
k7S
## ADDRESS
## PHONE
tOPERTY OWNER'S
## SIGNATURE
## OWNER'S NAME
## (PRINTED)
## Jot
<Pj(Ur\
rJ
k\l\e/W)tk
50.
11/4
## N4A
## ScAtii\kA Tici\\A
\Iwo \f.)C\
-
1/\o
## Mag
## CcGt
## PROPERTY ADDRESS
## (PRINTED)
(.9 3
Va &t.Cr\t
.
jON\S
## A V
1 /4,
2—
; 11
5+
"Jo Vis
fir<
439 S 1 J_olit)s•
1
## 150 5 AW/A)
14i-
## 13 Z GakfrID4
(020 (St
,
## 31.M
## Lks
q5M A/Orlal
vut.
This petition was circulated by:
The Minnesota Data Practices Act requires that we inform you of your rights about the private data we are requesting on this form.
Under the law, your telephone number is private data. This petition when submitted will become public information. There is no
consequence for refusing to supply this information.
You may attach extra pages with signatures.
## APRIL 2008
Page 34 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.12 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
Item Title: Purchase Request: Braemar Golf Dome Parking Lot Expansion Construction
## Action Requested:
Approve Purchase Request for Braemar Golf Dome Parking Lot Expansion Construction with Northwest
Asphalt for $830,037.31
## Requisition Number: 12600167
## Vendor: Northwest Asphalt Inc
## Equipment Status: New
## Funding Source: LOST Capital
Cost: $830,037.31
## Information/Background:
Braemar Park master plan identified several updates, enhancements, and replacements of amenities
park wide. Site improvements including trailhead parking and pickleball were identified. Staff studied
feasibility options for these improvements throughout the park and determined the best area for
addition was to site adjacent to the Braemar Golf Dome Parking lot. Improvements were designed to
address safety and maximize recreational potential while balancing the need to minimize tree
impacts and hard surfaces. This is the full construction package to be completed by Fall of 2026.
## Resources/Financial Impacts:
Project funded through local option sales tax (LOST)
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
## Engagement
Project engaged through Master Plan process. A pickleball survey was
also conducted during engagement.
Equity Braemar Park brings accessible recreation to the SW quadrant.
## Health
Addition of new recreational activities promoting physical and social
health.
Page 35 of 175
Stewardship Maximization of services and investments by expanding users.
Sustainability Minimizing impacts to natural resources and reduction of hard surfaces.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 36 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.13 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
Item Title: Purchase Request: Braemar Golf Dome Parking Lot Expansion Construction Oversight
## Action Requested:
Approve Purchase Request for Braemar Golf Dome Parking Lot Expansion Professional Services with
Short Elliot Henderickson Inc (SEH) for $156,120.
## Requisition Number: 12400158
## Vendor: Short Elliot Hendrickson
## Equipment Status: New
## Funding Source: LOST Capital
Cost: $156,120
## Information/Background:
At 500 acres Braemar Park attracts both residents and regional visitors to its numerous recreational
opportunities often utilizing Braemar Boulevard/ Hilary Lane for access. The Braemar Park Master Plan
identified upgrades for this critical road network to support multi-modal transportation and increase
bike and pedestrian safety. This includes increasing off street parking and sightlines.
SEH, through their master services contract will implement construction oversight during the Braemar
Golf Dome parking lot expansion. Parking, pickleball, biking, and pedestrian upgrades are supported
by local option sales tax funding.
## Resources/Financial Impacts:
## Local Option Sales Tax Funding. CIP P&R23208
## Relationship to City Policies/Plans/Budget Pillars:
This is part of Braemar Park Master Plan.
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
Engagement Engagement was a part of the Braemar Park Master Planning process.
## Health
Addition of pickleball court surfacing will promote physical fitness and
social play. Improved safety for parking lot and park users.
Page 37 of 175
## Stewardship
Staff is maximizing recreational potential of spaces to better utilize
Braemar Park and offer additional services to residents and visitors.
## Sustainability
Staff is looking at minimization of hard surfaces and optimization of
spaces.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 38 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.14 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
Item Title: Purchase Request: Braemar Park EV Charging Stations at Braemar Golf Dome
## Action Requested:
Approve Purchase Request for EV charging stations at Braemar Golf Dome with Carbon Day EV
Charging for $34,202.
## Requisition Number: 12600156
## Vendor: Carbon Day EV Charging
## Equipment Status: New
## Funding Source: Conservation & Sustainability Fund
Cost: $34,202
## Information/Background:
As part of the Braemar Park Master Plan implementation, improvements are being made at the
Braemar Golf Dome Parking lot. This parking lot expansion allows the opportunity to add public EV
charging stations for park users. These stations will be available to users of the Braemar Golf Dome,
Pickleball Courts, and Hiking and Biking Trailhead users. These stations will have year-round usage
with winter dome patrons, spring and fall trail users, and summer pickleball users. Three ChargePoint
stations will be purchased for a total of 5 EV parking spots. Stations are available for public use but
also compatible with Edina's green fleet.
## Resources/Financial Impacts:
## Conservation & Sustainability Fund
## Relationship to City Policies/Plans/Budget Pillars:
Providing EV charging is in alignment with the City's Comprehensive Plan and Climate Action Plan.
## Strong Foundation
## Reliable Service
## Values Impact:
## Stewardship
City of Edina's public EV charging pricing model is structured so that
costs incurred to own and operate the charger are covered by the
station's users.
## Sustainability
Public EV charging aligns with Edina's Climate Action Plan goals to
increase charging access across Edina, promote EV ownership, and
Page 39 of 175
reduce transportation emissions with low- and zero-emissions vehicles.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 40 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.15 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
Item Title: Waive Permit Fees Braemar Park Braemar Golf Dome Parking Lot Expansion
## Action Requested:
Waive permit fees for Braemar Park, Braemar Golf Dome Parking Lot Expansion Construction estimated
at $12,488.85.
## Requisition Number:
## Vendor:
## Equipment Status:
## Funding Source:
## Cost:
## Information/Background:
The City has the authority to waive building fee permits for municipal building projects. By doing so,
the City is able to set aside the amount that would have been spent on the fees to instead add value
to the overall project, cover potential future change orders, or make the project more affordable by
reducing the total project cost. The total estimated building permit fees for this portion of the project is
$12,488.85.
## Building Permit Fees Estimated $7,569.00
## Plan Review Fees Estimated $4,919.85
## Total Waived Fees Estimated $12,488.85
## Work Scope included in Permitting includes Construction Supervision, Mobilization, Demolition,
Excavation, Grading, Stormwater Infrastructure, Paving, Lighting, and other labor and materials
required to implement Braemar Golf Dome Parking Lot Expansion Bid documents.
## Resources/Financial Impacts:
Project funded by Local Option Sales Tax.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation
## Values Impact:
## Stewardship
Waiving Permit Fees allows for value to be invested into projects and
infrastructure
Page 41 of 175
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 42 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.16 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
## Item Title: Purchase Request: Yorktown Master Planning
## Action Requested:
Approve Purchase Request for Yorktown Master Planning Professional Services with Confluence for
$37,200.
## Requisition Number: 12600158
## Vendor: Confluence
## Equipment Status: Replacement
## Funding Source: CIP
Cost: $37,200
## Information/Background:
Yorktown Park located in the Promenade neighborhood bordering Richfield is one of Edina's smallest
parks. With the removal of Fire Station 2 on this parkland, this small area park requires a study to
determine vision and future needs. This study evaluates existing recreational features including skate
park, community gardens, and regional trail link. This project would be the funding required to vision
and engage with the community for the creation of the Yorktown Park Master Plan. This will be done in
conjunction with the City of Richfield with their Park Systems Master Planning and Adams Hill Park
Master Planning.
## Resources/Financial Impacts:
## CIP Item P&R25103
## Relationship to City Policies/Plans/Budget Pillars:
Master Plan process ensures sustainability and project longevity by reducing project waste. This
process promotes smart and strategic growth. Existing infrastructure is no longer operational (skate
park, fire station). Framework of trails exist but space has additional recreational potential that has not
been identified.
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
Page 43 of 175
## Engagement
This project would engage community on collaboration level to create
park infrastructure and amenities that support community
needs. Infrastructure improvements will be based off evaluated needs
both from inspections but also community identified programming
needs.
## Equity
Improvements promote outdoor recreation and both physical and
mental health by making recreation more accessible to
all. Engagement will focus on accessibility and removal of barriers for
recreation and park usage.
## Health
Design will incorporate gathering spaces that encourage community
well-being and support programming opportunities.
## Stewardship
Improvements would be designed to meet park and programming
needs while minimizing environmental impacts and maximizing energy
efficiencies and opportunities.
## Sustainability
Planned improvements would exceed sustainability standards to help
CAP goals and initiatives. Project would be subject to sustainable
building policy. Improvements would be designed to meet park and
programming needs while minimizing environmental impacts and
maximizing energy efficiencies and opportunities.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
1. Yorktown_Proposal (Board Portal)
Page 44 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.17 Department: Parks & Recreation
## Item Activity: Action Prepared By: Kersten McManamon, Marketing Manager
## Item Title: Purchase Request: Recreation Enterprise Digital Advertising Services
## Action Requested:
Approve purchase request for recreation enterprise digital advertising services with Star Tribune
Media for $74,100.
## Requisition Number: 2026/12600163
## Vendor: Star Tribune Media
## Equipment Status: Service Contract
## Funding Source: Enterprise Operating Expense
Cost: $74,100
## Information/Background:
This is a contract for digital services through Star Tribune's digital advertising network, Advantage for
Edinborough Park, Edina Liquor, Edina Art Center, Braemar Golf Course and Braemar Golf Dome, Edina
Aquatic Center and Centennial Lakes Park. All facilities aside from Braemar Golf Dome will be
completed during fiscal year 2026, with the Braemar Golf Dome contract running through March of
2027.
## Resources/Financial Impacts:
This service contract is allocated to the Edinborough Park, Edina Liquor, Edina Art Center, Braemar Golf
Course and Braemar Golf Dome, Edina Aquatic Center and Centennial Lakes Park operating budgets.
## Relationship to City Policies/Plans/Budget Pillars:
Digital tactics include streaming audio, search engine marketing, targeted email, geofencing and
display advertising. Key performance indicators for the program holistically are click through rates,
website visits, time spent on site, foot traffic/attendance, and class sign ups.
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
## Engagement
Audience and target segments are tailored by facility and campaign
outcome but overall target is Edina residents and those just outside its
borders.
Page 45 of 175
## Stewardship
Key performance indicators for the program holistically are click
through rates, website visits, time spent on site, foot traffic/attendance,
and class sign ups.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 46 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.18 Department: Parks & Recreation
Item Activity: Action Prepared By: Perry Vetter, Parks & Recreation Director
Item Title: Purchase Request: Change Order to Braemar Ice Arena Pre-construction Services
## Action Requested:
Approve purchase request for pre-construction services to the Braemar Ice Arena Construction
Manager at Risk contract for pre-construction services for $137,000 with Knutson Construction.
Requisition Number: 2025 12500219
## Vendor: Knutson Construction Services
## Equipment Status: New
## Funding Source: LOST Funded Project
Cost: $137,000.00
## Information/Background:
Braemar Ice Arena, 7600 Ikola Way, is planning the expansion portion of the Braemar Park master plan.
Previously, the City of Edina entered into a contract with Knutson Construction for Construction
Manager at Risk services for the renovation and expansion on June 3, 2025. This change order to pre-
construction services will allow Knutson to advance the early services for shop drawings and related
engineering work to procure precast wall panels that will be used in the expansion portion of this
project. This allows the design detail portion to remain on track for the future enclosure work of the
north rink development.
## Resources/Financial Impacts:
This is being funded by the Local Option Sales Tax referendums that occurred in 2022 and 2023 that
provided $45.2M for the project.
## Relationship to City Policies/Plans/Budget Pillars:
The Braemar Park Master Plan was adopted by the Edina City Council in 2018 and amended in 2022.
## Strong Foundation
## Reliable Service
## Livable City
## Better Together
## Values Impact:
## Engagement
This project is one portion of the overall Braemar Park Master Plan and
Braemar Ice Arena renovation and expansion project.
Page 47 of 175
## Equity
## This project directly impacts the Edina High School, Edina Hockey
## Association, Braemar City of Lakes Figure Skating Club, Breakaway
## Academy, General Sports, Ikola Cup members and Da Beauty League
feedback.
## Health
The primary focus for this project is to improve and expand for all users
as an athlete first facility.
## Stewardship
This project replaces existing capital assets with new and more reliable
infrastructure.
## Sustainability
This project will provide needed upgrades to the physical capital
infrastructure that will operate more efficiently, saving energy, reducing
carbon use and support aspects of the Climate Action Plan.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 48 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.19 Department: Parks & Recreation
Item Activity: Action Prepared By: Perry Vetter, Parks & Recreation Director
Item Title: Purchase Request: Braemar Ice Arena Phase 2 Rink Improvements
## Action Requested:
Approve Purchase Request for Braemar Ice Arena Phase 2 Construction Improvements with All
## American Ice LLC for $4,053,742.00
## Requisition Number: 12600157
## Vendor: All American Ice LLC
## Equipment Status: Replacement
## Funding Source: LOST Capital
Cost: $4,053,742.00
## Information/Background:
This purchase is in support of the Braemar Park Master Plan and the Braemar Ice Arena renovation
and expansion project. The request includes a 240 Ton Ammonia Refrigeration System to support the
West and South Rink Refrigeration System. This system includes two compressor packages linked for
redundancy and includes ten flow pumps, waste heat system exchanger, snow melting systems
(reusing waste heat) in the equipment rooms, microprocessors and all electrical power and control
wiring. This is purchase is full package including equipment, supplies, installation and removal of
existing systems in the West and East rink condenser rooms. These improvements were part of the
infrastructure plans as identified in the project needs summary for capital asset replacement.
Approval of this request would allow work to begin after the current hockey season in April 2027 and
be ready for ice making in September for the 2027 hockey season.
## Resources/Financial Impacts:
This project is to improve and expand Braemar Ice Arena by improving the quality of the ice, adding a
fourth indoor rink and improving the user experience with a focus on being an athlete first facility. This
is being funded by the Local Option Sales Tax referendums that occurred in 2022 and 2023 that
provided $45.2M for the project.
## Relationship to City Policies/Plans/Budget Pillars:
The Braemar Park Master Plan was adopted by the Edina City Council in 2018 and amended in 2022.
## Strong Foundation Reliable Service Livable City Better Together
Page 49 of 175
## Values Impact:
## Engagement
This project is one portion of the overall Braemar Park Master Plan and
Braemar Ice Arena renovation and expansion project.
## Equity
## This project directly impacts the Edina High School, Edina Hockey
## Association, Braemar City of Lakes Figure Skating Club, Breakaway
## Academy, General Sports, Ikola Cup members and Da Beauty League
feedback.
## Health
The primary focus for this project is to improve and expand for all users
as an athlete first facility.
## Stewardship
This project replaces existing capital assets with new and more reliable
infrastructure.
## Sustainability
This project will provide needed upgrades to the physical capital
infrastructure that will operate more efficiently, saving energy, reducing
carbon use and support aspects of the Climate Action Plan.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 50 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.20 Department: Parks & Recreation
Item Activity: Action Prepared By: Perry Vetter, Parks & Recreation Director
Item Title: Waive Permit Fees for Braemar Ice Arena Phase 2 Rink Improvements
## Action Requested:
Waive Permit fees for Braemar Ice Arena Phase 2 Rink Improvements in the amount of $65,526.73.
## Information/Background:
The City has the authority to waive building fee permits for municipal building projects. By doing so,
the City is able to set aside the amount that would have been spent on the fees to instead add value
to the overall project, cover potential future change orders, or make the project more affordable by
reducing the total project cost. The total estimated building permit fees for this portion of the project is
$65,526.73.
Permit fees were calculated based on Commercial Mechanical Permit fee calculator. Calculation based on value of
work for Braemar Ice Arena Phase 2 work including MEP and construction associated with new refrigeration system
including pumps, treatment, piping, fluids, exhaust, and electrical, as well as demo, tie ins, and upgrades to existing
systems for compatibility.
## Building Permit Fee Estimate $52,421.38
## Plan Review Fee Estimate $13,105.35
## Total Estimate $65,526.73
It is important for the City Council to determine if these project’s building permit fees will be waived so
that staff is able to prepare project budgets with the most accurate information available.
## Resources/Financial Impacts:
Project funded by Local Option Sales Tax.
## Relationship to City Policies/Plans/Budget Pillars:
## CIP P&R 23207
## Strong Foundation Reliable Service
## Values Impact:
Equity Project reduces barriers for players and spectators
## Health
Project support physical health and promotes safety for players and
spectators.
Page 51 of 175
Stewardship Upgrades promote sustainable maintenance needs.
## Sustainability
Project support sustainability and energy efficiency goals of City and
State.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 52 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.21 Department: Parks & Recreation
Item Activity: Action Prepared By: Perry Vetter, Parks & Recreation Director
## Item Title: Purchase Request: Institution Community Work Crew Contract
## Action Requested:
Approve two-year Institution Community Work Crew contract with the State of Minnesota for $216,300.
## Requisition Number: 2026/12600164
## Vendor: State of Minnesota
## Equipment Status: Service Contract
## Funding Source: Operational Funds
Cost: $216,300.00
## Information/Background:
The Institution Community Work Crew program has provided manual labor for various aspects of City
of Edina projects and maintenance across multiple departments within city operations. Examples
include buckthorn and invasive species removal, tree removal, snow and ice control, sports dome
installation, right-of-way maintenance, general cleaning and additional high labor tasks.
## Resources/Financial Impacts:
Costs associated with the contract are shared between the Public Works/Engineering Department
and Parks & Recreation Department operational budgets.
## Relationship to City Policies/Plans/Budget Pillars:
The work completed through the Institution Community Work Crew program supports a range of City
services that contribute to maintaining public infrastructure, parks and natural resources, safe
transportation corridors, and clean public spaces. These efforts advance community goals related to
service delivery, environmental stewardship, and maintaining high-quality public amenities for
residents.
The City Council has included in its legislative platform support for the removal of constitutional
language permitting involuntary servitude as punishment for a crime. The recommendation to
continue the program reflects the current operational needs and community impacts of the work
being performed, while also recognizing the importance of ongoing discussion about adopted policy
positions and community values over time.
Page 53 of 175
## Strong Foundation Reliable Service
## Values Impact:
## Equity
The ICWC program and its operational policy is set by the State of
Minnesota. The City has included this issue on its legislative platform,
reinforcing our commitment to fair and humane treatment of
incarcerated people while recognizing the opportunity the ICWC
program creates for hands-on job and basic skills training.
## Stewardship
Due to the compensation structure of the ICWC program set by the
State of Minnesota, the City can complete necessary tasks and projects
that would otherwise require additional staffing or contracting costs at a
much higher cost than the ICWC program.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 54 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.22 Department: Finance
## Item Activity: Action Prepared By: Pa Thao, Finance Director
Item Title: Cancellation of the Scheduled TEFRA Public Hearing for the 2026B Sales Tax Revenue Bonds
## Action Requested:
Cancel TEFRA public hearing related to the 2026B Sales Tax Revenue Bonds scheduled for June 2, 2026.
## Information/Background:
As part of its regular meeting agenda May 5, the Council approved a resolution to schedule a bond
sale for June 16 for the issuance of approximately 1$2,240,000 in General Obligation Sales Tax Revenue
Bonds, Series 2026B to finance various ongoing sales tax projects as authorized by the City’s special
Sales Tax Legislation. Portions of the proceeds were expected to be applied to costs of projects used
for the benefit of qualified 501(c)(3) organizations in addition to the general public. In order to
preserve tax-exemption for the proposed issue in compliance with Section 147(f) of the Internal
Revenue Code of 1986, as amended (the “Code”), the resolution authorized staff to schedule a public
hearing to be held June 2, 2026 to identify the said projects and the benefiting tax-exempt
organizations.
Discussions with Parks & Recreation, Ehlers and the City’s bond attorneys at Dorsey & Whitney since
that time have reviewed additional user agreements at Braemar Arena. They recommend that the
proposed bond issue should instead be designated as taxable to allow flexibility to consider additional
private use agreements and continued discussions on potential naming rights and advertising
revenues within the arena facility.
Based on this recommendation, staff determined to cancel the June 2 public hearing as it would no
longer be necessary. The sale of Bonds will continue to be scheduled for June 16th when competitive
bids will be presented to the City Council for award and final approval.
## Resources/Financial Impacts:
No impact
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation
## Values Impact:
## Engagement
This item was originally developed with a scheduled public TEFRA
hearing in mind, and although the hearing is no longer required, the
transparent review process and communication to Council continue to
support an informed, engaging, and welcoming community.
Page 55 of 175
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 56 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.23 Department: IT
## Item Activity: Action Prepared By: Ryan Browning, IT Director
## Item Title: Purchase Request: Microsoft Enterprise Agreement Change Order
## Action Requested:
Approve Purhcase Request for a change order for years 2 and 3 of our Microsoft Enterprise Agreement
from LOGIS (Insight) for $45,314.44.
## Requisition Number: 12500149
## Vendor: LOGIS (Insight)
## Equipment Status: New
## Funding Source: I.T. Budget
Cost: $45,314.44
## Information/Background:
This is a request for purchase for a change order for years two and three of our Microsoft Enterprise
Agreement. This increase is due to an increase in licenses related to email security and retention,
process automation, Copilot capabilities and Teams Rooms licensing.
## Resources/Financial Impacts:
This purchase consists of an increase of $19,056.39 in 2026 and $26,258.05 in 2027 for a total
estimated expenditure of $45,314.44. It will be paid for from the I.T. budget and is within budget. Staff
recommends that the City proceed with this purchase.
## Relationship to City Policies/Plans/Budget Pillars:
Reliable Service: Expanding licenses for email security, retention, automation, Copilot, and Teams
Rooms helps maintain dependable, modern digital services that support staff and community needs.
## Reliable Service
## Values Impact:
## Stewardship
The I.T. Department works with all staff to ensure we are getting the most
from our Microsoft Enterprise Agreement.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
Page 57 of 175
## None
Page 58 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.24 Department: IT
## Item Activity: Action Prepared By: Ryan Browning, IT Director
## Item Title: Purchase Request: Fiber Expansion at Centennial Lakes Park
## Action Requested:
Approve Purchase Request for the expansion of our fiber network at Centennial Lakes Park from LOGIS
for $73,318.00.
## Requisition Number: 12600160
## Vendor: LOGIS
## Equipment Status: New
## Funding Source: IT Budget
Cost: $73,318.00
## Information/Background:
This purchase funds the installation of two additional fiber runs to connect the CLP maintenance
building and the CLP clubhouse to the City's fiber network. These connections will deliver improved
reliability, speed, and security, while the increased bandwidth will accommodate the addition of
security cameras. Because fiber offers a substantially longer service life than the current wireless
solution, this investment is expected to reduce costs over time.
## Resources/Financial Impacts:
This purchase will enhance service quality at Centennial Lakes Park and reduce staff workload by
eliminating the need for ongoing wireless equipment replacements and troubleshooting. The cost will
be funded through the IT Budget, is within the budget, and staff recommends moving forward.
## Relationship to City Policies/Plans/Budget Pillars:
Strong Foundation: This project strengthens the City’s technology infrastructure by replacing a less
reliable wireless connection with long-lasting fiber service to key park facilities.
Reliable Service: The additional fiber connections will improve speed, reliability, and security while
supporting increased bandwidth needs, such as security cameras.
## Strong Foundation
## Reliable Service
## Values Impact:
Page 59 of 175
## Stewardship
Fiber provides a longer service life than the current wireless solution,
making this a wise long-term investment that can reduce costs over
time.
## Sustainability
By investing in durable infrastructure with a longer useful life, the project
supports long-term planning and reduces the need for more frequent
replacement or maintenance. This new connection will use less power.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 60 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.25 Department: Police
## Item Activity: Action Prepared By: Ryan Schultz, Lieutenant
## Item Title: Purchase Request: 2026 Toyota Grand Highlander Hybrid
## Action Requested:
Approve the Purchase Request for a 2026 Toyota Grand Highlander.
## Requisition Number: 2026/12600166
## Vendor: Nation Auto Fleet Group
## Equipment Status: Replacement
## Funding Source: Equipment Replacement Budget
Cost: $44,286.44
## Information/Background:
Purchase request for a 2026 Toyota Grand Highlander AWD Hybrid for $44,286.44 from Nation Auto
Fleet Group. This 2026 Toyota will replace a 2019 Toyota Highlander that is due for replacement. This
purchase will be funded from the equipment replacement budget and is within budget.
## Resources/Financial Impacts:
This purchase will be funded out of equipment replacement and is within budget.
## Relationship to City Policies/Plans/Budget Pillars:
## Reliable Service
## Values Impact:
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 61 of 175
## Purchase Request
June 2, 2026
## City Council
## Item Number: 6.26 Department: Police
## Item Activity: Action Prepared By: Ryan Schultz, Lieutenant
## Item Title: Purchase Request: 2026 Kia Sorento Hybrid
## Action Requested:
Approve Purchase Request for 2026 Kia Sorento.
## Requisition Number: 2026/12600155
## Vendor: Bloomington Luther Kia
## Equipment Status: Replacement
## Funding Source: Equipment Replacement Budget
Cost: $37,020
## Information/Background:
This 2026 Kia Sorento Hybrid will replace a 2019 Toyota Rav4 that is due for replacement. This
purchase will be funded out of equipment replacement and is within budget.
## Resources/Financial Impacts:
This purchase will be funded out of equipment replacement and is within budget.
## Relationship to City Policies/Plans/Budget Pillars:
## Reliable Service
## Values Impact:
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 62 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.27 Department: Administration
## Item Activity: Action Prepared By: Sharon Allison, City Clerk
Item Title: Special Use Permit to Serve Alcohol on City Property at the Edina Art Fair, June 5-7
## Action Requested:
Approve special use permit for Pajarito to serve alcohol on city property during the Edina Art Fair.
## Information/Background:
Pajarito has applied for a Special Permit to Use City Property to serve alcohol at Nolan Mains Plaza for
the Edina Art Fair scheduled for June 5-7, 2026.Pajarito will provide alcohol service using their State-
issued Alcohol Caterer’s Permit. Pajarito meets all requirements in City Code Section 24-346 and staff
recommends approval of the permit.
## Supporting Documentation:
## None
Page 63 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 6.28 Department: Administration
## Item Activity: Action Prepared By: Scott Neal, City Manager
## Item Title: Out-of-State Travel for Mayor Hovland
## Action Requested:
Approve out-of-state travel for Mayor Hovland for June 4-7, 2026, to attend the U.S. Conference of
Mayor's 94th Annual Meeting in Long Beach, CA.
## Information/Background:
Mayor Hovland requests approval from the City Council, per the City's Elected Official Out-of-State
Travel Policy, to attend the U.S. Conference of Mayor's 94th Annual Meeting in Long Beach, CA, from
June 4-7. The estimated cost is $3,500. The City Manager has confirmed that sufficient funds for this
expense are included in the City's 2026 budget.
## Supporting Documentation:
## None
Page 64 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 7.1 Department: Administration
## Item Activity: Information Prepared By: Sharon Allison, City Clerk
Item Title: League of Minnesota Cities to Recognize City Manager Scott Neal
## Action Requested:
None; information only.
## Information/Background:
Executive Director Luke Fischer and LMC Board President Wendy Berry to recognize City Manager Neal
for his years of service on the LMC Board of Directors and congratulate him on his retirement. Manager
Neal served from 2023-2026 (term ending in June).
## Supporting Documentation:
## None
Page 65 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 8.1 Department: Community Development
## Item Activity: Action Prepared By: Cary Teague, Community Development Director
Item Title: Zoning Ordinance Amendment, Preliminary Rezoning & Site Plan for 4200 76
th
## Street West
(Salvation Army)
## Action Requested:
Close the public hearing at noon on Sunday, June 7, 2026 and continue action to the June 16, 2026 City
Council meeting.
## Information/Background:
The Salvation Army is proposing to remodel and reuse the existing 28,000 square foot building at 4200
76
th
Street West into an 18,425 square foot Salvation Army retail store with a 9,434 square foot
warehouse and indoor drop off. There are no plans to alter the site plan or exterior of the existing
building. The request requires the following:
1. Zoning Ordinance Amendment to allow secondhand stores to exceed 2,500 square feet in size
in the PCD-Planned Commercial District.
2. Rezoning the site from PID, Planned Industrial District to a PCD, Planned Commercial District.
3. Site Plan Review.
Staff supports the Planning Commission recommendation to amend the Ordinance to allow
secondhand stores to exceed 2,500 square feet in the PCD-2 and PCD-3 Districts, and leave the
restriction on the size requirement in the PCD-1 District.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Staff Report to Planning Commission, May 13, 2026
## 2. Proposed Plans
## 3. Applicant Narrative (Board Portal)
## 4. Traffic and Parking Study (Board Portal)
## 5. Staff Presentation
Page 66 of 175
## Staff Report
Date: May 13, 2026
## To: Planning Commission
## From: Cary Teague, Community Development Director
Subject: Zoning Ordinance Amendment, Rezoning & Site Plan – 4200 76
th
## Street West - (Salvation Army)
Staff Recommendation: Approval of the Zoning Ordinance Amendment, Rezoning and Site Plan for
Salvation Army.
## Information/Background:
The Salvation Army is proposing to remodel and reuse the existing 28,000 square foot building at 4200
76
th
Street West into an 18,425 square foot Salvation Army retail store with a 9,434 square foot
warehouse and indoor drop off. There are no plans to alter the site plan or exterior of the existing
building. The request requires the following:
1. Zoning Ordinance Amendment to allow secondhand stores to exceed 2,500 square feet in size
in the PCD-Planned Commercial District.
2. Rezoning the site from PID, Planned Industrial District to a PCD, Planned Commercial District.
3. Site Plan Review.
## SUPPORTING INFORMATION
## Surrounding Land Uses
Northerly: Multi-family Condominiums; Zoned PRD-4, Planned Residential District and guided High
Density Residential.
Easterly: Multi-family Apartments; Zoned PUD, Planned Industrial and guided Office-Residential.
Southerly: LA Fitness & the Edina Fire Station; Zoned PID, Planned Industrial and guided Office-
Residential.
Westerly: Office/Bank; Zoned PID, Planned Industrial and guided Office-Residential.
## Existing Site Features
The subject property is 2 acres in size, contains a single-story office building built in 1969 with a large
surface parking lot.
Page 67 of 175
## Planning
Guide Plan designation: OR, Office Residential
Zoning: PID, Planned Industrial
## Issues/Considerations:
## Rezoning
As demonstrated below there is a mixture of zoning districts on this portion of 76
th
Street. The property to
the east is a multifamily residential PUD; to the south is property zoned PID but consist of an Edina Fire
Station and LA fitness (similar to a commercial use, but allowing in PID); and to the west is a bank zoned PID
(banks are also allowed in a commercial zoning district). The proposed use would be consistent with the
existing uses on the block.
Per Section 36-216 of the City Code, the Commission may recommend approval by the council based upon,
but not limited to, the factors below.
Is consistent with the comprehensive plan.
The proposed rezoning is consistent with the Comprehensive Plan. The Comprehensive Plan guides
this site for OR, Office Residential land uses. The following page describes the land use, development
character and density. Limited retail is considered a secondary use.
## Site
Page 68 of 175
## Categories Description, Land Uses Development Character
and Guidelines
## Density
and
## Intensity
## OR
## Office Residential
Transitional areas along major thoroughfares
or between higher intensity districts and
residential
districts. Many existing highway-oriented
commercial areas are
anticipated to transition to this more mixed-
use character.
Primary uses are offices, attached or
multifamily housing. Secondary uses:
Limited retail and service uses (not including
“big box" retail), limited
industrial (fully enclosed),
institutional uses, parks and open space.
Upgrade existing streetscape and
building appearance, improve
pedestrian and transit environment.
Encourage structured parking and
open space linkages where feasible;
emphasize the enhancement of the
pedestrian environment.
20 – 75 residential
dwelling units/acre
The Salvation Army is not a big‑box retailer. It is a non‑profit charitable organization that operates thrift
stores rather than large‑format retail superstores.
Will not be detrimental to properties surrounding the tract.
The site plan and building would not change. The existing building would be utilized as well as the existing
parking lot. Landscaping will be added to enhance the site. There are several uses in the area that are
somewhat similar to retail, including a bank to the west and a health club to the south.
Will not result in an overly intensive land use.
The building size would remain the same, a large portion would be used for storage and drop off. The
parking requirements would be met. A traffic and parking study was done by Stantec and concludes that
the existing roadways would support the project, and there would be enough parking. (See page 7-1 in the
attached traffic study.) The proposed secondhand store and donation drop off would generate less traffic
than the existing LA fitness located across the street.
Will not result in undue traffic congestion or traffic hazards.
Traffic study was done by Stantec and concludes that the existing roadways can support the project. (See
attached traffic study.)
Conforms to the provisions of this section and other applicable provisions of this Code.
Assuming the change to the Zoning Ordinance to allow the proposed use, the project would conform to
the PCD-2 ordinance standards. The side yard setback is an existing condition.
Page 69 of 175
Provides a proper relationship between the proposed improvements, existing structures, open space
and natural features.
There would be no building alteration or change in the parking lot. There will be added landscaping to
enhance the appearance of the site.
Zoning Ordinance Amendment. Per Sec. 36-608 (47) of the Edina Zoning Ordinance
“Secondhand stores, not exceeding 2,500 square feet of gross floor area, but excluding pawn shops”
are a permitted use in the PCD 1-3, Planned Commercial Zoning districts.
The applicant is proposing a Zoning Ordinance Amendment that would allow secondhand stores to
exceed 2,500 square feet in size in the PCD-Planned Commercial District. Below is the proposed
amendment; it would apply to all PCD Zoning Districts.
Section 1. Chapter 36, Article VIII, Division 8, Sec. 36-608 is hereby amended as follows:
Sec. 36-608. - Principal uses in the PCD-1 subdistrict.
(47) Secondhand stores, not exceeding 2,500 square feet of gross floor area, but excluding pawn shops.
Staff supports the ordinance amendment; secondhand stores, like Salvation Army or Goodwill, function
the same as any other retail use.
Staff conducted contacted Eden Prairie, St. Louis Park, Richfield and Bloomington. All allow secondhand
stores in their commercial zoning districts. They do not differentiate new vs. secondhand retail. Eden
Prairie allows retail in an industrial zone with a PUD with limited retail square feet. Edina is the only
city among our neighboring border cities that limit square feet and call out secondhand stores as a
distinct retail category.
Page 70 of 175
## Compliance Table
## City Standard (PCD-2)
## Proposed
Setbacks (Structure)
Front (76th)
Side (West)
Side (East)
## Rear
50 feet
20 feet
25 feet
25 feet
50 feet
15 feet (existing condition)
20 feet (existing condition)
95 feet
Parking Stalls Retail - 1/250 s.f. (74 required)
Warehouse – 1/2000 s.f. (5 required)
79 stalls required
80 stalls existing
## FAR 1.5% .32%
## Building Coverage
30% 32% (existing condition)
## Site Plan Review
## Parking
Based on the City Code requirement, Section 36-1311, the proposed parking spaces meet City Code. An
18,425 square foot retail store with a 9,434 square foot warehouse would require 79 parking stalls. The
existing site provides 80 parking stalls. The parking study concludes that 54 parking stalls would be
adequate.
## Site Circulation/Access/Traffic
Primary access to the proposed development would be off 76
th
Street. No changes are proposed from the
existing conditions. Stantec conducted a traffic study. The study concludes that the proposal can be
supported by the existing roadways. (See attached traffic study.)
## Landscaping
Based on the perimeter of the site, 32 overstory trees would be required. The proposed plans show 32
existing and proposed overstory trees on site. A full complement of understory shrubs and bushes are
also proposed.
Page 71 of 175
## Living Streets/Multi-Modal Consideration
Sec. 36-1274. - Sidewalks, trails and bicycle facilities.
(a) In order to promote and provide safe and effective sidewalks and trails in the City and encourage the use of
bicycles for recreation and transportation, the following improvements are required, as a condition of
approval, on developments requiring the approval of a final development plan or the issuance of a conditional
use permit pursuant to article V of this chapter:
(1) It is the policy of the City to require the construction of sidewalks and trails wherever feasible so as to
encourage pedestrian and bicycle connectivity throughout the City. Therefore, developments shall
provide sidewalks and trails which adjoin the applicant's property:
a. In locations shown on the City's sidewalk and trail plan; and
b. In other locations where the council finds that the provision of such sidewalks and trails enhance
public access to mass transit facilities or connections to other existing or planned sidewalks, trails or
public facilities.
(2) Developments shall provide sidewalks between building entrances and sidewalks or trails which exist
or which will be constructed pursuant to this section.
(3) Developments shall provide direct sidewalk and trail connections with adjoining properties where
appropriate.
(4) Developments must provide direct sidewalk and trail connections to transit stations or transit stops
adjoining the property.
(5) Design standards for sidewalks and trails shall be prescribed by the engineer.
(6) Nonresidential developments having an off-street automobile parking requirement of 20 or more
spaces must provide off-street bicycle parking spaces where bicycles may be parked and secured from
theft by their owners. The minimum number of bicycle parking spaces required shall be five percent
of the automobile parking space requirement. The design and placement of bicycle parking spaces and
bicycle racks used to secure bicycles shall be subject to the approval of the city engineer. Whenever
possible, bicycle parking spaces shall be located within 50 feet of a public entrance to a principal
building.
(b) The expense of the improvements set forth in subsection (a) of this section shall be borne by the applicant.
The City’s Comprehensive Plan identifies a new sidewalk on the north side of 76
th
## Street. Therefore, a
boulevard-style sidewalk should be installed on the site. This shall be made a condition of approval.
Page 72 of 175
## PRIMARY ISSUES/STAFF RECOMMENDATION
## Primary Issues
For this project, the City of Edina has complete discretion to approve or deny this request. A case can be
made for both approval and denial of this project. Findings for both approval and denial of this project are
provided for the Planning Commission and City Council to consider.
• Is the Zoning Ordinance Amendment Reasonable?
Yes. Staff would support the Ordinance Amendment for the following reasons:
1. Secondhand stores are currently allowed in the PCD zoning district at a limited scale.
2. Secondhand stores, like Salvation Army or Goodwill, function the same as any other retail use.
3. The adjacent Cities of Eden Prairie, St. Louis Park, Richfield and Bloomington, all allow secondhand
stores in their commercial zoning districts. They do not differentiate between new vs. secondhand
retail.
4. Pawnshops would continue to be prohibited.
• Is the Proposed Rezoning to PCD-2 Reasonable?
Yes. Staff supports the request for the following reasons:
1. The findings for rezoning per Section 36-216 of the City Code would be met.
2. The Rezoning would not be detrimental to properties surrounding this site.
3. The site plan and building would not change. The existing building would be utilized as well as the
existing parking lot. Landscaping will be added to enhance the site.
4. There are several uses on 76
th
Street that are similar to retail, including a bank to the west and a health
club to the south.
5. Would not result in an overly intensive land use.
Page 73 of 175
## Options for Consideration
As mentioned, for this project, the City of Edina has complete discretion to approve or deny this request. A
case can be made for both approval and denial of this project. The following outlines alternatives for approval
and denial for the Planning Commission and City Council to consider.
## Denial
## Zoning Ordinance Amendment
Recommend the City Council deny the Zoning Ordinance Amendment to allow secondhand stores in
the PCD districts at any size.
## Rezoning and Site Plan Review
Recommend the City Council deny the Rezoning and Site Plan based on the following findings:
1. The proposed land use is not appropriate for this site.
2. Retail sales and other uses allowed in the PCD-2 Zoning District are not appropriate for this area.
## Approval
## Zoning Ordinance Amendment
Recommend the City Council approve the Zoning Ordinance Amendment to allow secondhand stores
in the PCD districts at any size. Approval is based on the following findings:
1. Secondhand stores are currently allowed in the PCD zoning district at a limited scale.
2. Secondhand stores, like Salvation Army or Goodwill, function the same as any other retail use.
3. Edina’s regulations on secondhand store would be consistent with adjacent cities of Eden Prairie, St.
Louis Park, Richfield and Bloomington.
4. Pawnshops would continue to be prohibited.
## Rezoning and Site Plan Review
Recommend the City Council approve the Rezoning and Site Plan based on the following findings:
1. The findings for rezoning per Section 36-216 of the City Code would be met.
Page 74 of 175
2. Would not be detrimental to properties surrounding the tract.
3. The site plan and building would not change. The existing building would be utilized as well as the
existing parking lot. Landscaping will be added to enhance the site.
4. There are several uses in the area that are similar to retail, including a bank to the west and a health
club to the south.
5. Would not result in an overly intensive land use.
Approval is subject to the following Conditions:
1. The Final Site Plans must be consistent with the plans date stamped March 20, 2026.
2. The Final Landscape Plan must be consistent with the approved plan and meet all minimum landscaping
requirements per Chapter 36 of the Zoning Ordinance. A performance bond, letter-of-credit, or cash
deposit must be submitted for one and one-half times the cost amount for completing the required
landscaping, screening, or erosion control measures at the time of any building permit. The property
owner is responsible for replacing any required landscaping that dies after the project is built.
3. All donations must be dropped off and stored inside the building.
4. There shall be no outside storage or outside collection areas, including collection boxes, and
temporary trailers used for collection.
5. A boulevard-style sidewalk must be constructed along 76
th
Street. Sidewalk must be 6 feet minimum
width with a 5-foot minimum width boulevard, subject to approval of the city engineer.
6. No truck loading shall be allowed on 76
th
Street.
## Staff Recommendation
Staff recommends approval of the Ordinance Amendment, Rezoning and Site Plan subject to the findings and
conditions above.
Deadline for a City decision: July 21, 2026
Page 75 of 175
## Proposed Site Plan
Page 76 of 175
## Landscape Plan
Page 77 of 175
## EdinaMN.gov
## Ordinance Amendment, Rezoning, & Site Plan
4200 76
th
## Street West (Salvation Army)e Page Style
Page 78 of 175
## Zoning Map & Site
## Location
## Site
## Location
Page 79 of 175
## Land Use Map
## & Site Location
## Site
## Location
Page 80 of 175
## Existing Building
Page 81 of 175
## Proposed Site Plan
Page 82 of 175
## Proposed Landscape
## Plan
Page 83 of 175
## Request Requires
Zoning Ordinance Amendment to allow secondhand stores to exceed 2,500 square
feet in size in the PCD-Planned Commercial District.
Rezoning the site from PID, Planned Industrial District to a PCD, Planned Commercial
District.
Site Plan Review.
Page 84 of 175
## Pyramid of Discretion
Page 85 of 175
## Zoning Ordinance Compliance Table
Page 86 of 175
## Primary Issues
Is the Zoning Ordinance Amendment Reasonable?
Is the Proposed Rezoning to PCD-2 Reasonable?
Page 87 of 175
## Land Use Description for Office Residential
Page 88 of 175
## Staff Recommendation
Motion to close the public hearing on June 7, 2026, and
continue action to the June 26, 2026, City Council agenda.
Page 89 of 175
## Ordinance 2026-8: Amending Chapter 36, Article VIII,
Division 8, Section 36-609
## The City Of Edina Ordains:
Section 1. Chapter 36, Article VIII, Division 8, Sec. 36-609 is hereby amended to add the following:
Sec. 36-609. Principal uses in the PCD-2 subdistrict.
(42) Secondhand stores but excluding pawn shops.
Section 2. This ordinance is effective immediately.
## Summary for Publication:
n/a
Page 90 of 175
## Resolution 2026-27: Rezoning & Site Plan
BE IT RESOLVED by the City Council of the City of Edina, Minnesota, as follows:
## Section 1. BACKGROUND
1.01. The Salvation Army is proposing to remodel and reuse the existing 28,000 square foot building
at 4200 76th Street West into an 18,425 square foot Salvation Army retail store with a 9,434
square foot warehouse and indoor drop off. There are no plans to alter the site plan or exterior
of the existing building.
1.02. The subject property is legally described as Tract 1, Registered Land Survey No. 1129, Hennepin
## County Minnesota
1.03. To accommodate the request, the following is requested:
• Rezoning the site from PID, Planned Industrial District to a PCD, Planned Commercial
District.
## • Site Plan Review
1.04. On May 13, 2026, the Planning Commission held a public hearing and recommended approval
of the Rezoning. Vote: 4 Ayes and 2 Nays.
1.05. On June 2, 2026, the City Council held a public hearing and considered the requests.
1.06. On June 16, 2026, the City Council approved the requests.
## Section 2. FINDINGS
2.01. Approval is based on the following findings:
1. The findings for rezoning per Section 36-216 of the City Code would be met.
2. Would not be detrimental to properties surrounding the tract.
3. The site plan and building would not change. The existing building would be utilized as
well as the existing parking lot. Landscaping will be added to enhance the site.
4. There are several uses in the area that are similar to retail, including a bank to the west
and a health club to the south.
5. Would not result in an overly intensive land use.
## Section 3. APPROVAL
NOW THEREFORE, it is hereby resolved by the City Council of the City of Edina, approves the
Rezoning and Site Plan as proposed. Approval is subject to the following conditions:
Page 91 of 175
1. The Final Site Plans must be consistent with the plans date stamped March 20, 2026.
2. The Final Landscape Plan must be consistent with the approved plan and meet all
minimum landscaping requirements per Chapter 36 of the Zoning Ordinance. A
performance bond, letter-of-credit, or cash deposit must be submitted for one and
one-half times the cost amount for completing the required landscaping, screening, or
erosion control measures at the time of any building permit. The property owner is
responsible for replacing any required landscaping that dies after the project is built.
3. All donations must be dropped off and stored inside the building.
4. There shall be no outside storage or outside collection areas, including collection boxes,
and temporary trailers used for collection.
5. A boulevard-style sidewalk must be constructed along 76th Street. Sidewalk must be 6
feet minimum width with a 5-foot minimum width boulevard, subject to approval of the
city engineer.
6. No truck loading shall be allowed on 76th Street.
Adopted by the City Council June 16, 2026.
Page 92 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 8.2 Department: Community Development
## Item Activity: Action Prepared By: Cary Teague, Community Development Director
## Item Title:
Comprehensive Plan Amendment, Site Plan and Variances for 6016 Vernon Ave, EV Charging Station
## Action Requested:
Adopt Resolutions 2026-28 and 2026-29 approving the Comprehensive Plan Amendment and Site Plan
with Variances.
## Information/Background:
Ionna Rechargery is proposing to remodel the existing Kee’s auto repair shop at 6016 Vernon Avenue
into an electric vehicle charging station. An electric vehicle charging station is a permitted use in the
PCD-4 zoning district, in which this site is located. The site, however, is guided for medium density
residential use in the Comprehensive Plan. The site would feature seven (7) level 3 DC fast chargers.
The existing building would be remodeled to be a lounge waiting area with a mini convenience store or
vending machines. The convenience store and lounge would be accessible 24 hours a day by a QR
code, and open to the public with no QR code from 9 am to 6 pm. Security will be via cameras on site,
and they would partner with a security firm to dispatch as necessary and only escalate to police if the
situation calls for it. If the need arises, a Phase 2 security plan that will have an onsite security guard,
though IONNA does not foresee this being a need. The building and site trash from bins will be
collected via a janitorial contract, and the site will be checked daily for cleanliness.
To accommodate this request, the following is requested:
• A Comprehensive Guide Plan Amendment to re-guide the site from MDR, Medium Density
Residential to Neighborhood Node. The site is zoned PCD-4, in which a gas station is a
permitted use. A gas station is defined as “a principal building and its accessory structures
used for the sale of motor fuels and oils, where automotive accessories and convenience
goods may be sold, but where repair and servicing of motor vehicles does not occur;
provided, however, that an accessory carwash is permitted.”
• Site Plan Review.
• Multiple Variances: Drive Aisle/Parking Space Setbacks from 20 to 2 feet, Setback to
Residential Property from 50 and 110 feet to 12 and 60 feet, Canopy setbacks from 35 & 25 to
0 and 5 feet, Pump Island Setbacks from 20 to 10 and 0 feet, Patio setback from 20 to 2 feet,
Mechanical Equipment Setback from 35 to 13 feet, and Parking Lot Setback from the Building
from 10 to 2 and 6 feet.
Page 93 of 175
While the proposed use is permitted in the PCD-4 zoning district, because of the Comprehensive Plan
Amendment and the Variances needed, the City does have some discretion to approve or deny the
request.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Staff Report to Planning Commission, April 29, 2026
## 2. Engineering Memo
## 3. MPCA Clean Up Letter
## 4. Applicant Narrative
## 5. Proposed Plans
## 6. LMC Pyramid of Discretion
## 7. Applicant's Proposed Plans (Board Portal)
8. Project Renderings - (Board Portal)
## 9. Floor Plan and Architectural Plans (Board Portal)
## 10. Traffic and Parking Study (Board Portal)
## 11. Staff Presentation
Page 94 of 175
## Comprehensive Plan Amendment, Site Plan and
## Variances for 6016 Vernon Ave, EV Charging
## Station
Page 95 of 175
## Comprehensive Plan Amendment, Site Plan and
## Variances for 6016 Vernon Ave, EV Charging
## Station
Page 96 of 175
## Staff Report
Date: April 29, 2026
## To: Planning Commission
## From: Cary Teague, Community Development Director
Subject: Comprehensive Plan Amendment, Site Plan and Variances – 6016 Vernon (EV Charging Station)
Staff Recommendation: Recommend the City Council approve the request subjects to findings and
conditions outlined in this report.
## Information/Background:
Ionna Rechargery is proposing to remodel the existing Kee’s auto repair shop at 6016 Vernon Avenue
into an electric vehicle charging station. An electric vehicle charging station is a permitted use in the
PCD-4 zoning district, in which this site is located. The site, however, is guided for medium density
residential use in the Comprehensive Plan.
The site would feature seven (7) level 3 DC fast chargers. The existing building would be remodeled to
be a lounge waiting area with a mini convenience store or vending machines. The convenience store
and lounge would be accessible 24 hours a day by a QR code, and open to the public with no QR code
from 9 am to 6 pm. Security will be via cameras on site, and they would partner with a security firm to
dispatch as necessary and only escalate to police if the situation calls for it. If the need arises, a Phase 2
security plan that will have an onsite security guard, though IONNA does not foresee this being a
need. The building and site trash from bins will be collected by a janitorial contract, and the site will be
checked daily for cleanliness.
To accommodate this request, the following is requested:
➢ A Comprehensive Guide Plan Amendment to re-guide the site from MDR, Medium Density
Residential to Neighborhood Node. The site is zoned PCD-4, in which a gas station is a
permitted use. A gas station is defined as “a principal building and its accessory structures used
for the sale of motor fuels and oils, where automotive accessories and convenience goods may be
sold, but where repair and servicing of motor vehicles does not occur; provided, however, that an
accessory carwash is permitted.”
➢ Site Plan Review.
➢ Multiple Variances: Drive Aisle/Parking Space Setbacks from 20 to 2 feet, Setback to
Residential Property from 50 and 110 feet to 12 and 60 feet, Canopy setbacks from 35 & 25
to 0 and 5 feet, Pump Island Setbacks from 20 to 10 and 0 feet, Patio setback from 20 to 2
feet, Mechanical Equipment Setback from 35 to 13 feet, and Parking Lot Setback from the
Building from 10 to 2 and 6 feet. (See Compliance Table on page 9 of this staff report.)
Page 97 of 175
While the proposed use is permitted in the PCD-4 zoning district, because of the Comprehensive Plan
Amendment and the Variances needed, the City does have some discretion to approve or deny the request.
(See attached pyramid of discretion.)
## Surrounding Land Uses
Northerly: Single-family homes; zoned R-1, Single-Dwelling Unit District and guided Low Density
Residential.
Easterly: Single-family homes; zoned R-1, Single-Dwelling Unit District and guided Low Density
Residential.
Southerly: Single-family homes; zoned R-1, Single-Dwelling Unit District and guided Low Density
Residential.
Westerly: Apartments/Condos; zoned PRD-3, Planned Residential District and guided Medium Density
Residential.
## Existing Site Features
The subject property is 16,373 square feet in size and contains a single-story two-bay auto repair shop,
accessory buildings and parking lot. The main building was constructed in 1957, and the site was also used
as a gas station until the early 1990’s. In 1992 the gas pumps were removed, and soil pollution remediation
was done. The cleanup was satisfactorily done, and no further action was required by the MPCA. (See
attached documentation from the MPCA.)
## Planning
Guide Plan designation: MDR, Medium Density Residential
Zoning: PCD-4, Planned Commercial District – 4
## Comprehensive Guide Plan Amendment
This site is unique in Edina in that it is, and has been zoned PCD-4, Planned Commercial District for the
automotive repair use and gas station, however, it is guided in the Comprehensive Plan for Medium
Density Residential. The Comprehensive Plan designation has been in place at least since 1980 when that
Comprehensive was adopted. Staff assumes that when that Comprehensive Plan land use designation was
established to match the existing medium density multi-family housing located to the west.
To accommodate the request, a Comprehensive Plan amendment is required to change the future land use
designation from Medium Density Residential to NN, Neighborhood Node. This would accommodate a
Page 98 of 175
small-scale commercial use. This category is where several of the City’s current gas stations are located.
(See attached PowerPoint) Below shows the proposed change:
## Existing Land Use Plan
## Site
## Site
## Proposed Land Use Plan Change
## Existing
## Proposed
Page 99 of 175
Comprehensive Plan. The site is guided MDR, Medium Density Residential in the Comprehensive Plan.
Below is the land use category and description:
## Categories Description, Land
## Uses
## Development
Character and
## Guidelines
Density and
## Intensity
## MDR
## Medium-Density
## Residential
Applies to attached
housing
(townhouses, quads, etc.)
and multi-family
complexes
of moderate density. May
also include small
institutional uses.
In new development or
redevelopment, improve
integration of multi-family
housing into an
interconnected street
network and work to
create an attractive,
pedestrian-friendly street
edge.
5 – 12 residential
dwelling units/acre
Based on the current designation of medium density residential, a total of 4 units maximum could be
developed on the site, due to its small lot size. Over the past couple years, residential developers have
looked at the site for potential residential development. None had any interest in pursuing
development; that includes the developer that submitted a sketch plan for the 20-unit memory care
housing project.
## Categories Description, Land
## Uses
## Development
Character and
## Guidelines
Density and
## Intensity
## NN
## Neighborhood Node***
Current examples:
• 44th &
## France
• 70th &
## Cahill
• Valley
View &
## Wooddale
• Lincoln & Londonderry
In general, small-to
moderate-scale
commercial,
residential or mixed-use
buildings serving primarily
the adjacent
neighborhood(s).
Primary uses encouraged
are neighborhood-serving
retail and services, offices,
studios, institutional and
residential.
Building footprints
generally less than 20,000
sq. ft. (or less for individual
storefronts). Parking is less
prominent than pedestrian
features.
Encourage underground
parking (for comparatively
larger developments),
district parking for smaller
developments, and open
space linkages where
feasible; emphasize
enhancement of the
pedestrian environment.
Varies by small area:
• Wooddale/Valley
View – 12-30
du/acre
• 70th & Cahill – 10-50
du/acre
• 44th & France – 12-
60 du/acre
• Lincoln/Londonderry – 10-
60 du/acre
Page 100 of 175
Based on the size of the subject property and the density allowed in the MDR Districts, four (4) units could be
constructed on the subject property. However, given the odd shape, small size and restrictive setbacks
required with two of three street frontages, variances would be needed redevelop the site with housing. (See
attached PowerPoint.)
## Site Plan Review
## Parking
Based on the City Code requirement, Section 36-1311, the proposed parking spaces meet City Code. City
Code requires 5 stalls for the proposed use. The applicant is proposing 16 stalls total; 14 charging station
stalls and 2 general parking stalls.
A parking study was conducted by Stantec and concluded that there would be adequate parking. (See
attached study.)
## Site Circulation/Access/Traffic
Primary access to the proposed development would be off Vernon Avenue, by the two existing access
points. Stantec conducted a traffic study. The study concludes that the existing roadways can be supported
by the project. (See attached traffic study.)
## Landscaping
Based on the perimeter of the site, 17 overstory trees would be required. The proposed plans show 17
overstory trees on site. A full complement of understory shrubs and bushes are also proposed. The
applicant is proposing a cedar fence to provide screening the residential area to the north and west.
Per Section 36-1457 (4) of the Zoning Ordinance: “Off-street parking facilities containing six or more
spaces and all loading facilities shall be screened from streets located within 50 feet, and from lots which
are used for any residential purpose which are located within 50 feet. Said distance shall be the shortest
distance between the parking facility or loading facility and the nearest part of the street or the nearest lot
line of the residential lot.” This site is located within 50 feet of residential uses to the west and north but
would be screened.
## Trash Enclosure
Trash storage facilities, including recycling storage facilities, shall be screened from all lot lines and public
road rights-of-way. As proposed, the trash enclosure would be located in front of the building and would
be screened.
Page 101 of 175
## Grading/Drainage/Utilities
The city engineer has reviewed the proposed plans and found them to be acceptable subject to the
comments and conditions outlined in the attached memo. Any approvals of this project would be subject
to review and approval of the Nine Mile Creek Watershed District, as they are the City’s review authority
over the grading of the site.
## Mechanical Equipment
Any new rooftop and/or ground level equipment would have to be screened if visible from adjacent
property lines. Lights would be LED and pointed down and shielded. Dimming of canopy lighting are
proposed to match sunrise and sunset times.
## Lighting
The applicant has submitted a lighting plan that demonstrates City Code compliance on all lot lines. (See
proposed plans.)
## Noise
Noise generated from the chargers will be required to meet the City Code (State Statutes). The applicant
has stated that the noise will meet the City Code and provided the information below.
o Sound levels drop significantly as you move away from the source. The 52 dBA rating is typically
measured immediately next to the unit. For every doubling of distance, the sound level drops by
approximately 6 decibels. By the time the sound reaches the property line or the nearest sidewalk,
it will likely be lower than the existing ambient traffic noise in the area.
o The actual sound profile of the entire site will remain well within standard city noise ordinances
and will be comparable to the ambient sounds of a quiet suburban street.
Page 102 of 175
## Gas Station Regulations
Per Section 36-618 (15) of the Edina City Code, the following is required for Gas Stations:
(15) Automobile service centers and gas station standards.
a. Minimum lot area:
1. For an automobile service center, 20,000 square feet, plus 5,000
square feet for each service bay in excess of three.
2. For a gas station, 15,000 square feet.
b. Maximum lot area: 60,000 square feet.
c. Hydraulic hoists, pits, lubrication, washing, repairing and diagnostic equipment
shall be used and stored within a building.
d. Interior curbs of not less than six inches in height shall be constructed to
separate driving surfaces from sidewalks, landscaped areas and streets.
e. No automobile service station on a lot adjoining a lot in a residential district
shall be operated between the hours of 11:00 p.m. and 6:00 a.m.
f. All driving surfaces shall be constructed and maintained in the same manner as
prescribed for parking lots by this chapter.
g. No merchandise shall be displayed for sale outside a building, except in that
area within four feet of the building or within pump islands used for dispensing
motor fuels.
h. No motor vehicles, except those owned by the operators and employees of
the principal use, and vehicles awaiting service, shall be parked on the lot
occupied by the principal use. Vehicles being serviced may be parked for a
maximum of 48 hours.
i. Body work and painting is prohibited.
j. No buildings, driveway surfaces, parking areas or other improvements shall be
located within 110 feet of any portion of a lot in a residential district which is
used for residential purposes if separated from the lot by a street, or within 50
feet, if not so separated by a street.
k. Pump islands shall maintain a front and side street setback of at least 20 feet
and an interior side yard and rear yard setback of at least 25 feet.
l. Notwithstanding the requirements of article XII, division 3 of this chapter,
driveways and drive aisles need only provide a setback of not more than five
feet from all lot lines, subject to the requirements of subsection (15)j of this
section.
Page 103 of 175
## Signage
There were no signage variances requested. Below are the Code requirements for signage in the PCD-
## 4 Zoning District:
PCD-4 20% of
wall area
20-foot setback
to a street
Number of Signs – One per
building per frontage
80 square feet for first sign, 50 square
feet for each additional sign
20 feet
tall
All signage for the site should meet City Code requirements. The wall sign shown and sign above the
canopies on the images do not meet City Code requirements.
## Living Streets/Multi-Modal Consideration
Sec. 36-1274. - Sidewalks, trails and bicycle facilities.
(a) In order to promote and provide safe and effective sidewalks and trails in the City and encourage the use of
bicycles for recreation and transportation, the following improvements are required, as a condition of
approval, on developments requiring the approval of a final development plan or the issuance of a conditional
use permit pursuant to article V of this chapter:
(1) It is the policy of the City to require the construction of sidewalks and trails wherever feasible so as to
encourage pedestrian and bicycle connectivity throughout the City. Therefore, developments shall
provide sidewalks and trails which adjoin the applicant's property:
a. In locations shown on the City's sidewalk and trail plan; and
b. In other locations where the council finds that the provision of such sidewalks and trails enhance
public access to mass transit facilities or connections to other existing or planned sidewalks, trails or
public facilities.
(2) Developments shall provide sidewalks between building entrances and sidewalks or trails which exist
or which will be constructed pursuant to this section.
(3) Developments shall provide direct sidewalk and trail connections with adjoining properties where
appropriate.
(4) Developments must provide direct sidewalk and trail connections to transit stations or transit stops
adjoining the property.
(5) Design standards for sidewalks and trails shall be prescribed by the engineer.
(6) Nonresidential developments having an off-street automobile parking requirement of 20 or more
spaces must provide off-street bicycle parking spaces where bicycles may be parked and secured from
theft by their owners. The minimum number of bicycle parking spaces required shall be five percent
of the automobile parking space requirement. The design and placement of bicycle parking spaces and
bicycle racks used to secure bicycles shall be subject to the approval of the city engineer. Whenever
possible, bicycle parking spaces shall be located within 50 feet of a public entrance to a principal
building.
(b) The expense of the improvements set forth in subsection (a) of this section shall be borne by the applicant.
Page 104 of 175
The City’s Comprehensive Plan identifies a new sidewalk on the north side of Vernon Avenue between
Blake Road/Olinger Boulevard to Olinger Road/Highwood Drive. Therefore, a boulevard-style sidewalk
should be installed on the site, should this proposal be approved per the attached engineering memo.
## Compliance Table
## City Standard (PCD-4)
## Proposed
Setbacks (Structure)
Front (Vernon)
## Front (EP Road)
Side (West)
Setbacks (Canopy)
Front (Vernon)
## Front (EP Road)
Side (West)
## Setbacks (Pump Islands)
Front (Vernon)
## Front (EP Road)
Side (West)
Setbacks (Parking lot)
Drive aisle (Vernon)
Drive aisle (EP Road)
Side (West)
## Setback from Residential Use
From adjacent property
From property separated by a
street
35 feet
25 feet
25 feet
35 feet
25 feet
25 feet
20 feet
20 feet
25 feet
20 feet
20 feet
10 feet
50 feet
110 feet
25 feet (existing)
20 feet (existing)
25 feet (existing)
0 feet*
10 feet*
40+ feet
0 feet*
10 feet*
50+ feet
0 feet*
10 feet*
12 feet
12 feet*
60 feet*
Parking Setback from Building 10 feet 6 & 8 feet*
Maximum Lot Size 60,000 s.f. 16,373 s.f.
Minimum Lot Size 15,000 s.f. 16,373 s.f.
Parking Stalls 1 space per employee plus 1 space per
300 square feet
5 stalls required
16 stalls
## FAR 30% 8%
*Variance Required
Page 105 of 175
## PRIMARY ISSUES/STAFF RECOMMENDATION
## Primary Issues
For this project, the City of Edina has discretion to approve or deny this request. A case can be made for both
approval and denial of this project. Findings for both approval and denial of this project are provided for the
Planning Commission and City Council to consider. (See pages 13-15 of this report.)
As outlined below, staff is recommending approval of this proposal, primarily due to the fact that the site is
currently zoned for auto oriented uses (PCD-4) like the gas station and auto repair station that have existed
on the site for 50+ years.
## Primary Issues
• Is the Comprehensive Plan Amendment reasonable?
Yes. The Comprehensive Plan Amendment is reasonable for the following reasons:
1. The subject property has been used a commercial site with proper zoning for over 50 years. The
proposed amendment is reasonable given the consistency in use from an auto-repair and former gas
station to an electric vehicle charging station. The Comprehensive Plan Amendment would be
consistent with the existing commercial zoning on the site.
2. The existing zoning is PCD-4, which allows automobile service centers, gas stations and car washes.
The Metropolitan Council requires cities to have their land use plan within the Comprehensive Plan,
consistent with their zoning designations.
3. The proposed NN, Neighborhood Node, would accommodate a small-scale commercial use. This
category is where several of the City’s current gas stations are located.
4. The proposed use would be supported by the existing roads. The number of vehicular trips to the site
would have minimal impact on the existing roads. (See page 7-1 of the traffic study.)
• Are the proposed Variances justified?
Yes. Subject to approval of the Comprehensive Plan Amendment, staff believes that the Variances
requested with this project are reasonable and meet the variance criteria as outlined below.
➢ The existing use on the property has been commercial for over 50 years.
➢ The closest adjacent structure would be 105+/- feet away and would be screened by fencing
and landscaping.
Page 106 of 175
➢ The practical difficulties include the existing small lot size, irregular shape of the lot and street
frontages on two of the three sides.
➢ It would be difficult to build anything on this site without variances, due to the small size and shape of
the lot. (See attached buildable area.)
➢ The proposed cedar fence and landscaping along the west and north lot lines would minimize impact
on the adjacent residential use to the north and west.
➢ The proposal would be an improvement over existing conditions and use of the site.
Minnesota Statutes and Section 36-98 of the Edina Zoning Ordinance require that a variance
shall not be granted unless the following findings are made:
1. The variances would be in harmony with the general purposes and intent of the ordinance.
Ariticle 1. – In General; Section 36-1 – Findings state “Through the enactment of the ordinance from
which this chapter is derived, the council intends to implement this statement of philosophy so as to
provide for the orderly and planned development and redevelopment of lands and waters in the city,
to maintain an attractive living and working environment in the city, to preserve and enhance the high
quality residential character of the city and to promote the public health, safety and general welfare.”
Section. 36-2 Objectives of the Zoning Ordinance includes:
➢ Control the use, development and expansion of certain nonresidential uses in the Single
Dwelling Unit District in order to reduce or eliminate undesirable impacts of such
nonresidential uses.
➢ Encourage orderly development, use and maintenance of office, commercial and industrial uses
which are compatible with the residential character of the city.
➢ Recognize and distinguish commercial districts at the neighborhood level, the community level
and the regional level, so as to provide retail establishments compatible in use and scale with
surrounding properties, especially those used for residential purposes.
➢ Establish standards for landscaping and screening to contribute to the beauty of the
community, add to the urban forest and buffer incompatible uses from one another.
By adding conditions to minimize impacts on adjacent property, such as landscaping, screening, limiting
hours of operation the intent of the ordinances could be met.
2. The variance would be consistent with the Comprehensive Plan.
Subject to approval of the Comprehensive Plan amendment, the proposal would be consistent with the
Comprehensive Plan. Below is the land use categories and description.
Page 107 of 175
## Categories Description, Land
## Uses
## Development
Character and
## Guidelines
Density and
## Intensity
## NN
## Neighborhood Node***
Current examples:
• 44th &
## France
• 70th &
## Cahill
• Valley
View &
## Wooddale
• Lincoln & Londonderry
In general, small-to
moderate-scale
commercial,
residential or mixed-use
buildings serving primarily
the adjacent
neighborhood(s).
Primary uses encouraged
are neighborhood-serving
retail and services, offices,
studios, institutional and
residential.
## Within Lincoln &
Londonderry, limited
industrial is also a primary
use.
Building footprints
generally less than 20,000
sq. ft. (or less for individual
storefronts). Parking is less
prominent than pedestrian
features.
Encourage underground
parking (for comparatively
larger developments),
district parking for smaller
developments, and open
space linkages where
feasible; emphasize
enhancement of the
pedestrian environment.
Varies by small area:
• Wooddale/Valley
View – 12-30
du/acre
• 70th & Cahill – 10-50
du/acre
• 44th & France – 12-
60 du/acre
• Lincoln/Londonderry – 10-
60 du/acre
30%/70%
residential/commercial
mixed-use
3. There are practical difficulties in complying with the ordinance. The term “practical difficulties” means
the following:
i. The property owner proposes to use the property in a reasonable manner not permitted by the
Zoning Ordinance.
Reasonable use does not mean that the applicant must show the land cannot be put to any reasonable
use without the variance. Rather, the applicant must show that there are practical difficulties in
complying with the code and that the proposed use is reasonable. “Practical difficulties” may include
functional and aesthetic concerns.
These variances are reasonable given the existing small size of the site, the triangular shape of the site,
and two lot frontages. The proposal utilizes the existing building and updates the existing parking lot.
The use would be reasonably screened by landscaping and fencing and located 105 feet to the building
to the west. The previous use of this site was auto repair and a gas station. The proposed use is
generally consistent with those uses. The mechanical equipment would be well screened and located
away from the single-family homes to the north.
ii. The plight of the landowner is due to circumstances unique to the property not created by the
landowner.
Page 108 of 175
Yes. The unique circumstances including the small lot size, location of existing building, unique shape,
existing zoning being commercial (PCD-4) and the Comprehensive Plan designation of multi-family
residential are not created by the landowner.
iii. The variance, if granted, will not alter the essential character of the locality.
The variances would not alter the essential character of the locality. The existing use has been
automobile repair with outside storage. The remodeling of the building, upgrading of the parking
lot, added landscaping and fencing would improve the look of the site, which would remain
commercial.
Options for consideration
For this project, the Planning Commission and City Council have discretion to approve or deny the request. A
case can be made for both approval and denial of this project. The following outlines alternatives for the
Planning Commission to consider.
## Denial
## Comprehensive Plan
Recommend the City Council deny the Comprehensive Plan Amendment to re-guide the site from MDR,
Medium Density Residential to NC, Neighborhood Commercial. Denial is based on the following findings:
1. The subject property is too small to accommodate the proposed uses. The EV charging stations and
related mechanical equipment, given the number of variances being requested, would be an overly
intensive use for the site.
2. The proposed use and site plan to accommodate the use is not compatible with the adjacent
residential land uses. The variances proposed are significant.
3. The site is currently guided for Medium Density Residential land uses.
## Site Plan with Variances
Recommend the City Council Deny the Site Plan Review and Variances. Denial is based on the following
findings:
1. The Variance criteria have not been met. There are no practical difficulties that prohibit reasonable
use of the property.
Page 109 of 175
2. The practical difficulty is caused by the applicant’s desire for an expanded parking field for the EV
charging stations and mechanical equipment that does not fit properly on the site to minimize impacts
on adjacent properties.
## Approval
## Comprehensive Plan
Recommend the City Council approve the Comprehensive Plan Amendment to re-guide the site from MDR,
Medium Density Residential to NN, Neighborhood Node. Approval is based on the following findings:
1. The proposed use and site plan to accommodate the use is consistent with the previous land uses on
this site. The existing building would be used rather than tearing it down and replacing it. The proposal
would be an improvement to the site compared to current conditions.
2. The subject property has been used a commercial site with proper zoning for over 50 years. The
proposed amendment is reasonable given the change in use from an auto-repair and former gas station
to an EV charging station and convenience store. The Comprehensive Plan Amendment would then be
consistent with the existing commercial zoning on the site.
3. The proposed amendment would allow a re-development of a commercial property that would be an
amenity serving the area. A convenience store and lounge could be a small-scale community gathering
space for this neighborhood.
4. With the requirement of a fence located along the west and north lot lines and the landscaping
proposed, the project would be screened from adjacent residential land uses to minimize impacts.
## Site Plan with Variances
Recommend the City Council Approve the Site Plan Review and Variances. Approval is based on the following
findings:
1. The proposed variances are reasonable given the practical difficulties associated with the site including
the triangular shape of the site, street frontage on two sides, and the lots small size.
2. The project would include a restoration of the existing building; the expansion area would the west,
where the nearest building would be 105+/- feet away.
Page 110 of 175
3. The proposed cedar fence along the west and north lot lines would minimize impact on the adjacent
residential use to the north and west.
4. The proposal would be an improvement over existing conditions and use of the site.
Approval is subject to the following Conditions:
1. The Final Landscape Plan must meet all minimum landscaping requirements per Chapter 36 of the
Zoning Ordinance. A performance bond, letter-of-credit, or cash deposit must be submitted for one
and one-half times the cost amount for completing the required landscaping, screening, or erosion
control measures at the time of any building permit. The property owner is responsible for replacing
any required landscaping that dies after the project is built.
2. Compliance with all the conditions outlined in the city engineer’s memo dated April 22, 2026.
3. Variances are subject to approval of the Comprehensive Plan Amendment, Site Plan approval by City
Council.
4. Submit a copy of the Nine Mile Creek Watershed District permit. The City may require revisions to
the approved plans to meet the district’s requirements.
5. A cedar fence must be installed and maintained along the west and north lot line as proposed to
provide screening from adjacent properties.
6. A boulevard-style sidewalk must be constructed along Vernon Avenue. Sidewalk must be 6 feet
minimum width with a 5-foot minimum width boulevard.
7. Noise levels from the site shall not exceed City Code (State Statutes).
## Staff Recommendation
Staff recommends approval of the Comprehensive Plan Amendment, Site Plan and Variances subject to the
findings above.
Deadline for a City decision: June 16, 2026
Page 111 of 175
## DATE: 4/22/2026
TO: 6016 Vernon Ave S, Owner and Development Team
CC: Cary Teague – Community Development Director
## FROM: Andrew Reinisch – Engineering Technician
RE: 6016 Vernon Ave S – Development Review
The Engineering Department has reviewed the subject property for pedestrian facilities, utility connections,
grading, flood risk, and storm water. Plans reviewed included civil, landscape, and survey drawings dated
2/24/2026
## Review Comment Required For
## General
1. Existing easements held by the City require Council action to
vacate if deemed appropriate and necessary for the project.
Consideration of requests can require up to 60-days to process.
## General Comment
2. Deliver as-build records of public and private utility infrastructure
post construction.
## Certificate of Occupancy
3. Maintenance of sidewalks internal to the site will be responsibility
of property owner. Sidewalks along Vernon Avenue will be
maintained by the City.
## General Comment
## Survey
4. An existing and proposed site condition survey is required. Grading/Building Permit
4.1 Show all existing and proposed public and private easements. Grading/Building Permit
## Living Streets
5. Design sidewalks to meet ADA requirements. Grading/Building Permit
6. Saw cut concrete sidewalk joints on public sidewalks. Grading/Building Permit
7. Public sidewalk to be minimum 5’ in width with a 5’ boulevard.
Extend the Vernon Avenue sidewalk east to the shared use path
extended from Eden Prairie Road. Provide an off-ramp for the
west end of the Vernon Avenue sidewalk onto the shoulder of
Vernon Avenue.
## Grading/Building Permit
8. It is unclear how many bicycle parking stalls are proposed. The
recommendation for this location given the proximity to bike
lanes on Vernon Ave is 6.
## Grading/Building Permit
Page 112 of 175
9. Bike rack style and spacing should confirm to the
recommendations of the American Pedestrian and Bicycle
Professionals.
## Grading/Building Permit
10. Applicant should consider including e-bike charging stations. Grading/Building Permit
11. It is recommended that this project be exempt from the TDM
Policy requirements. Providing information on pedestrian transit
facilities is not going to reduce the volume of vehicles traveling to
the site.
## Grading/Building Permit
## Traffic and Street
12. Review fire access requirements with fire department. Fire truck
turning template attached.
## Grading/Building Permit
13. Provide traffic study and implement City-approved
recommendations.
## Grading/Building Permit
14. Driveway Entrance permit required for entrance reconstruction.
Vernon Ave driveway permits will need to be obtained through
Hennepin County.
## Building Permit
15. Road patching shall conform to Edina Standard Plates 540-545. Certificate of Occupancy
## Sanitary and Water Utilities
16. Verify fire demand and hydrant locations. Grading/Building Permit
17. Domestic water shall be sized by the developer’s engineer. Grading/Building Permit
18. Domestic sanitary shall be sized by the developer’s engineer. Grading/Building Permit
19. Apply for a sewer and water connection permit with Public
Works if needed.
## Prior to Starting Utility Work
19.1 Public Works to determine acceptable installation methods. Grading/Building Permit
20. If necessary, disconnected sanitary and water services to be
capped at main.
21. A SAC determination will be required by the Metropolitan
Council. The SAC determination will be used by the City to
calculate sewer and water connection charges
## Grading/Building Permit
22. Single connection from main for fire and domestic, split after
main connection.
## Grading/Building Permit
23. A sealed well is on the site. Additional wells not in use must be
sealed by a licensed well contractor pe
r MN Rules, Chapter 4725.
## Certificate of Occupancy
## Storm Water Utility
Page 113 of 175
24. Provide hydraulic and hydrologic report meeting watershed and
state construction site permit requirements.
## Grading/Building Permit
25. Submit watershed district permit and copies of private
maintenance agreement in favor of watershed.
## Grading/Building Permit
## Grading Erosion and Sediment Control
26. A SWPPP consistent with the State General Construction Site
Stormwater Permit is required.
## Grading/Building Permit
## Constructability and Safety
27. Construction staging, traffic control, and pedestrian access plans
will be required.
## Grading/Building Permit
28. Retaining walls over 4-ft in height require design by a structural
engineer.
## Grading/Building Permit
## Sustainability
29.
This project is not required to follow the Sustainable Building
Policy.
Applicant is encouraged to maximize energy efficiency during
building renovation with LED lighting, optimized controls and
upgrade HVAC systems. Applicant can either participate in Xcel
Energy’s Energy Efficient Buildings program for free design
services, or participate in Xcel Energy and CenterPoint Energy’s
building assessment programs. Both programs will provide
support for equipment identification, system sizing and access to
rebate programs.
The City of Edina will cover the co-pay for the building
assessment programs, which should be coordinated with the
Sustainability Division (MBayer@EdinaMN.gov).
## General
## Other Agency Coordination
30. MDH, MPCA and MCES permits required as needed. Grading/Building Permit
31. Nine Mile Creek Watershed District permit is required. Grading/Building Permit
32. Hennepin County is the LGU for Vernon Ave. Driveway entrance
permit will need to be obtained through them.
## Grading/Building Permit
Page 114 of 175
Page 115 of 175
Page 116 of 175
t-rem-vic2-09 · LB 1528 · 8/5/21
March 1, 2022
## VIA EMAIL
## Marty Collins
## Special X Properties LLC
## 6016 Vernon Ave S
## Edina, MN 55436-1908
## RE: No Association Determination
## Kevin Kee's Auto Service, 6016 Vernon Ave, Edina
## MPCA Site ID: BF0001999
## Billing ID: 104880
## PIN: 3211721230027
## Dear Marty Collins:
This letter is in response to the request from Greg Browne of The Javelin Group, Inc. for a determination
under Minn. Stat. § 115B.178 that certain actions proposed to be taken by Special X Properties LLC at
the Kevin Kee's Auto Service site, located at the address referenced above (the Site), will not constitute
conduct associating Special X Properties LLC with the release or threatened release of hazardous
substances, pollutants, or contaminants at the Site for the purpose of Minn. Stat. § 115B.03, subd. 3(4).
The Minnesota Pollution Control Agency (MPCA) staff in the Voluntary Investigation and Cleanup (VIC)
Program has reviewed the documents submitted for the Site. The 0.38-acre Site was undeveloped until
construction of the current Site building in 1957. The building was occupied by a gas station until the
early 1990s and has since operated as an auto repair shop. A petroleum release was discovered in
November 1992 when underground storage tanks were being removed from the Site. The leak site
(MPCA Site ID# LS0002247) was closed in February 2002. Special X Properties LLC intends to renovate
the existing Site building for use as a restaurant.
An environmental investigation completed at the Site in September 2021 included three interior soil
borings and one exterior soil boring. Four soil samples were collected and analyzed for volatile organic
compounds (VOCs) and diesel range organics (DRO); two of the soil samples were also analyzed for
Resource Conservation and Recovery Act (RCRA) metals and one sample for polynuclear aromatic
hydrocarbons (PAHs). Tetrachloroethene (PCE) was detected in one sample collected near the
flammable waste trap at a concentration of 0.24 milligrams per kilogram (mg/kg), which is greater than
the MPCA’s screening soil leaching value (SLV). Groundwater was not encountered during the
investigation.
Five exterior soil vapor samples were collected at the Site in August 2018 and three sub-slab soil
vapor samples were collected at the Site in September 2021 (non-heating season) and November
2021 (heating season). PCE was detected at a maximum concentration of 279 μg/m
3
, which is less
than the MPCA action level of thirty-three times (33X) its commercial intrusion screening value (ISV).
Low concentrations of cis-1,2-dichloroethene (cis-1,2-DCE) were also detected in soil vapor.
Page 117 of 175
## Marty Collins
Page 2
March 1, 2022
For the purpose of this letter, the identified release consists of PCE in soil, and PCE, cis-1,2-DCE and
other non-petroleum-VOCs in soil vapor (Identified Release). This letter does not address petroleum-
related contaminants. Petroleum contamination detected at the Site is under the oversight of the
MPCA’s Petroleum Brownfield Program.
Based upon a review of the information provided to the MPCA VIC Program, and subject to the
conditions set forth in this letter, a determination is hereby made pursuant to Minn. Stat. § 115B.178,
subd. 1 that the proposed actions (Proposed Actions) listed below will not associate Special X Properties
LLC with the Identified Release for the purpose of Minn. Stat. § 115B.03, subd. 3(4). This determination
applies only to the following Proposed Actions:
• Purchase of the Site;
• Renovation of the existing Site building for use as a restaurant; and
• Operation and maintenance of the Site building, grounds, and related infrastructure.
This determination is made in accordance with Minn. Stat. § 115B.178, subd. 1, and is subject to the
following conditions:
1. The Proposed Actions shall be carried out as described herein.
2. Special X Properties LLC shall cooperate with the MPCA, its employees, contractors, and others
acting at the MPCA’s direction, in the event that the MPCA takes, or directs others to take, response
actions at the Site to address the Identified Release or any other as yet unidentified release or
threatened release of a hazardous substance, pollutant, or contaminant, including, but not limited
to, granting access to the Site so that response actions can be taken.
3. Special X Properties LLC shall avoid actions that contribute to the Identified Release or that interfere
with response actions required under any MPCA-approved response action plan to address the
Identified Release.
Pursuant to Minn. Stat. § 115B.178, subd.1, when Special X Properties LLC takes the Proposed Actions in
accordance with the determination in this letter, subject to the conditions stated herein, the Proposed
Actions will not associate Special X Properties LLC with the Identified Release for the purpose of Minn.
Stat. § 115B.03, subd. 3(4).
The determination made in this letter applies to Special X Properties LLC’s successors and assigns if the
successors and assigns: 1) are not otherwise responsible for the Identified Release at the Site; 2) do not
engage in activities with respect to the Identified Release which are substantially different from the
activities which Special X Properties LLC proposes to take, as described herein; and 3) comply with the
conditions set forth in this letter.
Please be advised that the determination made in this letter is subject to the disclaimers found in
Attachment A and is contingent on compliance with the terms and conditions set forth herein.
Page 118 of 175
## Marty Collins
Page 3
March 1, 2022
If you have any questions about the contents of this letter, please contact Amanda Guertin, Project
Manager/Hydrologist, at 651-757-2369 or by email at amanda.guertin@state.mn.us.
## Sincerely,
## Amy K. Hadiaris
This document has been electronically signed.
Amy K. Hadiaris, P.G.
## Supervisor
## Redevelopment Unit
## Remediation Division
## AKH/AG:akh
## Enclosure
cc: Greg Browne, The Javelin Group, Inc.
## Sharon Allison, City of Edina
## John Evans, Hennepin County
Page 119 of 175
## Attachment A
Page 1 of 1
## Disclaimers
## Kevin Kee's Auto Service
## MPCA Site ID: BF0001999
1. Reservation of authorities
The Minnesota Pollution Control Agency (MPCA) Commissioner reserves the authority to take any
appropriate actions with respect to any release, threatened release, or other conditions at the Site.
The MPCA Commissioner also reserves the authority to take such actions if the voluntary party does
not proceed in the manner described in this letter or if actions taken or omitted by the voluntary
party with respect to the Site contribute to any release or threatened release, or create an imminent
and substantial danger to public health and welfare.
2. No MPCA assumption of liability
The MPCA, its Commissioner, and staff do not assume any liability for any release, threatened
release or other conditions at the Site or for any actions taken or omitted by the voluntary party
with regard to the release, threatened release, or other conditions at the Site, whether the actions
taken or omitted are in accordance with this letter or otherwise.
3. Letter based on current information
All statements, conclusions, and representations in this letter are based upon information known to
the MPCA Commissioner and staff at the time this letter was issued. The MPCA Commissioner and
staff reserve the authority to modify or rescind any such statement, conclusion or representation
and to take any appropriate action under his authority if the MPCA Commissioner or staff acquires
information after issuance of this letter that provides a basis for such modification or action.
4. Disclaimer regarding use or development of the property
The MPCA, its Commissioner, and staff do not warrant that the Site is suitable or appropriate for any
particular use.
5. Disclaimer regarding investigative or response action at the property
Nothing in this letter is intended to authorize any response action under Minn. Stat. § 115B.17,
subd. 12.
6. This approval does not supplant any applicable state or local stormwater permits, ordinances, or
other regulatory documents.
Page 120 of 175
## 4022 Stirrup Creek Drive, Suite 315, Durham, NC 27703
This project proposes to establish a new IONNA Rechargery located at 6016 VERNON AVE,
Edina, MN. This installation will feature seven (7) Level 3 DC fast-charging stations with
mini canopies, providing essential charging infrastructure for the growing electric vehicle
community in Minnesota.
IONNA, a joint venture established by leading automotive manufacturers including BMW,
General Motors, Honda, Hyundai, Kia, Mercedes-Benz, Stellantis, and Toyota, is creating
North America's premier charging network. This location will serve as a crucial link in
IONNA’s expanding charging infrastructure, supporting both local EV drivers and travelers
along the Interstate 5 corridor.
The proposed installation will feature high-powered charging capabilities compatible with
both North American Charging Standard (NACS) and Combined Charging System (CCS)
connectors, ensuring accessibility for all electric vehicle makes and models. Along with an
amenity building that will provide a lounge, restrooms, and a small, unmanned
convenience store powered by Amazon’s “Just Walk Out” technology.
The unmanned convenience store will be accessible via QR code 24/7 to the public via
access through the lounge. Our lounge will also be 24/7, and open to the public with no QR
code from the hours of 9AM – 6PM.
Security will be via cameras on site, and we will partner with a security firm to dispatch as
necessary and only escalate to police if the situation calls for it. If the need arises, we have
a Phase 2 security plan that will have an onsite security guard, though IONNA does not
foresee this being a need.
The building and site trash from bins will be collected via a janitorial contract, and the site
will be checked daily for cleanliness.
This Rechargery represents an investment in Edina’s future by providing essential EV
charging infrastructure to the area. The location's proximity to major thoroughfares makes
it an ideal spot for drivers and local businesses, bringing an untapped market to the City.
The project will adhere to all required safety standards and will be designed to minimize
impact on existing infrastructure while maximizing accessibility for EV drivers.
Page 121 of 175
## Proposed Site Plan with Landscaping
Page 122 of 175
## Proposed EV Charging Station
Page 123 of 175
## Proposed EV Charging Station
Page 124 of 175
Page 125 of 175
## EdinaMN.gov
## 6016 Vernon Avenue –EV Charging Station Page Style
Page 126 of 175
## Zoning Map & Site Location
## Site Location
Page 127 of 175
## Land Use Map
## & Site Location
## Site Location
Page 128 of 175
## Proposed Charging Station
Page 129 of 175
## Floor Plan
Page 130 of 175
## Request Requires
➢A Comprehensive Guide Plan Amendment to re-guide the site from MDR, Medium
Density Residential to Neighborhood Node. The site is zoned PCD-4, in which a gas
station is a permitted use. A gas station is defined as “a principal building and its
accessory structures used for the sale of motor fuels and oils, where automotive accessories
and convenience goods may be sold, but where repair and servicing of motor vehicles does
not occur; provided, however, that an accessory carwash is permitted.”
➢Site Plan Review.
➢Multiple Variances: Drive Aisle/Parking Space Setbacks from 20 to 2 feet, Setback to
Residential Property from 50 and 110 feet to 12 and 60 feet, Canopy setbacks from 35
& 25 to 0 and 5 feet, Pump Island Setbacks from 20 to 10 and 0 feet, Patio setback
from 20 to 2 feet, Mechanical Equipment Setback from 35 to 13 feet, and Parking Lot
Setback from the Building from 10 to 2 and 6 feet. (See Compliance Table on page 9
of this staff report.)
Page 131 of 175
## Neighborhood
## Nodes
Page 132 of 175
## Pyramid of Discretion
Page 133 of 175
## Site Plan
Page 134 of 175
## Rendering
Page 135 of 175
## Mechanical Equipment
Page 136 of 175
## Fencing
Page 137 of 175
## Site Rendering
Page 138 of 175
## Landscape Plan
Page 139 of 175
## Lighting Plan
Page 140 of 175
## Zoning Ordinance Compliance Table
## City Standard (PCD-4)
## Proposed
Setbacks (Structure)
Front (Vernon)
## Front (EP Road)
Side (West)
Setbacks (Canopy)
Front (Vernon)
## Front (EP Road)
Side (West)
## Setbacks (Pump Islands)
Front (Vernon)
## Front (EP Road)
Side (West)
Setbacks (Parking lot)
Drive aisle (Vernon)
Drive aisle (EP Road)
Side (West)
## Setback from Residential Use
From adjacent property
From property separated by a
street
35 feet
25 feet
25 feet
35 feet
25 feet
25 feet
20 feet
20 feet
25 feet
20 feet
20 feet
10 feet
50 feet
110 feet
25 feet (existing)
20 feet (existing)
25 feet (existing)
0 feet*
10 feet*
40+ feet
0 feet*
10 feet*
50+ feet
0 feet*
10 feet*
12 feet
12 feet*
60 feet*
Parking Setback from Building 10 feet 6 & 8 feet*
Maximum Lot Size 60,000 s.f. 16,373 s.f.
Minimum Lot Size 15,000 s.f. 16,373 s.f.
Parking Stalls 1 space per employee plus 1 space per
300 square feet
5 stalls required
16 stalls
## FAR 30% 8%
Page 141 of 175
## Buildable Area
2’
13’
0’0’
2’
6’
6’
10’
## Proposed & Existing Setbacks
## Proposed Setbacks
Page 142 of 175
## Primary Issues
•Is the Comprehensive Plan Amendment reasonable?
•Are the proposed Variances justified?
Page 143 of 175
## Staff Recommendation
## Adopt the Resolutions approving the Comprehensive Plan
Amendment and Site Plan with Variances.
Page 144 of 175
## Resolution 2026-28: Comprehensive Plan
## Amendment
BE IT RESOLVED by the City Council of the City of Edina, Minnesota, as follows:
Section 1. BACKGROUND.
1.01. Ionna Rechargery is proposing to remodel the existing Kee’s auto repair shop at 6016 Vernon
Avenue into an electric vehicle charging station. An electric vehicle charging station is a
permitted use in the PCD-4 zoning district, in which this site is located. The site, however, is
guided for medium density residential use in the Comprehensive Plan.
1.02. The property is legally described as follows Tract C, Registered Land Survey No. 194, files of
the Registrar of Titles, except that part of said tract embraced within Registered Land Survey
No. 1081, Hennepin County, Minnesota.
1.03. To accommodate the request, the following is requested:
• A Comprehensive Plan Amendment from MDR, Medium Density Residential to
Neighborhood Node.
1.04. On April 29, 2026, the Planning Commission held a public hearing and recommended
approval of the requests. Vote: 9 Ayes and 0 Nays.
1.05. On June 2nd, 2026, the City Council held a public hearing and approved the requests.
## Section 2. FINDINGS
2.01. Approval is based on the following findings:
1. The proposed use and site plan to accommodate the use is consistent with the
previous land uses on this site. The existing building would be used rather than tearing
it down and replacing it. The proposal would be an improvement to the site
compared to current conditions.
2. The subject property has been used a commercial site with proper zoning for over 50
years. The proposed amendment is reasonable given the change in use from an
auto-repair and former gas station to an EV charging station and convenience store.
The Comprehensive Plan Amendment would then be consistent with the existing
commercial zoning on the site.
3. The proposed amendment would allow a re-development of a commercial property
that would be an amenity serving the area. A convenience store and lounge could be
a small-scale community gathering space for this neighborhood.
4. With the requirement of a fence located along the west and north lot lines and the
landscaping proposed, the project would be screened from adjacent residential land
uses to minimize impacts.
## Section 3. APPROVAL
NOW THEREFORE, it is hereby resolved by the City Council of the City of Edina, approves the
Comprehensive Plan Amendment to designate the site Neighborhood Node in the Comprehensive
Page 145 of 175
Plan based on the findings above.
Adopted by the City Council June 2, 2026.
Page 146 of 175
## Resolution 2026-29: Site Plan and Variances
BE IT RESOLVED by the City Council of the City of Edina, Minnesota, as follows:
Section 1. BACKGROUND.
1.01. Ionna Rechargery is proposing to remodel the existing Kee’s auto repair shop at 6016 Vernon
Avenue into an electric vehicle charging station. An electric vehicle charging station is a
permitted use in the PCD-4 zoning district, in which this site is located.
1.02. The property is legally described as follows Tract C, Registered Land Survey No. 194, files of the
Registrar of Titles, except that part of said tract embraced within Registered Land Survey No.
1081, Hennepin County, Minnesota.
1.03. To accommodate the request, the following is requested:
• Site Plan Review with the following Variances. Drive Aisle/Parking Space Setbacks from 20
to 2 feet, Setback to Residential Property from 50 and 110 feet to 12 and 60 feet, Canopy
setbacks from 35 & 25 to 0 and 5 feet, Pump Island Setbacks from 20 to 10 and 0 feet,
Patio setback from 20 to 2 feet, Mechanical Equipment Setback from 35 to 13 feet, and
Parking Lot Setback from the Building from 10 to 2 and 6 feet.
1.04. On April 29, 2026, the Planning Commission held a public hearing and recommended approval
of the requests. Vote: 7 Ayes and 2 Nays.
1.05. On June 2nd, 2026, the City Council held a public hearing and approved the requests.
## Section 2. FINDINGS
2.01. Approval is based on the following findings:
1. The proposed variances are reasonable given the practical difficulties associated with
the site including the triangular shape of the site, street frontage on two sides, and the
lots small size.
2. The project would include a restoration of the existing building; the expansion area
would the west, where the nearest building would be 105+/- feet away.
3. The proposed cedar fence along the west and north lot lines would minimize impact on
the adjacent residential use to the north and west.
4. The proposal would be an improvement over existing conditions and use of the site.
## Section 3. APPROVAL
NOW THEREFORE, it is hereby resolved by the City Council of the City of Edina, approves Site Plan and
variances. Approval is subject to the findings in Section 2 above, and the conditions below:
1. The Final Landscape Plan must meet all minimum landscaping requirements per Chapter 36 of
the Zoning Ordinance. A performance bond, letter-of-credit, or cash deposit must be submitted
for one and one-half times the cost amount for completing the required landscaping,
Page 147 of 175
screening, or erosion control measures at the time of any building permit. The property owner is
responsible for replacing any required landscaping that dies after the project is built.
2. Compliance with all the conditions outlined in the city engineer’s memo dated April 22, 2026.
3. Variances are subject to approval of the Comprehensive Plan Amendment, Site Plan approval
by City Council.
4. Submit a copy of the Nine Mile Creek Watershed District permit. The City may require revisions
to the approved plans to meet the district’s requirements.
5. A cedar fence must be installed and maintained along the west and north lot line as proposed
to provide screening from adjacent properties.
6. A boulevard-style sidewalk must be constructed along Vernon Avenue. Sidewalk must be 6 feet
minimum width with a 5-foot minimum width boulevard.
7. Noise levels from the site shall not exceed City Code (State Statutes).
Adopted by the City Council June 2, 2026.
Page 148 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 9.1 Department: Administration
## Item Activity: Action Prepared By: Sharon Allison, City Clerk
## Item Title: Resolution 2026-30: Accepting Donations
## Action Requested:
Approve Resolution 2026-30 accepting donations.
## Information/Background:
To comply with State Statute, all donations to the City must be accepted by resolution and approved
by two-thirds majority of the Council.
## Supporting Documentation:
## None
Page 149 of 175
## Resolution 2026-30: Accepting Donations
Whereas Minnesota Statute 465.03 allows cities to accept grants and donations of real or personal
property for the benefit of its citizens; and
Whereas said donations must be accepted via a resolution of the Council adopted by a two-thirds
majority of its members.
Now, therefore, be it resolved that the Edina City Council accepts with sincere appreciation the
following listed donations on behalf of its citizens.
## Parks & Recreation
## Matt and Jennifer Wilson $350 Tree Donation
## Bruce and Diane Kirking $3,200 Bench Donation
## Jonathon Gross $3,200 Bench Donation
## Anne Kraft $3,200 Bench Donation
Dated: June 2, 2026
Page 150 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 9.2 Department: Administration
## Item Activity: Action Prepared By: Sharon Allison, City Clerk
Item Title: Recommendation to Limit In-Person Primary Election Voting to the 18-Day Early Voting
## Period
## Action Requested:
Approve limiting in-person Primary Election voting at City Hall to the statutory 18-day Early Voting
period beginning with the 2026 Primary Election.
## Information/Background:
Staff recommends limiting in-person voting at City Hall for Primary Elections to the statutory 18-day
Early Voting period rather than offering the full 46-day in-person voting period. This recommendation
is based on:
• Operational efficiency
• Staffing sustainability and capacity
• Fiscal responsibility
• Historical voter usage trends
• Preservation of City Hall operations and resources
This recommendation applies only to Primary Elections. Staff is not recommending a change to
General Election voting operations at this time due to significantly higher voter participation and
demand.
## Background
Recent legislative changes provide municipalities with flexibility to offer either:
## Option 1: Full 46-Day Voting Period
• 28 days of Absentee Voting
• 18 days of Early Voting
## Option 2: Early Voting Period Only
• 18 days of Early Voting
The legislation was supported by local government organizations to provide municipalities flexibility
based on community needs, staffing resources, and operational capacity.
The purpose of this flexibility is to allow cities to align election operations with local demand while
maintaining voter access.
## Voter Usage Trends
Page 151 of 175
Historical election data indicates that Primary Election turnout remains comparatively modest and
that most in-person voting activity occurs during the final 18 days before Election Day. Key
observations include:
• Primary Election participation is substantially lower than General Election participation.
• The highest concentration of in-person voter traffic occurs during the final 18-day voting
period.
• Earlier absentee voting periods experience lower and less consistent voter volume.
• Voter preference has increasingly shifted toward direct ballot voting at City Hall during the final
18 days.
By comparison, General Elections experience significantly different voting patterns and support
maintaining broader in-person access. For example:
• During the 2024 General Election, City Hall processed approximately 778 voters per day on
average, with one day approaching 1,000 voters.
## Fiscal Impact
Estimated temporary staffing costs for the upcoming Primary Election are outlined below:
Limiting in-person voting operations to the 18-day period would reduce estimated temporary staffing
costs by approximately $8,000, excluding additional indirect operational expenses.
## Operational Impacts
Extended voting operations affect multiple City Hall functions beyond election administration.
## Facility and Resource Impacts
• Increased parking constraints for employees and visitors
• Relocation of City vehicles during peak periods
• Greater use of remote work arrangements to accommodate parking needs
• Reduced availability of shared public spaces
## Space and Meeting Impacts
• Council Chambers function as both a voting location and meeting space
• Extended voting periods require repeated room setup and breakdown
• An 18-day model reduces operational disruption
## Service Impacts
Extended election operations create competing demands on staff and resources that affects other
## Voting Period Estimated Temporary Staffing Cost
## First 28 Days (Absentee Voting Period) $8,000
## Final 18 Days (Early Voting Period) $15,000
Page 152 of 175
City services and priorities.
## Staffing Sustainability and Capacity
Election administration requirements continue to expand and now include:
• Two required Saturdays of voting
• One required Sunday of voting
• Extended weekday hours through 7:00 p.m.
• Increased staffing requirements related to ballot security and election operations
Additional considerations for the 2026 election cycle include:
• Deputy City Clerk vacancy and transition activities
• Recruitment, scheduling, training, and certification of 200 election judges and approximately 14
temporary election staff
• Pollbook and Head Judge training responsibilities
• Election equipment and materials preparation
Limiting Primary Election voting operations would allow staff to prioritize these critical activities and
better position the organization for successful election administration.
## Continued Voter Access
Limiting in-person voting at City Hall to the 18-day Early Voting period would not eliminate voter
access options.
Voters would continue to have multiple methods available to cast a ballot:
1. Vote by mail through Hennepin County
2. Drop off mail ballots at City Hall for secure transport to Hennepin County
3. Vote in person at Hennepin County locations during the 28-day Absentee Voting period
4. Vote in person at City Hall during the 18-day Early Voting period
5. Vote at assigned polling locations on Election Day
Multiple accessible voting options would remain available throughout the election period.
## Staff Recommendation
Based on historical voter usage trends, projected cost savings, staffing considerations, and
operational impacts, staff recommends limiting in-person Primary Election voting at City Hall to the
statutory 18-day Early Voting period. Staff is required to notify Hennepin County by June 12, 2026.
## Appendix A: Supporting Election Data
Recent Voting Activity 2022 Primary 2022 General 2024 Primary 2024 General
Total Absentee Voting 1,813 11,340 1,728 20,848
Total Voting at City Hall 1,158 7,539 952 14,992
Envelope Voting (28 days) 415 3,968 225 3,650
Page 153 of 175
## Key Observations
• Primary Election turnout remains significantly lower than General Election turnout.
• Voters increasingly prefer direct ballot voting at City Hall.
• Direct ballot (18 days) activity during the final voting period substantially exceeds earlier
envelope (28 days ) voting activity.
• General Election demand demonstrates significantly different usage patterns and supports
maintaining broader access.
## Election Administration Workload
Over the last six years, the City Clerk Division has administered 14 elections, creating an increasingly
continuous election cycle affecting staffing capacity and operational priorities.
Key impacts include:
• Election planning and preparation frequently spans several months
• Recruitment and training activities overlap with active election administration
• Election responsibilities occur alongside regular City Clerk operations and service delivery
Direct Ballot Voting (18 days) 743 3,755 727 11,672
Mail Ballots (Hennepin County) 1,000 4,789 1,660 7,300
## Resources/Financial Impacts:
Fiscal, operational, facility, staffing, and service impacts associated with this recommendation are
detailed within the staff report above.
## Relationship to City Policies/Plans/Budget Pillars:
This recommendation supports the City’s Strong Foundation and Reliable Service budget pillars by
aligning election operations with demonstrated voter demand while maintaining accessible voting
options. The proposed approach promotes responsible stewardship of City resources, supports
sustainable staffing practices, and allows the organization to maintain high-quality election
administration alongside other core City services.
## Strong Foundation
## Reliable Service
## Values Impact:
## Engagement
Residents will continue to have multiple accessible voting options
available, including mail voting, in-person early voting, and Election Day
voting opportunities.
## Equity
The recommendation maintains equitable voter access by preserving
multiple voting methods and ensuring continued compliance with
election accessibility requirements.
Page 154 of 175
## Health
The recommendation supports employee wellbeing by helping balance
operational demands and reducing prolonged staffing impacts
associated with extended election operations.
## Stewardship
The recommendation supports responsible stewardship of public
resources by aligning staffing, facility usage, and operational costs with
actual voter participation trends.
## Sustainability
Limiting the in-person voting period for Primary Elections supports long-
term operational sustainability by reducing strain on staffing capacity,
facilities, and organizational resources during an increasingly
continuous election cycle.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 155 of 175
## Item Report
June 2, 2026
## City Council
## Item Number: 10.1 Department: Administration
Item Activity: Information Prepared By: MJ Lamon, Special Projects & Engagement
## Manager, Nelly Chick-Brewer, Assistant Finance Director
Item Title: Quarterly Financial Report and Strategic Plan Updates – Q1 2026
## Action Requested:
None.
## Information/Background:
The attached Q1 2026 Quarterly Financial Report provides an overview of the City’s financial position
and operational performance through the first quarter of the fiscal year. Staff continues to monitor
revenues, expenditures, capital projects, and external economic conditions to ensure alignment with
the City Council’s adopted budget and strategic priorities. In addition to the financial report, quarterly
updates have been completed for the City’s strategic plans and work plans within the Progress Portals.
These updates provide transparency into ongoing initiatives, project milestones, and organizational
priorities identified through the 2026-2027 strategic planning and work plan development process.
Highlighted Q1 accomplishments and areas of significant activity include:
• Advanced major infrastructure initiatives, including continued planning for Fire Station #3,
Braemar Ice Arena improvements, Fred Richards Park improvements, and sanitary sewer
capacity expansion projects
• Continued implementation of public safety and employee wellbeing initiatives, including
expanded social disruption tracking tools, peer support coordination, and mental-health
response collaboration with Hennepin County through the Alternative Response Team (ART)
and COPE program
• Advanced organizational efficiency and innovation efforts through citywide exploration of
artificial intelligence and process automation tools, including development of an AI Use Case
Library and expanded use of workflow automation technologies
• Continued advancement of affordable housing initiatives, including rehabilitation and sale of
affordable ownership housing units through community land trust partnerships and evaluation
of future redevelopment opportunities for City-owned land
• Advanced zoning code modernization efforts through Planning Commission and City Council
work sessions focused on lot size, setbacks, district organization, and user-friendly code
improvements
• Progressed the Safe & Equitable Mobility Action Plan (SEMAP), including draft plan review and
preparation for City Council consideration
• Continued efforts to improve inclusive community engagement practices through expansion of
Edina U, enhanced outreach strategies to renters, and development of additional Volunteer
Edina opportunities across departments
Page 156 of 175
The Progress Portals continue to serve as the City’s centralized platform for tracking organizational
goals, budget work plan initiatives, and strategic outcomes. The public may review updated work plan
information through the links below:
## 2026-2027 Budget Work Plan
## 2026 Advisory Commission Work Plans
## Climate Action Plan
## Supporting Documentation:
## 1. Q1 2026 Financial Report-Final
Page 157 of 175
## Quarterly Financial Report
## First Quarter Ended March 31
st
, 2026
## Prepared by Finance Department
Page 158 of 175
## Table of Contents
## Cash & Investment Balances..........................................................3
## Investments...........................................................................4-6
## Statement of Revenues & Expenditures, General Fund........................7-8
## Statement of Revenues & Expenses, Major Enterprises......................9-10
## Statement of Revenues & Expenses, Non-Major Enterprises..................11
## Utility Fund............................................................................12
## Edina Liquor, Braemar Golf Course................................................13
## Edina Aquatic Center, Braemar Arena.............................................14
## Edina Art Center, Edinborough Park................................................15
## Centennial Lakes Park, Braemar Field...............................................16
## Enterprise Cost Recovery............................................................17
## Glossary.................................................................................18
Page 159 of 175
12/31/25 Balance 3/31/26 Balance
## YTD Change
## YTD % Change
## General
General42,440,477$ 31,031,746$ (11,408,731)$ -27%
## Special Revenue
Police Special Revenue1,082,485 1,108,906 26,421 2%
Braemar Memorial132,156 101,672 (30,484) -23%
Pedestrian and Cyclist Safety(373,866) (518,927) (145,061) 39%
Conservation & Sustainability919,888 1,123,450 203,562 22%
Housing & Redvlpmt Authority20,493,665 17,623,158 (2,870,507) -14%
## Local Affordable Housing Aid1,014,724 955,552 (59,172) -6%
Opioid Epidemic Response277,667 271,957 (5,710) -2%
Public Safety Fund1,832,225 1,832,929 704 0%
Total25,378,944 22,498,697 (2,880,247) -11%
## Debt Service
Debt Service8,376,910 882,697 (7,494,213) -89%
## Construction
Capital Projects14,783,064 8,796,214 (5,986,850) -40%
Equipment Replacement4,003,128 3,882,724 (120,404) -3%
PIR Capital Projects14,951,391 15,053,323 101,932 1%
Street Lighting Fund(24,745) (23,433) 1,312 -5%
MSA Tracking(1,445,830) (1,920,342) (474,512) 33%
Special Street Levy5,534,033 5,504,037 (29,996) -1%
P&R Spec Park Impr Levy (SPIL)2,066,129 2,075,477 9,348 0%
Local Sales Tax (LST)31,917,592 34,222,789 2,305,197 7%
Total71,784,762 67,590,789 (4,193,973) -6%
## Park Enterprise
Art Center206,592 124,416 (82,176) -40%
Braemar Golf Course4,232,252 3,758,706 (473,546) -11%
Aquatic Center2,247,484 2,098,924 (148,560) -7%
Edinborough Park(394,617) (650,021) (255,404) 65%
Braemar Arena408,009 14,494 (393,515) -96%
Braemar Field1,540,116 1,711,827 171,711 11%
Centennial Lakes1,016,018 762,515 (253,503) -25%
Total9,255,854 7,820,861 (1,434,993) -16%
## Liquor
Liquor524,749 391,070 (133,679) -25%
## Utility
Utility Fund49,430,053 46,245,008 (3,185,045) -6%
## Internal Services
Risk Management3,946,633 4,232,518 285,885 7%
Equipment Operations1,441,676 1,281,875 (159,801) -11%
Information Technology704,398 774,024 69,626 10%
Facilities Management652,502 717,106 64,604 10%
Total6,745,209 7,005,523 260,314 4%
Grand Total213,936,958$ 183,466,391$ (30,470,567)$ -14%
## Unaudited Cash & Investment Balances by Fund
## For Quarter Ended March 31st, 2026
3
Page 160 of 175
## Investments
The City of Edina (CoE) investments are held in the following accounts.
Money Market: This account is internal. The balance in this account at the end of Q1 is $94M. The City
uses a network of four institutional brokers who recommend securities in compliance with our
investment policy. Funds in this account are managed primarily for cash flow purposes and annual debt
service payments.
Investment Sweep: This account is internal. The balance in this account at the end of Q1 is $2.4M. The
City uses a network of four institutional brokers who recommend securities in compliance with our
investment policy. Funds in this account are managed primarily for cash flow purposes and annual debt
service payments.
PFM Asset Management: PFM is the City’s outside investment manager, they oversee a $47M
portfolio for the City. These securities are held in a custodian account at U.S. Bank. Funds in this account
are not needed for cash flow and can be invested in longer maturities. Allowable investments include U.S.
Treasuries and Agencies up to, but not including, ten years and agency mortgage-backed pass-through
securities guaranteed by Fannie Mae (FNMA) and Freddie Mac (FHLMC).
2022B Fire Station 2: This account holds proceeds from 2022B. Q1 balance is $299k. Funds were
needed to finance site acquisition and design of Fire Station 2.
2023A All Streets: This account holds proceeds from 2023A. Q1 balance is $432k. Funds were needed
to finance Lift Station replacements, sanitary and storm sewer improvements, Morningside and Brook Dr
street reconstruction.
2024A Streets, Fire Station 2 and Eden Wilson: This account holds proceeds from 2024A. Q1
balance is $2.9M. Funds were needed to finance Fire Station 2, reconstruction of several local streets,
storm and sanitary sewer improvements and lift station improvements.
2024B LOST and Fire Station 2 Refunding: This account holds proceeds from 2024B. Q1 balance is
$4.3M. Funds were needed for the refunding of 2023C (Fire Station 2) and to finance Local Option Sales
Tax (LOST) projects Fred Richards Park and Braemar Park & Arena.
2024C Edina West HIA: This account holds proceeds from 2024C. Q1 balance is $29k. Funds were
needed to refinance construction of common area housing improvements in the Edina West
Condominium Association Housing Improvement area.
LOST Tax Proceeds: This account holds proceeds from Local Options Sales Tax (LOST). Q1 balance
is $20.9M. Funds are to finance LOST projects Fred Richards and Braemar Arena.
2025A Streets, FS2, Utilities: This account holds proceeds from 2025A. Q1 balance is $5.5M. Funds
were needed to finance Fire Station 2, Presidents A & B neighborhood roadway reconstruction and utility
infrastructure improvements.
2025B TH100, Aquatic Center: This account holds proceeds from 2025B. Q1 balance is $4.2M. Funds
were needed to finance Vernon Ave and Highway 100 Interchange street reconstruction and the Edina
Aquatic Center facility improvements.
4
Page 161 of 175
## Investments
For the month ended March 31
st
, 2026
## Investment Type Base Market Value + Accrued Percent of Total
Cash $ (140,609) 0%
Brokered CD 11,186,114 7%
## ABS* 302,495 0%
Government Securities 52,027,697 34%
Money Market 24,855,752 16%
Mortgage Securities 13,861,352 9%
Municipal Securities 51,025,472 33%
## Total
$ 153,118,273
100%
Average Maturity (Years) 3.32
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
## < 1 Year1-3 Years3-5 Years5-10 Years> 10 Years
## Maturities
## Base Market Value + AccruedBase Book Value
*Asset-Backed Security
5
Page 162 of 175
## Investments
The following are yields for current investments against a similar benchmark. The internal and
external portfolios have different investment strategies.
INTERNAL: The internal is intended to remain sufficiently liquid to enable the City to manage
daily City cash flow as well as make debt payments. The average days to maturity for the
internal portfolio is approximately two years (including the money market account). Maturities
range from one day (money market) to nine years.
EXTERNAL: The external portfolio has longer term investment options to optimize return
within our investment policy. The external portfolio benchmark of Bloomberg Barclays
Intermediate U.S. Government/Mortgage Index represents an investment pool including U.S.
Treasuries and Agencies up to, but not including, nine years and agency mortgage-backed pass-
through securities guaranteed by Fannie Mae (FNMA) and Freddie Mac (FHLMC). The average
maturity for the external portfolio is eight years with maturities ranging from one month to 26
years. The later maturities represent mortgage-backed securities.
## Total Return, Net of Fees
## Account/Index
## Trailing
## Month
Trailing 3
Mos.
Trailing 6
Mos.
Trailing 12
Mos.
ICE BofA 0-1 Year US Treasury Notes & Bonds 0.238% 0.787% 1.836% 4.034%
CoE Main -0.503%0.540% 1.593% 4.183%
## City of Edina: Bloomberg Barclays Intermediate
## U.S. Government/Mortgage Index
-1.390%0.230% 1.666% 4.888%
CoE – PFM -1.062%0.285% 1.456% 4.346%
Index Total -0.289%0.605% 1.781% 4.326%
Account Total -0.684%0.455% 1.549% 4.246%
6
Page 163 of 175
## General Fund
## Statement of Revenues & Expenditures - General Fund
## For Quarter Ended March 31st, 2026
2025 YTD 2026 YTD 2026 Budget
% of
## Budget
## Revenues
Property Taxes $ - $ - $ 53,012,940 0%
Franchise Fees - - 715,000 0%
Lodging Tax 3,829 14,620 20,400 72%
Licenses & Permits 2,160,506 2,581,875 5,775,325 45%
Intergovernmental 177,786 172,610 2,383,595 7%
Charges for Services 1,440,611 1,304,314 6,695,303 19%
Fines & Forfeitures 132,483 123,335 500,000 25%
Investment Income 2,465,263 390,397 450,000 87%
Rental of Property 34,740 341,393 545,000 63%
Other Revenue 24,329 49,423 16,000 309%
Total Revenues 6,439,548 4,977,968 70,113,563 7%
## Expenditures
Personnel Services 9,138,759 9,719,092 48,917,183 20%
Contractual Services 1,843,901 2,014,494 11,466,543 18%
Commodities 212,183 329,250 2,463,468 13%
Internal Services 1,515,914 1,720,702 6,882,806 25%
Capital Outlay 35,427 7,282 - N/A
Debt Service 3,017 - - N/A
Total Expenditures 12,749,201 13,790,819 69,730,000 20%
## Revenues Over (Under)
Expenditures (6,309,653) (8,812,851) 383,563
Transfers In (Out) 48,122 45,359 (383,563) -12%
## Net Increase (Decrease)
In Fund Balance $ (6,261,531) $ (8,767,492) $ (0)
Commentary is included for categories that have variances greater than or less than 25% compared
to the budget. This applies to the General Fund, Major Enterprises and Non-Major Enterprises.
## Revenues
• Property Taxes are 0% compared to $53M annual budget in Q1. It’s the primary source of
revenue and is received in June and December.
• Franchise Fees are 0% of budget in Q1, since the quarterly payments are received on one
month lag, hence Q1 payments received in Q2.
• Lodging Tax is 72% of budget in Q1. 95% of lodging tax received is paid to Explore Edina.
Variance is due to timing of payment to Explore Edina.
7
Page 164 of 175
## General Fund Continued
•Licenses & Permits are 45% of budget in Q1. Building permit revenue fluctuates based on the
number of permits and valuations. 342 Building Permits were issued in Q1.
•Intergovernmental revenue is 7% of budget. The variance is largely due to timing on revenue
payments. Budget is largely made of state aid, and payment timing varies throughout the year.
•Charges for Services are 19% of budget, due to lower activity in Ambulance and Registration
in Q1. Services are billed to other funds and external vendors.
•Investment Income is 87% of annual budget. $532K income received on investment income,
excluding unrealized gains/losses. Unrealized gains/losses and Interest allocation booked at year-
end, creating budget variance.
•Building Rental is 63% of budget. The account is made up of Park and Cell Tower rental. Cell
Tower rental billed upfront for the year.
•Other Revenue is 309% and $33K over budget, driven by Donations and Sale of Equipment.
## Expenses
•Personnel Services is at 20% of budget, variance primarily due to payroll cutoff in Q1. Seven
Q1 payroll days paid in Q2.
•Contractual Services accounts are18% of budget, due to lag in monthly invoices creating
budget variance.
•Commodities are 13% of budget, due to lag in monthly invoices creating budget variance.
•Transfers In (Out) are 12% over budget. Operating Transfers has not been entered yet,
pending audit completion. Current $45K balance due to Utility Contribution in Q1.
8
Page 165 of 175
2025 YTD 2026 YTD 2026 Budget
% of
## Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget
## Operating Revenues
Sales7,095,269$ 7,202,332$ 35,217,740$ 20%2,439,342$ 2,279,244$ 10,960,000$ 21%-$ -$ 157,685$ 0%
Memberships- - - N/A- - - N/A- (81) 320,000 0%
Admissions- - - N/A- - - N/A- - 591,000 0%
Building Rental- - - N/A- - - N/A- - 84,716 0%
Equipment Rental- - - N/A- - - N/A- - - N/A
Greens Fees- - - N/A- - - N/A- - - N/A
Other Fees16,553 435,699 - N/A- - - N/A(165) - 7,500 0%
Total Operating Revenues7,111,822 7,638,031 35,217,740 22% 2,439,342 2,279,244 10,960,000 21%(165) (81) 1,160,901 0%
## Operating Expenses
Cost of Sales & Services- - - N/A1,652,541 1,524,721 7,348,000 21%1,296 - 81,500 0%
Personnel Services634,811 677,641 3,957,086 17%563,941 407,942 1,786,618 23%19,040 20,865 696,847 3%
Contractual Services2,313,746 2,976,004 11,060,699 27%142,135 166,151 820,569 20%19,362 14,612 341,188 4%
Commodities132,665 216,942 1,419,150 15%14,341 9,160 51,500 18%2,315 4,243 159,121 3%
Internal Services410,546 450,362 1,801,447 25%114,752 100,839 403,356 25%13,134 18,735 74,939 25%
Depreciation1,541,805 1,608,081 - N/A31,284 30,840 - N/A50,628 49,872 - N/A
Capital Outlay- 8,557 22,676,037 0%- - - N/A- - - N/A
Total Operating Expenses5,033,572 5,937,588 40,914,419 15%2,518,995 2,239,652 10,410,043 22%105,775 108,328 1,353,595 8%
Operating Income (Loss)2,078,250 1,700,443 (5,696,679) -30%(79,653) 39,592 549,957 7%(105,940) (108,409) (192,694) 56%
## Non Operating Revenues
(Expenses)
Intergovernmental(213) (200) 182,000 0%- - - N/A- - - N/A
Investment Income46,171 159,576 447,020 36%- (1,278) 45,320 -3%- 4,269 49,440 9%
Interest & Fiscal Charges(822,806) (872,831) (1,643,406) 53%- - - N/A(5,700) (3,900) (5,900) 66%
Other Non Operating270 1,260 5,000 25%(30) - - N/A- 4,000 - N/A
## Total Non Op Revenues
(Expenses)
(776,579) (712,195) (1,009,386) 71%(30) (1,278) 45,320 -3%(5,700) 4,369 43,540 10%
## Net Income (Loss) Before
## Transfers
1,301,672 988,248 (6,706,065) (79,682) 38,314 595,277 (111,640) (104,040) (149,154)
Transfers In (Out)(106,086) (90,978) (517,051) 18%1,268 1,219 (644,600) 0%1,491 1,837 19,400 9%
Net Income (Loss) 1,195,586$ 897,270$ (7,223,116)$ (78,414)$ 39,533$ (49,323)$ (110,150)$ (102,203)$ (129,754)$
## Statement of Revenues & Expenses - Major Enterprise Funds
## For Quarter Ended March 31st, 2026
## UtilitiesLiquorAquatic Center
9
Page 166 of 175
2025 YTD 2026 YTD 2026 Budget
% of
Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget
## Operating Revenues
Sales35,887$ 25,922$ 434,250$ 6%123,053$ 91,277$ 322,500$ 28%
Memberships96,944 106,588 340,000 31%- - - N/A
Admissions894,227 898,025 1,400,000 64%60,955 77,888 196,250 40%
Building Rental20,797 21,226 200,000 11%846,469 654,897 2,402,000 27%
Equipment Rental- 183 509,000 0%2,798 4,344 - N/A
Greens Fees142,681 117,201 3,357,000 3%- - - N/A
Other Fees551 (10) 34,150 0%34,382 38,565 78,375 49%
Total Operating Revenues1,191,087 1,169,137 6,274,400 19%1,067,658 866,971 2,999,125 29%
## Operating Expenses
Cost of Sales & Services43,670 28,229 306,000 9%61,000 41,064 128,125 32%
Personnel Services477,506 495,294 2,906,674 17%365,840 376,923 1,639,083 23%
Contractual Services231,577 234,095 933,677 25%204,093 329,111 1,286,102 26%
Commodities45,174 67,204 508,050 13%16,167 10,254 160,363 6%
Internal Services114,301 148,658 594,633 25%68,873 84,610 338,439 25%
Depreciation195,375 189,957 - N/A129,177 128,010 - N/A
Capital Outlay5,871 - 571,000 0%709 - - N/A
Total Operating Expenses1,113,474 1,163,437 5,820,034 20%845,859 969,972 3,552,112 27%
Operating Income (Loss)77,612 5,699 454,366 1%221,798 (103,001) (552,987) 19%
## Non Operating Revenues
(Expenses)
Intergovernmental- - 1,500 0%- - - N/A
Investment Income- 12,37853,560 23%- (716) 13,390 -5%
Interest & Fiscal Charges(100,372) (88,672) (165,194) 54%(26,445) (23,955) (43,025) 56%
Other Non Operating- - - N/A(1,940) 6,000 - N/A
## Total Non Op Revenues
(Expenses)
(100,372) (76,294) (110,134) 69%(28,385) (18,671) (29,635) 63%
## Net Income (Loss) Before
## Transfers
(22,760) (70,595) 344,232 193,413 (121,671) (582,622)
Transfers In (Out)16,860 16,817 100,700 17%18,927 10,061 192,250 5%
Net Income (Loss) (5,900)$ (53,778)$ 444,932$ 212,340$ (111,610)$ (390,372)$
## Statement of Revenues & Expenses - Major Enterprise Funds
## For Quarter Ended March 31st, 2026
## Golf CourseArena
10
Page 167 of 175
2025 YTD 2026 YTD 2026 Budget
% of
## Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget 2025 YTD 2026 YTD 2026 Budget
% of
## Budget
## Operating Revenues
Sales-$ -$ -$ N/A36,295$ 26,549$ 73,000$ 36%17,888$ 13,220$ 30,000$ 44%-$ -$ -$ N/A
Memberships- - - N/A39,835 32,108 163,940 20%- - - N/A- - - N/A
Admissions35,546 37,319 125,000 30%288,210 203,903 809,000 25%- -800 0%15,159 16,701 30,750 54%
Building Rental- - - N/A81,925 71,672 245,150 29%1,468 10,488 93,000 11%267,668 334,655 538,900 62%
Equipment Rental- - - N/A- - - N/A169,291 111,306 195,000 57%- - - N/A
Greens Fees- - - N/A- - - N/A- - 300,000 0%- - - N/A
Other Fees75 - - N/A60,854 80,955 239,708 34%86,930 115,250 363,959 32%175 5 500 1%
Total Operating Revenues35,621 37,319 125,000 30%507,120 415,185 1,530,798 27%275,576 250,264 982,759 25%283,002 351,361 570,150 62%
## Operating Expenses
Cost of Sales & Services- - - N/A16,078 14,722 39,500 37%5,602 4,167 15,000 28%- - - N/A
Personnel Services61,617 72,938 340,623 21%278,645 285,956 1,264,187 23%176,413 209,127 1,041,847 20%62,857 67,864 224,433 30%
Contractual Services11,643 9,041 83,824 11%103,014 105,230 501,678 21%41,950 36,359 427,645 9%45,821 67,731 301,414 22%
Commodities4,404 3,675 29,275 13%31,604 40,367 207,456 19%15,079 15,438 149,805 10%117 198 19,675 1%
Internal Services13,410 15,761 63,043 25%45,024 64,766 259,064 25%36,830 44,333 177,334 25%9,353 24,550 98,199 25%
Depreciation1,368 945 - N/A69,531 66,747 - N/A41,208 41,340 - N/A133,692 132,144 - N/A
Capital Outlay- - - N/A- - - N/A- - - N/A- - 200,000 0%
Total Operating Expenses92,441 102,360 516,765 20%543,895 577,788 2,271,885 25%317,081 350,765 1,811,631 19%251,840 292,487 843,720 35%
Operating Income (Loss)(56,821) (65,041) (391,765) 17%(36,776) (162,603) (741,087) 22%(41,505) (100,500) (828,872) 12%31,162 58,875 (273,570) -22%
## Non Operating Revenues
(Expenses)
Investment Income- 426 4,120 10%- - 10,300 0%- 2,122 4,936 43%- 3,442 26,780 13%
Other Non Operating800 900 - N/A- 6,000 - N/A- 7,200 - N/A- -- N/A
## Total Non Op Revenues
(Expenses)
800 1,326 4,120 32%- 6,000 10,300 58%- 9,322 4,936 189%- 3,442 26,780 13%
## Net Income (Loss) Before
## Transfers
(56,021) (63,715) (387,645) (36,776) (156,603) (730,787) (41,505) (91,178) (823,936) 31,162 62,317 (246,790)
Transfers In (Out)401 413 501,025 0%5,345 3,866 721,000 1%6,944 4,533 446,532 1%260 217 1,330 16%
Net Income (Loss) (55,620)$ (63,303)$ 113,380$ (31,431)$ (152,737)$ (9,787)$ (34,561)$ (86,645)$ (377,404)$ 31,422$ 62,534$ (245,460)$
## Art CenterEdinborough ParkCentennial Lakes ParkBraemar Field
## Statement of Revenues & Expenses - Non Major Enterprise Funds
## For Quarter Ended March 31st, 2026
11
Page 168 of 175
## Major Enterprises - Utility Fund
## Revenues
• For 2026, Utility user rates were increased between 5.25-15% based on the recommendations
from the utility rate study in 2025. Q1 sales revenues are up $107K and trending 20% to budget
due to lower water usage during winter months.
• There is a $435K increase in other fees when compared to PY Q1, this increase is driven by
payments received from Napoli Shkolnik for the PFAS (per-and polyfluoroalkyl substances)
settlement.
• Intergovernmental revenues are payments from the County’s recycling and organic score grant
programs to be received later in the year.
• Investment income increased by $113K and trending above budget at 36% due to favorable
market conditions.
• Interest and Fiscal charges are at 53% of budget due to the first of two annual debt payments
being made in Q1.
## Expenses
• Q1 total operating expenses are up $904K or 18% year over year and trend below budget at
15%. The increase is mainly due to increases in contractual services, commodities and
personnel expenses.
• Personnel expenses are below budget at 17% being down one FTE in Q1.
• Contractual services are higher at 27% of budget mostly due to a $626K increase in sewer
service payment to the Metropolitan Council.
• Commodities are up $84K and are trending below budget at 15% because of lower water
demands due to weather and seasonal conditions.
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
## JanuaryFebruaryMarch
## Thousands of Gallons
## Water Pumped from Wells
2023 2024 2025 20262016-2026 Average Water Pumped
12
Page 169 of 175
## Major Enterprises - Golf Course & Liquor
## Golf Course
## Revenues
• Q1 revenues are down $22K and trend below budget, at 19%, related to seasonality.
• Admissions are over budget, at 64%, related to dome activity during the cooler months.
• Greens Fees are down $25K or 18% year over year and make up 3% of budget. This is
expected to increase in late Spring and Summer.
o Sales, Building and Equipment Rental, and Other Fees all trend significantly under
budget, as is expected at this point in the season. These categories are anticipated to
increase in late Spring and Summer.
## Expenses
• Q1 expenses are up $50K and trend slightly below budget at 20%.
• Cost of Sales and Services are below budget at 9% in response to sales.
• Personnel Services are below budget at 17% as greater personnel costs are expected during
the busier operational months.
• Commodities are up $22K due to course maintenance equipment purchases. However,
commodities are currently below budget at 13% related to seasonality.
• Internal Services are up $34K related to additional budgeted shared management costs.
## Liquor
## Revenues
• Q1 revenues are down $160K and slightly under budget at 21%. This is attributable to a
general shift in consumer confidence and lingering construction impact on ease of store
accessibility.
## Expenses
• Q1 expenses are down $279K or 11% year over year and slightly under budget at 22%.
• Cost of Sales and Services are below budget at 21% in response to sales.
• Personnel Services are down $156K due to hibernation of several extended part-time
positions. Current year expenses are trend as expected relative to budget, at 23%.
• Contractual Services and Commodities trend slightly under budget, at 20% and 18%, mostly
related to professional services, supplies, advertising and credit card fees.
-
25,000
50,000
75,000
100,000
125,000
150,000
## 202320242025YTD 2026
## Dome Timed Golf & Course Range Buckets
## # of Range Buckets# of Dome Timed Golf
13
Page 170 of 175
## Major Enterprises - Arena & Aquatic Center
## Braemar Arena
## Revenues
•Q1 revenues are down $201K and trend as expected relative to budget, at 29%.
•Other Fees are ahead of budget, at 49%, due to cash over/short.
•Admissions are over budget, at 40%, related to daily skating fees and class registrations.
•Building Rental is down $192K or 23%, due to timing of ice rental payments, loss of tenant
space rental, and construction impacts. Current year trends slightly over budget, at 27%.
•Sales trend slightly over budget due to higher than anticipated concessions sales.
## Expenses
•Q1 expenses are up $124K or 15% year over year, however, trend slightly over budget, at
27%.
•Cost of Sales & Services are above budget, at 32%, in response to concession sales.
•Contractual Services are up $125K due to current year water heater replacements and
emergency repairs. Current year trends slightly over budget, at 26%.
•Personnel Services are slightly under budget, at 23%, due to less than expected overtime.
•Commodities are significantly under budget, at 6%, specifically, supplies and printing for
which costs are incurred as needed based on operational demand.
## Aquatic Center
The Aquatic Center is currently closed for the season and will re-open on June 4
th
, 2026.
## Revenues
•Revenues are expected to be received beginning in the second quarter with the opening of
the Aquatic Center.
## Expenses
•Q1 expenses are up $3K and trend significantly below budget as majority of costs are
expected to be incurred during operational months.
•Cost of Sales & Services, Personnel Services, Contractual Services and Commodities all
trend under budget and are anticipated to trend as expected relative to budget during
operational months.
0%
20%
40%
60%
80%
100%
Utilization % - PrimeUtilization % - Non-prime
## Braemar Arena Ice Hours Utilization*
2023
2024
2025
2026
14
Page 171 of 175
## Non-Major Enterprises - Edinborough Park & Art Center
## Edinborough Park
## Revenues
• Q1 revenues are down $92K and trend at 27% of budget.
• Sales are at 36% of budget due to more than anticipated concessions sales.
• Memberships are slightly under budget, at 20%, which is directly driven by a decline in user
demand for PlayPark/Adventure Peak and Pool & Track memberships.
• Admissions are down $84K or 29%, mostly related to fewer daily admissions in 2026.
• Building Rental is slightly over budget, at 29%, largely tied to birthday party rentals.
• Other Fees trend above budget, at 35%, directly related to association fee revenue collection
timing.
## Expenses
• Q1 expenses are up $34K or 6% year over year and trend as expected relative to budget.
• Cost of Sales and Services are above budget, at 37%, in response to sales.
• Personnel Services are slightly below budget, at 23%, mostly tied to full time salaries and health
insurance contribution.
• Commodities trend at 19%, tied to cleaning supplies and pool chemicals.
• Internal Services are up $20K related to additional budgeted shared management costs.
## Art Center
The Southdale Library project construction is underway and on schedule. The future building will
house the new Edina Art Center and is expected to open at the end of 2027.
## Revenues
• Q1 revenues are up $2K and trend above budget, at 30%, due to more than anticipated class
registrations.
## Expenses
• Q1 expenses are up $10K and trend slightly under budget, at 20%.
• Personnel Services are up $11K due to additional art instructor hours in 2026. Current year
expenses trend slightly below budget, at 21%.
• Contractual Services and Commodities both trend under budget, at 11%, largely tied to
professional services, art supplies, repairs and maintenance, and advertising.
-
10,000
20,000
30,000
40,000
## Q1Q2Q3Q4
## Daily Admissions by Quarter
2023
2024
2025
## YTD
2026
15
Page 172 of 175
## Non-Major Enterprises - Centennial Lakes & Braemar Field
## Centennial Lakes
Ice Skating & Sledding closed for the season on February 12
th
## . Putting Course, Paddle Boat Rental &
Lawn Bowling opened for the season on April 8th and will remain open through the warmer weather
months.
## Revenues
•Q1 revenues are down $25K and trend as expected relative to budget.
•Sales are at 44% of budget due to more than anticipated concession sales.
•Building Rental is up $9K due to Farmer’s Market space fees. Current year trends below budget
due to seasonality of facility demand.
•Equipment Rental is down $68K due to unusually high demand for rentals in 2025. Current year
trends above budget, at 57% tied to skate and sled rentals.
•Other Fees are up $25K year over year and trend over budget, at 32%, related to timing of
Association Fees.
## Expenses
•Q1 expenses are up $33K and trend below budget, at 19%.
•Cost of Sales and Services are above budget, at 28%, in response to sales.
•Personnel Services are up $33K due to new part-time maintenance and shared facility
coordinator filled positions. Current year trends slightly below budget, at 20%, related to
seasonality of operations and staffing needs.
•Contractual Services and Commodities trend below budget, at 9% and 10%, related to seasonality
of operations.
## Braemar Field
## Revenues
•Q1 revenues are up $68K and trend as over budget, at 62%.
•Admissions trend over budget, at 54%, due to increased open dome/soccer demand.
•Building Rental is up $67K largely related to priority scheduling fees. Current year trends above
budget, at 62%, due to overall increase in facility user demand.
## Expenses
•Q1 expenses are up $41K and trend over budget, at 45%.
•Personnel Services trend over budget, at 30%, due to seasonal staffing needs in response to
increased facility demand.
•Contractual Services are up $22K largely due to dome takedown expense timing and
miscellaneous repairs and maintenance. Current year trends under budget, at 22%.
•Commodities trend under budget, at 1%, related to supplies.
•Internal Services are up $15K related to additional budgeted shared management costs
-
5,000
10,000
15,000
20,000
25,000
## 202320242025YTD 2026
## Ice Skate Rentals
16
Page 173 of 175
## Cost Recovery
Cost recovery percentages indicate a facility’s ability to cover operating expenses with operating revenues.
In 2018, the City established two cost calculations, Total Cost Recovery and Management Cost Recovery.
Total Cost Recovery is calculated by dividing total revenues by total expenses. Management Cost Recovery
is calculated by dividing operating revenues by operating expenses, which excludes non-operational items
such as donations, investment income, transfers, depreciation, central services, and utilities.
The following charts represent total 2023, 2024, 2025 and YTD 2026 Total Cost Recovery and
Management Cost Recovery percentages. Differences between quarterly results and annual results may be
due to the timing of revenues and expenses.
0%
20%
40%
60%
80%
100%
120%
140%
160%
## Total Cost Recovery
2023
2024
2025
## YTD 2026
0%
50%
100%
150%
200%
250%
300%
## Management Cost Recovery
2023
2024
2025
## YTD 2026
17
Page 174 of 175
## Glossary
Asset-Backed Security (ABS): An investment security that is collateralized by a pool of assets,
such as loans, leases, etc. Acts like mortgage-backed security.
Certificate of Deposit (CD) or Brokered CD: A financial instrument issued by banks or
other financial institutions, promising a specific interest rate to the bearer in exchange for leaving
a predetermined deposit for a specific period. The period for CD generally ranges from one
month to five years.
Cost Recovery: Total revenues as a percentage of total expenses.
Government Securities: Most commonly includes US Government Bonds; a debt security
sold by the government to support government obligations and spending and US Treasury Bills
or T-Bills; A short-term debt security that is backed by the US Treasury department. US T-Bills
have a maturity of one year or less. These investments are considered low risk as they are
government backed.
Investment Sweep: Moves funds between a checking account and an investment account with the
intention of earning interest on excess cash.
Major Enterprise Funds: Utility fund and larger scale enterprises including Liquor, Aquatic Center,
Braemar Golf Course and Braemar Arena.
Management Cost Recovery: Operating revenues as a percentage of operating expenses
(excludes
depreciation, central services, and utilities).
Money Market: A mutual fund that invests in short-term, higher quality securities. Designed to
provide high liquidity with lower risk, stability of capital and typically higher yields than some
other cash products.
Mortgage-Backed Security (MBS): A type of asset-backed security that is backed by a pool of
mortgages and originated from a regulated and authorized financial institution. Through the
investment in MBS, the investor is essentially lending money to a home buyer or a business.
Municipal Securities: Debt securities and investment funds issued by local bodies like
municipalities, cities, states, or countries to fund their capital expenditure.
Non-Major Enterprise Funds: Smaller scale enterprises including Art Center, Edinborough Park,
Centennial Lakes Park and Braemar Field.
Prime & Non-Prime Utilization: utilization represents hours scheduled out of total hours
available. Prime vs non-prime is dependent on time of day and year, which are charged at
different rates.
18
Page 175 of 175