Agenda · Edina City Council
Edina City CouncilAgendaTuesday, April 28, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## City Council Retreat Agenda
April 28, 2026, 5:30 PM
## South Metro Public Safety Training Facility, 7525
## Braemar Blvd
## Accessibility Support:
The City of Edina wants all residents to be comfortable being part of the public process. If you need
assistance in the way of hearing amplification, an interpreter, large-print documents or something
else, please call 952-927-8861 at least 72 hours in advance of the meeting.
1. Call to Order
## 2. Roll Call
## 3. Meeting Topics
## 3.1. Welcome & Retreat Protocols
## 3.2. Budget Work Plan Update
3.3. 2027 - 2032 CIP & 2027 Budget
## 3.4. Horizon Parks and Recreation Projects
## 3.5. City Manager Transition Update
4. Adjournment
Page 1 of 35
## Item Report
April 28, 2026
## City Council
## Item Number: 3.1 Department: Administration
Item Activity: Information Prepared By: Scott Neal, City Manager, Ari Lenz, Deputy City
## Manager
## Item Title: Welcome & Retreat Protocols
## Action Requested:
None, information only.
## Information/Background:
Tonight’s retreat is part of a continuation of conversations continuing throughout the year, tonight we
will focus on two topics: the 2027 Budget Development and the City Manager Transition. The purpose of
this session is to align on priorities, clarify expectations, and provide strategic direction to staff. We will
treat tonight similar to a work session with the Mayor moderating with the extra assistance from the
City Manager and Deputy City Manager. The agenda tonight is packed with content, so there may be
times where items put in the "parking lot" or noted for longer discussion items at a future date.
This year is a capital year, where the City prioritizes the review and spends more time discussing the
capital aspects of the budget. As a benefit of being a capital year, we have the previous year's
operating budget projection (second year budget) to start from (in a operating year, we would start
with capital). Staff will begin with presentations and key information, followed by time for discussion.
Council Members and Executive Leadership Team Members are encouraged to engage in open,
respectful dialogue, and build on one another’s perspectives.
Later in the agenda, the retreat will shift to a discussion on the City Manager transition. The Council
Committee (Council Member Pierce and Jackson) will provide an update on the RFP process, with
Dave Unmacht summarizing the results of the feedback Council, ELT, Community and Staff provided in
the surveys. Dave will then facilitate the conversation. City Manager Neal will excuse himself for that
conversation.
Below is a projected timeline for the evening:
5:30 - Dinner will be served
6:00 - 6:15: Welcome and Retreat Protocols, Budget Work Plan Update
6:15 - 6:45: Staff Presentations
6:45 - 7:30: Discussion
7:30 - 7:45: Wrap up and summarize
7:45 - 8:00: Break
8:00 - 9:00: City Manager Transition
## Supporting Documentation:
## None
Page 2 of 35
## Item Report
April 28, 2026
## City Council
## Item Number: 3.2 Department: Administration
## Item Activity: Information Prepared By: Ari Lenz, Deputy City Manager
## Item Title: Budget Work Plan Update
## Action Requested:
None, information only.
## Information/Background:
The 2026-2027 Budget Work Plan was adopted by Council as part of the budget process. Staff
recommend two minor changes to the Budget Work Plan. The first is to add an item related to the City
Manager transition. While Council and Staff are already engaged in this work, it is an important
transition that should be formally included in the Budget Work Plan.
The second change is to combine the Fire Station 3 and City Hall/Police Department updates into a
single item, “Municipal Campus.” These projects are interconnected, have the same project teams,
much of the work will be coordinated to ensure one project does not limit or impact the site or options
for the other. It will be very challenging to separate contracts and project scopes. There are likely
needs that both facilities have that may be better resolved from a stewardship perspective by
considering both projects at once (HVAC, parking, etc). Combining the project would not limit the City
from breaking the project into phases, if necessary.
## Supporting Documentation:
## None
Page 3 of 35
## Item Report
April 28, 2026
## City Council
## Item Number: 3.3 Department: Finance
## Item Activity: Discussion Prepared By: Pa Thao, Finance Director
Item Title: 2027 - 2032 CIP & 2027 Budget
## Action Requested:
None, discussion only.
## Information/Background:
## Timeline
The development of the annual budget is a multi-faceted project encompassing an almost year-
round process and is guided by the city’s strategic profile.
Historically, the council reviews the draft Capital Improvement Program (CIP) during a work session in
late summer. They then approve the preliminary budget and levy in September. In December, another
work session is held to review both the operating budget and CIP, finalize the CIP, and conclude with a
public meeting and official council adoption in December.
In recent years additional budget work sessions were added to the budget calendar in response to the
council's request to be engaged in the budget process early enough to provide guidance prior to final
adoption night in December.
Departments completed their review of both the 2027 budget and the 2027–2031 Capital Improvement
Plan (CIP) on March 31st. Following this, staff have been actively analyzing projects and updating long-
term financial projections. These efforts are focused on maintaining the sustainability of the capital
and enterprise funds connected to capital outlay projects.
The proposals resulting from these reviews will continue to be refined and evaluated prior to the
council’s assessment of the 2027–2031 CIP at the upcoming council retreat scheduled for June 23. Staff
remain dedicated to ensuring that all proposed projects and financial plans align with long-term
goals and fiscal responsibility.
As in previous years, directors and project managers have consistently reported rising costs for goods
and services. While inflation has eased compared to the peaks experienced in the past couple of
years, there is ongoing market uncertainty—particularly surrounding the possible effects of tariffs.
Recent market trends are also contributing to cost pressures. Crude oil futures, for example, have been
a significant inflation driver; increased fuel prices typically lead to higher shipping and transportation
costs. Prices rose sharply from $57 per barrel at year end 2025 to a peak of $112 in April 2026.
Additionally, the Personal Consumption Expenditures (PCE) Price Index remains elevated at 2.8%,
indicating continued inflationary pressure across a broad range of consumer goods and services.
These factors are being closely monitored as staff work to finalize the budget and CIP proposals.
Page 4 of 35
## 2027 Budget Projections
Similar to capital projects, staff is anticipating that inflationary increases will also place pressure on the
operating budget. During the development of the current 2026 budget, staff forecasted a 2027 levy
increase of 9.82 percent. At the time, the projected increase included:
• New debt service addition for Fire Station 2, new filter room at the Edina Aquatic Center and the
Vernon Ave & Highway 100 interchange
• Six new Paramedic/Firefighters
## • 2050 Comprehensive Plan Updates
• Funding public safety partnership programs with Hennepin County, such as the Joint
Community Police Partnership and the Police Department’s embedded social worker program,
that were previously funded with ARPA money.
For taxes payable in 2027, residential property owners will likely experience a smaller shift in the
property tax burden compared to 2026. All property types saw overall valuation increases. The
increases were 5.8 percent for commercial, 5.7 percent, for apartment and 3.6 percent for residential.
Taxes are distributed based on tax capacity, and the tax capacity increases are 4.1 percent for
residential, 1.9 percent for commercial and 4.7 percent for apartments. Staff is waiting for final tax rate
calculations from Hennepin County to estimate what this impact may be for residential property
owners. The tax rate information typically becomes available mid-summer.
State of the Facilities
The City’s portfolio of facilities continues to experience growing levels of deferred maintenance as
aging infrastructure, inflationary pressures, and increased service demands outpace available
funding. In 2023, the City identified approximately $46.2 million in deferred maintenance needs across
all facilities. This figure increased to $47.7 million in 2025 and is projected to rise significantly to $72.9
million by 2027. The sharp escalation reflects both the cumulative impact of deferred reinvestment
and rising costs associated with critical building system replacements.
With planned construction activities in 2026 through 2027 a portion of this deferred maintenance will
fall off and current projects estimate the amount to be $54.0 million by 2028.
## Debt Service Levy Projections
As we look at debt service projections over the next five years, there is an opportunity for strategic
planning to align funding needs with available resources:
• Four existing debt service levies will fall off within the next five years, creating flexibility to
consider new bonding opportunities.
• Citywide Roof: Staff is proposing splitting this project up into two phases in 2028 and 2032.
• Fire Station 3: Site procurement is still pending for the Fire Station 3 (FS 3), plan is to acquire
property remaining after Vernon bridge project adjacent to City Hall. Staff is proposing delaying
project construction to 2030 due to the delay in site acquisition (assuming City Hall Site). Next
steps include further site planning (see work plan item).
• Police and City Hall Project: Site procurement for Fire Station 3 is still not complete. Staff is
proposing to delay the Police Department, and City Hall projects to 2030, with the first bond
Page 5 of 35
payment occurring in 2031. This lines up with the proposed FS 3 project to minimize impact on
the community and staff and maximize project potential.
• Public Works: Staff proposes delaying this project until 2031, with the first bond payment
occurring in 2032.
## Early Redemption of 2017C Bonds
A principal balance of $2.81 million remains outstanding on the 2017C Refunding Bonds and is eligible
for prepayment. The City is currently assessing whether to exercise its call option and prepay this
remaining principal, which became eligible for early redemption as of February 1, 2026. Originally
issued to refinance the 2009A Capital Improvement Plan Bonds at lower interest rates, the 2017C
Refunding Bonds generated approximately $1.4 million in savings over their remaining term. There are
three annual payments left from 2027 through 2029, totaling $2.93 million in scheduled principal and
interest, with a levy requirement of $3.08 million pursuant to statutory 105% levy rules.
Prepayment would eliminate up to $123,527 in future interest expenses, remove levy obligations for
2027–2029, decrease administrative costs, and enhance the City’s credit profile by reducing long-term
liabilities. Should the City decide to proceed, the Council must pass a resolution authorizing early
redemption and issue at least 30 days’ notice to bondholders prior to the designated prepayment
date.
## Construction Fund Levy Projections
The levy dedicated towards the CIP has been reduced from the prior year's estimates to
accommodate potential increases from the Fire Station 2 bond issuances. Departments are reviewing
capital projects to find alternative funding solutions, analyzing useful lives of equipment, and deferring
some projects that are not financially feasible. An in-depth review of the CIP will be done by the June
work session, but as of now, the 2027 CIP levy will be brought back to prior year’s actuals in
consideration of deferred maintenance.
Tonight's agenda item is intended to provide high-level insight into the challenges and opportunities in
developing both the 2027 budget and the 2027–2031 CIP. Staff would also appreciate the council's
feedback on budget priorities, including but not limited to operations, programming and capital
projects.
Lastly, the levy is impacted by the budget decisions made during the development process.
Traditionally, the council would see the estimated preliminary levy at its study session in August, due to
this being the second year in the budget cycle we have a better understanding of the operating
budget this same process will not be possible next year. This retreat along with the retreat session in
June are an opportunity for discussion about council's direction and desires, which then allows staff
sufficient time to work on the preliminary budget before the August study session and preliminary levy
approval in September.
## Resources/Financial Impacts:
This is essential for the funding of the City's operation and capital projects.
Page 6 of 35
## Relationship to City Policies/Plans/Budget Pillars:
The budget details the key priorities of the City Council and the resources dedicated to achieve results
for Edina residents utilizing strategic guidance from Vision Edina, the Comprehensive Plan, and the
Capital Improvement Plan.
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
## Engagement
We build meaningful connections and create spaces where everyone
feels welcome, valued and has a sense of belonging.
## Equity
We provide equitable opportunities for people to participate in the city
government and access City institutions, facilities, and services.
## Health
We use Health-in-All Policies to promote and protect the physical,
mental, and social wellbeing of all people who live, work, or visit Edina.
## Stewardship
We make wise investments that focus on the best long-term value for
residents.
## Sustainability
We ensure that our policies, decisions, and plans have a positive impact
on people and the planet now and for future generations.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Staff Presentation
Page 7 of 35
## EdinaMN.gov
2027 –2032 CIP & Budget
## Council Retreat
April 28, 2026
Page 8 of 35
2
## Agenda
## •Welcome & Budget Work Plan Update
•Timeline
•State of the Facilities
•Update on select Horizon Park Projects
## •Debt Service Levy Projections
## •2027 Budget Projections
•Discussion
Page 9 of 35
3
## Tentative Timeline
•Completed to date:
•The 2026 Levy & Budget were approved on December 16, 2025.
•Departments began reviewing the 2027 Budget and 2027–2031 CIP on February
24.
•Council reviewed kickoff materials and State of the Utilities in March work session.
•Departments submitted their budget and CIP materials on March 31
•(Currently in Finance Review)
•Upcoming milestones:
•Council retreats on April 28 and June 23 to establish direction and goals.
•Council work sessions scheduled for August 18
th
, Sept. 15
th
, Oct. 20
th
, Nov. 17
th
,
Dec. 1
st
, Dec. 15
th
to refine budget and CIP priorities.
•Adoption of the 2027 Preliminary Levy on September 15.
•Final adoption of the 2027 Levy, Budget, and 2027–2031 CIP on December 15
th
Page 10 of 35
4
State of the Facilities
•Deferred Maintenance
•2023
## •$46.2M
•2025
## •$47.7M
•2026
## •$72.9M
•Art Center $1.56M
•Fire Station #2 $800K
•Braemar Arena $25.4M
## •$54.0M
•Current projects include the removal of the Art Center and FS#2 sites in 2026/27
above and estimate to reduction of the Braemar Arena DM to $10.0M.
Page 11 of 35
5
2026 Deferred Maintenance $72.9M
$671,000
$806,000
$935,000
$1,400,000
$1,520,000
$1,560,000
$1,720,000
$2,370,000
$2,540,000
$2,760,000
$4,710,000
$5,170,000
$6,970,000
$13,300,000
$25,400,000
## A Q U A T I C C E N T E R
## F I R E S T A T I O N # 2
## S E N I O R C E N T E R
## U T I L I T Y B U I L D I N G S
## F I R E S T A T I O N # 1
## A R T C E N T E R
## L I Q U O R
## S O U T H M E T R O P U B L I C S A F E T Y
## B R A E M A R G O L F
## P A R K I N G R A M P S
## P U B L I C W O R K S
## P A R K S S H E L T E R S
## C H & P D
## E D I N B O R O U G H P A R K
## B R A E M A R A R E N A
$- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000
## DEFERRED MAINTENANCE
Page 12 of 35
6
2026 Deferred Maintenance $54.0M
$671,000
$935,000
$1,400,000
$1,520,000
$1,720,000
$2,370,000
$2,540,000
$2,760,000
$4,710,000
$5,170,000
$6,970,000
$10,000,000
$13,300,000
## A Q U A T I C C E N T E R
## S E N I O R C E N T E R
## U T I L I T Y B U I L D I N G S
## F I R E S T A T I O N # 1
## L I Q U O R
## S O U T H M E T R O P U B L I C S A F E T Y
## B R A E M A R G O L F
## P A R K I N G R A M P S
## P U B L I C W O R K S
## P A R K S S H E L T E R S
## C H & P D
## B R A E M A R A R E N A
## E D I N B O R O U G H P A R K
$- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000
## DEFERRED MAINTENANCE
Page 13 of 35
8
## Take Aways
•Available CIP for maintenance
competes with other needs.
•Deferred Maintenance growth is
outpacing current funding sources
•$10.0M annually over 10-year
period
•Assumes like for like replacements
Data from:
## Mortenson
## Construction
## Cost Index
Page 14 of 35
9
## Update on select Horizon Park Projects
## •Braemar Golf Course Clubhouse
•Edinborough Park
## •Centennial Lakes Park
Page 15 of 35
10
## Debt Service Levy Projection (Approved vs. Future)
## Debt Service Levy Projection
2024
2025
2026
2027
2028
2029
2030
2031
## Budget
## Budget
## Budget
## Projection
## Projection
## Projection
## Projection
## Projection
## EXISTING DEBT SERVICE LEVIES
## Gymnasium Debt Service 2015 HRA
392,000
398,000
-
-
-
-
-
-
## Fire Station Debt Service 2016A
403,000
406,000
403,000
404,000
-
-
-
-
## Public Works Facility Debt Service 2017C
1,029,200
1,030,000
910,783
980,166
1,025,000
-
-
-
## Public Works Facility Debt Service 2021B (2013A)
478,800
482,000
478,800
480,000
480,000
480,000
-
-
## Sports Dome 2014 HRA
1,168,700
1,165,100
1,166,100
1,166,400
1,164,800
1,166,400
1,167,000
1,165,400
## Community Health & Safety Center Debt Service 2024A
-
1,133,449
1,070,600
1,070,600
1,069,800
1,073,500
1,070,900
1,072,700
## Community Health & Safety Center Debt Service 2024B
-
763,090
1,071,100
1,071,100
1,070,300
1,073,900
1,071,300
1,071,700
## Community Health & Safety Center Debt Service 2025A
-
-
700,900
701,800
701,800
701,300
700,300
698,700
## Aquatic Center 2025B
-
-
439,800
688,000
688,000
688,000
688,000
688,000
Highway 100 Interchange 2025B
-
-
207,200
209,800
209,800
209,800
209,800
209,800
GO Bond for Citywide Roof in 2028 $5M 10 years Part 1
-
-
-
-
340,000
680,000
680,000
680,000
GO Bond for PW Cold Storage in 2028 $1.5M 10 years
-
-
-
-
203,900
203,900
203,900
203,900
GO Bond for PD/CH in 2031 $14M - 30 years
-
-
-
-
-
-
-
405,000
GO Bond for FS3 in 2031 $30M - 30 years
-
-
-
-
-
-
-
868,500
GO Bond for PW in 2030 $4.2M - 10 years
-
-
-
-
-
-
543,700
543,700
GO Bond for Edinborough 2028 $30M - 20 Years
-
-
-
-
GO Bond for Citywide Roof Part 2 2030 $7.5M 10 years
1,020,000
1,020,000
## Debt Service Levies Total
3,471,700
5,377,639
6,448,283
6,771,866
6,953,400
6,276,800
7,354,900
8,627,400
Increase from prior year (%)
7.48%
54.90%
19.91%
5.02%
2.68%
-9.73%
17.18%
17.30%
Page 16 of 35
11
## Debt Service Levy Projection (Approved vs. Future) continues
$-
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
20242025202620272028202920302031
## Millions
## Gymnasium Fire Station 1 Public Works Facility Sports Dome
Fire Station 2 Aquatic Center Highway 100 Interchange Future Potential Projects
Page 17 of 35
12
## Future Potential Projects - Bonding
•Citywide Roof – Part 1: $5 million.
•Project starts in 2027. First debt levy in 2028.
•Citywide Roof – Part 2: $7.5 million.
•Project starts in 2029. First debt levy in 2030.
•Public Works Cold Storage: $1.5 million.
•Project starts in 2027. First debt levy in 2028.
•Civic Campus: $56.5 million
•Project start 2030, first debt levy 2031
•Public Works Facility Maintenance: $4.2 million.
•Project starts in 2030. First debt levy in 2031.
Page 18 of 35
13
Uncontrollable factor - PCE (Personal Consumption
## Expenditures) Index
Page 19 of 35
14
## Uncontrollable factor – Material Pricing Changes
## Source: Mortenson Construction Cost Index
Page 20 of 35
15
## Uncontrollable factor – U.S. Treasury Curve
Page 21 of 35
16
## 2027 Projected Tax Levy
2024
## Adopted
2025
## Adopted
2026
## Adopted
2027
## Previously
## Projected
2027
## Current
## Projection
## General Fund$43,744,165$47,543,215$53,012,940$56,929,645$56,259,645
## Debt Service$3,471,700$5,377,639$6,448,283$6,771,866$6,771,866
## Construction$4,470,000$3,668,000$2,913,450$4,219,278$4,219,278
## Special Street$1,481,000$1,762,000$1,053,000$1,355,400$1,355,400
## Special Park$1,000,000$400,000$0$400,000$400,000
## HRA$251,700$259,300$267,100$275,100$275,100
## Total Tax Levy$54,418,565$59,010,154$63,694,773$69,951,289$69,321,289
% Increase9.15%8.44%7.94%9.82%8.83%
Page 22 of 35
17
## 2027 Budget Projection Discussion
•2017C Payoff (further discussion in June)
•Current Projection
•Clean up and fine tuning ($630,000, reductions already included in
projection)
•Comp Plan double budget
•Elections (savings from every other year)
•Publications reductions
•Minor cross-organization fine tuning
•Other items for discussion (not included)
•494 Corridor (further direction in June)
•Human Services Funds (up to $175,000)
Page 23 of 35
18
Next steps
•Tour of Edinborough Park & Aquatic Center (June)
•2025 Fund Balance (June)
•Construction Levy/CIP & CEP (June)
## •2027 Operational Budget Update (June – August)
•Revenue Analysis
•2027 Preliminary Levy (September)
## •Edinborough Park Study Finalization (2026 Q4)
## Discussion Time ☺
Page 24 of 35
19
## City Manager Transition Process
•City Council committee update
## •City Manager Quality and Attributes – David Unmacht
Page 25 of 35
## Item Report
April 28, 2026
## City Council
## Item Number: 3.4 Department: Parks & Recreation
Item Activity: Discussion Prepared By: Perry Vetter, Parks & Recreation Director
## Item Title: Horizon Parks and Recreation Projects
## Action Requested:
None, discussion only.
## Information/Background:
The City Council has had a successful pattern of receiving and providing feedback on recreation
facility studies to ensure appropriate use and value are provided to the community. These studies
build upon a prior need, goal, or challenge that is on the horizon for either operational or financial
investments. The goal is to provide a comprehensive evaluation of the current and future needs for the
facility operation, albeit at a snapshot in time during the review. Often these studies or portions of the
study are revisited for ongoing conversations.
While staff continually review and monitor operational and infrastructure conditions, over the last
decade-plus many of the recreation facility operations have undergone detailed analysis with varying
formats and content. This includes the Edina Art Center (multiple), Braemar Arena (2021), Braemar Golf
Course (2014/2024), Centennial Lakes Park (2023), and Edinborough Park (2012). The study information
has been used for varying beneficial needs such as either expanding initiatives, to inform and support
renovations, or to support current operations. This agenda item will work to refresh the conversation
around three of these operations that require varying stages of analysis.
## Centennial Lakes Park
At the request of the City Manager a detailed operational assessment was conducted and presented
to the City Council for Centennial Lakes Park in April of 2023. This 24-acre park enjoys year-round
amenities surrounded by evolving mixed use development. The analysis explored the background and
zoning of the adjacent land use, park amenities and programs, park uses and corresponding
influences, park budget, staffing structure and amenity condition. The three central issues of the
assessment were (1) identify a reliable source of operational revenue given the changes in
maintenance fees, (2) determine the future scale and quality of amenities along with services that
drive staffing and related expenses; and (3) determine an approach to funding capital improvements
and renewal around the park. This discussion will focus on the changes anticipated in the park
maintenance fees.
The public and private partnership that worked together to develop the park and surrounding
properties agreed to a park maintenance fee to support park maintenance. As part of the original
development, six properties adjoining the park have contractual obligation to the City of Edina through
the HRA to help offset the cost to maintain Centennial Lakes Park. The unique nature of the entire
development solidifies the need for a greater working relationship between the property owners and
Page 26 of 35
the City.
Contract terms for properties were for an initial 30 years with an auto additional 10 years, unless 75% of
homeowners and park owners agree to term at 30 years.
Status of HRA agreements:
• Centennial Lakes Village Homes amended to continue until 12/21/2034.
• Coventry Homes continues until 2040.
• South Office Park, Medical Office Building, Retail Plaza, and Pinstripes expire at the end of 2028.
The near-term concern acknowledged previously and again for discussion is the identification of a
reliable source of operational revenue given the changes in maintenance fees at the end of 2028.
These HRA agreements for park maintenance fees support roughly 37% of the total Centennial Lakes
Park operating budget.
The action item for Centennial Lakes Park will be to define a strategy to close the gap by the expiration
of the maintenance fees.
Quality of Life Survey Results - 84% of households used Centennial Lakes Park and 96% rated it as
excellent or good.
## Edinborough Park
Edinborough Park, located in the very south-eastern portion of Edina, is home to Aventure Peak, an
indoor playground, performance amphitheater, Summit gym play area, indoor lap pool and elevated
walking track with select fitness equipment. The facility hosts an extensive entertainment series for
youth, family and adults, hosts birthday parties, and is consistently rated as one of the top-rated
indoor play experiences annually.
This facility has not had a level of analysis done since prior to 2012 and use patterns are drastically
different now due to the expansion of similar offerings in the market and evolving recreation trends.
Page 27 of 35
The facility has a vast list of infrastructure deficiencies overdue, due in the short-term and needed in
the future.
Staff will be bringing a purchase request for professional services to conduct a thorough analysis of
Edinborough Park for City Council consideration. This study would ensure that the four public facing
areas of aquatics, Playpark & gym play, performance area and walking/fitness are well analyzed. This
would include not just infrastructure assessments, but also an analysis of the complicated and unique
facility architecture. The facility currently has multiple shared property lines and parking structures,
shares three walls with the corporate center, assisted living facility, and the apartment (former hotel)
complex. Like Centennial Lakes Park there are park maintenance agreements in place, and a review of
those agreements would be included. Currently those fees do not have an expiration and are in
perpetuity. The analysis would also include a review of staffing levels as there is a current joint
operational management of the Aquatic Center, market comparables and future visioning and
potential of the facility.
The action item will be to discover options that include a scope of need and potential pathways to
reach a vision.
Quality of Life Survey Results - 46% of households used Edinborough Park and 91% rated as excellent or
good.
## Braemar Golf Course Clubhouse
The history of Braemar Park and Braemar Golf goes back to the homestead of the Marth family. Of their
original 1,300-acre estate, over 400 acres became Braemar Park. Initial discussions around the
creation of a public golf course began in 1956. Over time, considerable evolution of the golf course
occurred.
In 2024 staff conducted an analysis for long-term investments for the two public use facilities
supporting golf in Edina. This review included the existing conditions, potential future use, revenue
opportunities and overlapping uses for integration.
Built in the early 1960’s, the facility provides a counter service restaurant for food and beverage
offerings, a banquet room, outdoor deck, pro shop, administrative offices, two meeting rooms and golf
cart storage. Due to the location and site placement of the facility on the crest of a steep hill, there are
concerns related to ADA accessibility preferences and to a lesser degree the physical exertion required
for some patrons to access the building.
The clubhouse has been renovated multiple times in its history and while regular maintenance has
occurred, there are deferred investments that are a part of this discussion. As part of the study, the
facility was reviewed for accessibility, aesthetics, deterioration, energy usage, hazardous materials,
health & safety, estimated useful life and remaining useful life. Those evaluations were looked at as a
priority level of immediate need, short-term need, and long-term need.
In comparison with market competition, the clubhouse is lacking in amenities, such as a modern
banquet space, restaurant facilities, community use areas and additional year-round programming
Page 28 of 35
areas. These amenities are not only sought within the community but also have vast revenue potential
for the golf operations. When evaluating the useful and remaining life of a facility, there is a tradeoff
between renovation and new construction. Additionally, in context of the prior investments in the golf
experience, the existing clubhouse has a vast disconnect to the function and flow of the overall
experience. For example, the investments in the courtyard and course, bring users past the cart
storage and maintenance area of the building. Patrons crossing over from one side of the course to
the other need to go up the hill to access the restaurant for food and beverage selection. No matter
the level of investment in remodeling the existing clubhouse the vertical site challenges for access
would remain.
Reviewing an option for a new structure would provide an opportunity for supporting golf and
community opportunities in the same facility. Ideally a facility of modern use would attract both golf
enthusiasts and the non-golfer alike.
Recently, the Minnesota Golf Association (MGA) has approached staff requesting to formally study the
partnership potential of a new clubhouse facility that would allow MGA operations to move to Braemar.
Currently, Braemar Golf operations partners with the MGA on program such as the Adaptive Open and
many other valuable programs. Because the values of MGA align well with Edina’s golf operations the
partnership has tremendous potential.
Because of this formal request, staff request feedback on pursuing concept planning work for a new
clubhouse and identification of potential partnerships, including the MGA. While this would be
exploration in nature and not detailed design development, there is value to understanding the facility
needs, operational issues and revenue potential that would come with this model.
The action item would be to explore where we want to be in the future for the Braemar Golf Course.
Quality of Life Survey Results - 36% of households used Braemar Golf Course and 94% rated it as
excellent or good.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
1. Braemar - Letter of Interest
Page 29 of 35
## OFFICERS
## President
## Paul Meierant
## The Playas Golf Club
## Vice President
## Jerry Rose
## Alexandria Golf Club
## Secretary/Treasurer
## Matt Hanson
## Hazeltine National Golf Club
## Past President
## Ede Rice
## Edina Country Club /
## Woodhill Country Club
## REGIONAL
## VICE PRESIDENTS
## Metro
## Joe Conzemius
## Interlachen Country Club
## Jenny Malek
## Highland National Golf Club
## Northeast
## Mike Stone
## Crosswoods Golf Course
## Northwest
## Glen Hasselberg
## The Vintage at Staples
## Southeast
## Skip Hambright
## Med City Golf Club
## Southwest
## Mark Loosbrock
## Great Life Golf & Fitness
## West Central
## Andy Jacobson
## Eagle Creek Golf Club
## STAFF
## Executive Director
## Jon Mays
www.mngolf.org
## 6550 York Avenue South, Sui te 411
●
Edi na, Minnes ota 55435
●
952.927.4643 phone
●
952.927.9642 f ax
Serving the game for all golfers in Minnesota
## Dear Braemar Golf Course Leadership Team,
Thank you for the opportunity to meet and discuss the future vision for Braemar Golf Course
and the potential development of a new clubhouse facility. We are grateful for the conversation
and the thoughtful exploration of how the Minnesota Golf Association (MGA) and the MGA
Foundation might be part of that future.
This letter serves as an expression of interest only and is not intended to constitute a binding
commitment. Rather, it reflects our belief that there is strong mission alignment and meaningful
long-term potential in continuing to explore this opportunity together.
Braemar Golf Course and the MGA share a relationship that spans decades. Braemar has long
been an important public golf facility within Minnesota’s golf ecosystem, and the MGA has
consistently believed that the game’s future depends on strong, accessible public venues. As a
statewide governing body dedicated to serving golfers of all backgrounds and abilities, the
MGA believes it belongs at a vibrant public green-grass facility that reflects the inclusive spirit
of the game.
A modern clubhouse at Braemar could create a setting that supports both organizations’ goals.
From the MGA perspective, a shared facility could:
• Provide a welcoming and highly visible home for Minnesota’s statewide golf community
• Create access to gathering spaces for championships, member engagement,
education, and meetings
• Allow greater integration with golfers through daily interaction at a public facility
• Strengthen our ability to collaborate on community-focused initiatives that grow the
game, with funding supported through the MGA Foundation
Importantly, this type of partnership could also enhance the reach and impact of MGA
Foundation programming. Proximity to an accessible public course and practice facilities would
create expanded opportunities for initiatives such as Youth on Course, adaptive golf
programming, and caddie development efforts. These programs are designed to remove
barriers to participation and introduce more Minnesotans to the game, and a setting like
Braemar could help amplify that impact.
We appreciate Braemar’s willingness to consider how a collaborative approach could create
mutual benefit and community value. We look forward to continuing discussions as the project
vision develops and as we each evaluate feasibility, logistics, and long-term alignment.
Thank you again for including us in this important conversation about the future of Braemar
Golf Course and public golf in Minnesota.
## Jon Mays
## Executive Director
## MGA & MGA Foundation
Page 30 of 35
## Item Report
April 28, 2026
## City Council
## Item Number: 3.5 Department: Administration
## Item Activity: Discussion Prepared By: Ari Lenz, Deputy City Manager
## Item Title: City Manager Transition Update
## Action Requested:
None, discussion only.
## Information/Background:
Council Committee (Council Member Pierce and Jackson) will provide an update on the RFP process
and Dave Unmacht will present his draft summary of the feedback received from Council, Community,
ELT and Staff on the qualities and attributes for review, comment and discussion.
## Supporting Documentation:
1. Draft City of Edina City Manager Qualities and Attributes Summary
Page 31 of 35
## City of Edina, Minnesota City Manager Recruitment –
## Initial Phase
The initial phase of the recruitment process began with a survey of four stakeholder groups: Five
City Council members, nine Executive Leadership Team members, 38 members of staff and 150
community responses (surveys for staff and community were open to all). By any measure or
comparison, this is a significant amount of input, which makes the information both reliable and
valid.
A summary of the feedback from each group was prepared. Based on an extensive review and
evaluation of all the input and information, it is straightforward to find consensus and consistency
in the data.
The format below is designed to support the preparation of the Position Profile. The Profile
includes the top qualities and characteristics desired in the next City Manager and identifies the
most important projects and priorities of the City. The Profile is an informational brochure and
marketing tool used to inform and recruit qualified applicants. The Profile contains valuable
information on the city, community, the organization, and the position, all of which applicants use
to consider whether to apply for the position.
With over 200 individuals included in the process, it is not possible to successfully include every
opinion and perspective. All of the input was analyzed and the most prominent and consistent
themes were selected. Also included in this report is a supplement highlighting unique themes
by stakeholder group.
***********************************
The expectations for this position are high. As is natural, when employing a new City Manager,
there is both excitement and anxiousness. No matter who is hired, change is coming. The early
weeks and months in office are a transition period for the Manager, City Council, staff, and
community. It is important to set reasonable and fair expectations and to be patient, supportive
and respectful of the learning curve needed to be successful in this role.
***********************************
The City of Edina is seeking a leader who, in partnership with the City Council and city staff can
combine financial and operational discipline with a sincere appreciation and respect for engaging
people. A n individual who leads collaboratively, communicates transparently, and can balance
Edina’s highly engaged residents and competing and ambitious expectations with realistic
sustainable progress. This individual must be a: trusted bridge builder, disciplined operator, and
a strategic navigator of change.
## David Unmacht
## David Unmacht
April 28, 2026
Page 32 of 35
## Qualities and Characteristics Desired in the City Manager
## Position
Position profiles generally follow certain models but are unique to the search firm, city, and type
of search. It is important to point out that the language in the fi nal Profile may not mirror exactly
the wording below. The selected search firm will review this material and in partnership with the
City Council and staff, create the final language.
Within each of the seven attribute s are four descripti ve phrases. The phrases (presented as
bullets ) elaborate and articulate behaviors desired in the City Manager. With seven attributes and
four descriptions, a total of 28 essential qualities of the position are captured – no question a
strong statement of consistency across all four groups.
## Interpersonal Style
• High emotional intelligence and self-awareness, calm, steady, and resilient (“thick skin”)
• Personable, approachable, and engaging with Council, staff and residents
• Active participant in dialogue—not passive or overly reserved
• Willing to push back (“stand their ground”) and provide candid, professional advice
## Leadership and Decision-Maker
• Decisive thinker, delegates with confidence, trust and accountability
• Recognizes and values expertise of subject matter experts; staff, commissions, etc.
• Inspires, empowers and motivates individuals and teams
• Collaborative and inclusive; operates openly and seeks opinion of others
## Communication and Transparency
• Clear, concise, and proactive communicator (ability to tell our story)
• Strong commitment to transparency and to minimize surprises
• Builds trust through consistent and open engagement with all residents and
stakeholders
• Crisis management skills; can maintain composure and self-confidence under pressure
## Strategic and Technical Competence
• Visionary , mission driven, forward-looking strategic thinker who aligns short-term
actions with long-term goals
• Strong background in public finance and budgeting, capital planning, and infrastructure
management, operations, and public safety
• Comfortable using technology, data, performance metrics, AI, and other tools
• Works to align Council priorities into cohesive policy direction and implementation plans
## Governance and Political Acumen
• Skilled in navigating council dynamics and political environments
• Navigates diverse and often competing community perspectives
• Operates in a non-partisan, fair and objective manner
• Comfortable with complex issues, managing conflict and personal criticism
Page 33 of 35
## Values and Mindset
• Operates with integrity, empathy, and trustworthiness
• A role model enhancing the organization’s reputation in the city, community, region and
state
• Listens and seeks to build trust by reaching out and engaging residents and stakeholders
• Encourages results and outcomes supporting creative and innovative thinking
## Role Expectations
• Visib ly active and accessible, engaging residents and participating in events
• Build and strengthen the trust in city government with fairness, responsiveness, listening
and follow-through
• Engage with peers, partners, colleagues and associations; representing the City while
balancing participation with organizational priorities
• Supports professional growth and development personally and for the staff
## Major Projects and Priorities
The major projects and priorities is not a “to do” list, but a strong representative sample of the
important areas of learning and focus for the new City Manager, especially early in their tenure.
The City Manager will want prioritize learning, and understanding the timeliness, importance
and substance of these topics.
## Financial Stewardship
• Understand the City’s history and experience in financial affairs, including budgeting,
utility rates, capital projects (e.g., Fire Station), capital and equipment planning,
infrastructure needs, deferred maintenance, and city enterprises
• Understand budget pressures, including inflation, tax levy capacity, spending patterns
and fiscal controls to seek long term financial health and affordability
• Partner with the City Council to work toward a sustainable general levy target
• Align capital planning with redevelopment and coordinate city projects with private
development
## Administration and Organizational Capacity
• Recruit, h ire and retain quality and competent staff
• Promote and advance a positive, high performing premier workplace culture
• Assess operations and ensure basic core services (“nuts and bolts”) are prioritized
• Understand the depth and breath of city programs and services; become fluent in city
operations, policy and strategy
• Study t he organization’s culture, strengths and areas of opportunity; introduce change in
a deliberate and thoughtful approach
## Growth and Development
• Study and examine Edina’s historical growth and development patterns
Page 34 of 35
• Partner with the Council to develop a process that minimizes project by project conflict
and volatility
• Lead the development of the 2028 Comprehensive Plan creating a framework for the
(re) development of housing, transportation, multi-modal infrastructure, and key
development areas such as small area plans and Southdale
• Understand regional, state, and federal legislative processes particularly affecting land
use, housing and zoning
## Unique Themes by Stakeholder Group
The majority of input provided by each stakeholder group was consistent. However, the lens
through which each group operates is distinct and unique. I captured the key distinctions by
group.
## Community
• Focused on specific city practices and policies (TIF, housing, public safety, sustainability
etc.)
• Broader based statements (“concerned about/perception/desire for/questions”)
• Seeking an “experienced” manager
• Strong emphasis on communicating, connecting and being visible
• Emphasis on core services and the basics (need versus want)
## Staff
• Internal focused with emphasis on the staff, workforce and organization
• Focused on leadership style and personal qualities (fit)
• Non-partisan bridge builder, connector, advocate and relator
• Understands Plan B form of government with a preference for Minnesota candidates
## Executive Leadership Team
• Focused on leadership style and personal qualities (fit)
• More in depth input on vision, policy and strategy
• Greater emphasis on the relationship between the Manager, staff and Council
• Process improvement, change management and technologically savvy
## City Council
• Focused on leadership style and personal qualities (fit)
• Big picture, future direction and policy emphasis
• Relationship between Council -Manager and Community-Manager
• More in depth input on specific projects and priorities
Page 35 of 35