Agenda Text
---
## author: Jesse Sierks
date: D:20171017085700-05'00'
---
## Special Meeting
Tuesday, May 5, 2026 5:00 PM
## ECC 350 and Virtual, 5701 Normandale Road, Edina, MN 55424
## I. Determination of Quorum and Call to Order
## II. Approval of Agenda
## School Board Special Meeting
Tuesday, May 5, 2026; 5:00 PM
## ECC Room 350
## I. Determination of Quorum and Call to Order
## II. Approval of Agenda
## III. Discussion
## A. Long-Term Financial Planning and Potential Future Funding Considerations
## IV. Leadership Updates
## V. Adjournment
NOTE: School Board members may participate by interactive technology
as permitted by Minnesota Statute 13D.02
## III. Discussion
## III.A. Long-Term Financial Planning and
## Potential Future Funding Considerations
Speaker(s): Dr.
## Daniel Bittman,
## Superintendent
## Board Meeting Date: 5/5/26
## Title: Long‑Term Financial Planning and Potential Future Funding Considerations
## Type: Discussion
## Presenter(s): Dr. Daniel Bittman, Superintendent
Description: This agenda item provides an opportunity for a preliminary School Board
discussion related to long‑term financial planning and anticipated future needs. The
conversation will focus on maintaining a shared understanding of emerging priorities,
including areas such as safety and security, aging facilities, building capacity and early
learning.
Recommendation: No decisions or actions are planned at this time.
Desired Outcome(s) from the Board: This discussion is intended to support thoughtful
governance and ensure adequate time for reflection before any potential options are
considered further or brought forward for broader engagement.
Attachment(s): n/a
## Potential
## Referendum:
## Executive Summary
Presented by:
## Dr. Daniel Bittman Superintendent
## Mert Woodard Director, Finance and Operations
May 2026
## Table of Contents
Introduction i
Section 1: Purpose and Recommendation 4
## Section 2: Project Scope and Overview 6
## Section 3: Construction Feasibility 7
## Section 4: Preliminary Project Cost Estimates (Facilities) 12
## Section 5: Operating and Staffing Impacts 13
## Section 6: Financing Structure and Options 14
## Section 7: Illustrative Tax Impact (Preliminary) 15
## Section 8: Governance Process and Decision Timeline 16
## Section 9: Key Risks, Constraints, and Considerations 17
## Section 10: Recommended Next Steps (Board Action Path) 18
## Introduction
Edina Public Schools is at a moment that will shape its direction for years to come.
Enrollment patterns, instructional expectations, and community standards for school
safety have evolved significantly over the past decade, placing increasing pressure on
facilities that were largely designed for a very different educational and security
environment. At the same time, the district has or plans to expand or reimagine early
learning, special education, talent development and language programming, and
student support services in ways that require more specialized space, better building
design, and more modern safety infrastructure. The facilities and systems currently in
place, while well maintained, do not fully align with the educational, operational, and
security demands of today and tomorrow.
This executive summary outlines a comprehensive bond and capital projects levy
referendum framework intended to address these needs in a financially responsible
and programmatically coherent manner. The purpose of a potential referendum
would be to take care of what we currently have in terms of students, facilities, and
community expectations. The proposal combines targeted facility investments with
staffing and technology enhancements to improve safety, increase capacity, and
support new and evolving programs across the district. It also presents a range of
financing options, tax-impact scenarios, and a statutory timeline for board action
and voter approval, providing the School Board with a clear foundation for
evaluating whether, when, and how to move forward with a community-supported
investment in Edina’s schools. The administration is confident that the construction
projects and on-going financing recommendations it makes will serve the District
well for the next 20 years.
## SECTION 1
## Purpose and Recommendation
This executive summary outlines a potential voter referendum package that
includes:
• Add dedicated student and staff wellness, safety, security and cybersecurity
staff capacity to implement and maintain an enhanced safety and security
posture.
• Modernize districtwide safety and security technology (cameras, public
announcement systems, access controls, notification systems, crisis detection
and prevention systems, etc.) and establish sustainable funding for
replacement cycles.
• The construction of a new Early Learning and Family Center (ELFC) designed
for modern early childhood programming, safer family access, and superior
design and aesthetics. Over the last several years, the District’s resident
student population has declined to 77% of total enrollment. While the
District’s total enrollment has not suffered due to its ability to attract students
from other districts, declining birth rates will affect all sections of the
metropolitan area — it is imperative that the District retains more of its
residents to lessen the reliance on open enrollment. Enhanced early learning
programming and facilities is a key strategy for doing that.
• Add space at Edina High School (EHS) to accommodate current and future
specialized programming, alleviate cafeteria space inadequacy, and
address current classroom shortages. Dozens of licensed staff do not have
dedicated rooms for instruction, creating cascading effects on the
schedule and implementation of programming. Multiple teachers are
forced to share classrooms, and EHS has 4 fewer science classrooms and
labs than the optimal level.
• Add space at South View Middle School to address a lack of dedicated
classroom spaces for non-core curriculum programming including, but not
limited to before/after school activities, talent development, multilingual
learning, intervention, etc.
• Add space at Valley View Middle School to address a lack of dedicated
classroom spaces for non-core curriculum programming including, but not
limited to before/after school activities, talent development, multilingual
learning, intervention, etc.
• Kuhlmann Stadium renovations to improve safety, separation of home and
away fans, ticketing, concessions, restroom facilities, a more contiguous flow
between the various athletic amenities on the campus, and add additional
bleachers for more seating.
• This process would require the District administration to advance a two-part
referendum concept: (1) a school building bond for major capital
construction and potentially initial safety technology purchases, and (2) a
capital projects levy increase to fund ongoing safety technology lifecycle
replacement and safety/security staffing for 10 years.
## SECTION 2
## Project Scope Overview
The conceptual scope is summarized below. Final scope would be refined through
collaboration with the Board, staff, stakeholders, and the District’s architect.
Schematic design, cost validation, and community engagement will be priorities
prior to Board action on a final ballot proposal.
## Component Preliminary Scope Elements Notes
New Early Learning Modernized early childhood facility; improved safety by Option A: ~90,000 SF standalone. Option
## Center
separating early learners from all-ages traffic; optional
gym/community space; departure from ECC creates
potential space for Transition (18–22) programming.
## B: ~138,000 SF with gyms. Option C:
Remodel of ECC.
## Elementary: Creek
## Valley
Secure entrance reconfiguration + additions; improved
sightlines and controlled ingress/egress; additional
flexible instructional/support space.
~9,000 SF addition.
## Elementary:
## Concord
Previously-planned ~4,000 SF addition; loading dock
improvements; potential office/courtyard
reconfiguration.
~4,000 SF concept addition.
Edina High School Addition to accommodate current and future
specialized programming; alleviate cafeteria capacity
constraints; address classroom shortages.
~26,000 SF (up to ~8 classrooms); larger
~66,000 SF adds up to 16.
South View MS Additional space for non-core curriculum programming
including before/after school activities, talent
development, multilingual learning, intervention, etc.
~6,600–23,400 SF yielding 3–9
classrooms.
Valley View MS Additional space for non-core curriculum programming
including before/after school activities, talent
development, multilingual learning, intervention, etc.
~6,600 SF yielding 3 classrooms.
## Kuhlmann Stadium
New structure on the North end including indoor
restrooms, home and away ticketing, modern
## ~38,000 SF.
concessions, flexible second-floor space.
Safety & security
technology
Camera modernization; PA/notification redesign; access
control expansion; servers/software standardization;
replacement cycle funding.
~$10M–$15M (to be validated).
## Safety/security
staffing
## Add 4 roles: Cybersecurity, Security Systems, Physical
## Safety & Security, Behavior & Threat Assessment
Annual cost: ~$575K–$650K.
Coordinators.
## SECTION 3
## Construction Feasibility
Several of the projects described in Section 2 require new construction on sites with
limited available land or constrained municipal infrastructure. The administration
and the City of Edina have been in constant communication to evaluate potential
sites and address feasibility challenges. This section summarizes those findings.
## Early Learning and Family Center — Site Search
There is an extreme lack of parcels available in the City of Edina large enough (more
than 5 acres) to accommodate a new early learning facility. The administration has
reviewed more than 20 sites in coordination with the City, evaluating each for parcel
size, level of difficulty, assessed valuation, and overall feasibility. The sites reviewed
span all areas of Edina and include district-owned land, City-owned parcels, houses
of worship, office buildings, and potential assemblies of residential properties. The
complete inventory is presented below.
## Address Acres Difficulty Hurdles Valuation Status
4401 W 76th St 3.5 Low — $0 Excess land for Fire Station #2
7600 Parklawn
## Ave
5.24 Low Loss of tax base $6,300,000 Office building; possible redevelopment
## 4200–4444 W
76th St
4.0 Low — $6,700,000 Two outdated flex buildings
4931 W 77th St 1.8 Low Loss of TIF $6,600,000 Hotel pad with parking garage
## 7401 Cahill Rd
3.23 Low — $4,300,000 Flex office warehouse
7125 Cahill Rd 3.98 Low — $3,700,000 Office/industrial
7001 Cahill Rd 4.26 Low — $7,000,000 Outdated strip center
7671 Cahill Rd 3.9 Low — $6,400,000 Flex office warehouse
5555 W 78th St 5.05 Low — $5,200,000 Flex office warehouse
5200 Willson Rd 3.25 Low — $5,800,000 Older office building
4500 W 50th St
4.08 Moderate Loss of park $0 Wooddale Park
## 5421 France Ave 2.68 Moderate Uncertain $0 St. Peters church/school
6600–6800
## France Ave
## 21.69 Moderate Prime tax base $41,700,000 Southdale Office Center
## 7300 York Ave 9.24 Moderate Eminent
domain
## $24,500,000 Edina Place Condos
7600 France Ave 6.65 Moderate Buyer will resist $13,600,000 Spartan Nash anchor
5730 Grove St 7.16 Moderate Traffic impact $0 Good Samaritan Church
5146 Eden Ave 3.0 Moderate City contract $0 City-owned parcel
4115 Grimes 4.69 High Flood plain $0 Weber Park area
59th & School Rd
## 3.25 High Eminent
domain
$8,200,000 13 houses, Normandale
6400 Tracy 8.29 High No sewer $0 Church, no sewer capacity
## 5700 Benton 4.31 High Eminent
domain
$9,800,000 11 houses, Countryside
## 5516 Vernon 3.0 High Eminent
domain
$4,400,000 6 houses, Highlands
5901 Lincoln Dr 17.29 High Sewer + flood $15,600,000 Older office, parking struct.
5780 Lincoln Dr 2.59 High No sewer $2,100,000 Older office building
8 Merilane 15.1 High Traffic impact $7,000,000 Residential neighborhood
Source: City of Edina site search — Early Childhood Program, 5-acres with easy access (March 2026)
Among the non-district-owned sites evaluated, the property at 7600 Parklawn
Avenue (5.24 acres) appears most favorable due to its parcel size, existing parking
infrastructure, and proximity to Fred Richards Park. However, developers have
expressed interest in converting the property from office space to tenant-owned
senior living. Nothing has been finalized or advanced through the Planning
Commission, and the administration remains in contact with the current owners.
Absent a viable non-district-owned acquisition, the best option is to construct on a
district-owned site. Otherwise, the District may be forced to renovate the existing
space at the Edina Community Center. Among district-owned sites, two represent
feasible options from a pure acreage standpoint: Cornelia Elementary and Creek
Valley Elementary. Both sites have more than 6.0 acres of available land for
development, and potentially more if adjacent City-owned land is included.
## Creek Valley Elementary Site
The Creek Valley site is likely not viable due to a lack of sufficient sewage capacity in
that part of Edina. The City engineering department has informed the
administration that only 10 sewage available charge (SAC) units are available, which
translates to roughly 10 single-family homes at most — nowhere near enough to
accommodate an educational facility of any significance. A preliminary site plan
prepared by Wold Architects & Engineers is shown below for reference, though the
sewage constraint remains unresolved.
Creek Valley Elementary site — preliminary test fit (Wold Architects & Engineers, December 2025)
## Cornelia Elementary Site
That leaves Cornelia as the lone district-owned site with viable infrastructure. The
Cornelia site is 14.3 acres with another 4.3 acres owned by the City immediately to the
west and south. There is anywhere between 7.0–10.5 acres of land on the site to
accommodate another facility, with the exact amount depending on a number of
different factors. While no decisions or formal conversations have been had, the
administration has had “test fits” applied to the parcel to visualize potential options:
Cornelia Elementary site — preliminary test fit, 138,000 SF concept
## Edina High School — Sewage Infrastructure
Significant construction at the Edina High School campus may not be feasible due
to a lack of sewage infrastructure and capacity. The City and administration are in
constant communication, and the City continues to analyze long-term solutions.
## Cost Escalators
Beyond land and infrastructure constraints, several regulatory and code-driven
factors have the potential to materially increase construction costs across the
referendum portfolio. These escalators are not reflected in the preliminary cost
estimates presented in Section 4 and will require detailed validation during
schematic design.
## Storm Shelter Requirements
Minnesota adopted the 2018 International Building Code (IBC), which references the
ICC 500 standard for storm shelter design. Under this code, any Group E occupancy
(schools) with an occupant load of 50 or more — the equivalent of roughly two
classrooms — is required to include a storm shelter capable of withstanding 250
mph winds as part of any new construction or building addition. The storm shelter
must be sized to accommodate all occupants of the entire facility, not just the
addition itself. This means that even a modest classroom addition can trigger a
shelter requirement scaled to the full building population.
The structural, mechanical, electrical, and architectural hardening required to meet
ICC 500 standards is substantial. Storm shelter construction requires reinforced walls,
hardened doors, ballistic-rated windows or storm shutters, independent ventilation,
emergency power, and sanitation provisions. A joint study conducted by Wold
Architects & Engineers, the District’s Board-appointed architect, along with BKBM
Engineers and Stahl Construction found that structural costs alone can more than
double when a space is designed as a storm shelter compared to conventional
construction. A rough rule of thumb is an additional $100 per square foot of
construction, which can add up to 20% to total project costs.
This cost escalator is particularly pronounced for the smaller additions proposed at
Concord, Creek Valley, South View, and Valley View, where the shelter square footage
requirement may approach or exceed the size of the addition itself. For the new Early
Learning and Family Center, the shelter requirement will be incorporated into the
facility design from the outset, but it nonetheless adds meaningfully to the overall
project budget. Wold has extensive experience integrating storm shelters into school
designs in a way that maintains a welcoming learning environment — using
consistent architectural language, natural light through storm-rated glazing, and
multi-use spaces such as gymnasiums and classrooms that serve double duty as
shelter areas.
## Storm Water Management
The City of Edina is a highly developed community that has reached a point where
any removal of pervious surface — such as green space, unpaved areas, or natural
ground — triggers a requirement for the developer to furnish storm water
management facilities. This applies to all new construction and building additions
within the city, including school district projects.
Depending on the amount of pervious surface removed by a given project and the
existing (or nonexistent) storm water management infrastructure on the site,
construction costs can escalate significantly. Storm water solutions may include
underground detention or retention systems, rain gardens, permeable paving, or
other engineered systems designed to manage runoff volume and rate to meet
current City code. Sites with little or no existing storm water infrastructure face the
highest potential cost impact.
Each of the preliminary project cost estimates presented in Section 4 includes
contingencies set aside for site work; however, those contingencies may not fully
accommodate what is necessary to meet current storm water code requirements. It
is very difficult to estimate these costs with precision before full project design, site
surveying, and coordination with the City’s engineering department. The
administration will work with Wold Architects & Engineers and the City during
schematic design to develop site-specific storm water management plans and refine
cost projections accordingly.
## SECTION 4
## Preliminary Project Cost Estimates (Facilities)
Preliminary project costs reflect early planning estimates including construction
and owner/soft costs. Cost estimates assume a November 2026 election and
construction beginning the summer of 2028.
## Project Indicative SF Preliminary Total Project Cost
Concord Elementary addition 4,000 $10,522,278
Creek Valley Elementary addition 9,000 $12,210,588
Edina High School – specialized programming &
classroom capacity
Option A: up to 16 classrooms ~66,000 $59,670,000
Option B: up to 8 specialty classrooms ~26,000 $29,296,250
## South View MS
Option A: 9 classrooms
~23,400 $25,112,550
Option B: 3 classrooms ~6,600 $13,010,850
## Valley View MS ~6,600 $11,354,950
## New Early Learning and Family Center
Option A: facility with gyms & community
~138,000 $104,678,750
spaces
Option B: standalone early learning facility ~90,000 $75,968,750
Option C: remodel of existing ECC
## N/A $44,869,813
Safety & security (PA, cameras, door security,
vestibule hardening)
## N/A $10,000,000–$15,000,000
## Kuhlmann Stadium Enhancement
Option A ~38,000 $50,662,500
## Option B
$35,700,000
## Option C
$27,150,000
## Subtotal Range – Facilities Projects
$158,414,729–$289,211,616
The subtotal range above assumes all projects are included in a single referendum package. The
actual ballot proposal may include a subset of these projects depending on Board direction,
community input, and financing capacity.
Administration’s minimum recommendation: The administration’s minimum recommendation
would be for $205,000,000 in bonding authority, which would accommodate safety & security
infrastructure enhancements, a new standalone Early Learning & Family Center, and additions to
Edina High School, South View, Valley View, Concord, and Kuhlman Stadium. These represent the
most urgent priorities given current facility constraints and evolving security needs.
## SECTION 5
## Operating and Staffing Impacts
New or expanded facilities or security enhancements require operating capacity to
protect the investment and sustain service levels:
• Custodial/maintenance staffing needed for a new standalone ELFC –
approximately four custodial staff, estimated annual cost of
$315,000–$330,000.
• Ongoing safety/security and student/staff wellness staff (4–6
positions) – estimated at $575,000–$720,000 annually including benefits.
• Technology lifecycle replacement – safety and security systems require
planned replacement cycles. Sustainable levy funding is necessary to avoid
future ‘cliff ’ replacements.
## SECTION 6
## Financing Structure and Options
The district’s current revenue structure does not accommodate the magnitude of
the proposed investments; voter authorization would be required.
## GO School Building Bonds
(voter-approved)
## Capital Projects Levy Increase
Purchase/installation of safety/security
technology. Construction and
renovation projects (ELFC, EHS, SV, VV,
CC, CV, Kuhlmann Stadium).
Ongoing safety/security staffing;
technology lifecycle replacement
fund; potential pay-as-you-go capital
needs. 10 years of authority.
Amortizes capital costs over 20+
years. Bond size should reflect final
scope, escalation, contingencies, and
inflation.
Creates sustainable annual capacity.
A 1.4% increase is estimated to
generate ~$2.2M annually.
Structuring options include: (a) a single-question bond including facilities plus initial
safety technology, paired with a levy increase; or (b) separate ballot questions.
Administration will return with a recommended structure after scope and
messaging refinement.
## SECTION 7
## Illustrative Tax Impact (Preliminary)
Estimated monthly tax impact for a home valued at $800,000, November 2026
election (taxes payable 2027), combining various bond sizes with a $2.2M annual
capital projects levy increase (+1.4% to the existing capital project levy of 5.932%).
## Scenario Term Bond/Mo Levy/Mo Total/Mo
$60M Bond + $1.6M Levy 20 yr $2 $7 $9
$80M Bond + $1.6M Levy 20 yr $3 $7 $10
$100M Bond + $1.6M Levy
20 yr $4 $7 $11
$120M Bond + $1.6M Levy 20 yr $5 $7 $12
$140M Bond + $1.6M Levy 20 yr $6 $7 $13
$160M Bond + $1.6M Levy 21 yr $8 $7 $15
$180M Bond + $1.6M Levy 22 yr $10 $7 $17
$200M Bond + $1.6M Levy 22 yr $13 $7 $20
$220M Bond + $1.6M Levy
22 yr $16 $7 $23
$240M Bond + $1.6M Levy 22 yr $20 $7 $27
$260M Bond + $1.6M Levy 23 yr $25 $7 $32
$280M Bond + $1.6M Levy 23 yr $30 $7 $37
$300M Bond + $1.6M Levy 24 yr $34 $7 $41
Tax impacts will be updated as the Board narrows scope. The District currently
finances a robust LTFM plan utilizing a significant yearly pay-as-you-go levy. This levy
can be shifted into bonded debt, allowing a major voter-approved bond to not
significantly increase overall school taxes for residents.
## SECTION 8
## Governance Process and Decision Timeline
Minnesota school building bonds require a state Review & Comment process and a
statutory election timeline.
Milestone Nov 3, 2026 Feb 9, 2027 Apr 13, 2027 May 11, 2027
## Submit Review & Comment to
## MDE
Jun 16, 2026 Sep 22, 2026 Nov 24, 2026 Dec 22, 2026
Adopt Resolution (≥84 days) Aug 11, 2026 Nov 17, 2026 Jan 19, 2027 Feb 16, 2027
## Receive MDE Review &
## Comment
Sep 4, 2026 Dec 11, 2026 Feb 12, 2027 Mar 12, 2027
Board public meeting on MDE
response
Aug 25, 2026 Dec 1, 2026 Feb 2, 2027 Mar 2, 2027
## Publish Review & Comment
(48–70 days)
Sep 16, 2026 Dec 23, 2026 Feb 24, 2027 Mar 24, 2027
Election Date Nov 3, 2026 Feb 9, 2027 Apr 13, 2027 May 11, 2027
A November 2026 election provides the earliest viable path. Later dates allow
additional time for design and engagement but delay project delivery.
## SECTION 9
## Key Risks, Constraints, and Considerations
• Land availability: See Section 3 (Construction Feasibility) for a
detailed assessment of site availability, sewage capacity constraints,
and ongoing coordination with the City of Edina.
• Cost escalation: Delaying a vote adds 5.0–10.0% per year. The Concord
addition proposed in 2022 is now twice as expensive for the same scope.
• Scope discipline: Maintaining clear linkage between the community’s
highest-priority needs and the final ballot package.
• Operational sustainability: Ensuring student and staff wellness staffing,
security staffing, and technology replacement cycles are funded.
• Ballot structure: Whether to bundle or separate facilities and
security/operations for voter clarity; alignment with legal parameters for bond
vs. levy.
• Community engagement: Surveys, listening sessions, and stakeholder
advisory structures prior to final Board action.
• Capital project levy authority: There is no cap beyond what voters authorize.
The District has many eligible costs currently paid from other funds. As of
taxes payable 2026, the District produces $1,138 and $209 less per ADM than
Hopkins and Richfield respectively. A 1.0% increase would still leave the
District $956 short of Hopkins and $30 short of Richfield per ADM.
• Peer district referendum activity: Between FY2016–2026, neighboring
## districts authorized: Wayzata ($566M), St. Louis Park ($279M), Hopkins
## ($309M), Minnetonka ($85M), Richfield ($87M), Eden Prairie ($38M). Edina’s
total: $7M. Upcoming 2026 referenda include Wayzata ($496M, April 2026),
St. Louis Park ($50M bond + levy increase from 4.287% to 10.127%), and
Robbinsdale (~$550M, under Board consideration). The District’s investment
posture has been significantly more conservative.
## SECTION 10
## Recommended Next Steps (Board Action Path)
Administrative Recommendation: The administration believes the following to be
required for the District’s long-term success: $10,000,000–$15,000,000 in bonding
authority to immediately implement safety & security equipment and technology
upgrades, a 1.0% increase (~$1.6M annually) to the existing capital project levy to
finance on-going safety, security, and wellness staff and related software and
equipment replacement costs, the additions to both South View and Valley View
middle schools, and a standalone Early Learning and Family Center.
• Confirm scope of projects and preferred referendum structure (bond +
levy, including whether initial safety technology is funded through the
bond).
• Initiate schematic design and cost validation for each major project
component; identify phasing approach and disruption mitigation.
• Refine safety/security technology program standards and produce a detailed
cost plan (including lifecycle replacement schedule).
• Confirm ongoing operating costs (custodial/maintenance staff, student and
staff wellness staff, security staff, utilities) and determine levy funding
requirements.
• Complete legal preparation: draft ballot language, coordinate with bond
counsel, and prepare Department of Education Review & Comment
submission materials.
• Identify an election date and backward-plan Board work sessions and
community engagement milestones leading to formal Board actions.