Agenda · Edina City Council
Edina City CouncilAgendaTuesday, April 21, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## City Council Meeting Agenda
April 21, 2026, 7:00 PM
Edina City Hall, Council Chambers, 4801 W. 50th St.
Participate in the meeting:
Watch the meeting on cable TV or YouTube.com/EdinaTV.
Provide feedback during Community Comment by calling 312-535-8110. Enter access code 2863 586
7069. Password is 5454. Press *3 on your telephone keypad when you would like to get in the queue to
speak. A staff member will unmute you when it is your turn to speak.
## Accessibility Support:
The City of Edina wants all residents to be comfortable being part of the public process. If you need
assistance in the way of hearing amplification, an interpreter, large-print documents or something
else, please call 952-927-8861 at least 72 hours in advance of the meeting.
1. Call to Order
## 2. Roll Call
3. Pledge of Allegiance
## 4. Approval of Meeting Agenda
## 5. Community Comment
During "Community Comment," the Mayor will invite residents to share issues or concerns that are not scheduled
for a future public hearing. Items that are on tonight's agenda may not be addressed during Community
Comment. Individuals must limit their comments to three minutes. The Mayor may limit the number of speakers
on the same issue in the interest of time and topic. Individuals should not expect the Mayor or Council to respond
to their comments tonight. The City Manager will respond to questions raised during Community Comments at
the next meeting.
## 5.1. City Manager's Response to Community Comments
## 6. Adoption of Consent Agenda
All agenda items listed on the Consent Agenda will be approved by one motion. There will be no separate
discussion of items unless requested to be removed by a Council Member. If removed the item will be considered
immediately following the adoption of the Consent Agenda. (Favorable roll call vote of majority of Council
Members present to approve, unless otherwise noted in consent item.)
## 6.1. Minutes: Work Session and Regular, April 7, 2026
Page 1 of 160
6.2. Payment of Claims
6.3. Traffic Safety Report of February 24, 2026
## 6.4. Purchase Request: Ouster LiDAR Vehicle Detection System
## 6.5. Purchase Request: Natural Areas Long-Term Maintenance for 2026-2028
## 6.6. Purchase Request: 2026 Commodity Quotes
6.7. Purchase Request: Edinborough Park Emergency Repairs for Fire Alarm and Smoke
## Evacuation System
6.8. Purchase Request: Prospect Knolls A/C/D & Parklawn Ct Neighborhood Roadway
## Reconstruction Materials Testing
## 6.9. Purchase Request: France Ave Sidewalk Phase 4 Construction
## 6.10. Purchase Request: France Ave Sidewalk Phase 4 Construction Services
## 6.11. Purchase Request: Parks & Recreation Annual Software Renewal
## 6.12. Purchase Request: Cleaning Services for Edina Aquatic Center
6.13. Purchase Request: Furniture, Fixtures, and Equipment for Edina Aquatic Center
## 6.14. Waive Permit Fees: Fred Richards Park Master Plan Implementation
## 6.15. Purchase Request: Helpdesk Software Subscription
6.16. On-Sale Intoxicating Liquor License: Cielito Lindo Southdale LLP dba Cielito Lindo
## 7. Special Recognitions and Presentations
## 7.1. Introduce Human Resources Director, Jessica Nikunen
## 7.2. Proclamation: Building Safety Month — May 2026
7.3. Proclamation: Arbor Day — April 24, 2026
## 7.4. I-494 Corridor Update
Page 2 of 160
8. Reports/Recommendations
## 8.1. Resolution 2026-20: Accepting Donations
## 8.2. Rosland Park Pedestrian Bridge Bid Results
8.3. Purchase Request: Professional Services for Preliminary Engineering of France Avenue
## Pedestrian Underpass
## 8.4. Sketch Plan Review - 7600 Parklawn (Senior Housing)
## 9. Manager's Comments
## 10. Mayor and Council Comments
11. Adjournment
Page 3 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 5.1 Department: Administration
## Item Activity: Information Prepared By: Scott Neal, City Manager
## Item Title: City Manager's Response to Community Comments
## Action Requested:
None, information only.
## Information/Background:
Responses to questions posed during Community Comment at the last meeting were posted on the
City's website (URL). City Manager Neal will provide summaries of those responses during the meeting.
## Supporting Documentation:
## None
Page 4 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 6.1 Department: Administration
## Item Activity: Action Prepared By: Sharon Allison, City Clerk
## Item Title: Minutes: Work Session and Regular, April 7, 2026
## Action Requested:
Approve minutes as presented.
## Information/Background:
## Supporting Documentation:
## 1. Minutes: Work Session, Apr. 7, 2026
2. Minutes: Regular, Apr. 7, 2026
Page 5 of 160
## MINUTES
## OF THE EDINA CITY COUNCIL
## WORK SESSION
## COMMUNITY ROOM, CITY HALL
## TUESDAY, APRIL 7, 2026
## 5:30 P.M.
## 1.0 CALL TO ORDER
Mayor Hovland called the meeting to order at 5:33 p.m.
## 2.0 ROLL CALL
Answering roll call were Members Agnew, Jackson, Risser, and Mayor Hovland. Pierce arrived at
5:36 p.m.
Staff in attendance: Scott Neal, City Manager; Ari Lenz, Assistant City Manager; Addison Lewis,
## Community Development Coordinator; Cary Teague, Community Development Director; Chad
## Millner, Public Works Director/City Engineer; Stephanie Hawkinson, Affordable Housing Manager;
Jesse Meyer-Ruude, I.T. Supervisor; and Sharon Allison, City Clerk.
Also present: Michael Stein, ZoneCo, City’s consulting partner (virtual), David Alkire, Chair of
Planning Commission to give PC’s feedback.
## 3.0 MEETING TOPICS
## 3.1 ZONING AND SUBDIVISON ORDINANCE UPDATE – R-1 ANALYSIS
Manager Neal introduced the topic and shared that it was presented to the Planning
Commission (PC) and Chair Alkire was present to share the PC’s feedback. Neal said staff were
asking for feedback, no decision.
Planning Coordinator Lewis shared the current zoning ordinance was adopted in 1970 and that
the vision, housing market and development in the R-1 zoning districts were different today. He
said in the last 5-10 years, the issue was amplified and an audit was done in 2024 in preparation
for the 2040 Comprehensive Plan. Key findings were the need for approval for simple
development projects, overly specific allowed uses and standards, and front yard setback
standards that created barriers and are burdensome. In addition to aligning with the Comp Plan,
he said this was an opportune or an ordinance that was simply and efficient as possible, easy to
understand, administer and amend, and uses plain language that reduces the potential for
erroneous or controversial interpretations. In addition to simplifying, other goals are updating
or creating new zoning districts, add development incentives, update permitted, conditional and
accessory uses, definitions, etc.
Council asked about timing, and staff indicated recommendations are anticipated later this year
or early next year. Council expressed interest in establishing clear guiding principles to inform
zoning decisions, including considerations such as sustainability, tree canopy, and neighborhood
character. Council noted that shared principles would provide consistency and help guide
decision-making when disagreements arise. There was also discussion about differences across
neighborhoods, including lot configurations, sidewalk presence, and tree canopy, and the need
to apply standards equitably while recognizing these variations. Council asked about impervious
Page 6 of 160
surfaces and environmental impacts, with staff noting that additional analysis may be addressed
in future phases of the work.
Consultant Michael Stein introduced a proposal to create R-1 subareas based on existing
neighborhood characteristics such as lot size, width, and depth. The intent is to better align
standards with existing conditions, simplify administration, and improve predictability for
residents. Front yard setbacks and nonconformities were identified as key issues, with
significant variation across neighborhoods often resulting in the need for variances. Examples
were discussed illustrating the current cost and complexity of subdivision and variance
processes, with staff noting that the proposed changes aim to reduce financial burdens and
increase predictability for property owners. Staff described proposed adjustments to reduce
setback creep and minimize the frequency of variances while maintaining neighborhood
character.
Feedback from the Planning Commission was noted as positive, particularly regarding improved
clarity and reduced costs for residents navigating the zoning process. Questions were raised
about infrastructure capacity, such as sewer systems, with staff confirming these factors are
evaluated during subdivision review. Council expressed general support for the direction of the
work.
## 4. ADJOURNMENT
Mayor Hovland adjourned the meeting at 6:36 p.m.
Respectfully submitted,
## Sharon Allison, City Clerk
## James B. Hovland, Mayor
Minutes approved by Edina City Council, April 21, 2026. Audio copy of the work session available.
Page 7 of 160
Page 1
## MINUTES
## OF THE REGULAR MEETING OF THE
## EDINA CITY COUNCIL
## HELD AT CITY HALL
## APRIL 7, 2026
## 7:00 P.M.
## I.0 CALL TO ORDER
Mayor Hovland called the meeting to order at 7:01 p.m.
## 2.0 ROLLCALL
Answering rollcall were Members Agnew, Jackson, Pierce, Risser, and Hovland.
## 3.0 PLEDGE OF ALLEGIANCE
## 4.0 MEETING AGENDA – APPROVED
Member Pierce made a motion, seconded by Member Jackson, approving the meeting
agenda. Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
## 5.0 COMMUNITY COMMENT
Ralph Zickert discussed comments made by Mayor Hovland regarding the 2026 budget and City
Manager Neal at the March 3, 2026, City Council meeting and stated that they were disrespectful.
Rick Vining stated that the 91 trees being proposed on the shoreline of Lake Cornelia would impact
the community negatively and would hinder residents from being able to enjoy the area.
Pieter Friedrich stated that the City should understand what the resolution going through the State
legislature contains. Mr. Friedrich discussed the Kona leadership and Hindu Nationalism associated
with the resolution.
Marillene Allen stated her support for a crosswalk on Coopers Avenue on Interlachen Boulevard.
Mrs. Allen read in full a statement from her grandson regarding an incident where he and his dog
were struck by a vehicle that failed to stop. Mrs. Allen noted that they need a crosswalk to make it
safer for residents to cross Interlachen Boulevard.
## 5.1. CITY MANAGER’S RESPONSE TO COMMUNITY COMMENTS
City Manager Neal responded to Community Comments from current and past meetings.
## 6.0 CONSENT AGENDA – ADOPTED
Member Pierce made a motion, seconded by Member Jackson, approving the consent
agenda as follows:
6.1. Approve regular and work session meeting minutes of March 17, 2026
6.2. Approve Claims for Payment for Check Register Pre-List Dated March 13, 2026,
totaling $2,069,662.17, Check Register Claims Pre-List Dated March 20, 2026,
totaling $962,868.14, and Check Register Claims Pre-List Dated March 27, 2026,
totaling $2,125,925.49
6.3. Sustainable Building Policy Partial Waiver for Braemar Arena Expansion
## Project
6.4. Request for Purchase, Lake Herbicide Treatments for Algae, awarding the bid
to the recommended low bidder, Lake Management Inc., at $20,594
6.5. Request for Purchase, Stormwater Assets Inspection 2026, awarding the bid to
the recommended low bidder, Barr Engineering at $127,000.00
Page 8 of 160
Page 2
6.6. Request for Purchase, Sanitary and Storm Sewer Manhole Lining, awarding the
bid to the recommended low bidder, Underground Utility Specialists at
$75,000.00
6.7. Adopt Resolution No. 2026-18, Authorizing Community Tree Planting Grant
## Agreement
6.8. Request for Purchase, York Pond Storm Water Improvements, awarding the
bid to the recommended low bidder, Boulder Creek Inc., at $832,865
6.9. Request for Purchase, Prospect Knolls A, C & D and Parklawn Court
Neighborhood Roadway Reconstruction, awarding the bid to the recommended
low bidder, McNamara Contracting at $9,999,999.25
6.10. Request for Purchase, Fred Richards Park Preconstruction Tree Removals,
awarding the bid to the recommended low bidder, Hoffman Unhorn
Construction at $162,076.00
6.11. Request for Purchase, Fred Richards Park Design and Engineering Construction
Administration, awarding the bid to the recommended low bidder, Confluence,
at $346,000
6.12. Request for Purchase, Network Storage Replacement, awarding the bid to the
recommended low bidder, LOGIS at $313,917.17
6.13. Adopt Resolution No. 2026-17, authorizing application for the Livable
## Communities Grant Program
## 6.14. Parks & Recreation Commission Appointment
6.15. Request for Purchase, July 4th Fireworks, awarding the bid to the recommended
low bidder, J&M Displays, Inc., at $20,500
## 6.16. Digital Accessibility Policy
Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
## 7.0 SPECIAL RECOGNITIONS AND PRESENTATIONS
## 7.1. PROCLAMATION: DAYS OF REMEMBRANCE – PROCLAIMED
Mayor Hovland read in full the proclamation declaring April 13-20, 2026, as Days of Remembrance
in Edina. Ian Nemerov, Days of Remembrance Event Organizer, accepted the proclamation and
thanked the City for how they honor the Days of Remembrance in the City. Mr. Nemerov noted
that the event will take place on April 14th, 2026, at Fire Station #2.
Member Jackson made a motion, seconded by Member Pierce, approving the
proclamation declaring Days of Remembrance on April 13-20, 2026, in the City of
Edina. Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
Asad Masood, new City Management Fellow, was introduced to the Council.
## 7.2. PROCLAMATION: NATIONAL 911 PUBLIC SAFETY TELECOMMUNICATOR
## WEEK – PROCLAIMED
Mayor Hovland read in full the proclamation declaring April 12-18, 2026, as National 911 Public
Safety Telecommunicator Week in Edina. Janelle Harris, Dispatch Supervisor, accepted the
proclamation and thanked the Council for their recognition of the hard work and critical duties the
911 dispatchers have.
Member Pierce made a motion, seconded by Member Agnew, approving the
## proclamation declaring National 911 Public Safety Telecommunicator Week as April
12-18, 2026, in the City of Edina. Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
Page 9 of 160
Page 3
## 7.3. PROCLAMATION: EARTH DAY – PROCLAIMED
Mayor Hovland read in full the proclamation declaring April 22, 2026, as Earth Day in Edina.
Sustainability Manager Bayer thanked the Council for the proclamation and discussed events the
City will be holding to celebrate Earth Day this year. Paul Thompson discussed the Earth Day
Festival that will be taking place on April 26, 2026.
Member Jackson made a motion, seconded by Member Pierce, approving the
proclamation declaring Earth Day as April 22, 2026, in the City of Edina. Ayes: Agnew,
Jackson, Pierce, Risser, Hovland. Motion carried.
## 7.4. ANNUAL SUSTAINABILITY AND CLIMATE ACTION UPDATE –
## PRESENTED
Sustainability Manager Bayer presented the annual sustainability update, including information
regarding the Climate Action Plan, progress towards goals, Conservation & Sustainability Fund,
2025 Grant & Tax Credit Funding for CAP Implementation, future of sustainability funding,
accomplishments, programs, capital investments, policies, Extreme Heat in Edina report, and looking
ahead.
The Council asked questions regarding soy-diesel conversion, additional data points from the single-
use bag ordinance, use of the land behind Fire Station #2, and bag fees. Sustainability Manager Bayer
stated that the soy-diesel project received a lot of State and Federal funding, and they have installed
the tank and updated all the trucks, and they will know in a few weeks if everything is running well
and shared that her goal is to ensure a sustainability element is put into the land behind Fire Station
#2.
The Council discussed the importance of comparative data to see how their goals are being met
and are creating an impact.
## 8.0 REPORTS / RECOMMENDATIONS
## 8.1. ORDINANCE NO. 2026-02, AMENDING SECTION 4-9-9; REPEALING AND
## REPLACING CHAPTER 6 ARTICLE III LAWFUL GAMBLING OF THE EDINA
## CITY CODE – ADOPTED
City Manager Neal noted they are advocating to develop a clean, easy system for lawful gambling in
the City. City Clerk Allison gave a brief overview of what was discussed and approved at the
February 17, 2026, City Council meeting.
The Council recommended limiting the ordinance to Edina-based nonprofits and removing the 10%
contribution to the City to not take funds from a good cause. City Manager Neal noted that if the
percentage is not established now, it will be hard to do so later.
Member Jackson made a motion to amend the definition in Section 6.63, licensed
organization, to include nonprofits located in Edina. Member Pierce seconded the motion.
Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
Member Jackson made a motion to eliminate Section 6.70, 10% contribution of net
profits to fund administered by the City. Member Pierce seconded the motion. Ayes: Jackson,
Pierce, Risser, Hovland. Nay: Agnew. Motion carried.
Member Jackson made a motion to adopt the amended Ordinance No. 2026-02,
Amending Section 4-9-9; Repealing and Replacing Chapter 6, Article III, Lawful
Page 10 of 160
Page 4
Gambling of the Edina City Code, and waive Second Reading if applicable. Member
Pierce seconded the motion. Ayes: Jackson, Pierce, Risser, Hovland. Nay: Agnew. Motion carried.
Member Jackson made a motion, seconded by Member Pierce, to approve summary
publication of Ordinance No. 2026-02. Ayes: Jackson, Pierce, Risser, Hovland. Nay: Agnew.
Motion carried.
## 9.0 COMMISSION CORRESPONDENCE (MINUTES AND ADVISORY
## COMMUNICATION) – Received
## 9.1. ADVISORY COMMUNICATION: E-BIKE REGULATION
## 9.2. ADVISORY COMMUNICATION: SUPPORT MITIGATION AND
## ADAPTATION SOLUTIONS LISTED IN EDINA’S EXTREME HEAT REPORT
## 10.0 MANAGER’S COMMENTS – Received
## 11.0 MAYOR AND COUNCIL COMMENTS – Received
## 12.0 ADJOURNMENT
Member Jackson made a motion, seconded by Member Pierce, to adjourn the meeting
at 9:18 p.m. Ayes: Agnew, Jackson, Pierce, Risser, Hovland. Motion carried.
Respectfully submitted,
## Sharon Allison, City Clerk
## James B. Hovland, Mayor
Minutes approved by Edina City Council, April 21, 2026. Video Copy of April 7, 2026, meeting
available.
Page 11 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 6.2 Department: Finance
## Item Activity: Action Prepared By: Pa Thao, Finance Director
## Item Title: Payment of Claims
## Action Requested:
Approve claims for payment
## Information/Background:
For security purposes and to meet ADA Web Content Accessibility Guidelines (URL), the detailed claims
reports are not included in the public packet but they are available to City Council through a secure
Board Portal. To request the claims reports, please submit a data request (URL).
## List of Payment Claims:
## 1. Check Register Claims Pre-List Dated 03.31.2026 Total $95,236.47
## 2. Check Register Claims Pre-List Dated 03.31.2026 Total $66.62
## 3. Check Register Claims Pre-List Dated 04.02.2026 Total $1,906,002.34
## 4. Check Register Claims Pre-List Dated 04.10.2026 Total $1,999,375.38
Page 12 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 6.3 Department: Public Works
Item Activity: Action Prepared By: Nick Bauler, Traffic Safety Coordinator, Andrew
## Scipioni, Transportation Planner
## Item Title: Traffic Safety Report of February 24, 2026
## Action Requested:
Approve the recommendations of the Traffic Safety Committee.
## Information/Background:
The Traffic Safety Committee recommends action on two items and no action on two items. The
Transportation Commission reviewed the report at their March 26 regular meeting and had no
additional recommendations.
## Traffic Safety Committee Recommendations:
## Section A Action Recommended
## A1. Request for crosswalk over Interlachen Blvd at Cooper Ave
Description Concern about lack of gaps to cross and only one marked
## crossing over Interlachen Blvd at Vandervork Ave
AADT 7,260 vehicles per day (2024)
Crashes Two in last 10 years, one involving a pedestrian
Ped/Bike Crosses 90 crosses from September 2025 study
Peak hour of 24 crosses at 1:30-230 PM
## Lane
## Configuration
Two travel lanes with standard bike lanes
## Previous Work Interlachen Blvd overlaid in 2019
## Unique
## Circumstances
Permanent dynamic display speed signs approx. 700' east
Proposed reconstruction of Interlachen Blvd in 2027 (Blake Rd to
## Mirror Lakes Dr)
TSC recommends a crosswalk over Interlachen Blvd at Cooper Ave per City's Pedestrian
Crossing Policy.
A2. Request for crosswalk over Concord Ave at W 60th St
Page 13 of 160
Description Concord for children crossing to go to Concord Elementary School
AADT 1,541 vehicles per day (2025)
Crashes Six in last 10 years
Ped/Bike Crosses 88 total in one day
Peak hour of 19 crosses at 9:00-1:00 AM
## Lane
## Configuration
Two travel lanes
## Previous Work Concord Ave reconstructed in 2008
## Unique
## Circumstances
Sidewalks on north, south and west intersection approaches
Proposed sidewalk on W 60th St east of Concord Ave
TSC recommends a crosswalk over Concord Ave at W 60th St per City's Pedestrian
Crossing Policy.
## Section B No Action Recommended
B1. Request for crosswalk over Interlachen Blvd at Mirror Lakes Dr
Description Concern about lack of gaps to cross and only one marked
## crosswalk over Interlachen Blvd at Vandervork Ave
AADT 7,260 vehicles per day (2024)
Crashes None in last 10 years
Ped/Bike Crosses 27 crosses in September 2025 study
Peak hour of 9 crosses at 8:45-9:45 AM
## Lane
## Configuration
Two travel lanes with standard bike lanes
## Previous Work Interlachen Blvd overlaid in 2019
## Unique
## Circumstances
## Sidewalk on Interlachen Blvd east of Mirror Lakes Dr
Proposed reconstruction of Interlachen Blvd in 2027 (Blake Rd to
## Mirror Lakes Dr)
TSC recommends no action per City's Pedestrian Crossing Policy.
B2. Request for increase crosswalk treatment over Valley View Rd at Cheyenne Trl
Description Concern about pedestrian safety
AADT 3,913 vehicles per day (2023)
Page 14 of 160
Crashes None in last 10 years
## Ped/Bike
## Crosses
42 crosses in September 2025 study
Peak hour of 14 crosses at 5:15-6:15 PM
## Lane
## Configuration
Two travel lanes with parking lane and striped shoulder
## Previous Work Sidewalk on east side of Valley View Rd
Crosswalk installed in 2024
TSC recommends no action per City's Pedestrian Crossing Policy.
## Section C Further Study Recommended
## Section D Requests Handled by Staff
D1. Complaint about vegetation blocking stop sign at W 42nd St and France Ave; staff trimmed
adjacent vegetation.
D2. Report of inoperable pedestrian crossing sign at W 70th St and northbound Normandale Rd;
referred to MnDOT staff.
D3. Report of downed tree branch near Wilryan Ave and W 66th St; staff cleared the obstruction.
## Section E Enforcement Referral
## Resources/Financial Impacts:
Traffic control signage and pavement markings within the public right-of-way are owned and
maintained by the Public Works Department. Changes or additions to signage or markings will be
funded through the Streets Division operating budget or the Pedestrian and Cyclist Safety (PACS)
Fund.
## Relationship to City Policies/Plans/Budget Pillars:
The recommendations in these reports support the goal in the Transportation Chapter of the
Comprehensive Plan to "manage, maintain and operate roadways to maximize, wherever possible, the
safety and mobility of all users and all modes."
## Reliable Service Livable City
## Values Impact:
## Engagement
Members of the public are given opportunities to provide additional
information to the Transportation Commission and City Council.
## Equity
The Traffic Safety Committee's recommendations are guided by the
## Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD) and
the City's local traffic policies. Staff strives to apply this guidance
equitably to all areas of the City.
Page 15 of 160
## Health
The Traffic Safety Committee recommendations promote the physical
well-being of all people who live, work or visit Edina.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 16 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.4 Department: Public Works
## Item Activity: Action Prepared By: Noah Silver, Electrical Supervisor
## Item Title: Purchase Request: Ouster LiDAR Vehicle Detection System
## Action Requested:
Approve Purchase Request for Ouster LiDAR Vehicle Detection System from Traffic Control Corporation
for $41,750.
## Requisition Number: 12600111
## Vendor: Traffic Control Corporation
## Equipment Status: Replacement
## Funding Source: Traffic Signal Repairs and Maintenance budget
Cost: $41,750
## Information/Background:
The existing video detection system for the 66th and Valley View Rd. traffic signal has exceeded its
service life. The new Ouster LiDAR Vehicle Detection System will ensure reliable vehicle detection for
this traffic signal and will be installed and maintained by City electricians.
## Resources/Financial Impacts:
This replacement is within the traffic signal operations budget and part of the City's traffic signal
upgrade and repair plan. The City of Edina will operate and maintain the new vehicle detection
system.
## Relationship to City Policies/Plans/Budget Pillars:
This aligns with the Comprehensive Plan and the City's traffic signal upgrade and repair plan.
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
## Stewardship
Capital assets and infrastructure systems are managed to minimize risk
and sustain service levels to be safe and reliable.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 17 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.5 Department: Public Works
## Item Activity: Action Prepared By: Jessica Vanderwerff Wilson, Water Resources
## Coordinator
## Item Title: Purchase Request: Natural Areas Long-Term Maintenance for 2026-2028
## Action Requested:
Approve purchase request for ENG 26-5 Natural Areas Long-Term Maintenance for 2026-2028 with
Landbridge Ecological for $634,694.86.
## Requisition Number: 12600112
## Vendor: Landbridge Ecological
## Equipment Status: N/A
## Funding Source: Stormwater Utility Fund
Cost: $634,694.86
## Information/Background:
The project consists of site preparation; furnishing, transporting, and installing all seeds, plant
materials, and other materials as required for the restoration and establishment of native plant
communities; and management of planting areas across 12 project areas. The project includes three
years of maintenance; final completion date is December 31, 2028.
## Resources/Financial Impacts:
## Stormwater Utility Fund - Natural Areas Maintenance Budget
## Relationship to City Policies/Plans/Budget Pillars:
## Climate Action Plan and Water Resources Management Plan
## Livable City
## Values Impact:
## Sustainability
Natural areas restoration supports clean water and a healthy
ecosystem.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 18 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.6 Department: Public Works
## Item Activity: Action Prepared By: Dave Goergen, Assistant Director
## Item Title: Purchase Request: 2026 Commodity Quotes
## Action Requested:
Approve Purchase Request for 2026 Public Works Commodities.
## Requisition Number: 12600120
## Vendor: Various
## Equipment Status: New and Replacement
## Funding Source: Public Works Operating Budget
Cost: $3,844.03
## Information/Background:
The following is a summary of commodities that may be used, depending on need, in 2026. This is an
annual contract with multiple vendors and commodities which will exceed a $20,000 purchase and by
approving this, the below pricing is locked in for the year.
Martin Marietta - Ready mix bituminous materials SPNWB330B $48.90, Ready mix bituminous materials
SPWEA340B $51.65, Ready mix bituminous materials SPWEB340B $50.70.
AVR - Concrete 200 cu yd $205.00, Concrete 400 cu yd $179.00.
Hawkins Inc - Hydrofluosilicic Acid $.56/lb, Liquid Chlorine $1.44/lb, Ortho-Polyphosphate 50/50 blend
$11.77/ Gal, Tonkazorb 3% $15.32/Gal, Ammonium Sulfate $10.69/ Gal.
ESS Brothers and Sons - San Sewer R1733 complete casting and lid $441, San Sewer R1733 casting only
$224, San Sewer R1733 lid only $217, St Sewer R2390 complete casting and lid $497, San Sewer R2390
casting only $224, St Sewer R2390 lid only $273, St Sewer 3067V complete casting and lid $635, St
Sewer 3067V casting only $248, St Sewer 3067V lid only $213, curb box $174.
## Crow Hassan Nursery - Weed Mowing $10.00/SF
All Around Concrete - Retaining Wall Repair $31.50, Concrete removal and replacement curb and
gutter $42.00, Concrete removal and replacement flatwork 4" $12.00, Concrete removal and
replacement flatwork 6" $13.25, ADA Ramp $14.25.
## Resources/Financial Impacts:
Funding for these commodities comes from various utility funds and Public Works operating budgets,
depending on what commodities are needed during the year.
Page 19 of 160
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation Reliable Service
## Values Impact:
## Health
Sound water and sanitary infrastructure is paramount to community
health.
## Stewardship
Re-investment in City infrastructure to ensure consistent customer
service.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 20 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.7 Department: Public Works
## Item Activity: Action Prepared By: Noah Silver, Electrical Supervisor
Item Title: Purchase Request: Edinborough Park Emergency Repairs for Fire Alarm and Smoke
## Evacuation System
## Action Requested:
Approve purchase request for change order #4 of contract #300151 for Edinborough Park emergency
repairs for fire alarm and smoke evacuation system from LVC Companies and Corporate Mechanical
for $60,630.00.
## Requisition Number: 300151 CO#4
## Vendor: LVC Companies and Corporate Mechanical
## Equipment Status: Repairs Needed
## Funding Source: Asset Prevention Fund
Cost: $60,630
## Information/Background:
The fire alarm and smoke evacuation system for Edinborough Park requires urgent repairs to ensure
the park remains open to the public and safe for all occupants.
## Resources/Financial Impacts:
Asset preservation will fund this repair. This change order will increase the total contract amount to
$289,663.
## Relationship to City Policies/Plans/Budget Pillars:
This aligns with the Comprehensive Plan.
## Strong Foundation Reliable Service Livable City
## Values Impact:
## Health
The smoke evacuation system ensures the safety of all building
occupants.
## Stewardship
Maintaining life safety systems for the building will provide safe
occupancy for the community well into the future.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
Page 21 of 160
## None
Page 22 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.8 Department: Public Works
## Item Activity: Action Prepared By: Aaron Ditzler, Assistant City Engineer
Item Title: Purchase Request: Prospect Knolls A/C/D & Parklawn Ct Neighborhood Roadway
## Reconstruction Materials Testing
## Action Requested:
Approve purchase request for ENG 26-2, Prospect Knolls A, C & D and Parklawn Court Neighborhood
Roadway Reconstruction Materials Testing, with Braun Intertec for $71,697.00.
## Requisition Number: 12600127
## Vendor: Braun Intertec
## Equipment Status: N/A
Funding Source: The improvements will be funded by special assessments, property taxes, storm
sewer utility, and the Pedestrian and Cyclist Safety (PACS) fund
Cost: $71,697.00
## Information/Background:
The project involves reconstruction of 3.25 miles of local streets, the replacement of existing concrete
curb and gutter, replacement of asphalt and concrete streets with asphalt, construction of new
concrete sidewalk on Parklawn Court, and localized rehabilitation of the sanitary sewer, watermain
and storm sewer systems in the neighborhood.
The project area includes West 70th Street, Antrim Court, Antrim Road, Antrim Terrace, Down Road,
Dublin Circle, Dublin Road, Fleetwood Drive, Kemrich Drive, Kerry Road, Lanham Lane, Lee Valley Circle,
Lee Valley Road, Parklawn Court, Shannon Drive, Tara Road, Tralee Drive, Village Drive, Weston Circle
and Wexford Road.
This contract will provide the necessary material testing to ensure the project is built according to the
specifications.
## Resources/Financial Impacts:
The improvements are listed in the 2025-2030 Capital Improvement Plan (CIP) under CIP numbers CIP
19-308, CIP 19-309, ENG23001, ENG25074. The improvements will be funded by special assessments,
property taxes, water utility, sanitary sewer utility, storm sewer utility, and the Pedestrian and Cyclist
Safety (PACS) fund.
Public Works will maintain the infrastructure following the warranty period.
Page 23 of 160
## Relationship to City Policies/Plans/Budget Pillars:
This project aligns with the Comprehensive Plan, Pedestrian & Bicycle Master Plan, Water Resources
Management Plan and Climate Action Plan and is included in the Capital Improvement Plan.
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
Engagement Residents have voiced concerns about the condition of the streets.
## Health
Well-maintained water, storm, and sanitary infrastructure is key to a
healthy community.
## Stewardship
Replacing aging infrastructure at the appropriate time is sound asset
management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 24 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.9 Department: Public Works
## Item Activity: Action Prepared By: Ben Jore, Senior Project Engineer
## Item Title: Purchase Request: France Ave Sidewalk Phase 4 Construction
## Action Requested:
Approve Purchase Request for France Ave Phase 4 Sidewalk Construction Services with New Look
Contracting for $528,729.75.
## Requisition Number: 12600124
## Vendor: New Look Contracting
## Equipment Status: N/A
Funding Source: Pedestrian and Cyclist Safety, Watermain, Storm Sewer, and Sanitary Sewer
Cost: $528,729.75
## Information/Background:
The project includes the installation of a sidewalk along the east side of France Avenue from 62nd
Street to Highway 62. It will be a 5-ft boulevard with a 5-ft sidewalk for the majority of the length.
Hennepin County has design requirements that the project was able to meet with the existing right-
of-way. Staff have worked directly with the property owners on specific impacts to each property,
such as trees, landscaping, fences, and driveway adjustments.
## Resources/Financial Impacts:
The improvements are funded by the Pedestrian and Cyclist Safety Fund (PACS). The City will
implement, own, and operate, including snow removal.
## Relationship to City Policies/Plans/Budget Pillars:
This project aligns with the Comprehensive, Pedestrian & Bicycle Master and Climate Action Plans.
## Strong Foundation Livable City
## Values Impact:
Stewardship Sound infrastructure is good asset management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 25 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.10 Department: Public Works
## Item Activity: Action Prepared By: Ben Jore, Senior Project Engineer
Item Title: Purchase Request: France Ave Sidewalk Phase 4 Construction Services
## Action Requested:
Approve Purchase Request for France Ave Phase 4 Sidewalk Construction Services with Bolton and
Menk for $97,500.00.
## Requisition Number: 12600119
## Vendor: Bolton and Menk
## Equipment Status: N/A
## Funding Source: Pedestrian and Cyclist Safety
Cost: $97,500
## Information/Background:
The project includes the installation of a sidewalk along the east side of France Avenue from 62nd
Street to Highway 62. It will be a 5-ft boulevard with a 5-ft sidewalk for the majority of the length.
Hennepin County has design requirements that the project was able to meet with the existing right-
of-way. Staff have worked directly with the property owners on specific impacts to each property,
such as trees, landscaping, fences, and driveway adjustments.
## Resources/Financial Impacts:
The improvements are funded by the Pedestrian and Cyclist Safety Fund (PACS). The City will
implement, own, and operate, including snow removal.
## Relationship to City Policies/Plans/Budget Pillars:
This project aligns with the Comprehensive, Pedestrian & Bicycle Master and Climate Action Plans.
## Strong Foundation Livable City
## Values Impact:
Stewardship Sound infrastructure is good asset management practice.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 26 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.11 Department: Parks & Recreation
Item Activity: Action Prepared By: Tracy Petersen, Assistant Director Parks &
## Recreation
## Item Title: Purchase Request: Parks & Recreation Annual Software Renewal
## Action Requested:
Approve purchase request for Parks & Recreation software renewal with CivicPlus, LLC for $47,821.05.
## Requisition Number: 12600118
## Vendor: Civic Plus, LLC
## Equipment Status: N/A
## Funding Source: Parks & Recreation Administrative Operating Budget
Cost: $47,821.05
## Information/Background:
This is the annual payment for the Parks & Recreation Department's recreation management software
system, Civic Rec. This system provides user-friendly and accessible registration for programs, events,
point-of-sale facility transactions and facility rentals offered through the department.
## Resources/Financial Impacts:
This system is budgeted in the Parks & Recreation Administrative Operating Budget. The amount for
2026 is a 3% increase from our renewal rate in 2025.
## Relationship to City Policies/Plans/Budget Pillars:
This registration system aligns with the Parks & Recreation Strategic Plan to provide community health
and wellness by engaging all residents in our parks, programs, recreation facilities and services.
## Reliable Service Better Together
## Values Impact:
## Equity
Provides an accessible registration format for all to access programs
and facilities.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 27 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.12 Department: Parks & Recreation
## Item Activity: Action Prepared By: Nate Morrison, Maintenance Supervisor
## Item Title: Purchase Request: Cleaning Services for Edina Aquatic Center
## Action Requested:
Approve purchase request for cleaning services at Edina Aquatic Center with Covas Cleaning
Services, LLC for $36,500.
## Requisition Number: 12600122
## Vendor: Covas Cleaning Services LLC
## Equipment Status: N/A
## Funding Source: Edina Aquatic Center Operating Budget
Cost: $36,500
## Information/Background:
This purchase is for pre-season deep cleaning, daytime and overnight cleaning services at the Edina
Aquatic Center for the 2026 season, June 4- August 23. These services provide a clean and safe
facility during all hours of operation for the 1,000-2,000 daily visitors in attendance.
## Resources/Financial Impacts:
This service is budgeted for within the Edina Aquatic Center operating budget.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation Reliable Service
## Values Impact:
## Health
This service provides a clean and welcoming environment for all users
of the facility
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 28 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.13 Department: Parks & Recreation
## Item Activity: Action Prepared By: Nate Morrison, Maintenance Supervisor
Item Title: Purchase Request: Furniture, Fixtures, and Equipment for Edina Aquatic Center
## Action Requested:
Approve purchase request for furniture, fixtures, and equipment for Edina Aquatic Center with
Henricksen for $196,809.60.
## Requisition Number: 12600131
## Vendor: Henricksen
## Equipment Status: New
## Funding Source: Edina Aquatic Center Bonding
Cost: $196,809.60
## Information/Background:
This purchase is for furniture, fixtures and equipment to service new amenities and enhance the
overall guest experience at the Edina Aquatic Center. The filter room construction project includes
replacing the existing shade structure and the addition of cabanas to increase the availability of
shaded spaces. The majority of the filter room project is not usable by Aquatic Center guests.
However, the new shade structure and cabanas provide a fresh, functional and modern aesthetic
improvement to the facility. The furnishings include comfortable, multi-functional pieces for families
and groups to gather and ADA-compliant seating for use throughout the facility. The proposed
furniture will also support new additional services, including cabana rentals, birthday parties and an
expanded food & beverage operation in those areas.
## Resources/Financial Impacts:
This equipment was budgeted for within the construction project bonding and is under OMNIA public
sector state contract pricing.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation Reliable Service Better Together
## Values Impact:
## Engagement
Creating comfortable and welcoming open spaces for the community
to connect.
## Equity
Adding much-needed ADA-compliant chairs for ease of use and
comfort for guests with limited ability to use existing furniture options.
Page 29 of 160
## Health
The Edina Aquatic Center creates a space where 70,000 people of all
ages gain physical health; providing updated furniture creates
welcoming/relaxing spaces for improved mental health and social
environment.
## Stewardship
Taking advantage of bulk purchasing power to replace existing assets
at a lower cost, and provide safer/updated furniture and greater value
to future generations of customers.
## Sustainability
All items were chosen based on being manufactured from recyclable
materials and/or have a long expected useful life.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 30 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 6.14 Department: Parks & Recreation
## Item Activity: Action Prepared By: Rachel DeVries, Park Planner
Item Title: Waive Permit Fees: Fred Richards Park Master Plan Implementation
## Action Requested:
Waive Permit fees for Fred Richards Park Master Plan Implementation's construction activities, inclusive
of all city permitting in the amount of $124,238.40.
## Information/Background:
The City has the authority to waive building fee permits for municipal building projects. By doing so,
the City is able to set aside the amount that would have been spent on the fees to instead add value
to the overall project, cover potential future change orders, or make the project more affordable by
reducing the total project cost. The total estimated building permit fees for this portion of the project is
$124,238.40.
## Building Permit Fee $75,296.00
## Plan Review Fee $48,942.40
Total $124,238.40
Permit fees are inclusive of the following scope of work: Demolition, Grading, Building Construction,
Building Renovation, Mechanical and Plumbing, Signage and all other project components for
construction of park and facilities at and on City Property, Fred Richards Park.
## Resources/Financial Impacts:
Project funded by Local Option Sales Tax.
## Relationship to City Policies/Plans/Budget Pillars:
## Strong Foundation Reliable Service Livable City Better Together
## Values Impact:
## Engagement
The project was engaged in 2016 to identify community needs through
outreach. Concepts were presented in 2024 for comments and
feedback.
## Equity
The project will examine accessibility and needs of regional users as well
as community surrounding the site. Barriers will be removed to create a
welcoming and high functioning space for all to enjoy. Architectural
design will be people-centered and reflect the needs of all users
## Health
Designs and layouts will promote physical and mental
health. Accessible connections to nature will be incorporated.
Page 31 of 160
## Stewardship
Designs will reflect city standards and needs for long term sustainability
and support. Strategic renovation and re-purposing will allow for
budget maximization as well as impact.
## Sustainability
Facilities will be designed to reflect the Park goals and support City's
sustainability goals. SITES and LEED will be pursued with this project.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 32 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 6.15 Department: IT
## Item Activity: Action Prepared By: Ryan Browning, IT Director
## Item Title: Purchase Request: Helpdesk Software Subscription
## Action Requested:
Approve purchase request for the annual helpdesk software subscription from HappyFox for
$31,609.20.
## Requisition Number: 12600129
## Vendor: HappyFox
## Equipment Status: Renewal
## Funding Source: IT Budget
Cost: $31,609.20
## Information/Background:
This request is for a one-year renewal of the HappyFox help desk software, used by departments to
track, manage, and respond to work requests. The system supports unlimited agents and ticket
requesters, making it a cost-effective solution to extend structured service tracking and improve
visibility across a larger number of staff.
## Resources/Financial Impacts:
This request is within budget and will be paid for out of the I.T. budget. I.T. also provides support for this
system.
## Relationship to City Policies/Plans/Budget Pillars:
This software enables more efficient support by tracking work for multiple City departments.
## Reliable Service
## Values Impact:
Stewardship Streamlines support for I.T., Communications, and Facilities.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## None
Page 33 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 6.16 Department: Administration
## Item Activity: Action Prepared By: Kari Sinning, Deputy City Clerk
Item Title: On-Sale Intoxicating Liquor License: Cielito Lindo Southdale LLP dba Cielito Lindo
## Action Requested:
Approve On-Sale Intoxicating and Sunday Sale liquor licenses for Cielito Lindo Southdale LLP dba
Cielito Lindo.
## Information/Background:
Cielito Lindo, located at 10 Southdale Center Suite 2290, has applied for On-Sale Intoxicating and
Sunday Sale liquor licenses. Staff reviewed the application and found that it complies with city code
requirements and a background investigation was completed by the Police Department. Staff
recommends approval of the liquor license.
## Supporting Documentation:
## None
Page 34 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 7.1 Department: Administration
## Item Activity: Information Prepared By: Scott Neal, City Manager
## Item Title: Introduce Human Resources Director, Jessica Nikunen
## Action Requested:
None, information only.
## Information/Background:
Jessica Nikunen will attend and introduce herself.
## Supporting Documentation:
## None
Page 35 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 7.2 Department: Fire
## Item Activity: Action Prepared By: Nate Borwege, Chief Building Official
## Item Title: Proclamation: Building Safety Month — May 2026
## Action Requested:
Adopt proclamation declaring May 2026 as Building Safety Month.
## Information/Background:
Throughout May, the City of Edina will participate in the 46th annual Building Safety Month, a worldwide
campaign presented by the International Code Council, its members, and partners to promote
building safety. This year’s campaign, “Built to Last,” encourages people to get involved in all aspects of
building safety. The campaign also makes the connection between building codes and personal
safety, as well as the important work done by building safety professionals in our communities.
This year’s campaign addresses how building safety impacts everyone at the personal, local, and
global levels.
• Week 1: Safe Homes, Strong Communities (May 1–10) focuses on simple actions homeowners
can take to improve safety at home.
• Week 2: Voices of the Built Environment (May 11–17) spotlights building safety professionals and
the roles they play in keeping communities safe.
• Week 3: Prepared to Protect (May 18–24) encourages community preparedness and highlights
how disaster-resilient building codes protect people and property.
• Week 4: Communities Without Limits (May 25–31) showcases the importance of accessibility in
building construction and design.
Our department is using Building Safety Month to educate the community. It is an opportunity to
increase public awareness of the role building safety and fire prevention officials, local and state
building departments, and federal agencies play to protect lives and property. They are the “silent
defenders” who are seldom seen but work daily to ensure safety in the built environment.
## Supporting Documentation:
## None
Page 36 of 160
## Proclamation: Building Safety Month — May 2026
Whereas, our City of Edina is committed to recognizing that our growth and strength depends on the
safety and essential role our homes, buildings and infrastructure play, both in everyday life and in
times of natural disaster, and;
Whereas, our confidence in the structural integrity of these buildings that make up our community is
achieved through the devotion of vigilant guardians––such as building safety and fire prevention
officials and others in the construction industry––who work year-round to ensure the safe construction
of buildings, and;
Whereas, these guardians are dedicated members of the International Code Council (ICC), who are
experts in the built environment to create and implement the highest-quality codes to protect us in the
buildings where we live, learn, work, play, and;
Whereas, these modern building codes and standards include safeguards to protect the public from
natural disasters such as hurricanes, snowstorms, tornadoes, wild land fires, floods and earthquakes,
and;
Whereas, Building Safety Month is sponsored by the ICC to remind the public about the critical role of
our communities’ largely unknown protectors of public safety––our local code officials–– who assure
us of safe, sustainable and affordable buildings that are essential to our prosperity, and;
Whereas “Built to Last,” the theme for Building Safety Month 2026, encourages us all to raise awareness
about building safety on a personal, local and global scale, and;
Whereas, each year, in observance of Building Safety Month, people all over the world are asked to
consider the commitment to improve building safety and to acknowledge the essential service
provided to all of us by local, state, tribal, territorial, and federal building safety and fire prevention
departments, in protecting lives and property.
Now, therefore, the City Council of the City of Edina, MN, hereby proclaims the month of May 2026, as
## Building Safety Month
In the City of Edina, MN, accordingly, I encourage our citizens to join with their communities in
participating in Building Safety Month.
Dated April 21, 2026
Page 37 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 7.3 Department: Parks & Recreation
## Item Activity: Action Prepared By: Luther Overholt, City Forester
## Item Title: Proclamation: Arbor Day — April 24, 2026
## Action Requested:
Adopt proclamation declaring April 24, 2026 as Arbor Day.
## Information/Background:
Arbor Day is a holiday that originated in Nebraska City, Nebraska by J. Sterling Morton, to encourage
the planting and caring for trees. The first Arbor Day was held on April 10, 1872, and an estimated one
million trees were planted that day. Many countries now observe a similar holiday. Though usually
observed in the Spring, the date varies, depending on climate and suitable planting season.
This will be the City of Edina’s 28
th
year as a Tree City USA city and our 6
th
year as a Tree City of the
World. Recognition is received annually as a Tree City for meeting their 4 core standards: Maintaining
a tree board or department, having a community tree ordinance, spending at least $2 per capita on
urban forestry, and celebrating Arbor Day.
Edina has been a Tree City of the World since the program’s inception 6 years ago. Tree Cities of the
World must successfully meet 5 core standards: Identify who is responsible for city trees, have an
official law or policy that governs the management of forests and trees, have access to a recent
inventory, survey, or canopy assessment, have a city budget for tree planting, maintenance, and
removal, host at least one or more public events celebrating trees and the workers who plant and
maintain them.
Edina and Minneapolis are the only two cities in the state of Minnesota to hold this
designation. Worldwide there are 200 recognized cities in 22 different countries. The increased
benefits include but are not limited to: clean water, clean air, stormwater management, lower urban
temperatures, better mental health, and crime reduction.
City Forester, Luther Overholt, will recognize the Edina Arbor Day celebration on Friday, April 24, 2026,
from 10 a.m.-2 p.m. at Creek Valley School Park. Staff will be planting over 50 new trees throughout the
park and will have free tree seedlings available. To assist with planning the event those interested in
volunteering to help plant trees are asked to RSVP by searching “Arbor Day” on the City of Edina
website.
## Supporting Documentation:
## None
Page 38 of 160
## Proclamation: Arbor Day — April 24, 2026
Whereas, in 1872, J. Sterling Morton proposed to the Nebraska Board of Agriculture that a special day
be set aside for the planting of trees, and
Whereas, this holiday, called Arbor Day, was first observed with the planting of more than a million
trees in Nebraska, and
Whereas, forest soils prevent flooding and reduce storm water by capturing and storing rainwater and
snowmelt, which is then slowly released to our lakes, streams and groundwater; and
Whereas, trees and forests improve our physical health by cleaning the air, reducing exposure to the
sun’s UV rays and decreasing temperatures during the summertime; and
Whereas, One tree provides $62,000 worth of pollution control over a period of 50 years; and
Whereas, trees can reduce the erosion of our precious topsoil by wind and water, cut heating and
cooling costs, moderate the temperature, clean the air, produce life-giving oxygen, and provide
habitat for wildlife, and
Whereas, forests create high-quality drinking water by acting as a natural filter; and
Whereas, Edina is proud of the beautiful shade trees which grace our homes and public places;
Now, therefore, be it resolved that the City Council of the City of Edina, MN, hereby proclaims April 24,
2026, as
## Arbor Day
in the City of Edina, MN, and call upon the spirited and foresighted citizens of Edina to plant trees now
for our pleasure and that of future generations.
Dated: April 21, 2026
Page 39 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 7.4 Department: Administration
## Item Activity: Information Prepared By: Scott Neal, City Manager
## Item Title: I-494 Corridor Update
## Action Requested:
None, information only.
## Information/Background:
I-494 Corridor Commission Executive Director, Melissa Madison, will give a brief presentation regarding
membership and services of the I-494 Corridor Commission.
## Supporting Documentation:
## 1. I-494 Corridor Presentation
Page 40 of 160
## Edina’s Return on Investment
in the I-494 Corridor
Commission and
## Commuter Services
Page 41 of 160
## Working Jointly on Transportation Improvements
## The I-494 Corridor Commission is a joint
powers organization established in 1986 to
address concerns about increasing traffic
congestion along the I-494 corridor
## Member cities include Edina, Richfield,
## Bloomington, Eden Prairie, and
## Minnetonka
Member cities pay $0.60 per resident per
city to the Corridor Commission
The City of Edina’s membership dues are
4% of our overall budget, so we are able to
provide Edina a great return on investment
Page 42 of 160
## The I-494 Corridor Commission Takes a Supply Side
## and Demand Side Approach
## to Slowing Traffic Congestion
Page 43 of 160
## Reduced Trips Are Not As Visible As A New Road
Page 44 of 160
95% of the Corridor Commission’s Budget is Spent on
## Demand Management, and 5% is Spent on Supply Side Projects
Page 45 of 160
## Commuter Services Staff
## In 2001 the I-494 Corridor
Commission hired staff to work
with employers to reach
employees with resources to shift
drive alone commuters into a
sustainable mode
## Edina receives Commuter Services
as part of your membership in the
## Corridor Commission
Page 46 of 160
## I-494 Corridor
•Over 340,272jobs near the I-494 corridor
in our five member cities compared with
216,000jobs in downtown Minneapolis
45,881jobs in downtown St. Paul
Most of the major interstates have a
Corridor Coalition to look out for the
interests of the communities along it
Page 47 of 160
## I-494 Corridor
•People from 85 out of 87 counties in
Minnesota use this section of I-494 on a
daily basis
Page 48 of 160
Commuter Services was created to influence employers and commuters
toward sustainable commute options
to slow the growth of traffic congestion and reduce demand for roads
Page 49 of 160
## We Hold Over 100 Onsite Commuter Fairs
## Annually
Page 50 of 160
## Strategies and Resources for Employers
Displays: with transit routes serving that employer,
bicycle commuting tips, carpool and Guaranteed
## Ride Home information
Preferential carpool parking: management of
carpool parking
Commuter Fairs: on-site, interactive events
Lunch & Learns: construction projects, how to bike
in traffic, updates on transit projects
Customized communications: written content to
promote sustainable commute options
Transit pass program enrollment assistance
Telework/Hybrid resources
Road construction updates
Page 51 of 160
## Commuter Services created Twin Cities Telework
## Twin Cities Telework Website
www.tctelework.com
Webinars
Ask an Expert
Newsletter
Free Consulting
Page 52 of 160
## Employers Have Requested
## Telework and Hybrid Resources
•Guidance on How to Create
## Connection on a Hybrid Team
## •Effective Communication Tips
•Ensuring equal opportunity for
participation from off-site employees
•Scheduling issues for gathering
together on-site
## •Ergonomic and Home Office Safety
recommendations
•Help with lack of consistent company
hybrid policies between departments
Page 53 of 160
## Edina Employer Outreach
50
th
## & France Business Association
## 7700 France Avenue
## Abdo
## Advent Talent Group
## Aurora on France
## BI Worldwide
## Braemar Office Park
## Caribou Coffee
## Casa de Corazon
## CBRE
## Centennial Lakes Office Park
## Cetera
## Children’s Hospitals and Clinics
## City of Edina
## Cool Planet
## Cub Foods
## Doherty Staffing Solutions
## DuPont Water Solutions (Dow/Filmtec)
## Edina Chamber of Commerce
## Edina Coffee Roasters
## Edina Library
## Edina Public Schools
## Edina Realty
## Edinborough Corporate Center
## English Rose Suites
## Fairview Ebenezer
## Fairview Health Services
## Frauenshuh
## Hellmuth & Johnson
## Homewood Suites by Hilton Edina
## Jerry’s Foods
## Katun Corporation
## Kowalski’s
## Lunds & Byerly’s
## M Health Fairview Southdale Hospital
## Microsoft Corporation
## MMIC Group
## Newbridge Health & Wellness
## Panera Bread
## Pentagon Park
## PGC
## Puttshack
## Royal Credit Union
## Seagate
## Southdale Center
## Southdale Library
## Southdale Office Center
## Southwest Suburban Cable Commission
## SpartanNash
## Sunrise Senior Living
Ta rg e t
## The Nerdery
## Westin Hotel
Page 54 of 160
## Quote from Joanne Mallon from Centennial Lakes Office Park
“Commuter Services is a
wonderful resource for our
tenants. They make daily travel
easier and more affordable while
supporting a more sustainable
community. Their guidance,
tools and programs help
commuters find smart, stress
reducing commuting options.”
Page 55 of 160
## Quote from Mary Younggren, CEO of Advent Talent Group
“Commuter Services has been a go-
to resource we share with
employees. Whether they are
mapping a transit route, exploring
carpool options or taking advantage
## of the Guaranteed Ride Home
program, the tools at
www.commuter.org
make
commuting easier and less
stressful.
Their telework resources have been
genuinely valuable!”
Page 56 of 160
## Individualized Commute Assistance
Ridematching: Individuals with a similar commute who are
interested in sharing the ride for carpooling or vanpooling
Customized transit information: Personalized trip itinerary,
schedules for bus or train, two free passes to try it
Bike commuting resources: Hennepin County bike trails map,
tips on biking in traffic, bike apps and the MN bike laws
Guaranteed Ride Home: $100 free taxi, Uber or Lyft rides per
year as a safety net for people who use an alternative to
driving alone to work
Telework/Hybrid resources: Deep set of resources for
teleworkers and hybrid workers, telework trends newsletter,
## Ask An Expert, webinars
Resources in multiple languages: We carry several of our most-
used resources in Spanish and Somali, but can translate to
other languages as requested
Page 57 of 160
## 884 Edina Residents and Commuters
## Requested Sustainable Commuting Resources
Page 58 of 160
## After We Assist People with Customized Commute
## Resources We Survey to Determine Mode Shift
91% of drive-alone commuters report they
tried the mode we helped them with
Page 59 of 160
## We Ask: How Frequently Are You Using Your New
Mode Now?
## Once Per Week = 37%
## Twice Per Week = 19%
## Three Days Per Week = 11%
## Four Days Per Week = 9%
## Five Days Per Week = 19%
## Do Not Use New Mode = 5%
Page 60 of 160
## Quote from Michelle O’Kelley, Edina Commuter from
## Advent Talent Group
“I have personally used
## Commuter Services to
evaluate and plan viable
transportation options,
including public transit, biking
and carpooling.
The assistance I received was
individualized, practical and
not one-size fits all.”
Page 61 of 160
## Quote from Will Madry, Edina Commuter from
## BI Worldwide
“I love incorporating biking into my
commute. Having time outside
and starting the day with exercise
is amazing.
I bike to lower my carbon
emissions and cut out pollution as
much as I can.
It makes me feel way more
productive when I haven’t had to
navigate a snarl of traffic to get to
## Edina.”
Page 62 of 160
Outreach in the Community
Community events provide an excellent
way to reach residents. In 2025 and 2026,
Commuter Services has participated in:
EdinaRides
## Edina Clothing Swap
## Edina Jewelry Swap
## Edina Toy Swap
## Edina Earth Day
## Edina Farmers Markets
Edina State of the City
## Metro South Adult Basic Education
## Edina Senior Center Health Fair
## Southdale YMCA Senior Health Fair
## Edina Fall Into the Arts
## City of Edina Fire Station 2 Open House
Page 63 of 160
## Working with the Joint Community Police Partnership
## Fourty-Fourty Flats
The Sound on 76th
## Metro South Adult Basic Education
And more are planned...
Page 64 of 160
## Residential Outreach
## Commuter Services Residential Outreach program
builds relationships with multifamily property
managers who, in turn, pass along our free
transportation resources to their residents
Free displays, transit maps, transit route schedules, bike
maps
Information about the Transit Assistance Program for
low- and fixed income residents
Tabling at resident events to share resources; all
residents get free bus tokens to try transit
Provide construction updates through direct emails
Commuter Services currently shares resources with 28 Edina
Multi-Unit residential properties
Page 65 of 160
## Edina Residential Properties We Work With
51 France
71 France
Cedars of Edina
Durham Edina
Ebenezer
## Edina Highland Villa
Edina Park
Ewing Place
Forty-Forty Flats
Highland Management
Interlachen Court
Maison Green
Millennium
Nolan Mains
Oaks Braemar
Oaks Lincoln
Oaks Vernon
## One Southdale Place
Onyx
Parklawn Estates
The Bower, The Eddi, Edina Towers, The Sound, York Place, York Plaza,
## Willows on France
Page 66 of 160
## We Hosted a Metro E Line Webinar for Edina
## Residents, Employers and Commuters
Watched by 192 people
Page 67 of 160
## The Webinar is Available to Watch Any Time on Our
## YouTube Channel:
www.youtube.com/@commuterservices494
Page 68 of 160
## Commuter Services
## Annual Results by Mode
1,887 new transit riders
1,635 new carpoolers
1,254 new bicycle commuters
937 new teleworkers
43 new vanpoolers in 15 vanpools
5,756 Drive alone commuters switch to using a sustainable
commute mode (three or more days per week) after receiving
customized assistance from Commuter Service
Page 69 of 160
Resulting in an estimated 56 million vehicle miles avoided annually
as a direct result of Commuter Services outreach
Page 70 of 160
## Annual Report Summary
56 million vehicle miles avoided is 23,234
metric tons of CO2 emissions saved
Page 71 of 160
Making a difference
It takes 1,161,692 million mature trees to reduce
the same amount of CO2 emissions
Page 72 of 160
## We Are Helping the City of Edina Reach Your
## Climate Action Goals
Page 73 of 160
Thank You!
For information, please contact:
## Melissa Madison
## Executive Director
## Commuter Services
612-749-4494
melissa@494corridor.org
www.commuter.org
Page 74 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 8.1 Department: Administration
## Item Activity: Action Prepared By: Kari Sinning, Deputy City Clerk
## Item Title: Resolution 2026-20: Accepting Donations
## Action Requested:
Approve resolution 2026-20 accepting donations.
## Information/Background:
To comply with State Statute, all donations to the City must be accepted by resolution and approved
by two-thirds majority of the Council.
## Supporting Documentation:
## None
Page 75 of 160
## Resolution 2026-20: Accepting Donations
Whereas Minnesota Statute 465.03 allows cities to accept grants and donations of real or personal
property for the benefit of its citizens and;
Whereas said donations must be accepted via a resolution of the Council adopted by a two-thirds
majority of its members.
Now, therefore, be it resolved that the Edina City Council accepts with sincere appreciation the
following listed donations on behalf of its citizens.
## Edina Senior Center
## Friends of the Edina Library $5,000.00 General Use
## Edina Parks & Recreation
## Edina Girls Athletic Association $3,200.00 Bench Donation
## Jennifer and Scott Gill $700.00 Two Trees
## Suzanne and Kip Knelman $350.00 One Tree
## Edina Police Department
## Kowalskis Edina Market $150.00 Cops on the Court Donation
## Jerry's Foods Edina $200.00 Cops on the Court Donation
## Chick Fil A Bloomington $543.00 Cops on the Court Donation
## Starling $500.00 Cops on the Court Donation
## Chick Fil A Bloomington $1,098.00 Dia del Nino Donation
## Zensai Spa $420.00 Mothering Series Donation
## Starling $500.00 Mothering Series Donation
Dated: April 21, 2026
Page 76 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 8.2 Department: Public Works
Item Activity: Discussion Prepared By: Chad Millner, Director of Public Works and City
## Engineer
## Item Title: Rosland Park Pedestrian Bridge Bid Results
## Action Requested:
None, discussion only.
## Information/Background:
The Rosland Park Pedestrian Bridge is a piece of critical transportation infrastructure that must be
replaced. The bridge connects the north and south communities by providing a safe overpass bridge
above Minnesota Highway 62. It is a critical connection for pedestrians from northern Edina to
safely access Rosland Park and its amenities, including the Edina Aquatic Center. The current
pedestrian bridge is owned and managed by the Minnesota Department of Transportation (MnDOT). It
was built in the 1960s. The bridge does not meet Americans with Disabilities Act (ADA) standards and
was substantially damaged when it was struck twice in 2022 by vehicles traveling on Minnesota
Highway 62. The damage resulted in the closure of the bridge for most of 2022, until expensive
temporary repairs were made in January 2023.
Project goals
• Improve safety and mobility for all users
• Create ADA compliant pedestrian and bike route
• Improve connectivity between the residential neighborhoods and Rosland Park
• Limit impacts on residential and park properties, trees, and road operations with an eye on long
term operations and maintenance
## Engagement
• April 12, 2023, Resident Meeting
• Nov. 8, 2023, Resident Meeting
• Nov. 21, 2023, City Council Meeting – Council directed for more community feedback
## • Nov. 22, 2023, Created BTE Website
• Dec. 14, 2023, Community Meeting - 3 Councilmembers in attendance
## • Dec. 19, 2023, City Council Meeting
• Jan. 11, 2024, Resident Meeting
## • Feb. 22, 2024, BTE Updated Concepts and Matrix
## • March 1, 2024, BTE Graphical Renderings
• March 5, 2024, BTE additional Graphical Renderings
• March 19, 2024 City Council Meeting – Location and Alignment Decision
## • June 18, 2024 City Council Meeting – Architect Selected
Page 77 of 160
## • January 21, 2025 City Council Meeting – Project Update
• March 18, 2025 City Council Meeting – Bridge Fabricator Contract Awarded
## • June 3, 2025 City Council Meeting – Project Update
## • September 16, 2025 City Council Meeting – Project Update
• April 13, 2026 Open Bids
• April 21, 2026 – City Council Meeting – Review Bids
• May / June 2026 - City Council Meeting – Award Contract
• 2026 / 2027 Construction TBD
All the required user groups at MnDOT have signed off on the final plans. This included an ADA review.
Staff bid the project with 3 build options with 2 schedules. This was done to create options for the
contract award that best meets budget and construction timing. Build options were no cladding,
partial cladding ( bridge only), and full cladding (bridge & ramps). 4 contractors bid on the project.
Two completion dates were bid, December 1, 2026 and June 1, 2027. The December 1, 2026 completion
date was approximately $1.1 million more expense and the June 1, 2027 completion date. Staff would
recommend the June 1, 2027 completion date. Lunda Construction was the lower bidder for all three-
build options using the June 1, 2027 completion date. Using the low bids and adding total project costs
such as the steel truss and engineering, the following are the total project costs.
1. $7.6M No Cladding
## 2. $8.0M Partial Cladding - Bridge Only
3. $8.4M Full Cladding – Bridge and Ramps
Budget: Recall we secured $6.2M in various state funds for this project. A funding gap exists ranging
from $1.4 (No Cladding) to $2.2M (Full Cladding). Staff is willing to use a combination of Municipal
State Aid (MSA) and Pedestrian and Cyclist Safety (PACS) funds to cover the no cladding gap. Using
these funds will delay a sidewalk along Olinger Boulevard and delay a few smaller MSA maintenance
type projects. It will also use PACS funds dedicated to the Prospect Knolls Project.
If council requires the full cladding option, closing the funding gap becomes much more impactful to
infrastructure due for maintenance. We would have to delay the Wooddale Avenue Bridge
Replacement Project from 2029 to 2030, delay two bridge beam painting projects on the Benton
Avenue and Valley View Road bridges over CPKC Rail from 2030 to 2031, and delay Hillary Lane
Reconstruction from 2031 to 2032. The delays to MSA projects will continue in out years.
Staff would recommend a June 1, 2027 completion date with no cladding.
## Resources/Financial Impacts:
TBD based on the review of the bid results.
## Relationship to City Policies/Plans/Budget Pillars:
This project aligns with the Comprehensive Plan, Pedestrian & Bicycle Master Plan and Climate Action
Plan and is included in the Capital Improvement Plan.
## Strong Foundation Reliable Service Livable City Better Together
Page 78 of 160
## Values Impact:
## Engagement
Residents have voiced many concerns about the lack of an ADA
compliant bridge over Highway 62 at Rosland Park.
## Equity
Improving multimodal transportation options in Edina ensures that
residents who do not have a car — whether that be because they are
low-income, seniors who no longer drive, or children — are able to live
their daily lives and experience all that Edina has to offer
## Health
Many of the non-car transportation options this project will promote
inherently improve residents' health by giving them more opportunities
to walk and bike.
## Stewardship
Replacing aging infrastructure at the appropriate time is sound asset
management practice.
## Sustainability
Providing pedestrian and bicycle transportation options should reduce
vehicle miles traveled.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Staff Presentation
Page 79 of 160
## EdinaMN.gov
## Rosland Park Pedestrian Bridge
## Bid Results
## April 21, 2026City Council Meeting
## Chad Millner, Public Works Director / City Engineer
Page 80 of 160
## Project Team, Engagement, Approvals
## •Bolton Menk, Snow Kreilich Architects, and Anderson Bridges
•13
th
public meeting this project has been discussed.
•Meetings started April 2023.
•MnDOT Bridge and all MnDOT user groups have approved the project. This included
an ADA review.
Page 81 of 160
## Construction Completion Dates
•Schedule #1 December 1, 2026Completion Date
•Schedule #2 June 1, 2027Completion Date was $1.1 million less.
•All Project Costs will be using Schedule #2 with a completion date of June 1, 2027.
Page 82 of 160
## Cladding Options
•No Cladding
•Partial Cladding –Bridge Only
•Full Cladding – Bridge and Ramps
Page 83 of 160
## NoCladding
Page 84 of 160
## Partial Cladding Bridge Only
Page 85 of 160
## Full Cladding Bridge and Ramps
Page 86 of 160
## No Cladding
Page 87 of 160
## Partial Cladding Bridge Only
Page 88 of 160
## Full Cladding Bridge and Ramps
Page 89 of 160
## Bid Results and Funding
•$7.6 million No Cladding
## •$8.0 million Partial Cladding – Bridge Only
•$8.4 million Full Cladding – Bridge and Ramps
•Recall, $6.2 million secured in state funds.
•Funding gap of $1.4 million (no cladding) up to $2.2 million (full cladding).
Page 90 of 160
## FundingImpacts
•Recommend no cladding and delay Olinger Sidewalk Project, use PACS funds from
Prospect Knolls Neighborhood Project, and delay miscellaneous municipal state aid
maintenance projects.
•If Council requires full cladding, very impactful to infrastructure due for maintenance.
•Delay Wooddale Avenue Bridge Replacement from 2029 to 2030.
•Delay 2 bridge beam painting projects from 2030 to 2031.
•Delay Hillary Lane Reconstruction from 2032 to 2033.
•Delay all future MSA projects.
Page 91 of 160
## Discussion
•Not asking to award a contract tonight.
•We need to understandwhat to award tonight.Wewould bring back a contract after
MnDOT completes their bid review.
Page 92 of 160
## Purchase Request
April 21, 2026
## City Council
## Item Number: 8.3 Department: Public Works
Item Activity: Action Prepared By: Chad Millner, Director of Public Works and City
## Engineer, Bill Neuendorf, Economic Dev Mgr
Item Title: Purchase Request: Professional Services for Preliminary Engineering of France Avenue
## Pedestrian Underpass
## Action Requested:
Approve or Deny a purchase request for Professional Services for preliminary engineering for the
## proposed France Avenue Pedestrian Underpass with LHB for $387,527.00
## Requisition Number: 12600116
## Vendor: LHB
## Equipment Status: NA
## Funding Source: Centennial Lakes TIF
Cost: $387,527.00
## Information/Background:
## Bid Summary
In Fall 2025, the City issued a Request for Proposal (RFP) for preliminary architectural and engineering
services for 30% design of a proposed France Avenue Pedestrian Crossing / Underpass.
Four teams responded by the November 2025 deadline. The lead organization and proposed costs are
summarized below:
• Bolton & Menk $392,501
• Kimley Horn $395,960
## • LHB $387,527
## • TKDA $414,800
A review team consisting of staff from multiple City Departments and Hennepin County reviewed and
discussed each proposal in November 2025. The review team noted that each of the four proposals
were submitted by qualified and experienced companies with teams in the Twin Cities. The review
team agreed that the proposal from LHB noted the strong understanding of the project goals, was
responsive to the RFP and offered services at the lowest cost. These combinations of factors lead the
review team to conclude that the LHB proposal offered the best value to the City.
## About the LHB Team
LHB is a multi-disciplinary professional service firm with a staff of 225, with offices in Minneapolis,
Cambridge, Duluth, and Superior, WI. LHB is known for design leadership and loyalty to clients. The
firm’s background is deeply rooted in road and bridge work. They have worked extensively in all
phases of municipal project delivery including scoping, preliminary and final design, and construction
Page 93 of 160
inspection and administration. For the proposed France Avenue project, LHB intends to provide project
management, public engagement, roadway and ADA design, survey, bridge and wall design, staging,
and plan development.
LHB's proposal noted relevant experience including previous work for: City of Edina, Dakota County,
City of Minneapolis, Washington County, City of Wayzata, City of Duluth, Olmsted County, City of Grant
## and Three Rivers Community Action
LHB's team is anticipated to be lead by Brad Reifsteck, PE (Project Manager) and Matt Settergren, PE
(Project Principal / Quality Manager).The LHB's internal team of engineers, architects and planners is
supplemented by additional experts at SEH and Confluence.
## Contract Execution to Satisfy City Objectives
Per the terms of the RFP, proposal and contract, the LHB Team will work closely with staff of City of
Edina, Hennepin County, and adjacent property owners to begin design of a pedestrian-focused
underpass that extends below France Avenue between Gallagher Drive and 72
nd
Street. This level of
design is sufficient to refine the design in a manner that will be acceptable to Hennepin County,
enable the City to pursue funding from external programs and refine the estimated construction costs
for the project.
This proposed underpass would be incorporated into the design of the westerly Promenade that
extends through the redevelopment sites on both sides of France Avenue. The intention of the
proposed underpass is to establish a dedicated route for pedestrians and bicyclists that is separated
from the nine (9) lanes of vehicle traffic on France Avenue / County Road 17. The LHB team is aware of
the City's intention to incorporate a "people-first" design so that this underpass is not only functional,
but safe and inviting to users. The completion of this contract is anticipated to take 11-12 months.
The design character of the proposed underpass is heavily influenced by the human experience of
traveling to and through the underpass to reach their ultimate destination. Personal safety, both
actual and perceived, is essential for the design. Keeping the underpass as short as possible with
direct views through to activity on the other side is important. Bringing natural light in during the day
and allowing light from inside the underpass to shine up at night is also important to make the
inside/outside connection. Lighting, interior surface materials and colors, artwork, and shapes of walls
and ceilings will all influence the feeling of safety.
## About the Proposed Promenade Extension / Underpass Project
The redevelopment of the parcels at 7200/7250 and 7235 France Avenue presents an opportunity to
extend the Edina Promenade in the westerly direction to connect the South Cornelia and Parklawn
neighborhoods. The approved site plans include new public sidewalks, public trails and public plazas
that collectively serve to extend the Edina Promenade so that the general public has permanent rights
to travel through these spaces.
The redevelopment of these sites also creates an opportunity to improve the pedestrian and bicycle
crossing of France Avenue. There have been multiple studies over the past two decades which noted
Page 94 of 160
the desire for a grade separated crossing of France Avenue. The width and traffic volumes of this
County Road create a barrier to pedestrian movements. This barrier has existed for many decades.
Challenges for implementation include right-of-way, roadway geometry, traffic volumes and funding.
The Nine Mile Creek Regional Trail crosses France Avenue at Gallagher Drive. This proposed underpass
project would not remove this crossing nor replace the current alignment. Users of the trail would have
a choice on how to cross France Avenue. Trail use was measured near 7235 France Avenue at an
average of 300 users per day for a week on September 2024.
The City of Edina has explored various methods and locations for a pedestrian crossing, finding the
current proposal for a pedestrian underpass most viable due to favorable grades and the concurrent
redevelopment of adjacent properties. In 2025, a 5-minute video was created to illustrate one
example of how this proposed underpass could be designed to create new pedestrian
improvements.
The project's goals include ensuring a safe and comfortable crossing, maintaining current traffic
conditions, adhering to Hennepin County's roadway standards, integrating with ongoing
redevelopment, extending the character of Centennial Lakes Park and The Promenade, and aligning
with the Greater Southdale Area Plan and other city plans. The proposed pedestrian underpass would
connect the neighborhoods west of France Avenue to the Centennial Lakes/Promenade
neighborhoods east of France Avenue, enhancing pedestrian and bicyclist access. It should integrate
seamlessly with the character of Centennial Lakes and The Promenade, reflecting their design and
investment, while influencing private developments to ensure a cohesive and engaging experience for
users.
## Summary of Public Engagement
City staff has engaged the adjacent property owners, neighbors and general public on multiple
occasions since this current study began in 2023. Initially, a "scrapbook of ideas" was compiled to
identify and understand realistic options to extend the Edina Promenade and improve connections
across France Avenue. The Better-Together-Edina website was used as the primary method to collect
ideas and comments. A large neighborhood meeting was held in 2025 and a public open house was
held earlier this month. The website was well used and the in-person meetings were well attended.
Opinions and support for this proposed project are varied. In general, the following types of comments
have been heard consistently since this pedestrian crossing began to be studied:
• Younger people tend to support this project due to the functional and quality of life benefits it
could deliver
• Older people tend to oppose this project because they do not intend to walk or bicycle in this
area and are concerned with City spending and property taxes
• Good design is essential to minimize personal safety risks including potential conflicts between
bicyclists and slower moving pedestrians
• Support tends to decline if the construction or maintenance costs of this project results in a
significant increase in property taxes paid by residents
Page 95 of 160
## Contract Financing
This contract is funded by existing monies held in the Centennial Lakes TIF Fund. These funds can be
used for design and construction of public infrastructure improvements such as roads, bridges,
sidewalks and trails.
## Overall Project Financing
If the City Council chooses to fund construction of this proposed underpass in the future, multiple
funding sources will be pursued. The City's general tax levy is not expected to be a source for
construction funding. The primary funding will come from the new property taxes paid by the
commercial properties at 7200, 7250 and 7235 France Avenue. Tax Increment Financing (TIF) Districts
have previously been established at these properties. While existing taxes from these properties will
continue to be distributed to City, County, Schools and State, the new taxes will be dedicated to
financial obligations incurred in this immediate area.
There are multiple grant opportunities and transportation programs available to supplement the
City's funding. If City Council approves this contract, staff will also start applying for grant funding
opportunities.
## Direction Needed
This concept has been discussed since 2007. Most recently, this underpass has been explored (on and
off) for nearly 3 years. The purchase request has been delayed until both properties are clearly on the
path to redevelopment. The properties on the west side of the street are under construction with
completion expected in late 2026 and early 2027. The 7235 property on the east side of France Avenue
was recently acquired by the real estate developer with site preparation and ground breaking for the
first phase of new construction anticipated in 2026.
Today, staff is seeking direction from City Council to proceed with 30% engineering design and grant
funding applications, or to pause the project for future consideration, or to end study of this potential
project now.
## Resources/Financial Impacts:
This contract is funded by Centennial Lakes TIF Fund. If approved, staff will start submitting
applications for grant funding to assist with funding this project. Maintenance funding and
responsibilities will be determined once the actual project elements are finalized.
## Relationship to City Policies/Plans/Budget Pillars:
This proposed project aligns with the Comprehensive Plan, Pedestrian & Bicycle Master Plan and
Climate Action Plan and is included in the Capital Improvement Plan.
This project could improve non-motorized connections between neighborhoods that are separated
by a wide and busy county road. Improvements like this contribute to a more livable city by creating
new options that are not currently available and improve the overall quality of life for residents,
employees and visitors.
## Livable City
Page 96 of 160
## Values Impact:
## Engagement
A wide range of feedback—both supportive and critical—has been
gathered about this project.
## Equity
This project provides new travel options for pedestrian and bicyclists
while retaining existing routes for drivers. This project is located at the
boundary of Edina's two most populous census tracts. Compared to
Edina as a whole, residents in these census tracts tend to be older in
age, lower in household income, with higher percentages of disabilities.
Improving multimodal transportation options in Edina ensures that
residents who do not have a car — whether that be because they are
low-income, seniors who no longer drive, or children — are able to live
their daily lives and experience all that Edina has to offer.
## Health
This project provides an alternative to driving. It enables pedestrian and
bicycle access whether for leisure, fitness or commuting to work or
errands. New non-motorized routes inherently improve residents' health
by giving them more opportunities to walk and bike.
## Stewardship
This type of project transforms mobility in the most densely populated
area of Edina and will serve nearby residents and visitors for
generations.
## Sustainability
This project improves mobility for vehicles and modes that have a
dramatically smaller carbon footprint compared to typical motorized
vehicles.Providing pedestrian and bicycle transportation options may
also reduce vehicle miles traveled, especially short trips.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Staff Presentation
## 2. Community Comments April 2026
Page 97 of 160
## Extending the Edina Promenade
## France Avenue Pedestrian Crossing
## City Council
April 21, 2026
## For Discussion
Page 98 of 160
2
## Overview
•Background
•Alternatives Considered
•Proposed Concept
•Cost & Financing
•Community Outreach
•Next Steps
Page 99 of 160
3
## Discussion Needed
HRA provided direction in 2023. 2024 Feasibility Report unable to identify any red
flags that would prevent construction. Developers are moving forward. HRA &
City should soon decide how they will proceed (if at all)
• Option 1a – Proceed with intention to construct in phases in the near future
• Option 1b –Proceed with preliminary design and budget preparation and delay
decision-making whether or not to proceed to the future
• Option 2 –Do not study this concept further
Page 100 of 160
4
## Background and Existing Conditions
Page 101 of 160
5
Background; 2007 URS Study identified several needed improvements
Page 102 of 160
6
Approved site plans -privately led development with public easements
Page 103 of 160
7
Alternatives Considered, 2007 alignment and early modification
2007 Study by URS shows bridge at 72
nd
## St
2023 Sketch by CSG shows bridge or
tunnel between 72
nd
## St and Gallagher Dr
Page 104 of 160
8
Alternates Considered; traffic calming - local & through separation
Page 105 of 160
9
Alternatives Considered; traditional tunnel
Page 106 of 160
10
Alternatives Considered; tunnel leading to outdoor plaza
Shakopee pedestrian tunnel
terminates in outdoor plaza
## John Hancock Plaza in Chicago is
appealing to pedestrians
Page 107 of 160
11
Alternatives Considered; examples of bridge with ramps & steps
Page 108 of 160
12
Alternatives Considered; modernbridge with ramps
Page 109 of 160
13
## Alternatives Considered; bridge along Nine Mile Creek bike trail
Page 110 of 160
14
Alternatives Considered; bridge with steps and elevator
Page 111 of 160
15
Alternates Considered; iconic bridge and land bridge
Page 112 of 160
16
Alternatives Considered; underpasses in near vicinity
Page 113 of 160
17
Concept Layout; Aerial view showing pedestrian and vehicle routes
Page 114 of 160
18
## Estimated Project Cost
•$ 0 M -Land
•$ 4.2 M -Bridging structures & retaining walls
•$ 1.5 M -Architectural elements
•$ 660 k -Water & sewer
•$ 500 k -Private utility
•$ 1.2 M -Street and sidewalks
•$ 3.0 M -Landscape & streetscape
•$ 1.0 M - Traffic control and phasing
•$12.085 M – Estimated sub-total
•$ 2.4 M -Add 20% contingency
•$ 5.1 M - Add 35% financing, design, legal, construction admin
## •$19.6 M – Estimated Total Cost
## Source: Appendix A-10, 2024 Feasibility Report
Page 115 of 160
19
## Anticipated Project Financing
•$ 0General (residential) property taxes
•$ 500 kSite work by commercial properties
•$ 0Federal (unlikely)
•$ 3 MState (estimated)
•$ 3 MCounty & Met Council (estimated)
•$12.1 MIncremental (new) taxes from adjacent properties
## •$19.6 M
•These are estimates only; intended to illustrate the overall strategy.
Page 116 of 160
20
Community Outreach –2023 to present
•Hennepin County
## •Three Rivers Park District
## •Adjacent Property Owners
•Neighborhood groups
•Better Together Edina website
## •2025 Quality of Life Survey
## •Edina Housing & Redevelopment Authority
•Edina Commissions
•Spring 2026 Open House
Page 117 of 160
21
## Summary of Community Input
•2025 Quality of Life survey included a
general question about pedestrian
improvements in this location. 70
percent strongly or somewhat support
## Comments received at Open House
similar to those previously collected.
•Most people express support safe
pedestrian routes
•Concern for City spending and
reasonable taxes
•Younger families tend to support, older
people tend to oppose
•Concerns about cost control and
financing
•Concerns about personal safety
(including security, vandalism and
bicycle/pedestrian conflicts)
•Concerns about maintenance costs
Page 118 of 160
22
## Discussion
Staff is available to answer questions as you
discuss this proposed project
• Option 1a – Proceed with intention to
construct in phases in the near future
• Option 1b – Proceed with preliminary design
and budget preparation and delay decision-making
whether or not to proceed to the future
• Option 2 – Do not study this concept further
Page 119 of 160
## April 6, 2026 Open House Comments Page 1
## Promenade Extension West / France Ave Pedestrian
## Crossing
## April 6, 2026 Open House
## Summary of Comments Received
## ABOUT THE OPEN HOUSE
Doors open at 6 pm. Seven poster boards were scattered around the perimeter of the room.
Each board was staffed to answer questions about the proposed project. The 5-minute video ran
in a loop during most of the meeting. Staff presented 25-minute overview at 6:15 and repeated
at 7:15. Doors closed at 8 pm. Staff continued Questions/Answers sessions with residents until
8:20 pm.
Event was staffed by 3 City of Edina staff and 2 consultants from Confluence Design who
created the video depicting the hypothetical project. Event was advertised to general public with
additional outreach to neighbors in South Cornelia, Parklawn Centennial Lakes and Promenade
neighborhood. Approximately 200 people attended the Open House during the 2+hour time
period. Attendees ranged in age from school-age to senior citizens.
## QUESTIONS AND COMMENTS OFFERED VERBALLY
Staff Note: The five people that presented and staffed the poster stations debriefed after the
event and compiled these frequently heard concerns, questions and suggestions.
1) City spending and project financing
a. Large cost for single project
b. Initially concerned about high cost but support the funding strategy presented
c. How likely is Edina to receive grants?
d. Will taxes from adjacent commercial sites (TIF) be adequate?
e. Can $20 M be spent in a way that benefits more people?
f. Can $20 M be spent on different projects around the City related to core services?
g. Will taxpayers be stuck with higher tax bills due to this project?
Page 22 of 68
Page 120 of 160
## April 6, 2026 Open House Comments Page 2
h. Support the project if typical taxpayer is not impacted
2) General comments about government
a. Concerned that project will be mismanaged, with delays and unbudgeted
expenses
b. Accusations that decision is already made and meetings are just for show
c. Anger at government spending and taxes, in general
3) Are pedestrian improvement such as this a “need” or a “want”?
a. Any documented safety problems?
b. How many people will use this new route on a daily, weekly, annual basis
c. Project does not fully address safety and accessibility issues on entire France Ave
corridor
d. Good idea to extend the Edina Promenade to serve nearby neighborhoods
4) Personal safety and security
a. Concerned an underpass would be unsafe and create a nuisance
b. Many participants said they would feel comfortable using underpass if well-
designed, other participants said they feel unsafe regardless of design
c. Suggest separating bicyclists from walkers to avoid conflicts
5) Many people support the project
a. Younger participants tend to support this proposed project
b. Benefits families, neighbors, kids
c. Provides better access for South Cornelia and Parklawn neighborhoods
d. Creates new travel options for people of all ages and all abilities
e. Improves pedestrian / bicyclist safety by separating from fast-moving vehicles
6) Some people oppose the project
a. Older participants tend to oppose this proposed project
b. Alleged boondoogle and political legacy
c. Doesn’t improve poor walking conditions on France Ave near Southdale Center
d. This doesn’t directly benefit residents who live west of Hwy 100
Page 23 of 68
Page 121 of 160
## April 6, 2026 Open House Comments Page 3
e. Not worth the expense
f. I won’t use this and neither will anyone else
7) Other concerns related to France Avenue in Greater Southdale Area
a. Some prefer that the City continue urging the County to apply a ‘road diet’ to
France Avenue and reduce the number of vehicle lanes to better suit the demand
and to deter speeding vehicles
b. Will the City consider crossing improvements elsewhere on France Ave to be
convenient for other neighborhoods?
8) Construction impacts
a. How many months/years of road detours?
b. Any economic impact on nearby businesses?
9) Repair and Maintenance
a. Concerned about day-to-day cleaning
b. Would like to see estimate of long-term maintenance costs and who pays for that
## WRITTEN COMMENTS SUBMITTED DURING THE OPEN HOUSE
Staff Note: Individual comments are transcribed. Zip codes of participants shown, when
included on comment card.
1. This seems very expensive and the City of Edina needs to stop giving developers a tax
break with TIF financing. Time for new city council members if this continues. 55436
2. Has there been any discussion with the Edina superintendent and principal at Cornelia
elementary to give opportunity for their concerns?
3. All for it. Please proceed. I appreciate the Park like feel on both sides. I’m all for
separating pedestrians and cars. Please make sure bike lane is separated from
pedestrians or make 10 mph maximum speed. 55416
4. Separate bikes from pedestrians. Understanding that no pedestrian crossing on street
level so France traffic doesn’t stop for them and only car cross traffic. Love the concept.
Page 24 of 68
Page 122 of 160
## April 6, 2026 Open House Comments Page 4
Keep tall buildings way back from Promenade, don’t destroy it. New construction
contractors should pay more of the cost. 55435
5. Love how pedestrian friendly the proposed underpass looks. The simulated drone video
was a fabulous way to show the paths stairs and elevated walkways and the surrounding
buildings and parkways! 55435
6. Good presentation, planning shows. Is the reason for the tunnel rather than a bridge due
to aesthetics and ADA compliance? Why was the elevator idea used in Colorado
rejected? What is the cost difference between a bridge and a tunnel? Have security
issues been addressed? Why aren’t developers contributing to the payment since this
will certainly enhance the value of their property. 55435
7. Concerns: cost cost cost. No info on a risk assessment of cost. Interference with France
Avenue traffic. 55435
8. Too much money for not year-round use. For the small percentage of people crossing,
concern for safety, graffiti opportunities and homelessness. Much safer and practical to
build a pedestrian and biking bridge across France. Design the bridge so it becomes a
beautiful Edina Landmark. 55435
9. On behalf of our 1000+ community at Cedars of Edina we are 100% for this tunnel! Thank
you! 55435
10. Please build this project! I live nearby and the number of bikes and peds crossing is
tremendous. Cars are all having to stop. The regional trail should not cross seven lanes of
traffic at grade. It is dangerous. 55435
11. I’m an avid biker, but this isn’t necessary! I commute on my bike in the summer on the
Nine Mile Trail. The current crossing works. It’s not great but it works. 55424
12. For all the years, do you have current data on how many people try to walk/ bike across
France every day? Share it if you do. If not, you should get some. Otherwise it is a very
much of a wish not a need. I have crossed there and have never seen anyone else
crossing the road. It’s a lot of money. You haven’t accounted for upkeep of the space if
you do it. Don’t you need to?
13. This is a hard NO. This plan does not seem to be an appropriate answer to the problem of
how to address pedestrian traffic and bikers crossing France Avenue. Number one it fails
on a cost benefit standpoint. Just too expensive both to build, maintain, and replace. Just
not enough people on the west side wanting to go east or vice versa. Number two it is too
long of a tunnel for people to feel safe to be in there. Actually could cause more problems
than it solves. Tunnels attract graffiti artists in all cities I’ve ever lived. They attract
Page 25 of 68
Page 123 of 160
## April 6, 2026 Open House Comments Page 5
unhoused people and smell like sewers. Other municipalities have closed their tunnels.
Not a good idea! Number three use the TIF money for more important things. Why not use
the money to help support Centennial Lakes Park for the next 30 years? Or affordable
housing? Number four not safe for bike bikes. 90° angles posts, etc.’s can’t link to
promenade because bikes are not allowed there.
14. There are too many unknowns in the plan. The project could take years to complete
making travel on France impossible. Cost overruns even with a 20% contingency. Your
bridge concepts are not realistic. You have no data on the number of people who would
utilize the tunnel. The funding does not compute. 55424
15. I’m very disappointed that we could not ask questions in a group setting. This fire
department doubled in cost during the build. What is preventing this project from going
from $20 M to $40 M? We have school funding needs that should take priority. Why can’t
we implement a better crosswalk? I believe this is a want versus a need. I don’t think this
meeting indicated any interest in finding a less expensive or less disruptive option. 55435
16. First nice presentation. But I don’t need the tunnel and I will never use it. I live in the
South Cornelia neighborhood. Second with the advisors you are using is there a conflict
of interest? I think so. Third construction time is a problem. Also, the disruption along
France Avenue could be a killer for businesses. Fourth cost to maintain. 55435
17. First, I would really like to see an annual budget estimate of maintenance costs before
approval so we can make appropriate long range planning. Second on slide 3.2 it was said
that this [custom crosswalk design with 8 lanes of traffic] isn’t any better and it wasn’t
clear what was meant by that statement. A wider more visible at grade crossing would
certainly be cheaper and could be something to start with and see if it meets the need.
Third what exactly is wrong with a really long bridge? We have one like this already on
France Avenue that works well by the Nine Mile Creek Watershed District. 55424
18. Do not do any further work on this concept. It’s too expensive and there are too many
unknowns. What are the risks associated with this project? A risk assessment is a basic
staff function. Where is it? The cost of $20 M doesn’t include the long-term costs
associated with maintaining the tunnel. These costs could exceed the cost of building it.
What is the expected life cycle of the tunnel? 10 years? 20 years? Where is the traffic
analysis that shows building the tunnel at this location is warranted? Will there be a
public hearing given the large expenditure of funds? Not enough information was
presented to fully comment on this concept.
19. This is the poorest area of Edina with the most diversity. This area needs investment like
the tunnel and public spaces to encourage racial equity! 55435
Page 26 of 68
Page 124 of 160
## April 6, 2026 Open House Comments Page 6
20. I believe it would be helpful to provide a bigger picture context in two ways. Show how this
tunnel ties into the biking and walking infrastructure envision for this whole southeast
quadrant. Include the Nine Mile Creek Trail, west Promenade, current Promenade, etc.
Second show how much the completion of the Nine Mile Creek Trail increased bike traffic
on the trail. This is a “if you build it, they will come” type of argument. I like and support
this project.
21. No tunnel. Get rid of TIF money you’re giving away to prime real estate.
22. I would be against your tunnel 100%.
23. I am completely in favor of the proposed tunnel. It would make the area more walkable
and safer. Too many cars speed, and or go through red lights making crossing a difficult
endeavor. 55435
24. The clocks in this room are off by one hour.
25. We very strongly oppose this project. I haven’t found any estimate of the number of users
per month, per season, per year. Is it $5 per crossing? $10 per crossing? Also, please do
not use TIF to make the residents pay. 55424
26. Do not proceed with this idea. Estimated costs are from 1-1/2 years ago. West side of the
tunnel is on private property. How does it get maintained for walkways bikeways. West
side also has two steep slopes up to Gallagher for ADA compliance. Is this another DOJ
investigation? How do Nine Mile Creek path users get to the trail if westbound? Cut
across the street? Dangerous. The video widens and flattens perspective. 55424
27. I have grave concerns about the cost because of the war in Iran’s impact on all goods
within the next six months. That the burden of Cost will fall on all residents for the benefit
of primarily the new development owners. The ethics of using TIF to fund what amounts
to a vast return of benefit again to the developers. Underestimating the structure of the
roadway in the animation; it is unrealistically thin. 55435
28. What are maintenance costs for snow plowing, changing lightbulbs, removing graffiti,
trash removal? These need to be identified before the project is approved. Then the City
assets found and the budget needs to include this.
29. Where is the pedestrian safety risk assessment? Pedestrian tunnels are not safe. The city
of Birmingham in the UK developed a tunnel system for pedestrians and later spent much
money in reducing it. Is the proposal fully ADA compliant? 55424
30. What is the data on usage of the pedestrian tunnel between York to the YMCA correlated
with weather? Are propose 7235 buildings (ABCD) definite or speculative? What is the
Page 27 of 68
Page 125 of 160
## April 6, 2026 Open House Comments Page 7
number of residential units? What is the cost of yearly maintenance? What will drive two-
way pedestrian traffic east and west and west and east? 7235 buildings = no tax base for
finance. 55439
31. This tunnel will not serve enough of the residents to justify costs. It will not be usable in
winter due to ice unless you install heating. The paths at Centennial Lakes are
consistently icy in winter due to thawing and dripping water that collects under there. The
tunnel under 70th St. is impassible between November and March due to ice buildup.
This Minnesota climate does not support such a huge cost for six months usage out of the
year. I don’t believe the project will be useful for cyclists - too indirect and filled with
obstacles like food trucks. Bicycles have already been restricted from circling Centennial
Lakes. 55435
32. I am opposed to the tunnel. Our taxes are increasing immensely. We need to cut back. I
watch traffic on the intersection of France and 66th every day. Everything seems to be
working well. If you did something similar, you would save lots of money and not have
disruption of traffic for a long time. Also concerned about the safety at night time in the
tunnel.
33. Minneapolis has not used any TIF financing on their side of France Avenue. Developers
should pay for this project themselves. TIF financing is not free money. Spending here
takes $20 M away from your residents for better projects and improvements.
34. Misleading community interest inquiry in this project. Voters remember and I know I will.
Irresponsible expenditure!
35. This is an ill advised use of funds. Unnecessary and expensive. Please take a poll of
residents to see what they think. Or are you worried about the results? Also, Edina has
too much TIF debt. I wonder if the tunnel fits in the T:IF definition“but for” requirement?
How long will France Avenue be closed? Will the County approve that? 55424
36. I am not a fan of this concept. I am concerned about the negative impact this project will
have on existing business. During two years of construction. Local resident will not walk
miles to access this tunnel. This $20 M budget will balloon into a higher number probably
closer to $30 M. 55439
37. I am strongly opposed to this project. We as a city do not have the money and this is not a
need. 55424
38. The Cities track record of estimating costs versus actual costs (Cornelia pool) or
completion dates (50th and Highway 100 bridge construction) is not good. What
guarantees are there? This is another boondoggle. You don’t have credibility. 55424
Page 28 of 68
Page 126 of 160
## April 6, 2026 Open House Comments Page 8
39. I believe the properties have been financed by tax increment financing (TIF). Does that
mean any tax increases to help fund the tunnel won’t be available for about 25 years?
Construction of tunnel of France will impact north and south flow of traffic. Talk to the
County to get the timing of lights extended to make crossing France safer. 55424.
40. There are many other projects that are much higher priority for Edina than this pedestrian
tunnel. Total waste for the community at large. Let developers pay for this project. 100%
opposed. This is 99% useless to 98% or more of Edina residents. 55424
41. First a risk reward analysis is really needed. Secondly TIF. Does the proposed use of TIF
consider TIF is already approved for 7200-7250 projects? Third who will actually use this
tunnel? Doesn’t the neighborhood have a large senior population? Finally, you are trying
to sell us a project we just don’t need and cannot afford. 55435
42. Do we need to construct additional green space to solve a road crossing problem. This is
a pie in the sky project that has been going on for 10 years. 55424
43. Looks very nice and functional. I am looking for more information before I decide whether
I am for the project or not. Need revised estimate for 2026 including current costs for time
materials and consideration of tariffs oil and gas prices and inflation $19.6 million is not
realistic in 2026. Also a rendering showing accessibility and compliance with ADA
requirements. Minnesota is aging (see Project 2030 from Minnesota DHS). Thank you
55424
44. How long will it take? Will it be safe? What popular stores are there going to be? Is there
going to be any stores in the tunnel? Is there going to be a sweet science ice cream?
Signed kids of Edina!
45. No!
46. How accurate is the financial estimate in 2026 based on the 2024 date of the last study?
If this project moves forward benches are needed along the tunnel also chairs with arms
ADA height and backs. 55435
47. Very common sense proposal to accommodate anticipated development. 55435
48. The economics of the issue are confusing. Explain how taxpayers are not contributing to
costs when they pay higher taxes for TIF districts.
49. A better use would be to hire crossing guards to help escort pedestrians. The 2024 budget
numbers are based on outdated values and costs which are certainly low compared to
the actual future costs. Glad the city is trying to improve pedestrian access. This is just
not the right approach. Thanks. 55439
Page 29 of 68
Page 127 of 160
## April 6, 2026 Open House Comments Page 9
50. How long will construction disrupt traffic on France?
51. This is a great plan. Very safe and seems like the most viable option. I’m referring to the
underpass. 55416
52. I saw the breakdown of how the project will be funded. But how much money does the
average taxpayer (like me) will come out of my purse? It’s a beautiful idea but as a senior,
I can’t afford it. And more disruption on France Avenue. 55435
53. The presentation made it sound like Edina taxpayers will not be paying anything for the
underpass. This defies credibility. Also, if Hennepin County thinks crosswalks are a
problem why are there so many of them on France Avenue. 55435
54. I applaud your efforts to find a solution to pedestrian and bike safety crossing France
Avenue. Some concerns include; Cost. Wow! Better places to use the money, safety and
security or crime and maintenance. I have lived in three cities where pedestrian
underpasses are known as places to urinate or to get mugged. For this reason, most
people avoid them even in well traveled areas. What about shrinking France Avenue
instead? It is overbuilt with too many lanes that are never full. Take away two lanes and it
would be easier to cross. 55436
55. Yes. Build it. Crossing France Avenue as a pedestrian or bicyclist is deadly. A pedestrian
crossing is needed. Concerned that it may be dark have been addressed. If it doesn’t get
built, it’ll be even darker. 55436
56. Please make this happen. 55436
57. I walk the neighborhood often and frequently walked to Centennial Lakes Park. I would
truly welcome not having to interact with traffic on France Avenue! This looks like a good
option if it is well lit, safe and well maintained. Thank you. 55435
58. Southdale and Cornelia areas have the most crime. Tunnel would not be safe! And the
maintenance would be very expensive! Pumping water would be an issue and ice in the
winter. Too expensive!
59. I moved from downtown Minneapolis to this area for the walk ability and bike trails. As
you add new developments, it is imperative to add amenities like this tunnel and paths to
accommodate all the new users, otherwise Centennial Lakes will be overcrowded. So
yes. Yes. Yes. 55435.
60. Please, please please do not abandon this project! Make walk ability in the most dense
area of Edina safe and accessible. Enough with enabling more cars! This is the future. I
Page 30 of 68
Page 128 of 160
## April 6, 2026 Open House Comments Page 10
would use this bridge daily with my young family. This is a once in a lifetime opportunity.
55435
61. Too expensive. I don’t understand why this needs a $19 million tunnel but other parts of
France can be crossed with a crosswalk.
62. Pedestrian and bike paths need to be clearly marked and separated. Areas of potential
bike and pedestrian traffic need to be designated with directions for a smooth flow. My
wife and I are in support of this project since we live in the area, walk to many amenities
and bike regularly. 55435
63. I’d like to see improvements at Street level before spending this kind of money.
64. This is a very expensive project serving a small niche need. I’m skeptical that people
crossing France Avenue just a few blocks north or south of the tunnel will bother to
detour. Please find a better use for all of this money. And I live close by so I might even
use it. 55435
65. As a future resident of Centennial Lakes neighborhood, I fully support this project. The
walk ability of this neighborhood will only be enhanced with this project, especially given
the increased density of the new housing projects. Take advantage of the tax increment
financing. Centennial Lakes took us in similar direction to this. 55435
66. Add a dog park too!
67. I used pedestrian tunnels in other places and in general, I don’t feel comfortable in them
in terms of feeling safe and the number of people in them. There are lots of intersections
on France. I don’t think people will go out of their way to use this tunnel. This tunnel is
super expensive for only one crossing point on all of France. Very expensive exclamation!
55435
68. Is this public land? I don’t think it is. 55416
69. My concern is crime. Will it be monitored if it’s an underpass? Crime has escalated - not
to all of the new residence. When will the construction is done. I live on Centennial Lakes.
55435
70. not on private land. 55435
71. Do you have buy in from the police? Who will take ownership if there is crime or
homelessness in the space? We appreciate all the considerations and designs that went
into this concept with all the new apartments coming the future France Avenue needs a
safe pedestrian crossing. Gathering facts on the number of accidents on France Avenue
could be helpful in supporting the need for this. I know there have been many close calls!
Page 31 of 68
Page 129 of 160
## April 6, 2026 Open House Comments Page 11
We like it! And while we would have rather have less apartments and less need for this,
the apartments are coming. France Avenue will get busier. This will be needed in the
future. 55435
72. I like the plans. But I would like to have bike lanes separated from pedestrian lanes.
73. Better look to it than I thought. If you can really see through to the other side that makes a
difference. Funding is still a concern, especially with the introduction of the Trump 2026
through 2027 fiscal year budget. 55436
74. I’m concerned about what seems to be continuous disruption of traffic on France
Avenue. The extent of this project looks like it would take a long time! 55410
75. $20 million? I’ll take the over!
76. I think it’s lovely. Smiley face.
77. We think this is a good thing safety wise. 55424
78. This is great. France Avenue is a disgrace. I encourage city council to support.
79. Bicycles and pedestrians must have separate lanes. Improve safety on France to gain
access to the tunnel. There must be a solution to drainage and ice! 55435
80. Who will maintain the underpass and adjacent areas leading up to it in the winter to keep
it usable; plowing, sweeping up leaves, etc. in the fall. 55435
81. I think this project is a great idea and the fact that it’s been studied multiple times really
proves why it is needed. I commute along the Nine Mile Creek bike trail to a job in
Richfield and cross France Ave via bicycle six times a week. I’ve had close calls crossing
at the existing crossing and would love the option to go under! 55408
82. Generally positive. I walk this area frequently and the lack of a good crossing at 72nd St.
is a problem. The concept of extending the Promenade is excellent. The cost doesn’t
seem unreasonable. 55435
83. What is the anticipated volume of traffic using the new improvements? 55435
84. Great planning! Love the underpass idea! Just do it! 55424
85. City staff is very impressive! The research and preliminary design is very attractive. This
underpass is needed for increasing the desirability and financial viability of the
community and Edina as a whole. Crossing France is not particularly safe in a car at a
Page 32 of 68
Page 130 of 160
## April 6, 2026 Open House Comments Page 12
crossing with a light let alone crossing on foot. Public restrooms? Would it be possible to
partner with apartments or businesses along the route to include them? 55435
86. Need to stop the TIF financing
87. You haven’t explained why it is necessary to fix the crosswalk, much less spend $20
million. 55424
88. This tunnel is a bad idea! We do not have the money first. Do not tax us anymore.
Additionally, it’s dangerous! And a flood risk. Stop this madness. 55424
89. No tunnel! 55439
90. I’ve been wanting a safer crossing at France since moving to South Cornelia in 2018.
Thrilled THAT it could finally be happening and think the tunnel is an elegant and safe
solution. 55435
91. Should have Q&A when here!
92. Was not contacted and two blocks away. Village Homes of Centennial Lakes over 250
owners 7400. 40 mph speed on France = walkers do not like. What will it take to stop the
project? How much has already been spent? 55435
93. Please consider a shuttle service to facilitate ped access across France Avenue.
Flexibility of pick up and drop off times. Enhanced access for peds with less stamina for
long walks. 55435
94. Disappointing that Hennepin County won’t help with a more cost efficient solution but it
is what it is. I love the idea, but I just can’t be confident in the value of this project versus
other potential uses for $20 million. This is really great, but what other opportunities are
there? I know there’s some leverage and TIF (unique to this opportunity). I worry that we
don’t adequately consider maintenance costs. What’s the capitalized 2026 cost of 20
years of maintenance? 55424
95. City does not need this under France! This is a safety issue! Quiet living like it’s 1950!
Crime is rampant in Southdale area.
96. A project of this magnitude should be taken to a vote. Not enough taxpayers are engaged
in meetings and Better Together. Ask as many people as possible putting it on a ballot in
November. The City is already challenged with a maintenance backlog. We are not good
at keeping up with maintenance - see emergency aquatic center repairs. Is there a long-
term plan for maintenance? Chad thought it may need to be an additional tax levy so this
is not a project without increased taxes. Shouldn’t other solutions be explored before a
large project like this is approved? Please no more TIF. 55439.
Page 33 of 68
Page 131 of 160
## April 6, 2026 Open House Comments Page 13
97. This underpass is a good idea. Bikes and pedestrians need safe safer ways to cross
France Avenue. Make sure the west end leads to desirable destinations. 55435.
98. What is the problem we are trying to solve? This does make a bike connection to Nine
Mile Creek Trail but not to the 70
th
Street bike lane. For pedestrians and access for those
living in the area (many seniors) this does not solve the challenge of getting across France
in multiple locations. This tunnel is too out of the way for many residents to use.
Improved crosswalks at grade and reducing speed on France would be a better use of
money to assist more people. Are new taxes from these new properties really additional
from what was collected from previous properties? What is our opportunity cost with that
money? How else could we use it as a city? 55416
99. Very full room. Only one bicycle parked outside. Are we solving a problem that doesn’t
exist? Do bikes pay a user fee? Mention of a food truck plaza. Does Edina allow food
trucks? I pay over $1000 annually in property taxes enough! 55436
100. No more TIF. TIF isn’t free. No don’t do it. The city is broke! County has already said
they will give no money. The state has no money. This is a want and not a need.
101. This is useless to most Edina residence. I take issue with his proposal on several
fronts. Wildly expensive even with TIF financing. Let’s not forget we the taxpayers will pay
for this. Has a request for extended crossing times at grade been made? Misleading
inquiry into community interest – a $20+ million tunnel was not a part of that inquiry.
Tunnels are well documented to be unsafe. This is obviously a “dream scenario” for the
developers involved. No one wants to go walk amongst apartment and condo
developments with no draw. The placement of this proposed tunnel serves only
developers interests. If you want to serve Edina community in the Southdale area, far
more compelling to address easier pedestrian access from Southdale to Galleria to
Target etc at street level. There is no need for this extravagant plan. Act with greater
fiduciary responsibility. I did not see a line item on the budget for what I presume would
be a significant expense to redo the France Ave., road and reroute traffic! 55424
102. My comments first will it be open at night? Who will repaint graffiti? Will it become
a homeless shelter, especially in winter? Will it become a public latrine? Who will provide
security? How much will it cost (see #6). Hire two school crossing guards with stop signs.
Install flashing yellow lights as at schools and parks and other pedestrian crossings. $20
million somebody or other taxes pay 55435
103. No tunnel! Dangerous. Adds crime. $$$ 55439
104. Concerned about; this doesn’t connect publicly owned property. And feasibility of
the ADA plans.
Page 34 of 68
Page 132 of 160
## April 6, 2026 Open House Comments Page 14
105. Please vote to proceed with this wonderful plan! I’ve been concerned about safety
for years. I’m dropping emails I sent in 2019 into the comment box for reference. This
investment will provide wonderful returns for our community. Thank you for your hard
work!
Attached email dated May 27, 2019 emailed to KStaunton@edinamn.gov. I’m writing
because I am concerned about the safety of the intersection at Park lawn Avenue in
France Avenue (right at the corner by Whole Foods). This intersection is heavily used by
pedestrians and bikers and yet there is no crosswalk painted on the road. It’s the perfect
location for pedestrians and bikers because it connects beautiful new biking and walking
trails with Centennial Lakes Park. Yet to cross the street people need to cross up to
EIGHT lanes of traffic. I’ve included some pictures from last summer when my daughter
and I attended the art fair. It’s terrifying to think of all the people trying to cross there
without any protective measures in place. I’m hoping you can share some ideas with me
about what Edina can do to remedy this dangerous situation. Thank you. 55435
106. comment card includes notes referencing York Avenue tunnel at the YMCA, the
low spot of the roadway in France Avenue, the 2007 study, the Nine Mile Creek Trail, local
existing underpasses in Chaska, Chanhassen and Golden Valley. Possible alternatives
include shuttle?
107. Interesting idea. I don’t agree that this is a need. It is amazing that you don’t think
this will raise taxes but I think $20 million of tax revenue could be better spent. I also
don’t have faith that this area would be well kept. France Avenue in general looks terrible
all summer. The weeds are left growing out of control and the planting beds along France
and various intersections look terrible. What are the maintenance costs yearly for the
project and who pays for it? Year after year? I suspect it will be paid for by city taxes and
that is not good! While a nice idea, this seems like a solution looking for a problem.
108. Fully support this project. Don’t listen to the negative baby boomers.
## END
Page 35 of 68
Page 133 of 160
## Item Report
April 21, 2026
## City Council
## Item Number: 8.4 Department: Community Development
## Item Activity: Discussion Prepared By: Cary Teague, Community Development Director
## Item Title: Sketch Plan Review - 7600 Parklawn (Senior Housing)
## Action Requested:
Provide the applicant non-binding feedback on a potential future land use application.
## Information/Background:
The City Council is asked to consider a sketch plan proposal to tear down the existing office building
and build two 125–150-unit senior apartment buildings. Two different development proposals with
varying heights are provided for consideration. The site is zoned MDD-6, Mixed Development District 6.
To accommodate this request, the following would be required:
• Site Plan Review.
• Multiple Variances: Building height, lot area per dwelling unit, and usable lot area.
As with all sketch plan reviews, the Planning Commission is asked to provide non-binding comments
and direction on a potential future development request. Areas of focus should be on the scale of the
proposed use, given the number of variances necessary regarding building height and density using
the existing MDD-6 Zoning District, or should PUD zoning be required.
## Supporting Documentation:
Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL)
and are not included in the public packet. To request a board portal document, please submit a data
request (URL).
## 1. Planning Commission Staff Memo from April 15, 2026
## 2. Staff Presentation at Planning Commission
## 3. Site Location, Zoning, Comp. Plan, Proposed Plans
## 4. Applicant Narrative
## 5. Proposed Plans (Board Portal)
## 6. Applicant Presentation at Planning Commission (Board Portal)
Page 134 of 160
## Staff Report
Date: April 15, 2026
## To: Planning Commission
## From: Cary Teague, Community Development Director
## Subject: Sketch Plan Review – 7600 Parklawn (Senior Housing)
Staff Recommendation: No recommendation. The Planning Commission is asked to provide non-
binding comment and direction on a potential future development request.
## Information/Background:
The Planning Commission is asked to consider a sketch plan proposal to tear down the existing office
building and build two 125–150-unit senior apartment buildings. Two different development proposals
with varying heights are provided for consideration. The site is zoned MDD-6, Mixed Development
District 6. To accommodate this request, the following would be required:
➢ Site Plan Review.
➢ Multiple Variances: Building height, lot area per dwelling unit, and usable lot area. (See
Compliance Table on page 3 of this staff report.)
As with all sketch plan reviews, the Planning Commission is asked to provide non-binding comments
and direction on a potential future development request. Areas of focus should be on the scale of the
proposed use given the number of variances necessary regarding building height and density using the
existing MDD-6 Zoning District, or should PUD zoning be required. The potential variances are listed
on the last page of this report.
## Issues/Considerations:
Comprehensive Plan. The site is guided OR, Office Residential in the Comprehensive Plan. Below is the
land use category and description. The proposed density is 48-58 units per acre.
## Categories Description, Land Uses Development Character and
## Guidelines
Density and
## Intensity
## OR
## Office
## Residential
Transitional areas along major thoroughfares
or between higher intensity districts and
residential districts. Many existing highway-
oriented commercial areas are anticipated to
transition to this more mixed-use
character.
Primary Uses are offices, attached or
multifamily uses. Secondary uses are retail and
service.
Upgrade existing streetscape and building
appearance, improve pedestrian and transit
environment. Encourage structured parking
and open space linkages where feasible;
emphasize the enhancement of the
pedestrian environment.
20-75 residential
dwelling units/acre
Page 135 of 160
Density. The proposed density is consistent with the Comprehensive Plan; however, it far exceeds the current
zoning regulations for the site, which would only allow a maximum of 125 units on the site. A variance would
be required as the applicant is proposing 250-300 units in the development. This discrepancy is one of the
reasons that the current Zoning Ordinance is being revised, rather than using PUD Zoning to consider
increases in density.
Proposed heights. The proposed height of 7-12 stories exceeds the code required 4-story maximum. As a
comparison the Fred and Finch new housing developments to the west are 5-7 stories in height. Variances
would also be required for the proposed heights.
Using the Existing MDD-6 Zoning District rather than PUD. The previously mentioned Fred and Finch project
requested rezoning to PUD, Planned Unit Development. Using PUD zoning, flexibility in relaxing the above-
mentioned density and height requirements was used in exchange for meeting the City’s affordable housing
and sustainable buildings policies. Using existing zoning, these cannot be required. Rather the variances
requested would be considered using the standard variance criteria.
Pedestrian Connection to Fred Richards Park. Final development plans should include connections to Fred
Richards Park.
Sidewalks. A boulevard style sidewalk would be required to be installed along Parklawn Avenue per the City’s
Bike and Pedestrian Master Plan.
Traffic and Parking Study. Will be done as part of a formal application.
Signage. Signage is not specifically proposed yet. Below are the Code requirements for signage in the
## PCD-4 Zoning District:
➢ One sign per development for each frontage.
➢ Sign area: Maximum area of first sign: 100 square feet. Maximum area of additional signs: 70
square feet.
➢ Sign height: 8 feet tall
➢ Building identification signs: residential. One freestanding sign not to exceed 24 square feet for
each building with ten or more dwelling units. One wall sign not to exceed six square feet for
each building. Maximum height: eight feet.
Page 136 of 160
## Compliance Table
## City Standard (MDD-6)
## Proposed
## Building Setbacks
## Front – Parklawn
## Rear – Fred Richards Park
## Side – North
## Side – South
35 feet
35 feet
20 feet
20 feet
35 feet
35 feet
25 feet
50+ feet
Building Height 4 stories and 48 feet
7 & 12 stories*
Lot Area Required 1,800 s.f. per unit (24 units per acre – 125 units
maximum for this site)
250-300 units*
Density Per the Comp. Plan 20-75 units per acre
48-58 units per acre
## Building Coverage 30%
23-30%
## Floor Area Ratio (FAR) 1.0
.96
Usable Lot area 200 s.f. per dwelling = 50,000-60,000 s.f.
34,000-51,600 s.f.*
Parking Stalls .75 spaces per unit = 188-225 stalls required 476 stalls
*Variance Required
Page 137 of 160
## EdinaMN.gov
## Sketch Plan Review – 7600 Parklawn Avenue
## (Senior Housing)e Page Style
Page 138 of 160
## Zoning Map & Site
## Location
## Site
## Location
Page 139 of 160
## Land Use Map
## & Site Location
## Site
## Location
Page 140 of 160
## Building Massing – Option 1
Page 141 of 160
## Building Massing – Option 2
Page 142 of 160
## Site Plan – Option 1
Page 143 of 160
## Site Plan – Option 2
Page 144 of 160
## Zoning Compliance – MDD-6 District
Page 145 of 160
## Areas of Focus for the Planning Commission
ØThe scale of the proposed use, given the number of variances
necessary regarding building height and density using the existing
## MDD-6 Zoning District; or
ØShould PUD zoning be encouraged.
Page 146 of 160
## Zoning Map & Site
## Location
## Site
## Location
Page 147 of 160
## Land Use Map
## & Site Location
## Site
## Location
Page 148 of 160
## Land Use Description for Office Residential
Page 149 of 160
## Proposed Site Plan
Page 150 of 160
## Site Plan
Page 151 of 160
## Building Massing – Option 1
Page 152 of 160
## Building Massing – Option 2
Page 153 of 160
## Site Plan – Option 1
Page 154 of 160
## Site Plan – Option 2
Page 155 of 160
## Zoning Compliance – MDD-6 District
Page 156 of 160
## Areas of Focus for the Planning Commission
ØThe scale of the proposed use, given the number of variances
necessary regarding building height and density using the existing
## MDD-6 Zoning District; or
ØShould PUD zoning be encouraged.
Page 157 of 160
## Cary Teague
## Community Development Director
## City of Edina
4801 w. 50
th
## St
## Edina, MN 55424
March 16, 2026
## Re: 7600 Parklawn Avenue Sketch Plan Project Narrative
## Dear Cary-
Please see below the written narrative for the proposed project at 7600 Parklawn Avenue.
Intended Use: The proposed project is a two-phase redevelopment replacing an existing
office building located at 7600 Parklawn Avenue in Edina. The proposed redevelopment
would transition the existing office building into residential uses, age restricted for 55+
occupants, bringing forward approximately 125-150 units in each phase or approximately
250-300 units in total. Once completed the newly developed community would offer first
class living, lifestyle amenities, concierge level service, and direct access to the
reenvisioned Fred Richards Park.
The property will be developed and operated by Greco, a Twin Cities-based development
firm with over 25 years of experience in the multifamily space. Once fully developed the
properties are projected to employ a total of 7-8 full-time personnel.
## Site Plan Considerations
The development team is evaluating the feasibility of two different conceptual site plans for
the Phase I project and we have included both building footprints in the package for
consideration and feedback.
## Key Project Features
• 250-300 units in total, 125-150 units per phase
• Underground Parking of 1 per bedroom
• Approximately 54 surface stalls for guests and vendors
• Two 7 story concepts (Option 1) and a 12 and 7 story concept (Option 2)
• Walk-up units
• Elevated amenity courtyards and ground level walking paths
Page 158 of 160
• Outdoor pools and spas
• Gardening areas
• Dog runs
• Screened in porches
• Outdoor firepits and kitchens
• Premium interior and exterior finishes and fixtures
• Interior amenities
o Private dining rooms
o \ndoorgoliunge
o Wellness center
o Library/reading rooms
o Hobby lounge
o Arts rooms
o Work from home/office suites
## o Resident Bistro
Site Zoning and Proposed: The site is currently zoned MDD-6 witha land use of Office.
Below is chart outlining the early identification of zoning compliance/exceptions tor the
proposed redevelopment. As the project progresses, we anticipate further discussion and
refinement on proposed exceptions.
Page 159 of 160
## ELEMENT
## Current Zoning
## Proposed
## Site Data
Total Site Area (SF) 228,402 228,402
## Total Site Area (acres) 5.24
5.24
## District MDD-6 Mixed Development MDD-6 Mixed Development
Total Units 105 to 393
125-150 each phase (250-300 total) -
assume 270 units
Units /Acre 20 to 75 units/acre - Office/Resi 48-58 units/acre
## Height
HOD-4 - 4-stories 48'
144 feet (12 Stories)-directly across
street (85'-0" Max -7 Levels)
## Lot Area Required
Req'd 3,300 sf/ unit = 891,000
Max Allowance 1,500 = 405,000
914 sf to 762 sf/ unit base - not
including potential allowances
## Lot Coverage
max lot coverage 30%
200 sf of useable lot area req'd per unit
200 sf x 270 units= 54,000sf. Actual=
54,775 sf
## F.A.R.
Residential Uses shall not exceed 0.5
0.96
## Setbacks
Afronting a Street/Front 35 feet Miniumum 35 feet
Side Street (ft) 35 feet
## NA
## Interior Side Yard (ft)
20 feet Minimum 20 feet
Rear Yard (ft) 35 feet Miniumum 35 feet
## Parking Setback
>20' from public street ROW or
>1O' from interior side lot line
Minimum 20 feet from public ROW, 1O
feet from interior lot line
## Total Impervious Surface
## Current Site approx 90% Impervious Proposed potential 65% Impervious
## Required Parking
(1 per bedroom) 540 Required
530 including visitor
## Visitor Parking
based on exposed spaces? see above
Standard 90 degree
## Parking
8'-6" x 18 ' - 24' drive aisles
8'-6" x 18 ' - 22' drive aisles
Compact 90 degree
## Parking
7'-6" x 18 ' - 24' drive aisles 7'-6" x 18 ' - 22' drive aisles
## Accessilble Parking State Accessibilty Code State Accessibilty Code
## Bike Parking
1 per every 14 units Minimum 18 to 22 depending on final
unit count
We look forward to further discussions regarding the proposed redevelopment. While we
understand this is the very beginning stage of the project, we are excited to further the
conversation on what we believe to be a compliment of the guiding principles outlined in
the Edina Comprehensive Plan, specifically those directed towards the Greater Southdale
## Plan..,,...,
Page 160 of 160