StoryPlanning Commission approvals of three development projects with various conditionsMarch 27, 2025

Planning Commission Approves Three Development Projects

Meeting date: Mar 27, 2025
Published Jul 2, 2025

The Edina Planning Commission approved three development projects during its March 26 meeting, including a water treatment building expansion at the Aquatic Center, sign variances for Meeting House Church, and a comprehensive development plan for a new Opus headquarters building.

The commission granted an 11.5-foot variance for the Aquatic Center's pump house expansion, allowing construction within 38.5 feet of the swimming pool pond instead of the required 50-foot setback. The project will replace aging infrastructure from 1958 and add amenities including pool cabanas on an upper deck. City staff recommended approval, citing the building's obsolete condition and unique circumstances.

Meeting House Church received approval for two sign variances at their Colonial Way location. The variances allow a 30-foot reduction in setback requirements from a water body for one monument sign and a 6-foot height increase for a Highway 62 sign to improve visibility from the elevated roadway.

The commission's most complex approval involved Opus Development's proposed headquarters at 5100 Eden Avenue in the Grand View District. The 112,000-square-foot office building with ground-floor retail space requires multiple variances for setbacks, height, floor area ratio, and building materials. Commissioners added conditions requiring improved pedestrian and bicycle access from Eden Avenue, additional sidewalk connectivity, and consideration of natural materials at ground level.

The commission also elected Commissioner Alaire as vice chair, with Commissioner Bennett continuing as chair and Commissioner Bornstein remaining as secretary. The next Planning Commission meeting is scheduled for April 8.

Our proprietary artificial intelligence agent analyzed publicly available documents including meeting agendas, minutes, and transcripts to write this story to help inform local residents. Feedback helps us improve, so please consider rating how we did with the thumbs up or down below.

Go deeper on this topic

Research related meeting documents and build a brief — without rewriting the story.

Full analysis

Votes (3)

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

Approved with one abstention (Commissioner Day abstained due to prior involvement with the project)

Dissent: Commissioner Phelp expressed concern about consistency with previous denials of residential setback variances but did not vote against the motion.

Moved by Chair Bennett [0:45:14] · Seconded by Unknown [0:45:20]

Staff presented a conditions assessment showing the 67-year-old pump house has critical structural and mechanical deficiencies, with ceiling heights of 8-9.5 feet unsuitable for modern equipment. The existing building is located between West 64th Street and the swimming pool pond. The applicant proposes expanding the pump house eastward, requiring an 11.5-foot variance from the 50-foot setback requirement (reducing it to 38.5 feet at the closest point). The setback requirement was mandated by the Department of Natural Resources in 1990; the previous requirement was 25 feet. Commissioners discussed the practical necessity of the expansion given utility constraints (existing pipes connected to pool drains), the infeasibility of relocating the pump house, and the addition of amenity deck space with cabanas above. Commissioner Phelp expressed concern about consistency with previous denials of setback variances for residential patios, questioning whether a cost-benefit or social benefit analysis was conducted. Chair Bennett and Commissioner Eliire noted the variance meets the legal criteria for practical difficulties and that the project delivers public benefit rather than private benefit. The project includes an infiltration basin for stormwater management and tree preservation considerations.

Sign Variance Requests: Meeting House Church (6200 Colonial Way)

Approved unanimously (9-0)

Dissent: None. Commissioner Phelp's concern about the combination of variances was addressed by staff clarification that backlighting is code-compliant.

Moved by Chair Bennett [1:00:15] · Seconded by Unknown [1:00:29]

The applicant requested two variances for monument sign replacements at the church's three street frontages. Variance 1: 30-foot setback variance from the 50-foot ordinary high water elevation requirement for a sign at the Olinger Boulevard and Colonial Way intersection, allowing placement at 20 feet from the water body. Variance 2: 6-foot height variance to allow a 14-foot tall sign adjacent to Highway 62 (versus the 8-foot requirement measured from the road centerline elevation). Staff noted that engineering reviewed the sign location and had no concerns. The applicant explained that the third sign (adjacent to Highway 62) had fallen due to ground subsidence (losing approximately one inch per year due to swampy conditions). Commissioners discussed the visibility needs created by the highway elevation difference and the practical constraints of the corner location. Commissioner Smith noted the church's iconic steeple is visible from Highway 494, but the third sign replacement is still needed for wayfinding. The applicant indicated signs would be video displays (signs 1 and 2) with potential solar-powered backlighting for sign 3, and that illumination would comply with city code (lights off between 10 p.m. and 7 a.m. unless the facility is open). Commissioner Phelp raised a concern about the combination of height variance plus illumination, but staff clarified that backlighting is not beyond current code requirements.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

No vote recorded in provided transcript

Dissent: Multiple commissioners (Hanaman, Nelson, Phelp) expressed significant concerns about the glass facade, building mass, height variance, material consistency with the Grand View framework, and pedestrian connectivity on the east side. Commissioner Phelp specifically stated concern about the 200+ foot uninterrupted north elevation variance. No formal vote was taken during the portion of the transcript provided.

Moved by Not recorded in provided transcript · Seconded by Not recorded in provided transcript

The Planning Commission held a public hearing on a major mixed-use development proposal for the Eden 100 site (the 'building on stilts'). The applicant (Opus) proposes to demolish the existing 38,000 sq. ft. building and construct a 112,000 sq. ft. office building with approximately 6,000 sq. ft. of retail/restaurant space. The project requires: (1) rezoning from Planned Office District to Planned Commercial District 2; (2) subdivision consolidating seven lots into one; (3) site plan approval; and (4) multiple variances including setbacks on all four sides, height (81 feet vs. 48 feet required), floor area ratio (2.0 vs. 1.5 required), building materials (primarily glass facade), and utility equipment screening. The applicant presented significant design refinements since the sketch plan, including: shifting the podium 17 feet inward along Arcadia, adding a recessed arcade/breezeway with balconies at the southwest corner, relocating the main entrance to Arcadia, moving surface parking 20 feet from the property line, tucking the loading dock under the building, and enhancing landscaping with pollinator-friendly plantings. The design features a distinctive 'dock' element (wood-look material) protruding from beneath the glass tower, celebrating Minnesota's water heritage. Commissioners raised multiple concerns: (1) the extensive glass facade and potential glare on Highway 100, particularly given recent examples of glare issues on Highway 62; (2) the 200+ foot uninterrupted north elevation requiring a variance, with questions about whether design features (balconies, material changes) could break up the mass without the variance; (3) parking efficiency and whether the building could be smaller with greater height; (4) lack of pedestrian connectivity on the east side of the building (between parking and Highway 100), with suggestions to continue the sidewalk around the north side; (5) building materials consistency with the Grand View District framework (which emphasized stone and brick rather than extensive glass); (6) the rooftop patio size and programming; and (7) the adequacy of the transit connection (quarter-mile to bus stop) and pedestrian safety crossing the roundabout. The applicant explained that the glass facade is driven by tenant demand for natural light and open floor plates, that the building's footprint and height were optimized based on market analysis and parking requirements (3 spaces per 1,000 sq. ft. for office), that stormwater infiltration tanks are located on the east side limiting westward expansion, and that the east side lacks active uses and eyes on the street, making it less suitable for pedestrian circulation. Opus confirmed it will occupy approximately 30% of the building as the lead tenant, with preliminary interest from four to five additional tenants, and that the company needs the space by the end of next year. The applicant stated there is no TIF request and the project is fully privately financed. No vote was recorded in the provided transcript.

Notable Quotes (31)

The Aquatic Center opened in 1958 with some of the current infrastructure 67 years old. The original pump room has undergone retrofits over time and additions over decades but years of exposure to the corrosive gases and a very limited Headroom in height in a range of about 8 feet to 9 and 1/2 ft makes the space unsuitable for current equipment.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

The setback was mandated by the Department of Natural Resources. It's not something that the city had a choice.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

The existing pump room is too small for the expanded equipment that needs to be installed. We needed to expand in some way. Of course keeping the pipes coming in as they are that are already connected underneath for the drains of the existing water bodies made it difficult to try to think about moving those because you'd have to rebuild the water bodies if we were to move the existing pump room.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

I'm struggling because we have previously on a couple of occasions in the city has recommended against putting things in high water level areas and one of them was for patio structure. I understand that the pool is an important piece of the city but I think if we as a city are asking residents not to do this I think we have to spend a lot of time kind of justifying why we can do it.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

When I look at the conditions of what what needs to be achieved to secure a variance to me this is a very straightforward approval. The bigger the ask, the more discretion we have to make decisions. This is a very straightforward approval because the conditions for practical difficulties are met—the proposed use is reasonable in nature, the circumstances are unique to the property, and if granted it will not alter the central character of the locality.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

This project delivers a public benefit rather than a private benefit. The main feature of the land between the new pump house and the pond is a two-lane road and that's certainly a different circumstance than anything we have seen in residential applications around ponds.

Variance Request: Edina Aquatic Center Pump House Expansion (4300 West 66 Street)

These are signs that were permitted back in 1977 when the church was originally built and we're basically just trying to replace the ones that are there in the same locations with similar signs.

Sign Variance Requests: Meeting House Church (6200 Colonial Way)

The ground there is really swampy. It is around the church as well and it keeps decaying we lose about an inch a year in height. The sign so that's why that one went down.

Sign Variance Requests: Meeting House Church (6200 Colonial Way)

I spent literally almost an hour yesterday trying to find that third sign. It was literally laying down in the image. Since you know commissioner alaire have found it, it makes sense now that you're replacing it because the bridge and the steeple are very iconic and you could see it on your approach easily, but that third sign just confirms that it's there.

Sign Variance Requests: Meeting House Church (6200 Colonial Way)

The purpose and the intent of the code is to allow for Monument signs that provide visibility without causing impacts on safety or sight lines. The requested variances would be in harmony with the general purpose and intent of the code.

Sign Variance Requests: Meeting House Church (6200 Colonial Way)

We've had our neighborhood meeting, our sketch plan, both Planning Commission as well as Council took some feedback and took your comments and what we heard and have made some changes. We worked with City staff on a handful of other variances that we had and I think all of them actually are off of there now.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

The primary comments that sketch plan were this emphasis on Arcadia and really celebrating that in the pedestrian realm. A big part of it was shifting the building and the podium itself to really increase that setback along Arcadia. We shifted that Podium piece 17 feet inward and then the building kind of proper as it kind of touches the ground was also inset four feet.

— Applicant/Matt Aahn (ESG Architects) [1:16:11]
Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I think it's a great resource for the city. In terms of the design I think it makes sense where the pump room is going to be located. The roadway I think it's like 7 ft from the edge of the road to the actual proposed pump line pump room wall the closest point. Generally speaking the ride of way and the setback requirements is like around 5 ft roughly for most buildings that are 8 ft tall so if this was a house it probably would be okay in that location.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

There was a lot of discussion in the work that we looked at about how close you are to Transit and there was most of the information said it was a quarter of a mile and I understand that that gives you the ability to change the parking numbers function of how close you are to Transit but then in the Transportation memo it said that was a half a mile.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

Why so much glass? How do you make that determination? Is that a function of utilities or exposure or cost?

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

From the development standpoint and from the leaseability standpoint within the office space, the all-glass facade is certainly the most desirable. That space is what people want—a lot of natural light. You're seeing a lot of office spaces transformed since COVID with more open functional spaces. When you have a lot of glass on the exterior you're able to get a lot of that light into the center core of the building so you can illuminate the whole floor and create a much better work environment from a leaseability standpoint.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

What makes this building successful is the juxtaposition of the component that is kind of protruding out from underneath the building and then the building itself. We really celebrated more opacity at the podium element—our dock—and then letting the building proper be more glassy so that we can really create a nice contrast between those two elements. Additionally, both East and West sides will have horizontal shading fins so that when you get that warm Western Summer Sun you'll get some reprieve within the building.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I'm looking at the Cabana, I just want to get your sense of safety right. We have the railing there. Do you have any concerns at all with kids climbing over that thing, running out into the street, climbing up to get into the aquatic center?

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I just did want to make one more note. Obviously it's in the staff report it says you this pump house must be located here. Obviously it really needs to be located here. There would be extreme expense to move it and put it somewhere else. You're talking about rebuilding pools and relanding it. The only other comment I really wanted to make was that I'm going to abstain here. Don L did propose on this project so I'll be abstaining.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I'm new to the commission but I've got a fair amount of history with this the Grand View area. We talked for what seemed like years on that plan. We had a lot of vision for it. The rendering showed housing. I do like a few things about this. I like bringing 300 or several hundred people into the area to help support Grand View. I like the dock, the walking area, the front area where you have the little seating. It's nice to have the welcoming door on Arcadia. But the one thing we talked about at length on this site was that this is the one location in Grand View where height is really seemed to be okay. My feeling was that this site could support we always talked about going up to the height of the Jerry's Tower. It seems like that was what it was. You didn't go all the way up. It seems like it could have gone up a little bit higher. The building materials—not a huge fan of that glass. I kind of understand what you're saying about tenants and liking to see out and having the natural light come in. Glass is fine, it's just that there's a lot of glass and there's not a lot of the materials that we kind of had in that Grand View area plan—the stone, the brick.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

The concrete we've got a couple ramps in town that made it through this and got built that aren't the prettiest in town. I'm thinking of the Southdale medical office building ramp. They made them some detail on it. There are things that could be done to it and stone or brick in my opinion would be nice and carrying it up through elements of the building and either columns or somehow showing that.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

The renderings I think it seemed like you saw rings from the freeway somewhere. It gave me a feeling like a cut off IDS Tower, a shrunk down blast building that didn't really fit the area. Across the way we've got the brand new residential building that's there which put a lot of effort into what they did for finishes.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I'm having trouble and maybe you can explain why we can't orient the public space more to the north and west because I think chair Bennett had even mentioned like we don't care about the setback on the highway side push it that direction push the height. Why can't we preserve some of that space on the west for that engagement since this is supposed to be the jewel box and the entrance into Grand View?

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

One of them is our storm water mitigation strategy. Our storm water really the only place we could get it to fit was on the east side so there's a limitation on how much we can shove our building East. We did it as far as we possibly could. We can only locate it within our property so we've put the storm water tanks as far east as possible.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I think what we were trying to do is we were totally embracing the idea of activating and engaging Arcadia. The amount of vegetation and the amount of relief we have from the street is I think it is going to be welcoming. We really wanted to define that street edge and we're thinking ahead of what might be developed across the street and really embracing the idea that this might feel like an outdoor room framed by buildings on both sides.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I'm rethinking like on day one I just can't imagine like the why someone would circulate along the along the east and north like there's it seems like they I don't know if that it's actually a shortcut to get anywhere but if they're going to commute they're going to take the shortest route possible and without it available you're inviting people through the building and the parking instead.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I definitely have a hang up with not shifting the building East and so one of the questions that I'm just still thinking about is you know sometimes with the storm water mitigation you know it can get like buried under a portion of the building. You know you sacrifice some parking and you know you have your foundation wall kind of over to one side. Was that considered to kind of maximize because I I just see this and I think this is really great but the next step better is again to get more space on that west side.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

I'm going to bring up the bike again. If I biked here to go to the Toasted restaurant because I would go to a Toasted restaurant, I'm going to go behind City Hall and I'm going to go on the Southside and I'm going to park in the back and I'm going to go in the back doors.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

We studied that this will be our headquarters. We need space by the end of next year. We will be moving forward with this assuming that we get through the entitlement process. We've run the returns and the math on our end and we're confident with the building that we've proposed today. We do not have a TIF ask out to the city for this project so we will be fully moving forward—private financed.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

What type of tenants this might attract under what circumstance? What size are they?

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

We've kind of seen all across the board whether it's financial groups or real estate groups or a wide array. You're seeing in some of the larger tenants that are looking they're typically actually downsizing. They were maybe in 80s or 90s office buildings with floor plates that didn't work anymore and they're going from 40 or 50,000 down to the 25,000 foot plate because they can be so much more efficient than they used to be.

Rezoning, Subdivision, Site Plan, and Variances: Opus Office Building (5100 Eden Avenue)

Ordinances & Resolutions (9)

City Code Section 36-1268Ordinance

Setback requirement from ordinary high water elevation of naturally occurring lakes, ponds, or streams (50 feet)

Staff Report dated February 21, 2025Plan

Comprehensive staff analysis of Edina Aquatic Center pump house expansion variance request with survey plans and engineering submissions

Planned Office District (POD)Plan

Current zoning for 5100 Eden Avenue site; proposed to be rezoned to Planned Commercial District 2

Planned Commercial District 2 (PCD2)Plan

Proposed zoning for 5100 Eden Avenue project; consistent with comprehensive plan mixed-use center guidance

Grand View District Development FrameworkPlan

Comprehensive plan guidance for mixed-use development in the area; emphasizes pedestrian-oriented, vibrant development

City Sign CodeOrdinance

Governs sign setbacks, height, illumination requirements, and change frequency for monument signs

Edina Comprehensive PlanPlan

Future land use designation for low-density residential (Aquatic Center) and mixed-use center (Eden Avenue site)

Watershed District ApprovalPermit

Required approval for pump house expansion project affecting water body setback

Transportation Study (Stantech)Plan

Traffic and parking analysis for Eden Avenue project; concludes existing roadways can support development; roundabouts designed with development in mind

Source document

Was this story helpful?

Other Topics from This Document

  • Edina Aquatic Center Pump House Expansion and Variance

  • Meeting House Church Sign Variances

  • Opus Office Building Rezoning, Subdivision, Site Plan, and Variances at 5100 Eden Avenue

  • Planning Commission Officer Elections

Want to know when new stories arrive?

Enter your email to receive updates.

We will not use your email for any other purpose. You can unsubscribe at any time.