RecordingTranscript available

Elevare 2nd Addition Preliminary and Final Plat

Hopkins Public SchoolsThursday, January 15, 2026
Watch on original source

Document Analysis

Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.

Transcript
[0:02] Hello, [laughter] I am Bria Ottoman, [0:04] Minnetonka planner. If you have any [0:07] questions after viewing this [0:08] presentation, please feel free to [0:10] contact me by phone or email as noted [0:13] here. [0:17] This is the staff presentation for Elev [0:19] second edition. [0:22] Staff recommends that the planning [0:24] commission recommend that the city [0:25] council approve a preliminary and final [0:28] plat with a final, excuse me, with a [0:31] flood plane alteration permit at 253 and [0:35] 255 Plymouth Road. Four votes are [0:39] required for this project. [0:43] The subject property is located east of [0:45] Plymouth Road, just north of Elevare. [0:47] For clarification, this project is the [0:50] second edition of the same name as Elev. [0:52] However, the applicant and property [0:54] owner have changed. The current [0:56] applicant and property owner of Elevare [0:58] First and Second Edition is now Swanson [1:01] Homes. [1:03] Although this project will be processed [1:05] as a subdivision, it is for simplicity [1:08] within the repling process, not to [1:10] further divide the parcels. [1:13] With a subdivision, we can process the [1:15] vacation request to remove the previous [1:17] easements and create new easements under [1:21] the single review before recording with [1:23] the county. The intention is to have the [1:26] final plat as clean as possible for [1:28] recording with Henipin County. [1:32] The addition contains two single [1:34] residence properties, both accessed off [1:37] of Plymouth Road via shared driveway. [1:41] The original homes have both been [1:43] demolished. Both sites are currently [1:45] unimproved. [1:47] The combined total of the two lots is [1:49] 1.91 acres. [1:52] The property currently has one flood [1:54] plane generally located between the [1:57] homes along the existing property line. [2:01] This proposal will not change the number [2:03] of homes or parcels. The final proposal [2:06] consists of two single residence homes [2:09] and two parcels in total. [2:15] Swanson Homes is requesting a [2:16] preliminary and final plat with a flood [2:18] plane alteration permit to redevelop [2:21] these properties. [2:23] This proposal will meet the subdivision [2:25] ordinance, the tree protection [2:27] ordinance, and does not require any [2:29] variances. [2:31] The proposal is to redevelop the two [2:33] parcels for two new homes on more [2:36] similarly sized lots. The most [2:39] significant change to the properties [2:41] would be the relocation of the access [2:43] from Plymouth Road [2:45] to Elev, excuse me, Emerald Trail. [2:50] 255 Plymouth Road currently has [2:53] right-of-way access to Emerald Trail. [2:56] No special approvals are required for [2:58] this change of access location. [3:00] However, a driveway agreement is [3:02] required to allow both properties to [3:05] access off of Emerald Trail through the [3:08] singular right-of-way access. [3:11] A driveway agreement is required to [3:13] outline the drive the private accordance [3:15] and responsibilities of that shared [3:17] driveway between the both lots. [3:21] Emerald access from Emerald Trail has [3:24] been advocated by Henipin County, the [3:27] authority in granting and maintaining [3:29] access off of county roads such as [3:31] Plymouth Road. This plan reflects those [3:34] county comments. [3:39] The property's highest point is on the [3:41] eastern portion of the property where [3:43] the further home is proposed. [3:46] The lowest point of the property is the [3:47] flood plane and proposed infiltration [3:50] basin. [3:52] Grading is proposed in these areas of [3:55] the new driveway and homes to create a [3:57] burm and to create a burm on the western [4:00] portion of the property between the [4:03] first home and Plymouth Road [4:06] and for flood plane alteration between [4:08] the single residence homes near the [4:11] central portion of the property. [4:16] The project proposes flood plane [4:18] alteration which will be adjacent to [4:20] floodplane alteration [4:23] proposed and currently constructed for [4:25] elevator first edition. There will be [4:28] cross development across the property [4:30] line. [4:31] The combined flood plane alteration has [4:33] a net increase meaning that flood plane [4:36] capacity will be increased [4:39] and have additional storage. [4:42] The proposal meets our flood plane [4:44] ordinance standards generally requiring [4:46] that flood plane not be filled but must [4:49] be mitigated elsewhere on the same site. [4:53] In reference to the slide shown, this [4:55] means that the amount of filled flood [4:57] plane must be equal to or less than the [5:00] amount of cut or increase in the flood [5:02] plane capacity. [5:04] This proposal achieves that. [5:09] The applicant proposes to connect the [5:11] storm water utilities to those approved [5:14] for elevator first edition and currently [5:16] in place. [5:19] The addition is shown on the screen in [5:21] red. [5:25] The utility will help to outlet storm [5:27] water collected on the site basin of [5:30] elevator second edition. As with any [5:33] project, storm water management must [5:35] ensure that facilities control rate, [5:38] quality, and flow at or better than the [5:41] existing conditions of the site. [5:46] The flood plane alteration and storm [5:47] water utilities will require revised [5:50] agreements updating those initially [5:53] recorded for elevation. [5:59] Elev first edition was atypical in [6:01] regards to tree protection ordinance in [6:04] that because it proposed a density of at [6:06] least one unit per acre, it was allowed [6:09] to exceed the standard removal [6:11] thresholds. [6:13] More commonly, we see sites that do not [6:15] propose a density of at least one acre [6:17] per parcel, therefore must meet the [6:20] removal thresholds. [6:22] Elev second edition is proposing a [6:25] density of 0.9 units per acre, meaning [6:29] that they must meet the tree protection [6:31] ordinance as is or request a variance. [6:35] Again, this proposal is not requesting a [6:38] variance. [6:39] This redevelopment [6:41] would remove 15 high priority trees and [6:44] 21 significant trees. This proposal [6:47] meets the tree protection ordinance. [6:53] Staff finds that the proposal meets all [6:55] standards of the subdivision ordinance, [6:57] which includes meeting resources [6:59] standards such as flood plane and tree [7:01] ordinance standards. [7:03] Staff recommends that the planning [7:04] commission recommend that the city [7:07] council approve the preliminary and [7:09] final plat with the floodplane [7:11] alteration permit for ELA second edition [7:14] at 25503 and 2550 Plymouth Road. [7:20] If you would like to comment on this [7:22] project, please use the public comment [7:24] button on the Elev second edition web [7:26] page at minitonka matters.com. [7:30] All written comments submitted will be [7:32] provided to the planning commission and [7:33] city council before their meetings. [7:36] The planning commission will review this [7:38] project on January 22nd, 2026. [7:43] Again, thank you for viewing this prep [7:46] presentation.