Minneapolis City Council — Transcript

Thursday, June 18, 2026

Consent Agenda Approvals

Van White Memorial Boulevard Resurfacing Project

West Fulton Neighborhood Improvements Phase 1 Project

Appointment of Public Works Department Director Tim Sexton

Redesign of Highway 280 and Community Engagement

Pedestrian and Bicycle Advisory Committees' 2025 Annual Reports

Votes (7)

Consent Agenda Items 4 through 22

Approved (The eyes have it)

Dissent: None

Moved by Chair Wonsley [04:10] · Seconded by Unknown [04:10]

The consent agenda included various authorizations for construction easements, cooperative agreements, committee appointments, master utility agreements, public hearing settings, bid acceptances, and contract authorizations. Council Member Rainville offered compliments on the planning and outreach for the First Avenue North Reconstruction project (item 11). Item 6.11 (Bicycle Advisory Committee appointments) was referred back to staff due to a nominee moving. A revision was noted for item 8 (University Avenue Southeast and Fourth Street Southeast Project).

Van White Memorial Boulevard Resurfacing Project Public Hearing

Approved (The eyes have it)

Dissent: None

Moved by Chair Wonsley [09:45] · Seconded by Unknown [09:45]

Tracy Lindgren presented the project, detailing the scope of mill and 2-inch asphalt overlay on Van White Memorial Boulevard, a municipal state-aid road with a pavement condition index of 52. The project cost is $404,440, with $70,125.60 from special assessments. Outreach included mailings and a virtual meeting with no attendees. Council member Warren praised the ADA improvements and overall work in Ward 5.

West Fulton Neighborhood Improvements Phase 1 Project Public Hearing

Approved (The eyes have it)

Dissent: None

Moved by Council member Palmisano [13:40] · Seconded by Unknown [13:40]

Allison Bell presented the project focusing on resurfacing Chowen Avenue South and Beard Avenue South, part of the PV 131 Residential Neighborhood Reconstruction Program. The project targets streets reconstructed in 1969 with a PCI of 36, costing $502,690, with 13% covered by special assessments. Extensive public engagement has been conducted since 2024. Council member Palmisano highlighted the project's long history and the positive change from full reconstruction to full depth reclamation due to soil testing.

Mayor's Nomination of Tim Sexton for Public Works Department Director

6-0 Approved (Roll Call Vote)

Dissent: None

Moved by Chair Wonsley [53:00] · Seconded by Unknown [53:00]

Mayor Frey nominated Tim Sexton, praising his track record in delivering core city services, securing federal funding, and leading major infrastructure projects. Support poured in from Senator Scott Dibble, Metropolitan Council Chair Robin Hutchinson, and LiUNA Minnesota, all commending Sexton's collaborative leadership and commitment to public good. Director Sexton expressed humility and outlined his department's accomplishments, challenges, and future focus on core services, climate, equity, and safety. Committee members universally lauded his accessibility, leadership style, and impact on livability issues and equitable investment, while also raising questions about future success metrics, equitable investment distribution, and areas for improved communication.

Resolution Expressing Concern about the Redesign of Highway 280 and Calling for Increased MnDOT Engagement

Approved

Dissent: None

Moved by Council Member Rainville [01:03:00] · Seconded by Chair Wonsley [01:03:30]

Public Works staff introduced MnDOT and Minneapolis Park Board representatives to address a resolution co-authored by Council Member Rainville and Chair Wonsley. MnDOT's Ryan Wilson outlined the history of the 280 project since 2020, focusing on infrastructure maintenance, safety, and the proposed closure of northbound 280 to westbound Broadway. He acknowledged past insufficient outreach in Northeast Minneapolis and detailed an updated engagement plan. MPRB's Julie Aldridge emphasized the critical multi-agency partnership for completing the Grand Rounds Missing Link, noting MnDOT's significant contribution to improving the Broadway/Industrial intersection. Council Member Rainville underscored the resolution's intent to support the Park Board and ensure robust community engagement.

Pedestrian Advisory Committee (PAC) 2025 Annual Report

Received and Filed

Dissent: None

Moved by Chair Wonsley [01:27:10] · Seconded by Unknown [01:27:10]

PAC Chair Lisa May Withrow Wistrom presented the report, emphasizing that 'pedestrian' includes users of mobility devices. Key observations included widespread sidewalk accessibility and condition issues, hampered by construction and a lack of clear detours (e.g., 26th & Hiawatha/24th St Bridge). She highlighted challenges with all-season clearance, signage, temporary asphalt fillings, and utility connections creating trip hazards. Recommendations focused on improved communication for renters, leveraging traffic calming for pedestrian safety, and enhancing inter-departmental cooperation, especially with county and state partners. Council Member Palmisano inquired about the criteria for opposing projects, and Council Member Warren expressed concern about uneven sidewalks and advocated for more attention to existing infrastructure.

Bicycle Advisory Committee (BAC) 2025 Annual Report

Received and Filed

Dissent: None

Moved by Chair Wonsley [01:27:10] · Seconded by Unknown [01:27:10]

BAC Chair Alyssa Schoffman presented the report, underscoring the committee's vision for a city where biking is easy and joyful for all. She highlighted the committee's active year, reviewing over 40 projects. Using the 35th Avenue Flood Mitigation Project as a case study, she lauded the process win of having BAC input on utility-driven projects and the inclusion of traffic calming. However, she pointed out shortcomings, such as the initial reluctance to remove parking despite data, hindering opportunities for wider sidewalks and dedicated bikeways on a designated 'all ages and abilities' corridor. The BAC's intervention led to parking removal on one side, improving the design. She emphasized the value of the Complete Streets policy checklist for transparency and called for more transformative projects to meet climate and transportation goals.

Notable Quotes (18)

I just want to speak briefly to item number 11, which is the planning for First Avenue, and I wanted to compliment the staff. I'm looking around for Luke. Is he here? Oh, there you're hiding. Uh you were the lead. You had a lot of other people helping you, but it was just fantastic. Uh the response I've gotten from the community there. They're very happy, which as we know is somewhat unusual. And uh we're going forward. It's still construction's a long ways away, but the hard work of this planning and outreach has has come and gone, and thank you so much for that.

Council member Rainville [04:00]
Consent Agenda Items 4 through 22

The purpose of the asphalt pavement resurfacing program is to extend the life of some city streets which are not scheduled for any preventative maintenance, renovation, or reconstruction in the foreseeable future. This resurfacing program is addressing city streets that are at a point in their life cycle where a new street surface will extend the street's life, improve ride quality and neighborhood livability, and help slow the overall deterioration of our city street system.

Tracy Lindgren [07:25]
Van White Memorial Boulevard Resurfacing Project Public Hearing

I want to say thank you, Director Sexton and your team for all of the wonderful work that you have been doing on the Van White Boulevard there in in North Minneapolis in Ward 5. All of the great ADA improvements to the curvature and all of that. It looks absolutely wonderful. So, I am excited and will be supporting this assessment today.

Council member Warren [09:00]
Van White Memorial Boulevard Resurfacing Project Public Hearing

City staff have conducted meaningful engagement during the planning and design process of this project. There were three rounds of engagement that started in the spring of 2024 and concluded earlier this year. The project team conducted multiple public meetings, neighborhood and business association outreach, hosted online surveys and comment maps, uh attended pop-up events, held office hours for area residents, and shared information through e-newsletters.

Allison Bell [11:15]
West Fulton Neighborhood Improvements Phase 1 Project Public Hearing

This is for the two blocks that actually got changed from being full reconstruction to instead being this lighter or lesser amount of work after more soil testing. It was seen that we could accommodate what we needed to do here with this full depth reclamation instead of a full reconstruction project.

Council member Palmisano [13:00]
West Fulton Neighborhood Improvements Phase 1 Project Public Hearing

During his time as Public Works Director, the City of Minneapolis has been recognized as the number one drinking water city in the state of Minnesota. We've completed major storm water projects and secured critical infrastructure funding from the federal government without sacrificing core city goals.

Mayor Frey [14:45]
Mayor's Nomination of Tim Sexton for Public Works Department Director

What I've always appreciated about Tim is that he understands transportation is not simply a matter of moving vehicles, but as a public investment that creates opportunity for people. He understands that our transportation system must work for everyone, whether they drive, walk, bike, use transit, use mobility devices, or rely on a combination of these options.

Senator Scott Dibble [16:50]
Mayor's Nomination of Tim Sexton for Public Works Department Director

Moving forward, my focus remains clear. Deliver excellent core services, deeply embed climate, equity, and safety into everything we build, and support an an engaged and diverse workforce.

Tim Sexton [24:45]
Mayor's Nomination of Tim Sexton for Public Works Department Director

One of my goals when I got to City Hall was to develop and maintain a relationship with this department. And that is because this is what matters the most to North Minneapolis. These livability issues that you all tackle every single day is something I hear about all the time.

Council Member Vita [26:10]
Mayor's Nomination of Tim Sexton for Public Works Department Director

Director Sexton, you are one of the most directly accessible directors in this whole city and I thank you for that. Although I try not to contact you outside of regular working hours, when I've needed to, you've always been quick to respond and to activate your team to manage a situation.

Councilmember Palmisano [33:30]
Mayor's Nomination of Tim Sexton for Public Works Department Director

I think that's actually at the core of public works too that often gets um overlooked. Of course we want to hone in on the core services um and and reduce public work to just putting in um, you know, new streets or or lighting but we we also have to acknowledge what places like 38th in Chicago and even I-94 which we're going to have a role in in rethinking and reframing what that project looks like. Um, we recognize historically infrastructure projects have also been used as a tool to um, widen racial and economic disparities. And it's important that as community leaders or workers in this this this field, we not only acknowledge that history but also use the tools and our expertise to do everything that we can to undo that harm and also lead with new um, and better actions that actually bring our communities together That promotes uh, restoration and uh, a reparative justice.

Chair Wonsley [49:50]
Mayor's Nomination of Tim Sexton for Public Works Department Director

One of the things that came up maybe in the last half a year, three quarters of a year is we did not do as much outreach as we probably should have in Northeast Minneapolis. So, we, uh, tweaked our engagement plan. We actually have an engagement plan in process and motion starting in June going through the summer of reaching out to some additional folks, the East Bank neighborhood partnership, um, additional additional, uh, neighborhood associations in Northeast, uh, St. Anthony, just your friends to the east, and just kind of having those conversations, getting some dialogue and and happy to talk about some of that in further detail if you are interested in that information.

Ryan Wilson [57:30]
Resolution Expressing Concern about the Redesign of Highway 280 and Calling for Increased MnDOT Engagement

MnDOT has generously offered to take on um improvements at the intersection of Broadway and Industrial, which otherwise would have become a Park Board project in excess of $1 million. MnDOT is well positioned to navigate the coordination with the railroad and our agency partners at the city and the county um to improve that intersection. That's a huge benefit for the Park Board to be able to move this project forward.

Julie Aldridge [01:00:30]
Resolution Expressing Concern about the Redesign of Highway 280 and Calling for Increased MnDOT Engagement

One of the things that we have noticed in the PAC is that sidewalk accessibility and condition has been all over the place throughout the city. We have noticed a few specific things that sidewalk accessibility and condition can impact. Um construction work has caused sidewalks to be closed without visible detours or detours getting thwarted...

Lisa May Withrow Wistrom [01:07:30]
Pedestrian Advisory Committee (PAC) 2025 Annual Report

One of the biggest things that will cause the committee to not support a project is if there is great prioritization of private vehicle storage. We want to make sure that there is more room given to pedestrians and transit users because there's a lot of overlap between these fields.

Lisa May Withrow Wistrom [01:13:30]
Pedestrian Advisory Committee (PAC) 2025 Annual Report

Our streets are public places where our values are made manifest. They're put forward, they're tested, they're contested, Um, um you know, to some degree the entire not just our streets, but the entire enterprise of public works uh is is a demonstration of how we want to be together as a community and what we want to do for each other.

Alyssa Schoffman [01:18:45]
Bicycle Advisory Committee (BAC) 2025 Annual Report

However, this corridor still won't have the improvements that it needs in order to be an effective part of the bike network, right? So, narrowed streets are not a bike way. Traffic calming is the end result of the infrastructure changes that we make. It's not a bike way. There's not actually anything in this design that anyone who bikes would call a bike way on this project and this corridor 34th Avenue is part of the all ages and abilities network. It's supposed to have a bike way.

Alyssa Schoffman [01:21:40]
Bicycle Advisory Committee (BAC) 2025 Annual Report

I want to invite you to get on a bike for whatever reason moves you. There's no better way to understand how far we've come and how far we have left to go.

Alyssa Schoffman [01:23:30]
Bicycle Advisory Committee (BAC) 2025 Annual Report

Ordinances & Resolutions (11)

Climate and Infrastructure Committee Work Plan (2026-2029)Plan

Subject of a public comment period scheduled for July 9th, 2026.

Minnesota Government Data Practices ActOther

Law classifying recording and broadcast of public hearings as public data.

City Project 2388Other

Identifier for the West Fulton Neighborhood Improvement Project.

PV 131 Residential Neighborhood Reconstruction ProgramProgram

Program under which the West Fulton Neighborhood Improvement Project falls.

Racial Equity Framework for TransportationFramework

Tool used by Public Works to prioritize neighborhoods for equitable investment, initiated by former director Robin Hutcheson.

Transportation Action PlanPlan

Seminal document guiding Public Works' future work, in partnership with the Racial Equity Framework.

Grand Rounds Missing Link projectProject

A long-standing Minneapolis Park Board project, revisited since 2023, subject of multi-agency partnership discussions related to Highway 280 redesign.

Complete Streets policy checklistPolicy

A transparency tool that allows public to see how the city is implementing its complete streets policy on projects, highlighted by BAC.

Bicycle Advisory Committee 2025 Annual ReportReport

Report summarizing the activities and recommendations of the Bicycle Advisory Committee in 2025.

Pedestrian Advisory Committee 2025 Annual ReportReport

Report summarizing the activities and recommendations of the Pedestrian Advisory Committee in 2025.

Climate Equity Action PlanPlan

Plan whose presentation was postponed to the next C&I meeting.

View Source
Minneapolis City Council - Minneapolis Recorder