RecordingTranscript available15:46
Whittier Safe Routes to School, Phase 2 Neighborhood pre construction meeting, June 11, 2026
Minneapolis City CouncilThursday, June 18, 2026
Watch on original sourceDocument Analysis
Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.
Transcript
Okay, 4:32 um I'll just start the uh meetings. Um hello everyone. This is greater separate routes to school phase two project. Welcome to our neighborhood construction meeting. The meeting is on June 11, 2026 at 4:30 p.m. This meeting is virtual and recorded. Meeting agenda is is follows. Introduction, my name is Wenwen and I am construction engineer of the project. Overview of using Microsoft Teams. Project overview. Background, scope, and budget. Construction overview. Construction schedule, detour, traffic control, and access. Coordinate coordinated work encroachments and working hours. What to expect during construction. Communication. Questions and concerns. Overview of using Microsoft Teams. How to ask uh questions. Click the uh ask a question button in the lower right corner. How to pause or exit the meeting. Click the pause button in the lower left to pause your viewing of the meeting. Exit the event by closing the browser window. Project overview. Project locations. The work will be on West 26th, 27th, and 28th Streets between Lyndale Avenue and Lyndale Avenue. As well as the intersection of East 26th Street and Stevens Avenue. This federal project will include grading, bituminous and concrete surfacing, lighting and signals, curb extension and traffic circles, concrete medians and raised crossings, Americans with Disabilities Act compliant pedestrian ramp and utility improvements. Project scope, 2026 scope of work includes um intersection improvements, pull outs, and ADA at 16 intersections, storm sewer and water improvements, hydrant replacement on West 26th Street at Pleasant, Pillsbury, and Stevens, and traffic circles on West 27th Street at Garfield, Pleasant, and Pillsbury, and speed humps at 26th and Pleasant, 26th and Pillsbury, 27th and Harriet, 28th and Pleasant, and 28th and Pillsbury. Revised street lighting system at West 26th Street and Stevens Avenue intersections, revised control signal system on West 28th Street at Grand and Pleasant Avenues, and new pavement markings. 2027 scope of work um adding concrete median on West 26th and 28th Streets. That includes uh bufferings separating bicycle lanes. Estimated total project cost 2.8 million. Construction overview, construction anticipate start date is June 22nd, 2026. Meyer Contracting is a project contractor. Substantially completion date is November 1st, 2026. Subject of change will depend on weather conditions or unforeseen circumstances we may have. So, please see our website for current information and you can sign up for the email update from our project website. The tour Uh so, please keep in mind that the tour will be changes as we go with different construction phases of the project. As of right now, we are going through the tour for the construction phases that will be started on June 22nd. Um Pillsbury Avenue and West 26th Street detour will be West 26th Street, Linda Avenue South, West 28th Street, and Pillsbury Avenue. For Pleasant Avenue and West 27th Street and Harriet Avenue and 27th detour will be West 26th Street, Linda Avenue South, West 28th Street, and First Avenue South. Steven Avenue and East 26th Street detour will be West 26th Street, Lyndale Avenue, West 28th Street, and Fifth Avenue South. Bus detour, Metro Transit website has the most current information about routes and schedule changes. You can follow up with the update from the web page. Traffic control and access Traffic and pedestrian detour will vary at each intersection depending on the work schedule. Lane narrowing or intersection closure are expected under construction. Local access for residents will be maintained. Coordinated work, um contractor will do removals, water, storm sewer, asphalt, concrete, signal, signage, and striping. City of Minneapolis performs construction surveying and material testing. For utility work, Lumen will will be adjusting the cables and hand holes. Hours of operations, standard hours are from 7:00 a.m. to 6:00 p.m. uh, from Monday to Friday. We may have to work outside of these standard hours and days occasionally, and that requires a permit in advance. Right-of-way enforcement, please note that the city right-of-way extends beyond the back of the existing sidewalks. Um, right-of-way usually from 2 to 4 ft behind the sidewalk. And the purpose of this information is to notify you that any private, that includes uh, sprinkler systems, decorative pavers, flowers, shrubs, um, or any other special items, please relocate or remove these items from the construction area uh, before the construction begins. Uh, decorative items in the right-of-way are the responsibility of the homeowner. What to expect during construction, um, construction operations, uh, partial road closure and detour, um, local access to be maintained. Um, utility work includes the storm sewer and water work. Asphalt surfacing, curb and gutter installations, revised control signal system. A sidewalk close and follow pedestrian details. A concrete median and protected bike way installations. Raising maintenance hole. Final asphalt concrete resurfacing and striping. Um communications weekly updates will be sent through GovDelivery email. You can sign up for email update from our website. Uh we have bi-weekly stakeholder meetings for this project and our next virtual meeting will start on Friday, June 26th at 10:00 a.m. Again, you can find that information from the project website. Or you can scan this QR code to go to video project web page. And how to sign up for the project update. Um go to the project website. You will find sign up form there. As indicated in the picture, put in your email address and submit it. Project contact information. Um this is city city of Minneapolis public works. Um project engineers with my name and contact information. Noah Morics as project chief field inspector. Joshua Lindquist is contractors project manager and his contact information. Um just please feel free to reach out if you have any concerns about the project. Um, and that's all I have for today's presentations. I will leave this open to questions and answer. So, feel free to put in the chat box your questions and we're happy to answer. I'll wait for another um 5 minutes to see if we have any questions for the project. >> So, on the screen you will see the instruction how to put a uh your questions um to me. You can uh click the ask a question button in the lower right corner. Um I will wait for another couple minutes for questions. So, I see someone is typing a question. So, hopefully we get one. >> All right, when we have a question in the chat here when it says I can't remember will the circles have vegetation leave referring to the traffic circles on 27th. >> Hi Jeffrey Carson. So thank you for coming. For the circle on 27th I can give you more detail about what we will have in that circle on 27th. So but pretty much right now that we will be seeding and solving for the the circle on 27th Street. But I will get into detail to see you know if if we if that may change in the near future or something else, but I will get to you to that. Thank you for the question. That's really good. questions um But yeah, usually we we have we have plants and mulch in circle after other intersection, but for this specific one on 27th that I have to get back to you on that. >> And they replied with sounds good. Thanks. >> Thank you Jeffrey. So I don't see any other questions. as well as um no one typing is right now. Um so I would call the meeting adjourned and we will post this um PowerPoint slides um on the project web page uh for your reference. So thank you for today and have a good rest of your day.