Mound City Council — Transcript

Tuesday, June 23, 2026

Mound Fire Department Operations and Personnel Recognition

Residential Boat Rental Business and Code Violations on Oak Lane

West Edge Boulevard Traffic Management and Safety During Construction Detour

Votes (2)

Amendment to Agenda: Add West Edge Conversation as New Business Item 9A

Passed Unanimously

Dissent: None

Moved by Council member [00:01:46] · Seconded by Unknown [00:02:00]

Council Member Herrick requested adding the West Edge Boulevard traffic discussion as a separate new business item, allowing for a more detailed and actionable debate beyond general public comments. The Mayor and Council agreed to the procedural change.

New Business: West Edge Boulevard Traffic Management during Construction Detour

Motion for West Edge-specific resolution not voted on; direction given to staff to draft a general policy for future construction projects.

Dissent: Mayor Holt and other council members preferred a general city-wide policy over a West Edge-specific resolution. The motion for West Edge-specific action did not proceed to a vote.

Moved by Council member Herrick [00:52:16]

Council Member Herrick presented research asserting that current orange detour signs for 20 mph are not legally enforceable, leading to police issuing warnings instead of tickets. She shared traffic data, including one instance of 62 mph and a daily average of 5,574 cars. She proposed a motion for a formal, enforceable 20 mph limit with white R2-1 signs and temporary traffic calming measures. City Engineer Matt Thman shared additional data indicating a 27 mph average speed. The council decided against a West Edge-specific resolution, opting instead to develop a general 'best practices' policy for managing construction detours in residential areas city-wide, including considerations for enforceable signage, police enforcement, and traffic calming. Staff was directed to investigate the feasibility and implications of various solutions and collaborate with the Orno Police Department, with an update expected at the next meeting.

Notable Quotes (13)

Over the course of the last 12 to 15 months, this group has spent 140 hours doing their firefighter one and two and hazmat training, 40 hours doing their EMR training. They've spent uh 24 hours at business meetings, 48 hours at drills, and then 36 hours at fish fries. So in the last year they spent 288 hours at the fire station and department doing work for the community and training and that doesn't even count the calls they've made in that whole time too.

Chief Drilling [00:04:19]
Mound Fire Department Firefighter Swearing-In

What we have is we've recruited and hired great people that fit into our culture. That's what I'm most proud of. And the three key components of that backbone of our fire department and the culture. ... Training is one of the components. Another one is hard work. ... And the third one, which is probably the most important, it is the most important, and that's commitment.

Chief Greg Peterson [00:07:33]
Proclamation Honoring Chief Greg Peterson's 51 Years of Service

Beginning on February 3rd, 1975, Chief Peterson has developed an incredible 51 years of protecting Mound and our neighbors. Over the course of those five decades, Greg answered 15,695 calls, amassing over 17,000 call hours.

Council member Castellano [00:10:39]
Proclamation Honoring Chief Greg Peterson's 51 Years of Service

Uh this uh particular resident at 2935 Oaklan um was right across the street from me is running a boat rental business. Uh it's doesn't seem to be totally on the up and up because people have a hard time getting information about business licenses and different information about uh you know how he's running his business.

Jim Funk [00:16:11]
Public Comments: Residential Boat Rental Business and Code Violations on Oak Lane

My son had to ditch his bike and run into the front yard to avoid being hit by a car when he was in a driveway. He wasn't in the street. He was in the driveway. ... It's only a matter of time before one of them gets hit on a bike rollerblading, walking down the street.

Kendra Andre [00:18:25]
Public Comments: Residential Boat Rental Business and Code Violations on Oak Lane

The code enforcement runs on a complaint basis. Um, after that, there's investigation to make a determination of any code violations with the um goal of any code enforcement to be self-compliance. ... If if those avenues don't work... it would be either turned over to the prosecuting city at prosecuting attorney or the or my office to do a civil enforcement.

Scott Lansman/City Attorney [00:22:15]
Public Comments: Residential Boat Rental Business and Code Violations on Oak Lane

The 20 mph speed limit signs. It was a nice touch, but no enforcement of said 20 mph speed limit. ... Something needs to be done to mitigate the amount of traffic. Be it stop signs, speed bumps, temporary speed bumps.

Matthew Meyer [00:27:01]
Public Comments: West Edge Boulevard Traffic and Speeding Concerns

Our mailbox was hit on that Thursday after the detour started and we have yet to replace it. ... Our slow sign, the turtle guy to try to help was stolen. ... I like the 20 mph, but something else needs to be done just for this last duration before this construction's done.

Christina Myer [00:44:59]
Public Comments: West Edge Boulevard Traffic and Speeding Concerns

I live on Beachwood. We don't have any place to play. We have no place to play. So, for safety purposes, I'm okay. I drive that road four times a day, and I have seen a significant decrease in traffic. I have never seen anyone pass me.

Helen Canyon [00:42:37]
Public Comments: West Edge Boulevard Traffic and Speeding Concerns

These orange signs are considered warning and information signs. They are not legally enforceable, which is probably why the Orno Police Department is not writing tickets. In order for it to be a regulatory sign, it has to be a white R2-1 speed sign.

Michelle Herrick [00:51:39]
New Business: West Edge Boulevard Traffic Management during Construction Detour

We did formally establish a temporary speed limit or we at least need to, which is the motion that I brought before the council, would like to have brought before the council this roadway. Um, I mean, they can't even enforce those orange temporary signs because this roadway is not actually an active work zone. It's a detour.

Michelle Herrick [00:52:16]
New Business: West Edge Boulevard Traffic Management during Construction Detour

The challenge I have with this is that okay, we we have a construction project. It started out not having all the safeguards for the community residents. No doubt. We had a meeting. We instructed the staff to handle it and they've handled it. Many of the things in your in your resolution are already done by staff.

Mayor Holt [00:56:56]
New Business: West Edge Boulevard Traffic Management during Construction Detour

So speed bumps, I don't have the data in front of me, but when we talked about this a couple years ago, a lot of what we find is that they'll slow down, they'll go over it, and then they basically, as you're saying, they they speed up to go to the next until they hit the next thing that will slow them down. And so, you're going to get more revving and more noise like that.

Matt Thman/City Engineer [01:04:47]
New Business: West Edge Boulevard Traffic Management during Construction Detour

Ordinances & Resolutions (4)

Humane Pet Store OrdinanceOrdinance

Newly passed city ordinance prohibiting the sale of animals from puppy mills.

MUTCD requirements for traffic controlOther

Manual on Uniform Traffic Control Devices requirements, cited for legal enforceability of traffic signs.

Speed Summary ReportOther

Traffic data report from Orno Police Department detailing vehicle speeds and volumes on West Edge Boulevard.

CAD Activity ReportOther

Call activity report by address and date range from the Orno Police Department, showing incidents on West Edge Boulevard.

View Source
Mound City Council - Mound Recorder