00:00:05.800 --> 00:00:09.834
We’ll go ahead and call the Meeting back to order. I don’t
00:00:09.834 --> 00:00:12.867
think we need to do, do we need to do roll call? Because, OK, I 00:00:12.867 --> 00:00:15.533
am going to read this off so people have an understanding of
00:00:15.533 --> 00:00:19.533
what’s going on, but um, as previously noted, Commissioner
00:00:19.533 --> 00:00:23.100
Maria Tran of the Economic Development Authority. will be 00:00:23.100 --> 00:00:26.367
participating in the meeting by interactive technology pursuant
00:00:26.367 --> 00:00:31.533
to Minnesota statute, Section 13.D02 rather than in person at 00:00:31.533 --> 00:00:33.734
the economic Development Authority regular meeting place
00:00:33.734 --> 00:00:38.000
at City Hall, council chambers,, 5200 85th Avenue North,
00:00:38.000 --> 00:00:40.634
Brooklyn Park, Minnesota. I am physically present in the city 00:00:40.634 --> 00:00:44.266
council chamber along with commissioners Nicole Kanowski,
00:00:44.266 --> 00:00:48.100
Cushian Eriksson, Tony McGarvey, and Shelley Page. All
00:00:48.100 --> 00:00:51.834
commissioners can hear and see one another and can hear all 00:00:51.834 --> 00:00:54.467
discussion and testimony, members of the public can
00:00:54.467 --> 00:00:58.166
monitor the EDA meeting by watching on CCX Media Channel
00:00:58.166 --> 00:01:07.266
16 or by live streaming it at www.Brooklynark.org/ 00:01:07.266 --> 00:01:08.667
economic-development Authority slash. All right, so we’ll go
00:01:08.667 --> 00:01:13.734
ahead and jump into uh the meeting, uh, so we’ll head into 00:01:13.734 --> 00:01:17.734
Public involvement, uh. So we’ll start with response to
00:01:17.734 --> 00:01:23.100
prior public comment. Uh, thank you, Mr. President, uh, members 00:01:23.100 --> 00:01:25.000
of the commission. We didn’t have any comments that were
00:01:25.000 --> 00:01:29.667
part of the public comment period. We had several comments
00:01:29.667 --> 00:01:33.000
during the um Aon or Huntington Place discussion, as well as 00:01:33.000 --> 00:01:38.266
the 4D, but nothing specific during general public comment.
00:01:38.266 --> 00:01:45.367
OK, so we will go ahead and head into a public comment, uh, 00:01:45.367 --> 00:01:50.567
and we have Jeff von Felt. uh, so if you could, uh, uh, yeah, 00:01:50.567 --> 00:01:54.800
go ahead, uh, introduce yourself, went up there, um.
00:01:54.800 --> 00:01:58.734
State name, uh, address, uh, and then we ask folks to limit
00:01:58.734 --> 00:02:05.000
it to, is it 3 minutes? 3 minutes. Yes. Thank you, Mr. 00:02:05.000 --> 00:02:08.467
President. Members, uh, my name is Jeff Van Velt with Duffy
00:02:08.467 --> 00:02:13.100
Development. We are the developers, owners, uh, 00:02:13.100 --> 00:02:15.300
management company for Tuscan Ridge Apartments. On 8 5th
00:02:15.300 --> 00:02:20.100
Avenue. I’m just here tonight to um remind members who were 00:02:20.100 --> 00:02:24.266
here last year, some new members here now that uh we
00:02:24.266 --> 00:02:29.233
brought before. The EDA, uh, package of funding, um, to
00:02:29.233 --> 00:02:32.500
apply to the Minnesota Housing Finance Agency. Again last year. 00:02:32.500 --> 00:02:39.266
item was tabled at that time. Um, and I’m just back to remind
00:02:39.266 --> 00:02:43.734
folks, I believe that is still tabled. We are still interested 00:02:43.734 --> 00:02:49.467
in um Moving forward with that development and so just back
00:02:49.467 --> 00:02:54.166
here requesting. EDA to take another look at the phase two 00:02:54.166 --> 00:02:58.367
or a first look at the phase 2 development, um, And just a
00:02:58.367 --> 00:03:02.000
reminder at the time, uh, last year this was the rule where it 00:03:02.000 --> 00:03:05.467
required 2 members of. EDA minimum of 2 members of the EDA
00:03:05.467 --> 00:03:11.367
to to. Remove it from the table, so we’re here just to um let 00:03:11.367 --> 00:03:14.400
you know we’re still around, we’re still interested in
00:03:14.400 --> 00:03:18.233
developing that site, very similar building, if not. Looks
00:03:18.233 --> 00:03:20.767
exactly like the phase one building, and of course, we 00:03:20.767 --> 00:03:26.667
would follow all the cities. Requirements for that. Applic
00:03:26.667 --> 00:03:29.800
applications for the funding to the state are due in July, so
00:03:29.800 --> 00:03:32.533
it’s important now that we have time to review that with the 00:03:32.533 --> 00:03:37.467
city. And talk about funding sources and the development
00:03:37.467 --> 00:03:41.734
itself. Hennepin County’s already awarded $1.5 million to 00:03:41.734 --> 00:03:46.467
the development. Um, and it’s awaiting any further support
00:03:46.467 --> 00:03:50.834
from other entities. Finally I understand there’s a bus tour 00:03:50.834 --> 00:03:54.934
going around, uh, on Wednesday, Wednesday, um, I hope you’re
00:03:54.934 --> 00:03:57.634
all part of that and I understand that’s stopping at
00:03:57.634 --> 00:04:00.266
Tessman Ridge, so I look forward to seeing you all there 00:04:00.266 --> 00:04:10.467
if you will attend, OK? Thank you. Thank you. All right, so 00:04:10.467 --> 00:04:15.367
next we will move to. We don’t have any public, uh, there’s no
00:04:15.367 --> 00:04:17.634
public presentation or announcements. So we’ll go
00:04:17.634 --> 00:04:21.367
ahead and move to the consent agenda. Is there a motion to 00:04:21.367 --> 00:04:29.767
approve. The consent agenda. All right, so, uh, motion was
00:04:29.767 --> 00:04:33.867
made by Commissioner Kloanowski seconded by Commissioner 00:04:33.867 --> 00:04:42.500
McGarvey. So we will need a roll call. Commissioner Tran. I. 00:04:42.500 --> 00:04:53.133
Commissioner Eriksson. Right Commissioner Kloofsky. 00:04:53.133 --> 00:04:56.266
Commissioner McGarvey. Commissioner Page, President
00:04:56.266 --> 00:05:04.367
Winston. Motion carries with 6 yes and 0 nos. Right. Thank you. 00:05:04.367 --> 00:05:12.467
So next we’ll go ahead and move to Uh, let’s see, item 5.1. To 00:05:12.467 --> 00:05:21.667
consider approving the transfer of EDA owned land. Located at 00:05:21.667 --> 00:05:24.667
PID 1611921220094 to the city of Brooklyn Park for
00:05:24.667 --> 00:05:29.767
consideration of a subsequent sale to Adam, uh, Shiso for
00:05:29.767 --> 00:06:05.233
$2000. Yes Let’s do screen. that were good. All right, 00:06:05.233 --> 00:06:09.100
thank you, um, good evening, Mayor and EDA commissioners. uh,
00:06:09.100 --> 00:06:12.734
tonight we have a two-part agenda item regarding an EDA 00:06:12.734 --> 00:06:16.000
owned parcel of land, uh, item 5.1 tonight starts with a
00:06:16.000 --> 00:06:18.533
public hearing, of course, about the sale of this EDA
00:06:18.533 --> 00:06:21.800
parcel and following will be the consideration for 00:06:21.800 --> 00:06:25.467
transferring this parcel to the city of Brooklyn Park, um, to
00:06:25.467 --> 00:06:27.634
aid in facilitating its sale, and I’ll get to that a little
00:06:27.634 --> 00:06:31.734
bit more later, but first, I wanted to give this 00:06:31.734 --> 00:06:33.834
presentation for um all the here now and provide that
00:06:33.834 --> 00:06:36.133
context and background. the public hearing starts and
00:06:36.133 --> 00:06:44.533
consideration comes later. So, as I mentioned, the purpose is 00:06:44.533 --> 00:06:48.300
to hold the public hearing first and foremost to abide by
00:06:48.300 --> 00:06:51.100
state statute for Minnesota statute 469.105 for the sale or 00:06:51.100 --> 00:06:54.266
transfer of land owned by an economic development authority
00:06:54.266 --> 00:06:57.367
and of course here public comment and or questions
00:06:57.367 --> 00:06:59.200
regarding this potential sale and is mentioned following the
00:06:59.200 --> 00:07:02.300
public hearing we’ll move to a second part where you will, uh, 00:07:02.300 --> 00:07:04.367
consider approving this transfer of land to the city of
00:07:04.367 --> 00:07:08.033
Brooklyn Park, but I have a whole slide on that, so I will
00:07:08.033 --> 00:07:12.934
get to that expeditiously here. So 1st, 1st some table setting, 00:07:12.934 --> 00:07:15.634
the property location, as you can see from this map, the
00:07:15.634 --> 00:07:19.767
property is located along Ninety-Second Avenue, um. I put
00:07:19.767 --> 00:07:23.000
in a red arrow cause those always help, but it’s, it’s 00:07:23.000 --> 00:07:26.166
yellow highlighted there. It’s a small parcel. Uh, the nearest
00:07:26.166 --> 00:07:28.367
major intersection for reference is near the southwest
00:07:28.367 --> 00:07:33.266
corner of 93rd and Zane Avenues. It’s a small outlet adjacent to 00:07:33.266 --> 00:07:36.367
the petitioner tonight, Mr. Adam Chisel, who is in
00:07:36.367 --> 00:07:40.834
attendance, um, in his property at 5901 92nd Avenue North, and 00:07:40.834 --> 00:07:44.567
now it’s a good time to note that this property’s small size
00:07:44.567 --> 00:07:47.533
or regular location make it impractical for independent
00:07:47.533 --> 00:07:53.900
development. So for further table setting uh regarding the 00:07:53.900 --> 00:07:57.634
property’s information, the property in question is a small
00:07:57.634 --> 00:08:02.467
0.05 acre parcel identified as Olot A. It abutts 5901 92 as 00:08:02.467 --> 00:08:07.000
mentioned to the Northwest, um. Which is the home of Brooklyn
00:08:07.000 --> 00:08:10.500
Park resident Mr. Schisel. Mr. Sizel has been maintaining this 00:08:10.500 --> 00:08:12.166
property and recently discovered it was owned by the
00:08:12.166 --> 00:08:14.900
EDA rather than being part of his property. And since then
00:08:14.900 --> 00:08:17.667
he’s submitted a petition in the form of procuring an
00:08:17.667 --> 00:08:21.200
appraisal to purchase the land for $2000. This monetary value 00:08:21.200 --> 00:08:23.367
is consistent with the appraised value determined by
00:08:23.367 --> 00:08:26.000
the professional appraisal that was submitted to city staff and
00:08:26.000 --> 00:08:32.400
attached to your packets. So now moving on to property 00:08:32.400 --> 00:08:36.734
history, one of the things we wanted to find out was why is
00:08:36.734 --> 00:08:39.900
this parcel essentially exists? Why is it so small, regularly
00:08:39.900 --> 00:08:42.500
shaped and owned by the EDA through the help of our legal 00:08:42.500 --> 00:08:44.567
counsel and the county recorder’s office, we were able
00:08:44.567 --> 00:08:47.300
to find out that the subject properties complex ownership
00:08:47.300 --> 00:08:50.533
dates back to 1991. At that time, the city acquired 00:08:50.533 --> 00:08:53.166
easements over multiple adjacent properties through
00:08:53.166 --> 00:08:55.800
eminent domain. Uh, these properties were later conveyed
00:08:55.800 --> 00:09:00.200
to the city in fee in 1998 by the same owner at that time. In 00:09:00.200 --> 00:09:03.367
2001, the city transferred all of these properties to the EDA
00:09:03.367 --> 00:09:06.066
which then platted the area that same year, creating what
00:09:06.066 --> 00:09:09.934
is now outlet a the subject property. While public records
00:09:09.934 --> 00:09:12.533
do not specifically document the purpose of this outlaw. It 00:09:12.533 --> 00:09:15.100
appears the small parcel may have been intended as an access
00:09:15.100 --> 00:09:19.400
point to the cul-de-sac of 92nd Avenue North, jumping to 2005,
00:09:19.400 --> 00:09:22.567
the nearby properties to the north, now an assisted living 00:09:22.567 --> 00:09:25.834
facility in an early childhood development center were
00:09:25.834 --> 00:09:29.100
subsequently platted as part of the hogs Creek development, but
00:09:29.100 --> 00:09:32.734
the 2005 declaration. of access does not specifically mention a 00:09:32.734 --> 00:09:36.100
lot a, suggesting that whatever act access purpose it may have
00:09:36.100 --> 00:09:39.634
originally served was no longer necessary after the completion
00:09:39.634 --> 00:09:43.400
of that planet development. Now that brings us to the inquiring 00:09:43.400 --> 00:09:47.800
parties current. proposal, but first, I mentioned earlier, I
00:09:47.800 --> 00:09:50.734
wanted to have a slide just for the legal process requirements. 00:09:50.734 --> 00:09:54.100
I mentioned in the beginning that the first step would, if
00:09:54.100 --> 00:09:57.266
approved, uh, would be transferring this to the city,
00:09:57.266 --> 00:10:01.000
and the reason for that now is in consultation with legal 00:10:01.000 --> 00:10:03.634
counsel, we’ve determined that the EDA statutes restrict the
00:10:03.634 --> 00:10:07.467
sale of EDA owned property to only transactions that include
00:10:07.467 --> 00:10:10.367
certain development or capital improvement requirements, since 00:10:10.367 --> 00:10:13.834
Mr. Sizel’s intended use for this small allot will not meet
00:10:13.834 --> 00:10:16.000
these statutory requirements for capital improvements. Such
00:10:16.000 --> 00:10:18.767
as constructing a building or any other development purposes,
00:10:18.767 --> 00:10:21.834
the EDA cannot sell the property directly to him. So 00:10:21.834 --> 00:10:24.467
therefore, legal counsel has recommended that the EDA first
00:10:24.467 --> 00:10:26.767
transfer the property to the city of Brooklyn Park, which
00:10:26.767 --> 00:10:30.367
can then execute the sale to the adjacent property owner. 00:10:30.367 --> 00:10:33.667
This two-step process ensures Compliance with statutory
00:10:33.667 --> 00:10:35.634
requirements while still achieving a potential desired
00:10:35.634 --> 00:10:41.033
outcome. I’ll, I’ll pause there for a moment just because. If 00:10:41.033 --> 00:10:44.367
there’s any questions up until this point or the two-step
00:10:44.367 --> 00:10:47.634
process regarding the legality of the needs here, if there’s
00:10:47.634 --> 00:10:49.100
any initial questions. Otherwise, we can have Q and A
00:10:49.100 --> 00:10:58.200
at the end as well. To go. All right, so to add an extra layer 00:10:58.200 --> 00:11:01.533
to this, there are sewer and water lines running through the 00:11:01.533 --> 00:11:03.634
uh property and near the property that required
00:11:03.634 --> 00:11:06.734
continued public access for maintenance, our engineering
00:11:06.734 --> 00:11:08.734
and operations and maintenance departments have therefore
00:11:08.734 --> 00:11:11.500
recommended that the property have an easement created to 00:11:11.500 --> 00:11:13.367
cover the future potential maintenance needs within this
00:11:13.367 --> 00:11:17.367
property. Uh, legal counsel has identified several options for
00:11:17.367 --> 00:11:20.567
ensuring these rights. An example is shown here on the 00:11:20.567 --> 00:11:22.767
PowerPoint slide, but regardless upon an approval to
00:11:22.767 --> 00:11:26.033
the of a transfer to the city of Brooklyn Park, Staff would
00:11:26.033 --> 00:11:28.667
work towards bringing a recommendation to a future city
00:11:28.667 --> 00:11:30.867
council meeting. The overall goal in this again would be to 00:11:30.867 --> 00:11:34.000
ensure that the city maintains necessary access to its
00:11:34.000 --> 00:11:36.834
infrastructure while allowing the property transfer to
00:11:36.834 --> 00:11:40.300
proceed. Another way to put it is the property is so small, it 00:11:40.300 --> 00:11:46.200
is essentially all right away. Uh, financial detail details,
00:11:46.200 --> 00:11:49.367
the proposed sale price again is $2000 based on an
00:11:49.367 --> 00:11:51.166
independent appraisal procured by the petitioner and reflects 00:11:51.166 --> 00:11:54.367
the fair market value of the property, the property
00:11:54.367 --> 00:11:57.000
currently generates no revenue, being publicly owned, and its
00:11:57.000 --> 00:11:59.567
sale would place it back on the tax rolls, generating a small
00:11:59.567 --> 00:12:03.266
amount of property tax revenue for the city in the future. Uh, 00:12:03.266 --> 00:12:05.400
the transaction would incur nominal costs for recording the
00:12:05.400 --> 00:12:08.734
deed, recording the city right away easement and state taxes
00:12:08.734 --> 00:12:12.934
as shown on the screen there. And jumping ahead to the staff 00:12:12.934 --> 00:12:17.166
recommendation. After the public hearing is opened and
00:12:17.166 --> 00:12:19.033
closed after recommends approval of the resolution
00:12:19.033 --> 00:12:21.467
authorizing the transfer of EDA owned property to the city of 00:12:21.467 --> 00:12:24.100
Brooklyn Park to aid and facilitating the potential sale
00:12:24.100 --> 00:12:28.467
to Adam Sheel for $2000 subject, of course, to the inclusion of
00:12:28.467 --> 00:12:31.000
appropriate utility easements to protect public 00:12:31.000 --> 00:12:34.800
infrastructure. Uh, this recommendation is based on the
00:12:34.800 --> 00:12:36.567
property’s limited development potential, the fair market
00:12:36.567 --> 00:12:41.166
value being offered in the Proper protection of public 00:12:41.166 --> 00:12:44.900
infrastructure through appropriate easements. Here now
00:12:44.900 --> 00:12:47.533
would be the next steps if approved, the ED would transfer
00:12:47.533 --> 00:12:51.834
the property to the city via quick claim deed, which is um 00:12:51.834 --> 00:12:54.133
Recommended by legal counsel as the most appropriate and
00:12:54.133 --> 00:12:58.266
efficient method. The city would then review and approve
00:12:58.266 --> 00:13:02.200
any new purchase agreement with Mr. Sizil at a future city 00:13:02.200 --> 00:13:04.133
council meeting, and then in the meantime, staff would work
00:13:04.133 --> 00:13:07.867
with legal counsels of prayer any necessary legal documents,
00:13:07.867 --> 00:13:11.100
including the quick paying deed from the EDA to the city, the 00:13:11.100 --> 00:13:13.934
deed from the city to Mr. Shezel and the right of way
00:13:13.934 --> 00:13:16.467
easement and we’ll also handle recording all the documents of
00:13:16.467 --> 00:13:20.634
the Henin County to ensure the proper sequencing of these 00:13:20.634 --> 00:13:22.934
recorded needs. As far as timelines goes, each of these
00:13:22.934 --> 00:13:25.300
instances take a few weeks, so we estimate 60 to 90 days until.
00:13:25.300 --> 00:13:37.166
I am now happy to answer any questions you may have. 00:13:37.166 --> 00:13:39.467
Apparently it’s pretty straightforward, so there’s no
00:13:39.467 --> 00:13:42.367
questions. It’s a good report then, right? Yeah. There you go, 00:13:42.367 --> 00:13:48.500
Uh, so I will, um, having said that, uh, we’ll go ahead and uh
00:13:48.500 --> 00:13:52.834
open up the public hearing. Are there any Residents or anybody 00:13:52.834 --> 00:14:00.834
who would like to make a comment. All right. So, uh, 00:14:00.834 --> 00:14:04.133
we’ll go ahead and close the public hearing. Uh, does
00:14:04.133 --> 00:14:10.533
anybody Care to Because you’re asking us to, to, to kind of 00:14:10.533 --> 00:14:14.400
move forward with this process, right? Yeah, the approval to
00:14:14.400 --> 00:14:19.900
authorize. The transfer and go quickly. Uh, if I’m wrong, to
00:14:19.900 --> 00:14:23.567
the city to be um To considered at a future city council 00:14:23.567 --> 00:14:29.033
meeting. Uh, commissioner Klinowski. Thank you, President.
00:14:29.033 --> 00:14:36.100
I’ll go ahead and. Um, I moved to waive the reading and adopt 00:14:36.100 --> 00:14:41.300
the resolution approving the transfer of EDA on land located 00:14:41.300 --> 00:14:50.900
at PID. 0, 1611921220094 to the city of Brooklyn Park for the 00:14:50.900 --> 00:14:57.300
potential subsequent sale to Adam Scheel for $2000. So the
00:14:57.300 --> 00:15:02.100
motion was made by Commissioner Kanowski, uh, seconded by 00:15:02.100 --> 00:15:04.767
Commissioner Page. So we will need a roll call. Commissioner
00:15:04.767 --> 00:15:12.867
Eriksson. Commissioner Kloovski. Commissioner McGarvey. 00:15:12.867 --> 00:15:20.233
Commissioner Page. Commissioner Tran. Abstain President Winston. 00:15:20.233 --> 00:15:30.467
I Motion carries with 5 yes 0 no’s and 1 abstention. Right 00:15:30.467 --> 00:15:38.000
Wonderful. So, we will go ahead and move to item 6.1. Review
00:15:38.000 --> 00:15:42.767
Huntington Place Apartments loan forgiveness request. So 00:15:42.767 --> 00:15:45.100
we’ll let folks make the presentation and I know there’s
00:15:45.100 --> 00:15:48.266
some folks that want to speak. Uh, residents don’t want to
00:15:48.266 --> 00:15:52.367
speak. I go through the presentation first. Thank you, 00:15:52.367 --> 00:15:55.033
Mr. President. Excuse me, members of the commission and
00:15:55.033 --> 00:15:58.367
apologize for having some tech issues so our cameras not
00:15:58.367 --> 00:16:01.533
broadcasting the moment, so, uh, Commissioner Tran, we apologize. 00:16:01.533 --> 00:16:05.133
We’ll get this back up and running in a second. Um, today
00:16:05.133 --> 00:16:08.934
we’re back. We were just at the February meeting, EDA made a
00:16:08.934 --> 00:16:15.300
motion, made an approval. Uh, to grant loan forgiveness and a 00:16:15.300 --> 00:16:20.100
$3.8 million on two conditions. One, we get access to an unused 00:16:20.100 --> 00:16:23.634
$4 million federal grant and 2, an original offer from the
00:16:23.634 --> 00:16:29.000
lender. Um, national equity fund for a 450,000 cash
00:16:29.000 --> 00:16:33.467
settlement. Um, based on the action, we sent that 00:16:33.467 --> 00:16:36.667
information to the lender. They came back and said, if you get
00:16:36.667 --> 00:16:41.467
the $4 million on a $3.8 million dollar loan, um, we 00:16:41.467 --> 00:16:46.300
would rescind that extra $450,000. Keep in mind on a $70
00:16:46.300 --> 00:16:49.567
million plus loan, they’re getting about a $30 million
00:16:49.567 --> 00:16:52.900
purchase, so there aren’t any net proceeds, um, on this 00:16:52.900 --> 00:16:56.100
project, so they’re taking a significant loss, um, they
00:16:56.100 --> 00:16:59.567
didn’t think it was fair that we got more value than our
00:16:59.567 --> 00:17:03.266
original. Outstanding loan. Uh, we do have representatives from 00:17:03.266 --> 00:17:06.100
Aon and the lending group if they want to get dive into more
00:17:06.100 --> 00:17:09.734
detail on that, um, but that essentially sets up, um, what
00:17:09.734 --> 00:17:16.667
we are here to do. It’s not sharing at the moment, yeah, 00:17:16.667 --> 00:17:19.867
there’s some teams has crashed on this computer at the moment.
00:17:19.867 --> 00:17:22.567
Sorry. Um, I will, after we’re done speaking, I’ll try to get 00:17:22.567 --> 00:17:27.834
that back up. So that leads us with a few options. And the
00:17:27.834 --> 00:17:31.033
reason that we spent a little bit of time getting you a copy 00:17:31.033 --> 00:17:35.000
of the resolution is last week, uh, we got some concerning
00:17:35.000 --> 00:17:38.500
feedback from HUD on the $4 million loan, indicating that
00:17:38.500 --> 00:17:41.200
maybe chances were not very high, that we were going to get 00:17:41.200 --> 00:17:45.467
that $4 million loan. We had lots of discussions with HUD.
00:17:45.467 --> 00:17:48.634
Fast forward to this morning, we did have a better meeting
00:17:48.634 --> 00:17:51.834
with HUD this morning, um, who said, look, there is a pathway 00:17:51.834 --> 00:17:55.200
to approval, uh, with some additional steps that they’ve
00:17:55.200 --> 00:17:59.300
provided, um, based off of the timing of the Zane Wood teen
00:17:59.300 --> 00:18:01.467
Center already under construction. So city staff was 00:18:01.467 --> 00:18:04.634
part of that conversation with another member of the HUD staff.
00:18:04.634 --> 00:18:06.900
We’re feeling better and I just want to repeat what we
00:18:06.900 --> 00:18:09.834
mentioned last time. I can’t guarantee, we can’t guarantee
00:18:09.834 --> 00:18:13.767
that we’re going to get that $4 million federal loan, um, but 00:18:13.767 --> 00:18:15.200
indications are that there still is a pathway to make.
00:18:15.200 --> 00:18:20.166
that happen Um, so if you take an action today, an alternative 00:18:20.166 --> 00:18:25.000
number 2, which is the lender’s counter proposal that Priority
00:18:25.000 --> 00:18:27.667
number one is securing that $4 million. If we get that, the
00:18:27.667 --> 00:18:33.000
lender is saying we won’t offer the 450. If we don’t get the $4 00:18:33.000 --> 00:18:37.367
million loan, I think our stance would still be then that
00:18:37.367 --> 00:18:40.533
450,000 is still in play. That is still significantly less 00:18:40.533 --> 00:18:44.100
than our $3.8 million that’s due on the lawn, um, but keep
00:18:44.100 --> 00:18:47.900
in mind that there are not sufficient sale proceeds given
00:18:47.900 --> 00:18:51.634
the loss of value on this transaction to pay the loan 00:18:51.634 --> 00:18:53.834
back. If we push this much further, it’s likely that At
00:18:53.834 --> 00:18:57.100
this point, the project actually is going to go into
00:18:57.100 --> 00:19:00.367
foreclosure, in which case that would terminate the loan anyway. 00:19:00.367 --> 00:19:04.533
I won’t go into all the details we’ve had lots of updates on
00:19:04.533 --> 00:19:07.734
this EDA, um, if the general public wants to get additional
00:19:07.734 --> 00:19:11.000
information, we are more than happy to sit down with 00:19:11.000 --> 00:19:14.133
residents of Huntington or others. We’ve kept it very
00:19:14.133 --> 00:19:17.834
basic here today, solely because your only action here
00:19:17.834 --> 00:19:21.233
today is really, do you want to modify the conditions of loan 00:19:21.233 --> 00:19:24.266
forgiveness to make it either or instead of both. So with
00:19:24.266 --> 00:19:36.467
that, I will stand for any questions. So I, I guess I 00:19:36.467 --> 00:19:42.900
would just ask this, um, I think most people are kind of 00:19:42.900 --> 00:19:45.367
saying that they want to get something back for what’s
00:19:45.367 --> 00:19:48.800
occurred. So I, I guess I don’t know if this is a legal thing
00:19:48.800 --> 00:19:54.100
or what, but I think it’s uh, you know, 400 and You able to 00:19:54.100 --> 00:19:57.834
hear. Suddenly I couldn’t hear anything, so I signed up and I
00:19:57.834 --> 00:20:03.266
signed back in and do the same but now you, you just hear that 00:20:03.266 --> 00:20:07.166
Commissioner Tran, can you hear us now? Commissioner Tran, can
00:20:07.166 --> 00:20:16.367
you hear us? You’re on mute. I, I suddenly cut off. I couldn’t 00:20:16.367 --> 00:20:20.867
hear anything. Yeah. So I sign out and I signed back in. Uh, 00:20:20.867 --> 00:20:25.634
it’s not fine, but the system crashed on us. We just got it
00:20:25.634 --> 00:20:31.500
back up running. So our apologies. Technology failed. 00:20:31.500 --> 00:20:37.467
Sorry, yeah, thank you. All right, so, um, So I guess if we
00:20:37.467 --> 00:20:42.233
just reason this out, we say, OK, we, we, we want the 450 and 00:20:42.233 --> 00:20:44.900
and the 4 million, which is the offer that we made to say we’re
00:20:44.900 --> 00:20:48.000
gonna forgive the loan, right? Uh, and I think part of that
00:20:48.000 --> 00:20:53.934
was we don’t. We gave a pretty significant amount. Residents 00:20:53.934 --> 00:20:56.800
want their money back, and I don’t think that the city wants
00:20:56.800 --> 00:20:59.367
to feel like we’re easily kind of pushed around when it comes
00:20:59.367 --> 00:21:04.033
to these things. If I’m just being honest with you, so it’s 00:21:04.033 --> 00:21:08.467
And now they’re saying, well, if, if we agree, if, if that
00:21:08.467 --> 00:21:11.634
happens and you actually get the 4 million, then we We get 00:21:11.634 --> 00:21:16.667
the We’re not going to give you the 450, right? And that’s the
00:21:16.667 --> 00:21:19.033
deal. Now I don’t necessarily have an issue with that. I
00:21:19.033 --> 00:21:23.467
think the issue I have is that if, if I don’t think, I don’t 00:21:23.467 --> 00:21:26.133
think there is a will for people to simply just accept
00:21:26.133 --> 00:21:30.767
450. I think there’s not the will there, right? That’s kind 00:21:30.767 --> 00:21:34.533
of what I’m reading from folks. I can’t speak for everybody,
00:21:34.533 --> 00:21:38.467
but that is generally what I’m kind of feeling and and sensing
00:21:38.467 --> 00:21:42.667
from people, uh, and so I just want To see if I’m reasoning 00:21:42.667 --> 00:21:46.233
that out correctly in terms of what they’re offering us, what
00:21:46.233 --> 00:21:49.767
they’re kind of offering back. Correct. That is what they’re
00:21:49.767 --> 00:21:55.834
offering. Yeah, so we get the 450 if we don’t get the $4 00:21:55.834 --> 00:21:59.033
million grant. But Mr. President, what I’m hearing
00:21:59.033 --> 00:22:01.934
from you is almost we either get the $4 million or we don’t 00:22:01.934 --> 00:22:05.533
forgive the loan. Is that what you were suggesting just a
00:22:05.533 --> 00:22:08.367
moment ago and like I said, I can’t speak for everybody. I’d
00:22:08.367 --> 00:22:11.667
want to hear what other, you know, council members think 00:22:11.667 --> 00:22:15.734
about this, but that’s kind of what I’ve been feeling a little
00:22:15.734 --> 00:22:19.467
bit is that people do not want to walk away from, I can’t even
00:22:19.467 --> 00:22:22.000
remember how how much we’ve given, right? But people don’t 00:22:22.000 --> 00:22:26.867
want to walk away with 10% of that. Right, right. Uh,
00:22:26.867 --> 00:22:29.100
especially when, you know, we could, we could use those
00:22:29.100 --> 00:22:32.467
dollars for other things. I understand that the horror show 00:22:32.467 --> 00:22:35.900
that has been put in front of us, if, if, if this doesn’t go
00:22:35.900 --> 00:22:40.166
through, but I just want to make sure that we At at least 00:22:40.166 --> 00:22:43.000
communicate how we feel right now. Councilor, uh,
00:22:43.000 --> 00:22:49.800
commissioner Page. Thank you, President. uh, I think just two
00:22:49.800 --> 00:22:54.567
things for me is just listening to our residents that um I 00:22:54.567 --> 00:22:59.533
haven’t received any support for forgiveness, um, and also
00:22:59.533 --> 00:23:03.634
to address that we are. We’ve used it over and over again, 00:23:03.634 --> 00:23:06.400
but we’re kicking the can down the road. We’re passing this on
00:23:06.400 --> 00:23:14.900
to Every year or every month now. Um So I would also agree 00:23:14.900 --> 00:23:23.467
with what the president stated. All right, so I know we have a 00:23:23.467 --> 00:23:28.266
I’m not seeing any other. Questions. Um, I know we have,
00:23:28.266 --> 00:23:33.100
uh, rich Sheng wanted to speak to this. I’m gonna ask you to 00:23:33.100 --> 00:23:37.867
limit it to 3 minutes. Will do. Good evening, President
00:23:37.867 --> 00:23:40.500
Commissioner of Staff and the residents of Brooklyn Park. I 00:23:40.500 --> 00:23:43.767
want to start by expressing my empathy for the residents of
00:23:43.767 --> 00:23:46.900
Huntington Place. It’s got to be rough and tough knowing
00:23:46.900 --> 00:23:50.166
about filling the uncertainty of it all. Whatever decision is 00:23:50.166 --> 00:23:53.634
made, I know we all agree the residents in the city deserves
00:23:53.634 --> 00:23:58.100
better. Since the lender has now rejected the city’s
00:23:58.100 --> 00:24:02.900
conditions from the March EDA which look at whatever 00:24:02.900 --> 00:24:05.634
maneuvering you guys decide on that night was, you know, it
00:24:05.634 --> 00:24:09.934
was a great, it was a good move to try to get both. Um, fast
00:24:09.934 --> 00:24:13.934
forward to today, understanding with whatever was determined 00:24:13.934 --> 00:24:18.467
today with um Tim was talking about uh community development.
00:24:18.467 --> 00:24:21.667
I’m glad I was referring to something I have to dive into a 00:24:21.667 --> 00:24:24.834
little bit more. I just want to kind of come back to things
00:24:24.834 --> 00:24:29.100
that I’ve been concerned about as other residents were truly
00:24:29.100 --> 00:24:35.100
concerned about um mass capital, a bar that We’re not sure what 00:24:35.100 --> 00:24:38.734
they’re all about. Yes, we’re giving a loan keeps the
00:24:38.734 --> 00:24:40.467
affordability provisions on paper, but that’s not enough 00:24:40.467 --> 00:24:43.133
for us to for me to feel comfortable that the residents
00:24:43.133 --> 00:24:46.734
will get what they need, safe conditions, responsive
00:24:46.734 --> 00:24:49.367
management, and more moderate camp space and facilities. So
00:24:49.367 --> 00:24:54.266
with that being said, I would like the commission to with 00:24:54.266 --> 00:24:58.100
option one to try to capture at least that $4 million. Um, I
00:24:58.100 --> 00:25:00.567
think that was one of the options that was in the 00:25:00.567 --> 00:25:03.266
proposal. So, um, I, I can see the rest. of my time. Thank you.
00:25:03.266 --> 00:25:16.634
All right, so I, I’m, I’m going to move and just say that we 00:25:16.634 --> 00:25:20.900
are willing to move forward if the um I’ll make a motion 00:25:20.900 --> 00:25:23.634
saying that, uh, and I don’t know about the, the particular
00:25:23.634 --> 00:25:26.834
language we can wordsmith it as we go. We do have a lawyer over
00:25:26.834 --> 00:25:33.166
here as well, um, so, but, you know, I’m willing to be I think 00:25:33.166 --> 00:25:35.367
The motion needs to be, you know, that we need to create
00:25:35.367 --> 00:25:39.500
some language where it is contingent upon us receiving
00:25:39.500 --> 00:25:43.367
the $4 million from HUD. Um, I don’t think that. The will is 00:25:43.367 --> 00:25:47.734
up here. I would, I, I’m just, I’m not seeing it. Uh, people
00:25:47.734 --> 00:25:49.767
aren’t making comments, so I think it has to be contingent
00:25:49.767 --> 00:25:53.667
about getting the $4 million from, uh, from Hyde the 450 is 00:25:53.667 --> 00:25:57.233
not gonna do it, right? And I think us saying that changes it
00:25:57.233 --> 00:26:00.934
to where we don’t necessarily have to continue to mention the 00:26:00.934 --> 00:26:05.734
450K. So I’m not sure how we would actually put that into a
00:26:05.734 --> 00:26:09.100
motion, but, you know, that’s what I’m guess I’m putting
00:26:09.100 --> 00:26:13.233
forward right now. But I see, um, council member Erickson. 00:26:13.233 --> 00:26:23.367
Commissioner Erickson. a Um, I’m going to take a run at the 00:26:23.367 --> 00:26:30.900
motion just based on what’s already in the packet. Which OK. 00:26:30.900 --> 00:26:40.900
Just because I’m No, no, no, you, Just what the language 00:26:40.900 --> 00:26:43.667
would be and I can note it and then absolutely we can work on
00:26:43.667 --> 00:26:46.233
what it would be in the, in the, in the official motion is what
00:26:46.233 --> 00:26:53.233
I was asking. I move to waive the reading and adopt 00:26:53.233 --> 00:26:57.533
resolution 2025 for giving certain loan with Aon BP LLC,
00:26:57.533 --> 00:27:01.800
Huntington Place Apartments, contingent upon receipt of a $4 00:27:01.800 --> 00:27:08.166
million federal congressionally. Congressional spending grant.
00:27:08.166 --> 00:27:18.533
And Period. Or it can give us 4 million too. I was going to say, 00:27:18.533 --> 00:27:22.133
it could be a $4 million grant, federal grant, or they can give 00:27:22.133 --> 00:27:32.767
us 4 million. Um, yeah, ready for, for the, um, yeah, so I, I, 00:27:32.767 --> 00:27:38.000
I guess we can just limit it to the AI I mean to the uh To the,
00:27:38.000 --> 00:27:40.734
uh, what is it, the, the congressional spending grant 00:27:40.734 --> 00:27:42.867
because I, if I’m honest, they’re not going to match,
00:27:42.867 --> 00:27:47.667
they’re not going to give $4 million regardless. So yeah,
00:27:47.667 --> 00:27:53.033
I’ll second that motion. And Mr. President, If, if I could, for 00:27:53.033 --> 00:27:58.867
the EDA attorney, it seems that we would modify section 403 and
00:27:58.867 --> 00:28:02.800
0404 to modify that language. So I’m assuming the, the motion 00:28:02.800 --> 00:28:06.467
would include direction to the EDA attorney to change the
00:28:06.467 --> 00:28:11.100
resolution based off of that direction. Uh, yes, that is 00:28:11.100 --> 00:28:15.467
correct. That’s what I would request. So it’d be as if I
00:28:15.467 --> 00:28:20.266
believe it would be as you stated it, plus, uh, Ma a 00:28:20.266 --> 00:28:23.667
restatement, absolutely. OK. I’m going to restate the motion.
00:28:23.667 --> 00:28:29.767
I moved to waive the reading and adopt resolution 2025 for
00:28:29.767 --> 00:28:34.100
giving a certain loan with Aon BP LLC Huntington Place 00:28:34.100 --> 00:28:39.467
Apartments, contingent upon receipt of $4 million federal
00:28:39.467 --> 00:28:43.233
congressional spending grant. And instruct city staff to 00:28:43.233 --> 00:28:54.367
amend the resolution. Appropriately Right Second, So 00:28:54.367 --> 00:28:58.734
the motion was made by Commissioner Erickson, seconded
00:28:58.734 --> 00:29:03.467
by President Winston. We will need a roll call vote. 00:29:03.467 --> 00:29:08.000
Commissioner Erikson. Commissioner Klonofsky.
00:29:08.000 --> 00:29:17.367
Commissioner McGarvey. All right. Commissioner Page. Can 00:29:17.367 --> 00:29:21.233
you reread the motion for me, please, just so I hear it. I’m 00:29:21.233 --> 00:29:32.000
sorry. Moved to waive the reading and adapt resolution 00:29:32.000 --> 00:29:37.100
2025 for giving a certain loan with A on BP LLC, Huntington
00:29:37.100 --> 00:29:42.567
Place Apartments, contingent upon receipt of a $4 million 00:29:42.567 --> 00:29:46.734
federal congressional spending grant and instruct city staff
00:29:46.734 --> 00:29:52.033
to amend resolutions appropriately. Right. 00:29:52.033 --> 00:30:02.200
Commissioner Tran. Um, before I vote, I want to, uh, I need a 00:30:02.200 --> 00:30:07.667
clarification because I just got an email uh from Tim. Uh,
00:30:07.667 --> 00:30:16.567
about. We might not uh The, the HUD, uh, I’m not sure about the 00:30:16.567 --> 00:30:25.767
4 million. Um But the city Mr. President, I can take out an 00:30:25.767 --> 00:30:29.934
attempt at that. So we’re not guaranteed to get the $4
00:30:29.934 --> 00:30:33.767
million grant yet. So let’s say worst case scenario, we’re not 00:30:33.767 --> 00:30:37.033
successful in getting that grant. This resolution becomes
00:30:37.033 --> 00:30:40.800
null and void, and we’ve got to come back at that point or and 00:30:40.800 --> 00:30:44.900
and the lenders have to make a decision, so the loan
00:30:44.900 --> 00:30:47.634
forgiveness cannot move forward under the current motion unless
00:30:47.634 --> 00:30:57.166
we get that federal grant. OK, so this is for the. This way, 8. 00:30:57.166 --> 00:31:07.000
Can you confirm, was that an I? Yeah, it’s, I thank you. Thank 00:31:07.000 --> 00:31:13.233
you for explaining. President Winston? I Motion carries with 00:31:13.233 --> 00:31:19.166
6 yes and 0 no’s. All right, thank you. Thanks everybody. I
00:31:19.166 --> 00:31:22.467
know it’s not an easy decision. I know for Ann, this isn’t an 00:31:22.467 --> 00:31:34.567
easy situation either, so. All right, so next we will move to 00:31:34.567 --> 00:31:38.367
item 6.2. Consider selecting Beer companies and Gramercy
00:31:38.367 --> 00:31:41.567
companies for the Apo Common site in Krous Anderson for the 00:31:41.567 --> 00:31:45.367
former park and ride site and directing staff to enter into
00:31:45.367 --> 00:32:08.734
development partnership negotiations. Yes. Good to go 00:32:08.734 --> 00:32:12.634
again. All right, perfect. Well, thank you and good evening 00:32:12.634 --> 00:32:16.400
again, um, Mayor and EDA commissioners tonight I’ll also
00:32:16.400 --> 00:32:20.200
be presenting um agenda item 6.2 regarding the selection of 00:32:20.200 --> 00:32:22.667
development partners for the Oxboat Common sites in the
00:32:22.667 --> 00:32:26.834
former Park and Ride site following a request for
00:32:26.834 --> 00:32:32.300
qualifications process initiated late last year. So 00:32:32.300 --> 00:32:35.467
with that said, the purpose of this item is to consider
00:32:35.467 --> 00:32:38.100
selecting development partners for our EDA owned sites
00:32:38.100 --> 00:32:41.867
following the RFQ initiated September of 2024 and overall, 00:32:41.867 --> 00:32:44.834
the panel put together by city staff is recommending the
00:32:44.834 --> 00:32:48.233
selection of beer companies and Gramercy companies for the Oxbo
00:32:48.233 --> 00:32:51.467
Common sites and Kraus Anderson for the former park and ride 00:32:51.467 --> 00:32:55.166
site to continue negotiations towards feasible development
00:32:55.166 --> 00:32:57.834
concepts. This recommendation aligns with our original RFQ’s
00:32:57.834 --> 00:33:01.033
intent of seeking qualified partners who can work 00:33:01.033 --> 00:33:04.233
collaboratively, uh, with the EDA to develop. these sites as
00:33:04.233 --> 00:33:06.900
stated in our RFQ, we sought a quote unquote partner to
00:33:06.900 --> 00:33:09.634
develop these sites who is willing to push the boundaries
00:33:09.634 --> 00:33:12.233
on the current market and be a creative partner who thinks 00:33:12.233 --> 00:33:15.634
outside the box. Uh, given the current market conditions, this
00:33:15.634 --> 00:33:18.300
partnership approach gives us the flexibility to refine
00:33:18.300 --> 00:33:20.834
development concepts while working with these highly 00:33:20.834 --> 00:33:25.400
qualified development teams. So moving on to some background
00:33:25.400 --> 00:33:28.033
onto these sites, we have two significant development
00:33:28.033 --> 00:33:30.467
opportunities represented on these ED owned properties. The 00:33:30.467 --> 00:33:36.834
former park and ride site at 4201 95th Avenue North is 6.85
00:33:36.834 --> 00:33:39.567
acres with excellent visibility from Highway 610. The EDA
00:33:39.567 --> 00:33:43.767
purchased the site in 2018 for a little over 1.2 million. It 00:33:43.767 --> 00:33:45.834
is currently designated as institutional in the
00:33:45.834 --> 00:33:48.634
comprehensive plan and zoned as public institution, which will
00:33:48.634 --> 00:33:51.233
need to be amended to accommodate future development. 00:33:51.233 --> 00:33:54.467
Uh, the Oxville Commons development, on the other hand,
00:33:54.467 --> 00:33:58.233
consists of 4 parcels totaling approximately 16.9 acres. These
00:33:58.233 --> 00:34:01.867
were acquired by the EDA in 2014 for a total of just over 00:34:01.867 --> 00:34:06.834
$1 million. As a part of the Highway 610 corridor study in
00:34:06.834 --> 00:34:10.000
2023. These properties were rezoned and re-guided in the 00:34:10.000 --> 00:34:13.834
comp plan uh with two parcels being designated as high
00:34:13.834 --> 00:34:20.100
density residential and two as mixed use. Again, a visual for 00:34:20.100 --> 00:34:22.767
this presentation, as you can see on the map, both sites are
00:34:22.767 --> 00:34:26.533
strategically located within our Highway 610 corridor. Um,
00:34:26.533 --> 00:34:30.400
I’m going to move. This just in case that’s in the way for you 00:34:30.400 --> 00:34:34.500
all as well. The subject properties are highlighted in
00:34:34.500 --> 00:34:36.734
orange with Oxville Commons being that in the top left of
00:34:36.734 --> 00:34:38.934
the picture and the former park and ride being the orange one
00:34:38.934 --> 00:34:42.000
and the right. I also highlighted the parks just to 00:34:42.000 --> 00:34:44.467
give the visual reference. To know where it is for the public.
00:34:44.467 --> 00:34:54.233
All right, so now to touch on the RFQ process. The RFQ is 00:34:54.233 --> 00:34:58.000
open from September 23rd to November 18th of last year and
00:34:58.000 --> 00:35:00.166
resulted in 4 responses. During the same period, a panel was 00:35:00.166 --> 00:35:03.800
formed to aid in guiding, review and ultimately making a
00:35:03.800 --> 00:35:07.767
recommendation. This panel consisted of 7 members, uh,
00:35:07.767 --> 00:35:10.533
council member Klanowski, Community Development director 00:35:10.533 --> 00:35:14.567
Tim Gladhill, City Financial advisor Jason Arswald. Our
00:35:14.567 --> 00:35:16.734
housing and redevelopment coordinator John Cannara, 2
00:35:16.734 --> 00:35:19.467
members from our planning division with both senior
00:35:19.467 --> 00:35:23.634
planners Aaron McDermott and Kara Donovan and then. myself. 00:35:23.634 --> 00:35:24.834
Initial pre-screening connections took place
00:35:24.834 --> 00:35:28.100
throughout December and early January with formal interviews
00:35:28.100 --> 00:35:32.166
taking place on Friday, January 17th at City Hall. Since those 00:35:32.166 --> 00:35:35.233
interviews, the panel, staff, and city’s financial advisors
00:35:35.233 --> 00:35:38.033
worked with each of the proposals to conduct
00:35:38.033 --> 00:35:40.867
preliminary analysis and to ensure best fit from this 00:35:40.867 --> 00:35:44.467
research and analysis, the panel decided that 3 of the
00:35:44.467 --> 00:35:48.734
proposals aligned with the EDA’s vision for these sites.
00:35:48.734 --> 00:35:52.500
So for the Opo common selections, the panel is 00:35:52.500 --> 00:35:55.166
recommending Beer Companies and commerce companies based on
00:35:55.166 --> 00:35:58.367
their strong qualifications, including the combination of
00:35:58.367 --> 00:36:04.734
relevant experience. Let me go ahead and move this again. 00:36:04.734 --> 00:36:07.033
Their combination of relevant experience and openness to the
00:36:07.033 --> 00:36:10.567
potential for a mixed use in high density residential 00:36:10.567 --> 00:36:12.900
development, uh, this demonstrates their capability
00:36:12.900 --> 00:36:16.567
in handling project of this scope and complexity. They both
00:36:16.567 --> 00:36:19.734
have strong financial capacity and have shown creative
00:36:19.734 --> 00:36:21.000
approaches to development challenges which will be 00:36:21.000 --> 00:36:24.500
important given the market conditions going forward. The
00:36:24.500 --> 00:36:27.200
proposals were also on track with aligning with the EDA’s
00:36:27.200 --> 00:36:30.900
vision for creating dense, walkable environments at Oxwell 00:36:30.900 --> 00:36:33.567
Commons. Finally, they both demonstrated a commitment to
00:36:33.567 --> 00:36:36.233
quality design and community engagement, which again aligns
00:36:36.233 --> 00:36:40.000
with our community values and to talk specifics Beer 00:36:40.000 --> 00:36:42.200
Companies primarily has dealt with multi-family developments,
00:36:42.200 --> 00:36:45.300
however, they have the capability and expressed
00:36:45.300 --> 00:36:47.400
interest in exploring commercial components to this
00:36:47.400 --> 00:36:49.467
site, uh, which is something the panel strongly preferred to
00:36:49.467 --> 00:36:53.900
see. The Mercy companies who is offering a unique first of its 00:36:53.900 --> 00:36:58.100
kind, equitable home ownership model in the form of a non-age
00:36:58.100 --> 00:37:01.000
restricted cooperative is open to accompanying a commercial 00:37:01.000 --> 00:37:03.500
component, otherwise they offer the most equity on the
00:37:03.500 --> 00:37:13.634
individual resident level to the Brooklyn Park community. So 00:37:13.634 --> 00:37:16.467
for the former Park and Ride site, the panel is recommending
00:37:16.467 --> 00:37:20.000
Kraus Anderson based on a number of exceptional 00:37:20.000 --> 00:37:22.100
qualifications, including their successful track record with
00:37:22.100 --> 00:37:23.767
similar development projects and how that gives us
00:37:23.767 --> 00:37:26.800
confidence in their ability to execute a desirable development.
00:37:26.800 --> 00:37:29.734
They also have a vast experience incorporating
00:37:29.734 --> 00:37:32.767
commercial elements within the residential developments, which 00:37:32.767 --> 00:37:35.634
is the preference and most appropriate for this high
00:37:35.634 --> 00:37:38.200
visibility site. Also, they have an innovative approach to
00:37:38.200 --> 00:37:41.867
site planning. They thoroughly respected the adjacent uses, 00:37:41.867 --> 00:37:43.133
which is important to the surrounding neighborhood
00:37:43.133 --> 00:37:47.166
landscape. Capes. Lastly, they demonstrated the ability to
00:37:47.166 --> 00:37:49.500
navigate complex development processes with their long
00:37:49.500 --> 00:37:51.533
organizational history, which will be valuable as we work 00:37:51.533 --> 00:37:54.634
through things like comp plan amendments and uh site specific
00:37:54.634 --> 00:38:01.500
needs for this location. So next steps if the EDA approves 00:38:01.500 --> 00:38:04.233
the selection, staff will work with the developers to further
00:38:04.233 --> 00:38:06.734
refine development concepts based on feasibility and
00:38:06.734 --> 00:38:09.100
potential timelines. Our first step will be to provide the
00:38:09.100 --> 00:38:11.767
selected developers with our financial assistance 00:38:11.767 --> 00:38:14.100
application, which will help transform their preliminary
00:38:14.100 --> 00:38:16.734
financial estimates into more detailed and concrete numbers
00:38:16.734 --> 00:38:19.767
at the same time, we’ll continue exploring various
00:38:19.767 --> 00:38:22.166
financing structures and things like potential phasing options 00:38:22.166 --> 00:38:24.667
to adapt to the current market realities, all the while
00:38:24.667 --> 00:38:27.166
ensuring the developments are both viable and aligned with
00:38:27.166 --> 00:38:31.033
our vision. So, together with the partners, the goal is to 00:38:31.033 --> 00:38:33.667
identify opportun opportunities to maximize the potential of
00:38:33.667 --> 00:38:36.934
what each developer can bring to these sites, all the while
00:38:36.934 --> 00:38:39.634
focusing on creating high quality developments to benefit
00:38:39.634 --> 00:38:43.200
the community. Lastly, staff will return to the EDA at each 00:38:43.200 --> 00:38:46.467
significant milestone in this process, providing updates on
00:38:46.467 --> 00:38:49.300
the evolving development concepts, uh, specific
00:38:49.300 --> 00:38:52.367
locations within the Oville Common side of things and 00:38:52.367 --> 00:38:54.233
detailed information about what these developments could bring
00:38:54.233 --> 00:38:59.100
to the city. As far as the next slide in financial
00:38:59.100 --> 00:39:01.900
considerations, there are no immediate financial 00:39:01.900 --> 00:39:04.634
implications for this action. Any future development
00:39:04.634 --> 00:39:08.367
agreement will include specific financial terms and potential
00:39:08.367 --> 00:39:11.634
public assistance which each instance would return to the 00:39:11.634 --> 00:39:14.300
EDA for consideration. The development teams are also now
00:39:14.300 --> 00:39:16.900
preliminarily aware of the NDA’s financial parameters and
00:39:16.900 --> 00:39:20.166
we’ll work within this to develop feasible proposals. So 00:39:20.166 --> 00:39:24.367
I’ve said it a few times, I’ll just throw it up there for the
00:39:24.367 --> 00:39:27.000
staff recommendations of the selected developers to partner
00:39:27.000 --> 00:39:33.367
with and I’ll open it up for questions. Uh, thank you for 00:39:33.367 --> 00:39:38.367
that, uh, Commissioner Kanowski. Thank you, President, and thank
00:39:38.367 --> 00:39:41.467
you for the presentation and thanks for, I mean, all the 00:39:41.467 --> 00:39:46.800
work that you and the team did, getting the selection. Done and
00:39:46.800 --> 00:39:51.567
setting up all the interviews, um, having had the privilege to 00:39:51.567 --> 00:39:53.900
sit in with staff on a lot of these, uh, a couple of
00:39:53.900 --> 00:39:59.133
highlights I just wanted to share with the EDA, um, I think
00:39:59.133 --> 00:40:03.834
the KA team came with a really. I, I believe it was Aaron or a 00:40:03.834 --> 00:40:07.767
couple of staff members said this is really a perfect
00:40:07.767 --> 00:40:11.033
response. They put together an amazing team, including a 00:40:11.033 --> 00:40:15.133
black-owned architecture team. They had J. Benson as a partner
00:40:15.133 --> 00:40:19.533
to learn how to do development and Jay Benson is a minority
00:40:19.533 --> 00:40:23.734
owned general contractor, which the CEO Paul Edlund himself was 00:40:23.734 --> 00:40:27.367
a former attorney, so he worked with at-risk youth, and he
00:40:27.367 --> 00:40:31.233
talked a lot about how he hoped to come in and work with our 00:40:31.233 --> 00:40:34.300
community, our young people to get them involved in the
00:40:34.300 --> 00:40:37.133
project so they could have access to living wage jobs. It
00:40:37.133 --> 00:40:40.734
was just, I thought that interview was incredible. They 00:40:40.734 --> 00:40:44.100
came really well prepared. They cared about Brooklyn. Park and
00:40:44.100 --> 00:40:47.634
our success. They also community space, which I
00:40:47.634 --> 00:40:50.300
appreciated they built in community space and they were 00:40:50.300 --> 00:40:53.500
very, very willing to work with the community, the local
00:40:53.500 --> 00:40:56.367
community to make sure that everyone’s needs were met at
00:40:56.367 --> 00:41:03.033
the end of the day. Um, gramercy, what a unique model, 00:41:03.033 --> 00:41:04.300
um, generational wealth building, and it, the co op
00:41:04.300 --> 00:41:08.467
functions in a way that everyone owns a share of a
00:41:08.467 --> 00:41:11.233
corporation. So if I bought my share of the corporation, I 00:41:11.233 --> 00:41:14.400
could pass that to my children. It’s not, you don’t necessarily
00:41:14.400 --> 00:41:17.166
own the condo in the same way as like you’d own a real estate
00:41:17.166 --> 00:41:20.800
like your house. You own a share. So everyone is tied into 00:41:20.800 --> 00:41:24.734
the success of the property. I thought it was a fascinating
00:41:24.734 --> 00:41:26.734
model, one of a kind, really because it would be the first
00:41:26.734 --> 00:41:30.467
non-ag. restricted, you see senior co-ops, but this would 00:41:30.467 --> 00:41:35.166
be a community co op. Which we all loved. And then Bader
00:41:35.166 --> 00:41:37.834
responded really well to that particular site that we asked
00:41:37.834 --> 00:41:41.266
them to look at and being willing to entertain commercial 00:41:41.266 --> 00:41:44.834
with a focus on the walkability, specifically with all the
00:41:44.834 --> 00:41:49.033
connections to trails in the community. Um, we had another
00:41:49.033 --> 00:41:51.233
proposal that really didn’t fit the needs of the city, and I 00:41:51.233 --> 00:41:55.467
think they got eliminated really quickly, but, um, Yeah,
00:41:55.467 --> 00:41:59.734
this, this group that came and presented to us had really
00:41:59.734 --> 00:42:01.300
innovative and insightful approaches to development of 00:42:01.300 --> 00:42:14.233
Brooklyn Park. Commissioner Page. Thanks for the 00:42:14.233 --> 00:42:21.100
presentation, um, I would like to see more senior housing, so. 00:42:21.100 --> 00:42:24.100
I’m just wondering how that fits in here. I, I’m very
00:42:24.100 --> 00:42:29.100
familiar with co op. Um, it does limit your lending
00:42:29.100 --> 00:42:36.233
possibilities, but it also gives a lower price, um, to, to 00:42:36.233 --> 00:42:40.900
own a part of that. So I, I’m a little concerned about more 00:42:40.900 --> 00:42:45.734
high density. Living, so how does, is that what this
00:42:45.734 --> 00:42:49.900
contract will do to come up with those ideas that would be
00:42:49.900 --> 00:42:56.834
presented before the EDA to. Consider Yes, right now we’re 00:42:56.834 --> 00:43:00.100
at the conceptual level. What this RFQ, um, you know, 00:43:00.100 --> 00:43:02.734
announcing the partnerships and, and aligning with that original
00:43:02.734 --> 00:43:05.500
goal would be to take it to the next level. We need to get to
00:43:05.500 --> 00:43:07.900
the nitty gritty of the finances to find out what’s
00:43:07.900 --> 00:43:11.900
feasible, it’s kind of the way to put it, so. Any type of uh 00:43:11.900 --> 00:43:13.467
project or concept would always come back before the EDA for
00:43:13.467 --> 00:43:17.734
review. And are any of those folks here to answer questions
00:43:17.734 --> 00:43:20.900
or that typically goes through you. That, yes, I would go 00:43:20.900 --> 00:43:24.133
through me. We kept it close to chess. We didn’t want to, um,
00:43:24.133 --> 00:43:26.266
we decided not to tell them who was being awarded before the
00:43:26.266 --> 00:43:31.000
EDA. knew the news. So could I ask questions then about the 00:43:31.000 --> 00:43:35.300
one particular, OK, so for the projects that you put in here
00:43:35.300 --> 00:43:38.500
that was in comparison to the AOCA Co op. I’m trying to think
00:43:38.500 --> 00:43:44.900
where I saw that, um. How long did it take to build that and 00:43:44.900 --> 00:43:50.467
then how fast to, um, Have a 100% occupancy. I do know from 00:43:50.467 --> 00:43:53.734
the meetings and, and initial screenings and the interviews
00:43:53.734 --> 00:43:57.166
with Gramercy that it, uh, took them a little bit longer as a
00:43:57.166 --> 00:44:00.900
smaller developer, especially with the They’re they were 00:44:00.900 --> 00:44:03.233
originally proposing about 100 unit building and that’s a
00:44:03.233 --> 00:44:05.800
fraction of the size of the other two proposals, but their
00:44:05.800 --> 00:44:10.100
timeline was just as long, so I, I think I remember it being 4 00:44:10.100 --> 00:44:12.734
years without the proposal being in front of me. From
00:44:12.734 --> 00:44:18.100
start to finish. Because what they I have Tim if you can
00:44:18.100 --> 00:44:24.000
remember too, they do a Lisa prior to um advancing on phase 00:44:24.000 --> 00:44:27.100
one, much like you see with commercial phasing and things
00:44:27.100 --> 00:44:33.100
like that, they do the lease up before they keep advancing. Um, 00:44:33.100 --> 00:44:36.533
Mr. President, members of the commission, usually with multi
00:44:36.533 --> 00:44:39.033
family and I think this kind of fits within that for you window
00:44:39.033 --> 00:44:42.266
within there, yes, there’s the initial lease up so they have 00:44:42.266 --> 00:44:44.734
enough people that sign on board so they want to have a
00:44:44.734 --> 00:44:48.033
project but a project of this magnitude is going to be about
00:44:48.033 --> 00:44:51.634
12 to 18 month construction period and another 12 to 18 00:44:51.634 --> 00:44:54.300
month lease up here, and I think that was generally kind
00:44:54.300 --> 00:44:58.100
of what they saw when they had pretty big interest. I know all
00:44:58.100 --> 00:45:02.834
this project working next door in a similar community, um. 00:45:02.834 --> 00:45:07.166
There wasn’t anything unique in terms of major delays. This was,
00:45:07.166 --> 00:45:09.834
this project was also a city land purchase as well from the
00:45:09.834 --> 00:45:14.100
city of Anoka, so. Nothing stood out as like completely 00:45:14.100 --> 00:45:22.200
out of the ordinary from what we could tell. To you, 00:45:22.200 --> 00:45:36.000
Commissioner Eriksson. Thank you. Um. I definitely don’t 00:45:36.000 --> 00:45:42.367
have any problems with the density question. My concern 00:45:42.367 --> 00:45:49.300
would be more about. Kind of the timeline of an eventual
00:45:49.300 --> 00:45:53.634
project. So we enter into sort of a development partnership 00:45:53.634 --> 00:45:58.400
kind of memorandum of understanding right now, and
00:45:58.400 --> 00:46:02.634
then as they develop a proposal if they develop a proposal. We 00:46:02.634 --> 00:46:07.000
still own the land, so it’s kind of a iterative process of
00:46:07.000 --> 00:46:10.767
what we eventually end up with. Is that correct? Correct. So on 00:46:10.767 --> 00:46:13.900
the technical side of things, what we would do is extend them
00:46:13.900 --> 00:46:17.133
our financial, uh, developers’ financial assistance
00:46:17.133 --> 00:46:18.800
application with that application, we’d get their
00:46:18.800 --> 00:46:21.367
detailed financials where we could work with our Ellers, our 00:46:21.367 --> 00:46:24.500
financial advisor to find out essentially feasibility
00:46:24.500 --> 00:46:26.233
regardless of what the things look like right now, that’s why
00:46:26.233 --> 00:46:29.033
I added in the visuals at the end. I’m a visual person. I
00:46:29.033 --> 00:46:32.033
want you guys all to see, you know, each proposal that was 00:46:32.033 --> 00:46:35.100
sent in, but between now and feasibility, those might change
00:46:35.100 --> 00:46:37.934
about, uh, you know, a lot, so I didn’t want to put them as a
00:46:37.934 --> 00:46:42.800
focus point, um. During that time, what we do or what the 00:46:42.800 --> 00:46:44.800
city of Brooklyn Parks traditionally done is what’s
00:46:44.800 --> 00:46:49.033
called a term sheet. We’d come with a 12 pager of what would
00:46:49.033 --> 00:46:51.767
eventually turn into a developer’s assistance 00:46:51.767 --> 00:46:53.900
agreement, developer’s agreement, all that would be
00:46:53.900 --> 00:46:58.200
approved by the EDA and at that point, we would know concept,
00:46:58.200 --> 00:47:00.834
timeline construction lines, but a lot of it is in our 00:47:00.834 --> 00:47:05.100
ballpark once they get in that application, so I mean we can
00:47:05.100 --> 00:47:07.800
do application review too. There’s Um, I don’t wanna take
00:47:07.800 --> 00:47:10.667
up much more of your time. I know some cities do do that, 00:47:10.667 --> 00:47:16.467
but yeah. Every update would come before. OK, so we’re not,
00:47:16.467 --> 00:47:22.367
um, I guess my concern, I said it before, I’ll say it again. 00:47:22.367 --> 00:47:26.500
I’m I’m I’m less concerned about the noble site, but
00:47:26.500 --> 00:47:30.233
especially with the Zain Oak Grove area. It’s a little bit 00:47:30.233 --> 00:47:38.166
more central, bit more show PC. I I’m just concerned about the
00:47:38.166 --> 00:47:43.634
Out of the box apartment project number 3. thing So 00:47:43.634 --> 00:47:52.567
would, would love to see more creativity more. Um Something 00:47:52.567 --> 00:47:56.834
more interesting uh in that area, so. I’m glad we’re still
00:47:56.834 --> 00:48:04.400
early on. Yeah, I, I, I, that makes sense. Um, uh, I know 00:48:04.400 --> 00:48:08.634
that we have a resident that wanted to say a few words on
00:48:08.634 --> 00:48:14.734
this as well, so uh. Rich young Again, if you could just very 00:48:14.734 --> 00:48:18.233
announce who you are, but if you could limit it to 3 minutes.
00:48:18.233 --> 00:48:22.500
Thank you. Again, good evening, President Commissioner staff 00:48:22.500 --> 00:48:27.300
and residents of Brooklyn Park. My name’s Richone. I live at
00:48:27.300 --> 00:48:33.734
4034 Fox Glove Avenue. Because my previous one here’s my um I 00:48:33.734 --> 00:48:38.000
know this has been a long time coming, dating back to 2018,
00:48:38.000 --> 00:48:42.233
2019. I just want to commend uh both the two most recent 00:48:42.233 --> 00:48:46.000
councils have been earnest partners in having discussions
00:48:46.000 --> 00:48:48.767
with redevelopment project with um the residents. Thank you for
00:48:48.767 --> 00:48:52.934
doing that. Uh, I supposed wanna take a moment to thank, 00:48:52.934 --> 00:48:54.500
uh, Council member Koanowski and Council member Page for
00:48:54.500 --> 00:48:57.734
meeting with the residents, um, to talk about, um, that
00:48:57.734 --> 00:49:01.100
redevelopment. I can’t speak for everyone, but I speak for a 00:49:01.100 --> 00:49:04.734
number of us that we support in moving forward with Cross
00:49:04.734 --> 00:49:07.000
Anderson as a development partner for this former park
00:49:07.000 --> 00:49:10.200
and ride site, um, because it’s time, it’s time to kind of see 00:49:10.200 --> 00:49:15.934
what that, that lot can do. Um, however, I like to see an
00:49:15.934 --> 00:49:19.367
updated project timeline, continue to have opportunities
00:49:19.367 --> 00:49:22.867
to have further conversations with the developer, city staff, 00:49:22.867 --> 00:49:25.634
planning commissions, um, EDA and City council. I know things
00:49:25.634 --> 00:49:28.233
are not set in stone, but I’ll make sure we like to have those
00:49:28.233 --> 00:49:31.934
opportunities. down somewhere in the timeline. Um, things 00:49:31.934 --> 00:49:34.567
that are concerning, still concerning to us is traffic
00:49:34.567 --> 00:49:38.834
impacts, storm water management, uh mitigation strategies of the
00:49:38.834 --> 00:49:42.033
rainwater, community benefits and integrations within the 00:49:42.033 --> 00:49:44.367
nearby neighborhood. Um, I look forward to hearing the staff’s
00:49:44.367 --> 00:49:47.900
response to my requests and comments. Um, last, I would
00:49:47.900 --> 00:49:52.166
like to take a moment to recognize community development 00:49:52.166 --> 00:49:54.367
director Tim Gladhild. Um, he’s been a great addition to the
00:49:54.367 --> 00:49:57.500
city. I appreciate the thoroughness and presentations
00:49:57.500 --> 00:50:01.467
and his ability to explain things, situations, um, in 00:50:01.467 --> 00:50:04.500
layman terms. So those of us who aren’t in council or
00:50:04.500 --> 00:50:07.734
commission can kind of keep up. Uh, so, I would like to comment,
00:50:07.734 --> 00:50:12.500
um, Dylan is saying has been pretty speedy and respond to 00:50:12.500 --> 00:50:14.734
our questions and inquiries, and um we’re just looking
00:50:14.734 --> 00:50:18.900
forward to what this But this lot will do to benefit the city
00:50:18.900 --> 00:50:21.934
and to be beneficial to the neighborhood close to it. Thank 00:50:21.934 --> 00:50:31.767
you. Thank you. Um. Before I call you, Commissioner Page, I 00:50:31.767 --> 00:50:35.734
will say that um I think I have some of the same concerns as
00:50:35.734 --> 00:50:38.100
counsel, I mean, as Commissioner Erickson, I, I
00:50:38.100 --> 00:50:42.467
think this is a, uh, overall good approach, so. I’m inclined 00:50:42.467 --> 00:50:47.367
to, to vote for the motion as it’s, as it’s written. I just,
00:50:47.367 --> 00:50:50.000
I would like you to have some of that wow factor, but I know 00:50:50.000 --> 00:50:53.100
we’re early on in the process, so that will come in front of
00:50:53.100 --> 00:50:59.100
us, but, um, also, uh, to Commissioner Klowski, thank you
00:50:59.100 --> 00:51:02.100
for, um, bringing some of that information forward in terms of 00:51:02.100 --> 00:51:06.100
we have specific goals and and as a struggle as a city, we are
00:51:06.100 --> 00:51:09.200
struggling to figure this out. But I think when you have
00:51:09.200 --> 00:51:13.467
developers coming forward looking to help. Uh, I guess 00:51:13.467 --> 00:51:17.467
develop the next generation of talent and considering the
00:51:17.467 --> 00:51:21.000
diversity we have in our city, they’re looking to, to go along 00:51:21.000 --> 00:51:24.100
those lines, which could mean any number of things, right? Uh,
00:51:24.100 --> 00:51:28.767
I think that’s very much appreciated and I think that’s
00:51:28.767 --> 00:51:32.033
approach that um as a council, we can very much support, but I 00:51:32.033 --> 00:51:34.367
personally support because I think that that skill set does
00:51:34.367 --> 00:51:37.266
have to get to the next generation of developers, uh,
00:51:37.266 --> 00:51:40.100
and it has to get the folks that haven’t always had that 00:51:40.100 --> 00:51:43.367
opportunity. So maybe some of that wild will come from some
00:51:43.367 --> 00:51:47.100
of those newer ideas that come along with the newer folks
00:51:47.100 --> 00:51:49.734
learning those ideas. So thank you for bringing that forward
00:51:49.734 --> 00:51:54.000
and thank you for uh for working on this and, and thank 00:51:54.000 --> 00:51:57.133
you for uh Central District folks being so commissioner
00:51:57.133 --> 00:52:00.300
Page being so involved with this as well. Rich, thank you 00:52:00.300 --> 00:52:05.200
for being involved, uh, and, uh, uh, civil during the whole
00:52:05.200 --> 00:52:07.400
process because I know that you’ve been pretty passionate
00:52:07.400 --> 00:52:14.367
about this as well. So, um, Commissioner Page. I’m still 00:52:14.367 --> 00:52:18.367
doing my buttons. Thank you, President. um, it’s almost the
00:52:18.367 --> 00:52:21.166
same thing. I was, it’s almost like we have the same brain. I 00:52:21.166 --> 00:52:23.767
can’t imagine. I never, never believed that before I got
00:52:23.767 --> 00:52:27.734
elected or in this commission, but I will say this is exactly
00:52:27.734 --> 00:52:29.767
how things should go in the city. This is what people need
00:52:29.767 --> 00:52:34.166
to recognize is the city works super hard and detailed 00:52:34.166 --> 00:52:36.867
information and their strengths within all of the commissioners
00:52:36.867 --> 00:52:42.533
and our president, um, And our director where we all and I I 00:52:42.533 --> 00:52:46.734
said that first staff is first, um, they worked the hardest.
00:52:46.734 --> 00:52:49.500
And, but then for the residents to be active, engaged and
00:52:49.500 --> 00:52:52.800
involved, and to have these conversations, um, this is the 00:52:52.800 --> 00:52:55.300
way it should always work, where we all get better
00:52:55.300 --> 00:52:58.567
understanding of what we’re all trying to move, um, Brooklyn
00:52:58.567 --> 00:53:08.734
Park Forward, so I second what you were saying. Thank you. 00:53:08.734 --> 00:53:13.166
Commissioner Kloanowski. I want to go ahead and make the motion 00:53:13.166 --> 00:53:18.300
if we’re ready to go. Again, a big thank you to city staff and
00:53:18.300 --> 00:53:21.500
the developers in the community who have been looking out for 00:53:21.500 --> 00:53:25.200
their neighborhood and everyone and being passionate and
00:53:25.200 --> 00:53:30.000
open-minded. Um, I moved to waive the reading and adopt 00:53:30.000 --> 00:53:33.233
resolution 2025, selecting Baer companies and Gramercy
00:53:33.233 --> 00:53:36.634
companies for the Oxboll Common sites and Kraus Anderson for
00:53:36.634 --> 00:53:41.233
the former park and ride site and directing staff to enter 00:53:41.233 --> 00:53:47.734
into development partnership negotiations. Did you. So, uh,
00:53:47.734 --> 00:53:50.867
uh, so, uh, commissioner Kanowski made the motion. 00:53:50.867 --> 00:53:55.100
President Winston seconded it. We will need a roll call.
00:53:55.100 --> 00:53:58.834
Commissioner Klonowski. I. Commissioner McGarvey.
00:53:58.834 --> 00:54:06.467
Commissioner Page. Commissioner Tran. abstain. Commissioner 00:54:06.467 --> 00:54:14.467
Eriksson. President Winston. Motion curries with 5 yes, 0 00:54:14.467 --> 00:54:19.266
no’s, and 1 abstention, abstention. All right. Again,
00:54:19.266 --> 00:54:22.900
thank you, um, Director Gladhill and staff, you make 00:54:22.900 --> 00:54:25.033
everybody up here look smarter because of the work you guys do
00:54:25.033 --> 00:54:29.300
behind the scenes. So, uh, we very much appreciate it. So
00:54:29.300 --> 00:54:35.367
next we’ll, we’ll move to item. Let’s see, 6.3. Uh consider 00:54:35.367 --> 00:54:37.834
contract professional services with Fairmount Properties
00:54:37.834 --> 00:54:40.634
related to biotech innovation District implementation. Thank 00:54:40.634 --> 00:54:43.634
you, Mr. President. Members of the commission, I’ll keep this
00:54:43.634 --> 00:54:49.033
brief. At your last meeting, you narrowed down 8 different
00:54:49.033 --> 00:54:53.000
proposals down to one, which is Fairmont Properties who also 00:54:53.000 --> 00:54:56.567
merged with Burrow Appold. Uh, which is really the extension
00:54:56.567 --> 00:54:59.200
of the Northwest area plan. It’s the economic development
00:54:59.200 --> 00:55:02.367
and housing side, it’s implementation side over the 00:55:02.367 --> 00:55:07.233
next 2 to 3 years. Um, at that point, we noted that we were
00:55:07.233 --> 00:55:12.033
still working on the scope of services because we actually 00:55:12.033 --> 00:55:14.734
merged two proposals. We’ve done that. The city attorney
00:55:14.734 --> 00:55:17.500
has drafted a contract for services. So we really wanted
00:55:17.500 --> 00:55:23.233
to lock in actually authorizing staff to execute that agreement 00:55:23.233 --> 00:55:26.634
and um really established the final amount for the project.
00:55:26.634 --> 00:55:31.266
Keeping in mind this is over at least 2 fiscal years, if not 3, 00:55:31.266 --> 00:55:36.734
it is not to exceed $600,000. They do ask for some
00:55:36.734 --> 00:55:39.834
consideration on uh unique expenses as well. And this is
00:55:39.834 --> 00:55:43.567
really in line kind of with the median for the different 00:55:43.567 --> 00:55:47.367
proposals, uh, that we got. So again, this is to do the
00:55:47.367 --> 00:55:50.533
execution of the uh consultant selection that you made at your 00:55:50.533 --> 00:55:53.367
last meeting and at this point, staff will stand for any
00:55:53.367 --> 00:56:03.166
questions. Commissioner Kliowski. Unless there’s 00:56:03.166 --> 00:56:05.000
questions, I was going to make the motion. I feel like we’ve
00:56:05.000 --> 00:56:10.767
gone over this multiple times. OK, um, I move to waive the 00:56:10.767 --> 00:56:15.567
reading and adopt resolution 2025, proving contract for
00:56:15.567 --> 00:56:19.300
professional services with Fairmount properties related to
00:56:19.300 --> 00:56:25.166
biotech innovation district implementation. Oh *** was made 00:56:25.166 --> 00:56:28.467
by Commissioner Konowski, seconded by Commissioner
00:56:28.467 --> 00:56:34.233
McGarvey. So we’ll need a roll call. Thank you, Commissioner 00:56:34.233 --> 00:56:40.634
McGarvey. Commissioner Page. Commissioner Tran. think 00:56:40.634 --> 00:56:49.667
Commissioner Eriksson. Commissioner Kloowski. I
00:56:49.667 --> 00:56:54.166
President Winston? A. Motion carries with 5, yes, 0 no’s, 00:56:54.166 --> 00:56:59.367
and 1 abstention. All right, thank you. And then again,
00:56:59.367 --> 00:57:03.567
thank you to um Uh, because I know it was a pretty extensive 00:57:03.567 --> 00:57:07.367
process to actually get to,, to, to, to picking the consultants
00:57:07.367 --> 00:57:11.567
and so thank you to staff, uh, Director Gladhill for, for, for 00:57:11.567 --> 00:57:14.400
going through that process, uh, but also thank you to the
00:57:14.400 --> 00:57:17.900
council for, um, Being patient as we go through this process
00:57:17.900 --> 00:57:20.800
as well to plan out this particular area and thank you 00:57:20.800 --> 00:57:25.467
to residents. I’ve heard a lot of uh Now I was the most vocal,
00:57:25.467 --> 00:57:28.166
but residents have sent in things saying that they are
00:57:28.166 --> 00:57:32.033
supportive of this process, so, uh we appreciate those kind 00:57:32.033 --> 00:57:36.667
words from uh you as well. So next, we’ll go ahead and move
00:57:36.667 --> 00:57:42.000
to the EDA status updates. Thank you, Mr. President, 00:57:42.000 --> 00:57:44.667
members of the commission just want to call it a few things,
00:57:44.667 --> 00:57:47.834
um, earlier it was noted that we do have the development bus
00:57:47.834 --> 00:57:51.567
tour later this week, Wednesday, um, we’re leaving here at City 00:57:51.567 --> 00:57:55.767
Hall at 5 o’clock, um, and we like to show off some existing
00:57:55.767 --> 00:57:58.634
recent developments as well as some new and upcoming
00:57:58.634 --> 00:58:02.767
developments as well. Um, also wanna call out in our EDA staff 00:58:02.767 --> 00:58:05.734
report, we’ve been providing some development inquiry
00:58:05.734 --> 00:58:09.533
updates, uh, that is on page 6. It is section D development
00:58:09.533 --> 00:58:13.500
inquiries. We get unique proposals that may or may not 00:58:13.500 --> 00:58:16.834
fit either zoning or typical deal parameters. We’re putting
00:58:16.834 --> 00:58:19.367
them in here to let you know what we’re talking to these
00:58:19.367 --> 00:58:22.734
developers. If you ever see us say, no, this doesn’t meet our 00:58:22.734 --> 00:58:25.767
parameters, but you think it’s a really unique project? Let
00:58:25.767 --> 00:58:27.934
staff know and then we’ll be able to forward that to a
00:58:27.934 --> 00:58:31.100
future meeting too. So this is how we’re trying to make better 00:58:31.100 --> 00:58:33.767
use of staff time while giving you the opportunity to call
00:58:33.767 --> 00:58:37.033
time out and say, hey, we actually want to review that
00:58:37.033 --> 00:58:39.500
proposal. So don’t be shy when you see that, um, sort of thing.
00:58:39.500 --> 00:58:45.000
here as well. Um, we are in the process of filling, um, on a 00:58:45.000 --> 00:58:47.166
more permanent basis, our economic development and
00:58:47.166 --> 00:58:50.400
housing director role. We did a 2nd round of interviews. We’ve 00:58:50.400 --> 00:58:53.533
got one final round coming up, um, and then soon thereafter
00:58:53.533 --> 00:58:56.200
we’ll be looking at our workforce development role,
00:58:56.200 --> 00:58:59.367
director role as well, and then finally, just want to continue
00:58:59.367 --> 00:59:02.634
to call out that this is our 10th anniversary of our 00:59:02.634 --> 00:59:05.767
Brooklyn program. So later this summer, we’ll do a little bit
00:59:05.767 --> 00:59:08.500
of celebrating when they finish up their summer programming. Um,
00:59:08.500 --> 00:59:12.233
with that, that ends my updates and then we do have um a couple 00:59:12.233 --> 00:59:20.233
other updates, most notably SBC update right after this. All 00:59:20.233 --> 00:59:23.000
right, so yeah, I guess we’ll, we’ll move to that before we go
00:59:23.000 --> 00:59:26.634
to that, uh, wait, we have Brooklyn Park Smith. Yeah, SBC.
00:59:26.634 --> 00:59:29.500
So I did want to say, um, for our interim director in that
00:59:29.500 --> 00:59:32.000
role, and then for you, Director Gladhill, thanks for 00:59:32.000 --> 00:59:34.834
stepping in. I know you’ve taken on quite a bit, uh, in
00:59:34.834 --> 00:59:41.567
that role. I appreciate it and um and our interim director, uh, 00:59:41.567 --> 00:59:44.800
um, Malcolm, please forgive me for forgetting your last name,
00:59:44.800 --> 00:59:51.166
Hicks. Interim director Hicks. So, um, thank you. Uh, I know 00:59:51.166 --> 00:59:54.400
you made a presentation to us upstairs a little bit earlier.
00:59:54.400 --> 00:59:58.100
And as I was thinking about it, it felt like in some ways, your,
00:59:58.100 --> 01:00:01.834
your job is boiling the ocean, uh, and that is not an easy 01:00:01.834 --> 01:00:04.634
place to be in, uh, especially because you’ve been helping
01:00:04.634 --> 01:00:08.934
people at a very individual level as well. So just know, uh,
01:00:08.934 --> 01:00:12.033
it’s appreciated. People see what y’all are doing, uh, and 01:00:12.033 --> 01:00:14.300
What y’all are doing as a team. So very much appreciate it.
01:00:14.300 --> 01:00:19.100
Thank you. So next we’ll move to the uh Brooklyn Park Small
01:00:19.100 --> 01:01:39.634
Business Center quarterly updates. It’s OK. Right. Uh, 01:01:39.634 --> 01:01:45.400
good evening, um, President and commissioners, um, I’m uh 01:01:45.400 --> 01:01:48.634
Indrad Alexander, executive director for the Brooklyn Park
01:01:48.634 --> 01:01:52.467
Small Business Center here to give you a quarterly update, I 01:01:52.467 --> 01:01:56.200
think the last time I was here, um, it was before the end of
01:01:56.200 --> 01:02:01.467
the 4th quarter, so some of the information will also include 01:02:01.467 --> 01:02:08.100
um 4th quarter and um first quarter of 2025. Um, just a
01:02:08.100 --> 01:02:12.900
reminder, I know we do have some new commissioners, um, the 01:02:12.900 --> 01:02:16.000
mission of the small business Center is to the Brooklyn Park
01:02:16.000 --> 01:02:20.300
Small Business Center is to provide a multicultural 01:02:20.300 --> 01:02:24.367
collaborative space that fosters creativity and
01:02:24.367 --> 01:02:28.166
innovation for local entrepreneurs to grow small
01:02:28.166 --> 01:02:30.300
businesses to inclusive economic development. The 01:02:30.300 --> 01:02:34.000
vision of the small business center is to provide an
01:02:34.000 --> 01:02:37.767
inclusive workspace for small businesses to find resources
01:02:37.767 --> 01:02:43.100
and community to take their business to the next level. Um, 01:02:43.100 --> 01:02:48.533
this is just an an overview of what the um first quarter
01:02:48.533 --> 01:02:52.734
summary, um, will include and moving forward, this is the 01:02:52.734 --> 01:02:55.233
information that we plan to provide on our quarterly
01:02:55.233 --> 01:03:04.467
updates. Um, so, uh, just a brief, um. Overview of our 01:03:04.467 --> 01:03:08.367
operations, um, the hours of the Brooklyn Park Small
01:03:08.367 --> 01:03:12.567
Business Center, um. For our members, they do have access to 01:03:12.567 --> 01:03:18.500
the building 7 days a week, 8:00 a.m. to 8:00 p.m., um,
01:03:18.500 --> 01:03:21.567
they are allowed to stay in the building. We don’t ask anyone 01:03:21.567 --> 01:03:25.300
to leave the building, but it just, um, is a little bit more
01:03:25.300 --> 01:03:28.500
difficult to move around, so if someone is in the midst of
01:03:28.500 --> 01:03:31.367
working on a project, we don’t ask them to stop. They just 01:03:31.367 --> 01:03:35.033
know that if they leave after 8 p.m. that they won’t be able to
01:03:35.033 --> 01:03:40.367
get back in. Um, the other exception to um having access 01:03:40.367 --> 01:03:44.100
to the building, um, 7 days a week from 8:00 a.m. to 8:00
01:03:44.100 --> 01:03:49.367
p.m. is for our essential co-worker co-working members,
01:03:49.367 --> 01:03:53.000
um, which have a limited um work hour from 9 a.m. to 5:00 01:03:53.000 --> 01:03:57.300
p.m. They also have a limited workspace of really just being
01:03:57.300 --> 01:04:01.567
confined to um the main reception area. Um, our 01:04:01.567 --> 01:04:05.367
receptionist staff is available to assist members Monday
01:04:05.367 --> 01:04:10.266
through Friday, 8 or 9 a.m. to 8 p.m. and on Saturday 9:00 01:04:10.266 --> 01:04:17.166
a.m. to 7:00 p.m. Uh, just an overview of uh visitors um to
01:04:17.166 --> 01:04:21.367
the space. We do try to track all of our visitors that come 01:04:21.367 --> 01:04:23.667
into the space regardless if they are there to see a member
01:04:23.667 --> 01:04:28.767
or if there’s there as part of an event. So for the 4th
01:04:28.767 --> 01:04:35.233
quarter of 2024, we had 1,084 visitors. And then for the 1st 01:04:35.233 --> 01:04:44.934
quarter of 2025, we had 1370 visitors. Um, we also have 01:04:44.934 --> 01:04:48.634
several meeting spaces, so we have conference rooms,
01:04:48.634 --> 01:04:52.300
presentation rooms, um, and this is available to our 01:04:52.300 --> 01:04:57.100
members to use also we do make it available to outside
01:04:57.100 --> 01:04:59.900
organizations and other community members at a fee. Um,
01:04:59.900 --> 01:05:05.667
so we, for the 4th quarter of 2024, we had 149 bookings. Um, 01:05:05.667 --> 01:05:11.166
it was a total hours booked of 387 hours and 45 minutes, um, 01:05:11.166 --> 01:05:19.000
that brought in revenue of $76,330 and it also allowed for
01:05:19.000 --> 01:05:22.900
our members to use their credit hours, so they use 91 credit 01:05:22.900 --> 01:05:27.166
hours to be able to use the space. Um, in 2025 for the
01:05:27.166 --> 01:05:33.467
first quarter, we had 135 bookings, um, total hours 01:05:33.467 --> 01:05:39.834
booked of 262262 hours and 15 minutes, um, which generated
01:05:39.834 --> 01:05:46.767
revenue of $2,020,210,000. Um And then our members were able 01:05:46.767 --> 01:05:50.500
to use 150.5, um, our credit hours to go towards booking the 01:05:50.500 --> 01:05:57.000
spaces. In here you see just a a summary of our different
01:05:57.000 --> 01:06:01.500
memberships, the different rates that are available, the 01:06:01.500 --> 01:06:05.233
current number of members under each of those different types
01:06:05.233 --> 01:06:09.033
of memberships and then our projected or kind of our goals
01:06:09.033 --> 01:06:13.533
of what we think, um, we should be able to hit, so. Um, I won’t 01:06:13.533 --> 01:06:18.634
go through all of those for you. Um, this right here just gives
01:06:18.634 --> 01:06:25.100
you kind of a, a snapshot of our membership. Um, basis, so, 01:06:25.100 --> 01:06:30.467
uh, for the first quarter we saw 16 new members, uh, and uh 01:06:30.467 --> 01:06:34.166
we also had 7 members canceled in the 1st quarter, and this is
01:06:34.166 --> 01:06:38.467
a mix of the different types of memberships, and we do try to
01:06:38.467 --> 01:06:41.567
work with our members to make sure that we are supporting 01:06:41.567 --> 01:06:44.767
their businesses. We understand that most of these are new
01:06:44.767 --> 01:06:48.734
business owners that are also facing different challenges,
01:06:48.734 --> 01:06:51.734
financial challenges, so we do try to work with them. So right 01:06:51.734 --> 01:06:55.467
now we have 2 members with arrangements, um, and those are
01:06:55.467 --> 01:07:00.767
retail members at the time. OK, um, in here you’ll also see a 01:07:00.767 --> 01:07:04.533
graphic that kind of shows the different um new members, lost
01:07:04.533 --> 01:07:10.467
members, and the net effect on our membership. Um, the next 01:07:10.467 --> 01:07:14.166
few slides are really just demonstrating the different
01:07:14.166 --> 01:07:18.500
businesses that we are able to support as new members, um,
01:07:18.500 --> 01:07:22.100
starting in October, as you can see, November and December we 01:07:22.100 --> 01:07:27.100
get pretty slow, really the holidays. Um, and then you’ll
01:07:27.100 --> 01:07:30.834
see that in January it starts to pick back up again. February 01:07:30.834 --> 01:07:41.300
and March. Um, so the projected earned revenue for memberships 01:07:41.300 --> 01:07:46.100
for 2025 is 633,0624 and these numbers were really the same
01:07:46.100 --> 01:07:52.000
numbers that we presented um at our last presentation. On the 01:07:52.000 --> 01:07:56.233
next page is a summary of the budget again, this was, I
01:07:56.233 --> 01:07:58.667
believe we’ve covered this in the last presentation as well,
01:07:58.667 --> 01:08:05.867
right? So if anyone has any questions regarding that Um, 01:08:05.867 --> 01:08:09.233
some of the successes that we’ve seen, um, for the first
01:08:09.233 --> 01:08:15.033
quarter is really um. Creating a more formal process for um 01:08:15.033 --> 01:08:18.767
bookings, um, we brought on a meeting and event manager um
01:08:18.767 --> 01:08:23.500
who we brought on last year, um, she has done a phenomenal job 01:08:23.500 --> 01:08:29.367
of working with our members and outside guests in coordinating
01:08:29.367 --> 01:08:33.100
um different events, um, and the different types of meetings 01:08:33.100 --> 01:08:36.400
um that we are experiencing in the space, um, we started
01:08:36.400 --> 01:08:40.367
working in an employee handbook as well as a member handbook, 01:08:40.367 --> 01:08:45.900
um, and um the member handbook is updated on a regular basis
01:08:45.900 --> 01:08:50.166
and is also um available to our members, uh, real time on our 01:08:50.166 --> 01:08:54.567
member portal, which is Office R&D. Um, we launched a
01:08:54.567 --> 01:08:59.233
newsletter, um, a monthly newsletter, um, kind of helping
01:08:59.233 --> 01:09:03.033
our members know about different events going on as 01:09:03.033 --> 01:09:07.367
well as trying to bring in some additional resources to
01:09:07.367 --> 01:09:10.533
strengthen the foundations of many of these business owners, 01:09:10.533 --> 01:09:14.900
so one of the things that we’ve um launched is the lunch and
01:09:14.900 --> 01:09:18.634
learn series, um, where we try to focus on different topics
01:09:18.634 --> 01:09:24.400
throughout the week, um, from technology to insurance to. Um, 01:09:24.400 --> 01:09:27.567
just different business processes. Right now we are in
01:09:27.567 --> 01:09:32.467
the midst of a lunch and learn series with Stearns Bank, so 01:09:32.467 --> 01:09:36.634
they have um had different presenters, um, we’ve done this
01:09:36.634 --> 01:09:40.900
in a hybrid um type of environment, so our members can 01:09:40.900 --> 01:09:44.634
come into the training room, bring their lunch, and hear the
01:09:44.634 --> 01:09:50.467
presentation or they can join from their desks. Um, we have, 01:09:50.467 --> 01:09:54.300
um, we’re also bringing on interns or we’ve we’re um
01:09:54.300 --> 01:09:58.033
working with um North Hennepin Community College, which is our
01:09:58.033 --> 01:10:04.000
3rd, um, summer of um working or bringing on an intern, um, 01:10:04.000 --> 01:10:07.567
from North Hennepin. This year we are focusing on their
01:10:07.567 --> 01:10:11.467
graphic designers, um, seeing that we are doing a lot of 01:10:11.467 --> 01:10:14.667
marketing and um especially with the newsletter we saw that
01:10:14.667 --> 01:10:17.767
we were running into some limitations, so now we’re um
01:10:17.767 --> 01:10:22.000
looking at bringing on a graphic designer to help us, um, 01:10:22.000 --> 01:10:26.367
do that, so we actually um participated in their interview
01:10:26.367 --> 01:10:31.266
process last week, um, and then next week we will be bringing 01:10:31.266 --> 01:10:35.900
in those finalists to um do a tour and just get a, get to be
01:10:35.900 --> 01:10:40.734
able to experience the small business center, um, we’re also 01:10:40.734 --> 01:10:44.133
introducing or we did introduce quarterly member meetings given
01:10:44.133 --> 01:10:46.834
our meeting, our members the opportunity to give us some
01:10:46.834 --> 01:10:51.900
feedback. On, um, just how the space is running. What are some 01:10:51.900 --> 01:10:57.166
of their concerns. It gives us a lot of an opportunity to
01:10:57.166 --> 01:10:59.367
really help them understand many of the rules and
01:10:59.367 --> 01:11:02.634
regulations that are in place and the rationale behind those 01:11:02.634 --> 01:11:08.000
rules. Um, and then we, we had to do a little bit of adjusting
01:11:08.000 --> 01:11:13.000
on the member advisory board, um, but the, um, the members 01:11:13.000 --> 01:11:18.634
who were um. Who have been identified to participate on
01:11:18.634 --> 01:11:21.834
the advisory board were all notified last week and we’re 01:11:21.834 --> 01:11:24.734
waiting for a response, um, and I believe that their first
01:11:24.734 --> 01:11:28.233
meeting will be coming up shortly. And then last but not
01:11:28.233 --> 01:11:33.000
least is our rise networking. Um, session, uh, which takes 01:11:33.000 --> 01:11:37.834
place on the first Thursday of every month. We’ve had great
01:11:37.834 --> 01:11:41.033
participation um for both members and non-members, and I 01:11:41.033 --> 01:11:44.900
think we’ve even seen some staff there, um, coming to
01:11:44.900 --> 01:11:48.634
participate in some of the activities, so I think it’s
01:11:48.634 --> 01:11:53.200
something that um each month is growing larger and larger and 01:11:53.200 --> 01:11:57.000
uh folks are bringing are inviting um other members to
01:11:57.000 --> 01:12:01.800
come in and participate. Some areas of improvement that we’ve 01:12:01.800 --> 01:12:07.200
been working on is um really helping our members understand
01:12:07.200 --> 01:12:11.100
the incident reporting system, so we have an internal system 01:12:11.100 --> 01:12:16.266
of our staff and um to be able to report on any type of
01:12:16.266 --> 01:12:21.100
incidents within the center so that um me as the executive 01:12:21.100 --> 01:12:24.400
director and our uh management staff. We have a good
01:12:24.400 --> 01:12:27.567
understanding of what the incident was, um, and all of
01:12:27.567 --> 01:12:32.367
the the details behind it. And then also putting in place um 01:12:32.367 --> 01:12:37.767
an opportunity for our members who um want to be able to
01:12:37.767 --> 01:12:42.467
express themselves, um, have a way of, of communicating by um 01:12:42.467 --> 01:12:47.367
create or sending in an email, um, instead of emailing all of
01:12:47.367 --> 01:12:51.467
our commissioners’ uh, personally, so it really gives 01:12:51.467 --> 01:12:54.900
us an opportunity to to deal with that. Um, our retail bays
01:12:54.900 --> 01:12:57.834
we’re working on the ventilation and the sink
01:12:57.834 --> 01:13:02.667
installation. We did. have an initial um installation we have 01:13:02.667 --> 01:13:07.233
seen that there’s been um some um. I don’t know what’s the
01:13:07.233 --> 01:13:10.767
word you want to use, but um we’ve had some issues with it, 01:13:10.767 --> 01:13:15.100
so now we’re going back to readdress that, um, and it
01:13:15.100 --> 01:13:20.367
sounds like we have a plan moving forward, um, the other 01:13:20.367 --> 01:13:23.533
area that we’ve been hearing some complaints from our
01:13:23.533 --> 01:13:28.367
members is the soundproofing on the offices. The, um, we do
01:13:28.367 --> 01:13:32.200
have demisable walls on the office side, so we are looking 01:13:32.200 --> 01:13:35.800
to see if there’s an opportunity to create some
01:13:35.800 --> 01:13:40.133
sound barrier insulation. between those tiles, um, in the 01:13:40.133 --> 01:13:43.834
offices and then the last one is improved lighting on the
01:13:43.834 --> 01:13:46.767
reception area in the retail area, so those are some other
01:13:46.767 --> 01:13:51.867
things that we’re looking at. Opportunities moving forward, 01:13:51.867 --> 01:13:58.200
um, we have been moving forward with um the partnerships with
01:13:58.200 --> 01:14:01.400
the outside community organizations, um, in DC we are 01:14:01.400 --> 01:14:05.800
um looking to move forward with their Planet series, um,
01:14:05.800 --> 01:14:09.667
hosting one of their Planet series this fall, um, we
01:14:09.667 --> 01:14:12.767
attempted to do one last spring. Didn’t really get the 01:14:12.767 --> 01:14:15.667
participation, so we’re gonna hopefully see that this one
01:14:15.667 --> 01:14:18.734
will be a little bit more successful, the last one we
01:14:18.734 --> 01:14:21.500
were really trying to I do recruiting over the holiday 01:14:21.500 --> 01:14:24.367
season, so we felt like that probably wasn’t the best timing.
01:14:24.367 --> 01:14:28.667
Um, we’ve met with me several times just looking to see how
01:14:28.667 --> 01:14:32.467
we can get them in there and working with many of our 01:14:32.467 --> 01:14:38.200
businesses, um, we’re trying to also um. Yeah, I take advantage
01:14:38.200 --> 01:14:42.533
of our relationship with Elevate HC, um, they are going 01:14:42.533 --> 01:14:46.567
to be hosting another co-starter series this fall and
01:14:46.567 --> 01:14:50.533
um they are gonna be joining us on the lunch and learn series 01:14:50.533 --> 01:14:53.834
coming up as well. Um, and then I talked a little bit about
01:14:53.834 --> 01:14:59.033
Stern’s Bank, and then we do have a member who has an
01:14:59.033 --> 01:15:04.533
internal or has a um. Online directory type of portal, um, 01:15:04.533 --> 01:15:09.867
and so we are actually working with him. He is going to be um
01:15:09.867 --> 01:15:13.000
providing free profiles to all to all of our members, um, and 01:15:13.000 --> 01:15:16.734
giving them an opportunity to create profiles that not they
01:15:16.734 --> 01:15:22.133
can not only or can. Not only use on this portal, but to be 01:15:22.133 --> 01:15:26.867
able to use in more of their social media outreach, um, and
01:15:26.867 --> 01:15:30.734
then this is also kind of our starting point. We’re really 01:15:30.734 --> 01:15:34.467
looking at how we can create more of an e-commerce community
01:15:34.467 --> 01:15:42.400
to help support our retail uh members. Um, Let’s see, um, so 01:15:42.400 --> 01:15:47.300
that was, that’s pretty much it. And uh so open it if you have
01:15:47.300 --> 01:15:55.133
any questions. So I know that, um, thank you for that. I know 01:15:55.133 --> 01:15:57.800
you’ve done quite a bit of work there and I, I’ll speak on that,
01:15:57.800 --> 01:16:02.100
but I know Commissioner Page wanted you to go back to the Uh, 01:16:02.100 --> 01:16:17.634
was it the budget page? Yes. That you put to the Mhm I’m 01:16:17.634 --> 01:16:21.367
sorry, say that again. You were Malcolm, if you could just kind 01:16:21.367 --> 01:16:26.166
of high level walk through the budget. So for uh this budget
01:16:26.166 --> 01:16:30.934
summary, this is the approved budget for 2025, uh, consists 01:16:30.934 --> 01:16:35.867
of the EDA operators contract in Alexander agencies, um,
01:16:35.867 --> 01:16:44.867
beliefs in kind. Is EDA support to uh go toward the Lease and 01:16:44.867 --> 01:16:50.734
cams, um. Community area management or maintenance, my 01:16:50.734 --> 01:16:54.533
apologies, um, for the small business center, uh, the earned
01:16:54.533 --> 01:16:58.200
revenue membership, this number was arrived at by the By
01:16:58.200 --> 01:17:00.834
calculating the amount of memberships, current membership 01:17:00.834 --> 01:17:05.567
prices, um, taking into account the booking fees, um, and all
01:17:05.567 --> 01:17:09.934
other revenue generations, um, to determine this number. The
01:17:09.934 --> 01:17:14.667
deed contract, um, small business center along with 01:17:14.667 --> 01:17:17.000
Brooklyn’s Workforce Development Program, uh, was
01:17:17.000 --> 01:17:24.266
awarded, um. funding to go toward programming, uh, this 01:17:24.266 --> 01:17:31.200
$150,000 is um a 3 year grant, um, so it’s $150,000 per year. 01:17:31.200 --> 01:17:35.567
Uh, the expenses. Again, you’ll see the operator’s contract
01:17:35.567 --> 01:17:42.467
here that lease in Cammount for the. Small business centers, um, 01:17:42.467 --> 01:17:46.667
lease payments and CAMs to go toward Northwest Plaza, um.
01:17:46.667 --> 01:17:51.000
Which is also mentioned up here as well. Contractual services, 01:17:51.000 --> 01:17:54.800
uh, this number here is also listed here and broken down
01:17:54.800 --> 01:17:58.934
into the various areas, building security, uh, CAMs
01:17:58.934 --> 01:18:02.667
here within the center as mentioned, we do have some 01:18:02.667 --> 01:18:06.166
other construction some other construction. construction
01:18:06.166 --> 01:18:08.667
issues that we are currently working on, which consists of
01:18:08.667 --> 01:18:13.467
the plumbing and the beauty bays and the HVAC as well. Um, 01:18:13.467 --> 01:18:16.734
this budget is scheduled to take care of that and any other
01:18:16.734 --> 01:18:19.367
maintenance issues within the building. Uh, going back down
01:18:19.367 --> 01:18:23.100
this list, you’ll just see some other contractual services with 01:18:23.100 --> 01:18:28.367
vendors that we, um, utilized throughout the year, cleaning,
01:18:28.367 --> 01:18:33.133
Comcast, um, maintenance, HR, marketing advertisement, um. 01:18:33.133 --> 01:18:38.500
bring you to this total below. Uh, supplies and legal fees,
01:18:38.500 --> 01:18:41.467
those are the last two, which brings us to the overall budget. 01:18:41.467 --> 01:19:00.400
Commissioner Page. Thank you, President. So just explain to 01:19:00.400 --> 01:19:06.367
me, I’m not really well versed on commercial leasing. So where
01:19:06.367 --> 01:19:13.734
it says lease and Cam’s 500,000 as an expense, but there’s also 01:19:13.734 --> 01:19:17.467
Another 200,000. Can you just explain to me what’s in the
01:19:17.467 --> 01:19:22.266
500,000. You said the 200,000 was the additional plumbing. 01:19:22.266 --> 01:19:29.300
Yes. So, For the 500,000 that goes to leasing CAMs that
01:19:29.300 --> 01:19:33.000
includes the payment for the small business center, uh, to 01:19:33.000 --> 01:19:38.533
maintain that space, the CAMs is the Overall funding amount
01:19:38.533 --> 01:19:43.100
divided by all of the tenants within the plaza to take care 01:19:43.100 --> 01:19:47.467
of um common area of maintenance that includes, um,
01:19:47.467 --> 01:19:51.634
any maintenance fees outside of the building, um, parking lot, 01:19:51.634 --> 01:19:55.367
um, plowing, um, landscaping. Anything that all of the
01:19:55.367 --> 01:19:59.533
tenants can benefit from, um, that’s what that specific $500
01:19:59.533 --> 01:20:04.400
is for, uh, what may be confusing is that it says Kim’s 01:20:04.400 --> 01:20:08.734
under the um expenses and then also cams under the contractual
01:20:08.734 --> 01:20:11.934
services. The cam under the contractual services is for the 01:20:11.934 --> 01:20:16.767
small business center itself. So any services or um. Any
01:20:16.767 --> 01:20:21.000
items that may need to be fixed, such as the HVAC units, uh, the 01:20:21.000 --> 01:20:24.734
plumbing within the center itself. Uh, North Wind Plaza is
01:20:24.734 --> 01:20:28.934
not responsible for that. So that Cam under that category is
01:20:28.934 --> 01:20:32.734
budgeted to take care of those items specifically. So what’s 01:20:32.734 --> 01:20:35.634
included in the operator contract for that expense. No
01:20:35.634 --> 01:20:42.900
repairs. No, so the operator contract is um. Funding 01:20:42.900 --> 01:20:46.200
budgeted for Indred and her team and that is um
01:20:46.200 --> 01:20:52.533
specifically for staffing. And how many staff? Well. 12 2. Got 01:20:52.533 --> 01:21:04.200
you. Thank you. Yeah, I don’t know that I have a, a, a ton of 01:21:04.200 --> 01:21:08.000
questions. I, um, In the office out of there, so thank you guys
01:21:08.000 --> 01:21:10.233
for, you know, doing an excellent job from that 01:21:10.233 --> 01:21:15.467
perspective, but also from a city perspective, I think, um,
01:21:15.467 --> 01:21:18.767
uh, you know, it is very much a jewel that people are noticing
01:21:18.767 --> 01:21:22.467
or, you know, I, I, somebody asked me, they want to have an 01:21:22.467 --> 01:21:25.133
event somewhere. And I said, we’ll do it at the SPC. And
01:21:25.133 --> 01:21:30.934
they ignored me. You know, sometimes I get angry, but 01:21:30.934 --> 01:21:33.734
they’re good friends, so I just kind of let it pass, and then
01:21:33.734 --> 01:21:36.800
they brought it to me again and I said, I told you SBC, and
01:21:36.800 --> 01:21:39.467
then I showed them a picture of the SPC and they said, oh, I
01:21:39.467 --> 01:21:42.133
didn’t know SBC looked like that. And I said, I told you. 01:21:42.133 --> 01:21:45.500
What it, you know, that is a nice place. So I think part of
01:21:45.500 --> 01:21:48.166
it is getting the word out about it, but it is, it’s a
01:21:48.166 --> 01:21:50.800
really nice place and I think when my friend saw it, they 01:21:50.800 --> 01:21:55.000
were like, wow, OK, now I wanna see what I can do there, or,
01:21:55.000 --> 01:21:59.133
you know, programming wise or whatever, so um thank you for
01:21:59.133 --> 01:22:02.400
making it, you know, that type of location because I think 01:22:02.400 --> 01:22:04.634
people forget how difficult it was to, to get it going. I
01:22:04.634 --> 01:22:09.000
think one of the things that um you know, that takes time to
01:22:09.000 --> 01:22:11.934
figure out, right? It’s just, you know, as the offices fill 01:22:11.934 --> 01:22:17.000
up. uh, the retail is doing pretty well. I think those, you
01:22:17.000 --> 01:22:21.767
know, those kind of co-working spaces and, and how do we begin 01:22:21.767 --> 01:22:24.834
to fill those in, right? So that we have more people coming
01:22:24.834 --> 01:22:28.533
in using it for 2 to 3 hours, uh, I know that they’re
01:22:28.533 --> 01:22:31.266
starting to use more the, the, the temporary meeting rooms 01:22:31.266 --> 01:22:34.467
that people can use, but how do we begin to get more traffic in
01:22:34.467 --> 01:22:38.400
there. I will say you’ve done a good job in terms of getting um
01:22:38.400 --> 01:22:41.000
a number of folks that just have events there to look at 01:22:41.000 --> 01:22:44.100
the space, to pay for the space, to use the. space, right? So
01:22:44.100 --> 01:22:47.266
that’s, that’s incredibly important, uh, but I, I also
01:22:47.266 --> 01:22:52.100
feel like you have had to do a lot of the work of In marketing 01:22:52.100 --> 01:22:57.467
this in some creative ways. So it’s not um It’s not criticism,
01:22:57.467 --> 01:23:00.233
right? It’s just, that’s the one thing I I see that we, we 01:23:00.233 --> 01:23:04.000
really need to work on, but I also realized that you’ve
01:23:04.000 --> 01:23:06.634
really had to fight maybe some assumptions of what that space
01:23:06.634 --> 01:23:09.734
would look like, and you’ve had to bring people in there
01:23:09.734 --> 01:23:12.400
through your network, through the city’s network. And so now 01:23:12.400 --> 01:23:15.166
it’s getting out, but I think that’s the place that we, you
01:23:15.166 --> 01:23:17.800
know, um, I don’t know if you want to speak a few words to it,
01:23:17.800 --> 01:23:22.634
but how we can improve getting More people in for that 01:23:22.634 --> 01:23:25.200
particular co-working space. Yeah, thank you for bringing
01:23:25.200 --> 01:23:34.266
that up. So um we actually are, are shifting now, um, to a more 01:23:34.266 --> 01:23:38.100
um marketing um approach. Um, we’ve really have had to uh
01:23:38.100 --> 01:23:42.800
deal with the center in in phases um from development to 01:23:42.800 --> 01:23:46.533
filling it up, um, you know, now we’re, we’re really
01:23:46.533 --> 01:23:49.667
focusing on the programming and marketing. Um, so this
01:23:49.667 --> 01:23:54.533
afternoon I actually or this. morning, uh, actually met with 01:23:54.533 --> 01:23:58.467
uh the new uh manager over at Edinburgh, um, and we are
01:23:58.467 --> 01:24:03.734
talking about how we can do um some more uh collaborative 01:24:03.734 --> 01:24:07.467
marketing to really get folks to look at Brooklyn Park, um,
01:24:07.467 --> 01:24:13.400
as a, as a destination place for events, um, so, um, as 01:24:13.400 --> 01:24:17.166
she’s trying to, you know, get things up and running. Um, I’ve
01:24:17.166 --> 01:24:21.367
been kind of, I’ve um. have offered to kind of assist her 01:24:21.367 --> 01:24:24.000
and in some of the software that we’re using and some of
01:24:24.000 --> 01:24:27.667
the things, the events that we’re looking to bring to the
01:24:27.667 --> 01:24:34.567
table, um, we now have a um a more um focused marketing 01:24:34.567 --> 01:24:41.000
director, um, who has had a lot of experience in um marketing 01:24:41.000 --> 01:24:47.400
marketing forum theater, um, uh, commute and um more public
01:24:47.400 --> 01:24:50.767
relations communication, so now her focus is really on helping 01:24:50.767 --> 01:24:56.467
us build out a more um concise marketing campaign. Um, one of
01:24:56.467 --> 01:24:59.667
the things that we’ve um started looking at working with
01:24:59.667 --> 01:25:04.634
the city and getting um the list from the real estate um 01:25:04.634 --> 01:25:10.400
forum, um, and, uh, I think we had a Malcolm had mentioned at 01:25:10.400 --> 01:25:13.734
the real estate forum, just how the realtors can actually come
01:25:13.734 --> 01:25:18.100
and use that space. It’s an excellent um space for realtors
01:25:18.100 --> 01:25:21.834
to either the dedicated ated deaths or the co-working space 01:25:21.834 --> 01:25:24.734
when they’re meeting with their clients. Um, so we’re just
01:25:24.734 --> 01:25:28.533
trying to look at different ways um to really kind of bring
01:25:28.533 --> 01:25:32.300
the community and and focus on the co-working space and the 01:25:32.300 --> 01:25:41.867
dedicated desk. Thank you, uh, Commissioner McGarvey. Thank 01:25:41.867 --> 01:25:46.233
you, Mr. President. So just a quick question. The 12, uh,
01:25:46.233 --> 01:25:49.867
employees you have there, are they employees of the city or
01:25:49.867 --> 01:26:00.667
are they employees of employees of my firm. Alright, seeing no 01:26:00.667 --> 01:26:03.200
further questions, um, thank you again for the work you’ve
01:26:03.200 --> 01:26:06.467
done and assuming this responsibility and then Malcolm,
01:26:06.467 --> 01:26:09.734
uh, I’m sorry, uh, Director Hicks, um, interim director
01:26:09.734 --> 01:26:12.934
Hicks, thank you for, uh, can I see you there, working through 01:26:12.934 --> 01:26:18.634
a lot of those problems from day one, I don’t think people
01:26:18.634 --> 01:26:20.467
understand when, when I walked in there when I first came in 01:26:20.467 --> 01:26:23.133
there, it was just dusty and we’re looking at the place
01:26:23.133 --> 01:26:27.367
saying you have to get this ready by when, um, so you guys
01:26:27.367 --> 01:26:31.000
have made a lot of progress on that, so I appreciate the 01:26:31.000 --> 01:26:33.634
dedication and professionalism all around for that, but um,
01:26:33.634 --> 01:26:37.400
you know, the more we can do to, to get the uh co-working spaces
01:26:37.400 --> 01:26:40.033
filled, I think the more vibrant it’s gonna be. And then 01:26:40.033 --> 01:26:42.533
of course for our bottom line is a city that’s gonna do quite
01:26:42.533 --> 01:26:46.634
a bit as well, so. Thank you. All right, thank you. All right.
01:26:46.634 --> 01:26:54.166
So next, uh, we will go ahead and move to verbal commissioner 01:26:54.166 --> 01:26:59.734
reports and announcements. Are there any? Commissioner
01:26:59.734 --> 01:27:08.033
McGarvey. Thank you, Mr. President. I am sorry. I, oh, 01:27:08.033 --> 01:27:15.266
here we go. Didn’t include the date. I, I wanted to appeal 01:27:15.266 --> 01:27:18.000
once again to folks in Brooklyn Park and remind them that the
01:27:18.000 --> 01:27:26.033
um That the veterans Uh, this, this disabled veterans of 01:27:26.033 --> 01:27:29.667
America Olympics is being held here in Minnesota this year and
01:27:29.667 --> 01:27:32.900
in Brooklyn Park specifically, there are 2 days at Bowlero, 01:27:32.900 --> 01:27:36.667
where the bowling will take place and, uh, they are still
01:27:36.667 --> 01:27:41.500
in need of If you volunteers, so I’ll keep bringing that up 01:27:41.500 --> 01:27:44.634
till it happens. It happens in July, and I apologize for not
01:27:44.634 --> 01:27:48.800
having the date right with me. That’s my bad, but uh, thank
01:27:48.800 --> 01:27:58.100
you. All right. Seeing there are no more uh comments or