Woodside road construction informational meeting 08-04-2020
Wednesday, August 5, 2020
Woodside Road, Woodside Lane, and Kathleen Court infrastructure improvement project
Water main extension and directional drilling operations
Roadway reclamation and bituminous pavement improvements
Archaeological investigation and historical site preservation (State Statute 307 and 138)
Construction impacts: emergency access, driveway usage, and utility notifications
Residential water connection procedures, fees, and well disconnection requirements
Communication plan and construction project schedule
Notable Quotes (2)
If you do see something that you'd like to have adjusted we ask that you contact us to discuss the feasibility of moving those locations.
Water service connectionDiscussing placement of water service connection stakes.
The city of Shorewood's connection fee is ten thousand dollars. There have been studies that indicate that that fee likely will increase.
Budget/FeesExplaining the cost structure for residents choosing to hook into municipal water.
People (4)
GregCity Representative
Moderating the open house and managing participant questions.
Katie KoslakEngineer
Providing technical overview of construction, road improvements, and water utility project details.
Brent BlackieResident
Inquiring about potential damage to existing Mediacom cable lines under the roadway.
Andy EsslingerCity Official
Designated as an on-site point of contact for project-related questions.
Places Mentioned
Woodside RoadHoward's Point RoadWoodside LaneKathleen CourtBoulder Bridge DriveCity of Shorewood
Events & Meetings (2)
- August 10th: Commencement of construction activities
- Next day: 9:30 AM neighborhood resident meeting with Katie Koslak
Ordinances & Resolutions (1)
State Statute 307 and 138
Burial Sites Act and Historic Sites Act governing archaeological reviews for construction excavation.