Smithtown Pond/Shorewood Oaks drainage update, March 11, 2021
Wednesday, March 10, 2021
Smithtown Stormwater Pond Project
Shorewood Oaks Drainage Improvements
Western Shorewood Drainage Study implementation
Tree removal and preservation plan
Construction timeline and phasing
Lake Minnetonka Regional Trail detour
Groundwater and well water impact analysis
Mosquito control and pond maintenance
Native habitat and pollinator restoration
Notable Quotes (3)
The hydraulics and water quality of the overall watershed will be greatly improved.
They are still considered moving water because there's enough water moving through those on a regular basis that you're not creating the stagnant condition.
If I don't see them there I will feel as though additional review is going to be required.
People (6)
City of Shorewood administrator facilitating the open house meeting.
Lead engineer overseeing the design and technical aspects of the drainage projects.
Public works official addressing maintenance and operational concerns.
Local resident concerned about maintenance, flooding, and water table impact.
Local resident inquiring about water levels and maintenance protocols.
Resident living adjacent to the project site concerned about erosion.
Places Mentioned
Events & Meetings (1)
- Open house meeting regarding Shorewood Oaks and Smithtown pond projects