## CITY OF SAINT PETER, MINNESOTA
## AGENDA AND NOTICE OF MEETING
City Council Workshop Session of Monday, June 15, 2026 - 5:30 p.m.
## Community Center - Governor's Room (600 South Fifth Street)
## I. CALL TO ORDER
## II. DISCUSSION
a. Comprehensive Plan Update - p. 2-53
b. Department Presentation: Police - p. 54
c. Public Works Optimization - p. 55-64
d. Presidents Corner Update - p. 65-67
## II. ADJOURNMENT
## Todd Prafke
## City Administrator
## Memorandum
## TO: Todd Prafke DATE: 6/12/2026
## City Administrator
## FROM: Benjamin Baker
## Community Development Director
RE: Comprehensive Plan Update – Joint Meeting with City Council & Planning Commission
## ACTION/RECOMMENDATION
Review and provide input on a Comprehensive Plan Update, including results from the recent
community survey.
## BACKGROUND
Members should be aware that Planning and Zoning members have been invited to attend this
meeting to receive this information at the same time as the City Council. This was done for two
reasons:
• Efficiency, based on the number of meetings our consultant is contracted to participate in.
• We believed that bringing the groups together would provide for a rich and thoughtful
discussion.
Comp Plan Consultant Sarah Swedburg, from BMI, will be at the meeting to provide an update
on the Comprehensive Plan and go over “what we heard” from the community survey.
## Comp Plan Timeline:
## April
## Community Survey
13
th
## - Pop-Up Event @ Hy-Vee
16
th
## – Pop-Up Event @ Bike Rodeo
29
th
## - Steering Committee Workshop
## May
Community Survey (continued)
## June
o 15
th
## – Meeting with City Leadership Group
o 15
th
## – Joint Meeting with City Council & Planning Commission
o 16
th
## – Steering Committee
o 18
th
## – Sustainability Task Force Workshop
## o Start Drafting Chapters
2
## July
## o Continue Drafting Chapters / Review Chapters
## August
## o TBD - Local Agency Meeting
o 26
th
## – Steering Committee Workshop
o Begin Preparing to Publicly Share Draft Chapters
Our goal for the meeting is to give both the Council and Planning and Zoning members opportunity
to see, hear and discuss this work and share thoughts and ideas about the information provided
and work going forward.
Please feel free to contact me should you have any questions or concerns on this agenda item.
## BB
3
## COMMUNITY PROFILE
## SAINT PETER, MINNESOTA
## POPULATION KEY FACTS:
12,198
## Total Population
2.25
## Average
## Household Size
35.6
## Median Age
19%
Residents who
have a Disability
## COMMUNITY KEY FACTS:
419
## Total Businesses
64.9%
## Home Ownership
$961
## Median
## Rental Cost
34.5%
## Bachelor’s Degree
or Higher
80.4%
## White/Caucasian
## Alone
## EMPLOYMENT & INCOME KEY FACTS:
15.4
## Average Commute
## Time (In Minutes)
50.6%
## White Collar
## Jobs
62.2%
## Workforce Participation
## Rate
## MEDIAN HOUSEHOLD
## INCOME
$
:
65,122
## INFLOW
4,823
## Employees work in Saint Peter
but live elsewhere
1,638
Employees live and work
## within Saint Peter
## OUTFLOW
3,433
County residents employed
## outside Saint Peter
The data shown was gathered from the U.S. Census Bureau, Esri ArcGIS Business Analyst,
and the Minnesota State Demographic Center.
4
## Saint Peter 2050 Comprehensive Plan
## Public Survey Results
There were over 660 participants in the public survey. Responses show strong community pride and a clear desire to
protect what makes Saint Peter distinctive while addressing key livability challenges. Residents consistently value the
small-town feel, historic downtown, local businesses, parks, walkability, and sense of community. The most
common concerns focused on housing affordability, property taxes and utility costs, Highway 169 traffic and
pedestrian safety, business retention, and growth that remains consistent with community character.
## Key Areas of Consensus
• Small-town character is a major strength — Saint Peter is seen as friendly, safe, welcoming, and easy to
navigate.
• Historic downtown and local businesses matter — respondents want to preserve the city’s unique identity
and support local-serving businesses.
• Parks, trails, and walkability are highly valued — these were repeatedly identified as major quality-of-life
assets.
• Community pride is strong — many responses emphasized Saint Peter as a good place for families,
neighbors, and future generations.
## Common Areas of Concern
• Housing affordability and availability — especially for first-time buyers, seniors, families, and moderate-
income households.
• High property taxes and utility costs — a recurring concern tied to overall cost of living.
• Highway 169 traffic and safety — concerns about speed, noise, trucks, and difficulty crossing for
pedestrians.
• Business retention and variety — residents want more retail, dining, entertainment, and fewer empty
storefronts.
• Infrastructure and amenities — continued need for road, sidewalk, and facility maintenance, along with
more youth and family activities.
## Mixed Views
• Growth is supported, but only if thoughtful and fiscally responsible.
• More housing is needed, but there is no clear consensus on type (single-family, townhomes, senior
housing, apartments, mixed-density).
• Residents want business growth, but generally prefer local, community-scaled development over
large corporate or industrial growth.
• Transportation priorities are mixed — some emphasize walkability and safer crossings, while others
prioritize parking and traffic flow.
## Areas of Disagreement
• Strong opposition to data center development due to concerns about water use, energy demand,
environmental impacts, and fit with Saint Peter’s identity.
• Debate over the city’s future identity — some favor preserving the city’s current form, while others
support modernization and sustainability measures if done carefully.
• Affordability and inclusivity are shared values, but residents differ on how those goals should be
addressed.
5
## Saint Peter 2050 Comprehensive Plan
## Local Agency Survey Results
Agency feedback centered on housing, workforce, and economic development as the most important long-range
issues. Respondents also highlighted industrial park development, downtown vitality, transportation
coordination, and future land use planning as important opportunities and discussion points. Overall, the
responses reflect support for measured growth, strengthening the community’s regional role, and ensuring the city
remains attractive to residents, workers, and employers.
## Areas of Consensus
• Housing is both a challenge and an opportunity. Multiple respondents identified affordable housing,
housing inventory, and broader housing development—including apartments, townhomes, and single-family
homes—as key priorities.
• Workforce and job growth are important. Several responses emphasized workforce attraction and
retention, expanding the employer base, and creating moderate- to high-paying jobs.
• The community has strong assets to build on. Respondents pointed to assets such as schools, downtown,
public services, the hospital, and the city’s role as county seat.
• Future planning should support business and industrial growth. Comments referenced industrial park
occupancy, preserving industrial land, and planning for future business expansion.
## Areas of Concern
• Housing availability and affordability remain pressing concerns. Respondents noted limited housing
inventory and the difficulty of maintaining enough supply to attract and retain residents.
• Workforce attraction is a challenge. Agencies identified limited workers and the need to remain
competitive in attracting and retaining labor.
• Industrial and employment growth need attention. Concerns were raised about industrial park occupancy
and the need to grow the employer base.
• Infrastructure and transportation issues should be addressed. Specific comments referenced stormwater
retention, the 169 bypass settlement, and street design that could better support bike and pedestrian safety.
## Areas of Mixed View
• Housing diversity vs. affordability. While respondents agreed more housing is needed, they pointed to
both affordable housing and moderate- to upper-end housing as priorities.
• Downtown investment vs. industrial expansion. Some responses emphasized mixed-use downtown
growth and better river connections, while others focused on preserving industrial land for future job
growth.
• Regional coordination vs. local focus. One response stressed alignment with broader regional plans and
workforce strategies, while others focused more directly on city-level land use and growth needs.
## Areas of Disagreement
• No major direct disagreements emerged. Responses were generally aligned around housing, workforce,
and economic development, with differences showing up more in emphasis than outright opposition.
• The main variation was in how growth should be prioritized—for example, whether emphasis should be
placed more on downtown mixed-use development, industrial growth, housing mix, or transportation
improvements.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
## Memorandum
## TO: Honorable Mayor Nowell DATE: 6/12/26
## Members of the City Council
## FROM: Todd Prafke
## City Administrator
## RE: Department Presentation: Police
## ACTION/RECOMMENDATION
None needed. For Council information and discussion only.
## BACKGROUND
Each year, each City Department provides a presentation to the City Council at a Workshop. The
tentative schedule for Department Presentations is as follows:
## March Community Development (completed) July City Attorney
## April Public Works (completed) August Fire & Rescue
## May Hospital November Rec & Leisure Services
## June Finance & Police
The workshop on Monday evening will feature a presentation from Chief Grochow where he will
provide the Annual Police Report as well as other items related to the department.
Please know that once presented the Annual Report will be placed on the website within a few
days.
Please feel free to contact me if you have any questions or concerns on this agenda item.
## TP/ks
54
## Memorandum
## TO: Todd Prafke DATE: 6/12/26
## City Administrator
## FROM: Pete Moulton
## Public Works Director
## RE: Public Works Facilities Optimization Consulting Services
## ACTION/RECOMMENDATION
For your information, discussion and review.
## BACKGROUND
In March, the Public Works Department posted on the City’s website a Request for Qualifications
to provide services for Public Works Facilities Optimization Consulting Service. On March 12,
2026, an “Industry Day” was held to give the consulting services a chance to come to Public
Works and ask questions or take a tour of the facility. City staff collected and reviewed four
proposals.
Public Works staff reviewed the four Requests for Qualifications and scored them based on the
following:
## 1. Firm and Team Experience
• Demonstrated experience performing logistics and facilities optimization studies for public-
sector agencies, particularly Public Works departments
• Experience with facility condition assessments, operational analysis, and capital planning
• Experience with similar size, scope, and complex projects
• Experience working collaboratively with municipal stakeholders and partner agencies
## 2. Project Team and Key Personnel
• Qualifications, expertise, and availability of proposed project manager and key staff
• Demonstrated experience of assigned personnel with logistics, facilities planning, and
optimization
• Clarity of roles, responsibilities, and level of participation
• Demonstrated history of effective collaboration among team members
3. Understanding of the Project and Technical Approach
• Demonstrated understanding of the City’s objectives, challenges, and operational context
• Quality, clarity, and feasibility of the proposed approach to completing the PWFO Study
• Use of appropriate analysis tools (e.g., scenario planning, benchmarking, etc.)
• Approach to stakeholder engagement, communication, and consensus-building
55
## 4. Past Performance and References
• Quality and relevance of representative projects
• Demonstrated success in delivering projects on schedule and within scope
• Client satisfaction and references
## 5. Project Management and Schedule
• Proposed project schedule and ability to meet City timelines
• Project management approach, reporting, and coordination methods
• Ability to manage risks, challenges, and stakeholder complexity
Staff reviewed and evaluated the proposals and held interviews with the top three consulting
services on June 3, 2026.
City staff will bring forward the recommendation that ISG of Mankato, Minnesota be authorized to
completed the study beginning this month and completed by the end of the year 2026. The
anticipated cost for this study is $75,000. This expense was not budgeted in any fund, but it would
be paid using the City’s standard cost-share allocation, which is generally based on the building’s
space usage. You do have the cash to complete this work. As an alternative, we could work to
ensure payment of this comes primarily in 2027.
Our goal for your meeting is to provide the information about selection and criteria and provide
the members with opportunity to provide thoughts and ask questions. We also hope to put you in
a position to take action in the near term at a regular City Council meeting.
I will be available to answer any questions or concerns on this agenda item.
## PM
56
## SAINT PETER PUBLIC WORKS FACILITIES
## OPTIMIZATION CONSULTING SERVICES
June 3, 2026
57
Architecture + Engineering + Environmental + Planning | ISGInc.com 2
## TIARA MARCUS
## Project Executive + Strategic Planning Facilitator
## INTRODUCTIONS
## TANYA M. PIERCE
## Business Unit Leader, Government + Cultural
58
## PHASE 1: LEADERSHIP + KEY STAKEHOLDER COLLABORATION
## PROCESS EVALUATION + PRIORITIZATION
• Evaluate and map key steps within the organization’s workflow
• Identify strengths, challenges, and opportunities for improvement
•
## F
acilitate a nine-vote prioritization exercise to determine the
highest-impact initiatives
## TECHNICAL EXPERTS
## Tiara Marcus
## Project Executive
+ Strategic
## Planning Facilitator
## Eric Eigenberg
## Project Manager
## Jay Lotthammer
## Public Works
## Operations Strategist
Architecture + Engineering + Environmental + Planning | ISGInc.com 3
59
## PHASE 2: FLOW + PROCESS MAPS
## SAFETY
• Reduce traffic
and storage
congestion
• Improve
ergonomics
by minimizing
unnecessary
movement
## QUALITY
• Streamline
training
and process
understanding
• Strengthen
visual
management
## COST/EFFICIENCY
• Optimize
material and
personnel flow
• Reduce
transportation
time, product
searching,
and process
confusion
## TECHNICAL EXPERTS
## Tiara Marcus
## Project Executive
+ Strategic
## Planning Facilitator
## Charley
## Hatterman
Data +
## Systems Engineer
## Josh Gross,
## AIA, NCARB, LEED AP
## BD+C, MPA
## Architect
## Bryan Petzel, PE
## Civil Site Engineer
Architecture + Engineering + Environmental + Planning | ISGInc.com 4
60
## PHASE 2 + 3: FACILITY EVALUATION + PRIORITIZATION
## Thad Dahling
## Facilities
## Assessment Lead
## Charley
## Hatterman
Data +
## Systems Engineer
## Luis Swanson
## GIS Specialist
Architecture + Engineering + Environmental + Planning | ISGInc.com 5
## Architecture + Engineering + Environmental + Planning ISGInc.com
## DASHBOARD EXAMPLES
## City of Savage, MN
## TECHNICAL EXPERTS
61
## Table Of Contents
Executive Summary ....................................
## Facility Recommendations
......................
## Overall Goals + Priorities
..........................
## S
takeholder Themes
..................................
Business Case ..............................................
## Implementation Schedule
## + Cost Estimates
.........................................
## PHASE 3 + 4: THEME IDENTIFICATION + IMPROVEMENT AREAS
## Thad Dahling
## Facilities
## Assessment Lead
Architecture + Engineering + Environmental + Planning | ISGInc.com 6
## Tiara Marcus
## Project Executive
+ Strategic
## Planning Facilitator
## Josh Gross,
## AIA, NCARB, LEED AP
## BD+C, MPA
## Architect
## Eric Eigenberg
## Project Manager
## TECHNICAL EXPERTS
62
Architecture + Engineering + Environmental + Planning | ISGInc.com 7
## STAFF +
## HOURLY RATE
## ANTICIPATED
## HOURS
## FEE
## PHASE 1: ORIENTATION + EXISTING CONDITIONS
## Architect
$180
## Civil Site Engineer
$200
Data +
## Systems Engineer
$140
## GIS Specialist
$220
## Facilities
## Assessment Lead
$195
## Project Manager
$195
## Public Works
## Operations Facilitator
$205
## Project Executive
+ Strategic
## Planning Facilitator
$240
120–135$23,250–$26,460
1.1 Project kickoff and stakeholder facilitation
1.2 Facility condition assessment and verification
1.3 Spatial scan and GIS mapping
1.4 Operations trends and benchmarking
1.5 Obtain and review existing data
1.6 Phase 1 summary report
## PHASE 2: INTERPRETATION + ANALYSIS
100–124$19,600–$24,304
2.1 Existing facilities and operations process mapping
2.2 GIS spatial optimization and site suitability analysis
2.3 Operational inefficiency analysis
2.4 Fleet movement analysis
2.5 Scenario planning and phasing options
2.6 StoryMaps generation
2.7 Identify renovation or relocation opportunities
2.8 Phase 2 analysis package
## PHASE 3: ALTERNATIVES + SHARED VISION
110–122$21,560–$23,912
3.1 Optimized workflows and design criteria
3.2 Stakeholder workshops and consensus
3.3 Facility and organization alternatives
3.4 Business case for total cost of ownership (TCO)
3.5 Preferred alternative and shared vision
## PHASE 4: FINAL RECOMMENDATIONS + IMPLEMENTATION
97–108$19,012–$21,168
4.1 Facility recommendations and site analysis
4.2 Implementation schedule and cost estimates
4.3 Programming and adaptive reuse strategies
4.4 Finalize report and StoryMaps
4.5 Final PWFO report
## TOTAL$83,422–$95,844
## FEE
63
## THANK YOU!
64
## Memorandum
## TO: Todd Prafke DATE: 6/12/2026
## City Administrator
## FROM: Benjamin Baker
## Community Development Director
## RE: 1225 S Washington Ave Development Update
## ACTION/RECOMMENDATION
Update on the 1225 S Washington Ave (Presidents Corner) housing development project.
## BACKGROUND
In 1854, the Original Plat of St. Peter was filed which dedicated three (3) public squares to the
public use including Minnesota Square, Washington Square (Community Center), and Jefferson
Square. An Amended Plat of Saint Peter was filed in 1859 since the Original Plat failed to
establish section line or corner posts. The Amended Plat also established the same three (3)
public squares. In the 1800s, a railroad was built which ran through the eastern portion of
Jefferson Square. When the railroad terminated its service in the 1900s, the railroad sold its
abandoned line/land, which once included a train depot, to H.W. Komatz. In 1965 H.W. Komatz
sought a Quiet Title Action in District Court to declare H.W. Komatz to be the owner of all of
Jefferson Square except for the westerly 122 ft. The westerly 122 ft. of the square was used as
a municipal well/water filtration plant. After 1965, the easterly 208 ft. of Jefferson Square was
developed into multiple residential structures, including two (2) single-family homes, a
duplex/apartment, and four (4) townhome units.
In 2010, the City of Saint Peter replaced the Jefferson Avenue Water Filtration Plant, at 1225 S
Washington Avenue, with a new state-of-the-art reverse-osmosis water treatment plant,
constructed just north of Gustavus Adolphus College at 1801 Broadway Avenue. Therefore, in
2011, the old water filtration plant was demolished, and the on-site wells were sealed. For the
past 15 years, the land has been left vacant (maintained grass) and turned into a seldom used
public property.
In May 2024, Adam Huiras, ALH Land Company, submitted an offer on the subject property,
proposing: 1) duplexes/townhomes up to eleven (11) units, or 2) multi-family residential up to
fourteen (14) units. Due to construction timing issues, the project was put on hold by Huiras.
In March 2025, Huiras submitted a revised offer for the subject property. That offer showed the
site developing into four (4) residential twin-homes (8-units) with walk-out basement/garages,
taking advantage of the sloping hillside. On May 12, 2025, the City Council approved a Purchase
Agreement. On December 8, 2025, the City Council reviewed an alternative design, submitted
65
by Huiras, showing two (2) townhome buildings, that would hold up to eleven (11) units. Although
the City Council was favorable moving forward with either development proposal, the developers
decided to proceed with the original idea due to construction costs. In January 2026, the City
signed an updated purchase agreement with ALH Land Company and Fox Valley Property’s,
extending the closing date deadline to May 31, 2026. Closing did not take place because of 2009
financing obligation with the State of Minnesota.
## Proposed Development
The proposed development site will contain four (4) separate buildings/twin-homes (8 total units).
Each building will host two (2) homes, including the following items:
1 front porch
1 kitchen
3 bathrooms
1 living room 3 bedrooms
1 utility/storage room
1 dining room
1 office (or bedroom)
2-stall garage (attached)
Due to the site topography, tuck-under garages are proposed, which will face the rear yard. The
garage and off-street parking traffic is designed to funnel to a single two-lane driveway that leads
to Pine Street (reducing traffic conflicts onto Jefferson Avenue and Washington Avenue). A curb-
cut was already created to serve the subject property along with the 2024 Pine Street Project.
The building footprint size is: 54’ x 52’ ( 2,808 sf) including the porch, and 54’ x 46’ (2,484 sf)
without the porch. The developer plans to make the units available for purchase or rent.
## Title / Land Issues
Issue # 1
In the Spring of 2025, the City Attorney found that the land had to go through a legal process
before being sold, since the subject property was originally platted as a public square
(Jefferson Square).
## Resolution
On September 29, 2025, the State of Minnesota District Court found that the Plaintiff (City of
Saint Peter) has title to the Subject Property and has the authority to sell said property (Court
File No. 52-CV-25-437, Findings of Fact, Conclusion of Law, and Order for Judgment
Document No. 355557, 10/7/25).
Issue # 2
In the Spring of 2026, the City Attorney found that the City is not allowed to sell this property
without the consent of the Minnesota Management & Budget Department, in this instance, for
40 years due to the City’s receipt of both loan and grant dollars from the State for a project
that occurred on this site. That project was for the removal of a water treatment building and
closure of the well on the property. That project was funded in 2009. At that time the City of
Saint Peter was awarded $19.7 million in bond and grant funds for the Clean Water/Drinking
Water Revolving Fund Program from the Minnesota Public Facilities Authority (PFA) to help
finance the following:
• New Broadway WTP - $16.7 million (20-year loan at 2.7%)
• Old Jefferson WTP and Watermain - $2 million (principal forgiveness)
• St Julien Plant - $0.9 million (principal forgiveness)
66
To be able to meet the requirements, sell the land and put in a property tax and utility paying
status, the City must follow and submit applicable items listed in the General Obligation
Compliance Checklist for Sale of G.O. Bond Financed Properties, including: 1) a signed
Resolution stating “that the Subject Property is no longer usable or needed to carry out the
governmental purpose for which it was originally acquired, constructed, or bettered”, and 2) a
sale of the property at fair market value, based on an appraisal by a certified appraiser. The
sale price agreed to was slightly over $64,000. That means that a grant of about $36,000
would be provided for the sale and title to be cleared for closing.
Once submitted to the Capital Bonding Coordinator, it can take up to 60 days for the State to
process the information for release. Along with the Compliance Checklist, the City will need
to pay the State $100,000, which is the appraised value of the Subject Property.
## Timeline for Issue Resolution
June 2026
o City Council approves a Resolution, declaring the property is not needed
o City Council approves a modified Purchase Agreement providing for the $100,000
sale amount as set by the appraiser
o Grant approval with funds from the Water Fund to the developer to provide the
agreed upon resources which meet the State requirements, namely meeting the
$100,000 sale appraisal threshold
o Compliance Checklist and documents submitted to State of Minnesota
o City sends $100,000 to the State of Minnesota
August 2026
o Commissioner of Minnesota Management & Budget consents to the property sale
o Closing on property
## Project Timeline
June-July 2026
o Building Permit and Civil Plans Submitted to City for review
August-September 2026
o Closing on property
o Grading and utility work
o Footing and foundation work on new homes
October-November 2026
o Enclosed new homes before winter weather arrives
December 2026 – April 2027
o Complete construction of new homes
Our goal for the workshop is to give members opportunity to understand the challenges that are
faced with the sale of the property and provide input on the solution(s) that have been identified.
We hope to put you in a position to approve the proposed actions and sell the parcel. We hope to
get that approval at an upcoming regular meeting cycle.
Please feel free to contact me should you have any questions or concerns on this agenda item.
## BB