Agenda · Meeting Calendar
Meeting CalendarAgendaThursday, August 27, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
---
## author: Russ Wille
date: D:20260820092432-05'00'
---
## C
## ITY OF SAINT PETER
## AGENDA & NOTICE OF REGULAR MEETING
## ECONOMIC DEVELOPMENT AUTHORITY
## T
## HURSDAY, AUGUST 27, 2026 - 12:00 PM
## GOVERNORS ROOM – ST PETER COMMUNITY CENTER
## I.CA
## LL TO ORDER
## II.APPROVAL OF AGENDA
## II
## I.APPROVAL OF MINUTES
A.June 4, 2026
## I
## V.NEW BUSINESS
A.Introduction & Visit from the Small Business Development Center – Hanna
h
## Bretz
## B.Comprehensive Plan Update – Sarah Swedburg and/or Mojra Hauenstein
,
## C
onsultants from Bolton & Menk
## V.OL
## D / UNFINISHED BUSINESS
A.Status of Downtown Sidewalks & Pavement Areas in Reference to a Potential
## Central Business District (CBD) Sidewalk & Pavement Improvement Program
## VI
## .REPORTS
## A.Revolving Loan Fund Report
## B.COVID-19 Hospitality Assistance Program Report
## C. City Updates & Projects
## V
## II.ADJOURNMENT
## B
en Baker
## Director of Community Development
1
## CITY OF SAINT PETER, MINNESOTA
## ECONOMIC DEVELOPMENT AUTHORITY
## MEETING MINUTES – JUNE 4, 2026
## SAINT PETER ROOM – SAINT PETER COMMUNITY CENTER
The m
eeting of the Saint Peter Economic Development Authority (EDA) was called to order at
approximately 12:03 pm by EDA President Julie Fredrickson. Roll call was taken with members
Fredrickson, Keri Johnson, Ayan Omar, and Josh Weisenfeld present. Members Nate
Newhouse, Bob Southworth and Cory Abels was absent. City staff present was Community
## Development Director Ben Baker, Community Development Specialist Hayden Lacher,
Community Development Specialist and Finance Director Perry Solheim. Visitors present were
Luke Rose of Paddlefish Brewing Co., Christine Rasmussen of River Rock Kitchen & Baking
Co., and Helena Juffer of River Rock Coffee & Tea.
## Approval of Agenda
## A
motion was made by Johnson, seconded by Omar to approve the agenda as presented. All
members voting aye, the agenda was approved.
## A
pproval of Minutes
## A
motion was made by Omar, seconded by Weisenfeld to approve the minutes from the March
26, 2026 meeting. All members voting aye, the minutes were approved.
Old /
## Unfinished Business
## U
pdate – Potential Central Business District (CBD) Sidewalk & Pavement Improvement
## Program
## B
aker provided an update on a possible downtown sidewalk or pavement improvement program
intended to support businesses with sidewalk, alley, private parking lot, or related pavement
repairs through either a loan or grant model.
## U
## pdate – Status of 2025 Accessibility Improvement Grant Projects
## B
aker reported that eight grants had been awarded to seven businesses the previous year, and
most projects have been completed and reimbursed. He added that the Timeless ramp project
was not completed because additional sidewalk work would be required to make the approach
ADA compliant.
## N
ew Business
## R
eview and Consider Approval of the 2026 Accessibility Improvement Program Grant
## Awardees
## B
aker explained that the ADA review committee met in May. The group included City staff, EDA
members, a member from the Planning Commission and Dr. Steven Moore, who uses a
wheelchair and provided first hand accessibility feedback. The committee reviewed seven
applications using the program’s established criteria.
Projects discussed included:
2
• Red Men Club: partial funding for ADA door improvements.
• Reflections Salon: entrance and door improvements.
• Hair Therapy / Four Seasons Mall: two automatic door openers.
• Sweet Alice: revised to fund a buzzer, sidewalk, and ramp rather than an automatic door
opener.
• Pulse Chiropractic: paving two handicap stalls.
• Shady Ridge Cabinetry: ramp and automatic door improvements.
A motion was made by Johnson, seconded by Weisenfeld with all members voting aye, to
introduce Resolution 2026-XX entitled “Recommending Approval of Accessibility Improvement
## Grants for Commercial Properties/Businesses”
Review and Consider Approval of $25,000 CBD Renovation / Enhancement Loan for 224
## S Minnesota Avenue (Erbert & Gerberts / Reflections Salon)
Baker explained that Maria O’Connell recently purchased the building at 224 S. Minnesota
Avenue. O’Connell is requesting a Central Business District (CBD) Renovation/ Accessibility
loan in the amount of $25,000 to help offset the costs of the $60,010 historic restoration project.
The project was reviewed by the Heritage Preservation Commission (HPC) who recommended
approval of the project.
A motion was made by Weisenfeld, seconded by Omar with all members voting aye, to
introduce Resolution 2026-XX entitled “Recommending Approval of Central Business District
Renovation/ Enhancement Loan for 224 S Minnesota Avenue (Erbert & Gerberts/ Reflections
## Salon).”
Review and Consider Approval of a $129,000 Revolving Loan for 301 S Minnesota
## Avenue (River Rock Coffee & Tea)
Helena Juffer of River Rock Coffee & Tea explained the work they have undertaken to stabilize
and restore the building. She added that project had encountered unexpected costs and timing
issues. She also added that they are renovating the upper apartment into two separate units
with plans to have one of those units as an Airbnb. The project includes exterior restoration,
painting, cleaning, and entrance improvements. River Rock Coffee & Tea is requesting a
Revolving Loan in the amount of $129,000 for exterior and interior improvements. Baker added
that staff recommends approval of the $129,000 loan over 20 years, with 4.75% interest and
monthly payments of $833. The project was reviewed by the Heritage Preservation Commission
(HPC) who recommended approval of the project.
A motion was made by Johnson, seconded by Omar, with all members voting aye to introduce
Resolution 2026 – XX entitled “Approving a Revolving Loan in the Amount of $129,000 for
improvements to the building at 301 South Minnesota Avenue River Rock Coffee & Tea
Building”.
Review and Consider Approval of a $10,000 Unforeseen Circumstances Micro Loan for
814 N Minnesota Avenue (El Agave), 219 Park Row (River Rock Kitchen & Baking Co.),
## and 108 S Minnesota Avenue (Paddlefish Brewing Co.)
Baker presented the first round of requests under the new unforeseen circumstance loan
program. Baker added that a partial application was submitted by Taqueria El Rey, but they had
3
not completed the full application. Three full applications were submitted from El Agave, River
Rock, and Paddlefish Brewing Co.
## E
l Agave
Baker reported that the loan review committee found the business has been affected for a four-
month period by an unforeseen circumstance and recommended approval.
River Rock Kitchen & Baking Co.
Baker reported that the loan review committee also had no hesitations recommending approval
of an unforeseen circumstance loan based on the application materials and financials.
## P
addlefish Brewing Co.
Baker reported that the loan review committee was unable to reach consensus, but staff still
recommended approval. The loan review committee had concerns regarding whether the
submitted documentation showed a qualifying unforeseen circumstance versus a continuation of
existing financial performance trends.
## A
motion was made by Johnson, seconded by Weisenfeld with all members voting aye, to
introduce Resolution 2026 – XX entitled “Approving Applications for the Unforeseen
Circumstances Micro Loan Program”.
## Reports
## R
## evolving Loan Fund Report
Baker provided an update on the revolving loans.
## C
## OVID-19 Hospitality Assistance Program Report
Baker provided an update on the COVID-19 loans.
## City Updates & Projects
Baker provided an update on new developments in the City.
## A
djournment
## W
ith no further business before the EDA, a motion was made by Omar, seconded by
Weisenfeld to adjourn. All members voting aye, the meeting adjourned at approximately 1 2:56
pm.
4
5
6
| 1
## Saint Peter 2050
## Comprehensive Plan
## Draft August 2026
7
| 2
## Council Resolution – Placeholder
8
| 3
Letter from the Mayor – Placeholder
9
| 4
## 1 | ACKNOWLEDGEMENTS
10
| 5
## Mayor
## Shanon Nowell*
## City Council Members
## Ben Ranft, Ward I
## Keri Johnson, Ward I
## Darrell Pettis, Ward I
## Dustin Sharstrom, Ward II
## Brad DeVos, Ward II*
## Joshua Weisenfeld, Ward II
## Planning and Zoning Commission
## Scott Zarn
## Mark Plotz*
## Ben Griffith
## Marc Bachman
## Zuleika Abdi
## Ben Ranft, City Council Liaison
## Brad DeVos, City Council Liaison*
## City Staff
## Todd Prafke, City Administrator
## Ben Baker, Community Development Director*
## Hayden Lacher, Community Development
## Specialist*
## Corree Johnson, Communications &
## Sustainability Coordinator*
## *Comprehensive Plan Steering Committee Member
## Comprehensive Plan Steering
## Committee
## Curtis Thompson, Water Resources
## Superintendent
## Jon Graff, Saint Peter Public Schools
## Superintendent
## Charlie Potts, Saint Peter Public
## Schools/Gustavus Adolphus College
## Shana Jackson, Nicollet County
## Bob Sandeen, Nicollet County Historical
## Society, Tourism and Visitors Bureau
## Mike Kunkel, Saint Peter Development
## Corporation, Pioneer Bank
## Matt Byers, Architecture, Planning, Design –
## PLAAD, LLC
## Matt Borowy, Architecture, Planning, Design –
## Bright Pixel Design
## Leah Petricka, Southwest Minnesota Housing
## Partnership – Real Estate Development
## Mary Gack, Southwest Minnesota Housing
## Partnership – Community Land Trust
## Sustainability Task Force
Insert names here
## Consultants
## Bolton & Menk Team:
## Jeff Domras, Municipal Project Manager
## Bob Rogers, Transportation Practice Lead
## Brenna McConnell Jansen, Planner I
## Dylan Edwards, Planner I
## Sarah Swedburg, Planner II
## Mojra Hauenstein, Senior Planner
## David Sandberg, GIS
11
| 6
## TABLE OF CONTENTS
1 | Acknowledgements .............................. 4
2 | Community Profile ................................ 7
Background .................................................. 8
Data and Demographics .............................. 9
## Data Sources and Local Adjustment .......... 13
Trends & Projections .................................. 13
3 | Economic Development ..................... 14
## City Recognition for Accessibility and
Economic Vitality ........................................ 15
Labor Force ................................................ 16
Educational Attainment .............................. 18
Wages ........................................................ 19
## Economic Development Goals ................... 20
4 | Housing .............................................. 22
## The 2024 Housing Study............................ 23
Housing Stock and Market ......................... 24
Housing Goals ........................................... 28
5 | Facilities and Infrastructure ................ 29
Stormwater Management ........................... 30
Electric Utility ............................................. 32
Water System ............................................. 32
Wastewater Collection and Treatment ....... 35
## Municipal Buildings and Civic Facilities ...... 36
## Emergency Services and Public Safety
Facilities ..................................................... 37
Facilities and Infrastructure Goals .............. 39
6 | Transportation .................................... 40
## Existing Transportation System .................. 41
## Transportation System Analysis of Future
Needs......................................................... 54
Transportation Goals .................................. 58
7 | Parks & Natural Resources ................ 59
Parks .......................................................... 60
Parkland per Resident ................................ 63
## Park Service Areas and Access.................. 63
Natural Resources ...................................... 63
Trails and Connectivity ............................... 64
Cultural Heritage ........................................ 67
## Parks & Natural Resources Goals .............. 68
8 | Sustainability ...................................... 70
## Energy, Emissions, and Municipal Operations
................................................................... 72
## Water Resources and Stormwater Resilience
................................................................... 73
## Land Use, Housing, and Sustainable
Development .............................................. 73
Transportation, Mobility, and Access .......... 73
Waste and Recycling .................................. 74
## Urban Forest, Parks, and Environmental
Quality ........................................................ 74
## Economic Resilience and Local Systems ... 74
## Institutional Partnerships and Community
Leadership ................................................. 75
Sustainability Goals .................................... 76
9 | Land Use ............................................ 79
## Existing Land Use ...................................... 80
Community Consensus .............................. 84
## Future Land Use......................................... 84
Densities .................................................... 88
## Land Use Goals.......................................... 92
10 | Implementation ................................... 93
Official Controls .......................................... 95
Funding Mechanisms ................................. 95
Implementation Matrix ................................ 95
## Appendix A | Public Comments ..................... 97
12
| 7 Community Profile
## 2 | COMMUNITY PROFILE
13
| 8
Saint Peter’s identity is shaped less by rapid growth and more by constant daily and seasonal
change. The combined presence of college students, in-commuting workers, and aging residents
creates fluctuating demand for housing, transportation, services, and public spaces that is not fully
reflected in population totals alone. This underscores the need for flexible land use, housing, and
infrastructure strategies that accommodate shared use while maintaining Saint Peter’s historic scale,
accessibility, and community character.
## Background
Saint Peter is the county seat of Nicollet County and a historic small city in the scenic Minnesota
River Valley, located about 10 miles north of Mankato and 45 minutes to the Twin Cities Metro Area
(Shakopee/Chaska/Prior Lake). Founded in 1853 and incorporated in 1873, the city was once
considered as Minnesota’s state capital, a legacy still reflected in its extra-wide streets and strong
historic character.
Today, Saint Peter is home to just over 12,000 residents, Gustavus Adolphus College, a historic
downtown, and a diverse mix of local businesses and regional institutions that make it an important
civic, educational, and employment center in south-central Minnesota.
## Placeholder – Location Graphic
14
| 9
## Vision – Placeholder
15
| 10
## Data and Demographics
## Demographics
Current demographic data establishes a baseline for understanding Saint Peter today and planning
for future needs through 2050. It helps the City identify trends, anticipate change, and guide
decisions. Key data highlights conditions that are important for long‑range planning.
Total Population (12,198 in 2024/25): Saint Peter is a small but significant regional community, so
the plan focuses on managed growth, maintaining services, and preserving community character as
the city changes over time.
Average Household Size (2.25): Smaller households than state average (2.43) signal demand for
smaller housing types such as townhomes, apartments, senior housing, and starter homes—not just
large single-family lots.
Residents with Disability (19%): A higher share of residents with disabilities indicates the need for
universal design, accessible housing, sidewalks, parks, public buildings, and transportation options.
## FIGURE 1 | SAINT PETER POPULATION
Median Age (35.6): The city has a
relatively balanced age profile, so
the plan supports families, working-
age adults, and aging residents at
the same time.
Large cohort of younger
residents: Younger age groups
aging into adulthood alongside a
growing older population highlights
the need for long‑term planning for
adaptable housing, workforce
retention, and age‑responsive
services and infrastructure.
## Source: U.S. Census ACS 2024 5-Year Estimates Age and Sex
## FIGURE 2 | POPULATION KEY FACTS
Source: U.S. Census Bureau, Minnesota State Demographic Center, and ESRI ArcGIS Business Analyst 2026
2,0001,5001,00050005001,0001,5002,000
Under 5
5 to 14
15 to 24
25 to 34
35 to 44
45 to 54
55 to 64
65 to 74
75 to 84
85 and older
## MaleFemale
16
| 11
## Community Key Facts
Total Businesses (419): Saint Peter has a solid local business base, so the plan supports business
retention, downtown vitality, and commercial growth opportunities.
Home Ownership (64.9%): Lower than state average (72.2%), but still strong ownership rate
suggests neighborhood stability. The plan ensures enough rental and entry-level ownership options
for younger households and workforce residents.
Median Rental Cost ($961): Rent levels appear relatively moderate, so the plan focuses on long-
term rental affordability and housing choice, especially as demand changes by 2050.
Bachelor’s Degree or Higher (34.5%): A well-educated population supports planning for skilled jobs,
entrepreneurship, quality amenities, and economic competitiveness.
White/Caucasian Alone (80.4%): While Saint Peter remains majority White, the plan emphasizes
inclusion, cultural responsiveness, and services that support a diversifying community over time.
## FIGURE 3 | COMMUNITY KEY FACTS
Source: U.S. Census Bureau, Minnesota State Demographic Center, and ESRI ArcGIS Business Analyst 2026
## Employment & Income Key Facts
Average Commute Time (15.4 minutes): Short commute times suggest Saint Peter functions as a
convenient place to live and work, so the plan reinforces local job access, walkability, and efficient
transportation connections.
White Collar Jobs (50.6%): A workforce split with a strong white-collar presence signals the need for
professional employment space, broadband, and quality-of-life investments that attract and retain
workers.
Workforce Participation Rate (62.2%): A healthy labor force allows the plan to offer strategies for
continued employment opportunities, childcare support, housing for workers, and transportation
access.
Median Household Income ($65,122): This indicates a generally moderate-income community, so
the plan balances housing affordability, infrastructure investment, and cost-of-living impacts.
Inflow (4,823 workers commute into Saint Peter): Saint Peter is a not just a job center, but
functions as a regional employment hub, meaning the city supports commercial/industrial land, traffic
management, parking, and workforce housing.
Live and Work in Saint Peter (1,638): A meaningful share of residents both live and work locally,
which supports planning for a complete community with nearby housing, jobs, services, and
multimodal connections and mixed uses.
17
| 12
Outflow (3,433 residents work outside Saint Peter): Many residents still commute elsewhere,
which signals the need to improve regional connectivity while also expanding opportunities for
residents to work locally.
## FIGURE 4 | EMPLOYMENT & INCOME KEY FACTS
## Housing
The city’s housing stock has continued to grow, but the 2024 Housing Study notes that standard
Census data may understate actual conditions because some specialized senior housing units were
classified as group quarters rather than housing units. For that reason, the Comprehensive Plan
should rely on both standard demographic sources and local housing data to understand existing
conditions and plan for future housing needs through 2050.
## Key Housing Profile Points:
• 2020 Housing Base: 3,902 housing units (U.S. Census)
• Undercount Identified: The 2024 Housing Study found that some specialized senior housing
units were classified as group quarters, likely understating the true housing supply
• Adjusted Stock: Actual 2020 housing units were likely somewhat higher than the official
Census count
• Recent Development Pattern: Ongoing housing growth, driven primarily by multifamily rental
production alongside steady single‑family construction
• 5‑Year Average Production: ~58 new units per year
o ~45 rental units annually
o ~12–13 owner‑occupied units annually
• Planning Growth Assumption: ~50 new households per year in Saint Peter (~55 per year in
the broader market area)
18
| 13
## Data Sources and Local Adjustment
Baseline demographic data for Saint Peter comes from the U.S. Census Bureau, Minnesota State
Demographic Center, and ESRI ArcGIS Business Analyst. While these sources are reliable and useful
for comparison, they rely on periodic estimates and may not fully capture recent local development
activity. For this reason, population and housing assumptions were adjusted to better reflect observed
local housing trends and construction patterns used to guide future housing, land use, and
infrastructure decisions.
• Previous projections did not account for more than 200 senior housing units, which affects
recent and future household growth.
• Growth assumptions were also updated to reflect an estimated pace of approximately 50 new
housing units per year, providing a more realistic basis for the 2050 Comprehensive Plan.
• Gustavus College students are included in the Census count only if they declare full‑time
residency. Students not counted as local residents still contribute significantly to the city’s
economy and workforce. With enrollment of approximately 1,906 students, Gustavus Adolphus
College continues to influence infrastructure and service demands during the academic year.
• Local adjustment note: State Hospital
## Trends & Projections
Rather than applying Saint Peter’s historical 1.01 percent annual Census population growth rate
through 2020, the Comprehensive Plan relies on the 2024 Housing Study assumption of adding
approximately 50 new households per year. This approach reflects recent local development activity.
The study estimates a base of 3,875 households in 2023, increasing to approximately 4,125
households by 2028.
Population projections use Saint Peter’s average household size of 2.25 persons, supplemented by a
constant estimate for residents in group quarters and other non‑household settings, including senior
housing and students. Calibrated to the verified 2024/25 population of 12,198, this method results in
an average annual growth rate of approximately 1.11 percent for households and 0.9 percent
for population between 2023 and 2050.
## TABLE 1 | SAINT PETER HOUSEHOLD & POPULATION PROJECTIONS
## Households Population
2020 3,708 11,548
2025 3,975 12,198
2030 4,225 12,873
2035 4,475 13,436
2040 4,725 13,998
2045 4,975 14,561
2050 5,225 15,123
## Method:
• Population basis of 12,198 (2024/25) and Household base: 3,875 households (2023)
• Annual household growth: +50 households per year and Average household size: 2.25 persons
• Population estimate: (Households × 2.25) + 3,366
• The constant reflects residents living in group quarters and other non-household arrangements,
calibrated to the verified 2024/2025 population estimate.
19
| 14
## 3 | ECONOMIC DEVELOPMENT
20
| 15
Saint Peter’s economic profile points to a community with a strong base in education, health care,
and other service-oriented employment, supported by a workforce that is both regionally connected
and locally rooted. The data suggests that Saint Peter benefits from institutional anchors and a
relatively accessible employment pattern, while also needing to plan for workforce diversification,
talent retention, and business growth that builds on its existing strengths. For the comprehensive
plan, this information helps connect economic development to land use, housing, transportation,
downtown vitality, and quality-of-life investments.
## City Recognition for Accessibility and Economic Vitality
In 2026, the City of Saint Peter received the League of Minnesota Cities City of Excellence Award for
its Central Business District Accessibility Enhancement Grant Program. The program helps downtown
business and property owners improve accessibility through grants for features such as ramps,
automatic doors, wheelchair lifts, and parking improvements.
The award recognizes Saint Peter's commitment to supporting local businesses, preserving historic
downtown buildings, and creating a more welcoming environment for residents and visitors of all
abilities. Funded through interest earnings from the City's revolving loan fund, the program
demonstrates an innovative approach to downtown investment and economic development.
This statewide recognition highlights Saint Peter's leadership in fostering an accessible, vibrant, and
economically resilient downtown: City of Saint Peter Honored With 2026 LMC City of Excellence Award -
## League of Minnesota Cities
## Placeholder – Award Photo
21
| 16
## Commute Times
Saint Peter serves as a regional employment hub, with 4,823 workers commuting into the city each
day compared with 3,433 residents commuting out for work. Combined with 1,638 people who both
live and work in Saint Peter, this pattern highlights the city’s importance as a center of jobs and
services within the region. Commute data further show that residents benefit from short commute and
strong access to nearby employment, with an average commute time of 15.4 minutes and more than
60% of commuters traveling less than 15 minutes. Together, these trends support strategies that
strengthen employment areas, improve connectivity, and position Saint Peter to capture more
resident growth, local spending, and business activity over time.
## FIGURE 5 | COMMUTE TIMES
Source: Esri (2023), Esri-Data Axle (2023), ACS (2017-2021), Esri-US BLS (2023), AGS (2023)
## Labor Force
## Labor Force Sectors
The labor force sector breakdown shows that white-collar employment makes up the largest share of
resident work, but it is not an overwhelmingly one-dimensional workforce. Blue-collar and service-
sector jobs remain a meaningful part of the local economy, which points to a community with a mixed
workforce and a broader range of employment needs. For the comprehensive plan, this is important
because it means Saint Peter needs to plan for a balanced economic future, including office and
institutional jobs, industrial and trades-based employment, and service-sector businesses that
support everyday community life. This kind of workforce mix also reinforces the need for a range of
housing choices, transportation options, and business spaces that serve different income levels and
employment types.
## Resident Occupations
Saint Peter’s economy is shaped by a mix of educational services, health care, manufacturing, and
other local-serving sectors. This diversity provides stability and helps reduce dependence on any one
industry. Moving forward, economic development efforts should both support major employment
anchors and create space for entrepreneurship, small business growth, and complementary
industries that strengthen the city’s overall economic base. Rather than relying on a single
0%10%20%30%40%50%
Less than 10 minutes
10 to 14 minutes
15 to 19 minutes
20 to 24 minutes
25 to 29 minutes
30 to 34 minutes
35 to 44 minutes
45 to 59 minutes
60 or more minutes
## Percent of Commuters
## Commute Time in Minutes
22
| 17
recruitment strategy, Saint Peter should pursue a balanced approach that supports a variety of
employers, workforce partnerships, and business environments.
## FIGURE 6 | PERCENT OF LABOR FORCE PER INDUSTRY
Source: Esri Civilian Labor Force Profile (2023), Esri-Data Axle (2023), ACS (2017-2021), Esri-US BLS (2023), ACS
(2023)
## Labor Force Projections
As Saint Peter looks ahead to future growth, one projection assume that recent population trends
continue by applying the City’s five-year annualized growth rate of 0.2188% to the 2024 base
population of 12,198. These projections are based on data drawn from the Minnesota State
Demographer PopFinder and the U.S. Census Bureau’s 2024 ACS 5-year age estimates.
Percentages represent each age cohort’s share of the total projected population for each Scenario 1
year. An additional scenario is provided in the Land Use Chapter.
## FIGURE 7 | FIGURE 1 LABOR FORCE PROJECTIONS
Age Group 2025 2030 2035 2040 2045 2050
16 to 24
years
2,811
(23.0%)
2,842
(23.0%)
2,873
(23.0%)
2,905
(23.0%)
2,937
(23.0%)
2,969
(23.0%)
25 to 54
years
3,861
(31.6%)
3,903
(31.6%)
3,946
(31.6%)
3,989
(31.6%)
4,033
(31.6%)
4,077
(31.6%)
55 to 64
years
1,461
(12.0%)
1,477
(12.0%)
1,493
(11.9%)
1,509
(11.9%)
1,526
(11.9%)
1,543
(12.0%)
65+ years
2,039
(16.7%)
2,061
(16.7%)
2,084
(16.7%)
2,107
(16.7%)
2,130
(16.7%)
2,153
(16.7%)
Saint Peter’s projections suggest a stable age structure with modest growth across all major cohorts,
rather than a major demographic shift. This means future economic development should focus on
## Educational Services
(24.9%)
## Health Care (15.9%)
Manufacturing (11.7%)
## Retail Trade (7.6%)
## Accomodation/Food
Services (7.0%)
## Public Administration (5.7%)
Construction (5.5%)
Other (21.7%)
23
| 18
retaining workers, supporting existing businesses, and strengthening the city’s talent pipeline, rather
than planning for rapid labor-force expansion.
The data also indicate that prime working-age adults (25–54) will remain the city’s largest economic
cohort, while younger residents (16–24) continue to represent an important source of future workers.
For Saint Peter, this points to the importance of workforce housing, school-to-work connections, local
job opportunities, and business retention strategies that help keep residents in the community over
time.
A consistently sizable 55–64 and 65+ population also suggests continued demand for health care,
services, and age-friendly employment and business opportunities. Overall, the projections support
an economic development strategy centered on steady growth, talent retention, and alignment
between jobs, housing, and community services.
## Educational Attainment
The educational attainment in Saint Peter has a solid base of residents with post-secondary
education, including a notable share with bachelor’s and graduate-level degrees, while also
maintaining a large population with high school, technical, or some-college backgrounds. This mix of
workforce can support both professional and institutional employers as well as technical, service, and
mid-skill jobs.
This data supports an economic strategy that encourages a wide range of opportunities—from
entrepreneurship and professional services to skilled trades, health care support, and local business
growth. Public input puts high value in strengthening partnerships between employers, schools, and
workforce development efforts so residents can move into local career paths.
## FIGURE 8 | EDUCATIONAL ATTAINMENT TABLE
Source: Esri (2023), Esri-Data Axle (2023), ACS (2017-2021), Esri-US BLS (2023), AGS (2023)
Saint Peter’s workforce capacity is layered rather than narrow. This means the community is
positioned to support a diverse economy, but only if land use, housing, and business development
strategies create opportunities for people across a range of education and income levels. It is key to
align economic development goals with workforce housing, local services, and employer needs.
2.7%
6.5%
28.2%
18.0%
10.2%
19.8%
14.7%
05001,0001,5002,0002,500
Less than 9th grade
9th to 12th grade, no diploma
High school graduate (includes
equivalency)
Some college, no degree
Associate's degree
Bachelor's degree
Graduate or professional degree
## Number of Adults 25 Years and Older
24
| 19
## Wages
The wage data for Saint Peter suggest that economic development efforts should prioritize the
expansion of higher-wage employment opportunities, particularly in management, healthcare, and
skilled trades. At the same time, the city should recognize the ongoing importance of lower-wage
service jobs and plan for workforce training, housing, and support systems that help residents move
into higher-paying career pathways.
Key data points:
• Saint Peter’s strongest wage opportunities are in management, healthcare
practitioners/technical occupations, and construction. These sectors likely offer the best
potential for higher-paying jobs and long-term economic growth.
• Lower wages in food service, personal care, sales, and healthcare support indicate that many
local jobs may remain in sectors with more limited earning power.
• In several occupations, regional wages appear lower than state wages, which may make it
harder to attract and retain workers in higher-skill fields.
• The city’s economic development strategy could focus on growing higher-wage industries,
while also supporting training, career advancement, and workforce housing for workers in
lower-wage occupations.
Overall, the data points to a need to improve both job quantity and job quality so Saint Peter can
remain competitive and support a stable workforce.
## FIGURE 9 | REGIONAL AND STATE WAGES CHART
Source: DEED wage statistics for EDR 9 / Mankato-North Mankato MSA and Minnesota State
While wages in the Mankato region are generally below statewide averages, relatively lower cost-of-
living conditions in Blue Earth and Nicollet Counties help offset this gap, particularly for lower-wage
occupations. These data points show that Saint Peter’s economy is supported by a stable mix of
institutional, service, and workforce-based employment, but that future success will depend on how
well the City connects economic development to housing, transportation, land use, and business
growth strategies.
$0.00$10.00$20.00$30.00$40.00$50.00$60.00
## Construction and Extraction
## Education, Training, and Library
## Food Prep and Serving Related
## Healthcare Practitioners and Technical
## Healthcare Support
## Management
## Office and Administrative Support
## Personal Care and Service
## Production
## Sales and Related
## Industry
## Regional Hourly WageState Hourly Wage
25
| 20
## Economic Development Goals
## Goal 3.1 Support Quality Job Growth and Economic Diversification
Policy 3.1.1 Prioritize business growth and recruitment efforts that expand access to higher-wage
employment opportunities, particularly in management, healthcare, skilled trades, and other
growth-oriented sectors.
Policy 3.1.2 Encourage economic development activities that strengthen the city’s tax base while
also improving the quality and wage potential of local jobs.
Policy 3.1.3 Support a balanced local economy by retaining and attracting businesses across a
mix of sectors, with particular attention to industries that offer long-term stability and advancement
opportunities.
## Goal 3.2 Strengthen the Local Workforce Pipeline
Policy 3.2.1 Support partnerships between employers, schools, and training providers to create
clearer pathways into local career opportunities.
Policy 3.2.2 Promote internships, apprenticeships, work-based learning, and job training
programs that prepare residents for occupations in demand.
Policy 3.2.3 Align workforce development efforts with the skills needed in higher-wage and hard-
to-fill occupations, including healthcare, technical fields, and skilled trades.
## Goal 3.3 Retain and Develop Local Talent
Policy 3.3.1 Support strategies that help retain younger workers and prime working-age adults in
the community.
Policy 3.3.2 Encourage career advancement opportunities that help residents move from lower-
wage service jobs into more stable and higher-paying occupations.
Policy 3.3.3 Promote local conditions that make it easier for workers to remain in Saint Peter
over time, including access to training, childcare, transportation, and other workforce supports.
## Goal 3.4 Support Existing Businesses and Employers
3.4.1 Prioritize business retention and expansion efforts that help existing employers remain
competitive and grow within Saint Peter.
3.4.2 Work with local employers to identify workforce challenges, succession needs, and
opportunities for business expansion.
3.4.3 Support employer partnerships that improve recruitment, retention, and workforce
development outcomes.
## Goal 3.5 Improve Economic Competitiveness
3.5.1 Strengthen Saint Peter’s competitiveness as a place to do business by supporting efficient
development processes, business-friendly policies, and coordinated economic development
efforts.
3.5.2 Promote the city’s workforce, institutions, and quality of life as assets that support business
retention and attraction.
3.5.3 Coordinate economic development planning with broader community investments that
improve access, services, and long-term business confidence.
26
| 21
## Goal 3.6. Expand Access to Economic Opportunity
3.6.1 Support economic development strategies that benefit residents across a range of skill
levels and career stages.
3.6.2 Encourage pathways to upward mobility for workers in lower-wage sectors through training,
credentialing, and employer partnerships.
3.6.3 Promote an economy that creates not only more jobs, but also better jobs with stronger long-
term earning potential.
Please see Sustainability Chapter for Sustainable Goals and Strategies that relate to this
chapter.
27
| 22
## 4 | HOUSING
28
| 23
People choose their homes based on many factors, but the community around them is often among
the most important. Saint Peter has 4,249 housing units, providing shelter for its 12,198 residents.
The recent 2024 city-commissioned housing study and current data demonstrate that Saint Peter has
strong housing demand, but not necessarily the space or developers to meet it. This chapter will
examine the city’s housing market and its projected future conditions through 2050.
## The 2024 Housing Study
The City of Saint Peter commissioned Community Partner has 4,249 housing units, update its
housing study, providing a foundation for housing policy, funding, and development decisions through
2028. The study analyzes demographic trends, housing inventory, affordability, and future needs.
## Findings
Growth & Demographics: Saint Peter continues to grow, with most new households projected to be
in older age ranges (55+). By 2028, nearly half of households will be age 55 or older.
Housing Production: The city averaged 58 new units per year (45 rentals, 13 owner-occupied) over
the past five years. Multifamily rental construction has been strong, but vacant lot supply is limited,
constraining new development.
Affordability: Median renter income is $39,000, and homeowner income is $99,000. 40% of renters
are cost-burdened, spending 30% or more of their income on housing. Rental occupancy rates are
very high, with low vacancies and waiting lists.
Senior Housing: No new specialized senior housing has been built since 2012, but demand is
expected to grow, especially for those 75+.
## Placeholder – Homes
29
| 24
## Recommendations
Rental Housing: Promote 180–220 new rental units over five years, including market-rate, moderate
rent/tax credit, subsidized, and senior-designated units.
Home Ownership: Support 110–120 new owner-occupied units, with emphasis on affordable and
entry-level homes. Most new construction should be mid- to high-priced ($350k+), with attached
single-family housing gaining market share.
Rehabilitation: Continue owner-occupancy and rental rehabilitation programs, especially for older
neighborhoods and multifamily structures. Address mobile home quality and encourage removal of
older units.
## Housing Stock and Market
## Housing Age
The housing stock in Saint Peter is not old: 47.7% of homes in the city were built after 1980, and only
17.7% were constructed prior to 1939. Older housing stock tends to require greater maintenance,
creating costs that are not always reflected in home values, thereby reducing the affordability of
homes within a buyer’s budget. A newer housing stock in a community with a commitment to
rehabilitation programs shows awareness of homes' long-term value to a community beyond their
current occupants, supporting homes that hold value and require less long-term maintenance.
## FIGURE 10 | HOUSING STOCK AGE
## 2024 American Community Survey 5-Year Estimates Selected Housing Characteristics
## Home and Tenure Occupancy
In Saint Peter, 65% of households are homeowners, with the remaining 35% residing in rental units.
As the 2024 housing study notes, the income disparity between rental and home-owning households
is significant. The share of renters has grown as developers have produced more rental housing units
in the city than owner-occupied units since at least 2020. Only 3.8% of households were moved into
from 2020 to the present that were owned, as opposed to 12.9% for rentals. The vacancy rate in
Saint Peter is 4.5% below the healthy market rate of 5%.
0%5%10%15%20%
2020-Present
2010-2019
2000-2009
1990-1999
1980-1989
1970-1979
1960-1969
1950-1959
1940-1949
1939-Before
## Percent of Housing Stock
## Year of Construction
30
| 25
## FIGURE 11 | OWNED AND RENTED HOUSING
## 2024 American Community Survey 5-Year Estimates Selected Housing Characteristics
## Home Values
Saint Peter’s median-value home is $250,700, which remains more affordable than the state median-
value home of $374,000. This contributes to the lower average mortgage as a percent of salary in the
community, which average’s 26.4% the household expenses on housing are considered affordable if
they are below 30%.
## FIGURE 12 | SAINT PETER HOMES BY VALUE
## Esri Economic Development Report
## Student and Senior Housing
With over 1,900 students, Gustavus Adolphus University in St. Peter is an integral part of the
community and a major part of the housing market. Students who are not housed on campus create
pressure on the housing market. This is often missed in census data that classifies households by
65%
35%
## Owner-Occupied
## Renter-Occupied
31
| 26
residency. For example, an apartment with 4 students from North Dakota who do not change their
permanent addresses will be counted in the population of their North Dakota towns while living in St.
Peter’s housing units. This underreports population and households and overreports vacancies as
students move out for the year.
The 2024 housing study noted a similar phenomenon with the senior housing facilities in the
community, such as the State Hospital, which is classified by the census in a manner that does not
count these housing units as households. This classification tends to understate the population's
housing needs, as these seniors in assisted housing environments remain in housing and continue to
generate a need for specialized housing in the market.
## Projections
Housing demand in Saint Peter will continue to be shaped by population growth, demographic shifts,
housing affordability, and local institutions. The City's growth is expected to generate demand for a
wider range of housing options, including workforce housing, senior housing, rental units, and
ownership opportunities. As Saint Peter plans for growth through 2050, maintaining an adequate
supply of housing while preserving affordability will be critical to supporting residents, employers, and
community vitality.
## Housing Unit Supply
Based on current growth trends and household projections, Saint Peter will need a steady pipeline of
new housing construction to accommodate anticipated demand through 2050. The 2024 Housing
Study identified a need for approximately 290 to 340 new housing units by 2028, consisting of both
rental and owner-occupied housing. Continued construction beyond the study period will be
necessary to meet future demand generated by population growth, an aging population, and
changing household preferences.
The limited supply of vacant residential lots within the city presents a challenge to meeting future
housing needs. As existing developable land becomes scarcer, the City will need to support infill
development, redevelopment opportunities, strategic neighborhood expansion, and infrastructure
investments that facilitate residential growth. Providing a variety of housing types will help ensure the
housing market can respond to changing demographic and economic conditions.
## Housing Unit Demand
Future housing demand will be influenced by both population growth and changes in household
composition. The 2024 Housing Study projects that a significant share of new households will be in
the 55 and older age groups, with nearly half of all households expected to be headed by individuals
age 55 or older by 2028. This trend will increase demand for age-friendly housing, accessible housing
options, and senior-oriented living arrangements.
At the same time, Saint Peter must continue to provide housing opportunities for young families,
workforce households, and Gustavus Adolphus University students. The city's role as a regional
employment center and college community contributes to housing demand that is not always fully
reflected in traditional population and household statistics. Maintaining a balanced supply of rental
and ownership housing will be essential to supporting workforce recruitment, economic development,
and long-term community stability.
## Housing Costs vs. Income
Housing affordability remains one of Saint Peter's most significant housing challenges. While home
values remain below statewide averages, housing costs continue to rise faster than many household
32
| 27
incomes. Approximately 40% of renter households are cost-burdened, meaning they spend more than
30% of their income on housing. Low vacancy rates and sustained demand for rental housing have
contributed to increasing rents and limited housing options for many residents.
As shown in Figure 9, projected increases in housing costs are expected to outpace income growth
over the long term. Rental costs are projected to increase by approximately 4% annually, while home
values are projected to grow by approximately 5% annually. Assuming more modest income growth,
affordability pressures are expected to intensify through 2050. The average mortgage payment is
projected to exceed the amount affordable to a household earning the Area Median Income before
2030, while rental costs will consume an increasing share of household incomes.
These trends underscore the importance of encouraging housing production at a variety of price
points, preserving existing affordable housing, supporting rehabilitation programs, and expanding
opportunities for workforce and entry-level homeownership. A diverse housing supply will help Saint
Peter remain an affordable and accessible community for residents of all ages, incomes, and
household types.
## FIGURE 13 | HOUSING COSTS THROUGH 2050
2024 American Community Survey 5-Year Estimates Selected Housing Characteristics, Esri Housing Market
## Characteristics Report
The median rent in Saint Peter is $961/month, and the average mortgage is $1,593/month. The rate
of inflation for rental units is approximately 4% annually, slightly higher than the 3% annual inflation.
Between 2026 and 2050, the median rent will begin to close in on the housing budget for a median-
income household. The current mortgage average is slightly below the housing budget for the median
income household in Saint Peter, but as home values grow at 5% annually, the gap between the
average mortgage payment and what the median income can afford will increase, surpassing the
100% AMI affordable rate before 2030.
33
| 28
## Housing Goals
Goal 4.1 Provide a Diverse Supply of Housing to Meet Community Needs
Policy 4.1.1: Encourage a variety of housing types, densities, and price points, including single-
family homes, townhomes, multifamily housing, workforce housing, student housing, senior
housing, and accessible housing to meet the needs of residents at all stages of life.
Policy 4.1.2: Support residential development that expands housing options for existing residents,
employees, students, seniors, and future households while maintaining compatibility with
surrounding neighborhoods.
## Goal 4.2 Promote Housing Attainability and Preserve Existing Housing Assets
Policy 4.2.1: Support the development of ownership and rental housing attainable to households
across a range of income levels, with particular emphasis on workforce, entry-level, and
moderate-income housing.
Policy 4.2.2: Encourage the maintenance, rehabilitation, and reinvestment of existing housing
stock to preserve neighborhood character, extend housing life cycles, and maintain affordability.
## Goal 4.3 Plan for Long-Term Housing Growth and Changing Demographics
Policy 4.3.1: Ensure an adequate supply of land, infrastructure, and development opportunities is
available to accommodate projected housing demand through 2050.
Policy 4.3.2: Promote housing that responds to Saint Peter's aging population, growing senior
housing needs, and the unique influence of Gustavus Adolphus College and institutional housing
on the local housing market.
Please see Sustainability Chapter for sustainable Goals and Strategies that relate to this
chapter.
34
| 29
## 5 | FACILITIES AND INFRASTRUCTURE
35
| 30
A reliable and resilient system of public facilities and infrastructure is essential to supporting Saint
Peter’s quality of life, economic vitality, public health, and future growth. As the community plans for
2050, investments in stormwater management, utilities, emergency services, parks, and public
facilities must be coordinated with anticipated development patterns, changing environmental
conditions, and government mandates.
Saint Peter benefits from a well-established network of public infrastructure, including the advantage
of owning its own municipal water, wastewater, stormwater, electric, and emergency service systems.
Recent planning efforts—including the 2008 Stormwater Master Plan, 2024 Stormwater Resiliency
Plan, utility system studies, and capital improvement planning—provide a foundation for managing
growth while maintaining service reliability and environmental stewardship.
## Stormwater Management
## Existing Conditions
Stormwater management is one of Saint Peter’s most significant infrastructure challenges due to
rapid runoff, sensitive groundwater resources, agricultural runoff from the west, aging portions of the
storm sewer system, and increasingly intense rainfall events. The city’s storm sewer pipe network is
generally designed to convey a 10-year storm event, while regional storage and flood control features
are designed to accommodate 100-year storm events.
## Placeholder – Infrastructure
36
| 31
Flood resilience has improved significantly in recent years. In 2015, MnDOT raised TH 169 north and
south of Saint Peter, allowing the highway to remain open during a 100-year flood event. As a result,
most of the city’s transportation network remains accessible during major flooding. When the
Minnesota River reaches a 100-year flood elevation, roadway impacts within the city are generally
limited to the TH 99 bridge crossing, the Front Street and Walnut Street intersection, and portions of
Freeman Drive on the south side of the city. While regional flood risk has been reduced, continued
stormwater management investments remain important to address localized flooding, protect
infrastructure, and accommodate increasingly intense rainfall events.
The Minnesota River, Robart’s Creek, and local wetlands receive stormwater discharges from the
community. Portions of the system were constructed before current water-quality standards and
include direct discharge points with limited treatment. Development pressure and increasing
impervious surface coverage place additional demands on the system and contribute to flooding,
erosion, and water-quality concerns. Coupled with the same concerns for the Minnesota River’s
upstream watershed increases the risk of Minnesota River flooding, and adverse impacts to city
residents and infrastructure.
Since the inception of stormwater management in the 1990’s, Saint Peter has been proactive with
planning for stormwater rate and volume control. The city has taken a regional basin approach
meaning they have planned and designated locations for regional stormwater treatment. The regional
basin concept reduces the overall number of basins to report and monitor. Until regional basins are
constructed, temporary and smaller basins are installed, then filled when no longer needed.
Saint Peter’s location over highly permeable soils and the Jordan Aquifer create unique challenges.
Stormwater management practices must balance groundwater recharge benefits with protection of
drinking water resources from nitrate contamination and other pollutants.
Recent studies identified localized system constraints and flooding concerns near the TH 169
corridor, Nichols Street, Swift Street, Hallett Pond, and other portions of the existing drainage
network.
## Future Needs and Direction
By 2050, Saint Peter should continue transitioning toward a watershed-based stormwater
management approach that emphasizes regional treatment, water quality improvement, groundwater
protection, and climate resilience.
The 2024 Stormwater Resiliency Plan prioritized best management practices such as wetlands,
storage ponds, saturated buffers, bioreactors, two-stage ditches, and other projects that can reduce
flooding while improving nitrate removal and water quality. These projects should be pursued as
funding becomes available and coordinated with development activity.
Future investments should focus on:
• Expanding and retrofitting regional stormwater facilities.
• Promoting onsite stormwater treatment, such as green depressions and perforated
underground piping, for sites with limited space.
• Protecting wellhead protection areas and groundwater resources.
• Reducing flood risks associated with more intense precipitation events, including spring
flooding from snowmelt
• Improving water quality before discharge to the Minnesota River and local waterways.
• Maintaining compliance with MS4 permit requirements and evolving state and federal
regulations.
37
| 32
• Preserving green corridors, wetlands, and natural drainage pathways for storm events
exceeding 100-years.
• Coordinating stormwater improvements with parks, trails, and open space systems.
## Electric Utility
## Existing Conditions
Saint Peter owns and operates a municipal electric utility that provides local control over electric
service, reliability, and long-term system planning. The city’s electric system includes three 69 kV to
13.8 kV substations: the Main/Front Substation, Broadway Substation, and Sunrise Substation. The
system is served by an external 69 kV transmission network and includes two underground internal
69 kV transmission lines connecting the city’s substations.
The city’s electric distribution system operates at 13.8 kV and is entirely underground. Much of the
system was rebuilt after the 1998 tornado, which has contributed to a high level of reliability and
reduced exposure to weather-related outages. The system currently includes 14 load-serving circuits
distributed among the three substations.
Electric demand has continued to increase. The 2021 Electric System Master Plan found that
summer peak demand increased by approximately 1.5 percent annually over the previous decade,
with the overall system peak reaching 23,492 kW in 2019. The plan projected peak demand to grow
from 22,025 kW in 2020 to approximately 27,533 kW by 2030.
Although the system performs well under normal operating conditions, the master plan identified
reliability and capacity concerns under contingency conditions, such as the loss of a substation
transformer, switchgear bus, or feeder. Identified issues include voltage drop concerns, transformer
loading constraints, aging equipment at the Main/Front Substation, and obsolete control equipment at
the Broadway generation plant.
Future Needs to 2050
By 2050, Saint Peter’s electric system must continue to support residential growth, commercial and
industrial development, institutional users, electric vehicle charging, and broader electrification trends.
The city should continue using the Electric Master Plan as a guide for capital improvements, system
redundancy, and growth-area planning.
The Electric Master Plan recommends maintaining N-1 reliability, meaning the system should be
able to operate during peak load with the loss of a single major component. This standard will remain
important as the city grows and as residents and businesses become increasingly dependent on
reliable electric service.
Key long-term priorities include replacing aging substation equipment, upgrading indoor switchgear,
improving feeder ties, adding Broadway Substation capacity, constructing new feeders, and
continuing regular system reviews every three to five years. These improvements will help maintain
reliability, expandability, and operational flexibility as Saint Peter approaches 2050.
## Water System
## Existing Conditions
Saint Peter’s municipal water system includes groundwater wells, two water treatment plants, two
500,000-gallon water towers and a 267,000-gallon and 2,000,000-gallon ground reservoir, two
38
| 33
pressure zones, booster facilities, and a distribution network serving residential, commercial,
institutional, and industrial users. Together, the water system can produce 3.3 million gallons of water
per day. The 2024 Water Model Update evaluated system performance based on pressure, fire flow,
pipe velocity, and headloss.
The water model was updated to reflect watermain improvements since 2020, corrected pipe
diameters from GIS data, and updated average and maximum daily demand. Hydrant testing
completed on July 24, 2024 was used to calibrate the model. This provides the city with a current tool
for evaluating system performance and guiding infrastructure decisions.
Model results indicate that system pressures generally meet recommended performance standards.
Under average daily demand, pressures range from 42 to 94 psi in the Upper Pressure Zone and 44
to 91 psi in the Lower Zone. Under maximum daily demand, pressures range from 35 to 87 psi in the
Upper Zone and 32 to 79 psi in the Lower Zone.
Available fire flow is generally adequate in much of the system, but localized deficiencies exist. Under
maximum daily demand, modeled fire flows range from 600 to more than 5,000 gpm in the Upper
Zone and 600 to 4,200 gpm in the Lower Zone. Several locations fall below the recommended 1,000
gpm residential fire-flow benchmark, typically where dead-end or small-diameter watermains limit
capacity.
39
| 34
## FIGURE 14 | PUBLIC INFRASTRUCTURE MAP
40
| 35
Future Needs to 2050
Through 2050, Saint Peter should continue focusing on maintaining water quality and system
reliability. Priority improvements include looping dead-end watermains, extending parallel mains along
the boundary between pressure zones, and strengthening service to critical facilities such as the two
Regional Treatment Center (RTC) campuses, one in each pressure zone.
The 2024 Water Model Update identifies several specific improvement concepts, including looping
Church Street north of Woodland Street to Sunrise Drive, extending parallel mains along South
Washington Avenue toward College Avenue, extending Upper Zone watermain along Lincoln Drive
between Grace Street and Sioux Lane, and extending an additional feed to each RTC campus.
The City’s 2007 Water Master Plan recommends the installation of 12-inch diameter watermains to
the growth area west of Sunrise Drive. As development occurs, the city has been proactive with
extension of the 12-inch watermains to the west along CR 15, Traverse Road, Broadway Avenue,
and Jefferson Avenue. These 12” watermains have been looped by connecting to each with a 12-inch
watermain installed along Nicollet Avenue between Broadway Avenue and CR 15, and along
Jefferson Avenue south of Broadway Avenue. The current watermain extensions and looping
provides ample opportunity for water demands expected by residential, commercial, and even
industrial development to the west.
In 2009, the city was able to upsize their watermain in TH 169 (Minnesota Avenue) between Jefferson
Avenue and Ramsey Street. This greatly improved fire flow and pressure in the downtown corridor.
During the 2023 TH 169 Improvements between TH 99 and TH 22 on the south end of town, a 12-
inch watermain was extended south within TH 169 between Jefferson Avenue and the frontage road
along the west side of the highway. In the future, this 12-inch watermain is proposed to continue west
on 3
rd
Street and connect to the existing 12-inch watermain in S Washington Avenue. Once
completed, the city will have 12-inch watermain along its east edge, improving pressure and flow in
the entire TH 169 corridor between Union Street and TH 99 west.
A 12-inch watermain was also stubbed across TH 169 toward the Minnesota River at TH 22 south. If
needed, this stub makes water available to development east of the Minnesota River in Le Sueur
County. If needed in the future, the 12-inch watermain could also serve the water needs for the City of
Kasota.
Future development approvals should include a water system review to confirm adequate pressure,
fire flow, pipe velocity, and headloss for watermain sizing. This will help ensure that growth areas are
served efficiently and that higher-intensity land uses are phased with necessary water infrastructure
improvements.
## Wastewater Collection and Treatment
## Existing Conditions
Saint Peter’s Wastewater Treatment Facility is located at 400 St. Julien Street and is classified as a
Major Class A facility including preliminary treatment, rapid mix and flocculation, primary clarification,
biological aerated filters, ultraviolet disinfection, and biosolids handling. Once wastewater is treated,
the resulting clean water discharges to the Minnesota River. The wastewater treatment plant was
constructed new in 2002.
The WWTF is designed for an average dry weather flow of 2.0 MGD, average wet weather flow of
4.0 MGD, and peak hourly wet weather flow of 11.1 MGD. Existing flows remain below design
capacity, but wet-weather peaks indicate inflow and infiltration concerns within the collection system.
41
| 36
The 2024 WWTF Facility Plan projects Saint Peter’s population to increase to approximately 14,700
residents by 2045, representing about 20 percent growth over the planning period. The facility plan
used a 20-year design horizon to guide wastewater flows, loadings, and future treatment needs.
While the facility has adequate hydraulic capacity for projected growth, many major components are
aging and require rehabilitation or replacement. Identified needs include improvements to the main lift
station, pretreatment system, rapid mix and flocculation, primary clarifiers, biological aerated filters,
biosolids handling, building systems, HVAC, and odor control.
Sanitary sewer wastewater is delivered to the wastewater treatment facility by a series of pipe and
two large pump lift stations. Although piping installed prior to 1970 is likely vitrified clay pipe (VCP)and
susceptible to groundwater inflow & infiltration (I&I), the city has chosen to line VCP within the
Minnesota River Floodplain. If outside the floodplain, the VCP sanitary sewer is replaced with new
polyvinylchloride (PVC) pipe whenever a roadway is reconstructed. PVC pipe is gasketed and
prevents groundwater I&I.
Like watermain, large sanitary sewer piping has been extended west of Sunrise Drive, deep enough
to serve future west growth area. A combination of 10-inch and 12-inch PVC pipe is at the current
westerly City Limits along CR 15, Clark Street, Traverse Road, Broadway Avenue, and Jefferson
Avenue. Newer PVC sanitary sewer pipe can be extended to the west as needed in the future to
serve residential, commercial, and industrial development both west and north of the city.
Future Needs to 2050
The WWTF Facility Plan recommends a major rehabilitation program to extend the useful life of the
facility, improve operational efficiency, address safety and odor concerns, and prepare for future
regulatory requirements. Recommended improvements are estimated at approximately $25 million
to $35 million, with construction generally anticipated between 2025 and 2027.
A major long-term issue is nutrient regulation. The plan anticipates that future total nitrogen limits may
be imposed within the next 5 to 15 years. If that occurs, the city may need to add post-anoxic
denitrification treatment, estimated at approximately $14 million to $16 million.
The plan also recommends transitioning to a biosolids heat-drying process as the preferred long-term
biosolids strategy. Heat drying would reduce odors, improve operator safety, reduce hauling volume,
and better position the city for future PFAS-related biosolids regulations.
Collection system improvements should also remain a priority. The facility plan identifies replacement
of approximately 2,200 linear feet of sanitary sewer in coordination with TH 169 and Front Street
improvements, helping reduce inflow and infiltration while avoiding duplicative street restoration.
## Municipal Buildings and Civic Facilities
## Existing Conditions
Saint Peter’s municipal buildings and civic facilities support the daily operations of local government
and provide essential public services to residents, businesses, and visitors. These facilities include
City Hall and administrative offices, Public Works facilities, utility operations buildings, maintenance
shops, equipment storage areas, fleet facilities, and community-facing public buildings such as the
library and community center.
City-owned facilities play an important role in service delivery, including administration, inspections,
permitting, utility operations, public meetings, community programming, emergency coordination, and
42
| 37
public information access. These buildings also support the city’s ability to maintain infrastructure,
respond to service requests, and manage capital improvements across departments.
As Saint Peter continues to grow, municipal facilities must remain accessible, efficient, safe, and
appropriately sized for staffing, equipment, fleet storage, technology, and public service needs. Public
input during the comprehensive planning process emphasized the importance of maintaining high-
quality city services, managing costs, and investing responsibly in public infrastructure and facilities.
Future Needs to 2050
Through 2050, Saint Peter should continue evaluating municipal buildings and civic facilities as part
of long-term capital improvement planning. Facility decisions should consider building condition,
accessibility, energy efficiency, operational needs, public access, staffing levels, equipment storage,
fleet needs, and the ability to adapt to changing service demands.
Future priorities may include:
• Maintaining and modernizing City Hall and administrative spaces to support efficient public
service delivery.
• Ensuring Public Works and utility operations facilities have adequate space for staff,
equipment, materials, fleet vehicles, and emergency response needs.
• Incorporating accessibility, safety, energy efficiency, and technology improvements into facility
upgrades.
• Coordinating facility investments with broader infrastructure planning, utility improvements, and
emergency preparedness efforts.
• Evaluating community-facing facilities, such as the library and community center, to ensure
they continue meeting resident needs for public access, programming, information, and
gathering space.
By 2050, Saint Peter’s municipal buildings and civic facilities should continue to provide reliable,
accessible, and cost-effective support for city operations and community services while reflecting
responsible stewardship of public resources.
## Emergency Services and Public Safety Facilities
## Existing Conditions and Future Direction
Saint Peter’s public safety system includes police, fire, emergency response coordination, emergency
management, and regulatory enforcement functions. The Saint Peter Police Department includes 13
sworn officers and three civilian employees serving a population of more than 12,456 residents.
Fire protection is provided by the Saint Peter Volunteer Fire Department, an all-volunteer agency
established in 1869. The department has 32 members and provides fire suppression, rescue
operations, public education, and fire prevention services. The Fire Department’s service area
includes the City of Saint Peter and portions of Lake Prairie, Oshawa, and Traverse Townships,
covering approximately 90 square miles. The fire station is located at 602 Sunrise Drive, near the
Broadway Avenue/Sunrise Drive intersection.
Saint Peter also maintains emergency management and resilience functions through planning for
extreme weather, utility disruptions, public health needs, and infrastructure continuity. The City has
participated in regional climate vulnerability and adaptation planning and has identified municipal
facilities as resources during extreme heat events.
43
| 38
The City’s MS4 Enforcement Response Procedures also support public safety and environmental
protection by establishing procedures for construction stormwater violations, illicit discharges, post-
construction stormwater issues, enforcement actions, MPCA referrals, and recordkeeping.
## 2050 Facilities and Infrastructure Direction
As Saint Peter grows toward 2050, public safety planning should ensure that police, fire, EMS
coordination, and emergency management capacity keep pace with population growth, future
development, institutional needs, and regional service demands.
Future planning should evaluate:
• Police staffing levels, call volumes, response times, equipment, and facility needs.
• Fire Department volunteer recruitment, training, equipment, station capacity, and service-area
demands.
• EMS coordination and emergency medical response capacity.
• Emergency access to new subdivisions, redevelopment areas, schools, healthcare facilities,
downtown, and major corridors.
• Mutual aid reliance and regional emergency coordination.
• Facility resilience, backup power, communications, and continuity of operations.
By 2050, Saint Peter should maintain a public safety system that provides adequate staffing,
volunteer capacity, emergency access, modern facilities, reliable equipment, and coordinated
emergency management to protect residents, businesses, institutions, and surrounding service areas.
44
| 39
## Facilities and Infrastructure Goals
## Goal 5.1: Maintain Reliable, Cost-Effective Public Infrastructure
Policy 5.1.1: Prioritize maintenance, rehabilitation, and replacement of existing infrastructure
before major system expansion, especially where aging facilities create service, safety, or cost
concerns.
Policy 5.1.2: Use capital improvement planning, utility studies, and lifecycle cost analysis to
sequence infrastructure investments in a financially responsible manner that balances service
needs with affordability concerns expressed by residents.
## Goal 5.2: Strengthen Stormwater Resilience and Water Resource Protection
Policy 5.2.1: Implement regional stormwater improvements, green corridors, and best
management practices that reduce flooding, improve water quality, and protect the Minnesota
River, Robart’s Creek, wetlands, and the Jordan Aquifer.
Policy 5.2.2: Require future development and redevelopment to manage runoff through
stormwater treatment, rate control, infiltration protection, and preservation of emergency overflow
routes, particularly in wellhead protection and growth areas.
Goal 5.3: Provide Safe and Adequate Water Service for Existing and Future
## Development
Policy 5.3.1: Maintain water system pressures, fire flows, and distribution capacity consistent with
accepted engineering standards and public safety needs.
Policy 5.3.2: Prioritize watermain looping, dead-end elimination, and service redundancy
improvements to strengthen fire protection, water quality, and reliability for neighborhoods, growth
areas, and critical facilities.
## Goal 5.4: Sustain Wastewater Capacity, Compliance, and Long-Term Treatment
## Reliability
Policy 5.4.1: Complete planned wastewater treatment facility rehabilitation to extend facility life,
improve operational efficiency, and prepare for future regulatory requirements.
Policy 5.4.2: Reduce inflow and infiltration within the sanitary sewer collection system by
coordinating sewer improvements with street reconstruction, utility upgrades, and redevelopment
projects.
## Goal 5.5: Support a Reliable and Resilient Municipal Electric System
Policy 5.5.1: Continue implementing electric system improvements that maintain reliability,
support projected load growth, and provide adequate redundancy under contingency conditions.
Policy 5.5.2: Coordinate electric utility planning with future land use, economic development,
institutional growth, and emerging demands such as electric vehicle charging and increased
electrification.
Please see Sustainability Chapter for sustainable Goals and Strategies that relate to this
chapter.
45
| 40
## 6 | TRANSPORTATION
46
| 41
Transportation is central to the economic, social, and environmental well-being of the City of Saint
Peter and the surrounding area. This chapter presents a strategic approach to improving connectivity,
strengthening infrastructure resilience, and expanding access for residents and visitors. Through
targeted investments and recommendations, Saint Peter can build a transportation network that
supports daily travel needs while advancing long-term growth and prosperity.
The remainder of this chapter discusses existing roadways, nonmotorized transportation facilities,
transit service, future project opportunities, and goals for transportation in the community. The
following sections and figures describe various components of the existing transportation system in
Saint Peter today.
## Existing Transportation System
## Jurisdictional Classification System
Roadway jurisdictional classification identifies which level of government or agency owns, maintains,
and administers a specific road. Specific items that are associated with jurisdictional ownership
include an agency’s responsibilities for snowplowing, resurfacing, and major reconstruction. Other
jurisdictional considerations involve design policies and standards, including speed limits, load limits,
and multimodal accommodation. The standard levels of jurisdictional classification are state, county,
municipal (city/township), and private. Figure 15 illustrates the roadway jurisdiction of roadways within
and surrounding Saint Peter and depicts recent traffic volumes on these roadways.
## Placeholder – Transportation
47
| 42
## State Roadways
•State highways, such as US Highway (US) 169, Trunk Highway (TH) 22, and TH 99 are owned
and maintained by the Minnesota Department of Transportation (MnDOT).
•US Highway 169 is the primary north-south transportation corridor in Saint Peter that connects
the community north to Belle Plaine, Jordan and continues to the southwestern suburbs and
into the heart of the Twin Cities Metropolitan Area. To the south, US 169 connects to the cities
of Mankato and North Mankato. US 169 is complemented by Trunk Highway (TH) 22 and TH
99.
•TH 22 to the south passes through the cities of Kasota and Mankato and connects to US 14.
To the north, TH 22 connects to TH 111 northwest of Saint Peter and continue north to the City
of Gaylord and connects to TH 19, and US 212 near Glencoe.
•TH 99 provides east-west mobility and connects Saint Peter to communities to the east
including Cleveland and LeCenter and to the west passing through the City of Nicollet and
connecting to US 14
## County Roadways
Nicollet County owns and maintains several County State Aid Highways (CSAH) and County Roads
within the City of Saint Peter. County Highway 5 (Broadway Avenue), CSAH 15 (Klein Street), and
CSAH 20 serve portions of Saint Peter, along with County Roads 51 (W Traverse Road) and County
Road 74 (Sunrise Drive).
## City Streets
The City of Saint Peter has a comprehensive network of local streets. City streets are typically closely
spaced shorter routes that primarily focus on providing land access and connections between
neighborhoods and major traffic generators such as industrial parks, shopping centers, and medical
or education complexes.
## Township Roads
The City of Saint Peter is surrounded by two townships (Oshawa and Traverse), which have a
network of regularly spaced township roadways that provide access to agricultural fields and low
density rural residential land uses. Township roads provide connections to state highways, the
Nicollet County roadway system and, in some cases, to city streets. Township roads commonly carry
low levels of traffic and have minimal design features including gravel surfaces.
48
| 43
## FIGURE 15 | ROADWAY JURISDICTIONS & TRAFFIC COUNTS MAP
49
| 44
## Functional Classification System
Functional classification is a system by which roadways are grouped according to the function they
are intended to serve. Basic to this process is the recognition that individual roadways do not function
independently, rather most travel involves movement along a network of different functional types of
roads. In simplistic terms, “functional classification” involves determining what role (level of mobility
versus property access) each roadway should perform prior to determining its design features, such
as street widths, design speed, and intersection control. Furthermore, functional classification is an
important consideration in the development of local land use regulations. Careful management of site
development and access spacing standards should protect the mobility of higher classified roadways.
Transportation problems commonly occur when a roadway’s design and the management of access
to the roadway are inconsistent with the functional and operating demands imposed by the
surrounding land uses.
The Federal-Aid Highway Act of 1973 first established the functional classification concepts,
procedures, and criteria that are still being utilized today. Four basic functional classification
categories are typically used for transportation planning: Principal Arterials, Minor Arterials,
Collectors, and Local Roadways.
The Federal Highway Administration has established guideline ranges for travel volume (vehicle miles
traveled) and mileage percentage recommendations for each of the four functional classification
categories for both urban and rural areas. MnDOT, Nicollet County, and Saint Peter have designated
their roadways in a fashion that complies with the intent of the federal standards.
## FIGURE 16 | LAND ACCESS AND MOBILITY RELATIONSHIP BY FUNCTIONAL CLASSIFICATION
## Source:
## Note: Percentage of
recommended roadway mileage
by functional classification
50
| 45
A functional classification system also provides a means for identifying roadways which are oriented
toward providing mobility for through trips (Principal and Minor Arterials) versus those that are
oriented more toward providing accessibility or land access (Collectors and Local Streets). Figure 16
depicts the relationship between land access and mobility and how the different classifications of
roads provide varying degrees of mobility versus land access. Figure 17 depicts the basic framework
and layout of the functional classification system of roads in Saint Peter.
## Principal Arterials
These roadways largely serve interstate and statewide travel, connecting large activity centers and
attracting relatively long trips. Principal arterial routes generally have higher speed limits and may
include additional travel lanes, turn lanes, and other design features to safely and efficiently move
traffic. In Saint Peter, US 169, and TH 22 south towards Mankato are the only principal arterial
roadways in the community.
## Principal Arterial Roadway Characteristics:
• Emphasis on mobility rather than providing land access, with exception of urban core areas
• High speed design with travel speeds of 55 mph or greater in rural areas
• Serve longer trips (regional, inter-county, state-wide)
• Commonly spaced at larger intervals (6-plus miles apart)
## Minor Arterials
Minor Arterials are commonly higher volume roadways that interconnect with the principal arterial
system and provide connections to surrounding communities and access to more developed areas.
Minor Arterial routes continue to favor mobility but may have higher levels of access to surrounding
developments.
Minor arterials are intended to connect important locations both inside and outside of Saint Peter. The
function of this type of roadway is intended to provide service for trips of moderate length at a
somewhat lower level of mobility than principal arterials. However, minor arterials should continue to
have a greater focus on mobility rather than providing land access. Minor Arterials generally connect
to principal arterials, other minor arterials, or major collectors. They are commonly of regional
importance because they relieve traffic on, or substitute for principal arterials when necessary. In
Saint Peter, the following roadways are classified as minor arterials: East and west junctions of TH
99; the portion of TH 22 from US 169 to Sunrise Drive; and the segment of Broadway Avenue
between US 169 and Washington Avenue.
## Minor Arterial Roadway Characteristics:
• Emphasis more on mobility rather than providing land access
• Higher speed design (35-40 mph or greater)
• Serve longer (regional, inter-county, inter-city) trips
## Collectors
Within a functional classification system there are collector roadways, which provide a balance
between land access and mobility. Collector roadways are designed to serve shorter trips that occur
primarily within the city, and to collect and distribute traffic from one part of the community to another
and from employment centers to the arterial system. These roadways can be part of the county
roadway system as well as the local street system.
The classification of collectors into major or minor collectors is based on their location and the type of
service they provide. According to the Federal Highway Administration (FHWA), major collector routes
51
| 46
are generally longer in length, have higher traffic volumes, provide less frequent access, and are
spaced at greater intervals compared to Minor collectors
1
. Major collectors in Saint Peter include, but
not limited to portions of County Highway 5, TH 22 (west of Sunrise Dr.), N. Washington Avenue,
Broadway Avenue west of Washington Ave., St. Julian Street between US 169 and N. Washington
Ave., Sunrise Drive, and County Highway 20. Examples of Minor collectors include portions of Front
Street, Union Street, Old Minnesota Avenue, Traverse Road, Grace Street, S 3rd Street, Jefferson
Street, Nicollet Avenue, and County Road 15.
## Collector Roadway Characteristics:
• Emphasis equally balanced between mobility and providing land access for major collectors
and more focused on land access for minor collectors
• Serving shorter length trips and commonly spaced at least 1/4-mile apart in urban areas
• Travel speeds typically range from 30-40 mph in urban areas
## Local Roadways
Local roadways have the most mileage of any type of roadway in Saint Peter. Local streets operate at
slower travel speeds and are designed to have high accessibility and connectivity to collector roads
and arterial routes. Local roadways are not designed or intended for longer trips and through travel.
The City of Saint Peter has developed a series of roadway design standards organized by roadway
type and functional classification. This information is used for new developments and during roadway
reconstruction planning and design.
## Local Roadway Characteristics:
• Local roads provide the highest level of direct property access and typically carry lower traffic
volumes at slower speeds (30 mph or less).
• Typically, they serve trips that range from one city block in urban areas to less than 2 miles in
rural areas.
• Local roadways are spaced as needed
1 FHWA’s Highway Functional Classification Concepts, Criteria and Procedures - 2023 Edition provides extensive guidance on roadway functional
classification (https://www.fhwa.dot.gov/policyinformation/hpms/hfcccp.cfm).
52
| 47
## FIGURE 17 | FUNCTIONAL CLASS MAP
53
| 48
## Multimodal Facilities
The City of Saint Peter has a variety of modal transportation users and services, including transit,
trucking, bicyclists, and pedestrians.
The Minnesota River Valley Transit (MRVT) offers public transit in Saint Peter. Transit rides are a Dial-
a-Ride (DAR) only service and include trips within the City of Saint Peter as well as trips to/from
Kasota and LeSueur. TRUE Transit offers community DAR service throughout Blue Eart, Nicollet, and
Le Sueur Counties. The GUS Bus is a student transit service provided in conjunction with Gustavus
Adophus College. Rides are provided to active students on Friday and Saturday nights throughout the
academic school year.
Saint Peter’s commercial, industrial, and manufacturing employers depend on the trunk highway
system, including US 169, TH 22, and TH 99, to move goods safely and efficiently to and from the
city, supporting a strong and growing local economy.
Pedestrian facilities, which include sidewalks, shared use paths, and crosswalks, are an important
aspect of the transportation system in Saint Peter. In addition to allowing pedestrians, shared use
paths are meant to be shared with bicyclists. Sidewalk and shared use trails allow for pedestrians and
bicycles to move freely, safely, and efficiently through the city. In spots where safe pedestrian facilities
are unavailable, pedestrians may be forced into unsafe decisions, like walking in the street, crossing
the street in dangerous locations, or be forced into taking unnecessary, short-distance vehicle trips.
The bicycle and pedestrian network in Saint Peter is shown in Figure 17.
Existing city policies promote new sidewalks along the road or trails where planned. Private
developers are required to install sidewalks on both sides of local streets, unless authorized in the
subdivision process to only construct a sidewalk one side of the street. Efforts have also been made
to add new sidewalks and/or shared use paths to existing roads as part of local roadway
reconstruction projects.
This has helped improve
user safety and
connectivity by closing
gaps in the
pedestrian/bicycle network.
Although substantial
investments and needed
improvements have been
made to US 169, the
corridor continues to limit
pedestrian movement
through the community.
## Source: Google Maps (US 169 at Walnut St.)
54
| 49
Higher speeds on the north and south sides of Saint Peter make crossing the wide, four-lane divided
highway unsafe, while heavy traffic volumes downtown reduce gaps for safe pedestrian crossings.
Between Broadway Avenue and College Avenue, several marked crosswalks, some with pedestrian
refuges, curb bump-outs, push buttons, countdown timers, and signalized intersections, provide
pedestrian crossing accommodations in downtown Saint Peter and nearby areas.
55
| 50
## FIGURE 18 | BICYCLE & PEDESTRIAN FACILITIES MAP
56
| 51
## Crash Data Review
Ensuring safe travel is one of the primary concerns for agencies responsible for improving and
maintaining transportation facilities. Safety concerns often result when a roadway or system of roads
inhibits the efficient movement of travel. Other safety problems can arise due to traffic volumes on a
particular roadway, an intersection approaching or exceeding the design capacity of the intersection,
or geometric design deficiencies (e.g., intersection control type, restricted sightlines, etc.) that
contribute to unsafe or inefficient conditions.
To evaluate potential safety issues within Saint Peter, a high-level crash analysis was performed
using the Minnesota Department of Transportation’s Crash Mapping Software (MnCMAT2) for
crashes reported between July 2021 and June 2026. Crash data was collected for state highways,
county state-aid highways, county roads, and city streets. Figure 18 illustrates the five-year crash
history for roadways within the Saint Peter area. It should be noted that the figure only reflects
“reported” crashes, so instances where no law enforcement officer responded to a crash site or if a
crash report were not completed, would not be shown in this assessment.
As shown in Figure 18, crashes are most concentrated at intersections and along higher-volume
corridors. The crash heat map visually identifies high-frequency crash areas but does not show the
total number of reported crashes. Locations with higher crash concentrations or fatal and serious
injury crashes should receive greater attention.
Highway 169 had the highest number of crashes, likely due to higher traffic volumes and frequent
access points serving both local and regional travel. Several crashes were also reported along
Highway 22 (north junction), including at the Washington Avenue and Sunrise Drive intersections.
Ongoing monitoring and coordination with MnDOT is recommended to determine the timing and type
of intersection safety improvements.
Local street intersections were also reviewed for potential crash “hot spots.” The intersection of
Broadway Avenue and Sunrise Drive is shown as having a safety concern, but this intersection was
recently reconstructed that included a roundabout configuration to improve safety and traffic flow. The
intersections listed below should be monitored, and if safety concerns are identified, a more detailed
safety study should be completed to define issues and potential mitigation options.
## • Broadway Avenue and Washington Avenue
• Broadway Avenue and 3
rd
## Street
## • Washington Avenue and College Avenue
Potential cause and analysis of crashes at a particular intersection was not conducted for this
analysis. A rigorous roadway safety audit and/or intersection control evaluation with detailed analysis
tools is needed to better understand the traffic operations and provide the detailed crash history for
each site.
57
| 52
## FIGURE 19 | FIVE-YEAR CRASH SUMMARY MAP
58
| 53
## Traffic Volumes
Traffic counts were obtained from online resources including MnGEO and MnDOT’s Traffic Mapping
Application. The Average Annual Daily Traffic (AADT) and heavy commercial annual average daily
traffic volumes are displayed in Figure 15. Existing traffic counts help determine future roadway
needs, including repairs, maintenance, and potential capacity expansion.
Capacity constraints on the local and regional roadway system were evaluated using current traffic
volumes. Traffic operations data shows that noticeable issues typically begin when volumes approach
approximately 85 percent of a roadway’s design capacity. For a two-lane road, this generally occurs
when traffic exceeds 10,500 to 12,000 trips per day (see Table 2).
Roadway level of service (LOS) is commonly used to assign a value to the level of congestion and
efficiency of the roadway. LOS is a measure of delay and operating conditions defined by the
Highway Capacity Manual using a grading scale from A to F. LOS A and B indicate conditions when
traffic demand is well below the roadway capacity and travel is free-flowing. At LOS C, the average
speed decreases and slower traffic and turning traffic may cause delays. At LOS D, traffic volumes
approach a roadway’s functional capacity, stoppage and delays begin to occur regularly, the average
speed is reduced during peak travel times, and passing is challenging and may be unsafe. At LOS E,
traffic demand exceeds capacity, drivers are choosing other routes and times to travel, and any
disturbance to the traffic flow, such as turning traffic, quickly drops roadway operations LOS F. At LOS
F, traffic demand far exceeds capacity, heavy congestion is prevalent, long periods of stop and go
conditions occur, and travel time is severely degraded.
## TABLE 2 | AVERAGE ANNUAL DAILY TRAFFIC (AADT) PLANNING LEVEL CAPACITIES BY
## FACILITY TYPE
## Roadway Type
## Level of Service Based on AADT
## LOS A LOS B LOS C LOS D* LOS E LOS F
Two-Lane <8,000
8,000-
9,500
9,250-
10,750
10,500-
12,000
11,750-
13,250
>13,250
Three-lane (center
left turn lane)
<9,000
9,000-
12,000
11,500-
14,500
14,000-
17,000
16,500-
19,500
>19,500
## Four-lane
(undivided)
<12,000
12,000-
15,000
14,500-
17,500
17,000-
20,000
19,500-
22,500
>22,500
Four-lane (divided
with center
median)
<19,000
19,000-
22,000
21,500-
24,500
24,500-
27,000
26,500-
29,500
>29,500
* ADT associated with LOS D represent traffic volumes approaching 85-percent of a roadways
design capacity.
The capacity thresholds listed in Table 2 were considered for the various roadways throughout Saint
Peter to assess the operations of the existing system. The capacity table provides a means to
determine what typical roadway sections would be generally acceptable at various levels of traffic.
The information contained in the table was also utilized in an assessment of capacity constraints.
According to existing traffic volumes, US 169 south of downtown has traffic volumes that appear to
exceed the capacity of the four-lane roadway. Recent roadway and intersection control improvements
have been constructed south of Jefferson Avenue and while these changes have improved safety
through intersection control and geometric improvements, the total volume of traffic results in travel
time delays during morning, and evening peak travel periods.
59
| 54
## Airport
There is no local or regional airport within the City of Saint Peter. The nearest airfield is the Mankato
Regional Airport (MKT), which is located approximately 6-miles south of Saint Peter at 3030 N. Airport
Road, Mankato, MN. Currently, no commercial airline service is provided to/from the airport. North
Star Aviation is the fixed-based operator (FBO) for full- and self-service contracting at the airport.
## Transportation System Analysis of Future Needs
As the City of Saint Peter approaches a projected population of approximately 14,700 residents by
2045 and beyond, transportation investments will need to support continued residential growth,
economic development, and changing mobility preferences while maintaining safe and efficient travel
for all users.
A primary transportation objective for the 2050 planning horizon is the creation of a more connected,
safe, and accessible multimodal network. The City’s Active Transportation Plan proposes expanding
the network across the community to nearly 70 miles of sidewalks and approximately 50 miles of
bikeways and shared-use paths, including new shared-use paths, bike boulevards, and enhanced
pedestrian facilities. Priority active transportation corridors include:
## • Broadway Avenue
## • Washington Avenue
## • Sunrise Drive
• 3rd Street
These corridors offer opportunities to strengthen connections among neighborhoods, schools, parks,
downtown businesses, Gustavus Adolphus College, healthcare facilities, and employment centers.
Future improvements could include buffered bike lanes, separated facilities, shared-use paths, traffic
calming, improved crossings, and ADA upgrades. The roadway typical sections (Figure 20 through
Figure 23 on the following pages), reflect Complete Streets principles and show that
accommodations may be provided on street, off street, or through a combination of both.
Safety will remain a key transportation priority for all system users. Future roadway projects should
follow a Safe System Approach that considers a holistic transportation framework aimed at reducing
crashes through core elements like safe travel speeds, enhanced visibility, safer vehicles, and safer
roadway design elements that accommodate all users. Recommended pedestrian/bicycle safety tools
include installation of rectangular rapid flashing beacons (RRFBs), pedestrian hybrid beacons
(PHBs), curb extensions, raised crossings, medians/refuges, improved lighting, and roundabouts.
60
| 55
## FIGURE 20 | TWO-LANE ROADWAY SECTION (WITH SHOULDERS) WITH SIDEWALK ON BOTH
## SIDES OF THE ROAD
## FIGURE 21 | TWO-LANE SECTION (NO SHOULDERS) WITH SIDEWALK ON BOTH SIDES OF
## THE ROADWAY
61
| 56
## FIGURE 22 | TWO-LANE ROADWAY SECTION (SEPARATED ON-STREET BIKE LANES) WITH
## SIDEWALKS ON BOTH SIDES
## FIGURE 23 | TWO-LANE DIVIDED ROADWAY SECTION (ON-STREET BIKE LANES) WITH
## SIDEWALKS ON BOTH SIDES
62
| 57
By 2050, Saint Peter's transportation system should provide residents with safe and convenient travel
choices regardless of age, ability, or mode of transportation. Continued investment in complete
streets, connectivity, active transportation infrastructure, transit access, and regional partnerships will
help support the city's long-term goals for economic vitality, public health, sustainability, and quality of
life.
Future development in Saint Peter, particularly areas where collector roads will be established or
extended, should consider the right-of-way needed to accommodate roadway elements (e.g.,
sidewalks, trail, utilities) and intersection control type to balance mobility, safety, and economic
development objectives while minimizing traffic conflicts.
As documented in the Highway 22 Corridor Study
(completed May 2023), the future reconstruction of this
route from US 169 to County Road 20 presents a
significant opportunity to improve safety and mobility
through corridor enhancements. The study
recommended changes to the roadway typical section,
intersection control modifications, including
roundabouts, adding buffered bicycle facilities, closing
gaps in the sidewalk system, enhanced pedestrian
crossings (RRFB, underpass), and access
management improvements. Coordination with MnDOT
and Nicollet County will remain essential as these
improvements move forward.
Highway 22 through Saint Peter and beyond, has
previously been considered as a candidate for
jurisdictional transfer from MnDOT to Nicollet County.
To date, no formal transfer agreement has been
discussed.
Several improvements have occurred or are being
planned along US 169. MnDOT recently completed
safety improvements from Jefferson Avenue to S.
## Washington Avenue. Pavement and safety
improvements are also being designed from Broadway Avenue/Hwy 99 to Union Street, with
construction anticipated in 2028. These improvements will provide better traffic flow and safer access
to the highway.
A “near-town” US 169 bypass has been previously discussed with the goal of improving Saint Peter’s
historic downtown district by providing better traffic flow and enhanced walkability for visitors of local
businesses. Alignment options for a near-town bypass would likely utilize portions of existing right of
way (e.g., Front Street). Environmental documentation and public input on several alternatives would
be required before a concept could move through future design and construction stages.
Ongoing coordination with MnDOT and other key stakeholders will continue as safety and mobility
improvements within Saint Peter are considered on US 169, Highway 22, and Highway 99. State
highway projects in Saint Peter commonly require MnDOT to obtain municipal consent. This is a
formal review and coordination process, required under state statutes, giving the city approval
authority on project improvements involving access changes, capacity changes, alignment changes,
or when permanent right-of-way acquisition is needed.
63
| 58
## Transportation Goals
## Goal 6.1 Improve Transportation Safety for All Users
Policy 6.1.1 Enhance pedestrian safety at key crossings along Highway 169/Minnesota Avenue
through improved crosswalks, pedestrian signals, refuge islands, and traffic calming measures.
Policy 6.1.2 Identify and address high-priority safety concerns on local streets and intersections
through roadway improvements, speed management, and Safe Routes to School initiatives.
## Goal 6.2 Develop a Connected and Walkable Community
Policy 6.2.1 Expand and maintain a connected network of sidewalks, trails, and bicycle facilities
that link neighborhoods to schools, parks, downtown, Gustavus Adolphus College, employment
centers, and community destinations.
Policy 6.2.2 Require new development and redevelopment projects to contribute to the
completion of planned pedestrian and bicycle connections.
## Goal 6.3 Support an Efficient and Reliable Transportation Network
Policy 6.3.1: Coordinate with MnDOT, Nicollet County, and regional partners to improve traffic
operations, freight movement, and corridor functionality while maintaining local access and
community character.
Policy 6.3.2: Prioritize investments in maintaining and modernizing existing transportation
infrastructure to maximize safety, system performance, and long-term fiscal sustainability.
## Goal 6.4 Increase Transportation Options and Accessibility
Policy 6.4.1 Support expanded regional transit and local mobility options that improve access to
employment, healthcare, education, and shopping for residents of all ages and abilities.
Policy 6.4.2 Design transportation facilities using universal accessibility principles to ensure safe
and convenient travel for seniors, individuals with disabilities, youth, and residents without access
to a personal vehicle.
Please see Sustainability Chapter for sustainable Goals and Strategies that relate to this
chapter.
64
| 59
## 7 | PARKS & NATURAL RESOURCES
65
| 60
Parks and natural resources are a foundational component of Saint Peter’s identity, contributing to
community livability, environmental health, recreation, and sense of place. The City is distinguished
by both its extensive system of parks and trails and its location within the Minnesota River Valley,
where natural landscapes, ecological corridors, and cultural heritage shape the character of the
community. Together, these assets support active recreation, passive enjoyment, conservation, and
community events, while also improving public health, environmental resilience, and quality of life. As
Saint Peter looks toward 2050, continued investment in parks, trails, and natural resources will be
essential to accommodating growth, improving access, and preserving the environmental systems
that contribute to community pride.
## Parks
Saint Peter maintains a broad and diverse park system that includes 23 parks and natural resource
areas totaling more than 775 acres, with approximately 16.5 miles of existing trails and 21.7 miles of
proposed future trails identified in the 2024 Parks + Recreation Master Plan. The system includes
neighborhood parks, athletic complexes, civic gathering spaces, dog parks, natural resource areas,
and river-oriented recreation spaces. The Master Plan concluded that Saint Peter’s overall supply of
parkland and facilities compares favorably to peer communities and national benchmarks; however,
the City’s greatest needs relate less to the total quantity of parkland and more to access, connectivity,
modernization of aging facilities, and equitable distribution of amenities.
## Placeholder – Parks
66
| 61
Several parks play especially important roles in the community:
Minnesota Square Park is Saint Peter’s historic civic park and one of the community’s most
recognizable public gathering spaces. Located near the center of the city, it includes a pavilion,
playground, courts, open green space, and Veterans Memorial, and continues to host community
festivals, markets, and public events.
Gorman Park serves as a centrally located neighborhood and community park adjacent to the
Community Center and Library. It includes playground equipment, shelter space, ballfields, and open
space, and has been identified for continued reinvestment and redesign in recent planning efforts.
Community Spirit Park functions as one of the City’s major regional athletic destinations, with
multiple multi-use fields, courts, parking, and support facilities serving local leagues and tournaments.
Jefferson Park includes approximately 13 acres of active athletic fields and is directly connected to
Jefferson Park West Natural Resource Area, a 40-acre natural area with open space and trails that
adds passive recreation and environmental value to the park system.
Hallett Park provides a combination of neighborhood recreation and natural amenities, including a
playground, picnic areas, trails, and a fishing pier, and also serves as an important water-oriented
recreation site.
Riverside Park and related riverfront park areas offer campground facilities, walking paths, disc golf,
scenic open space, and river-oriented recreation, although several of these facilities are affected by
floodplain conditions.
The City has a broad inventory of amenities, including:
• 15 playgrounds
• 14 picnic shelters
• 14 baseball/softball fields
• 19 multi-use fields
• 12 tennis courts
• 6 pickleball courts
• 2 dog parks
• 1 disc golf course
• 1 outdoor pool
• multiple fishing, camping, and trail-based recreation opportunities.
This broad supply of amenities provides a strong foundation for current and future residents, but the
Master Plan identifies the need to continue updating aging facilities and adapting the system to
evolving recreation trends and demographics.
67
| 62
## FIGURE 24 | PARKS & NATRUAL RESOURCES MAP
68
| 63
## Parkland per Resident
Saint Peter’s park system provides a strong level of service when measured by acres of parkland
relative to population. Based on the 2024 Parks Master Plan inventory of more than 775 acres of
parks and natural resource areas and a current population of 12,198, the City provides approximately
63.5 acres of parkland per 1,000 residents. This far exceeds commonly cited planning benchmarks of
approximately 7 to 10 acres per 1,000 residents, indicating that Saint Peter has a substantial overall
supply of parkland and open space. However, because this figure includes a mix of active parks,
athletic complexes, and natural resource areas, acreage alone does not fully capture how well the
system serves day-to-day neighborhood needs. As a result, future planning should continue to
evaluate not only quantity, but also distribution, accessibility, and connectivity.
## Park Service Areas and Access
While Saint Peter has a strong overall supply of parkland, accessibility is best measured by proximity,
walkability, and the ability to safely reach parks and trails. For planning purposes, neighborhood parks
are typically expected to serve residents within a ¼-mile walking distance, while community parks
serve a broader area within approximately ½-mile to 1-mile.The 2024 Parks Master Plan used both
population-based and access-based Level of Service (LoS) standards to evaluate how well Saint
Peter’s parks serve residents. That analysis found that the City performs well in terms of overall
supply, but also identified important access gaps, particularly in newer growth areas, locations with
limited sidewalk infrastructure, and places where major roads create barriers.
Parks such as Minnesota Square Park, Gorman Park, Hallett Park, and Jefferson Park provide strong
park coverage in established portions of the community. However, walk-time and amenity-distribution
mapping prepared as part of the 2024 Parks Master Plan found that certain areas, especially near
Gustavus Adolphus College, parts of the northwest growth area, and areas separated by US Highway
169 and Broadway Avenue have reduced walkable access to parks or specific amenities. The Master
Plan also noted that some natural resource areas provide important recreational value but are not
always easily accessible from surrounding neighborhoods, particularly where floodplain conditions,
limited entry points, or lack of sidewalks and trails reduce day-to-day usability.
Key access issues identified in the 2024 Parks Master Plan that are relevant to this Comprehensive
Plan include:
• Gaps in neighborhood-level park access in developing and underserved areas;
• Limited safe pedestrian and bicycle crossings at major roadways, especially Highway 169 and
## Broadway Avenue;
• Discontinuous trail and sidewalk connections between neighborhoods, parks, schools, and
natural areas; and
• Reduced accessibility in floodplain parks during seasonal flooding or wet conditions.
These findings reinforce that future investments should prioritize walkable access, safe crossings,
trail infill, and new parks or amenities in underserved growth areas, rather than simply increasing
overall acreage.
## Natural Resources
Saint Peter’s natural resource system is one of the community’s defining assets and is closely tied to
its location within the Minnesota River Valley. The 2024 Parks Master Plan emphasizes that the City’s
park and natural resource system should be understood not only as recreation infrastructure, but also
as a network of environmental assets that contribute to habitat preservation, floodplain function,
stormwater management, scenic quality, and resilience. The river corridor supports mature tree cover,
69
| 64
wildlife habitat, wetlands, bluff and bottomland ecosystems, and passive recreation opportunities that
distinguish Saint Peter from many peer communities.
The City also benefits from several major natural resource areas and preserves, including Jefferson
Park West Natural Resource Area, McGill Natural Resource Area, Traverse des Sioux Natural
Resource Area, Riverside Park Extension, and other floodplain-related open spaces. Among these,
the Traverse des Sioux Natural Resource Area is especially significant, with the Parks Master Plan
identifying it as one of the City’s largest natural resource assets. These areas provide ecological
value while also supporting natural surface trails, habitat, river access, and educational or interpretive
opportunities.
A particularly important regional natural asset is the Arboretum at Gustavus Adolphus College, a
publicly accessible 125-acre natural area that includes prairie, woodland, wetlands, ponds, and more
than 2.5 miles of trails. The Arboretum plays an important role in environmental education, community
recreation, and stewardship, and serves as both a natural and cultural resource for the city.
The 2024 Parks Master Plan also highlights several environmental challenges and opportunities
relevant to the Comprehensive Plan:
• A substantial portion of parkland lies within the Minnesota River floodplain, which provides
ecological benefits but creates recurring access and maintenance challenges;
• Several recreation facilities, including disc golf and dog park uses, are constrained by
floodplain conditions and may need to be reconsidered or relocated over time;
• Native plantings, habitat restoration, shade tree expansion, and green infrastructure should be
integrated into future park improvements; and
• The City’s parks should continue to function as part of a broader environmental system that
supports climate resilience and stormwater management.
Together, these findings point to a future in which Saint Peter’s parks and natural resources are
managed not only for recreation, but also for ecological function, climate adaptation, and long-term
environmental stewardship.
## Trails and Connectivity
Saint Peter’s parks are supported by a growing trail and sidewalk network that serves both
recreational and transportation purposes. Trails connect neighborhoods to parks, schools, downtown
destinations, and natural resource areas, and they are consistently identified by residents as one of
the most important park-related investments for the future. At present, Saint Peter has approximately
16.5 miles of existing trails and a planned expansion of 21.7 additional miles. These include paved
multi-use trails, internal park trails, and natural surface trails in areas such as Jefferson Park West,
Riverside Park, and the Traverse des Sioux corridor. The Master Plan notes that Saint Peter’s
existing natural trail system is already a community strength and that expanding these connections
could further strengthen the City’s reputation as an outdoor and recreation destination.
The 2024 Parks Master Plan also identifies several key trail-related needs:
• Better connections between neighborhoods and parks;
• Expanded links to regional and adjacent trail systems;
• Improved pedestrian and bicycle safety along major roadways;
• More continuous walking loops and paved accessible routes; and
• Wayfinding, signage, and maintenance improvements, including path resurfacing and snow
removal where appropriate.
70
| 65
Locally, the City should continue to view trails as both mobility infrastructure and recreation
infrastructure. As the city grows, completing missing trail links and improving sidewalk access to
parks will be just as important as adding new parkland. Priority should be placed on strengthening
connections between parks, schools, residential neighborhoods, downtown, and major natural
resource areas.
Growth in the City is largely contained by a floodplain to the east and south, and topography to the
west and north. Park Search Areas identify places where future park development should be
considered as new homes are developed. The 2024 Parks Master Plan provides a Park Search Area
indicting where future parks could be located.
71
| 66
## FIGURE 25 | PARK SEARCH AREA MAP FROM THE 2024 PARKS MASTER PLAN
72
| 67
## Cultural Heritage
Saint Peter is located within the traditional homelands of the Dakota people and lies near Traverse
des Sioux, a site of significant cultural and historical importance. The Treaty of Traverse des Sioux,
signed in 1851 just north of the present-day city, resulted in the cession of large portions of land
across southern Minnesota and marked a profound shift in the region’s history. Following Euro-
American settlement, Saint Peter developed as a regional center for government, commerce,
education, and transportation. Many of the community's historic neighborhoods, civic institutions, and
landmark buildings were established during the late nineteenth and early twentieth centuries,
reflecting the city's growth and importance within south-central Minnesota. Although no Tribal lands
exist within the City today, the Minnesota River Valley and surrounding landscapes remain deeply
connected to Dakota heritage and identity. These lands continue to hold cultural, historical, and
ecological significance. The City of Saint Peter recognizes the importance of these connections and
will seek opportunities to incorporate cultural awareness, stewardship, and collaboration into future
planning efforts.
73
| 68
## Parks & Natural Resources Goals
Goal 7.1 Maintain and modernize Saint Peter’s parks, trails, and recreation
amenities to provide safe, high-quality facilities for all users.
Policy 7.1.1 Prioritize reinvestment in aging park infrastructure, including playgrounds, restrooms,
shelters, trails, and other core amenities.
Policy 7.1.2 Align park capital improvements with safety, condition, use, and lifecycle replacement
needs.
Policy 7.1.3 Incorporate shade, seating, water access, and comfort amenities into park upgrades
where feasible.
Policy 7.1.4 Support long-term maintenance practices that preserve park quality and reduce
deferred maintenance.
Goal 7.2 Improve equitable access to parks, trails, and recreation opportunities
throughout Saint Peter.
Policy 7.2.1 Expand parks and trails in underserved neighborhoods and growth areas.
Policy 7.2.2 Use walk-time, service area, and barrier analysis to guide future park and amenity
investments.
Policy 7.2.3 Improve safe pedestrian and bicycle access to parks across barriers such as
Highway 169 and Broadway Avenue.
Policy 7.2.4 Coordinate park planning with housing growth, neighborhood development, and
school access needs.
Goal 7.3 Expand and connect Saint Peter’s trail, sidewalk, and greenway
network to support recreation, wellness, and active transportation.
Policy 7.3.1 Implement priority trail connections between neighborhoods, parks, schools,
downtown, and natural resource areas.
Policy 7.3.2 Expand paved, accessible trail loops and improve year-round trail usability where
appropriate.
Policy 7.3.3 Coordinate local trail investments with regional trail systems and adjacent
jurisdictions.
Policy 7.3.4 Improve wayfinding, signage, and trail maintenance to strengthen the overall user
experience.
Goal 7.4 Protect, restore, and integrate natural resources as a core part of Saint
Peter’s park system and long-term resilience.
Policy 7.4.1 Preserve and restore natural resource areas, floodplain lands, wetlands, wooded
areas, and the Minnesota River corridor.
Policy 7.4.2 Integrate native plantings, pollinator habitat, shade trees, and green infrastructure
into park projects.
Policy 7.4.3 Manage floodplain parklands to balance recreation, habitat, and resilience to flooding
and climate impacts.
74
| 69
Policy 7.4.4 Support environmental stewardship, education, and partnerships that strengthen
long-term natural resource management.
Goal 7.5 Foster an inclusive, community-centered park system that reflects Saint
Peter’s identity, supports partnerships, and serves residents of all ages and
abilities.
Policy 7.5.1 Incorporate ADA-compliant and inclusive design features into park improvements and
new amenities.
Policy 7.5.2 Support a balanced mix of active recreation, passive recreation, wellness, and
nature-based experiences.
Policy 7.5.3 Continue partnerships with schools, Gustavus Adolphus College, community
organizations, and user groups to expand programming, stewardship, and funding opportunities.
Policy 7.5.4 Use parks and open space to strengthen community identity, cultural awareness, and
year-round public spaces and events.
Please see Sustainability Chapter for Sustainable Goals and Strategies that relate to this
chapter.
75
| 70
## 8 | SUSTAINABILITY
76
| 71
Sustainability is meeting the needs of the present without compromising the needs of future
generations. Sustainability connects the City’s long-term decisions about land use, housing,
transportation, utilities, parks, economic development, and public health. As the community plans for
2050, sustainability means using public resources wisely, reducing long-term infrastructure and
energy costs, protecting natural systems, and preparing for changing environmental, economic, and
demographic conditions.
Saint Peter has already taken meaningful steps toward becoming a more sustainable and resilient
community. The City participates in the Minnesota GreenStep Cities program and recently reached
Step 3 of 5, with plans to announce this achievement at City Council in late June. This milestone
builds on Saint Peter’s prior GreenStep progress, which included completed actions related to energy
efficiency, LED conversions, stormwater management, community solar participation, water
conservation, tree management, transit access, Safe Routes to School, and climate adaptation
planning.
## Placeholder – Sustainability
77
| 72
Saint Peter’s existing plans and studies provide a strong foundation for sustainability work. The 2024
Active Transportation Plan connects walking, biking, and rolling improvements to affordability, public
health, greenhouse gas reduction, and local economic vitality. The 2024 Parks and Recreation Master
Plan identifies parks, trails, floodplain areas, and natural resources as important parts of community
health and climate resilience. The 2024 Stormwater Resiliency Plan emphasizes watershed-based
solutions that reduce flooding, protect the Jordan Aquifer, and improve water quality through multi-
benefit best management practices. Utility planning for electric, water, wastewater, and stormwater
systems provides the infrastructure basis for reliable, cost-effective, and resilient growth.
For Saint Peter, sustainability is also closely tied to affordability and livability. Compact growth, mixed-
use development, energy-efficient housing, walkable neighborhoods, multimodal transportation, local
food systems, renewable energy, waste reduction, and green infrastructure can help reduce
household costs while improving access to jobs, parks, schools, services, and daily needs. This
chapter brings those themes together and identifies priority strategies that emerged from the
Sustainability Task Force workshop in May of 2026.
## GreenStep Cities Framework
The Minnesota GreenStep Cities program provides Saint Peter with a practical framework for
organizing sustainability work across City departments and community partners. GreenStep best
practices address buildings and lighting, land use, transportation, environmental management,
economic and community development, and resilience. Saint Peter’s advancement to Step 3
demonstrates that the City has moved beyond initial implementation and is continuing to formalize
sustainability practices, partnerships, and performance tracking.
The 2023 GreenStep Assessment identified several areas where Saint Peter had already made
progress, including municipal energy efficiency, utility rebates, stormwater management, tree
programs, rain barrel incentives, transit access, Safe Routes to School participation, community solar,
and climate adaptation planning. The assessment also identified opportunities for additional progress
in complete streets, surface water protection, city fleet efficiency, demand-side travel planning, green
business development, benchmarking, and community engagement.
The goals and strategies in this chapter use the GreenStep framework as an implementation tool,
while remaining grounded in Saint Peter’s local conditions, public input, and existing plans.
## Energy, Emissions, and Municipal Operations
Energy efficiency is one of the most direct ways Saint Peter can reduce operating costs and
environmental impacts. The City owns and operates a municipal electric utility, giving Saint Peter local
control over electric service, reliability, and long-term system planning. The 2021 Electric System
Master Plan found that summer peak demand had increased by approximately 1.5 percent annually,
with system peak demand projected to increase to approximately 27,533 kW by 2030.
Reducing energy use in municipal buildings is a near-term opportunity that supports both fiscal
responsibility and sustainability leadership. Benchmarking public buildings, improving energy
performance, and coordinating upgrades with capital improvement planning can help the City reduce
utility costs while demonstrating practical actions that residents and businesses can also consider.
Municipal building efficiency received strong support by the Sustainability Task Force.
Saint Peter can also support private energy improvements by connecting residents, landlords,
businesses, institutions, and property owners to available rebates, tax credits, financing tools, and
technical assistance. These programs can help lower utility costs, improve building comfort, support
reinvestment in existing homes and commercial buildings, and reduce long-term emissions.
78
| 73
## Water Resources and Stormwater Resilience
Water resource protection is central to Saint Peter’s long-term sustainability. The City is located in the
Minnesota River Valleyand relies on groundwater resources, including the Jordan Aquifer, for drinking
water. Stormwater planning must balance flood risk reduction, water quality protection, groundwater
recharge, and development needs.
The 2024 Stormwater Resiliency Plan identifies flooding, aquifer protection, and nitrate reduction as
major issues. The plan recommends multi-benefit practices such as wetlands, saturated buffers, two-
stage ditches, storage ponds, and other best management practices that can reduce flooding while
improving water quality and nitrate removal.
The 2008 Stormwater Master Plan also remains relevant because it established the importance of
regional stormwater basins, green corridors, preserved overflow routes, and wellhead protection
standards. In areas with highly permeable soils over vulnerable groundwater resources, stormwater
practices should include lined pretreatment before infiltration to reduce nitrate risks.
Future sustainability work should continue to integrate stormwater management with parks, trails,
natural areas, and development review. Green infrastructure can provide multiple benefits at once,
including flood storage, water quality treatment, habitat, shade, aesthetics, recreation, and
neighborhood connectivity.
## Land Use, Housing, and Sustainable Development
Land use decisions have long-term sustainability implications because they shape infrastructure
costs, travel patterns, housing affordability, and access to daily needs. Saint Peter’s prior
Comprehensive Plan already supported infill, mixed-use development, compact neighborhoods, and
higher-intensity commercial development in appropriate areas. The GreenStep Assessment also
identified land use best practices as an area where Saint Peter can continue to build on prior work.
The 2024 Housing Study shows that Saint Peter needs additional rental, ownership, senior,
workforce, and attainable housing options. The study found that the City averaged approximately 58
new housing units per year over the last five years, including about 45 rental units and 12 to 13
owner-occupied units annually. It also found that nearly 40 percent of renters are cost burdened and
that market-rate rental vacancy rates are below 1 percent, indicating a very tight rental market.
Sustainable housing strategies should therefore focus not only on energy efficiency, but also on
location, affordability, and access. Infill and redevelopment housing can reduce pressure for outward
expansion, use existing infrastructure more efficiently, and place residents closer to jobs, schools,
parks, transit, and daily services. Mixed-income and mixed-use housing received the highest vote
total in the Sustainability Task Force Workshop.
## Transportation, Mobility, and Access
Transportation is one of the strongest connections between sustainability, affordability, health, and
quality of life. Saint Peter’s 2024 Active Transportation Plan identifies walking, biking, and rolling as
strategies that reduce household transportation costs, support greenhouse gas reduction, improve
health, and strengthen local economic activity. The plan documents 44.6 miles of existing sidewalks,
24.3 miles of proposed sidewalks, 22.2 miles of existing bikeways and paths, and 28 miles of
proposed bikeways and paths.
The Sustainability Task Force ranked Complete Streets implementation as one of the highest-priority
sustainability strategies. Complete Streets principles support streets that are safe, convenient, and
accessible for people walking, biking, rolling, taking transit, driving, or using mobility devices. This is
79
| 74
especially important for seniors, youth, people with disabilities, students, workers, and residents who
do not have reliable access to a personal vehicle.
Priority transportation sustainability efforts should include safer crossings, sidewalk gap closures,
bikeway and trail connections, traffic calming, ADA upgrades, transit-supportive design, and
coordination with MnDOT and Nicollet County on major corridors such as Highway 22, Highway 169,
and Highway 99. These investments can reduce short vehicle trips, improve access to daily needs,
and support a more connected community.
## Waste and Recycling
Waste reduction, recycling, urban forestry, parks, and green infrastructure all contribute to Saint
Peter’s environmental quality. The GreenStep Assessment notes that the City has active stormwater
education, water conservation efforts, tree programming, and environmental stewardship actions
already in place. The Sustainability Task Force identified recycling improvements, urban forest
expansion, and parks and green infrastructure as priority strategies with votes tallied.
## Urban Forest, Parks, and Environmental Quality
Saint Peter’s park system is a major sustainability asset. The 2024 Parks and Recreation Master Plan
identifies 23 parks and natural areas totaling more than 775 acres, with 16.5 miles of existing trails
and 21.7 miles of proposed trails. The plan emphasizes that future park investments should prioritize
modernization, accessibility, trail connectivity, natural resource management, and resilience. St. Peter
takes pride in its urban forest, earning Tree City USA status through the Arbor Day Foundation.
Parks, trails, and natural areas should continue to function as more than recreation spaces. They can
provide stormwater storage, habitat, cooling, floodplain protection, outdoor wellness, and community
gathering space. Expanding tree canopy, native plantings, pollinator habitat, and green infrastructure
will help Saint Peter adapt to heavier rainfall, heat, and changing environmental conditions while
improving comfort and livability in neighborhoods and public spaces.
Saint Peter's urban tree canopy is an important community asset and currently covers approximately
26% of the city, according to American Forests' Tree Equity Score. The City could support tree
preservation and planting efforts with a goal of increasing canopy coverage to 30% within the next
two to three years. Expanding tree canopy will enhance shade, reduce heat impacts, improve
stormwater management, strengthen neighborhood character, and support community resilience.
Progress can be tracked using the Tree Equity Score platform maintained by American Forests.
## Economic Resilience and Local Systems
Sustainability also supports economic resilience. Renewable energy, local food systems, recycling,
local purchasing, green infrastructure, and compact development can keep more value circulating
locally and reduce dependence on outside systems. Saint Peter’s economy is anchored by education,
health care, public institutions, local businesses, and regional employers, and the Comprehensive
Plan’s economic development chapter emphasizes business retention, workforce development, and
job quality.
The Sustainability Task Force identified renewable energy expansion, support for local food systems,
and strengthening the local economy as strategies with votes tallied. These strategies can be
implemented through partnerships with local institutions, businesses, schools, public health
organizations, waste and food recovery partners, and regional agencies.
Local food systems are especially connected to public health, waste reduction, economic
development, and community resilience. Food recovery, community gardens, farmers markets,
80
| 75
institutional purchasing, and composting partnerships can reduce waste while improving access to
healthy food and supporting local producers.
## Institutional Partnerships and Community Leadership
Saint Peter's long-term sustainability efforts will benefit from collaboration with the community's major
institutions, particularly Gustavus Adolphus College. With approximately 1,900 students and a
significant presence within the community, Gustavus influences housing demand, transportation
patterns, infrastructure use, economic activity, and community life throughout the year. Gustavus has
received a gold rating through the AASHE Sustainability Tracking, Assessment & Rating System and
has been advancing its sustainability efforts through initiatives such as the Gustavus Solar Field,
which meets 10% of the campus electricity needs. Opportunities exist to strengthen collaboration
between the City and Gustavus on topics such as energy conservation, greenhouse gas reduction,
climate resilience, sustainable transportation, natural resource stewardship, environmental education,
and community engagement. The college's 125-acre Arboretum, which includes prairie, woodland,
wetlands, ponds, and trail networks, already serves as an important community resource for
recreation, education, and environmental stewardship.
81
| 76
## Sustainability Goals
## Goal 8.1 Implement Complete Streets and Safer Multimodal Connections
Policy 8.1.1 Implement Complete Streets principles to improve safety, accessibility, and comfort
for people walking, biking, rolling, using transit, and driving. Complete Streets improvements
should prioritize safe crossings, sidewalk and trail connections, traffic calming, ADA accessibility,
and stronger links between neighborhoods, schools, parks, downtown, Gustavus Adolphus
College, employment centers, and services.
Priority Rank: 10 votes — highest-ranked strategy.
## Goal 8.2 Promote Mixed-Income and Mixed-Use Housing
Policy 8.2.1 Promote mixed-income and mixed-use housing that supports affordability, access to
services, and more complete neighborhoods. This strategy should encourage housing in locations
that support walkability, reduce household transportation costs, and place residents closer to daily
needs, employment areas, parks, schools, and community services.
Priority Rank: 9 votes.
## Goal 8.3 Improve Municipal Building Efficiency
Policy 8.3.1 Improve municipal building efficiency through benchmarking, energy audits, lifecycle
cost analysis, and capital improvements that reduce energy use and operating costs. The City
should continue using public facilities as a leadership opportunity by tracking energy use,
identifying cost-effective improvements, and coordinating upgrades with capital improvement
planning.
Priority Rank: 8 votes.
## Goal 8.4 Improve Water Efficiency and Resource Conservation
Policy 8.4.1 Improve water efficiency in municipal operations, public facilities, and private
development through conservation, system monitoring, and water-saving technologies. Water
efficiency efforts should support long-term utility reliability, reduce operating costs, and help
protect Saint Peter’s water resources.
Priority Rank: 6 votes.
## Goal 8.5 Expand Parks and Green Infrastructure
Policy 8.5.1 In accordance with the Parks Master Plan, expand parks, trails, and green
infrastructure as part of a connected public system that supports recreation, stormwater
management, habitat, shade, public health, and neighborhood quality of life. Green infrastructure
investments should be coordinated with park improvements, trail connections, stormwater
projects, complete streets projects, and growth-area planning.
Priority Rank: 6 votes.
## Goal 8.6 Expand Renewable Energy Opportunities
Policy 8.6.1 Expand renewable energy opportunities for municipal facilities, residents,
businesses, and institutions where financially and technically feasible. Renewable energy efforts
should build on Saint Peter’s local utility capacity, community partnerships, and long-term goals for
energy resilience and cost management.
Priority Rank: 5 votes.
82
| 77
## Goal 8.7 Expand Lifecycle and Senior Housing Options
Policy 8.7.1 Expand lifecycle and senior housing options that allow residents to remain in Saint
Peter as their needs change over time. Housing strategies should support accessible units,
smaller housing types, senior-oriented options, and locations near services, parks, health care,
transportation, and daily needs.
Priority Rank: 5 votes.
## Goal 8.8 Advance Green Building Practices
Policy 8.8.1 Advance green building practices and site design standards that reduce energy
demand, improve stormwater performance, support long-term affordability, and improve building
resilience. This may include encouraging voluntary standards, incentives, technical assistance,
and financing tools for public, private, and institutional projects.
Priority Rank: 4 votes.
## Goal 8.9 Improve Recycling and Waste Reduction
Policy 8.9.1 Improve recycling to include composting/organics pickup and waste reduction
through public education, partnerships, collection improvements, and coordination with Tri-County
Solid Waste, River’s Edge Hospital, and other local partners. Efforts should focus on increasing
participation, reducing waste sent to landfills, and strengthening community-wide environmental
stewardship.
Priority Rank: 4 votes.
## Goal 8.10 Expand and Protect the Urban Forest
Policy 8.10.1 Expand and protect the urban forest to increase shade, improve air quality, reduce
heat impacts, manage stormwater, support habitat, and strengthen neighborhood character. Urban
forestry efforts should include setting tree canopy goals, tree planting, maintenance, protection of
trees during construction, species diversity, selection of adaptable species, replacement planning,
and coordination with parks, streets, and development projects.
Priority Rank: 4 votes.
Goal 8.11 Reduce risk and prepare for natural hazards, such as floods, storms,
drought, and heat waves.
Policy 8.11.1 Integrate vulnerability and risk assessments and risk-reduction strategies into
capital improvement planning and projects.
Policy 8.11.2 Reevaluate hazard mitigation and emergency response plans at regular intervals,
and identify resources needed for planning and responding to natural hazards.
Goal 8.12 Nurture partnerships to advance sustainability goals.
Policy 8.12.1 Partner with Gustavus Adolphus College and other major institutions to advance
sustainability initiatives, support climate resilience, improve multimodal connectivity, promote
resource conservation, and identify opportunities for collaborative implementation of community
sustainability goals.
83
| 78
## Removed Strategies with 3 Votes or Fewer
The following strategies were not included because the updated Matrix shows 3 votes or fewer:
expand private energy programs; expand stormwater management; maintain and implement the
comprehensive plan; promote compact and mixed-use growth; corridor development; expand
multimodal system; improve fleet efficiency; improve wastewater systems; improve air quality and
EV access; support local food systems; strengthen local economy; sustainability governance;
climate resilience; encourage infill, higher-density, and workforce housing; incentivize energy-
efficient housing; support infill and redevelopment housing; and align housing with jobs and transit
84
| 79
## 9 | LAND USE
85
| 80
Land use planning guides future development based on community consensus and a shared vision
for the future. It helps ensure that growth supports community goals, economic development,
infrastructure investments, and quality of life. The Future Land Use Plan establishes a framework for
growth through 2050 by identifying appropriate locations for residential, commercial, industrial,
institutional, parks and open space, and mixed-use development. Building upon existing development
patterns, the plan provides opportunities for housing, employment, and efficient infrastructure
expansion. Together, the Existing and Future Land Use Maps serve as policy guides for elected
officials, staff, developers, and residents, helping ensure that development, zoning, annexation, and
capital improvement decisions are consistent with the community's vision and long-term goals.
## Existing Land Use
The City of Saint Peter and its future growth area encompass approximately 5,130 acres, of which
3,194 acres (62%) are located within the city limits and 1,935 acres (38%) are located in the growth
area. Existing land use patterns reflect a mature community with a strong institutional presence,
established residential neighborhoods, significant park and open space resources, and considerable
undeveloped land available for future growth.
## Placeholder – Land Use
86
| 81
## TABLE 3 | AREA OF EXISTING LAND USES
## Existing Land Use
## Within City
## Limits
## Growth
## Area/Outside
## City
## Total
## Acreage
% of Total
1-2 Family 57.48 0.00 57.48 1.12%
Commercial 116.40 0.29 116.69 2.28%
Future Commercial 10.07 2.65 12.73 0.25%
Future Floodplain 0.00 66.13 66.13 1.29%
Future Industrial 6.59 145.90 152.50 2.97%
Future Residential 94.40 1,719.13 1,813.53 35.35%
Industrial 109.19 0.00 109.19 2.13%
Institutional 999.93 0.00 999.93 19.49%
Mobile Homes 44.98 0.00 44.98 0.88%
Multi Family 89.72 0.00 89.72 1.75%
Parks 709.24 1.26 710.50 13.85%
Single Family 623.68 0.01 623.68 12.16%
Vacant 43.13 0.01 43.14 0.84%
Unassigned 289.50 0.02 289.52 5.64%
## TOTAL 3,194.31 1,935.41 5,129.72 100.00%
## Residential
Residential development represents a substantial portion of the community at approximately 52% of
total area (including growth area). Existing single-family residential areas account for approximately
624 acres, while multi-family residential uses occupy nearly 90 acres, mobile home parks comprise
approximately 45 acres, and smaller areas are categorized as one- and two-family residential
development. Together, these housing types form the foundation of Saint Peter's established
neighborhoods and support a range of housing choices throughout the community.
## Institutional
Institutional uses are the largest developed land use category, accounting for nearly 1,000 acres. This
reflects the significant presence of regional and community-serving institutions within Saint Peter,
including educational, governmental, healthcare, and other public facilities. Parks and open space
represent an additional 710 acres, highlighting the community's longstanding commitment to
recreation, environmental stewardship, and quality of life.
87
| 82
## Commercial
Commercial development occupies approximately 117 acres, while industrial uses account for
approximately 109 acres. These areas provide employment opportunities, commercial services, and
support for the local economy. The City's commercial and industrial districts are generally
concentrated along major transportation corridors and near existing infrastructure.
## Future Growth Area
A notable feature of the existing land use pattern is the amount of land identified for future
development in the Existing Land Use Map. Approximately 1,814 acres are currently designated as
future residential growth areas, while an additional 152 acres are identified as future industrial land
and approximately 13 acres as future commercial land. Most of these future development areas are
located outside the current city limits within the City's growth area and represent Saint Peter's long-
term growth opportunities.
The presence of relatively small amounts of vacant land within the city limits suggests that much of
Saint Peter's future development will occur through a combination of infill, redevelopment,
annexation, and planned growth into surrounding areas.
88
| 83
## FIGURE 26 | EXISTING LAND USE MAP
89
| 84
## Community Consensus
Community engagement consistently supported a growth strategy that balances new residential and
economic development with protection of community character, parks, natural resources, and
infrastructure investments. Residents and stakeholders generally favored directing growth within the
Urban Growth Boundary, expanding housing choices, supporting business and industrial
development, and encouraging orderly, fiscally responsible development patterns.
Community consensus represents the prevailing view expressed through public engagement and
stakeholder outreach. It reflects the majority perspective and common themes that emerged across
all participants rather than individual opinions or isolated comments. Consensus areas include:
• Support continued residential growth within the Urban Growth Boundary.
• Maintain Saint Peter's traditional pattern of predominantly low-density residential
neighborhoods while providing opportunities for medium- and high-density housing.
• Direct commercial development to existing commercial corridors, activity centers, and
redevelopment areas rather than creating dispersed commercial nodes.
• Preserve and expand industrial land near Highway 169 and Highway 22 to support
employment growth and economic development.
• Coordinate growth with the efficient extension of public infrastructure and municipal services.
• Protect parks, open space, natural resources, floodplain areas, and shoreland resources as
growth occurs.
• Encourage mixed-use development in appropriate locations to support housing diversity,
walkability, and economic activity.
• Promote orderly annexation and development within the Urban Growth Boundary before
extending growth farther into rural areas.
• Preserve the community character that residents value while accommodating future population
and employment growth.
## Future Land Use
The Future Land Use Plan establishes a framework for managing growth, preserving community
character, expanding housing opportunities, and supporting economic development through the
planning horizon. The plan accommodates future growth while ensuring that new development occurs
in a coordinated and efficient manner consistent with the City's infrastructure, transportation, and
environmental objectives.
90
| 85
## TABLE 4 | FUTURE LAND USE ACREAGE
## Future Land Use
## Within City
## Limits
## Growth
## Area/Outside
## City
## Total Acreage
Percent of
## Total Area
(including growth
area)
Commercial 144.46 2.94 147.41 2.87%
## High Density Residential
(HDR) 9-20 du/ac
128.02 0.00 128.02 2.50%
Industrial 165.75 145.91 311.66 6.08%
Institutional 1,020.45 0.00 1,020.45 19.89%
## Low Density Residential
(LDR) 1-2 du/ac
658.16 1,621.07 2,279.23 44.43%
## Medium Density
Residential (MDR) 3-8 du/ac
220.04 54.03 274.08 5.34%
Mobile Homes 66.15 44.03 110.19 2.15%
Parks 791.27 67.41 858.68 16.74%
## TOTAL 3,194.31 1,935.41 5,129.72 100.00%
## Residential
Residential uses continue to comprise the largest land use category in the Future Land Use Map.
Low Density Residential areas account for approximately 2,279 acres, representing the primary
location for future neighborhood expansion. Much of this acreage is located within the growth area,
reflecting Saint Peter's anticipated outward growth over the planning period. Medium Density
Residential uses account for approximately 274 acres, while High Density Residential uses comprise
approximately 128 acres, providing opportunities for a broader range of housing types to meet
changing demographic needs and housing demand.
## Commercial
Commercial land uses total approximately 147 acres and are generally focused along major corridors
and activity centers where access, visibility, and supporting infrastructure can encourage investment
and support local businesses. Future commercial growth is intended to strengthen the tax base,
provide neighborhood and regional services, and support employment opportunities.
## Industrial
Industrial uses are planned to expand significantly, encompassing approximately 312 acres, including
nearly 146 acres within the growth area. These areas provide opportunities for manufacturing,
warehousing, research, technology, and other employment-generating activities. Reserving adequate
industrial land will be important to maintaining Saint Peter's economic competitiveness and supporting
long-term job growth.
## Institutional
Institutional uses remain a major component of the future land use pattern, accounting for
approximately 1,020 acres. This designation recognizes the importance of Saint Peter's educational,
governmental, healthcare, and public service facilities and allows for their continued operation and
expansion as community needs evolve.
91
| 86
## Parks and Open Spaces
Parks and open spaces are planned to increase to approximately 859 acres, reflecting the City's
commitment to expanding recreational opportunities, enhancing trail connectivity, protecting natural
resources, and improving environmental resilience. These areas support both active and passive
recreation while contributing to community health and quality of life.
## Overlays
The Future Land Use Map also includes a Mixed Use Overlay encompassing approximately 229
acres and a Shoreland Overlay covering approximately 214 acres. These overlays provide additional
planning guidance intended to encourage compatible development patterns, protect sensitive
environmental resources, and support strategic redevelopment and investment opportunities
throughout the community.
The Mixed Use Overlay supports a mix of residential, commercial, office, and service uses in a
compact, walkable development pattern. This overlay increased the base zonign densities for
residential to allow densities of 21 to 40 dwelling units per acre, thus accommodating higher-density
housing in neighborhood-serving retail, employment, and walkable areas.
The Shoreland Overlay (214 acres) helps protect sensitive water resources, natural habitat, and
scenic areas. Development within the overlay is subject to additional standards related to setbacks,
vegetation protection, stormwater management, and environmental impacts to ensure that growth
occurs in a manner that preserves water quality and natural resource functions.
Overall, the Future Land Use Plan directs growth toward a balanced pattern of residential
neighborhoods, employment centers, commercial services, parks, and institutional uses while
preserving flexibility for future development and ensuring that growth occurs in a coordinated, fiscally
responsible manner.
## TABLE 5 | AREA OF OVERLAYS
## Overlay Acreage % of Total Area
Shoreland Overlay 214.17 4.18%
## Mixed Use Overlay 228.63 4.46%
Note: Overlays (not included in total acreage, because they overlap underlying land use designations)
92
| 87
## FIGURE 27 | FUTURE LAND USE MAP
93
| 88
## Key Findings
Low Density Residential (LDR) is the dominant future land use designation, comprising 44.4% of
the planning area. This reflects Saint Peter's anticipated growth pattern through 2050, with new
development occurring primarily in low-density residential neighborhoods. More than 1,620 acres of
LDR land are located within the growth area outside current city limits, providing significant long-term
capacity for residential expansion and future annexation.
Institutional uses comprise nearly 20% of the planning area, highlighting the continued importance
of major institutions such as Gustavus Adolphus College, the Minnesota Security Hospital, schools,
and other public facilities.
Parks and open space represent approximately 16.7% of the total area, supporting recreation,
environmental resources, and community sustainability.
Industrial land comprises 6.1% of the future land use plan and includes nearly 146 acres in the
growth area, providing significant opportunity for future employment growth
The Mixed Use Overlay (229 acres) and Shoreland Overlay (214 acres) provide additional planning
guidance rather than standalone land use classifications. These overlays promote context-sensitive
development, support redevelopment opportunities, encourage a mix of uses where appropriate, and
protect sensitive environmental resources along lakes, rivers, and drainageways
Commercial land accounts for 2.9% of the Future Land Use Plan (147 acres), reflecting a strategy
of targeted commercial growth rather than large-scale expansion.
Most commercial land is within existing city limits, with only about 3 acres located in the growth
area. Future commercial demand is expected to be accommodated through infill, redevelopment, and
expansion of existing commercial districts.
Residential growth will outpace commercial growth, emphasizing the importance of monitoring
future retail and service needs as new neighborhoods develop.
The Mixed Use Overlay provides additional flexibility for future retail, office, service, and residential
development without requiring significant increases in commercial land designations.
94
| 89
## Densities
## Residential Density and Build-Out Analysis
The Future Land Use Plan provides substantial capacity for future housing growth through 2050.
Assuming 100% build-out of all residentially designated land and applying the proposed density
ranges to the gross acreage of each residential land use category, Saint Peter has the potential to
accommodate a wide range of future residential development patterns.
## TABLE 6 | BUILD-OUT CAPACITY BY FUTURE LAND USE CATEGORY
## Future Land Use Category
## Gross
## Acres
## Density Range
(DU/Ac)
## Potential Dwelling
## Units
Low Density Residential (LDR) 2,279.2 Up to 2 Up to 4,558 DU
## Medium Density Residential
## (MDR)
## 274.1 3-8 822-2,193 DU
High Density Residential (HDR) 128.0 9-20 1,152-2,560 DU
Mixed Use Overlay (O-MU) 228.6 21-40 4,801-9,145 DU
Mobile Home Park (MHP) 110.2 6-10 661-1,102 DU
## Total Residential Capacity
Under a theoretical 100% build-out scenario, the Future Land Use Plan could accommodate
approximately the following number of dwelling units. While full development of every parcel that
could allow residential development is unlikely, the analysis illustrates Saint Peter's full housing
capacity through 2050 based on the Future Land Use Map:
• Minimum build-out: 11,994 dwelling units
• Maximum build-out: 19,558 dwelling units
These figures represent a theoretical planning capacity and do not account for environmental
constraints, streets, public facilities, free market conditions, stormwater features, open space
requirements, or phased development.
## Growth Scenarios
## Inbound Commuter Capture Scenario
Saint Peter functions as a regional employment center, attracting approximately 4,823 workers who
commute into the city each day. If the City were able to attract and retain just 1% of these inbound
commuters as Saint Peter residents each year, it would result in approximately 48 additional
households annually. Using the City's average household size of 2.25 persons, this would equate to
roughly 108 additional residents per year.
Over the 25-year planning horizon from 2025 to 2050, maintaining a 1% annual commuter capture
rate could generate approximately 1,200 additional households and 2,700 additional residents
beyond current projections.
This scenario demonstrates the importance of housing availability, housing choice, and quality-of-life
investments. Rather than relying solely on attracting new employers, Saint Peter may be able to
increase population growth by converting a small share of its existing workforce into residents. As
more workers choose to live where they work, the community may benefit from reduced commuting
95
| 90
distances, increased local spending, stronger neighborhood vitality, and growth in the residential tax
base.
## 1% Annual Inbound Commuter Capture Scenario
• Daily inbound commuters: 4,823
• Annual capture rate: 1%
• Additional households per year: ~48
• Additional residents per year: ~108
• Estimated additional households by 2050: ~1,200
• Estimated additional residents by 2050: ~2,700
## Scenario 1: 1% Inbound Commuter Capture
While theoretical, this scenario demonstrates that attracting just 1% of Saint Peter's 4,823 inbound
commuters annually could generate approximately 1,200 additional households and 2,700 additional
residents by 2050. By comparison, the Future Land Use Plan provides capacity for approximately
11,994 to 19,558 dwelling units under a full build-out scenario. Even at the low end of the build-out
analysis, the additional 1,200 households generated through commuter capture would utilize only
about 10% of the City's minimum residential capacity. This indicates that Saint Peter's Future Land
Use Plan contains more than sufficient residential land and housing capacity to accommodate both
the City's projected growth and a successful workforce attraction strategy that converts a portion of
existing commuters into residents. The analysis suggests that future housing demand is more likely to
be constrained by market conditions, infrastructure timing, and development activity than by the
availability of land designated for residential development.
## Scenario 2: 5% Inbound Commuter Capture
Saint Peter serves as a regional employment hub, with approximately 4,823 workers commuting into
the city each day. If the City were able to attract 5% of these inbound commuters to become Saint
Peter residents by 2050, it would result in approximately 241 additional households relocating to the
community. Using the City's average household size of 2.25 persons, this would equate to
approximately 542 additional residents. [
This scenario is significant because it assumes Saint Peter captures only a small portion of workers
who are already employed within the community. Rather than relying on major new employment
growth, the scenario reflects the potential for existing workers to choose Saint Peter as their place of
residence due to factors such as housing availability, neighborhood amenities, quality of life, schools,
parks, and proximity to work.
The analysis highlights an opportunity to convert a portion of the City's existing workforce into
residents, reducing commuting distances while increasing local spending, strengthening
neighborhood vitality, and expanding the residential tax base. As employers continue to attract
workers from throughout the region, providing a variety of housing types and price points may help
Saint Peter retain more of these employees within the community.
## 5% Inbound Commuter Capture Scenario
• Daily inbound commuters: 4,823
• Capture rate: 5%
• Additional households: 241
• Average household size: 2.25
• Additional residents: 542
96
| 91
The Future Land Use Plan provides capacity for approximately 11,994 to 19,558 dwelling units under
a theoretical full build-out scenario. Compared to this capacity, the addition of approximately 241
households under a 5% commuter capture scenario would utilize only about 2% of the minimum
residential capacity identified in the Future Land Use Plan.
This analysis demonstrates that Saint Peter's Future Land Use Plan contains more than sufficient
residential land to accommodate both projected population growth and a realistic workforce attraction
strategy. Even if the City successfully attracted 5% of its existing inbound workforce to become
residents by 2050, the resulting housing demand would represent only a small fraction of the
residential capacity already planned within the Urban Growth Boundary.
## Planning Implications and Growth Potential
The Future Land Use Plan provides sufficient land to accommodate anticipated growth through 2050
while supporting a variety of housing types and densities. Although full build-out is unlikely, the plan
demonstrates that Saint Peter has ample long-term residential capacity within its planned growth
framework.
The City's greatest growth opportunities are located within the Urban Growth Boundary, which
contains approximately 1,935 acres outside the current city limits. Much of this land is designated for
future residential and industrial development and is located near existing infrastructure and
transportation corridors.
Future residential growth is expected to occur primarily in Low Density Residential areas, with more
than 1,600 acres planned outside the city limits. These areas provide the greatest opportunity for new
neighborhoods and population growth, while Medium- and High-Density Residential areas support
additional housing choice.
The City's strongest employment growth potential is found in planned industrial areas near U.S.
Highway 169 and Highway 22. Nearly 146 acres of future industrial land are available within the
growth area, offering excellent access to transportation and utilities.
To maximize efficiency and minimize public costs, future development should be directed to areas
that can be readily served by existing or planned water, sewer, transportation, and utility
infrastructure. Overall, Saint Peter is well-positioned to accommodate future residential, commercial,
and industrial growth in a coordinated and sustainable manner.
.
97
| 92
## Land Use Goals
## Goal 9.1: Direct Growth in an Orderly and Efficient Manner
Policy 9.1.1: Guide new development to areas within the Urban Growth Boundary that can be
efficiently served by existing or planned public infrastructure, including streets, water, sewer, and
utilities.
Policy 9.1.2: Encourage annexation and development patterns that support compact, contiguous
growth, maximize public infrastructure investments, and minimize the long-term cost of municipal
service extensions.
## Goal 9.2: Promote Well-Planned and Connected Growth Areas
Policy 9.2.1: Encourage the development of complete neighborhoods that provide a mix of
housing options, parks, trails, and convenient access to employment, services, and community
destinations.
Policy 9.2.2: Promote interconnected street, sidewalk, and trail networks that enhance
connectivity between existing neighborhoods, new growth areas, schools, parks, and commercial
centers.
## Goal 9.3: Expand Employment and Commercial Opportunities
Policy 9.3.1: Preserve and enhance industrial growth areas along major transportation corridors,
including Highway 169 and Highway 22, to support employment-generating uses.
Policy 9.3.2: Encourage commercial growth, redevelopment, and reinvestment within existing
commercial districts and designated mixed-use areas.
## Goal 9.4: Encourage Flexible and High-Quality Development
Policy 9.4.1: Encourage mixed-use development that integrates residential, commercial, office,
and services with infrastructure capacities to create vibrant activity centers.
Policy 9.4.2: Support site design, land use transitions, and development standards that protect
community character while accommodating future growth and redevelopment.
Policy 9.4.3: Encourage the preservation, rehabilitation, and adaptive reuse of historic buildings,
cultural resources, and traditional development patterns that contribute to Saint Peter's unique
identity, character, and sense of place.
Please see Sustainability Chapter for sustainable Goals and Strategies that relate to this
chapter.
98
| 93
## 10 | IMPLEMENTATION
99
| 94
The Implementation Chapter will be shaped by public engagement over the next several months. This
chapter will be written last.
## Placeholder – Implementation
100
| 95
## Official Controls
## Zoning
## Text
## Land Division Ordinance
## Text
## Ordinance Amendments
## Text
## Funding Mechanisms
## Text
## Capital Improvement Program (CIP):
## Text
## Grants and External Funding:
## Text
## Implementation Matrix
## Text
## Priority Levels
## Text
## Leader
Leaders found in the following implementation matrix are:
• List
101
| 96
## Implementation
## Number Goal/Strategy Priority Lead + Partners Funding
3.1 Goal
3.1.1 Strategy
x.x Goal
x.2.1 Strategy
x.x Goal
3.3.1 Strategy
• List of resources
Sustainability chapter will have its own matrix with KPIS so it is a little more detailed. We will want to
discuss how to integrate, because KPIs for all goals and strategies is not typical or recommended.
102
| 97
## APPENDIX A | PUBLIC COMMENTS
103
## Memorandum
## TO: Economic Development Authority (EDA) Members DATE: 8/14/2026
## FROM: Benjamin Baker
## Community Development Director
## RE: Potential Funding Program for Downtown Sidewalk & Pavement Improvements
## ACTION / RECOMMENDATION
None. Update only.
## BACKGROUND
The Central Business District (CBD) has been identified as a historic downtown, gathering place,
shopping center, entertainment hub, and significant community asset (similar to a park).
Therefore, City Staff will be working on the following items over the next half-year to determine if
a funding program needs to be established to help pay for sidewalks and other pavement areas
located in withing the CBD:
## Inventory & Improvement Plan
• Sidewalk & Other Pavement Areas - conditions inventory and map –
## MOSTLY COMPLETE (SEE ATTACHMENT)
• Sidewalk & Other Pavement Areas - improvement plan (priority ranking)
## Funding Sources
• Development Incentives (TIF); Taxes / Fees / Assessments; Loans & Grants
## Previously Identified Downtown Pavement Projects
## • Park Row (Timeless) Sidewalk – ON HOLD
• Walnut Street (Hulsebus Chiro) On-Street Parking – COMPLETE (95% PRIVATE)
• Block 178 (FNB/Contents) Alley/Parking Lot – COMPLETE (100% PRIVATE)
## Cost Estimates – Downtown Sidewalk
• Basic - $85/ft (full block) - $94/ft (1/4 block)
• Complete - $185/ft (full block) - $244/ft (1/4 block)
• ¼ Block (155 ft): $15k - $37k
• Full Block (664 ft): $57k - $124k
Therefore, if $50,000/year was budgeted for a Downtown Sidewalks program, it is assumed
that approximately ½ - ¾ block segments could be completed in a year, depending on the
project scope.
104
## Preliminary Sidewalk Conditions Map
There are approximately ( 19) “¼ block segments” shown on the sidewalk conditions map shown
as “poor” (needing repair). At $135/ft, that is nearly $400,000 to complete the “poor” sidewalk
sections. At $50,000 per year in funding, it would take around 8 years to tackle the worst
sidewalks in the Downtown area.
## Program Timing
Moving forward, it is likely that the annual “Accessibility Improvement Grant Program” will be
changed to run every-other-year and coincide with a potential “Downtown Sidewalk Program”.
## Example
• 2027 Downtown Sidewalk Program $50,000 (2-3 sections)
• 2028 Accessibility Improvement Program $50,000
• 2029 Downtown Sidewalk Program $50,000 (2-3 sections)
• 2030 Accessibility Improvement Program $50,000
• 2031 Downtown Sidewalk Program $50,000 (2-3 sections)
• 2032 Accessibility Improvement Program $50,000
Please feel free to contact me if you have any questions or concerns about this agenda item.
## BB
105
## W Park Row St
## W Nassau St
## W Myrtle St
## W Mulberry St
## W Grace St
## W Chestnut St
## W Broadway Ave
## S Front St
## S 4th St
## S 3rd St
## N Minnesota Ave
## N Front St
## N 3rd St
## E Broadway Ave
## Sidewalk Survey
## Street Names
## City Limits
Parcels (5-28-2025)
## 8/12/2026, 2:33:39 PM
00.060.110.03mi
00.090.170.04km
1:4,514
## City of Saint Peter Web GIS
## Source: City of Saint Peter, Nicollet County, Esri
106
## REVOLVING LOAN REPORT7/1/2026
## CBDORIGINALORIGINATIONCURRENT12/31/2025BALLOON DUE
## BORROWERRENO/ACCBORROWERDATEBALANCEBALANCEor REVIEW DUE
Flame Bar/Mike HobdayX25,000.00$ 11/1/20198,333.60$ 9,583.58$ Oct-27230 Fund
Forever Plaid LLC/Autumn Rettig50,000.00$ 3/1/202447,202.23$ 47,844.38$ Jul-44
Forever Plaid - 208 S Minn/Autumn RettigX25,000.00$ 4/1/202419,375.09$ 20,625.07$ Mar-32
Forever Plaid - 212 S Minn/Autumn RettigX25,000.00$ 4/1/202419,375.09$ 20,625.07$ Mar-32
River Rock Bakery X21,960.00$ 11/1/202418,483.00$ 19,581.00$ Jul-32
Sota Scoops4,815.00$ 9/1/20254,012.50$ 4,494.00$ Aug-30
The Haven at Hallet's/G. Dotson & A. Pipal30,000.00$ 12/1/202323,942.24$ 25,192.15$ Nov-28
Timeless/ Brycorpx19,416.00$ 9/1/202517,798.00$ 18,768.80$ Jan-33
Tremendous Brewery/ 227 Mulberry100,000.00$ 6/1/202494,495.75$ 95,934.19$ Jul-29
Tremendous BreweryX10,000.00$ 9/1/20248,250.07$ 8,750.05$ Oct-29
Azure Skye, LLC25,000.00$ 4/1/202624,583.34$ -$ 240 Fund
Bushaw Properties25,000.00$ 4/1/202624,583.34$ -$
River Rock Bakery Building21,500.00$ 9/1/202017,980.43$ 18,307.61$ Sep-45
Halal Meat & Grocery3,834.98$ 9/21/2021363.55$ 363.55$ Nov-24
K&C/ StelterX25,000.00$ 1/1/20208,750.26$ 10,000.24$ Dec-27
MNO Real Estate, LLC74,500.00$ 6/1/202263,283.02$ 64,773.13$ Jun-27
Nicollet Hotel/Peter TannisFaçade 0%10,000.00$ 10/1/20222,666.52$ 3,666.54$ Oct-26
Paddlefish Brewery25,000.00$ 1/1/202318,833.24$ 19,845.23$ Jan-33
Red Men Club/Ed JohnsonX25,000.00$ 6/1/202317,291.79$ 18,541.77$ May-31
Kottke/Spring Touch Real Estate Holdings500,000.00$ 8/1/2025147,317.64$ 191,926.32$ Aug-30
St. Peter Food Coop350,000.00$ 4/1/2011102,767.66$ 114,643.59$ Dec-25
Tanis Brothers59,012.00$ 9/1/201423,221.62$ 26,674.94$ Oct-29
Timeless/ Brycorp26,650.00$ 9/1/202525,978.06$ 26,411.82$ Oct-45
River Rock Bakery & Kitchen40,000.00$ 4/1/2016WRITE OFF2,276.72$ Feb-26
Brandt20,593.00$ 3/1/2021WRITE OFF6,171.00$ May-26
Anytime Fitness/Chad Guentzel75,000.00$ 1/1/2021PAID IN FULL59,941.67$ Apr-26
Azure Skye/Bertram16,003.00$ 1/1/2019WRITE OFF5,000.00$ Oct-25
## Traverse des Sioux Enterprises/
Check due Feb & Aug 1st
416,673.18$ 8/1/2009PAID IN FULL13,888.99$ Jan-24230 Fund
David Bushaw20,000.00$ 12/1/2016WRITE OFF5,000.00$ Nov-26
Kaduce Properties16,831.00$ 9/1/2017WRITE OFF5,000.00$ Aug-27
Mayer - Chabeans25,000.00$ 7/1/2016WRITE OFF5,000.00$ Jun-26
JAEL Properties65,008.00$ 8/1/2014PAID IN FULL37,070.22$ Aug-25240 Fund
PJ's Pizza5,629.47$ 2/1/20105,629.47$ 5,629.47$ JUDGEMENT
2,182,425.63$ 744,517.51$ 911,531.10$
Loan 230Loan 240Loan 250
## LOAN FUND BALANCES
(report from Joey)
2,501,628.02$ 464,509.54$ 1,873,135.29$ 163,983.19$
## LOANS OUTSTANDING744,517.51$
$3,246,145.53
107
## GRAND TOTAL
2026
## 2026 COVID-19 HOSPITALITY ASSISTANCE PROGRAM PAYMENTS
#1
## 5D
## BUSINESS
## LOAN AMOUNT
## 2025 BALANCE CARRY
## OVER
## FUND DEPT
## JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECBALANCE
Date of Note 2021
Darlene's Daycare/Darlene Kopischke5,795$ 1,095$ 24036111
100 100 100 100 100 100 100
395$
Diamond Dust Bakery/Cheryl Brown10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Dunkin Donuts/Oliver Schugel
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Frey Salon/Schoper & Mcgowan
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Halal Meat & Grocery Store/Karima Abdullahi6,743$ 4,543$ 240361114,543$
Johnson Hall/Brian Kuiper, Treas.
10,000$ 5,200$ 24036111
100 100 100 100 100 100 100
4,500$
La Mexicana Market/Douglas Johnson7,636$ 2,936$ 24036111
100 100 100 100 100 100 100
2,236$
## Nicollet Café/Neslihan Sengul
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Poshinate Kiddos/Lynne Gross
9,955$ 6,255$ 24036111
100
## 6,155$ NSF
## ON HOLD FOR 6 MONTHS
Puddle Jumpers Early Learning/Jessica Rodning6,944$ 3,744$ 240361113,744$
## RTN
## River Rock Coffee/Katie Aho
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Saints Laundry Company, LLC/Megan Willette10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
St. Peter Comm. Childcare Center/Sadie Laidlaw10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
St. Peter Eyecare Center/Dr. Zach Dirks10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Subway/Dave Gruenzner
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## The Great Wall/Tin Thanh Huynh
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## YV Services, LLC/Yakub Aden
2,879$ 2,779$ 240361112,779$
149,952$ 79,552$ 999 101001400 1300 1300 1300 1300 1300 1300 0 0 0 0 0 70,352.00$ 9,200.00$
## Jul-26
28,575.00$
108
## 2026 COVID-19 HOSPITALITY ASSISTANCE PROGRAM PAYMENTS
#2
## 5E
## BUSINESS
## LOAN AMOUNT
## 2025 BALANCE CARRY
## OVER
## FUND DEPT
## JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECBALANCE
Date of Note 2021
American Legion Post 37/David S. Arpin10,000$ 5,200$ 24036111
100 100 100 100 100 100 100
4,500$
## Best Western Plus/Brian Kern
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Cheese & Pie Monger/Liberty Warren8,081$ 3,381$ 24036111
100 100 100 100 100 100 100
2,681$
Chiropractic Holistic Health /Dr. Steven J. Moore10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Cornerstone Wellness/Dr. Steven J. Moore10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Don's Appliance/Jeff Orth
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## El Agave/Eber Noe Juarez
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Embassy Bar & Grill/Terry Blaschko10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Extra Innings Paninos/Michael Sweetman10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Fantastic Sam's/David A. Schultz
10,000$ 5,200$ 24036111
100 100 100 600 600 600 600
2,500$
4/01/26 increased payments to $600. Last payment on 12/01/26 $100.
## Her Happy Place/Lisa Eide
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Inspire Bridal Boutique/Brittany Jones9,482$ 4,882$ 24036111
100 100 100 100 100 100
4,282$
## RTN
## Jakes Pizza/Wallace Boyer
10,000$ 5,300$ 24036111
100 100 100 100 100
-$
5/18/26 received check for $4800 to pay off
## Julee's Jewelry/Julee Johnson
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
137,563$ 71,663$ 999 101001400 1400 1400 1900 1900 1800 1700 0 0 0 0 0 55,363.00$ 11,500.00$
## Jul-26
109
## 2026 COVID-19 HOSPITALITY ASSISTANCE PROGRAM PAYMENTS
#3
## 5F
## BUSINESS
## LOAN AMOUNT
## 2025 BALANCE CARRY
## OVER
## FUND DEPT
## JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECBALANCE
Date of Note 2021
Kid's Corner Child Care Center/Cassie Frey - Director10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
see note in cell A50-Kids Corner
## Knit & Sew World/Shawn Dolan
7,778$ 3,078$ 24036111
100 100 100 100 100 100 100
2,378$
## Olita Gifts/Jill Hass
5,330$ 1,030$ 24036111
100 100 100 100 100 100 100
330$
## Park Row Nutrition/Derrik Kraft
8,694$ 4,594$ 24036111
100 100 100 100 100 100 100
3,894$
Patrick's on 3rd /Bartelt / Mayer
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## Red Men Club/Ed Johnson
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
River Rock Kitchen & Bakery/Christine Rasmussen10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
Sweet Alice Floral/Sara Nett - Torgrimson10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
## The Flame Bar/Mike Hobday
10,000$ 5,300$ 24036111
100 100 100 100 100 100 100
4,600$
The Pulse Fitness Studio/Rachel More10,000$ 4,000$ 24036111
125 125 125 125 125 125 125
3,125$
$125 per month
## The River Nutrition/Scott Spiess
9,347$ 4,647$ 24036111
100 100 100 100 100 100 100
3,947$
101,149$ 49,149$ 999 101001125 1125 1125 1125 1125 1125 1125 0 0 0 0 0 41,274.00$ 7,875.00$
## 166,989.00$ OUTSTANDING BALANCE
200,364$
## Jul-26
110
## New City Hall –1441 Civic Way
•All departments (Transit,
## Police, Admin, Finance,
## Community Development) now
moved in.
•Project is 95% complete
(fur
niture currently being
installed).
•Council and Board meetings
may
start taking place in
August-September.
111
## Old City Hall – 227 South Front Street
•Old City Hall is now vacant.
•Development agreement being
d
rafted for 3-story multi-use
development.
•HPC recently approved the
pr
oject design.
112
## Downtown Updates
113
## Downtown Updates Continued
114
## North Mixed-Use Business Park
## Klein Street Apartments
•First lift of asphalt on parking lot
•New trail constructed through woods
•New sidewalk along Klein Street
•Currently framing third floor
## M
## nDOT Truck Station
•Initial site grading and utility work underway
115
## North Mixed-Use Business Park Continued
## North End Secure Storage
•Site will be paved by fall
•Fencing and gate currently being installed
## DC
## Hub Commercial Condos
•Grading and underground utility work complete
•Two new buildings under construction
116
## Old Minnesota Avenue
## Lagers
•No information
pro
vided by
property owner.
## Green Valley
•Mobile home buy
out p
rogram.
•Lot/home #0
re
cently torn dow
n
an
d removed.
•39 original homes;
15 re
moved;
24
r
emain.
## Old CarQuest Building
•Future Stas
h
## Di
spensary
•Under Construction
117
## Traverse Green
## Traverse Green – Phase I
•All lots reserved; majority of development is full
•SWMHP has reserved 2 lots for future CLT homes (based on State
funding)
•SWMHP has sold all 3 of their initial CLT homes
## Traverse Green – Phase II / TG Townhomes
•Phase II – full (4 lots)
•Essler St Townhomes – full (7 units)
## Traverse Green – Phase III (Cullen Street)
•Miller Homes planning to start 7 new homes, including some custom
homes
•Miller Homes constructing more twin-homes along Clark Street
•Miller Real Estate is helping City sell Blocks 2 & 4
•Fieldstone Homes are potentially interested in purchasing some lots
## Traverse Green – Phase IV (Future Phase 16-32 lots?)
•Very preliminary initial planning work has been started
## •Potential parters include Miller Homes, Fieldstone Homes, Habitat,
## SWMHP
118