North St. Paul City Council Meeting - 6/16/26
Adoption of the Agenda
Consent Agenda Items
Public Comment
North St. Paul City Council Advances Key Development Projects, Amends ADU Rules
Variance Request for 2130 Corn Place
Zoning Ordinance Text Amendment for Accessory Dwelling Units
McNite Athletic Complex Preliminary Design Development
2026 Crack Sealing Project Bids and Contract Award
Manager and Department Reports
Directional Drilling Crew Installation
Pole Installations/Change Outs
Fiber Company Transfer
Time Capsule Event
Full Document Analysis
Votes (6)
Adopt the agenda
Moved by Unspecified · Seconded by Unspecified
Approve the consent agenda
Moved by Unspecified · Seconded by Unspecified
Deny the variance application for the property at 2130 Cronin Place East
Moved by Jason · Seconded by Unspecified
Adopt the zoning ordinance text amendment (Ordinance 2026-XX) regarding Accessory Dwelling Units
Moved by Council member Woods · Seconded by Council Member McKenzie
Authorize City Manager to execute contract with WSB for McNite Athletic Complex preliminary design services ($129,000 not to exceed)
Moved by Unspecified · Seconded by Council member Woods
Accept bids and award contract for the 2026 crack sealing project to SealPros ($60,116.78)
Moved by Unspecified · Seconded by Council member Norby
Notable Quotes (9)
If you see someone in the audience that hasn't been here before and it's obvious that you can pick them out because there's nobody here anyway... Why don't you just come out in that 10 minutes after the uh workshop before the meeting and do you have something that you might want to say because they're not there to uh tick off an item on their bucket list. They're there for a reason and this woman was. But they get a better deal because they get more than three minutes like the last time because you got to straighten it out.
The second item is the uh situation that is it going to happen with the electric bill for the month of uh June that we get uh on sometime in July and the reduction in the uh rate for the power adjustment which I still you ought to have the the newspapers come to this uh city and do a story on uh that the rates for electricity across the nation have gone up 6% over a year, but you are reducing an item that you've already paid out because it's a power adjustment adjustment and has been paid for. But it was said at that workshop meeting and there hasn't been anything in the newsletter about this. I mean, this is wonderful. Get the newspapers, get the TV stations here to do a story on that you're reducing electric rates to your citizens. It is a story.
We did not find any special conditions or any special reasons in the code preventing them from meeting that 948 square ft. They want larger they they they want a larger garage. So it's in in staff's opinion because of that this request does not meet all the criteria in order for the city to grant a variance.
The variance will not adversely affect the health, safety, general welfare of the city because it subsequently gives better aesthetic to the locality and pre presents proper storage use.
We had a maximum size of 900 square f feet. We've changed that to 40% of the floor area of the principal dwelling. And in the applicant's case, uh that would allow them to have,60 or 80 square feet of ADU, which would be enough to accomplish their uh request, initial request.
Hiring a contractor for like to build your streets or to work on utilities, uh there's very clear um direction in terms of how cities might go about uh taking sealed bids, comparing those. Um requirement to award a contract to the lowest responsive and responsible bidder, that sort of thing. Um, professional services a little bit different. There's no requirement to have to go out, you know, certainly you can go out for RFPs.
I'm confident in telling the council here that the the scope and the price that is being presented to you is competitive. We put a lot of thought into it.
Crack ceilings, a type of regular pavement manage maintenance that is used to extend the lifespan of pavement.
The lowest quote we received was from Sealros. Sealos is a new contractor to the city of North St. Paul. So, we did reach out to three references from the city of Brooklyn Park, the city of Eden Prairie, and the city of Afton. All three cities were happy with the work they did and would work with the contractor again.
People (13)
Council member NordbyCouncil MemberParticipated in roll call and voting.
Participated in roll call and voting.
Council member WoodsCouncil MemberParticipated in roll call and voting, made motions.
Participated in roll call and voting, made motions.
Council member McKenzieCouncil MemberParticipated in roll call and voting, seconded motions.
Participated in roll call and voting, seconded motions.
Council member SchwearCouncil MemberAbsent from the meeting.
Absent from the meeting.
Mayor MongiMayorPresided over the meeting, participated in roll call and voting.
Presided over the meeting, participated in roll call and voting.
John SchmallPublic SpeakerProvided public comment and suggestions.
Provided public comment and suggestions.
Ken RobertsCommunity Development DirectorPresented information on variance request and ADU ordinance.
Presented information on variance request and ADU ordinance.
BrianUnknownIntroduced Ken Roberts for the variance request.
Introduced Ken Roberts for the variance request.
JasonCouncil MemberMade a motion related to the variance denial.
Made a motion related to the variance denial.
MorganUnknownResponded to a question about bidding for professional services.
Responded to a question about bidding for professional services.
Candace AmbergLandscape ArchitectPart of the WSB team for McNite Athletic Complex design, has parks and rec experience.
Part of the WSB team for McNite Athletic Complex design, has parks and rec experience.
RonUnknownMentioned as having knowledge of soil conditions at McNite Athletic Complex.
Mentioned as having knowledge of soil conditions at McNite Athletic Complex.
TyUnknownReceived thanks after the crack sealing project motion.
Received thanks after the crack sealing project motion.
Places Mentioned
Events & Meetings (4)
- June 2nd, 2026 workshop and regular meeting
- Meeting Date: June 10th, 2026 (implied by contract date)
- Public Hearing on June 4th (Planning Commission)
- Earliest crack sealing completion: End of June
Ordinances & Resolutions (3)
Amending portions of chapter 154 of the North St. Paul City Code, regarding the definition of an accessory dwelling unit and accessory dwelling unit regulations.
Resolution recommending denial of the variance application for the oversized accessory garage at 2130 cow in place.
Resolution accepting quotes and awarding a construction contract for the 2026 cracking project.