Agenda · Roseville City Council
Roseville City CouncilAgendaTuesday, April 28, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## Public Works, Environment and Transportation
## Commission Agenda
Tuesday, April 28, 2026
## 6:30 PM
## City Council Chambers
In accordance with Minnesota Statutes §13D.02 and City policy, Council and Commission members may
attend meetings remotely up to three times per calendar year.
(Times listed are approximate – please note that items may be earlier or later than listed on the agenda)
6:30 p.m. 1. Swearing in of New Commission Members
a. Swearing in of New Commissioners
6:35 p.m. 2. Roll Call
6:37 p.m. 3. Approve Agenda
6:38 p.m. 4. Election of Officers
a. Election of Officers
6:40 p.m. 5. Receive Public Comment
6:45 p.m. 6. Business Items
6:45 p.m. a. Communication Items
6:55 p.m. b. Approve Bike Plan
## 7:30 p.m. c. Pathway Master Plan - Continued Segment Review
## 8:20 p.m. 7. Commission Direction on Member Initiated Agenda Items
## a. Commission Direction on Member Initiated Agenda Items
8:28 p.m. 8. Approval of Meeting Minutes
## a. Approve March Minutes
8:30 p.m. 9. Adjourn
Page 1 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 1.a.
## ITEM DESCRIPTION: Swearing in of New Commissioners
## Background
The City Council appointed Luke Sandstrom and Charles Tedder to the Public Works, Environment and
Transportation Commission on March 2, 2026 and April 6, 2026, respectively. We welcome Luke and
Charles to the commission.
## Recommendation
The Commission Chair will swear in Mr. Sandstrom and Mr. Tedder as a Commission members.
## Attachments
## 1. Luke Sandstrom Commissioner Oath
## 2. Charles Tedder Commissioner Oath
Page 2 of 165
-Rl'SEVILLE
## OFFICIAL OATH
for
## Luke Sandstrom
## Public Works, Environment, and Transportation
## Commission
I, Luke Sandstrom, do solemnly swear that I will support the Constitution of the
United States of America and the Constitution of the State of Minnesota, and that I
will faithfully, justly, and impartially discharge the duties of the Public Works,
## Environment, and Transportation Commission for the City of Roseville,
Minnesota, to the best of my judgment and ability.
## Luke Sandstrom
Subscribed and sworn
to before me this twenty-eighth day of April 2026.
## Jesse Freiheimer, Public Works Director
Attachment 1
Page 3 of 165
## OFFICIAL OATH
for
## Charles Tedder
## Public Works, Environment, and Transportation
## Commission
I, Charles Tedder, do solemnly swear that I will support the Constitution of the
United States of America and the Constitution of the State of Minnesota, and that I
will faithfully, justly, and impartially discharge the duties of the Public Works,
## Environment, and Transportation Commission for the City of Roseville,
Minnesota, to the best of my judgment and ability.
## Charles Tedder
Subscribed and sworn to before me this twenty-eighth day of April 2026.
## Jesse Freihammer, Public Works Director
Attachment 2
Page 4 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 4.a.
## ITEM DESCRIPTION: Election of Officers
## Background
As required by City Code, 201.06.A, at the last meeting preceding the end of regular terms of appointment,
each advisory commission shall elect a chair and vice-chair from among its appointed members for a term of
one year and appoint a member to serve on the Ethics Commission.
Since this should have been completed at the March meeting, the two new PWET commissioners cannot
vote or be elected as chair, vice-chair or serve on the ethics committee.
For reference, attached is the City Code as it pertains to advisory commissions, the Public Works,
Environment and Transportation Commission and the Ethics Commission.
## Recommendation
Elect a chair, vice-chair and a member to serve on the Ethics Commission.
## Attachments
## 1. PWET Commission, Ethics Commission
Page 5 of 165
## CHAPTER 201
## ADVISORY COMMISSIONS
## SECTION:
201.01: Establishment
201.02: Purpose
201.03: Membership
201.04: Terms
201.05: Compensation
201.06: Organization
201.07: Meetings and Reports
## 201.01: ESTABLISHMENT:
A.All permanent standing advisory commissions to the City shall be established by adoption
of an ordinance under this Title, and shall be governed by the provisions of this Chapter.
B.From time to time, the City Council may elect to establish other advisory groups by
adoption of a resolution establishing, among other things, the purpose, membership,
organization, duties and term of service for such advisory groups.
## 201.02: PURPOSE:
Advisory Commissions are established to provide a method for citizen input and are advisory to
the City Council. No advisory commission shall have decision-making authority for the City,
except as expressly established by this Code or State Statutes.
## 201.03: MEMBERSHIP:
A.All members of advisory commissions shall be residents of the City, and shall be appointed by
majority vote of the City Council.
B.In addition to the regular commission members, the City Council may appoint up to two
additional residents of the city who are the age of 18 or under and enrolled in high school to
serve one-year terms on a commission as ex-officio youth commissioners.
## 201.04: TERMS:
A.Term Length: Members shall serve terms of three years, except for youth members and the
first members appointed following the creation of the commission. First members shall be
appointed as follows: At least one third of members shall be appointed for three-year terms, up to
one third of the members shall be appointed for two-year terms, and the balance of the members
shall serve a one-year term. Term length for any member will be established by the Council at the
time of the appointment.
B. Oath of Office: Every appointed member, before beginning his or her duties shall take an oath
stating that he or she will faithfully discharge of the duties of the commission to which he or she
was appointed. Individual commissioners are expected to understand and adhere to the Roseville
Ethics Code and attend the annual ethics training.
C. Expiration of Terms: A member’s term shall expire on March 31 of the year of the expiration
Attachment 1
Page 6 of 165
of the term, or at such time as a successor is appointed. Youth commissioner terms expire on July
31 of each year.
D. Term Limits: Members are eligible to serve two consecutive full terms on a commission in
addition to any partial term served to complete an unexpired term resulting from a vacancy or an
initial term upon creation of a commission. When members of an existing commission are
transferred by the City Council to a new commission, term limits apply to the combined time on
both commissions. Youth commissioners may serve up to three consecutive terms. Youth
commissioners may not be appointed or re-appointed to a term during which they will turn 19
years of age. Upon completion of service on one commission, residents can be eligible for
appointment to another commission, or after a period of at least one year, for appointment to the
same commission on which they have previously served.
E. Vacancies: Vacancies during a term shall be filled by the City Council for the unexpired portion
of a term. A vacancy occurs in any of the following circumstances: resignation, residence outside
the city, removal or death. The City Council reserves the right to defer filling commission
vacancies for any length of time deemed necessary.
F. Attendance: It is the expectation that Commissioners attend all meetings of the commission.
An absence is considered the same whether it is excused or unexcused. If a commissioner is absent
three consecutive meetings and/or misses a total of 30% or more of commission meetings in a
rolling 12 month period, the staff liaison or commission chair will forward the information to the
City Council.
G. Removal: Members may be removed by the City Council without cause. A member’s removal
shall be by majority vote of the City Council. In addition:
1. If a member fails to comply with the Roseville Ethics Code, the member may be
removed by the City Council.
2. If a member has absences from more than three consecutive commission meetings, or is
absent from more than 30% of the meetings in any rolling 12 month period, the member may be
removed by the City Council.
## 201.05: COMPENSATION:
Members of all advisory commissions shall serve without compensation.
## 201.06: ORGANIZATION:
A. Election of Officers: At the last meeting preceding the end of regular terms of appointment, or
at such other time as required by State Statutes, each advisory commission shall elect a chair and
vice-chair from among its appointed members for a term of one-year and appoint a member to
serve on the Ethics Commission as described in Chapter 207 of this code.
B. Governing Documents: City Code and State Statutes will govern commission activities. A
commission shall not adopt separate by-laws or rules to govern commission duties or activities.
C. Committees, Subcommittees and Task Forces: Commissions may by majority vote appoint
committees or subcommittees of their own members from time to time as required for the conduct
of their business. The formation of any other committees, task forces and/or alternate workgroups
would be subject to the provisions of this Chapter and shall be created only after approval of the
City Council. Subcommittees shall report on work underway and completed on a regular basis to
the full commission.
Page 7 of 165
D. Logo and Materials: To reflect the official nature of the commission and to preserve
consistency of the City’s brand, only the official city logo or a Council-approved derivative of the
logo, that contains the words “City of Roseville,” shall be used on commission materials.
E. Accessibility: Commission members will be available to residents of the city by providing a
preferred phone number or email address that can be used on the city website and/or on print
materials.
F. Staff Liaison: Each commission will be served by a staff liaison to assist in meeting planning
and commission processes and serve as a conduit to city staff and the City Council.
G. New Commissioner Training: New commission members will receive both general and
commission-specific training from the staff liaison and commission chair before beginning their
term. (Ord. 1498, 4/11/2016) (Ord. 1528, 6/5/2017)
## 201.07: MEETINGS AND REPORTS:
A. Meeting Schedule: Prior to the start of each calendar year, each commission shall adopt a
regular meeting schedule for the coming year. Commissions may amend their regular meeting
schedule, cancel meetings, or call special meetings as needed by majority vote at a regular
commission meeting. Commissions shall meet at least quarterly, except as otherwise required by
this Code or State Statutes. A special meeting of a commission may be called by the commission
chair and/or the City Manager between regular meetings after consultation and approval of both
parties.
B. Joint Meeting with City Council: At least once a year, each commission shall meet with the
City Council to report on the previous year’s work and to discuss work plans and pending issues
for the upcoming year. Commissions may request additional joint meetings with the City Council
whenever necessary to share information or seek guidance. A staff liaison is assigned to assist
each commission and will work with the City Manager to schedule any joint meetings.
C. Open Meeting Law and Data Practices: All meetings of a quorum of a commission need to be
properly noticed and shall be subject to the requirements of State Statutes section 13D, as
applicable. Individual commissioners are expected to understand and adhere to applicable state
laws and statutes. When a vacancy exists on a commission, a quorum shall consist of a majority of
the commission’s non-vacant seats.
D. Rules of Order: All commissions shall be subject to the same Rules of Order as are adopted
annually by the City Council.
E. Meetings: Commission meetings shall be held in a public place and the time, date, and location
of the meeting shall be publicly noticed. Commission must allow time for public comment on each
agenda item and at a Public Comment portion of the agenda at the beginning of each meeting. All
meetings shall be televised and recorded for future reference. External site tours by a Commission
shall be exempt from being televised, but such tours shall be publicly noticed as all other
Commission meetings.
F. Minutes and Reports: Commissions are required to keep a record of its meetings and actions
available through the City, as well as other recommendations, reports, studies and other documents
created or performed by or for a commission. Minutes of the meeting shall be detailed in the same
way as the City Council minutes are written.
(Ord. 1481, 07-20-2015) (Ord. 1498, 4/11/2016)
Page 8 of 165
## CHAPTER 206
## PUBLIC WORKS, ENVIRONMENT, AND
## TRANSPORTATION COMMISSION
## SECTION:
206.01: Establishment and Membership
## 206.02: Scope, Duties and Functions
## 206.01: ESTABLISHMENT AND MEMBERSHIP:
There is established a public works, environment, and transportation commission of the city
which shall consist of seven members appointed by the City Council and which shall be
subject to Chapter 201 of the City Code. (Ord. 1260, 4-15-2002) (Ord. 1313, 12-6-2004)
## 206.02: SCOPE, DUTIES AND FUNCTIONS:
The duties and functions of the commission shall be as follows:
A. Serve in an advisory capacity to the City Council, City Manager and Director of Public
Works on public works, environmental, and transportation matters. (Ord. 1313, 12-6-
2004)
B. Maintain an interest in and an understanding of the functions and operations of the
Public Works Department.
C. Maintain an interest in and an understanding of federal, state, county, regional and other
public works, environmental, and transportation services that impact City services.
(Ord. 1313, 12-6-2004)
D. Perform other duties and functions or conduct studies and investigations as specifically
directed or delegated by the city. (Ord. 1260, 4-15-2002) (Ord. 1481, 07-20-2015)
Page 9 of 165
## CHAPTER 207
## ETHICS COMMISSION
## SECTION:
207.01: Establishment and Membership
## 207.02: Scope, Duties and Functions
## 207.01: ESTABLISHMENT AND MEMBERSHIP:
There is established an ethics commission of the City which shall consist of one member
from each City Advisory commission and which shall be subject to Chapter 201 of the City
Code. (Ord. 1498, 4/11/2016)
The ethics commission shall hold an annual meeting and otherwise meet on an as-needed
basis or when an ethics complaint is filed.
## 207.02: SCOPE, DUTIES AND FUNCTIONS:
The duties and functions of the Commission shall be as follows:
A. Serve in an advisory capacity to the City Council on matters involving any ethics code
adopted by the City Council.
B. Administer any ethics code adopted by the City Council.
C. Perform other duties and functions or conduct studies as specifically directed or
delegated by the City Council. (Ord. 1338, 6-12-2006) (Ord. 1481, 07-20-2015)
Page 10 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 6.a.
## ITEM DESCRIPTION: Communication Items
## Background
At each commission meeting, City staff provides updates on City activities and projects ongoing within the
city that pertain to public works activities.
## Recommendation
Receive report and provide feedback.
## Attachments
## 1. Communications Memo
## 2. 2026 Roseville Project Map
## 3. April Development Activity Report
Page 11 of 165
## Public Works Department
## Memo
## To: P
## ublic Works Environmental and Transportation Commission Members
## From: Jennifer Lowry, City Engineer
Date: April 23, 2026
## Re: Communications Items
The following are updates to projects and other activities happening in Roseville since the last
commission meeting. Note that links to most planned or active construction projects can be found on
our construction projects website. http://www.cityofroseville.com/697/Construction-Projects
## R
oseville Public Works project updates:
•Maintenance Operation Center (MOC) / License & Passport Centers / Dance Studio (LPCDS)
oMOC - City staff from Public Works and Parks met with the consulting teams for a design
charette on March 26 to discuss layout options. Those options have had several
iterations while the consultants draft a Program and Conceptual Design Report. That
report will be shared with this commission and seek Council approval once complete.
oLPCDS – the concept planning for the building is further along that the MOC but will also
require Council action prior to detail design of construction plans.
•Lexington Avenue Pathway - County Road B to TH 36
oConstruction anticipated to start week of April 27 and be substantially complete by end
of May. Lexington Avenue will have lane shifts, but remain open to traffic.
•Hamline Avenue – County Road C to Snelling Avenue
oBid opening on April 29.
## •2026 PMP Project
oNearly 6 miles of roads are planned for rehabilitation in 2026. Bid opening on May 7.
## •Twin Lakes Trail Phase 2
oEasement needs to be negotiated with property owner. Plans complete, likely a 2027
construction due to tree removal needs.
•Wagner/Western Pathway
oEasement being negotiated with Ramsey County, construction optimistically
anticipated late 2026.
## •2026 Sewer Cleaning & Lining
oAwarded. Preconstruction meeting will be scheduled for early May.
## •Booster Station Phase 4 Improvements
oBuilding improvements to occur in coordination with the solar install in 2026.
•Lift Stations
oCohansey Lift Station upgrade with construction anticipated summer 2026.
oLift station assessment to establish 10-year work plan has been received from
consultant and is under review by staff. The last major study was completed in 2014.
•Wayfinding Signage
oSign installations to begin again in spring.
Attachment 1
Page 12 of 165
## PWET Communications Memo Page 2
## • Willow Pond
o Dredging of Willow Pond is planned for the winter of 2026/27 or the summer of 2027,
depending on the contractor. The Environmental Assessment Worksheet (EAW) will be
reviewed by City Council on June 8.
## • Keya Park Pathway along Pascal Street
o Council gave staff direction to build a path along the Pascal Street hill, but not to move
the curbs. This will be completed with the 2026 PMP project.
• Lighting
o Intersection lighting in eastern Roseville planned for 2026.
o Owasso Hills to decide standard vs enhanced lighting.
Other agency project updates:
## • Ramsey County
o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road and bridge
over railroad
Roadway scheduled for bidding this spring and construction this summer/fall
and bridge construction in 2027. Utility work ahead of project is underway.
## o Fairview from Larpenteur Avenue to County Road B2
Bids open April 30 for resurfacing and signal work, at County Road B and Gluek
Lane. Work can begin after May 10, hard closure can’t occur until June 11.
## o County Road D from Fairview Avenue to Cleveland Avenue
Design in process for 2027 project to include resurfacing and construction of a
path on the south side.
o Victoria Street Path from County Road C to Harriet Avenue
Design in process for 2028 project.
Public Open House scheduled for May 20 from 5-87PM at the Roseville Skating
Center.
## o Rice from Wheelock Parkway to County Road B
Design in process for 2028 project.
## o Larpenteur Corridor Study
RFP to be released soon for study of entire corridor.
• MnDOT
## o Snelling Avenue from TH 36 to Grey Fox Road
Construction begins April 27. Expect lane closures and short-term closures of
side streets when there is work nearby. Anticipate two weekend directional
closures with detours. Construction to be complete by State Fair.
Resurfacing and road repairs also include new off-road pathway west of Snelling
Avenue from Lydia Avenue to Old Snelling.
o TH 280 from Wabash Avenue in St. Paul to I35 W
Resurfacing and bridge work underway. Northbound is currently closed and
southbound anticipated to close April 29. Reopening lanes prior to State Fair.
Note that I-94 has another closure anticipated 10pm May 30- 5am June 1.
Closure from 35E to 35W eastbound and to Dale Street westbound.
Public question or complaints about 280, including things like increased traffic
on Cleveland Avenue or Snelling Avenue, can be shared with MnDOT at 612-254-
7776 or info@hwy280construction.com.
Page 13 of 165
## PWET Communications Memo Page 3
## o Gateway Bridge Project
Interagency meeting kickoff held for the 2031 project on I35W, TH 36 and 12-14
bridges from Fairview Avenue to the east.
• Other
## o G Line (Metro Transit)
Construction 2026-2028.
## o Private Utilities
Xcel is inspecting and replacing poles around town throughout the year. They are
also undergounding lines in seven small areas where damage to lines is
reoccurring and problematic.
Lumen is placing new fiber on Transit Avenue from Rice Street to Western Avenue.
## Engineering Updates:
• Roseville has remaining water efficiency rebates to use until June 30. An application has been
submitted for the 2026-2028 grant cycle.
## Environmental & Sustainability Updates:
• Climate Equity Action Plan Draft is available for review on the City website thru June 6.
http://www.cityofroseville.com/4004/Climate-Equity-Action-Plan
• DeVonte Roberts is this year’s Sustainability Intern and has started part time until going full time
this summer.
• The second Native Plant Sale with MNL will open for orders thru May 14, for pickup May 30. Both
residents of Roseville and non-residents can place orders at
http://www.cityofroseville.com/3979/Roseville-Native-Plant-Sale
• The EAW was submitted to the Environmental Quality Board (EQB) Monitor on March 24 and is
also posted on our website for public comment thru April 30. The EAW will be discussed at the
May PWET meeting. http://www.cityofroseville.com/willowpond
• The annual stormwater update, to fulfill MS4 permit requirements, is scheduled for May 19
during the PWET meeting.
• Clean Up Day is April 25, 2026, from 8am to 1pm, at the Dale St. Soccer Fields (2555 Dale St.
Roseville, MN). Open to Roseville residents only.
• Shredding Day is May 16, 2026, from 9am to noon, held in the parking lot of City Hall (2660 Civic
Center Drive, Roseville, MN). Open to Roseville residents only.
## Maintenance Updates:
• Street and Storm
o Early Spring Street sweeping of roads/parking lots completed (400 yards of material).
o Checking/clearing all catch basins to clean out the backs of debris.
o Fifth compost turning of 2025 fall leaves completed.
o Begin pathway patching problem areas.
o Grinding trip hazards on concrete sidewalks.
o Spring restoration of water break repairs in the roadway.
o Seasonal equipment changeover from winter to summer.
o Ongoing storm sewer and sign maintenance.
o Earth day trash pickup events by Hawkins and University of Northwestern.
o Spring turf restorations/mailbox repairs from winter maintenance operations.
o Spring stormwater sump cleaning and mosquito control.
Page 14 of 165
## PWET Communications Memo Page 4
## • Water and Sanitary Sewer
o Continued inspections for water service line inventory.
o St. Croix storm lift station metal repairs.
o Continued locates, weekly lift station inspections/repairs, collection of water samples.
o Responded to and repair water main breaks, water gate valves and sewer backups.
## Council Updates:
• Below is a highlight of items recently presented to and/or acted on by the City Council. More
information can be found in the agenda packets and minutes for the referenced Council
meetings:
o March 23
Discussed: Appointment process of Roseville resident to Falcon Heights's Les
## Bolstad Golf Course Redevelopment Community Advisory Committee
o April 6
## Received: Presentation on Draft Climate Equity Action Plan
## Approved: Award Contract for Rosebrook General Park Improvements
Approved: Appointment of Roseville Resident Jewelie Grape to Falcon Heights'
## Les Bolstad Golf Course Redevelopment Community Advisory Committee
## Approved: Final Payment for 2025 Pavement Management Project 25-04
Adjourned to Closed Session to discuss a potential offer to VFW
o April 13
## Approved: Adopt Resolution Awarding Construction Contract for 2026 Sanitary
## Sewer Lining Project (26-06)
o April 20 (public, but not on camera)
## Discussed: 2027 Budget and Implementation of City’s Strategic Plan
Page 15 of 165
0700100020003000
## Feet
## DISCLAIMER:
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records,
information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be
used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose
requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies
are found please contact 651-792-7044. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21
(2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and
agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third
parties which arise out of the user's access or use of data provided.
## AllProjects2026
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## IL
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## IC
## C
## E
## NT
## E
## R DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## IL
## LS
## C
## O
## U
## R
## TE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## AL
## TI
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TER
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## UR
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SA
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOS
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## WN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DEL
## LW
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLE
## VE
## LA
## N
## D
## A
## VE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## IS
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MA
## RI
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## AU
## T
## U
## M
## N
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## NSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## RO
## S
## E
## G
## AT
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## RR
## IN
## G
## TO
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## LA
## N
## D
## S
## E
## R
## VI
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## CC
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## SB
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## IL
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## IC
## C
## E
## NT
## E
## R DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## IL
## LS
## C
## O
## U
## R
## TE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## AL
## TI
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TER
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## UR
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SA
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOS
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## WN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DEL
## LW
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLE
## VE
## LA
## N
## D
## A
## VE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## IS
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MA
## RI
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## AU
## T
## U
## M
## N
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## NSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## RO
## S
## E
## G
## AT
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## RR
## IN
## G
## TO
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## LA
## N
## D
## S
## E
## R
## VI
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## CC
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## SB
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## D
## D
## D
## DDDDDDDDDDDDDD
## DD
## D
## D
## D
## D
## D
## DDDD
## DDD
## DDDD
## D
## D
## D
## D
## D
## D
## D
## D
## D
## D
## D
## DD
## D
## DDDDDD
## D
## DDDDDDDDDDD
'
'
'
!
(
!
(
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
## L
## Data Sources
## * Ramsey County GIS (2/14/2026)
## * City of Roseville Community Development
## * City of Roseville Finance Department
## Prepared by: Engineering Department
2/27/2026
## 2026 All Projects
## MnDOT Roadway
## Ramsey County Roadway
## City Roadway Reconstruction
## City Roadway Reclaim
## DDD
## City Roadway Mill & Overlay
## Pathway Construction
## Pathway Maintenance
## Watermain Project
## Storm Project
'
## Sanitary Pipe Lining (TBD)
## Sanitary Project and Lift Station Project
## Signal Project
!
(
## Intersection Streetlight Installation
"
)
## Non-Metered Streetlight Replacement
!
(
## Booster Station ProjectCity Campus Project
## Storm Pump Project
## New Streetlight Installation
Attachment 2
Page 16 of 165
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Arden Hills
## Falcon
## Heights
## Lauderdale
## Little Canada
## Maplewood
## New Brighton
## St. Anthony
## St. Paul
## Shoreview
## Minneapolis
## The Enclave
## Rosedale Center
(multiple,
see reverse)
## MnDOT
## Waters
## Edge
Villas of
## Reservoir
## Woods
New home
New home
## New Home
Temple of
## Hmongism
New home
New home
## Hand in Hand
## Montessori
## Von Maur ramp
## Presbyterian
## Homes
New home
New home
## Horton Inc
## Hamline
## Automotive
## Ding
## Tea
## Eaglecrest
## Twin Lakes
## Buildings
## A & B
## FedEx
## Old Dutch
## Blastoff
## Play Park
## Pottery Barn
## Adapt Health
## Omni Health
## Former Dept
of Education
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Arden Hills
## Falcon
## Heights
## Lauderdale
## Little Canada
## Maplewood
## New Brighton
## St. Anthony
## St. Paul
## Shoreview
## Minneapolis
## The Enclave
## Rosedale Center
(multiple,
see reverse)
## MnDOT
## Waters
## Edge
Villas of
## Reservoir
## Woods
New home
New home
## New Home
Temple of
## Hmongism
New home
New home
## Hand in Hand
## Montessori
## Von Maur ramp
## Presbyterian
## Homes
New home
New home
## Horton Inc
## Hamline
## Automotive
## Ding
## Tea
## Eaglecrest
## Twin Lakes
## Buildings
## A & B
## FedEx
## Old Dutch
## Blastoff
## Play Park
## Pottery Barn
## Adapt Health
## Omni Health
## Former Dept
of Education
Prepared by:
## Community Development Department
April 14, 2026
## Sources
## Ramsey County GIS (3/4/2026)
## Community Development Department
0 1,0002,0003,000
## Feet
## L
## See Reverse For Project Details
## Æ
## Residential
## Æ
## Retail
## Æ
## Office / Non-Retail
## Æ
## Industrial
## Æ
## Public / Institutional
## Development Projects: April 2026
Attachment 3
Page 17 of 165
Updated:[Type here]
[Type here] [Type here]
## ROSEVILLE COMMUNITY DEVELOPMENT ACTIVITY REPORT
## UPDATED: 4/14/2026
## Project Name Address Project Description Applicant/Owner Information Starting
## RESIDENTIAL
The Enclave 201-261 McCarrons Pl 20 detached townhomes (12 completed-8 lots remain) Multiple Summer 2021
Residential New Construction 2164 Eustis St New single family home Mike Torkelson Development Winter 2024
Residential New Construction 2976 West Owasso Blvd New single family home TJB Homes Winter 2026
Residential New Construction 2050 Eldridge New single family home Lee Homes Winter 2026
Residential New Construction 649 Heinel Dr New single family home Croix Custom Homes Summer 2025
Residential New Construction 595 Heinel Dr New single family home Lee Homes Winter 2026
Residential New Construction 1928 South Gluek Ln New two family dwelling Cara Builders Spring 2025
Residential New Construction 560 Ryan Ave New single family home Structural Buildings of MN Summer 2025
Villas of Reservoir Woods new homes 699/707 Shryer Ave, 692/700/708 Skillman Ave New single family home Cara Builders LLC Summer 2025
## RETAIL
Abercrombie & Fitch 1595 Highway 36 #400 Interior Alteration TBD (In plan review) Spring 2026
Pottery Barn 1595 Highway 36 #1600 New façade and interior alteration McGough Construction (In plan review) Spring 2026
Apple Store Breakroom Shell Space 1595 Highway 36 #130 Shell space for new breakroom P.R.M. Contracting Summer 2025
Blastoff Play Park 2325 Prior Ave Indoor playground, arcade, restaurant and bar Chan Consulting LLC Spring 2026
Vacant Tenant 1595 Highway 36 #170 Tenant Remodel P.R.M. Contracting Fall 2025
Ding Tea 2401 Fairview Ave Interior Alteration Tran Construction and Remodeling Fall 2025
Twin Lakes Building A 2033 Twin Lakes Pkwy New Construction Shell Building Sherburne Slater Construction (In plan review) Fall 2025
Twin Lakes Building B 2037 Twin Lakes Pkwy New Construction Shell Building Sherburne Slater Construction (In plan review) Spring 2026
Von Maur Ramp 1595 Highway 36 Ramp Repair Cy-Con Inc Fall 2025
## NON-RETAIL/OFFICE
MnDOT Waters Edge 1500 County Road B2 Mechanical upgrades Versacon Inc Fall 2023
## Eaglecrest 2945 Lincoln Dr Interior Alteration MRI, Inc Spring 2026
Adapt Health 2215 Highway 36 Interior Alteration The Bainey Group Construction Spring 2026
Horton Inc. 2565 Walnut St Interior Alteration Bauer Design Build (In plan review) Summer 2025
Hamline Automotive 2150 Hamline Ave Addition Sherburne Slater Construction (In plan review) Spring 2026
Former Dept of Education building 1500 Highway 36 Full demolition JE Dunn Construction Spring 2026
Old Dutch 2375 Terminal Rd Solar panels Blue Horizon Energy Spring 2026
Omni Health 1970 Oakcrest Ave Interior Alteration – Mental Health Clinic Fixed Assets, Inc Spring 2026
FedEx 2323 Terminal Rd Full demolition Veit and Companies Spring 2026
Temple of Hmongism 2381 Rice St Interior Remodel E11even Construction MN Summer 2025
Hand in Hand Montessori 211 North McCarrons Blvd Greenhouse/Shed Install Vanguard Builders Inc Summer 2025
Presbyterian Homes & Services 2925 Lincoln Dr Interior Remodel Maintenance Repairs & Installations Fall 2025
Page 18 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 6.b.
## ITEM DESCRIPTION: Approve Bike Plan
## Background
Roseville was awarded an Active Transportation Planning Assistance grant from MnDOT that Roseville used
to create a bike plan to complement our existing Pathway Master Plan. The Bike Plan was produced with the
assistance of a MnDOT consultant team and reviewed by the Bike Plan Committee, consisting of
representatives from various City departments and commissions, Roseville Public Schools, Ramsey County,
and a Roseville resident. Public engagement during the development of the Plan is noted in the Plan’s
appendices.
The Plan was first introduced to PWET on March 26, 2024, with updates in April and June of 2024, and
March and September of 2025. In addition, it was shared with the Parks & Recreation Commission in
October 2025. The draft Plan is posted on the City website and public comments were solicited from
October 10 – November 30, 2025.
Attached is the updated draft Bike Plan with appendices for your review and discussion. Staff will make a
short presentation at the meeting and seek Commission feedback and a recommendation to City Council.
The Plan will also be brought back to the Parks & Recreation Commission, then the City Council.
## Recommendation
Receive update and recommend City Council approve The Bike Plan.
## Attachments
## 1. Bike Plan
Page 19 of 165
## Establishing Roseville’s Bicycling Network
D R A F T ( V e r 1 . 2 ) F O R A P P R O V A L
## A P R I L 2 0 2 6
Attachment 1
Page 20 of 165
## B I C Y C L E P L A N
## Roseville, MN
2
## Acknowledgement
## Bike Plan Committee:
2
This Plan was funded through
the Minnesota Department of
Transportation’s (MnDOT)
## Active Transportation Program
and developed with the
technical assistance of MnDOT
and its consultants.
Learn more:
www.dot.state.mn.us/active-
transportation-program
## Jennifer Lowry, PE
## City of Roseville – City Engineer
## Noelle Bakken
## City of Roseville – Sustainability
## Specialist
Matthew Johnson, M Ed.
## City of Roseville – Parks & Recreation
## Director
## Jesse Freihammer, PE
## City of Roseville – Public Works
## Director
## Thomas Paschke
## City of Roseville – City Planner
## Antonio Montez
## City of Roseville – Organizational
## Development Manager
## Jacob Swanson
## City of Roseville – Police, Towards
## Zero Death Coordinator
## Nick Boulton
## Roseville Parks and Recreation
## Commission Member
## Bryant Ficek, PE
## Roseville Public Works, Environment
## & Transportation Commission Chair
## Bob Bierscheid
## Roseville Resident
## Kou Xiong
## Roseville Area Schools Representative
## Connie Bernardy
## Ramsey County Representative
Page 21 of 165
## B I C Y C L E P L A N
## Roseville, MN
3
## Executive Summary
This Bike Plan is the result of a collaboration in 2024 and
2025. A local Bike Plan Committee comprised of city, county,
and school district staff and a resident, came together to set
direction, co-create strategy and engagement which included
bicycle audits, hands-on network planning workshop, and
hosted an online interactive mapping tool and survey to
collect broader input.
This Plan serves as a living guide. The Plan builds on existing
plans, engagement with residents, lessons learned from other
cities, and observation and coordination with city staff to
establish a Priority Bike Network for Roseville, along with a
preliminary prioritization framework, and next steps for
moving the plan forward.
3
Page 22 of 165
## B I C Y C L E P L A N
## Roseville, MN
4
What’s in the Plan?
4
## Bicycle Terminology
The Plan uses the terms bicycling, bike, biking and bicyclist
broadly to refer to people of all abilities riding bicycles both
human-powered and electric-assisted, including devices adapted
for use by people with disabilities.
The terms bikeway, bike facility and bike infrastructure refers to a
bicycle lane, bicycle path, bicycle boulevard, shared use path, or
similar bicycle facility, regardless of whether it is designed for the
exclusive use of bicycles or for shared use with other
transportation modes. See Appendix A for more information on
different types of bikeways, routes, facilities and infrastructure.
Introduction | Section 1: Discusses the purpose of the Plan, the
benefits of biking and why the City of Roseville values biking and
the benefits it brings to the community.
## Our Streets Today | Section 2: Highlights existing conditions,
policy and plans that support this plan and data and insights
from the engagement process. It presents the physical and
geographical barriers to a connected network, how to overcome
them and how different agencies and partners should work
together to create a seamless experience for people biking.
## Bikeways for All, Bike Network Framework | Section 3: Focuses
on who bikes, why people bike (or might not) and the approach
the city will take to getting more people on bikes. It introduces a
framework for how the city’s bike network and its bikeways can
be categorized and the types of facilities that support people
biking of all abilities.
## Building the Network | Section 4: Presents Roseville’s
Priority Bike Network developed during this plan, the
different types of bikeways that make up the Network, and
Core Concepts to provide examples for how Roseville can
implement their Bike Network.
## Setting Our Wheels In Motion | Section 5: Discusses the
opportunities and processes for getting the Bike Network
implemented, including funding, planning, prioritization and
maintenance of projects. It explains how a network can be
supported through other initiatives and programs to grow a
culture of biking in Roseville.
Moving Forward | Section 6: A call to action to join
Roseville’s steps towards becoming a more bike-friendly city!
This is Roseville’s first Bike Plan and is meant to establish a solid start for
defining and building a more robust bike network in Roseville. This Plan
shares the purpose, vision, and goals that drove the planning efforts to
date. It includes the benefits of biking and why the City of Roseville values
biking and the benefits it brings to the community. The Plan highlights how
existing policies and plans, existing biking condition, crash data, and public
engagement helped inform the proposed Priority Bike Network.
Additionally, it introduces a framework for how the bike network and its
bikeways can be categorized and suggests next steps for how Roseville can
implement a robust bike network for all abilities to use.
To make the plan more accessible to the public and usable by staff, the
body of the Bike Plan was intentionally made to be a summary of the data,
efforts, resources, and input that went into its creation. The appendices
include nearly 80 pages of additional information.
## Appendix A – Research & Resources
## Appendix B – Community Engagement
## Appendix C – Existing Network and Draft Prioritization
## Appendix D – Demonstration Project
## Appendix E – Policy, Practice, and Program Recommendations
Protected bike lane (curb-level)Protected bike lane (bollard-protected)
Shared-use path (In Roseville)
Shared-use path
Painted bike lane
Painted buffered bike lane
Shared-use street (bicycle boulevard)
Neighborhood greenway
Painted bike lane
Protected bike lane (curb-level)
Shared-use path
Neighborhood greenway
Page 23 of 165
## B I C Y C L E P L A N
## Roseville, MN
5
Why a Bike Plan?
## PURPOSE
Bicycling is a sustainable transportation option that
contributes to a vibrant, equitable and sustainable
city. The Plan builds from, and is supported by, the
## city’s Complete Streets Policy, 2040 Roseville
## Comprehensive Plan, 2021 Pathways Master Plan
and community goals.
The primary purpose of this Plan is to develop a
network of bikeways that creates opportunities for
people of all abilities to safely and comfortably ride
bicycles for both recreational and functional trips:
daily errands, to get to work, a friend’s house,
school, or to enjoy Roseville’s great parks. This is a
network-level planning document that identifies
specific corridors (bikeways) for future investment
in bike infrastructure. The recommended bike
network policies and programs in this Plan serve as
a roadmap and should be used to guide next steps
and other planning efforts that impact biking.
A bicycle network that is safe, comfortable
and accessible for riders of all abilities,
especially for people experiencing systemic
barriers and inequities, to use confidently.
## V I S I O N
## G O A L S
Safe Streets: Create a safer, comfortable and convenient
network that prioritizes people of all abilities bicycling,
improving community access and safety for all.
Health & Well-Being: Encourage a healthy, active lifestyle for
all, improving community health outcomes.
Transportation Choice: Make bicycling an efficient way to get
around the community, reach neighboring cities and connect
to transit, increasing bicycle trips and reducing automobile
trips.
Page 24 of 165
## B I C Y C L E P L A N
## Roseville, MN
6
## How the Plan was Developed
6
The Bike Plan is the result of a collaborative process led by Roseville’s Bike Plan
Committee. The committee came together to host and participate in:
•Bicycle audits to assess existing conditions
•Network mapping workshop to define bikeways and connections
•Online engagement using an interactive mapping tool and survey to collect
broader community input
•Plan review through virtual meetings with city champions who
participated in the network mapping workshop
•Implementation of a demonstration project on Hamline from B to B2
The Plan builds on existing plans and policies, community and committee
participation and evidence-based state and national best practices to identify a
bicycle network and action steps to guide future investments in making
bicycling safer and more accessible for all.
The City of Roseville received planning assistance to develop this Plan, funded
by the Minnesota Department of Transportation (MnDOT) Active
## Transportation Program. The Active Transportation Program aims to increase
the number of people walking and biking to destinations.
## (Delineator) Protected Bike Lane Network Mapping Workshop
## Bike Audit
Page 25 of 165
## B I C Y C L E P L A N
## Roseville, MN
7
## SOCIAL CONNECTION
"Humans are social creatures—we live in
community.Individual health and
wellbeing is intricately tied to the health
of our communities and our interactions
with others.“
Bicycling provides us more opportunity to
interact with our friends, neighbors and
community.
## HAPPINESS
Researchers at the University of
Minnesota have found bicycling to be the
happiest form of transportation.
## HEALTH & WELLBEING
Bicycling as part of everyday travel is as
effective as structured workouts for
improving health. Active commuting is
associated with a 11% reduction in
cardiovascular risk.
## WhyBicycling Matters
## University of Minnesota. (2018, August 20). The
happiest mode of transportation? That would be
cycling. University of Minnesota. https://twin-
cities.umn.edu/news-events/happiest-mode-
transportation-would-be-cycling
## Taking Charge of Your Health & Wellbeing. (n.d.). How do
our social networks affect wellbeing? University of
Minnesota. https://www.takingcharge.csh.umn.edu/how-
do-our-social-networks-affect-wellbeing
## American Public Health Association. (2010). The
hidden health costs of transportation.
https://www.apha.org/-
/media/files/pdf/topics/transport/apha_active_tran
sportation_fact_sheet_2010.pdf
Page 26 of 165
## B I C Y C L E P L A N
## Roseville, MN
8
## EQUITY
7.4% percent of Roseville households do
not have access to a vehicle and 36.7%
percent have just one. Owning a new car
costs roughly $12,182 per year (AAA,
2023). This is a sharp increase from 2022
when the average yearly cost was
$10,728. Car ownership should not be a
requirement for getting around safely
and efficiently.
## ENVIRONMENT
The city supports Minnesota’s goal of an
80% reduction of greenhouse gas (GHG)
by 2050. Vehicle travel is the second
leading source (42%) of GHG emissions in
the City of Roseville.
Bike networks reduce dependence on
driving to get around. Less driving
provides two-fold benefit – cleaner air
and reduced impact on our climate.
## ECONOMY
Bicycling means business: it stimulates
local economies through job creation,
tourism and business development.
People biking make more frequent trips
than people driving, spending more
money at local businesses.
## WhyBicycling Matters
Schmitt, A. (2012, December 5). Cyclists and pedestrians can end up
spending more each month than drivers. Bloomberg.
https://www.bloomberg.com/news/articles/2012-12-05/cyclists-and-
pedestrians-can-end-up-spending-more-each-month-than-drivers
## Minnesota Department of Transportation. (n.d.). Minnesota Walks:
Statewide Pedestrian System Plan.
https://www.dot.state.mn.us/minnesotawalks/index.html
2022 American Community Survey 5-year estimate, table B08201
AAA Newsroom. (2023, August 30). Annual new car ownership costs
boil over $12K. AAA. https://newsroom.aaa.com/2023/08/annual-
new-car-ownership-costs-boil-over-12k/
Page 27 of 165
## B I C Y C L E P L A N
## Roseville, MN
9
## Why Bicycling Matters | Safer Streets for All
9
Lyndale Ave in Richfield before (above) and after (below)
the installation of modern roundabouts at multiple
intersections, which allowed lane space to be reallocated for
protected bike lanes (cycle tracks).
Traffic-related crashes that killand severely injure people are a serious
transportation equity and public health concern. Minnesota is seeing a rising share
of crashes involving people biking that result in fatal and serious injuries.
## Ramsey County’s 2015 County-wide Pedestrian & Bicycle Plan estimated that
Ramsey County has the second highest serious injury rate of bicyclists relative to the
rest of the state. In Ramsey County, three-percent of all crash fatalities are bicyclists
which is one-and-half times the state average. Streets with higher numbers of bike
crashes tend to be in St. Paul; in Roseville, up to six bicycle crashes were reported
on nearly all major roads.
In Roseville, over 130 people walking or biking were involved in a crash in the last
10 years, 5 of them lost their lives, and 25 sustained life-changing injuries. Of the
crashes involving people walking and biking in the past 10 years, nearly 20%
occurred on Roseville city streets (vs County or State-owned streets).
One of the top reasons people cite for not biking is concern about safety (both
traffic safety and personal security). People who bike (and walk) are the most
vulnerable transportation system users. National and state data show American
## Indian/Alaskan Native, Black/African American and Hispanic people and low-income
individuals are at greater risk of being severely injured or killed due to a motor
vehicle related crash while biking.
Streets that are safer for people biking (and walking) reduce the frequency and
severity of crashes and minimize conflicts between all transportation users. Safety,
both real and perceived, is essential to increasing the number of people who bike.
Page 28 of 165
## B I C Y C L E P L A N
## Roseville, MN
10
## Policy Framework,
## Existing Plans & Policies
Recent plans and policies have made efforts to improve biking in Roseville. Plans
have established comprehensive standards for the development and maintenance of
bikeways, creating safe and accessible travel for pedestrians, cyclists and other
wheeled users. Additionally, they collectively support a vision of growth of a well-
connected bike network, enhancing safety and connectivity while promoting
physical activity and community interaction.
This bike plan seeks to build from the Pathways Master Plan by:
•Reaffirming proposed pathway segments identified in 2021 that continue to be
priorities for bicycling upgrades today
•Identifying new bikeways to add to the bicycle network in Roseville. See page 6
for bikeway definition
•Identifying the types of bike facility upgrades appropriate for these bikeways
•Providing a clearer vision for implementation of bikeways when opportunities
arise
## COMMUN IT Y SNAPSHOT
Roseville’s Bike Plan supports and is informed by the following existing plans and
policies:
Pathway Master Plan (2021 Update) – This plan provides policies and standards
for the community’s pathway facilities including planning, design, construction,
and maintenance. The goal is to have safe travel for pedestrians, cyclists, and
other wheeled users ( e.g., in-line skaters) on every street. Pathways are intended
to connect residents to schools, retail, residential, parks and other destinations
inside and outside the city.
Roseville 2040 Comprehensive Plan (2020) – The Comprehensive Plan provides a
vision for growth and development. It analyzes and sets policies and goals
regarding land use, housing, economic development, transportation, utilities,
parks and trails and more. The plan is guided by several goals including providing
access to destinations through a reliable, affordable and efficient multi-modal
transportation system and encourages the use of non-motorized transportation
by providing and supporting development of a high-quality network of both off-
road and on-road pathways.
Complete Streets Policy (2019) – This policy states Roseville will create a safe and
sustainable transportation network for motorized and non-motorized [active]
transportation users. The policy encourages the use of active transportation
through the development of a high-quality network of both off-road and on-road
facilities to ensure that bikeways and pedestrian routes are safe, efficient and
attractive.
Ramsey County Wide Pedestrian & Bicycle Plan – This plan envisions that walking
and bicycling is an integral part of daily life in Ramsey County for people of all
abilities, allowing them to move freely across the integrated system. An annual
inventory is conducted by individual jurisdictions, typically municipalities, to
identify the types and miles of various active transportation facilities. A new
Ramsey County All-Abilities 2050 Transportation Plan was being developed in
2023-2025 and will be also considered and coordinated with moving forward.
“Roseville’s streets enhance neighborhood character, encourage
human interaction and physical activity, and facilitate
engagement in the community and local commerce.
City policies and transportation projects incorporate principles
of sustainability and environmental stewardship, reflecting the
value of natural spaces and clean air and water for the
## community.” – Roseville’s Complete Streets Policy
Page 29 of 165
## B I C Y C L E P L A N
## Roseville, MN
11
## Existing Bike Network
The existing network of bikeways in Roseville is comprised of
striped shoulders, sidewalks, and shared-use paths that are
mostly located on Ramsey County roads. Shared-use paths in
Roseville city parks also contribute to the existing network. There
are very few on-road bike lanes that are relatively new (i.e. the
delineator protected bike lane on Hamline Avenue from County
Road B to B2 installed as a demonstration project associated
with this planning effort).
Sidewalks comprise nearly 50% of existing bikeways in Roseville.
While city ordinance allows biking on sidewalks, sidewalks are
not a long-term solution for cycling in Roseville as sidewalks are
not designed for people to bike; they are narrow, which creates
conflicts between bicyclists and pedestrians, and drivers do not
expect to see cyclists on sidewalks.
The map on the following page shows pathways proposed in
Roseville’s 2021 Pathway Master Plan update overlaid on the
existing bike network. The map also shows the progress the City
has made on since 2021, with nine recently completed pathway
segments and six near term pathways programmed for
completion in the upcoming year.
## Bikeway Type
## Existing
## Mileage
Sidewalks: 5-6 feet wide along
busy roads, bicycling allowed,
but not ideal.
47
Shared-use path: 8-10 feet
wide along busy roads, shared
by people walking and biking.
37
## Striped Shoulders: street-level
paved shoulders often shared
with parking and marked with
a white line.
18
## Total102
## Striped Shoulders on Western Ave
## Shared-use Path on County Road C
## Sidewalk on County Road B2
Page 30 of 165
## B I C Y C L E P L A N
## Roseville, MN
12
## Pathways Progress
in Roseville
Page 31 of 165
## B I C Y C L E P L A N
## Roseville, MN
13
How the Community Was Engaged See Appendices B & D.
## Roseville Bike Plan Survey
Open from April 18
th
to July 1
st
, 2024. There were 370 responses to the survey.
## Networking Mapping Workshop
## Audit Team for Rosedale Mall Area Bike-ability
## Roseville Bike Plan Interactive Comment Map
Open from April 10
th
to June 30
th
, 2024. There were 324 visitors who left 378
comments.
## Walk and Bike Audits
Three audits that took place on June 10
th
and June 11th, 2024. City staff,
project staff, committee members and residents were present.
## Network Mapping Workshop
The in-person mapping workshop took place on June 11th, 2024. City staff,
committee members and residents worked together to identifying a priority
bicycle network for Roseville.
## Demonstration Project
A delineator protected bike lane was installed on Hamline Avenue from
County Road B to B2 in May 2025; public feedback was received Oct 10-Nov
30, 2025 from 181 respondents via an online survey, email and phone calls.
## Demonstration on Hamline Avenue
Page 32 of 165
## B I C Y C L E P L A N
## Roseville, MN
14
## Overarching Findings from Engagement
## Need for Improved Comfort and Safety
## on Major Roads
There are significant concerns about biking safety
and comfort on major roads like Snelling Avenue,
County Road B, Rice Street and Fairview Avenue.
## Lack of Dedicated Bike Infrastructure
Bikeways separated from vehicle traffic were
expressed as a desire to enhance safety and
comfort, especially for families and commuters.
## Challenging Bikeways in Key Areas
Several areas were noted for having inadequate or
uncomfortable bike paths, but issues vary depending on
the area. People biking in Central Park experience
conflicts with pedestrians while there are not bike facilities
for people biking to Rosedale Center on Co Rd B2.
## High Traffic Volume
High traffic volumes and are major concerns. Locations
like County Road C east of Lexington Ave and the
## intersection of County Road B and Hamline Ave are
areas where traffic conditions make biking intimidating.
## Complex Intersections
Bike audit and interactive comment map results
frequently showed that large, complex intersections in
Roseville are uncomfortable for bicyclists of all abilities.
## Improved Amenities and Maintenance
There is a notable concern about the lack of bike racks at
key destinations, poor maintenance of existing bike paths
and the need for better infrastructure support.
Page 33 of 165
## B I C Y C L E P L A N
## Roseville, MN
15
## Priority Bike Network
The Priority Bike Network provided on the next page was developed through the planning efforts previously described. This proposed Priority Bike
Networks helps Roseville be strategic about investments and implementation, especially in partnership with Ramsey County and MnDOT. It will inform
the selection of bikeway facility types by showing where higher quality facilities are needed to best support all abilities bicyclists (“interested but
concerned” type of bicyclist). If a project is planned on a roadway that is shown on the bike network, project development should prioritize including
the appropriate bike infrastructure.
The Priority Bike Network map identifies two different types of bikeways:
The Priority Bike Network identified through development of this plan is extensive. To help the city identify projects to move forward in the near-term a
draft prioritization is provided in Appendix C. In addition, the city will not always have the opportunity to implement a street’s preferred or highest
quality bikeway in the short term. Facilities like protected bike lanes or shared-use pathways often require full street reconstruction. The city should be
prepared to implement interim bikeway facilities as the streets are maintained. For example, restriping projects can narrow vehicle travel lanes to
stripe bike lanes or use pavement markings and signage to convert “bikeable shoulders” that exist today to dedicated bike lanes.
Shared-use street (bicycle boulevard)
Painted buffered bike lane
•All Abilities Bikeways – these bikeways focus on the half-mile major road grid in Roseville where vehicle
volumes and speeds are high enough that complete separation of bike facilities from vehicle traffic is
required for bicyclists of all abilities to feel comfortable. These routes are located on city, county, and state
roads. Along with separation from vehicle traffic, improving the complex intersections and barrier
crossings along these bikeways will be essential to making them available to all abilities of cyclists.
•Traffic-Calmed Local Street Bikeways – these bikeways focus on city streets where traffic volumes and
speeds might be low enough for bike lanes, buffered bike lanes, and shared-use street treatments to
provide a comfortable environment for users of all abilities and complete separation of bike facilities from
vehicle traffic may not be required. Intersections where these bikeways cross major roads will also need
improvement.
Page 34 of 165
## B I C Y C L E P L A N
## Roseville, MN
16
## Roseville’s Priority
## Bike Network
Refer to Appendix C for additional details
on each numbered bikeway
Page 35 of 165
## B I C Y C L E P L A N
## Roseville, MN
17
Next Steps See Appendices C & E for more details.
Conduct additional engagement.
A public comment period and focused
engagement with underserved
communities are wanted to collect
additional input and finalize this plan.
The City has identified these as critical
steps to successful implementation of
this plan.
•Conduct focused engagement with
underserved communities and
update this plan based on
feedback.
•Develop a shorter, two-page
summary of this plan to make
public review more accessible.
•Collect broad public comment on
this plan and update this plan
based on feedback.
Identify a network of Traffic-
## Calmed Local Streets
## Traffic-Calmed Local Streets
provide an alternative and
redundant route to the all-abilities
routes on the arterial streets and
can be implemented using less
costly, temporary materials.
This plan identifies three Traffic-
## Calmed Local Street bikeways, but
the City will work to identify
additional of these local routes to
add to the Priority Bike Network.
These bikeways can include
painted bike lanes and/or traffic
calming treatments to achieve a
low-speed, low-volume
environment for bicyclists to share
the street with drivers.
## Identify Priority
Intersections and
## Barrier Crossings for
## Improvement
## Given that Roseville’s
## Priority Bike Network is
comprised of the half-
mile grid of major roads,
plus additional Traffic-
## Calmed Local Streets,
there are many
intersections and barriers
in the network that
require improvement. Use
engagement data
collected for this Plan and
crash data to prioritize
intersections for
improvements.
## Finalize Prioritization
This plan provides a
preliminary prioritization
framework to start
planning and
implementing projects.
The City should add to and
finalize this prioritization
by considering:
•Bike crash history and
trends
•Critical gaps in existing
pathway network
•Implementability
•Priorities from the
## Pathways Master Plan
Page 36 of 165
## B I C Y C L E P L A N
## Roseville, MN
18
Next Steps See Appendices C &E for more details.
Coordinate and advocate
for this Plan
•Bring the plan to City
Council for consideration.
•Share it with partners.
•Continue to coordinate
## with Ramsey County,
MnDOT, and other agencies
to further corridor and
street design in support of
biking.
•Study and report lessons
learned from the
demonstration project on
## Hamline Avenue from
## County Road B to B2
Put the plan into action!
•Actively use this plan as a living guide and start to program
studies and update practices to advance Roseville’s Priority
Bike Network.
•Explore and identify funding opportunities listed in
Appendix A of this plan and identify appropriate projects
•Build momentum and participation by doing low-cost, quick
build projects or events to raise awareness.Taking
incremental steps to demonstrate change helps projects get
realized faster.Examples include:
•Consider paint or temporary devices to test curb
extensions to slow turning motorists and shorten
crossing distances. Or test narrower travel lanes to
paint a buffered bike lanes, providing more visual
separation between people biking and driving.
•Sign and use pavement markings to mark on-street
bike lanes.
## Periodically review Plan
Periodically review this plan
to confirm remaining steps
needed, add new bikeways,
and reprioritize.
5) Build momentum and participation by doing low-cost,
quick build projects or events to raise awareness.
Taking incremental steps to demonstrate change helps projects
get realized much faster than the typical street design process
allows. This saves money and time in the long run and builds
momentum and public appetite for permanent change.
•Use paint or temporary devices! When and where possible test
curb extensions to tighten curb radii to slow turning motorists
and shorten crossing distances. Or test narrower travel lanes
(10-feet) to paint a buffered bike lanes, providing more visual
separation between people biking and driving.
•Sign and use pavement markings to mark on-street bike lanes.
•Identify a priority project from this plan that is a candidate for a
demonstration project. Work with community members to
further test and refine ideas.
Page 37 of 165
## B I C Y C L E P L A N
## Roseville, MN
19
## RESEARCH & RESOURCES
## Appendix A
Page 38 of 165
## B I C Y C L E P L A N
## Roseville, MN
20
## Who are We
Designing For?
People. Pedal. Power.
## A B IKE NET WOR K FOR A LL A B ILIT IES, Y EA R ROUND
To become a premier bike-friendly city, Roseville’s bicycle network must accommodate
people biking of all levels, ages, abilities and preferences, and prioritize less confident
and more vulnerable people (e.g., children). The network must also accommodate
people in all seasons.
People bike for different trip purposes. Transportation-related trips are categorized as
trips to work, school, for errands (such as groceries) or connecting to transit. Recreational
trips are considered trips for physical activity or leisure.
Depending on trip purpose, people have different preferences. For example, people
bikingto the grocery store or work often prioritize directness as time is important,
whereas people out for a recreational bike ride value attractiveness and comfort more
than a direct route. Regardless of trip type, safety is critical for all people, especially
when ensuring children have safe routes to school, parks and other places.In addition,
people’s preferences and comfort for biking may change by time of day, who they are
traveling with (e.g., children), weather or other factors.
Understanding the diversity and nuance of trip purpose and bicyclists’ preferences is an
important part of planning for bikeways throughout Roseville. This Plan intentionally
avoids designating a bikeway for a particular trip purpose. Often, the same bikeway
network is used for both transportation and recreational trips. To make all forms of bike
trips a real option for more people, the Plan establishes the need, and incremental
steps, to prioritize the “interested but concerned” type of bicyclist who want to bike
more, but do not currently feel safe or comfortable doing so. Meeting the needs of this
cross section in bike network and facility design will create a low stress, all abilities
network that is inviting for the majority of the community.
## Transportation Equity
Policy, design and practices in our
transportation system have led to inequities,
disproportionately affecting low-income,
people with disabilities, Black, Indigenous and
People of Color, women and children.
Advancing transportation equity requires a
shift in transportation system design and
decision-making processes. For example, it
might mean more investment in areas that
have been historically underserved. It also
requires underserved users and communities
to share in the power of decision-making
through engagement and design processes.
Page 39 of 165
## B I C Y C L E P L A N
## Roseville, MN
21
## Safer Streets By Design
21
Street design and allocation of street space play a large part in managing vehicle speeds, which are directly correlated to injury and mortality
outcomes in crashes involving bicyclists and pedestrians. For example, narrowing and/or removing travel lanes allows space to be reallocated for bike
lanes, buffered bike lanes or fully separated or protected bike lanes (also called cycle tracks). Striping bike lanes on a street visually narrows the
street, which can reduce the speed of drivers and provide greater comfort to people walking.
Installing intersection treatments like modern roundabouts, a Federal Highway Administration (FHWA) Proven Safety Countermeasure, reduce
drivers’ speeds and decrease the distance people walking and biking need to cross at intersections. In addition, they increase vehicle capacity at
intersections without the need to add vehicle lanes, allowing street space to be reallocated for protected bike lanes or shared use paths. Designing
streets that are safer and more comfortable for people biking benefits the safety of other users, creating a positive feedback loop.
Streets that are complete put people first and become even greater community assets. They are places where people want to bike,rather than
places where people can bike if they must. In turn, more people choose to bike.
## Toward an All Abilities Bike Network
A high-quality bicycle network can significantly impact community access, convenience, well-being and environmental and economic resiliency. A
safer, more connected and balanced network will encourage and promote bicycling for everyday trips, giving people more transportation choice.
Plus, biking is a fun way to enjoy Roseville!
Page 40 of 165
## B I C Y C L E P L A N
## Roseville, MN
22
The significance of each principle may vary from bikeway
to bikeway and from person to person. For example:
Commute or Errand Trips: People commuting or running
errands value directness and safety.
## Recreational or Leisurely Trips: For recreational trip-goers
the biggest shift is in directness and attractiveness.
School Trips: This refers to elementary aged school
children. This is the hardest group to design for as safety
is vital, but all characteristics are important. The route is
only as strong as the weakest link, so safety at
intersections is also critical.
To provide transportation choice and encouragebiking trips, bikewaysmustbe:
## SAFE
Does the route minimize risk of injury and danger (both traffic and personal safety)?
## COMFORTABLE
Does the route appeal to a broad range of age and ability levels and are there user
amenities (e.g., places to sit, bike racks, protection from the weather)?
## COHERENT
How easy is it to understand where to go? How to navigate a crossing or an
intersection? How connected is the network?
## DIRECT
Does the route provide direct and convenient access to destinations?
## ATTRACTIVE
Is the route green, well-maintained and celebrate local identity?
## Bike Network Principles
Page 41 of 165
## B I C Y C L E P L A N
## Roseville, MN
23
## Bicyclist User Types
5-9%
4-7%
51-56%
## Low Stress Tolerance
## High Stress Tolerance
## INT ER EST ED B UT CONC ER NED
## E N T H U S E D &
## S O M E W H AT C O N F I D E N T
## H IG H LY
## CONF ID ENT
People in this group would like to bike more, but do not
feel safe on busy streets with fast moving traffic nearby. Biking on streets with
fewer and slower-moving cars or in a space separated from vehicles would
help them feel more comfortable. National and state research finds, on
average, over half of the population are interested in bicycling more often
but are concerned about having to share the road with motor vehicles. They
would like lower stress street environments to bike.
People who will ride
regardless of roadway
conditions and bicycle
facility. Highly confident
riders represent the
smallest category of
people willing to bike.
## NO WAY
## NO H OW
33%
People will
not bike out
of disinterest
or inability to
do so.
People who currently bike for
transportation. Sometimes
they are comfortable sharing
the street with drivers but
would prefer to ride on
streets with bike lanes or
separated paths.
Graphic adapted from AASHTO Guide for the Development of Bicycle Facilities
Page 42 of 165
## B I C Y C L E P L A N
## Roseville, MN
24
## Comfort Types of Bicyclists
## Low Stress ToleranceHigh Stress Tolerance
## INT ER EST ED B UT CONC ER NED
## H IG H LY
## CONF ID ENT
## WHAT IS TRAFFIC STRESS?
Bicycle Level of Traffic Stress (LTS) is a way to evaluate the stress a
person bicycling may feel when they ride on a road close to traffic. It
assigns a stress level to streets and bikeways based on factors such as:
•Traffic speed
•Number of travel lanes
•Number of vehicles
•Frequency of on-street
parking turnover
•Ease of intersection
crossings
•Presence of bike lanes
•Presence of physical barrier
to bike lane
## LTS 1
## LTS 2
## LTS 3
## LTS 4
Most children will feel safe bicycling on these streets.
The “interested but concerned” adult population
will feel safe bicycling on these streets.
Streets that are tolerable to “enthused and somewhat confident”
riders who still prefer having their own dedicated space.
High stress streets with high-speed limits, multiple travel
lanes and limited or non-existent marked bikeways.
## E N T H U S E D &
## S O M E W H AT C O N F I D E N T
Page 43 of 165
## B I C Y C L E P L A N
## Roseville, MN
25
## LTS
## LEVEL
## DESCRIPTION
## HIGHLY
## CONFIDENT
## BICYCLIST
## WILL RIDE
## ENTHUSED &
## SOMEWHAT
## CONFIDENT
## BICYCLIST
## WILL RIDE
## INTERESTED BUT
## CONCERNED
## BICYCLIST WILL RIDE
## LTS 1
## YESYESYES
## LTS 2
## YESYES
Inviting to most
adults, but
demands more
attention than
might be
expected from
children
## LTS 3
## YES
Often, but
more
variability in
level of
comfort
## NO
## LTS 4
## YESNONO
## Chart adapted from MnDOT Bicycle Facility Design Guide
Neighborhood street
Bike and pedestrian path separated by paint
Off-street bike path
Off-street bike and pedestrian path
On-street bike lane with painted
buffer
On-street bike lane with physical barrier
Neighborhood street
On-street bike lane
On-street bike lane
Shared-use collector or arterial street
Page 44 of 165
## B I C Y C L E P L A N
## Roseville, MN
26
## Best Practices
The bike network presented in thisPlan, and associated bikeway recommendations, are
based on state and national evidence-based bestpractices in bikeway design. Use, adopt
or endorse the following design guides to support decisions about design that will be
made during later stages of bikeway planning and implementation.
## Bicycle Facility Design
## Manual
## Minnesota Depart of
Transportation (MnDOT)
## Urban Street Design
## Guide
## National Association of City
## Transportation Officials
## (NACTO)
## Urban Bikeway Design
Guide, 3
rd
## Edition
## National Association of City
## Transportation Officials
## (NACTO)
## Bikeway Selection Guide
## Federal Highway
Administration (FHWA)
Guide for the
## Development of Bicycle
Facilities, 5
th
## Edition
## American Association of State
## Highway and Transportation
Officials (AASHTO)
The city can also refer to the Manual on Uniform Traffic Control Devices for Streets and Highways
issued by FHWA for guidance on traffic control, pavement markings, and signing related to bikeways.
Page 45 of 165
## B I C Y C L E P L A N
## Roseville, MN
27
## Complete Streets
Complete Streets is an approach that integrates people and place in the
planning, design, construction, operation and maintenance of streets. A
Complete Streets policy helps ensure a comprehensive and connected
multimodal transportation system that prioritizes safety over speed, more
equitably balances the needs of different modes and supports local land uses,
economies, cultures and natural environments.
Complete Streets look different from street to street. There is no “standard,”
rather a holistic and context sensitive approach is taken to address the unique
needs of users and characteristics of place. For example, to make biking safer,
more accessible and inviting, a “collector” or “arterial” street might include
buffered or protected bike lanes to account for higher traffic speeds and
volumes. On a residential street, people biking and driving might share the lane
and mix due to the low traffic speeds and volumes.
## Roseville’s Complete Streets Policy
“Roseville’s transportation system is robust and complex, providing facilities
for vehicles, freight, walking, bicycling, and transit, and prioritizing
connectivity between essential community hubs such as neighborhoods,
schools, shopping centers, and parks. All modes of transportation are equally
safe and accessible, facilitating the mobility of all community members and
especially vulnerable populations.”
## MnDOT Complete Streets Policy
“MnDOT must follow a complete streets approach in all
phases of planning, project development, operation and
maintenance activities.”
One of the four policy goals is to “increase bicycling and
walking as a percentage of all trips.” The policy states
higher priority should be given to address identified user
needs on projects that:
•Equity: Have a higher proportion of people with
disabilities, people of color, older adults, children or
low-income
•Mode Shift: Have a higher probability of increasing the
number of people walking, biking or taking transit
•Safety: Addresses a significant safety issue for
vulnerable users
•Connectivity: Addresses a gap or barrier created by
prior transportation investments
•Plan Alignment: Are identified in a local or regional plan
## Ramsey County All-Abilities Transportation Network
## Ramsey County All-Abilities Transportation Network
resolution (2016) to advance the county vision: “A vibrant
community in which all are valued and thrive.” Public works
uses an evaluation checklist for road, trail and transit
projects to ensure the resolution is put into practice.
Page 46 of 165
## B I C Y C L E P L A N
## Roseville, MN
28
## Safe System Approach
The Safe System Approach is the U.S. DOT’s guiding paradigm for traffic
safety. More communities and agencies, including MnDOT are following the
Safe System Approach to traffic safety, which aims to eliminate fatal and
serious injuries for all road users, including the most vulnerable users –
people walking, bicycling and rolling.
The Safe System Approach focuses roadway safety efforts on ways to
effectively:
1.Design for the people in the system
2.Manage vehicle speeds by design
3.Employ proactive tools to manage risks across an entire roadway
network, especially for the most vulnerable users
4.Foster integrated, collaborative and coordinated action
[MnDOT] can prevent traumatic life-altering, costly
crashes by focusing on creating low-speed environments
in population centers and around other destinations
where people are likely to walk [and bike]."
## - Statewide Pedestrian System Plan
## Learn more about the Safe System Approach:
https://www.transportation.gov/NRSS/SafeSystem
Page 47 of 165
## B I C Y C L E P L A N
## Roseville, MN
29
## Safe System: When to Mix, When to Separate
## BIKEWAY SELECTION GUIDE
The chart (left) was developed by Federal Highway Administration (FHWA) and
used by MnDOT in the Bicycle Facility Design Manual. It is considered a best
practice when selecting the best bikeway for a street.
A key aspect to ensure safer roads by design is separating users in the street
space. The greater the vehicle speed and the higher the vehicle volume,
thegreater the physical separation needs to be between people driving and
people biking.
Separate and protect people from moving traffic when vehicle speeds are
above 20 mph. This can be done visually with painted bike lanes or buffered
bike lanes or physically with bikeways fully separated by curbs, street trees, on-
street parking and more.
A shared streetenvironment, where users are mixed, can be createdfor
people biking and driving when speeds are at or below 20mph and vehicle
volumes are relatively low. This is a common environment on neighborhood
residential streets. Traffic calming tools, such as neighborhood traffic circles,
chicanes, pinch-points and curb extensions can be used to further mange and
achieve 20 mph speeds on residential or low volume streets.
Chart adapted from Federal Highway Administration Bicycle Selection Guide (2019).
Note: Chart assumes operating speeds are similar to posted speeds. If they
differ,operating speed should be used rather than posted speed.
Page 48 of 165
## B I C Y C L E P L A N
## Roseville, MN
30
## How to Select Bike Facility Type
There are many different types of bike facilities. These facilities are all different in the way they interact and operate with other users of the street.
The range of bicycle facility types is also always evolving. Determining how each bikeway will function requires detailed examination of each
corridor, using several interrelated concepts and approaches. As the city implements bikeways, they should consider the following elements:
•Context Sensitive: Balance the community’s economic, social and environmental needs and values alongside the corridor’s operational needs.
This includes considering existing and future land use, origins and destinations along the facility, and how the type of facility might vary along a
given route. Given that streets in Roseville are already built out, full reconstruction projects provide the most opportunity to reallocate street
space for people biking. However, interim improvements achieved through restriping, mill and overlay projects, or with temporary materials are
important as Roseville works towards its full vision.
•Complete Streets: Evaluate streets during any stage of a street project (e.g., planning, design, maintenance) to provide safe, comfortable and
inviting facilities for all transportation users, especially the most vulnerable.
•Safe System Approach: Prioritizes safety over speed. Focus on efforts to effectively design for all transportation users’ safety by managing
vehicle speeds through design. This is a proactive approach that provides guidance on how to select bike facilities and other proven safety
treatments based on traffic speeds and volumes.
•Engagement: Thoughtful engagement with the community living or working along the bikeway and those using the bikeway.
Page 49 of 165
## B I C Y C L E P L A N
## Roseville, MN
31
## Bikeway Facility Types
The bikeway routes and facility types discussed in this Plan are defined as:
•Protected bike lanes: Bikeways on busy streets that are physically
separated from moving vehicle traffic either using landscaping,
bollards or other vertical features such as flexible delineator posts or
curb. Protected bike lanes can be at the same level as the street or at
curb-level. Protected bike lanes may be one-way or two-way and are
only intended for people biking or using similar modes.
•Shared-use path: Bikeways shared by bicyclists and pedestrians for bi-
directional travel, which are typically 10-feet-wide or more. Shared-
use paths include paths at curb-level along a busy street or paths
farther from the street, like through a park.
•Painted bike lanes or painted buffered bike lanes: Bike lanes marked
on the roadway with white paint. As space allows, a painted buffer
space can be added to provide visual separation between the bike
lane and moving traffic, parked cars or both.
•Traffic-calmed local streets: Low-speed, low traffic volume streets
where bikes share the street space with vehicles. Shared-use streets
include both neighborhood greenways or bicycle boulevards (streets
that prioritize bike travel). Shared lane pavement markings may be
used to reinforce the bike route. Traffic-calmed local streets would
apply to a subset of Roseville’s local city street network.
Protected bike lane (curb-level)Protected bike lane (bollard-protected)
Shared-use path (In Roseville)
Shared-use path
Painted bike lane
Painted buffered bike lane
Shared-use street (bicycle boulevard)
Neighborhood greenway
Page 50 of 165
## B I C Y C L E P L A N
## Roseville, MN
32
## A SAFER CHOICE BY DESIGN
Modern roundabouts, including mini or compact
roundabouts, are a Federal Highway Administration
(FHWA) Proven Safety Countermeasure, creating a safer
intersection for all users:
•90% reduction in fatal crashes
•75% reduction in injury crashes
•30-40% reduction in pedestrian crashes
•10% reduction in bicycle crashes
•30-50% increase in traffic capacity
A single-lane modern roundabout can handle up to 25,000
vehicles per day (a compact roundabout slightly less); a
double-lane roundabout can handle up to 43,000 vehicles
per day. When designed properly, roundabouts ensure
motorist speeds of 15-23 mph, which increases drivers'
ability to judge and react to other people driving, walking
and biking. Roundabouts also create gateway treatments,
providing space for landscaping, local art and signage.
Photos (top to bottom right):
•Domed mini or compact roundabout
with curb extensions in winter. (Detroit
## Lakes, MN)
•Compact roundabout with a painted
rainbow creates a sense of arrival and
welcome. (Richfield, MN)
•Single lane roundabouts have fewer
vehicle-to-vehicle conflict points and
vehicle-to-person conflict points than a
signalized intersection.
•Massachusetts DOT diagram showing
guidance for roundabouts with
protected bike lanes and crossings.
## Core Concepts
## M O D E R N R O U N D A B O U T S
Page 51 of 165
## B I C Y C L E P L A N
## Roseville, MN
33
## Core Concepts
## DEDICATED SPACE FOR EACH MODE
Protected intersections provide dedicated space for each mode of travel: walking, biking
and driving. They can be implemented at stop-controlled or signalized intersections and
are most often used with separated bike lanes, but may be used with conventional bike
lanes, paved shoulders or even shared lanes. A variation on the standard protected
intersection can also be designed for two-way bicycle traffic on one side of the road.
## P R O T E C T E D I N T E R S E C T I O N S
•People using a protected bike
intersection. (Davis, CA)
•Graphic illustrates key features: a
corner island, bicycle queueing area,
driver yield zone and pedestrian refuge
## median. Source: MnDOT Bicycle Facility
## Design Manual
Graphic illustrating alternative design with two-
way bicycle traffic on one side of the road.
## Source: NACTO, “Don’t Give Up at the
## Intersection” National Association of City
## Transportation Officials (nacto.org)
## Truck Movements:
Protected intersections would be most
appropriate for bikeways on roads comprising
the ½ mile arterial grid in Roseville (primarily
County roads). For this reason, protected
intersections would need to accommodate
truck turning movements and the concept
designs shown on this page would need to be
adapted. However, there are examples in the
Twin Cities metro where protected
intersection elements have been
implemented on County roads that
accommodate truck turns.
Protected intersection benefits:
•Provide clear right-of-way
assignment between modes
•Maintain physical separation
between bicyclists and motor
vehicles through an intersection
•Place queued bicyclists in front of
and in clear view of drivers
•Improve visibility of bicyclists for
motorists while turning
•Clearly define pedestrian and
bicycle operating spaces
•Reduce pedestrian and bicycle
crossing distance
•Reduce motor vehicle turning speed
Elements of protected intersections can be implemented without
reconstruction using paint and bollards. See NACTO’s Don’t Give Up at the
Intersection (2019).
Source: MnDOT Bicycle Facility Design Manual, 5-37 and 5-38.
Page 52 of 165
## B I C Y C L E P L A N
## Roseville, MN
34
Photo (above): Main Street in Hamburg, NY is a major state truck route
carrying 12,000 vehicles per day. The town of Hamburg and NYDOT
replaced four intersections with single-lane modern roundabouts, removed
two travel lanes and narrowed the remaining lanes to 10-feet, allowing
wider sidewalks, park assist lanes and additional street trees.
10-ft travel lane
“park
assist” lane
Parking /
curb zone
## Core Concepts
## R I G H T-S I Z I N G S T R E E T S
More communities are prioritizing a people-first approach
to street design. To make streets safer for people walking,
biking and driving, street spaces is being reallocated by
reducing vehicle lane widths and removing lanes
altogether. The gained space is reallocated towards wider
sidewalks, bike lanes, separated bike lanes (also known as
protected bike lanes or cycle tracks), street trees, on-street
parking and more.
Right-sizing 5- or 4-lane streets to 3- or 2-lane streets
works best on streets that have daily traffic volumes of
8,000 to 20,000 vehicles. As streets reach the higher traffic
volumes additional intersection treatments, such as the
modern roundabout, might be needed to more effectively
manage vehicle traffic.
Page 53 of 165
## B I C Y C L E P L A N
## Roseville, MN
35
•Travel lanes could be as narrow as 10
feet. Narrower lanes and narrower
street width are associated with fewer
crashes.”
•MnDOT Technical Memorandum No.
17-12-TS-05 and No. 18-09-TS-06
Context Sensitive: AASHTO’s A Policy on Geometric Design of Highways and
Streets, commonly referred to as the “Green Book,” provides flexibility to use 10-
foot-wide travel lanes in a variety of situations depending on operating speeds,
volumes, traffic mix, design vehicle, horizontal curvature, use of on-street parking
and land use context.
Minnesota State Aid Standards (Part 8820.9941) note minimum lane width of 10
feet may be allowed on streets with bike lanes when design speeds are less than
35 mph and when all street factors are considered (e.g., bus route, traffic mix,
land use). It also notes engineering judgment should be used.
Travel Lane Width: Narrowing lanes can reduce the operating speed of traffic
while also providing the additional space needed for bikeways. Ten-foot-wide
lanes have a positive impact on a street’s safety without impacting traffic
operations. To support vulnerable users like pedestrians and bicyclists, streets
should maximize buffer space and work to manage safe speeds for all by design.
## National Association of Transportation Officials (NACTO): https://nacto.org/publication/urban-
street-design-guide/street-design-elements/lane-width/
## Core Concepts
## R I G H T-S I Z I N G S T R E E T S
•“Ten-foot lanes do not result in an
increase in crashes or reduce vehicle
capacity on roads with speeds of 45
mph or less. Narrower lane widths can
contribute to lower vehicle operating
speeds, which can increase safety for
all roadway users.”
## •FHWA Bicycle Selection Guide, 2019
Page 54 of 165
## B I C Y C L E P L A N
## Roseville, MN
36
## Core Concepts
## SAFER STREETS FOR ALL
Cities investing in bicycling infrastructure—from bike lanes to
fully separated or protected bike lanes (or cycle tracks)– achieve
environmental and safety advantages through the increase of
bicycle use. Bike lanes are one of FHWA’s Proven Safety
Countermeasures. Conventional bike lanes designate an
exclusive space for people biking with pavement markings and
signage. Many benefits of bike lanes go beyond the bicyclist:
•Creates visual separation between people biking and driving
•Increases predictability of bicyclist and motorist positioning
and interaction
•Visually reminds motorists of bicyclists’ right to the street
•Improves comfort for pedestrians by providing additional
buffer space to the sidewalk
•Improves emergency response by providing space for
motorists to pull over
•Supports more compact intersections as bike lanes provide
an effective turning radius for large vehicles, allowing for
other tools such as curb extensions to support people on foot
## B I K E L A N E S
## BIKE LANE SAFETY BENEFITS
49%
in total crashes decreased
on 4-lane undivided
collectors and local roads
due to marked space and
lane reduction.
30%
in total crashes decreased
on 2-lane undivided
collectors and local roads
due to marked space.
## Sources:
https://highways.dot.gov/safety/proven-safety-countermeasures/bicycle-lanes
https://nacto.org/publication/urban-bikeway-design-guide/bike-lanes/
https://www.aarp.org/content/dam/aarp/livable-communities/livable-
documents/documents-2014/Livability%20Fact%20Sheets/Bicycling-Fact-Sheet.pdf
Buffered bike lanes are almost always higher comfort
than conventional bike lanes. Fully separated bicycle
lanes provide further safety benefits and are more
comfortable to people of all abilities due to the greater
separation between people biking and driving.
Page 55 of 165
## B I C Y C L E P L A N
## Roseville, MN
37
## Core Concepts
## PRIORITIZE NEIGHBORHOOD BIKEWAYS
Bicycle boulevards (also called neighborways or neighborhood
greenways) arelow-volumeandlow-speed residential streets
that prioritize people walkingandbicycling anddiscourage
motor vehicle through traffic.Street design elements are mixed
and matched along the corridor to:
•Reduce or maintain low motor vehicle volumes
•Reduce or maintain low motor vehicle speeds
•Create a direct, coherent (logical) and continuous bikeways
•Create access to key community destinations
•Create comfortable and safe intersection crossings
•Give priority to people walking and biking, reducing delay
Combined, these treatments create anattractive, convenient
andcomfortable shared street environmentthat is welcoming to
people of allages and abilities.
## B I C Y C L E B O U L E V A R D
## PRIORITIZE
## PEDESTRIAN &
## BICYCLIST
## TRAVEL
## TRAFFIC
## REDUCTION
## WAYFINDING PAVEMENT
## MARKINGS & SIGNAGE
## INTERSECTION
## CROSSING
## TREATMENTS
## TRAFFIC
## CALMING
## B I C YC L E B O U L E VA R D S : A M I X O F D E S I G N
## E L E M E N T S
## Adapted from Portland Bicycle Boulevard Guide:
## PortlandBicycleBoulevardGuidebook.pdf
Page 56 of 165
## B I C Y C L E P L A N
## Roseville, MN
38
## Core Concepts
## SLOWER IS BETTER ON RESIDENTIAL STREETS
Traffic circles (also called mini-circles) work to reduce vehicle
speeds in a few ways.
First, they interrupt the “straightaway” feel of many residential
streets that can signal to drivers to go a faster speed than the
posted speed. Second, traffic circles narrow the intersection,
slowing drivers’ through and turning movements. Slower
intersection speeds increases motorists’ yielding behavior to
people walking and biking.
Traffic circles are a proven safety treatment, reducing all types of
intersection crashes by 90% and injury crashes by 97% (Seattle
Department of Transportation). They are most effective when
installed as a series at multiple intersections along a corridor and
are often suitable for replacing stop-controlled intersections.
## N E I G H B O R H O O D T R A F F I C C I R C L E
Traffic circles help achieve
neighborhood-friendly speeds of 15-20
mph by design.
## (Saint Paul, MN)
Traffic circles can be tested using low-
cost materials. They keep people safely
in motion, which is beneficial to people
biking. (Edgewater, CO)
Street trees in traffic circles adds to the
traffic calming effect while also helping
to better manage stormwater.
(Seattle, WA)
Traffic circles can be designed to create
gateways into key neighborhoods or
districts, like downtown, with features
such as sculptures or artwork.
(Holland, MI)
Page 57 of 165
## B I C Y C L E P L A N
## Roseville, MN
39
## Core Concepts
## SLOWER IS BETTER ON RESIDENTIAL STREETS
Chicanes slow vehicle traffic and can add space for greening and
stormwater management. They can also be implemented quickly
with just paint and temporary bollards.
Chicanes are curb extensions that create a serpentine, horizontal
shifting, effect. This shifting eliminates long stretches of straight
streetway where motorists can pick up speed by requiring drivers
to drive more slowly due to the lateral shift. They are often
paired with median islands to further manage motorist speeds.
Chicanes can be created with parking stalls, sidewalk extensions,
or green infrastructure curb bump outs that allow for planting of
native vegetation and rain gardens. Chicanes also create space
for street furniture or public art.
## C H I C A N E S
Chicanes provide space for
native vegetation as seen
on Grand Avenue in
Minneapolis, MN.
A designated space
outside of the chicane
element helps
bicyclists avoid having
to merge into traffic
at a narrow pinch
point, and creates a
route for people
walking, especially
when no sidewalks
exist. (Source:
## NACTO.org)
Page 58 of 165
## B I C Y C L E P L A N
## Roseville, MN
40
## Core Concepts
## PRIORITIZE NEIGHBORHOOD BIKEWAYS FOR PEOPLE BIKING
Median refuges that extend through the intersection where a
bike boulevard crosses a busy street improve the crossing
experience for people walking and biking, especially at major
intersections by shortening the crossing distance into two
separate sections with a place to stop in the middle. They also
reduce vehicle traffic volumes on the bicycle boulevard by
restricting vehicle turning movements onto and off the busy
street.
Traffic analysis is needed to assess potential impact of diversion
onto nearby streets and to consider additional traffic calming
measures needed to mitigate any traffic impacts. Coordination
would be needed with Ramsey County or MnDOT if the diverter
is on their roadway. Impacts to emergency responders should be
considered before implementation; some treatments may be
designed to allow emergency vehicle access.
Median refuges with vehicle closure are only one method to keep
traffic volume low on local streets. Roseville should consult the
guides listed in this appendix for additional traffic reduction
strategies for Bicycle Boulevards.
M E D I A N R E F U G E-V e h i c l e C l o s u r e
Motorists can
only take a right
off the 40th
## Street Bicycle
Boulevard at
this traffic
diverter while
cyclists can
continue
through.
(Cedar Ave.
## Minneapolis,
## MN)
Motorists can make a
right turn onto and off
of the Charles Ave
## Bicycle Boulevard at
## Lexington Pkwy while
cyclists can continue
in any direction.
## (St. Paul, MN)
Page 59 of 165
## B I C Y C L E P L A N
## Roseville, MN
41
## State, Federal and County Funding for Active
Transportation (1 of 3)
In addition to local Capital Improvement Program funds,
local jurisdictions may seek state and federal funding to
assist with development of the active transportation
network. Most programs involve applying through one
of these agencies:
•Federal Highway Administration (FHWA)
•Minnesota Department of Transportation (MnDOT)
## •Minnesota Department of Natural Resources
## (MNDNR)
## •Greater Minnesota Regional Parks and Trails
Commission (GMRPTC)
•Legislative-Citizen Commission on Minnesota
Resources (LCCMR)
Grants are sometimes also available through
organizations that support economic development and
tourism, public health, and conservation and the natural
environment. Private donations are popular for projects
that support community recreation and well-being.
## SourceFundsPurpose
## FHWASafe Streets and Roads for All
## (SS4A)
## funds Comprehensive Safety
Action Plans (and demo
projects) and infrastructure
projects that are
recommended as a result of a
SS4A plan
## FHWA Reconnecting
## Communities Pilot
## Reconnecting Communities Pilot
## (RCP)
Creating connections across
highways disconnected or
destroyed by highway
development
## MnDOT Active
## Transportation Program
## Infrastructure Grants, Planning
## Assistance, Quick
## Build/Demonstration Projects
Support active transportation
capacity building and facilities
## MnDOT Safe Routes to
## School
## Planning Assistance and Boost
grants
Support current SRTS plans
and programs
## MnDOT Safe Routes to
## School
Infrastructure FundsConstruct sidewalks; improve
crossings
MnDOT (Federal funding)Transportation Alternatives
## (TAP)
New pedestrian and bike
facilities
## MnDOTState Aid for Local
Transportation (SALT)
Highway projects
Page 60 of 165
## B I C Y C L E P L A N
## Roseville, MN
42
## State, Federal and County Funding for Active
Transportation (2 of 3)
## SourceFundsPurpose
Metropolitan CouncilRegional SolicitationMulti-modal infrastructure projects that focus on outcomes like
moving people more effectively, managing congestion, safer streets
for people walking and biking and improving air quality
MN DNRRegional Trail GrantMotorized, non-motorized and joint trail usage for trails that are
regionally significant
MN DNROutdoor Recreation Grant ProgramMatching grant for the cost of acquisition, development, and/or
redevelopment of local parks and recreation area. Trail must be
internal to a park
MN DNRLocal Trail Connections ProgramSupports acquisition and development of trail linkages for small
train connections that are not regional
MN DNR (Federal funding)Federal Recreational Trail ProgramNew trails, trail maintenance and trailhead construction
## Greater Minnesota Regional Parks and Trails
## Commission
Parks and Trails Legacy Grant Program“Regionally Designated” parks and trails can be funded
## Legislative-Citizen Commission on Minnesota
Resources (LCCMR)
## Environment and Natural Resources Trust
Fund (ENRTF)
Activities that protect, conserve, preserve and enhances
Minnesota's air, water, land, fish, wildlife and other natural
resources
Page 61 of 165
## B I C Y C L E P L A N
## Roseville, MN
43
## State, Federal and County Funding for Active
Transportation (3 of 3)
## SourceFundsPurpose
Active Living Ramsey CommunitiesBe Active! Be Green! Bench InitiativeThe goal of the Be Active! Be Green! Bench Initiative is to have
benches placed often enough that when people sit on one bench,
they're able to see the next one — with the thought that seniors,
people with disabilities, or small children can more easily make it
to the next bench.
Ramsey County Active Transportation FundingContact County Public Works for more details on funding
opportunities for municipalities to make active transportation
improvements on County roads.
Ramsey County Economic Development Critical Corridors ProgramsRamsey County's Critical Corridors programs offer assistance to
qualifying public, private and nonprofit organizations for place-
based investments along major transportation, commercial and
cultural corridors. The programs are fully funded by the Housing
Redevelopment Authority (HRA) levy. Eligible projects or activities
seeking funding must align with the county's Economic
## Competitiveness & Inclusion Plan and Equitable Development
Framework.
## Saint Paul Ramsey County Public Health
## Department
Community Innovation GrantsSaint Paul – Ramsey County Public Health (SPRCPH) is offering
grants to support activities, programs and initiatives that improve
public health issues in the community. They must be related to
building capacity, planning, developing, implementing or evaluating
work designed to address our Community Health Improvement
Plan (CHIP) priorities.
Page 62 of 165
## B I C Y C L E P L A N
## Roseville, MN
44
## COMMUNITY ENGAGEMENT
## Appendix B
Page 63 of 165
## B I C Y C L E P L A N
## Roseville, MN
45
## How the Community Was Engaged
## Roseville Bike Plan Survey
Open from April 18
th
to July 1
st
, 2024. There were 370 responses to the survey.
## Networking Mapping Workshop
## Audit Team for Rosedale Mall Area Bike-ability
## Roseville Bike Plan Interactive Comment Map
Open from April 10
th
to June 30
th
, 2024. There were 324 visitors who left 378
comments.
## Walk and Bike Audits
Three audits that took place on June 10
th
and June 11th, 2024. City staff,
project staff, committee members and residents were present.
## Network Mapping Workshop
The in-person mapping workshop took place on June 11th, 2024. City staff,
committee members and residents worked together to identifying a priority
bicycle network for Roseville.
Page 64 of 165
## B I C Y C L E P L A N
## Roseville, MN
46
How Is Roseville Moving Today?
1.7% Walk
In Roseville, 1.7 percent of commuters
walk to work compared to 2.2 percent
statewide.
1
1.6% Bike
In Roseville, 1.6 percent of commuters
bike to work compared to 1.7 percent
statewide.
1
1.5% Transit
In Roseville, 1.5 percent of commuters
take transit to work compared to 1.5
percent statewide.
1
## C O M M U T E T Y P E I N R O S E V I L L E
## WalkBikeTransitCar/Carpool
1
American Community Survey, 2022 5-yearestimates. The American Community Survey is an ongoing survey administered by
the U.S. Census Bureau that provides vital information on a yearly basis about our nation and its people.
Page 65 of 165
## B I C Y C L E P L A N
## Roseville, MN
47
11.1% Directness
66.8% Safety
6.4% Comfort
5.0% Attractiveness
Of the 361 Roseville Bike Plan survey respondents, 241
prioritize safety above all other principles, indicating
that most people value safety regardless of their biking
confidence level or reason for biking. Definitions of the
Bike Network Principles are provided on the previous
page.
## Key Principles of Bikeability| Bike Plan Survey Results
## I M P O R T A N C E O F K E Y B I K E
## N E T W O R K P R I N C I P L E S
10.8% Coherence
Page 66 of 165
## B I C Y C L E P L A N
## Roseville, MN
48
## Bike Travel in Roseville| Bike Plan Survey Results
0
50
100
150
200
250
300
350
## Responses
## Types of Bike Trips
## B I K E T R A V E L I N R O S E V I L L E
89%
Of survey respondents said they
bike for exercise and leisure
Out of the 360 respondents who answered the
question about their reasons for biking in
Roseville, 323 indicated they bike for exercise or
leisure, 163 for shopping or errands, 118 for
commuting to school or work, and 29 selected
other reasons. It’s no surprise most people bike
for recreational trips given the many high-quality
parks and trails in Roseville. There is opportunity
to increase transportation-related trips with the
future bikeway network.
Page 67 of 165
## B I C Y C L E P L A N
## Roseville, MN
49
What Type of Bicyclist Are You? | Bike Plan Survey Results
## 3.3% No Way, No How
## 18.9% Highly Confident
## 39.5% Enthused and Somewhat Confident
39.4% Interested but Concerned
Of the 365 Roseville Bike Plan survey respondents,
nearly 80% identified themselves as either
enthused and somewhat confident or interested
but concerned, indicating they would bike more
with improved infrastructure.
## T Y P E S O F B I C Y C L I S T S I N R O S E V I L L E
Page 68 of 165
## B I C Y C L E P L A N
## Roseville, MN
50
## What We Heard, Observed, Learned
## The Roseville Bike Plan Interactive
Comment Map allowed community
members to place pins on a map based on
four categories:
•Destinations (places people currently
bike or wish to bike to)
•Safe/Comfortable Biking
•Unsafe/Uncomfortable Biking
•Ideas/Requests (bike facility suggestions)
The map was open from April 10th to June
30
th
, 2024 and had 324 visitors who left 378
comments
“I would love for our city to be more bike
friendly. We have plenty of businesses that
are fairly close but they're inaccessible
without a car. Adding bike lanes would be
amazing.” – Community Member
50
## Destinations
Biking is currently safe/comfortable
Biking is currently unsafe/uncomfortable
## Ideas/requests
## Legend:
Page 69 of 165
## B I C Y C L E P L A N
## Roseville, MN
51
## What We Heard | Specific Issues and Opportunities
“There is a nice bike path that just
ends at Industrial Blvd, but a bridge
would connect the two cities for safer
riding than Larpenteur or Fairview.”
“Cycling along Victoria is considered one
of the "safer" routes for crossing
Highway 36, but heading southbound on
this stretch can be perilous. I've had
close calls with cars nearly brushing past
me because the shoulder is so narrow.”
“My teen wants to bike here with
friends, but the theater/mall might
as well have a moat around it. It's
unclear how people on bikes are
supposed to navigate to the mall or
on its grounds/lots/routes.”
“Cycling to Harmar/Target is
currently unfeasible unless you are
willing to bike in trafficked lanes.”
“Central Park has shared bike/ped
trails and separate trails. Better
markings are needed to let those
new to the trails know and remind
all others of these trails.”
“Cleveland south of the off road
bikeway and down to Hwy 36 is very
uncomfortable with not even a
shoulder to ride on.”
Page 70 of 165
## B I C Y C L E P L A N
## Roseville, MN
52
## Interactive Comment Map
•There is a desire for better bike infrastructure on Hamline
Ave N. Users would like to see marked bike lanes and
eventual conversion to protected bike lanes.
•Snelling Ave N is perceived as dangerous and unsafe.
Several comments indicated a desire for a bike and
pedestrian bridge near County Rd C for an east to west
connection.
•Fairview Ave N in front of Rosedale Center is stressful for
cyclists because of high traffic speeds, congestion and high
number of intersections.
•Users say they will not bike to Rosedale Center because
they feel it is unsafe even though there are plenty of
amenities they’d like to bike to like shopping, restaurants
and a movie theatre.
•There is a desire for improvements to Central Park biking paths
like updating signage, improving bumpy areas of the paths and
creating separate paths for walkers and bikers.
•Users find the County Rd C and Dale St N intersection
dangerous, with frequent stop sign violations. They request
better traffic control and support the planned 3- to 4-lane
conversion on County Rd C.
•Users say they avoid riding on Rice St because it has a lot of
traffic. They use alternate routes on local streets when
possible.
•The north section of Victoria St N is undesirable and unsafe for
bikers. Although it is used by confident bicyclists, there are no
sidewalks, and the shoulder width is narrow.
The majority of comments received on the interactive map related to places where biking is currently unsafe or
uncomfortable. Those comments are summarized here:
Page 71 of 165
## B I C Y C L E P L A N
## Roseville, MN
53
## Interactive Comment Map
•Users would like to bike to Rosedale Center and the
transit center that is nearby.
•Users would like to see bike facilities on Lexington
Ave so that there is a safe connection to Como Park.
•Bike parking is essential and requested by bicyclists
at stores and restaurants including Cub Foods and
Dairy Queen.
•Har Mar Mall is near residential areas and users
want connections from those residential areas to
the commercial businesses like Cub Foods and
Target.
•Users love the Diagonal Trail and appreciate the
connection that it provides to Minneapolis.
•Central Park is well used and loved by the community,
but they would like more connections from residential
areas.
•Residents want their children to have the option to
bike to schools like, Roseville Area High School and
Central Park Elementary, safely.
The remainder of comments received on the comment map were related to places where biking is currently safe
or comfortable, destinations, and ideas. Those comments are summarized here:
Page 72 of 165
## B I C Y C L E P L A N
## Roseville, MN
54
## Bike Audits
## Members of the Roseville Bike Plan Committee were
joined by residents for three bike audits on June 10
th
and 11
th
, 2024. The groups who participated in the
audits are shown starting from lower left: Rosedale
Center, Acorn Park, and Lake McCarron’s County Park.
Page 73 of 165
## B I C Y C L E P L A N
## Roseville, MN
55
## Bike Audits
## Members of the Roseville Bike Plan Committee
were joined by residents for three bike audits on
June 10
th
and 11
th
, 2024. The audits were held
## starting from Rosedale Center, Lake McCarron’s
## County Park (southeast Roseville), and Acorn
Park (northeast Roseville). Key observations and
takeaways from these audits are summarized in
the following pages.
Bike audits are powerful tools for
engagement, bringing together people
with diverse perspectives and
experiences—from city staff and elected
leaders to community members—to:
•Observe and deepen understanding
of how active transportation users
experience a street
•Tap into people’s knowledge of place
•Learn from the physical built
environment
•Engage in meaningful dialogue
Bike audit route in southeast Roseville
Bike audit route in northeast Roseville
Bike-focused walk audit route near Rosedale Center
Page 74 of 165
## B I C Y C L E P L A N
## Roseville, MN
56
## What We Heard | Bike and Walk Audit Comments
“Relative transit rich area and you get
dumped into a sea of parking.”
“It is much more comfortable to ride
on neighborhood streets like
Western, than it is riding on Rice.”
“There are a variety of different
types of riders in Roseville, but all
riders prioritize safety.”
“It is hard to relax when cycling in an
urban environment. If there were
trails or sidewalks, they had debris or
weren’t maintained very well.”
“Right now, it is calm, but parent
drop off can be scary and chaotic”
“It is uncomfortable to walk here in a
group of people and a neon vest, I
can’t imagine trying to bike.”
Page 75 of 165
## B I C Y C L E P L A N
## Roseville, MN
57
## Key Observations: Bike-Focused Walk Audit
Biking around Rosedale Center and adjacent commercial and
retail destinations presents challenges due to the lack of bike
lanes on County Rd B2, forcing cyclists onto narrow sidewalks
where they may come into conflict with pedestrians. While
Fairview Ave has a recently constructed trail on the east side of
the road, access to the business entrances are lacking for
people biking and conflicts with motorists at driveways still
pose a problem. High traffic speeds in the area contribute to a
noisy environment, making sidewalks feel uncomfortable for
people walking or biking, especially where sidewalks are
immediately adjacent to the curb (no landscape buffer to
separate people walking from the motorist travel lane).
Despite being a well-served transit area, connections to transit
are unclear and indirect.
## WALK AUDIT – Rosedale Center
## Heavy Traffic and Speeds
## Reduce Bicyclist Comfort
To create a comfortable environment for all,
tools are needed to address loud, fast traffic
near pedestrian and cyclist facilities.
Implementing traffic calming measures and
dedicated bike lanes can enhance safety and
comfort.
## Potential Conflicts Between
## Pedestrians and Bicyclists
Without bike lanes, most cyclists resort to
riding on the sidewalk. This can create
conflicts with pedestrians and
compromise safety for both groups.
## KEY FINDINGS
Page 76 of 165
## B I C Y C L E P L A N
## Roseville, MN
58
## Key Observations: Bike-Focused Walk Audit
## Sidewalk and Road Geometry
Sidewalk and road geometry can be
challenging for cyclists near Rosedale
Center, especially 90-degree turns. These
sharp turns make navigation across
intersections difficult due to lack of space
for a rider’s bike and can compromise
safety.
## Long Distances Between
## Crosswalks
Long blocks can lead to pedestrians
crossing midblock using the median. This
behavior indicates a need for more
crossing points.
## Access Challenges
At Rosedale Center, navigation for cyclists
can be challenging due to limited direct
paths to building entrances. Sidewalks
often lead in the opposite direction of the
mall. Additionally, bike parking is limited
and it’s difficult for walkers and cyclists to
reach the transit center.
## Corners and Curb Ramps
While there is a new shared-use path on
## Fairview Ave near Rosedale Center, the
group observed that the corners still
provide little space for a cyclist to turn
their bike to stop and wait to cross
Fairview Ave.
## WALK AUDIT KEY FINDINGS, CONTINUED
Page 77 of 165
## B I C Y C L E P L A N
## Roseville, MN
59
## Key Observations: Bike Audits
In addition to the Bike-Focused Walk Audit at the Rosedale
Center area, the Roseville Bike Plan committee and residents
convened for two bike audits. Participants got on their bikes
and experienced Roseville’s streets and bike facilities for
themselves. Bike audits started from McCarron’s County Park
and Acorn Park and were 3- to- 4-mile loops covering a variety
of existing biking conditions and facilities in Roseville. The key
observations from these audits are summarized on this and
the following page.
## BIKE AUDITS – McCarron’s County Park and Acorn
## Park
## The Comfort of Quiet Roads
Bike facilities on quieter roads, with less
traffic and lower speeds, like Western Ave,
rather than busy ones like Rice St, create a
more comfortable environment for
cyclists.
## Complexities in Navigation
The group discussed that wayfinding for
cyclists is complex and can be a barrier for
people not familiar with the area. Logical
and coherent routes, aided by signs and
wayfinding would be very helpful to
cyclists in Roseville.
## KEY FINDINGS
Page 78 of 165
## B I C Y C L E P L A N
## Roseville, MN
60
## Key Observations: Bike Audits
## Rice Street
Rice Street is heavily trafficked, so
cyclists prefer riding on the sidewalk.
Where shoulders exist, they are often
dropped and merged with the right turn
lane. The left turn from Rice St onto Co
Rd B2 is awkward and uncomfortable,
requiring either a risky maneuver across
multiple lanes of traffic or a two-stage
left turn.
Youth are a Priority
Safe travel to school, parks and other
places youth like to access is critical to
their health and independence. To make
cycling a safe option for youth, dedicated
bike lanes, safe crossings and bike-friendly
policies are crucial.
## Overgrown Vegetation
The audit group observed that there
are comfortable shared-use trails in
Roseville parks that can be used for
bike commuting, but trees and bushes
over-growing into the paths make it
hard for cyclists to share these
facilities with people walking.
## Bike Lanes Benefit All
Having dedicated bike space separate
from the sidewalk is beneficial for both
the cyclist and the pedestrian. Bike lanes
put vehicle travel lanes farther away from
traffic.
## BIKING AUDIT KEY FINDINGS, CONTINUED
Page 79 of 165
## B I C Y C L E P L A N
## Roseville, MN
61
## Network Mapping Workshop
Eme rgi n g Pr i o r i t y B i keways Id e nt i f i e d D u r i n g t h e Wo r ks h o p
The half-mile arterial road grid emerged as a priority during the workshop as these roads
provide direct and continuous bikeways through the city, which are important features
for cyclists. Some specific bikeways in the half-mile arterial road grid that emerged as
priorities during the workshop were Fairview Ave, Hamline Ave, County Rd C –
connection to the Diagonal Trail, and Roselawn Ave as a connection to St. Paul and
Victoria St.
Workshop participants were also visionary in their thinking about future bikeways in
Roseville, suggesting dedicated routes for cyclists that cross the city without using the
existing street grid. The Diagonal Trail in Minneapolis is an example of this and is a
bikeway that cyclists in Roseville would like to connect to and wish existed in Roseville
itself. Documentation of the “diagonal” bikeways identified during the workshop are
provided on the next page.
After the walk and bike audits were complete, a network mapping
workshop was held where community members and city staff applied
their observations to start identifying priority bikeways in Roseville.
Approximately 20 Roseville residents and other stakeholders
participated.
The workshop began with an overview of active transportation
principles and established what kind of bikeway facility types are
most convenient and comfortable for different types of cyclists.
Participants then used large maps of Roseville to identify important
trip origins and destinations. Next, participants drew connections
between trip origins and destinations and identified what
improvements were needed along these bikeways to make them safe
and comfortable for all cyclists. At the end of the session, small
groups shared out the bikeways they identified, and the group
discussed the priority network that was starting to emerge. The
results of the Network Mapping Workshop formed the basis of the
Priority Bike Network presented in this plan.
## Drafting the Priority Bike Network
Page 80 of 165
## B I C Y C L E P L A N
## Roseville, MN
62
## Network Mapping Workshop Maps
Page 81 of 165
## B I C Y C L E P L A N
## Roseville, MN
63
63
## EXISTING NETWORK &
## DRAFT PRIORITIZATION
## Appendix C
Page 82 of 165
## B I C Y C L E P L A N
## Roseville, MN
64
## Pathway Master Plan
What is a Pathway?
Any facility that serves non-motorized users commonly within the public right-of-way. They can be
paved shoulders and bike lanes to sidewalks, trails, and footpaths.
## Building from the Pathway Master
## Plan
## The 2021 Pathway Master Plan is
comprehensive and holistic, incorporating a
“constellation” (park service areas) concept
to connect residents to parks within park
service areas and between park service areas.
The Master Plan also used a detailed scoring
criteria to prioritize pathway projects.
## Given that the Pathway Master Plan was
designed to address the needs of all non-
motorized users, not just cyclists, it lacks
specifics on how a proposed pathway can
specifically address the needs of cyclists.
## This Bike Plan builds from the Pathway
## Master Plan by:
1. Reaffirming proposed pathway segments
identified in 2021 that continue to be
priorities for bicycling upgrades today
2. Identifying new bikeways to add to the
bicycle network in Roseville.
3. Identifying the types of bike facility
upgrades appropriate for these bikeways
4. Providing a clearer vision for
implementation of bikeways when
opportunities arise
The Pathway Master Plan, updated in 2021, presented the existing pathway network
in Roseville and identified additions and upgrades to the existing pathway network
for people walking, biking and skating. The proposed pathway segments from the
Master Plan are shown on the map above, along with existing pathways. The
Pathway Master Plan is adopted by reference in the City's Comprehensive Plan and
serves as a planning tool to assist the City on decisions regarding pathway issues.
Page 83 of 165
## B I C Y C L E P L A N
## Roseville, MN
65
## Bike Network
## Existing Network & Pathways Progress in Roseville
The map on the next page shows proposed pathways identified in Roseville’s 2021 Pathway Master plan update
overlaid on the existing bike network. The map also shows the progress the City has made on the Pathway
Master plan since 2021, with nine recently completed pathway segments and six near term pathways
programmed for completion in the next few years.
## Priority Bike Network – New & Reaffirmed Bikeways
The second map shows priority bikeways identified through the development of this bike plan. It also identifies
pathways that were identified in the 2021 Pathway Master Plan and were again identified during development
of this bike plan. These bikeways are highlighted in orange on the following map and labeled as “reaffirmed
priority bike network segments” to illustrate where this bike plan overlaps with the 2021 Pathways Master Plan
and where new priority bikeways have been identified.
Page 84 of 165
## B I C Y C L E P L A N
## Roseville, MN
66
## Roseville’s Existing
## Bike Network
Page 85 of 165
## B I C Y C L E P L A N
## Roseville, MN
67
## The Priority Bike
Network and 2021
## Pathways
Page 86 of 165
## B I C Y C L E P L A N
## Roseville, MN
68
## Draft Prioritization
Roseville can expand on this preliminary prioritization framework by adding in additional metrics:
•Safety: Perform a city-wide traffic safety analysis to determine intersections or street segments that have a history of being dangerous for
people on bike.
•Implementability: Based on city and county programmed street projects and relative cost of appropriate improvements for the route (e.g.,
mini traffic circles vs full reconstruction) the city can make a qualitative determination of which bikeways are most implementable and achieve
those in the next 3-5 years.
•Re-affirmed Bikeways: Review results of the Pathways Master Plan and consider giving segments or bikeways in the Bike Network extra priority
if they were identified again during development of this Plan.
Note: This is a draft prioritization list. The table and map that follows is a comprehensive list of routes and segments that have been identified
through engagement with the community and collaboration with city staff. The City of Roseville will need to continue to refine and finalize this
network and prioritization of bikeways and projects.
Page 87 of 165
## B I C Y C L E P L A N
## Roseville, MN
69
## Draft Prioritization
To get started, Roseville will need to create an implementation schedule for Priority Bike Network bikeways to determine what to program and to
share their priorities with Ramsey County. This plan provides a draft prioritization framework on the following pages. Routes were prioritized
using the following criteria and the results are summarized in this appendix. The criteria listed below are not ranked or weighted, though
Roseville could consider doing so when finalizing the prioritization:
•Equity: MnDOT’s Active Transportation Equity score tool was used for this criteria. MnDOT’s Active Transportation Equity score divides the
state into small polygons and considers multiple demographic, public health, and existing infrastructure factors to assign an equity score to
each polygon. Roseville’s Priority Bike Network was overlayed with these polygons, and each route was assigned a high, medium, or low equity
priority based on the polygons they intersect. Bike Network bikeways intersecting with equity polygons with a score of 0-5 were assigned low
equity priority, 4-10 were assigned medium equity priority, and 11-15 were assigned high equity priority. See the map on next page.
•Transit: Connections to transit was a priority for the city when embarking on this bike planning process. Location and frequency of planned
transit routes were compared with the Priority Bike Network and network bikeways were assigned a transit connectivity score based on their
interaction with planned transit routes. Metro Transit’s Network Next and Network Now were used to identify planned transit routes in
Roseville. See the second map.
•Connections to Neighboring Bike Networks: As a first-ring suburb, Roseville’s bike network plays an important role in regional connectivity for
cyclists. Additionally, engagement results indicated a strong desire for Roseville residents to be able to connect to neighboring cities by bike.
Neighboring cities’ existing and planned bikeways were identified, and Roseville’s Priority Bike Network bikeways were scored based on their
connectivity to these bikeways. See the second map.
•Connections to School: The ability of children to safely and comfortable use a cycling network speaks to its all-abilities nature. Prioritizing
connections to school will help Roseville take the first steps to providing safe and comfortable biking conditions for this key group of bikers.
Bikeways in the Priority Bike Network were compared to locations of schools and given a qualitative score based on their proximity or
connection to schools in Roseville. See the second map.
Page 88 of 165
## B I C Y C L E P L A N
## Roseville, MN
70
## Roseville’s Priority Bike
## Network and Equity
Page 89 of 165
## B I C Y C L E P L A N
## Roseville, MN
71
## Roseville’s Priority Bike
## Network and Transit
Page 90 of 165
## B I C Y C L E P L A N
## Roseville, MN
72
## Route
# (See
## Map)
## Route/Segment
## Equity – MnDOT
## Active
## Transportation
## Equity Score
## Transit Connectivity
## Connects to Neighboring
## Network
## Connects to School
1
## County Rd C Between
## Long Lake Rd and
## Cleveland Ave
MediumLow – connects to
medium and low
frequency bus routes
Medium – does not connect directly to
neighboring network but completes
bikeway to the Diagonal Trail in
## Minneapolis
Low – no schools nearby
2
## County Rd C – Central
## Park to Rice St
MediumHigh – connects to future
high frequency transit
route on Rice St.
Low – does not connect directly to
neighboring network
Medium – schools within ~1/2 mile
3
## Fairview Ave – North-
## South Artery
MediumHigh – completes
connection to future high
frequency transit route
High – connects directly to neighboring
networks
Low – no schools nearby
4
## Roselawn Ave across
town from Reservoir
## Woods to Lauderdale
MediumHigh – intersects existing
and future high frequency
transit
High – connects directly to neighboring
network
Medium – schools within ~1/2 mile
5
## Hamline Ave N
MediumMedium – connects to
low and medium
frequency future transit
routes
High – connects directly to neighboring
network
High – connects directly, or almost
## directly, to Roseville Area High School
## Bicycle Priority Network Prioritization
This framework represents a starting point for prioritization that the City can build upon and ultimately finalize based on public input,
alignment with the Pathways Master Plan, and feedback from other stakeholders. Route numbers do not indicate priority ranking.
Page 91 of 165
## B I C Y C L E P L A N
## Roseville, MN
73
## Route
# (See
## Map)
## Route/Segment
## Equity – MnDOT
## Active
## Transportation
## Equity Score
## Transit Connectivity
## Connects to Neighboring
## Network
## Connects to School
6
## Victoria Ave from
## Reservoir Woods to Co Rd
## D
HighMedium – connects to
low and medium
frequency future transit
routes
Medium – Does not connect to
neighboring network but gets close
Medium – school within ~1/2 mile
7
## Snelling Ave – Arden Hills
## to Roselawn Ave
HighHigh – connects to high
frequency future transit
routes
High – connects directly to neighboring
network
Medium – school within ~1/2 mile
8
## Fernwood Ave
MediumMedium – connects to
medium-frequency future
transit routes
High – connects directly to neighboring
network
Low – no schools nearby
9
## Dale St from Larpenteur
## Ave to Owasso Blvd
(Crossing Hwy 36)
MediumMedium – Connects to
and overlaps with
medium-frequency future
transit routes
High – connects directly to neighboring
network
High – connects directly, or almost
directly, to two schools
10
Crossing over Hwy 280 to
## Minneapolis
MediumMedium – would provide
connection to
Minneapolis and
additional transit
opportunities but does
not directly connect to
transit within Roseville
High – Does not connect directly to
neighboring facility but provides
connection to extensive bike network
in Minneapolis
Low – no schools nearby
## Bicycle Priority Network Prioritization
Page 92 of 165
## B I C Y C L E P L A N
## Roseville, MN
74
## Route
# (See
## Map)
## Route/Segment
## Equity – MnDOT
## Active
## Transportation
## Equity Score
## Transit Connectivity
## Connects to Neighboring
## Network
## Connects to School
11
## Northwest Roseville
## Connections
MediumLow – connects to low-
frequency future transit
routes
High – connects directly to neighboring
network
Low – no schools nearby
12
## Western Ave – Owasso to
## McCarron’s
HighHigh – connects to high-
frequency future transit
routes
Low – does not connect directly to
neighboring network
Medium – school within ~1/2 mile
13
## Co Rd B2 from Long Lake
## Blvd to Rice St
MediumHigh – connects to
multiple future high-
frequency transit routes
and medium-frequency
routes
Medium – does not connect directly to
neighboring network but gets close
High – 13b connects directly to school
14
## Fairview Ave - Oakcrest
## Ave to Co Rd B2
MediumHigh – connects to and
overlaps with future high-
frequency transit routes
Low – does not connect directly to
neighboring network
Low – no schools nearby
15
## Co Rd C2
HighLow – connects to low-
frequency future transit
routes
Low – does not connect directly to
neighboring network
Low – no schools nearby
## Bicycle Priority Network Prioritization
Page 93 of 165
## B I C Y C L E P L A N
## Roseville, MN
75
## Route
# (See
## Map)
## Route/Segment
## Equity – MnDOT
## Active
## Transportation
## Equity Score
## Transit Connectivity
## Connection to Neighboring
## Network
## Connects to School
16
## Rice St
HighHigh – overlaps with
future high-frequency
transit route
High – connects directly to neighboring
network
Low – no schools nearby
17
## Brimhall Elementary
## School to Reservoir
## Woods Park
MediumMedium – connects to
future high- and medium-
frequency transit routes
Medium – does not connect directly to
neighboring network but gets close
High – connects directly to school
18
## Co Rd B – Snelling Ave to
## Rice St
MediumHigh – connects multiple
high- and medium-
frequency future (and
existing) transit routes
Medium – does not connect directly to
neighboring network but gets close
High – connects directly, or nearly
directly, to school
19
## Cleveland Ave – Co Rd C2
## to Roselawn Ave
MediumMedium – connects to
future medium- and low-
frequency transit routes
High – connects directly to neighboring
network
Medium – school within ~1/2 mile
20
## Connection from Co Rd C
## to Diagonal Trail
MediumMedium – connects to
future medium- and low-
frequency transit routes
High – connects directly to neighboring
network
Low – no schools nearby
21
## Minnesota Ave/Lovell Ave
## from Rice St to Dale St
MediumHigh – connects to future
high-frequency transit
routes
Low – does not connect directly to
neighboring network
High – connects directly to Concordia
## Academy and King of Kings Lutheran
## School
## Bicycle Priority Network Prioritization
Page 94 of 165
## B I C Y C L E P L A N
## Roseville, MN
76
## DEMONSTRATION PROJECT
## Appendix D
Page 95 of 165
## B I C Y C L E P L A N
## Roseville, MN
77
## Hamline Avenue
The City of Roseville, in partnership with
## Ramsey County and MnDOT Metro
District, right-sized a half-mile section of
## Hamline Avenue between County Road
B and County Road B2 to improve the
safety and comfort for people biking.
Travel lanes were narrowed to add
painted buffered bike lanes.
## Project Snapshot
Initial install cost for demonstration
project: $46,000*
*$17k paid by MnDOT grant & $10k paid by County
Page 96 of 165
## B I C Y C L E P L A N
## Roseville, MN
78
## Pre- vs Post-Demonstration Conditions
Pre-demo roadway cross section
•12’ center left turn lane
•12’ driving lane
•6’ shoulders
## Curb-to-Curb
## Width
80 feet
## Posted Speed35 MPH
## Average Daily
Traffic (ADT)
6,875
vehicles
Post-demo roadway cross section
•11’ center left turn lane
•10.5’ driving lanes
•2’ buffer zone
•6’ bike lane
**18-ft lane represents an implied 12-ft travel lane with a 6-ft shoulder
Page 97 of 165
## B I C Y C L E P L A N
## Roseville, MN
79
Driver’s Speed – How did the project impact
motorists’ speeds?
Before Demo.
## Project
After Demo.
## Project
Posted Speed35 mph35 mph
Average Speed38 mph36 mph
85
th
Percentile Speed42 mph39 mph
Radar gun was used to collect speed data from the corner of Colonial Drive and
Hamline Avenue. Pre-install data was collected 4/16/2025 and post-install data
was collected 11/6/2025. Data was collected by the Ramsey County and
analyzed by the MnDOT planning assistance consultant team.
2 mph decrease in
average motorist speed
## Findings
•Fewer drivers traveling at the fastest
speeds. The share of vehicles traveling
41-45 mph decreased 13%
•More drivers traveling near the posted
speed. After installation, a larger share
of vehicles shifted into the 31-35 mph
range
3 mph decrease in 85
th
percentile motorist speed
Page 98 of 165
## B I C Y C L E P L A N
## Roseville, MN
80
Bicycle Use – What changes were observed in
biking activity?
Before Demo.
## Project
After Demo.
## Project
Bicycle Counts120 bicyclists134 bicyclists
Video camera was placed at Hamline and Commerce intersection to record
bikers during peak hour periods:
•7 AM to 9 AM
•2 PM to 4 PM
•4 PM to 6 PM
Pre-install data was collected on Tuesday 5/13/2025 and Wednesday 5/14/2025.
Post-install data was collected on Tuesday 9/30/2025 and Wednesday
10/1/2025. Bikers were recorded by City of Roseville when entering either side
of the intersections. Data was analyzed in 15-minute intervals by the MnDOT
planning assistance consultant team.
~12% (11.7%) increase
in people biking
## Findings
Data shows a positive trend. It is worth noting
that the shorter count durations (1.5 days for
each pre- and post-install data collection) may
not represent typical weekly conditions.
Additionally, seasonal and weather conditions
may have influenced bicycle volumes,
particularly as pre-install counts occurred in early
May.
Page 99 of 165
## B I C Y C L E P L A N
## Roseville, MN
81
## SUCCESS STORY
The project increased biking activity and
slowed vehicle speeds along the corridor.
Bicycle counts rose by 12%, while average
driving speeds dropped by 2 miles per
hour (mph)(from 38 to 36 mph) and high-
end speeders slowed by 3 mph, moving
closer to the 35 mph posted speed limit.
An added benefit of the bike lanes is that
they increased separation between
people walking and driving, improving
the safety and comfort for all active
transportation users.
Page 100 of 165
## B I C Y C L E P L A N
## Roseville, MN
82
## Public Feedback
181 people provided comments via email, phone
call or online survey. The percentage of submittals
that were supportive of the demonstration, critical
of all or some elements of the demonstration, or
neutral on it are shown here.
An online survey regarding the demonstration project was
open from Oct 10-Nov 30, 2025. Below are some themes
resulting from the online survey’s 160 respondents:
## Travel Mode Themes
•People who biked (63 respondents) or walked (15) emphasized how
the project increased comfort over Highway 36, especially for families.
Many commented that the presence of protection meaningfully
shaped their route choice.
•People who drove (79) were more likely to express concerns about
lane width, turn-lane removal, plowing feasibility, and nighttime
visibility. A subset acknowledged traffic calming as a benefit.
•People who did not visit the site (3) frequently questioned usage levels
or the prioritization of cycling improvements.
## Gender-Based Themes
•Female respondents (79) frequently described safety benefits—
especially when biking with children—and cited greater comfort
crossing Highway 36. As drivers, many expressed difficulty navigating
tight lanes and right-turn movements.
•Male respondents (68) often emphasized operational concerns as
drivers (lane width, plowing, emergency pull-over). Those who bike
regularly voiced strong support for protected lanes and network
expansion.
## Relationship to Hamline & Roseville
•Residents living on Hamline Avenue (11 respondents) submitted
the most detailed comments related to operations—turning
difficulty, backups at key intersections, and winter maintenance
concerns —reflecting daily exposure to the corridor.
•Residents who live, work, or travel through Roseville showed a
range of views: multimodal users were mostly positive about
safety and visibility improvements, while driver-only respondents
reported confusion at intersections and visual clutter.
## Age-Based Themes
•Ages 26–39 (27 respondents) tended to express strong support
for protected infrastructure and requested corridor extensions.
Many felt comfortable adjusting to changes when driving and
reported increased confidence biking over Highway 36.
•Ages 40–54 (50) provided mixed feedback: those who walk or bike
were positive about perceived safety improvements, while
driver-only respondents raised concerns regarding narrowed
lanes, removal of turn lanes, and nighttime visibility.
•Ages 55–74 and 75+ (77) were more likely to describe stress as
drivers, citing narrow lanes, difficult turns, and concerns about
bollard durability and emergency vehicle access.
Page 101 of 165
## B I C Y C L E P L A N
## Roseville, MN
83
## LESSONS LEARNED
Some delineators were moved after the initial 2025 install to address concerns related to mailbox access.
Despite designing for large vehicle turning radii, some delineators were often hit, but remained in place.
The number and spacing of delineators was both visually overwhelming to some. All delineators were
removed for the 2025-2026 winter due to concerns about snow clearing. In Spring 2026 the delineators will
be placed in the corridor again, with modified spacing, and with the intent to keep them in place
throughout the winter. City and County staff will continue to learn from this demonstration project and use
lessons learned to improve this segment of road and other future installations.
Page 102 of 165
## B I C Y C L E P L A N
## Roseville, MN
84
## POLICY, PRACTICE, &
## PROGRAM RECOMMENDATIONS
## Appendix E
Page 103 of 165
## B I C Y C L E P L A N
## Roseville, MN
85
## Promote All Abilities Bikeways on All Roads in the Half-Mile
## Arterial Grid
Ramsey County roads create most of the half-mile arterial grid within
the city, making them critical to the city’s bike network.
## The County’s Pedestrian and Bicycle Plan (2015) Bicycle Network
Deficiency Analysis identifies those streets that are most and least
suitable for traveling by users of all abilities as determined by the level
of traffic stress. Many of the county roads in Roseville are classified as
high to extreme stress due to high vehicle speeds and volumes, multi-
lane conditions and minimal to no bikeway facilities, such as portions
of Larpenteur Ave, Hamline Ave, Rice St and County Road C, B and B2.
Continue to partner with Ramsey County to improve safety for
bicyclists on the county’s high-speed, high-volume arterial streets by
coordinating efforts and pooling resources to ensure protected bike
lanes or shared-use pathways continue to get built.
While local streets are often considered low stress, the county’s
analysis classifies most local streets in Roseville as moderate stress
because the city’s default posted speed limit is 30 mph, which is too
high for users of all abilities to ride in mixed traffic.
## Ramsey County Bicycle Network Deficiency Analysis
Page 104 of 165
## B I C Y C L E P L A N
## Roseville, MN
86
## Promote All Abilities Bikeways on All Roads in the Half-Mile
## Arterial Grid (cont.)
Several next steps include:
Keep the momentum going on these joint projects:
## •Hamline Ave Bike Lane Demonstration Project
## •County Road C 4-3 Lane Conversion
Continue involvement in the planning process for a longer-term re-
visioning of Rice Street.
## Share this Plan and collaborate with Ramsey County, Hennepin
County, Met Council, and MnDOT.
Seek funding: By jointly applying for regional, state or federal grants,
the city and county can secure funding for infrastructure upgrades, like
protected bike lanes and safer intersections. This collaboration ensures
a unified approach to road safety that addresses both local needs and
county goals to create a more comprehensive, sustainable and bike-
friendly transportation network.
## Supplemental Opportunity: Identify Opportunities for
## Diagonal Connections
The Network Mapping Workshop conducted with local stakeholders during
development of this plan identified a network of “diagonal” bikeways as a
visionary future desire for cycling in the City. “Diagonal” bikeways refer to
bikeways that traverse the city without adhering to the existing street network
and would be for exclusive use of people riding bikes, walking, or rolling.
Achieving such facilities in Roseville is challenging as the road network and
land uses are already substantially built out and acquisition of the land
necessary to construct significant segments of a diagonal trail network could
be cost prohibitive. While the priorities of this plan are to develop a bikeway
network in Roseville relying on the existing roadway network, the City can
take steps towards implementing Diagonal Connections as part of their
priority bike network:
1.Trail Connection to Local Roads: The City can take steps towards making
the existing street network more “diagonal” by identify opportunities to
close small gaps from local roads to parks, businesses, and other
frequently traveled places. These gaps will be identified when
redevelopment or other activities occur. Examples opportunities for these
connections include the trail by Applewood Overlook to Pescal Street,
Dionne Street to Cub parking lot, and Hillscourte South to Mackubin
Street.
2.Opportunities for Right-of-Way Acquisition: Through redevelopment or
other activities, the City can look for opportunities to purchase the right-
of-way necessary to construct larger segments of diagonal bikeways.
Page 105 of 165
## B I C Y C L E P L A N
## Roseville, MN
87
## Address Complex Intersections and Barrier Crossings
## Complex Intersections
A bikeway is only as strong as its weakest intersection or crossing.
Intersections are the place where many vehicle-bike conflicts occur.
Many intersections in Roseville are highly complex with multiple
vehicle lanes, wide travel lanes, long crossing distances and overly
wide turn radii which encourage drivers to make fast, sweeping
turns. These auto-oriented designs increase exposure and risk for
people biking (and walking), reduce safety and comfort of the bike
network and can discourage bicycling altogether. As Roseville works
to make streets safer and more welcoming for bicyclists of all
abilities, intersection design is key – don’t drop bicyclists at the
intersection.
As a next step, consider doing a city-wide or corridor specific
intersection and crossing safety analysis to prioritize intersections
and crossings and start to identify safety countermeasures and
treatments. Remember: just because people are not observed
biking at an intersection does not mean they do not want to bike
through that intersection. Be proactive - observed bicycle traffic
should not be a major input when deciding to build safer
intersections.
Page 106 of 165
## B I C Y C L E P L A N
## Roseville, MN
88
## Address Complex Intersections and Barrier Crossings (cont.)
## Barrier Crossings
A key takeaway from the network mapping workshop conducted
during the development of this plan was the presence of major
barriers throughout the city, namely Hwy 36, I-35W, and Hwy 280 as
well as associated interchanges and on and off ramps. These
freeways prevent low-traffic, low-volume local streets from being
viable bikeways for cyclists as these local streets do not connect
over these barriers, forcing cyclists on to high-volume, high-speed
arterial streets. The continuity of this half-mile arterial street
network is why an all-abilities bikeway network should be
implemented on these streets, but safe and comfortable crossings
of barriers are essential to making the network truly all-abilities.
Part of improving barrier crossings for people biking will be
improvements to traffic signal operation and timing – things like
leading pedestrian intervals, shorter signal phases, no right turn on
red, and bike specific signal heads can improve the experience for
cyclists crossing complex intersections. Since Roseville does not
operate any traffic signals, the City will need to coordinate with
agency partners to consider these changes.
MnDOT’s on-going Highway 36 study, of which Roseville has been
a key partner, is an important component to start addressing
crossings over Hwy 36 for bicyclists in Roseville. The study started
in 2023 and concluded in April 2025 and extends from Cleveland
Ave to the west to the Bruce Vento Trail in Maplewood to the
east. The study describes ideas the study team analyzed to meet
the project’s purpose and need, including ideas for improving
safety and comfort for people crossing over Hwy 36 by bike or
foot. These ideas could include closing ramp access, adding
protected or buffered bike lanes, setting a target speed of 30 mph
on streets that cross Hwy 36, intersection treatments designed to
slow driver speeds to less than 10 mph at crossings, and
restricting right turns during red lights.
“Snelling Ave is downright dangerous on
a bike but the only remotely viable
options (Hamline and Fairview) are also
dangerous and incredibly dilapidated.
Could probably say the same regarding
Hwy 61, using English or Edgerton as
alternatives, these roads/crossings were
not designed with cyclists in mind.”
- Comment from MnDOT’s Highway 36
study survey
In addition to Hwy 36, other
barriers were identified as
missing or in need of
improvement during
development of this Bike Plan:
•Hwy 280 in the southwest
corner of the city
## •Co Rd C2 over I-35W
Page 107 of 165
## B I C Y C L E P L A N
## Roseville, MN
89
## Fill Gaps in Existing Shared-Use Path Network
Roseville has been building shared-use paths through its
parks and in partnership with Ramsey County on several
county roads, including County Road C.
A large section of County Road C west of Lexington Ave
includes a shared-use path. A gap exists in this path
## between Cleveland Ave and Long Lake Rd. During the
engagement process of this Plan, many people shared the
desire for this gap to be closed. Additionally, a gaps in the
shared-use path on Fairview Ave exist as well.
Filling in shorter, missing segments of shared-use path along
already existing bikeways is one step towards creating a
network of all-abilities bikeways through the city to
connect more people to important destinations like
## Rosedale Center (Fairview Ave) and the Diagonal Trail in
Minneapolis (County Road C).
Shared-use paths and driveways:
As shared-use path gaps are closed and new shared use paths are
built, ensure where the path crosses driveways that the path cross
slope is maintained (does not dip down). This prioritizes bicyclists’
safety and through movement at minor crossings such as
driveways. It slows motorists turning movements, increases
motorists yielding behavior, and reduces conflicts between people
driving and bicycling. As an added benefit, communities find snow
removal of paths that do not dip down at driveways work better
for snowplow equipment.
During a bike audit along Rice St the group noted that the
numerous driveways along the existing shared-use path created a
bumpy ride. Maintaining a relatively flat cross slope where a
shared-use path crosses a driveway creates a more comfortable
bikeway for bicyclists.
Page 108 of 165
## B I C Y C L E P L A N
## Roseville, MN
90
Continue identifying and start improving a network of Traffic-
## Calmed Local Streets
Roseville’s local street network (city-owned streets) feature limited
direct, continuous bikeways for bicyclists. Routes using local streets
are winding, have dead-ends or are super blocks (long blocks with
limited to no connectivity due to large parks, schools, shopping
centers or other land use decisions).
However, local streets are currently some of the only alternatives to
roads like Snelling Ave and Co Rd C, and many cyclists in Roseville
take advantage of local streets to supplement their bikeways. This
means bicyclists ride in mixed traffic or on a shoulder that is shared
with pedestrians and/or parked vehicles. Some local streets are
posted at 30 mph or higher. For example, parts of Victoria Ave are
posted at 35 mph. The higher vehicle speeds reduce the safety and
comfort for bicyclists, and most people who fall into the “interested
but concerned” bicyclist category are likely not to bike.
While the local street network works for some bicyclists, it does not
work for everyone. There is an opportunity to strengthen a subset
of Roseville’s local streets to create a Traffic-Calmed Local Streets
network for riders of all abilities. This network can be achieved
through incremental, cost-effective approaches.
## Identify the Network
Traffic-Calmed Local Streets can supplement, be an alternative to,
or provide connection to the All-Abilities Bikeways identified in the
## Priority Bike Network. A Traffic-Calmed Local Street network is
especially important as All Abilities bikeways might take longer to
implement given the need for reconstruction and coordination with
other agencies to complete these routes.
This plan has identified three local bikeways (routes #8, #17, and
#21 in the Priority Bike Network) to become Traffic-Calmed Local
Streets, but the City should work to identify additional bikeways to
add to this network that supplement and connect to the All Abilities
routes by:
•Reviewing local network links identified in the 2021 Pathways plan
•Identifying continuous local street bikeways
•Reviewing public engagement collected for this Plan
•Conducting additional engagement on additional streets to add to the
## Traffic-Calmed Local Streets network
•Aiming for one east-west and one north-south traffic-calmed local street
within each ½ mile quadrant
Page 109 of 165
## B I C Y C L E P L A N
## Roseville, MN
91
Continue identifying and start improving a network of Traffic-
## Calmed Local Streets (cont.)
## Use Paint
Once the city has identified the Traffic-Calmed Local Street network,
paint can be used to implement some routes. This approach allows
for the city to take a context sensitive and Safe System Approach to
Complete Streets. By narrowing travel lanes and reallocating space
for painted bike lanes or painted buffered bike lanes, Roseville can
create a clear visual separation between people biking and driving.
Painted bike lanes also help slow motorists’ speeds and serve as a
visible reminder to drivers to be mindful of people biking,
promoting a more cautious and considerate driving culture.
Importantly, using paint provides a more flexible solution, allowing
cities to test the effectiveness of new traffic patterns and adjust as
needed. By reallocating space in this way, cities demonstrate a
commitment to making streets safer and more accessible for all
road users. See Core Concepts in Appendix A.
## Target Speed and Posted Speed
The default speed limit on Roseville’s local streets is 30 mph, which
is too high for cyclists of all abilities to feel comfortable sharing
space with vehicle traffic. To start slowing driver operating speeds
and improving safety for all users on Traffic-Calmed Local Streets,
the city should consider establishment of a 20-25 mph target speed
for local streets within the Traffic-Calmed Local Street Network. This
slower target speed cannot be achieved solely through changing
the posted speed. Achieving operating speeds that align with the
target speed is primarily accomplished through geometric changes
designed with the target speed in mind such as traffic calming
elements and on-road buffered bike lanes. City staff should work
with City Council to develop a program that allows reduction of
speed limits on Traffic-Calmed Local Streets once an agreed upon
set of traffic calming tools or elements have been implemented or
are planned to be implemented.
Page 110 of 165
## B I C Y C L E P L A N
## Roseville, MN
92
## 4. Identify and Improve a Network of Traffic-Calmed Local
## Streets
## Bicycle Boulevards:
Some bikeways in the Traffic-Calmed Local Street network might be
low-speed and low-volume enough that painted bike lanes are not
necessary and elements design to calm traffic and alert drivers to
presence of cyclists at key locations are appropriate. Many of these
bikeways simply require the city to sign and use pavement markings to
mark these as shared use streets or “bicycle boulevards.” In some
cases, additional traffic calming tools should be considered to
encourage motorists go 20 mph and vehicle volumes stay low. These
traffic calming tools can include neighborhood traffic circles, chicanes,
or median refuges with vehicle closure. Roseville should consult the
guides listed in Appendix A of this plan for additional treatments to
consider for Bicycle Boulevards. How these treatments work together
to form a Bicycle Boulevard is described in Appendix A. In general,
additional analysis will be require to determine which tools are
necessary to support slower speeds, as it may be more than simple
paint and signage. See the discussion of target speed and posted speed
on the prior page for additional context.
## Safe Routes to School
Prioritizing bikeways to schools is a crucial first step in building a
city’s bike network because it encourages active transportation for
children and promotes healthy habits from a young age. Ensuring
safe routes for students also addresses concerns about road safety,
giving parents more confidence to allow their children to bike to
school. By focusing on schools, Roseville can establish a core
network of bikeways that connect key neighborhoods, laying the
foundation for a more extensive, citywide bike infrastructure. The
minimum allowable speed limit in a Minnesota school zone is 15
mph but lowering city street speed limits around schools to 20 mph
may also address road safety.
Improving biking conditions on a network of Traffic-Calmed Local
Streets will provide a more comfortable parallel bikeways to high-
volume, high-speed major roads and can be implemented faster than
improvements to major roads (many of which are county roads).
In addition to calming traffic, these treatments also act as wayfinding for
cyclists, alerting them that they are on a route intended for them.
Page 111 of 165
## B I C Y C L E P L A N
## Roseville, MN
93
## Policy
## Recommendation: What
is being suggested?
Description: What is the policy?
Action Step: What is a next
step(s) to take?
## Toward Zero
## Deaths
Make an official and
public commitment to a
## Toward Zero Deaths (TZD)
goal to achieve zero traffic
fatalities or severe injuries
among all road users
within a set timeframe.
Toward Zero Deaths is a strategy to eliminate all traffic fatalities
and severe injuries. A local policy lays out goals, timeline,
stakeholders and a commitment to multi-disciplinary
cooperation and collaboration, community engagement,
transparency and equitable outcomes. Establishing a Toward
Zero Deaths goal can help justify other changes in how streets
are designed, maintained and operated which improves safety
for all. Minnesota Toward Zero Deaths (TZD) is a program and
network to support local and statewide traffic fatalities or severe
injury reduction goals. Learn more and join the Minnesota TZD
network.
❑Establish the city’s own TZD
goal in collaboration with
the mayor, city council and
city manager.
❑Continue participation in
## County and City of St Paul
TZD efforts
## Safer Vehicle
## Operating
## Speeds
Take advantage of
reconstruction projects to
change street design to
support slower operating
speeds.
Roseville acknowledges that posted speed limits are less
effective than roadway design at managing driver speeds. The
city would like to begin pursuing changes in their street design
process that prioritize slower vehicle operating speeds. This
could look like establishing a target speed (the speed you want
drivers to go) for different street types (e.g., 20 mph for Traffic-
Calmed Local Streets) and establishing design standards to be
used during redesign and reconstruction of these streets.
❑Establish a “Target Speed”
street design policy that
states street elements
should be designed to the
desired operating speed,
rather than the speed
drivers are already going.
❑Establish target speeds for
different street types in the
city.
## Policy Recommendations
The following are policy recommendations that
support bicycling.
Page 112 of 165
## B I C Y C L E P L A N
## Roseville, MN
94
## Policy
## Recommendation:
What is being
suggested?
Description: What is the policy?
Action Step: What is a next
step(s) to take?
## Land Use,
## Development
## Code/
## Ordinance
Ensure current land
use code and
ordinances support
compact, mixed-use
practices to help
encourage bicycling
trips.
Retail and commercial sites are important local and regional
destinations in Roseville. Land use is a big factor in supporting
active trips. Retail and commercial development has historically
prioritized the car with strip-style development which creates
unclear and indirect access to business entrances for people
arriving on foot or bike. As development and redevelopment of
retail sites in Roseville continues, the city has an opportunity to
influence the built form through development ordinance and
design review. Compact, mixed-use development with short blocks,
pedestrian and bike-only links or trails, buildings that front the
street, ample bike parking and reducing or eliminating off-street
parking requirements for vehicles allows active transportation
(including transit) to work more effectively. Higher housing density
located in and near retail or mixed-use commercial districts is key
to addressing local housing needs and mode shift, as well. Density
can be done well. For example, many cities are incentivizing
Accessory Dwelling Units (ADUs) on residential, single family zoned,
properties by eliminating off-street parking requirements to
support this incremental development strategy.
❑Review and revise land
use development code/
ordinances to help
promote bicycle trips
## Policy Recommendations
The following are policy recommendations that
support bicycling.
Page 113 of 165
## B I C Y C L E P L A N
## Roseville, MN
95
## Policy
## Recommendation: What is
being suggested?
Description: What is the policy?
Action Step: What is a next
step(s) to take?
## Bike Parking in
## Private
## Development
Update parking ordinances to ensure
bike parking is required in future
development projects.
Secure, well located and highly accessible bike parking is necessary
for biking to be a viable transportation option. It is a relatively
compact and cost-effective parking strategy. Many cities have
minimum ordinances for bike parking and bike racks. These
requirements can include the number of spaces needed, where to
locate them, availability of short- and long-term options and how to
install. To encourage installation of bike parking ordinances often
apply to new developments, counting toward vehicle parking
## requirements. Resource: Essentials of Bike Parking, Association of
## Pedestrian and Bicycle Professionals
❑Review current parking and
land-use/development
ordinances to evaluate bike
parking requirements and
develop recommendations to
increase bike parking.
❑Develop a grant program to
support private property
owners who want to add bike
parking.
## Equitable
Enforcement of
## Cyclist Behavior
Revise existing city policies related to
disparities in traffic enforcement to
include cyclists.
Roseville Police Department currently has policies in place to
address the disparities communities of color experienced related to
traffic enforcement. Currently, the policies only refer to vehicular
and pedestrian traffic. The current policy stresses a focus on
moving violations versus equipment violations.
❑Review and revise city policies
related to disparities in traffic
enforcement to include
bicyclists.
❑As is also referenced in the
TZD practice recommendation
in this Plan, consider use of
TZD grant funds for additional
driver and cyclists education
efforts on bicycling laws and
cyclist right of way.
## Policy Recommendations
The following are policy recommendations that
support bicycling.
Page 114 of 165
## B I C Y C L E P L A N
## Roseville, MN
96
## Practice
## Recommendation: What
is being suggested?
Description: What is the practice?
Action Step: What is a next
step(s) to take?
## Complete
## Streets
## Checklist
## Revise Complete Streets
checklist to be used by
public works and
planning.
Roseville currently has a Complete Streets checklist, but it
should be revisited and updated.
Complete Streets checklists are used to help put Complete
Streets Policies into practice. Checklists are used at the start of
any project to summarize data and information about the street
and surrounding land use, record details of the project and
identify specific improvements that can be incorporated. See an
example of a Complete Streets Checklist.
❑Review and revise the
## existing Complete Streets
Checklist using current
standards and examples to
use in support of Complete
Streets Policy.
## Design
## Guidance
Adopt or endorse national
or state street design
guides.
Rewriting street design guides can be time intensive and cost
prohibitive for many communities. To support implementation
of Complete Streets and this Plan, adopt or endorse state and
national design guides to enable the use of best practices and
design flexibility. Such as:
## •National Association of City Transportation Officials (NACTO)
## Urban Street Design Guide
## •NACTO Urban Bikeway Design Guide and Designing for Small
Things with Wheels (guidance on e-bikes)
## •Federal Highway Administration (FHWA) Small Town and Rural
## Multimodal Networks
## •MnDOT Bicycle Facility Design Manual
## •American Association of State Highway and Transportation
## Officials (AASHTO) Comprehensive Bike Guide
❑Review and adopt or
endorse design guide(s) to
be used by city staff and
consultants on street
projects.
## Practice Recommendations
The following are practice or agency procedure
recommendations that support bicycling.
Page 115 of 165
## B I C Y C L E P L A N
## Roseville, MN
97
## Practice
## Recommendation:
What is being
suggested?
Description: What is the practice?
Action Step: What is a next step(s)
to take?
## Bike Parking in
## Street Projects
Update bicycle
parking practices to
expand bicycle racks
in the right of way to
accommodate the
diversity of bike types
(e.g., adaptive and
cargo bikes, e-bikes,
scooters).
Cities have been providing on-street parking, often for free, for
vehicles for decades. To help encourage and achieve local mode
shift goals and ensure biking is a viable transportation option,
future capital street projects should include an approach to
reserving curbside or furnishing zone of sidewalks for bike racks.
These spaces should include covered, weather protected,
options, support electric charging needs and accommodate
larger bikes (e.g., cargo or adaptive). Bike racks can be
customized to reflect the character of the community and serve
as a public art element.
❑Complete a citywide evaluation
of bike rack installations and
develop a process to identify
locations to add bike racks
across the city.
❑Install bicycle parking with all
capital street projects.
## Maintenance
## Procedures
Ensure annual budget
provides for regular
maintenance and
minor repairs of active
transportation
facilities.
Shared use paths, on-street bicycle facilities and sidewalks
require regular maintenance. People walking and biking are
more susceptible than motor vehicles to pavement irregularities
such as cracks, potholes, broken glass and gravel. Establishing
an annual process for assessing conditions and determining
where repairs are needed, including addressing ADA compliance
is an important practice to maintaining active transportation
network.
❑Complete a condition inventory
of sidewalks, multi-use trails or
paths and ADA compliance.
❑Establish and prioritize repair
locations using a data driven
approach based on inventory
data.
## Practice Recommendations
The following are practice or agency procedure
recommendations that support bicycling.
Page 116 of 165
## B I C Y C L E P L A N
## Roseville, MN
98
## Practice
## Recommendation: What
is being suggested?
Description: What is the practice?
Action Step: What is a next step(s)
to take?
## Winter
## Maintenance
Ensure that bikeways and
walkways are cleared
from snow in a timely
manner.
Maintaining winter access for people walking and biking in
the city is critically important. Winter maintenance often
requires many people and institutions throughout the city
help ensure paths are kept clear and passable.
Currently, the city is responsible for clearing all shared-use
paths within the city within 24 hours after snow has quit
falling and after a minimum of 2” of accumulated snowfall.
Additionally, the city does not allow parking on city streets
after two or more inches of continuous snowfall until streets
have been plowed curb to curb.
❑Expand education and
awareness efforts for residents
and businesses on city’s
bikeway snow and ice removal
ordinance, related standards
and responsibilities.
❑Establish a city-run corner and
transit clearing program.
❑Determine best way to ensure
existing and future on-street
bike lanes and bicycle
boulevards have the same
quality of snow and ice
clearance as protected bike
lanes and shared use paths.
## Practice Recommendations
The following are practice or agency procedure
recommendations that support bicycling.
Page 117 of 165
## B I C Y C L E P L A N
## Roseville, MN
99
## Practice
## Recommendation: What
is being suggested?
Description: What is the practice?
Action Step: What is a next step(s)
to take?
## Toward Zero
Deaths (TZD)
## Continue TZD program
efforts through
participation in County-
wide program facilitated
## by the Saint Paul Police
Department.
Toward Zero Deaths is a strategy to eliminate all traffic
fatalities and severe injuries. A local policy lays out goals,
timeline, stakeholders and a commitment to multi-
disciplinary cooperation and collaboration, community
engagement, transparency and equitable outcomes.
Establishing a Toward Zero Deaths goal can help justify other
changes in how streets are designed, maintained and
operated which improves safety for all. Minnesota Toward
Zero Deaths (TZD) is a program and network to support local
and statewide traffic fatalities or severe injury reduction
goals. Learn more and join the Minnesota TZD network.
Roseville currently partners with the Saint Paul Police
Department for a county-wide TZD grant provided through
MnDOT.
❑Continue, and explore
expanding, the city’s role in
county-wide TZD efforts
coordinated by the Saint Paul
Police Department.
❑Explore using funds available
through TZD program
participation towards driver
and cyclist education on
bicycling laws and rights of
way.
## Practice Recommendations
The following are practice or agency procedure
recommendations that support bicycling.
Page 118 of 165
## B I C Y C L E P L A N
## Roseville, MN
100
## Program Recommendations
The following are program recommendations
that support bicycling.
## Program
## Recommendation: What
is being suggested?
Description: What is the program?
Action Step: What is a next
step(s) to take?
## Safe Routes to
School (SRTS)
Continue to support local
## Safe Routes to School
program efforts.
Safe Routes to School programs improve safety, reduce traffic
and improve air quality near schools through a multidisciplinary
approach that is structured around the “6 Es.” These are
evaluation, education, encouragement, equity, engagement and
engineering. Cities can continue to support by leading
engineering efforts by prioritizing active transportation
investments along key routes to school. Related to education, in
2023 state legislation was passed that requires all public-school
students receive instruction in safe walking and bicycling skills at
the beginning of the school year. Resource: Walk and Bike Safety
## Education for K-8 Students, MnDOT
❑Work with school partners
to apply for MnDOT
planning, boost or
infrastructure grants to
enact this Plan and a SRTS
## Plan. See MnDOT’s Safe
## Routes to School Grant
Funding page for
opportunities.
## School Streets
and Park &
## Walk
## Programs
## Pilot School Streets
and/or Park & Walk in
partnership with
neighborhood schools.
School Streets are temporary car-free zones adjacent to or
leading up to a school. School Streets help manage traffic and
improve safety during school arrival and dismissal by eliminating
vehicle congestion in front of schools. This creates an
environment that encourages children and caregivers to walk,
bike, roll, play and learn before, during and after school. Often
School Streets are paired with Park & Walk zones where school
buses and/or caregivers drop students at an established
location(s) a few blocks from school. School staff, parents and
other volunteers walk the kids to/from school.
❑Collaborate with school
partners and neighborhood
residents on a School
## Street pilot. See Minnesota
## Safe Routes to School Guide
## on School Streets and Park
& Walk and learn from
## Seattle Department of
## Transportation School
Streets.
Page 119 of 165
## B I C Y C L E P L A N
## Roseville, MN
101
## Program Recommendations
The following are program recommendations that
support bicycling.
## Program
## Recommendation: What
is being suggested?
Description: What is the program?
Action Step: What is a next
step(s) to take?
## Bicycle Rack
and Corral
## Cost Share
## Program
Develop a bike rack and
corral cost share program.
Cities are instituting bike rack programs that allows businesses
and other eligible organizations to request bike racks for the
public right of way in front of their property. This includes bike
corrals that can store 10-12 bikes , including covered, placed in
an on-street parking stall. Minneapolis allows eligible businesses
to be reimbursed up to 50% of the bicycle rack or corral cost and
50% of the installation cost. Schools, libraries, parks and other
eligible public facilities can request to receive racks at no cost.
❑Assess current bike parking
availability and develop
recommendations to
increase bike parking
through a cost share bike
rack and corral program.
## E-bike Rebate
## Program
Develop and pilot a local
E-bike rebate program,
and promote existing
rebate opportunities
To encourage more people to bicycle and make bicycling more
accessible, the City can establish its own e-bike rebate program
and promote existing opportunities such as the Minnesota State
E-bike Rebate Program.
❑Research how other cities
have established rebate
programs.
## Wayfinding
## Program
Continue developing a
wayfinding program for
cyclists
Help existing and new bicyclists identify bikeways they can use,
either now or as the Priority Network is implemented.
Wayfinding can consist of virtual or print maps, signage and
pavement markings.
❑Continue developing a
wayfinding program for
cyclists
❑Develop a plan to update
the wayfinding program
annually as projects are
completed and based on
public feedback
Page 120 of 165
## B I C Y C L E P L A N
## Roseville, MN
102
## Program Recommendations
The following are program recommendations that
support bicycling.
## Program
## Recommendation: What
is being suggested?
Description: What is the program?
Action Step: What is a next
step(s) to take?
## Monitoring
and Reporting
Develop a program to
collect metrics related to
cyclist comfort and safety.
While an annual monitoring and reporting program for bike
improvements in the city is likely not within current staff
capacity, the City could still explore establishing a bicycle
improvement monitoring program focusing on key metrics and
in coordination with the County such as: Level of Traffic Stress,
for both roadway segments and intersections, length of
improvements completed on the Connected Ramsey Community
Network and Design Flag Analysis at intersections.
❑Collect baseline data
related to cyclist safety and
comfort in Roseville in the
next 1-2 years.
Page 121 of 165
## B I C Y C L E P L A N
## Roseville, MN
103
## Next Steps for Collaboration with Ramsey County
## Next StepDescription
1
Apply for the Ramsey County Active Living Ramsey Communities Be Active! Be Green! Bench Program and create more bench corridors
throughout Roseville.
2
Continue participating in the Active Living Ramsey Communities Coalition.
Active Living Ramsey Communities Mission: Active Living Ramsey Communities improves health through community engagement. We
promote and create environments that make it safe and easy for everyone to integrate physical activity into their daily routine.
3
Continue to update Roseville's Pedestrian and Bicycle inventory and plans in the Ramsey Countywide Pedestrian and Bicycle GIS
Clearinghouse through Active Living Ramsey Communities GIS Clearinghouse—Geographic Information Systems (GIS) is a collaborative
mapping tool that can represent spatial and geographic data. It is used to map, visualize, analyze and interpret data to better understand
relationships, patterns and trends between local government jurisdictions in Ramsey County. Pedestrian and bicycle data is collected
annually from Ramsey County communities by Ramsey County. An updated set of current bicycle and pedestrian related data for the
whole county in maintained by Ramsey County. This collaborative works helps make applying for funding easier.
4
Collaborate, support and update the Ramsey Countywide Connect Ramsey Communities Bicycle Network and continue to include it in the
Roseville Comprehensive Plan. Roseville has included the Connect Ramsey Communities Bicycle Network in its planning documents for
the past two decades and will continue to do so in the future.
Page 122 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 6.c.
## ITEM DESCRIPTION: Pathway Master Plan - Continued Segment Review
## Background
The City of Roseville last updated the Pathway Master Plan in 2021. That update was relatively minor in the
sense that the only part of the plan that was reviewed was the segments. Pathway segments that had been
completed were removed and six new segments were added and ranked on the preference list.
The last major upgrade to the plan was in 2018 in conjunction with the Transportation Plan which was a
requirement of the Comprehensive Plan. During that update, the entire plan was looked at including goals,
objectives, changing from a priority list to a preference list, and adding/removing pathway segments.
Once again, since the 2021 plan was adopted, there have been many changes to the system. New
pathways have been added and there have been additional requests for additional pathway segments to be
added to the Pathway Master Plan. Similar to the last update, staff would use the Public Works Environment
and Transportation Commission as a working group to update the plan. In addition to looking to add/remove
segments, staff would also like to look at the plan to make it clearer and more concise and easier to
understand for the public. There have been additional corridor studies completed since the 2018 plan update
including the TH 36 study, Victoria Pathway Study, County Road B/Snelling Study, etc., and many changes
in land use, including new parks and new housing. We would also like to tie in the draft Bike Plan. The goal
is to bring the final draft of the Bike Plan to the commission in September for final recommendation. Staff
would also like to review if the current preference list is using the correct criteria to rank the segments.
Staff would use this PWETC meeting to review the current plan and highlight areas of the plan that will be
looked at. Staff would like feedback on the process and what information the commission will need. The
overall update will likely be done over a series of meetings. Similar to the 2021 update, we would hold public
hearings for segments that are being considered to be added. Residents near and adjacent to the segments
would be invited to the meeting.
Below is a draft task list of items to be updated or incorporated into the new plan. Additionally, they are in a
proposed order for the commission to address. We can use the meeting to further refine which items the
commission would like to review and discuss.
## • Existing Plan Review
• Should any segments be added to the pathway master plan?
o Should any Parks & Recreation Constellation Plan segments be pathway master plan
segments?
• Bike plan incorporation
## • Preference List Ranking
o Modify the Criteria
• Provide recommendations to the 5-year CIP
The commission began this review at the November 2025 meeting and continued at the March 2026
meeting. This is a continuation of that discussion and includes an update (Attachment 3) which includes
additional segments to consider. Attachment 5 now includes updated notes from both meetings.
Page 123 of 165
## Recommendation
Review existing segments and provide feedback and recommendations.
Review existing constellation plan and provide feedback and recommendations if any of these segments
should be added to the pathway master plan.
Review possible pathway segments to add and provide feedback and recommendations.
## Attachments
## 1. Existing Pathway Master Plan
## 2. Existing Constellation Plan
## 3. Possible Pathway Master Plan Segments to Add
## 4. Existing Pathway CIP
## 5. Pathway Master Plan Segment List
Page 124 of 165
## City of Roseville Pathway Master Plan
Page 45
Attachment 1
Page 125 of 165
## City of Roseville Pathway Master Plan
Page 46
Page 126 of 165
## City of Roseville Pathway Master Plan
Page 47
Page 127 of 165
## City of Roseville Pathway Master Plan
Page 48
Page 128 of 165
## City of Roseville Pathway Master Plan
Page 52
Attachment 2
Page 129 of 165
0700100020003000
## Feet
## DISCLAIMER:
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records,
information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be
used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose
requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies
are found please contact 651-792-7044. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21
(2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and
agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third
parties which arise out of the user's access or use of data provided.
## PotentialPathwayMasterPlanSegments
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## IL
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## IC
## C
## E
## NT
## E
## R DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## IL
## LS
## C
## O
## U
## R
## TE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## AL
## TI
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TER
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## UR
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SA
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOS
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## WN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DEL
## LW
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLE
## VE
## LA
## N
## D
## A
## VE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## IS
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MA
## RI
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## AU
## T
## U
## M
## N
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## NSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## RO
## S
## E
## G
## AT
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## RR
## IN
## G
## TO
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## LA
## N
## D
## S
## E
## R
## VI
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## CC
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## SB
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## IL
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## IC
## C
## E
## NT
## E
## R DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## IL
## LS
## C
## O
## U
## R
## TE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## AL
## TI
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TER
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## UR
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SA
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOS
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## WN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DEL
## LW
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLE
## VE
## LA
## N
## D
## A
## VE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## IS
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MA
## RI
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## AU
## T
## U
## M
## N
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## NSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## RO
## S
## E
## G
## AT
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## RR
## IN
## G
## TO
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## LA
## N
## D
## S
## E
## R
## VI
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## CC
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## SB
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## D
## L
## E
## A
## H
## B
## J
## I
## F
## K
## G
## C
## P
## M
## N
## O
## School
## School
## School
## School
## School
## School
## School
## School
## School
## School
## School
## School
6
7
28
5
35
1
10
2
8
9
11
13
17
24
37
## 3B
## 25B
## 12C
## 3A
## 12A
## 12B
## 12B
14
36
33
23
30
## 25A
## 25A
21
22
34
32
27
31
29
18
20
19
40
2
2
2
## 12C
## L
## Data Sources
## * Ramsey County GIS (2/14/2026)
## * City of Roseville Community Development
## * City of Roseville Finance Department
## Prepared by: Engineering Department
3/17/2026
## Potential Pathway Master Plan Segments
## Park
## Golf Course
## School
## Pathway Master Plan Segments (16.5 miles)
Existing Trail (37.3 miles)
Existing Sidewalk (47.2 miles)
Existing Footpath (1.1 miles)
Boardwalk- 0.6 miles
## Proposed Planned Master Plan Segments (4.2 miles)
Attachment 3
Page 130 of 165
0700100020003000
## Feet
## DISCLAIMER:
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records,
information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be
used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose
requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies
are found please contact 651-792-7075. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21
(2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and
agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third
parties which arise out of the user's access or use of data provided.
2026_NewPathway_CIP
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## PATT
## ON
## RD
## HIGHCREST
## RD
## MILLW
## OOD
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGEROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## SH
## OREW
## OOD
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## LI
## NC
## OLN
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIVIC CE
## NTER D
## R
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## CUR
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVEWHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HIGH
## POINTE
## CURV
## OWASSO
## HILLS
## DR
## N
## HILLSC
## OURTE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## GALTIE
## R
## ST
## MAT
## ILD
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S OW
## ASSO
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TERR
## ACE
## HILL
## SCO
## URTE
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SAN
## DHU
## RST
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANTAVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## WOODB
## RID
## GE
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOSS
## AR
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## LOVELL LN N
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## ROSE
## TOWN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN S
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## SIMP
## S
## ON
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## ARO
## NA
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DELLW
## OOD
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## FERN
## WOOD
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIALDR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLEVELA
## ND
## AVE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RDHADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## FERRIS
## FERRIS LN
## GLU
## EK
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MARIO
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## LO
## RE
## N
## RD
## AUT
## U
## MN
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## ELDRIDGE
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## COH
## ANSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## CRE
## SC
## ENT
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## ROSEG
## ATE
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## FARRING
## TON CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## CLEVE
## LAND S
## ERVIC
## E DR
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## WOOD
## RUFF
## S MCCA
## RRONS
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## LAN
## GT
## ON LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## ASBUR
## Y ST
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## L
## Data Sources
## * Ramsey County GIS (10/3/2025)
## * City of Roseville Community Development
## * City of Roseville Finance Department
## Prepared by: Engineering Department
11/20/2025
## 2026- New Pathway 5 Year CIP
## Existing City Pathways and Parking Lots
## 2028 New Pathway
## 2027 New Pathway
## 2026 New Pathway
Attachment 4
Page 131 of 165
## Map Ref. Project NameDescriptionTYPENOTES
## Total
## Points
## Pathway Master Plan
## and Parks Constellation
## Plan Rank
## PWET
## Comments
28
## Snelling Avenue*
Develop off road pathway between County Road B and County Road C
## Trail/Sidewalk251
## Keep
4ACounty Road C (A)
Construct an on-road pathway from Lexington Avenue to Victoria St.
## On Road2026 Project232
## Remove
9Snelling Avenue South of Highway 36
Complete pathway along east side of Snelling Avenue for improved access to A-BRT transit stations.
## Trail/Sidewalk223
Modify -
"east"
16Rosedale to HarMar Connection
A pedestrian bridge across Highway 36 and pathway connection between Rosedale and HarMar Mall.
## Trail/Sidewalk
## TH 36 Study - Snelling
Bridge 2030223
## Remove
12CLexington Avenue ( C)
Complete off-road pathway on the east side of Lexington Avenue from County Road C2 to County Road D.
## Trail
Only C2-Cty D is missing -
## Modify223
## Modify
12ALexington Avenue (A)
Complete off-road pathway on the east side of Lexington Avenue from Larpenteur Avenue to Roselawn
## Avenue County Road B
## Sidewalk
## Only Larpentuer to
Roselawn is Missing -
## Modify216
## Modify
12BLexington Avenue (B)
Complete off-road pathway on the east side of Lexington Avenue from County Road B2 to County Road C.
## Trail/Sidewalk
2026 project. After
2026 only missing B2-C -
## Modify197
## Modify
4BCounty Road C (B)
Construct an on-road pathway from Victoria St to Dale St.
## On Road
2026 Project for on
road - Modify?197
## Remove
3ACounty Road C-2 (A)
Complete both on- and off-road pathways within the County Road C-2 alignment from Snelling Avenue to
## Hamline Ave
## On Road &
Trail/SidewalkShould we do both?189
## Keep
4CCounty Road C (C)
Construct an on-road pathway from Dale St to Western Ave.
## On Road
2026 Project for on
road - Modify?189
## Remove
4DCounty Road C (D)
Complete off-road pathway on northside of County Road C from Western Ave to Rice St.
## Trail/Sidewalk
2026 Project for on
road - Modify?189
## Delete
6
## Cleveland Avenue
Complete off-road pathway segments between County Road C and County Road D.
## Trail/Sidewalk
Partial completed -
## Modify1712
## Modify
13Rice Street
Complete an off-road pathway from County Road C to C2.
## Trail/SidewalkMissing C-C21712
## Modify
## 25AHamline Avenue A
An off-road trail from County Road C to County Road C-2.
## Trail
2026 Project - Can
## Remove1712
## Remove
10
## Victoria Street (north of C)
Develop an on- road and off-road pathway from County Road C to County Road D.
## Trail/Sidewalk2028 Project - Modify1615
## Keep
## CC-3
## Constellation Link C3
Develop a constellation link pathway along Woodhill Drive between Hamline Avenue and Civic Center
## Drive to connect to Howard Johnson Park
## Trail/SidewalkPotential Add1615
## Reference E
36
## Snelling Service Dr E
Develop an off road pathway along the east side of the East Snelling Service Drivet, C2 to Lydia
## Trail/Sidewalk1615
## Modify
## 2County Road C-2 West of Snelling
Develop on-and/or off-road pathways on County Road C-2 from Old8 to Long Lake Road/Partridge
## On Road &
## Trail/Sidewalk1518
## Modify
8
TH 51 connection to Old Snelling (Arden Hills)
Work with Arden Hills to develop a regional pathway connection along Snelling Avenue to Old Snelling
Avenue in Arden Hills connecting Roseville to Mounds View High School, Valentine Hills Elementary School,
Bethel College, Lake Johanna Park and County Road E2 commercial businesses.
## Trail
MnDOT 2026 Project -
## Can Remove1518
## Remove
## 25BHamline Avenue B
An off-road trail from County Road C-2 to County Road D.
## Trail
2026 Project - Can
## Remove1518
## Remove
Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway.
## Parks and Recreation Master Plan Constellation Link
## Project Preference List
Page 1 of 4
Attachment 5
Page 132 of 165
## Map Ref. Project NameDescriptionTYPENOTES
## Total
## Points
## Pathway Master Plan
## and Parks Constellation
## Plan Rank
## PWET
## Comments
Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway.
## Parks and Recreation Master Plan Constellation Link
## Project Preference List
3BCounty Road C-2 (B)
Complete an off-road pathway on County Road C-2 from Lexington Ave to Victoria St.
## Trail/Sidewalk1518
## Modifty
## CD-1
## Constellation Link D1
Develop a constellation link pathway along Oxford Street between Woodhill Avenue pathway and County
Road C2.
1518
Remove from
## Pathway Plan
27
## Tamarack Park Connection*#
Install a pathway connection from South McCarron’s Blvd to Tamarack Park.
## Trail1423
Remove from
## From Plan
## CC-2
## Constellation Link C2
Develop a constellation link pathway along Griggs Street beween Veterans Park and County Road C2.
1423
## Remove
## CK-2
## Constellation Link K2
Develop a constellation link pathway along Aldine Street/Midlothian Road between Roselawn Pathways
and County Road B pathways.
1423
Leave for
now
35
## Fairview Ave, west side B2 to C2
Develop an off road pathway along the west side of Fairview Avenue from County Road B2 - C2
## Trail/Sidewalk1423
## Keep
29
## Commerce Street*
Develop a pathway connection on the south side between State Farm Rd and Hamline Ave
## Trail/Sidewalk1327
## Modify
## CF-3
## Constellation Link F3
Develop a constellation link pathway along Minnesota Avenue between Lovell Avenue pathways and
Materion Park.
1327
## F &H ADD
## CI-1
## Constellation Link I1
Develop a constellation link pathway along Oakcrest Avenue between Fairview Avenue pathways and
Rosebrook Park.
1327
## Don’t Add
37
## Lydia Avenue
Develop and off road pathway on Lydia Avenue between Snelling Avenue and Hamline Avenue
## Trail/Sidewalk1327
## Keep
## 5County Road C Sidewalk
Construct a sidewalk on the north side of County Road C from Western to Rice Street.
SidewalkNot part of 2026 project1231
## Keep
7Fairview Avenue C (north of B-2)
Development of off-road pathways between County Road C2 and County Road D.
## Trail/Sidewalk1231
## Keep
31
## Pascal Street*
Develop a pathway connection between County Road B and Commerce Street
## Trail/Sidewalk1231
## CC-1
## Constellation Link C1
Develop a constellation link pathway along Arona/Lydia between County Road C2 and Autumn Grove Park.
1231
## CF-2
## Constellation Link F2
Develop a constellation link pathway along Galtier Street and Matilda Street to connect County Road B2
pathways to Acorn Park.
1231
18
## Judith to Iona Connection#
Develop a pathway connection between Judith Ave and Iona Lane.
## Trail/Sidewalk1136
## CA-1
## Constellation Link A1
Develop a constellation link pathway along Maple Lane between Highcrest Road pathway and Old Hwy 8
pathway.
1136
## CH-1
## Constellation Link H1
Develop a constellation link pathway along Oakcrest Avenue and Fernwood Street between Hamline
Avenue pathways and Willow Pond Park pathways.
1136
## CHI
## Constellation Connection H to I
Develop a constellation connection between Consellation H and I across Snelling Avenue between County
Road B2 and County Road C.
1136
## CN-1
## Constellation Link N1
Develop a constellation link pathway along William Street between the pathway on N McCarrons
Boulevard and the pathway along County Road B.
1136
1
## County Road D
Develop pathway facilities, both on- and off-road, between Cleveland and Fairview Avenue.
## Trail/Sidewalk2027 Project1041
## 11Dale Street South
The construction of an off-street pathway from Reservoir Woods Park to Larpenteur Avenue.
## Trail/Sidewalk1041
19
## Lovell to Minnesota Connection
Develop a pathway connection between Lovell Ave and Minnesota Street.
## Trail/Sidewalk1041
21
## Millwood to County Road C2 Link
Develop a pathway connection that creates a link between the corner of Millwood and Chatsworth
through the Ramsey County open space to County Road C2.
## Trail/Sidewalk1041
Page 2 of 4
Page 133 of 165
## Map Ref. Project NameDescriptionTYPENOTES
## Total
## Points
## Pathway Master Plan
## and Parks Constellation
## Plan Rank
## PWET
## Comments
Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway.
## Parks and Recreation Master Plan Constellation Link
## Project Preference List
24
## Alta Vista Drive
Develop a pathway connection along Alta Vista Drive between Larpenteur Avenue and Reservoir Woods
Park.
## Trail/Sidewalk1041
30
## Albert Street*
Develop a pathway connection between County Road B and Commerce Street
## Sidewalk
Partial completed -
## Modify1041
## CB-2
## Constellation Link B2
Develop a constellation link pathway along Aldine St between Oasis Park and Lydia Avenue pathway.
1041
## CG-1
## Constellation Link G1
Develop a constellation link pathway along Rose Place and Aladdin Street to connect Fisk Street with
## Central Park (Dale Street Soccer Fields)
1041
## CG-2
## Constellation Link G2
Develop a constellation link pathway along Oxford Street between County Road B2 pathways and Central
Park pathway off Brooks Street.
1041
## CH-2
## Constellation Link H2
Develop a constellation link pathway along Pascal Street between County Road B2 pathways to
Pocahontas Park.
1041
## CL-1
## Constellation Link L1
Develop a constellation link pathway along Shryer Avenue and the east side of the Har Mar Mall to
connect the pathway on Hamline to the pathway of County Road B.
1041
## CL-3
## Constellation Link L3
Develop a constellation link pathway along Ryan Avenue and Fernwood Street to connect Bruce Russell
Park to Keller Mayflower Park.
1041
## CM-2
## Constellation Link M2
Develop a constellation link pathway along Chatsworth Street between Roselawn and Shryer to connect to
Pioneer Park.
1041
## CM-4
## Constellation Link M4
Develop a constellation link pathway along Alameda Street between Resevoir Woods and the pathways on
County Road B.
1041
## CN-3
## Constellation Link N2
Develop a constellation link pathway along Dionne Avenue and Galtier Street to connect Tamarack Park to
the pathway on South McCarrons Boulevard.
1041
34
## Marion Street
Develop an off road pathway along Marion Street from Larpentuer Avenue to the cul-de-sac
SidewalkCompleted 20231041
23
## Cohansey St to HANC Connection
Develop a pathway connection between Cohansey Street and HANC.
## Trail/Sidewalk957
## CA-2
## Constellation Link A2
Develop a constellation link pathway along Lydia Avenue between Highcrest pathway and Brenner Street.
957
## CB-1
## Constellation Link B1
Develop a constellation link pathway along County Road C2 beween Langton Lake Park and Fairview
Avenue pathway.
957
## CE-3
## Constellation Link E3
Develop a constellation link pathway along Mackubin Street and Woodhill Drive to connect pathways to
Owasso Hills Park to Woodhill Park.
957
## CG-3
## Constellation Link G3
Develop a constellation link pathway along Grotto Street between County Road B2 pathways and Central
Park Pathways at Sextant Avenue.
957
## CK-1
## Constellation Link K1
Develop a constellation link pathway along Prior Avenue between Roselawn pathway and County Road B
pathway/Fairview Community Center.
957
## CL-4
## Constellation Link L4
Develop a constellation link pathway along Fernwood Street and Roselawn Avenue to connect Garden
Avenue pathways to Bruce Russell Park.
957
## CM-1
## Constellation Link M1
Develop a constellation link pathway along Shryer Avenue to connect Lexington Park pathways to Pioneer
Park.
957
## CM-3
## Constellation Link M3
Develop a constellation link pathway along Chatsworth Street, Roma Avenue, Aglen Street, Ruggles Street
and Oxford Street to connect the pathway on Victoria Street to the pathway on Roselawn Avenue.
957
Page 3 of 4
Page 134 of 165
## Map Ref. Project NameDescriptionTYPENOTES
## Total
## Points
## Pathway Master Plan
## and Parks Constellation
## Plan Rank
## PWET
## Comments
Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway.
## Parks and Recreation Master Plan Constellation Link
## Project Preference List
33
## Tamarack Park
## Develep a pathway from Western Avenue into Tamarack Park
## Trail
Completed 2025 -
## Remove957
20
## Villa Park Connections
Develop a pathway connection from Shryer Ave and from Ryan Ave into Villa Park.
## Trail/Sidewalk867
## CF-1
## Constellation Link F1
Develop a constellation link pathway along Oakcrest Avenue between Cohansey Street and Western
Avenue pathway.
867
## CF-4
## Constellation Link F4
Develop a constellation link pathway along Matilda Street to connec to Materion Park with County Road
B2 pathways.
867
## CL-2
## Constellation Link L2
Develop a constellation link pathway along Fernwood Street and Eldridge Avenue to connect Keller
Mayflower Park to Lexington Park.
867
17
## Heinel Drive Connection
Develop a pathway connection between S. Owasso Blvd and County Road C along Heinel Drive.
## Trail/Sidewalk771
## CE-2
## Constellation Link E2
Develop a constellation link pathway along Iona Street and Matilda Street to connect Woodhill Park to
Mapleview Park.
771
## CJ-1
## Constellation Link J1
Develop a constellation link pathway through Midland Hills Golf Course between Roselawn Avenue and
County Road B pathway.
771
32
## Eustis Street
Develop an off road pathway along Eustis Street between County Road B and the cul-de-sac
TrailCompleted 2023771
14
## Langton Lake Loop
Develop a pathway that goes around all of Langton Lake.
## Trail/Sidewalk675
22
## Eustis to St. Croix Connection
Develop a pathway connection between Eustis Street and St. Croix Street.
## Trail675
## CE-1
## Constellation Link E1
Develop a constellation link pathway along Matilda Street to connect Mapleview Park to S Owasso
Boulevard pathway.
675
## CA-3
## Constellation Link A3
Develop a constellation link pathway along Brenner Street/Patton Road between Highcrest Road pathway
and Sandcastle Park.
578
## CD-2
## Constellation Link D2
Develop a constellation link pathway along Millwood Avenue and Brennue Avenue to connect Valley Park
to West Owasso Boulevard pathway.
578
## A
## Long Lake Road
Trail/Sidewalk on west side from County Road C - County Road C2
## Trail/SidewalkPotential Add
## B
## Long Lake Road
Trail/Sidewalk on east side from Terminal - County Road C
## Trail/SidewalkPotential Add
## C
## Cleveland Avenue
Sidewalk connection on east side of road from RR tracks to County Road C
## SidewalkPotential Add
DSnelling AvenueTrail - County Road C to Lydia Ave (West Side)
## TrailPotential Add
## EWoodhill Dr
## Trail - Hamline to Lexington Avenue (South Side)
## Trail/SidewalkPotential Add
## FMinnesota AvenueSidewalk/Trail from Lovel to Western
## Trail/SidewalkPotential Add
## Add
## G
## Western Avenue
Sidewalk/Trail on east side from Minnesota to Lovell Avenue
## Trail/SidewalkPotential Add
## Add
## HMinnesota AvenueSidewalk/Trail from Western to Rice St
## Trail/SidewalkPotential Add
## IAldine St ROWSidewalk/Trail from Roselawn Ave to Ryan Ave
## Trail/SidewalkPotential Add
## J
## County Road B
Sidewalk on the south side of County Road B between Avon St and Dale St
## SidewalkPotential Add
KTerminal RdLong Lake Rd to Clevelend Ave (North Side) Updgrade Sidewalk to Trail on Bridge
## TrailPotential Add
## LSkillman AveFairview Ave to Snelling Ave
## Trail/SidewalkPotential Add
MCentral ParkPathway connection west of Victoria St to pathway around frog pond
## Trail/SidewalkPotential Add
## N
## Rose Place
## Trail connection between Dunlap St and Roseplace Cul-de-sac
## Trail/SidewalkPotential Add
## OJudith Ave ExtensionConnection from Griggs to Veterans Park
## Trail/SidewalkPotential Add
## Add
POxford StConnection from Centrail Park across RR tracks to Cty Rd C
## SidewalkPotential Add
Page 4 of 4
Page 135 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 7.a.
## ITEM DESCRIPTION: Commission Direction on Member Initiated Agenda Items
## Background
## Suggested Items:
• May 19
## o WM Recycling Update
## o MS4/Stormwater Update
• June 23
## o Prep for Joint Council Meeting
## o Recommend Approval of Climate Equity Action Plan
## o Leaf Site Recommendations
## Looking Ahead:
• Future
## o MnDOT Safe Systems Approach
## o Pavement Funding
## o Speed Limits
## Recommendation
Approve future agenda.
## Attachments
## None
Page 136 of 165
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: April 28, 2026 ITEM: 8.a.
## ITEM DESCRIPTION: Approve March Minutes
## Background
Attached are the minutes from the March 24, 2026 meeting.
## Recommendation
Motion approving the minutes of March 24, 2026, subject to any necessary corrections or revision.
## Attachments
## 1. Draft March Minutes
Page 137 of 165
## Page
1 of 28
## Roseville Public Works, Environment
## and Transportation Commission
## Meeting Minutes
Tuesday, March 24, 2026, at 6:30 p.m.
## City Council Chambers, 2660 Civic Center Drive
## Roseville, Minnesota 55113
1.
## Introduction / Roll Call 1
Chair Ficek called the meeting to order at approximately 6:30 p.m. and at his 2
request, Public Works Director Jesse Freihammer called the roll. 3
4
Present: Chair Bryant Ficek, Vice Chair Edwin Hodder, and Members Daniel 5
## Fergus, Allison Luongo, and Katie Brokaw Palalay 6
7
## Youth Commissioners: Carsten Bauer, and Alexis Jendro 8
9
## Absent: Members Jarrod Cicha and Des Mueller (Excused) 10
11
## Staff Present: Public Works Director Jesse Freihammer 12
13
2.Approve Agenda14
15
## Motion16
Member Fergus moved, Member Luongo seconded, approval of the March 24,17
2026 Agenda as presented.18
19
Ayes: 720
Nays: 021
Motion carried.22
23
3.Public Comments24
25
Vice Chair Hodder explained that he wanted to draw attention to a Star Tribune26
article on large data centers and noted that residents were now expressing concerns27
about smaller facilities. He asked whether the City currently had any data centers.28
29
Public Works Director Freihammer responded that they were not aware of any data30
centers in the city. It was noted that such facilities are typically constructed on31
larger parcels of land, which are limited within the city, although smaller-scale32
versions could exist. He indicated that none were currently known.33
Attachment 1
Page 138 of 165
Page 2 of 28
34
4. Business Items 35
a. Communication Items 36
Mr. Freihammer provided an update on upcoming construction and 37
maintenance activities in the city. 38
Mr. Freihammer explained that construction season is expected to be busy, 39
with several projects starting in the coming months. He reported that the 40
Lexington pathway project is expected to begin in early May. The Hamline 41
project remains under review with state aid and is likely to start after July, 42
potentially extending into a two-year project. The PMP project is expected to 43
go out for bid soon and begin in June. Sewer lining work was scheduled for 44
award at the April 20 Council meeting. Lift station work is entering the 45
bidding phase, and a related study will be completed soon to support the 46
City’s capital improvement plan. 47
Mr. Freihammer noted that wayfinding signage installation would resume in 48
the coming weeks after ground thawing. The Willow Pond project remains in 49
planning, with work expected in late 2026 or later. He said the environmental 50
review would be submitted for public comment, and neighbors within 500 feet 51
would be notified. Lighting upgrades will continue at intersections and along 52
the Lincoln corridor and parts of Long Lake Road. He added that the Owasso 53
Hills neighborhood project is under review and may return later in the year 54
pending a benefit assessment and possible policy changes. 55
Mr. Freihammer reported on county projects, noting that County Road C plans 56
were complete and expected to be bid soon, with construction planned for the 57
summer and bridge work in 2027. The Fairview project would include a mill 58
and overlay as well as reconstruction of the intersection at County Road B, 59
which would be turned into a four-way stop. Other county projects are in 60
design, including corridors on County Road D, Fairview Avenue, Cleveland 61
Avenue, Victoria Street path, Rice Street, and the Larpenteur Avenue corridor 62
study. 63
Mr. Freihammer indicated MnDOT projects would include work on Snelling 64
Avenue starting in mid to late April and continuing through the State Fair, 65
with traffic reduced to one lane in each direction. Highway 280 is expected to 66
be closed for most of the summer, with full closures beginning in mid-April. 67
Mr. Freihammer announced that extra water efficiency grant funding had been 68
approved and would be available to residents. The climate equity action plan 69
will return to the Council on April 6. A native plant sale will run from 70
April 13 to May 14. 71
Mr. Freihammer finished with maintenance updates, mentioning that staff had 72
been busy with compost operations and planned to open the leaf site in early 73
Page 139 of 165
Page 3 of 28
April for about four weeks. He reported that crews responded to several water 74
main breaks and pump failures during the week and had also completed snow 75
removal after a significant storm. He noted that while snowfall totals were 76
lower than expected, it was still one of the season's largest storms and 77
required multiple plow operations. 78
Member Brokaw Palalay asked whether the Snelling paving project and the 79
Hamline Avenue project would overlap, noting that the Snelling project was 80
outside the Commission’s direct purview but related to overall construction 81
timing. 82
83
Mr. Freihammer said there would be some overlap between the Snelling paving 84
project and the Hamline Avenue project, noting that the extent of the overlap 85
was not yet known. He explained that if the state project began in April and the 86
City project started after July, the timelines would intersect. He added that the 87
City project limits might not cover the full length of Hamline Avenue. He noted 88
there was a tie-in point at the north end of the project where MnDOT would be 89
completing ramp work, including curb ramps. 90
91
Member Brokaw Palalay commented that for connecting streets such as Lydia 92
Avenue and County Road C, there should be consideration of additional signage 93
or traffic-calming measures during construction. He expressed concern that 94
drivers may use those routes as cut-throughs when traffic on Snelling Avenue 95
is reduced to one lane in each direction, particularly at intersections with 96
signals, which could experience increased traffic volumes. 97
98
Mr. Freihammer indicated staff would look into the concern regarding 99
additional signage on connecting streets. He noted that staff was already 100
coordinating with MnDOT on the Highway 280 corridor to add signage, 101
particularly in areas where drivers often become confused during closures. 102
103
Mr. Freihammer explained that additional signage would be installed in the 104
County Road B neighborhood west of Cleveland Avenue, where drivers 105
sometimes attempt to use disconnected routes during the Highway 280 106
shutdown. He added that the county was also working with MnDOT to install 107
signage along Cleveland Avenue, as it was expected to serve as a primary 108
detour route. He confirmed that staff would continue working with MnDOT to 109
add signage as needed. 110
111
Member Brokaw Palalay expressed concern about speeding along County Road 112
C2, noting that it was already an issue and that the area lacked sidewalks. He 113
said increased cut-through traffic during construction could further impact 114
safety and emphasized concern for pedestrians during the summer months. 115
116
Mr. Freihammer explained that dredging at Willow Pond could occur during 117
the winter, depending on the method selected. He noted that contractors had 118
Page 140 of 165
Page 4 of 28
indicated a preference for working with higher water levels so equipment could 119
operate from barges rather than creating excessive mud conditions. 120
121
Mr. Freihammer noted that another option would be winter dredging, in which 122
ice could be removed and excavation completed under frozen conditions. He 123
added that staff may allow contractors to propose either approach, depending 124
on what is most effective for a pond of that size. 125
126
Mr. Freihammer said it was uncertain whether Willow Pond would freeze 127
completely because of its large drainage area and continuous water flow. 128
However, he noted that it would need to freeze solid for certain construction 129
methods. He indicated that additional information would be available once 130
plans were finalized. 131
132
Mr. Freihammer added that Ryan would be present at the May meeting and 133
could provide a more detailed update on the Willow Pond project. 134
135
Member Luongo asked about the amount of road construction planned for the 136
summer, noting that there may be more activity than usual on major city roads. 137
He acknowledged that road construction is typical during the summer months 138
but expressed that this season appeared especially active. 139
140
Mr. Freihammer said this construction season would be busier than normal. He 141
explained that several projects had been delayed in prior years, resulting in 142
multiple carryover projects occurring in the same season. He noted that projects 143
such as Twin Lakes, Lexington, and Hamline were all carryovers, contributing 144
to the increased activity. 145
146
Mr. Freihammer added that there was also some overlap of larger corridor 147
projects, including County Road C, which further contributed to the higher level 148
of construction. He said the city would also be bidding on two separate 149
pavement projects, including the pavement management project and a 150
reconstruction project in the Walnut and Terminal Road industrial area. He 151
noted that the latter project would take place later in the year and primarily 152
impact businesses in that corridor. 153
154
Member Luongo asked whether information about the upcoming construction 155
projects could be included in the city newsletter, noting that staff may already 156
be doing so, but wanted to confirm. 157
158
Mr. Freihammer explained that staff already share construction information 159
through city communication channels, including the newsletter, and would 160
continue to provide updates to residents. He indicated that staff make efforts to 161
inform the public about project timing, impacts, and detours so residents can 162
plan accordingly. 163
164
Page 141 of 165
Page 5 of 28
Member Luongo asked whether the city could create a dedicated webpage for 165
summer 2026 road construction projects that would compile all projects in one 166
place for residents to review. 167
168
Mr. Freihammer explained that the city already provides construction 169
information on its website, including a dedicated projects page and an 170
interactive GIS map that allows users to zoom in and select individual projects 171
for more details. 172
173
Mr. Freihammer explained that residents can sign up for construction alerts 174
through the city, which are typically distributed on Fridays and include updates 175
on city, county, and MnDOT projects. He added that residents can also 176
subscribe to Ramsey County alerts, which are generally sent later on Fridays, 177
as well as MnDOT alerts, where users can choose to receive updates on specific 178
projects. 179
180
Chair Ficek asked about the leaf site, specifically whether staff would monitor 181
activity and observe operations once it opens. 182
183
Mr. Freihammer noted that staff would be monitoring activity at the leaf site 184
and collecting data, explaining that the spring season can be more challenging 185
for gathering information due to lower usage compared to fall. He reported that 186
staff planned to use cameras again to assist with monitoring. 187
188
Mr. Freihammer explained that staff had received a high number of calls from 189
residents due to incorrect information online identifying the site as a yard waste 190
facility. He indicated that staff were working to correct the information so 191
residents would not attempt to bring materials that are not accepted. 192
193
Mr. Freihammer reported that staff would bring the topic back to the 194
Commission in June for further discussion, with the goal of allowing the 195
Council to make a decision in July. He added that any changes or updates would 196
then be communicated in the fall newsletter to prepare residents for the 197
upcoming season. 198
199
## b. Civic Campus Project Update 200
Mr. Freihammer reported that there were no major updates at this time, noting 201
that a stakeholder meeting had not yet occurred, but work on the project 202
continued. He explained that both the license passport dance studio and the 203
maintenance operations center remained in the concept design phase. He 204
indicated that the concept for the license passport facility was nearing 205
completion, although negotiations with the VFW were still ongoing. 206
Mr. Freihammer explained that staff had revisited programming for the 207
maintenance operations center over the past month to refine space needs and 208
sizing. He noted that a design charrette was scheduled for later in the week, 209
Page 142 of 165
Page 6 of 28
where layout options would be evaluated and refined based on concepts 210
prepared by the architects. He indicated that this exercise would help move 211
the project forward. 212
Mr. Freihammer reported that more detailed updates were expected at the next 213
meeting and that a stakeholder meeting was anticipated in April to gather 214
additional feedback, particularly regarding the north side of the site. He added 215
that significant progress was expected over the next few months, with more 216
substantial updates anticipated in April and May. 217
## c. Pathway Master Plan 218
Mr. Freihammer explained that the discussion would continue the pathway 219
review process previously started in November. He noted that the goal was to 220
work through as much of the material as possible during the meeting, potentially 221
completing a substantial portion in one session rather than spreading it across 222
multiple meetings. 223
224
Mr. Freihammer reported that the materials had been updated to correct minor 225
errors and include additional maps. He explained that the map identified 226
segments by number, with additional lettered segments representing potential 227
additions to the plan. He noted that several segments had already been reviewed 228
and generally supported for further consideration, and that additional segments 229
not previously discussed would be reviewed at the end. 230
231
Mr. Freihammer explained that staff would provide a brief overview of each 232
segment, after which the Commission could determine whether to keep, 233
modify, or remove it from consideration. He clarified that adding a segment at 234
this stage would not formally include it in the pathway master plan, but would 235
move it forward for further evaluation. 236
237
Mr. Freihammer outlined that the next step would involve neighborhood 238
engagement, including a public meeting, followed by Commission review and 239
potential recommendation to the Council for final consideration. He noted that 240
the proposed segments had originated from input by the Mayor, 241
Councilmembers, staff observations, and resident feedback. 242
243
Chair Ficek clarified that the term "segment" did not specify whether the 244
connection would be a sidewalk or a trail; rather, it indicated a general 245
connection. 246
247
Mr. Freihammer explained that segments in the pathway master plan can 248
include either sidewalks or trails, depending on existing conditions and 249
available space. He noted that while some segments are identified specifically 250
as sidewalk or trail, many are listed more generally because the exact facility 251
type has not yet been determined. 252
253
Page 143 of 165
Page 7 of 28
Mr. Freihammer indicated that when filling gaps in existing infrastructure, staff 254
would typically match what is already in place, such as continuing a sidewalk 255
or trail on the same side of the street. He added that in some cases the plan may 256
specify a particular side, such as north or south, when there is an existing facility 257
on one side and a need to extend it. 258
259
Mr. Freihammer noted that, for the proposed segments under consideration, the 260
focus at this stage is on whether the connection should be included at all, rather 261
than on determining the exact placement or facility type. 262
263
Member Fergus asked what the difference was between a trail and a sidewalk. 264
265
Mr. Freihammer explained that all connections are considered pathways within 266
the pathway master plan, with distinctions between trails and sidewalks based 267
on design and use. He noted that trails are typically eight to ten feet wide, 268
constructed of bituminous material, and designed to accommodate biking and 269
walking with additional clear space. 270
271
Mr. Freihammer indicated that sidewalks are generally six feet wide, 272
constructed of concrete, and primarily intended for pedestrian use, although 273
biking is permitted. He added that trails are better suited to multi-use activities, 274
including both biking and walking. 275
276
Mr. Freihammer explained that sidewalks are generally intended for walking, 277
although children may also use them for biking. He noted that the standard 278
sidewalk width is typically six feet to allow two people to walk side by side 279
comfortably, although widths may vary in some cases. 280
281
Mr. Freihammer then transitioned to the pathway segment review, noting that 282
the Commission would continue working through the listed segments in order. 283
He explained that the meeting materials included the original pathway master 284
plan, a map with labeled segments for proposed additions, and a spreadsheet 285
with descriptions of existing segments for reference and potential modification. 286
287
Mr. Freihammer reported that the Commission had previously reviewed 288
segments 9 and 16 and would begin with segment 12C. He described the 289
segment as Lexington Avenue, currently identified as completing an off-road 290
pathway on the east side from County Road C to County Road D. He noted that 291
a pathway already exists from County Road C to County Road C2 and 292
suggested that the description could be modified to reflect a connection from 293
## County Road C2 to County Road D. 294
295
Mr. Freihammer explained that the segment would pass through an area that 296
includes open space, nearby apartments, and commercial uses. He indicated that 297
staff would recommend a trail for this segment, consistent with existing 298
conditions along much of the corridor. He noted that the Commission could 299
Page 144 of 165
Page 8 of 28
choose to keep, modify, or remove the segment and that discussion would guide 300
any updates rather than formal motions at this stage. 301
302
Member Brokaw Palalay recommended keeping the segment, noting that the 303
existing pathway was already busy and that maintaining the planned connection 304
was supported. 305
306
Mr. Freihammer asked whether the Commission wanted to modify the segment 307
description to reflect that the connection would be from County Road C2 to 308
County Road D, noting that the segment between County Road C and County 309
Road C2 had already been constructed in recent years. 310
311
Member Fergus recommended modifying the segment, noting that the portion 312
from County Road C to County Road C2 had already been completed. 313
314
Mr. Freihammer explained that portions of the pathway had already been 315
constructed as part of recent development. He noted that the apartment and 316
senior housing developments installed segments of sidewalk or pathways as 317
part of their projects, and that the city completed additional connections around 318
the same time, approximately five years ago. 319
320
Member Fergus asked whether the segment being discussed included the large 321
wetland area. 322
323
Mr. Freihammer confirmed that the segment included the wetland area, noting 324
that it is part of Ramsey County land associated with Lake Johanna and 325
Josephine Park. He indicated that staff would modify the segment description 326
to reflect the connection from County Road C2 to County Road D. 327
328
Mr. Freihammer then introduced the next segment, 12A on Lexington Avenue, 329
described as completing an off-road pathway on the east side from Larpenteur 330
Avenue to County Road B. He noted that the missing portion is only between 331
Larpenteur Avenue and Roselawn Avenue, as a sidewalk has already been 332
constructed north of Roselawn. He indicated that the description could be 333
modified accordingly. 334
335
Member Fergus clarified that there is a sidewalk north of Roselawn and asked 336
whether the proposed segment would be an on-road trail or pathway. 337
338
Mr. Freihammer clarified that the segment would be an off-road pathway. 339
340
Chair Ficek noted that the segment was intended to recognize a gap in the 341
system and acknowledged that it represented a missing connection. 342
343
Page 145 of 165
Page 9 of 28
Mr. Freihammer confirmed that the segment represented a gap and 344
recommended modifying the description to reflect the portion from Larpenteur 345
## Avenue to Roselawn Avenue. 346
347
Mr. Freihammer then introduced segment 12B on Lexington Avenue, described 348
as an off-road pathway on the east side between County Road B and County 349
Road C. He noted that a portion of this segment would be completed as part of 350
the 2026 project beginning in May, leaving only the section from County Road 351
B2 to County Road C as the remaining gap. 352
353
Mr. Freihammer explained that this segment runs from the high school area to 354
the north end of Central Park. He noted that while there are some informal 355
connections into the park from nearby streets, this segment would provide a 356
more direct connection along Lexington Avenue. He added that the area 357
includes residential properties and landscaping within the city-maintained right-358
of-way. 359
360
Member Fergus asked whether there is a sidewalk on the west side of Lexington 361
Avenue. 362
363
Mr. Freihammer confirmed that there is a pathway on the west side of 364
Lexington Avenue and crosswalks in the area. He explained that on the east 365
side, the connection near Central Park is incomplete, noting that users traveling 366
from the south are left without a clear continuation at County Road B2. 367
368
Mr. Freihammer indicated that while there is some access to Central Park via 369
Brooks Avenue, completing the full segment from County Road B2 to County 370
Road C would provide a continuous north-south connection. He noted that a 371
portion of the segment would be constructed as part of an upcoming project, 372
leaving approximately a half-mile gap. 373
374
Mr. Freihammer recommended modifying the segment description to reflect 375
completion of the remaining portion, and the Commission expressed support 376
for finishing the connection. 377
378
Mr. Freihammer explained that the segments were being reviewed in the order 379
of the current priority list, noting that higher traffic corridors appeared first and 380
that later segments may require more discussion. 381
382
Mr. Freihammer then introduced segment 4B on County Road C, described as 383
the construction of an on-road pathway from Victoria Street to Dale Street. He 384
explained that this improvement, in the form of a bike lane, is already scheduled 385
as part of a 2026 county project associated with roadway reconfiguration. 386
387
Mr. Freihammer recommended removing the segment from the plan, noting that 388
it is expected to be completed by the time the review process is finalized. 389
Page 146 of 165
Page 10 of 28
390
Mr. Freihammer clarified that segment 4B on County Road C includes on-road 391
pathways in the form of bike lanes from Victoria Street to Dale Street, which 392
will be incorporated into the County Road C project. 393
394
Chair Ficek clarified that the segment referred specifically to bike lanes along 395
County Road C and acknowledged that the improvement would be completed 396
as part of the upcoming construction project. 397
398
Mr. Freihammer confirmed that segment 4B was already planned as part of the 399
County Road C project and, with the Commission's agreement, recommended 400
removing it from the pathway master plan. 401
402
Mr. Freihammer then introduced the next segment on County Road C, described 403
as the completion of both on- and off-road pathways from Snelling Avenue to 404
Hamline Avenue. He explained that this segment originated from an earlier 405
concept in the pathway master plan that envisioned a continuous bike corridor 406
along County Road C2, including a potential overpass over Interstate 35. He 407
noted that the overpass concept had since been removed and that County Road 408
C had become the primary corridor for connectivity. 409
410
Mr. Freihammer indicated that the segment description differs from others due 411
to its historical context and broader scope. He noted that the Commission could 412
choose to simplify the description to a general pathway if preferred. He also 413
explained that the corridor currently lacks dedicated pedestrian facilities, with 414
only a shoulder used for parking, and that the area serves both residential 415
neighborhoods and nearby businesses. 416
417
Mr. Freihammer asked whether the Commission preferred to keep the segment 418
as currently written, including both on and off-road pathways, or modify it to 419
specify only an off-road pathway. He noted that the bike plan recommendations 420
for the corridor were not immediately recalled and suggested the Commission 421
could leave the description as is for now and refine it later if needed. 422
423
Chair Ficek indicated he was ok with leaving it as written. 424
425
Mr. Freihammer introduced the next segment on County Road C, described as 426
the construction of an on-road pathway from Dale Street to Western Avenue. 427
He explained that this improvement would be completed as part of the 2026 428
project and recommended removing the segment from the pathway master plan, 429
with the Commission's agreement. 430
431
Mr. Freihammer then presented another County Road C segment, described as 432
completing both on-road and off-road pathways from Western Avenue to Rice 433
Street. He noted that the on-road component would be constructed as part of the 434
upcoming project, while the off-road pathway would not be included. 435
Page 147 of 165
Page 11 of 28
436
Mr. Freihammer explained that the off-road pathway on the north side had 437
originally been proposed but was removed from the project by the Council. 438
However, it remains in the pathway master plan for potential future 439
consideration. He indicated that the Commission could choose to retain the off-440
road segment and clarify that it would be located on the north side, where no 441
pathway currently exists, since there is already one on the south side. He also 442
noted that the Commission could consider removing it entirely if desired. 443
444
Member Fergus noted significant pushback from residents on that segment. 445
446
Mr. Freihammer explained that residents had petitioned to remove the segment, 447
and the Council acted on that feedback. He noted that while some residents 448
supported the project, a larger number expressed opposition during the process. 449
450
Member Fergus recalled that the Council chose not to pursue the project at that 451
time, but kept it in the pathway master plan for future consideration and asked 452
for confirmation. 453
454
Mr. Freihammer explained that the Council considered removing the segment 455
from the pathway master plan but ultimately chose to keep it on the list for 456
future consideration. 457
458
Member Luongo asked when the Commission would have another opportunity 459
to review or revisit this segment, expressing concern that they might otherwise 460
miss the chance to weigh in. 461
462
Mr. Freihammer explained that the opportunity to include the segment in the 463
current project had passed. He noted that while the right-of-way still exists, any 464
future construction would likely depend on a cost-share policy and would not 465
occur in the near term. 466
467
Mr. Freihammer indicated that it could be 10 or more years before the project 468
is reconsidered, and that future opportunities would depend on available 469
funding and stronger community support. He added that while the segment may 470
still rank highly, it would be evaluated based on timing and feasibility, and the 471
Commission could choose to keep it for future consideration or remove it if it 472
is not expected to move forward. 473
474
Chair Ficek expressed support for keeping the segment in the pathway master 475
plan. He noted disagreement with the prior decision to remove it from the 476
project, stating that the pathway had been planned for many years. He added 477
that having facilities on both sides of the roadway improves usability by 478
reducing the need for pedestrians and cyclists to cross the street multiple times. 479
He acknowledged that the project is unlikely to occur in the near term but 480
supported retaining it for future consideration. 481
Page 148 of 165
Page 12 of 28
482
Member Luongo expressed support for keeping the segment in the pathway 483
master plan. He noted that master plans often remain in place for many years 484
and that community perspectives may change over time, making the segment a 485
viable option for future consideration. 486
487
Mr. Freihammer asked whether the Commission preferred to modify the 488
segment description to specify the completion of an off-road pathway on the 489
north side of County Road C from Western Avenue to Rice Street. 490
491
The commission agreed to the change. 492
493
Mr. Freihammer indicated that he would describe the segment generally as a 494
pathway rather than specifying a trail or sidewalk. He then introduced segment 495
6 on Cleveland Avenue, described as the development of an off-road pathway 496
between County Road C and County Road D. He noted that the segment was 497
somewhat disjointed and would be reviewed in more detail. 498
499
Mr. Freihammer explained that the Cleveland Avenue segment from County 500
Road C to County Road D is largely completed, though in a split configuration. 501
He noted that a sidewalk exists on the east side from County Road C to County 502
Road C2, while a pathway continues on the west side from County Road C2 to 503
## County Road D. 504
505
Mr. Freihammer indicated that this creates a continuous corridor, but with a 506
mid-segment shift from east to west. He explained that the Commission could 507
consider the segment complete as is, or modify it to create a continuous facility 508
on one side. He noted that completing the corridor on the east side would likely 509
require extending a sidewalk, whereas completing it on the west side would be 510
less desirable due to freeway ramps. 511
512
Mr. Freihammer added that the corridor includes a mix of commercial, 513
industrial, residential, and park uses, including access to Langton Park and 514
nearby senior housing. He noted that while Cleveland Avenue is a busy 515
roadway, it is not classified as a full arterial, which may influence whether 516
facilities on both sides are prioritized. He indicated that the Commission could 517
choose to remove the segment or modify it based on priorities. 518
519
Chair Ficek asked whether, for the segment from County Road C to County 520
Road C2, where there is no facility on the west side, the city would consider 521
adding a pathway on that side in the future if an opportunity arose, despite the 522
presence of the ramp entrance. 523
524
Mr. Freihammer explained that adding a pathway on the west side between 525
County Road C and County Road C2 could be considered. However, it would 526
depend on county priorities and future ranking evaluations. He noted that 527
Page 149 of 165
Page 13 of 28
because there are no adjacent businesses along that stretch, the city would likely 528
be responsible for winter maintenance, thereby increasing operational costs. 529
530
Mr. Freihammer added that the corridor has inconsistencies in bicycle 531
infrastructure, with on-street bike lanes present north of Iona but not south of 532
it, where traffic volumes are higher. He noted that this creates a connectivity 533
gap, particularly in a busy area near Twin Lakes. 534
535
Chair Ficek suggested splitting the segment into two parts, identifying a 536
pathway on the west side from County Road C to County Road C2 and a 537
pathway on the east side from County Road C2 to County Road D. He indicated 538
that the Commission would then need to determine whether both segments 539
should be included. 540
541
Mr. Freihammer indicated that the segment is currently listed as one, but noted 542
that it could be divided into two separate segments if the Commission preferred, 543
and acknowledged that splitting it may provide clearer direction. 544
545
Member Brokaw Palalay expressed support for splitting the segment into two 546
if that approach would provide greater clarity. He also asked for additional 547
clarification on pathway conditions further south along Cleveland Avenue. 548
549
Mr. Freihammer explained that, farther south along Cleveland Avenue, there is 550
generally a sidewalk on the east side, extending down to County Road B2. He 551
noted that on the west side, there is a sidewalk in certain areas due to terrain 552
challenges, including a steep hill. 553
554
Mr. Freihammer identified a short gap in the system, approximately 400 feet 555
long, that is difficult and costly to complete. He explained that the gap currently 556
requires pedestrians to cross mid-block, creating an awkward and less safe 557
condition. He added that there are only a few properties on the west side in that 558
area, and overall, the corridor functions primarily along an east-side alignment. 559
560
Member Fergus described traveling north along the corridor, then transitioning 561
to the west-side sidewalk, and sought clarification on the connection. 562
563
Mr. Freihammer explained that pedestrians traveling north and using the west-564
side sidewalk must cross back due to a gap created by a steep hill in the corridor. 565
He noted that addressing the gap would require significant improvements, such 566
as constructing a retaining wall or narrowing the roadway, which would be 567
costly and complex. He indicated that the current configuration reflects a 568
simpler approach that directs pedestrians to cross mid-block. 569
570
Member Brokaw Palalay noted that although there are few residents in that area, 571
several bus stops still generate pedestrian activity. 572
573
Page 150 of 165
Page 14 of 28
Mr. Freihammer explained that the corridor includes hotels and pedestrian 574
activity, including people walking to nearby destinations such as Walmart. He 575
noted that the segment from County Road C to County Road C2 is primarily 576
commercial, while areas north of Langton Park include residential properties, 577
particularly on the east side. 578
579
Mr. Freihammer added that there is an existing pathway connection between 580
residential lots that provides direct access to Langton Lake, allowing 581
neighborhood residents to reach the park without traveling along Cleveland 582
Avenue, except for those directly adjacent to the corridor. 583
584
Chair Ficek summarized the discussion and indicated support for including a 585
segment on the east side from County Road C2 to County Road D. He then 586
raised the question of whether to include a west side segment from County Road 587
C to County Road C2, or remove it if it is not necessary. He also asked whether 588
that segment should be identified specifically as a sidewalk or more generally 589
as a pathway, noting that no facility currently exists there. 590
591
Member Fergus confirmed that there is currently no facility in that area and 592
asked whether County Road C2 is where the hotels are located. 593
594
Mr. Freihammer explained that County Road C2, or Center Point, is where the 595
hotels are located. He clarified that a portion of the pathway on the west side 596
has already been constructed as part of the Center Point development. 597
598
Mr. Freihammer explained that the remaining gap is relatively short, beginning 599
around Iona and extending approximately 400 feet north. He indicated that 600
completing a pathway in that section would fill the remaining connection 601
between County Road C and the existing infrastructure. 602
603
Chair Ficek noted that there is currently no pathway on the west side, but 604
explained that adding one would provide additional connectivity options. He 605
indicated that a west-side pathway could allow users to travel south to the 606
signalized crossing at the ramp or continue north without unnecessarily crossing 607
the road. He emphasized that while access is limited today, adding a pathway 608
would improve overall flexibility and connectivity for users along the corridor. 609
610
Member Brokaw Palalay expressed support for adding the west side segment 611
and noted that its priority could be evaluated during the future prioritization 612
process. 613
614
Chair Ficek agreed that the west side segment would likely rank low in priority, 615
noting that the area is primarily stormwater ponds. 616
617
Mr. Freihammer noted that the area includes a stormwater pond on the north 618
side, with the remainder consisting of wetlands owned by MnDOT. 619
Page 151 of 165
Page 15 of 28
620
Member Luongo asked whether there may be political viability with the county 621
to extend on-street bike lanes from Iona further south, as an alternative 622
approach. 623
624
Mr. Freihammer explained that extending the street bike lanes in that area 625
would be challenging due to traffic conditions at the intersection. He noted that 626
the corridor includes double left-turn lanes and multiple through lanes as part 627
of a relatively recent project, which would make modifications more difficult, 628
though not impossible. 629
630
Member Luongo expressed interest in finding a way to continue dedicated bike 631
facilities through the corridor. 632
633
Mr. Freihammer noted that extending bike lanes to County Road C would be 634
beneficial but would require significant rework. He indicated that adding 635
southbound bike lanes may be more feasible, whereas northbound 636
improvements would be more challenging given existing roadway conditions. 637
638
Chair Ficek suggested that if on-street bike lanes are not feasible, the segment 639
could instead be designated as a trail to accommodate bicycle use better. He 640
noted that this approach could provide a dedicated corridor for bikes and 641
pedestrians, particularly since the east side already includes a sidewalk, and 642
indicated support for describing the segment more generally as a pathway or 643
trail. 644
645
Mr. Freihammer summarized the discussion, indicating that the segment would 646
be split into two parts. He confirmed that one segment would include 647
completing a sidewalk on the east side from County Road C2 to County Road 648
## D. 649
650
Mr. Freihammer noted that the second segment would include constructing a 651
trail on the west side from County Road C to just north of Iona, connecting to 652
existing facilities. He clarified that the trail would be designed as a wider, multi-653
use facility. 654
655
Mr. Freihammer indicated that the segments would be labeled separately for 656
clarity and that the exact naming convention would be determined as part of the 657
plan updates. 658
659
Member Fergus asked whether the trails located around and behind the hotel 660
are maintained by the city. 661
662
Mr. Freihammer confirmed that the trails around and behind the hotel are city 663
trails. He explained that while the city owns and maintains them, winter 664
maintenance is performed by adjacent property owners due to their proximity 665
Page 152 of 165
Page 16 of 28
to commercial properties. He noted that the trails were reconstructed 666
approximately four to five years ago, having originally been built to a 667
substandard six feet wide, and were widened to eight feet. He added that the 668
trails are well used, particularly by nearby apartment residents, hotel guests, and 669
employees, with many using them to access Langton Park. 670
671
Mr. Freihammer then introduced the next segment on Rice Street, described as 672
completing an on and off-road pathway from County Road C to the north city 673
boundary. He noted that the portion from County Road C2 to the north 674
boundary has already been constructed, leaving only the segment from County 675
Road C to County Road C2 as the remaining gap. He explained that this area 676
serves primarily residential uses, including a church and a large apartment 677
complex on the west side. 678
679
Member Luongo expressed concern about safety in the area, noting that people 680
frequently walk in the street, including older adults and individuals using 681
mobility scooters, creating a dangerous situation. 682
683
Mr. Freihammer indicated that the Rice Street segment description would be 684
modified to reflect the remaining portion from County Road C to County Road 685
C2. He noted that the county has a project planned within the next five to six 686
years and that the city has communicated interest in coordinating improvements 687
with that effort. 688
689
Mr. Freihammer then introduced the next segment on Hamline Avenue, 690
described as an off-road trail from County Road C to County Road C2, and 691
recommended removing it since the city will be constructing that segment 692
within the next year. 693
694
Mr. Freihammer then presented the Victoria Street segment north of County 695
Road C, described as developing both on road and off road pathways from 696
County Road C to County Road D. He noted that a portion from County Road 697
C to Woodhill has already been constructed as a sidewalk, while the county is 698
beginning design for a future project, tentatively scheduled for 2028, which may 699
include a trail instead. He recommended keeping the segment as currently 700
written in the pathway master plan, noting that final decisions on facility type 701
and location would be determined through the county’s design process. 702
703
Member Luongo recommended keeping the segment in the pathway master 704
plan until the project is fully confirmed and constructed. 705
706
Mr. Freihammer introduced the concept of constellation links, explaining that 707
they are intended to connect parks and represent preferred routes for traveling 708
between park locations. He noted that these links were added to the pathway 709
master plan during a previous update without extensive discussion, which has 710
led to some confusion. 711
Page 153 of 165
Page 17 of 28
712
Mr. Freihammer explained that some of the proposed links follow low-volume 713
neighborhood streets, raising questions about whether additional pathways are 714
necessary when pedestrians can already use the roadway. He indicated that the 715
concept differs from traditional pathway planning, as it focuses on suggested 716
routes rather than required infrastructure. 717
718
Mr. Freihammer noted that while some constellation links may align with 719
existing or planned pathways, others may not be practical or necessary. He 720
added that people often choose their own routes and may not regularly travel 721
directly between parks, instead starting from their homes. He provided this 722
context to guide the Commission’s review of the upcoming segment. 723
724
Member Luongo asked whether an actual pathway could be constructed instead 725
of relying on a designated constellation link route. 726
727
Mr. Freihammer explained that a constellation link can be converted into a 728
formal pathway if the Commission prefers, but noted that doing so would 729
require a clear designation. He indicated that labeling something as a 730
constellation link can create confusion, as it is unclear whether it represents a 731
suggested connection or a planned, constructed facility. 732
733
Mr. Freihammer emphasized that if the intent is to build a pathway, it should 734
be identified as such in the plan rather than remaining a constellation link. He 735
noted that this distinction had not been clearly defined in previous updates to 736
the pathway master plan. 737
738
Mr. Freihammer then introduced constellation link C3, described as a 739
connection along Woodhill Drive between Hamline Avenue and Civic Center 740
Drive, providing access to Howard Johnson. 741
742
Member Luongo recommended designating the connection as a formal pathway 743
rather than a constellation link, noting that it would be more appropriate given 744
anticipated future conditions. 745
746
Mr. Freihammer noted that designating the connection as a pathway could 747
address both the constellation link concept and previously identified needs for 748
a trail connection in the area. He explained that similar requests had come from 749
both engineering and parks staff, and combining them into a single pathway 750
designation would streamline the plan. 751
752
Mr. Freihammer indicated that with upcoming projects, including the Hamline 753
Avenue work in 2026 and the Civic campus project anticipated around 2028, 754
much of the corridor would likely be completed, leaving only a short gap 755
between Civic Center Drive and Hamline Avenue. He recommended keeping 756
the full corridor in the plan to ensure long-term continuity. 757
Page 154 of 165
Page 18 of 28
758
Chair Ficek expressed support for converting the segment to a pathway and 759
noted that the current gap is relatively small. 760
761
Chair Ficek asked whether the identified gap should be defined as extending 762
from the existing sidewalk connection to Hamline Avenue. 763
764
Mr. Freihammer recommended defining the segment to extend to Lexington 765
Avenue, noting that the full corridor should remain in the plan. He explained 766
that the Civic campus project would likely include pathway construction on 767
both sides, supporting a continuous connection through the area. 768
769
Chair Ficek expressed concern about adding the pathway, only to end up with 770
a partial connection, noting a preference to avoid creating an incomplete 771
segment. 772
773
Mr. Freihammer explained that staff had proposed a similar connection as 774
segment E, which would include a trail from Hamline Avenue to Lexington 775
Avenue on the south side. He indicated that if the Commission supports that 776
approach, segment E could be added and would effectively replace the 777
constellation link. 778
779
Member Luongo asked whether a trail within Veterans Park would be included 780
in the Civic campus plan or handled separately through parks planning. 781
782
Mr. Freihammer explained that a trail within Veterans Park would likely be 783
included in the Civic campus and park redesign project. He noted that adding a 784
walking path is one of the concepts under consideration and that additional 785
discussion would occur as planning progresses. 786
787
Mr. Freihammer then introduced segment 36 on the east side of the Snelling 788
service drive, described as the development of an off-road pathway. He noted 789
that this segment had been previously discussed and referenced the map for its 790
general limits. 791
792
Mr. Freihammer recalled that the segment had been previously discussed and 793
clarified that it extends from County Road C2 to Lydia Avenue along the east 794
side of the Snelling service drive. He noted that the segment runs in front of 795
several apartment buildings. 796
797
Mr. Freihammer explained that this segment was added in 2021 at the request 798
of residents and had already gone through the full review process at that time. 799
800
Member Brokaw Palalay recommended modifying the segment description to 801
specify developing an off-road pathway along the east side of the east Snelling 802
service drive from County Road C2 to Lydia Avenue. 803
Page 155 of 165
Page 19 of 28
804
Mr. Freihammer introduced the next segment on County Road C2 west of 805
Snelling Avenue, described as the development of both on- and off-road 806
pathways from the west city boundary to Snelling Avenue, including a proposed 807
pedestrian bridge over Interstate 35W. 808
809
Mr. Freihammer explained that this segment originated from an earlier, more 810
ambitious concept intended to create a continuous east-west pedestrian corridor. 811
He noted that existing conditions include partial sidewalk connections, 812
pathways through Langton Park, and segments with wide shoulders but no 813
dedicated pedestrian or bicycle facilities. He added that the corridor passes 814
through wetlands, residential areas, parkland, and industrial areas with limited 815
pedestrian demand. 816
817
Mr. Freihammer indicated that the proposed pedestrian bridge was a key 818
component of the original concept, intended to provide an alternative crossing 819
to the County Road C corridor. However, he noted that without the bridge, the 820
corridor would not function as a continuous route. He questioned whether 821
constructing a bridge at this location aligns with current priorities and whether 822
it is a worthwhile long-term investment. 823
824
Member Luongo expressed concern about the feasibility of funding a pedestrian 825
bridge, noting uncertainty about the funding source. 826
827
Member Brokaw Palalay expressed concern about the value of the proposed 828
corridor, noting uncertainty about how many people would use it. He indicated 829
that without a broader regional connection, such as a continuous greenway 830
linking multiple cities, the segment may have limited usefulness. 831
832
Chair Ficek noted that broader considerations regarding regional bike 833
connections would be more appropriate to discuss in the future bike plan. 834
835
Member Luongo noted that while the connection could be beneficial for linking 836
to the northeast, it was unclear whether there would be significant demand to 837
travel into the city's residential areas from that direction. 838
839
Mr. Freihammer explained that the current primary connection for pedestrians 840
and bicyclists runs along the diagonal trail and County Road C corridor, which 841
has been improved with a pathway on the south side that connects to the city’s 842
trail system. He noted that this infrastructure did not exist when the County 843
Road C2 concept was originally developed in the early 2000s. 844
845
Mr. Freihammer indicated that additional improvements on the County Road D 846
corridor, planned for a future project, will further enhance connectivity, 847
reducing the need for a separate C2 corridor. He explained that these newer 848
corridors provide viable alternatives that were not previously available. 849
Page 156 of 165
Page 20 of 28
850
Mr. Freihammer suggested that the Commission could consider removing the 851
pedestrian bridge component if it is no longer feasible. He also noted that the 852
segment could be modified or broken into smaller portions, such as focusing on 853
a shorter stretch of County Road C2, rather than maintaining the full original 854
concept, particularly since parts of the corridor do not currently exist. 855
856
Member Luongo suggested that it may be beneficial to include a sidewalk on 857
the west side of County Road C2 to provide nearby residents with a safe place 858
to walk and improved local connectivity. 859
860
Chair Ficek suggested starting the discussion with the proposed bridge over 861
Interstate 35W. He noted that while pedestrian-only facilities can be appealing, 862
the location may limit their usefulness, since they do not connect to a major 863
regional trail and are somewhat out of the way. 864
865
Chair Ficek summarized that there was consensus to remove the bridge 866
component from the segment. He explained that the remaining portions of the 867
corridor could be considered separately on each side of Interstate 35W. 868
869
Mr. Freihammer recommended breaking the west side into two segments, one 870
from Highway 8 to Highway 88 and another from Highway 88 to Long Lake 871
Road, to allow for more targeted evaluation. He noted that this approach would 872
align with prior discussions about potential improvements along Long Lake 873
Road. 874
875
Chair Ficek and Mr. Freihammer discussed focusing on the west side of County 876
Road C2. They noted that a pathway already exists along much of Long Lake 877
Road, allowing for a potential connection from Long Lake to Old Highway 8, 878
which also has a sidewalk. They discussed whether to formalize improvements 879
as on-street bike lanes or maintain flexibility. 880
881
Mr. Freihammer recommended keeping the description broad as an on- and off-882
road pathway to allow for future design decisions, including potential bike lanes 883
or trail development. Chair Ficek supported maintaining flexibility, and the 884
group agreed to use “and or” language to preserve multiple options. 885
886
Mr. Freihammer suggested defining the segment from Old Highway 8 to Long 887
Lake Road and noted that it could be split into two segments, Old Highway 8 888
to Highway 88 and Highway 88 to Long Lake Road, to allow for phased 889
implementation. Chair Ficek acknowledged that keeping segments flexible 890
would not prevent phased construction, and the group agreed on the general 891
approach before moving on to discuss the east side. 892
893
Mr. Freihammer discussed the east side of the County Road C2 corridor, noting 894
that a connection already exists into Langton Park. He indicated that additional 895
Page 157 of 165
Page 21 of 28
improvements on the east side may be limited, but suggested that a potential 896
connection between Langton Park and Oasis Park could be considered. 897
898
Mr. Freihammer explained that this would involve a short connection through 899
a primarily residential area near Fairview Avenue, where parks are located on 900
either side. He noted that this concept aligns with what had previously been 901
identified as a constellation link. However, it was not labeled separately because 902
the broader C2 corridor was already included in the pathway master plan. 903
904
Member Luongo expressed uncertainty about the need for a separate pathway 905
in that area, noting that it is a low-volume, contained residential corridor and 906
may not justify the investment. He indicated openness to including it if there 907
has been resident interest, but did not strongly support it. 908
909
Chair Ficek noted that the connection appearing in multiple planning 910
documents created some uncertainty. He expressed hesitation about prioritizing 911
a pathway in this case, explaining that the corridor is a low-volume local road 912
where pedestrians can already walk safely without additional infrastructure. 913
914
Mr. Freihammer noted that the area consists of very low-volume streets serving 915
small, isolated neighborhoods. He explained that there is no through traffic and 916
that vehicles in the area are typically limited to residents accessing their homes 917
or visitors traveling to the nearby parks. 918
919
Chair Ficek indicated he could support either option for the segment, noting 920
that it would likely be a low priority regardless. 921
922
Chair Ficek and Mr. Freihammer noted that the connection between Langton 923
Park and Oasis Park would likely be a low construction priority and would most 924
realistically be completed in coordination with another project rather than as a 925
standalone improvement. It was noted that while it could score well on planning 926
metrics due to its proximity to Fairview Avenue and its park connectivity, it 927
would likely be an opportunistic project. 928
929
Mr. Freihammer indicated that if included, the segment should be clarified as a 930
general pathway connection between the two parks, without pursuing additional 931
expansion beyond that scope. The Commission agreed to retain the segment in 932
a limited, flexible form. 933
934
Mr. Freihammer then introduced the next segment, a Trunk Highway 51 935
connection to Old Snelling. He recommended removing it since MnDOT is 936
constructing the pathway on the west side this year, completing the connection 937
with prior improvements by Arden Hills. 938
939
Page 158 of 165
Page 22 of 28
Mr. Freihammer next presented a Hamline Avenue segment between County 940
Road C2 and County Road D and recommended removing it as it is planned for 941
construction in 2026. 942
943
Mr. Freihammer then returned to the County Road C2 corridor, introducing a 944
segment between Lexington Avenue and Victoria Street. He described the 945
corridor as primarily residential with moderate traffic and noted nearby open 946
space and informal walking trails. He recommended modifying the description 947
to specify completing an off-road pathway along County Road C2 from 948
Lexington to Victoria. He added that the 2028 Victoria Street improvements 949
would include pathways on both sides, further enhancing connectivity. The 950
Commission agreed to retain the segment with the modified description. 951
952
Member Brokaw Palalay asked about a remaining gap along County Road C2 953
near Oasis Pond, noting that most of the corridor had already been discussed. 954
955
Mr. Freihammer clarified that the area was part of the previously discussed 956
segment west of Snelling and explained that the Twin Lakes Phase Two project 957
would include pathway connections through that area. He noted that the project 958
would provide a connection, though not a direct one due to wetland constraints, 959
and could potentially be constructed as early as this year. 960
961
Member Brokaw Palalay acknowledged the clarification and indicated that it 962
addressed the remaining concern. 963
964
Mr. Freihammer then introduced another constellation link, identified as D1 965
along Oxford Street between Woodhill Drive and County Road C2. He 966
explained that the intent was to connect neighborhood areas to nearby parks. 967
He noted that the area is a low-volume residential neighborhood and suggested 968
that people already have multiple routes to access the parks via existing streets. 969
970
Member Luongo indicated that he did not see a clear benefit to the proposed 971
connection. 972
973
Mr. Freihammer expressed uncertainty about selecting Oxford Street as the 974
preferred connection, noting that similar access could be achieved from 975
multiple nearby streets. He added that both parks are natural areas rather than 976
destination playgrounds, so there may be limited demand for direct travel 977
between them. 978
979
Chair Ficek asked whether the east-west connection at the bottom of the map 980
has already been constructed. 981
982
Mr. Freihammer confirmed that there is a sidewalk on the south side of 983
Woodhill Drive, providing the east-west connection. 984
985
Page 159 of 165
Page 23 of 28
Member Fergus questioned whether Oxford Street was selected because it 986
already had a sidewalk connection. 987
988
Mr. Freihammer explained that Oxford Street likely appeared in the plan 989
because it is centrally located in the neighborhood and may have been identified 990
as a logical connection at the time. He noted that a sidewalk now exists south 991
of Woodhill Drive along Oxford and suggested that the constellation link may 992
have been created before that sidewalk was constructed, which may reduce the 993
need for the proposed connection. 994
995
Chair Ficek, Member Luongo, and Mr. Freihammer discussed the east-west 996
connection and clarified that the sidewalk along the south side of Woodhill 997
Drive already provides a continuous connection from Lexington Avenue to 998
## Victoria Street. 999
1000
Mr. Freihammer explained that the remaining portion under consideration was 1001
the north-south Oxford Street connection, originally identified as part of a 1002
constellation link. He noted that because the east-west connection is already 1003
complete and local streets provide adequate access, additional infrastructure 1004
may not be necessary. 1005
1006
The Commission agreed that the Oxford Street connection did not warrant 1007
inclusion as a formal pathway and supported its removal from the pathway 1008
master plan, while allowing it to remain as a conceptual constellation link 1009
within parks planning. 1010
1011
Mr. Freihammer then introduced segment 27, a Tamarack Park connection from 1012
South McCarrons Boulevard. He explained that the area is served by low-1013
volume local streets and already has informal access into the park. The 1014
Commission applied consistent reasoning used for similar segments and 1015
supported removing both segment 27 and a related segment due to the limited 1016
need for additional infrastructure on local roads. 1017
1018
Mr. Freihammer next presented a constellation link along Gregg Street 1019
connecting Veterans Park to County Road C2. The discussion shifted to a 1020
related proposed segment that would provide a direct connection to Veterans 1021
Park from the north. The Commission expressed support for advancing that 1022
proposed segment for further study and neighborhood engagement, while 1023
removing the Gregg Street constellation link. 1024
1025
Mr. Freihammer then introduced a segment along Aldine Street near Roselawn 1026
Avenue, noting that it has been the subject of recent resident input and is 1027
currently under review by the Council and Parks Department. He explained that 1028
a feasibility study is underway to evaluate a potential nature style pathway. 1029
Given ongoing discussions and mixed resident feedback, the Commission 1030
Page 160 of 165
Page 24 of 28
considered leaving the segment unchanged in the plan pending further 1031
direction. 1032
1033
Member Luongo asked how removing the segment from the pathway master 1034
plan would interact with the ongoing Council process and resident input. 1035
1036
Mr. Freihammer explained that the segment is already under active review, 1037
including multiple Council discussions and a pending report related to a 1038
potential vacation. He noted that there has been significant resident 1039
involvement, including petitions both for and against the proposal. 1040
1041
Mr. Freihammer indicated that Council will likely act on the report before the 1042
updated pathway master plan returns for approval. He explained that removing 1043
the segment now would not prevent Council from proceeding with a project if 1044
they choose to do so, and conversely, Council could also decide to remove it 1045
independently. He noted that the pathway master plan update is likely at least a 1046
year away from Council consideration. 1047
1048
Chair Ficek and Mr. Freihammer discussed how to handle the Aldine segment 1049
given the ongoing Council review. They agreed it would be best to leave the 1050
segment as is for now rather than making changes prematurely. 1051
1052
Chair Ficek noted support for the concept of a connection, while Mr. 1053
Freihammer indicated staff would revisit it after Council action and update the 1054
plan accordingly, either removing it if constructed or if not pursued. 1055
1056
Mr. Freihammer then introduced segment 35 on Fairview Avenue, described as 1057
developing an off-road pathway on the west side from County Road B2 to 1058
County Road C2. He clarified that a continuous pathway already exists on the 1059
east side, while the west side has partial segments with gaps. 1060
1061
Mr. Freihammer explained that this segment intends to fill the remaining gaps 1062
on the west side, particularly given the higher traffic volumes on Fairview 1063
Avenue south of County Road C2. He noted that recent improvements have 1064
addressed portions of the corridor, but several gaps remain that would improve 1065
overall connectivity. 1066
1067
Member Brokaw Palalay noted that this Fairview Avenue segment reflects 1068
earlier concerns about safety, particularly with people using scooters and 1069
walking in the roadway, and pointed out the presence of bus stops that increase 1070
pedestrian activity. 1071
1072
Mr. Freihammer confirmed those conditions, and the Commission expressed 1073
support for completing the west side gaps. 1074
1075
Page 161 of 165
Page 25 of 28
Mr. Freihammer then introduced the Commerce Street segment, described as 1076
developing a pathway connection between Albert Street and Hamline Avenue. 1077
He explained that the area includes a high concentration of apartments and key 1078
destinations such as the library, high school, and nearby retail, including Target. 1079
He noted that a portion of the pathway has already been constructed by recent 1080
apartment development. 1081
1082
Mr. Freihammer indicated that completing the connection would improve 1083
pedestrian access throughout the corridor. He suggested that a road diet on the 1084
four-lane street could make it feasible to add the remaining sidewalk or 1085
pathway. 1086
1087
Chair Ficek recommended extending the Commerce Street segment west to 1088
State Farm Road, noting that pedestrians regularly use that corridor to access 1089
nearby destinations such as Target. 1090
1091
Mr. Freihammer confirmed that the upcoming development, including the State 1092
Patrol site, may incorporate sidewalk improvements in that area. The 1093
Commission supported modifying the segment to develop a pathway on the 1094
south side of Commerce Street from State Farm Road to Hamline Avenue. 1095
1096
Mr. Freihammer then clarified that the Minnesota Avenue constellation link 1097
was a duplicate of a previously discussed segment. He noted that the 1098
Commission had already supported adding a pathway along Minnesota Avenue 1099
from Lovell Avenue through Western Avenue and continuing east, effectively 1100
covering the entire corridor. 1101
1102
Mr. Freihammer next introduced the constellation link I1 along Oakcrest 1103
Avenue between Fairview Avenue and Rosebrook Park. He explained that the 1104
connection would provide access from a residential neighborhood into the park 1105
system, with broader links to other parks in the area. He noted that Oakcrest 1106
Avenue is a low-volume residential street with limited traffic and that existing 1107
pathways are available along Fairview Avenue and within the park. 1108
1109
Member Luongo asked whether there had been any resident feedback regarding 1110
the Oakcrest Avenue connection. 1111
1112
Mr. Freihammer indicated there had not been notable input and explained that 1113
the roadway now functions as a low-volume local street due to limited access 1114
at Snelling Avenue. 1115
1116
The Commission agreed the segment did not warrant inclusion as a formal 1117
pathway and supported leaving it as a constellation link rather than adding it to 1118
the pathway master plan. 1119
1120
Page 162 of 165
Page 26 of 28
Mr. Freihammer then introduced the Lydia Avenue segment, described as the 1121
development of an off-road pathway between Snelling Avenue and Hamline 1122
Avenue along the north side of Autumn Grove Park. He noted that this segment 1123
was added during the 2021 pathway master plan update at the request of 1124
residents and had already gone through neighborhood engagement and Council 1125
approval. He added that a portion of the pathway along Hamline Avenue is 1126
expected to be constructed this year. 1127
1128
Member Luongo expressed support for retaining the Lydia Avenue segment, 1129
noting that it provides a direct connection to Northwestern and serves students 1130
living in the neighborhood's eastern portion. 1131
1132
Chair Ficek confirmed that Lydia functions as a collector roadway, reinforcing 1133
the need for pedestrian infrastructure. 1134
1135
Member Brokaw Palalay also supported the segment, and the Commission 1136
agreed it addresses a clear need. 1137
1138
Mr. Freihammer noted that the segment was originally requested by residents 1139
and had received general support during prior engagement, with only limited 1140
opposition. He added that implementation could include a road diet to improve 1141
safety and accommodate the pathway. 1142
1143
The Commission agreed to keep the segment. 1144
1145
Mr. Freihammer then revisited a County Road C segment related to 1146
constructing a sidewalk on the north side between Western Avenue and Rice 1147
Street. He noted that this overlapped with a previously discussed segment and 1148
recommended keeping the updated version and removing the duplicate. 1149
1150
The Commission agreed. 1151
1152
Mr. Freihammer introduced segment 7 on Fairview Avenue, north of County 1153
Road B2, described as the development of an off-road pathway between County 1154
Road C2 and County Road D. He noted that the corridor currently lacks 1155
pedestrian facilities and functions more like a rural roadway with wide 1156
shoulders. 1157
1158
The Commission agreed that, given traffic levels and the need for connectivity, 1159
the segment should be retained. 1160
1161
Mr. Freihammer concluded by noting significant progress in reviewing the 1162
segments. 1163
1164
Chair Ficek suggested pausing at that point. 1165
1166
Page 163 of 165
Page 27 of 28
Mr. Freihammer noted that the Commission reviewed approximately 28 to 30 1167
segments and indicated that the next discussion would likely occur in July or 1168
August due to a full meeting schedule. He encouraged members to submit 1169
additional segment ideas if they believe anything is missing, explaining that 1170
staff can add them for review and initiate the standard neighborhood 1171
engagement process before bringing recommendations forward to the 1172
Commission and Council. 1173
1174
Chair Ficek asked whether there are other right-of-way corridors in the city, 1175
similar to Aldine, that could be considered for future pathway connections. 1176
1177
Mr. Freihammer explained that Aldine is a unique case, as most right-of-way 1178
corridors have already been evaluated through a prior process that identified 1179
potential vacations. He noted that some corridors were short or disconnected 1180
and therefore not suitable for connecting pathways. He added that several 1181
existing pathway connections into parks, such as Tamarack and Mattern, were 1182
created using former right-of-way corridors. 1183
1184
Mr. Freihammer indicated that only a limited number of additional 1185
opportunities remain, with a few still identified in the pathway master plan, 1186
including some in the Owasso Hills area that may be reviewed in future 1187
discussions. 1188
1189
## 5. Commission Direction on Member-Initiated Agenda Items 1190
Mr. Freihammer provided an overview of upcoming Commission activities and 1191
meeting topics. 1192
1193
Mr. Freihammer reported that a new Commission member, Luke Sandstrom, would 1194
be sworn in at a future meeting and noted that he has prior city experience and 1195
familiarity with the pathway master plan. He indicated that ethics training would 1196
likely occur in early April. 1197
1198
Mr. Freihammer outlined upcoming agenda items, including the adoption of the 1199
bike plan, a potential discussion of streetlight policy, continued review of the 1200
pathway master plan, a Waste Management presentation in May, stormwater 1201
updates, and preparation for the Joint Council meeting. He noted that the June 1202
meeting would likely include a discussion on the climate equity action plan and a 1203
leaf site recommendation, which may generate public interest. 1204
1205
Chair Ficek asked whether additional meetings would be needed to complete the 1206
pathway master plan review. 1207
1208
Mr. Freihammer indicated there is no strict deadline and explained that the current 1209
effort is intended to prepare for a larger transportation plan update expected to begin 1210
in 2027. He noted that the Commission is making steady progress and could 1211
continue at the current pace, with the option to add a special meeting if needed. 1212
Page 164 of 165
Page 28 of 28
1213
Chair Ficek also asked about the Joint Council meeting timeline and encouraged 1214
members to begin thinking about topics they may want to discuss. 1215
1216
Mr. Freihammer indicated the meeting is typically held in July and suggested 1217
further discussion at an upcoming meeting to coordinate participation and 1218
messaging. 1219
1220
6. Approval of February 24, 2026, Meeting Minutes 1221
Comments and corrections to the draft minutes had been submitted by PWETC 1222
commissioners prior to tonight’s meeting, and those revisions were incorporated 1223
into the draft presented in the meeting materials. 1224
1225
Motion 1226
Vice Chair Hodder moved, Member Fergus seconded, approval of the 1227
February 24, 2026, meeting minutes as presented. 1228
1229
Ayes: 5 1230
Nays: 0 1231
Abstain: 2 (Luongo, and Brokaw Palalay) 1232
Motion carried. 1233
1234
7. Adjourn 1235
1236
Motion 1237
Member Luongo moved, Member Fergus seconded, and the meeting 1238
adjourned at approximately 8:28 p.m. 1239
1240
Ayes: 7 1241
Nays: 0 1242
Motion carried. 1243
Page 165 of 165