Agenda · Roseville City Council
Roseville City CouncilAgendaTuesday, August 25, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## Public Works, Environment and Transportation
## Commission Agenda
Tuesday, August 25, 2026
## 6:30 PM
## City Council Chambers
In accordance with Minnesota Statutes §13D.02 and City policy, Council and Commission members may
attend meetings remotely up to three times per calendar year.
(Times listed are approximate – please note that items may be earlier or later than listed on the agenda)
6:30 p.m. 1. Roll Call
6:32 p.m. 2. Approve Agenda
6:34 p.m. 3. Receive Public Comment
6:40 p.m. 4. Business Items
6:40 p.m. a. Communication Items
6:45 p.m. b. Metro Transit Update
7:15 p.m. c. Streetlight Policy/Assessment Policy
## 8:00 p.m. d. City Council Joint Meeting Review
## 8:20 p.m. 5. Commission Direction on Member Initiated Agenda Items
## a. Commission Direction on Member Initiated Agenda Items
8:28 p.m. 6. Approval of Meeting Minutes
## a. Approve July Minutes
8:30 p.m. 7. Adjourn
Page 1 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 4.a.
## ITEM DESCRIPTION: Communication Items
## Background
At each commission meeting, City staff provides updates on City activities and projects ongoing within the
city that pertain to public works activities.
## Recommendation
Receive report and provide feedback.
## Attachments
## 1. Communications Memo
## 2. 2026 Roseville Project Map
## 3. June Development Activity Report
Page 2 of 47
## Public Works Department
## Memo
## To: P
## ublic Works Environmental and Transportation Commission Members
## From: Jennifer Lowry, City Engineer
Date: August 20, 2026
## Re: Communications Items
The following are updates to projects and other activities happening in Roseville since the last
commission meeting. Note that links to most planned or active construction projects can be found on
our construction projects website. http://www.cityofroseville.com/697/Construction-Projects
## R
oseville Public Works project updates:
•Maintenance Operation Center (MOC) / License & Passport Centers / Dance Studio (LPCDS)
Staff continues to work with consultants to develop the construction plans and anticipate bidding this
fall. A design development update will be provided to Council on Sept 14.
•Lexington Avenue Pathway - County Road B to TH 36
oThe construction of the pathway is substantially complete and open to pedestrians with
the decorative fence being installed in the coming weeks.
•Hamline Avenue – County Road C to Snelling Avenue
oConstruction of the Hamline Avenue Reconstruction Project was suspended after field
verification identified a conflict with an existing Xcel Energy gas main. Xcel anticipates
installing the new gas main in September/October and completing the project early 2027
(re-energizing after winter). Staff and project partners are evaluating phasing options for
resuming the project following the relocation in 2027.
## •2026 PMP Project
oNearly 6 miles of roads are planned for rehabilitation in 2026. Construction continues on
schedule and is now in the Grandview area.
## •Twin Lakes Trail Phase 2
oEasement needs to be negotiated with property owner. Construction likely in 2027 due
to tree removal date restrictions.
•Wagner/Western Pathway
oEasement being negotiated with Ramsey County.
## •2026 Sewer Cleaning & Lining
oLining will resume in September near County Road C and Snelling Avenue and is
currently on schedule.
## •Booster Station Phase 4 Improvements
oBuilding improvements to occur in coordination with the solar installation in 2026.
•Lift Stations
oCohansey Lift Station upgrade awarded with start date anticipated beginning of October.
oBrenner Lift Station design and construction administration contract approved on
July 20. Design is anticipated to be completed this fall.
•Wayfinding Signage
oRemaining signs to be coordinated with upcoming construction projects and/or pending
easements from others.
Attachment 1
Page 3 of 47
## PWET Communications Memo Page 2
## • Alameda Pond
o Staff is working with the University of MN Saint Anthony Falls Laboratory (SAFL) on a
research project aimed to better understand how aeration and mixing of water within
storm ponds can improve water quality. In the next few months, an aerator will be
installed adjacent to the pond on Alameda Street. SAFL will monitor the pond to find out
how the aeration system affects the water quality. Currently, our electrician is working
with Xcel Energy to run power to the aerator location, and City staff will install a concrete
pad.
• Lighting
o Intersection lighting in eastern Roseville planned for 2026. Construction is anticipated
to begin after September 11.
o Owasso Hills was asked to decide standard vs enhanced lighting – see Streetlight
agenda item for more information.
## • Bike Plan
o PWET and the Parks Commission recommended Council approve the Bike Plan – a
Council date is TBD for later this year.
## • Rosebrook Park
o Parks and Rec construction is underway to remove the existing southern parking lot,
playground, and kiddie pool, and add a new larger parking lot, splash pad, and
playground.
Other agency project updates:
## • Ramsey County
o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road and bridge
over railroad
Construction is underway and anticipated to be complete this fall. The
intersection of County Road C and Lexington Avenue will have a temporary
traffic signal during the State Fair and stop signs into the fall when a new signal
will be installed. Bridge construction planned for 2027.
## o Fairview from Larpenteur Avenue to County Road B2
Fairview is reopened to traffic and traffic control will be removed during the State
Fair. Remaining work to be completed after the Fair.
## o County Road D from Fairview Avenue to Cleveland Avenue
The Public Open House has been rescheduled for August 24 from 4:30 p.m. to
6:30 p.m. at Oasis Park. Design in process for 2027 project to include
resurfacing and construction of a path on the south side.
o Victoria Street Path from County Road C to Harriet Avenue
Design in process for 2028 project. Presentation made to City Council on July 20.
## o Rice from Wheelock Parkway to County Road B
Design in process for 2028 project. Public Open House held June 24.
## o Larpenteur Corridor Study
Consultant proposals for study of entire corridor have been received and are
under review.
• MnDOT
## o Snelling Avenue from TH 36 to Grey Fox Road
Page 4 of 47
## PWET Communications Memo Page 3
Lane reductions due to utility and pathway construction will be removed prior to
the State Fair. Southbound closure of Snelling Avenue is tentatively planned for
September 25-27.
o TH 280 from Wabash Avenue in St. Paul to I35 W
Project is on schedule to open lanes prior to State Fair. Minor work may
continue after State Fair.
• Other
## o G Line (Metro Transit)
Construction 2026-2028, start date TBD.
## o Private Utilities
Xcel is inspecting and replacing poles around town throughout the year - no
closures currently anticipated.
Xcel is undergrounding overhead lines in seven small areas in Roseville where
damage to lines is reoccurring and problematic - no closures currently
anticipated.
Fiber projects are underway in various locations around Roseville and change
weekly.
## Engineering Updates:
• Summer internships are coming to an end. Lots of side projects were accomplished thanks to
our awesome interns!
• We will receive an update on the Ramsey County’s proposed Cost Participation Policy in early
September.
• The City was successful in getting 11 new Be Active Be Green benches from Ramsey County
Active Communities. Benches will be received late fall after Council approval of the agreement.
## Environmental & Sustainability Updates:
• The Climate Equity Action Plan adoption will be celebrated at an upcoming launch event on
## Thursday, September 10,
from 6:00 p.m. – 8:00 p.m. at Showtime Studio and Coffee.
• Staff has been collaborating with Ramsey County on multiple sustainability project ideas,
including community gardens and food security, future swap events, and chloride reduction
programs.
• Planning for the second annual clothing swap is underway. Donations will be accepted
from August 17 thru 25 at City Hall, and the swap will be held August 27 and 28 from
11:00 a.m. to 6:00 p.m. each day at the Rose Room in the skating center.
## Maintenance Updates:
• Street and Storm
o Flared End Storm structure maintenance.
o Streets patching problem areas.
o ROW mowing.
o Flex Sealing catch basins begin in July.
o Annual crack sealing to begin at the end of July.
o Assist Utilities with water valve replacements.
o Ongoing sign maintenance.
o Curb and Sidewalk concrete replacements.
## • Water and Sanitary Sewer
o Continued inspections for water service line inventory.
Page 5 of 47
## PWET Communications Memo Page 4
o Continued locates, weekly lift station inspections/repairs, collection of water samples.
o Responded to and repair water main breaks, water gate valves and sewer backups.
o Valley Rich replaced (2) 12” valves at County Road C and Western Avenue. 8” Valve to
be replaced August 24, 2026.
o Repaired /replaced 6” Valve on Matilda Street on August 19, 2026.
## Council Updates:
Below is a highlight of items recently presented to and/or acted on by the City Council. More information
can be found in the agenda packets and minutes for the referenced Council meetings:
o August 10
## Approved: Youth Commissioner Reappointments
o August 14 – special meeting
## Approved: Primary Election Results
o August 24 - planned
## Receive: Proposed Budget from City Manager
Page 6 of 47
0700100020003000
## Feet
## AllProjects2026
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## I
## L
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## I
## C
## C
## E
## N
## T
## E
## R
## DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## I
## L
## L
## S
## C
## O
## U
## R
## T
## E
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## A
## L
## T
## I
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## T
## E
## R
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## U
## R
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## S
## A
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## B
## O
## S
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## W
## N
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DE
## L
## L
## W
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## C
## LE
## VE
## L
## A
## N
## D
## A
## V
## E
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## I
## S
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## M
## A
## R
## I
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## A
## U
## T
## U
## M
## N
## P
## L
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## N
## SE
## Y
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## R
## O
## S
## E
## G
## A
## T
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## R
## R
## I
## N
## G
## T
## O
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## L
## A
## N
## D
## S
## E
## R
## V
## I
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## C
## C
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## S
## B
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Sunset
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## P
## A
## T
## T
## O
## N
## RD
## HIGHCREST
## RD
## M
## I
## L
## L
## W
## O
## O
## D
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGE
## ROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## S
## H
## O
## R
## E
## W
## O
## O
## D
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## L
## I
## N
## C
## O
## L
## N
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIV
## I
## C
## C
## E
## N
## T
## E
## R
## DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## C
## U
## R
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVE
## WHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HI
## G
## H
## P
## OIN
## T
## E
## CURV
## OWASSO
## HILLS
## DR
## N
## H
## I
## L
## L
## S
## C
## O
## U
## R
## T
## E
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## G
## A
## L
## T
## I
## E
## R
## ST
## M
## A
## T
## I
## L
## D
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S
## O
## W
## A
## S
## S
## O
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## T
## E
## R
## R
## A
## C
## E
## H
## I
## L
## L
## S
## C
## O
## U
## R
## T
## E
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## S
## A
## N
## D
## H
## U
## R
## S
## T
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANT
## AVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## W
## O
## O
## D
## B
## R
## I
## D
## G
## E
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## B
## O
## S
## S
## A
## R
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## R
## O
## S
## E
## T
## O
## W
## N
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## S
## I
## M
## P
## S
## O
## N
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## A
## R
## O
## N
## A
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DE
## L
## L
## W
## O
## O
## D
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## F
## E
## R
## N
## W
## O
## O
## D
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIAL
## DR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## C
## LE
## VE
## L
## A
## N
## D
## A
## V
## E
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RD
## HADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## F
## E
## R
## R
## I
## S
## FERRIS LN
## G
## L
## U
## E
## K
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## M
## A
## R
## I
## O
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## L
## O
## R
## E
## N
## RD
## A
## U
## T
## U
## M
## N
## P
## L
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## E
## L
## D
## R
## ID
## G
## E
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## C
## O
## H
## A
## N
## SE
## Y
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## C
## R
## E
## S
## C
## E
## N
## T
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## R
## O
## S
## E
## G
## A
## T
## E
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## F
## A
## R
## R
## I
## N
## G
## T
## O
## N
## CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## C
## L
## E
## V
## E
## L
## A
## N
## D
## S
## E
## R
## V
## I
## C
## E
## D
## R
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## W
## O
## O
## D
## R
## U
## F
## F
## S
## M
## C
## C
## A
## R
## R
## O
## N
## S
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## L
## A
## N
## G
## T
## O
## N LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## A
## S
## B
## U
## R
## Y
## S
## T
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## D
## D
## D
## DDDD
## D
## D
## D
## DD
## D
## D
## D
## D
## D
## DDDD
## DDD
## DDDD
## D
## D
## D
## D
## D
## D
## D
## D
## D
## D
'
'
'
'
!
(
!
(
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
"
)
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
## L
## Prepared by: Engineering Department
6/11/2026
## 2026 All Projects
## MnDOT Roadway
## Ramsey County Roadway
## City Roadway Reclaim
## DDD
## City Roadway Mill & Overlay
## Pathway Construction
## Pathway Maintenance
## Watermain Project
## Storm Project
'
## Sanitary Pipe Lining (TBD)
## Sanitary Project and Lift Station Project
## Signal Project
!
(
## Intersection Streetlight Installation
"
)
## Non-Metered Streetlight Replacement
!
(
## Booster Station ProjectCity Campus Project
## Storm Pump Project
## New Streetlight Installation
## GIS Data:
The maps provided by the City of Roseville are compilations of records, information and data
from various sources, and they are to be used for reference purposes only. The City does not
warrant or guarantee that the Geographic Information Systems (GIS) data or maps are
complete, current, or accurate. The data is offered “as is” and the City of Roseville does not
represent that the GIS data can be used or is accurate for legal, navigational, or any purposes
requiring exacting measurement of distance or direction or precision in the depiction of
geographic features. Pursuant to Minnesota Statutes, Section 466.03, Subdivision 21, the City of
Roseville disclaims any liability for claims based on alleged or actual inaccuracies in the GIS data
or maps. For more information, please contact 651-792-7044.
## Data Sources
## * Ramsey County GIS (4/26/2026)
## * City of Roseville Engineering Department
Attachment 2
Page 7 of 47
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Arden Hills
## Falcon
## Heights
## Lauderdale
## Little Canada
## Maplewood
## New Brighton
## St. Anthony
## St. Paul
## Shoreview
## Minneapolis
## Rosedale Center
(multiple,
see reverse)
## MnDOT
## Waters
## Edge
New home
New home
## New Home
New home
New home
## Von Maur ramp
## Presbyterian
## Homes
New home
New home
## Hamline
## Automotive
## Ding
## Tea
## Eaglecrest
## Twin Lakes
## Buildings
## A & B
## FedEx
## Old Dutch
## Blastoff
## Play Park
## Pottery Barn
## Omni Health
## Former Dept
of Education
## Pace
## Analytical
## King of Kings
## Lutheran Church
## Shell
building
## Arby's
## Hand in Hand
## Montessori
New home
New home
New home
## Whispering Pines
## Assisted Living
## T-Mobile
New home
## Rosebrook
## Park
## Pepperl
and Fuchs
## AbleNet
## MN Institute
for Pain
## Management
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Æ
## Arden Hills
## Falcon
## Heights
## Lauderdale
## Little Canada
## Maplewood
## New Brighton
## St. Anthony
## St. Paul
## Shoreview
## Minneapolis
## Rosedale Center
(multiple,
see reverse)
## MnDOT
## Waters
## Edge
New home
New home
## New Home
New home
New home
## Von Maur ramp
## Presbyterian
## Homes
New home
New home
## Hamline
## Automotive
## Ding
## Tea
## Eaglecrest
## Twin Lakes
## Buildings
## A & B
## FedEx
## Old Dutch
## Blastoff
## Play Park
## Pottery Barn
## Omni Health
## Former Dept
of Education
## Pace
## Analytical
## King of Kings
## Lutheran Church
## Shell
building
## Arby's
## Hand in Hand
## Montessori
New home
New home
New home
## Whispering Pines
## Assisted Living
## T-Mobile
New home
## Rosebrook
## Park
## Pepperl
and Fuchs
## AbleNet
## MN Institute
for Pain
## Management
Prepared by:
## Community Development Department
August 7, 2026
## Sources
## Ramsey County GIS (7/20/2026)
## Community Development Department
0 1,0002,0003,000
## Feet
## L
## See Reverse For Project Details
## Æ
## Residential
## Æ
## Retail
## Æ
## Office / Non-Retail
## Æ
## Industrial
## Æ
## Public / Institutional
## Development Projects: August 2026
Attachment 3
Page 8 of 47
## ROSEVILLE COMMUNITY DEVELOPMENT ACTIVITY REPORT
## UPDATED: 7/24/2026
## Project Name Address Project Description Applicant/Owner Information Starting
## RESIDENTIAL
Residential New Construction 2164 Eustis St New single family home Mike Torkelson Development Winter 2024
Residential New Construction 2976 West Owasso Blvd New single family home TJB Homes Winter 2026
Residential New Construction 2050 Eldridge Ave New single family home Lee Homes Winter 2026
Residential New Construction 649 Heinel Dr New single family home Croix Custom Homes Summer 2025
Residential New Construction 595 Heinel Dr New single family home Lee Homes Winter 2026
Residential New Construction 1928 South Gluek Ln New two family dwelling Cara Builders Spring 2025
Residential New Construction 560 Ryan Ave New single family home Structural Buildings of MN Summer 2025
Residential New Construction 615 Roselawn Ave New single family home Bristol Built LLC Summer 2026
Residential New Construction 2380 Laurie Ct New single family home Creative Custom Homebuilders LLC Summer 2026
Residential New Construction 2137 Fairways Ln New single family home Vivid Homes Summer 2026
Residential New Construction 987 Brenner Ave New single family home Cara Builders LLC Summer 2026
## RETAIL
Abercrombie & Fitch 1595 Highway 36 #400 Interior Alteration GGC National Contractors Spring 2026
Pottery Barn 1595 Highway 36 #1600 New façade and interior alteration McGough Construction (In plan review) Spring 2026
Apple Store 1595 Highway 36 #130 Shell space for new breakroom P.R.M. Contracting Summer 2025
Blastoff Play Park 2325 Prior Ave Indoor playground, arcade, restaurant and bar Chan Consulting LLC Spring 2026
Vacant Tenant 1595 Highway 36 #170 Tenant Remodel P.R.M. Contracting Fall 2025
Ding Tea 2401 Fairview Ave Interior Alteration Tran Construction and Remodeling Fall 2025
Twin Lakes Building A 2033 Twin Lakes Pkwy New Construction Shell Building Sherburne Slater Construction (In plan review) Fall 2025
Twin Lakes Building B 2037 Twin Lakes Pkwy New Construction Shell Building Sherburne Slater Construction (In plan review) Spring 2026
Von Maur Ramp 1595 Highway 36 Ramp Repair Cy-Con Inc Fall 2025
Arby’s 2105 Snelling Ave Interior Alteration Pro Services Construction Spring 2026
Hammermade 1595 Highway 36 #725 Interior Remodel Nielsen Construction Services Summer 2026
T-Mobile 1745 County Road B2 Interior Remodel Lakeview Construction LLC Spring 2026
## NON-
## RETAIL/OFFICE
MnDOT Waters Edge 1500 County Road B2 Mechanical upgrades Versacon Inc Fall 2023
## Eaglecrest 2945 Lincoln Dr Interior Alteration MRI, Inc Spring 2026
Pace Analytical 2665 Long Lake Rd Interior Alteration Robert Carr and Associates Spring2026
Hamline Automotive 2150 Hamline Ave Addition Sherburne Slater Construction Spring 2026
Former Dept of Education building 1500 Highway 36 Full demolition JE Dunn Construction Spring 2026
Old Dutch 2375 Terminal Rd Solar panels Blue Horizon Energy Spring 2026
Omni Health 1970 Oakcrest Ave Interior Alteration – Mental Health Clinic Fixed Assets, Inc Spring 2026
FedEx 2323 Terminal Rd Full demolition Veit and Companies Spring 2026
Shell Building 2700 Snelling Ave New Construction (In Plan Review) TBD Summer 2026
King of Kings Lutheran Church 2330 Dale St Interior Alteration, add fire sprinkler system Maertens-Brenny Construction Co. Summer 2026
Presbyterian Homes & Services 2925 Lincoln Dr Interior Remodel Maintenance Repairs & Installations Fall 2025
Hand in Hand Montessori 211 North McCarrons Blvd Interior Remodel Vanguard Builders Inc Summer 2026
Whispering Pines Assisted Living 2891 Merrill St Assisted Living Conversion and Renovation Aspire Builders Inc Summer 2026
Pepperl and Fuchs 2699 Patton Rd Interior Build Out Klodt Inc Summer 2026
Rosebrook Park 2590 Fry St Remove Pool & Alterations for Splashpad New Look Contracting Summer 2026
Xcel Energy 3115 Centre Pointe Dr Interior Remodel Xcel Energy Spring 2026
Abelnet 2625 Patton Rd Minor Interior Remodel Montgomery Brinkman LLC Summer 2026
MN Institute for Pain Management 2780 Snelling Ave Tenant Improvement Montgomery Brinkman LLC Summer 2026
Page 9 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 4.b.
## ITEM DESCRIPTION: Metro Transit Update
## Background
Representatives from Metro Transit will give an update about Metro Transit Operations. The update will
focus on updates to the Rosedale Transit Center. George Serumgard will present on behalf of Metro
Transit.
## Recommendation
Receive presentation from Metro Transit.
## Attachments
## None
Page 10 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 4.c.
## ITEM DESCRIPTION: Streetlight Policy/Assessment Policy
## Background
At the July 28, 2026 meeting, the Commission discussed the Streetlight Policy. Staff will provide updates
made to the policy based on feedback at the last meeting. Attachment 1 is the existing Streetlight Policy and
Attachment 2 is a draft update to the policy, for discussion.
Updates to the Streetlight Policy could impact the Assessment Policy. The current Assessment Policy was
last updated in 2012. In addition to any changes to the streetlight assessments, staff would like to review the
Assessment Policy as a whole as it has been 14 years since the last upgrade.
Attachment 3 is the existing Assessment Policy and Attachment 4 is a draft update to the policy, for
discussion.
Staff would like the commission to provide feedback on both policies. Based on feedback, we will update
both policies, review them with the City Attorney, and bring back both policies for final recommendations
from PWETC in September. We will then forward these recommendations to Council sometime in October.
## Recommendation
Provide feedback on both policies.
## Attachments
## 1. Existing Streetlight Policy
## 2. Draft Update to the Streetlight Policy
## 3. Existing Assessment Policy
## 4. Draft Update to the Assessment Policy
Page 11 of 47
## Final
October 13, 2025
Page 1 of 5
## City of Roseville March 2024
## Streetlight Policy
## City of Roseville
## Streetlight Policy
October 13, 2025
## I.Pu
rpose and Need for Policy
The installation of streetlights provides a safer environment for the community in regard
to traffic and pedestrian safety. Due to limited funds and varying viewpoints of individual
property owners, as to the desirability of such installations, the City has established this
policy to define its streetlighting program.
## II.Policy Statement
The City shall adopt and utilize the following standard policy for the installation,
maintenance, and funding of streetlighting. It is important to establish a consistent,
equitable approach, relating to the method of selecting the locations for streetlights, to
insure fair and reasonable treatment for property owners. Streetlighting in all areas of the
City shall follow the requirements detailed below.
## III.Co
nditions
•All new lights installed shall be full cutoff lights.
•All new streetlighting must be consistent with the adopted City standards.
•Variations to the City standard streetlight types will be allowed only by City Council
action. Extra costs associated with variations to the City standard, both installation and
ongoing operation and maintenance costs, will be the responsibility of the benefiting
properties.
•All streetlighting designs shall consider industry standards, safety, uniformity, lighting
intensity and cost.
•Qualifying requests for streetlights may be scheduled for installation in a subsequent
year if the City determines sufficient funds are not available in the current City budget.
•On projects where pedestrian level lighting is installed, a continuous level of light
should be maintained for the design. Spacing would be determined applying
engineering standards. Spacing typically results in poles every 90 to 120 feet.
## IV.S
treetlight Districts
To develop a rational approach to streetlight installation, the City Council in 1957,
established a policy to install streetlights at no assessment to ensure that the lights would
be installed where most needed and wanted.
Since the need for lighting varies by adjacent use, different standards will apply as
follows.
## A.Standard District
oThis standard be used for all areas in the City unless they are defined as
Commercial, City Special or Enhanced districts as shown in Appendix A,
oProcedure
Attachment 1
Page 12 of 47
## Final
October 13, 2025
Page 2 of 5
## City of Roseville March 2024
## Streetlight Policy
If the following conditions are met, the City will install streetlights at the
following locations:
• The location is at the intersection of two streets, OR
• The location is at the end of a cul-de-sac, OR
• The location is on a severe curve, either vertically or horizontally,
## OR
• The location is at a marked pedestrian crosswalk.
Illuminance Target: illuminance ranges from 0.3 – 0.6 foot-candles.
City staff will notify property owners within 300 feet of the new light
location where lighting will be installed at least three weeks prior to the
installation of the light.
Mid-block lights are desirable and should be considered for placement if
the spacing between existing lights is greater than 600 feet. If the above
conditions are met, an individual property owner may circulate a petition
in the neighborhood to determine if the light is desired (particularly by
those property owners directly adjacent to the proposed light). If 60%
consensus is built with property owners within 150 feet of the proposed
light, the City staff will work with the electric utility company to install
the light.
## o Streetlight Design
## Streetlight Type: LED Cobrahead Cutoff
## Pole Type:
• Wooden if available
• Fiberglass or aluminum if a pole needs to be installed.
o Funding
The City will fund installation and maintenance of lights within the
Standard District.
## B. Business District
o This standard will be applied to all areas identified as Business Districts as shown
## in Appendix A
o Procedure
Property owners that would like street segments to be added to the
## Business Lighting District shall petition the City Council. The Council
will determine if the street will be added to the Business District.
• Over 60% of benefitting property owners shall petition the City to
be considered.
• Only streets that are non-single family residential will be
considered.
## o Streetlight Design
## Streetlight Type: LED Cobrahead Cutoff
## Pole Type:
• Wooden if available
• Fiberglass or aluminum if a pole needs to be installed.
Page 13 of 47
## Final
October 13, 2025
Page 3 of 5
## City of Roseville March 2024
## Streetlight Policy
This lighting would be a brighter, higher quality of lighting. Lights would
be designed per engineering standards typically resulting in poles every
250-300 feet. As a minimum standard, all intersections, marked
crosswalks, and horizontal and vertical curves would have streetlights.
o Funding
Initial costs to install lighting to Business District standards will be
assessed to adjacent property owners.
Maintenance and future replacement costs will be paid by the City.
## C. City Special District
o City Special Districts are as shown in Appendix A.
o This type of lighting will be for special areas as determined by the City Council.
This type of lighting may include streetlighting or pedestrian level lighting
or decorative style lighting.
The lighting standards for each Special District shall be designed for the
specific purpose and need of the district.
o Funding
The City will fund installation and maintenance of lights within the City
Special District.
## D. Enhanced District
o When property owners want a different location, design, or number of requested
lights above the Standard Streetlight district standards, property owners may
request that the City undertake an Enhanced District project.
o Procedure
When a request for an Enhanced District project is received, City staff,
working with property owners, will determine the boundaries of the
project. Requests for streetlighting can be initiated through a petition
process that includes signatures representing at least 60% of the property
in the project area.
## Petition Process
• Upon receipt of a petition signed by the owners of sixty percent
(60%) of the property area within the proposed project limits, City
staff will prepare a preliminary report detailing the streetlight
types, location, costs, and proposed assessments.
• The City Council will be asked to call and hold a public hearing
pursuant to Minnesota Statutes, Section 429.031.
• If the project goes to the public hearing, but is not ordered forward,
subsequent petitions will not be undertaken for the same project
area or any part of the project area for a two (2) year period
beginning on the hearing date. The exception to this requirement
would be if the City initiates a street reconstruction project in the
area.
o Funding
The additional costs of an Enhanced Distr ict project shall be assessed to
the benefiting property owners according to City Assessment Policy. All
Page 14 of 47
## Final
October 13, 2025
Page 4 of 5
## City of Roseville March 2024
## Streetlight Policy
properties within 150 feet (Street frontage) of each light shall be
considered for assessment. City staff shall determine the number and
locations of lights that could have been installed under the Standard
District section of this policy. The maintenance cost for these lights will
be deducted from the overall project cost.
A summary of the assessable cost shall be as follows:
• Cost of installation of enhanced streetlights
plus Cost of Operation, Maintenance (pro-rated for 25 years)
plus Administrative costs
minus “Standard District” maintenance cost (if applicable)
= total assessable cost.
Xcel energy provides a 25-year warranty for the streetlights that they
install. This is included in the City’s monthly charge. At the end of this
period the City will evaluate the maintenance needs for the “enhanced”
areas. A reconstruction project will be considered where the new
operation and maintenance costs for the next 25 years will be proposed to
be assessed to the benefiting properties.
## V. Development/ Redevelopment Streetlights
The Developer of any proposed subdivision or redevelopment area, whether residential,
business or other may elect to install streetlights as a part of their overall development
plans. Approval and implementation shall conform to this policy. Developers shall meet
the Streetlight Standard District criteria unless they apply to meet other district criteria.
Installation of public streetlights shall be included as part of the development agreement.
## A. Procedure
o The developer shall submit a streetlighting plan for review and approval by
the City Engineer.
o For new residential subdivisions and business areas, the developer shall pay
the operation and maintenance costs to the electric utility company until the
City accepts the streetlighting system.
o Acceptance of the new streetlights must be requested in writing by the
developer, along with a certification from the electric utility company that it
was installed according to their specifications.
## B. Funding
o The costs for installation, operation, and maintenance of streetlights in
developments will be paid for by the developer according to the provisions set
forth in this Policy.
o The operation and maintenance costs for an Enhanced District project in new
developments shall be paid for by the new development in perpetuity. These
costs shall be determined and included in the Development Contract. The
costs shall either be paid up front by the developer or assessed to the property
owners. The total cost shall be the “enhanced” operation and maintenance
cost minus the City’s Standard District contribution. The City’s basic
Page 15 of 47
## Final
October 13, 2025
Page 5 of 5
## City of Roseville March 2024
## Streetlight Policy
contribution shall be determined based on the procedure outlined in section
IV.A. of this policy.
## VI. Authority
It is implemented through the provision in each year’s budget to pay for the cost of power
and maintenance of the existing system and funds for additional new lights. The Public
Works Department shall be responsible for the implementation of this policy.
Page 16 of 47
0700100020003000
## Feet
## DISCLAIMER:
This map is neither a legally recorded map nor a survey and is
not intended to be used as one. This map is a compilation of records,
information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be
used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose
requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies
are found please contact 651-792-7075. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21
(2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and
agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third
parties which arise out of the user's access or use of data provided.
## StreetlightDistricts
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## PATT
## ON
## RD
## HIGHCREST
## RD
## MILLW
## OOD
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGEROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## SH
## OREW
## OOD
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## LI
## NC
## OLN
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIVIC CE
## NTER DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## CUR
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVEWHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HIGH
## POINTE
## CURV
## OWASSO
## HILLS
## DR
## N
## HILLSC
## OURTE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## GALTIE
## R
## ST
## MAT
## ILD
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S OW
## ASSO
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TERR
## ACE
## HILL
## SCO
## URTE
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SAN
## DHU
## RST
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANTAVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## WOODB
## RID
## GE
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOSS
## AR
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## LOVELL LN N
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## ROSE
## TOWN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN S
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## SIMP
## S
## ON
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## ARO
## NA
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DELLW
## OOD
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## FERN
## WOOD
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIALDR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLEVELA
## ND
## AVE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RDHADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## FERRIS
## FERRIS LN
## GLU
## EK
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MARIO
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## LO
## RE
## N
## RD
## AUT
## U
## MN
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## ELDRIDGE
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## COH
## ANSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## CRE
## SC
## ENT
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## ROSEG
## ATE
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## FARRING
## TON CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## CLEVE
## LAND S
## ERVIC
## E DR
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## WOOD
## RUFF
## S MCCA
## RRONS
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## LAN
## GT
## ON LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## ASBUR
## Y ST
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## Lake Josephine
## Park
## Lake
## McCarrons
## County Park
## Ramsey County
## Open Space
(Ramsey County)
## Lake Josephine
## Beach Park
## Park
## Lake
## Langton
## Sandcastle
## Park
## Lake
## Park
## Oasis
## Central
## Park
## Acorn
## Park
## Central
## Park
## Central
## Park
## Park
## Villa
## Park
## Keya
## Park
## Park
## Tamarack
## Park
## Reservoir Woods
## Reservoir Woods
## Rosebrook
## Langton
## Park
## Park
## Autumn
## Grove
## Park
## Park
## Cottontail
## Veterans
## Park
## Howard
## Johnson
## Park
## Willow Pond
## Cedarholm
## Golf Course
## Evergreen
## Park
## Keller
## Mayflower
## Park
## Lexington
## Park
## Bruce
## Russell
## Park
## Pioneer
## Park
## Concordia
## Park
## Materion
## Park
## Central
## Park North
## Owasso
## Ballfields
## Valley
## Park
## Owasso
## Hills
## Park
## Ladyslipper
## Park
## Mapleview
## Park
## Woodhill
## Park
## Applewood
## Park
## Applewood
## Overlook
## Memorial
## Park
## Midland
## Gardens
## Park
## Unity
## Park
## Lake
## Josephine
## Lake
## Owasso
## McCarrons
## Lake
## Lake
## Bennett
## Pond
## Willow
## Zimmerman
## Lake
## Oasis Pond
## Lake
## Johanna
## Lake
## Langton
## Walsh
## Lake
## BRENNER
## ST
## LYDIA
## AVE
## LYDIA
## CT
## PATT
## ON
## RD
## HIGHCREST
## RD
## MILLW
## OOD
## ST
## BRENNER
## CT
## LONG
## LAKE
## RD
## STANBRIDGE
## ST
## MANSON
## ST
## MAPLE
## LN
## OLD
## HIGHWAY 8
## TROSETH
## RD
## COUNTY HIGHWAY 88
## COUNTY
## ROAD D
## RD
## PARTRIDGEROAD C2
## CENTRE
## POINTE
## DR
## AVE
## INTERSTATE 35W
## ROAD C
## LONG
## LAKE
## RD
## CLEVELAND
## COUNTY
## COUNTY
## PATTON
## RD
## COUNTY
## ROAD D
## WILDER
## ST
## MOUNT
## RD
## RIDGE
## EVELYN
## ST
## BRENNER
## AVE
## PRIOR
## CIR
## ST
## ARTHUR
## DR
## AVE
## MILDRED
## ST
## SH
## OREW
## OOD
## AVE
## BRENNER
## LYDIA
## ARTHUR
## PL
## MILDRED
## DR
## STANBRIDGE
## MILLWOOD
## MAPLE
## ST
## WHEELER
## WHEELER
## SHORE
## CURV
## WOOD
## LN
## LN
## ST
## ALDINE
## AVE
## AVE
## AVE
## LI
## NC
## OLN
## DR
## RD C2
## COUNTY
## AVE
## COUNTY
## RD C2
## RD C2
## COUNTY
## CENTENNIAL
## DR
## DR
## TERRACE
## LINCOLN
## DR
## SNELLING
## FAIRVIEW
## ST
## ARTHUR
## ROAD C
## RD C2
## COUNTY
## PRIOR
## AVE
## COUNTY
## ASBURY
## RIDGEWOOD
## ST
## RD
## GLEN HILL
## RD
## AVE
## AVE
## WOODLYNN
## CLARMAR
## BRENNER
## AVE
## ST
## ST
## ST
## ST
## AVE
## DR
## AVE
## LYDIA
## ASBURY
## ARONA
## SIMPSON
## PASCAL
## AVE
## WOOD
## MILL
## ST
## ST
## ALBERT
## ALBERT
## SHELDON
## ST
## JOSEPHINE
## E SNELLING
## COUNTY
## RD C2
## RD
## AVE
## MERRILL
## ST
## BELAIR
## CIR
## ST
## FERNWOOD
## LEXINGTON
## RD C2
## DR
## DR
## TERRACE
## ROAD C
## TERRACE
## DR
## AVE
## DR
## ST
## ST
## ST
## ST
## GRIGGS
## ST
## CIVIC CE
## NTER DR
## LEXINGTON
## HAMLINE
## AVE
## JUDITH
## RD
## RAMBLER
## PRIMROSE
## CURV
## TALISMAN
## CUR
## V
## SHELDON
## ST
## JUDITH
## WOODHILL
## HURON
## FERN
## MERRILL
## DELL
## WOOD
## WOOD
## COUNTY
## E SNELLING
## DR
## ST
## AVEWHEATON
## HEINEL
## DR
## CIR
## HEINEL
## DR
## TERRACE
## ST
## DALE
## ST.
## ALBANS
## ST
## IONA
## LN
## HEINEL
## S OWASSO
## ROAD C
## AVE
## ST
## CHURCHILL
## OXFORD
## ST
## AGLEN
## AVE
## AVE
## LAKEVIEW
## AVE
## JUDITH
## WOODHILL
## COUNTY
## COUNTY
## ST
## DR
## KENT
## BLVD
## SANDY HOOK
## DR
## RD
## SANDY HOOK
## DR
## LITTLE BAY
## TURNSTONE
CT (Private)
## S OWASSO
## BLVD
## LYNN AVE
## WOOD-
## HIGH
## POINTE
## CURV
## OWASSO
## HILLS
## DR
## N
## HILLSC
## OURTE
## W
## HILLSVIEW
## HILLSVIEW
## E
## ST
## MARION
## ST
## GALTIE
## R
## ST
## MAT
## ILD
## A
## ST
## MAPLE
## LN
## RD C2
## AVE
## DR
## LN
## IONA
## CIR
## IRENE
## CIR
## RAMBLER
## CT
## TERRACE
## DR
## JUDITH
## AVE
## CENTENNIAL
## DR
## WESTERN
## AVE
## ROAD C
## AVE
## VIRGINIA
## ST
## FARRINGTON
## ST
## MATILDA
## ST
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## OAKCREST
## AVE
## LN
## OAKCREST
## BROOKS
## CIR
## ROSE PL
## COHANSEY
## CIR
## AVE
## AVE
## MATILDA
## ST
## GALTIER
## ST
## RD B2
## ST
## WEWERS
## RD
## CIR
## GALTIER
## ST
## MARION
## ST
## WOODBRIDGE
## ST
## WESTERN
## AVE
## AVE
## TOP HILL
## CIR
## DR
## SOUTHHILL
## ST
## SANDHURST
## RICE
## AVE
## HAND
## AVE
## AUERBACH
## MATILDA
## DR
## CENTENNIAL
## PASCAL
## PASCAL
## ST
## ST
## COUNTY
## COUNTY
## ROAD D
## CHURCHILL
## CHATSWORTH
## ST
## ST
## WOODLYNN
## BRENNER
## AVE
## LYDIA
## MILLWOOD
## ST
## OXFORD
## LYDIA
## DR
## DR
## LYDIA
## VICTORIA
## AVE
## AVE
## AVE
## ST
## MILTON
## ST
## BRENNER
## AVE
## MILLWOOD
## AVE
## ST
## AVON
## W OWASSO
## BLVD
## RD C2
## ORCHARD
## LN
## CIR
## STANBRIDGE
## HIGH-
## COURTE
## MAPLE LANE
## CT
## COUNTY
## FARRINGTON
## MILLWOOD
## ST
## WESTERN
## AVE
## BLVD
## S OW
## ASSO
## WOODLYNN
## AVE
## ST
## WOODBRIDGE
## NORTHVIEW
## ST
## RICE
## LN
## IONA
## ST
## RICE
## CT
## TERR
## ACE
## HILL
## SCO
## URTE
## S
## COUNTY
## WOODHILL
## IONA
## MACKUBIN
## ST
## KENT
## ST
## ST
## MACKUBIN
## ST
## DALE
## AVE
## AVE
## SEXTANT
## COUNTY
## AVE
## ST
## IRENE
## ST
## IRENE
## ST
## SEXTANT
## AVE
## CT
## IRENE
## CIR
## VIRGINIA
## CIR
## FARRINGTON
## MATILDA
## BROOKS
## TRANSIT
## AVE
## ST
## ROAD B
## ST
## MINNESOTA
## LOVELL
## LOVELL
## AVE
## GRAND-
## VIEW
## COHANSEY
## SAN
## DHU
## RST
## DR
## BLVD
## COUNTY
## VICTORIA
## SEXTANTAVE
## TRANSIT
## AVE
## BROOKS
## TRANSIT
## ST
## BLVD
## ST
## ALBEMARLE
## ST
## SKILLMAN
## AVE
## WOODBRIDGE
## ST
## MCCARRON
## ST
## AVE
## WESTERN
## AVE
## FARRINGTON
## ST
## AVE
## ROMA
## AVE
## DIONNE
## GALTIER
## GRANDVIEW
## AVE
## MINNESOTA
## AVE
## WOODB
## RID
## GE
## S
## T
## CIR
## CAPITOL
## MARION
## VIEW
## VIEW
## CAPITOL
## VIEW
## CAPITOL
## CIR
## ST
## DR
## BOSS
## AR
## D
## ST
## IRENE
## AVE
## OXFORD
## CHURCHILL
## AGLEN
## ST
## ST
## ST
## ST
## COUNTY
## ROSE
## OAKCREST
## FISK
## ST
## GROTTO
## ST
## LOVELL LN N
## AVE
## RD B2
## PL
## AVE
## ST
## ALADDIN
## CT
## ROSE
## TOWN
## DR
## OVERLOOK
## ST
## ST
## TRANSIT
## AVE
## PL
## NANCY
## AVE
## VICTORIA
## LOVELL
## GRANDVIEW
## COPE
## GROT
## ST.
## ALBA
## NS
## TO
## ST
## ST
## ST
## NANCY
## PL
## AVE
## SANDHURST
## MILTON
## AVE
## AVE
## AVE
## SANDHURST
## DR
## ROAD B
## ST
## GROTTO
## ST
## SHERREN
## ST
## OXFORD
## GRANDVIEW
## ST
## ST
## LOVELL
## LOVELL LN S
## LOVELL LN
(Private)
## SHERREN
## COUNTY
## AVE
## CURV
## SNELLING
## ROSE
## PL
## PASCAL
## ST
## ST
## SIMP
## S
## ON
## AVE
## BROOKS
## AVE
## TRANSIT
## ST
## ARO
## NA
## SEXTANT
## AVE
## AVE
## SEXTANT
## ST
## HOLTON
## ST
## ALBERT
## ST
## SHELDON
## COUNTY
## OAKCREST
## ROSE
## PL
## WILLOW
## CIR
## DELLW
## OOD
## CIR
## CHRISTY
## RD B2
## AVE
## WILLOW
## BROOKS
## AVE
## TRANSIT
## AVE
## SEXTANT
## AVE
## LN
## PL
## ROSE
## ST
## DUNLAP
## ST
## ST
## FERN
## WOOD
## DUNLAP
## ST
## AVE
## HAMLINE
## COLONIALDR
(Private)
## ST
## ALBERT
## ST
## DR
## SANDHURST
## AVE
## ST
## DELLWOOD
## DELLWOOD
## ST
## MERRILL
## ST
## ROAD B
## ST
## FERNWOOD
## SHERREN
## ST
## RD
## LAURIE
## DR
## SANDHURST
## LEXINGTON
## AVE
## AVE
## COMMERCE
## COUNTY
## ST
## PASCAL
## OAKCREST
## AVE
## AVE
## ROSE
## ROSE
## AVE
## ELDRIDGE
## ST
## ST
## SAMUEL
(Private)
## LN
## S RIDGEWOOD
## N RIDGEWOOD
## LN
## LN
## MID OAKS
## MID OAKS
## RD
## AVE
## BURKE
## ELDRIDGE
## BELMONT
## RYAN
## SHRYER
## SKILLMAN
## PL
## OAKCREST
## BEACON
## ST
## WHEELER
## AVE
## ST
## HERSCHEL
## RD B2
## COUNTY
## CLEVELAND
## CLEVELA
## ND
## AVE
## AVE
## COUNTY
## AVE
## AVE
## PL
## AVE
## ST
## ALDINE
## ST
## CHARLOTTE
## ST
## FRY
## SNELLING
## RD B2
## PERIMETER
## DR
## FAIRVIEW
## N GLUEK LN
## S GLUEK LN
## LN
## ROAD B
## AVE
## HERSCHEL
## RD
## MIDLOTHIAN
## RDHADDINGTON
## RD
## LAURIE
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36
## SERVICE DR
## PRIOR
## FERRIS
## FERRIS LN
## GLU
## EK
## COUNTY
## WEST
## WALNUT
## ST
## ROSE
## PL
## TERMINAL
## ST
## LONG
## LAKE
## RD
## RD
## RD
## TERMINAL
## ST
## ST. CROIX
## ST. CROIX
## ST
## ST
## ST
## ST. STEPHEN
## ST
## FULHAM
## LAURIE
## RD
## MARIO
## N
## RD
## ACORN
## RD
## N HIGHWAY 36 SERVICE DR
## S HIGHWAY 36 SERVICE DR
## WALNUT
## INTERSTATE
## 35W
## EUSTIS
## ST
(Private)
## FULHAM
## COUNTY
## FAIRWAYS
## LN
## FULHAM
## ST
## LAKE ST
## MIDLAND
## HILLS
## RD
## ROAD B
## N ROSEWOOD
## LN
## LN
## S ROSEWOOD
## AVE
## SKILLMAN
## AVE
## DRAPER
## HYTHE
## DR
## CIR
## ST
## ROSELAWN
## AVE
## CLEVELAND
## AVE
## AVE
## PRIOR
## SHARONDALE
## AVE
## AVE
## ELDRIDGE
## WILDER ST
## ELDRIDGE
## AVE
## SKILLMAN
## AVE
## SKILLMAN
## AVE
## EVERGREEN
## CT
## AVE
## AVE
## SHRYER
## RYAN
## LO
## RE
## N
## RD
## AUT
## U
## MN
## PL
## ROSELAWN
## TATUM
## ST
## DR
## DRAPER
## FAIRVIEW
## BEACON
## HERSCHEL
## WHEELER
## ST
## ST
## ST
## SHRYER
## RYAN
## ELDRIDGE
## SKILLMAN
## ALDINE
## ST
## AVE
## AVE
## SNELLING
## AVE
## AVE
## FRY
## MIDLOTHIAN
## RD
## ROSELAWN
## AVE
## AVE
## AVE
## LN
## AVE
## AVE
## AVE
## ASBURY
## ST
## ST
## ARONA
## ST
## SIMPSON
## ST
## PASCAL
## SHRYER
## ELDRIDGE
## BURKE
## RYAN
## DRAPER
## ROSELAWN
## DELL
## WOOD
## AVE
## AVE
## HAMLINE
## LN
## SKILLMAN
## BELMONT
## AVE
## ST
## DELLWOOD
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## AVE
## WOOD
## FERN
## ST
## AVE
## LINDY
## KARYL
## PL
## LEXINGTON
## AVE
## AVE
## HAMLINE
## LARPENTEUR
## GARDEN
## AVE
## LEXINGTON
## AUTUMN
## ST
## SUMMER
## ST
## RUGGLES
## ST
## ST
## RUGGLES
## AVE
## HURON
## MERRILL
## DELLWOOD
## AVE
## AVE
## ROMA
## FERNWOOD
## ST
## DUNLAP
## LINDY
## AVE
## DIONNE
## ST
## AVE
## AVE
## BURKE
## PARKER
## SHRYER
## AVE
## RYAN
## AVE
## AVE
## RYAN
## AVE
## DRAPER
## HARRIET
LN (Private)
## OXFORD
## ST
## ST
## CHATSWORTH
## VICTORIA
## AVE
## ROSELAWN
## PARKER
## AVE
## AVON
## ALAMEDA
## ST
## ST
## AVE
## ELDRIDGE
## LN
## BELMONT
## AVE
## SKILLMAN
## AVE
## SHRYER
## DALE
## VICTORIA
## AVE
## RD
## ST
## ALAMEDA
## STUBER
## ROMA
## ST
## ST. ALBANS
## AVE
## RIDGE
## EMERALD
## CT
## PINEVIEW
## DR
## ALTA VISTA
## CT
## DALE
## DALE
## ST
## LARPENTEUR
## ST
## RUGGLES
## ST
## ROMA
## AVE
## DIONNE
## ST
## CHATSWORTH
## ST
## ST
## ST
## OXFORD
## AGLEN
## COH
## ANSEY
## SHRYER
## AVE
## AVE
## MOUNDSVIEW
## AVE
## RYAN
## AVE
## RYAN
## AVE
## ELDRIDGE
## CRE
## SC
## ENT
## LN
## COHANSEY
## BLVD
## ST
## IRENE
## WESTERN
## HAND
## AVE
## AVE
## FARRINGTON
## BURKE
## BLVD
## N MCCARRONS
## DR
## N MCCARRONS
## ELMER
## ST
## GIES-
## MANN
## AVE
## ST
## WILLIAM
## ST
## MARION
## CT
## ALBEMARLE
## WILLIAM
## ST
## BLVD
## CT
## WOODBRIDGE
## MARION
## ST
## RICE
## PL
## WAGENER
## SHADY
## AVE
## BEACH
## CENTER
## ST
## HILLTOP
## AVE
## GLENWOOD
## AVE
## WAGNER
## ST
## AVE
## KENT
## ST
## AVE
## ROSELAWN
## BAYVIEW
## AVON
## ST
## LONG
## LAKE
## RD
## ROSEGATE
## ROSEG
## ATE
## DR
## STATE HIGHWAY 280
## ROSE-
## DALE
## WEST-
## WOOD
## LYDIA
## AVE
## W SNELLING
## DR
## W SNELLING
## DR
## ROSE VISTA
## CT
(Private)
## FERNWOOD
## CT
## FERN-
## WOOD
## ST
## DUNLAP
## ST
## CHATS-
## WORTH
## CHATS-
## WORTH
## FARRING
## TON CT
## COHAN-
## SEY CIR
## AVE
## WOOD-
## BRIDGE
## S HIGHWAY 36
## SERVICE DR
## FARRING-
## TON
## KENT
## ST
## CHANDLER
## AVE
(Private)
(Private)
## SAND-
## HURST
## CIR
(Private)
(Private)
## LN
(Private)
## MIDLAND
## VIEW CT
## ST
## ARONA
## CT
## APPLEWOOD
## TERRACE
## DR
## NATURE
## VIEW CT
(Priv)
## E SNELLING
## SVC DR
## CLEVE
## LAND S
## ERVIC
## E DR
## S COUNTY C SERVICE DR
## CHATS-
## WORTH
## CT
## WOOD
## RUFF
## S MCCA
## RRONS
## RESERVOIR
## WOODS CIR
## AMERICAN ST
## MOUNT RIDGE RD
## IONA LN
## TWIN
## LAN
## GT
## ON LAKE
## MAPLE LN
## DUNLAP
## ST
## DUNLAP
## CIR
(Private)
## MILTON
## CT
## ASBUR
## Y ST
## PKWY
## DR
## TWIN LAKES
## PKWY
## LAKES
## MCCARRONS PL
(Priv)
## LEXINGTON
(Priv)
## HERSCHEL ST
(Priv)
## PL
## LAURIE CT
(Priv)
## L
## Data Sources
## * Ramsey County GIS (1/04/2024)
## * City of Roseville Community Development
## * City of Roseville Finance Department
## Prepared by: Engineering Department
1/30/2024
## Streetl
ight Districts
## Residential (Manufactured Housing Park;
## Common Ar
## eas; Single Family Attached; Single
## Family Detached; Multi Family)
## Commercial (Business/Retail; Heavy
## I
## ndustrial; Institutional; Light Industrial;
## Office)
## City Special District
## Business District
## Enhanced District
Page 17 of 47
Page 1 of 6
## City of Roseville DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
## City of Roseville
## Streetlight Policy
October 13, 2025
DRAFT August 20, 2026
## I.Purpose and Need for Policy
The installation of streetlights provides a safer environment for the community in regard
to traffic and pedestrian safety. Due to limited funds and varying viewpoints of individual
property owners, as to the desirability of such installations, the City has established this
policy to define its streetlighting program. The policy aims to find a balance between
minimal lighting requirement for safety of the public and dark sky efforts.
## I
## I. Policy Statement
The City shall adopt and utilize the following standard policy for the installation,
maintenance, and funding of streetlighting. It is important to establish a consistent,
equitable approach, relating to the method of selecting the locations for streetlights, to
insure fair and reasonable treatment for property owners. Streetlighting in all areas of the
City shall follow the requirements detailed below.
## III. Conditions
•All new lights installed shall be full cutoff lights.
•All new streetlighting must be consistent with the adopted City Ordinances, Design
standardsStandards, and this Policy.
•Variations to the City standard streetlight types will be allowed only by City Council
action. Extra costs associated with variations to the City standard, both installation and
ongoing operation and maintenance costs, will be the responsibility of the benefiting
properties.
•All streetlighting designs shall consider industry standards, safety,
uniformity, lighting
intensity and cost.
•Qualifying requests for streetlights may be scheduled for installation in a subsequent
year if the City determines sufficient funds are not available in the current City budget.
•On projects where pedestrian level lighting is installed, a continuous level of light
should be maintained for the design. Spacing would be determined applying
engineering standards. Spacing typically results in poles every 90 to 120 feet.
## IV. Streetlight Districts
To develop a rational approach to streetlight installation, the City Council in 1957,
established a policy to install streetlights at no assessment to ensure that the lights would
be installed where most needed and wanted and wanted.
Since the need for lighting varies by adjacent use, different standards will apply as follows.
## A. Standard District
oThis standard be used for all areas in the City unle
ss they are defined as
Commercial, City Special or Enhanced districts as shown in Appendix A.
Attachment 2
Page 18 of 47
Page 2 of 6
## City of Roseville
## DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
o
The locations and illuminance target for this district shall be the minimum for all
lighting districts.,
o Procedure
If the following conditions are met, the City will install streetlights at the
following locations:locations identified below.
• The location is at the intersection of two streets, OR
• The location is at the end of a cul-de-sac, OR
• The location is on a severe curve, either vertically or horizontally, OR
• The location is at a marked pedestrian crosswalk.
Illuminance Target: illuminance ranges from 0.3 – 0.6 foot-candles.
City staff will notify property owners within 300 feet of the new light
location
where lighting will be installed at least three weeks prior to the
installation of the light.
Mid-block lights are desirable and should be considered for placement if the
spacing between existing lights is greater than 600 feet. If the above
conditions are met, an individual property owner may circulate a petition in
the neighborhood to determine if the light is desired (particularly by those
property owners directly adjacent to the proposed light). If 60% consensus
is built with property owners within 150 feet of the proposed light, the City
staff will work with the electric utility company to install the light.
## o Streetlight Design
## Streetlight Type: LED Cobra head Cutoff
## Pole Type:
• Wooden if available
• Fiberglass or aluminum if a pole needs to be installed.
Locations:
• at the intersection of two streets, OR
• at the end of a cul-de-sac, OR
• on a severe curve, either vertically or horizontally, OR
• at a marked pedestrian crosswalk.
Illuminance Target: between 0.3 – 0.6 foot-candles.
Mid-block lights are desirable and should be considered for placement if the
spacing between existing lights is greater than 600 feet. If the above
conditions are met, a n individual property owner may submit a petition to
the City Engineer with signatures representing at least 60% of the property
owners circulate a petition in the neighborhood to determine if the light is
desired (particularly by those property owners directly adjacent to the
proposed light). If 60% consensus is built with property owners within 150
feet of the proposed light. If a valid petition is received, the City staff will
have the light installedwork with the electric utility company to install the
light.
•
o Funding
The City will fund installation and maintenance of lights within the
Standard District.
Page 19 of 47
Page 3 of 6
## City of Roseville
## DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
Lights are typically owned and maintained by Xcel who charges the city a
monthly flat rate per light.
## B. Business District
o This standard will be applied to all areas identified as Business Districts as shown
## in Appendix A
o Procedure
Property owners that would like street segments
established as a to be added
to the Business Lighting District shall petition the City Council. The
Council will determine if the street will be added to theas a Business
District.
• The petition must include signatures representing at least 60% of the
property owners abutting the right-of-way in the project area. City
staff can work with property owners to determine the project
area.Over 60% of benefitting property owners shall petition the City
to be considered.
• If on a street bordering another city, only the Roseville parcels will
be used to determine 60%.
• Only streets that are non-single family residential will be
considered.
## o Streetlight Design
This type of lighting may include street and/or pedestrian level lighting or
decorative style lighting.
## Streetlight Type: LED Cobrahead Cutoff
## Pole Type:
• Wooden if available
• Fiberglass or aluminum if a pole needs to be installed.
This lighting would be a brighter, higher quality of lighting. Lights would
be designed per engineering standards typically resulting in poles every
250-300 feet. As a minimum standard, all intersections, marked crosswalks,
and horizontal and vertical curves would have streetlights.
o Funding
Initial costs to install lighting to Business District standards will be assessed
to adjacent property owners.
Maintenance and future replacement costs will be paid by the City.
Lights are typically installed and maintained by Xcel who leases them to
the City for 25 years after which they become City owned or replaced and
a new 25-year lease started.
## C. City Special District
o City Special Districts are as shown in Appendix A.
o This type of lighting will be for special areas as determined by the City Council.
This type of lighting may include street
lighting and/or pedestrian level
lighting or decorative style lighting.
The lighting standards for each Special District shall be designed for the
specific purpose and needs of the district.
o Funding
Page 20 of 47
Page 4 of 6
## City of Roseville
## DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
The City will fund installation and maintenance of lights within the City
Special District.
## D. Enhanced District
o
When If property owners want a different location, design, or number of requested
lights above the Standard Streetlight Ddistrict standards, property ownersthey may
request that the City establish an Enhanced District and undertake an Enhanced
District streetlight project.
o Procedure
When a request for an Enhanced District project is received, City staff,
working with property owners, will determine the boundaries of the project.
Requests for streetlighting can be initiated through a petition to City
Council. petition process that includes signatures representing at least 60%
of the property in the project area.
## Petition Process
• The petition must include signatures representing at least 60% of the
property owners abutting the right-of-way in the project area. City
staff can work with property owners to determine the project area.
If on a street bordering another city, only the Roseville parcels will
be used to determine 60%.
• Upon receipt of a valid petition signed by the owners of sixty percent
(60%) of the property area within the proposed project limits, City
staff will prepare a preliminary Feasibility Rreport detailing the
streetlight types, location, costs, and proposed assessments.
• The City Council will be asked to call and hold a public hearing
pursuant to Minnesota Statutes, Section 429.031 to determine if a
streetlight project will occur..
• If the project goes to the public hearing, but is not ordered
forwardapproved, subsequent new petitions will not be undertaken
for the same project area or any part of the project area for a two (2)
year period beginning on the hearing date. The exception to this
requirement would be if the City initiates a street reconstruction
project in the area.
o Funding
The additional costs of an Enhanced District project shall be assessed to the
benefiting property owners according to City Assessment Policy.
## All
properties within 150 feet (Street frontage) of each light shall be considered
for assessment. City staff shall determine the number and locations of lights
that could have been installed under the Standard District section of this
policy. The maintenance cost for these lights will be deducted from the
overall project cost.
• A summary of the assessable cost shall be as follows:
• Cost of installation of enhanced streetlights
plus Cost of Operation & , Maintenance (pro-rated for 25 years)
plus Administrative costs
minus “Standard District” maintenance cost (if applicable)
= total assessable cost.
Page 21 of 47
Page 5 of 6
## City of Roseville
## DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
• Note that costs for the enhancements above the cost of standard
lights may not exceed the assessable special benefit dollar amount.
Xcel energy provides a 25-year warrantyoperation and maintenance for the
streetlights that they install for 25-years by leasing the lights to the City.
This cost is included in one time installation fee from Xcel.
• the City’s monthly charge. At the end of this 25-year lease period
the lights become City owned and a period the City will evaluate the
maintenance needs for the “enhanced” areas. A reconstruction
project will be considered where the new installation, operation, and
maintenance costs for the next 25- years will be proposed to be
assessed to the benefiting properties.
• If a reconstruction project is not approved by City Council at the
assessment hearing, the existing lights will be removed, the area will
return to a Standard District, and the new lighting will be installed
to Standard District light standards.
## V. Development/ Redevelopment Streetlights
The Developer of any proposed subdivision or redevelopment area, regardless of zoning,
whether residential, business or other may elect to install streetlights as a part of their
overall development plans. Approval and implementation shall conform to this policy.
Developers shall meet the Streetlight Standard District criteria unless they apply to meet
other district criteria. Approval and implementation shall conform to this pPolicy.
Installation of public streetlights shall be included as part of the development agreement.
## A. Procedure
o The developer shall submit a streetlighting plan for review and approval by the
City Engineer.
o Installation of any streetlights installed in the right-of-way shall be included as
part of the Development Agreement approved by City Council.
o If the proposed lighting is part of a lease from Xcel, the City Engineer must be
included in communications with Xcel regarding the lighting.For new
residential subdivisions and business areas, the developer shall pay the
operation and maintenance costs to the electric utility company until the City
accepts the streetlighting system.
o Acceptance of the new streetlights lighting must be requested by the developer
in writing. The request must be submitted to the City Engineer and include in
writing by the developer, along with a certification from the electric utility
company that it was installed according to their plan and specifications.
## B. Funding
o The costs for initial installation will be paid by the developer regardless of
district. If establishing a Business or Enhanced District that results in decorative
lights leased to the City, the initial installation costs shall include the operation,
and maintenance costs for the duration of the lease.of streetlights in
developments will be paid for by the developer according to the provisions set
forth in this Policy.
Page 22 of 47
Page 6 of 6
## City of Roseville
## DRAFT FOR DISCUSSION 8/20/2026March 2024
## Streetlight Policy
o The operation and maintenance costs for an Enhanced District project in new
developments shall be paid for by the new development in perpetuity. These
costs shall be determined and included in the Development Contract. The costs
shall either be paid up front by the developer or assessed to the property owners.
The total cost shall be the “enhanced” operation and maintenance cost minus
the City’s Standard District contribution. The City’s basic contribution shall be
determined based on the procedure outlined in section IV.A. of this policy.
## VI. Homeowner’s Association Streetlights
A legally established Homeowner’s Association (HOA) may request that the City establish
an Enhanced District and undertake a streetlight project within the HOA’s boundary.
## A. Procedure
o Request is initiated by the HOA’s submittal of a petition to City Council that
includes signatures representing at least 60% of the HOA’s property owners.
o City Staff work with the HOA and Xcel to establish a lighting plan and cost
estimate.
o The project, and any associated agreements or donations, are presented to City
Council for approval.
o If approved, HOA pays City for the full cost and City Staff authorize Xcel to
proceed with installation.
o After the lease expiration, the process resorts back to the Enhanced District as
noted in section ____.
## B. Funding
o The HOA will be responsible for funding the cost difference from the Standard
to Enhanced District lighting as noted in section ___.
o The funds must be paid in advance of the start of construction and can be:
via agreement with the City OR
via a donation with conditions that is accepted by City Council.
## VI.VII. Authority
It is implemented through the provision in each year’s budget to pay for the cost of power
and maintenance of the existing system and funds for additional new lights. The Public
Works Department shall be responsible for the implementation of this policy.
Page 23 of 47
## City of Roseville
## SPECIAL ASSESSMENT POLICY
## ADOPTED DECEMBER 12, 2012
The purpose of this policy is to be used as a guide by the City of Roseville when preparing 1
assessment rolls, so as to assure uniform and consistent treatment of affected properties. It is the 2
general policy of the City of Roseville to assess all affected properties according to this policy 3
without regard to funding source.
4
Special assessments are a charge imposed on properties for a particular improvement that 5
benefits the owners of those selected properties. The authority to use special assessments
6
originates in the state constitution which allows the state legislature to give cities and other 7
governmental units the authority “to levy and collect assessments for local improvements upon 8
property benefited thereby.” The legislature confers that authority to
cities in Minnesota Statutes 9
Chapter 429. 10
1.Special Benefit Test: The proposed assessment shall be equivalent or less than the11
anticipated increase in market value for properties being assessed. Appraisals shall be12
completed to determine the influence of an improvement project on the value of the13
properties proposing to be assessed.14
2.Determining Assessable Frontage: Unless otherwise noted in this document, all15
assessments shall be calculated using property front footage on the segment of the16
infrastructure included in
the improvement project. The assessment rate shall be17
determined by dividing the total project cost by the total assessable frontage. The18
following formulas shall apply for calculating the total assessable frontage for the19
improvement project.20
(a)The assessable frontage shall be 100% of the short side of the lot.21
(b)Corner and Multiple Frontage LDR1 and LDR2 lots: All corner and multiple22
frontage LDR1 and LDR2
parcels shall be considered as having 10% of the long23
side as being assessable footage unless such parcels could be split or subdivided.
24
This is in addition to the short side frontage.25
(c)Corner and Multiple Frontage Lots (other zoning): All corner and multiple26
frontage lots for other property zoning shall be calculated at 10% for the first 15027
feet of the long side and then 100% for any additional footage. This is in addition28
to the short side frontage.
29
(d)Odd Lot Formula (all zoning): The odd lot formula shall apply for odd and30
irregularly shaped lots, which have rear widths that vary by more than 25% in31
comparison with the front width.
The lot will be assumed to have a depth equal to32
one-half the sum of the two sides and said depth will be divided into the area of33
the lot to determine the assessable frontage.34
(e)Lots with more than 4 sides: All lots of more than four sides will be geometrically35
converted to a four-sided lot of equal area, then the odd-lot formula as described36
in (d
) will be used to determine the assessable frontage. Where this is not37
practical, the assessable frontage will be determined by assuming the lot to have38
an assessable frontage equal to those of the typical rectangular lots near it which39
are comparable in overall area and nature.
40
(f)Private Driveway: If a public improvement takes place along a public street with41
a private driveway that serves more than one property owner, all properties with42
access to the public street via the private driveway will be assessed. The frontage43
Attachment 3
Page 24 of 47
## Assessment Policy Summary Page 2 of 5
Adopted 12/10/12
of the private property (or properties) directly adjacent to the roadway will be 1
used to determine the assessable frontage. This assessable frontage will be 2
proportionately shared among all properties with direct access to the private 3
driveway. 4
(g) City Property: If there is a City owned property adjacent to the public 5
improvement, the frontage of the City property will be added to the assessable 6
frontage and used to calculate the assessment rate. The City assessment will 7
become a city project cost. 8
(h) County Open Space Property: If there is Ramsey County Open Space adjacent to 9
the public improvement, the frontage will be added to the assessable frontage and 10
used to calculate the assessment rate. Assessments for public improvements 11
benefiting the Ramsey County open space properties shall be deferred as long as 12
the property remains as public open space. Recreational developments within the 13
property may include public access areas, trails, and other support facilities for 14
passive recreation, nature appreciation and outdoor recreation without affecting 15
the deferral. Such deferral will be made with the following conditions: 16
Interest will accrue on the deferred assessment. 17
In recognition of this deferral, Ramsey County will cooperate with the City of 18
Roseville by granting easements to the City for storm water drainage, utilities, 19
and local trails, and undertake, at its expense, improvements to the open space 20
that are mutually beneficial and agreed upon by the City and County at the time 21
of deferral. 22
The extent of such improvements shall take into consideration the amount of the 23
deferred assessment. 24
## 3. Pathway Construction Projects: 25
(a) There shall be no assessments for the construction of off road pathways that are 26
included as priority segments in the City’s Pathway Master Plan. Except in the 27
case of petition or development projects. 28
4. Roadway New Construction Projects: For all new public roadway construction, where no 29
roadway exists, the properties abutting the new road shall be assessed for 100% of the 30
cost. 31
5. Roadway Reconstruction Projects: The following is the assessment policy for all 32
roadway reconstruction projects in the City of Roseville. 33
(a) Property zoned LDR1 and LDR2 shall be assessed up to 25% of the project cost 34
for a 7-ton, 32-foot wide pavement with concrete curb and gutter and required 35
drainage. 36
(b) All other property zoning shall be assessed up to 50% of the project cost. 37
## (c) Municipal State Aid Roadways: 38
Property zoned LDR1 and LDR2 shall be assessed up to 25% of the cost of 39
a 7-ton, 32-foot wide pavement with concrete curb and gutter and required 40
drainage, even if the width or strength is greater. 41
All other property zoning shall be assessed up to 50% of the project costs. 42
## (d) Ramsey County or Minnesota Department of Transportation Roadways: 43
Page 25 of 47
## Assessment Policy Summary Page 3 of 5
Adopted 12/10/12
The amount of special assessments collected on a Ramsey County or MnDOT 1
roadway projects will be equal to or less than the total City cost share of the 2
improvement. 3
(e) All property accessing a private driveway that serves as a leg of an intersection 4
signal system shall be assessed 100% of the proportionate share of the signal 5
system cost. 6
6. Regional Improvement Projects: Projects that benefit more than just the properties 7
abutting the project may be assessed to all properties within the Benefited Area. 8
Regional Improvement Projects can include arterial roads, bridges, collector roads, 9
highway interchanges, intersections, or noise walls. 10
7. Traffic Management Program Projects: Assessments for Traffic Management Program 11
projects shall be assessed to all properties within the Benefited Area. The Benefited Area 12
would be determined on a project- by- project basis as a part of the Feasibility Report. 13
See TMP for details. 14
## 8. Sanitary Sewer Projects: 15
(a) Properties currently connected to public sanitary sewer will not be assessed for 16
reconstruction or major maintenance projects. Except in the case of subd. (d) 17
below. 18
(b) New construction shall be assessed 100% of the project cost based on a front 19
footage basis for all zoning. 20
(c) Any sanitary sewer main in excess of 8 inches in diameter will normally be 21
considered oversized. When oversizing is done to increase the capacity of the 22
City’s system, the added cost for oversizing shall be subtracted from the total cost 23
of the improvement. The result of said subtraction will be the cost to be assessed. 24
(d) New development property, or property which has altered its land use within the 25
past three years, shall be assessed at 100% of the city’s expense for the 26
improvement. 27
(e) Sewer services shall be assessed on a per service basis at 100% of the city’s 28
expense for such services. 29
## 9. Storm Sewer Projects: 30
(a) There shall be no assessments for storm sewer projects not associated with 31
roadway projects. Except in the case of petition or development projects. 32
10. Watermain Projects: 33
(a) Properties currently connected to public watermain will not be assessed for 34
reconstruction or major maintenance projects. Except in the case of subd. (d) 35
below. 36
(b) New construction shall be assessed 100% of the project cost based on a front 37
footage basis for all zoning. 38
(c) Any water mains in excess of 8 inches in diameter will normally be considered 39
oversized. When oversizing is done to increase the capacity of the City’s system, 40
the added cost for oversizing shall be subtracted from the total cost of the 41
improvement. 42
Page 26 of 47
## Assessment Policy Summary Page 4 of 5
Adopted 12/10/12
(d) New development property, or property which has altered its land use within the 1
past three years, shall be assessed at 100% of the city’s expense for the 2
improvement. 3
(e) Water services shall be assessed on a per service basis at 100% of the city’s 4
expense for such services. 5
## 11. Streetlight Installation Projects: 6
(a) Shall be assessed on a front footage basis and as follows: 7
(b) All properties within 150 feet (street frontage) of each light shall be considered 8
for assessment. 9
(c) City staff shall determine the number and locations of lights that could have been 10
installed under the “standard street light” section of the City’s Street light policy. 11
The maintenance cost for these lights will be deducted from the overall project 12
cost. 13
(d) 100% of the additional costs for an “enhanced street light” project shall be 14
specially assessed. The additional costs for an “enhanced street light” project 15
shall include; cost of installation of enhanced streetlights, cost of operation & 16
maintenance (pro-rated for 25 years), administrative costs, minus “standard street 17
light” maintenance cost (if applicable) 18
(e) At the end of 25 years, the City will evaluate the maintenance needs for the 19
“enhanced street light” areas. A reconstruction project will be considered where 20
the new operation and maintenance costs for the next 25 years will be proposed to 21
be assessed to the benefiting properties. 22
(f) In new development and redevelopments, the operation and maintenance costs for 23
an “enhanced street light” installation shall be paid for by the property owners in 24
the new development in perpetuity. These costs shall either be paid for up front 25
by the developer or assessed to the property owners. The total cost shall be the 26
“enhanced street light” operation and maintenance cost minus the City’s “standard 27
street light” contribution. The City’s basic contribution shall be determined based 28
on the procedure outlined in section IV. B. of the City Street Light policy. 29
12. Definitions 30
(a) Assessable frontage: Property frontage on a segment of infrastructure scheduled 31
for improvement. If a parcel is a corner lot or has multiple street frontages, the 32
parcel frontage shall only be calculated for the side abutting the infrastructure 33
scheduled for improvements. 34
(b) Benefited Area: The properties expected to receive positive impacts from the 35
proposed public improvement and which are subject to assessment for the cost of 36
construction. The Benefited Area is determined on a project- by- project basis. 37
(c) Enhanced Street Light: When the location, design, or spacing for requested lights 38
does not meet the “Standard Street Light” qualifying conditions, property owners 39
may request that the City undertake an “Enhanced Street Lighting” project. 40
(d) Long side: On a corner lot or multiple frontage lot, the frontage of a property that 41
is longest. 42
(e) Private Driveway: A driveway or road that serves as a primary access for one or 43
more property owners that is not maintained by the City of Roseville, MnDOT or 44
## Ramsey County. 45
Page 27 of 47
## Assessment Policy Summary Page 5 of 5
Adopted 12/10/12
(f) Required Drainage: Drainage improvements necessary because of an 1
improvement project. This can be the result of meeting City, watershed or 2
wetland requirements. Includes rate control, water quality treatment, infiltration, 3
and wetland mitigation. 4
(g) Roadway Reconstruction Project: This type of project involves removing and 5
replacing the existing roadway bituminous, more than 50% of the concrete curb, 6
the base materials, and oftentimes performing utility work (water, sewer, etc.) at 7
the same time. 8
(h) Roadway Maintenance Project: Performing a Reclaim and Overlay, Mill and 9
Overlay, or sealcoating of city streets. 10
(i) Short side: On a corner lot or multiple frontage lot, the frontage of a property that 11
is shortest. 12
(j) Standard Street Light: street light installation that meets the location, design and 13
spacing of the City street light policy qualifying conditions described in section 14
## IV. B. of the City Street Light policy. 15
(k) Total Project Cost: Project costs include actual construction cost plus all 16
associated overhead costs. The total cost of the associated overhead for a public 17
improvement project would typically include city administration, engineering, 18
fiscal, legal, capital interest, right of way acquisition and contingencies. 19
Page 28 of 47
## City of Roseville
## SPECIAL ASSESSMENT POLICY
## ADOPTED DECEMBER 12, 2012
## DRAFT FOR DISCUSSION August 18, 2026
## T
he purpose of this policy is to be used as a guide by the City of Roseville when preparing 1
assessment rolls, so as to assure uniform and consistent treatment of affected properties. It is the 2
general policy of the City of Roseville to assess all affected properties according to this policy 3
without regard to funding source. 4
Special assessments are a charge imposed on properties for a particular improvement that 5
benefits the owners of those selected properties. The authority to use special assessments 6
originates in the state constitution which allows the state legislature to give cities and other 7
governmental units the authority “to levy and collect assessments for local improvements upon 8
property benefited thereby.” The legislature confers that authority to cities in Minnesota Statutes 9
Chapter 429. 10
## 1.D
efinitions11
(a) Assessable frontage: Property frontage on a segment of infrastructure scheduled12
for improvement. If a parcel is a corner lot or has multiple street frontages, the13
parcel frontage shall only be calculated for the side abutting the infrastructure14
scheduled for improvements.15
(b) Benefited Area: The properties expected to receive positive impacts from the16
proposed public improvement and which are subject to assessment for the cost of17
construction. The Benefited Area is determined on a project- by- project basis.18
(c) Enhanced DistrictStreetlight: Streetlights in the right-of-way that exceed the19
When the location, design, or spacing of for requested lights does not meet the20
“Standard StreetlightDistrict” standards. qualifying conditions, property owners21
may request that the City undertake an “Enhanced Street Lighting” project.See22
Streetlight Policy for more details.23
(d) Long side: On a corner lot or multiple frontage lot, the frontage of a property that24
is longest.25
(e) Private Driveway: A driveway or road that serves as a primary access for one or26
more property owners that is not maintained by the City of Roseville, MnDOT or27
## Ramsey County.28
(f)Required Drainage: Drainage improvements necessary because of an29
improvement project. This can be the result of meeting City, watershed or30
wetland requirements. Includes rate control, water quality treatment, infiltration,31
and wetland mitigation.32
(g) Roadway Reconstruction Project: This type of project involves removing and33
replacing the existing roadway bituminous, more than 50% of the concrete curb,34
the base materials, and oftentimes performing utility work (water, sewer, etc.) at35
the same time.36
(h) Roadway Maintenance Project: Performing a Reclaim and Overlay, Mill and37
Overlay, or sealcoating of city streets.38
(i)Short side: On a corner lot or multiple frontage lot, the frontage of a property that39
is shortest.40
Attachment 4
Page 29 of 47
## Assessment Policy Summary Page 2 of 6
Adopted 12/10/12
## DRAFT FOR DISCUSSION August 18, 2026
(j) Standard StreetlightDistrict: street light installation that meets the location and 1
design standards, design and spacing of the City street lightStreetlight P policy. 2
qualifying conditions described in section IV. B. of the City Street Light policy. 3
(k) Total Project Cost: Project costs include actual construction cost plus all 4
associated overhead costs. The total cost of the associated overhead for a public 5
improvement project would typically include city administration, engineering, 6
fiscal, legal, capital interest, right of way acquisition and contingencies. 7
2. Special Benefit Test: The proposed assessment shall be equivalent or less than the 8
anticipated increase in market value for properties being assessed. Appraisals shall be 9
completed to determine the influence of an improvement project on the value of the 10
properties proposing to be assessed. 11
3. Methods for Assessment Calculation: A Feasibility Report shall be completed and 12
brought to City Council for each proposed assessment. In each report, City Staff shall 13
proposed a methos for calculating the assessments in an fair and equitable manner for 14
City Council to review. Methods include front footage, square footage or by parcel. 15
1. Unless otherwise noted in this Police, the assessment rate shall be determined by 16
dividing the total project cost by the total project frontage. 17
3.2. Determining AssessableAssessable Frontage: Unless otherwise noted in this 18
document, all assessments shall be calculated using property front footage on the 19
segment of the infrastructure included in the improvement project. The 20
assessment rate shall be determined by dividing the total project cost by the total 21
assessable frontage. The following formulas shall apply for calculating the total 22
assessable front frontage for the improvement project. 23
(a) The assessable frontage shall be 100% of the short side of the lot. 24
(b) Corner and Multiple Frontage LDR1 and LDR2 lots: All corner and 25
multiple frontage LDR1 and LDR2 parcels shall be considered as having 26
10% of the long side as being assessable footage unless such parcels could 27
be split or subdivided. This is in addition to the short side frontage. 28
(c) Corner and Multiple Frontage Lots (other zoning): All corner and 29
multiple frontage lots for other property zoning shall be calculated at 10% 30
for the first 150 feet of the long side and then 100% for any additional 31
footage. This is in addition to the short side frontage. 32
(d) Odd Lot Formula (all zoning): The odd lot formula shall apply for odd 33
and irregularly shaped lots, which have rear widths that vary by more than 34
25% in comparison with the front width. The lot will be assumed to have 35
a depth equal to one-half the sum of the two sides and said depth will be 36
divided into the area of the lot to determine the assessable frontage. 37
(e) Lots with more than 4 sides: All lots of more than four sides will be 38
geometrically converted to a four-sided lot of equal area, then the odd-lot 39
formula as described in (d) will be used to determine the assessable 40
frontage. Where this is not practical, the assessable frontage will be 41
determined by assuming the lot to have an assessable frontage equal to 42
those of the typical rectangular lots near it which are comparable in overall 43
area and nature. 44
(f) Private Driveway: If a public improvement takes place along a public 45
street with a private driveway that serves more than one property owner, 46
Page 30 of 47
## Assessment Policy Summary Page 3 of 6
Adopted 12/10/12
## DRAFT FOR DISCUSSION August 18, 2026
all properties with access to the public street via the private driveway will 1
be assessed. The frontage of the private property (or properties) directly 2
adjacent to the roadway will be used to determine the assessable frontage. 3
This assessable frontage will be proportionately shared among all 4
properties with direct access to the private driveway. 5
(g) City Property: If there is a City owned property adjacent to the public 6
improvement, the frontage of the City property will be added to the 7
assessable frontage and used to calculate the assessment rate. The City 8
assessment will become a city project cost. 9
(h) County Open Space Property: If there is Ramsey County Open Space 10
adjacent to the public improvement, the frontage will be added to the 11
assessable frontage and used to calculate the assessment rate. 12
Assessments for public improvements benefiting the Ramsey County open 13
space properties shall be deferred as long as the property remains as public 14
open space. Recreational developments within the property may include 15
public access areas, trails, and other support facilities for passive 16
recreation, nature appreciation and outdoor recreation without affecting 17
the deferral. Such deferral will be made with the following conditions: 18
• Interest will accrue on the deferred assessment. 19
• In recognition of this deferral, Ramsey County will cooperate with the 20
City of Roseville by granting easements to the City for storm water 21
drainage, utilities, and local trails, and undertake, at its expense, 22
improvements to the open space that are mutually beneficial and 23
agreed upon by the City and County at the time of deferral. 24
• The extent of such improvements shall take into consideration the 25
amount of the deferred assessment. 26
3. Types of Assessment by Project Type 27
## 4. Pathway Construction Projects: 28
(a) There shall be no assessments for the construction of off road pathways 29
that are
included as priority segments in the City’s Pathway Master Plan. 30
Except in the case of petition or development projects. 31
5. Roadway New Construction Projects: For all new public roadway construction, 32
where no roadway exists, the properties abutting the new road shall be assessed 33
for 100% of the cost. 34
6. Roadway Reconstruction Projects: The following is the assessment policy for all 35
roadway reconstruction projects in the City of Roseville. 36
(a) Property zoned LDR1 and LDR2 shall be assessed up to 25% of the 37
project cost for a 7-ton, 32-foot wide pavement street with concrete curb 38
and gutter and required drainage. 39
(b) All other property zoning shall be assessed up to 50% of the project cost
40
for a 7-ton, 32-foot wide pavement with concrete curb and gutter. 41
## (c) Municipal State Aid Roadways: 42
Page 31 of 47
## Assessment Policy Summary Page 4 of 6
Adopted 12/10/12
## DRAFT FOR DISCUSSION August 18, 2026
• Property zoned LDR1 and LDR2 shall be assessed up to 25% of the cost of 1
a 7-ton, 32-foot wide pavement with concrete curb and gutter and required 2
drainage, even if the width or strength is greater. 3
• All other property zoning shall be assessed up to 50% of the project costs. 4
## (d)(c) Ramsey County or Minnesota Department of Transportation Roadways: 5
The amount of special assessments collected on a Ramsey County or MnDOT 6
roadway projects will be equal to or less than the total City cost share of the 7
improvement. 8
(e)(d) All property accessing a private driveway that serves as a leg of an 9
intersection signal system shall be assessed 100% of the proportionate 10
share of the signal system cost. 11
7. Regional Improvement Projects: Projects that benefit more than just the 12
properties abutting the project may be assessed to all properties within the 13
Benefited Area. Regional Improvement Projects can include arterial roads, 14
bridges, collector roads, highway interchanges, intersections, or noise walls. 15
8. Traffic Management Program Projects: Assessments for Traffic Management 16
Program (TMP) projects shall be assessed to all properties within the Benefited 17
Area. The Benefited Area would be determined on a project- by- project basis as 18
a part of the Feasibility Report. See TMP for details. 19
## 9. Sanitary Sewer Projects: 20
(a) Properties currently connected to public sanitary sewer will not be 21
assessed for reconstruction or major maintenance projects. Except in the 22
case of subd. (d) below. 23
(b) New construction shall be assessed 100% of the project cost based on a 24
front footage basis for all zoning. 25
(c) Any sanitary sewer main in excess of 8 inches in diameter will normally 26
be considered oversized. When oversizing is done to increase the capacity 27
of the City’s system, the added cost for oversizing shall be subtracted from 28
the total cost of the improvement. The result of said subtraction will be 29
the cost to be assessed. 30
(d) New development property, or property which has altered its land use 31
within the past three years, shall be assessed at 100% of the city’s expense 32
for the improvement. 33
(e) Sewer services shall be assessed on a per service basis at 100% of the 34
city’s expense for such services. 35
## 10. Storm Sewer Projects: 36
(a) There shall be no assessments for storm sewer projects not associated with 37
roadway projects. Except in the case of petition or development projects. 38
11. Watermain Projects: 39
(a) Properties currently connected to public watermain will not be assessed 40
for reconstruction or major maintenance projects. Except in the case of 41
subd. (d) below. 42
(b) New construction shall be assessed 100% of the project cost based on a 43
front footage basis for all zoning. 44
Page 32 of 47
## Assessment Policy Summary Page 5 of 6
Adopted 12/10/12
## DRAFT FOR DISCUSSION August 18, 2026
(c) Any water mains in excess of 8 inches in diameter will normally be 1
considered oversized. When oversizing is done to increase the capacity of 2
the City’s system, the added cost for oversizing shall be subtracted from 3
the total cost of the improvement. 4
(d) New development property, or property which has altered its land use 5
within the past three years, shall be assessed at 100% of the city’s expense 6
for the improvement. 7
(e) Water services shall be assessed on a per service basis at 100% of the 8
city’s expense for such services. 9
## 12. Streetlight Installation Projects: 10
(a) Any assessable costs, as defined by the City’s Streelight Policy, shall be 11
assessed to the Benefited Area, as determined on a project-by-project basis 12
as a part of the Feasibility Report, in accordance with this Policy. See 13
TMPStreetlight Policy for details. 14
(a) Shall be assessed on a front footage basis and as follows: 15
(b) All properties within 150 feet (street frontage) of each light shall be 16
considered for assessment. 17
(c) City staff shall determine the number and locations of lights that could 18
have been installed under the “standard street light” section of the City’s 19
Street light policy. The installation and maintenance cost for these lights 20
will be deducted from the overall project cost. 21
(d) 100% of the additional costs for an “enhanced street light” project shall be 22
specially assessed. The additional costs for an “enhanced street light” 23
project shall include; cost of installation of enhanced streetlights, cost of 24
operation & maintenance (pro-rated for 25 years), administrative costs, 25
minus “standard street light” maintenance cost (if applicable) 26
(e) At the end of 25 years, the City will evaluate the maintenance 27
needs for the “enhanced street light” areas. A reconstruction 28
project will be considered where the new operation and 29
maintenance costs for the next 25 years will be proposed to be 30
assessed to the benefiting properties. 31
(f) In new development and redevelopments, the operation and 32
maintenance costs for an “enhanced street light” installation shall 33
be paid for by the property owners in the new development in 34
perpetuity. These costs shall either be paid for up front by the 35
developer or assessed to the property owners. The total cost shall 36
be the “enhanced street light” operation and maintenance cost 37
minus the City’s “standard street light” contribution. The City’s 38
basic contribution shall be determined based on the procedure 39
outlined in section IV. B. of the City Street Light policy. 40
## 1. Definitions MOVED TO START 41
(a) Assessable frontage: Property frontage on a segment of infrastructure 42
scheduled for improvement. If a parcel is a corner lot or has multiple 43
street frontages, the parcel frontage shall only be calculated for the side 44
abutting the infrastructure scheduled for improvements. 45
Page 33 of 47
## Assessment Policy Summary Page 6 of 6
Adopted 12/10/12
## DRAFT FOR DISCUSSION August 18, 2026
(b) Benefited Area: The properties expected to receive positive impacts from 1
the proposed public improvement and which are subject to assessment for 2
the cost of construction. The Benefited Area is determined on a project- 3
by- project basis. 4
(c) Enhanced Street Light: When the location, design, or spacing for 5
requested lights does not meet the “Standard Street Light” qualifying 6
conditions, property owners may request that the City undertake an 7
“Enhanced Street Lighting” project. 8
(d) Long side: On a corner lot or multiple frontage lot, the frontage of a 9
property that is longest. 10
(e) Private Driveway: A driveway or road that serves as a primary access for 11
one or more property owners that is not maintained by the City of 12
## Roseville, MnDOT or Ramsey County. 13
(f) Required Drainage: Drainage improvements necessary because of an 14
improvement project. This can be the result of meeting City, watershed or 15
wetland requirements. Includes rate control, water quality treatment, 16
infiltration, and wetland mitigation. 17
(g) Roadway Reconstruction Project: This type of project involves removing 18
and replacing the existing roadway bituminous, more than 50% of the 19
concrete curb, the base materials, and oftentimes performing utility work 20
(water, sewer, etc.) at the same time. 21
(h) Roadway Maintenance Project: Performing a Reclaim and Overlay, Mill 22
and Overlay, or sealcoating of city streets. 23
(i) Short side: On a corner lot or multiple frontage lot, the frontage of a 24
property that is shortest. 25
(j) Standard Street Light: street light installation that meets the location, 26
design and spacing of the City street light policy qualifying conditions 27
described in section IV. B. of the City Street Light policy. 28
(k)(b) Total Project Cost: Project costs include actual construction cost plus all 29
associated overhead costs. The total cost of the associated overhead for a 30
public improvement project would typically include city administration, 31
engineering, fiscal, legal, capital interest, right of way acquisition and 32
contingencies. 33
Page 34 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 4.d.
## ITEM DESCRIPTION: City Council Joint Meeting Review
## Background
The PWETC held a joint meeting with the City Council at the July 20 City Council meeting. There was
conversation between the Commission and City Council about upcoming topics that the Commission may
take up in the next calendar year.
The Commission and staff will review the topics and comments from the City Council and use that
discussion to guide the creation of a preliminary schedule of topics for the next calendar year.
## Recommendation
Review joint meeting with the City Council.
## Attachments
1. Request for Council Action (RCA) for the July 20 Joint Meeting
Page 35 of 47
## RE
## QUEST FOR COUNCIL ACTION
Date : July 20, 2026
## Item No.:
## Department Approval City Manager Approval
## Item Description: Public Works, Environment, and Transportation Commission Joint Meeting
with the City Council
Page 1 of 2
## BACKGROUND 1
Each year, the Public Works, Environment, and Transportation Commission meets with the City 2
Council to review activities and accomplishments, and to discuss the upcoming year’s work plan and 3
other potential issues to consider. The following are activities over the past year and issues the 4
Commission tentatively will have on future agendas in the next year. Additionally, the Commission 5
plans to share their thoughts on the value of being part of the commission and their experiences as 6
commission members. 7
Activities and accomplishments: 8
## •Engineering Intern Presentations9
## •City Campus Master Plan Update10
## •Joint Council Recap11
## •Municipal State-Aid Street (MSAS) Safety Plan12
## •Pathway Master Plan Update Discussion13
## •Consider Closure of Roseville Leaf Recycling Center14
## •Bike Plan Discussion15
## •City Campus Project – Appoint Committee Member16
## •City Code Update – Chapter 802.17 Obstructions17
## •Climate Equity Action Plan18
## •2026 Proposed Utility Rates19
## •2026 Public Works Work Plan20
## •Pathway Master Plan Segments21
## •Keya Park/Pascal Layout Recommendations22
## •Noise Ordinance Recommendations23
•Snow & Ice Control Policy for Streets and Parking Lots Recommendations24
## •Maintenance Operations Center Update25
## •Climate Equity Action Plan Update26
## •2026 Sustainability Update27
## •Maintenance Operations Center Update28
## •Civic Campus Project Update29
## •Pathway Master Plan30
## •Approve Bike Plan31
## •Pathway Master Plan - Continued Segment Review32
•WM Recycling Update 2026-202733
Attachment 1
Page 36 of 47
Page 2 of 2
## • Cart Rollout Update 34
• 2025 MS4 Annual Meeting 35
## • Leaf Site Future 36
## • Climate Equity Action Plan 37
• Prep for Joint Council meeting 38
Work Plan items for the upcoming year: 39
o Pavement management and future funding 40
## o Pathway Master Plan Updates 41
o Assessment Policy 42
Questions or Concerns for the City Council: This year, Chair Ficek worked with the commission 43
members to summarize their activities over the last year and asked each commissioner two 44
questions: 45
1. What you felt most connected to or appreciated with being on the Commission, and 46
2. Are there any areas you would like feedback on from the Council, or are there specific issues you 47
would like them to address? 48
The commission would like the council's feedback on which of the following topics to pursue 49
further: 50
1. Organized Collection 51
2. Speed Limits 52
## POLICY OBJECTIVES 53
Per City Code 201.07.B - At least once a year, each Commission shall meet with the City Council to 54
report on the previous year’s work and to discuss work plans and pending issues for the upcoming 55
year. 56
## EQUITY IMPACT SUMMARY 57
There are no equity impacts associated with this joint meeting. 58
## BUDGET IMPLICATIONS 59
There are no budget impacts. 60
## STAFF RECOMMENDATION 61
Staff recommends the City Council hold the joint meeting and provide feedback. 62
## REQUESTED COUNCIL ACTION 63
Hold joint meeting and provide feedback. 64
## Prepared by: Jesse Freihammer, Public Works Director
## Attachments: None
Page 37 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 5.a.
## ITEM DESCRIPTION: Commission Direction on Member Initiated Agenda Items
## Background
## Suggested Items:
• September 22
## o AARP Active Living Certification
## o Lighting Policy Recommendation
## o Assessment Policy Recommendation
o
• October 27
## o Utility Rates
## o Pathway Master Plan
o
• November 24
## o 2027 Public Works Work Plan
## Looking Ahead:
• Future
## o MnDOT Safe Systems Approach
## o Speed Limits
## o Organized Collection
## o Pavement Funding
## Recommendation
Approve future agenda.
## Attachments
## None
Page 38 of 47
## Roseville Public Works, Environment and Transportation Commission
## Agenda Item
DATE: August 25, 2026 ITEM: 6.a.
## ITEM DESCRIPTION: Approve July Minutes
## Background
Attached are the minutes from the July 28, 2026 meeting.
## Recommendation
Motion approving the minutes of July 28, 2026, subject to any necessary corrections or revision.
## Attachments
## 1. Draft July Minutes
Page 39 of 47
## Page
1 of 8
## Roseville Public Works, Environment
## and Transportation Commission
## Meeting Minutes
Tuesday, July 28, 2026, at 6:30 p.m.
## City Council Chambers, 2660 Civic Center Drive
## Roseville, Minnesota 55113
1.
## Introduction / Roll Call 1
Vice Chair Hodder called the meeting to order at approximately 6:30 p.m. and at 2
his request, Assistant Public Works Director/City Engineer Jennifer Lowry called 3
the roll. 4
5
Present: Chair Bryant Ficek, Vice Chair Edwin Hodder, and Members 6
Daniel Fergus, Allison Luongo, Luke Sandstrom, and Charles 7
Tedder 8
9
## Youth Commissioners: 10
11
## Absent: Member Katie Brokaw Palalay and Alexis Jendro (Excused) 12
13
## Staff Present: Assistant Public Works Director/City Engineer Jennifer Lowry 14
15
2.Approve Agenda16
17
## Motion18
Member Luongo moved, Member Fergus seconded, approval of the July 28,19
2026 Agenda as presented.20
21
Ayes: 622
Nays: 023
Motion carried.24
25
3.Public Comments26
No one wished to address the commission.27
28
Vice Chair Hodder did inquire about a recent news report describing cyberattacks29
that had affected several municipal water systems throughout the region. He asked30
whether Roseville had been impacted or whether staff had received any information31
regarding the incident.32
33
Attachment 1
Page 40 of 47
Page 2 of 8
Ms. Lowry responded that they had not heard of any impacts involving Roseville 34
but would follow up with neighboring agencies, including St. Paul, to determine 35
whether any local systems had been involved. 36
37
4. Business Items 38
a. Communication Items 39
Assistant Public Works Director/City Engineer Lowry provided a brief review 40
and update on projects and maintenance activities listed in the staff report 41
dated July 23, 2026. 42
43
Chair Ficek asked how residents receive notification when emergency water 44
main repairs or roadway work temporarily affect neighborhoods. 45
46
Ms. Lowry explained that construction projects require contractors to post 47
advance-notice signs about seven days before work and notify residents of 48
access restrictions. Emergency repairs usually involve direct notification to 49
impacted households due to brief water service interruptions. The City also 50
distributes notifications to emergency responders, law enforcement, the 51
Postal Service, school transportation, and other agencies via an established 52
email system. 53
54
b. Streetlight Policy 55
Assistant Public Works Director/City Engineer Lowry provided a brief 56
presentation of the streetlight policy and some questions staff sought direction 57
on regarding the implementation of, or potential changes to, the existing 58
## Streetlight Policy. 59
60
Member Tedder asked whether all three proposed lighting options satisfied 61
current dark-sky requirements. 62
63
Ms. Lowry responded that all of the proposed fixtures utilized LED 64
technology with cutoff lighting to reduce light spillover. However, she 65
indicated staff was still confirming whether every fixture met formal 66
DarkSky certification requirements. She added that lighting could also be 67
adjusted to better shield neighboring properties regardless of the certification 68
status of an individual fixture. 69
70
## Public Hearing
71
72
Vice Chair Hodder opened the public hearing and asked anyone wishing to 73
speak to come forward, state their name and address for the record, and limit 74
comments to approximately three minutes. 75
76
Ms. Jean Peterson, 600 Terrace Court, representing one of the Owasso Hills 77
homeowners associations, addressed the commission and explained that her 78
association had already submitted a petition about the decorative streetlights. 79
Page 41 of 47
Page 3 of 8
She asked whether residents who signed the petition would remain 80
committed if the City's final proposal differed significantly from what 81
homeowners had originally anticipated. 82
83
Ms. Peterson stated that she believed homeowners requesting enhanced 84
decorative lighting should expect to pay the additional cost of those 85
improvements. Still, she wanted residents to understand their obligations 86
before the process moved forward fully. 87
88
Mr. Todd Larson, 2920 Hillsview East, questioned the staff's estimated 89
replacement costs. He encouraged the city to investigate whether competitive 90
bidding or requests for proposals could reduce project costs rather than 91
relying solely on Xcel Energy's estimates. He also asked whether the existing 92
decorative fixtures could be refurbished rather than completely replaced, 93
noting that many appeared structurally sound. Based on the preliminary 94
estimates, he calculated that replacement costs approached $10,000 per 95
fixture and believed additional analysis was warranted before making a final 96
decision. 97
98
Ms. Alici a House, 542 Owasso Hills Drive, explained that Owasso Hills 99
residents were not requesting additional streetlights or a higher level of 100
service. Rather, they hoped to preserve a defining neighborhood feature that 101
had existed since the subdivision's development. She stated that many 102
homeowners believed the original installation costs had already been paid 103
under the developer's agreement and questioned whether residents should 104
again be assessed to replace the same lighting system twenty-five years later. 105
106
Ms. House also encouraged the City to partner with Xcel Energy to identify 107
longer-term replacement strategies that would reduce future costs, preserve 108
the neighborhood's appearance, and protect property values. 109
110
Mr. Christer Cedarberg, 534 Owasso Hills Drive, an original homeowner in 111
the development, explained that decorative streetlighting was one of the 112
features that attracted him to the neighborhood. After reviewing the 113
homeowners association governing documents, he found detailed provisions 114
on landscaping and common areas but no language assigning long-term 115
responsibility for replacing the decorative lighting after the Xcel Energy 116
lease expired. He suggested that the City replace the existing system without 117
assessing current homeowners and then ensure that future development 118
agreements clearly identify maintenance and replacement responsibilities so 119
future property owners fully understand those obligations. 120
121
Mr. David Trapp, 2990 Highcourte, explained that the neighborhood is 122
divided among multiple homeowners associations and noted that only three 123
streetlights in his area would be replaced. He emphasized the importance of 124
maintaining both the neighborhood's appearance and public safety. Mr. Trapp 125
Page 42 of 47
Page 4 of 8
expressed concern that if some HOAs selected enhanced lighting. In contrast, 126
others chose standard lighting, it could create an inconsistent appearance 127
across the community and raise questions about how associated costs would 128
be distributed. He encouraged the HOAs to work together to reach a 129
coordinated decision. 130
131
Vice Chair Hodder closed the public hearing and returned the matter to the 132
commission for further discussion and consideration. 133
134
The commission generally agreed that the Owasso Hills project highlighted 135
an issue that had not been fully contemplated when the City's updated 136
Streetlight Policy was adopted. The discussion focused on balancing 137
neighborhood expectations, public safety, long-term maintenance 138
responsibilities, and equitable treatment of taxpayers throughout the city. 139
140
Member Tedder asked whether the petition requirement and the assessment 141
process should be treated as two separate policy decisions. 142
143
Ms. Lowry said the commission could recommend letting an existing 144
enhanced neighborhood keep decorative lighting and decide whether 145
homeowners should pay for the extra cost through assessments. She 146
explained staff presented those issues separately because multiple policy 147
options were still available. 148
149
Member Fergus asked whether the estimated homeowner assessment 150
represented a recurring expense or a one-time obligation. 151
152
Ms. Lowry said the assessment was a one-time fee for the twenty-five-year 153
lease, not annual. She noted the City might revisit this at the next lease 154
expiration unless a new long-term policy is adopted. She also said that since 155
Owasso Hills has four homeowners associations, each could independently 156
decide on enhanced lighting. 157
158
Member Luongo questioned how the original enhanced lighting districts had 159
been established and why existing development documents did not address 160
long-term replacement responsibilities. 161
162
Ms. Lowry said staff reviewed development records and found no 163
responsibility clauses after the Xcel Energy lease ended. She noted future 164
projects will likely include detailed agreements, as City policies on public 165
infrastructure are now clearer than during the original subdivision. 166
167
The commission also discussed maintenance responsibilities associated with 168
decorative lighting. 169
170
Page 43 of 47
Page 5 of 8
Ms. Lowry explained that replacing the Owasso Hills system via a new Xcel 171
Energy lease would grant twenty-five years of maintenance from Xcel 172
Energy. Conversely, decorative systems owned by the City require Public 173
Works staff to find replacement fixtures and coordinate repairs themselves, 174
which becomes harder as fixtures become obsolete. She noted that obtaining 175
replacement parts is often a challenge as lighting technology advances. 176
177
The commission reviewed the City's assessment policy and the concept of 178
"special benefit." 179
180
Ms. Lowry explained assessments are linked to the property, not the 181
homeowner, and Roseville provides deferral programs for qualifying owners, 182
including seniors, veterans, and disabled residents, allowing deferred 183
payments until sale or transfer. 184
185
The commission next considered whether enhanced lighting districts should 186
be subject to maximum spacing requirements similar to those applied under 187
the City's standard streetlight policy. 188
189
Member Tedder observed that the standard policy generally evaluates 190
whether mid-block lighting is warranted when spacing between intersections 191
exceeds approximately 600 feet. 192
193
Ms. Lowry explained that no comparable spacing standards currently exist 194
for enhanced lighting districts and that staff was seeking guidance on whether 195
such standards should be incorporated into future policy revisions. 196
197
Several commissioners expressed concern that eliminating assessments for 198
decorative lighting could establish a precedent encouraging similar requests 199
throughout Roseville. Members observed that decorative lighting provides 200
aesthetic benefits that many neighborhoods might desire if the City absorbed 201
the additional costs entirely. 202
203
Ms. Lowry acknowledged the possibility but noted neighborhood preferences 204
differ. Some residents want more lighting for safety, others prefer darker 205
streets. She said the City's policy should balance neighborhood preferences 206
with citywide equity and fiscal responsibility. 207
208
The commission generally recognized that Owasso Hills represented a 209
unique situation because decorative lighting had been an established feature 210
of the neighborhood since its original development. Members distinguished 211
between preserving an existing neighborhood characteristic and creating 212
entirely new enhanced lighting districts. The commission indicated that 213
future policy revisions should recognize that distinction while remaining 214
flexible enough to provide consistent guidance for similar situations that may 215
arise in the future. 216
Page 44 of 47
Page 6 of 8
217
The commission generally recommended that the revised policy clearly defines 218
when streetlight improvements would be considered a citywide public benefit 219
and when the associated costs would be assigned to benefiting property owners 220
through an assessment. 221
222
The commission also encouraged staff to develop a more consistent and 223
transparent process for evaluating requests for enhanced lighting, including 224
consideration of safety, neighborhood character, lighting uniformity, 225
maintenance responsibilities, and long-term replacement costs. 226
227
The commission further recommended that staff review how costs would be 228
allocated when a lighting project affected multiple neighborhoods, homeowner 229
associations, or property types, particularly when those groups did not agree on 230
the preferred lighting style or level of improvement. 231
232
The commission emphasized the importance of avoiding inconsistent lighting 233
designs within the same general area and encouraged coordination among 234
affected homeowner associations before a project moved forward. They also 235
recommended that residents receive clear information regarding available 236
lighting options, estimated costs, assessment procedures, and the potential 237
consequences if portions of a neighborhood selected different lighting 238
standards. 239
240
Ms. Lowry indicated that the commission’s comments would be used to refine 241
the proposed Streetlight Policy revisions. Staff would also coordinate the policy 242
changes with the City’s broader assessment policy review to ensure that the two 243
policies used consistent standards for determining public benefit, private 244
benefit, eligibility, and cost responsibility. Updated policy language and 245
recommendations would be returned to the commission for additional review 246
before the matter was presented to the City Council for formal consideration 247
and possible adoption. 248
249
c. Intern Presentations 250
This item was postponed to a future meeting. 251
252
## d. City Council Joint Meeting Review 253
This item was postponed to a future meeting. 254
255
## e. Pathway Master Plan Segment Review 256
This item was postponed to a future meeting. 257
258
## f. Future Agenda Items 259
Ms. Lowry reviewed the commission's upcoming work plan and future agenda 260
items. She explained that staff intended to return in August with a Metro 261
Transit update, including information on the Roseville Transit Center, Metro's 262
Page 45 of 47
Page 7 of 8
microtransit program, the City's assessment policy (covering alleys, 263
streetlights, traffic signals), and a summary of Streetlight Policy discussions. 264
The City's sustainability intern was also scheduled to present on summer 265
projects. 266
267
Ms. Lowry stated that work on the Pathway Master Plan would stay flexible, 268
allowing staff to postpone it if other policy issues needed attention, without 269
affecting other projects. 270
271
The commission also agreed that the work from the recent Joint City Council 272
meeting required more time, as councilmembers had listed many topics for 273
future review. 274
275
Vice Chair Hodder suggested organizing the Joint City Council follow-up into 276
a more structured work plan before bringing the topics back to the 277
commission. 278
279
The commission agreed that presenting the topics in a "yes or no" format 280
would help streamline future discussions and assist the commission in 281
establishing priorities for the coming year. 282
283
The commission expressed consensus with staff's proposed work plan and 284
agreed to continue refining priorities as additional projects progressed. 285
286
## 5. Commission Direction on Member-Initiated Agenda Items 287
288
6. Approval of May 19, 2026, and June 23, 2026, Meeting Minutes 289
Comments and corrections to draft minutes had been submitted by PWETC 290
commissioners prior to tonight’s meeting, and those revisions were incorporated 291
into the draft presented in meeting materials. 292
293
Motion 294
Member Ficek moved, Member Sandstrom seconded, approval of the May 19, 295
2026, meeting minutes as presented. 296
297
Ayes: 6 298
Nays: 0 299
Motion carried. 300
301
Motion 302
Member Tedder moved, Member Fergus seconded, approval of the June 23, 303
2026, meeting minutes as presented. 304
305
Ayes: 5 306
Nays: 0 307
Abstain: 1 (Luongo) 308
Page 46 of 47
Page 8 of 8
Motion carried. 309
310
311
312
7. Adjourn 313
314
Motion 315
Member Tedder moved, Member Luongo seconded, adjournment of the 316
meeting at approximately 8:43 p.m. 317
318
Ayes: 6 319
Nays: 0 320
Motion carried. 321
Page 47 of 47