Agenda Text
## Planning Commission Agenda
Wednesday, August 5, 2026
## 6:30 PM
## City Council Chambers
In accordance with Minnesota Statutes §13D.02 and City policy, Council and Commission members may
attend meetings remotely up to three times per calendar year.
(Times listed are approximate – please note that items may be earlier or later than listed on the agenda)
1. Call to Order
## 2. Roll Call
3. Approval of Agenda
## 4. Public Comment
## 5. Approval of Meeting Minutes
a. Review of July 1, 2026 Minutes
6. Communications and Recognitions
## 7. Public Hearing
8. Business
## 9. Commission Direction on Member Initiated Agenda Items
a. Evaluate Roseville's EVCS and EVSE (electric vehicle charging) requirements for new parking
areas — Commissioner Cyra
10. Adjourn
Page 1 of 12
## REQUEST FOR COMMISSION ACTION
Date: 8/5/2026
Item No.: 5.a.
## Department Approval Agenda Section
## Approval of Meeting Minutes
## Item Description: Review of July 1, 2026 Minutes
Page 1 of 1
1
2Application Information
3n/a
4
5Background
6n/a
7
8Staff Recommendation
9n/a
10
## 11Requested Planning Commission Action
12Review the July 1, 2026 minutes and make a motion to approve subject to requested corrections.
13
14Alternative Actions
15n/a
16
Prepared by:
## Attachments:
1. July 1, 2026 Minutes
17
Page 2 of 12
## Planning Commission Regular Meeting
## City Council Chambers, 2660 Civic Center Drive
Draft Minutes – Wednesday, July 1, 2026 – 6:30 p.m.
1. Call to Order
1
Chair Bjorum called to order the regular meeting of the Planning Commission meeting at 2
approximately 6:30 p.m. and reviewed the role and purpose of the Planning Commission. 3
4
2. Roll Call 5
At the request of Chair Bjorum, City Planner Thomas Paschke called the Roll. 6
7
Members Present: Chair Erik Bjorum and Commissioners Steve Cyra, Allison 8
## Campbell Jensen, Rose Lindsay, Erin Lynch, and Ben Schaefer 9
10
## Members Absent: Vice-Chair Pamela Aspnes 11
12
## Staff Present: City Planner Thomas Paschke, Community Development Director 13
## Janice Gundlach, and Sustainability Specialist Noel Bakken 14
15
3. Approve Agenda 16
17
## MOTION 18
Member Lindsay moved, seconded by Member Campbell Jensen, to approve the 19
agenda as presented. 20
21
Ayes: 6 22
Nays: 0 23
Motion carried. 24
25
4. Public Comment 26
27
5. Review of Minutes 28
29
## a. May 6, 2026, Planning Commission Regular Meeting 30
31
## MOTION 32
Member Schaefer moved, seconded by Member Cyra, to approve the May 6, 33
2026, meeting minutes. 34
35
Ayes: 6 36
Nays: 0 37
Motion carried. 38
39
6. Communications and Recognitions: 40
41
Page 3 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 2
7. Public Hearing 42
43
8. Business 44
45
## 9. Commission Direction on Commission Member Initiated Agenda Items 46
47
a. Evaluate Roseville’s EVCS and EVSE (Electric Vehicle Charging) Requirements 48
## for New Parking Areas – Commissioner Cyra 49
50
Sustainability Specialist Noel Bakken presented an overview of Roseville's existing 51
electric vehicle charging ordinance and explained why staff believed it was an 52
appropriate time to evaluate whether revisions were warranted. 53
54
Ms. Bakken reviewed the ordinance's history, explaining that it was developed during the 55
City's Phase Two Zoning Code Update process. While the first phase of the zoning update 56
focused primarily on implementing the City's 2040 Comprehensive Plan, the second 57
phase included sustainability initiatives identified by the Planning Commission and City 58
Council. Because transportation is a significant contributor to greenhouse gas emissions, 59
staff determined that encouraging electric vehicle infrastructure aligned with the City's 60
long-term sustainability objectives. 61
62
City Planner Thomas Paschke evaluated ordinances adopted by comparable Minnesota 63
communities, including St. Louis Park, Minneapolis, Edina, and guidance prepared by the 64
Great Plains Institute. Based on that research, Roseville adopted its ordinance in 2023 65
requiring electric vehicle charging infrastructure in larger parking lots associated with 66
new development and major redevelopment projects. 67
68
Ms. Bakken summarized the City's current requirements. Parking lots containing fewer 69
than 30 spaces are exempt from the ordinance. Larger commercial developments are 70
generally required to provide electric vehicle charging stations equal to approximately 71
5% of the parking supply. In contrast, multifamily residential developments have separate 72
requirements that emphasize Level 1 charging for overnight use. Residential charging 73
requirements recognize that residents typically leave vehicles parked for extended 74
periods, making slower, more practical charging necessary. In contrast, commercial 75
developments require Level 2 charging to serve customers and employees during shorter 76
visits. 77
78
Ms. Bakken explained that since the ordinance became effective, only two developments 79
have been subject to charging requirements. Both developments ultimately requested and 80
received variances, reducing the number of charging stations required. Those variance 81
requests prompted staff to revisit the ordinance to determine whether adjustments may be 82
appropriate before additional projects move forward. 83
84
Ms. Bakken then reviewed anticipated changes to the Minnesota State Building Code. 85
The proposed code will establish statewide minimum electric vehicle charging 86
requirements for new developments. Unlike Roseville's ordinance, the proposed state 87
standards distinguish among installed charging stations, EV-ready spaces with conduit 88
Page 4 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 3
and wiring already in place, and EV-capable spaces that reserve future electrical capacity 89
for charging equipment. 90
91
Ms. Bakken acknowledged that the proposed state terminology has generated questions 92
throughout Minnesota, including among electrical inspectors and municipal staff. She 93
explained that staff contacted state building officials directly to obtain clarification 94
regarding the new definitions and confirmed that the proposed requirements remain under 95
consideration. 96
97
Mr. Paschke also compared Roseville's ordinance with those of Minneapolis, St. Louis 98
Park, and Edina. While Roseville's commercial requirements are generally consistent 99
with those of comparable communities, the City's residential requirements exceed those 100
of the State Building Code. Because state law prohibits municipalities from enforcing 101
building standards more restrictive than the State Building Code, Roseville will 102
eventually need to revise or repeal portions of its ordinance once the state requirements 103
take effect. 104
105
Ms. Bakken presented several possible options for commission consideration. Staff could 106
continue researching the issue, prepare an ordinance amendment to reduce the 107
commercial charging requirement for employment-based developments from 5% to 3%, 108
or wait until the State Building Code is finalized before recommending revisions. 109
110
Ms. Bakken concluded by noting that transportation currently accounts for approximately 111
48 percent of Roseville's greenhouse gas emissions. The City's Climate Equity Action 112
Plan establishes a goal of reducing transportation emissions by 57 percent by 2036 while 113
increasing electric vehicle ownership from approximately 1.6 percent of all registered 114
vehicles to 15 percent. She emphasized that, regardless of any modifications that may 115
eventually be made to the ordinance, encouraging electric vehicle charging infrastructure 116
continues to support the City's adopted sustainability goals. 117
118
Commissioner Campbell Jensen thanked staff for the extensive research and commented 119
that the presentation provided valuable background regarding both the City's existing 120
ordinance and anticipated state requirements. She asked staff to clarify the distinction 121
between employment-based developments and traditional commercial developments to 122
better understand how the proposed three percent requirement would be applied. 123
124
Ms. Bakken explained that the discussion primarily involved office and employment 125
campuses where parking facilities are used almost exclusively by employees throughout 126
the workday. Those developments differ significantly from retail centers where customers 127
arrive and depart throughout the day, creating much different charging patterns and 128
infrastructure needs. She explained that the proposal was intended to recognize those 129
operational differences while still encouraging electric vehicle charging. 130
131
Commissioner Lynch asked about the anticipated timeline for implementation of the new 132
State Building Code and whether Roseville needed to act immediately. 133
134
Page 5 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 4
Community Development Director Janice Gundlach explained that the revised building 135
code is expected to take effect sometime in 2027. As with other building code revisions, 136
the state typically provides an educational period before strict enforcement begins. She 137
reminded the commission that municipalities cannot maintain standards that are more 138
restrictive than the State Building Code. Once the new requirements become effective, 139
Roseville will be required to amend or repeal portions of its ordinance to remain 140
consistent with state law. 141
142
Ms. Bakken added that some Minnesota communities are evaluating alternative 143
approaches that rely on development incentives rather than mandatory requirements. 144
Under those programs, developers could receive flexibility in areas such as setbacks or 145
building height in exchange for voluntarily providing additional sustainability 146
improvements, including electric vehicle charging infrastructure or solar energy systems. 147
148
Commissioner Lindsay questioned whether reducing Roseville's commercial charging 149
requirement from five percent to three percent would have prevented either of the two 150
recent variance requests. 151
152
Ms. Bakken explained that both developments would likely have continued seeking 153
variances because each request involved unique circumstances, rather than simply 154
objecting to the required percentage. One development proposed installing fewer 155
charging stations but providing faster Level 3 chargers that would better serve public 156
users. Another employment-based development demonstrated that projected employee 157
demand did not justify the number of charging stations required under the ordinance. 158
159
Ms. Gundlach further explained that the Dick's Sporting Goods variance involved a retail 160
development, meaning the proposed three percent reduction for employment 161
developments would not have applied. She emphasized that the two variance requests 162
were fundamentally different and were evaluated independently based on their individual 163
circumstances. 164
165
The commission discussed whether reducing the required percentage would eliminate 166
future variance requests or merely reduce their magnitude. Several commissioners 167
observed that developers would likely continue to request variances whenever they 168
believed site-specific conditions justified a different approach. 169
170
Commissioner Lindsay questioned whether creating a separate employment-based 171
classification could unnecessarily complicate the ordinance by introducing additional 172
definitions that might be difficult to administer consistently. 173
174
Ms. Bakken acknowledged that clearer terminology would likely be necessary if the 175
commission chose to pursue that option. 176
177
Ms. Gundlach agreed, explaining that Roseville's Comprehensive Plan already 178
distinguishes employment districts from traditional commercial districts. If the 179
commission wished to proceed, staff could develop language that more accurately 180
reflected those distinctions rather than relying on the phrase "private commercial." 181
Page 6 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 5
The discussion then shifted toward the variance process itself. 182
183
Ms. Gundlach explained that applicants requesting variances must demonstrate practical 184
difficulties associated with complying with the ordinance. Simply preferring fewer 185
charging stations is not sufficient. Applicants are expected to provide evidence supporting 186
their request, including parking demand studies, operational data, or other documentation 187
demonstrating why the ordinance creates unique hardships for a particular development. 188
189
The commission agreed that this process encourages thoughtful discussion regarding each 190
project's actual charging needs rather than relying solely on numerical requirements. 191
They also discussed how quickly an ordinance amendment could be completed if 192
modifications were desired. 193
194
Ms. Gundlach explained that staff could prepare a zoning text amendment relatively 195
quickly. Following a public hearing before the Planning Commission, the amendment 196
would proceed to the City Council before becoming effective after publication. She 197
estimated that revisions could become effective as early as September if directed by the 198
commission. She also advised the commission that several employment-based 199
developments are currently undergoing review. At least one project may seek a variance 200
if the current five percent requirement remains unchanged. 201
202
Commissioner Campbell Jensen commented that reducing the requirement to 3% could 203
provide a reasonable bridge until the State Building Code becomes effective, while also 204
creating greater consistency for projects currently under review. 205
206
Some of the commissioners began considering whether modifying the ordinance's 207
existing cost exception might provide a more effective solution. 208
209
Ms. Gundlach reminded the commission that the ordinance currently includes an 210
exception that allows flexibility when compliance costs exceed 5% of the total project 211
cost. She explained that recent variance requests have shown that the greatest expense 212
often lies in electrical infrastructure rather than the charging stations themselves. 213
214
Ms. Bakken agreed, explaining that the charging equipment itself represents only a small 215
portion of the total installation cost. The necessary electrical infrastructure, transformers, 216
switches, and utility improvements often account for the majority of project expenses. 217
218
Several commissioners indicated they preferred exploring modifications to the existing 219
cost exception rather than lowering the required percentage of charging stations. 220
221
Commissioner Campbell Jensen observed that modifying the cost exception could 222
maintain the City's commitment to sustainability while recognizing that infrastructure 223
costs vary significantly between developments. 224
225
Commissioner Lindsay agreed that refining the exception would avoid creating additional 226
classifications while preserving flexibility for projects experiencing unusually high 227
installation costs. 228
Page 7 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 6
229
Ms. Bakken cautioned against selecting a new cost threshold without first consulting 230
developers, architects, and other industry professionals. 231
232
Mr. Paschke indicated that staff would prefer to gather additional information before 233
recommending any revisions to the existing exception. 234
235
The commission also discussed whether infrastructure costs vary depending on the 236
availability of electrical service throughout the city. 237
238
Ms. Gundlach explained that Roseville's commercial districts generally have sufficient 239
electrical capacity because the community is fully developed. However, the cost of 240
delivering additional electrical service to individual developments can vary considerably 241
depending on the equipment required and site-specific conditions. 242
243
As the discussion continued, commissioners reflected on the ordinance's overall purpose 244
rather than focusing solely on numerical requirements. 245
246
## Commissioner Campbell Jensen emphasized that Roseville's Comprehensive Plan 247
encourages long-term sustainability and that electric vehicle charging infrastructure will 248
become increasingly important as vehicle technology continues to evolve. She 249
commented that charging infrastructure should be viewed similarly to other essential 250
building systems that require long-term investment. 251
252
Ms. Bakken agreed, explaining that although federal tax incentives have been reduced, 253
staff expect electric vehicle ownership to continue increasing as used electric vehicles 254
become more widely available and affordable. She believes the long-term demand for 255
charging infrastructure will continue growing regardless of short-term market 256
fluctuations. 257
258
Several commissioners observed that the previous variance requests had already 259
prompted constructive discussions and, in some instances, led to improved charging 260
infrastructure. Rather than simply reducing requirements, the variance process 261
encouraged developers to justify their requests while allowing the commission to 262
evaluate the merits of each proposal individually. 263
264
Ms. Gundlach suggested that staff further evaluate modifications to the ordinance's cost 265
exception rather than immediately reducing the required percentage of charging stations. 266
Staff also intends to consult with developers, architects, and other municipalities to 267
determine whether alternative exception language may better address unusually high 268
infrastructure costs while preserving the City's sustainability goals. 269
270
The commission expressed general agreement with that approach. Rather than pursuing 271
an immediate ordinance amendment to reduce charging requirements, the commission 272
reached consensus directing staff to continue researching potential revisions to the cost-273
based exception and to return with additional recommendations at a future meeting. 274
275
Page 8 of 12
## Regular Planning Commission Meeting
Minutes – Wednesday, July 1, 2026
Page 7
10. Adjourn 276
277
## MOTION 278
Member Lynch, seconded by Member Cyra, to adjourn the meeting at 7:36 p.m. 279
280
Ayes: 6 281
Nays: 0 282
Motion carried. 283
284
285
Page 9 of 12
## REQUEST FOR COMMISSION ACTION
Date: 8/5/2026
Item No.: 9.a.
## Department Approval Agenda Section
## Commission Direction on Member
## Initiated Agenda Items
Item Description: Evaluate Roseville's EVCS and EVSE (electric vehicle charging) requirements
for new parking areas — Commissioner Cyra
Page 1 of 2
1
2Application Information
3Not applicable. This is a city-initiated request.
4
5Background
6The City of Roseville adopted an ordinance requiring electric vehicle charging on March 20, 2023 as part
7of the phase 2 zoning code update. This project was aided by consulting services with HKGi.
8
9Since adoption, two developments sought and received variances to reduce the requirements of the
10ordinance.
11
12Commissioner Cyra brought this item forward for discussion during the May 6, 2026 Planning
13Commission meeting, with a majority of commissioners voting to evaluate the ordinance to determine if
14changes were necessary. At the July 1, 2026 Planning Commission meeting, city staff followed up with
15initial research requested by commissioners. This included information on the general use of electric
16vehicles, relevant goals from Roseville's recently adopted Climate Equity Action Plan, a review of other
17City ordinances, and forthcoming Department of Labor and Industry requirements.
18
19After discussion, the Commission determined that Roseville's requirements, specifically pertaining to
20private commercial developments, were not greatly out of line in comparison to other cities or the
21requirements the Department of Labor and Industry intends to impose with the upcoming Building Code
22update. The commission further questioned whether amending Roseville's regulations was worth the
23effort given the Department of Labor and Industry's requirements, once adopted, will supersede
24Roseville's. However, there was concern the variance process may not be the most viable interim
25solution, as a year or more could pass before the new Building Code is enacted and enforced. So as
26not to expend considerable effort on further research and amendment of the current charging
27requirements, staff suggested amending the current language that provides for an exemption. There
28was consensus amongst the commission that this was a viable option and directed staff to bring forward
29language for consideration.
30
31Given the commission discussion surrounding exemptions, and feedback from one of the variance
32recipients, staff is suggesting broadening the exemption language to include a second condition
33regarding electrical capacity. Additionally, staff would suggest lowering the existing project cost
34exemption. Because staff is not an expert in commercial project costs or electrical capacity, we reached
35out to three different developers/contractors who are currently working on projects in the City for
36feedback on these two exemption options. As of the writing of this report, we had not gotten their
37feedback, although we are expecting responses from at least two of the three. In an effort to continue
38moving forward, staff drafted amended exemption language to compare against the existing ordinance
39(see Attachment 1), but left out the details we await feedback on.
40
Page 10 of 12
Page 2 of 2
41Regarding the proposed exemption language in Attachment 1, staff offers the following additional
42information:
43• While most of the concern centered on electric vehicle charging requirements for private
44commercial developments, the proposed language does not make any distinction on use. After
45some thought, staff isn't entirely certain this is necessary as the existing exemption language did
46not factor in the use. Additionally, staff suspects a project requiring at least 30 parking stalls
47(triggering electric vehicle charging), and which is a use serving the public, would likely not meet
48the project cost or electrical capacity exemption anyway. The one variance granted that served
49the public (Dick's Sporting Goods) was an anomaly and one the City was backed into given
50Rosedale made commitments to Dick's before the City's ordinance was enacted and they felt
51blindsided by the added cost so late in their negotiation.
52• The exemption language already gives staff the ability to approve a reduction when the project
53does not otherwise require City Council approval. However, staff feels additional language was
54needed that would require supporting documentation to help determine the level of
55reduction. As drafted, this could be used for either administrative approval or a City Council
56approval if one is necessary.
57• The exemption language proposed explicitly states a project can not be completely absolved of
58electric vehicle charging.
59
60At this time, staff is requesting the commission review the conceptual draft exemption language provided
61in Attachment 1 and offer feedback. Once developer/contractor feedback is received, staff will
62incorporate that, along with any commission feedback, into a formal ordinance for consideration at an
63upcoming meeting.
64
65Staff Recommendation
66Review the information contained herein and offer feedback.
67
## 68Requested Planning Commission Action
69Review the information contained herein and offer feedback.
70
71Alternative Actions
72Since this is a City-initiated item, no action is required.
73
Prepared by:
## Janice Gundlach, Community Development Director
## Attachments:
## 1. Draft Ordinance Language
74
Page 11 of 12
## ATTACHMENT 1
1Section 1013.04. – Minimum parking spaces and electric vehicle charging requirements.
## 2(d) Electric Vehicle Charging Standards
3
## 4EXISTING
5(3) Reductions to EVSE and EVCS requirements. When the cost of meeting the requirements
6of this section would exceed five percent of the total project cost, the property owner or
7applicant may request a reduction in the requirements and submit cost estimates for city
8consideration. When City Council approval of the project is not required, the Community
9Development Department may administratively approve a reduction to the requirements
10in order to limit the installation costs to not more than five percent of the total project
11cost.
12
## 13PROPOSED
14(3) Reductions to EVSE and EVCS requirements. Reductions to EVSE and/or EVCS
15requirements may be granted when at least one of the following is met:
16a. When the cost of meeting the requirements of this section would exceed
17(something less than five) percent of the total project cost.
18b. When the amount of electrical capacity needed to meet the requirements of this
19section would exceed ___ of the total amount of electrical capacity needed for the
20project.
21To request a reduction in the EVSE and/or EVCS requirements, the property owner or project
22applicant shall submit evidence to the City confirming eligibility under this section. When
23City Council approval of the project is not required, the Community Development
24Department may administratively approve the reduction to EVSE and/or EVCS requirements
25when eligible under this section. Supporting documentation to determine the level of
26reduction may be required, but under no circumstance shall reductions approved by the City
27Council or Community Development Department result in complete elimination of EVSE
28and/or EVCS parking spaces and/or equipment for projects that would otherwise be subject
29to the requirements in Section 1013.04 (d).
30
Page 12 of 12