Agenda · Roseville City Council
Roseville City CouncilAgendaWednesday, May 6, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
## Planning Commission Agenda
Wednesday, May 6, 2026
## 6:30 PM
## City Council Chambers
In accordance with Minnesota Statutes §13D.02 and City policy, Council and Commission members may
attend meetings remotely up to three times per calendar year.
(Times listed are approximate – please note that items may be earlier or later than listed on the agenda)
1. Call to Order
## 2. Roll Call
3. Approval of Agenda
## 4. Public Comment
## 5. Approval of Meeting Minutes
a. Review of April 1, 2026 Minutes
6. Communications and Recognitions
## 7. Public Hearing
8. Business
## 9. Commission Direction on Member Initiated Agenda Items
a. Evaluate Roseville's EVCS and EVSE (electric vehicle charging) requirements for new parking
areas - Commissioner Cyra
10. Adjourn
Page 1 of 11
## REQUEST FOR COMMISSION ACTION
Date: 5/6/2026
Item No.: 5.a.
## Department Approval Agenda Section
## Approval of Meeting Minutes
## Item Description: Review of April 1, 2026 Minutes
Page 1 of 1
1
2Application Information
3n/a
4
5Background
6n/a
7
8Staff Recommendation
9n/a
10
## 11Requested Planning Commission Action
12Review the April 1, 2026 minutes and make a motion to approve subject to requested corrections.
13
14Alternative Actions
15n/a
16
Prepared by:
## Attachments:
1. April 1, 2026 Minutes
17
Page 2 of 11
## Planning Commission Regular Meeting
## City Council Chambers, 2660 Civic Center Drive
Draft Minutes – Wednesday, April 1, 2026 – 5:30 p.m.
1. Call to Order
1
Chair Bjorum called to order the regular meeting of the Planning Commission at 2
approximately 5:30 p.m. and reviewed the role and purpose of the Planning Commission. 3
4
2. Roll Call 5
At the request of Chair Bjorum, City Planner Thomas Paschke called the Roll. 6
7
## Members Present: Chair Erik Bjorum, Vice-Chair Pamela Aspnes, and 8
## Commissioners Steve Cyra, Allison Campbell Jensen, Rose 9
## Lindsay, Erin Lynch, and Ben Schaefer 10
11
## Members Absent: None 12
13
## Staff Present: City Planner Thomas Paschke, Community Development Director 14
## Janice Gundlach, and Senior Planner Bryan Lloyd 15
16
3. Approve Agenda 17
18
## MOTION 19
Member Aspnes moved, seconded by Member Cyra, to approve the agenda as 20
presented. 21
22
Ayes: 7 23
Nays: 0 24
Motion carried. 25
26
4. Public Comment 27
28
5. Review of Minutes 29
30
## a. March 4, 2026, Planning Commission Regular Meeting 31
32
## MOTION 33
Member Campbell Jensen moved, seconded by Member Cyra, to approve the 34
March 4, 2026, meeting minutes. 35
36
Ayes: 7 37
Nays: 0 38
Motion carried. 39
40
6. Communications and Recognitions: 41
Page 3 of 11
## Regular Planning Commission Meeting
Minutes – Wednesday, April 1, 2026
Page 2
42
a. Swear in New Members. 43
44
Chair Bjorum performed the Oath of Office on new Commission Members Rose 45
## Lindsay and Ben Schaefer. 46
47
7. Public Hearing 48
49
8. Business 50
51
## a. Annual Organizational Business 52
53
City Planner Paschke reported that, in accordance with City Code 201.03.A, each 54
advisory commission shall elect a chair and vice-chair from among its appointed 55
members for a term of one year, as well as appoint a member to serve on the Ethics 56
Commission. The Planning Commission shall also appoint three members and one 57
alternate to serve on the Variance Board. 58
59
## MOTION 60
Member Aspnes, seconded by Member Cyra, to appoint Erik Bjorum as Chair 61
of the Planning Commission. 62
63
Ayes: 7 64
Nays: 0 65
Motion carried. 66
67
## MOTION 68
Member Bjorum, seconded by Member Cyra, to appoint Pamela Aspnes as Vice-69
Chair of the Planning Commission. 70
71
Ayes: 7 72
Nays: 0 73
Motion carried. 74
75
Member Cyra indicated he wanted to be on the Variance Board. 76
77
Member Campbell Jensen also agreed to serve on the Variance Board. 78
79
Vice-Chair Aspnes asked to be on the Variance Board again and indicated she 80
would like to continue in the role of Chair. 81
82
Member Lynch agreed to serve as the alternate on the Variance Board. 83
84
Mr. Paschke noted that this did not require a motion because the Variance 85
Board selects its own Chair and Vice-Chair. 86
87
Member Lynch indicated she would like to volunteer for the Ethics Committee. 88
Page 4 of 11
## Regular Planning Commission Meeting
Minutes – Wednesday, April 1, 2026
Page 3
89
## 9. Commission Direction on Commission Member-Initiated Agenda Items 90
91
Member Cyra indicated that he would like to add a member-initiated agenda item for the 92
next meeting to discuss Ordinance 10.13.04(d), which relates to minimum electric vehicle 93
charging station requirements for multi-family residential and non-residential buildings. 94
He explained that the request was prompted by a variance application reviewed that 95
evening and noted the topic would be worthwhile for further discussion. He also 96
encouraged commissioners, particularly newer members, to review the recording of the 97
variance board meeting for additional context. 98
99
Chair Bjorum asked staff if adding this item to the next meeting required a vote. 100
101
Ms. Gundlach explained that adding the item to the agenda does not require a vote. She 102
noted that Commissioner Cyra will prepare written materials for the next meeting, and at 103
that time, the Commission will review the information and formally vote on whether to 104
take further action. 105
106
10. Adjourn 107
108
## MOTION 109
Member Aspnes, seconded by Member Campbell Jensen, to adjourn the meeting 110
at 5:41 p.m. 111
112
Ayes: 7 113
Nays: 0 114
Motion carried. 115
116
117
Page 5 of 11
## REQUEST FOR COMMISSION ACTION
Date: 5/6/2026
Item No.: 9.a.
## Department Approval Agenda Section
## Commission Direction on Member
## Initiated Agenda Items
Item Description: Evaluate Roseville's EVCS and EVSE (electric vehicle charging) requirements
for new parking areas - Commissioner Cyra
Page 1 of 1
1
2Application Information
3Applicant: n/a
4Location: n/a
5Application Submission: n/a
6City Action Deadline: n/a
7Zoning: n/a
8
9This is a commissioner-initiated item and is not subject to application and/or city action deadlines.
10
11Background
12At the April 1, 2026 Planning Commission meeting, Commissioner Cyra requested that the Commission
13evaluate the City's requirements for electric vehicle charging installations in conjunction with construction
14of new parking areas. In accordance with Roseville's City Council and Advisory Commission Rules of
15Procedure, upon the item/issue being presented by a Commissioner, the item is placed on the agenda
16for the next meeting, at which time the Commissioner provides preliminary materials for inclusion in the
17meeting packet (see Attachment 1). The Commission, upon review of this information, then provides
18staff direction as to whether, how, and when the agenda item will be taken up at a subsequent
19meeting. This must be done via motion.
20
21Staff Recommendation
22The Commission should vote on whether, how and when to initiate discussion surrounding the
23evaluation of the City's electric vehicle charging requirements for new parking areas, in service of
24possible amendment to the zoning code.
25
## 26Requested Planning Commission Action
27The Commission should vote on whether, how and when to initiate discussion surrounding the
28evaluation of the City's electric vehicle charging requirements for new parking areas, in service of
29possible amendment to the zoning code.
30
31Alternative Actions
32A lack of a motion would result in the item not coming forward for discussion.
33
Prepared by:
## Janice Gundlach, Community Development Director
## Attachments:
1. Commissioner Cyra discussion materials
34
Page 6 of 11
## MEMORANDUM
## To: Roseville Planning Commission
## From: Commissioner Steve Cyra
Date: April 9, 2026
Subject: Considerations for the future
direction of Roseville’s non-
residential parking lot EV
charging policy.
## Recommended Action: Commence Planning
Commission evaluation of
## Roseville’s EVCS and EVSE
requirements for new parking
areas (code section 1013.04.D)
to consider whether any
amendments should be
recommended to the City
Council.
## Purpose
The purpose of this memo is to support the commencement of Planning Commission discussion about
whether Roseville's current electric vehicle parking requirements (EVCS and EVSE) should be amended for
new parking lots. Based on the two variance applications submitted since the ordinance was enacted, there
is evidence that the current code may be imposing requirements that are difficult to apply to some non-
residential development projects. A targeted review now would allow the Commission to consider whether
the ordinance should be adjusted to meet our stated goals to facilitate and encourage the use of electric
vehicles, and to expedite the establishment of a convenient, cost-effective electric vehicle charging
infrastructure, while also considering local market conditions, the practices of neighboring municipalities,
and consumer preferences.
## Background on the Current Ordinance
Roseville adopted EV charging requirements on March 20, 2023 as part of Phase 2 zoning code
amendments. For non-residential parking areas with 30 to 49 spaces, the code requires two EV charging
stations (EVCS), at least one accessible, at Level 2 or greater. For non-residential parking areas with 50 or
more spaces, the code requires 5 percent of required parking spaces as Level 2 or greater EV charging
stations, with at least one accessible. Additionally, code section 1013.04.D.2.d.1 requires that ALL new non-
residential parking areas provide electric vehicle supply equipment (EVSE) with the electrical capacity
necessary to accommodate the future hardwire installation of EVCS as Level 2 or greater for a minimum of
10% of required parking spaces.
## ATTACHMENT 1
Page 7 of 11
## What the Two Variance Applications Suggest
The two variance applications submitted since adoption of the ordinance suggest that the current
standards may be difficult to implement as written for some large commercial projects. In the
Rosedale/Dick's Sporting Goods case, the Planning Division staff determined the project would otherwise
be required to install 15 Level 2 charging stations and 30 EVSE stalls, but they advocated for a variance
requiring a total of only six chargers (three Level 2 and three Level 3) plus the 30 EVSE stalls as required by
code. The applicant argued that fast charging was a better fit for a retail setting with higher customer
turnover and shorter dwell times and also that Level 3 chargers should be considered to count for more
level 2 chargers given the significantly increased turnover. The packet also documented nearby charging
options and noted that several neighboring municipalities either had no minimum EV charging requirement
or materially lower requirements. The variance was granted by the Variance Board.
In the Hempel Real Estate / 2700 Snelling Avenue case, Planning Division staff concluded that the project
would otherwise be required to install 26 Level 2 or greater EV charging stations and 53 EVSE stalls for a
528-space lot. The applicant proposed instead to install eight Level 2 chargers and 22 EVSE stalls. Staff
recommended approval of the proposal and stated that, as the ordinance is being more widely
implemented, it is becoming clear that a one-size-fits-all approach for non-residential uses may not be
appropriate. Staff further stated that the EV standards may need modification to adjust required numbers
for large parking lots, especially where the use does not serve a more transient customer base. The
variance board denied the variance request, citing a lack of unique circumstances to the property and the
proposal failing to align with the intent of the zoning code.
## Regional Context and Neighboring Municipalities
The variance materials provide a useful snapshot of the regional landscape. The Rosedale/ Dick's Sporting
Goods variance packet stated that Minneapolis required a minimum of 5 percent of parking stalls to be EV
charging stalls at Level 2 or greater, while St. Paul, Bloomington, Edina, and Blaine did not have minimum
EV requirements in code. The same packet states that Minnetonka encourages appropriate planning for
future installation but had no minimum EV requirement. Even allowing for the fact that municipal
ordinances evolve over time, the variance record supports the general conclusion that Roseville's current
non-residential requirements are more aggressive than those in several nearby communities.
That regional comparison matters because development decisions are often made across a competitive
metropolitan market. If Roseville's code imposes materially higher up-front costs than neighboring
communities, it is reasonable for the Commission to evaluate whether the current structure is calibrated
appropriately or whether a less restrictive framework would better support redevelopment and new
investment while simultaneously supporting electrification goals.
## Current EV Adoption and Charging Trends in Minnesota
MnDOT indicates Minnesota is not on track to meet its 2030 EV target, although EV registrations continue
to increase. (http://www.mndot.net/measures/electric-vehicles.html)
## ATTACHMENT 1
Page 8 of 11
Figure 1: Electric Vehicles Sales and targets in Minnesota, from MNDOT EV Performance Measures
Dashboard.
It may also be important to consider local supply and demand for public EV charging when evaluating
whether additional Level 2 chargers in non-residential parking lots would meaningfully advance the City’s
stated goals. I was not able to find charger utilization data specific to the Twin Cities metro, but I did find
state-level estimated utilization data from Stable Auto. According to that source, Minnesota’s estimated
Level 3 charger utilization was 4 percent as of Q2 2025, compared with 18 to 23 percent in states such as
California, Nevada, Florida, and Maryland. This could suggest that charging demand in Minnesota may not
yet justify uniformly high upfront installation requirements in every non-residential setting.
https://stable.auto/insights/electric-vehicle-charger-utilization-by-month
Figure 2: Estimated average level 3 charger utilization rates from Stable.Auto
## ATTACHMENT 1
Page 9 of 11
Further, in the Hempel Real Estate variance packet, Planning Division staff noted that “18 major
automakers have scaled back, delayed, or scrapped electric vehicle (EV) plans or models in the U.S. as of
March 2026, driven by slowing demand and reduced incentives.” This represents another headwind to
near-term EV adoption.
Lastly, we should evaluate consumer charging preferences and how they are evolving (home, workplace,
public level 2, public level 3) to find a targeted strategy that will give us the best chance of achieving our
long-run goals.
## Economic Considerations for Businesses
In addition to the high upfront installation costs, estimated at more than $500,000 in the Rosedale/DSG
case, businesses must also consider ongoing maintenance costs and whether they want to take on what is
effectively an EV charging business. If chargers fail and the owner chooses not to repair them, I am not
aware of any provision in the current code that requires uptime or continued operation. That raises a
practical concern: the code may be forcing businesses with no real interest in operating EV charging
infrastructure to make a major investment, even when it may not be sustainable or financially viable. If so,
what prevents those chargers from simply being taken offline? For the same reasons, the 10% EVSE
requirement may never bear fruit in terms of actual charging capacity at many installations.
## Policy Considerations for Possible Code Amendments
If the Commission chooses to continue this discussion, there are several policy directions worth studying.
First, the ordinance could distinguish between public-facing uses with higher turnover, such as retail and
entertainment, and private employment-oriented uses where the same vehicles may remain parked for
most of the day. Second, the ordinance could establish different thresholds or reduced percentages for very
large lots, where a straight percentage of required parking can produce unusually high totals that may not
match demand. Third, the code could provide additional flexibility to substitute a smaller number of Level 3
direct-current fast chargers where that technology better serves the use. Fourth, the City could benchmark
Roseville's requirements against nearby municipalities to ensure the code remains competitive while still
advancing long-term electrification goals.
## Balancing Private Mandates with Public Investment
If the Commission determines that the current requirements for private development should be adjusted, it
may be appropriate to consider how the City can simultaneously expand public charging infrastructure on
municipal properties. This would allow Roseville to continue advancing its electrification goals while shifting
some of the implementation burden from private developers, who may lack the expertise, interest, or
sustained commitment to operate charging infrastructure, to purpose-driven charging networks with
proven business models.
One option would be to explore partnerships with established charging providers active in Minnesota, such
as ChargePoint, EVgo, Electrify America, Blink Network, and ZEF Energy. Through an RFP process, the City
could invite these companies to install and operate chargers at municipal sites such as City Hall, the Library,
and parks, potentially in exchange for lease payments, revenue-sharing agreements, or no-cost installation.
This approach could address several concerns identified in this memo: it would ensure that chargers remain
operational and maintained by entities with a business incentive to do so; it would create charging
## ATTACHMENT 1
Page 10 of 11
infrastructure in publicly accessible locations rather than private parking lots that may have restricted hours
or access; and it could generate modest revenue for the City while drawing residents to public facilities.
This concept would benefit from input from the Parks and Recreation Commission and the Public Works
Commission regarding site selection, electrical infrastructure, and operational considerations. If the
Planning Commission is interested in pursuing this approach, staff could be directed to report back on the
feasibility of such partnerships as part of the broader EV policy discussion.
## Recommended Action
I recommend that the Planning Commission continue its discussion of Roseville’s EVCS and EVSE
requirements for new parking lots and consider whether any amendments should be recommended to the
City Council. The purpose of that discussion would be to evaluate whether the current standards remain
appropriately calibrated to the City’s goals, local development conditions, and regional context.
## Draft Motion
Move to continue the Planning Commission’s discussion of potential amendments to Roseville’s electric
vehicle charging requirements for new parking areas and to direct Planning Division staff to report back at a
future meeting on:
1. How implementation of the current code has proceeded to date, including issues or concerns raised
by developers; and
2. How Roseville’s current requirements compare with those of neighboring municipalities.
## Source Notes
## • City of Roseville Zoning Code
• Rosedale Center / Dick's Sporting Goods variance packet (uploaded file).
• Hempel Real Estate / 2700 Snelling Avenue variance packet (uploaded file).
• MnDOT Electric Vehicles performance dashboard.
• Stable.Auto charger utilization data
## ATTACHMENT 1
Page 11 of 11