Agenda · Belle Plaine City Council

Belle Plaine City CouncilAgendaMonday, August 17, 2026

Not yet analyzed

Analyze this document to extract topics and generate news stories.

Agenda Text
Subject to change. Live stream/video recording of council meeting at www.belleplainemn.gov ## BELLE PLAINE CITY COUNCIL ## NOTICE OF REGULAR MEETING AND AGENDA Monday, August 17, 2026 – 6:05 PM ## City Hall, 218 North Meridian Street, Belle Plaine, Minnesota Please use the north entrance door ## 1. PLEDGE OF ALLEGIANCE. ## 2. CALL TO ORDER. Roll Call. ## 3. APPROVAL OF AGENDA. ## 4. PUBLIC FORUM. *Anyone wishing to address the Council must sign up before the meeting and then have a seat in the audience. The signup sheet is removed 5 minutes before the start of the meeting. Maximum of three (3) minutes per speaker. No official action will be taken. ## 5. APPROVAL OF CONSENT AGENDA. 5.1. Regular Session Minutes of August 3, 2026. 5.2. Work Session Minutes of August 3, 2026. 5.3. Council Drone Demonstration Minutes of August 6, 2026. 5.4. Resolution 26-096 Accepting Donations for the 2026 Hook, Line and Heroes Youth Fishing Event. 5.5. Authorize Purchase of Mower for Public Works. 5.6. Resolution 26-100 Approve Premise Permit for Belle Plaine Chamber of Commerce at The Shipwreck. 5.7. Resolution 26-101 Authoring Execution of Cooperative Construction Agreement with Scott County and the City of Belle Plaine for the TH 25/CSAH 3 Roundabout Project as part of the FY 2026 Metro Local Partnership Program Funding. 5.8. Resolution 26-102 Approve Premise Permit for German Days Inc. at The Shipwreck. ## 6. DEPARTMENT REPORTS. ## 6.1. Community Services Department. (Report Only) ## 6.2. Ambulance Department. (Report Only) 6.3. Police Department. 6.4. Fire Department. 6.5. Community Development Department. ## 7. PUBLIC HEARINGS. ## 8. BUSINESS. 8.1. Presentation of Claims. ## 8.2. Discussion and Direction: Plow Truck No. 8 Page 1 of 104 8.3. Resolution 26-097 Consideration of Awarding the Bid to KUE Contractors, Inc. in the amount of $3,463,827.22 for the Public Safety Facility Renovation and Expansion Project. 8.4. Resolution 26-098 Awarding the Bid to Holtmeier Construction, Inc. in the amount of $1,147,522.43 for the TH 25/CSAH 3 Roundabout Project. 8.5. Resolution 26-099 Accepting the Preliminary Engineering Report and Call for the Public Hearing on the 2027 Improvement Project. ## 9. ADMINISTRATION. 9.1. 1. Downtown Music and Food Trucks, Wednesday, August 19, 4:30 – 8:00 PM. 2. Open House TH 25/CSAH 3 Roundabout Project, Thursday, August 20, 5:00 – 6:30 PM. 3. City Offices Closed in Observance of Labor Day, Monday, September 7. 4. Public Safety, Tuesday, September 8, 7:00 AM. 5. Design, Tuesday, September 8, 5:00 PM. 6. City Council, Tuesday, September 8, 6:00 PM. 7. Work Session, Tuesday, September 8, 6:15 PM. ## 10. ADJOURN. Page 2 of 104 ## BELLE PLAINE CITY COUNCIL ## REGULAR MEETING ## AUGUST 3, 2026 ## 1. PLEDGE OF ALLEGIANCE. Mayor Evans led those present in the Pledge of Allegiance. 2. CALL TO ORDER. 2.1. Roll Call. The Belle Plaine City Council met in Regular Session on Monday, August 3, 2026 at 6:00 PM in the council chambers of City Hall, 218 North Meridian Street, Belle Plaine, MN. Mayor Evans called the meeting to order with Councilmembers Brady Hartmann, Luke Otto, Rex Stacey and Shane Theas present. Also present were City Administrator Meyer, Finance Director Jirik, Community Development Director Smith Strack, Public Works Superintendent Otto, City Engineer Duncan, City Attorney Vose and Police Sergeant Vycital. Bonnie Vinkemeier served as the video recording operator. ## 3. APPROVAL OF AGENDA. MOTION by Councilmember Hartmann, second by Councilmember Otto, to approve the Revised Agenda as presented. ALL VOTED AYE. MOTION CARRIED. ## 4. PUBLIC FORUM. * Anyone wishing to address the Council must sign up before the meeting and then have a seat in the audience. The signup sheet is removed 5 minutes before the start of the meeting. Maximum of three (3) minutes per speaker. No official action will be taken. None. ## 5. APPROVAL OF CONSENT AGENDA. 5.1. Regular Session Minutes of July 20, 2026. 5.2. Work Session Minute of July 20, 2026. 5.3. Resolution 26-092 Resolution Approving the Issuance of, and Providing the Form, Terms, Covenants, and Directions for the Issuance of Its Tax Increment Revenue Note, Series 2026, in an Aggregate Principal Amount not to Exceed $1,950,000. (Brecken Place Townhomes II, LLC). 5.4. Resolution 26-093 Authorizing Application for Planning Assistance Grant Funds from Metropolitan Council for 2050 Comprehensive Plan Update. 5.5. Approve Large Assembly for Monarch Joint Venture for Butterfly Days Festival on August 22, 2026. 5.6. Resolution 26-094 Accepting Donation from Riverside Woodworks, LLC. for the Fire Department. MOTION by Councilmember Theas, second by Councilmember Otto, to approve the Consent Agenda as follows: 5.1. Regular Session Minutes of July 20, 2026; 5.2. Work Session Minute of July 20, 2026; 5.3. Resolution 26-092 Resolution Approving the Issuance of, and Providing the Form, Terms, Covenants, and Directions for the Issuance of Its Tax Increment Revenue Note, Series 2026, in an Aggregate Principal Amount not to Exceed $1,950,000. (Brecken Place Townhomes II, LLC); 5.4. Resolution 26-093 Authorizing Application for Planning Assistance Grant Funds from Metropolitan Council for 2050 Comprehensive Plan Update; 5.5. Approve Large Assembly for Monarch Joint Venture for Butterfly Days Festival on August 22, 2026 and 5.6. Resolution 26-094 Accepting Donation from Riverside Woodworks, LLC. for the Fire Department. ALL VOTED AYE. MOTION CARRIED. ## 6. DEPARTMENT REPORTS. 6.1. Public Works Department. Public Works Superintendent Otto highlighted the Public Works Report. Page 3 of 104 ## Belle Plaine City Council ## Regular Meeting August 3, 2026 UNAPPROVED Page 2 of 2 6.2. City Engineer Department. City Engineer Duncan highlighted the City Engineer Report. 6.3. Administration Department. City Administrator Meyer highlighted the Administration report. 7. PUBLIC HEARINGS. None Scheduled. ## 8. BUSINESS. 8.1. Presentation of Claims. 8.1.1. Pay Request No. 3, McNamara Contracting, Inc., for the WWTF Access Road Improvement Project. 8.1.2. Pay Request No. 3, Wm. Mueller & Sons, Inc., for the 2026 Improvement Project. MOTION by Councilmember Stacey, second by Councilmember Theas, to approve the reviewed claims as presented in the amount of $861,246.39. ALL VOTED AYE. MOTION CARRIED. ## 9. ADMINISTRATION. 9.1. Upcoming Tentative Meetings. 1. Downtown Music & Food Trucks, 4:30 – 8:00 PM, Wednesday, August 5. 2. Finance Ways and Means, 3:00 PM, Thursday, August 6. 3. Primary Early Voting, 9:00 – 3:00 PM, Saturday, August 8. 4. EDA, 5:00 PM, Monday, August 10. 5. Planning, 6:00 PM, Monday, August 10. 6. Primary Election, 7:00 AM – 8:00 PM, Tuesday, August 11. 7. Public Safety, 7:30 AM, Tuesday, August 18. 8. Public Works, 7:00 AM, Wednesday, August 12. 9. Parks Commission, 5:00 PM, Monday, August 17. 10. Primary Canvas, 6:00 PM, Monday, August 17. 11. City Council, 6:05 PM, Monday, August 17. 12. Work Session, 6:15 PM, Monday, August 17. The Council was reminded of the upcoming tentative meetings as listed. ## 10. ADJOURN. MOTION by Councilmember Otto, second by Councilmember Hartmann, to adjourn the meeting at 6:11 ## PM. ALL VOTED AYE. MOTION CARRIED. ## Respectfully Submitted, ## Renee Eyrich ## Recording Secretary Page 4 of 104 ## BELLE PLAINE CITY COUNCIL ## WORK SESSION ## AUGUST 3, 2026 ## 1. CALL TO ORDER. 1.1. ROLL CALL. A Work Session of the Belle Plaine City Council met on Monday, August 3, 2026 at 6:19 PM in the council chambers of City Hall, 218 North Meridian Street, Belle Plaine, MN. Present were Mayor James Evans and Councilmembers Brady Hartmann, Rex Stacey, Luke Otto and Shane Theas. Also present were City Administrator Meyer, Community Development Director Smith Strack Public Works Superintendent Otto, Police Sergeant Vycital, City Engineer Duncan and City Attorney Bob Vose. ## 2. APPROVAL OF AGENDA. MOTION by Councilmember Hartmann, second by Councilmember Otto, to approve the Agenda as presented. ALL VOTED AYE. MOTION CARRIED. EDA President Duklet called the EDA Meeting to order at 6:20 PM with Commissioners Krant, Fahey and Buck present. Planning and Zoning President Romness called the Planning and Zoning Meeting to order at 6:20 PM with Commissioners Crosby, Walsh, Duklet, Schmitz and Eggers present. ## 3. DISCUSSION ITEMS. 3.1. School District Concept Plans with City Council, EDA & Planning and Zoning. Community Development Director Smith Strack introduced the subject and those in attendance. Rich Rodich of Bray Architects and Jeremy Anderson of Design Tree Engineering presented the concept plans for the upgrades at the school district facilities. The Council, EDA and Planning Commissions had a lengthy conversation and asked questions of District staff representatives. School District Superintendent Laager agreed to do a safety study on the concept. Mayor Evans called for a 5-minute recess at 7:30 PM. Mayor Evans reconvened at 7:36 PM. 3.2. Discussion: streamlining the Development Review Process with City Council, EDA & Planning and Zoning. Community Development Director Smith Strack reviewed the current process for Development Review with a brief slideshow and highlighted areas that could be streamlined. The Council, EDA and Planning Commissions held a lengthy conversation. The Council directed staff to work on ordinance changes for the most common occurrences including moving to one public hearing, minor variances, lot combo/splits. MOTION by Commissioner Krant, second by Commissioner Fahey, to adjourn the EDA meeting at 8:35 ## PM. MOTION by Commissioner Eggers, second by Commissioner Crosby, to adjourn the Planning and Zoning meeting at 8:35 PM. Mayor Evans called for a 5-minute recess at 8:36 PM. Page 5 of 104 ## Council Work Session August 3, 2026 UNAPPROVED Page 2 of 2 Mayor Evans reconvened at 8:39 PM. 3.3. Discussion: Prairie Park Shelter Repairs. City Administrator Meyer provided a brief overview. Councilmember Stacy brought forward concerns over local business owner offering to donate Prairie Park Shelter Repairs. The Council and staff held a lengthy discussion. Councilmember Hartmann and Otto requested that, for future offers, staff collect the offeror’s contact information and provide it to the Council. 3.4. Discussion: Public Works Lawn Mower Replacement. Public Works Superintendent Otto reviewed the request for a replacement lawn mower. The Council held a lengthy discussion. It was the consensus of the Council to move the replacement Lawn Mower purchase to the council meeting. ## 4. ADJOURN. MOTION by Councilmember Otto, second by Councilmember Theas, to adjourn the meeting at 9:04 PM. ## ALL VOTED AYE. MOTION CARRIED. ## Respectfully Submitted, ## Renee Eyrich ## Recording Secretary Page 6 of 104 218 North Meridian Street, P.O. Box 129, Belle Plaine, MN 56011 Phone 952-873-5553 Fax 952-873-5509 www.belleplainemn.com ## BELLE PLAINE CITY COUNCIL ## COUNCIL DRONE DEMONSTRATION ## AUGUST 6, 2026 ## 1. CALL TO ORDER. 1.1. ROLL CALL. The Belle Plaine City Council met for a Drone Demonstration on Thursday, August 6, 2026 at 4:32 PM at the Fire Department 700 East Main Street, Belle Plaine, MN. Councilmembers Brady Hartmann, Shane Theas, Luke Otto and James Evans were present. Councilmember Rex Stacey was absent. Also present were Police Sergeant Brian Vycital, Police Sergeant Sterling Cayer, and Police Officer Hunter Eschenbach. ## 2. DRONE DEMONSTRATION. Sergeant Cayer and Officer Eschenbach provided a demonstration of the drone's capabilities. Council members had the opportunity to ask questions about the drone's functions, capabilities, and potential use in various scenarios. ## 3. ADJOURN. The meeting was adjourned at 5:18 PM. ## Respectfully Submitted, ## Renee Eyrich ## Recording Secretary Page 7 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Amy Jo Jirik, Finance Director ## AGENDA ## ITEM: Resolution 26-096 Accepting Donations for the 2026 Hook, Line and Heroes Youth Fishing Event. ## BACKGROUND/ ## JUSTIFICATION: The City received generous donations from the following businesses for the 2026 Hook, Line ## and Heroes Youth Fishing Event: ## Sponsor Donation Chard Grading & Materials Youth Deer Hunt valued at $1,000.00. River Addicts Guide Service Guided Fishing Trip for two valued at $500.00. Kwik Trip $300.00 in Gift Cards. Coborns – Belle Plaine 3 Cases of Gatorade, 2 cases of Water and 2 boxes of Chips valued at $90.00. Down Rodders $125.00 in gift cards and Approx. $150.00 in bait and apparel. Kens Bait Night Crawlers valued at $200.00. ## Rucks Meat Pork Burgers and Hot Dogs valued at $180.90 4.0 Bus Service Transportation to boat landing and back valued at $450.00 ## Our Agrestic Life Art Work for T-shirts Volunteer Captains Gas, Bait and Tackle (valued at approx. $60.00 per captain) The donation must be accepted by the Council in Resolution form. ## FISCAL ## IMPACT: The donation will offset expenses for the event. ## STAFF ## RECOMMENDATION: Approve Resolution 26-096 Accepting Donations for the 2026 Hook, Line and Heroes Youth Fishing Event. Page 8 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-096 ## ACCEPTING A DONATIONS FOR THE ## 2026 HOOK, LINE AND HEROES YOUTH FISHING EVENT WHEREAS, the following sponsors have made donations for the 2026 Hook, Line and Heroes Youth ## Fishing Event; ## Sponsor Donation Chard Grading & Materials Youth Deer Hunt valued at $1,000.00. River Addicts Guide Service Guided Fishing Trip for two valued at $500.00. Kwik Trip $300.00 in Gift Cards. Coborns – Belle Plaine 3 Cases of Gatorade, 2 cases of Water and 2 boxes of Chips valued at $90.00. Down Rodders $125.00 in gift cards and Approx. $150.00 in bait and apparel. Kens Bait Night Crawlers valued at $200.00. ## Rucks Meat Pork Burgers and Hot Dogs valued at $180.90 4.0 Bus Service Transportation to boat landing and back valued at $450.00 ## Our Agrestic Life Art Work for T-shirts Volunteer Captains Gas, Bait and Tackle (valued at approx. $60.00 per captain) ## NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BELLE PLAINE, COUNTY OF SCOTT, MINNESOTA, THAT: It hereby accepts the donations to be used for the 2026 Hook, Line and Heroes Youth Fishing Event. The adoption of the foregoing resolution was duly moved by Councilmember _____ and seconded by Councilmember ______, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th day of August, 2026. ## ATTEST: ___________________ _______________________ ## James Evans Dawn Meyer Mayor City Administrator Page 9 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Public Works Superintendent, Todd Otto ## AGENDA ## ITEM: Authorize Purchase of Mower for Public Works. ## BACKGROUND/ ## JUSTIFICATION: The Public Works Department is in need of a new mower to replace the existing equipment used for daily operations throughout the year. The proposed replacement mower is a 2021 John Deere 1580 with 2,960 hours of use. The maintenance log is attached for review. Attached is a copy of the Quote Summary from Kibble Equipment – Belle Plaine in the amount of $30,123.14, after applying the total trade-in allowance of $9,000.00. The Public Works Committee discussed this item and recommended that it be brought forward for discussion at a Work Session. The City Council reviewed the request at the August 3 Work Session, where the majority of the Council recommended moving forward with the purchase of a new mower. This quoted price includes a John Deere 1580 Terrain Cut Commercial Front Mower, Single- Spool Auxiliary Hydraulic Kit, and 72 inch 7-Iron PRO Commercial Side Discharge Mower Deck, less the $9,000.00 trade-in allowance. ## FISCAL ## IMPACT: This purchase is a 2026 budgeted item and will be paid for out of the CIP Plan. ## STAFF ## RECOMMENDATION: Authorize Purchase of Mower for Public Works. Page 10 of 104 Page 11 of 104 Page 12 of 104 Page 13 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: Resolution 26-100 Approve Premise Permit for Belle Plaine Chamber of Commerce at The Shipwreck. ## BACKGROUND/ ## JUSTIFICATION: The Belle Plaine Chamber of Commerce has requested a premise permit for The Shipwreck for the remainder of 2026. Currently Belle Plaine Chamber of Commerce also conducts lawful gambling at Neisen’s Corner Bar, Johan’s Bar and Grill, Oldenburg Brewery, Ruby’s Family Restaurant and Steel Horse Tavern in the City of Belle Plaine. The City of Belle Plaine renews premise permits for lawful gambling purposes annually. The renewal period is for January 1 through December 31, due to the mid-year change of ownership and name the City requires a new premise permit be pulled. ## FISCAL ## IMPACT: The City requires 10% of lawful gambling proceeds be contributed to the City of Belle Plaine, those funds are used for Public Safety purposes. ## STAFF ## RECOMMENDATION: Approve Resolution 26-100 Approve Premise Permit for Belle Plaine Chamber of Commerce at The Shipwreck. Page 14 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-100 ## RESOLUTION APPROVING PREMISES PERMIT FOR BELLE PLAINE CHAMBER OF COMMERCE ## AT THE SHIPWRECK. WHEREAS, Belle Plaine Chamber of Commerce has requested to conduct lawful gambling in The ## Shipwreck in the City of Belle Plaine; WHEREAS, Belle Plaine Chamber of Commerce also conducts lawful gambling at Neisen’s Corner Bar, Johan’s Bar and Grill, Oldenburg Brewery, Ruby’s Family Restaurant and Steel Horse Tavern in the City ## of Belle Plaine; WHEREAS, the City’s Fee Schedule requires an annual premises permit fee of $100.00 per site; WHEREAS, the approval of the premises permits is contingent on approval from the MN Department of Gambling Division and submittal of all required paperwork. ## NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BELLE PLAINE, SCOTT COUNTY, MINNESOTA THAT: approves the premise permits for Belle Plaine Chamber of Commerce at The Shipwreck, 110 N. Meridian Street is hereby approved effective August 18, 2026 through December 31, 2026, contingent upon receipt of $100.00 annual per site fee. The adoption of the foregoing resolution was duly moved by Councilmember ____ and seconded by Councilmember ______, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th day of August, 2026. ## ATTEST: ___________________ _______________________ James Evans Dawn Meyer Mayor City Administrator Page 15 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: ## Resolution 26-101 Authoring Execution of Cooperative Construction Agreement with Scott County and the City of Belle Plaine for the TH 25/CSAH 3 Roundabout Project as part of the FY 2026 Metro Local Partnership Program Funding. ## BACKGROUND/ ## JUSTIFICATION: The State of Minnesota and Scott County require a Cooperative Agreement for jointly funded projects. Representatives from Scott County have developed the attached Cooperative Agreement for the construction of the TH 25/CSAH 3 Roundabout Project. The Cooperative Agreement has been reviewed by City staff and legal and is recommended for approval. City Attorney Vose noted Section 4a, Future Modifications, which states that no right- of-way permits for up to 5 years, the City Attorney comments that there may be legal required for issuing right of way permits. The City Council previously adopted Resolution 24-176 accepting Local Partnership Program funds from MnDOT for the TH 25 at CSAH 3 (Main Street) Roundabout Project for Fiscal Year 2026, with a maximum state funding award of $1,000,000 in eligible project costs. On May 18, 2026, the City Council also adopted Resolution 26-063 authorizing the advertisement for bids for the project. On July 20, 2026, the City council also adopted Resolution 26-090 authorizing execution of cooperative construction agreement with the Minnesota Department of Transportation. Approval of the attached Cooperative Agreement will allow the City, Scott County, and the State of Minnesota to proceed with the construction and administration of the jointly funded project. ## FISCAL ## IMPACT: ## STAFF ## RECOMMENDATION: ## Approve Resolution 26-101 Authoring Execution of Cooperative Construction Agreement with Scott County and the City of Belle Plaine for the TH 25/CSAH 3 Roundabout Project as part of the FY 2026 Metro Local Partnership Program Funding. Page 16 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 1 ## COOPERATIVE AGREEMENT THIS AGREEMENT, by and between the County of Scott, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "County" and the City of Belle Plaine, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "City". ## RECITALS: A. City has plans to reconstruct the intersection of County Highway (CH) 3, Walnut Street, and Trunk Highway (TH) 25 as a roundabout, County Project (CP) 03-09, State Aid Project (SAP) No. 070-603-015, and SAP No. 239-010-004. The plans include grading, concrete, bituminous paving, lighting, roundabout and ADA improvements construction and other associated construction, together referred to as the “Project”. B. The above-described Project lies within the corporate limits of the City. C. City applied for and will receive up to one million dollars ($1,000,000) in funding through the Minnesota Department of Transportation (MnDOT) Metro Local Partnership Program for the Project. D. County supports the planned Project and is willing to cooperate with City to complete the Project and share costs related to the Project. E. City has prepared an estimate of the County’s cost share for the Project contract work in the sum of two hundred fifty-three thousand seven dollars and forty-five cents ($253,007.45). F. It is contemplated that the Project shall be carried out by the parties under the provisions of Minn. Stat. §162.17, subd. 1 and Minn. Stat. §471.59. NOW, THEREFORE, in consideration of the mutual undertakings and agreement contained within this Agreement, the County and City hereby agree as follows: 1. Incorporation The recitals set out above are hereby incorporated into this Agreement as if fully restated herein. 2. Scope of Services a. City shall advertise for bids for the work and construction of the aforesaid Project, receive and open bids pursuant to said advertisement and enter into a contract (Contract) with the successful bidder at the unit prices specified in the bid of such bidder, according to law in such case provided for cities. The Contract will include the plans and specifications prepared by City or its agents, which plans and specifications are by this reference made a part hereof. b. City shall have overall authority to administer the Contract and inspect the Page 17 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 2 construction of the Contract work for the Project. City shall have ultimate authority in initiating and determining change orders, supplemental agreements, and final quantities. The County Engineer shall cooperate with the City Engineer and his staff at their request to the extent necessary but shall have no other responsibility for the supervision of the work. c. County agrees to provide any and all permanent or temporary right-of-way on property owned by the County and needed by the City for the completion of the Project at no cost. d. The City Engineer shall prepare monthly progress reports and furnish to the County upon request. 3. Payment a. A cost estimate for construction of the Project is attached to this agreement and incorporated as “Exhibit A”. It is specifically agreed that the estimate(s) mentioned in this Agreement is only a preliminary estimate of the cost for the work on the Project and that the unit prices set forth in the Contract and the final quantities as measured by the City Engineer shall govern in computing the total final construction cost for apportioning the cost of the Project according to the provisions of this section. b. Based upon the total final construction costs: 1) County shall reimburse the City one hundred percent (100%) of the final actual construction costs of the Project work on the County Highway 3 leg of the intersection. c. City shall be responsible for one hundred percent (100%) of the final Project costs for engineering and contract administration costs, which includes all actual costs of planning, design, environmental review, permits, preparation of bid, specifications, and contract administration related to the Project work. d. Upon completion of the Project, City will submit an invoice to County for the payment due, and County shall pay all amounts due within thirty (30) days. ## 4. Ongoing Maintenance Items a. Future Modifications. County reserves the right not to issue any permits for a period of five (5) years after completion of the Project for any service cuts in the roadway surfacing of the County Highway included in the Project for any installation of underground utilities which would be considered as new work; service cuts shall be allowed for the maintenance and repair of any existing underground utilities. b. Pav ement S triping and Markings. Initial pavement striping and markings shall be included as part of the Project. The County shall be responsible for all subsequent pavement striping and markings on its county roads as required after the initial work and shall be responsible for one hundred percent (100%) of the subsequent related costs. The City shall be responsible for all subsequent striping and markings on its city roads, including pedestrian markings across its City roadway intersection legs, as required after the initial work and shall be responsible for one hundred percent (100%) of the subsequent related costs. c. S now and Ice Control. Upon completion of the Project, the City, at its expense and discretion, shall perform snow, ice, and debris removal on all trails and sidewalks constructed with the Project. Page 18 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 3 d. Trail Maintenance. All future maintenance costs of Trail improvements constructed under this A greement will be shared equally between the County and City regardless of which party performs the maintenance work. Either party can initiate and complete such maintenance work with notice given to the other party. Upon completion of such work the initiating party will invoice the other for fifty percent (50%) of the actual total cost. The preventative maintenance on trails constructed with this project, including sealcoating, will be cost shared equally between the County and City with County administering the process. e. S tormwater. Upon completion of the Project, County shall maintain all stormwater quality, rate control, and volume control features such as ponds, infiltration basins and all aesthetic landscaping elements. All future maintenance of the stormwater features shall be the responsibility of County. City shall reimburse County annually for its share of the costs for maintenance of the stormwater features based on its percentage of contributing flow, determined as the area of drainage that flows to the basin outside of County Road right of way. City may in the future alter the stormwater quality, rate control, and volume control features to accommodate future development as long as County drainage is maintained at which time City’s percentage of contributing flow will be recalculated. f. R oundabout Landscaping. Upon completion of Project, City shall be responsible for maintenance of any landscaping in the roundabout Project area. Maintenance includes but is not limited to, vegetation control, litter and debris removal, removal and replacement of all dead or diseased plantings, and any other maintenance activities necessary to perpetuate the landscaping in a safe, usable, and aesthetically acceptable condition. g. Li ghting. As part of the Project, six (6) integral streetlights will be installed at the roundabout. The maintenance of these lights shall be shared between City and County as follows: 1) Electrical energy shall be one hundred percent (100%) the responsibility of City. City shall pay for the hook up cost and application to secure an adequate power supply to the service pad. City shall also pay all monthly electrical service expenses. 2) City shall be responsible for minor maintenance including, but not limited to, re-lamping or LED luminaire replacement, repair or replacement of all damaged luminaire glassware, luminaires when damaged or when ballasts fail, and photelectric control on luminaires at the sole cost of City. 3) Within County right of way only, County shall be the owner of the integral streetlights and shall perform all major maintenance, including, but not limited to, Gopher State One Call locates, knocked down poles including wiring within the poles, damaged poles, pull boxes, underground wire, loose connections, damaged foundations, defective starter boards or drivers, damaged fuse holders, and blown fuses for the entire system at the sole cost of County. 4) All decorative and continuous lighting shall be the sole responsibility of City. h. A future County Global Maintenance Agreement, upon execution, may supersede maintenance responsibilities stated in this Agreement. Page 19 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 4 ## 5. Effective Date of Contract This Agreement shall be effective upon execution by all parties to the Agreement. 6. Term of Contract This Agreement will terminate upon City’s completion and close out of the Project, provided that the Ongoing Maintenance Items section shall survive the Agreement termination. ## 7. Authorized Agents The Parties shall appoint an authorized agent for the purpose of administration of this Agreement. City is notified of the authorized agent of County as follows: Nathan Thomas, or his successor ## Highway Division Program Manager ## Scott County Transportation Services ## 200 Fourth Avenue West ## Shakopee, MN 55379 (952) 496-8479 nthomas@co.scott.mn.us The County is notified the authorized agent for City is as follows: ## Dawn Meyer ## City Administrator ## City of Belle Plaine ## 218 North Meridian Street ## Belle Plaine, MN 56011 (952) 873-5553 dmeyer@belleplainemn.gov ## 8. County and State Audit Pursuant to Minn. Stat. Sec. 16C.05, subd. 5, the books, records, documents, and accounting procedures and practices of the County and City pursuant to this Agreement shall be subject to examination by the County, City and the State Auditor. Complete and accurate records of the work performed pursuant to this Agreement shall be kept by the County and City for a minimum of six (6) years following termination of this Agreement for such auditing purposes. The retention period shall be automatically extended during the course of any administrative or judicial action involving the County or the City regarding matters to which the records are relevant. The retention period shall be automatically extended until the administrative or judicial action is finally completed or until the authorized agent of the County or City notifies each party in writing that the records no longer need to be kept. 9. Liability and Indemnity a. Neither party, its officers, agents or employees, either in their individual or official capacity, shall be responsible or liable in any manner to the other party for any claim, demand, action or cause of action of any kind or character arising out of, Page 20 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 5 allegedly arising out of or by reason of the performance, negligent performance or nonperformance of the described maintenance, restoration, repair or replacement work by the other party, or arising out of the negligence of any contractor under any contract let by the other party for the performance of said work; and each party agrees to defend, save, keep and hold harmless the other, its officers, agents and employees harmless from all claims, demands, actions or causes of action arising out of negligent performance by its officers, agents or employees. b. It is further agreed that neither party to this Agreement shall be responsible or liable to the other or to any other person or entity for any claims, damages, actions, or causes of actions of any kind or character arising out of, allegedly arising out of or by reason of the performance, negligent performance or nonperformance of any work or part hereof by the other as provided herein; and each party further agrees to defend at its sole cost and expense and indemnify the other party for any action or proceeding commenced for the purpose of asserting any claim of whatsoever character arising in connection with or by virtue of performance of its own work as provided herein. Each party’s obligation to indemnify the other under this clause shall be limited in accordance with the statutory tort liability limitation as set forth in Minnesota Statutes Chapter 466 to limit each party’s total liability for all claims arising from a single occurrence, including the other party’s claim for indemnification, to the limits prescribed under §466.04. It is further understood and agreed that the Parties’ total liability shall be limited to that of a single governmental unit pursuant to Minn. Stat. §471.59, Subdivision 1a. c. It is further agreed that any and all employees of each party and all other persons engaged by a party in the performance of any work or services required or provided herein to be performed by the party shall not be considered employees, agents or independent contractors of the other party, and that any and all claims that may or might arise under the Workers’ Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged shall be the sole responsibility of the employing party and shall not be the obligation or responsibility of the other party. 10. Insurance Since each party is a political subdivision of the State of Minnesota, each party shall maintain a program of self-insurance or insurance covering general liability and automobile liability coverage protecting itself, its officers, agents, employees and duly authorized volunteers against any usual and customary public liability claims to the limits prescribed under Minn. Stat. Sec. 466.04 and Workers’ Compensation in accordance with the Minnesota statutory requirements. Said coverage shall be kept in effect during the entire term of this Agreement. ## 11. Data Practices All records kept by the City and the County with respect to the Project shall be subject to examination by the representatives of each party. All data collected, created, received, maintained or disseminated for any purpose by the activities of the County or City pursuant to this Agreement shall be governed by Minnesota Statutes Chapter 13, as Page 21 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 6 amended, and the Minnesota Rules implementing such Act now in force or hereafter adopted. ## 12. Equal Employment and Americans with Disabilities In connection with the work under this Agreement, City agrees to comply with the applicable provisions of state and federal equal employment opportunity and nondiscrimination statutes and regulations. In addition, upon entering into this Agreement, City certifies that it has been made fully aware of Scott County's Equal Employment Opportunity and Americans With Disabilities Act Policies, that it supports these policies and that it will conduct its own employment practices in accordance therewith. Failure on the part of City to conduct its own employment practices in accordance with County Policy may result in the withholding of all or part of regular payments by the County due under this Agreement unless or until City complies with the County policy, and/or suspension or termination of this Agreement. ## 13. Controlling Law The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity and construction of this Agreement and the legal relations between the parties and performance under it. The appropriate venue and jurisdiction for any litigation hereunder shall be those courts located with the County of Scott, State of Minnesota. Litigation, however, in the federal courts involving the parties shall be in the appropriate federal court within the State of Minnesota. 14. Changes/Amendments The parties agree that no change or modification to this Agreement, or any attachments hereto, shall have any force or effect unless the change is reduced to writing, dated, and made part of this Agreement. The execution of the change shall be authorized and signed in the same manner as this Agreement, or according to other written policies of the original parties. 15. Severability In the event any provision of this Agreement shall be held invalid and unenforceable, the remaining provisions shall be valid and binding upon the parties unless such invalidity or non-enforceability would cause the Agreement to fail its purpose. One or more waivers by either party of any provision, term, condition or covenant shall not be construed by the other party as a waiver of a subsequent breach of the same by the other party. ## 16. Entire Agreement It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the County and City relating to the subject matter hereof. Page 22 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 7 IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be executed intending to be bound thereby. ## CITY OF NAME ## By And ## James Evans, Mayor Dawn Meyer, City Administrator Date Date ## COUNTY OF SCOTT ## By ## Lezlie Vermillion, County Administrator ## Date Upon proper execution, this agreement RECOMMEND FOR APPROVAL: will be legally valid and binding. ## By By ## Jeanne Andersen, Assistant County Attorney Anthony J. Winiecki, County Engineer Date Date Page 23 of 104 ## CP 03-09 ## City of Belle Plaine ## County of Scott 8 ## ADD EXHIBIT A – ENGINEER’S ESTIMATE OF CONSTRUCTION COSTS Link to document: 137897_Engineers_Estimate.pdf Page 24 of 104 ## CITY OF BELLE PLAINE ## RESOLUTION 26-101 ## RESOLUTION AUTHORING EXECUTION OF COOPERATIVE CONSTRUCTION ## AGREEMENT WITH SCOTT COUNTY AND THE CITY OF BELLE PLAINE FOR THE TH ## 25/CSAH 3 ROUNDABOUT PROJECT AS PART OF THE FY 2026 METRO LOCAL ## PARTNERSHIP PROGRAM FUNDING. WHEREAS, Scott County and the City of Belle Plaine are participating in the construction of the TH 25/CSAH 3 (Main Street) Roundabout Project; and WHEREAS, City staff has reviewed the Cooperative Construction Agreement and recommends its approval, subject to the City Attorney's comments; and WHEREAS, it is appropriate for the City Council to authorize execution of the Cooperative Agreement with Scott County for the TH 25/CSAH 3 Roundabout Project as part of the FY 2026 Metro Local Partnership Program Funding. NOW, THEREFORE BE IT RESOLVED THAT: The City Council of the City of Belle Plaine does hereby authorize the City Administrator to execute the Cooperative Agreement with Scott County for the TH 25/CSAH 3 Roundabout Project (Attachment A). The adoption of the foregoing resolution was duly moved by Councilmember __________ and seconded by Councilmember ______________, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th day of August, 2026. ## ATTEST: ___________________ _______________________ ## James Evans Dawn Meyer Mayor City Administrator Page 25 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: Resolution 26-102 Approve Premise Permit for German Days Inc. at The Shipwreck. ## BACKGROUND/ ## JUSTIFICATION: German Days Inc. has requested a premise permit for The Shipwreck for the remainder of 2026. Currently German Days Inc. also conducts lawful gambling at Neisen’s Corner Bar, Neisen’s Red Door Bar and Steel Horse Tavern in the City of Belle Plaine. The City of Belle Plaine renews premise permits for lawful gambling purposes annually. The renewal period is for January 1 through December 31, due to the mid-year change of ownership and name the City requires a new premise permit be pulled. ## FISCAL ## IMPACT: The City requires 10% of lawful gambling proceeds be contributed to the City of Belle Plaine, those funds are used for Public Safety purposes. ## STAFF ## RECOMMENDATION: Approve Resolution 26-102 Approve Premise Permit for German Days Inc. at The Shipwreck. Page 26 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-102 ## RESOLUTION APPROVING PREMISES PERMIT FOR GERMAN DAYS INC AT THE SHIPWRECK. WHEREAS, German Days Inc. has requested to conduct lawful gambling in The Shipwreck in the City of ## Belle Plaine; WHEREAS, German Days Inc. also conducts lawful gambling at Neisen’s Corner Bar, Neisen’s Red Door Bar and Steel Horse Tavern in the City of Belle Plaine; WHEREAS, the City’s Fee Schedule requires an annual premises permit fee of $100.00 per site; WHEREAS, the approval of the premises permits is contingent on approval from the MN Department of Gambling Division and submittal of all required paperwork. ## NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BELLE PLAINE, SCOTT COUNTY, MINNESOTA THAT: approves the premise permits for German Days Inc. at The Shipwreck, 110 N. Meridian Street is hereby approved effective August 18, 2026 through December 31, 2026, contingent upon receipt of $100.00 annual per site fee. The adoption of the foregoing resolution was duly moved by Councilmember ____ and seconded by Councilmember ______, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th day of August, 2026. ## ATTEST: ___________________ _______________________ James Evans Dawn Meyer Mayor City Administrator Page 27 of 104 ## City Council Report ## Dorothy Koller August 2026 ## Drivers Education  February is the next session  Two Behind-the-Wheel vehicles out on a regular basis ## Youth Enrichment & Recreation  Summer was AWESOME o Tons of participation from all ages and variations of camps, sports, art classes etc. ## Preschool/Kids Co/ECFE ##  Kids Company o Great summer - 191 total kids o Fall registration is open!  Preschool registration for 2026-27 o 4 year olds = FULL o 3 year olds = Almost Full ## Adult Rec/Enrichment/Family  Raise The Bar is continuing with strong energy. ##  BPXC Summer Training ##  Adult Trips ##  Online Classes Page 28 of 104 - August 03, 2026©2000-2026 Sansio Sansio - HealthEMS®Page 1 of 5 ## Agency Activity Summary ## Ridgeview Ambulance Service Agency: Ridgeview Ambulance Service | ePCR Branch: 301, 302, 305 | Data Source: ePCR | Service Date: Last Month Total Number of ePCRs: 129 ## Total Number of Incidents: 125 ## By Branch ## 301 BELLE PLAINE = 64 305 JORDAN = 65 ## Billing Disposition (ePCR Data Only) # % # % ## Treated/Transported8767.4% Dead Prior To Arrival10.8% ## Treated / Transferred CareN/AN/A Dead After ArrivalN/AN/A ## Treated/No Transport (AMA)21.6% Treat/Transported by Private Veh.10.8% ## Treated / No Transport (Per Protocol)75.4% AssistN/AN/A ## Transported / Refused CareN/AN/A Other32.3% ## No Transport / Refused Care86.2% No Patient FoundN/AN/A ## Cancelled2015.5% ## Left BlankN/AN/A ## Unit Disposition (ePCR Data Only) Description# % ## Cancelled Prior to Arrival at Scene107.8% ## Cancelled on Scene64.7% ## No Patient Contact43.1% ## Non-Patient Incident (Not Otherwise Listed)10.8% ## Patient Contact Made10883.7% ## Left Blank00.0% ## Total129100.0% ## Patient Evaluation/Care Disposition (ePCR Data Only) Description# % ## Not Applicable1310.1% ## Patient Evaluated and Care Provided9775.2% ## Patient Evaluated and Refused Care75.4% ## Patient Evaluated, No Care Required32.3% ## Patient Refused Evaluation/Care10.8% ## Left Blank86.2% ## Total129100.0% ## Crew Disposition (ePCR Data Only) Description# % ## Assumed Primary Care from Another EMS Crew21.6% ## Back in Service, Care/Support Services Refused86.2% ## Back in Service, No Care/Support Services Required43.1% ## Initiated and Continued Primary Care9573.6% ## Left Blank2015.5% ## Total129100.0% ## Transport Disposition (ePCR Data Only) Description# % ## No Transport86.2% ## Not Applicable129.3% ## Patient Refused Transport1410.9% ## Transport by This EMS Unit (This Crew Only)8666.7% Transport by This EMS Unit, with a Member of Another Crew10.8% ## Left Blank86.2% ## Total129100.0% Page 29 of 104 - August 03, 2026©2000-2026 Sansio Sansio - HealthEMS®Page 2 of 5 ## Run Type # % # % ## Emergency Runs12596.9% Non-Emergency Runs43.1% ## Stand By10.8% Stand By21.6% ## Mutual AidN/AN/A Mutual AidN/AN/A ## InterfacilityN/AN/A InterfacilityN/AN/A ## InterceptN/AN/A InterceptN/AN/A ## Emergency Runs (Scheduled)N/AN/A Non-Emergency Runs (Scheduled)N/AN/A ## Stand ByN/AN/A Stand ByN/AN/A ## Mutual AidN/AN/A Mutual AidN/AN/A ## InterfacilityN/AN/A InterfacilityN/AN/A ## InterceptN/AN/A InterceptN/AN/A ## Emergency Type Left Blank: 0 ## Runs by Unit (ePCR Data Only) ## Unit ## Total ## Runs ## Treat/ ## Transp ## Treat/ ## Transfer ## Treat/No ## Transp(AMA) ## Treat/No ## Transp(PP) ## Transp/ ## Ref. Care ## Cancelled ## Dead ## Prior Arr ## Dead ## After Arr ## T/T ## Priv Veh ## No Trans/ ## Ref. Care ## Assist ## Other No Pat. ## Found 100111000000000000 110072000030002000 12005942005070004010 140011000000000000 150020000020000000 20030001010001000 210041001010010000 40011000000000000 5004837020051001020 70022000000000000 ## Golf Cart10000010000000 ## Total129870270201018030 ## Runs by Service Level (ePCR Data Only) ## Dispatched Recommended Service Level# % Service Level# % ## BLS64.7% BLS2620.2% ## ALS12395.3% ALS110178.3% ## SCTN/AN/A ALS221.6% ## SCTN/AN/A ## Rotary WingN/AN/A ## Fixed WingN/AN/A Runs by Insurance Type with Service Level (ePCR Data Only) (Multiple insurance types may have been marked on a run) ## TypeBLS%ALS1%ALS2%SCT%Rotary Wing%Fixed Wing%Total% ## N/AN/A 10.8% N/AN/A N/AN/A N/AN/A N/AN/A 10.8% ## None2620.2% 10279.1% 21.6% N/AN/A N/AN/A N/AN/A 130100.8% ## Runs by Primary PI (ePCR Data Only) Description# % ## Abdominal Pain43.1% ## Airway Obstruction10.8% ## Anxiety10.8% ## Back Pain (No Trauma)43.1% ## Behavioral Disorder43.1% ## CVA/Stroke10.8% ## Cardiac Symptoms32.3% Cellulitis, unspecified10.8% ## Chest Pain43.1% ## Dizziness43.1% ## Dyspnea - SOB64.7% ## ETOH - Intoxication32.3% ## ETOH - Withdrawl21.6% Failure to Thrive - Adult (Suspected)10.8% Page 30 of 104 - August 03, 2026©2000-2026 Sansio Sansio - HealthEMS®Page 3 of 5 ## Heat Exhaustion - Initial Encounter43.1% ## Hypoglycemia10.8% Nausea with vomiting10.8% ## Nose Bleed21.6% ## Obvious Death10.8% Pain, chronic21.6% ## Psychiatric Emerg.32.3% ## Seizure64.7% Sepsis (Suspected)21.6% ## Syncope/Fainting21.6% ## Trauma Injury2317.8% ## Unconscious43.1% ## Unknown Medical97.0% ## Weakness97.0% ## Left Blank2116.3% ## Total129100.0% Page 31 of 104 - August 03, 2026©2000-2026 Sansio Sansio - HealthEMS®Page 4 of 5 ## Runs by Dispatch (EMD) Code Description# % ## 01C Abdominal Pain / Problems21.6% ## 01D Abdominal Pain / Problems21.6% 02A Allergies / Envenomations10.8% ## 05A Back Pain (Non Traumatic or Non Recent Trauma)10.8% ## 06D Breathing Problems97.0% ## 10D Chest Pain43.1% 11A Choking10.8% 12C Convulsions / Seizures10.8% 12D Convulsions / Seizures64.7% 17D Falls2418.6% ## 19D Heart Problems / AICD21.6% ## 20D Heat / Cold Exposure10.8% 21D Hemorrhage / Lacerations32.3% 23C Overdose / Poisoning / Ingestion10.8% ## 25C Psychiatric / Abnormal Behavior / Suicide Attempt75.4% ## 25D Psychiatric / Abnormal Behavior / Suicide Attempt21.6% ## 26A Sick Person (Specific Diagnosis)21.6% ## 26D Sick Person (Specific Diagnosis)1814.0% 28D Stroke (CVA)21.6% ## 29C Traffic / Transportation Accidents21.6% ## 29D Traffic / Transportation Accidents64.7% 30D Traumatic Injuries (Specific)53.9% 31D Unconscious / Fainting (Near)1310.1% ## 32C Unknown Problem (Person Down)10.8% ## 32D Unknown Problem (Person Down)64.7% 85A Standby10.8% 85C Standby10.8% 85D Standby10.8% ## 86D Medical Alarm43.1% ## Left Blank00.0% ## Total129100.0% Page 32 of 104 - August 03, 2026©2000-2026 Sansio Sansio - HealthEMS®Page 5 of 5 ## Transport From (Category) # % ## Home / Residence6248.1% ## Res. Custodial Facility21.6% ## Site of Transfer10.8% ## Res. Custodial Facility - Nursing Home64.7% ## Private Commercial Establishment53.9% ## Facility - Health Care Provider Office10.8% ## Facility - Urgent Care32.3% ## Public Building86.2% ## Recreation / Sport43.1% ## Street / Hwy1410.9% ## Unspecified10.8% ## Res. Custodial Facility - Assisted Living1511.6% --Left Blank--75.4% ## Total129100.0% ## Transport From (Facility) (ePCR Data Only) # % --Left Blank--9876.0% ## Kingsway Belle Plaine75.4% ## Oak Terrace Senior Living - Jordan64.7% ## Belle Plaine Lutheran Home64.7% ## Hope Residence53.9% ## Ridgeview Clinic - Belle Plaine43.1% ## Schule Haus32.3% ## Total129100.0% ## Transport To (Destination Facility) (ePCR Data Only) # % ## St. Francis Regional Medical Center4534.9% --Left Blank--4232.6% ## Ridgeview Medical Center1914.7% ## Mayo Clinic Health System - New Prague75.4% ## Two Twelve Medical Center75.4% ## Children's Health Care - Minneapolis32.3% ## Abbott Northwestern Hospital21.6% ## Ridges Hospital MHF10.8% ## Southdale Hospital MHF10.8% ## U of M East MHF10.8% ## Methodist Hospital - SLP10.8% ## Total129100.0% Page 33 of 104 Date IS BETWEEN 07/01/2026 AND 07/31/2026; AND Response Zone IS Belle Plain City ## Response Times by Priority ## Using Call Started Time ## Dispatch Priority ## Date ## Call Type ## Started TimeAt Scene ## Response Time Run # Incident # ## Late Reason Code 27/3/2026ALS20:38:4500:07:04<None> 942126-00916020:31:40 Code 27/5/2026BLS00:42:1600:05:33<None> 949426-00922800:36:43 Code 27/20/2026ALS02:57:4000:06:01<None> 1028626-01000602:51:39 Code 27/9/2026BLS11:20:4200:07:48<None> 972526-00945811:12:54 Code 27/12/2026ALS12:45:5900:28:40<None> 988526-00961312:17:19 Code 27/18/2026ALS01:12:5000:07:58<None> 1016326-00988601:04:52 ## Total Calls for Code 2: 6Average Response Time: 00:10:30 ## Dispatch Priority ## Date ## Call Type ## Started TimeAt Scene ## Response Time Run # Incident # ## Late Reason Code 37/18/2026ALS02:20:0400:23:27<None> 1016926-00989201:56:36 Code 37/18/2026ALS02:13:4400:16:03<None> 1017026-00989301:57:41 Code 37/18/2026ALS02:31:2100:15:56<None> 1017126-00989402:15:25 Code 37/18/2026ALS20:14:1900:05:19<None> 1021126-00993320:09:00 Code 37/18/2026ALS00:00:00N/A<None> 1021926-00994122:17:36 Code 37/19/2026ALS02:42:5100:09:07<None> 1022826-00995002:33:44 Code 37/13/2026ALS02:22:3400:06:59<None> 991326-00964002:15:35 Code 37/15/2026ALS15:30:0700:06:25<None> 1003326-00975615:23:42 Code 37/15/2026ALS18:19:4600:05:02<None> 1004026-00976318:14:44 Code 37/17/2026ALS06:08:1200:06:28<None> 1011326-00983606:01:44 Code 37/17/2026ALS13:59:3900:03:20<None> 1013326-00985613:56:19 Code 37/17/2026ALS00:00:00N/A<None> 013:56:19 Code 37/9/2026ALS14:48:4400:04:03<None> 973826-00947114:44:40 Code 37/9/2026ALS18:23:2300:10:56<None> 974726-00948018:12:27 Code 37/9/2026ALS18:45:4100:21:50<None> 974826-00948118:23:51 Code 37/10/2026ALS06:29:3100:06:18<None> 976926-00950206:23:13 Code 37/11/2026ALS14:36:3000:04:24<None> 984726-00957814:32:06 Code 37/12/2026ALS11:34:0200:05:34<None> 988426-00961211:28:28 Code 37/20/2026ALS11:08:2000:06:02<None> 1030226-01002211:02:18 Code 37/22/2026ALS00:20:0000:05:54<None> 1037226-01009100:14:06 Code 37/22/2026ALS05:35:4400:06:28<None> 1037826-01009705:29:16 Code 37/22/2026ALS06:28:5100:12:18<None> 1037926-01009806:16:33 Code 37/22/2026ALS06:44:0000:25:56<None> 1038026-01009906:18:04 Code 37/22/2026ALS21:06:4800:08:42<None> 1042026-01013920:58:06 Code 37/23/2026ALS12:19:3200:07:06<None> 1044526-01016412:12:26 Code 37/23/2026ALS17:51:2900:06:37<None> 1045826-01017717:44:52 Code 37/25/2026ALS11:28:5200:16:34<None> 1054226-01025911:12:18 Code 37/25/2026ALS18:26:0800:07:53<None> 1057026-01028718:18:15 Code 37/28/2026ALS15:29:1300:06:05<None> 1071026-01042315:23:08 Code 37/29/2026ALS02:19:4600:04:37<None> 1073826-01045102:15:09 Code 37/29/2026ALS09:50:1600:03:51<None> 1074926-01046209:46:25 \\zoll-02-p-web01\RNDB\reports32\DISPATCH\PERFORMANCE\RESPONSE TIMES\Response by Priority Call Started.rpt ## RescueNet™ Printed on: 8/3/2026 at 3:39:22PMPage 1 of 2 Page 34 of 104 Date IS BETWEEN 07/01/2026 AND 07/31/2026; AND Response Zone IS Belle Plain City ## Response Times by Priority ## Using Call Started Time ## Dispatch Priority ## Date ## Call Type ## Started TimeAt Scene ## Response Time Run # Incident # ## Late Reason Code 37/30/2026ALS13:26:4900:04:25<None> 1081026-01052213:22:24 Code 37/30/2026ALS00:00:00N/A<None> 1082326-01053516:28:41 Code 37/31/2026ALS14:35:5800:06:38<None> 1085526-01056714:29:20 Code 37/6/2026ALS00:00:00N/A<None> 955526-00928909:35:17 Code 37/6/2026ALS00:00:00N/A<None> 955626-00928909:35:53 Code 37/6/2026ALS00:00:00N/A<None> 957226-00930514:46:03 Code 37/6/2026ALS15:07:4800:20:39<None> 957326-00930614:47:08 Code 37/7/2026ALS22:51:4600:12:38<None> 964826-00938122:39:07 Code 37/7/2026ALS00:00:00N/A<None> 964926-00938222:39:54 Code 37/8/2026ALS00:00:00N/A<None> 968226-00941513:57:18 Code 37/8/2026ALS16:24:3100:06:40<None> 969026-00942316:17:51 Code 37/4/2026ALS10:17:4700:19:47<None> 944126-00918009:58:00 Code 37/4/2026ALS10:17:5000:13:52<None> 944326-00918010:03:57 Code 37/4/2026ALS18:44:0000:04:20<None> 947026-00920618:39:40 Code 37/1/2026ALS08:27:2800:05:32<None> 928626-00902908:21:56 Code 37/3/2026ALS13:06:0400:05:56<None> 939626-00913613:00:08 Code 37/3/2026ALS15:23:5500:04:58<None> 940226-00914215:18:57 Code 37/3/2026ALS16:25:4000:24:27<None> 940426-00914416:01:13 Code 37/3/2026ALS00:00:00N/A<None> 940526-00914416:03:12 Code 37/3/2026ALS18:33:0100:04:51<None> 941026-00914918:28:10 ## Total Calls for Code 3: 51Average Response Time: 00:07:55 ## Dispatch Priority ## Date ## Call Type ## Started TimeAt Scene ## Response Time Run # Incident # ## Late Reason Downgraded7/1/2026ALS08:18:4100:06:59<None> 928526-00902808:11:42 ## Total Calls for Downgraded: 1Average Response Time: 00:06:59 ## Total Average Response Time: 00:08:10Grand Total Calls: 58 \\zoll-02-p-web01\RNDB\reports32\DISPATCH\PERFORMANCE\RESPONSE TIMES\Response by Priority Call Started.rpt ## RescueNet™ Printed on: 8/3/2026 at 3:39:22PMPage 2 of 2 Page 35 of 104 ## Belle Plaine Police Department 420 E Main St., PO Box 129, Belle Plaine, MN 56011 ## Terry M. Stier ~ Chief of Police Office: 952-873-4307 Fax: 952-873-3850 DATE: August 7, 2026 ## TO: Mayor and Council ## RE: Monthly Police Report For the month of July, your Police Department handled 19 reported criminal cases, resulting in 47 offenses, wrote 202 traffic citations and warnings and recorded 602 calls for service. 07-01-26 Officer Guralnik and Officer Theis attended the Annual Diving Contest at Belle Plaine Aquatic Center. 07-08-26 Chief Stier and Officers attended All Wheel Wednesday Event. 07-09-26 Chief Stier attended a budget meeting at City Hall. 07-09-26 Officer Guralnik and Officer Weckman hosted Popsicles in the Park at Union Square Park. 07-11-26 Sgt. Cayer, Officer Guralnik, and Officer Weckman stopped at a Lemonade Stand where kids were raising money for families in need for the Belle Plaine Community. 07-13-26 Chief Stier attended a Minnesota Chiefs of Police and Minnesota Sheriffs Association bi-weekly regional teams meeting. 07-14-26 Chief Stier attended a briefing from the Bureau of Criminal Apprehension, Fusion Center for Current and Emerging Threats. 07-14-26 Chief Stier attended a drone committee meeting at the fire department. 07-15-26 Chief Stier attended a Towards Zero Deaths (TZD) grant meeting via TEAMS. 07-16-26 Police, Fire Department and EMS went to Early Childhood Academy for a Touch a Truck Event. 07-18-26 Chief Stier and Officers provided security and community engagement during the BBQ Days Celebration. 07-20-26 Chief Stier attended a Finance Ways and Means meeting at City Hall. 07-20-26 Chief Stier attended a City Council meeting at City Hall. 07-22-26 Chief Stier and Officers attended All Wheel Wednesday Event. Page 36 of 104 07-28-26 Chief Stier attended a briefing from the Bureau of Criminal Apprehension Fusion Center for Malicious Activity Water and Wastewater Facilities. 07-29-26 Chief Stier attended a Joint Terrorism Task Force (JTTF) Executive Board meeting at the Minnesota Federal Bureau of Investigations building in Brooklyn Center. 07-29-26 Chief Stier and Officers attended All Wheel Wednesday Event. 07-30-26 Officer Guralnik and Officer Weckman hosted Popsicles in the Park at Hickory Park. Page 37 of 104 ## JUNEJULYYEAR TO DATE ## TOTALTOTALTOTAL ## Alcohol Offenses147 ## Assault3315 ## Burglary000 ## Criminal Sexual Conduct203 ## Criminal Fire000 ## Damage to Property003 ## Disorderly Conduct001 ## Driving While Intoxicated4426 ## Drug Offenses102 ## Family Offenses002 ## Forgery/Fraud104 ## Harassment/Harassing Calls 000 ## Obstruction026 ## Stolen Motor Vehicle/Tampering102 ## Theft2215 ## All Others 5431 ## TOTAL2019117 ## July Clearance Numbers Include: A total of 19 separate cases resulting in 47 offenses Cases cleared by arrest 1917 Cases cleared by exception 01 Cases are currently inactive 01 Cases are currently active 10 ## Unfounded00 2019 ## July Percent Cleared : 95.00%95.00% ## BELLE PLAINE POLICE DEPARTMENT – MONTHLY STATISTICS-2026 ## CRIMINAL ACTIVITY Page 38 of 104 ## JUNEJULYYEAR TO DATE ## TOTALTOTALTOTAL ## Alarms4454 ## Animal Complaints1916107 ## Assist Other Departments5560305 ## Background/Record Checks8636405 ## Assist Public3348283 ## Civil Disputes8659 Domestics – not physical5425 ## Community Engagement3012130 ## Lost/Found161877 ## Handgun Permits5557 ## Juvenile/Mischief131068 ## Medical Assists4132247 ## Noise Complaints2521 ## Ordinance Violations13961 ## Patrol Checklist4938764 ## Predatory Offender Checks 5026 ## Motor Vehicle Accidents2937 Suspicion 3439250 ## Traffic Complaints13886 ## Vehicle Lockouts4431 ## Citations/Warnings1482021488 ## Warrants207 ## All Others1918122 ## TOTAL6065834710 ## NON-CRIMINAL ACTIVITY Page 39 of 104 ## JUNEJULYYEAR TO DATE ## TOTALTOTALTOTAL 101NW quadrant located N of Main Street4435395 201NE quadrant located N of Main Street2201891579 301SW quadrant located N of Hwy. 1698599796 302SW quadrant located S of Hwy. 16916983 401SE quadrant located N of Hwy. 1697785528 402SE quadrant located S of Hwy 1691321481203 202Outside City Limits (Assists to other Depts.)5237243 ## TOTAL6266024827 Total calls for service in the city limits alone, amount to 92.00%94.00% Total calls to assist other departments, outside of city limits, amount to8.00%6.00% ## ACTIVITY BY QUADRANT #QUADRANT LOCATION DESCRIPTION Page 40 of 104 ## CITATIONS & WARNINGSJUNE TOTALJULY TOTALYEAR TO DATE TOTAL ## DAR/DAC/DAS2330 ## Expired Registration1013 ## Speed1516109 ## Stop Sign2111 ## No Insurance2114 ## Snowbird/Street Cleaning3120 ## Other Citations 4446 ## Written Warnings1191761245 ## TOTAL1482021488 ## SOURCE OF CALLS FOR SERVICEJUNE TOTALJULY TOTALYEAR TO DATE TOTAL Telephone (non-emergency)109119729 ## Officer Initiated3153292849 ## Dispatch/9119080592 ## In Person3045222 ## Mail/Fax8228434 ## Officer at Scene011 ## TOTAL6266024827 ## CRIMES COMMITTED BYJUNE TOTALJULY TOTALYEAR TO DATE TOTAL ## Adults181492 ## Juveniles1417 ## Unknown118 ## TOTAL2019117 Page 41 of 104 ## DAILY ## TOTAL ## Sunday21291767 ## Monday6437 16117 ## Tuesday553518108 ## Wednesday35221168 ## Thursday523414100 ## Friday 49271288 ## Saturday29292078 ## TOTAL305213108626 Percent of total calls for service between the hours of 7 AM – 3 PM was 49.00% Percent of total calls for service between the hours of 3 PM – 11 PM was 34.00% Percent of total calls for service between the hours of 11 PM – 7 AM was 17.00% ## DAILY ## TOTAL ## Sunday22402688 ## Monday40192180 ## Tuesday37181570 ## Wednesday3324966 ## Thursday53291193 ## Friday285229109 ## Saturday25462596 ## TOTAL238228136602 Percent of total calls for service between the hours of 7 AM – 3 PM was 40.00% Percent of total calls for service between the hours of 3 PM – 11 PM was 38.00% Percent of total calls for service between the hours of 11 PM – 7 AM was 22.00% ## JULY ## ACTIVITY REPORT BY TIME ## AND DAY ## 7:00 AM ## TO 3:00 ## PM ## 3:00 PM ## TO 11:00 ## PM ## 11:00 PM ## TO 7:00 ## AM ## JUNE ## ACTIVITY REPORT BY TIME ## AND DAY ## 7:00 AM ## TO 3:00 ## PM ## 3:00 PM ## TO 11:00 ## PM ## 11:00 PM ## TO 7:00 ## AM Page 42 of 104 ## ?¾A@ ## GbWX ## GeWX ## ?¾A@ ## GbWX )y )y ## GdWX ## GfWX ## GdWX 40 2 30 1 10 1 20 1 30 2 40 1 20 2 ## ENTERPRISE DR ## SOUTH ST ## WEST COMMERCE DR ## MAIN ST ## E ORCHARD ST ## ELK ST ## EAST C OMMER CE DR ## FOREST ST ## LIN DEN ST ## PARK ST ## LAR EDO ST ## MERI DIAN ST ## MARKET ST ## STATE ST ## ASPEN LN N ## ENTERPRISE DR - BR IDGE ## SOUTH ST ## STATE ST ## COUR T ST ## PRAIRIE ST ## CEDAR ST ## WILLOW ST ## ASH ST ## ELM ST ## CHESTN UT ST ## PARK ST ## SCOTT LN ## OAKC REST TR ## EAGLE ST ## FOREST ST ## E ORCHARD ST ## MAIN ST ## S ELM ST ## 1ST ST NE ## MARKET ST ## LIN DSEY LN ## JASON AVE ## GROVE ST ## WA LNU T ST ## LIN DEN ST ## SOUTH MAPLE ST ## CHURCH ST ## S WALNUT ST ## CHERRY ST ## BEAVER ST ## KITTSON BLVD S ## OLD T.H. 169 BLVD ## E CENTURY ST ## OAKWOOD DR ## OAK ST ## SUNRISE LN ## S CEDAR ST ## O'BRIEN PKWY ## BUTLER DR ## BELLE PLAINE TR ## ELK ST ## PARK DR ## LAC Y LN ## DANIEL DR ## IVY H ILLS RD ## S CHESTNUT ST ## RUSTIC TR ## PRAIRIE OAK DR ## HARALSON DR ## WEST ST ## SHEA ST ## SCHOOLH OUSE DR ## PROVENCE LN ## FARMERS WAY ## PARK LN ## ASHFORD WAY ## RAVEN ST ## RIVERVIEW LN ## E EVERGREEN ST ## MALLARD LN ## FARMERS RI DGE TR ## STATE ST ## WEST EVERGREEN ST ## DIVERSIFIED DR ## HERITAGE LN ## BUFFALO ST ## DEER CREEK PKWY ## HERITAGE TR ## SHANNON LN ## LAC Y CT ## COBB LESTONE LN ## PLATEAU LN ## RIDGE LN ## SUNSET DR ## FRONTIER DR ## SHEA CI R ## KAYLA CIR ## SCOTT CIR ## ASH CIR ## FARMERS PL ## FARMERS LN ## WEST CENTU RY ST ## LIN WOOD RD ## CHATFIELD LN ## JAYMIE CT ## HAZEL ST ## E PINE ST ## HENRY CIR ## MORNINGSIDE PL ## SOUTH CHESTNUT ST ## SOUTH ST ## CREST ST ## MEADOW PL ## MAPLE CIR ## 240TH ST ## CREEKVIEW LN ## CENTURY CT ## ASHFORD RD ## PHEASANT CT ## ROBERT CREEK CURVE ## ORCH ARD CIR ## RIVER BLUFF ST ## PIONEER CIR ## OAKWOOD CIR ## DOVE CT ## HILLCR EST D R ## ROBERT CIR ## ALLEY BLK 131 ## FRONTIER CIR ## OAK VILLAGE CT ## WEST COMMERCE DR ## RIVERVIEW CT ## WOODBRIDGE CI R ## FOREST ST ## SOUTH ST ## RAVEN ST ## LIN DEN ST ## STATE ST ## MARKET ST ## COUR T ST ## ELK ST ## PRAIRIE ST ## BUFFALO ST ## E CENTURY ST ## SUNRISE LN ## BELLE PLAINE TR ## WEST ST ## ELM ST ## RAVEN ST ## PARK ST ## CHURCH ST ## ELK ST ## CHURCH ST ## BEAVER ST ## WEST ST ## ASH ST ## ALLEY BLK 106 ## ALLEY BLK 91 ## ALLEY BLK 95 ## ALLEY BLK 104 ## ALLEY BLK 134 ## ALLEY BLK 103 ## ALLEY BLK 102 ## ALLEY BLK 104 Map Document: \\arcserver1\GIS\BELL\_Basemap\ESRI\Maps\2017\Bell_PoliceGrids_11x17.mxd | Date Saved: 12/8/2017 3:16:32 PM ## Police Grids December 2017 ## Legend ## Police Grid ## Parcels ## City Limits 01,500 ## Feet ## Source: Scot County - 2016 County Photo ! ## I Page 43 of 104 ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## Fire Department Monthly City Council Report ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## City of Belle Plaine28134 ## Fire - Outside Fire - Wildfire - Wildland01 ## Fire - Structure Fire - Structural Involvement15 ## Fire - Structure Fire - Confined Cooking / Appliance Fire02 ## Fire - Transportation Fire - Vehicle Fire - Passenger12 ## Hazardous Situation - Hazard Non-Chemical - Electrical ## Power Line Down / Arching / Malfunction 11 ## Hazardous Situation - Hazard Non-Chemical - Electrical ## Hazard / Short Circuit 11 ## Hazardous Situation - Hazard Non-Chemical - Motor Vehicle ## Collision 16 ## Hazardous Situation - Hazardous Materials - Fuel Spill / Fuel ## Odor 01 ## Hazardous Situation - Hazardous Materials - Gas Leak / Gas ## Odor 08 ## Hazardous Situation - Hazardous Materials - Carbon ## Monoxide Release 02 ## Medical - Illness11 ## Medical - Illness - Back Pain (Non-Trauma)01 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 1 of 7 Page 44 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## Medical - Illness - Breathing Problems13 ## Medical - Illness - Cardiac Arrest04 ## Medical - Illness - Convulsions / Seizures110 ## Medical - Illness - Overdose / Poisoning01 ## Medical - Illness - Sick Case01 ## Medical - Illness - Stroke / CVA11 ## Medical - Illness - Unknown Problem27 ## Medical - Illness - No Appropriate Choice03 ## Medical - Injury03 ## Medical - Injury / Trauma - Fall12 ## Medical - Injury / Trauma - Motor Vehicle Collision13 ## Medical - Injury / Trauma - Other Traumatic Injury22 ## Medical - Other - Community Public Health23 ## Public Service - Citizen Assist - Lost Person11 Public Service - Citizen Assist - Citizen Assist / Service Call44 ## Public Service - Citizen Assist - Lift Assist221 Public Service - Alarms (Non Medical) - Fire / Smoke Alarm05 ## Public Service - Alarms (Non Medical) - CO Alarm14 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 2 of 7 Page 45 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## Public Service - Alarms (Non Medical) - Other Alarm01 ## Public Service - Other - Standby02 ## No Emergency - False Alarm - Malfunctioning Alarm16 ## No Emergency - False Alarm - Accidental Alarm03 ## No Emergency - False Alarm - Other False Call01 ## No Emergency - Good Intent - Smoke From Nonhostile ## Source (Smoke Scare) 12 ## No Emergency - Cancelled110 ## Blakeley Township122 ## Fire - Outside Fire - Vegetation / Grass Fire02 Fire - Outside Fire - Dumpster / Other Outdoor Container Fire01 ## Fire - Transportation Fire - Vehicle Fire - Passenger01 ## Hazardous Situation - Hazard Non-Chemical - Motor Vehicle ## Collision 01 ## Hazardous Situation - Hazardous Materials - Hazardous ## Material Release (Chemical from Transportation) 01 ## Medical - Illness - Breathing Problems01 ## Medical - Illness - Chest Pain (Non-Trauma)01 ## Medical - Illness - Convulsions / Seizures01 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 3 of 7 Page 46 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## Medical - Illness - Heart Problems01 ## Medical - Illness - Unknown Problem01 ## Medical - Injury / Trauma - Motor Vehicle Collision11 ## Public Service - Citizen Assist - Lift Assist05 Public Service - Alarms (Non Medical) - Fire / Smoke Alarm02 ## Rescue - Transportation (Land) - Motor Vehicle Collision ## Extrication / Entrapment 01 ## No Emergency - False Alarm - Accidental Alarm01 ## No Emergency - Cancelled01 ## Faxon Township316 ## Fire - Outside Fire - Other Outside Fire01 ## Fire - Outside Fire - Vegetation / Grass Fire01 ## Hazardous Situation - Hazard Non-Chemical - Electrical ## Power Line Down / Arching / Malfunction 12 ## Hazardous Situation - Hazardous Materials - Carbon ## Monoxide Release 01 ## Medical - Illness01 ## Medical - Injury / Trauma - Motor Vehicle Collision12 Public Service - Citizen Assist - Citizen Assist / Service Call11 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 4 of 7 Page 47 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## Public Service - Citizen Assist - Lift Assist03 ## Public Service - Alarms (Non Medical) - CO Alarm01 ## Rescue - Transportation (Land) - Motor Vehicle Collision ## Extrication / Entrapment 01 ## No Emergency - Cancelled01 ## Law Enforcement Support01 ## Hancock Township12 ## Medical - Injury11 ## Medical - Injury / Trauma - Motor Vehicle Collision01 ## St. Lawrence Township07 ## Fire - Outside Fire - Vegetation / Grass Fire01 ## Hazardous Situation - Hazard Non-Chemical - Motor Vehicle ## Collision 01 ## Medical - Injury / Trauma - Motor Vehicle Collision01 ## Rescue - Water - Watercraft in Distress01 ## No Emergency - Cancelled02 ## Law Enforcement Support01 ## San Francisco Township38 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 5 of 7 Page 48 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 ## RESPONSE ZONE / PRIMARY INCIDENT TYPELAST MONTH INCIDENT COUNTYEAR TO DATE INCIDENT COUNT ## Hazardous Situation - Hazard Non-Chemical - Electrical ## Power Line Down / Arching / Malfunction 01 ## Hazardous Situation - Hazard Non-Chemical - Motor Vehicle ## Collision 12 ## Medical - Illness - Chest Pain (Non-Trauma)11 ## Medical - Illness - Sick Case11 ## Medical - Illness - Unknown Problem01 ## Public Service - Citizen Assist - Lift Assist02 ## Belle Plaine Township08 ## Fire - Outside Fire - Vegetation / Grass Fire01 ## Hazardous Situation - Hazard Non-Chemical - Motor Vehicle ## Collision 01 ## Hazardous Situation - Hazardous Materials - Gas Leak / Gas ## Odor 01 ## Medical - Illness - Abdominal Pain / Problems01 ## Medical - Illness - Cardiac Arrest02 ## Public Service - Citizen Assist - Lift Assist01 Public Service - Alarms (Non Medical) - Fire / Smoke Alarm01 ## Total36197 Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 6 of 7 Page 49 of 104 ## Fire Department Monthly City Council Report ## Belle Plaine FD MN ## Address: 700 E Main St, Belle Plaine, MN, 56011 Description: To: Mayor James Evans, City Council Members, City Administrator, and Rural Farm Fire From: Tim Hentges Chief 2 Re: Monthly Rep This month the Fire Department welcomed David Wetzel to the Department. The department ran duty crews through BBQ days. We had training with Life Link. We had two members get their Drone certificates. Powered by TCPDF (www.tcpdf.org) Report ID: 147237 This report was generated on : 08/13/2026 01:56 PM Page: 7 of 7 Page 50 of 104 DATE: August 17, 2026 TO: Honorable Mayor Evans, Members of the City Council, & Administrator Meyer ## FROM: Cynthia Smith Strack, Community Development Director ## RE: Community Development Monthly Report to the City Council ## ECONOMIC DEVELOPMENT UPDATES The EDA met three times in the past month. The Council and EDA met in joint session on July 20 th to review a preliminary application for tax increment assistance. The Council, PZC, and EDA met in joint work session on August 3 rd to discuss streamlining development review. The EDA met in regular session on August 10 th to review preliminary budget. ## OTHER ECONOMIC DEVELOPMENT ITEMS: ##  Attended Scott County CDA Strategic Plan Visioning Session  Closing on city property sale  Zoning information/assistance to five commercial entities  City communications ##  Compile information for Scott County Housing and Commercial/Industrial Studies  LAHA grant request  Pre-TIF application coordination/review  HRA first time home buyer programming ## PLANNING COMMISSION UPDATES The Planning and Zoning Commission, Council, and EDA met in joint worksession on August 3 rd . The PZC received informational concept plans for Belle Plaine Schools projects and joined in discussion about streamlining development review. ## OTHER PLANNING ITEMS:  2050 Comprehensive Plan update  Physical profile mapping  Code review (zoning) assistance for building/zoning permits  Discussions with residential developer  Metro Council grant request ## MEMORANDUM Page 51 of 104 ## Community Development Monthly Report August 17, 2026 Page 2 ## DESIGN COMMITTEE The Design Committee did not meet in August. ## BUILDING OFFICIAL ACTIVITIES  9 On-site/in office consultations with property owners & contractors to discuss building options/permit questions. ## INSPECTIONS Commercial Residential ## Building 0 78 ## Rental 10 ## Zoning 10 ## Code Enforcement 37 ## TOTAL 135 ## BUILDING & ZONING PERMITS PROCESSED  1- Commercial Building – ## Existing – 201 Main Street West ## New Build –  0 - Commercial Plumbing – Existing – ## New Build -  2 - Commercial Mechanical – ## Existing- 119 Main Street West, 815 Prairie Street East ## New Build-  0- New House –  1- Deck – 820 Maple Street South  0 - Accessory Structure –  4 - Remodel/Building/Pool – 1003 Prairie Street West, 916 Riverview Lane, 117 Oakwood ## Drive, 151 Cedar Street South Page 52 of 104 ## Community Development Monthly Report August 17, 2026 Page 3  1 - Finish Basement – 820 Maple Street South  3 - Re-roof – 505 Farmers Place, 701 Butler Drive, 216 Market Street North  2 - Re-side – 200 Elk Street South, 315 Church Street East  4 - Re-window/Re-door – 705 Beaver Street East, 200 Elk Street South, 212 Chestnut Street ## North, 315 Church Street East  0 - Demolition -  4 - Fence – 1000 Lacy Lane, 933 Cobblestone Lane, 400 Main Street East, 508 Jaymie Court  1 - Shed – 508 Jaymie Court  1 – Sidewalk/Slab – 225 Walnut Street South  0 - Sign –  0 - Chickens – ## BUILDING PERMIT TREND DATA THROUGH JULY 2026 (The following data does not represent all permits issued.) Page 53 of 104 Page 54 of 104 Page 55 of 104 Page 56 of 104 Page 57 of 104 Page 58 of 104 Page 59 of 104 Page 60 of 104 Page 61 of 104 Page 62 of 104 Page 63 of 104 Page 64 of 104 Page 65 of 104 Page 66 of 104 Page 67 of 104 Page 68 of 104 Page 69 of 104 Page 70 of 104 Page 71 of 104 Page 72 of 104 Page 73 of 104 Page 74 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Todd Otto, Public Works Superintendent ## AGENDA ## ITEM: Discussion and Direction: Plow Truck No. 8. ## BACKGROUND/ ## JUSTIFICATION: The Public Works Department purchased a replacement plow truck in 2024 to replace the 2015 /2016 International 7400. Due to a lengthy build time, the City has now received the truck, and it is ready to be placed into service. As a result, the City is able to retire Plow Truck No. 8 from service. Nuss Truck and Equipment has offered the City $20,000.00 to purchase the truck through its buy-back program. Staff is requesting Council discussion and direction regarding which option to pursue for the Sale of Plow Truck No. 8. The following options are available: Option 1 – Trade-in for Cash Value to Nuss Truck and Equipment Trade-in the truck directly to Nuss Truck and Equipment for the offered purchase price of $20,000.00. Option 2 – Sell at Auction. Place the truck up for auction and accept the highest qualifying bid. Option 3 – Advertise for Sealed Bids. Advertise the truck for sale and accept sealed bids. The City reserves the right to reject any or all bids. The Public Works Committee reviewed this request on August 12 and recommended bringing the matter to the City Council for discussion and direction. The Committee’s recommendation is to trade-in the Plow Truck No. 8 to Nuss Truck and Equipment for $20,000.00. ## FISCAL ## IMPACT: Funds from the sale of Plow Truck No. 8 will be placed in Public Works Capital as part of the Capital Plan. ## STAFF ## RECOMMENDATION: Discussion and Direction: Plow Truck No. 8. Page 75 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: Resolution 26-097 Consideration of Awarding the Bid to KUE Contractors, Inc. in the amount of $3,463,827.22 for the Public Safety Facility Renovation and Expansion Project. ## BACKGROUND/ ## JUSTIFICATION: The City has evaluated options for a Public Safety Facility to address the need of the community and comply with applicable state and federal requirements. City Council members toured the existing facility with City staff and received detailed information regarding the current condition of the building, including deficiencies related to compliance with current regulatory and operational standards. After a preliminary facility plan presentation and extensive discussion, it was the consensus of the majority of the Council to proceed with preparation of construction documents. On June 16, 2026, the Council authorized Resolution 26-079 Authorizing Advertisement for Bids for the Belle Plaine Public Safety Facility Renovation and Expansion Project. The bids were received and reviewed on August 12, 2026. Staff was asked for an option that would eliminate the security fencing. Removing the fencing would result in a deduction of $134,489.25. Attached is the bid information with the apparent low bid from KUE Contractors, Inc. in the amount of $3,463,827.22. ## Available Funding: ## City Contribution – Capital Fund 402 Land Sale $1,195,248.00 ## City Contribution – Capital Fund 402 Encumbered Ambulance $149,501.56 ## City Contribution Land Sale August 2026 $265,000.00 ## Cash Fund Available $1,609,749.56 **Another option is for the Council to redirect the $300,000 in capital funds allocated for land purchases and the $52,000 allocated for Police Facilities to this project. The impact of using these funds would be a reduction in available capital funds for future land purchases. Staff has requested a bond run from the City’s financial advisors, Ehlers, for the remaining cost of the project. This information is currently being prepared and will be distributed to Council on Monday for review of potential impact. ## FISCAL ## IMPACT: This project will be paid for with cash on hand and an issued bond. ## STAFF ## RECOMMENDATION: Approve Resolution 26-097 Consideration of Awarding the Bid to KUE Contractors, Inc. in the amount of $3,463,827.22 for the Public Safety Facility Renovation and Expansion Project. Page 76 of 104 ## \\MANKATO5\H\BELL\25X139918000\1_CORRES\C_TO OTHERS\139918 RECOMMENDATION LTR.DOCX ## 1960 Premier Drive ## Mankato, MN 56001 Phone: (507) 625-4171 ## Bolton-Menk.com August 13, 2026 ## Dawn Meyer ## City Administrator ## City of Belle Plaine ## 218 North Meridian Street, PO Box 129 ## Belle Plaine, MN 56011-0129 ## RE: Police Department Expansion & Renovation ## City of Belle Plaine, MN ## BMI Project No. 25X.139918 ## Dear Dawn, Bids were received and opened electronically through QuestCDN at City Hall on Wednesday, August 12 at 11:00am for the project referenced above. Seven (7) bids were received and the results of the bids are tabulated below: Bidder Base Bid A Base Bid B Base Bid C Total Base Bid ## Deduct ## Alternate KUE Contractors, Inc. $381,834.24 $2,280,970.64 $801,022.34 $3,463,827.22 -$134,489.25 Met-Con Construction, Inc. $463,670.00 $2,585,070.00 $662,930.26 $3,711,670.26 -$117,910.00 Brennan Construction of MN Inc. $935,968.16 $2,354,031.84 $497,412.46 $3,787,412.46 -$125,000.00 Dering Pierson Group, LLC $1,019,309.30 $2,140,587.62 $731,497.31 $3,891,394.23 -$158,488.00 BCI Construction, Inc. $400,000.00 $2,825,000.00 $752,159.54 $3,977,159.54 -$10,000.00 Project One Construction, Inc. $621,156.00 $2,763,724.00 $745,293.86 $4,130,173.86 -$148,488.00 ## Rice Lake Contracting Corp dba ## Rice Lake Construction Group $515,211.00 $2,941,816.00 $730,762.00 $4,187,789.00 -$123,000.00 Engineer’s Estimate $500,000.00 $2,260,000.00 $688,520.50 $3,448,520.50 -$50,000.00 The low bidder for the project is KUE Contractors, Inc., from Watkins, Minnesota. The total low Base Bid is approximately 0.4% above the Engineer’s Estimate and the next lowest bid is approximately 7% over the low bid. A detailed bid abstract of all the bids with the engineer’s estimate is attached for your review. Based on past performance on similar projects in previous years, it is our opinion that KUE Contractors, Inc. is qualified to perform the work required under this contract. If deemed financially feasible, we hereby recommend that KUE Contractors, Inc. be awarded the Base Bid for the contract based on the bid contract amount of $3,463,827.22. Please keep their attached submitted documents for your records. ## Sincerely, Bolton & Menk, Inc. ## Meagan McColloch-Vencil ## Senior Architect ## Enclosure ## cc: D. Joseph Duncan II, P.E., Belle Plaine City Engineer Page 77 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM12 ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNITUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT BASE BID A: LUMP SUM: AMBULANCE BUILDING1 LUMP SUM$500,000.00$500,000.00$381,834.24$381,834.24$463,670.00$463,670.00 BASE BID B: LUMP SUM: POLICE BUILDING ADDITION AND RENOVATION1 LUMP SUM$2,260,000.00$2,260,000.00$2,280,970.64$2,280,970.64$2,585,070.00$2,585,070.00 ## BASE BID C C1 2021.501 MOBILIZATION1 LUMP SUM$45,000.00$45,000.00$55,985.33$55,985.33$51,649.57$51,649.57 ## C2 2101.502 CLEARING1EACH$400.00$400.00$816.40$816.40$3,150.00$3,150.00 ## C3 2101.507 GRUBBING1EACH$200.00$200.00$816.40$816.40$3,150.00$3,150.00 ## C4 2104.502 REMOVE SIGN8EACH$50.00$400.00$59.28$474.24$315.00$2,520.00 ## C5 2104.502 REMOVE TRELLIS(6)3EACH$1,500.00$4,500.00$2,204.80$6,614.40$1,575.00$4,725.00 ## C6 2104.502 SALVAGE BIKE RACK1EACH$250.00$250.00$156.00$156.00$525.00$525.00 ## C7 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH)11LIN FT$5.00$55.00$5.72$62.92$5.25$57.75 ## C8 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)152LIN FT$2.50$380.00$4.21$640.22$5.25$798.00 ## C9 2104.501 REMOVE CURB AND GUTTER210LIN FT$5.00$1,050.00$3.12$655.20$3.68$772.80 C10 2104.501 REMOVE CURB AND GUTTER (SPOT REPLACEMENT)50LIN FT$5.00$250.00$10.40$520.00$21.00$1,050.00 ## C11 2104.504 REMOVE BITUMINOUS PAVEMENT4492 SQ YD$4.00$17,968.00$3.80$17,051.63$1.58$7,097.36 ## C12 2104.518 REMOVE CONCRETE WALK1620 SQ FT$2.00$3,240.00$1.04$1,684.80$0.79$1,279.80 C13 2106.507 EXCAVATION - COMMON (P)(P) 1395 CU YD$18.00$25,110.00$34.79$48,532.05$5.51$7,686.45 C14 2106.507 EXCAVATION - SUBGRADE(EV)(1) 300CU YD$16.00$4,800.00$55.12$16,536.00$15.75$4,725.00 ## C15 2106.507 COMMON EMBANKMENT (CV)(P)(CV) 360CU YD$8.00$2,880.00$6.24$2,246.40$10.50$3,780.00 C16 2106.507 STABILIZING AGGREGATE(CV)(1)(2) 300CU YD$35.00$10,500.00$29.12$8,736.00$36.23$10,869.00 C17 2211.507 AGGREGATE BASE (CV) CLASS 5(P)(CV) 995CU YD$30.00$29,850.00$27.04$26,904.80$53.60$53,332.00 C18 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3;C)310TON$85.00$26,350.00$117.52$36,431.20$117.71$36,490.10 C19 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3;C)515TON$82.00$42,230.00$112.32$57,844.80$101.54$52,293.10 ## C20 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V8LIN FT$60.00$480.00$69.06$552.45$48.30$386.40 C21 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V198LIN FT$65.00$12,870.00$78.00$15,444.00$56.70$11,226.60 C22 2503.603 4" PVC SANITARY SERVICE PIPE24LIN FT$50.00$1,200.00$530.40$12,729.60$229.95$5,518.80 ## C23 2503.602 CONNECT TO EXISTING STORM SEWER1EACH$750.00$750.00$2,704.00$2,704.00$525.00$525.00 ## C24 2506.502 CASTING ASSEMBLY4EACH$1,100.00$4,400.00$1,248.00$4,992.00$1,732.50$6,930.00 ## C25 2506.502 ADJUST FRAME AND RING CASTING1EACH$750.00$750.00$390.00$390.00$1,575.00$1,575.00 C26 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1(3)4LIN FT$600.00$2,400.00$717.60$2,870.40$1,050.00$4,200.00 C27 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40229.4LIN FT$800.00$7,520.00$834.08$7,840.35$892.50$8,389.50 C28 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40205.8LIN FT$750.00$4,350.00$634.40$3,679.52$892.50$5,176.50 ## C29 2521.501 4" CONCRETE WALK3713 SQ FT$10.00$37,130.00$7.12$26,436.56$7.88$29,258.44 ## C30 2521.501 6" CONCRETE WALK780SQ FT$20.00$15,600.00$8.26$6,442.80$11.97$9,336.60 C31 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED)(4) 140EACH$12.00$1,680.00$15.34$2,147.60$16.80$2,352.00 C32 2521.618 4" CONCRETE WALK SPECIAL(5) 1065 SQ FT$25.00$26,625.00$7.12$7,582.80$13.44$14,313.60 C33 2531.501 CONCRETE CURB & GUTTER DESIGN B618612LIN FT$28.00$17,136.00$48.03$29,394.36$40.16$24,577.92 Met-Con Construction, Inc. ## Faribault, MN KUE Contractors, Inc. ## Watkins, MN ## Engineer's Estimate Bolton & Menk, Inc. Page 78 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM12 ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNITUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT Met-Con Construction, Inc. ## Faribault, MN KUE Contractors, Inc. ## Watkins, MN ## Engineer's Estimate Bolton & Menk, Inc. C34 2531.501 CONCRETE CURB & GUTTER DESIGN B618 (SPOT REPLACEMENT)50LIN FT$28.00$1,400.00$56.60$2,830.00$48.72$2,436.00 ## C35 2531.603 CONCRETE SILL233LIN FT$15.00$3,495.00$29.26$6,817.58$19.43$4,527.19 ## C36 2540.602 BOLLARD18EACH$800.00$14,400.00$936.29$16,853.22$1,428.00$25,704.00 ## C37 2540.602 INSTALL BIKE RACK1EACH$1,000.00$1,000.00$364.00$364.00$979.65$979.65 ## C38 2540.603 METAL RAILING22LIN FT$400.00$8,800.00$236.36$5,199.92$272.58$5,996.76 C39 2540.621 LANDSCAPING ALLOWANCE1 ALLOWANCE$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00 C40 2545.501 EXTERIOR LIGHTING SYSTEM1 LUMP SUM$162,360.00$162,360.00$123,687.00$123,687.00$84,000.00$84,000.00 C41 2557.602 12' ACCESS GATE - BLACK VINYL COATED1EACH$12,000.00$12,000.00$37,679.20$37,679.20$16,642.50$16,642.50 C42 2557.602 16' ACCESS GATE - BLACK VINYL COATED3EACH$15,000.00$45,000.00$33,529.60$100,588.80$17,167.50$51,502.50 C43 2557.602 6' SWING GATE - BLACK VINYL COATED2EACH$2,500.00$5,000.00$2,714.40$5,428.80$997.50$1,995.00 C44 2557.602 4' SWING GATE - BLACK VINYL COATED WITH SLATS1EACH$2,000.00$2,000.00$2,490.80$2,490.80$635.25$635.25 C45 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED525LIN FT$85.00$44,625.00$46.64$24,488.10$89.25$46,856.25 C46 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED WITH SLATES56LIN FT$95.00$5,320.00$122.72$6,872.32$110.25$6,174.00 ## C47 2563.601 TRAFFIC CONTROL1 LUMP SUM$2,500.00$2,500.00$3,640.00$3,640.00$5,918.85$5,918.85 ## C48 2564.518 SIGN18SQ FT$85.00$1,530.00$577.78$10,400.04$23.63$425.34 C49 2573.502 STABILIZED CONSTRUCTION EXIT1 LUMP SUM$2,000.00$2,000.00$11,960.00$11,960.00$1,575.00$1,575.00 ## C50 2573.502 STORM DRAIN INLET PROTECTION7EACH$250.00$1,750.00$298.48$2,089.36$498.75$3,491.25 C51 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER400LIN FT$4.00$1,600.00$5.67$2,267.20$4.20$1,680.00 ## C52 2574.507 ORGANIC TOPSOIL BORROW334CU YD$45.00$15,030.00$47.84$15,978.56$59.33$19,816.22 ## C53 2574.508 FERTILIZER TYPE 382POUND$2.00$164.00$7.80$639.60$0.74$60.68 ## C54 2575.505 SEEDING0.41ACRE$2,000.00$820.00$1,196.00$490.36$1,774.50$727.55 C55 2575.508 HYDRAULIC BONDED FIBER MATRIX(7) 1435 POUND$1.50$2,152.50$2.60$3,731.00$2.94$4,218.90 ## C56 2575.523 RAPID STABILIATION METHOD 32.5MGAL$250.00$625.00$520.00$1,300.00$782.25$1,955.63 ## C57 2575.608 SEED RESIDENTIAL TURFGRASS82POUND$6.50$533.00$8.32$682.24$3.15$258.30 ## C58 2582.503 4" SOLID LINE PAINT1004 LIN FT$1.00$1,004.00$1.75$1,757.00$0.53$532.12 ## C59 2582.518 PAVEMENT MESSAGE PAINT18SQ FT$6.00$108.00$104.00$1,872.00$5.78$104.04 ## TOTAL BASE BID AMOUNT BID:$3,448,520.50$3,463,827.22$3,711,670.26 1.1Security Fencing and Gates-1Lump Sum$50,000.00-$50,000.00$134,489.25-$134,489.25$117,910.00-$117,910.00 ## DEDUCT ALTERNATE NO. 1 Page 79 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNIT ## BASE BID A: LUMP SUM: AMBULANCE BUILDING1 LUMP SUM ## BASE BID B: LUMP SUM: POLICE BUILDING ADDITION AND RENOVATION1 LUMP SUM ## BASE BID C ## C1 2021.501 MOBILIZATION1 LUMP SUM ## C2 2101.502 CLEARING1EACH ## C3 2101.507 GRUBBING1EACH ## C4 2104.502 REMOVE SIGN8EACH ## C5 2104.502 REMOVE TRELLIS(6)3EACH ## C6 2104.502 SALVAGE BIKE RACK1EACH ## C7 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH)11LIN FT ## C8 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)152LIN FT ## C9 2104.501 REMOVE CURB AND GUTTER210LIN FT ## C10 2104.501 REMOVE CURB AND GUTTER (SPOT REPLACEMENT)50LIN FT ## C11 2104.504 REMOVE BITUMINOUS PAVEMENT4492 SQ YD ## C12 2104.518 REMOVE CONCRETE WALK1620 SQ FT ## C13 2106.507 EXCAVATION - COMMON (P)(P) 1395 CU YD ## C14 2106.507 EXCAVATION - SUBGRADE(EV)(1) 300CU YD ## C15 2106.507 COMMON EMBANKMENT (CV)(P)(CV) 360CU YD ## C16 2106.507 STABILIZING AGGREGATE(CV)(1)(2) 300CU YD ## C17 2211.507 AGGREGATE BASE (CV) CLASS 5(P)(CV) 995CU YD ## C18 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3;C)310TON ## C19 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3;C)515TON ## C20 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V8LIN FT ## C21 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V198LIN FT ## C22 2503.603 4" PVC SANITARY SERVICE PIPE24LIN FT ## C23 2503.602 CONNECT TO EXISTING STORM SEWER1EACH ## C24 2506.502 CASTING ASSEMBLY4EACH ## C25 2506.502 ADJUST FRAME AND RING CASTING1EACH ## C26 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1(3)4LIN FT ## C27 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40229.4LIN FT ## C28 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40205.8LIN FT ## C29 2521.501 4" CONCRETE WALK3713 SQ FT ## C30 2521.501 6" CONCRETE WALK780SQ FT ## C31 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED)(4) 140EACH ## C32 2521.618 4" CONCRETE WALK SPECIAL(5) 1065 SQ FT ## C33 2531.501 CONCRETE CURB & GUTTER DESIGN B618612LIN FT *bid amount changed due to found calculation/addition error 345 ## UNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT $935,968.16$935,968.16$1,019,309.30$1,019,309.30$400,000.00$400,000.00 $2,354,031.84$2,354,031.84$2,140,587.62$2,140,587.62$2,825,000.00$2,825,000.00 $5,000.00$5,000.00$10,242.05$10,242.05$22,210.31$22,210.31 $3,000.00$3,000.00$785.00$785.00$850.82$850.82 $11,714.00$11,714.00$785.00$785.00$850.82$850.82 $330.00$2,640.00$57.00$456.00$61.78$494.24 $745.00$2,235.00$2,120.00$6,360.00$2,297.76$6,893.28 $500.00$500.00$150.00$150.00$162.58$162.58 $53.18$584.98$5.50$60.50$5.96$65.56 $14.47$2,199.44$4.05$615.60$4.39$667.28 $21.52$4,519.20$3.00$630.00$3.25$682.50 $14.50$725.00$10.00$500.00$10.84$542.00 $10.71$48,109.32$3.65$16,395.80$3.96$17,788.32 $3.27$5,297.40$1.00$1,620.00$1.08$1,749.60 $25.00$34,875.00$33.45$46,662.75$36.25$50,568.75 $132.10$39,630.00$53.00$15,900.00$57.44$17,232.00 $59.31$21,351.60$6.00$2,160.00$6.50$2,340.00 $36.75$11,025.00$28.00$8,400.00$30.35$9,105.00 $46.03$45,799.85$26.00$25,870.00$28.18$28,039.10 $133.00$41,230.00$118.70$36,797.00$114.89$35,615.90 $120.00$61,800.00$111.01$57,170.00$101.88$52,468.20 $314.13$2,513.04$66.40$531.20$71.97$575.76 $62.46$12,367.08$75.00$14,850.00$81.29$16,095.42 $158.33$3,799.92$510.00$12,240.00$552.76$13,266.24 $2,275.00$2,275.00$2,600.00$2,600.00$2,818.01$2,818.01 $793.25$3,173.00$1,200.00$4,800.00$1,300.62$5,202.48 $1,910.00$1,910.00$375.00$375.00$406.44$406.44 $2,022.75$8,091.00$690.00$2,760.00$747.86$2,991.44 $669.36$6,291.98$802.00$7,538.80$869.25$8,170.95 $767.76$4,453.01$610.00$3,538.00$661.15$3,834.67 $8.38$31,118.65$7.42$27,550.46 $12.85$10,023.00$8.61$6,715.80 $18.20$2,548.00$25.00$3,500.00$15.99$2,238.60 $18.00$19,170.00$15.10$16,081.50$7.42$7,902.30 $48.75$29,835.00$31.25$19,125.00$50.05$30,630.60 BCI Construction, Inc. ## Sauk Rapids, MNRogers, MN Brennan Construction of MN Inc. ## Mankato, MN ## Dering Pierson Group, LLC Page 80 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNIT ## C34 2531.501 CONCRETE CURB & GUTTER DESIGN B618 (SPOT REPLACEMENT)50LIN FT ## C35 2531.603 CONCRETE SILL233LIN FT ## C36 2540.602 BOLLARD18EACH ## C37 2540.602 INSTALL BIKE RACK1EACH ## C38 2540.603 METAL RAILING22LIN FT ## C39 2540.621 LANDSCAPING ALLOWANCE1 ALLOWANCE ## C40 2545.501 EXTERIOR LIGHTING SYSTEM1 LUMP SUM ## C41 2557.602 12' ACCESS GATE - BLACK VINYL COATED1EACH ## C42 2557.602 16' ACCESS GATE - BLACK VINYL COATED3EACH ## C43 2557.602 6' SWING GATE - BLACK VINYL COATED2EACH ## C44 2557.602 4' SWING GATE - BLACK VINYL COATED WITH SLATS1EACH ## C45 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED525LIN FT ## C46 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED WITH SLATES56LIN FT ## C47 2563.601 TRAFFIC CONTROL1 LUMP SUM ## C48 2564.518 SIGN18SQ FT ## C49 2573.502 STABILIZED CONSTRUCTION EXIT1 LUMP SUM ## C50 2573.502 STORM DRAIN INLET PROTECTION7EACH ## C51 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER400LIN FT ## C52 2574.507 ORGANIC TOPSOIL BORROW334CU YD ## C53 2574.508 FERTILIZER TYPE 382POUND ## C54 2575.505 SEEDING0.41ACRE ## C55 2575.508 HYDRAULIC BONDED FIBER MATRIX(7) 1435 POUND ## C56 2575.523 RAPID STABILIATION METHOD 32.5MGAL ## C57 2575.608 SEED RESIDENTIAL TURFGRASS82POUND ## C58 2582.503 4" SOLID LINE PAINT1004 LIN FT ## C59 2582.518 PAVEMENT MESSAGE PAINT18SQ FT ## TOTAL BASE BID AMOUNT BID: ## 1.1Security Fencing and Gates-1Lump Sum ## DEDUCT ALTERNATE NO. 1 *bid amount changed due to found calculation/addition error 345 ## UNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT BCI Construction, Inc. ## Sauk Rapids, MNRogers, MN Brennan Construction of MN Inc. ## Mankato, MN ## Dering Pierson Group, LLC $51.00$2,550.00$46.00$2,300.00$58.99$2,949.50 $15.00$3,495.00$8.50$1,980.50$30.54$7,115.82 $1,000.00$18,000.00$4,465.00$80,370.00$1,246.43$22,435.74 $933.00$933.00$85.00$85.00$2,709.63$2,709.63 $227.27$5,000.00$22.22$488.84 $5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00 $80,000.00$80,000.00$86,708.00$86,708.00 $23,700.00$23,700.00$39,267.89$39,267.89 $28,850.00$86,550.00$34,943.32$104,829.96 $1,650.00$3,300.00$2,828.85$5,657.70 $1,660.00$1,660.00$2,595.82$2,595.82 $54.00$28,350.00$48.61$25,520.25 $88.00$4,928.00$127.89$7,161.84 $2,500.00$2,500.00$16,257.75$16,257.75 $138.89$2,500.00$270.96$4,877.28 $3,000.00$3,000.00$11,500.00$11,500.00$12,464.28$12,464.28 $257.14$1,799.98$287.00$2,009.00$311.06$2,177.42 $2.50$1,000.00$5.45$2,180.00$5.91$2,364.00 $57.49$19,201.66$46.00$15,364.00$49.86$16,653.24 $0.70$57.40$7.50$615.00$8.13$666.66 $1,690.00$692.90$1,150.00$471.50$1,246.44$511.04 $2.50$3,587.50$2.71$3,888.85 $745.00$1,862.50$500.00$1,250.00$541.92$1,354.80 $3.00$246.00$8.00$656.00$8.67$710.94 $0.80$803.20$2.49$2,499.96$0.81$813.24 $6.00$108.00$138.89$2,500.00$14.09$253.62 $3,787,412.46$3,891,394.23$3,977,159.54 $125,000.00-$125,000.00$158,488.00-$158,488.00$10,000.00-$10,000.00 Page 81 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNIT ## BASE BID A: LUMP SUM: AMBULANCE BUILDING1 LUMP SUM ## BASE BID B: LUMP SUM: POLICE BUILDING ADDITION AND RENOVATION1 LUMP SUM ## BASE BID C ## C1 2021.501 MOBILIZATION1 LUMP SUM ## C2 2101.502 CLEARING1EACH ## C3 2101.507 GRUBBING1EACH ## C4 2104.502 REMOVE SIGN8EACH ## C5 2104.502 REMOVE TRELLIS(6)3EACH ## C6 2104.502 SALVAGE BIKE RACK1EACH ## C7 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH)11LIN FT ## C8 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)152LIN FT ## C9 2104.501 REMOVE CURB AND GUTTER210LIN FT ## C10 2104.501 REMOVE CURB AND GUTTER (SPOT REPLACEMENT)50LIN FT ## C11 2104.504 REMOVE BITUMINOUS PAVEMENT4492 SQ YD ## C12 2104.518 REMOVE CONCRETE WALK1620 SQ FT ## C13 2106.507 EXCAVATION - COMMON (P)(P) 1395 CU YD ## C14 2106.507 EXCAVATION - SUBGRADE(EV)(1) 300CU YD ## C15 2106.507 COMMON EMBANKMENT (CV)(P)(CV) 360CU YD ## C16 2106.507 STABILIZING AGGREGATE(CV)(1)(2) 300CU YD ## C17 2211.507 AGGREGATE BASE (CV) CLASS 5(P)(CV) 995CU YD ## C18 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3;C)310TON ## C19 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3;C)515TON ## C20 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V8LIN FT ## C21 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V198LIN FT ## C22 2503.603 4" PVC SANITARY SERVICE PIPE24LIN FT ## C23 2503.602 CONNECT TO EXISTING STORM SEWER1EACH ## C24 2506.502 CASTING ASSEMBLY4EACH ## C25 2506.502 ADJUST FRAME AND RING CASTING1EACH ## C26 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1(3)4LIN FT ## C27 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40229.4LIN FT ## C28 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 48-40205.8LIN FT ## C29 2521.501 4" CONCRETE WALK3713 SQ FT ## C30 2521.501 6" CONCRETE WALK780SQ FT ## C31 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED)(4) 140EACH ## C32 2521.618 4" CONCRETE WALK SPECIAL(5) 1065 SQ FT ## C33 2531.501 CONCRETE CURB & GUTTER DESIGN B618612LIN FT *bid amount changed due to found calculation/addition error 67 ## UNIT PRICEAMOUNTUNIT PRICEAMOUNT $621,156.00$621,156.00$515,211.00$515,211.00 $2,763,724.00$2,763,724.00$2,941,816.00$2,941,816.00 $58,373.00$58,373.00$55,720.00$55,720.00 $3,300.00$3,300.00$828.00$828.00 $3,300.00$3,300.00$828.00$828.00 $62.00$496.00$60.00$480.00 $820.00$2,460.00$2,237.00$6,711.00 $354.00$354.00$158.00$158.00 $32.00$352.00$6.00$66.00 $4.60$699.20$4.00$608.00 $4.40$924.00$3.00$630.00 $16.00$800.00$11.00$550.00 $4.50$20,214.00$4.00$17,968.00 $1.20$1,944.00$1.00$1,620.00 $9.90$13,810.50$35.00$48,825.00 $14.30$4,290.00$56.00$16,800.00 $7.70$2,772.00$6.00$2,160.00 $40.70$12,210.00$30.00$9,000.00 $30.80$30,646.00$27.00$26,865.00 $124.30$38,533.00$123.00$38,130.00 $106.70$54,950.50$111.00$57,165.00 $184.80$1,478.40$70.00$560.00 $85.80$16,988.40$79.00$15,642.00 $697.40$16,737.60$538.00$12,912.00 $4,572.70$4,572.70$2,743.00$2,743.00 $1,182.50$4,730.00$1,266.00$5,064.00 $1,128.60$1,128.60$396.00$396.00 $861.30$3,445.20$728.00$2,912.00 $984.50$9,254.30$842.00$7,914.80 $834.90$4,842.42$644.00$3,735.20 $8.00$29,704.00$9.00$33,417.00 $14.30$11,154.00$14.00$10,920.00 $27.50$3,850.00$26.00$3,640.00 $16.50$17,572.50$16.00$17,040.00 $33.00$20,196.00$35.00$21,420.00 Project One Construction, Inc. ## Kimball, MN ## Rice Lake Contracting Corp dba Rice Lake ## Deerwood, MN Page 82 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM ## ITEM MNDOT APPROX. ## NO.SPEC NO.ITEMNOTESQUANT.UNIT ## C34 2531.501 CONCRETE CURB & GUTTER DESIGN B618 (SPOT REPLACEMENT)50LIN FT ## C35 2531.603 CONCRETE SILL233LIN FT ## C36 2540.602 BOLLARD18EACH ## C37 2540.602 INSTALL BIKE RACK1EACH ## C38 2540.603 METAL RAILING22LIN FT ## C39 2540.621 LANDSCAPING ALLOWANCE1 ALLOWANCE ## C40 2545.501 EXTERIOR LIGHTING SYSTEM1 LUMP SUM ## C41 2557.602 12' ACCESS GATE - BLACK VINYL COATED1EACH ## C42 2557.602 16' ACCESS GATE - BLACK VINYL COATED3EACH ## C43 2557.602 6' SWING GATE - BLACK VINYL COATED2EACH ## C44 2557.602 4' SWING GATE - BLACK VINYL COATED WITH SLATS1EACH ## C45 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED525LIN FT ## C46 2557.603 CHAIN LINK FENCE - BLACK VINYL COATED WITH SLATES56LIN FT ## C47 2563.601 TRAFFIC CONTROL1 LUMP SUM ## C48 2564.518 SIGN18SQ FT ## C49 2573.502 STABILIZED CONSTRUCTION EXIT1 LUMP SUM ## C50 2573.502 STORM DRAIN INLET PROTECTION7EACH ## C51 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER400LIN FT ## C52 2574.507 ORGANIC TOPSOIL BORROW334CU YD ## C53 2574.508 FERTILIZER TYPE 382POUND ## C54 2575.505 SEEDING0.41ACRE ## C55 2575.508 HYDRAULIC BONDED FIBER MATRIX(7) 1435 POUND ## C56 2575.523 RAPID STABILIATION METHOD 32.5MGAL ## C57 2575.608 SEED RESIDENTIAL TURFGRASS82POUND ## C58 2582.503 4" SOLID LINE PAINT1004 LIN FT ## C59 2582.518 PAVEMENT MESSAGE PAINT18SQ FT ## TOTAL BASE BID AMOUNT BID: ## 1.1Security Fencing and Gates-1Lump Sum ## DEDUCT ALTERNATE NO. 1 *bid amount changed due to found calculation/addition error 67 ## UNIT PRICEAMOUNTUNIT PRICEAMOUNT Project One Construction, Inc. ## Kimball, MN ## Rice Lake Contracting Corp dba Rice Lake ## Deerwood, MN $39.60$1,980.00$49.00$2,450.00 $9.90$2,306.70$9.00$2,097.00 $1,725.90$31,066.20$1,750.00$31,500.00 $1,650.00$1,650.00$1,899.00$1,899.00 $354.20$7,792.40$281.00$6,182.00 $5,000.00$5,000.00$5,000.00$5,000.00 $80,000.00$80,000.00$85,000.00$85,000.00 $26,070.00$26,070.00$16,722.00$16,722.00 $31,735.00$95,205.00$17,249.00$51,747.00 $1,815.00$3,630.00$1,002.00$2,004.00 $1,826.00$1,826.00$638.00$638.00 $59.40$31,185.00$90.00$47,250.00 $96.80$5,420.80$111.00$6,216.00 $6,200.70$6,200.70$6,330.00$6,330.00 $24.80$446.40$42.00$756.00 $15,899.40$15,899.40$12,133.00$12,133.00 $309.10$2,163.70$303.00$2,121.00 $5.10$2,040.00$6.00$2,400.00 $62.20$20,774.80$49.00$16,366.00 $0.80$65.60$8.00$656.00 $1,859.00$762.19$1,200.00$492.00 $3.10$4,448.50$3.00$4,305.00 $819.50$2,048.75$528.00$1,320.00 $3.30$270.60$8.00$656.00 $0.60$602.40$1.00$1,004.00 $19.80$356.40$5.00$90.00 $4,130,173.86$4,187,789.00 $148,488.00-$148,488.00$123,000.00-$123,000.00 Page 83 of 104 ## ABSTRACT OF BIDS ## POLICE DEPARTMENT EXPANSION & RENOVATION ## CITY OF BELLE PLAINE, MN ## BMI PROJECT NO. 25X.139918 ## BID DATE:8/12/2026 ## TIME:11:00 AM ## NOTES: ## (P)DENOTES PLANNED QUANTITY ## (CV)DENOTES COMPACTED VOLUME QUANTITY ## (EV)DENOTES EXCAVATED VOLUME QUANTITY (1) ## (2)ITEM TO BE USED FOR SUBGRADE CORRECTIONS AS DIRECTED BY THE ENGINEER ## (3)ITEM TO BE USED FOR 2'X3' PRECAST CONCRETE DRAINAGE STRUCTURE AS DETAILED IN THE PLANS. (4) ## (5)ITEM TO BE USED FOR COLORED CONCRETE SIDEWALK - SEE SPECS. ## (6)ITEM TO BE USED FOR REMOVAL AND DISPOSAL OF TRELLIS AND THE STONE PILLARS THEY SIT ON ## (7)ITEM TO BE USED FOR TEMPORARY SEEDING DRILLING & GROUTING REINFORCEMENT BARS SHALL BE PAID WHEN USED FOR PEDESTRIAN RAMP LANDINGS, BACK OF CURB REINFORCEMENT, DRIVEWAYS, PAR TIES, CONNECTION TO EXISTING CURB, AND CONNECTION TO EXISTING SIDEWALK AS SHOWN IN THE STANDARD PLANNS. ALL OTHER REINFORCEMENT BARS REQUIRED FOR THE VARIOUS ITEMS OF WORK SHALL BE ## INCIDENTAL. QUANTITY IS STRICTLY AN ESTIMATE AND MAY BE INCREASED OR DECREASED BY ANY AMOUNT WITHOUT A CHANGE IN THE UNIT ## PRICE BID. *bid amount changed due to found calculat Page 84 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-097 ## A RESOLUTION AWARDING THE BID TO KUE CONTRACTORS, INC. IN THE AMOUNT OF ## $3,463,827.22 FOR THE PUBLIC SAFETY FACILITY RENOVATION AND EXPANSION PROJECT WHEREAS, the City received bids on August 12, 2026 for the Public Safety Facility Renovation and ## Expansion Project, and WHEREAS, the bids were tabulated an analyzed as follows: ## Bidder Total Bid ## KUE Contractors, Inc. $3,463,827.22 ## Met-Con Construction, Inc. $3,711,670.26 ## Brennan Construction of MN Inc. $3,787,412.46 ## Dering Pierson Group, LLC $3,891,394.23 ## BCI Construction, Inc. $3,977,159.54 ## Project One Construction, Inc. $4,130,173.86 ## Rice Lake Contracting Corp dba Rice Lake ## Construction Group $4,187,789.00 ## Engineer’s Estimate $3,448,520.50 ## NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BELLE PLAINE, ## MINNESOTA THAT; 1. All bids of the Public Safety Facility Renovation and Expansion Project are hereby received and tabulated. 2. The bid of KUE Contractors, Inc., in the amount of $3,463,827.22 for the Public Safety Facility Renovation and Expansion Project in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and hereby is accepted. 3. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City. 4. The City Administrator is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposited of the successful bidder and the next lowest bidder shall be retained until a contact has been expected. The adoption of the foregoing resolution was duly moved by Councilmember ___________ and seconded by Councilmember __________, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th date of August, 2026. ## ATTEST: ___________________ ______________________ James Evans Dawn Meyer Mayor City Administrator Page 85 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: Resolution 26-098 Awarding the Bid to Holtmeier Construction, Inc. in the amount of $1,147,522.43 for the TH 25/CSAH 3 Roundabout Project. ## BACKGROUND/ ## JUSTIFICATION: On November 13, 2024, the City Council adopted Resolution 24-176 accepting funds from the Local Partnership Program Funds from the Minnesota Department of Transportation (MnDOT) for the TH 25 at CSAH 3 (Main Street) Roundabout project for fiscal year 2026. The program provides a maximum award of $1,000,000.00 for construction costs eligible for State funding. On May 18, 2026, the City Council authorized staff to advertise for bids for the project. The City ## Council subsequently authorized execution of MnDOT’s Cooperative Construction Agreement on July 20, 2026. Bids were received and reviewed on August 13, 2026. The apparent low bidder is Holtmeier Construction, Inc., with a bid amount of $1,147,522.43. The bid tabulation and supporting bid information are attached for the Council’s review. It is appropriate for the City Council to review the submitted bids and take one of the following actions: 1. Accept the apparent low bid and award the project to Holtmeier Construction, Inc. in the amount of $1,147,522.43. 2. Decline the bids and direct staff to rebid the project at a more favorable time. 3. Decline the bids and take no further action. Please note that declining the bids and not proceeding with the project will result in the forfeiture of the $1,000,000.00 Local Partnership Program funding. ## FISCAL ## IMPACT: ## STAFF ## RECOMMENDATION: Approve Resolution 26-098 Awarding the Bid to Holtmeier Construction, Inc. in the amount of $1,147,522.43 for the TH 25/CSAH 3 Roundabout Project. Page 86 of 104 ## \\MANKATO5\H\BELL\25X137897000\1_CORRES\C_TO OTHERS\137897 RECOMMENDATION LTR.DOCX ## 1960 Premier Drive ## Mankato, MN 56001 Phone: (507) 625-4171 ## Bolton-Menk.com August 13, 2026 ## Dawn Meyer ## City Administrator ## City of Belle Plaine ## 218 North Meridian Street, PO Box 129 ## Belle Plaine, MN 56011-0129 ## RE: TH 25 / CSAH 3 Intersection Improvements ## City of Belle Plaine, MN SP 7003-116 (TH=025), SAP 239-010-004 and SAP 070-603-015 ## BMI Project No. 25X.137897 ## Dear Dawn, Bids were received and opened electronically through QuestCDN at City Hall on Thursday, August 13 at 11:00am for the project referenced above. Eight (8) bids were received, and the results of the bids are tabulated below: ## Bidder Bid Amount ## Holtmeier Construction, Inc. $1,147,522.43 ## A-1 Excavating LLC $1,179,816.00 ## Valley Paving, Inc. $1,296,151.27 ## S.M. Hentges & Sons, Inc. $1,318,883.28 ## Park Construction Company $1,372,886.77 ## Heselton Construction, LLC $1,405,194.95 ## Meyer Contracting, Inc. $1,405,518.11 ## Wm. Mueller & Sons, Inc. $1,509,509.14 ## Engineer’s Estimate $1,587,292.25 The low bidder for the project is Holtmeier Construction, Inc., from Mankato, Minnesota. The low bid is approximately 28% below the Engineer’s Estimate. A detailed bid abstract of all the bids and the engineer’s estimate is attached for your review. Based on past performance on similar projects in previous years, it is our opinion that Holtmeier Construction, Inc. is qualified to perform the work required under this contract. It is hereby recommended the City award the contract to Holtmeier Construction, Inc., based on the bid amount of $1,147,522.43, pending a signed Cooperative Agreement with MnDOT and Scott County. Please keep their attached submitted documents for your records. ## Sincerely, Bolton & Menk, Inc. D. Joseph Duncan II, P.E. ## City Engineer ## Enclosure Page 87 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM 1 2 ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## BASE BID 1 ## 2011.601 AS BUILT 1 ## LUMP SUM $15,000.00 $15,000.00 $3,90 0.00 $3,900.00 $4,100.00 $4,100.00 2 ## 2021.501 MOBILIZATION 1 ## LUMP SUM $149,000.00 $149,000.0 0 $70,157.00 $70,157.00 $62,050.00 $62,050.00 3 ## 2101.502 CLEARING 4 ## EACH $360.00 $1,440.00 $550.00 $2,200 .00 $500.00 $2,000.00 4 ## 2101.502 GRUBBING 4 ## EACH $700.00 $2,800.00 $550.00 $2,200 .00 $1,100.00 $4,400.00 5 ## 2102.503 PAVEMENT MARKING REMOVAL 500 ## LIN FT $1.10 $550 .00 $3.00 $1,500.00 $3.50 $1,750.00 6 ## 2104.502 REMOVE MANHOLE 1 ## EACH $500.00 $500.00 $350.00 $3 50.00 $500.00 $500.00 7 ## 2104.502 REMOVE GATE VALVE AND BOX 2 ## EACH $500.00 $1,00 0.00 $50.00 $100.00 $200.00 $400.00 8 ## 2104.502 REMOVE DRAINAGE STRUCTURE 6 ## EACH $480.00 $2,88 0.00 $250.00 $1,500.00 $500.00 $3,000.00 9 ## 2104.502 SALVAGE GATE VALVE AND BOX 1 ## EACH $500.00 $500 .00 $250.00 $250.00 $500.00 $500.00 10 ## 2104.502 REMOVE SIGN 18 ## EACH $30.00 $540.00 $25.00 $450. 00 $35.00 $630.00 11 ## 2104.502 SALVAGE LIGHTING UNIT (4) 2 ## EACH $1,500.00 $3, 000.00 $1,500.00 $3,000.00 $1,058.00 $2,116.00 12 ## 2104.502 SALVAGE SIGN (9) 2 ## EACH $30.00 $60.00 $25.00 $50 .00 $35.00 $70.00 13 ## 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 33 6 ## LIN FT $15.00 $5,040.00 $1.95 $655.20 $5.00 $1,680.00 14 ## 2104.503 REMOVE PIPE DRAIN 170 ## LIN FT $12.00 $2,040.00 $2.00 $340.00 $5.00 $850.00 15 ## 2104.503 REMOVE CURB AND GUTTER 1218 ## LIN FT $10.00 $12 ,180.00 $1.75 $2,131.50 $4.00 $4,872.00 16 ## 2104.503 REMOVE WATER MAIN 440 ## LIN FT $6.00 $2,640.00 $ 4.00 $1,760.00 $10.00 $4,400.00 17 ## 2104.503 REMOVE SEWER PIPE (STORM) 761 ## LIN FT $25.00 $ 19,025.00 $12.00 $9,132.00 $10.00 $7,610.00 18 ## 2104.503 REMOVE SEWER PIPE (SANITARY) 50 ## LIN FT $5.00 $250.00 $1.00 $50.00 $10.00 $500.00 19 ## 2104.504 REMOVE CONCRETE WALK 716 ## SQ YD $16.00 $11,456 .00 $5.20 $3,723.20 $7.00 $5,012.00 20 ## 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT 252 ## SQ YD $16.00 $4,032.00 $5.50 $1,386.00 $7.00 $1,764.00 21 ## 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 98 ## SQ Y ## D $10.00 $980.00 $3.70 $362.60 $7.00 $686.00 22 ## 2104.504 REMOVE BITUMINOUS PAVEMENT (2) 4158 ## SQ YD $6. 00 $24,948.00 $2.50 $10,395.00 $4.00 $16,632.00 23 ## 2104.601 REMOVE TEMPORARY SIGNAL SYSTEM (6) 1 ## LUMP SU ## M $12,000.00 $12,000.00 $7,000.00 $7,000.00 $2,375.00 $2, 375.00 24 ## 2106.507 EXCAVATION - COMMON (P) 1482 ## CU YD $26.00 $38 ,532.00 $12.75 $18,895.50 $18.00 $26,676.00 25 ## 2106.507 EXCAVATION - SUBGRADE (P) 1290 ## CU YD $28.00 $ 36,120.00 $12.00 $15,480.00 $18.00 $23,220.00 26 ## 2106.507 SELECT GRANULAR EMBANKEMENT (CV) (P) 1380 ## C ## U YD $26.00 $35,880.00 $19.20 $26,496.00 $30.00 $41,400.0 0 27 ## 2106.507 COMMON EMBANKMENT (CV) (P) 416 ## CU YD $15.00 $ 6,240.00 $49.10 $20,425.60 $14.00 $5,824.00 28 ## 2112.604 SUBGRADE PREPARATION 3273 ## SQ YD $12.00 $39,27 6.00 $1.00 $3,273.00 $1.00 $3,273.00 29 ## 2111.519 TEST ROLLING 738 ## RD STA $20.00 $14,760.00 $0.0 1 $7.38 $1.00 $738.00 30 ## 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 1518 ## CU YD $ 45.00 $68,310.00 $29.65 $45,008.70 $34.00 $51,612.00 31 ## 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXUTRE ( ## 4,B) (1) 493 ## TON $110.00 $54,230.00 $82.00 $40,426.00 $87.0 0 $42,891.00 32 ## 2360.509 TYPE SP 12.5 WEARING COURSE MIXUTRE (4,F) (1) 656 ## TON $135.00 $88,560.00 $109.00 $71,504.00 $114.00 $ 74,784.00 33 ## 2502.503 4" PERF PE PIPE DRAIN 978 ## LIN FT $10.00 $9,78 0.00 $4.65 $4,547.70 $13.00 $12,714.00 34 ## 2503.503 8" PVC PIPE SEWER 79 ## LIN FT $70.00 $5,530.00 $ 53.25 $4,206.75 $72.00 $5,688.00 35 ## 2503.503 44" SPAN RC PIPE-ARCH SEWER CLASS IIA 145 ## L ## IN FT $250.00 $36,250.00 $244.70 $35,481.50 $272.00 $39,4 40.00 36 ## 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V 31 ## LI ## N FT $90.00 $2,790.00 $71.50 $2,216.50 $67.00 $2,077.00 37 ## 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V 173 ## L ## IN FT $105.00 $18,165.00 $77.25 $13,364.25 $73.00 $12,629 .00 38 ## 2503.503 30" RC PIPE SEWER DESIGN 3006 CLASS II 257 ## LIN FT $130.00 $33,410.00 $132.10 $33,949.70 $127.00 $32, 639.00 Holtmeier Construction, Inc. ## Mankato, MN ## Engineer's Estimate Bolton & Menk, Inc. ## A-1 Excavating LLC ## Bloomer, WI Page 88 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM 1 2 ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT Holtmeier Construction, Inc. ## Mankato, MN ## Engineer's Estimate Bolton & Menk, Inc. ## A-1 Excavating LLC ## Bloomer, WI 39 ## 2503.503 42" RC PIPE SEWER DESIGN 3006 CLASS II 29 ## L ## IN FT $250.00 $7,250.00 $220.05 $6,381.45 $217.00 $6,293. 00 40 ## 2503.503 48" RC PIPE SEWER DESIGN 3006 CLASS II 216 ## LIN FT $300.00 $64,800.00 $264.30 $57,088.80 $266.00 $57, 456.00 41 ## 2503.602 CONSTRUCT BULKHEAD 1 ## EACH $1,500.00 $1,500.00 $250.00 $250.00 $500.00 $500.00 42 ## 2503.602 CONNECT TO EXISTING STORM SEWER 5 ## EACH $1,80 0.00 $9,000.00 $1,000.00 $5,000.00 $800.00 $4,000.00 43 ## 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVIC ## E 2 ## EACH $400.00 $800.00 $550.00 $1,100.00 $200.00 $400.00 44 ## 2503.602 8" PIPE PLUG 1 ## EACH $450.00 $450.00 $195.65 $19 5.65 $150.00 $150.00 45 ## 2503.603 4" PVC SANITARY SERVICE PIPE 120 ## LIN FT $50. 00 $6,000.00 $33.35 $4,002.00 $59.00 $7,080.00 46 ## 2503.603 6" PVC SANITARY SERVICE PIPE 40 ## LIN FT $60.0 0 $2,400.00 $41.75 $1,670.00 $62.00 $2,480.00 47 ## 2504.602 CONNECT TO EXISTING WATER MAIN 4 ## EACH $1,500 .00 $6,000.00 $1,921.85 $7,687.40 $2,200.00 $8,800.00 48 ## 2504.602 RELOCATE HYDRANT AND VALVE 1 ## EACH $2,500.00 $ 2,500.00 $2,103.50 $2,103.50 $2,600.00 $2,600.00 49 ## 2504.602 INSTALL GATE VALVE AND BOX 1 ## EACH $1,500.00 $ 1,500.00 $1,412.85 $1,412.85 $800.00 $800.00 50 ## 2504.602 6" GATE VALVE AND BOX 1 ## EACH $4,000.00 $4,000 .00 $2,485.45 $2,485.45 $2,960.00 $2,960.00 51 ## 2504.602 10" GATE VALVE AND BOX 3 ## EACH $5,000.00 $15,0 00.00 $4,895.65 $14,686.95 $5,500.00 $16,500.00 52 ## 2504.603 6" PVC WATERMAIN 8 ## LIN FT $100.00 $800.00 $51. 35 $410.80 $79.00 $632.00 53 ## 2504.603 10" PVC WATERMAIN 474 ## LIN FT $100.00 $47,400. 00 $69.80 $33,085.20 $79.00 $37,446.00 54 ## 2504.603 18" PVC CASING PIPE (8) 230 ## LIN FT $250.00 $57 ,500.00 $202.60 $46,598.00 $143.00 $32,890.00 55 ## 2504.604 4" POLYSTYRENE INSULATION 126 ## SQ YD $100.00 $ 12,600.00 $57.45 $7,238.70 $77.00 $9,702.00 56 ## 2504.608 WATERMAIN FITTINGS 1138 ## POUND $15.00 $17,070. 00 $19.25 $21,906.50 $19.00 $21,622.00 57 ## 2506.502 CASTING ASSEMBLY 13 ## EACH $1,500.00 $19,500.00 $1,145.00 $14,885.00 $1,310.00 $17,030.00 58 ## 2506.502 ADJUST FRAME AND RING CASTING 1 ## EACH $1,500. 00 $1,500.00 $1,300.00 $1,300.00 $600.00 $600.00 59 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN G 8.8 ## L ## IN FT $500.00 $4,400.00 $490.65 $4,317.72 $515.00 $4,532. 00 60 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-40 20 8.2 ## LIN FT $575.00 $4,715.00 $772.60 $6,335.32 $805.00 $ 6,601.00 61 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-40 20 30.6 ## LIN FT $675.00 $20,655.00 $741.85 $22,700.61 $825. 00 $25,245.00 62 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-40 20 45.3 ## LIN FT $750.00 $33,975.00 $1,007.75 $45,651.08 $1, 095.00 $49,603.50 63 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-40 20 12 ## LIN FT $1,800.00 $21,600.00 $1,728.70 $20,744.40 $1, 815.00 $21,780.00 64 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4007 8 .7 ## LIN FT $500.00 $4,350.00 $530.60 $4,616.22 $625.00 $5,4 37.50 65 ## 2506.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE 1 ## EACH $1,300.00 $1,300.00 $900.00 $900.00 $1,000.00 $1,000 .00 66 ## 2521.518 4" CONCRETE WALK 6343 ## SQ FT $8.00 $50,744.00 $ 6.75 $42,815.25 $6.50 $41,229.50 67 ## 2521.518 7" CONCRETE WALK 1521 ## SQ FT $14.00 $21,294.00 $16.25 $24,716.25 $16.00 $24,336.00 68 ## 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED) 4 64 ## EACH $20.00 $9,280.00 $10.00 $4,640.00 $11.00 $5,104.00 69 ## 2521.618 CONCRETE CURB RAMP WALK 1535 ## SQ FT $20.00 $30 ,700.00 $15.75 $24,176.25 $16.00 $24,560.00 70 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 326 ## LI ## N FT $28.00 $9,128.00 $35.50 $11,573.00 $35.50 $11,573.00 71 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 935 ## LI ## N FT $35.00 $32,725.00 $39.50 $36,932.50 $39.50 $36,932.5 0 72 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 1 773 ## LIN FT $38.00 $29,374.00 $35.00 $27,055.00 $35.00 $27, 055.00 73 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 2 145 ## LIN FT $40.00 $5,800.00 $45.50 $6,597.50 $46.00 $6,670 .00 74 ## 2531.504 CONCRETE MEDIAN (3) 159 ## SQ YD $315.00 $50,085. 00 $90.00 $14,310.00 $87.50 $13,912.50 75 ## 2531.504 6" CONCRETE DRIVEWAY PAVEMENT 351 ## SQ YD $100 .00 $35,100.00 $85.50 $30,010.50 $83.00 $29,133.00 76 ## 2531.618 TRUNCATED DOMES 163 ## SQ FT $60.00 $9,780.00 $65 .00 $10,595.00 $66.00 $10,758.00 Page 89 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM 1 2 ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT Holtmeier Construction, Inc. ## Mankato, MN ## Engineer's Estimate Bolton & Menk, Inc. ## A-1 Excavating LLC ## Bloomer, WI 77 ## 2545.501 LIGHTING SYSTEM (7) 1 ## LUMP SUM $65,000.00 $65, 000.00 $55,000.00 $55,000.00 $36,953.00 $36,953.00 78 ## 2563.601 TRAFFIC CONTROL 1 ## LUMP SUM $45,000.00 $45,000 .00 $14,950.00 $14,950.00 $14,450.00 $14,450.00 79 ## 2563.601 ALTERNATE PEDESTRIAN ROUTE 1 ## LUMP SUM $5,500 .00 $5,500.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00 80 ## 2564.502 INSTALL SIGN 2 ## EACH $650.00 $1,300.00 $250.00 $ 500.00 $260.00 $520.00 81 ## 2564.518 SIGN 211 ## SQ FT $78.00 $16,458.00 $68.00 $14,348 .00 $69.00 $14,559.00 82 ## 2573.501 STABILIZED CONSTRUCTION EXIT 1 ## LUMP SUM $6,5 00.00 $6,500.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 83 ## 2573.501 EROSION CONTROL SUPERVISOR 1 ## LUMP SUM $9,000 .00 $9,000.00 $2,500.00 $2,500.00 $500.00 $500.00 84 ## 2573.502 STORM DRAIN INLET PROTECTION 16 ## EACH $250.00 $4,000.00 $200.00 $3,200.00 $150.00 $2,400.00 85 ## 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER 250 ## LI ## N FT $4.00 $1,000.00 $4.25 $1,062.50 $4.00 $1,000.00 86 ## 2574.505 SUBSOILING 0.3 ## ACRE $700.00 $210.00 $0.01 $0.00 $600.00 $180.00 87 ## 2574.505 SOIL BED PREPARATION 0.7 ## ACRE $800.00 $560.00 $2,750.00 $1,925.00 $2,100.00 $1,470.00 88 ## 2574.508 FERTILIZER TYPE 1 (1) 79 ## POUND $1.00 $79.00 $1. 75 $138.25 $4.00 $316.00 89 ## 2575.505 SEEDING 0.4 ## ACRE $1,800.00 $720.00 $2,750.00 $1 ,100.00 $700.00 $280.00 90 ## 2575.505 MOWING 0.8 ## ACRE $150.00 $120.00 $650.00 $520.00 $900.00 $720.00 91 ## 2575.505 WEED SPRAYING 0.2 ## ACRE $450.00 $90.00 $4,500.0 0 $900.00 $3,100.00 $620.00 92 ## 2575.506 WEED SPRAY MIXTURE 0.03 ## GALLON $85.00 $2.55 $3 ,500.00 $105.00 $2,600.00 $78.00 93 ## 2575.608 SEED SOUTHERN BOULEVARD 7 ## POUND $8.50 $59.50 $ 24.00 $168.00 $60.00 $420.00 94 ## 2575.608 SEED RESIDENTIAL TURFGRASS 2 ## POUND $7.00 $14. 00 $25.00 $50.00 $85.00 $170.00 95 ## 2575.508 HYDRAULIC REINFORCED FIBER MATRIX (1) 1120 ## P ## OUND $2.50 $2,800.00 $1.25 $1,400.00 $2.75 $3,080.00 96 ## 2575.523 RAPID STABILIZATION METHOD 3 3.8 ## M GALLON $6 50.00 $2,470.00 $550.00 $2,090.00 $780.00 $2,964.00 97 ## 2582.503 24" SOLID LINE MULTI-COMPONENT 75 ## LIN FT $15 .00 $1,125.00 $15.00 $1,125.00 $16.00 $1,200.00 98 ## 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROU ## ND IN (WR) 666 ## LIN FT $2.25 $1,498.50 $3.00 $1,998.00 $3.5 0 $2,331.00 99 ## 2582.503 24" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 46 ## LIN FT $17.50 $805.00 $30.00 $1,380.00 $32.00 $1,47 2.00 100 ## 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 2921 ## LIN FT $1.90 $5,549.90 $2.25 $6,572.25 $2.50 $7,3 02.50 101 ## 2582.503 6" DOTTED LINE MULTI-COMPONENT GROUND IN ## (WR) 42 ## LIN FT $1.90 $79.80 $2.25 $94.50 $4.00 $168.00 102 ## 2582.503 12" DOTTED LINE PREFORM THERMOPLASTIC GR ## OUND IN (WR) 60 ## LIN FT $16.00 $960.00 $19.00 $1,140.00 $21 .00 $1,260.00 103 ## 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC G ## ROUND IN 15 ## SQ FT $30.00 $450.00 $50.00 $750.00 $55.00 $825 .00 104 ## 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND I ## N 216 ## SQ FT $17.00 $3,672.00 $16.00 $3,456.00 $17.00 $3,672 .00 ## TOTAL AMOUNT BID: $1,587,292.25 $1,147,522.43 $1,179,8 16.00 ## NOTES: (1) ## SEE TABLE FOR BASIS OF ESTIMATE QUANTITIES. (2) ## SEE EXISTING BITUMNIOUS AND CONCRETE THICKNESS TABL ## E IN THE TYPICAL SECTIONS FOR ESTIMATED DEPTHS. (3) ## INCLUDES MEDIAN NOSES . SEE STANDARD PLATES AND PLA ## NS FOR PLACEMENT USE. (4) ## INSTALLATION OF SALVAGED LIGHTENING UNITS IS PAID F ## OR UNDER THE LUMP SUM LIGHTING. (5) ## USED FOR TRUCK APRON. SEE MISCELLANEOUS DETAILS FOR ## MORE INFORMATION. (6)(7)(8) ## ALTERNATIVE CASING PIPE MATERIALS ARE ALLOWED. ## (P) ## DENOTES PLAN QUANTITY ## (CV) ## DENOTES COMPACTED VOLUME ## (WR) ## DENOTES WET REFLECTIVEALL COMPONENTS OF TEMPORARY SIGNAL USED DURING FLOO ## DING EVENTS INCLUDING, BUT NOT LIMITED TO, WIRING, ## CONDUIT, MOUNTS, ## ETC. FOLLOWING THESE REMOVALS, XCEL ENERGY TO REMOV ## E WOOD POLES AND LIGHTING ARM UNITS ## ESALVAGED LIGHTING UNITS, PER DETAIL IN LIGHTING PL ## AN, ARE TO BE INSTALLED IN NEWER LOCATIONS. ADDITIO ## NAL LIGHTING POLE UNITS ## TO BE PROVIDED BY THE CITY OF BELLE PLAINE. Page 90 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT ## BASE BID 1 ## 2011.601 AS BUILT 1 ## LUMP SUM 2 ## 2021.501 MOBILIZATION 1 ## LUMP SUM 3 ## 2101.502 CLEARING 4 ## EACH 4 ## 2101.502 GRUBBING 4 ## EACH 5 ## 2102.503 PAVEMENT MARKING REMOVAL 500 ## LIN FT 6 ## 2104.502 REMOVE MANHOLE 1 ## EACH 7 ## 2104.502 REMOVE GATE VALVE AND BOX 2 ## EACH 8 ## 2104.502 REMOVE DRAINAGE STRUCTURE 6 ## EACH 9 ## 2104.502 SALVAGE GATE VALVE AND BOX 1 ## EACH 10 ## 2104.502 REMOVE SIGN 18 ## EACH 11 ## 2104.502 SALVAGE LIGHTING UNIT (4) 2 ## EACH 12 ## 2104.502 SALVAGE SIGN (9) 2 ## EACH 13 ## 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 33 6 ## LIN FT 14 ## 2104.503 REMOVE PIPE DRAIN 170 ## LIN FT 15 ## 2104.503 REMOVE CURB AND GUTTER 1218 ## LIN FT 16 ## 2104.503 REMOVE WATER MAIN 440 ## LIN FT 17 ## 2104.503 REMOVE SEWER PIPE (STORM) 761 ## LIN FT 18 ## 2104.503 REMOVE SEWER PIPE (SANITARY) 50 ## LIN FT 19 ## 2104.504 REMOVE CONCRETE WALK 716 ## SQ YD 20 ## 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT 252 ## SQ YD 21 ## 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 98 ## SQ Y ## D 22 ## 2104.504 REMOVE BITUMINOUS PAVEMENT (2) 4158 ## SQ YD 23 ## 2104.601 REMOVE TEMPORARY SIGNAL SYSTEM (6) 1 ## LUMP SU ## M 24 ## 2106.507 EXCAVATION - COMMON (P) 1482 ## CU YD 25 ## 2106.507 EXCAVATION - SUBGRADE (P) 1290 ## CU YD 26 ## 2106.507 SELECT GRANULAR EMBANKEMENT (CV) (P) 1380 ## C ## U YD 27 ## 2106.507 COMMON EMBANKMENT (CV) (P) 416 ## CU YD 28 ## 2112.604 SUBGRADE PREPARATION 3273 ## SQ YD 29 ## 2111.519 TEST ROLLING 738 ## RD STA 30 ## 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 1518 ## CU YD 31 ## 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXUTRE ( ## 4,B) (1) 493 ## TON 32 ## 2360.509 TYPE SP 12.5 WEARING COURSE MIXUTRE (4,F) (1) 656 ## TON 33 ## 2502.503 4" PERF PE PIPE DRAIN 978 ## LIN FT 34 ## 2503.503 8" PVC PIPE SEWER 79 ## LIN FT 35 ## 2503.503 44" SPAN RC PIPE-ARCH SEWER CLASS IIA 145 ## L ## IN FT 36 ## 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V 31 ## LI ## N FT 37 ## 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V 173 ## L ## IN FT 38 ## 2503.503 30" RC PIPE SEWER DESIGN 3006 CLASS II 257 ## LIN FT 3 4 5 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT $4,056.00 $4,056.00 $4,000.00 $4,000.00 $3,940.00 $3,940 .00 $82,204.00 $82,204.00 $127,800.00 $127,800.00 $137,000. 00 $137,000.00 $832.00 $3,328.00 $570.00 $2,280.00 $1,010.00 $4,040.00 $208.00 $832.00 $570.00 $2,280.00 $253.00 $1,012.00 $3.12 $1,560.00 $2.60 $1,300.00 $1.50 $750.00 $715.00 $715.00 $900.00 $900.00 $1,100.00 $1,100.00 $673.00 $1,346.00 $700.00 $1,400.00 $474.00 $948.00 $925.00 $5,550.00 $560.00 $3,360.00 $604.00 $3,624.00 $1,345.00 $1,345.00 $850.00 $850.00 $475.00 $475.00 $26.00 $468.00 $51.00 $918.00 $25.30 $455.40 $811.00 $1,622.00 $1,088.00 $2,176.00 $1,300.00 $2,600.0 0 $26.00 $52.00 $51.00 $102.00 $25.30 $50.60 $2.00 $672.00 $4.00 $1,344.00 $1.95 $655.20 $22.50 $3,825.00 $21.00 $3,570.00 $9.60 $1,632.00 $9.00 $10,962.00 $3.00 $3,654.00 $3.65 $4,445.70 $17.50 $7,700.00 $18.00 $7,920.00 $19.20 $8,448.00 $19.00 $14,459.00 $20.00 $15,220.00 $29.80 $22,677.80 $30.25 $1,512.50 $28.00 $1,400.00 $19.20 $960.00 $16.00 $11,456.00 $5.00 $3,580.00 $9.85 $7,052.60 $23.00 $5,796.00 $7.50 $1,890.00 $11.60 $2,923.20 $20.25 $1,984.50 $5.00 $490.00 $10.60 $1,038.80 $4.50 $18,711.00 $5.40 $22,453.20 $5.20 $21,621.60 $3,245.00 $3,245.00 $2,175.00 $2,175.00 $2,200.00 $2,200 .00 $19.25 $28,528.50 $14.40 $21,340.80 $25.00 $37,050.00 $21.00 $27,090.00 $12.40 $15,996.00 $25.00 $32,250.00 $21.00 $28,980.00 $20.00 $27,600.00 $47.00 $64,860.00 $37.50 $15,600.00 $56.00 $23,296.00 $40.00 $16,640.00 $1.75 $5,727.75 $1.80 $5,891.40 $0.98 $3,207.54 $4.87 $3,594.06 $0.01 $7.38 $0.01 $7.38 $39.50 $59,961.00 $46.00 $69,828.00 $28.70 $43,566.60 $78.00 $38,454.00 $89.00 $43,877.00 $76.80 $37,862.40 $104.75 $68,716.00 $112.00 $73,472.00 $104.00 $68,224.00 $16.00 $15,648.00 $7.00 $6,846.00 $8.60 $8,410.80 $96.00 $7,584.00 $59.00 $4,661.00 $91.40 $7,220.60 $264.00 $38,280.00 $298.00 $43,210.00 $292.00 $42,340.00 $85.50 $2,650.50 $93.00 $2,883.00 $72.90 $2,259.90 $70.00 $12,110.00 $89.00 $15,397.00 $78.80 $13,632.40 $134.50 $34,566.50 $163.00 $41,891.00 $153.00 $39,321.00 ## Park Construction Company ## Minneapolis, MN ## Shakopee, MN S.M. Hentges & Sons, Inc. ## Jordan, MN Valley Paving, Inc. Page 91 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT 39 ## 2503.503 42" RC PIPE SEWER DESIGN 3006 CLASS II 29 ## L ## IN FT 40 ## 2503.503 48" RC PIPE SEWER DESIGN 3006 CLASS II 216 ## LIN FT 41 ## 2503.602 CONSTRUCT BULKHEAD 1 ## EACH 42 ## 2503.602 CONNECT TO EXISTING STORM SEWER 5 ## EACH 43 ## 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVIC ## E 2 ## EACH 44 ## 2503.602 8" PIPE PLUG 1 ## EACH 45 ## 2503.603 4" PVC SANITARY SERVICE PIPE 120 ## LIN FT 46 ## 2503.603 6" PVC SANITARY SERVICE PIPE 40 ## LIN FT 47 ## 2504.602 CONNECT TO EXISTING WATER MAIN 4 ## EACH 48 ## 2504.602 RELOCATE HYDRANT AND VALVE 1 ## EACH 49 ## 2504.602 INSTALL GATE VALVE AND BOX 1 ## EACH 50 ## 2504.602 6" GATE VALVE AND BOX 1 ## EACH 51 ## 2504.602 10" GATE VALVE AND BOX 3 ## EACH 52 ## 2504.603 6" PVC WATERMAIN 8 ## LIN FT 53 ## 2504.603 10" PVC WATERMAIN 474 ## LIN FT 54 ## 2504.603 18" PVC CASING PIPE (8) 230 ## LIN FT 55 ## 2504.604 4" POLYSTYRENE INSULATION 126 ## SQ YD 56 ## 2504.608 WATERMAIN FITTINGS 1138 ## POUND 57 ## 2506.502 CASTING ASSEMBLY 13 ## EACH 58 ## 2506.502 ADJUST FRAME AND RING CASTING 1 ## EACH 59 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN G 8.8 ## L ## IN FT 60 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-40 20 8.2 ## LIN FT 61 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-40 20 30.6 ## LIN FT 62 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-40 20 45.3 ## LIN FT 63 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-40 20 12 ## LIN FT 64 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4007 8 .7 ## LIN FT 65 ## 2506.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE 1 ## EACH 66 ## 2521.518 4" CONCRETE WALK 6343 ## SQ FT 67 ## 2521.518 7" CONCRETE WALK 1521 ## SQ FT 68 ## 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED) 4 64 ## EACH 69 ## 2521.618 CONCRETE CURB RAMP WALK 1535 ## SQ FT 70 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 326 ## LI ## N FT 71 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 935 ## LI ## N FT 72 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 1 773 ## LIN FT 73 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 2 145 ## LIN FT 74 ## 2531.504 CONCRETE MEDIAN (3) 159 ## SQ YD 75 ## 2531.504 6" CONCRETE DRIVEWAY PAVEMENT 351 ## SQ YD 76 ## 2531.618 TRUNCATED DOMES 163 ## SQ FT 3 4 5 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## Park Construction Company ## Minneapolis, MN ## Shakopee, MN S.M. Hentges & Sons, Inc. ## Jordan, MN Valley Paving, Inc. $240.00 $6,960.00 $264.00 $7,656.00 $267.00 $7,743.00 $272.00 $58,752.00 $320.00 $69,120.00 $311.00 $67,176.00 $1,125.00 $1,125.00 $600.00 $600.00 $628.00 $628.00 $1,570.00 $7,850.00 $1,045.00 $5,225.00 $1,900.00 $9,500 .00 $1,806.00 $3,612.00 $673.00 $1,346.00 $1,910.00 $3,820.0 0 $495.00 $495.00 $472.00 $472.00 $136.00 $136.00 $63.25 $7,590.00 $52.00 $6,240.00 $74.70 $8,964.00 $74.30 $2,972.00 $56.00 $2,240.00 $77.80 $3,112.00 $2,243.00 $8,972.00 $2,400.00 $9,600.00 $3,680.00 $14,72 0.00 $3,538.00 $3,538.00 $4,200.00 $4,200.00 $5,130.00 $5,130 .00 $1,569.00 $1,569.00 $2,500.00 $2,500.00 $1,450.00 $1,450 .00 $3,070.00 $3,070.00 $2,900.00 $2,900.00 $2,750.00 $2,750 .00 $5,952.00 $17,856.00 $5,700.00 $17,100.00 $5,130.00 $15, 390.00 $68.00 $544.00 $125.00 $1,000.00 $84.30 $674.40 $62.00 $29,388.00 $96.00 $45,504.00 $84.80 $40,195.20 $209.00 $48,070.00 $229.00 $52,670.00 $157.00 $36,110.00 $50.50 $6,363.00 $70.00 $8,820.00 $47.00 $5,922.00 $17.50 $19,915.00 $19.00 $21,622.00 $20.70 $23,556.60 $950.00 $12,350.00 $1,118.00 $14,534.00 $1,030.00 $13,39 0.00 $1,089.00 $1,089.00 $783.00 $783.00 $820.00 $820.00 $404.00 $3,555.20 $713.00 $6,274.40 $457.00 $4,021.60 $735.00 $6,027.00 $948.00 $7,773.60 $944.00 $7,740.80 $1,131.00 $34,608.60 $783.00 $23,959.80 $785.00 $24,021. 00 $1,238.00 $56,081.40 $1,080.00 $48,924.00 $1,050.00 $47, 565.00 $2,105.00 $25,260.00 $1,980.00 $23,760.00 $1,930.00 $23, 160.00 $1,009.00 $8,778.30 $644.00 $5,602.80 $609.00 $5,298.30 $1,575.00 $1,575.00 $1,044.00 $1,044.00 $1,900.00 $1,900 .00 $6.30 $39,960.90 $7.40 $46,938.20 $6.10 $38,692.30 $15.75 $23,955.75 $16.00 $24,336.00 $15.80 $24,031.80 $10.50 $4,872.00 $15.00 $6,960.00 $10.20 $4,732.80 $16.50 $25,327.50 $14.70 $22,564.50 $16.10 $24,713.50 $36.75 $11,980.50 $22.60 $7,367.60 $35.70 $11,638.20 $40.97 $38,306.95 $25.00 $23,375.00 $39.80 $37,213.00 $36.24 $28,013.52 $20.60 $15,923.80 $35.20 $27,209.60 $47.27 $6,854.15 $31.00 $4,495.00 $45.90 $6,655.50 $87.19 $13,863.21 $51.00 $8,109.00 $84.70 $13,467.30 $82.46 $28,943.46 $97.60 $34,257.60 $80.10 $28,115.10 $54.00 $8,802.00 $74.00 $12,062.00 $66.30 $10,806.90 Page 92 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT 77 ## 2545.501 LIGHTING SYSTEM (7) 1 ## LUMP SUM 78 ## 2563.601 TRAFFIC CONTROL 1 ## LUMP SUM 79 ## 2563.601 ALTERNATE PEDESTRIAN ROUTE 1 ## LUMP SUM 80 ## 2564.502 INSTALL SIGN 2 ## EACH 81 ## 2564.518 SIGN 211 ## SQ FT 82 ## 2573.501 STABILIZED CONSTRUCTION EXIT 1 ## LUMP SUM 83 ## 2573.501 EROSION CONTROL SUPERVISOR 1 ## LUMP SUM 84 ## 2573.502 STORM DRAIN INLET PROTECTION 16 ## EACH 85 ## 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER 250 ## LI ## N FT 86 ## 2574.505 SUBSOILING 0.3 ## ACRE 87 ## 2574.505 SOIL BED PREPARATION 0.7 ## ACRE 88 ## 2574.508 FERTILIZER TYPE 1 (1) 79 ## POUND 89 ## 2575.505 SEEDING 0.4 ## ACRE 90 ## 2575.505 MOWING 0.8 ## ACRE 91 ## 2575.505 WEED SPRAYING 0.2 ## ACRE 92 ## 2575.506 WEED SPRAY MIXTURE 0.03 ## GALLON 93 ## 2575.608 SEED SOUTHERN BOULEVARD 7 ## POUND 94 ## 2575.608 SEED RESIDENTIAL TURFGRASS 2 ## POUND 95 ## 2575.508 HYDRAULIC REINFORCED FIBER MATRIX (1) 1120 ## P ## OUND 96 ## 2575.523 RAPID STABILIZATION METHOD 3 3.8 ## M GALLON 97 ## 2582.503 24" SOLID LINE MULTI-COMPONENT 75 ## LIN FT 98 ## 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROU ## ND IN (WR) 666 ## LIN FT 99 ## 2582.503 24" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 46 ## LIN FT 100 ## 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 2921 ## LIN FT 101 ## 2582.503 6" DOTTED LINE MULTI-COMPONENT GROUND IN ## (WR) 42 ## LIN FT 102 ## 2582.503 12" DOTTED LINE PREFORM THERMOPLASTIC GR ## OUND IN (WR) 60 ## LIN FT 103 ## 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC G ## ROUND IN 15 ## SQ FT 104 ## 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND I ## N 216 ## SQ FT ## TOTAL AMOUNT BID: ## NOTES: (1) ## SEE TABLE FOR BASIS OF ESTIMATE QUANTITIES. (2) ## SEE EXISTING BITUMNIOUS AND CONCRETE THICKNESS TABL ## E IN THE TYPICAL SECTIONS FOR ESTIMATED DEPTHS. (3) ## INCLUDES MEDIAN NOSES . SEE STANDARD PLATES AND PLA ## NS FOR PLACEMENT USE. (4) ## INSTALLATION OF SALVAGED LIGHTENING UNITS IS PAID F ## OR UNDER THE LUMP SUM LIGHTING. (5) ## USED FOR TRUCK APRON. SEE MISCELLANEOUS DETAILS FOR ## MORE INFORMATION. (6)(7)(8) ## ALTERNATIVE CASING PIPE MATERIALS ARE ALLOWED. ## (P) ## DENOTES PLAN QUANTITY ## (CV) ## DENOTES COMPACTED VOLUME ## (WR) ## DENOTES WET REFLECTIVEALL COMPONENTS OF TEMPORARY SIGNAL USED DURING FLOO ## DING EVENTS INCLUDING, BUT NOT LIMITED TO, WIRING, ## CONDUIT, MOUNTS, ## ETC. FOLLOWING THESE REMOVALS, XCEL ENERGY TO REMOV ## E WOOD POLES AND LIGHTING ARM UNITS ## ESALVAGED LIGHTING UNITS, PER DETAIL IN LIGHTING PL ## AN, ARE TO BE INSTALLED IN NEWER LOCATIONS. ADDITIO ## NAL LIGHTING POLE UNITS ## TO BE PROVIDED BY THE CITY OF BELLE PLAINE. 3 4 5 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## Park Construction Company ## Minneapolis, MN ## Shakopee, MN S.M. Hentges & Sons, Inc. ## Jordan, MN Valley Paving, Inc. $50,507.00 $50,507.00 $36,453.00 $36,453.00 $36,800.00 $ 36,800.00 $14,508.00 $14,508.00 $10,500.00 $10,500.00 $26,100.00 $ 26,100.00 $520.00 $520.00 $4,700.00 $4,700.00 $10,100.00 $10,100.0 0 $260.00 $520.00 $460.00 $920.00 $404.00 $808.00 $70.72 $14,921.92 $91.00 $19,201.00 $75.80 $15,993.80 $2,133.58 $2,133.58 $2,300.00 $2,300.00 $1,710.00 $1,710 .00 $2,075.52 $2,075.52 $10,000.00 $10,000.00 $2,460.00 $2,4 60.00 $133.25 $2,132.00 $146.00 $2,336.00 $197.00 $3,152.00 $3.22 $805.00 $3.60 $900.00 $4.55 $1,137.50 $884.00 $265.20 $514.00 $154.20 $881.00 $264.30 $2,600.00 $1,820.00 $2,000.00 $1,400.00 $2,020.00 $1,414 .00 $3.90 $308.10 $2.00 $158.00 $2.00 $158.00 $2,756.00 $1,102.40 $620.00 $248.00 $606.00 $242.40 $468.00 $374.40 $830.00 $664.00 $808.00 $646.40 $1,924.00 $384.80 $3,100.00 $620.00 $3,030.00 $606.00 $6,032.00 $180.96 $2,600.00 $78.00 $2,530.00 $75.90 $87.46 $612.22 $51.00 $357.00 $50.50 $353.50 $133.12 $266.24 $77.00 $154.00 $75.80 $151.60 $2.18 $2,441.60 $2.30 $2,576.00 $2.25 $2,520.00 $884.00 $3,359.20 $770.00 $2,926.00 $758.00 $2,880.40 $15.60 $1,170.00 $15.50 $1,162.50 $15.20 $1,140.00 $3.12 $2,077.92 $3.10 $2,064.60 $3.05 $2,031.30 $31.20 $1,435.20 $31.00 $1,426.00 $30.30 $1,393.80 $2.34 $6,835.14 $2.30 $6,718.30 $2.25 $6,572.25 $2.34 $98.28 $2.30 $96.60 $2.25 $94.50 $19.76 $1,185.60 $20.00 $1,200.00 $19.20 $1,152.00 $52.00 $780.00 $52.00 $780.00 $50.50 $757.50 $16.64 $3,594.24 $17.00 $3,672.00 $16.20 $3,499.20 $1,296,151.27 $1,318,883.28 $1,372,886.77 Page 93 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT ## BASE BID 1 ## 2011.601 AS BUILT 1 ## LUMP SUM 2 ## 2021.501 MOBILIZATION 1 ## LUMP SUM 3 ## 2101.502 CLEARING 4 ## EACH 4 ## 2101.502 GRUBBING 4 ## EACH 5 ## 2102.503 PAVEMENT MARKING REMOVAL 500 ## LIN FT 6 ## 2104.502 REMOVE MANHOLE 1 ## EACH 7 ## 2104.502 REMOVE GATE VALVE AND BOX 2 ## EACH 8 ## 2104.502 REMOVE DRAINAGE STRUCTURE 6 ## EACH 9 ## 2104.502 SALVAGE GATE VALVE AND BOX 1 ## EACH 10 ## 2104.502 REMOVE SIGN 18 ## EACH 11 ## 2104.502 SALVAGE LIGHTING UNIT (4) 2 ## EACH 12 ## 2104.502 SALVAGE SIGN (9) 2 ## EACH 13 ## 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 33 6 ## LIN FT 14 ## 2104.503 REMOVE PIPE DRAIN 170 ## LIN FT 15 ## 2104.503 REMOVE CURB AND GUTTER 1218 ## LIN FT 16 ## 2104.503 REMOVE WATER MAIN 440 ## LIN FT 17 ## 2104.503 REMOVE SEWER PIPE (STORM) 761 ## LIN FT 18 ## 2104.503 REMOVE SEWER PIPE (SANITARY) 50 ## LIN FT 19 ## 2104.504 REMOVE CONCRETE WALK 716 ## SQ YD 20 ## 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT 252 ## SQ YD 21 ## 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 98 ## SQ Y ## D 22 ## 2104.504 REMOVE BITUMINOUS PAVEMENT (2) 4158 ## SQ YD 23 ## 2104.601 REMOVE TEMPORARY SIGNAL SYSTEM (6) 1 ## LUMP SU ## M 24 ## 2106.507 EXCAVATION - COMMON (P) 1482 ## CU YD 25 ## 2106.507 EXCAVATION - SUBGRADE (P) 1290 ## CU YD 26 ## 2106.507 SELECT GRANULAR EMBANKEMENT (CV) (P) 1380 ## C ## U YD 27 ## 2106.507 COMMON EMBANKMENT (CV) (P) 416 ## CU YD 28 ## 2112.604 SUBGRADE PREPARATION 3273 ## SQ YD 29 ## 2111.519 TEST ROLLING 738 ## RD STA 30 ## 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 1518 ## CU YD 31 ## 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXUTRE ( ## 4,B) (1) 493 ## TON 32 ## 2360.509 TYPE SP 12.5 WEARING COURSE MIXUTRE (4,F) (1) 656 ## TON 33 ## 2502.503 4" PERF PE PIPE DRAIN 978 ## LIN FT 34 ## 2503.503 8" PVC PIPE SEWER 79 ## LIN FT 35 ## 2503.503 44" SPAN RC PIPE-ARCH SEWER CLASS IIA 145 ## L ## IN FT 36 ## 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V 31 ## LI ## N FT 37 ## 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V 173 ## L ## IN FT 38 ## 2503.503 30" RC PIPE SEWER DESIGN 3006 CLASS II 257 ## LIN FT 6 7 8 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT $7,055.00 $7,055.00 $3,900.00 $3,900.00 $10,000.00 $10,0 00.00 $163,000.00 $163,000.00 $128,470.94 $128,470.94 $122,95 0.00 $122,950.00 $1,100.00 $4,400.00 $1,250.00 $5,000.00 $1,000.00 $4,000 .00 $275.00 $1,100.00 $120.00 $480.00 $250.00 $1,000.00 $3.30 $1,650.00 $3.00 $1,500.00 $3.00 $1,500.00 $500.00 $500.00 $590.69 $590.69 $500.00 $500.00 $415.00 $830.00 $234.90 $469.80 $50.00 $100.00 $500.00 $3,000.00 $589.49 $3,536.94 $300.00 $1,800.00 $625.00 $625.00 $1,173.30 $1,173.30 $500.00 $500.00 $28.00 $504.00 $25.00 $450.00 $25.00 $450.00 $550.00 $1,100.00 $1,516.00 $3,032.00 $1,088.00 $2,176.0 0 $28.00 $56.00 $25.00 $50.00 $25.00 $50.00 $2.15 $722.40 $4.10 $1,377.60 $6.00 $2,016.00 $12.00 $2,040.00 $10.39 $1,766.30 $10.00 $1,700.00 $3.00 $3,654.00 $3.61 $4,396.98 $12.75 $15,529.50 $7.00 $3,080.00 $18.74 $8,245.60 $10.00 $4,400.00 $14.00 $10,654.00 $24.75 $18,834.75 $26.28 $19,999.08 $2.00 $100.00 $21.51 $1,075.50 $20.00 $1,000.00 $11.00 $7,876.00 $7.19 $5,148.04 $8.85 $6,336.60 $11.00 $2,772.00 $7.19 $1,811.88 $8.85 $2,230.20 $11.00 $1,078.00 $7.05 $690.90 $8.85 $867.30 $6.00 $24,948.00 $7.44 $30,935.52 $8.77 $36,465.66 $7,400.00 $7,400.00 $2,175.00 $2,175.00 $2,175.00 $2,175 .00 $17.50 $25,935.00 $12.37 $18,332.34 $40.30 $59,724.60 $17.50 $22,575.00 $14.53 $18,743.70 $24.90 $32,121.00 $26.00 $35,880.00 $30.98 $42,752.40 $23.30 $32,154.00 $5.65 $2,350.40 $15.89 $6,610.24 $16.10 $6,697.60 $1.25 $4,091.25 $2.28 $7,462.44 $2.55 $8,346.15 $0.25 $184.50 $0.01 $7.38 $0.01 $7.38 $39.00 $59,202.00 $28.78 $43,688.04 $52.92 $80,332.56 $90.00 $44,370.00 $82.00 $40,426.00 $110.62 $54,535.66 $120.00 $78,720.00 $109.00 $71,504.00 $126.47 $82,964.32 $12.00 $11,736.00 $13.97 $13,662.66 $14.97 $14,640.66 $90.00 $7,110.00 $88.63 $7,001.77 $89.29 $7,053.91 $280.00 $40,600.00 $385.77 $55,936.65 $351.63 $50,986.35 $83.00 $2,573.00 $98.89 $3,065.59 $93.06 $2,884.86 $73.00 $12,629.00 $105.16 $18,192.68 $77.77 $13,454.21 $155.00 $39,835.00 $182.56 $46,917.92 $169.00 $43,433.00 Wm. Mueller & Sons, Inc. ## Hamburg, MN ## Heselton Construction, LLC ## Faribault, MN Meyer Contracting, Inc. ## Maple Grove, MN Page 94 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT 39 ## 2503.503 42" RC PIPE SEWER DESIGN 3006 CLASS II 29 ## L ## IN FT 40 ## 2503.503 48" RC PIPE SEWER DESIGN 3006 CLASS II 216 ## LIN FT 41 ## 2503.602 CONSTRUCT BULKHEAD 1 ## EACH 42 ## 2503.602 CONNECT TO EXISTING STORM SEWER 5 ## EACH 43 ## 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVIC ## E 2 ## EACH 44 ## 2503.602 8" PIPE PLUG 1 ## EACH 45 ## 2503.603 4" PVC SANITARY SERVICE PIPE 120 ## LIN FT 46 ## 2503.603 6" PVC SANITARY SERVICE PIPE 40 ## LIN FT 47 ## 2504.602 CONNECT TO EXISTING WATER MAIN 4 ## EACH 48 ## 2504.602 RELOCATE HYDRANT AND VALVE 1 ## EACH 49 ## 2504.602 INSTALL GATE VALVE AND BOX 1 ## EACH 50 ## 2504.602 6" GATE VALVE AND BOX 1 ## EACH 51 ## 2504.602 10" GATE VALVE AND BOX 3 ## EACH 52 ## 2504.603 6" PVC WATERMAIN 8 ## LIN FT 53 ## 2504.603 10" PVC WATERMAIN 474 ## LIN FT 54 ## 2504.603 18" PVC CASING PIPE (8) 230 ## LIN FT 55 ## 2504.604 4" POLYSTYRENE INSULATION 126 ## SQ YD 56 ## 2504.608 WATERMAIN FITTINGS 1138 ## POUND 57 ## 2506.502 CASTING ASSEMBLY 13 ## EACH 58 ## 2506.502 ADJUST FRAME AND RING CASTING 1 ## EACH 59 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN G 8.8 ## L ## IN FT 60 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-40 20 8.2 ## LIN FT 61 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-40 20 30.6 ## LIN FT 62 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-40 20 45.3 ## LIN FT 63 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-40 20 12 ## LIN FT 64 ## 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4007 8 .7 ## LIN FT 65 ## 2506.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE 1 ## EACH 66 ## 2521.518 4" CONCRETE WALK 6343 ## SQ FT 67 ## 2521.518 7" CONCRETE WALK 1521 ## SQ FT 68 ## 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED) 4 64 ## EACH 69 ## 2521.618 CONCRETE CURB RAMP WALK 1535 ## SQ FT 70 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 326 ## LI ## N FT 71 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 935 ## LI ## N FT 72 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 1 773 ## LIN FT 73 ## 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL 2 145 ## LIN FT 74 ## 2531.504 CONCRETE MEDIAN (3) 159 ## SQ YD 75 ## 2531.504 6" CONCRETE DRIVEWAY PAVEMENT 351 ## SQ YD 76 ## 2531.618 TRUNCATED DOMES 163 ## SQ FT 6 7 8 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT Wm. Mueller & Sons, Inc. ## Hamburg, MN ## Heselton Construction, LLC ## Faribault, MN Meyer Contracting, Inc. ## Maple Grove, MN $255.00 $7,395.00 $309.83 $8,985.07 $241.12 $6,992.48 $300.00 $64,800.00 $368.98 $79,699.68 $265.77 $57,406.32 $685.00 $685.00 $628.67 $628.67 $750.00 $750.00 $1,900.00 $9,500.00 $805.93 $4,029.65 $3,000.00 $15,000. 00 $465.00 $930.00 $491.37 $982.74 $1,392.25 $2,784.50 $55.00 $55.00 $660.28 $660.28 $198.44 $198.44 $45.00 $5,400.00 $70.92 $8,510.40 $44.89 $5,386.80 $48.00 $1,920.00 $75.99 $3,039.60 $94.65 $3,786.00 $2,230.00 $8,920.00 $2,073.18 $8,292.72 $2,390.97 $9,563 .88 $3,325.00 $3,325.00 $4,746.52 $4,746.52 $6,852.61 $6,852 .61 $770.00 $770.00 $3,773.49 $3,773.49 $1,875.00 $1,875.00 $2,700.00 $2,700.00 $3,213.71 $3,213.71 $2,762.91 $2,762 .91 $5,445.00 $16,335.00 $6,156.04 $18,468.12 $5,490.84 $16, 472.52 $90.00 $720.00 $125.84 $1,006.72 $139.38 $1,115.04 $95.00 $45,030.00 $106.75 $50,599.50 $98.49 $46,684.26 $235.00 $54,050.00 $259.17 $59,609.10 $360.98 $83,025.40 $45.00 $5,670.00 $74.33 $9,365.58 $62.22 $7,839.72 $19.00 $21,622.00 $27.68 $31,499.84 $19.99 $22,748.62 $1,460.00 $18,980.00 $1,194.79 $15,532.27 $1,886.00 $24, 518.00 $760.00 $760.00 $1,680.38 $1,680.38 $2,010.00 $2,010.00 $620.00 $5,456.00 $688.05 $6,054.84 $463.22 $4,076.34 $788.00 $6,461.60 $1,048.50 $8,597.70 $969.15 $7,947.03 $680.00 $20,808.00 $966.83 $29,585.00 $730.48 $22,352.69 $888.00 $40,226.40 $1,286.53 $58,279.81 $1,023.78 $46,37 7.23 $1,500.00 $18,000.00 $2,047.02 $24,564.24 $1,756.81 $21, 081.72 $600.00 $5,220.00 $783.01 $6,812.19 $765.82 $6,662.63 $1,300.00 $1,300.00 $2,256.06 $2,256.06 $3,000.00 $3,000 .00 $8.30 $52,646.90 $6.06 $38,438.58 $7.60 $48,206.80 $18.70 $28,442.70 $15.66 $23,818.86 $17.10 $26,009.10 $11.00 $5,104.00 $10.10 $4,686.40 $10.00 $4,640.00 $19.00 $29,165.00 $15.91 $24,421.85 $17.35 $26,632.25 $39.50 $12,877.00 $38.60 $12,583.60 $35.00 $11,410.00 $44.00 $41,140.00 $42.64 $39,868.40 $39.00 $36,465.00 $39.00 $30,147.00 $38.10 $29,451.30 $34.50 $26,668.50 $51.00 $7,395.00 $48.70 $7,061.50 $45.00 $6,525.00 $100.50 $15,979.50 $83.84 $13,330.56 $99.00 $15,741.00 $109.00 $38,259.00 $79.29 $27,830.79 $94.50 $33,169.50 $72.00 $11,736.00 $65.66 $10,702.58 $65.00 $10,595.00 Page 95 of 104 ## ABSTRACT OF BIDS TH 25 / CSAH 3 Intersection ImprovementsCity of Belle Plaine, MNS.A.P. 239-010-004, S.P. 7003-116, and S.A.P. 070-6 03-015 ## BMI Project Number 25X.137897 ## BID DATE: 8/13/2026 ## TIME: ## 11:00 AM ## ITEM ## MNDOT ## APPROX. ## NO. ## SPEC NO. ## ITEM ## NOTES ## QUANT. ## UNIT 77 ## 2545.501 LIGHTING SYSTEM (7) 1 ## LUMP SUM 78 ## 2563.601 TRAFFIC CONTROL 1 ## LUMP SUM 79 ## 2563.601 ALTERNATE PEDESTRIAN ROUTE 1 ## LUMP SUM 80 ## 2564.502 INSTALL SIGN 2 ## EACH 81 ## 2564.518 SIGN 211 ## SQ FT 82 ## 2573.501 STABILIZED CONSTRUCTION EXIT 1 ## LUMP SUM 83 ## 2573.501 EROSION CONTROL SUPERVISOR 1 ## LUMP SUM 84 ## 2573.502 STORM DRAIN INLET PROTECTION 16 ## EACH 85 ## 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER 250 ## LI ## N FT 86 ## 2574.505 SUBSOILING 0.3 ## ACRE 87 ## 2574.505 SOIL BED PREPARATION 0.7 ## ACRE 88 ## 2574.508 FERTILIZER TYPE 1 (1) 79 ## POUND 89 ## 2575.505 SEEDING 0.4 ## ACRE 90 ## 2575.505 MOWING 0.8 ## ACRE 91 ## 2575.505 WEED SPRAYING 0.2 ## ACRE 92 ## 2575.506 WEED SPRAY MIXTURE 0.03 ## GALLON 93 ## 2575.608 SEED SOUTHERN BOULEVARD 7 ## POUND 94 ## 2575.608 SEED RESIDENTIAL TURFGRASS 2 ## POUND 95 ## 2575.508 HYDRAULIC REINFORCED FIBER MATRIX (1) 1120 ## P ## OUND 96 ## 2575.523 RAPID STABILIZATION METHOD 3 3.8 ## M GALLON 97 ## 2582.503 24" SOLID LINE MULTI-COMPONENT 75 ## LIN FT 98 ## 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROU ## ND IN (WR) 666 ## LIN FT 99 ## 2582.503 24" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 46 ## LIN FT 100 ## 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN ## (WR) 2921 ## LIN FT 101 ## 2582.503 6" DOTTED LINE MULTI-COMPONENT GROUND IN ## (WR) 42 ## LIN FT 102 ## 2582.503 12" DOTTED LINE PREFORM THERMOPLASTIC GR ## OUND IN (WR) 60 ## LIN FT 103 ## 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC G ## ROUND IN 15 ## SQ FT 104 ## 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND I ## N 216 ## SQ FT ## TOTAL AMOUNT BID: ## NOTES: (1) ## SEE TABLE FOR BASIS OF ESTIMATE QUANTITIES. (2) ## SEE EXISTING BITUMNIOUS AND CONCRETE THICKNESS TABL ## E IN THE TYPICAL SECTIONS FOR ESTIMATED DEPTHS. (3) ## INCLUDES MEDIAN NOSES . SEE STANDARD PLATES AND PLA ## NS FOR PLACEMENT USE. (4) ## INSTALLATION OF SALVAGED LIGHTENING UNITS IS PAID F ## OR UNDER THE LUMP SUM LIGHTING. (5) ## USED FOR TRUCK APRON. SEE MISCELLANEOUS DETAILS FOR ## MORE INFORMATION. (6)(7)(8) ## ALTERNATIVE CASING PIPE MATERIALS ARE ALLOWED. ## (P) ## DENOTES PLAN QUANTITY ## (CV) ## DENOTES COMPACTED VOLUME ## (WR) ## DENOTES WET REFLECTIVEALL COMPONENTS OF TEMPORARY SIGNAL USED DURING FLOO ## DING EVENTS INCLUDING, BUT NOT LIMITED TO, WIRING, ## CONDUIT, MOUNTS, ## ETC. FOLLOWING THESE REMOVALS, XCEL ENERGY TO REMOV ## E WOOD POLES AND LIGHTING ARM UNITS ## ESALVAGED LIGHTING UNITS, PER DETAIL IN LIGHTING PL ## AN, ARE TO BE INSTALLED IN NEWER LOCATIONS. ADDITIO ## NAL LIGHTING POLE UNITS ## TO BE PROVIDED BY THE CITY OF BELLE PLAINE. 6 7 8 ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT ## UNIT PRICE ## AMOUNT Wm. Mueller & Sons, Inc. ## Hamburg, MN ## Heselton Construction, LLC ## Faribault, MN Meyer Contracting, Inc. ## Maple Grove, MN $52,500.00 $52,500.00 $36,453.00 $36,453.00 $36,453.00 $ 36,453.00 $15,325.00 $15,325.00 $13,950.00 $13,950.00 $19,000.00 $ 19,000.00 $550.00 $550.00 $500.00 $500.00 $4,000.00 $4,000.00 $275.00 $550.00 $250.00 $500.00 $250.00 $500.00 $78.00 $16,458.00 $68.00 $14,348.00 $68.00 $14,348.00 $5,200.00 $5,200.00 $1,500.00 $1,500.00 $2,400.00 $2,400 .00 $1,350.00 $1,350.00 $5,000.00 $5,000.00 $3,000.00 $3,000 .00 $265.00 $4,240.00 $195.00 $3,120.00 $275.00 $4,400.00 $5.50 $1,375.00 $4.75 $1,187.50 $4.75 $1,187.50 $400.00 $120.00 $300.00 $90.00 $300.00 $90.00 $2,200.00 $1,540.00 $300.00 $210.00 $300.00 $210.00 $5.50 $434.50 $2.00 $158.00 $2.00 $158.00 $2,200.00 $880.00 $13,672.55 $5,469.02 $1,000.00 $400.00 $1,100.00 $880.00 $125.00 $100.00 $125.00 $100.00 $11,000.00 $2,200.00 $500.00 $100.00 $500.00 $100.00 $1,100.00 $33.00 $600.00 $18.00 $600.00 $18.00 $11.00 $77.00 $7.00 $49.00 $7.00 $49.00 $11.00 $22.00 $8.00 $16.00 $8.00 $16.00 $2.75 $3,080.00 $1.50 $1,680.00 $1.50 $1,680.00 $1,100.00 $4,180.00 $650.00 $2,470.00 $650.00 $2,470.00 $16.50 $1,237.50 $15.00 $1,125.00 $15.00 $1,125.00 $3.30 $2,197.80 $3.00 $1,998.00 $3.00 $1,998.00 $33.00 $1,518.00 $30.00 $1,380.00 $30.00 $1,380.00 $2.50 $7,302.50 $2.25 $6,572.25 $2.25 $6,572.25 $2.50 $105.00 $2.25 $94.50 $2.25 $94.50 $21.00 $1,260.00 $19.00 $1,140.00 $19.00 $1,140.00 $55.00 $825.00 $50.00 $750.00 $50.00 $750.00 $18.00 $3,888.00 $16.00 $3,456.00 $16.00 $3,456.00 $1,405,194.95 $1,405,518.11 $1,509,509.14 Page 96 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-098 ## A RESOLUTION AWARDING THE BID TO HOLTMEIER CONSTRUCTION, INC. IN THE AMOUNT OF ## $1,147,522.43 FOR THE TH 25/CSAH 3 ROUNDABOUT PROJECT WHEREAS, the City received bids on August 13, 2026 for the TH 25/CSAH 3 Roundabout Project, and WHEREAS, the bids were tabulated an analyzed as follows: ## Bidder Total Bid ## Holtmeier Construction, Inc. $1,147,522.43 ## A-1 Excavating LLC $1,179,816.00 ## Valley Paving, Inc. $1,296,151.27 ## S.M. Hentges & Sons, Inc. $1,318,883.28 ## Park Construction Company $1,372,886.77 ## Heselton Construction, LLC $1,405,194.95 ## Meyer Contracting, Inc. $1,405,518.11 ## Wm. Mueller & Sons, Inc. $1,509,509.14 ## Engineer’s Estimate $1,587,292.25 ## NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BELLE PLAINE, ## MINNESOTA THAT; 1. All bids of the TH 25/CSAH 3 Roundabout Project are hereby received and tabulated. 2. The bid of Holtmeier Construction, Inc. in the amount of $1,147,522.43 for the TH 25/CSAH 3 Roundabout Project in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and hereby is accepted. 3. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City pending a fully executed Cooperative Agreement with MnDOT and Scott County. 4. The City Administrator is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposited of the successful bidder and the next lowest bidder shall be retained until a contact has been expected. The adoption of the foregoing resolution was duly moved by Councilmember ___________ and seconded by Councilmember __________, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th date of August, 2026. ## ATTEST: ___________________ ______________________ James Evans Dawn Meyer Mayor City Administrator Page 97 of 104 ## MEMORANDUM ## DATE: August 17, 2026 ## FROM: ## Dawn Meyer, City Administrator ## AGENDA ## ITEM: Resolution 26-099 Accepting the Preliminary Engineering Report and Call for the Public Hearing on the 2027 Improvement Project. ## BACKGROUND/ ## JUSTIFICATION: City Engineer Duncan has completed the preliminary engineering report for the 2027 Improvement Project and will present it at the meeting. Improvements proposed for the 2027 construction season include the full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, and East Commerce Drive from Main Street to 900’ south. Following the presentation of the Preliminary Engineering Report, the City Council may accept the preliminary report and call for the improvement hearing for Monday, September 21, 2026. At that hearing, affected property owners will have an opportunity to review the proposed project and to address any concerns they have regarding the project with the City Council and Staff. Location maps are included in the packet. The full preliminary engineering report will be distributed at the meeting. ## FISCAL ## IMPACT: The proposed street improvement project is included in the 2026 budget. ## STAFF ## RECOMMENDATION: Approval of Resolution 26-099 Accepting the Preliminary Engineering Report and Call for the Public Hearing on the 2027 Improvement Project. Page 98 of 104 ## SB TH 169 ## NB TH 169 ## E PARK ST ## E PRAIRIE ST ## COMMERCE DR E ## S LINDEN ST ## S ELM ST ## S ASH ST ## E MAIN ST ## E PRAIRIE ST ## SB TH 169 ## East Commerce Dr ## NB TH 169 ## E MAIN ST ## FEETSCALE 0100 200 ## R Figure 1.1: Project Location (1 of 2) ## STREET & UTILITY RECONSTRUCTION ## H:\BELL\26X144199000\CAD\C3D\PER Drawings\FIGR-144199-LOCATION MAPS.dwg ## 8/11/2026 11:45:04 AM ## R ## 2027 Street & Utility Improvements ## City of Belle Plaine, MNAugust 2026 Page 99 of 104 ## ASPEN LN N ## COMMERCE DR E ## E MAIN ST ## E CHURCH ST ## E STATE ST ## E PRAIRIE ST ## E PARK ST ## SOUTH ST ## E SOUTH ST ## DIVERSIFIED DR ## SHANNON LN ## EAST ORCHARD ST ## LACY LN ## EAST ORCHARD ST ## EAST ORCHARD ST ## S ASH ST ## MAPLE ST ## LAREDO ST S ## S ASH ST ## LAREDO AVE ## MAPLE ST ## S ELM ST ## S MERIDIAN ST ## LINDSEY LN ## HICKORY BLVD ## SB TH 169 ## NB TH 169 ## FEETSCALE 0250 500 ## R Figure 1.2: Project Location (2 of 2) ## STREET RESURFACING ## FEETSCALE 0100 200 ## R ## STREET RESURFACING ## H:\BELL\26X144199000\CAD\C3D\PER Drawings\FIGR-144199-LOCATION MAPS.dwg ## 8/11/2026 11:45:28 AM ## R ## 2027 Street & Utility Improvements ## City of Belle Plaine, MNAugust 2026 Page 100 of 104 ## BELLE PLAINE CITY COUNCIL ## RESOLUTION 26-099 ## RESOLUTION RECEIVING THE PRELIMINARY ENGINEERING REPORT AND CALLING FOR ## PUBLIC HEARING FOR THE 2026 IMPROVEMENT PROJECT WHEREAS, The City Council deems it necessary and expedient that the City of Belle Plaine, Minnesota, construct certain improvements including installation of water, sanitary sewer, storm sewer, street, curb and gutter improvements associated with the 2027 Improvement Project, as described in and in accordance with the preliminary plans and report prepared by Bolton and Menk, Inc., consulting engineers including the following: A. Full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, East Commerce Drive from Main Street to 900’ south. WHEREAS, The City Council has been advised by the consulting engineers that said improvements are necessary, cost-effective and feasible and should best be made as proposed, and the consulting engineers’ report to this effect has hereto been received by the Council, and filed with the City Clerk; and WHEREAS, The statute provides that no such improvement shall be made until the Council shall have held a public hearing on such improvements following mailed notice and two publications thereto in the official newspaper stating the time and place of the hearing, the general nature of the improvement, the estimated costs thereof, and the area proposed to be assessed, in accordance with law. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Belle Plaine, Scott County, Minnesota as follows: 1. A public hearing will be held at the time and place set forth in the Notice of Hearing attached hereto as Exhibit A to consider proposed improvements. 2. The nature of the improvements, the estimated cost of each major portion thereof, and the areas proposed to be assessed therefore are described in the form of Notice of Hearing hereto attached. 3. The notice of said public hearing shall be in substantially the form contained in the notice hereto attached. 4. The City Administrator is hereby authorized and directed to cause notice of said hearing to be given two publications in the official newspaper. Said publication shall be one week apart, and at least three days shall elapse between the last publication and the hearing. Not less than ten days before the hearing the City Administrator shall mail notice of the hearing to the owner of each parcel of land described within the area proposed to be assessed as described in the notice. For the purpose of giving such mailed notice, owners shall be those shown to be such on the records of the County Auditor or, if the tax statements in the County are mailed by the County Treasurer, on the records of the County Treasurer. As to properties not listed on the records of the County Auditor or County Treasurer, the City Administrator shall ascertain such ownership by any practicable means and give mailed notice to such owners. 5. The City Administrator is hereby authorized and directed to cause to be prepared the Impact of Assessments, which may be in the form attached hereto as Exhibit 2, consistent with the determinations of this City Council on and prior to the date hereof. Resolution 26-099 Page 101 of 104 The adoption of the foregoing resolution was duly moved by Councilmember __________ and seconded by Councilmember ______________, and after full discussion thereof and upon a vote being taken thereon, the following Councilmembers voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 17 th day of August, 2026. ## ATTEST: ___________________ _______________________ ## James Evans Dawn Meyer Mayor City Administrator Page 102 of 104 ## EXHIBIT A ## NOTICE OF PUBLIC HEARING ON THE ## 2027 Improvement Project Notice is hereby given that the City Council of the City of Belle Plaine, Minnesota will meet at City Hall located at 218 North Meridian Street in Belle Plaine on Monday, September 21, 2026 at 6:05 p.m. to consider the construction of the following improvement of the 2027 Improvement Project. A. Full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, East Commerce Drive from Main Street to 900’ south. The total estimated project costs of said improvements is $_____________. The area to be assessed for such improvements are as follows: A. Full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, East Commerce Drive from Main Street to 900’ south. A reasonable estimate of the impact of the assessment will be available at the hearing. The City Council proposes to proceed under the authority granted by Chapter 429 M.S.A. Such persons as desire to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral objections will be considered. Dated: August 17, 2026 ## BY ORDER OF THE CITY COUNCIL _________________________________ ## Dawn Meyer, City Administrator Published in the Henderson Independent on 08/28/2026 and 09/04/2026. Page 103 of 104 ## Date ## Property Owner ## Address ## City, State, Zip Code ## NOTICE OF PUBLIC HEARING ON THE ## 2027 Improvement Project Notice is hereby given that the City Council of the City of Belle Plaine, Minnesota will meet at City Hall located at 218 North Meridian Street in Belle Plaine on Monday, September 21, 2026 at 6:05 p.m. to consider the construction of the following improvement of the 2027 Improvement Project. A. Full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, East Commerce Drive from Main Street to 900’ south. The total estimated project costs of said improvements is $_____________. The area to be assessed for such improvements are as follows: A. Full reconstruction of Linden Street from Main Street to Park Street and Prairie Street from Elm Street to Ash Street. Reconstruction shall include municipal improvements to watermain, sanitary sewer, storm sewer, bituminous pavement, curb and gutter and ADA accessibility. Also included are reclamation/resurfacing improvements on Orchard Street from Meridian Street to Hickory Blvd, Aspen Lane, East Commerce Drive from Main Street to 900’ south. A reasonable estimate of the impact of the assessment will be available at the hearing. The City Council proposes to proceed under the authority granted by Chapter 429 M.S.A. Such persons as desire to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral objections will be considered. Dated: August 17, 2026 ## BY ORDER OF THE CITY COUNCIL _________________________________ ## Dawn Meyer, City Administrator Published in the Henderson Independent on 08/28/2026 and 09/04/2026. Page 104 of 104
Agenda — Belle Plaine City Council - Belle Plaine Recorder