Joint Commission Meeting: Downtown Savage Redevelopment Vision
Sunday, April 13, 2025
Downtown plan recap and vision
Public engagement status and feedback loops
Equity in urban engagement
Physical constraints and redevelopment analysis
Proposed concept for public space at Depot parking lot
123rd Street as an active event street proposal
Infrastructure and traffic flow (Quinton to 124th realignment)
Bicycle and trail connectivity
Redevelopment potential for Hamilton block, Mall block, and Savage School site
Housing density and land use character areas
Notable Quotes (2)
it's really what is the series of both public and private actions necessary to move downtown into a more vibrant livable walkable place
Project VisionExplaining the goals of the downtown plan.
If nobody's heart was racing a little bit right now then I don't know if we've necessarily done our job
Public FeedbackSeeking reaction to bold infrastructure changes.
People (4)
MikeConsultant/Presenter
Leading the downtown planning study and presenting concepts to commissions.
ReginaCommission Organizer/Host
Organizing the virtual commission meeting and introducing the project.
AngieProject Lead/Staff
Collaborating on the downtown vision and refining planning documents.
GregStaff
Reviewing downtown development concepts with consultants.
Places Mentioned
Downtown SavageHighway 13 corridor123rd Street124th StreetQuinton StreetDepot parking lotSouth Hamilton blockSavage School siteBurnsville (adjacent)
Events & Meetings (1)
- Virtual Commission Meeting, November (implied)