Joint Commission Meeting: Downtown Savage Redevelopment Vision

Sunday, April 13, 2025

Downtown plan recap and vision

Public engagement status and feedback loops

Equity in urban engagement

Physical constraints and redevelopment analysis

Proposed concept for public space at Depot parking lot

123rd Street as an active event street proposal

Infrastructure and traffic flow (Quinton to 124th realignment)

Bicycle and trail connectivity

Redevelopment potential for Hamilton block, Mall block, and Savage School site

Housing density and land use character areas

Notable Quotes (2)

it's really what is the series of both public and private actions necessary to move downtown into a more vibrant livable walkable place

Mike
Project VisionExplaining the goals of the downtown plan.

If nobody's heart was racing a little bit right now then I don't know if we've necessarily done our job

Mike
Public FeedbackSeeking reaction to bold infrastructure changes.

People (4)

ReginaCommission Organizer/Host

Organizing the virtual commission meeting and introducing the project.

AngieProject Lead/Staff

Collaborating on the downtown vision and refining planning documents.

GregStaff

Reviewing downtown development concepts with consultants.

Places Mentioned

Downtown SavageHighway 13 corridor123rd Street124th StreetQuinton StreetDepot parking lotSouth Hamilton blockSavage School siteBurnsville (adjacent)

Events & Meetings (1)

  • Virtual Commission Meeting, November (implied)
View Source
Joint Commission Meeting: Downtown Savage Redevelopment Vision - Savage Recorder