Agenda Text
---
## author: Gina Wolbeck
date: D:20260709143503-05'00'
---
## 1) CALL TO ORDER
## 2) ROLL CALL
## 3) PROPOSED AGENDA
## 4) BUSINESS
## 4A. Water Tower Rehabilitation Presentation
## 4B. Ice Rink/Warming House Discussion
## 4C. Discuss Lakeside Park Fishing Pier Access Improvements
## 4D. City Hall Fleet Expansion Request Update
## 4E. Discuss Fire Department Vehicle Purchase/Sale
## 5) OTHER
## 6) ADJOURN
Disclaimer: This agenda has been prepared to provide information regarding an upcoming work session of the Big Lake City Council. This document does
not claim to be complete and is subject to change.
## AGENDA
## BIG LAKE CITY COUNCIL WORKSHOP
## COUNCIL CHAMBERS
## JULY 15, 2026
5:00 p.m.
## Prepared By:
## Dan Childs, Water/Wastewater Superintendent
## Meeting Date:
7/15/2026
Item No.
## 4A
## Item Description:
## Water Tower Rehabilitation
## Reviewed By: Hanna Klimmek, City Administrator
## Reviewed By: Deb Wegeleben, Finance Director
## COUNCIL DIRECTION REQUESTED
Discuss the benefits of early planning and procedures on reconditioning water towers. Also discuss moving
forward with rehabilitating water tower #3.
## BACKGROUND/DISCUSSION
In July 2023, staff retained KLM Engineering to inspect and evaluate the condition of the City's three water
towers. Following the inspections, KLM provided recommendations for the rehabilitation and long-term
maintenance of each tower. Due to other capital priorities, including unforeseen costs associated with the
City's well system, the recommended rehabilitation project was not brought forward at that time.
Recognizing the importance of maintaining the City's water infrastructure, staff have since worked with the
Finance Department to begin setting aside funds for future water tower rehabilitation projects. Based on
the 2023 inspection findings, including delaminating interior paint and other maintenance concerns, Water
Tower No. 3 has been identified as the highest priority and is the first tower recommended for
reconditioning.
Staff invited KLM Engineering to attend the workshop to review the inspection results, explain the
recommended rehabilitation process, discuss the benefits of proactive maintenance, and outline the
potential cost savings associated with planning and completing the project before the tower's condition
further deteriorates.
## FINANCIAL IMPACT
Not known at this time.
## STAFF RECOMMENDATION
Direct Staff to move forward with the rehabilitation of water tower #3.
## ATTACHMENTS
Inspection Report for Big Lake Water Tower #3 from KLM Engineering (July 2023)
## Proposal for Recondition Services from KLM Engineering (August 2023)
## WORKSHOP ITEM
## Big Lake City Council
## Big Lake, Minnesota
## InspecƟon Report:
500,000‐Gallon Capacity
## South Tower
July 2023
## Project No.: 1854‐23
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 1
## Table of Contents
1.0| PROJECT INFORMATION ................................................................................................ 2
2.0| REFERENCES .................................................................................................................. 3
3.0| COATINGS EVALUATION ................................................................................................ 3
3.1| Lead and Chromium Content Analysis ........................................................................ 3
3.2| Interior Wet Coating ..................................................................................................... 3
3.3| Interior Dry Coating ..................................................................................................... 3
3.4| Exterior Coating ........................................................................................................... 3
3.5| Replacement Coating Systems ................................................................................... 4
4.0| STRUCTURE MODIFICATIONS ......................................................................................... 4
4.1| Interior Wet Modifications ............................................................................................ 5
4.2| Interior Dry Modifications ............................................................................................. 5
4.3| Exterior Modifications .................................................................................................. 5
4.4| Cathodic Protection (CP) System ................................................................................ 6
5.0| PROPERTY CONSIDERATIONS ......................................................................................... 6
5.1| Site and Environmental Considerations ...................................................................... 6
5.2| Telecommunications Considerations........................................................................... 6
6.0| RECONDITIONING SUMMARY ........................................................................................ 6
6.1| Reconditioning Summary and Cost Estimate .............................................................. 6
## APPENDIX A: Photographs
## APPENDIX B: Inspection and Evaluation Methods
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 2
## 1.0| PROJECT INFORMATION
## KLM Project No.: 1854-23 Customer P. O. Number: N/A
## Tank Owner: Big Lake, Minnesota Phone: 763-251-8010
## Street/City/State/Zip: 160 Lake Street North, Big Lake, MN 55309
## Tank Owner Contact: Dan Childs, Water and Wastewater Superintendent
## Owner's Tank Designation: South Tower
## Tank Description: Single Pedestal
## Tank Street Location: 18073 198
th
## Avenue, Big Lake, MN 55309
## Purpose of Inspection: Condition Assessment
Date of Inspection: June 20, 2023
## Inspected By: Devin Severson, NACE #78234, and Matt Finley
## Type of Inspection: KLM standard ROV inspection
Manufacturer: Maguire Iron, Inc. Construction Date: 2001
## Serial No.: Unknown Design Code: AWWA D100-96
Capacity: 500,000 gallons
## Type of Construction: Welded
## Tank Diameter: ~55 Feet
Height to: Overall ~130 Feet
Height to: HWL 122’-0” LWL 82’-0”
## Tank Construction Drawings: Not Available to KLM
## Previous Inspection Records: KLM 2001 report
## EXISTING COATING INFORMATION
## Interior Wet Interior Dry Exterior
Date Last Coated 2001 2001 2001
Full or Spot Repair Full/New Full/New Full/New
Coating Contractor Maguire Iron, Inc. Maguire Iron, Inc. Maguire Iron, Inc.
## Surface Preparation Blast Blast Blast
Paint System Epoxy Epoxy Epoxy/Urethane
Paint Manufacturer Unknown Unknown Unknown
Paint Chip Samples N/A N/A N/A
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 3
## Big Lake, Minnesota
## 500,000-GALLON CAPACITY
## SOUTH TOWER
## 2.0| REFERENCES
The tank interior and exterior areas were evaluated in conformance with the following:
a. KLM Engineering, Inc. Proposal.
b. General guidelines of AWWA Manual M42 Appendix C “Inspecting and Repairing Steel Water Tanks,
## and Elevated Tanks for Water Storage.”
c. KLM "Procedures and Guidelines for Inspecting Existing Steel and Concrete Water Storage Tanks."
d. AWWA Standard D100-11; Welded Carbon Steel Tanks for Water Storage.
e. Great Lakes – Upper Mississippi River Board of State and Provincial Public Health and Environmental
Managers; Recommended Standards for Water Works 2018 Edition.
## 3.0| COATINGS EVALUATION
## 3.1| Lead and Chromium Content Analysis
The total lead and chromium content of the interior and exterior coatings was not analyzed. Based on the
2001 construction date of the tank, and regulations in effect at that time limiting the use of lead or chromium-
based coatings, KLM anticipates that neither the interior nor exterior coatings are lead or chromium-based
paints and will not generate hazardous waste during reconditioning.
## 3.2| Interior Wet Coating
The tower was constructed and originally painted in 2001 by Maguire Iron, Inc. The interior wet coating is in
good condition with less than two percent visible coating failures above and below the high-water line (HWL).
Failures above the HWL consist of pinhole corrosion along the dollar plate weld seam and surface corrosion
in the roof rigging couplings, on the drywell tube rigging brackets, and on the overflow weir box. Failures below
the HWL consist of randomly located pinhole corrosion on the shell and bowl and isolated topcoat delamination
on the drywell tube. Minimal sediment accumulation is present in the bowl area. See photos in Appendix A.
## 3.3| Interior Dry Coating
Overall, the coating in the interior dry area is in good condition with coating failures limited to areas susceptible
to condensation, such as the drywell tube, bowl, and landings (sweating areas). The sweating areas have
approximately one percent overall visible failures. These failures consist of minor and isolated surface
corrosion on the bottom of the drywell tube and on the bowl. Additional failures consist of typical topcoat
delamination along the tower base plate. See photos in Appendix A.
## 3.4| Exterior Coating
The exterior coating is in poor overall condition with greater than ten percent visible coating failures observed
throughout the structure. Failures consist of pinhole corrosion on wear areas such as the roof manways and
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 4
handrail, and widespread topcoat delamination across the roof and upper torus plates. Staining due to organic
growth is visible on the lower torus and bowl, making the exterior appear dirty in those areas.
## 3.5| Replacement Coating Systems
When the next full reconditioning is required, KLM recommends preparing surfaces in accordance with NACE
guidance and applying a coating system for each area according to the following.
## 3.5.1| Interior Wet Coating
Surface preparation should be performed according to SSPC-SP10 Near White Metal Blast criteria.
Apply a two-coat system:
1. moisture cured zinc-rich
2. NSF 61 certified epoxy
## 3.5.2| Interior Dry Coating
Surface preparation should be performed according to SSPC-SP6 Commercial Blast Clean criteria.
Apply a three-coat system:
1. moisture cured zinc-rich.
2. polyamidoamine epoxy
3. polyamidoamine epoxy
## 3.5.3| Exterior Coating
Surface preparation should be performed according to SSPC-SP6 Commercial Blast Clean criteria.
Apply a four-coat system:
1. moisture cured zinc-rich
2. polyamidoamine epoxy
3. aliphatic acrylic urethane
4. fluoropolymer
## 4.0| STRUCTURE MODIFICATIONS
Structure modifications and repairs serve to bring the tank into compliance with OSHA regulations, AWWA
standards, and Department of Health regulations. They also improve areas of the tank that are prone to
premature development of corrosion, repair surface defects resultant from tank construction, remove
abandoned and unnecessary equipment, and improve tank maintenance capabilities.
The following is a list of recommended modifications and repairs to be included during the next reservoir
reconditioning. Detailed information important to each item will be determined when developing the project
specifications. Additional minor modifications, not impacting on the estimated project cost, may be identified
and incorporated at that time.
Photographs referred to in this section are in Appendix A.
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 5
## 4.1| Interior Wet Modifications
4.1.1 Replace the gasket on the bowl manway. See photos 25 and 31.
4.1.2 Grind off all weld spatter and erection scab marks for compliance with AWWA D100-11.
4.1.3 Consider installing a submersible mixer in the tower to reduce the likelihood and magnitude of ice
formation in cold weather and prevent stratification in warm weather.
## 4.2| Interior Dry Modifications
4.2.1 Remove the cable bands in the drywell tube. Install cable brackets inside the drywell tube, equally
spaced, for the attachment of electrical and coaxial cables. See photos 26 through 29.
4.2.2 Install a pressure style manway in the drywell tube. This will improve the ventilation during
reconditioning and bring the tank into compliance with OSHA confined space entry requirements. Include a
manway step-off platform and hand grabs.
4.2.3 Replace the bowl drain plug with a stainless-steel freeze-resistant valve to better facilitate cleaning
and draining the bowl. Include replacement of the bowl coupling and install a clear, rigid, high-pressure hose
connecting the valve to the overflow pipe. See photo 31.
4.2.4 Convert the top landing of the riser into a condensate ceiling and install a drain in the low point of
the landing with a connecting line to the overflow pipe. This will prevent condensation from running down the
pedestal, exacerbating defects in the coating, and leading to corrosion and additional painting and
maintenance costs. See photos 32 and 33.
4.2.5 Temporarily remove the insulation and aluminum jacketing from the inlet pipe to facilitate abrasive
blasting and painting of the pipe. Reinstall after coating is complete. Replace any loose, missing, or broken
insulation on the inlet pipe. See photos 30 through 37.
## 4.3| Exterior Modifications
4.3.1 Install a climb assist on the exterior (roof side) of the drywell tube to improve safety while
transitioning in and out of the tube. See photos 43 and 44.
4.3.2 Remove the top +/- 6-inches of the drywell tube and wet access manway curbs just below the
existing side vents. Replace the manway lids with aluminum style lids. The existing lids are oversized and
can be a hindrance to open. The new lids should include a locking hasp and stop chain. See photos 44 and
45.
4.3.3 Replace the deteriorated rubber cover around the drywell tube with a new UV-resistant rubber
cover. See photo 44.
4.3.4 Install three hinge-covered ventilation manways on the roof, located outside of the roof handrail.
These will provide additional ventilation during the interior surface preparation and coating.
4.3.5 Replace the threaded rigging couplings with the same size unthreaded couplings with rubber
weathertight covers. See photos 44 and 47.
4.3.6 Install an additional corrosion-resistant, heavy-gauge, No. 24 mesh screen on the overflow pipe
outlet to comply with Department of Health regulations. See photo 60.
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 6
## 4.4| Cathodic Protection (CP) System
4.4.1 The reservoir does not have a cathodic protection system, and one is not required if the coating is
applied and maintained properly.
## 5.0| PROPERTY CONSIDERATIONS
## 5.1| Site and Environmental Considerations
5.1.1 The site includes the tank and the pumphouse in an open area with maintained grass. The site is
bordered by 198th Avenue to the west and the north of the tower. Cargill Animal Nutrition is located to the
south, and Storage Rentals of America to the east of the tower.
5.1.2 In conformance with Minnesota state rules, an analysis has been performed to determine the
methods of pollution control required for this storage structure during reconditioning. Precautions must be
taken to maintain air quality and to prevent the drift of dust and fugitive emissions. Such precautions shall
include, but not be limited to, the use of water or chemicals where possible or the use of a containment system
with negative air.
## 5.2| Telecommunications Considerations
5.2.1 The tower has some telecommunications equipment, including antennas, coaxial cables, support
brackets and other miscellaneous equipment. The Owner is advised to maintain accurate records of each of
the antenna sites on the tower, including as-built drawings, site manager and owner contact information,
upgrades performed, and future plans for antenna installations or upgrades. These records will help facilitate
the future reconditioning with a minimal amount of effort on the Owner’s part.
## 6.0| RECONDITIONING SUMMARY
## 6.1| Reconditioning Summary and Cost Estimate
KLM recommends the interior and the exterior coatings be inspected and evaluated again in three years to
monitor conditions, establish a rate of corrosion, and to determine a time frame for the next reconditioning of
the tower.
While not requiring repairs or coating replacement at this time, for budgetary purposes, if structure
modifications and interior and exterior coating replacements were to be performed, the estimated current cost
would be between $600,000 and $650,000. For competitive bids, the project should be bid 9 to 12 months
before the desired starting date.
An experienced tank-coating contractor with the proper crew and equipment should be able to complete the
project in 11 weeks. At the time of reconditioning, the tower will need to be drained and remain off-line during
interior structure modifications, abrasive blasting, and painting. However, most of the exterior structure
modifications can be performed prior to draining, with the tank in-service.
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
Page 7
## KLM ENGINEERING, INC.
Report prepared by:
Thomas Amarvi-Brown, P.E.
## Civil Engineer
## MN License No. 58770
Report reviewed by:
## Rodney Ellis
## Vice President/COO
## NACE Certified Coatings Inspector No. 1686
## AWS/CWI 0404031
Copyright 2023 by KLM Engineering, Incorporated. All rights reserved. This material may not be duplicated,
reproduced, displayed, modified, or distributed without the prior express written permission of KLM
Engineering, Incorporated.
## APPENDIX A
## PHOTOGRAPHS
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 1
Overall view of tower
## Photo No. 2
Top of drywell tube
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 3
Interior roof conditions
## Photo No. 4
Interior roof conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 5
Roof conditions
## Photo No. 6
Roof conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 7
Roof conditions
## Photo No. 8
Roof conditions with ventilation manway visible
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 9
Roof condition with rigging coupling visible
## Photo No. 10
Overflow weir box
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 11
Drywell tube conditions below HWL
## Photo No. 12
Drywell tube conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 13
Shell coating conditions
## Photo No. 14
Shell coating conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 15
Shell coating conditions
## Photo No. 16
Shell coating conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 17
Shell coating conditions
## Photo No. 18
View of shell
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 19
Shell coating conditions
## Photo No. 20
Lower torus coating conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 21
Lower torus coating conditions
## Photo No. 22
Bowl conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 23
Bowl coating conditions with fill pipe visible
## Photo No. 24
Bowl conditions with failures visible
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 25
Bowl conditions with manway and drain plug visible
## Photo No. 26
Top of drywell tube
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 27
Drywell tube conditions
## Photo No. 28
Drywell tube conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 29
View of drywell tube
## Photo No. 30
Bowl conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 31
Bowl drain line and manway
## Photo No. 32
Top landing conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 33
Pedestal conditions looking up at underside of top landing
## Photo No. 34
Pedestal conditions looking down at bottom landing
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 35
Bottom landing conditions
## Photo No. 36
View of tower base
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 37
Base cone conditions looking up at underside of bottom landing
## Photo No. 38
Base cone conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 39
Base cone conditions
## Photo No. 40
Base plate conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 41
Valve pit manway
## Photo No. 42
Valve pit conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 43
View of roof
## Photo No. 44
Drywell tube manway
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 45
Wet access manway
## Photo No. 46
Finial vent
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 47
Roof conditions
## Photo No. 48
Roof coating conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 49
Roof coating conditions
## Photo No. 50
Roof coating conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 51
Roof coating conditions
## Photo No. 52
Condition of lower torus and bowl with painter’s ring visible
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 53
Water compartment
## Photo No. 54
View of bowl and upper pedestal
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 55
View of bowl, pedestal, and base cone
## Photo No. 56
Base cone
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 57
Base cone conditions
## Photo No. 58
Typical foundation conditions
## SOUTH TOWER BIG LAKE, MINNESOTA
Inspection Report | Copyright 2023 by KLM Engineering, Inc.
## Photo No. 59
Overflow pipe outlet and splash pad
## Photo No. 60
Condition of overflow pipe screen
## APPENDIX B
## INSPECTION AND
## EVALUATION METHODS
## Copyright 2023 by KLM Engineering, Inc.Page 1
## 1.0| INSPECTION AND EVALUATION METHODS
Some or all of the following procedures were performed as applicable.
1.1| Methods
1.1.1
The inspection of the base metal and coatings on interior and exterior surfaces included only areas
accessible without scaffolding or special rigging. Where possible, the base metal and coating on the interior
wet surfaces were examined from either a rubber raft while the tank was being drained, by a Remote
Operated Vehicle (ROV) with the tower in service, or with both.
1.1.2 Tank plate thickness was measured at random locations on the liquid holding shell. The overall
structural condition of the tank was visually examined.
1.1.3 No structural analysis was done to determine if the tank design complies with the AWWA D100-11
Standard for “Welded Carbon Steel Tanks for Water Storage.” However, any observed non-conformance to
the AWWA D100-11 standard is noted in this report.
1.1.4 Although compliance with OSHA regulations was not a part of this inspection, any unsafe conditions or
violations of current OSHA regulation that were observed are noted in this report.
## 1.2| Examination and Evaluation Techniques
Some or all of the following procedures were performed as applicable.
1.2.1| Site
The tank site was evaluated for proper drainage conditions affecting access and lead paint abatement during
reconditioning.
Also, the following site dimensions were obtained: distance to fence(s), power lines, owner buildings, public
property, private property/buildings, school/playgrounds, public parks, and other property.
1.2.2| Foundations
The tank concrete foundation(s) were/was visually examined for cracks, spalling, conditions of grout,
indications of distress/settlement, and elevation above grade.
## 1.2.3| Tank Plate Thickness
Plate thickness measurements were taken using ultrasonic methods (UTM). The readings were taken using
a digital readout Elcometer MTG6 Ultrasonic Thickness Gage that has a dual element probe (transducer).
The probe’s transmitter element sends a short ultrasonic pulse through the material. The pulse gets
reflected as an echo from the opposite side of the plate and returns to the probe’s receiver element. The
round-trip time is directly related to the material’s thickness.
## 1.2.4| Coating Thickness
Interior and exterior coatings, where accessible, were tested in accordance with Steel Structures Painting
Council SSPC-PA2-18 “Procedure for Determining Conformance to Dry Coating Thickness Requirements”
using PosiTector-6000-F1 Type 2 gages.
## Copyright 2023 by KLM Engineering, Inc.Page 2
## 1.2.5| Coating Adhesion
Adhesion testing of the coating to the steel, and inner coat adhesion, was performed by ASTM D-3359:
Shear Adhesion Test, Measuring Adhesion by Tape Test. In addition, subjective coating adhesion
evaluation was performed using a penknife.
## 1.2.6| Coating Serviceability
The estimated remaining coating life or serviceability evaluation was performed using a wide variety of
inspection instruments such as dry film thickness gauge, pen knife, Tooke gauge, adhesion tester(s), 30x
microscope and serviceability evaluation experience (minimum experience 10 years).
The instrument inspection was combined with a close visual inspection of all accessible coatings. This was
done to detect any holidays (misses), skips, runs, sags, surface containments, overspray, dry spray, poor
coating cohesion, inter-coat delamination, loss of adhesion to the substrate, adverse conditions of the steel
underneath the coating, or any other defects affecting the intended service.
## 1.2.7| Coating Lead and Chromium Content Analysis
Samples may have been taken of the various types of coatings present on the interior and exterior surfaces.
GPI Laboratories, Inc. of Grand Rapids, Michigan tests these coatings in conformance with ASTM D-3335
Standard Test Methods for Concentrations of Lead and Chromium in Paint.
## BIG LAKE, MINNESOTA
Proposal for
## Reconditioning Services
August 4, 2023
Copyright 2023 by KLM Engineering, Inc. Page 2 of 27
August 4, 2023
## Sent via Email Only
## Mr. Dan Childs
## Water/Wastewater Superintendent
## City of Big Lake
160 Lake Street N.
## Big Lake, MN 55309
## RE: 500,000-Gallon Single Pedestal “South Tower”
## Big Lake, Minnesota
## Dear Mr. Childs:
Thank you for the opportunity to submit this proposal to provide consulting and inspection services during the
rehabilitation of the above-referenced water tank.
KLM is a consulting and inspection firm specializing in water storage tanks. Our staff has credentials associated
with AWS Welding and AMPP coating inspections. We bring together key components from all aspects of
services to fulfill each of our client’s goals and expectations.
The professionals at KLM have been working on water towers since the 1970’s. We have combined experience of
over 150 years and have rehabilitated over 500 water towers of various sizes. With KLM professional inspections,
a tower’s coating system can last 25 – 30 years.
KLM sets the standards that other companies strive to duplicate. No firm receives the respect from tank
contractors and subcontractors like KLM. Our inspectors climb the towers daily to inspect and document the
work; holding contractors accountable for quality workmanship and ensure that the specifications are met. Our
dedication to quality inspections can be seen nationally, as our projects are represented each year in Tnemec’s
Tank of the Year calendar contest.
We look forward to the opportunity to assist the City of Big Lake on this project. With our team’s expertise, we
are confident this project will be completed to your satisfaction.
## Sincerely Yours,
## KLM ENGINEERING, INC.
## Dewey Prinzing
## Vice President of Business Development
## 1976 Wooddale Drive, Suite 4
## Woodbury, MN 55125
Cell: 651-434-4321
Email: dprinzing@klmengineering.com
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 3 of 27
## TABLE OF CONTENTS
Project Profiles .......................................................................................................................... 4
References ................................................................................................................................ 6
FIRM PROFILE & TEAM MEMBERS ..................................................................................... 7
About Us.................................................................................................................................... 8
Regional Offices ........................................................................................................................ 8
Insurance Coverage................................................................................................................... 9
Professional Affiliations ............................................................................................................ 9
Project Team Chart ................................................................................................................. 10
Project-Specific Team Member Resumes ............................................................................... 11
PROPOSAL ...................................................................................................................... 15
Project Understanding ............................................................................................................ 16
Benefits to the City of Big Lake ............................................................................................... 16
Timeline................................................................................................................................... 16
Design ...................................................................................................................................... 17
Specifications .......................................................................................................................... 17
Construction Services.............................................................................................................. 19
Antenna Inspection ................................................................................................................. 20
Warranty Inspection ............................................................................................................... 20
Deliverables ............................................................................................................................. 21
Fee Summary .......................................................................................................................... 21
Why Use KLM .......................................................................................................................... 21
Agreement .............................................................................................................................. 22
KLM SUPPORT DOCUMENTS ........................................................................................... 23
KLM Terms and Conditions ..................................................................................................... 24
## DISCLAIMER:
The information in this proposal is confidential, may be legally privileged, and is intended for the sole
use of City of Big Lake. Access to this proposal by another company is not permitted. If you are not the
intended recipient, any disclosure, copying, distribution of any action taken or committed in reliance on
it is prohibited.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 4 of 27
## PROJECT PROFILES
KLM has an unparalleled record of consistently delivering successful projects like yours. KLM has
planned, designed and refurbished water towers for the past twenty-seven (27) years. The longevity of
the coatings system of our projects is what we are most proud of. What owners most appreciate is the
return-on-investment KLM brings to each new construction or rehabilitation project. This section
highlights projects KLM has completed.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 5 of 27
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 6 of 27
## REFERENCES
The following is a summary list of the projects from the past five (5) years. A more complete list of
references can be provided upon request.
## Reconditioning Projects
## Moorhead, MN
## 500,000 Gallon Single Pedestal
## Owner/Client: Moorhead Public Service, MN
## Contact: Marc Pritchard 218-477-8082
## *2018 Tnemec Tank of the Year Runner-Up
## Eden Prairie, MN
## 2,000,000 Gallon Composite
## Owner/Client: City of Eden Prairie, MN
## Contact: Rick Wahlen 952-949-8530
*2017 Tnemec Tank of the Year 2
nd
## Runner-Up
## Great Falls, MT
## 750,000 Gallon Elevated Water Tower
## Owner: City of Great Falls, MT
## Client: AE2S
## Contact: Nathan Weisenburger 406-217-3711
## Fargo, ND
## 500,000 Gallon Single Pedestal
## 1 Million Gallon Composite
## Owner: City of Fargo, ND
## Client: AE2S
## Contact: Kevin Johnson 218-299-5610
## Farmington, MN
## 1,500,000 Gallon Hydropillar
## Owner/Client: City of Farmington, MN
## Contact: Katy Gehler 651-280-6846
## Mineral Point, WI
## 400,000 Gallon Hydropillar
## Owner: Mineral Point, WI
Client: Delta 3 Engineering, Inc.
## Contact: Bart Nies, PE 608-348-5355
## Eagan, MN
## 4,000,000 Gallon Ground Storage Reservoir
## Owner/Client: City of Eagan, MN
## Contact: Jon Eaton 651-675-5215
## Randolph, MN
## 100,000 Gallon Oblatoid
## Owner/Client: City of Randolph, MN
## Contact: Benny Svien 507-645-7492
## Sioux Falls, SD
## 1,500,000 Gallon Composite
## Owner/Client: City of Sioux Falls, SD
## Contact: Darin Freese 605-373-6971
## Asbury, IA
## 400,000 Gallon Single Pedestal
## Owner/Client: City of Asbury, IA
## Contact: Tony Carr 563-582-4151
## Plymouth, MN
## 2,000,000 Gallon Toro Spheroid Tower
## Owner: City of Plymouth, MN
## Client: City of Plymouth
## Contact: Michael Thompson 763-509-5501
## Menomonie, WI
## 750,000 Gallon Single Pedestal
## Owner: City of Menomonie, WI
Client: Cedar Corp.
## Contact: Jeremy Hoyt (Menomonie) 715-232-2395
## Vermillion, MN
## 50,000 Gallon Hydrocone
## Owner/Client: City of Vermillion, MN
## Contact: Mark Peine 651-248-3108
## St. Croix Falls, WI
## 150,000 Gallon Single Pedestal
## Owner/Client: City of St. Croix Falls, WI
## Contact: Matt Larson 715-483-3929
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 7 of 27
## FIRM PROFILE
&
## TEAM MEMBERS
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 8 of 27
## ABOUT US
Founded in 1995, KLM Engineering, Inc. is a consulting and inspection firm. On average, KLM completes
over 150 water storage projects each year for clients across the United States. KLM specializes in:
Inspection services on new and reconditioned elevated water towers, ground storage reservoirs,
water treatment plants, wastewater treatment plants and concrete tanks during construction.
Inspection and evaluations of existing concrete and steel storage tanks, pressure vessels, and
other related structures.
Design Build services.
Preparation of project specifications for tank rehabilitation/ lead paint abatement and disposal.
Welding inspection during rehabilitation.
Tank cleanings.
Non-destructive testing.
Antenna lease reviews, removal and installation inspections, and drawing reviews.
Wastewater treatment plant inspections.
## Our Engineers Are:
Experienced in design and structure modifications based upon years of employment with tank
fabricators, erectors and consulting engineers.
Experienced at examining existing tanks regarding corrosion, structure integrity and fitness for
continued service.
Registered Professional Engineers with practical knowledge of current designs and code
requirements.
## Our Inspectors Are:
Association for Materials Protection & Performance (AMPP), formerly NACE, trained/ certified
protective coating inspectors.
American Welding Society (AWS) associate/ certified welding inspectors.
Experienced journeyman painters, climbers and riggers with the proven abilities to perform
proper hands-on inspections and testing.
Experienced in project management and enforcement of specifications for quality control and lead
abatement.
## REGIONAL OFFICES
## Headquarters | Woodbury, Minnesota
## Great Lakes Region | New Lenox, Illinois
## West Central Region | Prairie Village, Kansas
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 9 of 27
## INSURANCE COVERAGE
Our firm maintains general liability, automotive, professional liability insurance and workers
compensation. A certificate of insurance, listing the client as additional insured, will be provided upon
execution of a contract.
## PROFESSIONAL AFFILIATIONS
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 10 of 27
## PROJECT TEAM CHART
## Designed Specifically For:
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 11 of 27
## PROJECT-SPECIFIC TEAM MEMBER RESUMES
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 12 of 27
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 13 of 27
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 14 of 27
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 15 of 27
## PROPOSAL
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 16 of 27
## PROJECT UNDERSTANDING
KLM understands the City of Big Lake will be reconditioning the South Water Tower in 2024. KLM has
met with City staff to review the project and discuss what is important to them.
The tower was built in 2001 and the coatings have protected the tower well for the past 22 years. The
2023 evaluation report indicated the coatings are nearing the end of their life cycle and the time has
come to recondition the tank to protect the substrate for continued service.
Key project team members were brought together to review the KLM evaluation report to prepare the
outline of services required to replace the coatings and bring the tower up to current AWWA standards
and Minnesota Department of Health and OSHA codes.
## BENEFITS TO THE CITY OF BIG LAKE
Today’s protective coating systems are designed to last 25-30 years with only minor maintenance. Tight
project specifications and full-time inspections give the coating systems the opportunity to realize their
intended service life.
1. The reservoir-specific submittals will be reviewed to verify conformance to the specifications,
AWWA, OSHA, and State regulations. KLM will respond in writing regarding the acceptance of the
submittals.
2. KLM proposes to prepare a technical specification package specifically designed for water tower
reconditioning. Our experience has shown that the more comprehensive the specification is, the
more likely it is that the project is completed on time, on budget, with quality workmanship. The
technical specifications mitigate requests for change orders during reconditioning.
3. Welding & full-time AMPP Coating Inspections during reconditioning assures that the work
performed by the contractor is in conformance with the specifications, as to maximize its life
expectancy. KLM’s inspectors monitor workmanship during all phases of work to verify the
contractor’s work meets the specification. Utilizing this process reduces reconditioning cycles
over the life of the tank.
4. Our project administration and inspection services provide a buffer between the project
specifications and the real-world challenges that can negatively affect the project performance.
To initiate the project correctly, KLM’s project management assures that a qualified contractor is
retained at an appropriate cost.
## TIMELINE
Upon execution of an agreement, KLM proposes the following schedule to perform the work:
A. Specifications.
Completed in 60 days.
B. Construction Management & Inspection Services.
Completed in 2024.
C. Warranty Inspection (2 years).
ROV, completed per Agreement.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 17 of 27
## DESIGN
KLM will also perform the following related specification services:
1. Meet with the Owner to review plans and specifications.
2. Produce preliminary and completed copies of the specifications for the Owner.
3. Provide an updated cost estimate.
4. Advertise specifications.
5. Attend and facilitate a mandatory pre-bid meeting, virtually.
6. Respond (in writing) to bidder questions.
7. Tabulate results for Owners.
8. Evaluate contractors’ bid proposals for conformance to the specification.
9. Make a written recommendation to the Owner on the low, qualified bidder(s).
10. Prepare Notice of Award and contract Agreement (forward to Owner).
## SPECIFICATIONS
The project specifications will include:
a. Advertisement for Bids
This section provides a detailed description of the project and meets the requirements for legal
advertisements.
b. Instruction to Bidders
This section provides precise instructions to bidders, including the scope of work, insurance,
payments, time of completion, bidder qualifications, taxes and permits, legal requirements,
performance and payment bonds and other important project information.
## c. Bid Forms
This section contains the bid proposals, construction time frame, alternate bid proposals, legal
requirements and the bidder and subcontractor qualification forms.
## d. Project Requirements
This section includes a complete description of the project, project schedule(s), execution of
contract documents, notice to proceed, project meetings, quality assurance, liquidated damages
and legal and technical requirements for executing the scope of work.
## e. Technical Specifications
This section details the technical specifications for structural modifications, surface repairs, interior
and exterior surface preparation, exterior abrasive blast, containment, disposal of spent abrasives,
dehumidification, lettering and logo, submittals, workmanship, unfavorable weather conditions,
protective coating and material, repair work, health and sanitary facilities, clean up, ventilation and
safety requirements, inspection of work, sterilization of tank interiors and containment plan.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 18 of 27
## f. Supplemental Conditions
This section supplements or amends the General Conditions and/or other provisions of the
Contract Documents.
## g. General Conditions
This section includes all the General Conditions designed for water tank reconditioning, such as
authority of the Engineer, engineering inspection, modifications, additions and subtractions of
scope of work, extensions of time, insurance and other appropriate items.
## h. Contract Documents
This section provides the form of agreement to be used between the Owner and Contractor.
## i. Payment and Performance Bond
Bonds for payment and performance are required for this project, as specified by state law.
## j. Appendix A – Photos
This section includes copies of color photographs. This provides the contractor with a clear
perspective of the interior/exterior conditions of the tank and the scope of work involved.
## k. Appendix B – Drawings
This section includes drawings, which define structural repairs or modifications and welding
definitions.
## l. Appendix C – Surface Preparation Requirements
This section references excerpts from AMPP Standard Practice SP0178-2007 Standard Practice:
Design, Fabrication and Surface Finish Practices for Tanks and Vessels to Be Lined for Immersion
Services for defining welding and grinding requirements of the structural repair or modifications.
## m. Appendix D – Paint Chip Lead Test Results
This section contains paint chip test results for lead and chromium used to calculate the risk factor
and classification of containment required for conformance with Federal and State Environmental
Regulations.
n. Appendix E – Lettering and Logo (optional)
If required, this section includes drawings of any required lettering and logo. Such drawings are to
be provided by Owner.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 19 of 27
## CONSTRUCTION SERVICES
## Construction Administration
The project manager and project supervisor work together on managing the project. KLM performs the
review of the submittals and communicates with the inspector daily to help enforce the project
specifications, as necessary. The project supervisor is the main contact between the contractor
representative and the Owner/Engineer. The project manager performs the final review of the
submittals and will assist the supervisor, as required.
## Construction Management Consists of The Following:
Attend pre-construction conference.
Periodically perform on-site review of project’s work status and report to the Owner.
Coordinate progress meetings, as necessary.
Review of meeting minutes.
Scheduling of inspections.
Project close-out administration.
Establishes warranty date.
Review of inspector’s daily documentation.
Process change-orders.
Prepare monthly payment request forms.
Review & approve of the contractor’s submittals:
✓ Drawing reviews.
✓ Welder Certifications.
## ✓ Welder Qualifications
✓ Welding Procedures.
✓ Coating Materials Submittal.
✓ TLCP Sampling Plan.
## Construction Observation
The inspector assigned to this project will be an AMPP Coating Inspector and/or AWS Certified Welding
Inspector. All our inspectors have extensive practical experience and knowledge of water storage tank
reconditioning. They are experienced sandblasters, painters, climbers, riggers, coating inspectors,
welders and welding inspectors which allow the inspector to perform inspections alongside the
contractor to ensure the conformance to the project specification.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 20 of 27
## Field Inspections Consist of the Following:
A pre-construction meeting with the client and contractor to clearly define the role of the Engineer
and Inspector, to discuss the intent of the specifications, and to ensure all parties agree to the
scope of work and expectations regarding the quality of work.
Monitor and approval of the structure repairs and modifications for conformance to the
specifications.
Inspection of the abrasive blasting media and equipment for conformance to the specifications and
to prevent contamination of surfaces during surface preparation with moisture and oil or other
contaminants.
Monitor the paint removal and disposal process for conformance to the specifications and
environmental regulations.
Monitor the contractors mixing and application of the coats for conformance to the specifications
and the coat manufacturer’s recommendations.
Approve surface preparation samples.
Record the contractor’s progress for adherence to the construction schedule.
Submit daily and weekly inspection reports & photos. Prepare and file copies of the reports on
construction activities.
Coordinate and review testing of materials for conformance to the specification and environmental
regulations.
Monitor punch list items and subsequent corrective action by the contractor.
Final inspection, substantial completion and project acceptance.
## ANTENNA INSPECTION
Antennas will be required to be removed during the reconditioning to receive the best contractor bids.
Antenna management if required will be by separate agreement.
## WARRANTY INSPECTION (2 Year)
KLM proposes to perform a ROV warranty inspection on the referenced tank prior to the expiration of
the performance bonded warranty. The warranty inspection will include an inspection report. The fixed
fee does not include any necessary warranty repair work required.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 21 of 27
## DELIVERABLES
The city owns and retains this documentation. KLM also retains these records for future reference.
Deliverables submitted electronically, unless indicated hard copy.
Professional Engineering Certified plans and specifications.
State Regulatory documentation including permitting, State Agency or Department of Health, TCLP
Texting and Waste Tracking.
Contractor Submittals.
Daily Logs & Weather Logs.
Surface Preparation.
Daily Digital Photos.
Weekly Summary & Progress Meetings.
Project Acceptance Certificate.
Warranty Inspection Report (Owner & Contractor).
## FEE SUMMARY
KLM Engineering estimates this to be an eleven (11) week project for the contractor and ten (10) weeks
of inspection services during the course of the project. KLM will manage the water tower rehabilitation
with project management, welding inspection, coating inspection, antenna inspection and a ROV
warranty inspection, as detailed below.
Specification, Bidding Assistance & Submittal Reviews $ 15,000.00
Construction Management and Observation $ 90,224.00
## TOTAL FIXED, NOT TO EXCEED $105,224.00
Warranty Inspection 2025 $ 3,200.00
## WHY USE KLM
KLM Engineering, Inc. has been evaluating water towers for over 27 years. KLM is the leader in providing
engineering and inspection services during reconditioning of towers greater than 500,000-gallons in
Minnesota. Our reference list has customers including the US Military, US Steel, Indian Health Services,
State of Minnesota and municipalities ranging from coast-to-coast and beyond, including Hawaii.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 22 of 27
## AGREEMENT
This proposal is valid for thirty (30) days from the date of this proposal. If the City of Big Lake finds this
proposal acceptable, please sign and return it by mail, fax or email. By signing and returning this
signature page only, you agree to the terms of the entire proposal document submitted.
This Agreement, between the City of Big Lake of Big Lake, Minnesota and KLM Engineering, Inc. of
Woodbury, Minnesota is accepted by:
## CITY OF BIG LAKE
160 Lake Street N.
## Big Lake, MN 55309
## KLM ENGINEERING, INC.
## 1976 Wooddale Drive, Suite 4
## Woodbury, MN 55125
## Signature Signature
## Dewey Prinzing
## Name Name
## Vice President of Business Development
## Title Title
August 4, 2023
## Date Date
We look forward to working with you.
## Sincerely,
## KLM ENGINEERING, INC.
## Dewey Prinzing
## Vice President of Business Development
## 1976 Wooddale Drive, Suite 4
## Woodbury, MN 55125
Cell: 651-434-4321
Email: dprinzing@klmengineering.com
## REV 2023.01.01
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 23 of 27
## KLM
## SUPPORT DOCUMENTS
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 24 of 27
## KLM ENGINEERING, INC. (KLM)
## TERMS AND CONDITIONS
1. AGREEMENT. The agreement between the parties when entered by the parties shall include the
applicable referenced agreement documents (i.e., KLM proposal/Agreement) and shall include these
KLM Terms and Conditions (the “Agreement”). The Agreement may not be modified except by
mutual agreement in writing.
2. ADDITIONAL SERVICES. Additional work or services shall not be performed without a KLM
executed change order or purchase order outlining the scope of additional work or services.
3. KLM CLIENT RESPONSIBILITIES. The KLM Client shall fully disclose to KLM its knowledge of
the condition of the project structure(s), its past and present contents and shall provide KLM with full
information regarding the requirements for the project; shall designate an individual to act on the KLM
Client’s behalf regarding the project; and provide safe access to and at the project site. When
reasonably requested by KLM, the KLM Client shall furnish the services of other consultants including,
but not limited to engineers and insurance representatives. The KLM Client shall test for pollution and
hazardous materials when required by law or as requested by KLM. The KLM Client shall provide
KLM with all necessary permits and other authorizations.
4. SAFETY. KLM shall be responsible for the safety of KLM personnel at the project site. The KLM
Client or other persons shall be responsible for the safety of all other persons at the project site. The
KLM Client shall inform KLM of any known or suspected hazardous materials or unsafe conditions at
the project site. If, during the course of the KLM services, such materials, or conditions are discovered
at the project site, KLM reserves the right to take measures to protect KLM personnel and equipment or
to immediately terminate KLM services. The KLM Client agrees to be responsible for, and agrees to
pay, any such additional protection costs. Upon such discovery by KLM, KLM agrees to use
commercially reasonable efforts to notify the KLM Client in writing, of hazardous materials or unsafe
conditions regarding the project site.
5. HAZARDOUS MATERIALS. Unless otherwise agreed to in the scope of work with the KLM Client,
KLM has no responsibility for the discovery, presence, handling, removal or disposal of or exposure of
persons to hazardous materials at the project site. To the full extent permitted by the law, the KLM
Client shall defend, indemnify, and hold harmless KLM, its employees and representatives from all
claims, including costs and attorney fees, arising out of the presence of hazardous materials or exposure
to the same on the job site.
6. SITE ACCESS AND RESTORATION. The KLM Client will provide KLM and its representatives
with safe and legal project site access. It is understood by the KLM Client that in the normal course of
KLM providing its services and work, some nominal damage to the project site may occur. KLM agrees
to take reasonable commercial precautions to minimize such damage, if any. Restoration of the project
site, if any, is the responsibility of the KLM Client, unless otherwise agreed to in writing in the scope of
work.
7. KLM LIMITED WARRANTY AND DISCLAIMER. KLM will perform services consistent with
the standard of care and skill normally performed by other like firms in the industry and profession at
the time of this service and in the geographic area of the project. EXCEPT AS EXPRESSLY
## STATED IN THIS SECTION, THERE ARE NO WARRANTIES, EXPRESS OR IMPLIED, BY
## OPERATION OF LAW OR OTHERWISE, PERTAINING TO THE PRODUCTS AND
## SERVICES SOLD UNDER THIS AGREEMENT. KLM DISCLAIMS ANY IMPLIED
## WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. IN
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 25 of 27
## NO EVENT SHALL KLM BE LIABLE TO THE KLM CLIENT, ITS AGENTS,
## REPRESENTATIVES, EMPLOYEES, CUSTOMERS OR ANY OTHER THIRD PARTY, FOR
## ANY INCIDENTAL, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, INCLUDING
## WITHOUT LIMITATION LOSS OF USE, LOSS OF REVENUE OR LOSS OF PROFIT, IN
## CONNECTION WITH OR ARISING OUT OF THIS AGREEMENT OR THE EXISTENCE,
## FURNISHING OR FUNCTIONING OF ANY ITEM OR
## SERVICES PROVIDED FOR IN THIS AGREEMENT OR FROM ANY OTHER CAUSE,
## INCLUDING WITHOUT LIMITATION CLAIMS BY THIRD PARTIES, EVEN IF KLM HAS
## BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
8. SCHEDULING. Prior to KLM scheduling its services related to the project, the KLM Client shall
furnish KLM with a written Agreement, purchase order or other written request for KLM services and
shall give as much notice as reasonably possible in advance of the time when the KLM services are
desired to commence. The KLM service schedule shall be mutually agreed upon by the parties in
writing. If a KLM inspection is canceled or delayed after KLM personnel and/or equipment are in
transit to the project site, then the KLM Client shall be billed, and the KLM Client agrees to pay for
KLM time and expenses according to the then current KLM Fee Schedule for KLM time spent and
KLM costs incurred. If KLM is unable to redirect KLM representatives to other third-party project sites
on the canceled or delayed scheduled service day, at a minimum, the KLM Client will be billed and the
KLM Client agrees to pay KLM for one (1) full day of KLM labor.
9. INSURANCE. KLM will maintain worker’s compensation insurance and comprehensive general
liability insurance. KLM will provide KLM Client with a certificate of insurance upon KLM Client’s
request.
10. PAYMENT. KLM will submit periodic invoices for KLM services provided and work performed.
Invoices are due upon receipt. The KLM Client agrees to inform KLM of invoice questions or disputes
within 10 business days of the invoice date. The KLM Client agrees to pay all undisputed KLM
invoiced amounts within 45 days of the invoice date. The KLM Client agrees to pay interest on all
overdue amounts at a rate of 1.5% per annum or the rate allowed by law, whichever is less, plus costs of
collection, court costs, and reasonable attorney fees on all such amounts. If any undisputed invoice
remains unpaid for 60 days, then KLM may, at its sole discretion, suspend or terminate services to the
KLM Client without liability.
11. INDEMNIFICATION. KLM shall indemnify and hold harmless the KLM Client and its shareholders,
directors, officers, members, governors and employees from liability, claims, losses, and damages
arising out of or relating to the applicable Project, provided that such claims, costs, losses, or damages
are attributable to bodily injury, sickness, disease, or death, or injury to, or destruction of tangible
property, including the loss of use resulting therefrom to the extent caused by KLM’s negligent acts or
omissions.
The KLM Client shall indemnify and hold harmless KLM and its shareholders, directors, officers,
members, governors and employees from liability, claims, losses, and damages arising out of or relating
to the applicable Project, provided that such claims, costs, losses, or damages are attributable to bodily
injury, sickness, disease, or death, or injury to, or destruction of tangible property, including the loss of
use resulting therefrom to the extent caused by the KLM Client’s negligent acts or omissions. Further,
the KLM Client shall indemnify and hold harmless KLM from all claims or losses arising out of the
unauthorized use of KLM’s Documents.
## 12. LIMITATION OF LIABILITY. IN NO EVENT SHALL KLM OR THE KLM CLIENT BE
## LIABLE, ONE TO THE OTHER, FOR INDIRECT, SPECIAL, INCIDENTAL, OR
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 26 of 27
## CONSEQUENTIAL DAMAGES ARISING OUT OF OR IN CONNECTION WITH THE
## FURNISHING, PERFORMANCE OR USE OF ANY PRODUCTS OR SERVICES PROVIDED
## PURSUANT TO THIS AGREEMENT.
13. DELAYS. If KLM service or work delays are caused by the KLM Client, by third parties, strikes,
natural causes, weather, or other circumstances beyond KLM's control, a reasonable time extension for
performance of KLM services and work shall be granted, and KLM shall be entitled to and the KLM
Client agrees to pay KLM an equitable fee adjustment.
14. TERMINATION. After seven (7) days written notice, either party may elect to terminate this
Agreement. Notwithstanding the foregoing, the KLM Client agrees to pay for all KLM services
provided and work performed through the date of termination. Notwithstanding the foregoing, the
following sections shall survive the termination of this Agreement: Sections 5, 7, 10, 11, 12, 15, 16, 21
and 24.
15. SEVERABILITY. Any provisions of this Agreement later held to violate a law or regulation shall be
deemed void, and all remaining provisions of the Agreement shall continue in full force and effect.
16. KLM'S DOCUMENTS. All reports, specifications, drawings and other documents furnished by KLM
are part of KLM's services and work for the KLM Client and the same are for use only for the project
(KLM Documents). KLM retains all ownership of said documents regardless of whether the project is
completed. The KLM Client may retain copies of the KLM Documents for reference purposes. KLM
does not represent or warrant that the KLM Documents are suitable for reuse on any extension of the
project or on other projects. The KLM Client shall not use the KLM Documents without KLM's written
consent
17. ASSIGNMENT. KLM may not assign this Agreement to any other person unless written consent is
obtained from the KLM Client.
18. AMENDMENTS. Any modification or amendment of to this Agreement shall require a written
agreement signed by both Parties.
19. NONDISCRIMINIATION. In the hiring of employees to perform work under this Agreement, KLM
shall not discriminate against any person by reason of any characteristic or classification protected by
state or federal law.
20. GOVERNING LAW. This Agreement shall be governed by and interpreted in accordance with the
laws of the State of Minnesota without regard to or application of conflicts of law rules or principles.
All proceedings related to this Agreement shall be venued in Washington County, Minnesota.
21. AUDIT. Pursuant to Minnesota Statutes, § 16C.05, Subdivision 5, KLM agrees that the KLM
Client, the State Auditor, or any of their duly authorized representatives at any time during normal
business hours and as often as they may reasonably deem necessary (but under all circumstances not
more often than once per calendar year), shall have access to and the right to examine, audit, excerpt,
and transcribe any books, documents, papers, or records which are pertinent to the accounting practices
and procedures of KLM, and involve transactions relating to this Agreement.
## Big Lake, MN – .50MG South Tower RECON
Copyright 2023 by KLM Engineering, Inc. Page 27 of 27
22. JOB SITE IMAGES, PHOTOGRAPHY AND VIDEO. During the term of this Agreement and
thereafter, KLM has the KLM Client’s permission to take photographs or video of the project site for
training, documentation, education or KLM promotional purposes. A signed Agreement that includes
these KLM Terms and Conditions constitutes the KLM Client’s written permission to KLM regarding
the use of the items and information set forth in this section.
23. WAIVER. The waiver by either party of any breach or failure to comply with any provision of this
Agreement by the other Party shall not be construed as or constitute a continuing waiver of such
provision or a waiver of any other breach of or failure to comply with any other provision of this
Agreement.
24. HEADINGS. Section headings used in this Agreement are for convenience only, have no legal
significance, and in no way change the construction or meaning of the terms hereof.
25. ENTIRE AGREEMENT. This Agreement supersedes any prior or contemporaneous representations
or agreements, whether written or oral, between the Parties and contains the entire agreement.
End of the KLM Terms and Conditions.
Rev 2022.11.23
## THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
## Prepared By:
## Norman Michels, Streets, Parks, Fleet Superintendent
## Meeting Date:
7/1 5/2026
Item No.
## 4B
## Item Description:
## Ice Rink and Warming House Discussion
## Reviewed By: Hanna Klimmek, City Administrator
## Reviewed By: Deb Wegeleben, Finance Director
## COUNCIL DIRECTION REQUESTED
Staff is asking council to discuss and provide direction on removing the warming house, and future
location of the ice-skating rinks.
## BACKGROUND/DISCUSSION
The city has had a longstanding annual lease agreement with Mary of the Visitation Catholic Church, dating
back to the late 90’s. The lease agreement allows the city to utilize the open space adjacent to the City Hall
parking lot for outdoor community ice-skating rinks, a public warming house, and a space for a community
holiday tree. The city currently has two boarded ice-skating rinks, one open ice-skating rink, and a warming
house on the leased site. The city pays the Church $1,900 each year, and maintains the vacant area
throughout the year, which includes mowing the grassy area during the summer months.
Considering the future relocation of City Hall to a new location in late 2027 or early 2028, along with the
recent closing and potential sale of the entire Church property, staff is seeking council discussion and
direction on the possible relocation of the outdoor ice-skating rinks. The most current lease agreement will
end on December 31, 2026. If the city does not sign a new lease agreement for 2027, all structures must be
removed by the city prior to the end of the current lease.
In 2020, the warming house was closed to the public. With unpredictable winter weather since that time,
and the poor condition of the warming house, staff has not reopened the building for public use. Staff has
looked into the possibility of adding a self-locking door system to the building to minimize having to schedule
a warming house attendant, but found that the building framing will not support a self-locking door system.
Staff is asking council to discuss permanently removing the warming house due to its poor condition, and
direct staff to research potential new locations for an outdoor ice-skating rink.
## FINANCIAL IMPACT
## N/A
## STAFF RECOMMENDATION
Staff recommends council authorize removal of the warming house structure, and authorize staff to research
potential new locations for an outdoor ice-skating rink.
## ATTACHMENTS
## 2025/2026 Lease Agreement with Mary of the Visitation Catholic Church
## WORKSHOP ITEM
## Big Lake City Council
## Prepared By:
## Norman Michels, Streets/Fleet/Parks Superintendent
## Meeting Date:
7/15/2026
Item No.
## 4C
## Item Description:
## Discuss Fishing Pier Access
## Reviewed By: Hanna Klimmek, City Administrator
## Reviewed By: Deb Wegeleben, Finance Director
## COUNCIL DIRECTION REQUESTED
Staff is asking Council to discuss and provide direction.
## BACKGROUND/DISCUSSION
Lakeside Park has a fishing pier that is the responsibility of the city to maintain. Staff has noticed that over
the last few years sand has washed up around the entrance to the pier creating access issues, and is no
longer ADA compliant.
Staff reached out to the DNR Hydrologist to discuss options available to address the access issues:
• Option 1 – Excavation under the pier to create a level surface for access onto the pier. This option
would require a DNR work permit, which would cost $1,200.00 and requires an application
questionnaire and a detailed construction plan. There would be a required 30-day comment period
sent to DNR Divisions, SWCD, US Army Corps, and County. If approved this work would be performed
by the Public Works staff.
• Option 2 – Adding a dock section. This work would not require a permit from the DNR. The dock
section would be built to match the current dock sections and would allow for adjustability with
changing water levels. This work would be performed by the Public Works staff.
The DNR does not recommend Option 1 as it would be an ongoing maintenance issue and would require a
new permit every time maintenance is needed. The DNR recommends Option 2 and staff supports that
recommendation.
## FINANCIAL IMPACT
Costs to bring the Lakeside Park fishing pier into ADA compliance would be funded through Fund 198 -
Lakeside Park Allocation.
## STAFF RECOMMENDATION
Staff recommends Council authorize staff to move forward with Option 2 to bring the Lakeside Park fishing
pier into ADA compliance.
## ATTACHMENTS
## N/A
## WORKSHOP ITEM
## Big Lake City Council
## Prepared By:
## Deb Wegeleben, Finance Director
## Meeting Date:
7/15/2026
Item No.
## 4D
## Item Description:
City Hall Fleet Expansion Request – updated request
from 6/17/2026
## Reviewed By: Hanna Klimmek, City Administrator
Reviewed By: Norm Michels, Superintendent
## Streets/Parks/Fleet
## COUNCIL DIRECTION REQUESTED
Consider authorizing the purchase of one additional City Hall fleet vehicle with a purchase price not to exceed
$10,000, funded through proceeds from prior City vehicle sales.
## BACKGROUND/DISCUSSION
As discussed at the June 17, 2026, City Council workshop, staff identified a need for an additional vehicle to support
City Hall operations.
Historically, vehicles no longer needed by the Police Department have been reassigned to the City Hall fleet for use
by Engineering, Code Enforcement, Administration, Inspections, and other City staff. As staffing levels and field
responsibilities have increased, the availability of City Hall fleet vehicles has become limited.
At the June 17, 2026, workshop, Council directed staff to investigate whether a surplus vehicle from the Fire
Department could be reassigned for City Hall use. Following discussions with the Fire Department Finance
Committee, it was determined that two surplus vehicles are being recommended to be sold to a local fire
department and that the proceeds will be used for the purchase of a duty vehicle for the Fire Department. As a
result, no surplus Fire Department vehicle will be available for reassignment.
The current City Hall fleet consists of three shared vehicles: a 2018 Ford Explorer, a 2002 Ford Sport Trac, and a 2004
Ford Sport Trac. These vehicles are used by multiple departments for inspections, site visits, meetings, training, and
other City business. As City staffing and operational demands have grown, the limited number of available vehicles
has resulted in scheduling conflicts and reduced operational efficiency.
Staff are requesting Council direction regarding the acquisition of an additional City Hall fleet vehicle. Staff
recommend purchasing a reliable four-door sedan or small SUV that can accommodate multiple employees traveling
to meetings, conferences, training, inspections, and other City business.
Providing an economical fleet vehicle for these trips would reduce the City's mileage reimbursement costs, which
are currently reimbursed at $0.725 per mile, while also reducing the City's exposure to potential liability associated
with employees using their personal vehicles for official City business. An additional fleet vehicle would also provide
greater flexibility in scheduling and improve the efficiency of daily operations.
If approved, staff would pursue the most cost-effective option available through Minnesota State Surplus Services,
local dealerships, or other sources. The goal is to purchase a reliable used vehicle with low operating and
maintenance costs for $10,000 or less.
Recent sales of surplus City fleet vehicles generated $14,150 in proceeds, including $10,250 from the most recent
auction and $3,900 from a previous City Hall vehicle sale. Staff anticipate these proceeds will fully fund the purchase
without requiring additional City resources.
## WORKSHOP ITEM
## Big Lake City Council
As an example of current market pricing, staff identified a 2016 GMC Terrain with approximately 110,000 miles, an
estimated fuel economy of 20 MPG city and 29 MPG highway, and a sale price of $9,890. This example demonstrates
that reliable vehicles meeting the City's needs are currently available within the proposed budget.
## FINANCIAL IMPACT
The purchase will be funded entirely from proceeds received from the sale of former City fleet vehicles. Those
proceeds are currently included in the unallocated balance of CIP Fund 199 – Equipment and Building Replacement
Fund, and the purchase would be charged to that fund.
Because existing sale proceeds will be used, no additional General Fund appropriation or property tax levy increase
is required. Over time, the City also anticipates reduced mileage reimbursement costs as more employee travel can
be completed using a City-owned vehicle.
## STAFF RECOMMENDATION
Staff recommend authorizing the purchase of one additional City Hall fleet vehicle at a cost not to exceed $10,000,
utilizing available proceeds from prior City fleet vehicle sales.
Staff further recommend authorizing the Fleet Superintendent to complete the purchase of the most cost-effective
vehicle that meets the operational needs of the City through Minnesota State Surplus Services, a licensed dealership,
or other qualified source.
## ATTACHMENTS
## None
## Prepared By:
## Seth Hansen, Big Lake Fire Chief
## Meeting Date:
7/15/2026
Item No.
## 4E
## Item Description:
Sale of Grass Truck 14 and Grass Truck 16 and Purchase
## of a Duty Officer Command Vehicle
## Reviewed By: Hanna Klimmek, City Administrator
## Reviewed By: Deb Wegeleben, Finance Director
## COUNCIL DIRECTION REQUESTED
Provide direction and consensus regarding the proposed sale of Grass Truck 14 and Grass Truck 16,
including all associated equipment, to another local fire department, and the use of the sale proceeds to
purchase a replacement Duty Officer Command Vehicle.
## BACKGROUND/DISCUSSION
At the July 7, 2026, Fire Board mee�ng, the Board discussed the poten�al sale of the Department’s 2000
Grass Truck 14 and 2001 Grass Truck 16, fully ou�ited with equipment, to a neighboring fire department
that has expressed interest in purchasing the units. The proceeds from the sale would be used to purchase
a newer Duty Officer Command Vehicle that would beter meet the opera�onal needs of the department.
Currently, Grass Truck 14 is being u�lized as the department’s duty officer command vehicle. While
func�onal, it was originally designed as a grass fire response vehicle and does not adequately meet the needs
of a command vehicle. Replacing it with a dedicated Duty Officer Command Vehicle would provide improved
func�onality, reliability, and efficiency during emergency responses.
In July 2025, both the City and Township authorized the sale of the skid unit equipment, including the tank
and pump from Grass Truck 14. However, there was no market interest in purchasing the equipment
separately.
Staff es�mates that the sale of both fully equipped grass trucks could generate approximately $35,000. Those
proceeds would then be applied toward the purchase of a newer Duty Officer Command Vehicle.
The Fire Board approved moving forward with the sale of both vehicles and authorized the purchase of a
replacement Duty Officer Command Vehicle with the following condi�ons:
• The purchase price shall be no more than $10,000 above the proceeds received from the sale of the
two grass trucks.
• The goal is to complete the transac�on with litle to no net financial impact to the City and
Township.
The purpose of this agenda item is to obtain direction and consensus from the City Council and Township
board before moving forward with the proposed transaction. If consensus is received, staff will work with
the interested fire department to obtain a formal purchase offer for Grass Truck 14 and Grass Truck 16 and
identify a replacement Duty Officer Command Vehicle that meets the Fire Board’s approved budget
## WORKSHOP ITEM
## Big Lake City Council
parameters. The proposed sale and purchase will then be presented to both governing bodies for final
approval, for the City that would be at the August 19, 2026, council meeting.
## FINANCIAL IMPACT
Based on current estimates, the maximum additional cost to purchase the replacement Duty Officer
Command Vehicle would be $10,000, which would be shared equally between the City of Big Lake and Big
Lake Township. Staff anticipate that the sale proceeds will offset the majority of the purchase price,
resulting in a minimal financial impact.
## STAFF RECOMMENDATION
Staff recommends that the City Council and Township Board provide consensus to proceed with negotiating
the sale of Grass Truck 14 and Grass Truck 16 and the purchase of a replacement Duty Officer Command
Vehicle, consistent with the parameters established by the Fire Board. Staff will return with the final
purchase and sale agreements for formal approval at the August 2026 meetings.
## ATTACHMENTS
## N/A