Agenda · Calendar
CalendarAgendaMonday, June 22, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
---
author: CBL
date: D:20260618104421-05'00'
---
## 1) CALL TO ORDER
## 2) PLEDGE OF ALLEGIANCE
## 3) ROLL CALL
(Members: S. Creighton, K. Hanson, K. Noding, L. Odens, D. Peterson, M. Weber)
## 4) OPEN FORUM
## 5) ADOPT PROPOSED AGENDA
## 6) APPROVE MEETING MINUTES
6A. Approve Regular Parks Advisory Committee Meeting Minutes of April 27, 2026
## 7) BUSINESS
## 7A. Boy Scout Garbage Improvement Plan
## 7B. Current Balance of Funds Update
## 7C. Staff Updates
## 7D. Strategic Plan Standing Item
## 8) COMMITTEE MEMBERS’ REPORTS
## 9) OTHER
## 10) ADJOURN
## a) Next Parks Advisory Committee Meeting: July 27, 2026
Disclaimer: This agenda has been prepared to provide information regarding an upcoming meeting of the Big Lake Parks Advisory Committee. This
document does not claim to be complete and is subject to change.
Notice of City Council Quorum: A quorum of the City Council members may be present at this Big Lake Parks Advisory Committee meeting beginning at
6:00 p.m. in the City Council Chambers. No action will be taken by the City Council.
## AGENDA
## BIG LAKE PARKS ADVISORY COMMITTEE MEETING
## COUNCIL CHAMBERS
## JUNE 22, 2026
6:00 p.m.
## Prepared By:
Corrie Scott, Recreation and Communication
## Coordinator
## Meeting Date:
6/22/2026
Item No.
## 6A
## Item Description:
April 27, 2026 Parks Advisory Committee Regular
## Meeting Minutes
Reviewed By: Norm Michels, Streets, Parks, and
## Fleet Superintendent
## Reviewed By: N/A
## ACTION REQUESTED
Approve the April 27, 2026 Big Lake Parks Advisory Committee Regular Meeting Minutes as presented.
## BACKGROUND/DISCUSSION
The April 27, 2026 Parks Advisory Committee Regular Meeting Minutes are attached for review.
## FINANCIAL IMPACT
## N/A
## STAFF RECOMMENDATION
## N/A
## ATTACHMENTS
## 04-27-26 Parks Advisory Committee Regular Meeting Minutes
## AGENDA ITEM
## Big Lake Parks Advisory Committee
## Big Lake Parks Committee Meeting Minutes
Date: April 27, 2026
Page 1 of 5
## - DRAFT MINUTES -
## NOT APPROVED
## PARKS ADVISORY COMMITTEE
## MEETING MINUTES
## APRIL 27, 2026
## 1. CALL TO ORDER
Vice-Chair Creighton called the meeting to order at 6:00 p.m.
## 2. PLEDGE OF ALLEGIANCE
## 3. ROLL CALL
Committee Members present: Scott Creighton, Kameron Hanson, Kim Noding, Lisa Odens, Megan
Weber, and Jeff Webster. Committee Members absent: Doug Peterson. Also present: Streets,
Parks, and Fleet Superintendent Norm Michels and Finance Director Deb Wegeleben.
## 5. OPEN FORUM
Vice-Chair Creighton opened the open forum at 6:01 p.m. No one came forward. Vice-Chair
Creighton closed the open forum at 6:01 p.m.
## 4. ADOPT AGENDA
Committee Member Odens motioned to approve the agenda as presented. Seconded by
Committee Member Hanson, unanimous ayes, motion carried.
## 6. APPROVAL OF MINUTES
Committee Member Noding motioned to accept the January 26, 2026 Parks Advisory Committee
minutes as presented. Seconded by Committee Member Weber, unanimous ayes, motion carried.
## 7. BUSINESS
## 7A. SKATEPARK DISCUSSION
Michels asked the PAC to discuss and provide informal feedback regarding fencing and size of the
skatepark at Lakeside Park. Hanson asked what type of skatepark was at Lakeside Park previously.
Michels confirmed it was previously a modular design. Weber asked about the previous size.
Michels stated that he doesn’t have the specifics for its previous size. Hanson asked about the
previous fence. Michels stated that it previously had a six-foot fence that had two openings. He
## Big Lake Parks Committee Meeting Minutes
Date: April 27, 2026
Page 2 of 5
## - DRAFT MINUTES -
## NOT APPROVED
stated that he doesn’t feel a fence is necessary and that it may send the wrong message. Michels
stated that inground bowls aren’t an option due to the drainage to the lake and potential
stormwater issues, so everything needs to be at ground level or above.
Noding asked if the pictures in the PAC packet are proposed designs. Michels stated that they are
examples to give some reference to the PAC on what an in-ground skate park might look like.
Creighton asked about the costs that are listed with the reference pictures. Michels stated that the
preliminary numbers that were brought to City Council for an in-ground concrete design is
projected to be $400,000 and the modular design cost was projected to be around $320,000 to
$340,000 with the same size footprint as the previous skatepark.
Creighton recommended that there not be full fencing, but he is open to a four-foot fence in front
of the parking lot portion. Noding agreed that full fencing is not necessary. Hanson expressed
concern that skateboards could roll into the volleyball area if it is too close. Hanson asked about
the cost of installing a full fence. Michels stated that a four-foot fully enclosed fence would be
about $1,500. Hanson recommended concrete barriers as an alternative. Michels stated that
depending on the design and if there are ramps on the side where the volleyball court is located,
fencing or barriers may not be needed. Odens asked if it could be included in the specification
sheet that there be a design that prevents skateboards from being a hazard for the nearby
amenities. Michels and Wegeleben confirmed that this is an option.
Weber asked about the Apple Valley reference. Michels stated it was the closest example that he
could find for the PAC to reference. She stated that she agrees with staff’s recommendation on
using close to the same footprint as the previous skatepark so that there can be a good variety of
features. Odens stated that with the playground being far enough from the skatepark there
shouldn’t be any concern of small children entering the skatepark as a safety hazard. Creighton
stated his only concern would be the same as Hanson’s to ensure that the volleyball court is far
enough from the skatepark that there aren’t any safety concerns. Creighton agreed with keeping
the skatepark around the same size as it was previously.
Noding asked about grant funding. Wegeleben stated that the City has applied for grant funding
and they won’t be announced until the fall of 2026. Noding asked about Paul with City Skate.
Michels stated that staff has kept in touch with him. Michels stated that staff will put together a
specification sheet for the skatepark and bring it back for final review at an upcoming PAC meeting.
Weber asked if a requirement for variety of features could be included. Michels stated that this can
be included in the specification sheet. Weber asked if Paul with City Skate could help staff put
together a specification sheet to ensure that the lowest bid is still a quality design with various
features. Michels stated that he isn’t sure if Paul is able to help with that, but he may have
someone in his organization that could assist staff. Wegeleben stated that staff could ask
neighboring communities for help as well. Michels stated that there are a few cities in Minnesota
that have recently installed skateparks that he can reach out to for guidance.
## Big Lake Parks Committee Meeting Minutes
Date: April 27, 2026
Page 3 of 5
## - DRAFT MINUTES -
## NOT APPROVED
Odens asked if there is a way to give a vendor a budget that they need to work with so that the
design could be reviewed before being approved. Wegeleben stated that State Statute requires
projects over $350,000 it must go through the sealed bid process with a thirty-day notice.
## 7B. ARCHERY RANGE DISCUSSION
Michels asked the PAC to discuss and provide informal feedback regarding the potential location of
an Archery Range. Hanson stated that River Oaks is his preference. Creighton agreed that River
Oaks makes the most sense. He stated that there aren’t a lot of amenities and it is more isolated
which is more safe than Sanford Select Acres Park which is smaller and used by children. He stated
that there is more parking at River Oaks Park and it could encourage more people to use the space.
He stated that he has family friends who participate in archery and it is a growing sport. Odens
stated that she agreed River Oaks is a better option that seems much safer.
Weber asked if there is more space at Sanford Select Acres. Michels stated that because of the
location of the parking lot at River Oaks Park, there is more limited space there than at Sanford
Select Acres. He stated that if the archery range was installed where the RC car track is currently
located, it would be up to an 80-yard shot. He stated that there is a section of River Oaks Park
where an irrigator goes through and because of that it is landlocked. He stated that even with that
information in mind, the perception of having an archery range at Sanford Select Acres could bring
some concern and that is why he ultimately recommends River Oaks Park.
Weber asked how long of a range could be installed at River Oaks Park. Michels stated that
depending on whether a dirt berm or wall is chosen, he is hopeful that the range could be up to 60
yards. Michels stated that he has experience with archery and he would ideally like to see 20-, 40-,
and 60-yard ranges. He is also considering whether to install a crossbow target. He stated that he
will do more research and bring back the discussion on range length and crossbow targets at a
future meeting.
He stated that Bunker Hills Activity Center has very large ranges and walk through ranges. There
are also elevated platforms that can be an option. Weber stated that her children joined the
archery club and it would be nice to have local options for practice. Michels stated that Becker is
hosting regional events on donated land that has fully covered stations. He stated that Big Lake will
likely have a much smaller range due to space and funding limitations. Hanson asked about the
Eagle Scout that is interested in helping with the project and if the project could be completed by
the time it is due. Michels stated that it would need to be completed by spring of 2027and his
support would be for the physical labor. He stated that he has relayed to the Eagle Scout that there
is no guarantee on a timeline as it still needs formal approval by City Council.
Odens asked if the archery range is approved if the work can be done in-house. Michels confirmed
that the majority of the project should be able to be completed in-house. Hanson asked about
potential cost. Michels stated the cost would be around $15,000 and the majority of the cost would
## Big Lake Parks Committee Meeting Minutes
Date: April 27, 2026
Page 4 of 5
## - DRAFT MINUTES -
## NOT APPROVED
be backstops and labor. He stated that backstops are a continual cost to replace depending on how
heavily they are used. Hanson asked about the disc golf course’s practice range and if it needs to be
relocated. Michels stated that it would need to be moved, but because it is a practice tee, it
shouldn’t be an issue and he will consult with a disc golf course designer before making the change.
## 7C. CURRENT BALANCE OF FUNDS UPDATE
Wegeleben reviewed the current city budget pertaining to parks. Nodding asked if baby swings
have been ordered for the new parks. Michels stated that because the measurements for infant
swings are different, he cannot install them at all three new playgrounds, but that he should be
able to order and install at least one. Wegeleben stated that backstops would be included in the
general fund as an ongoing cost for general maintenance.
## 7D. STAFF UPDATES
Michels reviewed the status of current park projects and maintenance in the community. He stated
that spring fertilizing has been completed in the parks and staff is working on playground
inspections. He stated that once the inspections are completed, staff will update the Playground
Replacement Plan. Michels stated that every park that is having playground equipment replaced
will be included on the new Verizon system which should help with cost savings.
Michels stated that Lakeside Park playground installation will begin once rain clears up. He stated
that Public Works staff has been staging the playground equipment so it is ready for installation. He
stated that there is a section of sidewalk being replaced, then playground equipment will be
installed, and finally the Pour and Play will be poured. Lake Ridge Park and Shores of Lake Mitchell
playground installation will follow Lakeside Park’s installation. Public Works staff will complete final
grading and irrigation before they open to the public. Noding asked about the Pour and Play
surface. Michels stated that it is 4.5 inches of poured rubber that is porous with rock underneath it
to allow for water drainage. Michels stated that there are two small sections of Pour and Play
under the swings and near the entrance at Powell Park. He stated that it should make maintenance
easier for staff.
## 7E. STRATEGIC PLAN STANDING ITEM
Michels reviewed the Strategic Plan and asked for the PAC to recommend revisions as needed.
## 8. COMMITTEE MEMBERS’ REPORTS
## 9. OTHER
Michels stated that the Mitchell Farms Park survey went to City Council and staff was directed to
look into various options for amenities. He stated that he is requesting the PAC submit some
## Big Lake Parks Committee Meeting Minutes
Date: April 27, 2026
Page 5 of 5
## - DRAFT MINUTES -
## NOT APPROVED
amenity options for staff to research and review and then a further discussion will be brought to a
future PAC meeting. Noding mentioned that there are different types of playground equipment
that can be less expensive and on a smaller scale. Michels stated that it would be a good idea to
offer playground equipment that caters to different age groups.
Creighton stated that there were some people in attendance that entered after the open forum
was closed.
Vice-Chair Creighton opened the open forum at 7:10 p.m.
Shawn 5636 Loon Drive: Stated that he is following up on Mitchell Farms Park. He appreciates that
there are ongoing conversations regarding the park. He stated that some type of playground would
be most beneficial with the demographics in the area. He stated that there are dozens of
elementary school bus stops within walking distance of the park. He stated that although a
basketball court may be used by some of the people living in the area, it wouldn’t be best for the
majority. He stated that most children enjoy using a playground and will be the best solution. He
stated that the playground that was at the park before was liked by many that live in the area and
that the survey results showed people in the area would support funding for replacement of a
similar style playground. He stated that the community should be brought into the discussions that
directly impact them as residents.
Emily 5636 Loon Drive: Stated that she bought the house because of the playground in the
neighborhood and many of their neighbors did the same. She stated that the houses in the area
have a high turnover rate and there are always families moving to the neighborhood. She stated
that since the park has been removed she is noticing a lot of children biking in the roads. She stated
that in the very least it would be nice to have some swings installed at Mitchell Farms Park.
Vice-Chair Creighton closed the open forum at 7:16 p.m.
## 10. ADJOURN
Committee Member Weber motioned to adjourn the meeting at 7:17 p.m. Seconded by Committee
Member Noding, unanimous ayes, meeting adjourned.
## Prepared By:
## Norm Michels, Streets, Parks, and Fleet Superintendent
## Meeting Date:
6/22/2026
Item No.
## 7A
## Item Description:
## Boy Scout Garbage Can Improvement
## Reviewed By: N/A
## Reviewed By: N/A
## ACTION REQUESTED
Discuss and make a formal recommendation to City Council regarding the Garbage Can Improvement
Program.
## BACKGROUND/DISCUSSION
Staff was approached by a Boy Scout regarding a project that would improve the garbage cans at one of
the City’s parks. The proposal includes wooden structures to enclose the five garbage cans located at River
Oaks Park. It would provide a more aesthetic look and provide protection from animals and the wind. This
evening’s meeting will include a presentation and renderings of the project proposal.
If the Parks Committee recommends support, then this will be presented at an upcoming City Council
meeting. It also will need to be approved by the Boy Scouts Board. Once it has been fully approved, the
goal is for the project to be completed in the summer of 2026.
## FINANCIAL IMPACT
## N/A
## STAFF RECOMMENDATION
Discuss and make a formal recommendation to City Council regarding the Garbage Can Improvement
Program.
## ATTACHMENTS
## N/A
## AGENDA ITEM
## Big Lake Parks Advisory Committee
## Prepared By:
## Deb Wegeleben, Finance Director
## Meeting Date:
06/22/2026
Item No.
## 7B
## Item Description:
## Current Balance of Funds Update
## Reviewed By: Norm Michels, Streets, Parks, and
## Fleet Superintendent
Reviewed By: Hanna Klimmek, City
## Administrator
## ACTION REQUESTED
## N/A
## BACKGROUND/DISCUSSION
## Parks, Playgrounds, and Trails – Funding Sources Overview
## Total Available Funding: $952,316.01
## Park Development Fund 120 (Restricted Fund)
## Current Balance: $179,365.45
• Use: Enhancements of parks, recreational facilities, playgrounds, trails, wetlands, and open
spaces.
o Lakeside Park Playground allocation - $540,000
Equipment - $535,797.24
o Lake Ridge Park Playground allocation - $215,000
Equipment - $211,949.92
• Restrictions: Cannot be used for maintenance or routine repairs.
• Revenue Source: Park dedication fees from development projects.
2026 Park Dedication Fees: $29,013.66
## $11,412 (Big Lake Car Condos II)
$17,601.66 (Auto Zone)
2026 Donations: $0
2026 Interest Earnings: $6,723.90
## Parks-Trail Maintenance CIP Fund 195 (Unrestricted Fund)
## Current Balance: $712,950.56
• Use: Maintenance and development of parks and trails.
o Shores of Lake Mitchel Playground allocation- $215,000
Equipment - $211.059.08
• Revenue Source: Annual General Fund transfers and Interest Earnings.
## • Fund Allocations:
Trail Maintenance: $88,000
Park Maintenance/Development: $513,412.44
## Skate Rink at City Hall: $40,000
Unallocated: $71,538.12
• 2026 Approved Transfers:
Trail Maintenance: $9,000
Park Maintenance/Development: $100,000
## AGENDA ITEM
## Big Lake Parks Advisory Committee
## Equipment & Building Replacement CIP Fund 199 (Playground Equipment Only)
## Current Balance: $60,000
• Use: Replacement/maintenance of existing playground equipment (like-for-like
replacement only).
• Revenue Source: $5,000 annual transfer from the General Fund.
• 2026 Approved transfer - $5,000
## Long-Term Funding Considerations
• Fund 120 is restricted to park development and enhancement projects and cannot be used for
maintenance, repairs, or replacement of existing facilities.
• Funds 195 and 199 provide the primary funding sources for maintenance, repair, and replacement
of park, trail, and playground infrastructure.
• All projects, priorities, and funding allocations remain subject to future City Council approval.
## Local Government Aid (LGA) Impact
To support long-term capital planning, staff has reduced the annual LGA allocation assumed for park
and infrastructure improvements from $150,000 to $100,000.
Unless the Minnesota Legislature modifies the current LGA funding formula, the City is expected to
continue experiencing annual reductions in LGA due to the statutory adjustment that reduces aid by
approximately $10 per capita.
• 2026 LGA Received: $627,591
• Estimated 2027 LGA: $499,861
• Estimated Reduction: $127,730 (20.4%)
Continued reductions in LGA will reduce the City's ability to fund future parks, trail, playground, and
other infrastructure replacement projects and may require the City to identify alternative funding
sources or increase reliance on other revenue mechanisms to maintain existing facilities and amenities.
## FINANCIAL IMPACT
## N/A
## STAFF RECOMMENDATION
## N/A
## ATTACHMENTS
Cash flow projections
Costs per park/trails 2023-2025, through month end
## Park/Trails
## YTD COST
2026
## PROJECT YTD
2026
## TOTAL COST
2025
## TOTAL COST
2024
## TOTAL COST
20234.512
172nd Street Trail4,583.41 12,222.41 11,388.13 12,078.86 11,175.45
Artic Circle Trail1,145.85 3,055.60 2,847.03 3,019.72 2,793.86
Bluff Park7,126.64 19,004.37 20,009.64 21,431.73 19,690.62
Browns Square2,347.19 6,259.17 6,339.83 6,770.34 6,233.48
County Raod 5 Trail2,291.70 6,111.21 5,694.07 6,039.43 5,587.73
Hidden Rivers4,583.41 12,222.41 11,388.13 12,078.86 11,175.45
Highline14,891.35 39,710.28 47,445.52 51,268.87 46,807.47
Highline Drive Trail2,291.70 6,111.21 5,694.07 6,039.43 5,587.73
Hudson Woods14,822.92 39,527.80 46,649.09 50,367.43 46,011.03
Karen Lane Trail1,145.85 3,055.60 2,847.03 3,019.72 2,793.86
Kellerwood9,166.81 24,444.83 22,776.27 24,157.73 22,350.90
Lake Ridge14,545.50 38,788.00 43,420.29 46,712.90 42,782.23
Lakeside Park29,585.75 78,895.32 107,351.21 105,304.38 106,500.47
McDowell Trail11,458.51 30,556.04 28,470.34 30,197.16 27,938.63
## Minnesota Ave Trail-
- - - -
Mitchell Farms4,736.91 12,631.77 13,174.74 14,101.03 12,962.05
Norland4,768.36 12,715.61 13,540.67 14,515.21 13,327.98
Ormsbee Street Trail2,291.70 6,111.21 5,694.07 6,039.43 5,587.73
Powell2,402.67 6,407.13 6,985.59 7,501.24 6,879.24
River Oaks16,041.92 42,778.45 39,858.47 42,276.02 39,114.08
Riverside Landing- - - - -
Sanford Select9,499.72 25,332.59 26,650.83 28,543.16 26,225.46
Shores of Lake Mitchell14,582.49 38,886.64 43,850.80 47,200.17 43,212.74
Veterans Memorial4,649.99 12,399.97 12,163.05 12,955.95 11,950.36
Wrights Crossing9,740.15 25,973.75 29,449.12 31,710.41 29,023.75
188,700.51 503,201.36 553,687.97 583,329.20 545,712.29
-
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
## Parks and Trail Costs
## PROJECT YTD 2026TOTAL COST 2025TOTAL COST 2024TOTAL COST 2023
unaudited
% of budget year41.67%
12/31/202312/31/202412/31/20255/31/202612/31/2026
## Prior YTDPrior YTDPrior YTD
## Current YTDCurrent Budget
## Budget
## Remaining
% of
## Budget
## Expenditures
101-200-55-05-4002Wages222,575.02 206,274.70 222,575.02 74,346.15 277,872.00 203,525.85 27%
101-200-55-05-4003Wages - WC Supplement213.20 - 213.20 - - -
101-200-55-05-4004Overtime Wages1,924.02 988.34 1,924.02 973.68 1,000.00 26.32 97%
101-200-55-05-4008Insurance Benefits (er)4,457.04 4,650.43 4,457.04 2,065.55 5,253.00 3,187.45 39%
101-200-55-05-4009HSA Accounts450.00 500.00 450.00 187.50 450.00 262.50 42%
101-200-55-05-4010F.I.C.A./Medicare (er)16,519.46 15,232.71 16,519.46 5,430.55 21,438.00 16,007.45 25%
101-200-55-05-4012P.E.R.A. (er)14,486.58 12,764.33 14,486.58 5,574.38 19,713.00 14,138.62 28%
101-200-55-05-4016WC Insurance1,567.20 8,872.00 1,567.20 (6,907.00) 8,633.00 15,540.00 -80%
101-200-55-05-4017Unemployment Benefits8.24 - 8.24 - - -
101-200-55-05-4020Union Insurance56,635.00 54,240.00 56,635.00 25,100.00 59,040.00 33,940.00 43%
## 101-200-55-05-4021PFMLA-
- - 342.41 1,236.00 893.59 28%
101-200-55-05-4023ESST-PT- - - - 2,319.00 2,319.00 0%
101-200-55-20-4140Audit3,810.00 3,672.75 3,810.00 4,068.75 4,000.00 (68.75) 102%
101-200-55-20-4150Engineering2,851.00 16,915.50 2,851.00 3,714.00 2,000.00 (1,714.00) 186%
101-200-55-20-4170Legal- - - - - -
101-200-55-20-4180Other Consultants- - - 4,038.50 - (4,038.50)
101-200-55-20-4185Medical Exams340.00 - 340.00 55.00 - (55.00)
101-200-55-25-4200Printing - Newsletter etc920.19 932.85 920.19 - 950.00 950.00 0%
101-200-55-25-4208Copies1,528.12 2,581.49 1,528.12 694.60 2,040.00 1,345.40 34%
101-200-55-25-4209Recording Fees/Settlement chgs- - - - - -
101-200-55-25-4210Operating Supplies11,272.67 12,781.87 11,272.67
5,644.56 15,000.00 9,355.44 38%
101-200-55-25-4211Lakeside Park Supplies3,267.72 1,532.45 3,267.72 2,280.72 5,000.00 2,719.28 46%
101-200-55-25-4212Other Operations Expenses1,369.43 269.84 1,369.43 669.56 500.00 (169.56) 134%
101-200-55-25-4213Park Irrigation Supplies5,219.55 10,852.54 5,219.55 3,728.30 10,000.00 6,271.70 37%
101-200-55-25-4215Uniforms/Clothing1,627.88 2,729.06 1,627.88 868.77 3,000.00 2,131.23 29%
101-200-55-25-4218Boots/Clothing Reimb1,415.81 1,117.93 1,415.81 300.00 1,400.00 1,100.00 21%
101-200-55-25-4220Advertising1,582.50 1,081.25 1,582.50 420.00 - (420.00)
101-200-55-25-4225Sanitation/Garbage Removal11,467.88 18,219.70 11,467.88 3,163.52 15,000.00 11,836.48 21%
101-200-55-25-4230Telephone/Internet7,589.58 7,537.52 7,589.58 2,700.15 9,048.00 6,347.85 30%
101-200-55-25-4235Postage404.65 411.90 404.65 357.82 200.00 (157.82) 179%
101-200-55-25-4238Training/Schools- 750.00 - - 750.00
750.00 0%
101-200-55-25-4240Travel/Mileage- 112.56 - - 100.00 100.00 0%
101-200-55-25-4243Meals189.60 197.10 189.60 - 200.00 200.00 0%
101-200-55-25-4250Liability Insurance27,603.83 25,865.89 27,603.83 20,512.03 29,074.00 8,561.97 71%
101-200-55-25-4255Rent/Lease1,995.00 1,900.00 1,995.00 2,230.89 1,900.00 (330.89) 117%
## Parks Department
## Statement of Revenues and Expenditures
May 31, 2026
unaudited
% of budget year41.67%
12/31/202312/31/202412/31/20255/31/202612/31/2026
## Prior YTDPrior YTDPrior YTD
## Current YTDCurrent Budget
## Budget
## Remaining
% of
## Budget
## Parks Department
## Statement of Revenues and Expenditures
May 31, 2026
101-200-55-25-4257Contractors Hired8,513.36 5,597.00 8,513.36 6,678.03
6,500.00 (178.03) 103%
101-200-55-25-4260Subscriptions/Dues310.00 130.00 310.00 53.68 980.00 926.32 5%
101-200-55-25-4300Awards - Employee LOS29.53 - 29.53 69.53 25.00 (44.53) 278%
101-200-55-25-4311Cash Shortage- - - - - -
101-200-55-25-4320Sand/Salt- - - - - -
101-200-55-25-4321Beach Sand201.39 - 201.39 - 250.00 250.00 0%
101-200-55-25-4325Class 5/Concrete/Red Rock381.05 - 381.05 2,033.40 - (2,033.40)
101-200-55-25-4395Signs/Banners/Flags2,113.86 2,351.86 2,113.86 2,806.85 1,000.00 (1,806.85) 281%
101-200-55-25-4405Motor Fuel5,897.11 13,979.39 5,897.11 706.65 20,000.00 19,293.35 4%
101-200-55-25-4410Tires- - - - - -
101-200-55-25-4413Equipment/Accessories2,697.17 5,350.75 2,697.17 2,244.41 5,000.00 2,755.59 45%
101-200-55-25-4530Lake Maintenance23,326.20
19,648.73 23,326.20 - 20,000.00 20,000.00 0%
101-200-55-25-4535Playground Maintenance3,191.08 7,198.42 3,191.08 - 8,000.00 8,000.00 0%
101-200-55-25-4540Repair/Maintenance Buildings3,139.11 10,126.47 3,139.11 4,764.00 2,525.00 (2,239.00) 189%
101-200-55-25-4545Repair/Maintenance Equipment- - - - - -
101-200-55-25-4570Electricity5,217.89 6,780.40 5,217.89 1,942.57 8,008.00 6,065.43 24%
101-200-55-25-4580Natural Gas- 2,105.75 - - 2,500.00 2,500.00 0%
101-200-55-25-4582Solar(284.31) (1,114.67) (284.31) (377.34) (900.00) (522.66) 42%
101-200-55-25-4590Water/Sewer Utilities81,088.19 85,960.69 81,088.19 2,193.18 100,000.00 97,806.82 2%
101-200-55-71-4612Transfer Out - Fund 199 Misc Equip5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 - 100%
101-200-55-71-4612Transfer Out - Fund 195 Parks Improvement16,750.00 100,000.00 100,000.00 100,000.00 100,000.00 - 100%
101-200-55-71-4612Transfer Out - Fund 195 Trails Improvement9,000.00 9,000.00 9,000.00
9,000.00 9,000.00 - 100%
101-200-55-71-4612Transfer Out - Fund 199 Playground Equi5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 - 100%
Total Expenditures- Parks Dept574,862.80 690,099.50 658,112.80 304,675.35 790,004.00 485,328.65 39%
12/31/202312/31/202412/31/20255/31/202612/31/2026
## Prior YTDPrior YTDPrior YTDCurrent YTDCurrent Budget
## Budget
## Remaining
% of
## Budget
## Fleet & Equipment Associated with the Parks Department
101-200-52-25-4432Vehicle Maintenance-Parks736.81 1,744.51 1,921.48 - 2,000.00 2,000.00 0%
101-200-52-25-4547Repair/Maintenance Equip-Parks5,862.68 10,485.19 12,653.69 3,025.16 10,500.00 7,474.84 29%
## Total Expenditures- Parks Equip
6,599.49 12,229.70 14,575.17 3,025.16 12,500.00 9,474.84
Total Operational Expenditures581,462.29 702,329.20 672,687.97 307,700.51 802,504.00 494,803.49
unaudited
% of budget year41.67%
12/31/202312/31/202412/31/20255/31/202612/31/2026
## Prior YTDPrior YTDPrior YTD
## Current YTDCurrent Budget
## Budget
## Remaining
% of
## Budget
## Parks Department
## Statement of Revenues and Expenditures
May 31, 2026
Total Revenues(104,961.66) (84,099.24) (74,636.47)
(33,040.45)
(77,450.00) (44,409.55)
Total Expenditures581,462.29 702,329.20 672,687.97
307,700.51 802,504.00
494,803.49
Deficit covered by Property Taxes476,500.63 618,229.96 598,051.50 274,660.06 725,054.00
450,393.94
% of total General Levy10%
14%13%5%14%
12/31/202312/31/202412/31/20255/31/202612/31/2026
## Parks Operating Budgets
## Revenues
Intergovernmental-$ (4,000)$ -$ -$ -$ -$
Charges for Services(3,479) (2,625) (3,068) (1,870) (2,900) (1,030)
License & Permits(86,514) (74,684) (70,921) (22,584) (74,300) (51,716)
Donations(13,500) (1,300) - (8,500) - 8,500
Other - refunds/reimbursements(1,469) (1,490) (647) (87) (250) (164)
(104,962)$ (84,099)$
(74,636)$ (33,040)$ (77,450)$ (44,410)$ 43%
- - -
## Expenditures
Personnel318,836$ 303,523$ 318,836$ 107,113$ 396,954$ 289,841$
Professional Services7,001 20,588 7,001 11,876 6,000 (5,876)
Operating Costs219,876 259,218 227,851 69,711 280,550 210,839
Capital Transfers Out35,750 119,000 119,000 119,000 119,000 -
581,462$ 702,329$ 672,688$
307,701$ 802,504$ 494,803$ 38%
- - - - - -
Deficit covered by Property Taxes476,501 618,230 598,052 274,660 725,054 450,394
% of total General Levy13%15%13%5%14%
## Prior YTDPrior YTDPrior YTDCurrent YTDCurrent Budget
## Budget
## Remaining
## CASH FLOW PROJECTIONS12/31/2024
2023-2044
## FUNDYEAR
## DESCDEPOSITWITHDRAWBALANCE
## FUND
Fund - 1202023CASH BAL - 2023871,592.43 871,592.43 120
Fund - 1952023CASH BAL - 2023458,199.23 1,329,791.66 195
Fimd - 1992023
## CASH BAL - 202345,000.00 1,374,791.66
199
Fund - 1952023LAKESIDE PARK SIDWALK2,500.00 1,372,291.66 195
Fund - 19520232023 YE TRANSFER100,000.00 1,472,291.66 195
Fund - 1952024
## 2024 TRANS109,000.00 1,581,291.66
195
Fimd - 19920242024 TRANS5,000.00 1,586,291.66 199
Fund - 12020242024 PARK DEDICATION159,344.00 1,745,635.66 120
Fund - 1202024
## 2024 PICKLE BALL220,088.09
1,525,547.57
195
Fund - 12020242024 DONATION - PICKLE BALL25,000.00 1,550,547.57 120
Fund - 19520242024 BROWNS SQ UP10,297.56 1,540,250.01 195
Fund - 1952024
2024 Transfer from Liquor Store210.00 1,540,460.01
195
## PROPOSED -12020252025 NEW PARK - NO
- 1,540,460.01 120
fund - 19520252025 TRANS109,000.00 1,649,460.01 195
## PROPOSED - 1952025
## 2025 DONATION- 1,649,460.01
195
Fimd - 19920252025 TRANS
5,000.00 1,654,460.01 199
## PROPOSED - 19520252025 ARCHERY RANGE - ?
60,000.00 1,594,460.01 120
## PROPOSED -12020252025 LAKERIDGE PARK215,000.00 1,379,460.01 120
## PROPOSED -19520252025 LAKESIDE ALL540,000.00
839,460.01 120
## PROPOSED - 19920252025 SHORES OF LAKE MITCHEL215,000.00 624,460.01
195
## PROPOSED - 19520252025 MITCHELL FARM215,000.00 409,460.01 195
## PROPOSED -12020262026 SPLASH PAD - ?200,000.00
209,460.01 195
## PROPOSED - 19520262026 SKATE PARK400,000.00 (190,539.99)
195
## PROPOSED - 19520262026 TRANS-GF109,000.00 (81,539.99) 195
## PROPOSED - 19920262026 TRANS-GF5,000.00 (76,539.99) 199
## PROPOSED- 19520262026 KAREN LANE TRAIL8,000.00 (84,539.99)
195
## PROPOSED - 19520272027 LGA ALLOCATION50,000.00 (34,539.99) 195
## PROPOSED - 19520272027 TRANS - GF59,000.00 24,460.01 195
## PROPOSED - 19920272027 TRANS - GF5,000.00 29,460.01
199
## PROPOSED - 19520282028 TRANS - GF25,750.00 55,210.01 195
## PROPOSED - 19920282028 TRANS - GF5,000.00 60,210.01 199
## PROPOSED - 19520282028 LGA ALLOCATION50,000.00 110,210.01 195
## PROPOSED - 19520282028 BLUFF PARK180,000.00 (69,789.99) 120
## PROPOSED - 19520292029 TRANS - GF25,750.00
(44,039.99) 195
## PROPOSED - 19520292029 LGA ALLOCATION50,000.00 5,960.01 195
## PROPOSED - 19920292029 TRANS - GF5,000.00 10,960.01 199
## PROPOSED - 19520302030 TRANS - GF25,750.00 36,710.01 195
## PROPOSED - 19520302030 LGA ALLOCATION50,000.00 86,710.01 195
## PROPOSED - 19920302030 TRANS - GF5,000.00 91,710.01 199
## PROPOSED -19520302030 HIDDEN RIVERS30,000.00 61,710.01 195
## PROPOSED -19520312031 LGA ALLOCATION100,000.00 161,710.01 195
## PROPOSED - 19920312031 TRANS - GF PLAYGROUND EQ5,000.00 166,710.01 199
## PROPOSED -19520312031 TRANS - GF - PARKS/TRAILS25,750.00 192,460.01 195
## PROPOSED -19520322032 LGA ALLOCATION100,000.00 292,460.01 195
## PROPOSED - 1992032TRANS - GF PLAYGROUND EQ5,000.00 297,460.01 199
## PROPOSED -1952032TRANS - GF - PARKS/TRAILS25,750.00 323,210.01 195
## PROPOSED -19520332033 LGA ALLOCATION100,000.00 423,210.01 195
## PROPOSED - 1992033TRANS - GF PLAYGROUND EQ5,000.00 428,210.01 199
## PROPOSED -1952033TRANS - GF - PARKS/TRAILS25,750.00 453,960.01 195
## FUNDYEARDESCDEPOSITWITHDRAWBALANCEFUND
## PROPOSED -19520342034 LGA ALLOCATION100,000.00 553,960.01 195
## PROPOSED - 1992034
## TRANS - GF PLAYGROUND EQ5,000.00 558,960.01
199
## PROPOSED -1952034TRANS - GF - PARKS/TRAILS25,750.00 584,710.01 195
## PROPOSED -19520352035 LGA ALLOCATION100,000.00 684,710.01 195
## PROPOSED - 1992035
## TRANS - GF PLAYGROUND EQ5,000.00 689,710.01
199
## PROPOSED -1952035TRANS - GF - PARKS/TRAILS25,750.00 715,460.01 195
## PROPOSED -19520362036 LGA ALLOCATION100,000.00 815,460.01 195
## PROPOSED - 1992036
## TRANS - GF PLAYGROUND EQ5,000.00 820,460.01
199
## PROPOSED -1952036TRANS - GF - PARKS/TRAILS25,750.00 846,210.01 195
## PROPOSED -1952036HIGHLINE DRIVE TRAIL75,000.00 771,210.01 195
## PROPOSED -1952037
## 2037 LGA ALLOCATION100,000.00 871,210.01
195
## PROPOSED - 1992037TRANS - GF PLAYGROUND EQ5,000.00 876,210.01 199
## PROPOSED -1952037TRANS - GF - PARKS/TRAILS25,750.00 901,960.01 195
## PROPOSED -1952038
## 2038 LGA ALLOCATION100,000.00 1,001,960.01
195
## PROPOSED - 1992038TRANS - GF PLAYGROUND EQ
5,000.00 1,006,960.01 199
## PROPOSED -1952038TRANS - GF - PARKS/TRAILS25,750.00 1,032,710.01 195
## PROPOSED -1952038
## 2038 HIGLINE PARK250,000.00
782,710.01
195
## PROPOSED -19520382038 HUDSON WOODS
250,000.00 532,710.01 195
## PROPOSED -19520392039 LGA ALLOCATION
100,000.00 632,710.01 195
## PROPOSED - 1992039TRANS - GF PLAYGROUND EQ5,000.00 637,710.01 199
## PROPOSED -1952039TRANS - GF - PARKS/TRAILS25,750.00 663,460.01 195
## PROPOSED -19520402040 LGA ALLOCATION100,000.00
763,460.01
195
## PROPOSED - 1992040TRANS - GF PLAYGROUND EQ5,000.00 768,460.01 199
## PROPOSED -1952040TRANS - GF - PARKS/TRAILS25,750.00 794,210.01 195
## PROPOSED-19520402040 SANFORD SELECT300,000.00 494,210.01
195
## PROPOSED -19520402040 NORLAND PARK300,000.00 194,210.01 195
## PROPOSED -19520402040 ARCTIC CIRCLE TRAIL15,000.00
179,210.01 195
## PROPOSED -19520402040 MINNESOTA AVE TRAIL50,000.00 129,210.01
195
## PROPOSED -19520402040 ORMSBEE TRAIL50,000.00 79,210.01 195
## PROPOSED -19520412041 LGA ALLOCATION100,000.00 179,210.01 195
## PROPOSED - 1992041TRANS - GF PLAYGROUND EQ5,000.00 184,210.01
199
## PROPOSED -1952041TRANS - GF - PARKS/TRAILS25,750.00 209,960.01 195
## PROPOSED -19520422042 LGA ALLOCATION100,000.00 309,960.01 195
## PROPOSED - 1992042TRANS - GF PLAYGROUND EQ5,000.00 314,960.01 199
## PROPOSED -1952042TRANS - GF - PARKS/TRAILS25,750.00 340,710.01 195
## PROPOSED -19520422042 WRIGHTSS CROSSING325,000.00 15,710.01
195
## PROPOSED -19520432043 LGA ALLOCATION100,000.00 115,710.01 195
## PROPOSED - 1992043TRANS - GF PLAYGROUND EQ5,000.00 120,710.01 199
## PROPOSED -1952043TRANS - GF - PARKS/TRAILS25,750.00 146,460.01 195
## PROPOSED -19520442044 LGA ALLOCATION100,000.00 246,460.01 195
## PROPOSED - 1992044TRANS - GF PLAYGROUND EQ5,000.00 251,460.01 199
## PROPOSED -1952044TRANS - GF - PARKS/TRAILS25,750.00 277,210.01 195
## PROPOSED-19520442044 POWELL PARK 325,000.00
(47,789.99) 195
## PARK AND TRAIL CAPITAL IMPROVEMENTS
20242025202620272028202920302031203220332034203520362037203820392040
Beginning Balance1,472,292 1,540,460 469,460 115,460 29,460 (69,790) 10,960 61,710 192,460 323,210 453,960 584,710 715,460 771,210 901,960 532,710 663,460
Yearly Transfer from General Fund114,210 114,000 114,000 64,000 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750 30,750
Park Dedication Fee159,344 - - - - - - - - - - - - - - - -
Private Donations25,000 - - - - - - - - - - - - - - - -
## LGA Allocation-
-
- 50,000 50,000 50,000 50,000 100,000 100,000
100,000
100,000 100,000 100,000 100,000 100,000 100,000
100,000
## Total Funding Sources298,554
114,000
114,000
114,000 80,750 80,750 80,750
130,750
130,750
130,750
130,750 130,750 130,750 130,750 130,750
130,750
130,750
New Park - Not doing yet-
unknown when this was take place
## Browns Square10,298
## Pickle Ball220,088
Archery Range - (60K)-
60,000
## Lakeside Park Playground540,000
## Lake Ridge Park215,000
## Shores of Lake Mitchell215,000
Mitchell Farms215,000 **Not approved in 2025
Skate Park400,000 looking for grants
## Hidden Rivers Trail overlook30,000
## Bluff Park180,000
## Highline Park250,000
## Hudson Woods250,000
## Sanford Select300,000
## Norland300,000
Splash Pad - (200K)-
200,000
## Karen Lane Trail8,000
## Highline Drive Trail75,000
## Artic Circle Trail15,000
## Minnesota Avenue Trail50,000
## Ormsbee Trail50,000
Total Projected expenses230,386 1,185,000 468,000 200,000 180,000 -
30,000 - - -
- - 75,000 - 500,000 - 715,000
Ending Balance1,540,460 469,460 115,460 29,460 (69,790) 10,960 61,710 192,460 323,210 453,960 584,710 715,460 771,210 901,960 532,710 663,460 79,210
0.00
## FUNDING
## SOURCES
## PROPOSED
## PROJECTS
(500,000)
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
20242025202620272028202920302031203220332034203520362037203820392040
## PARKS AND TRAIL FUNDING
Yearly Transfer from General FundYearly Transfer from General FundPark Dedication FeePrivate DonationsTotal Funding SourcesTotal Funding Sources
79,210
(200,000)
-
200,000
400,000
600,000
800,000
1,000,000
2025203020352040
## PARK AND TRAIL CIP PROJECTED FUND BALANCE
## 7C
## Recreation and Communication Coordinator Updates
__________________________________________________________________
1. Programming
a. Summer Photo Contest: This contest helps the City add variety to pictures of the
community for marketing purposes and the winner receives a prize bag!
Deadline to submit pictures to cscott@biglakemn.org is September 4, 2026.
b. Movie in the Park: The May Movie in the Park was rescheduled due to rain on
May 29
th
and featured Zootopia 2. It was the most heavily attended Music in the
Park to date with well over 85 vehicles and 250-300 people. There were some
issues with trespassers on the playground equipment after 10pm and it took a
while to resolve as the Reserve officers were working graduation and the All-
night Grad Party that was happening simultaneously. In future years we will
schedule the event around graduation to avoid this potential issue. The
September Movie in the Park will take place on September 4th at 8 p.m.
featuring Hocus Pocus.
c. Music in the Park:
Music in the Park takes place every Thursday until August 6th.
Note that we are skipping June 25th and encouraging residents to attend the
kickoff to Spud Fest that Thursday. Seasonal staff have been tasked with
managing some of the events this season. Thank you to the seasonal staff and
police reserves for all that they do for this event!
d. Summer Farmers Market: The Big Lake Farmers Market takes place every
Wednesday from 3-7 p.m. from June to August and from 3-6 p.m. in September.
There are 25-32 vendors scheduled to attend every week, all summer long
marking the largest growth in the event’s history!
e. Coffee with the Mayor: This event series takes place on the second Saturday of
every other month from 9-10 a.m. at Ember Coffee.
f. Coffee with the Chief: This event series takes place on the first Wednesday of
every other month starting in February from 9-10 a.m. at Ember Coffee.
g. Recycling Day: Recycling day took place on May 16, 2026 from 8 a.m. – 12 p.m. at
the Township Maintenance Building.
## Prepared By:
## Corrie Scott, Recreation and Communication Coordinator
## Norm Michels, Streets, Parks, and Fleet Superintendent
## Meeting Date:
6/22/2026
Item No.
## 7D
## Item Description:
## Strategic Plan Standing Item
## Reviewed By: N/A
## Reviewed By: N/A
## ACTION REQUESTED
## N/A
## BACKGROUND/DISCUSSION
As per the Parks Advisory Committee’s request, staff is including the Parks Strategic Plan 2026-2028 in
each regular meeting packet for reference.
## FINANCIAL IMPACT
## N/A
## STAFF RECOMMENDATION
## N/A
## ATTACHMENTS
## Parks Advisory Committee Strategic Plan
## AGENDA ITEM
## Big Lake Parks Advisory Committee
1
## Big Lake Parks Advisory Committee (PAC) Strategic Plan
3-Year Perspective – 2026 through 2028
This Strategic Plan provides a practical approach to the goals and activities of the Parks Advisory
Committee (PAC). The purpose is to guide PAC Members and staff through Big Lake’s priorities regarding
the parks and trails system. This Strategic Plan will improve the capacity to measure outcomes.
The PAC Priority: To provide a safe leisure environment along with quality parks, facilities, trails, and
services; to preserve and protect open land and water areas that will benefit and improve the quality of
life for Big Lake residents now and in the future.
Strategy: Prioritize maintenance, clean up, and beautification of park system.
## Work Plan Objectives
1. Perform routine maintenance (including new mulch/fill mulch projects), clean up, and
beautification of the following parks:
• Bluff
## • Browns Square
## • Hidden Rivers
• Highline
## • Hudson Woods
• Kellerwood
## • Lake Ridge
• Lakeside
• McDowall
## • Mitchell Farms
• Norland
• Powell
## • River Oaks
## • Riverside Landing
## • Sanford Select Acres
## • Shores of Lake Mitchell
## • Veterans Memorial
## • Wrights Crossing
• Ice Rinks (leased space within redevelopment area)
2. Establish a working relationship with volunteer groups who would like to plant and care for
flowers throughout the parks and trail system.
3. Routinely take inventory of tree system and maintain trees within parks.
• Take advantage of Sherburne County programming, if needed, to ensure a healthy tree
system.
• Watch for diseased trees and create plans for them (i.e., try to save them or cut and
replace them)
2
Strategy: Plan for and complete necessary improvements, while taking into consideration the
community’s wants and needs.
2026 2027 2028
## Playground Installation:
## • Shores of Lake Mitchell
## Park
## • Lake Ridge Park
## • Lakeside Park
## Skate Park at Lakeside Park:
• Work with vendor to
provide plans to
reconstruct skate park
• Get recommendation
from PAC
• Get approval from the
## City Council
• Schedule project to be
completed
## Park Signage:
## • Lakeside Park Flags,
## Powell Park Donation,
## Hudson Woods
## Donation
• Create a plan to update
all general park signage
with current City logo
## Mitchell Farms Park:
• Survey community
• Work with vendor to
provide plans to
reconstruct park
• Get recommendation
from PAC
• Get approval from the
## City Council
• Schedule project to be
completed
## Bluff Park:
• Survey community
• Work with vendor to
provide plans to
reconstruct park
• Get recommendation
from PAC
• Get approval from the
## City Council
• Schedule project to be
completed
Strategy: Add connections and amenities to ensure the parks and trails system is growing and serving
the community’s wants and needs.
2026 2027 2028
## Ice Rinks New Location:
• Survey community
• Choose park location
• Work with vendor to
provide plans/concept
• Get recommendation
from PAC
• Get approval from the
## City Council
• Schedule project to be
completed
## Archery Range:
• Survey community
• Choose park location
• Work with vendor to
provide plans/concept
• Get recommendation
from PAC
• Get approval from the
## City Council
• Schedule project to be
completed
## Brom Park:
• Survey community
• Work with vendor to
provide plans/concept
• Get recommendation
from PAC
• Get approval from the
## City Council
The Big Lake PAC was created by Ordinance Number 2002-03, an act of the Big Lake City Council to:
3
1. Serve as a liaison between city government and the community.
2. Serve as a resource for new and existing neighborhoods, groups, and civic organizations seeking
information concerning the Big Lake park system.
3. To assist city government in setting open space, land acquisition and development policies.
4. To serve as a body to make recommendations to the City Council relating to specific parks, trails,
sidewalks, and open space development.
5. To assist City Council in researching a variety of funding sources for the Capital Improvement
Program and related park development.
## Member Seat Term Expires
## Doug Peterson Chair Dec. 31, 2026
## Jeff Webster PAC Member Dec. 31, 2027
## Scott Creighton Vice-Chair Dec. 31, 2027
## Megan Weber PAC Member Dec. 31, 2028
## Kameron Hanson PAC Member Dec 31, 2028
## Kim Noding Council Liaison Dec. 31, 2026
## Lisa Odens Planning Liaison Dec. 31, 2026
## Park Replacement Plan 2026-2028
## Park Year
## Built
## Amenities Rating *Year
## Replace
ment
*Replacement
$ Amount
Bluff 2006 Playground 3 2028 $230k
Browns Square 2024 Benches – Gazebo 10 2056 $65k
Hidden Rivers 2006 Trail – Overlook 6 2030 $30k
Highline 2007 Playground – Ball Field 7 2038 $200k
## Hudson Woods 2010 Playground – Frisbee Golf –
## Pickleball
7 2038 $200k
Kellerwood 2017 Benches – Trail 10
Lake Ridge 2026 Playground – Ball Field 10 2046 $240k
## Lakeside
(Skate Park)
2005 Skate Park – Benches *Removed 2026 $300k
## Lakeside
(Playground)
2026 Playground – Beach – Shelters
– Volleyball – Basketball
10 2046 $550k
## McDowall Trail – Benches 10
## Mitchell Farms 1997 Benches – Previous Playround *Removed N/A $240k
Norland 2015 Playground 8 2040 $240k
Powell 2022 Playground 10 2044 $240k
## River Oaks 2019 Frisbee Golf – Walking Path 10
## Riverside Landing Canoe Landing 10
Sanford Select 2016 Playground – RC Track 8 2040 $240k
Shores of
## Lake Mitchell
2026 Playground – Soccer 10 2046 $240k
## Veterans Memorial 2017 Sidewalk – Benches – Reader
## Board
10
Wrights Crossing 2004 Playground – Shelter 8 2042 $240k
Park Rating is Between 1-10 (1-Needs Replacement; 10-Excellent Condition)
## * Columns Are Based on Estimations
## Trail Replacement Plan 2026-2028
## Trail Year
## Built
Amenities Rating *Lifespan in
## Years
*Replacement
$ Amount
McDowall Trail 2019 Overlook, bat house,
benches
10 30 $150,000
## Arctic Circle Unknown N/A 8 25 $15,000
## Highline Drive Unknown N/A 6 15 $75,000
Karen Lane 2008 N/A 8 25 $15,000
## Minnesota Avenue Unknown N/A 8 25 $50,000
## Ormsbee Street Unknown N/A 5 10 $50,000
County Road 5 Unknown N/A 8 25 $100,000
## County Road 43
*two sections
## Unknown
2023
## N/A 6
10
15
30
$50,000
$50,000
County Road 81 Unknown N/A 6 15 $75,000
166
th
Street 2022 N/A 10 30 $15,000
172
nd
Street Unknown N/A 8 25 $100,000
205
th
Street 2023 N/A 10 30 $10,000
Park Rating is Between 1-10 (1-Needs Replacement; 10-Excellent Condition)
* Columns are Based on Estimations