Lake Elmo City Council — Transcript

Saturday, April 12, 2025

PFAS Contamination and Health Impacts

PFAS Remediation and Settlement Funding

Private Well Sampling and Treatment Program

Municipal Water System Plans for Lake Elmo

Votes (6)

Lake Elmo Municipal Well 2 PFAS Treatment Project

Project in design phase; targeted completion by summer 2025.

Well number two, one of Lake Elmo's three current municipal wells, has detected PFOA levels above the new EPA regulatory limit. The city has reduced its use to only peak summer days. A feasibility study, funded by the 3M settlement, confirmed treatment is feasible. The project is now in the design phase for a Granulated Activated Carbon (GAC) treatment facility, which will require modifying the wellhouse building to accommodate 15-foot pressure filters. The goal is to have the facility operational before the peak summer demands of 2025.

Lake Elmo New Municipal Wells 6 & 7 Development with Treatment

Planning and development underway; targeted completion by Spring 2027.

Due to ongoing community growth and the contamination in existing wells, Lake Elmo needs to add new municipal wells. The previous plan to locate these wells in the northern part of the city has been abandoned. New wells (Wells 6 and 7) are now planned for the South area, where much of the city's growth is occurring. These new wells will pump directly to a new central water treatment plant, utilizing either GAC or ion exchange filtration, before the water enters the distribution system. The objective is to have this new system operational by Spring 2027.

Lake Elmo Municipal Wells 4 & 5 Contingency Treatment Plan

Contingency plan developed for future implementation as needed.

While current testing shows only traces of PFAS in Lake Elmo's municipal Wells 4 and 5, not yet exceeding treatment thresholds, the city has developed a contingency plan. This plan involves putting another treatment plant at the location of Well 5, with a raw water line to combine and treat water from both Wells 4 and 5. This prepares the city for potential future contamination increases in these wells.

State Private Well Sampling and Treatment Program in East Metro (including Lake Elmo)

Ongoing program with significant backlog; resource expansion and increased lab/contractor capacity are underway to meet new demands.

The MPCA is actively managing over 7,000 private wells in the East Metro, having sampled over half. Roughly 1,500 private well advisories have been issued, leading to the installation of nearly 1,200 Point-of-Entry Treatment (POET) systems and 393 home connections to municipal water. Recent lowering of health-based values in January 2024 immediately triggered 650 new advisories and necessitates resampling for 1,300 residential wells using a new, more sensitive methodology. Lake Elmo accounts for 234 of these new advisories. The program faces challenges including staff turnover and delays in results, but efforts are underway to increase resources and lab capacity to address the backlog.

State Public Water Supply Regulation and Compliance

New federal regulations are in effect; state agencies are actively working with public water systems to achieve compliance by the 2029 deadline.

The EPA's Safe Drinking Water Act now includes enforceable standards (Maximum Contaminant Levels, MCLs) for PFAS, effective April 2024. Minnesota has been proactive, conducting statewide PFAS testing since 2021, ahead of federal regulations. Lake Elmo's Well 2 and both wells in Cimarron Park have PFOA/PFOS levels exceeding these new regulatory limits. Public water systems are required to test, inform the public (via Consumer Confidence Reports), and take action. Systems have until 2029 to achieve compliance, and the state is actively working with water systems, leveraging settlement funding, to implement necessary treatments such as reverse osmosis, ion exchange, or granular activated carbon (GAC) filtration. The MDH also provides public resources like an interactive PFAS dashboard and guidance on home treatment options.

Status of 3M Settlement Funding and Neighborhood Municipal Connections

Settlement funding is depleting; the neighborhood municipal water connection program is paused indefinitely. Transition to the 2007 Consent Decree for future projects is in development.

The $850 million 3M settlement, achieved in 2018 for natural resources damages, has been the primary funding source for PFAS remediation efforts, with 'Priority One' being safe and sustainable drinking water. However, these funds are projected to run out in the next few years. In light of this, the program for connecting existing neighborhoods with high concentrations of private well advisories to the municipal water system, which has successfully connected 292 properties since 2018, has been paused. Future planned connections for neighborhoods like Homestead and Packard Park Eden Park are now delayed or potentially canceled. The state is developing a transition plan to shift future project funding and management to the 2007 Consent Decree with 3M, which does not have a cap limit, but will require a new approval process for projects.

Notable Quotes (11)

as Lucas just presented we now have the contamination in well to and we have to provide treatment for that well or just continue uh using using the water

Jack Griffin/City Engineer for Lake Elmo [1:00:20]
Lake Elmo Municipal Well 2 PFAS Treatment Project

We're just entering in design and construction the idea is to put ax past treatment facility constructed on well number two and then we're hoping to have that online before those Peak summer demands in 2025

Jack Griffin/City Engineer for Lake Elmo [1:01:21]
Lake Elmo Municipal Well 2 PFAS Treatment Project

we're no longer going to look at the northern part of the city uh to construct those Wells we're coming down into the South area where most of the growth is anyway

Jack Griffin/City Engineer for Lake Elmo [1:02:07]
Lake Elmo New Municipal Wells 6 & 7 Development with Treatment

these wells will pump directly both of them will pump directly to a water treatment plant and will and it'll either be a Gak filter uh system or it'll be a a and an exchange filter system but the water will be treated and then pumped into the distribution system

Jack Griffin/City Engineer for Lake Elmo [1:02:44]
Lake Elmo New Municipal Wells 6 & 7 Development with Treatment

if and when the time comes that we need uh to address these two Wells with treatment we can put another treatment plant in this location and do a raw water line to combine these two Wells and bring those two Wells to a North treatment plant

Jack Griffin/City Engineer for Lake Elmo [1:03:57]
Lake Elmo Municipal Wells 4 & 5 Contingency Treatment Plan

in Lake Elmo there are uh 1300 roughly 1300 private drinking water wells uh 694 Wells have been sampled uh there's been 252 of those uh point of entry treatment systems installed and 230 homes have been connected to Municipal Water

Rebecca Place/3M Settlement Coordinator, Minnesota Pollution Control Agency [0:30:17]
State Private Well Sampling and Treatment Program in East Metro (including Lake Elmo)

that means that right away we know that 650 Wells um that didn't previously have an advisory would be triggered into the um well advisory status and then 1300 residential Wells need to be resampled using that new methodology that can that can test to the lower level

Rebecca Place/3M Settlement Coordinator, Minnesota Pollution Control Agency [0:30:54]
State Private Well Sampling and Treatment Program in East Metro (including Lake Elmo)

posos now have as of April of this year have enforcable standards that Public Water Supplies will need to meet in the future those enforcement standards include what's called maximum contaminant levels or mcls

Lucas Martin/District Engineer, Minnesota Department of Health [0:37:34]
State Public Water Supply Regulation and Compliance

the rule requires within f after 5 years of implementation so 2029 is the point at which the Water Systems would receive an actual violation of this rule

Lucas Martin/District Engineer, Minnesota Department of Health [0:43:24]
State Public Water Supply Regulation and Compliance

the uh money will be running out we are working with the trustees this fund has been managed uh via a settlement with trustees and we anticipate it's going to run out of the next few years after that the um we have transition to a consent decree that THM had signed with the state in 2007

Clark Schroer/Special Projects, City of Lake Elmo [1:15:38]
Status of 3M Settlement Funding and Neighborhood Municipal Connections

we've recently been informed that that that program is paused so we don't know what that means yet that's very new information to us but there's going to be a delay at the very least in this whether this this program continues to happen or not

Jack Griffin/City Engineer for Lake Elmo [1:06:55]
Status of 3M Settlement Funding and Neighborhood Municipal Connections

Ordinances & Resolutions (9)

2007 Consent OrderOther

State requirements memorialized on 3M for sampling and work at disposal sites; framework for future actions after settlement funds deplete.

Natural Resources Damages ClaimOther

Claim filed in 2010 by the state against 3M for environmental injuries, leading to the $850 million settlement.

Conceptual Drinking Water Supply PlanPlan

Finished in 2021, focuses on providing safe and sustainable drinking water for 14 impacted communities, including sampling and allocation of capital/O&M dollars, designed to be flexible and resilient.

Amar's LawOther

Legislation going into effect next year in Minnesota that will prohibit PFAS in some goods sold, aiming to reduce overall exposure.

EPA's Federal Safe Drinking Water ActOther

Federal regulation governing public water supplies; PFAS was added to this regulation with enforceable standards (MCLs) in April 2024.

Code of Federal RegulationsOther

Contains requirements and enforceable limits that Public Water Supplies need to meet under the Safe Drinking Water Act.

2040 Comp PlanPlan

City of Lake Elmo's comprehensive plan guiding growth and infrastructure, including previous plans for adding municipal wells.

Capital Improvement PlanPlan

City of Lake Elmo's plan for infrastructure projects, which included extending municipal water to certain neighborhoods.

Clean Drinking Water Supply PlanPlan

A specific plan that approved certain Lake Elmo neighborhoods for municipal water connections based on cost-effectiveness metrics.

View Source