5:00 PM P 4 Properties LLC – Hadley Storage – Development Concept Plan
5:15 PM Police Expansion and City Hall Remodel Budget and Value Engineering
5:30 PM Tanners Lake Interfund Loan Payable
## 5:45 PM 2027 Proposed Budget Updates
6:05 PM 2050 Comprehensive Plan Update and Climate Action Plan
6:20 PM Willowbrooke Fields Restroom/Shelter Construction Contract and Selection of Bid
## Alternates
## 6:30 PM Administrator Update
## 6:35 PM Council Topics
## 6:55 PM Adjourn
## COUNCIL MEMORANDUM
1
## To: Honorable Mayor and City Council
## From: Max Lohse, Planner
Date: July 14, 2026
Subject: P 4 Properties LLC – Hadley Storage – Development Concept Plan
## BACKGROUND
P 4 Properties LLC (Mulcahy), the developer, proposes constructing a self-service storage facility at the
property addressed 6815 55
th
St N. The building would have a footprint of 26,000 square feet and be
three stories in height. The building would feature a rental office with onsite management. The subject
property is vacant and approximately 8.2 acres in size, with approximately three acres of wetlands present
on the eastern half of the side. A standalone grading permit was pulled for the site in early 2026 (a tree
preservation plan was also reviewed and approved with the grading permit). The parcel is zoned B-4
General Industrial District, where self-service storage facility is not a permitted use. As such, the developer
would seek land use approvals to accommodate the use.
## Location Map – Hadley Storage
## PROCESS
City staff have identified several applications that are necessary to facilitate the proposed development.
The applications may be submitted and reviewed concurrently through the development process.
## • Comprehensive Plan Amendment
• Rezoning
• Variance
## • Preliminary Plat
## • Final Plat
## • Site Plan
2
## STAFF ANALYSIS
The following is staff’s analysis of the concept plan submittal. The concept plan materials were reviewed
by the City’s Development Review Committee on July 1, 2026.
Comprehensive Plan Guiding. According to the City’s Comprehensive Plan, the property is guided as
General Industrial. Allowed uses in this category include manufacturing, warehousing, and truck
terminals. To enable the proposed use, the subject property must be re-guided to the Industrial/Office
category where self-storage facilities are allowed. Properties to the west are generally guided Low Density
Residential, and properties to the east are guided General Industrial. If the property was re-guided to
Industrial/Office, it could potentially serve as a transitional space between residential uses to the west
and more intensive uses to the east.
• Given that comprehensive plan amendments are subject to a high level of Council discretion, it is
requested that the City Council provide their feedback on a Comprehensive Plan Amendment to
re-guide the site from General Industrial to Industrial/Office.
Zoning. The zoning of the subject property is B-4 General Industrial District, where self-service storage
facility is not a permitted use. Generally, the B-4 District is intended for more intensive industrial uses,
like truck terminals and heavy manufacturing. Self-service storage facility is permitted with standards in
the B-3 Light Industrial District. As a result, the applicant would need to rezone the property from B-4
General Industrial District to B-3 Light Industrial District.
• Given that rezoning requests are subject to a high level of Council discretion, it is requested that
the City Council provide their feedback on a rezoning of the subject property from B-4 General
Industrial District to B-3 Light Industrial District.
Variance. The B-3 Light Industrial District classifies self-service storage facilities as permitted with
standards. Standards are listed in the City of Oakdale Code of Ordinances, Chapter 25, Article 25-09,
Division 25-09-100, Sec. 25-09-117(a) requires the facility to be at least 350 feet from the nearest
residential property. The nearest residential property is approximately 253 feet away, necessitating a
variance.
Per the City of Oakdale Code of Ordinances, Chapter 25, Article 25-0 3, Division 25-03-500, Sec. 25-03-
502(c), variances may only be granted if the variance is consistent with the Comprehensive Plan and a
practical difficulty is present. Practical difficulties often include unique circumstances not created by the
landowner (terrain, wetlands, access limitations, etc.), but economic considerations alone do not
constitute practical difficulties.
There are natural features (wetlands) on the site that make meeting this setback requirement for this use
without a variance challenging for the site. In addition, Hadley Avenue North separates the proposed use
from the nearby residential properties (the residential properties are not accessed directly via Hadley
Avenue North).
• Given that variances are subject to a high level of Council discretion, it is requested that the City
Council provide their feedback on a variance for the self-service storage facility residential buffer
requirement (City of Oakdale Code of Ordinances, Chapter 25, Article 25-09, Division 25-09-100,
Sec. 25-09-117(a)).
Infrastructure. As seen on the developer’s concept plan, the site would have one new access. The site is
located on Hadley Ave N / CSAH 35, a County road. Washington County previously granted an access
permit to the site. Additionally, the site directly abuts the Gateway State Trail. City water and sanitary
3
sewer services appear readily available to serve the use as existing lines are located adjacent to the
property.
Building and Design Considerations. The building must be fully compliant with Building and Fire Code. As
such, the building must be properly outfitted with fire suppression systems. Hydrant locations and fire
department connections must also be identified in the developer’s civil plans.
Industrial buildings (including self-service storage facilities) must adhere to higher exterior building
material standards (i.e., minimum of 50% Class materials such as brick, stone, or glass). A review of the
architectural requirements will be conducted at time of Site Plan submittal.
If rezoned, the B-3 District requires that buildings be set back 30 feet from the front property line and 20
feet from side and rear property lines. Based on the concept plan, these requirements would be met.
Additional setback details would be verified at time of formal application submittal.
Minimum parking requirements for self-service storage facilities are one space per 8,000 square feet of
indoor storage area plus two visitor spaces per the City of Oakdale Code of Ordinances, Chapter 25, Article
25-10, Division 25-10-300, Sec. 25-10-304. The applicant has stated that there would be approximately
62,400 square feet of net rentable storage space. As a result, ten parking spaces would be required. The
concept plan currently shows seven spaces.
• The site plan must comply with parking requirements.
Park Dedication. As part of the platting and subdivision process, the developer must comply with the
City’s park dedication regulations. The park dedication will involve a cash payment to satisfy the
requirements, as there are no plans to establish a public park on the property. As described in the City’s
Subdivision Ordinance, park dedication payments “...are based on the proportionate need for parkland
and impact on the city park system created by the development and are presumptively proportionate.”
No new parks are planned near the subject property; as a result, a cash payment in lieu of land would be
required. The park dedication payment must be consistent with the City’s adopted Fee Schedule, which
is based on the acreage of commercial/industrial land.
Environmental Considerations. Stormwater management provisions to treat the proposed development
and associated infrastructure must be provided. A proposed stormwater pond is shown on the concept
site plan as being located north of the self-storage facility.
• The developer will need to work closely with the Valley Branch Watershed District and the City
Engineer to ensure stormwater requirements are met and proper stormwater management
provisions are installed.
The eastern half of the site contains several wetlands. As a result, the developer will need to comply with
Valley Branch Watershed District wetland requirements. Additionally, under the City’s current Subdivision
Ordinance, wetland areas and their buffers must be platted as an outlot. The City is currently considering
ordinance amendments that could result in different wetland requirements, including a potential option
for the developer to own the wetland and record easements over it.
• Compliance with wetland requirements must be met.
• It is requested that the City Council provide their feedback on whether a City-owned wetland or
privately owned wetland is preferred.
The property does not contain any Special Flood Hazard Areas or registered Historic Places. There are
numerous existing trees present on the property. A tree preservation plan was received and approved as
part of the standalone grading permit approved earlier this year.
4
• If any additional tree impacts are proposed to accommodate the use, the developer must
demonstrate compliance with the City’s tree preservation and replacement requirements.
## FINANCIAL CONSIDERATIONS
As required by the City’s Ordinance, the developer is responsible for installing all infrastructure that will
serve the development. The developer is not seeking financial assistance from the City for the proposal.
## CITY COUNCIL ACTION REQUESTED
Prior to the developer submitting any formal applications to proceed with the project, it is requested that
the City Council give clear direction to the developer on the appropriateness of the proposed use and set
expectations on the responsibilities of the developer to design and build the proposed development.
It is also requested that the City Council give specific feedback on the favorability of potential requests
for a Comprehensive Plan Amendment, rezoning, and variance.
## Attachments
## Development Checklist
## Developer’s Narrative
## Concept Site Plan and Rendering
## Business Plan Narrative
## Presentation Slides
City of Oakdale ● 1584 Hadley Avenue N, Oakdale, MN 55128
www.oakdalemn.gov ● 651-739-5086
## Development Checklist
## City of Oakdale
6815 55
th
## St N
## Hadley Storage
## Project name Hadley Storage
Proposed use Self-service storage facility
Existing site conditions Vacant; wetlands present
## Site access One proposed access from Hadley Ave N
## Zoning B-4 General Industrial District
## Comprehensive Plan guidance General Industrial
## Is a Comprehensive Plan amendment
required?
## Yes
## Any Zoning approvals anticipated? Comprehensive Plan Amendment, Rezoning,
## Variance, Site Plan
## Any Subdivision approvals anticipated? Yes – Preliminary and Final Plat
## Potential deviations from City Code (if a PUD)? No
Any Variances requested? Yes – variance for 350 ft buffer from residential
Any financial incentives from the City being
requested by the developer?
## No
Will developer seek 4d status? No
Has the developer met with the City’s
Development Review Committee?
## Yes
Has the developer submitted a formal
application?
## No
Any anticipated environmental impacts? Runoff from the use must be addressed through
stormwater management provisions. Tree
replacement requirements must be met. Wetland
areas must be properly protected.
Has the developer met with the Planning
Commission?
## No
Other jurisdiction approvals required Yes, the Valley Branch Watershed District for
stormwater management provisions and wetland
regulations, and the Metropolitan Council for a
Comprehensive Plan Amendment.
## Development Narrative – Hadley Storage
## Development
The subject property presents a unique and highly strategic development opportunity
encompassing approximately 7.5 acres, with approximately 2.2 acres targeted for immediate
development. While the parcel was once part of a larger residential holding, infrastructure
improvements associated with the Hadley Avenue and Highway 36 flyover project completed
between 2018 and 2019 transformed the site into a prime redevelopment candidate. The resulting
remnant parcel is ideally positioned to support a modern, high-quality light industrial and
climate-controlled storage development within a rapidly evolving commercial corridor.
Significant groundwork has already been completed to de-risk the project and accelerate the
development timeline. Detailed wetland delineation and tree survey efforts have been finalized, and
early coordination with the Valley Branch Watershed District has confirmed a clear path forward
regarding environmental considerations and setback requirements. The property also benefits from
established access via Hadley Avenue, with permits secured through Washington County. Much of
the associated access construction was completed under a previously issued City grading permit,
providing a meaningful head start on site development activities.
The proposed development consists of an approximately 84,000-square-foot, three-story
climate-controlled facility designed to maximize site efficiency, accessibility, circulation, and fire
protection. The building layout incorporates organized internal drive aisles and modern operational
features to provide a high-quality experience for tenants while maintaining efficient site functionality.
Architecturally, the project is envisioned as an attractive and durable addition to the community.
The building design incorporates a combination of brick masonry, insulated metal panel systems,
storefront glazing, and insulated garage doors to create a clean, professional appearance that
complements both nearby residential neighborhoods and surrounding commercial development.
The facility will be fully secured with controlled access systems, enhancing both functionality and
peace of mind for occupants.
From an entitlement standpoint, the project is well-positioned to move forward. Plans include
rezoning the property to a Light Industrial designation, which is both appropriate and
forward-looking given the site's location, infrastructure investment, and surrounding development
patterns. A variance will also be pursued to address proximity considerations related to adjacent
R-1 residential zoning. The development team is confident in presenting a strong and
well-supported case demonstrating compatibility with neighboring land uses and consistency with
long-term planning objectives.
With substantial due diligence completed, access improvements already in place, and a clear
development vision established, this project is exceptionally well-positioned for advancement. The
development team is committed to moving efficiently through the approval process, with the goal of
securing site plan approval and completing remaining site improvements during the current
construction season. Upon completion, the project will deliver a timely, high-quality development
that enhances the tax base, provides needed commercial services, and responds to growing
market demand within the area.
963.3
## INVFES
## P
## O
## O
## L
## I
## N
## G
## A
## R
## E
## A
## E
## A
## S
## E
## M
## E
## N
## T
## P
## E
## R
## D
## O
## C
## U
## M
## E
## N
## T
## N
## O
.
3
3
4
1
0
4
## C
## O
## R
## R
## E
## C
## T
## E
## D
## B
## Y
## D
## O
## C
## U
## M
## E
## N
## T
## N
## O
.
3
3
5
0
8
2
## P
## A
## R
## C
## E
## L
9
## M
## I
## N
## N
## E
## S
## O
## T
## A
## D
## E
## P
## A
## R
## T
## M
## E
## N
## T
## O
## F
## T
## R
## A
## N
## S
## P
## O
## R
## T
## A
## T
## I
## O
## N
## R
## I
## G
## H
## T
## O
## F
## W
## A
## Y
## P
## L
## A
## T
## N
## O
.
8
2
-
1
4
6
(
## E
## X
## C
## E
## P
## T
## I
## O
## N
)
## U
## N
## D
## E
## R
## G
## R
## O
## U
## N
## D
## C
## E
## N
## T
## U
## R
## Y
## L
## I
## N
## K
## L
## I
## N
## E
## PID: 06-029-21-41-0001
## TRANS
963.7
965.8
965.0
## FL
## 964.7INV RCP
## 965.0INV RCP
## UFO VAULT
## UE VAULT
## E
## X
## I
## S
## T
## I
## N
## G
## B
## U
## I
## L
## D
## I
## N
## G
981.1
981.0
982.0
977.1
982.6
983.7
## Δ
=
3
1
°
0
9
'
1
7
"
## R
=
1
8
3
4
.
8
6
9
9
7
.
7
1
(
## S
1
°
3
9
'
3
8
"
## E
## D
## E
## S
## C
)
(
## S
1
°
3
9
'
3
8
"
## E
## D
## E
## S
## C
)
(
## S
8
9
°
5
4
'
1
3
"
## E
## D
## E
## S
## C
)
(
## N
1
°
3
9
'
3
8
"
## W
## D
## E
## S
## C
)
3000
989.01
## CHK9001
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## W
## B
## R-1
2
5
.
0
'
3
5
0
## FT
2
5
3
## F
## T
## FOOTPRINT
## 26,000 SF
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
## B
## L
## D
## S
## B
1
8
0
.
0
0
1
4
4
.
98
1
4
4
.
98
1
8
0
.
0
0
EXISTING STORM SEWEREXISTING WATER MAINEXISTING CATCH BASINEXISTING HYDRANTEXISTING WATER VALVEEXISTING SIGNEXISTING CONCRETE SURFACEEXISTING BITUMINOUS SURFACEEXISTING EXISTING SPOT ELEVATIONEXISTING STORM SEWER APRONEXISTING ELECTRICAL BOXEXISTING CONTOURSEXISTING SANITARY SEWER MANHOLE
## X 952.36
## S
## EXISTING SANITARY SEWEREXISTING SANITARY FORCEMAIN
## FM
## EXISTING LIGHT POLE
## LEGEND
## EXISTING FIBER OPTIC BOXEXISTING RETAINING WALLEXISTING SANITARY SEWER MANHOLE
## D
## EXISTING UNDERGROUND ELECTRICEXISTING UNDERGROUND GAS
## E
## GAS
## EXISTING TELEPHONE
## TEL
## PROPOSED WETLAND BUFFER
## WB
## S:\PLOWE\CAD\26PROJ\2236 MINI STORAGE (OAKDALE)\223
## 6 CAD\2236 BASE 5.DWG
Wednesday, June 17, 2026 12:34:36 PM
(24" x 36")
## NORTH
## 1 INCH = 30 FEET
## HORIZONTAL
30
0
15
30
60
## FAX: (651) 361-8701
## PHONE: (651) 361-8210
## LINO LAKES, MN 55014
## 6776 LAKE DRIVE
## SUITE 110
## SITE PLANNING
## & ENGINEERING
## PLOWE
## ENGINEERING, INC.
## PREPARED FOR: P-4 PROPERTIES, LLC
## 6695 55TH ST N
## OAKDALE, MN
1
2
4
5
6
7
8
3
## MQA
## AG
## CHECK BY:
## DRAWN BY:
23-2131
## DATE:
## JOB NO:
06/26/25
## DESCRIPTIONDATENO.
## SHEET
## C1.1
Date: License No. 43963
## ADAM GINKEL
06.17.2026
I hereby certify that this plan was prepared by me
or under my direct supervision and that I am a duly
licensed professional engineer under the laws of
the State of Minnesota.
## SITE PLAN
## PRELIMINARY
23−2131
## R
Know what's
## DELINEATED WETLAND EDGE
## 25-FT WIDE WETLAND BUFFER
## STORMWATER
## POND
## Hadley Storage
## Business Plan for City Review
## Prepared for: City of Oakdale Planning Commission and City Council
## Prepared by: Tom Mulcahy
June 2026
## Executive Summary
Hadley Storage is a proposed three-story, climate-controlled self-storage facility located near the Hadley
Avenue and Highway 36 interchange in Oakdale, Minnesota. The project will redevelop an underutilized site
into a high-quality commercial development serving residents and businesses throughout the area.
## Project Description
The proposed development consists of approximately 78,000 gross square feet and approximately 62,400
net rentable square feet of climate-controlled storage space. The facility will include a rental office, secure
loading area, elevator access, modern architectural finishes, and professionally landscaped grounds.
## Market Need
A market feasibility study determined that existing competing facilities in the market area generally maintain
occupancies exceeding 90 percent and that demand exists for additional climate-controlled storage and
medium-sized units within the Oakdale market.
## Economic Benefits
The project will expand Oakdale's commercial tax base, create permanent management and maintenance
positions, generate construction employment, and redevelop a remnant parcel created by public
infrastructure improvements.
## Operations
The facility will operate with controlled access, video surveillance, professional management, online leasing
capability, and limited daily customer traffic. Self-storage facilities are recognized as low-traffic, low-noise
land uses compatible with surrounding commercial and industrial development.
## Community Compatibility
The project has been designed to complement nearby commercial uses with attractive architecture,
landscaping, lighting, and high-quality building materials. The development will improve the visual
appearance of the site and support long-term economic growth.
## Development Schedule
Upon receiving municipal approvals, final engineering and construction documents will be completed,
followed by permitting and construction. Estimated construction duration is approximately 12 months.
## Conclusion
Based upon market analysis, demographics, and strong occupancy levels within existing facilities, Hadley
Storage is well positioned to successfully serve Oakdale and surrounding communities while providing
long-term economic benefits.
## City Council Workshop
## Meeting
July 14, 2026
## Hadley Storage –Concept Plan
## Concept
## Site Plan
## Rendering
## COUNCIL MEMORANDUM
## To: Honorable Mayor and City Council
## From: Kelli Bourgeois, City Administrator
Date: July 14, 2026
Subject: Police Expansion and City Hall Remodel Budget and Value Engineering
## BACKGROUND
The City contracted with BKV Group for architectural services and Kraus-Anderson Construction (KA)
as Construction Manager at Risk under MN Statute 471.63 for the Police Expansion and City Hall
Remodel Project.
The project team has completed additional value engineering (VE) resulting in more than $1 million
in reductions, with further VE savings listed below for review.
Construction mobilization began June 1, 2026, building demolition is currently under way, and utility
work will begin within the next week.
## ADDITIONAL VALUE ENGINEERING CONCEPTS TO REVIEW
As discussed previously, funding gaps remain and additional value engineering and funding source
identification are in process. The contractor, owner’s representative, and architects have identified
the following possible value engineering options to reduce the overall budget:
1. Replace quartz countertops in non-public areas with other solid surface countertops
($50,000 potential savings)
2. Remove the interior brick from the North lobby entrance ($35,000 potential savings)
3. Reduce the amount of ceiling clouds throughout the building (potential savings TBD)
4. Reduce the total number of site lighting bollards by one third ($50,000 potential savings)
5. Reduce the size and/or number of plantings in the landscape beds ($75,000 potential
savings)
6. Use an alternate material for the memorial wall and benches ($100,000 potential savings)
In addition to the above value engineering options, staff is working to reduce the Audio Visual bid
amount and will bring a revised proposed plan and amount to City Council at the next workshop.
## COUNCIL DIRECTION REQUESTED
Staff seeks guidance and Council intent on which value engineering options to move forward with
and where the tree sculpture should be located.
## Attachments
## Countertop Plan Sheets
## Photo of North Lobby Brick
## Cloud Ceiling Plan Sheets
## Site Lighting Bollards Plan Sheet
## DN
## UP
## UP
## UP
## DN
## D
## W
## DN
## DN
## DN
## FEC-2
## FEC-2
## FEC-1
## FEC
-
1
## DN
## MEETING ROOM
185
## MAILROOM
188
## COPY / WORKROOM
187
## COMM. DEV.
## DIRECTOR
184
## PLANNING
## MANAGER
183
## CHIEF. BLDG. OFF.
182
## ASSIST. BLDG. OFF.
181
## CITY ENGINEER
180
## FINANCE DIRECTOR
177
## ASSIST. FIN.
## DIRECTOR
176
## CONF. ROOM
171
## MUDROOM
172
## MENS RR
163
## WOMENS RR
165
## BREAKROOM
137
## CONF. ROOM
139
## PUBLIC RR
140
## PUBLIC RR
141
## PUBLIC RR
142
## SOFT INTERV
145
## SOFT INTERV
144
## SOFT INTERV
143
## MENS LOCKERS
134
## OUTREACH
## STORAGE
159
## STORAGE
197
## RIFLES
113
## WEAPON CLEANING
147
## ARMORY
148
## ARCHIVE
196
## LONG-TERM
152
## VAULT
150
## VAULT
151
## EVIDENCE STORAGE
149
## POLICE LOBBY
102
## CONF. ROOM
103
## OFFICE
104
## OFFICE
105
## OFFICE
106
## OFFICE
107
## OFFICE
108
## MEETING RM
110
## WELLNESS
109
## WORK AREA
156
## OFFICE
154
## ELECTRICAL
111
## OFFICE
161
## RR
157
## RR
158
## DATA
162
## EVIDENCE
## PROCESSING
132
## EVIDENCE INTAKE
133
## DECON RR
114
## ELEVATOR 2
## E2-1
## JANITOR
131
## INTAKE
115
## HARD INTERVIEW
116
## HARD INTERVIEW
117
## JAN
118
## EVIDENCE GARAGE
123
## K9
124
## SWAT
126
## FIELD FORCE
125
## PARKING
120
## ELEVATOR 1
## E1-1
## VESTIBULE
100
## CONF. ROOM
186
## PHONE
170
## PERSONNEL FILE
## STORAGE
174
## CONF. ROOM
179
## DRONE
160
## LAUNDRY
146
## STORAGE
155
## ELEC.
166
## STAIR D
## SD-1
## STAIR E
## SE-1
## STAIR C
## SC-1
## STAIR A
## SA-1
## STAIR B
## SB-1
## PUBLIC LOBBY
101
## RR
119
## MUDROOM
112
## WOMENS LOCKERS
135
## ELEVATOR 3
## E3-1
## ELEV ROOM
169
## VESTIBULE
167
## OPEN OFFICE
153
## COPY / PRINT
191
## OPEN OFFICE
190
## OPEN OFFICE
189
## OPEN COLLAB.
173
## DUTY BAGS
130
## COMM. MANAGER
175
## WATER ROOM
127
## EVIDENCE GARAGE
122
## SUMP
129
## JANITOR
138
## MENS RR
194
## WOMENS RR
195
## EXIT CORRIDOR
198
## WELLNESS
168
## PHONE
178
## CORRIDOR
136
## CH CORRIDOR
193
## OPEN COLLAB.
192
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
## 6/1/2026 1:33:33 PM
## CO
## KN / MH
2730.01
## I101
## LEVEL 1 FINISH
## PLAN
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## I101
3/32" = 1'-0"
1
## LEVEL 1 -FINISH PLAN -OVERALL
## INTERIOR FINISH PLAN GENERAL NOTES
## 1. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXTENTS OF FLOOR FINISHES PRIOR TO
## INSTALLATION AND COORDINATE WITH FLOOR CONTRACTOR(S). VERIFY AREAS OPEN UNDER
## COUNTERS. (EXAMPLE -SINK CABINETS WITH REMOVEABLE BASE, OPEN SPACES BETWEEN BASE
## CABINETS, ETC.)
## 2. FLAME SPREAD RATINGS FOR ALL METERIALS SHALL CONFORM TO APPLICABLE REGULATORY
## CODES.
## 3. GOODS SUPPLIED FROM MORE THAN ONE DYE LOT MUST NOT BE SEAMED ADJACENT TO ONE
## ANOTHER OR INSTALLED IN THE SAME AREA.
## 4. SUBMIT DRAW-DOWNS AND SAMPLES OF ALL FINISHES FOR APPROVAL PRIOR TO APPLICATION.
## 5. SUBMIT FLOOR FINISH INSTALLATION PLAN(S) FOR APPROVAL PRIOR TO APPLICATION.
## 6. FLOOR SURFACE PREPARATION: CLEAN SURFACES TO BE COVERED. FILL AND SMOOTH ALL
## CRACKS, UNEVEN, AND/OR ROUGH SURFACES IN SUBSTRATE WHERE FLOOR COVERING IS TO BE
## INSTALLED, PRIOR TO INSTALLING FLOOR COVERING. LEVEL FLOOR IS DEFINED AS A FLOOR AREA
## NOT VARYING MORE THAN 1/4" WITHIN A 10'-0" RADIUS. JOINTS IN BASE SHALL NOT OCCUR CLOSER
## THAN 6" FROM CORNER AND SHALL BE BUTTED TIGHTLY TOGETHER.
## 7. FINISH TRANSITIONS BETWEEN FLOOR FINISHES TO BE AT THE CENTER OF CLOSED DOORS,
## UNLESS NOTED OTHERWISE.
## 8. ALL NEW ELECTRICAL/DATA OUTLETS TO BE GRAY WITH STAINLESS STEEL FACE PLATES UNLESS
## NOTED OTHERWISE.
## 9. ALL WALLS TO RECEIVE PTL-‘X’UNLESS NOTED OTHERWISE.
## 10. ALL ACCESS PANELS, METAL GRILLES, AND CABINET UNIT HEATERS (OR SIMILAR ITEMS) TO BE
## SELECTED FROM MANUFACTURER’S STANDARD FINISH OPTIONS UNLESS NOTED OTHERWISE.
## 11. ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED PTM-‘X’, UNLESS NOTED OTHERWISE.
## 12. ALL GYPSUM BOARD CEILINGS TO BE CEILING PTL-‘X’, UNLESS NOTED OTHERWISE.
## 13. ALL WOOD DOORS TO MATCH WD-‘X’.
## 14. ELEVATOR FLOORING TO BE ‘XX’.
## 15. WHEN SOFFIT DEPTH FROM WALL IS GREATER THAN 1’-0”, PAINT FACE OF SOFFIT WALL COLOR AND
## UNDERSIDE OF SOFFIT CEILING COLOR; WHEN SOFFIT IS LESS THAN OR EQUAL TO 1’-0”IN DEPTH
## FROM WALL, PAINT FACE AND BOTTOM OF SOFFIT SAME AS WALL COLOR. UNLESS NOTED
## OTHERWISE.
## 16. REFER TO MATERIAL ID LIST FOR ADDITIONAL FINISH INFORMATION.
## 17. REFER TO INTERIOR ROOM FINISH SCHEDULE FOR ROOM FINISH INFORMATION.
## 18. REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES, HEIGHTS, AND OTHER RELATED
## INFORMATION.
## 19. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL MATERIAL CALL-OUTS.
## 20. PROVIDE FINISHED END PANELS AT ALL EXPOSED CASEWORK ENDS U.N.O.
## B
## A
## C
## REVISION #DATEDESCRIPTION
## 01/23/2026 BID PACKAGE #1
## 03/31/2026 CONTRACT SET
## 706/04/2026 CONFORMED SET
## Paul Michell
## License Number
## Date
61543
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Architect under the laws of the
state of Minnesota
06/04/2026
## UP
## UP
## DN
## FEC-1
## FEC
-
1
## FEC-1
## FEC-1
## FEC
-
1
## HR LOBBY
243
## HR DIRECTOR
244
## ADMIN DIRECTOR
241
## CITY CLERK
240
## CONF. ROOM
239
## CITY
## ADMINISTRATOR
238
## WORKROOM
234
## COUNCIL
## WORKROOM
246
## STAFF RR
248
## STAFF RR
249
## SESSIONS / EOC
202
## COUNCIL
## CHAMBERS
201
## AV / PRODUCTION
## ROOM
245
## STORAGE
247
## CONF. ROOM
203
## IT OFFICE
227
## SHOWER
255
## SHOWER
254
## DMARC
229
## LOCKER ALCOVE
256
## FITNESS
226
## MECHANICAL
225
## MEN PUBLIC RR
205
## WOMEN PUBLIC RR
206
## SIMULATOR
257
## MAT ROOM
277
## FACILITIES
## WORKSHOP
250
## ELECTRICAL
278
## GENERAL STORAGE
253
## STORAGE
221
## BREAK ROOM
217
## TERRACE
218
## CASE MANAGEMENT
268
## STORAGE
267
## DRONE
## SURVEILLANCE
266
## QUARTER MASTER
261
## RR
273
## RR
272
## QUIET RM
259
## DATA
262
## EXPLORERS
## STORAGE
274
## OFFICE
207
## OFFICE
208
## OFFICE
209
## OFFICE
210
## OFFICE
211
## SOCIAL WORKER
212
## OFFICE
213
## OFFICE
214
## OFFICE
215
## REPORTS
219
## REPORTS
220
## ASSIST. CITY
## ADMINISTRATOR
236
## PHONE
233
## ELEC
237
## STORAGE
279
## JANITOR
252
## MEETING ROOM
204
## QUIET RM
260
## DIGITAL LAB
265
## STORAGE
258
## STORAGE
263
## IT STORAGE
228
## RR
271
## OPEN COLLAB.
242
## BRIEFING RM
223
## OPEN OFFICE
276
## PHONE
231
## COFFEE
232
## PARKING
## GARAGE ROOF
## PATROL
224
## COLLAB
275
## PD CORRIDOR
222
## OPEN OFFICE
269
## COPY
264
## COLLAB
270
## OPEN OFFICE
235
## CORRIDOR
230
## STORAGE
251
## UPPER PUBLIC
## LOBBY
200
## OPEN COLLAB
216
## ELEVATOR 3
## E3-2
## STAIR A
## SA-2
## STAIR B
## SB-2
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
## 6/1/2026 1:33:52 PM
## CO
## KN / MH
2730.01
## I102
## LEVEL 2 FINISH
## PLAN
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## INTERIOR FINISH PLAN GENERAL NOTES
## 1. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXTENTS OF FLOOR FINISHES PRIOR TO
## INSTALLATION AND COORDINATE WITH FLOOR CONTRACTOR(S). VERIFY AREAS OPEN UNDER
## COUNTERS. (EXAMPLE -SINK CABINETS WITH REMOVEABLE BASE, OPEN SPACES BETWEEN BASE
## CABINETS, ETC.)
## 2. FLAME SPREAD RATINGS FOR ALL METERIALS SHALL CONFORM TO APPLICABLE REGULATORY
## CODES.
## 3. GOODS SUPPLIED FROM MORE THAN ONE DYE LOT MUST NOT BE SEAMED ADJACENT TO ONE
## ANOTHER OR INSTALLED IN THE SAME AREA.
## 4. SUBMIT DRAW-DOWNS AND SAMPLES OF ALL FINISHES FOR APPROVAL PRIOR TO APPLICATION.
## 5. SUBMIT FLOOR FINISH INSTALLATION PLAN(S) FOR APPROVAL PRIOR TO APPLICATION.
## 6. FLOOR SURFACE PREPARATION: CLEAN SURFACES TO BE COVERED. FILL AND SMOOTH ALL
## CRACKS, UNEVEN, AND/OR ROUGH SURFACES IN SUBSTRATE WHERE FLOOR COVERING IS TO BE
## INSTALLED, PRIOR TO INSTALLING FLOOR COVERING. LEVEL FLOOR IS DEFINED AS A FLOOR AREA
## NOT VARYING MORE THAN 1/4" WITHIN A 10'-0" RADIUS. JOINTS IN BASE SHALL NOT OCCUR CLOSER
## THAN 6" FROM CORNER AND SHALL BE BUTTED TIGHTLY TOGETHER.
## 7. FINISH TRANSITIONS BETWEEN FLOOR FINISHES TO BE AT THE CENTER OF CLOSED DOORS,
## UNLESS NOTED OTHERWISE.
## 8. ALL NEW ELECTRICAL/DATA OUTLETS TO BE GRAY WITH STAINLESS STEEL FACE PLATES UNLESS
## NOTED OTHERWISE.
## 9. ALL WALLS TO RECEIVE PTL-‘X’UNLESS NOTED OTHERWISE.
## 10. ALL ACCESS PANELS, METAL GRILLES, AND CABINET UNIT HEATERS (OR SIMILAR ITEMS) TO BE
## SELECTED FROM MANUFACTURER’S STANDARD FINISH OPTIONS UNLESS NOTED OTHERWISE.
## 11. ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED PTM-‘X’, UNLESS NOTED OTHERWISE.
## 12. ALL GYPSUM BOARD CEILINGS TO BE CEILING PTL-‘X’, UNLESS NOTED OTHERWISE.
## 13. ALL WOOD DOORS TO MATCH WD-‘X’.
## 14. ELEVATOR FLOORING TO BE ‘XX’.
## 15. WHEN SOFFIT DEPTH FROM WALL IS GREATER THAN 1’-0”, PAINT FACE OF SOFFIT WALL COLOR AND
## UNDERSIDE OF SOFFIT CEILING COLOR; WHEN SOFFIT IS LESS THAN OR EQUAL TO 1’-0”IN DEPTH
## FROM WALL, PAINT FACE AND BOTTOM OF SOFFIT SAME AS WALL COLOR. UNLESS NOTED
## OTHERWISE.
## 16. REFER TO MATERIAL ID LIST FOR ADDITIONAL FINISH INFORMATION.
## 17. REFER TO INTERIOR ROOM FINISH SCHEDULE FOR ROOM FINISH INFORMATION.
## 18. REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES, HEIGHTS, AND OTHER RELATED
## INFORMATION.
## 19. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL MATERIAL CALL-OUTS.
## 20. PROVIDE FINISHED END PANELS AT ALL EXPOSED CASEWORK ENDS U.N.O.
## I102
3/32" = 1'-0"
1
## LEVEL 2 -FINISH PLAN
## B
## A
## C
## REVISION #DATEDESCRIPTION
## 01/23/2026 BID PACKAGE #1
## 03/31/2026 CONTRACT SET
## 706/04/2026 CONFORMED SET
## Paul Michell
## License Number
## Date
61543
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Architect under the laws of the
state of Minnesota
06/04/2026
## G
## H
## K
## A162
2.7
2.7
1.8
1.8
## COUNCIL
## WORKROOM
246
## COUNCIL
## CHAMBERS
201
20' - 6"
## J
## 201C
## 245A
246
## 201A
17' - 3"
10' - 9"
## SB4
## SB4
## SB4
2
## SB4
## A162
6
## A162
14
1
## A553
## 201B
## SF-201
## SF-16
## SF-15
## SF-15SF-16SF-15SF-16
## SF-15SF-16SF-15
## A26
## G.9
4.09
4.09
1
## A556
2
## A556
33' - 6"
6
## A556
1
"
/
1
'
-0
"
1" / 1'-0"
12' - 0"
## DN
## DN
## 201D
## A162
8
## A162
9
## A162
15
7
## A162
10
## A162
11
## A162
5
## A162
4
3
## A162
5
12
## T4
## T4
1' - 8 1/4"2' - 0"2' - 0"4' - 0"2' - 0"2' - 0"2' - 0"4' - 0"4' - 0"2' - 0"4' - 0"2' - 0"2' - 0"2' - 0"4' - 0"2' - 0"2' - 0"
1051' - 4"
1052' - 4"
14' - 7"
1051' - 4"
1052' - 4"
## T4
## 31' - 8" FIN
## S4
## S4
## T4
## S4
## S4
1
4
'
-
0
"
1
2
'
-
3
"
1
1
'
-
5
"
1
0
'
-
9
"
1
' -
2"
2' - 1"
4' - 4"
2' - 11"
2' - 1"
3' - 6"
6' - 11"
2' - 11"
1
' -
2"
3' - 6"
8
'
-
9
"
1
9
'
-
0
"
4
4
4
4
4
2' - 11"
3' - 2"
2' - 11"
4' - 2"
21' - 0"
5
5
3
' -
6"
1
2' - 0
"
5
## A50
## A50
## A50
## A50
5
5
5
5
1' - 4"
4' - 0"1' - 6"1' - 6"1' - 6"
2' - 10"
4"
## OPEN
## COUNTERTOP &
## BACKSPLASH, SSQ-1
## OPEN CUBBIES, PLAM-1,
## ALL SIDES
## VINYL BASE, RB-1
14
## A820
1
## A820
## PLAM-1 SHELVES
## W/ STAINLESS
## STEEL COAT ROD
5' - 0"
11
## A821
2' - 0"3' - 0"
11
## A821
4' - 0"
## WALL PANELING, PNLG-1
## WDB-1, WOOD BASE
## PAINTED GYP. BD, PT-9
## WALLCOVERING, WRAP
## COLUMN WALLS, WC-9
4
## WALL PANELING,
## PNLG-1
## ACOUSTIC
## WALLCOVERING, WC-1
## BACK WALL OF
## BANQUETTE NICHE
## ACOUSTIC WALLCOVERING,
## WRAPPED ON UPPER SOFFIT, WC-2
5
## A821
## BANQ-1, BUILT-IN SEATINGBASE, MT-1
## PAINTED GYP BD., PT-9,
## ON SIDES OF NICHE AND
## UNDERSIDE OF SOFFIT
## WDB-1, WOOD WALL
## BASE, TYP.
## EQ31' - 8"EQ
4
## WD-1 WRAPPED
## PODIUM
## SSQ-2,
## COUNTERTOP
## WDB-1, WOOD BASE
3' - 6"
3' - 5"
4"2' - 8"4"3' - 0"4"
2' - 6"
3' - 6"
## HIDDEN CASTERS
5
## A823
6
## A823
4
4
6"
3' - 0"
5
## FLUSH PANEL STORAGE
## DOOR, PULL-1
5
## WD-1 WRAPPED
## PODIUM
## SSQ-2,
## COUNTERTOP
## WDB-1,
## WOOD BASE
1' - 0"
2' - 6"
3' - 6"
## HIDDEN CASTERS
## IN BASE
1/2"
1/2"
2' - 1 1/2"
4"
5
## A823
4
4
4
## OPEN TO BACK HALL
## CUSTOM METAL LOGO
## SIGN, BLACK, BACKLIT,
## CENTERED BEHIND DAIS
## TV2TV2
## CEILING MOUNTED
## TVS BY OWNER
## CEILING MOUNTED
## TVS BY OWNER
7' - 6"
## WALL PANELING, PNLG-1,
## ALONG CURVED WALL
## WDB-1, WOOD BASE,
## ALONG CURVED WALL
## RAMP LOCATION, SEE PLAN
4
## A823
7
5
## METAL HANDRAIL & GUARDRAIL, SEE DETAIL
5
## WD-1 WRAPPED
## BALLISTIC WALL
## SSQ-2,
## COUNTERTOP,
## MONITORS &
## POWER TO BE
## INTEGRATED
## WDB-1, TYP.
## WD-1 WRAPPED
## BALLISTIC WALL
## WD-1 WRAPPED
## BALLISTIC WALL
## SSQ-2,
## COUNTERTOPS,
## POWER TO BE
## INTEGRATED
## WDB-1, TYP.
## WD-1 WRAPPED
## MOVABLE PODIUM
## SSQ-2, COUNTERTOPS
## SSQ-2,
## COUNTERTOPS
## INTEGRATED
## MONITOR SHELF,
## WD-1
## STEPS BEYOND
## STEPS
## BEYOND
## STORAGE DOOR
## OUTLET
## SSQ-2,
## COUNTERTOPS
## WDB-1, TYP.
## WD-1 WRAPPED
## PODIUM
## SSQ-2,
## COUNTERTOP
## WDB-1, WOOD BASE
## HIDDEN CASTERS
## IN BASE
3' - 6"
4"
2' - 8"
6"
4
4
1/2"
1/2"
5
## WD-1 WRAPPED
## PODIUM
## SSQ-2,
## COUNTERTOP
## WDB-1,
## WOOD BASE
## HIDDEN CASTERS
## IN BASE
1' - 0"
2' - 6"
3' - 6"
4
4
4
6"
6"
5
6"
2' - 2"
4"
3' - 0"
1/2"
2' - 6"
6"9' - 2"6"
10' - 2"
10' - 4"
8"9' - 0"8"
## WD-1 WRAPPED BALLISTIC WALL
## SSQ-2, COUNTERTOP
## WDB-1, WOOD BASE
3
## A823
4
4
## IN-WALL CANTILEVER STEEL
## SUPPORTS AS REQUIRED.
5
3' - 0"
1/2"
2' - 11"
2' - 9"
## WD-1 WRAPPED BALLISTIC WALL
## SSQ-2, COUNTERTOP
## WDB-1, WOOD BASE
4
## A823
4
4
5
10' - 2"
10' - 4"
3' - 0"
## WD-1 WRAPPED
## BALLISTIC WALL
## SSQ-2,
## COUNTERTOP
## WDB-1,
## WOOD BASE
3
## A823
4
1
## A823
## SSQ-2 COUNTERTOPS
## WD-1 PANEL
## WDB-1, WOOD BASE
1/2"
3' - 7 1/2"
4"
4' - 0"
4
4
5
1
## A823
## SSQ-2 COUNTERTOPS
## WD-1 PANEL
## WDB-1, WOOD BASE
3' - 0"
4 1/2"
2' - 1 1/2"
2' - 6"
1/2"
2' - 7 1/2"
4"
2
## A823
2
## A823
4
4
## MONITOR SHELF, WD-1
5
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
6/4/2026 12:01:47
## Author
## Checker
2730.01
## A162
## LEVEL 2 -
## ENLARGED
## PLANS AND
## ELEVATIONS
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## A162
1/4" = 1'-0"
1
## LEVEL 2 CH COUNCIL CHAMBERS
## A162
3/8" = 1'-0"
2
## COUNCIL WORKROOM 246 -EAST
## A162
3/8" = 1'-0"
6
## COUNCIL CHAMBERS 201 -EAST
## A162
3/8" = 1'-0"
14
## COUNCIL CHAMBERS 201 -NORTH
## KEYNOTES - ARCHITECTURAL
## A26STRUCTURAL COLUMN, PAINTED PT-8, TYP.
## A50DASHED LINES INDICATES LOCATIONS OF BALLISTIC MATERIAL WITHIN MILLWORK. SEE DETAILS
## AND SPECS FOR MORE INFORMATION.
## REVISION #DATEDESCRIPTION
## 03/31/2026CONTRACT SET
## 404/22/2026BP2 - ADD #1
## 54/29/2026BP2 - ADD #2
## 706/04/2026CONFORMED SET
## A162
3/8" = 1'-0"
8
## MOVABLE PODIUM -EAST
## A162
3/8" = 1'-0"
9
## MOVABLE PODIUM -WEST
## A162
3/8" = 1'-0"
15
## COUNCIL CHAMBERS 201 -EAST B
## A162
13
## COUNCIL CHAMBERS DAIS -3D FOR REF.
## A162
3/8" = 1'-0"
10
## MOVABLE PODIUM -SOUTH
## A162
3/8" = 1'-0"
11
## MOVABLE PODIUM -NORTH
## A162
3/8" = 1'-0"
4
## STAFF DAIS -NORTH TYP.
## A162
3/8" = 1'-0"
5
## STAFF DAIS -SIDE TYP.
## A162
3/8" = 1'-0"
3
## STAFF DAIS -SOUTH TYP.
## A162
3/8" = 1'-0"
7
## COUNCIL DAIS -EAST
## A162
3/8" = 1'-0"
12
## COUNCIL DAIS -WEST
4
4
4
4
4
4
4
5
5
5
## Change to Wilsonart, Slate Velvet 15507,
## Ultra Matte Finish
## Change to Wilsonart, Slate Velvet 15507,
## Ultra Matte Finish
## FEC-1
## REFLECTED CEILING PLAN LEGEND
## ACT-1
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 24"
## GYP-1
## : GYPSUM BOARD CEILING
## SLAT-1
## : WOOD-LOOK PLANK CEILING SYSTEM
## EXP
## : EXPOSED CEILING, ALL MECH/ELECT.
## COMPONENTS PAINTED, SEE PLAN & MATERIAL ID FOR
## DETAILS
## GYP-2
## : GYPSUM BOARD CEILING
## (1-HR FIRE RATED ASSEMBLY)
## ACT-2
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 48"
## ACT-5
: LAY-IN TECTUM CEILING PANEL, 24" x 24"
123
## E
## F
## G
45
## E.1
## F.1
1.1
4.1
678
## F.5
## F.8
9
## F.2
## G.1
4.9
0.10
## H
## K
## NN
## AA1
## AA3
## JJ
2.71.8
0.70.11
## J
## A702
4
## OPEN
## ABOVE
## OPEN
## ABOVE
## MEETING ROOM
185
## MAILROOM
188
## COPY / WORKROOM
187
## COMM. DEV.
## DIRECTOR
184
## PLANNING
## MANAGER
183
## CHIEF. BLDG. OFF.
182
## ASSIST. BLDG. OFF.
181
## CITY ENGINEER
180
## FINANCE DIRECTOR
177
## ASSIST. FIN.
## DIRECTOR
176
## CONF. ROOM
171
## MUDROOM
172
## MENS RR
163
## WOMENS RR
165
## BREAKROOM
137
## CONF. ROOM
139
## PUBLIC RR
140
## POLICE LOBBY
102
## OFFICE
104
## ELEVATOR 1
## E1-1
## VESTIBULE
100
## CONF. ROOM
186
## PHONE
170
## PHONE
178
## PERSONNEL FILE
## STORAGE
174
## CONF. ROOM
179
## ELEC.
166
## STAIR C
## SC-1
## STAIR A
## SA-1
## STAIR B
## SB-1
## ELEVATOR 3
## E3-1
## ELEV ROOM
169
## VESTIBULE
167
## OPEN OFFICE
190
5' - 9"
14' - 4"
63' - 0"
10' - 5"
63' - 0"9' - 4"
5' - 0"16' - 8"17' - 7 31/256"
16' - 8"
17' - 0"17' - 0"18' - 3 3/4"
52' - 3 3/4"
19' - 2"
17' - 2 1/4"
18' - 6 3/4"
54' - 11"
72' - 4"
3
0
'
-
0
"
8
'
-
0
"
## OPEN OFFICE
189
## COMM. MANAGER
175
## OPEN COLLAB.
173
## OPEN COLLAB.
192
## JANITOR
138
## CH CORRIDOR
193
9' -6"
## ACT-1
9' -6"
## ACT-1
9' -0"
## GYP-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
10' -0"
## ACT-2
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
8' - 6"
## ACT-1
8' - 6"
## ACT-1
10' -0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
10' -0"
## ACT-1
9' - 6"
## GYP-1
9' - 6"
## GYP-1
## SUMP
129
9' - 0"
## GYP-1
## PUBLIC LOBBY
101
8' - 6"
## ACT-1
8' - 6"
## GYP-1
8' - 6"
## GYP-1
7' - 2"
## GYP-1
1.6
## G.9
4.09
1
## A558
6
## A605
4
## A605
7
## A605
12
## A605
7
## A605
9
## A605
7
## A605
7
## A605
12
## A605
7
## A605
12
## A605
4
## A605
7
## A605
4
## A605
## C08
## C08
## C08
## C04
## C04
9' - 6"
## GYP-1
9' - 6"
9' - 6"
## GYP-1
9' - 6"
## C08
9' - 6"
## C08
## C08
8' - 6"
## GYP-1
2' - 6"2' - 6"
## WELLNESS
168
1' - 0"
1' - 0"
2' - 0"
2' - 0"
1' - 10 49/256"
2
'
-
0
"
## ALIGN
3' - 0"
3' - 0"
3' - 0"
3' - 0"
## ALIGN
## ALIGN
## ALIGN
## ALIGN
2' - 6"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
## ALIGN
3' - 0"
3' - 0"
3' - 0"
## ALIGN
## ALIGN
3' - 0"2' - 0"
6"
## ALIGN
5' - 5"
## ALIGN
4' - 0"
1' - 6"
7
## A605
## C01
## C01
## C01
## C01
## C01
## C01
6
## A605
9' - 0"
## ACT-1
6
## A605
## C10
9' - 6"
## GYP-1
## WC-9WC-9
5
5
11
## A620
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
6/4/2026 15:34:50
## CO
## KN / MH
2730.01
## A301A
## LEVEL 1 -
## REFLECTED
## CEILING PLAN -
## AREA A
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## KEYNOTES - REFLECTED CEILING PLAN
## C01PENDANTS IN EXPOSED VOLUME TO BE HUNG AT 9'-0" AFF FROM THE BOTTOM OF THE
## FIXTURE TO ALIGN WITH ADJACENT FLOATING ACT-# CEILING CLOUD.
## C04EXISTING CEILING CONDITIONS & EQUIPMENT TO REMAIN
## C08GYP. CEILING CONTROL JOINT, TYP.
## C10PENDANT CENTERED ON ACT TILE. SEE ELEVATION FOR MOUNTING HEIGHT.
## A301A
1/8" = 1'-0"
1
## LEVEL 1 -RCP -AREA A
## GENERAL RCP NOTES
## 1. DO NOT SCALE DRAWINGS
## 2. LOCATION OF DEVICES AND EQUIPMENT SHOWN ON DRAWINGS OF OTHER DISCIPLINES ARE
## SCHEMATIC AND GENERAL. SPECIFIC LOCATIONS OR GUIDELINES INDICATED ON THE
## ARCHITECTURAL DRAWINGS SHALL GOVERN THE LOCATION OF EXPOSED WORK OF ALL TRADES.
## 3. INSTALL SPRINKLER HEADS, SMOKE ALARMS, LIGHT FIXTURES AND OTHER EXPOSED
## FIXTURES/DEVICES AT CENTER OF ACOUSTICAL TILE (WHERE OCCURS), AT CENTER OF SOFFIT
## (WHERE OCCURS), OR AT CENTER OF ROOM, UNO. IF DIMENSION TO LOCATE A SPECIFIC DEVICE IS
## GIVEN IN ONE DIRECTION, CONTRACTOR TO CENTER THE DEVICE ON CEILING OR SOFFIT IN OTHER
## DIRECTION
## 4. REMOVE ALL BARCODE, TAGS, ETC. FROM CONDUIT, PIPING AND DUCTWORK PRIOR TO
## INSTALLATION. ROTATE PERMANENT MARKINGS TO CONCEAL.
## 5. ALL CEILING HEIGHTS INDICATED ARE FROM TOP OF FINISHED FLOOR, UNO.
## 6. AT ALL EXPOSED CEILING CONDITIONS, COORDINATE ALL WIRING, CONDUIT, DUCTS, ETC FOR AN
## ORGANIZED FINISHED LOOK.
## 7. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL FOR ADDITIONAL INFORMATION.
## 8. SEE INTERIOR ELEVATIONS/ SECTIONS/ DETAILS FOR ADDITIONAL INFORMATION ON FINISHED
## SOFFIT, BULKHEAD, CEILING, ETC.
## 9. PAINT ALL GYPSUM BOARD CEILINGS, REFER TO INTERIOR ROOM FINISH SCHEDULE.
## 10. INSTALL MECHANICAL AND PLUMBING WORK TIGHT TO STRUCTURAL ELEMENTS TO MAINTAIN
## MAXIMUM CEILING HEIGHT UNLESS NOTED OTHERWISE.
## 11. LIGHT FIXTURES SHOWN FOR REFERENCE ONLY, SEE ELECTRICAL DRAWINGS FOR FIXTURE TYPE.
## B
## A
## C
## REVISION # DATEDESCRIPTION
## 03/31/2026 CONTRACT SET
## 54/29/2026 BP2 - ADD #2
## 706/04/2026 CONFORMED SET
5
## Paul Michell
## License Number
## Date
61543
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Architect under the laws of the
state of Minnesota
06/04/2026
## FEC-1
## REFLECTED CEILING PLAN LEGEND
## ACT-1
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 24"
## GYP-1
## : GYPSUM BOARD CEILING
## SLAT-1
## : WOOD-LOOK PLANK CEILING SYSTEM
## EXP
## : EXPOSED CEILING, ALL MECH/ELECT.
## COMPONENTS PAINTED, SEE PLAN & MATERIAL ID FOR
## DETAILS
## GYP-2
## : GYPSUM BOARD CEILING
## (1-HR FIRE RATED ASSEMBLY)
## ACT-2
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 48"
## ACT-5
: LAY-IN TECTUM CEILING PANEL, 24" x 24"
123
## A
## B
## C
## D
## E
## F
45
## E.1
0.100.25
## Az
## AA1AA3
## JJ
0.70.11
2.3
## B.7
## OPEN
## ABOVE
## MENS RR
163
## WOMENS RR
165
## BREAKROOM
137
## CONF. ROOM
139
## PUBLIC RR
140
## PUBLIC RR
141
## PUBLIC RR
142
## SOFT INTERV
145
## SOFT INTERV
144
## SOFT INTERV
143
## MENS LOCKERS
134
## OUTREACH
## STORAGE
159
## STORAGE
197
## RIFLES
113
## WEAPON CLEANING
147
## ARMORY
148
## ARCHIVE
196
## LONG-TERM
152
## VAULT
150
## VAULT
151
## EVIDENCE STORAGE
149
## POLICE LOBBY
102
## CONF. ROOM
103
## OFFICE
104
## OFFICE
105
## OFFICE
106
## OFFICE
107
## OFFICE
108
## MEETING RM
110
## WELLNESS
109
## WORK AREA
156
## OFFICE
154
## ELECTRICAL
111
## OFFICE
161
## RR
157
## RR
158
## DATA
162
## EVIDENCE
## PROCESSING
132
## EVIDENCE INTAKE
133
## ELEVATOR 2
## E2-1
## JANITOR
131
## HARD INTERVIEW
117
## JAN
118
## ELEVATOR 1
## E1-1
## VESTIBULE
100
## DRONE
160
## LAUNDRY
146
## STORAGE
155
## ELEC.
166
## STAIR D
## SD-1
## STAIR E
## SE-1
## STAIR C
## SC-1
## WOMENS LOCKERS
135
## VESTIBULE
167
## DUTY BAGS
130
## OPEN OFFICE
153
10' - 5"
27' - 5 1/2"
27' - 5 1/2"
27' - 5 1/2"
27' - 5 1/2"
7' - 1"
5' - 0"16' - 8"
## CORRIDOR
136
## JANITOR
138
## CH CORRIDOR
193
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
8' - 6"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
10' -0"
## ACT-3
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## GYP-1
9' - 0"
## GYP-1
9' - 0"
## GYP-1
9' - 6"
## ACT-1
9' - 0"
## GYP-1
8' - 2"
## GYP-1
7' - 8"
## GYP-1
9' - 0"
## ACT-1
7' - 8"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 6"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
8' - 6"
## ACT-1
8' - 0"
## GYP-1
## EXIT CORRIDOR
198
## MENS RR
194
## WOMENS RR
195
9' -0"
## GYP-1
8' - 6"
## GYP-1
8' - 2"
## GYP-1
7' - 8"
## GYP-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
8' - 6"
## GYP-1
8' - 6"
## GYP-1
## C.6
## B.9
## D.3
## D.6
## A.6
## A.1
## A.9
1
## A558
6
## A605
6
## A605
6
## A605
7
## A605
7
## A605
7
## A605
7
## A605
6
## A605
4
## A605
2
## A605
9
## A605
6
## A605
6
## A605
7
## A605
7
## A605
7
## A605
4
## A605
4
## A605
4
## A605
## C02
## C03
## C05
## C08
## C02
## C02
## C03
## C08
## C03
## C08
8' - 0"
## GYP-1
8' - 0"
## GYP-1
9' - 0"
## GYP-2
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
3
## A605
9' - 0"
## ACT-1
9' - 0"
## ACT-1
2' - 6"
2' - 6"2' - 6"
2' - 6"
## ALIGN
## ALIGN, TYP.
2' - 4"
## ALIGN
2' - 4"
## ALIGN
2' - 4"
## PT-5
## PT-1
## PT-1
## PT-1
2' - 6"
2' - 6"2' - 6 1/16"
2' - 6"
2' - 0"2' - 0"
2' - 0"
2' - 0"
## ALIGN
3' - 0"
3' - 0"
3' - 0"
3' - 0"
2' - 10"
3' - 6"
3' - 0"
3' - 0"
## ALIGN
## ALIGN
## ALIGN
3' - 0"
3' - 0"
2' - 10"
## ALIGN
## ALIGN
## ALIGN
## ALIGN
## ALIGN
## ALIGN
## ALIGN
## ALIGN
## ALIGN
1' - 0"
1' - 0"
## C11
## C01
## C01
## C01
## C01
## C01
## C01
## C01
## C01
## C10
## C01
## C01
## C01
16
## A960
16
## A960
13
## A960
13
## A960
13
## A960
5
## A606
## T2
## T2
8' - 0"
## GYP-1
8' - 0"
## GYP-1
## WC-9
5
## WC-9
5
10' -0"
## ACT-2
9' - 6"
## GYP-1
6
## A606
6
## A606
6
## A606
6
## A606
11
## A620
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
6/4/2026 15:34:55
## CO
## KN / MH
2730.01
## A301B
## LEVEL 1 -
## REFLECTED
## CEILING PLAN -
## AREA B
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## A301B
1/8" = 1'-0"
1
## LEVEL 1 -RCP -AREA B
## KEYNOTES - REFLECTED CEILING PLAN
## C01PENDANTS IN EXPOSED VOLUME TO BE HUNG AT 9'-0" AFF FROM THE BOTTOM OF THE
## FIXTURE TO ALIGN WITH ADJACENT FLOATING ACT-# CEILING CLOUD.
## C02EXP. CLNG AND EXP. CLNG EQUIPMENT PAINTED PT-3.
## C03STRUCTURAL TRUSSES PAINTED ACCENT PT-3.
## C05PROVIDE SECURITY HOLD-DOWN CLIPS FOR ACT CEILING WITHIN THIS ROOM.
## C08GYP. CEILING CONTROL JOINT, TYP.
## C10PENDANT CENTERED ON ACT TILE. SEE ELEVATION FOR MOUNTING HEIGHT.
## C11PENDANTS CENTERED OVER ISLAND. SEE ELEVATION FOR MOUNTING HEIGHTS.
## GENERAL RCP NOTES
## 1. DO NOT SCALE DRAWINGS
## 2. LOCATION OF DEVICES AND EQUIPMENT SHOWN ON DRAWINGS OF OTHER DISCIPLINES ARE
## SCHEMATIC AND GENERAL. SPECIFIC LOCATIONS OR GUIDELINES INDICATED ON THE
## ARCHITECTURAL DRAWINGS SHALL GOVERN THE LOCATION OF EXPOSED WORK OF ALL TRADES.
## 3. INSTALL SPRINKLER HEADS, SMOKE ALARMS, LIGHT FIXTURES AND OTHER EXPOSED
## FIXTURES/DEVICES AT CENTER OF ACOUSTICAL TILE (WHERE OCCURS), AT CENTER OF SOFFIT
## (WHERE OCCURS), OR AT CENTER OF ROOM, UNO. IF DIMENSION TO LOCATE A SPECIFIC DEVICE IS
## GIVEN IN ONE DIRECTION, CONTRACTOR TO CENTER THE DEVICE ON CEILING OR SOFFIT IN OTHER
## DIRECTION
## 4. REMOVE ALL BARCODE, TAGS, ETC. FROM CONDUIT, PIPING AND DUCTWORK PRIOR TO
## INSTALLATION. ROTATE PERMANENT MARKINGS TO CONCEAL.
## 5. ALL CEILING HEIGHTS INDICATED ARE FROM TOP OF FINISHED FLOOR, UNO.
## 6. AT ALL EXPOSED CEILING CONDITIONS, COORDINATE ALL WIRING, CONDUIT, DUCTS, ETC FOR AN
## ORGANIZED FINISHED LOOK.
## 7. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL FOR ADDITIONAL INFORMATION.
## 8. SEE INTERIOR ELEVATIONS/ SECTIONS/ DETAILS FOR ADDITIONAL INFORMATION ON FINISHED
## SOFFIT, BULKHEAD, CEILING, ETC.
## 9. PAINT ALL GYPSUM BOARD CEILINGS, REFER TO INTERIOR ROOM FINISH SCHEDULE.
## 10. INSTALL MECHANICAL AND PLUMBING WORK TIGHT TO STRUCTURAL ELEMENTS TO MAINTAIN
## MAXIMUM CEILING HEIGHT UNLESS NOTED OTHERWISE.
## 11. LIGHT FIXTURES SHOWN FOR REFERENCE ONLY, SEE ELECTRICAL DRAWINGS FOR FIXTURE TYPE.
## B
## A
## C
## REVISION # DATEDESCRIPTION
## 03/31/2026 CONTRACT SET
## 54/29/2026 BP2 - ADD #2
## 706/04/2026 CONFORMED SET
5
5
## Paul Michell
## License Number
## Date
61543
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Architect under the laws of the
state of Minnesota
06/04/2026
## REFLECTED CEILING PLAN LEGEND
## ACT-1
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 24"
## GYP-1
## : GYPSUM BOARD CEILING
## SLAT-1
## : WOOD-LOOK PLANK CEILING SYSTEM
## EXP
## : EXPOSED CEILING, ALL MECH/ELECT.
## COMPONENTS PAINTED, SEE PLAN & MATERIAL ID FOR
## DETAILS
## GYP-2
## : GYPSUM BOARD CEILING
## (1-HR FIRE RATED ASSEMBLY)
## ACT-2
: LAY-IN ACOUSTIC CEILING PANEL, 24" x 48"
## ACT-5
: LAY-IN TECTUM CEILING PANEL, 24" x 24"
## E
## F
## G
45
## E.1
## F.1
1.1
4.1
678
## F.5
## F.8
9
## F.2
## G.1
4.9
## H
## K
## NN
## AA1
## AA3
## JJ
2.71.8
## J
## HR LOBBY
243
## HR DIRECTOR
244
## ADMIN
## DIRECTOR
241
## CITY CLERK
240
## CONF. ROOM
239
## CITY
## ADMINISTRATOR
238
## WORKROOM
234
## COUNCIL
## WORKROOM
246
## STAFF RR
248
## STAFF RR
249
## SESSIONS /
## EOC
202
## COUNCIL
## CHAMBERS
201
## AV /
## PRODUCTION
## ROOM
245
## STORAGE
247
## CONF. ROOM
203
## DMARC
229
## FACILITIES
## WORKSHOP
250
## ASSIST. CITY
## ADMINISTRATOR
236
## PHONE
233
## ELEC
237
## MEETING
## ROOM
204
## OPEN
## COLLAB.
242
## PHONE
231
## CORRIDOR
230
## OPEN OFFICE
235
5' - 9"
14' - 4"
63' - 0"
10' - 5"
63' - 0"9' - 4"
5' - 0"16' - 8"17' - 7 1/8"
3"
16' - 8"
17' - 0"17' - 0"18' - 3 3/4"
19' - 2"
17' - 2 1/4"
18' - 6 3/4"
54' - 11"
72' - 4"
8' - 4"
3
0
'
-
0
"
8
'
-
0
"
9' - 0"
## ACT-1
9' - 0"
## ACT-1
10' -0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
9' - 0"
## ACT-1
18' -5"
## GYP-1
9' - 6"
## ACT-1
9' - 0"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
9' - 6"
## ACT-1
8' - 0"
## GYP-1
9' - 0"
## ACT-1
9' - 6"
## GYP-1
11' -6"
## SLAT-1
## UPPER
## PUBLIC
## LOBBY
200
14' -0"
## ACT-1
9' -0"
## GYP-2
19' -2"
## SLAT-1
9' -0"
## ACT-1
## STAIR B
## SB-2
## ELEVATOR 1
## E1-2
## STAIR A
## SA-2
## ELEVATOR 3
## E3-2
9' -6"
## ACT-1
9' -6"
## ACT-1
9' -6"
## ACT-1
9' -0"
## ACT-1
## MEN PUBLIC
## RR
205
## STORAGE
251
10' -0"
## ACT-1
9' -0"
## GYP-1
9' -0"
## ACT-1
13' -0"
## GYP-1
10' -0"
## ACT-1
10' -0"
## GYP-1
8' -0"
## GYP-1
1.6
## G.9
4.09
1
## A558
10
## A605
10
## A605
9
## A605
2
## A605
6
## A605
6
## A605
## PNLG-1
7
## A605
4
## A605
14
## A605
13
## A605
8' -4"
## GYP-1
8' -4"
## GYP-1
## A622
2
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"3' - 0"
## ALIGN
2' - 0"
2' - 0"
2' - 0"
2' - 0 63/256"
2' - 6"
2' - 6"
2' - 6"2' - 6"
## ALIGN
## ALIGN
## COUNCIL
## CHAMBERS
## STAFF
## 201A
## A302A
2
## A302A
3
## C21
## C21
## C12
## C14
## C15
## C01
## C01
## C01
## C01
2' - 0"
10' -0"
## GYP-1
6
## A605
9' -0"
## ACT-1
9' -6"
## GYP-1
8' -0"
## GYP-1
## ALIGN
11' -6"
## GYP-1
6
## A605
11
## A605
11
## A605
11
## A605
10
## A605
11
## A605
11
## A605
11
## A605
11
## A605
11
## A605
8' -0"
## GYP-1
8' -0"
## GYP-1
8' -0"
## GYP-1
5
## A605
16
## A605
## C24
## C24
5
5
5
15
## A605
15
## A605
5
5
5
## A605
555
## F
## NNAA3
## JJ
0.7
4' - 6"
5' - 0"
10' - 5"
2' - 0"
5' - 0"
4' - 0"
9' - 11"
2' - 3"
2' - 0"
13' - 5"
4
'
-
3
"
3
'
-
0
"
3
'
-
0
"
1
2
'
-
0
"
2
'
-
6
"
1
'
-
6
"
3
'
-
0
"
2
'
-
0
"
4
'
-
0
"
1
0
'
-
0
"
## C12
## C15
## C14
## C13
## C16
## C14
## C12
## C15
## C13
## C12
## G
## NN
## JJ
3
'
-
0
"
5
'
-
2
1
/
4
"
1
'
-
0
"
3
'
-
0
"
4
'
-
2
1
/
4
"
13' - 6"
4' - 0"
5' - 0"
5' - 0"
4' - 3"
18' - 6"
5' - 0"
5' - 0"
3
'
-
2
"
4
'
-
2
"
## C20
## C19
## C18
## C20
## C17
## C18
## C17
## C19
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2026 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_AI_2025.rvt
6/4/2026 15:35:09
## CO
## KN / MH
2730.01
## A302A
## LEVEL 2 -
## REFLECTED
## CEILING PLAN -
## AREA A
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## A302A
1/8" = 1'-0"
1
## LEVEL 2 -RCP -AREA A
## KEYNOTES - REFLECTED CEILING PLAN
## C01PENDANTS IN EXPOSED VOLUME TO BE HUNG AT 9'-0" AFF FROM THE BOTTOM OF THE
## FIXTURE TO ALIGN WITH ADJACENT FLOATING ACT-# CEILING CLOUD.
## C12PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 8'-0"L.
## C13PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 6'-0"L.
## C14PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 7'-0"L.
## C15PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 9'-0"L.
## C16PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 10'-0"L.
## C17PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 3'-0"L.
## C18PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 2'-0"L.
## C19PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 4'-0"L.
## C20PENDANT HUNG FROM CEILING WITH A WIRE LENGTH OF 5'-0"L.
## C21SEE ELEVATION FOR LIGHTING FIXTURE MOUNTING HEIGHT.
## C24LIGHT COVE LOCATION ALONG PERIMETER OF WALL. SEE ELECTRICAL FOR MORE
## INFORMATION.
## GENERAL RCP NOTES
## 1. DO NOT SCALE DRAWINGS
## 2. LOCATION OF DEVICES AND EQUIPMENT SHOWN ON DRAWINGS OF OTHER DISCIPLINES ARE
## SCHEMATIC AND GENERAL. SPECIFIC LOCATIONS OR GUIDELINES INDICATED ON THE
## ARCHITECTURAL DRAWINGS SHALL GOVERN THE LOCATION OF EXPOSED WORK OF ALL TRADES.
## 3. INSTALL SPRINKLER HEADS, SMOKE ALARMS, LIGHT FIXTURES AND OTHER EXPOSED
## FIXTURES/DEVICES AT CENTER OF ACOUSTICAL TILE (WHERE OCCURS), AT CENTER OF SOFFIT
## (WHERE OCCURS), OR AT CENTER OF ROOM, UNO. IF DIMENSION TO LOCATE A SPECIFIC DEVICE IS
## GIVEN IN ONE DIRECTION, CONTRACTOR TO CENTER THE DEVICE ON CEILING OR SOFFIT IN OTHER
## DIRECTION
## 4. REMOVE ALL BARCODE, TAGS, ETC. FROM CONDUIT, PIPING AND DUCTWORK PRIOR TO
## INSTALLATION. ROTATE PERMANENT MARKINGS TO CONCEAL.
## 5. ALL CEILING HEIGHTS INDICATED ARE FROM TOP OF FINISHED FLOOR, UNO.
## 6. AT ALL EXPOSED CEILING CONDITIONS, COORDINATE ALL WIRING, CONDUIT, DUCTS, ETC FOR AN
## ORGANIZED FINISHED LOOK.
## 7. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL FOR ADDITIONAL INFORMATION.
## 8. SEE INTERIOR ELEVATIONS/ SECTIONS/ DETAILS FOR ADDITIONAL INFORMATION ON FINISHED
## SOFFIT, BULKHEAD, CEILING, ETC.
## 9. PAINT ALL GYPSUM BOARD CEILINGS, REFER TO INTERIOR ROOM FINISH SCHEDULE.
## 10. INSTALL MECHANICAL AND PLUMBING WORK TIGHT TO STRUCTURAL ELEMENTS TO MAINTAIN
## MAXIMUM CEILING HEIGHT UNLESS NOTED OTHERWISE.
## 11. LIGHT FIXTURES SHOWN FOR REFERENCE ONLY, SEE ELECTRICAL DRAWINGS FOR FIXTURE TYPE.
## B
## A
## C
## A302A
1/4" = 1'-0"
2
## LEVEL 2 -RCP -AREA A -DECORATIVE LIGHTING
## A302A
1/4" = 1'-0"
3
## LEVEL 2 -RCP -AREA A -DECORATIVE LIGHTING STAIR
## REVISION # DATEDESCRIPTION
## 03/31/2026 CONTRACT SET
## 54/29/2026 BP2 - ADD #2
## 706/04/2026 CONFORMED SET
5
## Paul Michell
## License Number
## Date
61543
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Architect under the laws of the
state of Minnesota
06/04/2026
## FEC-2
## FEC-2
## FEC-1
## FEC
-
1
## J
## J
## J
## J
## J
## J
## J
## J
## J
## J
## AUTO
## GATE
## OPERATOR
4,6
## LP-1B
## AUTO
## GATE
## OPERATOR
5,7
## LP-1B
## AUTO
## GATE
## OPERATOR
8,10
## LP-1B
## PROPOSED BUILDING ADDITION
## ELECTRICAL
111
## ELEC.
166
## SECURED PARKING AREA
## GCC/MTS
## GEN
## UTILITY XFMR
## CT CAB & METER
/
## 2 HES-1A
zx-4
## XW
96"
/
## 7 HP-1A
zx-4
## XW2
/
## 7 HP-1A
zx-4
## XW2
144"
144"
/
## 8 HP-1A
zx-1
## XW2
144"
120"
/
## 2 HES-1A
zx-1
## XW
/
## 2 HES-1A
zx-1
## XW
120"
/
## 2 HES-1A
zx-2
## XD2
120"
/
## 6 HP-1A
zx-3
## XP2
/
## 5 HP-1A
zx-2
## XP1
/
## 8 HP-1A
zx-1
## XP1
/
## 9 HP-1A
zx-5
## XP2
/
## 9 HP-1A
zx-5
## XW2
/
## 9 HP-1A
zx-5
## XW2
/
## 9 HP-1A
zx-5
## XP1
/
## 9 HP-1A
zx-5
## XP1
/
## 9 HP-1A
zx-5
## XP1
144"
144"
/
## 2 HES-1A
zx-5
## XW
120"
/
## 9 HP-1A
zx-5
## XP2
/
## 9 HP-1A
zx-5
## XP2
/
## 9 HP-1A
zx-5
## XP2
/
## 7 HP-1A
zx-4
## XW2
1
2
2
2
3
4
5
6
7
8
9
/
## 7 HP-1A
zx-4
## XP
/
## 5 HP-1A
## XP
/
## 6 HP-1A
zx-3
## XP
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 7 HP-1A
zx-4
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 5 HP-1A
zx-2
## XB
/
## 5 HP-1A
zx-2
## XB
/
## 5 HP-1A
zx-2
## XB
/
## 5 HP-1A
zx-2
## XB
/
## 8 HP-1A
zx-1
## XP
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XP
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XB
## EVCS
31,33
## LP-1B-2
## EVCS
## (FUTURE)
32,34
## LP-1B-2
## WP/GFCI
14
## LP-1A-1
10
## TREE
## LIGHTS
2
## LP-1A-1
11
## CHRISTMAS
## LIGHTING
12
## LP-1B-1
12
## GRILL
35
## LP-1B-2
/
## 7 HP-1A
zx-4
## XW2
/
## 7 HP-1A
zx-4
## XW2
117"
117"
/
## 5 HP-1A
zx-2
## XFL
/
## 8 HP-1A
zx-1
## XB
/
## 8 HP-1A
zx-1
## XP
/
## 8 HP-1A
zx-1
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 6 HP-1A
zx-3
## XB
/
## 8 HP-1A
zx-1
## XB
/
## 5 HP-1A
zx-2
## XL
/
## 5 HP-1A
zx-2
## XL
/
## 5 HP-1A
zx-2
## XL
/
## 5 HP-1A
zx-2
## XL
/
## 5 HP-1A
zx-2
## XL
## P-T1
## XCEL POLE
## TEMP OVERHEAD
## CABLES
## TEMP UNDERGROUND
## CABLES
117"
/
## 5 HP-1A
zx-2
## XB
## WP/GFCI
36
## LP-1B-2
## AC/WP/GFCI
36
## LP-1B-2
## SIGNAGE
15
## LP-1A-1
## TREATMENT
16
## LP-1A-1
## Architecture
## Interior Design
## Landscape Architecture
## Engineering
## TRUE NORTH
## PLAN NORTH
## 222 North Second Street
## Long & Kees Bldg
Suite 101
## Minneapolis, MN
55401
612.339.3752
www.bkvgroup.com
© 2025 BKV Group
## SHEET NUMBER
## SHEET TITLE
## DRAWN BY
## CHECKED BY
## COMMISSION NUMBER
## PROJECT TITLE
## CONSULTANTS
## CERTIFICATION
## Autodesk Docs://2730.01 Oakdale PD-CH Reno & Exp/27
30.01_Oakdale-PD-CH_MEP_2025.rvt
## 6/4/2026 9:39:06 AM
## SN
## CSK
2730.01
## E010
## ELECTRICAL SITE
## PLAN
## OAKDALE POLICE
## EXPANSION AND
## CITY HALL
## REMODEL
## ELECTRICAL SITE PLAN GENERAL NOTES
## APROVIDE ALL COORDINATION AND SCHEDULING FOR NEW ELECTRICAL SERVICE INSTALLATION.
## VERIFY EXACT LOCATION AND ROUTING OF SERVICE ENTRANCE CONDUITS WITH ENGINEER AND
## GENERAL CONTRACTOR PRIOR TO INSTALLATION.
## BPROVIDE ALL COORDINATION AND SCHEDULING FOR NEW TELEPHONE/DATA/TELEVISION SERVICE
## INSTALLATION. VERIFY EXACT LOCATION AND ROUTING OF SERVICE PROVIDERS CONDUITS WITH
## ENGINEER AND GENERAL CONTRACTOR PRIOR TO INSTALLATION.
## CPROVIDE LOCKABLE ENCLOSURE FOR ALL EQUIPMENT CONTAINING DISCONNECTING DEVICES OR
## CONTROLLERS WITHIN REACH OF THE PUBLIC.
## DPROVIDE WEATHERPROOF GFCI RECEPTACLES ON EXTERIOR WALLS ADJACENT TO EXTERIOR DOORS
## AT 24" AFG. PROVIDE HEAVY DUTY 'IN-USE' COVERS PER NEC.
## ECOORDINATE ALL LIGHTING FIXTURES, RECEPTACLES, AND EQUIPMENT POWER CONNECTIONS WITH
## CIVIL AND LANDSCAPE ARCHITECT DRAWINGS PRIOR TO INSTALLATION.
## FPROVIDE LOCKABLE ENCLOSURE FOR ALL EQUIPMENT CONTAINING DISCONNECTING DEVICES OR
## CONTROLLERS WITHIN REACH OF THE PUBLIC.
## GPROVIDE WEATHERPROOF GFCI RECEPTACLES ON EXTERIOR WALLS ADJACENT TO EXTERIOR DOORS
## AT 24" AFG. PROVIDE HEAVY DUTY 'IN-USE' COVERS PER NEC.
## HCOORDINATE ALL LIGHTING FIXTURES, RECEPTACLES, AND EQUIPMENT POWER CONNECTIONS WITH
## LANDSCAPE ARCHITECT DRAWINGS PRIOR TO INSTALLATION.
## ISITE POLE LIGHT FIXTURES SHALL MAINTAIN A DISTANCE 3'-0" FROM BACK OF CURB, UNLESS
## OTHERWISE NOTED.
## JREFER TO 7/E601 FOR PARKING LOT LIGHT POLE BASE DETAIL.
## KALL ELECTRICAL DEVI;CES AND LIGHT FIXTURES SHOWN ON SITE PLAN ARE NEW UNLESS OTHERWISE
## NOTED.
## E010
1" = 30'-0"
1
## ELECTRICAL SITE PLAN
## ELECTRICAL KEYNOTES
## 1PROVIDE POWER FOR UPLIGHTING AT FLAG POLES AND MEMORIAL SIGN. COORDINATE WITH
## LANDSCAPE DRAWINGS.
## 2PROVIDE POWER FOR AUTO GATE OPERATOR. COORDINATE WITH CIVIL AND LOW VOLTAGE
## DRAWINGS FOR EXACT LOCATION AND REQUIREMENTS.
## 3PROVIDE PAD MOUNTED UTILITY TRANSFORMER. COORDINATE WITH UTILITY COMPANY.
## 4PROVIDE CONDUIT FOR POWER DISTRIBUTION FROM UTILITY TRANSFORMER TO BUILDING CT
## CABINET. REFER TO RISER DIAGRAM ON E401 FOR QUANTITY AND SIZES.
## 5PROVIDE (3) THREE 4" CONDUITS FROM GENERATOR TO EXTERIOR BUILDING MOUNTED GCC/MTS.
## REFER TO RISER DIAGRAM ON E401 FOR ADDITIONAL INFORMATION.
## 6PROVIDE CONCRETE PAD FOR GENERATOR. COORDINATE WITH STRUCTURAL ENGINEER AND
## GENERATOR MANUFACTURER.
## 7PROVIDE (1) ONE 2" CONDUIT FROM GENERATOR TO ATS-ES IN ELECTRICAL ROOM 060. REFER TO
## RISER DIAGRAM ON E401 FOR ADDITIONAL INFORMATION.
## 8PROVIDE (5) FIVE 4" CONDUITS FROM THE BUILDING CT CABINET TO THE SDM IN ELECTRICAL 060.
## REFER TO THE RISER DIAGRAM ON E401 FOR ADDITIONAL INFORMATION.
## 9PROVIDE (5) FIVE 4" CONDUITS FROM THE GCC/MTS TO THE ATS-MDP IN ELECTRICAL 060. REFER
## TO THE RISER DIAGRAM ON E401 FOR ADDITIONAL INFORMATION.
## 10PROVIDE POWER AT THIS LOCATION FOR CHRISTMAS LIGHTING/DECORATIONS. COORDINATE
## EXACT LOCATION WITH LANDSCAPE AND CIVIL.
## 11PROVIDE POWER AT THE BASE OF THE TREE FOR CHRISTMAS TREE LIGHTING. COORDINATE
## EXACT LOCATION WITH LANDSCAPE AND CIVIL.
## 12PROVIDE POWER AT THE FENCE LINE FOR CHRISTMAS LIGHTING. COORDINATE EXACT LOCATION
## WITH LANDSCAPE AND CIVIL.
## REVISION #DATEDESCRIPTION
## 303/31/2026CONTRACT SET
## 706/04/2026CONFORMED SET
## Chad Kurdi
## License Number
## Date
42678
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Engineer under the laws of the
state of Minnesota
06/04/2026
## COUNCIL MEMORANDUM
1
## To: Honorable Mayor and City Council
## From: Mikaela Huot, Finance Director
Date: July 14, 2026
## Subject: Tanners Lake Interfund Loan Payable Update
## BACKGROUND
At the June 25, 2026 City Council Special Workshop, City staff was directed to contact legal counsel
regarding options for repayment of the Tanners Lake Interfund Loan (IFL) using existing Tax Increment
Financing (TIF) funds from the Bergen TIF District. During this Workshop, options for which the Council is
able to use Bergen TIF funds and ability to pay all or a portion of the IFL will be discussed.
## INTERFUND LOAN REPAYMENT DISCUSSION
City Council previously adopted a resolution in 2008 authorizing a Tax Increment Interfund Loan in an
amount not to exceed $2,000,000 with an 8% interest rate. The City incurred $1,510,000 relating to the
purchase of substandard buildings near Tanners Lake to facilitate redevelopment of the site as eligible
acquisition costs under the terms of the IFL. The IFL balance is currently estimated to be about $5.8
million with 8% compounding interest.
The City established Tax Increment Financing (Redevelopment) District No. 2-12 in 2017 as the
repayment source for the IFL. Tax Increment Financing (Redevelopment) District No. 6 (Bergen) was
established in 1988 and is a source of additional TIF dollars to ‘pool’ available TIF funds to Tanners Lake
TIF District, and provided certain limitations on use of TIF funds for pooling to Tanners Lake and Tartan
Crossing, in addition to in-district project expenses.
The Bergen TIF District is estimated to have available funds of approximately $4.8 million by the end of
2026, and if the District remains open for the maximum term of collection (by December 31, 2040), it
may generate an additional estimated $7.6 million. The total balance in the Bergen TIF District may grow
to an estimated $12.4 million, subject to future values, tax rates and property tax laws.
Questions that have been posed to legal counsel for interpretation related to potential repayment of the
## Tanners Lake TIF Interfund Loan are:
1. Does partial payment of interfund loan still allow Tanners Lake TIF District to remain open as the
total estimated TIF that could be generated has been estimated to be approximately $6.6 million,
based on a prior development proposal assumption for value, construction timing, and term of the
TIF District. TIF revenues from the TIF District would provide an additional funding source to
incentivize new development.
2. Does full payment of interfund loan require closure of Tanners Lake TIF District and forego
opportunity to capture any future TIF revenues that would be generated by new development?
3. Can Bergen TIF be used for any other purpose besides Tanners Lake TIF District and what would
be the expected maximum term of TIF revenues collected (i.e. up to required decertification date
of 12/31/40)?
Subject to legal interpretation, the City has the following options for additional discussion and
consideration:
Option 1: No pay down
Option 2: Pay down IFL partial payment
Option 3: Pay down IFL in full
A memo from Attorney Boulton explaining each option as well as the Tanners Lake Interfund Loan and
Bergen Plaza TIF Summary will be sent to City Council under separate cover.
## COUNCIL DIRECTION REQUESTED
Staff requests feedback on options as presented for repayment of Tanners Lake Interfund Loan.
## COUNCIL MEMORANDUM
1
## To: Honorable Mayor and City Council
## From: Mikaela Huot, Finance Director
Date: July 14, 2026
## Subject: 2027 Proposed Budget Updates
## BACKGROUND
At the May 28, 2026 City Council Special Workshop, General Fund operating revenues and expenses
were reviewed along with Special Revenue Funds. The General Fund expenses and revenues for 2027
were proposed to increase over the 2026 budgeted General Fund expenses and revenues.
At the June 25, 2026 City Council Special Workshop, the Capital Improvement Plan (CIP), Vehicle and
Equipment Replacement Fund (VERF), Enterprise Funds, and updates from the May 28, 2026 City Council
Special Workshop were reviewed. During these Workshops, follow up discussion topics and changes to
the assumptions were requested to be made to the operating, enterprise, capital, and special revenue
budgets.
## FOLLOW-UP ITEMS FROM WORKSHOPS
• Details on the Personnel and Benefit increases by department
• Total percent of the General Fund increase is due to Personnel and Benefits
• Total Cost of Summerfest overtime for Fire, Police, and Public Works
• Provide a Debt Service Levy breakdown by bond for the next 2-3 years
• Explore funding sources for SEED 220 Fund
• Provide details on the Enterprise Fund transfer amounts
• Update VERF to include 10-year fund summary to reflect future vehicle and equipment purchases
to understand annual levy estimate with 3% annual increase each year
• Separate Water, Sewer, Street light, and Storm Water projects from the Utility System
Replacement Fund (USRF) and propose how that would look as separate capital funds and closing
out the USRF
• Review fee schedule and timing for implementation
• Explore options for projects that can be funded by Street Lighting Fund
• Provide details on the Water Availability Reserve Fund (WAC) and the Sewer Availability Reserve
Fund (SAC) and description of current fund balance
• Research options on Tanners Interfund Loan and Bergen Plaza Tax Increment Financing (TIF)
## • Reenvision goals for Charitable Gambling Fund
• Strategic Planning discussion topics
## FINANCIAL CONSIDERATIONS
Council may want to consider the following for potential levy reduction options:
• Other Fund Balances available for one time project expenses
• Reduce debt service levy
o Use closed bond fund balance to cancel existing bond levies
2
o Review bond call options
• Consider Charitable Gambling Fund for one time project expenses
• Consider mid-year 2027 start dates for budgeting, potentially decreasing the levy
## • Reduce Capital Improvement Plan levy
## o Municipal Building Fund
## o Vehicle Equipment Replacement Fund
## • Review Enterprise Fund transfers
## • Tanners Lake Interfund Loan payback discussion
The following documents will be sent to City Council under separate cover.
• 2027 – 2030 Debt Levy Summary
• 2027 – 2031 Capital Improvement Plan (CIP), and CIP Fund Summaries
## • 2027 General, Enterprise, and Special Revenue Fund(s) Summary
• 2027 Personnel and Benefit Summary
## • Tanners Interfund Loan and Bergen Plaza TIF Summary
## • Additional Information on Follow-up Items
## COUNCIL DIRECTION REQUESTED
Staff requests feedback and intent on the General Fund budget and the overall levy in preparation for
approval of the 2027 Proposed Property Tax Levy at the September 8, 2026 City Council regular meeting.
The proposed property tax levy set is a maximum which can only be decreased prior to setting the final
levy scheduled for the December 8, 2026 City Council regular meeting. Staff also requests City Council
discuss holding an additional four hour special workshop later this month or early in August to fully review
bond, VERF, and general fund draft budget numbers.
Remaining Budget Calendar (if an additional half day workshop is not scheduled)
August 12, 2026 (Council Workshop)
City staff presents Council with the revised Special Revenue Funds after the June 25, 2026 Special
Council Workshop.
August 25, 2026 (Council Workshop)
City staff presents Council with the revised 2027-2031 Capital Improvement Plan after the June 25, 2026
Special Council Workshop.
September 8, 2026 (Council Meeting)
Council adopts preliminary levy and sets date for truth in taxation hearing on December 8, 2026.
October 13, 2026 (Council Workshop)
If needed, City Staff presents Council with the Department's final update on the 2027-2031 Capital
Improvement Plan, 2027-2036 Vehicle and Equipment Replacement Fund, and the 2027 General Fund
Budget Levy.
November 2026
Washington County sends proposed Property Tax (Truth in Taxation) notices to all property owners in the
City mid-November.
3
December 8, 2026 (Council Meeting)
Truth in Taxation meeting for the 2027 Budget and Tax Levy. City Council adopts 2027 Budget, 2027 Tax
Levy, and 2027-2031 Capital Improvement Plan, including the 2027-2036 Vehicle and Equipment
Replacement Fund.
## COUNCIL MEMORANDUM
1
## To: Honorable Mayor and City Council
## From: Luke McClanahan, Planning Manager
## Hannah Dunn, Senior Community Development Specialist
Date: July 14, 2026
## Subject: 2050 Comprehensive Plan Update and Climate Action Plan
## BACKGROUND
The following is intended to provide updates to the City Council on the 2050 Comprehensive Plan (Comp
Plan) and Climate Action Plan.
## Comprehensive Plan
As required by the Metropolitan Council, and by State Statute, the City must update its Comp Plan every
ten years. Oakdale’s 2050 Comp Plan must satisfy the Metropolitan Council’s minimum requirements
checklist, which is a 28-page document that specifies technical content to update. The Plan must be
submitted to the Metropolitan Council no later than December 31, 2028.
To date, staff have completed a number of tasks in preparation for the Comp Plan update. Specifically,
staff have prepared an analysis of potential redevelopment sites, audited content from the existing Plan
that must be updated, compiled a list of accomplishments from the 2040 Comp Plan, and discussed the
scope of the project with the City Council on January 13, 2026. To develop a budget for consulting support
for the Comp Plan update, staff also researched peer communities and prepared an independent cost
estimate.
To assist with the state-mandated update, the City Council approved a budget amendment on March 24,
2026, budgeting a total of $165,000 for consulting support. City staff initiated a competitive professional
services solicitation process in February 2026 to seek a qualified firm to assist with preparing the Comp
Plan update. In the months following, staff reviewed four proposals and interviewed three of the firms.
Evaluation of the firms and their proposals were based on the following criteria:
• Expressed understanding of proposal objectives
• Qualifications and experience of both the firm and key staff
• Methodology, approach, and deliverables to complete the project scope
• Cost detail and work plan
Staff have identified HKGi (among four proposals submitted) as the firm that best aligns with the criteria
noted above. The contract for professional services and project work scope is within budget and will be
provided under separate cover for review. HKGi previously provided support for the City’s Zoning and
Subdivision Code update project, which was completed in July 2025.
Upon contract approval, the selected firm and City staff will work collaboratively on the planning effort to
minimize costs. The selected firm will lead the report writing effort, prepare graphic design work, assist
with public engagement activities, coordinate goal setting/visioning meetings, perform data analysis (e.g.,
transportation modeling), and provide strategic guidance on the overall process. The consultant will also
provide recommendations based on best practices from comparable cities and the Met Council’s latest
information.
2
City staff will manage the overall project. City staff will also conduct public engagement efforts (e.g., public
meetings, online questionnaires, stakeholder identification), prepare packets for City Council and
advisory body meetings, conduct GIS work (mapping), perform select data analysis, inventory developable
sites, and compile existing planning documents that will inform the update.
## Climate Action Planning
As part of the 2050 Comp Plan update, a “Climate Element” section is required, which is more robust
than in past years. In order to meet and potentially exceed the 2050 Comp Plan climate requirements,
the City applied for $50,000 from the Minnesota Pollution Control Agency’s (MPCA) FY26 Local Climate
Action (LCA) Planning Grant to complete a Climate Action Plan. At the March 24, 2026 regular meeting,
the City Council approved budget carryforward funds in the amount of $25,000 to serve as the required
50% match for the grant. The City was notified in late April 2026 that it had been awarded the $50,000
grant.
Climate Action Plans are guiding frameworks that help entities measure greenhouse gas (GHG) emissions
and set goals, strategies, and actions to reduce GHG emissions and adapt to climate risks. An Oakdale
Climate Action Plan will be an opportunity to build off goals and policies from the 2040 Comp Plan
“Resilience Chapter” and integrate them with other climate-related activities and initiatives. Tasks
associated with climate planning efforts include:
• Conduct community engagement, in conjunction with Comp Plan engagement when feasible.
• Compile community-wide and City operations greenhouse gas inventories.
• Develop measurable and prioritized mitigation goals, strategies, and actions.
• Analyze historical climate trends and summarize downscaled projections and local climate
impacts.
• Develop measurable and prioritized adaptation goals, strategies, and actions.
• Assess and understand City infrastructure and assets that are at risk to climate impacts, as budget
allows.
• Engage City departments, advisory bodies, and Council throughout the project.
• Create the Climate Action Plan report that includes an implementation plan and sets metrics for
tracking progress that will be used to develop the Climate Element in the 2050 Comp Plan.
## Next Steps and Timeline
Upon approval of the contract for consulting support services for the Comp Plan update, the selected firm
and City staff will commence work on the update immediately. This project is anticipated to be completed
by mid-2028. The selected firm and City staff will work collaboratively on the planning effort to minimize
costs.
Upon approval of the MPCA LCA Planning Grant, the City will seek a climate planning consultant to provide
services for the Climate Action Plan. The contract with the consultant will not exceed the grant award and
match of $75,000. As part of the grant funding requirements, the Climate Action Plan must be completed
by June 30, 2027. It will then be used to develop the Climate Element in the 2050 Comp Plan.
Given the integration of both the Comp Plan update and the Climate Action Plan, staff have prepared a
preliminary timeline showing key milestones for both projects. The timeline is shown below.
3
## Preliminary Timeline
## COUNCIL DIRECTION REQUESTED
It is requested that the City Council discuss the scope and schedules for the upcoming 2050
Comprehensive Plan update and Climate Action Plan prior to staff seeking contract and grant approval,
respectively.
## Attachment
Accomplishments from the 2040 Comprehensive Plan
City of Oakdale ● 1584 Hadley Avenue N, Oakdale, MN 55128
www.oakdalemn.gov ● 651-739-5086
## LIST OF COMPREHENSIVE PLAN ACCOMPLISHMENTS TO DATE
Since adoption of the 2040 Comprehensive Plan, the City has completed or initiated a significant number
of implementation actions across land use, transportation, housing, economic development, parks,
resilience, and neighborhood planning. In preparation for the 2050 Comprehensive Plan update, staff have
compiled a list of accomplishments from the current 2040 Comprehensive Plan. The following list
emphasizes goals and policies with measurable outcomes; many of the Plan’s policies are intended as
general guiding principles and are therefore difficult to measure. Additionally, these outcomes primarily
focus on chapters relating to the Community Development Department’s primary areas of responsibility.
## Chapter 2 – Land Use
• Completed redevelopment plans and studies for many of the specified sites and areas of Chapter 2,
Goals 1 and 2 (redevelopment), including Oakdale Marketplace / Station Land Use Study, 12
th
and
Geneva Redevelopment Study, and Glenbrook Small Area Plan. Planning for the 55
th
## St N Corridor is
underway. Additionally, land use approvals have been completed for 7703 10
th
St (9
th
## St Landing)
and select parcels in Oakdale Marketplace.
• Goal 1, Policy 3 (Helmo Station Implementation) – more than half of the identified developable space
in Helmo Station has been developed or is being constructed.
• Goal 1, Policy 4 (Infill Sites) – A significant portion of these sites have been developed or have
received land use approvals, including the 4Front commercial and industrial areas, Oakdale
Marketplace (Harlan I and II), Granada Business Park Outlot B (Oakdale Public Works), 1470 / 1480
Helmo (Tierra Encantada and Companion Animal Control), Bergen Plaza (Taco Bell and Valvoline),
7049 4
th
St (94 Exchange), 3m Property (Willowbrooke), Parcel North of Tartan Crossing (Oakdale
Commons).
• Goal 2, Policy 3 – Modify the Comprehensive Plan, Zoning / Subdivision Ordinance, and Capital
Improvement Plans to facilitate [redevelopment goals] – A comprehensive zoning and subdivision
code update was adopted in 2025, modernizing the code and more easily facilitating redevelopment
/ infill.
• Goal 2, Policy 5 – Consider financial assistance on a case-by-case basis... – Approved conduit bond
financing for Oakdale Commons. Issued bonds for Gentry Townhomes rehabilitation. Applied for and
received more than $400,000 in state grant funds to assist with the Tanners Lake Redevelopment
Project.
Chapter 3 – Transportation
• Goal 2 – Highway 120 shall be safe, functional, aesthetically pleasing and support redevelopment
and transit... – The City is currently working with MnDOT and adjacent jurisdictions to develop plans
that prioritize safety for all road users and create opportunities for redevelopment. Additionally, the
Pedestrian and Bicycle Plan (2023) identifies Highway 120 as the most important pedestrian and
bicycle gap in the City’s network.
Page 2
July 8, 2026
• Goal 3, Policy 2 – Support a new multimodal bridge... connecting Helmo Ave N with Bielenberg Drive...
– the Bielenberg Bridge was constructed as part of the Gold Line Bus Rapid Transit Project.
• Goal 3, Policy 4 – Incorporate Planning of the new interchange at Highways 36 and 120... – The
Glenbrook Small Area Plan incorporates the footprint of a future interchange and considers its impact
on business access and traffic flow.
• Goal 4, Policy 1 – Update the 1995 Bicycle and Pedestrian Plan... – A new Pedestrian and Bicycle
Plan was adopted in 2023.
• Goal 4, Policy 2 – Request Washington County complete trails identified... along County Road 14 –
The trail gap between Granada and Hadley is being constructed.
• Goal 4, Policy 3 – Support the development of new sidewalk and trail connections identified in the
Gold Line BRT Helmo and Greenway Station Area Plans – all sidewalks / trails have been constructed
or are currently under construction.
• Goal 4, Policies 7 and 8 – Support the rebuilding of the 4
th
## Street Bridge... – The 4
th
## Street Bridge
has been reconstructed as part of the Gold Line Bus Rapid Transit project.
• Goal 4, Policy 9 – Support the addition of a pedestrian walkway adjacent to the 40th Street Bridge
over I-694... – The City received state bonding funds to construct the 40
th
Street pedestrian bridge.
• Goal 5, Policies 1 and 3 – Collaborate with Metro Transit to assess current transit service and
improve transit service for residents, workers, businesses, and transit-dependent residents...
encourage Metro Transit to develop additional bus connections between employment and
residential areas in the City and Gold Line Bus Rapid Transit (BRT) Helmo Station and Greenway
Station areas.
o The City collaborated with Metro Transit on the Network Now transit service study, which
outlines plans to streamline Bus Route 219 and create a new route along Hadley Ave N and
34
th
St N (Route 221).
o The City worked with Metro Transit to expand the Metro Micro Woodbury Service Area (an
on-demand transit service) to include more area in Oakdale.
o Metro Transit realigned local bus routes to connect more directly to Gold Line stations,
including Route 219.
• Goal 5, Policy 2 – Collaborate with Metro Transit to assess and improve transit facilities and
sidewalk and trail connections to and from transit facilities – T he Oakdale Pedestrian and Bicycle
Plan (2023) maps all city transit stops and identifies network gaps that make accessing transit a
barrier.
• Goal 5, Policy 5 – Support the implementation of the Gold Line Bus Rapid Transit Line – The City
adopted Planned Unit Developments for Greenway and Helmo Stations that incentivize transit-
oriented development and require transit-supportive uses. Additionally, more than 700 new
residential units have been constructed or approved along the Gold Line, creating a stronger
ridership base.
Page 3
July 8, 2026
Chapter 5 – Parks and Trails
• Goal 2 – Recreational programming, park facilities, and open space shall be accessible to all physical
abilities and incomes – The Oakdale Park System Plan was developed to increase ADA accessibility
and consider gaps in open space.
• Goal 3 – Parks shall be integrated into the City’s Pedestrian System – The Oakdale Pedestrian and
Bicycle Plan identifies future trail routes that would connect parks and major destinations in a
thoughtful manner.
Chapter 6 – Housing
• Goal 1, Policy 2 – Develop plans... to preserve existing affordable rental housing... - Affordability
agreements have been renewed for Gentry Place and Presbyterian Homes.
• Goal 1, Policy 3 – Facilitate the creation of at least an additional 791 housing units affordable to
households earning up to 80 percent of area median income... - A total of 168 new affordable senior
units were created as part of the Oakdale Commons development. Additionally, land use approvals
have been granted for Hudson Boulevard Apartments, which would create 130 new affordable units.
• Goal 1, Policy 4 – Promote and support homeownership and first-time homebuyers through
partnerships with Minnesota Housing and their Startup Program, Two Rivers Community Land Trust...
-
o Minnesota Housing – City staff collaborate closely to promote existing state housing
programs.
o Minnesota City Partnership Program – the City is a longtime participant in the Minnesota City
Partnership Program, which allows the Minnesota Housing Finance Authority to issue qualified
tax-exempt bonds on behalf of participants to fund affordable first-time homebuyer loans.
Since 2018, the program has originated more than 234 loans, totaling over $57,198,015 in
loan funds invested in the City.
o Two Rivers Community Land Trust – City staff collaborate closely and support grant
applications to acquire and rehab additional properties, totaling 40 properties in the City with
20 resales over time.
o Washington County Community Agency (CDA) – The City partnered with the CDA in 2026 to
use Local Affordable Housing Aid dollars to support home rehabilitation and first-time
homebuyer loans in Oakdale.
• Goal 1, Policy 5 - Develop, adopt, and implement a local fair housing policy... - The City’s fair
housing policy was approved in 2019.
• Goal 1, Policy 6 - Guide and zone land to facilitate and promote the construction of a full range of
housing choices...
o Expanded permitted housing types in the 2025 Zoning Code Update, including courtyard
cottages, mixed-use apartment buildings, detached Accessory Dwelling Units (ADUs) and
live-work units.
Page 4
July 8, 2026
o More than 1,940 housing units have been constructed in the City of Oakdale since 2021,
including more than 1,470 multifamily units and 241 single family units.
• Goal 1, Policy 7 - Promote the development of a variety of housing types within close proximity and
safe pedestrian access to shopping and services, centers or employment, transit, schools, parks,
trails and open space.
o The City has implemented the Greenway Station and Helmo Station PUDs, creating more
than 700 units near frequent and reliable transit.
o The City has permitted the Harlan Apartments and Oakdale Marketplace Seventh Addition,
creating new mixed-use housing opportunities in an existing commercial area near groceries
and shopping.
o The City approved Oakdale Commons, creating 168 units near grocery shopping
destinations and local bus service.
## Chapter 7 – Economic Development
• Goal 1, Policies 1, 2, and 4 – Administer a program to [attract and retain businesses] – the City
provides general business support resources and has maintained the Business Retention,
Expansion, and Attraction Program (BRE&A) with 36 visits to date.
• Goal 2, Policies 1, 2, and 3; Goal 4, Policy 1 – The City maintains a closer partnership with the
Minnesota Department of Employment and Economic Development (DEED) and refers current and
prospective businesses to financial resources maintained by partner agencies. City staff applied for
and received state grants on behalf of Pace Analytical.
Chapter 8 – Resilience
• Goal 1, Policy 1 and 5 – Promote reinvestment in residential and commercial properties through
energy efficiency education, technical assistance, and financing programs – The City promotes
energy efficiency programs offered by other agencies and partners with the Center for Energy and
Environment to offer discounted home energy squad visits to residents.
• Goal 1, Policy 2 - Connect low-income residents to home weatherization and energy efficiency
resources to encourage housing stock reinvestment – The City partners with the Washington
County CDA, which offers loan opportunities for low-income households looking to make
weatherization and energy efficiency improvements.
• Goal 1, Policies 3 and 4 – Protect and encourage on-site solar energy... adopt zoning regulations
[for solar energy] – The City’s zoning code allows solar energy systems by right and the City offers
resources to help navigate the permitting process.
• Goal 1, Policy 6 – Support private and public infrastructure that accommodates and encourages
use of electric and autonomous vehicles and explore options for City fleet use of electric vehicles.
o Supported approval of private electric vehicle charging stations at several businesses and
residential developments.
o Completed EV-Ready Community Study in 2021.
Page 5
July 8, 2026
o Updated language in the City’s Zoning Code in 2022 to allow electric vehicle charging
stations as accessory uses in zoning districts.
o Partnered with Xcel Energy to conduct a fleet assessment as part of their Fleet Electrification
Advisory Program.
o Purchased the City’s first fleet electric vehicle for the Police Department in 2025
• Goal 1, Policy 7 - Promote and encourage strategies that reduce waste generation and increase
options for reuse recycling, and composting of items in City operations, residential and commercial
developments.
o Annually apply for and receive the Washington County Municipal Recycling Grant to support
recycling efforts.
o Work underway to expand recycling access in Oakdale parks by installing dual-stream waste
bins.
o Host City-wide clean up events.
o Hosted the City’s first Clothing Swap to reduce textile waste and encourage reuse in 2026.
o Started to implement composting into City staff events such as the Employee Appreciation
Picnic.
o Continually promote the Food Scraps Pickup Program, available to Oakdale residents for
free.
• Goal 2, Policy 7 - Continue programs which increase the tree canopy in the city with disease-
resistant species for air quality and cooling benefits to the community - The City continues to
annually host the Pete Graske Arbor Day Tree Giveaway, where 200 trees are given away to
Oakdale residents for free.
• Goal 2, Policy 8 - Encourage the establishment and maintenance of community gardens throughout
the City to provide residents with easy access to healthy food – The City adopted the Park System
Plan in August 2025 that identified Preservation Park as a potential location for a community
garden.
Chapter 9 – Neighborhoods
• Goal 1, Policies 1, 2, and 3 – Continue to enforce [property maintenance code, rental property
licensing, and foreclosed / vacant home monitoring programs] – The Code Enforcement Officer
maintains and actively carries out these activities.
• Goal 1, Policy 4 - Identify opportunities to amend the zoning ordinance to promote housing
reinvestment. – The Oakdale Zoning Code Update (2025) streamlines the approval process for
select housing improvements and offers new housing types, allowing for continued neighborhood
reinvestment.
• Goal 1, Policy 5 – Continue to facilitate and fund housing reinvestment [programs].
o The City maintains a Housing Improvement Areas policy for major common interest
community reinvestment proposals.
Page 6
July 8, 2026
o The City is an active participant in the Minnesota City Participation Program, exceeding
program goals for all years of enrollment.
o The City maintains a close relationship with the Washington County CDA and has partnered
to provide additional rehabilitation and first-time homebuyer resources through the use of
Local Affordable Housing Aid dollars.
1
## COUNCIL MEMORANDUM
## To: Honorable Mayor and City Council
## From: Cory Tietz, Public Works Director
Date: July 14, 2026
## Subject: Willowbrooke Fields Restroom/Shelter Construction Contract and Selection of Bid
## Alternates
## BACKGROUND
At a meeting of the City Council of the City of Oakdale held on Tuesday, March 11, 2025, the City
Council approved Resolution 2025-17, approving plans and specifications for City Project P2025-
02 (Willowbrooke Fields Park and Prairie Trails Park (formerly Willowbrooke Park West and North)),
and authorizing the advertisement for and collection of bids.
Pursuant to Council authorization, SRF Consulting Group, Inc. solicited proposals from local general
contractors for construction services for the Willowbrooke Fields restroom and open-air picnic
shelter building, representing the final phase of construction at this park. The proposals received
were as follows:
## General Contractor Bid Price
## K.A. Witt Construction Inc. $349,544.00
## Apadana LLC $384,750.00
## Dering Pierson Group $401,000.00
## Engineer Estimate $416,612.21
## Brennan Construction of MN, Inc. $429,000.00
## CM Construction Company, Inc. $434,800.00
## Jorgenson Construction Inc. $488,655.00
## KNB Contracting $534,900.00
## Parkos Construction Company Inc. $536,711.50
In addition to selecting a general contractor for the construction services of the restroom and open-
air picnic shelter building, the project team gathered costs related to five (5) optional bid alternates:
• Alternate 1: Install a quantity of two (2) shade umbrellas, approximately 10’ x 20’ in size
each, in the designated seating area each along the north side of the Pickleball Court at a
total cost of $34,000.
• Alternate 2: Install a quantity of one (1) share umbrella, approximately 10’ x 10’ in size in
the designated seating area along the east side of the Volleyball Court at a cost of $16,300.
• *Alternate 3: Install field lighting around the Soccer Field at a cost of $179,000.
• *Alternate 4: Install field lighting for the Pickleball Courts at a cost of $110,000.
• *Alternate 5: Install field lighting for the Volleyball Court at a cost of $26,000.
*Athletic Lighting Controls are required at an additional cost of $19,000 if any combination of
athletic lighting is awarded.
2
## FINANCIAL CONSIDERATION
At the December 10, 2024, meeting of the City Council, Resolution 2024-115 was adopted, setting
the overall project budget for Willowbrooke Fields and Prairie Trails Park at $2,066,000 (P2025-
02). Since that time, contracts have been awarded to SRF Consulting Group, Inc. for design and
construction administration; KOMA for architectural services for the restroom and open-air shelter
at Willowbrooke Fields; and Sunram Construction, Inc. as the general contractor for site work at
both Willowbrooke Fields and Prairie Trails Park, which included the installation of the Volleyball
Court and Pickleball Courts at Willowbrooke Fields. In addition to these contracts, funds have been
appropriated for picnic tables and park entrance signs that will be installed at the end of the project.
To date, awards and project appropriations total $1,277,069.05.
## Council Approved Work
Willowbrooke Fields and Prairie Trails Park Site Work (Sunram Construction) $890,650.00
## - Site Work Construction Contingency (10%) $89,065.00
Picnic Tables (yet to be purchased) $16,382.80
## Trash/Recycling Receptacles (Grant Provided) $0.00
Park Entrance Signs for Willowbrooke Fields and Prairie Trails Park (Allowance) $30,000.00
## SRF Design and Construction Administration Fee $194,971.25
## KOMA Restroom Building Design Fee $56,000.00
## Council Approved Work $1,277,069.05
## Additional Work Requiring Council Action/Approval for Willowbrooke Fields
## Restroom Picnic Shelter Building (K.A. Witt Construction, Inc.) $349,544.00
- Building Construction Contingency (10%) $34,954.40
## Building Construction Cost $384,498.40
Alternate #1: Pickleball Court Shade Umbrellas (Qty of two: 10’x20’ each) $34,000.00
Alternate #2: Volleyball Court Shade Umbrella (Qty of one: 10’x10’) $16,300.00
*Alternate #3: Soccer Field Lighting $179,000.00
*Alternate #4: Pickleball Court Lighting $110,000.00
*Alternate #5: Volleyball Court Lighting $26,000.00
## *Athletic Lighting Controls, Monitoring System, and Mobilization (Required if
any combination of athletic lighting is awarded)
$19,000.00
## Maximum Alternate Costs $384,300.00
## Overall Project Balance
Maximum Project Cost for Willowbrooke Fields and Prairie Trails Park $2,045,867.45
## Project Budget $2,066,000.00
Project Balance (P2025-02) $20,132.55
3
## COUNCIL DIRECTION REQUESTED
It is the intent of City Staff to recommend K.A. Witt Construction Inc. as the general contractor for
construction services of the restroom and open-air picnic shelter building for a total of $384,498.40
at the July 28, 2026, regular meeting of the City Council. With a predictable project balance of
$404,432.55, City staff are seeking feedback from the City Council on the selection of the five (5)
proposed bid alternates, which would then be brought forward for award by the City Council, in
conjunction with the award for construction of the restroom/shelter on July 28, 2026.
## Attachments
## Willowbrooke Fields Site Plan
## Willowbrooke Fields Restroom and Picnic Shelter Rendering
## Willowbrooke Fields Restroom and Picnic Shelter Plan
## Hayward Ave N
Interstate 694
## Proposed
## Stormwater
## Filtration
## Basin
## Pickleball Courts
## Multi-Purpose Field
## (U12 Soccer Field Size)
## Vacant Lot
## Townhouses
## Existing Wetland
## Existing
## Parking Lot
02040 ft10
## N
## Picnic Lawn
## Space
## Willowbrooke Park West - Preferred Concept
## Coniferous Trees to
## Screen Interstate
## Pickleball Court - Shade Umbrella
## Court Seating
## Coniferous Tree Screening
## 8’ Wide Bituminous Trail
## Charcoal Grill
## Trash & Recycling Receptacle
## Trash & Recycling Receptacle
## Restroom Picnic Shelter Building
## Park Identification Sign
## Synthetic Turf Volleyball Court
## Bicycle Parking
240’
165’
20’
20’
## Multi-Purpose Field Lighting
## Optional Pickleball Court Lighting
## Optional Volleyball Court Lighting
## Pickleball Court Interior Fence
## Pickleball Court Perimeter Fence
## Bench
## Picnic Table with Optional Shade Umbrella
## Picnic Table with Optional Shade Umbrella
## Native Prairie Grass
## Coniferous Trees to
## Screen Townhomes
## Existing Trail
## Restroom Picnic Shelter Building
20’
## Willowbrooke Parks, City of Oakdale MN
Updated March 13, 2026
## 1/2 DISTANCE = 0' -2"
## DIAGONAL DISTANCE = 0' -3"
## MAX OCCUPANT LOAD
## OCCUPANT LOAD
## IS EXIT SIGN REQUIRED
## IS PANIC HARDWARE REQUIRED
## 1 HOUR RATED ASSEMBLY
## 2 HOUR RATED ASSEMBLY
## 3 HOUR RATED ASSEMBLY
## 1/2 AND (OPTIONAL) 1/3 DISTANCE ROUNDS UP TO NEAREST INCH
## 4 HOUR RATED ASSEMBLY
## TRAVEL DISTANCE
## COMMON PATH
## START POINT
## POINT WHERE AT LEAST 2 EXITS ARE AVAILABLE
## SAFE EGRESS LOAD TAG: THIS TAG INDICATES WHEN A LOAD
## HAS REACHED A SAFE EGERSS AND DOES NOT CONVERGE
## WITH ANOTHER LOAD
## OCCUPANT LOAD TAG
## EGRESS PATH
######
## PH
## FIXED SEATS49
## AREA: 500 SF
## AREA NAME
## EXIT SIGN
## AREA LABEL
## AREA TAG
## AREA NAME
## AREA: 4,200 SF
## @100 SF/OCC
## 2* EXITS GROUP B¹
42
??
??
12'
## COMBINED TRAVEL DISTANCE
## OCCUPANT LOAD AND OCCUPANCY LOAD FACTOR
## NUMBER OF EXITS AND OCCUPANCY GROUP
## FIXED SEAT OCCUPANT LOAD
## FILLED REGION INDICATES LIT FACE; REFER TO ELECTRICAL DOCUMENTS
## LEGEND -CODE PLAN
## PROJECT DATA:
## CODE CRITERIA
## 2020 MINNESOTA STATE BUILDING CODE (CHAPTER 1305)
## 2020 MINNESOTA STATE ACCESSIBILITY CODE (CHAPTER 1341)
## NOTE: THIS CODE ANALYSIS DOES NOT DELINEATE DETAILED REQUIREMENTS FOR
## THE MECHANICAL AND ELECTRICAL SYSTEMS.
## BUILDING
## USE AND OCCUPANCY CLASSIFICATION (SECTION 302)
## • GROUP B
## • ENCLOSED PORTION OF THE BUILDING IS UNCONDITIONED SPACE
## BUILDING AREA (SECTION 503, 506 AND 507, TABLE 503)
## • ALLOWABLE AREA PER STORY = 9,000 SF
## • PROVIDED AREA PER STORY (AREA UNDER ROOF, UNO):
## 1. 1,205sf TOTAL AREA UNDER ROOF
2. -289sf ENCLOSED BUILDING
## HEIGHT (SECTION 504 AND 504, TABLE 503)
## • ALLOWABLE HEIGHT FOR TYPE V-B CONSTRUCTION
## 1. MAX FEET ABOVE GRADE PLANE = 40
## 2. MAX STORIES ABOVE GRADE PLANE = 2
## TYPE OF CONSTRUCTION (SECTION 302)
## TABLE 601, SECTION 602
## BUILDING ELEMENTTYPE V-B
## STRUCTURAL FRAME INCLUDING COLUMNS,
## GIRDERS AND TRUSSES
0
## BEARING WALLS
## EXTERIOR
## INTERIOR
0
0
## NON-BEARING WALLS AND PARTITIONS
## EXTERIOR
## INTERIOR
## TABLE 602
0
## FLOOR CONSTRUCTION INCLUDING
## SUPPORTING BEAMS AND JOISTS
0
0
## ROOF CONSTRUCTION INCLUDING
## SUPPORTING BEAMS AND JOISTS
## FIRE SUPPRESSION SYSTEMS(SECTION 903)
## • SPRINKLERS ARE NOT REQUIRED.
## OCCUPANT LOAD (SECTION 1004)
## • TOTAL OCCUPANT LOAD = 35 OCC (3 OCC WITHIN ENCLOSED BUILDING/32
## OCC COVERED PICNIC AREA)
## EXIT AND EXIT ACCESS (SECTIONS 1005, 1015, 1016, AND 1017)
## • EXITS REQUIRED = 3 EXIT(S), 96" OF EXIT WIDTH
## • EXITS PROVIDED = 3 EXIT(S), 96" OF EXIT WIDTH
## EXIT SIGNS (SECTION 1003.2.10)
## 1. EXIT SIGNS ARE NOT REQUIRED IN ROOMS OR AREAS WHICH REQUIRE
## ONE EXIT OR EXIT ACCESS
## OUTLINE OF ROOF ABOVE
## UNISEX
## TOILET
101
## 1 OCC
## UNISEX
## TOILET
102
## 1 OCC
## MECHANICAL
100
## 1 OCC
## COVERED
## PICNIC
## AREA
103
## 32 OCC
## I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT
## WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
## THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF
## THE STATE OF MINNESOTA.
## DATE:REG. NO.:
## Stephen T. Iaria
46705
## CHECKED BY:
## DATE:
## DRAWN BY:
## PROJECT:
## REVISIONS:
## 2051 KILLEBREW DRIVE, SUITE 680, BLOOMINGTON, MN 55425
## P. 651.451.4605KOMAINC.COM
## THE DESIGNS AND PLANS INDICATED ON THIS DRAWING ARE
## THE PROPERTY OF KRECH, O'BRIEN, MUELLER & ASSOCIATES,
## INC. ALL RIGHTS ARE RESERVED. NO DESIGNS OR PLANS
## SHALL BE USED OR REPRODUCED IN ANY FORM OR BY ANY
## MEANS WITHOUT THE WRITTEN PERMISSION OF KRECH,
## O'BRIEN, MUELLER & ASSOCIATES, INC.
## PERMIT SET
## WILLOWBROOKE PARK WEST – RESTROOM AND PICNIC SHELTER
## TJA
## STI
25065
## 3700 HAYWARD AVEOAKDALE, MN 55128CODE DATA PLAN
## A1
2026-03-10
## A1 CODE DATA PLAN
1/4" = 1'-0"
1
## CODE PLAN
## N
## O
## R
## T
## H
3/10/2026