Agenda · Oakdale City Council
Oakdale City CouncilAgendaWednesday, August 12, 2026
Not yet analyzed
Analyze this document to extract topics and generate news stories.
Agenda Text
---
## author: Sue Barry
date: D:20260806135238-05'00'
---
## AGENDA
## City Council
## Workshop Meeting
August 12, 2026
## Discovery Center, 4444 Hadley Ave N
## 5:00 PM
5:00 PM Planning Commission Interview Candidate: Matthew Hersey
5:10 PM Parks and Recreation Commission Interview Candidates: Andy Ness and Jeff Bates
## 5:30 PM Discussion of Advisory Body Interview Candidates
## 5:50 PM Tanners Lake Park Initial Concept Options
## 6:10 PM Council Follow Up Tracker Review
## 6:30 PM Administrator Update
## 6:35 PM Council Topics
## 6:50 PM Adjourn
## COUNCIL MEMORANDUM
## To: Honorable Mayor and City Council
## From: Luke McClanahan, Planning Manager
Date: August 12, 2026
## Subject: Planning Commission Interview Candidate: Matthew Hersey
## BACKGROUND
At the August 12, 2026 Workshop, the City Council will interview one individual, Matthew Hersey, for
consideration to serve on the Planning Commission. At this time, the Planning Commission has one
vacancy.
Community Development staff has interviewed the applicant ahead of the Council Workshop and
recommends an interview by the City Council for the applicant as noted.
Application and staff interview materials will be provided to the City Council under separate cover.
## COUNCIL DIRECTION REQUESTED
The City Council is requested to interview the Planning Commission applicant and provide direction to
staff for possible appointment at the August 25
th
City Council regular meeting.
## COUNCIL MEMORANDUM
## To: Honorable Mayor and City Council
## From: Cory Tietz, Public Works Director
Date: August 12, 2026
Subject: Parks and Recreation Commission Interview Candidates: Andy Ness and Jeff Bates
## BACKGROUND
At the August 12, 2026 Workshop, the City Council is asked to interview two individuals, Andy Ness and
Jeff Bates, for consideration to serve on the Parks and Recreation Commission. At this time, the Parks
and Recreation Commission has one vacancy.
City staff has interviewed the applicants ahead of the Council Workshop and recommends an interview
by the City Council for the two applicants as noted.
Applications and staff interview materials will be provided to the City Council under separate cover.
## COUNCIL DIRECTION REQUESTED
The City Council is requested to interview each Parks and Recreation Commission applicant and select
one to fill the vacant seat.
## COUNCIL MEMORANDUM
1
## To: Honorable Mayor and City Council
## From: Hannah Dunn, Sr. Community Development Specialist
Date: August 12, 2026
## Subject: Tanners Lake Park Initial Concept Options
## BACKGROUND
At the August 12, 2026 Workshop, the project team, consisting of City and LHB staff, will review Tanners
Lake Park community engagement results and discuss design options and associated cost estimates.
Following the May 27, 2026 walking tour and listening session at Tanners Lake Park, the project team
compiled and analyzed the feedback received. Core themes for each focus area – parking lot, playground,
courts, and shoreline – were identified, as well as broader, cross-cutting themes. Summaries of these
themes are included in the presentation slides. The detailed engagement results from the walking tour
and listening session will be provided to the Council under separate cover.
Engagement results were then used to inform a suite of concept options for the focus areas and the
overall park. Preliminary cost estimates for the various options have been developed; the high-level costs
are included in the presentation slides. The next step in the design process is to prioritize the concept
options based on their estimated costs. For reference, the approved project budget is $2,117,619.
Multiple concept alternatives for Council consideration are provided in the presentation slides.
Using Council’s direction on concept options, the project team will develop two refined alternatives, which
will then be shared with the community to gather feedback. Engagement will occur in late August and
September, and include a pop-up event at Tanners Lake Park, tabling at community events such as the
Farmers Market, potential stakeholder meetings, and an online survey. City staff will also attend the
September 15, 2026 Parks and Recreation Commission meeting. Following the community engagement,
the project team will return to a future Workshop to seek direction on the final Tanners Lake Park concept
plan. Final design and preparation for bidding will take place in late fall.
Flagship Recreation has created two draft playground themes/concept – included in the presentation
slides – that are unique and reflect the character of Tanners Lake and the park. Before sharing them with
the community during the next round of engagement, the project team is seeking confirmation from the
Council that they are comfortable with the overall direction of the concepts. Both concepts can work within
the project budget but may require other improvements to be scaled back slightly. During the community
engagement process, the project team will gather feedback from residents, park users, and the Parks
and Recreation Commission to better understand what they like and dislike about each concept. This
input will help the Council select a final theme/concept. Once a final theme/concept is chosen, Flagship
Recreation will proceed with more detailed playground design.
## COUNCIL DIRECTION REQUESTED
It is requested that the City Council review engagement results and presentation slides with the concept
options, costs, and alternatives for consideration and provide input and direction for two Tanners Lake
Park concept alternatives to present to the community for feedback. It is also requested that the City
Council confirm their support for the two draft themes/concepts from Flagship Recreation. Lastly, Council
2
should provide feedback on whether adjustments to the project budget should be considered at this time
to help offset the $26,447 budget overage at Golfview Park. Tower Park remains within budget.
## Attachments
## Presentation Slides
## Plan Sheets – Tanners Lake Park Concept Options
## OAKDALE 2026 PARK
## IMPROVEMENTS-
## TANNERS LAKE, TOWER &
## GOLFVIEW PARKS
## 08.12.2026 CITY COUNCIL WORKSHOP
## January
•
## City Council Approval
•
## Contracting Begins
## January-February
•
Contractor procurement paperwork,
permitting requirements
## September-October
•
Tanners Lake warranty walks
## March-April
•
## Start construction for Tanners Lake
## May-August
•
Continue construction for
## Tanners Lake
## November-December
•
Complete & close-out construction
## for Tanners Lake
## September-October
•
Tower & Golfview warranty walks
## February
•
Kick-off meeting
•
Geotech & survey begin
•
## Site Visits
•
Engagement planning/overall
scheduling begins
•
## Park & Rec Commission:
## Project Overview
## March
•
Finish survey and geotech
•
## Develop Tower & Golfview to SD level
•
SD level cost estimate
•
Engage playground vendors about
options/costs
•
## City Council: Project Overview, Tower
## & Golfview Update
## April
•
Engage neighbors to review Tower &
Golfview playground options
•
## Park & Rec Commission: Staff Update
•
## Updated Tower and Golfview
drawings to align with budget
## May
•
## Park & Rec Commission: Present
Tower & Golfview options & costs
•
## City Council: Tower & Golfview
## Review, Tanners Lake Update
•
Engage stakeholders to discuss
## Tanners Lake Park
## June
•
## Finalize Construction Documents for
Tower & Golfview & order playground
equipment
•
## Prepare Tanners Lake
preliminary concepts
•
Engagement event with updates on
all parks, including Parks Commission
participation
## July
•
DRC meeting: review DD estimate &
engagement for Tanners Lake
•
## City Council: Approval for Golfview and
## Tower Parks
•
## Bid Golfview and Tower Parks
•
## Tanners Lake Concept Design
and Costing
## August
•
## Golfview and Tower Bid Opening
•
## City Council Workshop: Review
## Tanners Lake Options
•
## Refine Tanners Lake Concepts
•
## Tanners Lake Second Round of
## Engagement
•
Construction for Golfview and
Tower to begin and playground
equipment secured
## September
•
## City Council: Engagement Results
## Update, Tanners Lake Review
•
## Start Tanners Lake
## Construction Documents
•
Continue construction for Tower
& Golfview
## October
•
Tanners Lake 95% set ready for final
cost estimate & review
•
Finalize play equipment/
equipment options
•
Continue construction for Tower
& Golfview
## November
•
## City Council: Project Update
•
## Finalize Tanners Lake construction
documents
•
Continue construction for Tower &
Golfview as weather permits
## December
•
Construction substantial completion
for Tower & Golfview
•
## Bid Tanners Lake
•
Secure equipment purchasing for
## Tanners Lake
2026
20272028
## Meeting
## Key:
## Engagement Event
## PROJECT SCHEDULE
*Schedule subject to change / Project Team will be exploring ways to expedite construction schedules
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 2
## PROJECT SCHEDULE: WHERE ARE WE NOW?
## July
•
DRC meeting: review DD estimate &
engagement for Tanners Lake
•
## City Council: Approval for Golfview and
## Tower Parks
•
## Bid Golfview and Tower Parks
•
## Tanners Lake Concept Design
and Costing
## August
•
## Golfview and Tower Bid Opening
•
## City Council Workshop: Review
## Tanners Lake Options
•
## Refine Tanners Lake Concepts
•
## Tanners Lake Second Round of
## Engagement
•
Construction for Golfview and
Tower to begin and playground
equipment secured
## September
•
## City Council: Engagement Results
## Update, Tanners Lake Review
•
## Start Tanners Lake
## Construction Documents
•
Continue construction for Tower
& Golfview
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 3
## TANNERS LAKE PARK LISTENING SESSION
## Basketball
## Baseball
## Basketball
## Playground
## Beach
## Fishing Pier
## Boat Launch
## Pickleball
## Pickleball
## Tennis
## Picnic Shelter
## Park Building
## Volleyball
## T
a
n
n
e
r
s
## L
a
k
e
## T
a
n
n
e
r
s
## P
a
r
k
## R
o
a
d
## G
r
a
f
t
o
n
## A
v
e
n
u
e
## N
## Undersized
electrical
service
## Aging
playground
equipment
Inefficient parking
lot layout lacking
stormwater
management
## Degraded
shoreline
Very wet
area
## Existing
mature trees
No accessible
connection to
court spaces
## Tanners Lake
## Park Boundary
## Underutilized
paved area
## CITY OF OAKDALE
## CITY OF LANDFALL
85’
## Park Access Point
## Project Area
## Existing Trees
## Non-accessible Trail
## Playground Focus Area
## Parking Lot Focus Area
## Courts Focus Area
## Accessible Trail
## Fence
5’ Contour
1’ Contour
## Very Steep Slopes
## Steep Slopes
## Rain Gardens
## Shoreline
050100 Fee t
## N
1
2
3
4
1
2
3
## Shoreline Focus Area
(Pending Funding)
4
• Four groups toured four focus areas -
## 1. Glenbrook Parking Lot
## 2. Future Playground Area
## 3. Courts Area
4. Shoreline
• Over 50 Attendees
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 4
## Cross-cutting Themes (Across All Focus Areas)
• Preserve trees and natural character and avoid
overdevelopment (especially parking expansion)
• Users favor fixing and protecting what exists
first before adding new elements
• Operations (maintenance, enforcement)
are just as critical as physical design
• Improve safety (traffic, enforcement,
lighting where appropriate)
• Balance recreation with neighborhood impacts
• Enhance year-round usability (winter + summer)
## Summary of Additional Park-Wide Comments
• Core theme:
Improve maintenance, safety, and year-round usability
ƜImprove overall maintenance (trails, trash, facilities upkeep)
ƜIncrease enforcement and safety (ADA
compliance, rules, traffic) conditions
ƜReopen and better utilize park facilities
(bathrooms, building, programming)
## TANNERS LAKE PARK LISTENING SESSION SUMMARY
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 5
## Parking Lot Area
• Core theme:
Minimize expansion, prioritize safety,
ADA access, and neighbor impacts
ƜLimit or avoid parking expansion; prioritize
ADA-only and drop-off solutions
ƜAddress traffic safety through calming measures,
speed control, and enforcement
ƜPreserve mature trees and reduce footprint
to reduce neighbor impacts
## TANNERS LAKE PARK LISTENING SESSION RESULTS
## Precedent Imagery Shown for Listening Session
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 6
## Playground Area
• Core theme:
Design the hillside playground in a
manner that preserves trees and sledding
use while enhancing play value.
ƜPreserve sledding hill use
ƜRetain mature trees to maintain shade and natural character
ƜAdd diverse, inclusive play features (swings,
climbing, multi-age equipment)
## TANNERS LAKE PARK LISTENING SESSION RESULTS
## Precedent Imagery Shown for Listening Session
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 7
## Courts Area
• Core theme:
Maintain and upgrade high-use facilities,
especially basketball & pickleball
ƜMaintain both basketball courts as a
high-use, essential amenity
Ɯ Upgrade and expand pickleball facilities
to meet growing demand
ƜPrioritize resurfacing, drainage fixes,
and general court maintenance
## TANNERS LAKE PARK LISTENING SESSION RESULTS
## Precedent Imagery Shown for Listening Session
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 8
## Shoreline Area
• Core theme:
Improve water quality, maintain natural character,
enhance beach usability, and do not move
the fishing pier to north end of the park.
ƜImprove water quality and remove weeds
to support safe swimming
ƜMaintain and enhance beach area (sand quality, size, usability)
ƜPreserve natural shoreline character while
adding simple access features
ƜDo not move the fishing pier to the north end of
the park. Consider a central location that does
not conflict with the beach function.
## TANNERS LAKE PARK LISTENING SESSION RESULTS
## Existing Fishing Pier
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 9
Initial Design Ideas for Parking, Playground, and Courts Areas Presented to Development Review Committee
## TANNERS LAKE PARK INITIAL DESIGN IDEAS
## 5200 SF
## 3600 SF
## 5200 SF
## 3600 SF
June 24, 20267 of 7
## TANNERS LAKE INITIAL CONCEPTS
## 250707 / Oakdale Park Improvements
## 5200 SF
## 3600 SF
## Courts Focus Area / Concept
1. Full volleyball court with artificial turf
2. Full basketball court
3. Shade sail over picnic tables
4. ADA connection to courts
5. ADA connection to courts with culvert
0153060Feet
## N
4
2
1
3
5
## DRAFT
## Playground Area OptionsCourt Area Ideas and Site VisitsParking Lot Options
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 10
## • CIP Budget
## ƜApproved CIP Budget - $2,117,619.00
## ƜLHB Contract Amount - $209,056.86
## ƜConstruction Budget-
$ 1,908,562.14
## • Grant Funding for Project
Ɯ$500,000 awarded
## DNR Outdoor Recreation Grant
ƜDid not recieve the 3M PFAS
## Settlement Priority 2 Grant
## • Potential Funding
ƜPotential funding from
## Ramsey-Washington Metro
Watershed District from their
targeted retrofit program for
parking lot improvements.
## TANNERS LAKE PARK FUNDING
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 11
• Base cost includes:
1. Parking lot and associated
stormwater and lighting
## 2. Playground Area
(site + landscape improvements only)
## 3. Southern Court Area Repair,
new shaded seating area
## 4. Ballfield Drainage Improvements
• Preliminary base cost with contingencies
and escalation is $1,281,127
• Many alternates were included
to inform costs and priorities,
including trail reconstruction
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
Concept Plan for Pricing, North Side of Park (base cost scope highlighted in blue)
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 12
## Parking Lot Area
• Concept features included in base cost:
ƜPorous pavement surfacing with two landscaped islands
ƜStormwater management and associated utility work
Ɯ8 standard parking stalls, 2-4 ADA parking stalls,
and temporary drop-off zone near building
ƜBollards line sidewalks separating parking and park use
ƜLighting (dark-sky compliant)
ƜRemoves 2 trees near beach that are already dead or dying
ƜProtects trees between parking and adjacent neighbors
• Potential funding opportunity
ƜPorous pavement eligible for watershed’s targeted retrofit
grant program. RWMWD actively works with potential grant
recipients to tailor the grant award to match the project.
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
## Parking Lot Concept Plan for Pricing
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 13
## Playground Area
• Playground site improvements included in base cost:
ƜNew hillside play area with ADA pathway with
connection close to the park building
ƜKeeps sledding function on the east side of hill
ƜStays out of the existing wet area/swale on the east of the hill
ƜProtects existing oak trees and plants more trees
providing a buffer between adjacent neighbors and play area
• Playground equipment and surfacing $600-800K
ƜConcepts are being prepared at both ends of the cost range
• Picnic Shelter Alternate - $409,426
ƜAdd medium-sized picnic shelter and extend concrete plaza/patio
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
## Playground and Picnic Shelter Alternate Concept Plan for Pricing
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 14
## Courts Area
## • Southern Courts
ƜRecommend keeping basketball based on public feedback. Turn
tennis into pickleball courts or keep a tennis/pickleball court combo.
ƜOption 1 Repair - Included in base cost.
Repair/seal cracks and repaint, add shaded seating area at entry.
ƜOption 2 Rebuild - $478,043
Reconstruct courts in place with new sand base.
Replace 10’-0” perimeter fencing. Provide new nets and
basketball hoops. Add shaded seating at entry.
• Northern Courts Alternate - $546,545
ƜAdd accessible bituminous trail between north and south court
areas, small patio with shaded seating, artificial volleyball court, and
new basketball court (reclaim existing court pavement for base).
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
## Courts Area Concept Plan for Pricing
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 15
## Shoreline Area
## • Fishing Pier Relocation Alternate - $75,000
ƜRelocates fishing pier to center of park to
avoid conflict with beach use
ƜClearing vegetation for new connection
ƜNew trail connection to fishing pier
ƜRestoring vegetation along shoreline
• Baseball Drainage Improvements - included in base cost
ƜDraintile added in the outfield along warning track
ƜRemoval of concrete jersey barriers
ƜNew outlet to nearby stormwater basin/BMP
ƜRestoration of outlet slope
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
15'30'60'
Scale: 1"=30'
## SURFACING AND LAYOUT PLAN - SOUTH
1
## KAT
## NLS
## File Path:
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NODATEREVISION
## NODATEISSUED FOR
## COPYRIGHT 2026 BY LHB, INC. ALL RIGHTS RESERVED.
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:
## DRAWN BY:
## CHECKED BY:
## PROJ. NO:
## DRAWING NO:
1
07/27/2026
## CONCEPT/SD PRICING SET
1
## L102
## ALTERNATE 1B: REPAVE SHORELINE TRAIL
1
## L102
## ALTERNATE: RELOCATE FISHING PIER
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
>>
>>
## S
>>
>>
## S
>>
>>
## S
## EM
## EM
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## ST
>
>
## ST
>
>
>
>
>
>
>
>
>
>
>
>
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## RELOCATE FISHING PIER
## BASKETBALL COURT,
## SEE NARRATIVE
## RESTORE SHORELINE
## VEGETATION WITH
## NATIVE PLANTINGS AND
## SEED MIX
## ALTERNATE 3: TRAIL
## LIGHTING, TYP.
## SEE ELECTRICAL
## NARRATIVE
## ALTERNATE 1B: REPAVE
## SHORELINE TRAIL
## REPAVE BITUMINOUS TRAIL
## TO PARKING LOT
## SIDEWALK
## BITUMINOUS TRAIL
## CONNECTION
## ALTERNATE 1B: RESTORE
## SHORELINE VEGETATION
## WITH NATIVE PLANTINGS
## AND SEED MIX IMPACTED
## BY TRAIL
## RECONSTRUCTION
## BASKETBALL COURTS
## COURT FENCING
## GATE
## SHORELINE TRAIL. SEE C402 FOR FULL
## EXTENTS. RESTORE VEGETATION
## ADJACENT TO TRAIL, IF IMPACTED BY
## TRAIL RECONSTRUCTION.
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 16
## Trail Reconstruction Alternates
## • Northern Trail Reconstruction
-$215,406
Ɯwith lighting $359,712
Ɯwith conduit only $279,406
## • Southern Trail Reconstruction-
$106,612
Ɯwith lighting $189,073
Ɯwith conduit only $130,161
## • Total Trail Reconstruction
- $322,018
Ɯwith lighting $548,785
## TANNERS LAKE PARK CONCEPT PLAN FOR PRICING
15'30'60'
Scale: 1"=30'
## SURFACING AND LAYOUT PLAN - SOUTH
1
## KAT
## NLS
## File Path:
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NODATEREVISION
## NODATEISSUED FOR
## COPYRIGHT 2026 BY LHB, INC. ALL RIGHTS RESERVED.
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:
## DRAWN BY:
## CHECKED BY:
## PROJ. NO:
## DRAWING NO:
1
07/27/2026
## CONCEPT/SD PRICING SET
1
## L102
## ALTERNATE 1B: REPAVE SHORELINE TRAIL
1
## L102
## ALTERNATE: RELOCATE FISHING PIER
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
>>
>>
## S
>
>
>>
## S
>>
>>
## S
## EM
## EM
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## ST
>
>
## ST
>
>
>
>
>
>
>
>
>
>
>
>
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## RELOCATE FISHING PIER
## BASKETBALL COURT,
## SEE NARRATIVE
## RESTORE SHORELINE
## VEGETATION WITH
## NATIVE PLANTINGS AND
## SEED MIX
## ALTERNATE 3: TRAIL
## LIGHTING, TYP.
## SEE ELECTRICAL
## NARRATIVE
## ALTERNATE 1B: REPAVE
## SHORELINE TRAIL
## REPAVE BITUMINOUS TRAIL
## TO PARKING LOT
## SIDEWALK
## BITUMINOUS TRAIL
## CONNECTION
## ALTERNATE 1B: RESTORE
## SHORELINE VEGETATION
## WITH NATIVE PLANTINGS
## AND SEED MIX IMPACTED
## BY TRAIL
## RECONSTRUCTION
## BASKETBALL COURTS
## COURT FENCING
## GATE
## SHORELINE TRAIL. SEE C402 FOR FULL
## EXTENTS. RESTORE VEGETATION
## ADJACENT TO TRAIL, IF IMPACTED BY
## TRAIL RECONSTRUCTION.
## Northern Trail ScopeSouthern Trail Scope
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 17
## •Concept A - Base Option
## ƜParking Lot
## ƜPlayground Site Improvements
## ƜPlayground Equipment + Surfacing
$600,000 Budget (would need to
supplement $200K at high range)
## ƜRepair Southern C
ourts
## •Concept B - Court Focused
## ƜParking Lot
## ƜPlayground Site Improvements
## ƜPlayground Equipment + Surfacing
$150,000 Budget (would need
to supplement $450-650K)
## Ɯ R
## econstruct Southern Courts
## •Concept C - Trail Focused
## ƜParking Lot
## ƜPlayground Site Improvements
## ƜPlayground Equipment + Surfacing
$340,000 Budget (would need
to supplement $260-460K)
## ƜNorthern T
rail Reconstruction +
## Lighting Conduit Rough-ins
## •Concept D - Play + Gathering Focused
## ƜParking Lot
## ƜPlay
## ground Site Improvements
## ƜPlayground Equipment + Surfacing
$200,000 Budget (would need to
supplement $400-600K)
## ƜAdd Picnic Shelter and P
atio
## •Concept C Option
## ƜFull Trail Reconstruction
(no lighting)
## ƜPlayground Equipment + Surfacing
$300,000 Budget (would need
to supplement $300-500K)
## TANNERS LAKE PARK POTENTIAL CONCEPT ALTERNATIVES
Concept alternatives listed below demonstrate how the different concept options can be packaged within the construction
budget. Recommend that two concept packages move forward for public input.
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 18
## Tanners Lake Park
1210424-01-01
Loon on
the Lake
## PLAYGROUND EQUIPMENT IDEAS
• Concept 1 -
Loon on the Lake
ƜThe design envisions
children experiencing the
wonder of the lake through
play, embodying the spirit
of the loon as they climb,
balance, soar, and navigate
their own adventures. The
result is a nature-inspired
play environment that
feels uniquely Minnesotan
while creating meaningful
opportunities for
imaginative and active play.
ƜEstimated project
budget $800K
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 19
## Tanners Lake Park
1210424-02-01
## Under
the Dock
## PLAYGROUND EQUIPMENT IDEAS
• Concept 2 -
## Under the Dock
ƜThis concept
invites children to
experience the lake
from an entirely
new perspective.
Children can imagine
themselves diving
beneath the dock,
swimming alongside
fish, exploring
underwater habitats,
and discovering the
hidden life of the lake.
ƜEstimated project
budget $600K
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 20
## COMMUNITY ENGAGEMENT SCHEDULE
## •Tanners Lake Park Engagement Next Steps
ƜAugust 26th 6PM-8PM, Pop-up Event in the Park
ƜAugust 27th is the back-up date for inclement weather
ƜOnline surve
y launch to be timed with the pop-up event
and is planned to be open for a minimum of two weeks
## ƜPostcards/mailers
will be sent out to park neighbors
ƜTabling at existing community events such as Farmer’s Market
ƜCity staff to determine o
ther engagement
opportunities with key stakeholders
## LHBCORP.COMPERFORMANCE DRIVEN DESIGN | 21
25'
50'
100'
Scale: 1'=50'
## REMOVALS PLAN
1
## REMOVALS PLAN
## KAT
## NLS
## C101
## File Path:
## ..\250707\500 Drawings\LA\250707.TL L101 Landscape Plan.dwg
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NO
## DATE
## REVISION
## NO
## DATE
## ISSUED FOR
## COPYRIGHT
2026
## BY LHB, INC. ALL RIGHTS RESERVED.
## PRELIMINARY
## NOT FOR CONSTRUCTION
07/27/2026
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:DRAWN BY:
## CHECKED BY:
## PROJ. NO:DRAWING NO:
250707
1
07/27/2026
## CONCEPT/SD PRICING SET
1
## C401
1
## C401
## ALTERNATE 8: RELOCATE FISHING PIER
## INCLUDES CLEARING & GRUBBING AND
## ALL WORK ASSOCIATED WITH FISHING
## PIER REMOVAL AND RELOCATION
## ALTERNATE 1B: REPAVE SHORELINE TRAIL
## INCLUDES REMOVAL OF EXISTING
## BITUMINOUS TRAIL AND ALL WORK
## ASSOCIATED WITH INSTALLING NEW
## SHORELINE TRAIL
1
## C401
## ALTERNATE 7: NORTH COURT AREA
## INCLUDES REMOVAL OF EXISTING
## PAVEMENTS, TREES, AND EQUIPMENT
## AND ALL WORK ASSOCIATED WITH NEW
## COURT DESIGN.
## BASE BID: NO WORK.
1
## C401
## ALTERNATE 6: NORTH COURT AREA
## INCLUDES REMOVAL OF EXISTING
## PAVEMENTS, TENNIS AND BASKETBALLEQUIPMENT AND ALL WORK
## ASSOCIATED WITH NEW
## COURT DESIGN. BASE BID: NO
## REMOVALS. REPAIR AND REPAINT, SEE
## NARRATIVE.
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## S
## S
## S
## S
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## EM
## EM
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GM
## GM
>>
>>
>>
>>
>>
>>
>
>
>
>
>
>
>
>
>
## ST
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
## WM
## H
## Y
## D
## W
## E-OH
## E-OH
## E-OH
## E-OH
>
>
>
>
964
965
967
967
968
969
970
971
972
973
974
974
975
976
977
980
980
975
974
973
972
972
971
970
981
982
983
983
982
981
980
979
973
974
975
976
977
978
979
980
981
983
984
985
986
988
990
992
993
994
995
996
964
965
966
967
968
969
970
971
972
973
974
## REMOVE EXISTING
## PARKING LOT BITUMINOUS
## PAVEMENT
## REMOVE TREE,
## COURTS ALTERNATECONDITION ONLY
## REMOVE TREE,
## COURTS ALTERNATECONDITION ONLY
## REMOVE TREE,
## COURTS ALTERNATECONDITION ONLY
## REMOVE SAND
## SURFACING AND CURB
## IN PLAYGROUND AREA,
## EQUIP. REMOVAL BY
## OWNER
## REMOVE AND REPLACE
## BITUMINOUS TRAIL IN
## ACCORDANCE WITH
## PLANS
## 1A: REMOVE AND
## REPLACE
## BITUMINOUS TRAIL
## IN ACCORDANCE
## WITH PLANS
## PAVEMENT
## SAWCUT
## PAVEMENT SAWCUT
## PAVEMENT SAWCUT
## REMOVEBENCH AND
## CONC PAD
## REMOVE CONC PAD
## REMOVE SWING SET
## REMOVE
## SAND
## VOLLEYBALL
## COURT AND
## NET
## REMOVE SIGN, TYP.
## REMOVE CONCRETE
## CURB AND GUTTER
## REMOVE LIGHTPOLE
## REMOVE
## BASKETBALL
## COURT,
## PAVEMENT, HOOP
## AND FOOTING
## PAVEMENT SAWCUT
## REMOVE
## CONCRETE
## CURB
## TREE
## PROTECTION,
## TYP.
## TREE PROTECTION,TYP.
## TREE PROTECTION,TYP.
## CLEAR AND GRUB TREES
## AND VEGETATION
## FOR FISHING PIE
## RELOCATION
## REMOVE TREE,
## TYP.
## PROVDE TREE PROTECTION
## FENCING ALONG EXISTING
## WOODS
## REMOVE ALL PARKING
## SIGNS
## PAVEMENT SAWCUT
## 1A: REMOVE AND
## REPLACE
## BITUMINOUS TRAIL
## IN ACCORDANCE
## WITH PLANS
## 1A: REMOVE AND
## REPLACE
## BITUMINOUS TRAIL
## IN ACCORDANCE
## WITH PLANS
## EXISTING
## BASKETBALL
## COURT
## EXISTING TENNIS
## AND PICKLEBALL
## COURTS
## GENERAL NOTES
## EROSION CONTROL NOTES
## LEGEND
10'
30'
60'
## Scale: 1"=30'LAYOUT AND SURFACING PLAN - NORTH
1
## LAYOUT ANDSURFACING PLANNORTH
## KAT
## NLS
## LEGEND
## C401
## File Path:
## ..\250707\500 Drawings\LA\250707.TL L101 Landscape Plan.dwg
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NO
## DATE
## REVISION
## NO
## DATE
## ISSUED FOR
## COPYRIGHT
2026
## BY LHB, INC. ALL RIGHTS RESERVED.
## PRELIMINARY
## NOT FOR CONSTRUCTION
07/27/2026
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:DRAWN BY:
## CHECKED BY:
## PROJ. NO:DRAWING NO:
250707
1
07/27/2026
## CONCEPT/SD PRICING SET
1
## L101
## ALTERNATE 8: RELOCATE FISHING PIER
1
## L102
## ALTERNATE 1B: REPAVE SHORELINE TRAIL
1
## L101
## ALTERNATE:7: NORTHERN COURT AREA
1
## L101
## ALTERNATE:6: SOUTHERN COURT AREA
1
## C402
## ALTERNATE:1B: REPAVE SHORELINE TRAIL
## SEE SHEET C402 FOR FURTHER EXTENTS
1
## L101
## ALTERNATE 5: PICNIC SHELTER AREA
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
>>
>>
## S
>>
>>
## S
>>
>>
## S
>>
>>
## S
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## E-BUR
## EM
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GM
## GM
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>
>
>
>
>
>
>
>
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
## H
## Y
## D
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## 9'-0", TYP.
17'-2"
17'-2"
25'-4"
5'-0"
5'-0"
8'-0"
6'-0"
## 4" WIDE SOLID WHITE STRIPING, TYP.
## ARTIFICIAL TURF VOLLEYBALL COURT
## 2" WIDE SOLID WHITE STRIPING, TYP.
## COURT STRIPING TO MEET
## DIMENSIONAL REQUIREMENTS FOR TYP.
## VOLLEYBALL COURTS.
## NEW BASKETBALL COURT,
## 2" WIDE SOLID WHITE
## STRIPING, TYP. COURTSTRIPING TO MEET
## DIMENSIONALREQUIREMENTS FOR TYP.
## BASKETBALL COURTS.
## RELOCATE FISHING PIER
## CONCRETE
## PLAYGROUND CURB,
## SEE X/LXXX
## ALTERNATE 3: TRAIL
## LIGHTING, TYP.
## ALTERNATE 2: PROVIDE
## CONDUIT ALONG TRAIL
## FOR FUTURE LIGHTING.
## SEE NARRATIVE.
## PROVIDE PARKING LOT
## LIGHTING, SEE ELECTRICAL
## PROVIDE ELECTRICAL
## OUTLETS AT LARGE PICNIC
## SHELTER (4), SEE
## ELECTRICAL
## PROVIDE BOLLARDS ALONG
## PARKING LOT SIDEWALK, TYP.
## ACCESSIBLE TRAIL
## CONNECTION.
## CONCRETE PATIO SEATING AREA.
## BASKETBALL COURT,
## SEE NARRATIVE
## PICKLEBALL COURT COMPLEX
## (8 COURTS), SEE NARRATIVE
## PLAYGROUND AREA
## SEE L101
## CONCRETE WALK, TYP.
## CONCRETE PLAZA/PATIO
## CONCRETE PATIO SEATING AREA.
## CONCRETE STAIRS
## AND RAILING, TYP.
## RESTORE SHORELINE
## VEGETATION WITH
## NATIVE PLANTINGS AND
## SEED MIX
## REPAVE BITUMINOUS TRAIL
## TO PARKING LOT
## SIDEWALK
## BITUMINOUS TRAIL
## CONNECTION
## PICNIC SHELTER,
## SEE NARRATIVE
## EXISTING POLE MOUNTED
## TRANSFORMER.
## ALTERNATE 4: UPSIZE
## TRANSFORMER, SEE
## ELECTRICAL NARRATIVE.
15'
30'
60'
## Scale: 1"=30'SURFACING AND LAYOUT PLAN - SOUTH
1
## SURFACING AND LAYOUT PLANSOUTH
## KAT
## NLS
## C402
## File Path:
## ..\250707\500 Drawings\LA\250707.TL L101 Landscape Plan.dwg
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NO
## DATE
## REVISION
## NO
## DATE
## ISSUED FOR
## COPYRIGHT
2026
## BY LHB, INC. ALL RIGHTS RESERVED.
## PRELIMINARY
## NOT FOR CONSTRUCTION
07/27/2026
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:DRAWN BY:
## CHECKED BY:
## PROJ. NO:DRAWING NO:
250707
1
07/27/2026
## CONCEPT/SD PRICING SET
1
## L102
## ALTERNATE 1B: REPAVE SHORELINE TRAIL
1
## L102
## ALTERNATE: RELOCATE FISHING PIER
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
>>
>>
## S
>>
>>
## S
>>
>>
## S
## EM
## EM
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
## ST
>
>
## ST
>
>
>
>
>
>
>
>
>
>
>
>
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## 5'-0", TYP.
## RELOCATE FISHING PIER
## BASKETBALL COURT,
## SEE NARRATIVE
## RESTORE SHORELINE
## VEGETATION WITH
## NATIVE PLANTINGS AND
## SEED MIX
## ALTERNATE 3: TRAIL
## LIGHTING, TYP.
## SEE ELECTRICAL
## NARRATIVE
## ALTERNATE 1B: REPAVE
## SHORELINE TRAIL
## REPAVE BITUMINOUS TRAIL
## TO PARKING LOT
## SIDEWALK
## BITUMINOUS TRAIL
## CONNECTION
## ALTERNATE 1B: RESTORE
## SHORELINE VEGETATION
## WITH NATIVE PLANTINGS
## AND SEED MIX IMPACTED
## BY TRAIL
## RECONSTRUCTION
## BASKETBALL COURTS
## COURT FENCING
## GATE
## SHORELINE TRAIL. SEE C402 FOR FULL
## EXTENTS. RESTORE VEGETATION
## ADJACENT TO TRAIL, IF IMPACTED BY
## TRAIL RECONSTRUCTION.
15'
30'
60'
## Scale: 1"=30'LANDSCAPE PLAN
1
## LANDSCAPE PLAN
## KAT
## NLS
## LANDSCAPE NOTES
## PLANT SCHEDULE
## GENERAL LANDSCAPE NOTES:
1.
## THIS DRAWING DOES NOT CONSTITUTE AN OFFICIAL SURVEY OF THE SITE. CONFIRM
## ALL LOCATIONS OF SURFACE AND SUB-SURFACE FEATURES BEFORE BEGINNING
## INSTALLATION. ADVISE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES.
2.
## THE PLAN TAKES PRECEDENCE OVER THE PLANT SCHEDULE IF DISCREPANCIES EXIST.
## ADVISE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES.
3.
## CONFIRM ALL QUANTITIES, SHAPES, AND LOCATIONS OF LANDSCAPE AREAS, AND
## ADJUST TO CONFORM TO THE SITE CONDITIONS. CONFIRM ANY ADJUSTMENTS WITH
## THE LANDSCAPE ARCHITECT.
4.
## VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO DIGGING. NOTIFY THE
## LANDSCAPE ARCHITECT OF ANY CONFLICTS WITH PLANT INSTALLATION.
5.
## THE CONTRACTOR IS RESPONSIBLE FOR ALL MULCHES AND SOIL QUANTITIES TO
## COMPLETE THE WORK SHOWN IN THE DRAWINGS. VERIFY ALL QUANTITIES SHOWN ON
## THE PLANT SCHEDULE.
5.1.
REFER TO SPECIFICATION SECTION 31 2323 FILL FOR SOIL TYPES ANDREQUIREMENTS. DO NOT BEGIN PLANTING OPERATIONS IF SOIL CONDITIONS
## ARE NOT AS SPECIFIED.
5.2.
## REFER TO SPECIFICATION SECTION 32 9300 FOR MULCH TYPES ANDREQUIREMENTS.
6.
## STAKE TREE LAYOUT IN-FIELD FOR LANDSCAPE ARCHITECT APPROVAL PRIOR TO
## PLANTING OPERATIONS
## PROTECTIONS
7.
PROTECT EXISTING TREES. DO NOT STORE OR DRIVE HEAVY MATERIALS OVER TREEROOTS. DO NOT DAMAGE TREE BARK OR BRANCHES. REFER TO SHEET L500 FOR TREEPROTECTION REQUIREMENTS.
8.
## KEEP PAVEMENTS, FIXTURES AND BUILDINGS CLEAN AND UNSTAINED. ANY DAMAGE TO
## EXISTING FACILITIES WILL BE REPAIRED AT THE CONTRACTOR’S EXPENSE. KEEP THE
## PROJECT SITE CLEAR OF CONSTRUCTION WASTES AND DEBRIS.
9.
## PROVIDE AND MAINTAIN INLET AND PERIMETER EROSION CONTROL BMPS AS SPECIFIED
## ON CIVIL SHEETS.
10.
## ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION WILL BE RESTORED WITH SEED
## OR SOD UNLESS OTHERWISE NOTED. SEE SPECIFICATIONS FOR TURF RESTORATION
## REQUIREMENTS.
## PLANT MATERIAL
11.
## PLANT TREE ROOT BALLS FLUSH WITH FINAL GRADE AND THE TOP OF ROOT FLARE
## EXPOSED, PER PLANTING DETAILS.
12.
## NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ACCEPTED UNLESS APPROVED IN
## WRITING BY THE LANDSCAPE ARCHITECT.
13.
## THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH
## ARE DEEMED UNSATISFACTORY.
14.
## ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY
## STOCK", ANSI-Z60. LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN,
## INC.
15.
HEEL IN AND WATER ANY PLANT STOCK NOT PLANTED WITHIN 24 HOURS OF DELIVERYUNTIL INSTALLATION. PLANTS NOT MAINTAINED IN THIS MANNER WILL BE REJECTED.
16.
## REFER TO SPECIFICATIONS FOR WARRANTY REQUIREMENTS AND OTHER PLANTING
## ACCESSORIES.
## MAINTENANCE AND CARE
17.
## BEGIN PLANT MAINTENANCE IMMEDIATELY AFTER EACH PORTION OF THE WORK IS INPLACE.
18.
MAINTENANCE INCLUDES WATERING, WEEDING, MULCHING, REMOVAL OF DEADMATERIAL PRIOR TO GROWING SEASON, RE-SETTING PLANTS AND PROPER GRADE,
## AND KEEPING PLANTS IN A PLUMB POSITION.
19.
## REFER TO SPECIFICATIONS FOR FULL INSPECTION, MAINTENANCE, AND WARRANTYREQUIREMENTS.
## SITE FURNISHINGS
20.
## PICNIC TABLE AND BENCHES TO BE PROVIDED BY OWNER, PLAYGROUND VENDOR
## INSTALLED. COORDINATE WITH PLAYGROUND VENDOR.
21.
## OWNER TO PROVIDE AND INSTALL TRASH AND RECYCLING BINS. COORDINATE WITHOWNER.
## L101
## File Path:
## ..\250707\500 Drawings\LA\250707.TL L101 Landscape Plan.dwg
701 Washington Ave. N, Ste 200 | Minneapolis, MN 55401 | 612.338.2029
THIS SQUARE APPEARS 1/2" x 1/2"
## ON FULL SIZE SHEETS
## 7/28/2026 8:09 AM
## Plot Date:
## CLIENT:
## CITY OF OAKDALE
## 4444 HADLEY AVE N
## OAKDALE, MN 55128
## NO
## DATE
## REVISION
## NO
## DATE
## ISSUED FOR
## COPYRIGHT
2026
## BY LHB, INC. ALL RIGHTS RESERVED.
## PRELIMINARY
## NOT FOR CONSTRUCTION
07/27/2026
## PROJECT NAME:
## TANNERS LAKE PARK
## IMPROVEMENTS
## 400 GLENBROOK AVE N
## OAKDALE, MN 55128
## DRAWING TITLE:DRAWN BY:
## CHECKED BY:
## PROJ. NO:DRAWING NO:
250707
1
07/27/2026
## CONCEPT/SD PRICING SET
## KEYNOTES
## REFER TO C401 FOR ALTERNATE AREAS,
## L101 SHOWS FULL ALTERNATE CONDITION
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
## X
>>
>>
## S
>>
>>
## S
>>
>>
## S
>>
>>
## S
## EM
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GAS
## GM
## GM
>
>
>
>
>
>
>
>
## WM
## H
## Y
## D
## W
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## E-OH
## 5'-0", TYP.
## 5'-0", TYP.
10'-0"
## PICKLEBALL COURTS
## BASKETBALL COURTS
## COURT FENCING
## GATE
## NEW GATE, NORTHERN
## COURTS ALTERNATE ONLY
## PEDESTRIAN TRAILLIGHTING, TYP.
## SHORELINE TRAIL. SEE C402 FOR FULL
## EXTENTS. RESTORE VEGETATION
## ADJACENT TO TRAIL, IF IMPACTED BY
## TRAIL RECONSTRUCTION.
## SYMBOL
## QTY
## BOTANICAL / COMMON NAME
## DECIDUOUS CANOPY TREE
18
## Deciduous Tree
## GROUND COVERS
3,013 sf
## Landscape Plantings
3,594 sf
## PIP Resilient Playground Surfacing / By Playground Vendor
3,302 sf
Shoreline Seed Mix with Perennial Plugs at 18" O.C.
34,185 sf
Turf Seed / See 32 9219
## POURED IN PLACE RESILIENT PLAYGROUND SURFACING
## WITH DRAIN TILE, PROVIDED BY VENDOR.
## STAIRS WITH RAILINGS ON BOTH SIDES.SEE NARRATIVE.
## VOLLEYBALL COURT WITH ARTIFICIAL TURF SURFACING.
## CAFE TABLE AND CHAIRS BY OWNER.
## VOLLEYBALL NET.
## BASKETBALL HOOP.
## SINGLE POST SHADE STRUCTURE BY OWNER.
## LARGE PICNIC SHELTER WITH FOOTINGS.
## PLAYGROUND EQUIPMENT, PROVIDED BY VENDOR.
## LANDSCAPE BOULDER RETAINING WALL.
## RELOCATED FISHING PIER.
## COUNCIL MEMORANDUM
## To: Honorable Mayor and City Council
## From: Kelli Bourgeois, City Administrator
Date: August 12, 2026
## Subject: Council Follow Up Tracker Review
## BACKGROUND
In 2022, City staff created a Council Follow Up Tracker that documents needed follow up from City Council
meetings. On an ongoing basis, the tracker is reviewed and updated by staff; however, to ensure staff is
utilizing their time effectively, it is requested that Council review the tracker and provide feedback on
items that have been completed or are no longer a priority.
The Council Follow Up Tracker will be sent to Council under separate cover.
## COUNCIL DIRECTION REQUESTED
Staff requests that Council review the Council Follow Up Tracker and provide direction on the listed items.