Agenda · Woodbury City Council
Woodbury City CouncilAgendaMonday, June 15, 2026
Analysis complete
Topics, quotes, key people, and more have been extracted from this document.
Agenda Text
---
## author: Beck, Megan
date: D:20260611162727-05'00'
---
## Planning Commission Agenda
June 15, 2026 | 7:00 p.m.
## City Hall, Council Chambers
The June 15 , 2026 Planning Commission meeting is taking place at the Woodbury City Hall in the Council
Chambers.
Members of the public may attend the meeting in person and may also join the meeting using a
computer, tablet, or smartphone and accessing the virtual meeting link at
woodburymn.gov/VirtualMeetings.
Public comments will be accepted during the meeting both in person and virtually. Virtual questions
should be submitted via the online Q&A feature within the virtual meeting link.
Questions regarding this meeting can be taken between the hours of 8:00 a.m. to 4:30 p.m. via email
planning@woodburymn.gov or by calling 651-714-3533 and leaving a voicemail message.
The City of Woodbury is subject to Title II of the Americans with Disabilities Act, which prohibits discrimination on
the basis of disability by public entities. The City is committed to full implementation of the Act to our services,
programs and activities. Information regarding the provisions of the Americans with Disabilities Act is available
from the City Administrator’s office at 651- 714-3523. Auxiliary aids for disabled persons are available upon request
at least 72 hours in advance of an event. Please call the ADA Coordinator at 651-714-3523 (TDD 651-714-3568) to
make arrangements.
1. Call to Order
## 2. Public Input Sign-up Sheet
## 3. Roll Call
## 4. Discussion Items
## A: Bailey Properties Master Plan 19-2025-00603
The City of Woodbury has prepared the Bailey West Master Plan. The intent of the plan is to
document existing conditions and to provide guidance on the following development
components:
## • Stormwater Management
•
## Landscaping Themes
•
## Pedestrian Plans
•
## Roadway Designs
•
## Buffering and Screening
•
## Architectural Themes
The Bailey West Master Plan (the Plan) includes approximately 185 acres of land with the
vast majority of the land being under single ownership. It is anticipated that development of
the properties will occur over several years.
## 5. Council Report: Councilmember Donna Stafford
6. Approval of Minutes – May 4, 2026 draft
7. Adjourn
## CITY OF WOODBURY
## PLANNING COMMISSION STAFF REPORT
June 15, 2026
## Project No. : 19-2025-00603 Prepared By: Eric Searles
## City Planner
651-714-3532
eric.searles@woodburymn.gov
## Project Name: Bailey West Master Plan Recommendation: Approval
Request: Master Plan Site Size: Approx. 185 acres
## PROPOSAL
The City of Woodbury has prepared the Bailey West Master Plan. The intent of the plan is to document
existing conditions and to provide guidance on the following development components:
## • Stormwater Management
•
## Landscaping Themes
•
## Pedestrian Plans
•
## Roadway Designs
•
## Buffering and Screening
•
## Architectural Themes
Furthermore, the plan intends to provide policy direction regarding the following areas:
• Century Avenue to be designed to Washington County roadway standards to allow for future
county ownership.
• Modifications to the 2040 Comprehensive Plan to support New Life property acquisition
• Recommendation to re-guide northern portion of the property from Places to Work to Low
Density Residential as part of the 2050 Comprehensive Plan.
The Bailey West Master Plan (the Plan) includes approximately 185 acres of land with the vast
majority of the land being under single ownership. It is anticipated that development of the
properties will occur over several years which makes master planning important to ensure continuity
of development designs and implementation over the years.
City Council Directive 3.26 provides policy requirements and direction for the creation of master
plans. Master plans are required:
1. Prior to opening a development phase or sub-phase.
2. Prior to the approval of a Planned Unit Development for properties with common ownership
that are within the existing Metropolitan Urban Service Area (MUSA) and measure more than
100 acre
Components – The master plan covers a variety of considerations for the project area. For the
purposes of this staff report a summary of the report highlights are included here, for additional
details please review the attached report.
## Planning Commission Staff Report
June 15, 2026
Page 2 of 6
1. Stormwater management
The graphic below identifies a regional stormwater approach which will be designed to
provide stormwater management for the entire development area and for the future
upgrades to Bailey Road. The benefits of a regional approach for stormwater management
are as follows:
Removal of individual basins by each individual development site.
Improved efficiency for maintenance and construction.
Additional trail looping opportunity.
Ability to efficiently provide ponding for Bailey Road upgrades versus
providing in the future with the project.
The graphic below represents the location of the stormwater management areas for the
project area with the regional stormwater basins shown in the red boxes:
## Planning Commission Staff Report
June 15, 2026
Page 3 of 6
## Pedestrian and Greenway Plans
Creating a Natural Greenway Corridor - A design highlight of this plan is the establishment of a
dedicated 100-foot greenway corridor that wraps along the northern and eastern borders of the
property. This greenway acts as a natural buffer and creates an intentional trail system which
connects the uses internally but also assists in establishing a pedestrian connection from Bailey
Road to Carver Lake Park.
Protecting Wetlands and Natural Tree Lines - The plan is highly intentional about preserving the
natural environment. It successfully protects the existing wetlands and natural tree lines along the
project boundaries, especially around the regional ponds and eastern borders. Keeping these areas
intact provides a mature, green border between new developments and the existing neighborhoods
to the east. Future landscape plantings on the individual development sites will also be provided to
enhance the existing vegetation.
Strong Pedestrian Looping and Interconnectivity - Instead of isolating the different land uses, this
plan emphasizes interconnectivity between all land uses. A comprehensive network of trails (shown
with green dashed lines) links the commercial shopping area, New Life Church and Academy sports
fields, and the high/medium, and low-density residential neighborhoods. These trails form strong
pedestrian loops for future and existing adjacent residents to enjoy. Pedestrian infrastructure will
also be provided on both sides of Century.
Future Refinements for Commercial Access - While the trail system is highly connected, staff
anticipates that the final master plan graphics will be updated to better articulate a clearer,
more direct walking route from the southern retail/commercial area directly to the trail on Bailey
Road.
## Planning Commission Staff Report
June 15, 2026
Page 4 of 6
## Architectural Themes
One of the primary goals of a commercial master plan is to establish a clear framework for
architectural continuity, ensuring that the future development feels cohesive and
interconnected regardless of the specific development type. The image below establishes a
design guideline which creates a shared aesthetic across the different development types
such as large-scale corporate facilities to retail shops and various tiers of housing.
By standardizing high-quality building materials, complementary color palettes, and
intentional structural details, the built environment avoids looking like a patchwork of
random developments and instead presents itself as a unified, intentional community.
Elements like prominent brick masonry, clean neutral siding, dark-trimmed window frames,
and structural awnings are shown across all of the different categories. This level of
continuity ensures that as land uses transition from retail into residential neighborhoods, the
visual identity of the area remains strong which creates an inviting sense of place for
residents and visitors alike.
## Planning Commission Staff Report
June 15, 2026
Page 5 of 6
Modifications to the 2040 Comprehensive Plan to support New Life property
The graphic on the left below is from the 2040 Comprehensive Plan, which identified
approximately 40 acres of Mixed Use to the north of Bailey Road. The Mixed Use category
allows for retail uses and residential development up to 15 units per acre. The proposed land
uses relocate those 40 acres around the approximately 30-acre parcel proposed to be
acquired by New Life Academy for athletic and recreation purposes. While the total amount
of housing and retail remains unchanged from the 2040 plan, this modification provides the
opportunity for New Life Academy to continue to grow adjacent to its existing campus.
Recommendation to re-guide northern portion of the property from Places to Work to Low Density
Residential as part of the 2050 Comprehensive Plan.
The 2040 Comprehensive Plan identifies the area outlined in red below as Places to Work.
As part of the master plan, an evaluation of the highest and best use occurred. Due to the
area's proximity to Carver Lake Park and limited commercial marketability resulting from its
distance from Bailey Road, a change to low-density residential is recommended. This future
residential designation will provide additional activity to activate the proposed pedestrian
infrastructure, while also offering an opportunity for buyers looking for a homesite that is
walkable to nearby commercial opportunities. The timing of this area development, ultimate
connection to Century Avenue and final Land Use approvals will occur through the 2050
Comprehensive Plan process.
## Planning Commission Staff Report
June 15, 2026
Page 6 of 6
## RECOMMENDATION
Staff recommends approval of the Bailey West Master Master Plan, project number 19-2025-00603.
## ATTACHMENTS
## 1. Draft Bailey Wast Master Plan
## Bailey West
## Master Plan
## Draft
6/11/2026
32
## Bailey West Master Plan
## Acknowledgements
## Table of Contents
## Prepared for: The City of Woodbury
## Prepared by: HKGi
## Overview4
## Streetscape12
Parks and Trails 20
Screening and Buffering 22
## Site Design Guidelines 24
## Building Guidelines 30
Wayfinding and Placemaking 34
1
6
7
5
4
3
2
## Overview
1
What are design guidelines?
•Language of design guidelines is “should”, “encourage”, “prefer”.
•Focused on guiding development that creates a strong sense of place.
•Used alongside the required design standards in the zoning code.
How should the design guidelines be used?
•Property owners and developers should review these guidelines prior to
submitting a development application and should provide a narrative as part
of their development proposal that identifies how the project achieves these
guidelines.
•Design guidelines and master plan elements will be reviewed via
development application review.
## Design Guidelines
54
## Bailey West Master PlanOverview
## Existing Conditions
## Growth Area Background
Bailey Nurseries currently owns approximately 300 acres
of ag
ricultural fields at the intersection of the City of Woodbury,
the City of Maplewood, and the City of Newport.
The area is approximately one mile from I-494 along Bailey
Road. This property is anticipated to be sold by the owner for
development in the coming years.
## The Site Today
The master plan area is surrounded by low-density residential to
the east and rural estate to the south. In addition, the New Life
Church and Academy of Woodbury is adjacent to the southeast
edge of the property. On the north side of the
property is Carver Lake Park and beach.
## Proposed Development
The master plan area is anticipated to include commercial
development; low, medium, and high density residential
areas; an industrial building; greenways; and an expansion of
the adjacent New Life Church and Academy. In addition to this
development, Century Ave (CSAH 25) is planned to extend from
the northeast corner of the property south to Bailey Road (CSAH
18), bisecting the growth area. The growth area will also include
a park dedication area to expand 155-acre Carver Lake Park.
## Legend
2000800’
Figure 1. Existing conditions
City boundary
Development area boundary
## Newport
## Newport
## Wetland
## Maplewood
## Electric Power Transmission Line
## Bailey Road
## Carver Park
## Park
## Existing
## Low-Density
## Residential
## Existing
## Low-Density
## Residential
## Existing
## Low-Density
## Residential
## New Life Church
and Academy
Property entrance
Existing fields
End of Chamberlain Road at edge of
property (future connection)
76
## Bailey West Master PlanOverview
## Proposed DevelopmentDevelopment Identity
Bailey history and legacy as inspiration
The Bailey West Master Plan area will include design features influenced by the Bailey
history and legacy of the site. The design of the growth area should explore this farm
heritage in abstract, contemporary ways through plant species selection and layout,
architectural quality, and furnishings and monuments.
## Plant LayoutPlant Species
## Architectural Quality
Furnishings and
## Monuments
## Legend
2000800’
Figure 2. Proposed site use
## Newport
## Newport
## Wetland
## Regional
## Pond
## Regional
## Pond
## Maplewood
## Bailey Road
## Century Ave
## Electric Power Transmission Line
## Park
## Greenway
## Greenway
## Existing
## Low-Density
## Residential
## Existing
## Low-Density
## Residential
## Carver Park
## Trunk Water Main and
## Sanitary Alignment
## Trunk
## Water Main
## Connection
## Wetland and Tree
## Preservation Area
## Greenway
## New Life
Church and
## Academy
## New Life Church
and Academy
## Sports Fields
## Business Park
## Commercial
## High-
## Density
## Residential
## Medium-Density
## Residential
## Industrial/ Business park
## Commercial
New Life sports fields
Future low density residential
Medium density residential
High density residential
## Park
## Greenway
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
City boundary
Development area boundary
98
## Bailey West Master PlanOverview
## Illustrative Enlargements and Sections
The illustrative enlargements and sections are meant to convey typical conditions and act as a visual
reference for the guidelines throughout the document.
## Typical Streetscape Enlargement
## Streetscape Section at Century Ave
## Figure 3. Streetscape section at Century Ave
Figure 4. Streetscape enlargement
Figure 5. Commercial enlargement diagram
## Figure 6. Bailey Road & Century Avenue Enlargement
Suggestive tree layout: double allee
of trees planted in single species
blocks within the ROW
## Century Ave Right-of-Way
120’
## Double
## Row
20’
## Double
## Row
20’
## UtilityUtility
10’10’
## High-density Residential
## Business Park
## Building
## Trail
10’
## BermPrivate
## Drive
## Trail
10’
## Roadway
## Bailey Road & Century Avenue Enlargement
## Century Ave
120’ Right-of-
## Way
## Sidewalk
## Right-of-Way
## Pedestrian
## Light Fixture
## Tree
## Species
## A
## Tree
## Species
## B
## Tree
## Species
## C
## Private Drive
3
4
2
1
3
2
4
1
## Ornamental Trees in Parking Islands
## 15’ Right-of-Way Dedication
## Century Ave Right-of-Way (120’)
## Neighborhood Collector Right-of-Way (75’)
## Pedestrian Light Fixture,
## Modern Style, 120’ OC Spacing
## Newport
## Century Ave
## Bailey Road
## Century Ave
## Planting Bed
## Single Species
## Planting Beds
## Pedestrian Wayfinding
## Monument Sign
10’
## Typical
15’
## Typical
20’
## Typical
8’
## Typical
25’
## Typical
80’
## Typical
## Massed Planting:
## Species A
## Species B
## Species C
## New Life Sports Fields
## Monument Sign
## Suggestive Planting Layout
Massing of shrubs, perennials, and grouped trees to Bailey
farm history and screens headlights while maintaining views
to the commercial buildings from Bailey Road
## Key Map
## Neighborhood Collector Street
## See Figure 6
## Concept Commercial Area
1110
## Bailey West Master PlanStreetscape
## Legend
County Collector - Century Ave (CSAH 25) - 120’ right-of-way
Private road- sidewalk and trail
Residential Street - sidewalk
Private Drive - trail only
Private Drive - sidewalk only
Private Drive - no sidewalk or trail
2000800’
Figure 7. Street types
City boundary
Development area boundary
## Streetscape
2
## Newport
## Newport
## Wetland
## Regional
## Pond
## Regional
## Pond
## Maplewood
## Electric Power Transmission Line
## Century Ave
## Chamberlain Rd
## Bailey Road
## Carver Park
## Park
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
## 1/8 Mile Roadway
## Access Spacing
## Street Aligned with
## Chamberlain Rd, No
## Thru Connection
## New Life
Church and
## Academy
## Sports Fields
## Business Park
## Commercial
## High-
## Density
## Residential
## Medium-Density
## Residential
## Street Types
The street types recommended for the master plan area are based on anticipated traffic and pedestrian use.
Street types applied to the plan area are aligned with and adapted from the City of Woodbury’s “Roadway
Corridor Design Principles” (2023). Some road types identified are not described in the “Roadway Corridor
Design Principles,” and an additional description can be found below.
## Private Drives
“Private Drive” is not a street type determined in the
“Roadway Corridor Design Principles.” It is recommended that
some private drives are planned with a sidewalk to enhance
pedestrian connectivity throughout the development,
including the drives and parking lots within the proposed
commercial area and high desnity residential area. See Figure
5 for commerical area layout and recommendations.
## County Collector
“County Collector” is identified as the 120 feet of right-of-
way designated for the extension of Century Avenue through
the
plan area. County road to be designed as per Washington
County standards, including a trail on both sides and a 2-
lane
unidivided collector roadway.
Century Ave future connection point at
north side of Bailey property
Private drive without sidewalk
Private drive with sidewalk
Development area pedestrian network
1312
## Bailey West Master PlanStreetscape
City boundary
Streets and parking areas
Development area boundary
Intersections with pedestrian crossings
Major road, controlled intersection
Major road
Unregulated intersection
Pedestrian crossing sign
## Legend
2000800’
## Intersections
Figure 9. Intersections with pedestrian crossings
Figure 10. Typical pedestrian crossings at intersections
## Pedestrian Crossings at Intersections
Pedestrian movement and safety through the development area can be increased through safety and
accessibility features, including high visibility crosswalk markings, truncated domes, and pedestrian crossing
signs, where appropriate.
High visibility crosswalk markings and truncated domes could be used at intersections with a sidewalk or
trail. Pedestrian crossing signs could be used at the unregulated intersections identified in Figure 9, as
directed by the Engineering Department following traffic pattern review. Typical intersections, shown in
Figure 10, outline examples of where and how these crossings occur.
## Pedestrian Crossing Treatments
## Typical Intersections
## High Visibility Crosswalk
All intersections with pedestrian
crossings
## Pedestrian Crossing
at Century Ave and
## Neighborhood Collector
## Pedestrian Crossing at
## Neighborhood Collector
## and Private Drive
## Pedestrian Crossing
at Century Ave and
## Residential Street
## Truncated Domes
All intersections with pedestrian
crossings
## Pedestrian Crossing Sign
Unrelgulated intersections with
pedestrian crossings identified in
Figure 9
## Newport
## Wetland
## Regional
## Pond
## Regional
## Pond
## Maplewood
## Electric Power Transmission Line
## Bailey Road
## Carver Park
## Century Ave
## Century Ave
120’ Right-of-
## Way
## Century Ave
120’ Right-of-
## Way
1
3
1
3
2
2
## Park
## See Chapter 1, Figure 5
for intersections within
the commercial area
Development area pedestrian network
1514
## Bailey West Master PlanStreetscape
## Streetscape Amenities
## Street Trees
## Species
Street tree species planted along roadways should align with the species selection outlined in Chapter 5,
which is adpated from the “Roadway Corridor Design Principles.”
## Layout
The recommended street tree species layout is designed to
recall the agrarian layout of Bailey Nurseries.
## Massing
Street trees should be planted in blocks of single species, with
maximum 6 species in a single row. A maxiumum of 6 trees is
set to encourage biodiversity and resilience, in line with the
“Environmental Stewardship Plan” (2024). Where trees are
planted on both sides of the street, the tree species should be
the same.
“Fencerows”
Where possbile, incorporate double rows of trees along street.
This reinfores the property’s farm history and creates an allée
that provides a more hospitable pedestrian experience along
streets. Where a double row is not possible, consider a row
of perennials or shrubs to replace the role of a second row of
street trees. For typical sections and an enlargement diagram
of typical street tree layout, see Chapter 1, Figures 3 and 4.
Planting inspiration image of Bailey
## Nurseries
Double row of trees in the pedestrian
realm
Sidewalks, lighting, and planting in the
pedestrian realm of a shopping center
City boundary
## Development area boundarySpecies ASpecies E
## Legend
## Species BSpecies F
## Species CSpecies G
## Species DSpecies H
2000800’
## Newport
## Newport
## Maplewood
## Century Ave
Figure 11. Street tree species suggested layout
## Sidewalks and Pedestrian
## Realm
## Guidelines
•Provide high quality trail and sidewalk destinations to
retail, commercial, and residential areas.
•Connect sidewalks to key destinations, such as the
commerical area.
•Provide clearly marked walk/bike crossings at all primary
roadway intersections .
•Provide sidewalks along commercial building frontages.
•Encourage sidewalk connections from residential areas to
sidewalks along streets.
•Provide furnishings and lighting that accomodate
pedestrian safety along sidewalks, including benches and
waste receptacles.
## Electric Power Transmission Line
Layout shows street trees only. Trees
along streets (except Bailey Road)
are shown with a diameter of 30’ and
spaced at 35’ apart. Layout diagram
is suggestive of species clumping;
patterning and is not final.
Special street tree layout
along Bailey Road and
## Intersection of Bailey
Road and Century Ave.
See Figure 5.
## Wetland
## Regional
## Pond
## Regional
## Pond
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
## Business Park
## Commercial
## High-
## Density
## Residential
## Medium-Density
## Residential
## New Life
Church and
## Academy
## Sports Fields
1716
## Bailey West Master PlanParks and Trails
## Parks and Trails
3
## Pedestrian Network and Open Space
Trail on both sides of street - county road
Sidewalk - private drive
Trail - private drive
Sidewalk and trail - neighborhood street
Sidewalk - residential street
## Trail - Off-road / Greenway
## Sidewalk - Off-road
100’ wide greenway
Park dedication area
Existing walking path
Existing off-road cycling trail
City boundary
Development area boundary
## Newport
## Newport
## Maplewood
## Electric Power Transmission Line
## Century Ave
## Bailey Road
100’ Greenway
100’ Greenway
## Park Dedication
## Area
## Future Trail
## Construction
## Off-road
## Cycling Trails
## Connection
to Existing
## Development
## Legend
2000800’
Figure 12. Pedestrian network
Connection to
## Century Ave
## Open Space
Connection to
## Greenway
Trail at
## Pond Edge
New parks and trails through the development area are meant
to enhance existing park amenities and move pedestrians and
cyclists through greenway corridors connected to a proposed
trail and sidewalk network along streets. Parks
and trails
introduced in the growth area include:
•Two 100 foot wide greenway corrdidors on the north and
west edge of the low-density residential development
area with trails and plantings.
•Trail connection to Century Avenue
at the northwest
corner of the development through an exisitng easement.
•Trail connection between an existing wetland and
proposed pond across from low-density residential
access.
•Park dedication area connected to Carver Park, which will
encompass existing off-road cycling trails.
## Greenways
## Should:
•
•
Maintain a minimum 100 foot width to allow for a trail
alignment with interest.
Include a 10 foot wide multi-use trail per City detail plate..
•Use native vegetation to provide visual interest,
enhance ecological diversity, and reduce maintenance.
•Create an opportunity to contribute to density bonuses
for residential development in the growth area.
•Include seating, wayfinding signage, and interpretive
elements about the site’s history and natural context.
•Have easily accessible trailheads and access points.
## Park Dedication Area
## Should:
•Include native landscaping in some areas to complement
adjacent Carver Lake Park.
•Preserve existing mountain bike trails.
•Include a continuous trail connection between the two
proposed greenways in the master plan area.
## Trail at Stormwater Basin edge
## Should:
•Include a 10 foot wide trail to serve both residential and
business park users.
•Provide small seating areas such as benches, picnic
tables, or overlooks.
•Include interpretive elements about the site’s history and
natural context.
## Wetland
## Regional
## Pond
## Regional
## Pond
## New Life
Church and
## Academy
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
## Business Park
## Commercial
## High-
## Density
## Residential
## New Life
Church and
## Academy
## Sports Fields
## Medium-Density
## Residential
1918
## Bailey West Master PlanScreening and Buffering
## Screening and Buffering
4
## Legend
2000800’
Figure 13. Screening strategy
Medium opacity screening example
Special screening example
High opacity screening example
## Newport
## Newport
## Wetland
## Regional
## Pond
## Regional
## Pond
## Maplewood
## Electric Power Transmission Line
## Existing
## Low-Density
## Residential
## Existing
## Low-Density
## Residential
## Carver Park
## New Life
Church and
## Academy
High opacity screening
Medium opacity screening
Special screening at Bailey Road (see description)
Screening addressed using streetscape planting
City boundary
Development area boundary
## Screening Strategy
## Overview
Screening is an important design element to delineate uses, soften views, and create privacy among the
different adjacent uses in the master plan area. Screening can be achieved through planting of additional
trees and shrubs. A special screening strategy along Bailey Road and at the intersection of Century Avenue
and Bailey Road is recommended to achieve the following goals: screen the commercial area from
residential properties to the south; maintain business visibility from the road; and showcase the area’s
agrarian character. See Chapter 1, Figure 6 for a more detailed recommendation for screening at Bailey
Road.
## Guidelines
## High Opacity Screening
•Densely planted evergreen trees or shrubs
•Locate high opacity screening:
•Where residential areas are adjacent to Century Avenue
•Between different densities of residential land use.
•Between proposed growth area and existing
residential
land use, except where a proposed 100’ wide greenway
provides a buffer.
## Medium Opacity Screening
•Loosely planted evergreen trees, additional layer of
deciduous trees or shrubs, or more densely planted
deciduous trees and shrubs.
•Locate medium opacity screening:
•Where residential areas are adjacent to a collector
street or greenway
•Where commercial or business park areas are adjacent
to streets or other land uses.
## Special Screening at Bailey Road
Screening along Bailey Road should mitigate headlight
glare from the commercial area while maintaining business
visibility from the street. This should be achieved with a
combination of shrubs and trees that accomodate these two
needs. See Chapter 1, Figure 5 for planting layout along Bailey
Road.
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
## Century Ave
## Business Park
## High-
## Density
## Residential
## Medium-Density
## Residential
## New Life
Church and
## Academy
## Sports Fields
Special screening
## along Bailey Road
and Intersection
of Bailey Road and
## Century Ave. See
Chapter 1, Figure 5.
## Commercial
2120
## Bailey West Master PlanSite Design Guidelines
## Site Design Guidelines
5
## Guidelines
•Locate site furnishings for ease of use by patrons.
•Site plans for commerical and business park areas should
identify locations for seating and bike racks.
•Place street furnishings (benches and seating, trash/
recycling receptacles, bollards, bike racks, wayfinding
signage, etc.) at building entry areas, near intersections
and along the primary roadways.
•Utilize street furnishings that are made of durable
materials, easily maintained/repaired, and are locally
available, when feasible and meet city specifications.
The site design guidelines articulate the desired development characteristics for the growth area. The
guidelines are intended to reinforce the plan area’s identity, enhance pedestrian comfort, encourage
sustainability, and promote visual appeal.
## Furnishings
## Lighting
## Guidelines
## Commercial and Business Park Areas
•Use building lighting only for safe illumination of building
entries, service areas, and pedestrian/vehicle movement
areas.
•Lighting at building entries, service areas, and pedestrian/
vehicle movement areas should be limited to low wattage
downcast or low cut-off fixtures that may remain on
throughout the night.
•Service area lighting should be confined within the
service area boundaries and enclosure walls. No spill-over
lighting should occur outside of the service or storage
area. Lighting sources should not be visible from the
street.
•Accent lighting should be limited to indirect lighting of
architectural, and landscape features only; lighting should
not exhibit or advertise the buildings itself.
## Retail and Business Signage Lighting
•Light sources should be concealed.
•No flashing, moving, or color-changing lights.
•Color temperate should be a warm white (2700-4000k and
consistent among all signage).
•Lights should be LED and have autmatic dimmers to
reduce energy use and nighttime illumination.
## Streetscape, Sidewalk, and Trail Lighting
•Design streetssape lighting to accommodate vehicular
traffic, but also provide a comfortable and safe light level
for pedestrians.
•Utilize a similar family of fixtures for the lighting design of
all public streets within the growth area.
•Pedestrian light fixtures should be incorporated along the
private road on the north edge of the
commercial area
and within the commercial area where appropriate. See
Chapter 1, Figure 5 for recommended locations.
•Pedestrian light fixtures should be the modern style and
spaced 120 feet on center.
## Additional Considerations
•Consider how seasonal lighting can be incorporated to
promote placemaking.
•Consider special accent lighting for gateway features.
Approved streetscape lighting
Seasonal lighting example
2322
## Bailey West Master PlanSite Design Guidelines
## Planting
## Overview
The planting design guidelines establish a cohesive landscape character that reflects the agrarian
heritage of the growth area and provide practical direction for the location and species of trees
and plantings. All proposed landscaping shall meet code requirements for commercial and
residential properties including trees per lot and canopy coverage. See Figures 4, 5, and 6 for
illustrative planting intent at the commerical area, along Bailey Road, and in the streetscape. For
additional guidance on screening planting, see Chapter 4. Species selection is adapted and added
onto from Woodbury’s “Roadway Corrirdor Design Principles".
## Guidelines
## Species Selection
•Bailey Nurseries is known for the selection of
ornamental crabapple trees and hydrangeas and roses
they developed. Locate crabapple trees, hydrangeas,
and other Bailey-developed species at key areas with high
visibility and within the commercial area to celebrate the
nursery history.
•Prioritize durability, ease of maintenance
, simple
character, and year-round seasonal interest.
•Use a limited, consistent plant palette across the growth
area for a unified look.
•Use native plant and tree species where possible to
reduce maintenance and promote water conservation.
•For all approved streetscape species, see species list from
“Roadway Corridor Design Principles” in appendix.
## Trees
•Plant trees in formal rows, massing single species
together.
•Use consistent spacing where possible.
•In commercial areas:
•Use street trees to define pedestrian zones and frame
buildings frontages. Species to consider near buidlings
include columnar trees (oaks or maples) and
crabapple trees.
•Locate trees in parking areas to break up expanses of
pavement.
•In the streetscape:
•Where possible, integrate double rows of trees into the
streetscape to create a formal, agrarian rhythm. See
Chapter 2, Figure 11 for a suggested street tree layout.
## Planting Beds
## Reference image: Bailey Nurseries
Massed planting example
## Swamp White Oak
Quercus bicolor
White oak
Quercus alba
## Autumn Blaze Maple
## Acer x Fremanii
‘Jeffersred’
## Thuja ‘Green Giant’
## Kentucky Coffeetree
Gymnocladus diocius
## Prairie Dropseed
Gymnocladus diocius
## Blue Oat Grass
Gymnocladus diocius
## Karl Foerster
Calamagrostis actuiflora
## ‘ Karl Foerster’
## Viola Klose Salvia
Salvia sp. ‘Viola Close’
## Black-eyed Susan
Rudbeckia hirta
## Echinacea Kismet
‘Intense Orange’
## Switchgrass
Panicum virgatum
Monarda ‘Grape
## Gumball’”
## American Elm
## Ulmus Americana
## Basswood
## Tilia Americana
## Japanese Tree Lilac
Syringa reticulata ‘ Ivory
## Silk’
## Gladiator Crabapple
Malus × adstringens
‘Durleo’ (Bailey)
## Pop Star HydrangeaToscana Barberry
## Northern Pin Oak
Quercus ellipsoidalis
Row of columar trees
Row of crabapple trees
•Use bold masses of single plant species in linear
arrangements to evoke the layout of nursery fields.
## Massed
planting should be incorporated along Bailey Road and
along Century Avenue adjacent to the commercial area (See
Chapter 1, Figures 5 and 6). Where possible, a variation of
this planting scheme should be considered for the
commercial and residential area planting bed designs.
## Planting Guidelines Summary
•Use ornamental trees, hydrangeas, and other Bailey-
developed species in key areas
•Plant trees, shrubs, and perennials in blocked
masses of a single species
•Incorporate a double row of trees into the
streetscape
## Suggested Species Palette
## Trees
## Ornamental Trees
## Bailey- Developed Perennials
## Perennials and Shrubs
2524
## Bailey West Master PlanLand Use: Commercial
## Building Service and Access
## Service, Delivery, and Storage Areas
## Guidelines
## Location and Access
•Locate service, delivery, and storage areas so that views of
them from adjacent properties, streets, open spaces, and
pathways are minimized.
•Locate service access from secondary streets or drives.
•Consolidate service areas where possible to minimize
curb cuts and pavement.
•Use signage to clearly identify service entrances to
discourage the use of main building entries for service and
delivery areas.
## Screening
•Where feasible, utilize landscape and architectural
screening to minimize visual impacts of service, delivery,
and storage areas.
•Integrate enclosures into building massing rather than as
a stand-alone element where possible
•Screen loading docks, dumpsters, and storage area with
materials and design elements that complement the
adjacent architecture
## Utilities
## Guidelines
## Placement
•As streets are constructed, existing above ground
utilities should be relocated below ground within the
public street right-of-way whenever feasible. Encourage
undergrounding of utilities elsewhere in development
where possible.
•Locate above ground utility structures away from major
pedestrian and gathering areas, building entrances,
windows, and stormwater drainage areas where feasible.
## Screening
•Use landscaping to enhance the visual aesthetics of any
above ground utility structures.
## Parking
## Guidelines
## Location and Access
•Single-use or assigned parking spaces should be
minimized.
•Parking facilities should be easily accessible and
identifiable.
•Parking lots with street frontage should be minimized.
Where they occur, landscaping and other screening
devices are encouraged to buffer parking from the view
from the sidewalk and street.
•Design parking facilities to minimize impacts of vehicle
headlights on adjacent uses.
## Landscaping and Pedestrian Circulation
•Surface parking lots should be enhanced with landscaping
and tree plantings consistent with planting guidelines.
•Use salt-tolerant plant species near drive aisles and snow
storage areas
•Parking lots should have a strong pedestrian connection
to Bailey Road businesses and resident entries of
buildings.
•Use pedestrian-scaled lighting along pedestrian routes.
## Sustainability and Stormwater Management
•Incoporate EV charging stations and bicycle parking at
convenient, visible locations.
•Plant trees in parking islands to reduce heat island.
## On-Site Stormwater Management
## Guidelines
•Design site irrigation facilities with water efficient systems.
•
•
Utilize native plant material to reduce water demand.
Regional stormwater management to be provided for entire site.
2726
## Bailey West Master PlanBuilding Guidelines
## Building Guidelines
6
The building design guidelines establish the desired orientation and architectural character of buildings
in the planarea. The guidelines are intended to reinforce the Bailey identity, promote pedestrian comfort,
and create visual unity across the master plan area.
## Building Placement
## Guidelines
## Building Orientation
•Encourage front and building entrances to face streets or
public spaces.
## Setbacks
•Define setbacks to support walkability in retail areas with
larger setbacks in business park and residential areas.
## Architectural Character
The architectural character of the plan area should tie
to Woodbury’s established material palette and design and
be paired with accents that connect to site’s farm heritage.
Buildings should express a sense of quality and connection to
the land.
## Building Massing and
## Appearance
## Building Form
## Rooflines
•Rooflines on buildings should be contemporary and
paired with farm-style accents:
•Business Park buildings should have flat roofs.
•Commercial area buildings should have a mix of flat
and pitched roof styles.
•Medium and high-density residential buildings should
have a mix of flat and pitched roof styles.
•Low-density residential buildings should have primary
pitched roofs.
## Building Facade
•Building facades should be pedestrian-scale and be
articulated through modulation and material change.
## Entrances
•Entrances should face streets or key pedestrian
connections.
## Signs
•All signs should be consistent in height from ground and
lettering height.
•Signs should be mounted on building facade.
## Awnings and Canopies
•Awnings may be used in commercial and business park
areas.
•Awning may be either a shed-style fabric or flat, extruded,
metal canopy.
•Fabric or metal color: black.
•Use of awning types must be balanced for visual appeal
across the areas.
•Awnings should not bear signage, logos, or additional
detailing.
## Windows and Doors
•Encourage transparency using windows are doors in
commercial area.
•Ensure windows and door styles are consistent across
commercial area.
Example of signage mounted on building
facade
Example of fabric awning
Example of metal awning
Example of transparency in a commercial
building
Flat roofline
Pitched roofline
2928
## Bailey West Master PlanBuilding Guidelines
Wood or
## Wood Effect
## White
## Concrete
Warm, neutral
shades
## LimestoneBrick
## Cream
## Metal
## Buff
## Metal
## Black
## Brick
## Brown
## Materials
## Overview
•Brick should be the primary building material.
•Multiple colors of brick may be used. Brown brick is recommended as the primary color of
brick used in the development area. The brown brick may be accented by cream-colored
brick. Other high-quality materials, such as limestone, metal, or wood accents should be
used to complement brickwork.
•Wood or accents with a wood effect should appear painted white
•Metal accents should be coated in a neutral color, such as beige or black.
## Example Images
## Industrial/Business Park
## Commercial
## Commercial
5-10%
-
10-20%
10-20%
40-60%
10-30%
60-80%
20-30%
0-10%
10-20%
-
0-10%-
10-30%
10-30%
70-90%
Warm neutral shades may be
used in addition to white
To be focused at
entries or key areas
## Tilt-up
To be used for articulation and
to break up wall massing
5-10%5-10%
## Brick - Brown
## Brick - Cream
## Wood or Wood Effect
## Limestone
## Concrete
## Metal
## Business ParkResidential
## Material Composition
## Residential
Low-density residentialMedium-density residentialHigh-density residential
3130
## Bailey West Master PlanWayfinding and Placemaking
Wayfinding and
## Placemaking
7
Wayfinding should serve all modes of transportation and be clear and consistent across the plan area. In
addition, all elements should complement the architectural and landscape qualities of the plan area.
Additional placemaking elements, such as sculptures, panels, or special lighting should be considered in
key areas.
Wayfinding elements throughout the plan area include:
•Gateways and monument signage
•Pedestrian wayfinding
•Interpretive signage
## Pedestrian and Vehicular Wayfinding Examples
## Monument Signage and Placemaking Examples
## Planted Monument Sign
•Honors Bailey legacy
Tree-inspired sculpture
•Honors Bailey legacy and
Woodbury natural heritage
## Legend
2000800’
Figure 12. Wayfinding, destinations, and access
## Newport
## Newport
## Wetland
## Regional
## Pond
## Regional
## Pond
## Maplewood
## Electric Power Transmission Line
## Century Ave
## Medium-
## Density
## Residential
## High-
## Density
## Residential
## Commericial
## Business Park
## Existing
## Low-Density
## Residential
## Existing
## Low-Density
## Residential
## New Life
Church and
## Academy
## New Life
## Sports Facility
## Entry Sign
## Residential
Monument /
## Wayfinding Sign
## Gateway
Heart of
## Development
## Gateway
Monument signage - key development nodes
Interpretive signage
Monument signage - facility and amenity signs
Pedestrian wayfinding
## Low-Density Residential
Post Adoption of the 2050
## Comprehensive Plan
Existing walking path
Existing off-road cycling trail
Development area pedestrian network
City boundary
Development area boundary
## CITY OF WOODBURY
## DRAFT PLANNING COMMISSION MINUTES
May 4, 2026
Pursuant to due call and notice thereof, a regular meeting was held at Woodbury City Hall, 8301 Valley Creek
Road on Monday the 4, May 2026.
## CALL TO ORDER
Chair John Kollm called the meeting to order at 7:00 p.m.
## ROLL CALL
Upon roll call the following members were present: John Kollm, Stephanie Swanson, Marcia Kennedy,
Saurin Shah, Shae Seabrooks, Jim Gentile, Gisele Parnel, and Riyaan Hilowle.
## Absent member: Jacob Guzik
## Council Liaison Present: Donna Stafford
Staff Present: Eric Searles, Assistant Community Development Director/City Planner and Gina McCormack,
Senior Planner.
## DEVELOPMENT ITEMS
## ITEM 1: COTTAGE GROVE MASTER PLAN
Gina McCormack, Senior Planner stated that The City of Woodbury has prepared the Cottage Grove
Drive Master Plan. She said the intent of the plan is to document existing conditions, provide guidance
on lot and home types, roadway design and access management, stormwater management approach,
parks and open space, and pedestrian movements. She said the attached report provides additional
information on the master plan.
Ms. McCormack gave background on the Master plan saying City Council Directive 3.26 provides
policy requirements and direction for the creation of master plans. She said Master plans are
required:
1. Prior to opening a development phase or sub-phase.
2. Prior to the approval of a Planned Unit Development for properties with common ownership
that are within the existing Metropolitan Urban Service Area (MUSA) and measure more than
100 acres.
She said the Cottage Grove Drive Area Master Plan (the Plan) includes approximately 370 acres of
land with varied ownership, development interests and timing. She said the master plan contains the
remaining area of Sub-Phase 2D that has not been studied with a master plan, along with some
areas of Phase 3 to ensure future design consistency when those phases are opened for
development.
Ms. McCormack gave information on public engagement saying in advance of beginning the master
plan work, staff sent out a questionnaire to property owners in the area to understand the current
use of their property, if development was an opportunity, and timing for future plans. She said these
questionnaires led to several individual property owner meetings with staff.
She said due to the variety of interests and parcel sizes within the master plan area, staff has
coordinated:
- Two (2) formal property owner meetings for properties within the boundary
- 15+ individual property owner meetings
- One (1) surrounding area formal neighborhood meeting
Ms. McCormack said the master plan report covers a variety of considerations for the project area.
She said for the purposes of this staff report a summary of the report’s highlights are included in the
May 4, 2026 PLANNING COMMISSION MINUTES
Page 2
packet provided and said for additional details that the Commission could review the attached
report. She gave the following information to the Commission.
1. Development context
The Plan identifies a study area of approximately 370 acres in both Phase 2D and Phase 3
within the southeast portion of Woodbury. The area has a variety of ownership including 19
different property owners and 13 homesteads. While some of these are anticipated to be
sold to developers, other owners are interested in remaining on their properties for years to
come. The utilities to serve the future development will extend from the low density
residential subdivisions directly to the west. The surrounding areas adjacent to the master
plan are identified within the context map below.
2. Regional Stormwater management approach
The City of Woodbury consulted with Barr Engineering for an environmental planning study to
identify natural resource areas and future stormwater management approaches in areas
with future development in the City. One of the subject sites was this master plan area and
the findings indicated a majority of the project area (approximately 249 acres) could be
served by a regional stormwater management system on one property. The regional
approach has numerous benefits for the subject area including:
Removal of individual basins by development
Improved efficiency for maintenance and design
This area may contain karst topography throughout the area which would
make individual stormwater management per site challenging to design and
implement.
Ability to expand the adjacent stormwater management system from the
development to the west (Sienna Grove).
Ability to use the regional system to expand greenway corridor viewshed.
## 3. Housing Diversity
Multiple comprehensive plans, including the 2040 Comprehensive Plan, have established a
vision for Places to Live to offer housing choices to people in all stages of life. One of the
consistent land use policies looks to ensure diversity of housing is provided with a mix of
50% single-family units and 50% multi-family units. The master plan proposes a range of lot
sizes include 45-50’, 55-60’, 65’+ and 100’+ lots.
The areas identified in dark orange are for townhomes or small lot single family (45 foot
minimum) to meet the need for multi-family units. The housing market has identified
challenges with constructing townhomes at this time due rising homeowners association
(HOA) and increased insurance costs. The Plan is intended to provide flexibility to allow either
45’ lots or townhomes, within the dark orange/brown areas above, to ensure diversity of
housing products and prices can be achieved regardless of market conditions.
The master plan also identifies areas for the creation of 100 foot wide lots. One area is
based on property owner feedback to create an area of potential custom lots for non-national
builders and to establish a unique neighborhood with robust landscaping and screening from
nursery plants. The other area is adjacent to Dale Road. It was identified that each property
owner in this location has a variety of timing and development interests so the large lots
provide two solutions:
Allow each property to create value on the property while being able to retain the
existing home. 100 foot lots would be accessed from private drives on Dale
Road.
May 4, 2026 PLANNING COMMISSION MINUTES
Page 3
Preservation of the existing high quality woodlands on the northern portion of the
lots in exchange for access management flexibility through the Planned Unit
Development (PUD) process.
## 4. Park and Open Space Network
The Plan thoughtfully laid out greenway corridors, a neighborhood park and natural resource
preservation within the context of the uses and surrounding property uses.
Greenway corridor: The extension of the greenway into the master plan boundary
will essentially connect Woodbury Drive to Andy’s Bark Park. The corridor will
incorporate the regional stormwater management system, trunk sewer
alignment, and trails before heading south to Dale Road and an existing drainage
way on the properties to the south.
Neighborhood park: The comprehensive plan identifies a neighborhood park to
be established north of Dale Road, east of Cottage Grove Drive. The master plan
shows two potential locations where this park could be developed along with
performance standards for the park including a tot lot, setback from adjacent
roadways, tie to the greenway corridor and review of bump out parking stalls if
feasible.
High quality woodlands: The previously mentioned Barr Engineering study
identified natural resources within future development areas of the community.
The woodlands located on the north half of properties 13-17 were identified as
high quality and home to 300 oak trees in excellent condition. The City seeks to
preserve these natural resources by providing an alternate development pattern
and requirements for these lots in exchange for an easement for protection.
## 5. Street Typology
The master plan establishes access management requirements for Cottage Grove Drive and
Dale Road along with concepts of how these roads could be interconnected property by
property. These connections and final roadway design will be completed with subdivision
applications. The purpose of the master plan is to establish the sections for the major
collector roads (Cottage Grove Drive and Dale Road), right-of-way requirements, residential
road design standards and private drive standards.
Ms. McCormack stated that staff recommends approval of the Cottage Grove Drive Master Plan,
project number 2025-00604.
Chair Kollm thanked staff and opened it up to the Commission for questions.
Commissioner Jim Gentile asked if the 2028 Capital Improvement plan for the Bailey Road construction has
the intent that no current development is planned and will the existing utilities be utilized and then be switched
over. Ms. McCormack advised it is fully funded to be improved to Cottage Grove Drive. She stated the
Development would carry the trunk sanitary and water utilities forward with them and future roadways would
include Dale Road with Development possibly occurring until the funding is received and it is placed in the
Capital Improvement Plan. Mr. Searles said allowing the development to occur and then having the new
roadway improvement allows it to last much longer.
Mr. Gentile asked about the combined entrance for the future dog park with the three deep row of trees in the
area and if the shifting of that intersection would cause illumination of those trees. Ms. McCormack advised
that this is a concept to show that there is significant amount of space to provide those changes.
May 4, 2026 PLANNING COMMISSION MINUTES
Page 4
Mr. Gentile recommended that the community garden could be expanded. He also asked about the Oak trees
with the easement and asked if that meant the trees would stay. Ms. McCormack said that was correct.
Mr. Gentile asked about the two connection points for the pathways and the pending grant funding for an
underpass for the pedestrians and if it was considered to do an over bridge or just some sort of treatment to
the intersection and not rerouting back through that path as it is a significant part of that. Ms. McCormack
responded, saying what city staff would anticipate seeing and how the location would have a refuge approach
because of the unfavorable grades. She said that this location was identified to allow an underpass but would
need to be grant funded. Mr. Searles said this segment of Dale Road is anticipated to be a two-lane roadway
which is more favorable for crossing than a four-lane crossing would be.
Mr. Gentile asked how we are servicing the southeast with Public Safety services and if this Master Plan
includes that. Ms. McCormack gave information on Washington County holdings in the area for the
environmental center as well as Southern Public Works shops that are planned for future Public Works. She
also said the city owned parcels that have been in discussion for future fire stations. Mr. Searles advised that
the City Council authorized funding for a search to be conducted to look at Public Safety response times and
locations served and the study hasn’t been finalized yet but gave specific details on what that meant for the
future. He provided the reasons why that was important for the city.
Mr. Gentile asked about the existing property in regard to the watershed and if they had run into any issues
with the development of the storm water basins. Ms. McCormack stated that they had not advised that would
be in the next steps and gave information on it.
Commissioner Marcia Kennedy asked what the tipping point was with increased density’s triggering the need
for trunk utilities to be increased. Ms. McCormack said the need for the increasing of utilities is decided when
the d evelopment expands.
Ms. Kennedy asked about financial responsibility of the City for the expansion and if we need to engage with
Washington County to install more as the residential density grows. Ms. McCormack gave the anticipated goal
of the trunk sewer connection for individuals that may have private septic systems that fail would then have
access. Mr. Searles said after the zoning changes and municipal utilities are within an area city code requires
them to hook up.
Ms. Kennedy asked what the biggest challenges the city anticipates. Ms. McCormack advised that this is a
high-level concept plan, so the details aren’t considered as of yet. She discussed the goal of this and what
will come in the future. Mr. Searles said city staff does topography maps etc. but nothing replaces soil borings
and his thoughts on the areas regarding the larger lots.
Ms. Kennedy asked about how the subdivided lots would impact the number of units in the area. Ms.
McCormack advised it is less demand for the utilities.
Ms. Kennedy asked for the existing locations and if the property management assigns a lease and how that
impacts the development. Ms. McCormack with into the details on how the City would work with them on a
reasonable timeline.
Commissioner Stephanie Swanson asked about the high-quality oak trees and asked for confirmation that
those were located on private property and would not be part of the greenway corridor. Ms. McCormack
confirmed they were and it would not be part of it.
Ms. Swanson asked for clarification on verbiage provided on page four (4) in the staff report. Ms. McCormack
gave clarification on this providing flexibility to provide attainable housing.
May 4, 2026 PLANNING COMMISSION MINUTES
Page 5
Ms. Swanson asked if there was a percentage of units at these different lot widths. Mr. Searles said there are
some broad numbers based on the coloring to look at as part of the background information and said it did
meet the housing goals. Ms. Swanson asked what the percentage would be of the capped houses. Mr. Searles
said they caped from 45 to 50 percent and gave information on this decision and reasoning behind it.
Ms. Swanson asked about the purchase price and how it works in regard to income and purchasing price. Ms.
McCormack gave information on the attainable housing for first time homeowners and the approach.
Ms. Swanson asked about the different scenarios one might take to bend the rules with this and how the City
would prevent someone from doing something to bend the rules with the purchase price with the attainable
housing agreement. Mr. Searles said the value proposition that is proposed within this concept, and the buyer
brings a product forward that meets the AMI, they would qualify for the reduction. He said the City sees that
there aren’t products and this is trying to bring a different type of product to the marketplace.
Commissioner Saurin Shah asked if the property market as number three (3) which is designated as storm
water has an existing property owner currently living there in a house. Ms. McCormack confirmed. He asked
if the property owner would be okay with the site being signed up to be a future storm water location. Ms.
McCormack confirmed stating the city has met with the homeowner a few times and they have identified a
vision for the property to have it as an open space and the existing home can remain. Ms. McCormack said
she agrees and is happy to have the open space around the home.
Mr. Shah asked about how locations 14, 15, 16, and 17 are existing homes in the wooded area and who said
they will do the 100-foot lots. Ms. McCormack confirmed and gave details on why the residents appreciated
the approach and possible scenarios that may occur.
Mr. Shah asked what the individual access from Dale Road would look like as to what Ms. McCormack
discussed in her staff report. Ms. McCormack gave information saying all of the driveways are set up on the
edges so they can easily be turned into private drives. She gave specifics on how it would be laid out.
Mr. Shah said that they would have to widen the driveway with this as well. Ms. McCormack said they would.
Commissioner Shae Seabrook asked if she could point out the area on the map that currently has the interim
permit. Ms. McCormack said there isn’t currently an interim permit but as development occurs the city would
work with them to get an interim permit and said it was the same property as the stormwater basin discussed
prior. Ms. McCormack showed all the properties on the map.
Ms. Seabrook asked how vehicle trip counts are conducted and wondered if that could be expanded regarding
the huge uptick of development in the area. Ms. McCormack said they are done through the Comprehensive
Plan process and the process on how it is studied and with whom it is conducted.
Ms. Seabrook asked if the future development of the roadways is considered. Ms. McCormack said the
anticipated goal would be to have these paved with development consistent with the phasing timeline.
Ms. Seabrook asked about the south of the plan being zoned Urban Reserve and if there was talk of future
development in that area or is that part of a sperate plan. Ms. McCormack said Urban Reserve is outside of
the city’s phasing and outside of Municipal Urban Service Area (MUSA). She said that area is set with the
Comprehensive Plan and the Metropolitan Council. She said the City has received guidance that it is not
anticipated that the MUSA will be expanded so Urban Reserve land is intended to stay. She gave information
on 3M property showing on the map and how they don’t have any development timeline on this, and why this
is shown.
May 4, 2026 PLANNING COMMISSION MINUTES
Page 6
Student Commissioner Parnell asked about the high-quality woodlands and how she is aware that the city is
trying to preserve the natural resources but wondered what the alternate plan would look like. Ms. McCormack
said with those trees removed that these properties would essentially be 10 acres to allow for small finger
streets and also a straight road and a cul-de-sac adjacent to Andy’s Bark Park. She said the city would see
challenges meeting access management so street extensions, etc. would be needed.
Student Commissioner Hilowle asked staff to show the two potential locations for the neighborhood park. Ms.
McCormack used the map to point out the locations to the Commission.
Ms. Hilowle asked if there were surrounding trails for safe travels to be conducted within the area. Ms.
McCormack advised that the white lines shown on the map establish those trails through the greenway
corridor. She stated that there would be trails accessing both of the parks and mentioned the City’s Parks
and Recreation department mentioned amenities such as bump out parking with each subdivision potentially
serving those on road.
Chair Kollm asked if there were any other questions from any other Commissioners.
Council Member Donna Stafford asked if the access road from Dale Road to the Bark Park was going to be
paved. Ms. McCormack advised the anticipation of having the areas to the south within the subphase would
provide the funding to then extend the paving. Mr. Searles advised that there is a property that would be
investigated on the south side of Dale Road that in the future staff anticipate requesting council amend the
phasing plan to include the south piece to allow funding, grading and the ability to extend the paving of Dale
Road.
Chair Kollm said he had questions on the housing diversity plan but will wait until the end to ask them. Chair
Kollm asked about the regional basic for the storm water and asked how it worked from a funding standpoint
with all of the lots being developed at different stages. Mr. Searles said these types of regional amenities
occur through our utility charge approach. He gave information saying this looks at the infrastructure needed
over several decades divided by the acreage served that equals a per acre utility charge which is what is
proposed here. He said collection will be done acre by acre and said there are also some fund balances within
the utility charges to incur some of these expenses where, when development occurs, they will repay that fund.
Mr. Searles said those are existing development dollars that we have that are for these plan system
improvements that have been banked over the long term and is not a taxpayer dollar.
Chair Kollm asked about the greenway space, and it staff has considered purchasing the land and banked it
as park property versus the approach proposed. Ms. McCormack said it was considered due to the amount
of area and the cost to acquire that was guided by putting this into an easement to preserve the trees. Mr.
Searles discussed this in more detail and the reasoning for this guidance.
Chair Kollm asked if there was anything preventing the current owners of the existing homes to develop the
entire parcel where a home destruction could take place to construct a larger development. Ms. McCormack
said when looking at existing PUD’s they need to be in compliance with a Master Plan within the area. She
said that is one of the findings of fact that is brought to a Commission and said if it wasn’t in line with that
finding there would have to be some type of reason or extenuating circumstance for that to come forward.
She stated the city’s goal for all of the future properties coming forward is to have them in line with this Master
Plan.
Chair Kollm asked if putting this Master Plan in place secures that conservation of those trees and any future
development that would want to change that would have to come through the normal Planned Unit
Development process. Ms. McCormack confirmed.
May 4, 2026 PLANNING COMMISSION MINUTES
Page 7
Chair Kollm asked what the trigger is to look at a road as a two lane to a three-lane with a buffer road. Ms.
McCormack said that the main road would be Bailey Road, Manning and Woodbury Drive and said because of
the convenience movability and destinations on the road that it would be the main arterial road in this area.
Chair Kollm asked if there are any examples of other municipality’s doing the 45 minimum lot size and AMI
price capping that this is trying to memorialize. Ms. McCormack said housing attainability is at the forefront
of all of City’s minds at this time. She gave examples of different areas and what they are doing. She said it
is a goal to create smaller lots because the City is hearing from the market that if there are smaller lots given,
the attainable housing product would be able to be built. Mr. Searles gave more information and details
regarding this and other City projects.
Chair Kollm asked about the incentive if they adhere to the AMI level in the Master Plan and what that is for
the developer. Mr. Searles said that would be additional lots from that reduction. Chair Kollm gave concerns
about the math totaling the way we think it will. Mr. Searles gave information on reasoning for this decision
and reasons for this.
Chair Kollm asked if there was any restriction in the Master Plan for these being used for Primary Residences
rather than rental properties. Chair Kollm asked about restrictions.
Ms. Swanson gave her concerns about people taking advantage of this and whether the City thought about
ways to prevent that. Mr. Searles gave information saying the building community understands what their
margins are and said they will build in the size, amenities and finishes to support the sales price, which gave
comfort in this. He gave other details that caused comfort with this concern. He said it is certainly on staff’s
mind.
Chair Kollm said he believes the incentives are not strong enough to support a developer wanting to build a
development in that area if the City does want to deliver that housing stock to the community. Mr. Searles
said as this evolves there may be conversations, but the builders and developers are not known at this time.
He said they do know there are a lot of national builders who are interested and have historically built in
Woodbury and details given regarding the knowns and unknowns that will assist in providing.
Ms. Swanson asked if the City contemplated having the developer pick the price cap. Mr. Searles said that is
the reason that the Master Plan doesn’t have a hard number as future conversations would be incentivized
by this.
MOTION: Stephanie Swanson moved to approve COTTAGE GROVE MASTER PLAN subject to conditions as
outlined in the Staff Report.
## SECOND: Jim Gentile
VOTING: All in Favor: John Kollm, Stephanie Swanson, Marcia Kennedy, Saurin Shah, Shae
Seabrooks, and Jim Gentile.
## Absent: Jacob Guzik
## COUNCIL REPORT
Councilmember Donna Stafford provided an update of Council activities and meeting which was held last. For
further information about the Council meeting, refer to the minutes.
## APPROVAL OF MINUTES
May 4, 2026 PLANNING COMMISSION MINUTES
Page 8
MOTION: Stephanie Swanson moved to approve the minutes of the Planning Commission held on
February 23, 2026, as submitted with typos provided to Senior Planner.
## SECOND: Marcia Kennedy
VOTING: All in Favor: John Kollm, Stephanie Swanson, Marcia Kennedy, Saurin Shah, Shae
Seabrooks, and Jim Gentile.
## Against: None
## Absent: Jacob Guzik
## ADJOURNMENT