StoryCouncil approval of indoor pickleball facility conditional use permitJuly 17, 2025

Woodbury Council Approves Indoor Pickleball Facility Permit

Meeting date: Jul 17, 2025
Published Aug 5, 2025

The Woodbury City Council approved a conditional use permit Tuesday for SNF Corporation to operate an indoor pickleball facility in an existing building on Commerce Drive.

The facility will occupy 22,000 square feet of a building in the I1 light industrial district, featuring eight pickleball courts. The Planning Commission recommended approval after reviewing the application at their June 30 meeting. The permit caps commercial recreation use at 34% of the building unless future amendments are approved.

SNF Corporation plans to use the remaining 43,000 square feet for office and warehouse space. The site has 171 parking spaces, with 73 required for the pickleball facility based on city parking ratios. The facility will operate from 6 a.m. to midnight, with office suites available 24 hours for individual renters.

The council also reviewed a concept plan for a nine-lot residential subdivision at 4255 Woodlane Drive. The proposal would require a comprehensive plan amendment to allow smaller lot sizes than currently permitted. Staff noted the property's proximity to municipal utilities and a city well makes urban development more appropriate than the current rural estate designation.

During public comment, resident Jay Tophovven requested the city develop a policy for eradicating invasive burdock plants on city property, particularly near Valley Creek watershed areas. The council did not take action but indicated staff would follow up on the request.

Our proprietary artificial intelligence agent analyzed publicly available documents including meeting agendas, minutes, and transcripts to write this story to help inform local residents. Feedback helps us improve, so please consider rating how we did with the thumbs up or down below.

Go deeper on this topic

Research related meeting documents and build a brief — without rewriting the story.

Full analysis

The Woodbury City Council held their July 16, 2025 meeting, addressing three main items: a public comment about invasive burdock plants on city property, approval of a conditional use permit for an indoor pickleball facility, and review of a concept plan for a 9-lot residential subdivision. The meeting included routine consent agenda items and staff updates on upcoming meetings.

Source document

[4:32] Good evening. Welcome to the city of Woodberry City Council meeting for today, July 16th, 2025. It is 7:30 p.m.

[4:40] Uh, a couple comments about the agenda. We have had to revise the agenda. Item 7A has been revised to reflect a change

[4:46] to remove the number two close hearing from the agenda. We'll explain when we get there. Um the meeting is taking

[4:52] place here in person. We also um stream this so it's available virtually. If anyone wants to watch this in the

[4:58] future, you can just find our agenda online, click onto the green button, and you're brought right into the meeting.

[5:04] Um meetings are recorded by True Lens Community Media and are, as I said, broadcast live, also replayed on channel

[5:10] 799. You can also find these meetings on the city of Woodberry's YouTube channel.

[5:16] Um, and uh, public comments are welcome during the meeting either here in

[5:21] person. I already do have one green sheet or available online and Ashley monitors that. Um, so if you would join

[5:27] me in our pledge of allegiance. Pledge allegiance to the flag of the

[5:33] United States of America and to the republic for which it stands, one nation

[5:39] under God, indivisible, with liberty and justice for all.

[5:46] All right. And Ashley, our assistant city administrator, is here tonight. Um, Ashley, would you please do the roll

[5:51] call? Council member Morris here. Council member Santini, here. Council member Stafford

[5:57] here. Council member Wilson here. Mayor Bert here. We are all here tonight. So, we're able to conduct tonight's uh business.

[6:05] Um I do have an open forum green sheet. So, as a result of that, I'm going to read our open forum procedure. Uh this

[6:12] is the portion of the meeting portion of the meeting where a maximum of three persons will be allowed to address council on subjects which are not part

[6:19] of the meeting agenda. Um those wishing to speak must complete a signup sheet. Again, I have that in front of me. Um

[6:26] you can also submit your question or comment virtually. Again, we monitor that. Um, please provide your name and

[6:32] just your city of residence with a question for the official record. Just as a a note, we used to always in the

[6:37] past ask for your full address. Now, we just ask for the city of residence. We think um that's just fine. And then if

[6:44] you need us to comment or follow up, then you provide all that information on the sheet, but we don't need to make your address public. Uh the council will

[6:51] listen attentively to your comments, but in most instances, we will not respond at the meeting. Typically replies to the

[6:58] concerned express will be made via letter or phone call within a week. So I'd like to um bring up Jay Tophovven

[7:04] um who has a green sheet filled out here and um welcome again. State your name in place of residence as you three minutes.

[7:11] We do have this little clock we'll do. Don't be intimidated by it. It's don't don't worry it's only a page and a

[7:17] half. Okay. Um great but I do I did bring uh pictures to illustrate what I'm about to talk about. Can I hand them?

[7:23] Sure. Feel feel free to swipe. Okay, there you are. Thank you.

[7:31] Your honor and members of the Woodbury City Council, thank you for the opportunity to address you briefly this

[7:36] evening. I live on Afton Road and Afton Court just over here. And in front of my house, there's a strip of land between

[7:43] Busy Valley Creek and Afton Road. That's part of the Valley Creek watershed maintained by Washington County. It's a

[7:50] beautiful stretch of land, especially now when it's all in bloom with all sorts of wild flowers. And really, it's

[7:56] so important to me that every spring I devote two weekends to picking up all the trash that accumulated during the

[8:02] winter um between the area of where steeple view intersects with Afton Road

[8:08] all the way up to the top of the hill on Beenburg. And that's why I feel the need to say something when I feel that area

[8:14] is threatened. The city owns a stretch of land on steeple view between the

[8:19] Inspiri Company and Dunore on the north side of a pond and related drainageway

[8:24] that flows into this area along Valley Creek. There's a well pumping station there, but the land that it sits on

[8:31] stretches for quite a bit in either direction. It's infested with a plant

[8:37] called berdo. Berdo is also called false rhubarb because while it looks like rhubarb, it's not readily edible and the

[8:44] seed pods are covered with burrs that will attach themselves like velcro to anything. Uh birds, bunnies, humans, you

[8:52] name it. I have seen many a dog walker regret letting their dogs come even near

[8:57] it. Berdo is not on the Minnesota list of noxious weeds, so not a lot of attention

[9:04] is paid to it here. But if Minnesota had a list of obnoxious weeds, bo would

[9:09] surely be on it. As you can see by the pictures that I've I'm I've given you,

[9:15] the city property is a wall of bero plants. And in some cases, it appears

[9:20] that the berdo is attempting to overpower the pine trees that it grows under. And many of the plants are as

[9:26] tall as I am. I spoke to Ben in the environmental department and I'm grateful for the time that he gave uh

[9:34] and for his patience as we discussed city policy toward eradicating bo. In short, there isn't one. He explained

[9:40] that the plants along the northern edge of the pond and drainage area are cut down every four years, but otherwise

[9:46] there is really no special effort made to control bock on city property. Your

[9:52] honor and council members, as you can see, bo is an aggressive and prolific weed. If it reaches the watershed area

[9:59] on Valley Creek and becomes established, it would be a disaster to an area that I hold dear. I understand that there are

[10:06] many demands on funding and you must allocate resources wisely, but I feel compelled to request respectfully that

[10:13] this body do two things. First, please consider adopting a berdo eradication

[10:19] policy when it is found on city land. Second, please consider ways of clearing

[10:24] the bo infestation on this particular parcel of city land as soon as possible,

[10:29] such as cutting down more often or other measures that the environmental department may deem effective. Thank you

[10:36] very much. Thank you. Thank you for sharing that with the pictures. Um I'm just wondering

[10:41] if there's a way that may be valuable to our public works team and all. Is there a way that you could end up emailing

[10:48] those or something? Uh sure. or just some way to share those along with your comments that would be

[10:53] beneficial. Thank you. It's interesting that it actually looks attractive. I mean, the way it grows, it hasn't it has a

[11:00] pleasant look to it from a distance for sure. But yeah, if you get up, it's a little scary

[11:05] because it's coming into seed right now. So, all those barbs are like right there. Yeah. But from a distance,

[11:11] yeah, it looks okay. Well, thank you. Uh I have no expertise in that topic whatsoever. So, this is why we often

[11:17] none of us do here at this table. We don't address it now with your with your dog with me as I'm walking my dog.

[11:24] Thank you for coming and sharing your comments. We appreciate that. We will now move on to the consent agenda. All items listed under the

[11:31] consent agenda are considered to be routine by the city council and will be enacted by one motion and an affirmative

[11:38] vote by roll call of the majority of the members present. There be no separate discussion of these items unless a

[11:43] council member or a citizen so request in which event the item will be removed from the consent agenda and considered a

[11:49] separate subject of discussion by the council. So with that we have items 6A through 6H tonight. Does anybody from

[11:55] the public want anything removed? Seeing none anybody online Ashley? No. Council

[12:01] members, anything from you? May I just want to make sure that I know

[12:07] we have um some public here tonight. I just want to make sure that they understand because sometimes we understand it but sometimes the public

[12:13] doesn't quite understand that if there's anything in that consent agenda with the six before it if you want to if you want

[12:19] it removed to discuss it you have to fill out the sheet and bring it forward.

[12:24] Okay. Um council members if there's nothing else would somebody like put forth put forth a motion.

[12:30] Sure. I'll move to approve consent agenda item 6A through 6H. Second.

[12:35] Motion is second. Any further discussion hearing? None. The roll call, please. Council member Santini,

[12:41] I. Council member Stafford, I. Council member Wilson, I. Council member Morris.

[12:46] Mayor Bert. I. Those consent agenda items pass. We have uh three public hearings tonight. I

[12:54] don't have any green sheets, but maybe somebody wants to put one forward. So, as a result, I'm going to read what we

[12:59] do about public hearings. In order to allow full airing of all speaker comments, individual remarks may be may

[13:05] not exceed 10 minutes each. If a speaker determines that more time is necessary, they're advised to make a request in

[13:10] writing um prior to the meeting. If there are more than three green sheets

[13:16] at a hearing, we ask you to work together to reduce the time. We essentially allow 30 minutes per public

[13:23] comment for each of the each of the hearings. Remarks or points already made by someone else should be not re should

[13:29] not be repeated. Uh limit to the subject at hand. Speakers are encouraged to coordinate presentations to all extents

[13:35] possible. And those in attendance at the public hearing will will refrain from applause or other expressions of emotion

[13:41] whether in favor of or opposition to any particular application or argu or argument. Inappropriate language,

[13:48] outburst or criticism aimed at individuals or groups are not allowed. It's a very calm audience tonight. So, I

[13:54] don't think we need need to get too worked up about any of that stuff. But with that said, um uh we now are going

[14:01] to open the hearing for uh the continued RA road branch road additions. It's a reasonzoning and preliminary plat. And

[14:08] Eric, would you like to share more about this? Uh this item is being continued to the

[14:14] August 13th city council meeting. Okay. So, with that, that hearing is

[14:20] open. We will not close the hearing until we have that follow-up meeting on the 13th. Just need uh council to motion

[14:28] to approve this continuation. Move to continue till August 13th. Motion and second. Any further

[14:35] discussion? Hearing none. All in favor? I. Any opposed? No. Okay, that will

[14:41] continue. So, Eric, back to you for the indoor pickleball club.

[14:47] Thank you, mayor, members of council. SNF Corporation has submitted an

[14:52] application for a conditional use permit to construct a 8 court pickle ball court

[14:59] within an existing building. The project is located off of Commerce Drive and is zoned I1 light industrial district. It's

[15:07] guided as places to work on the land use plan. The indoor pickle ball use is proposed

[15:13] to take 22,000 square ft. The city has historically identified that commercial

[15:19] recreation uses are a supportive use within the places to work land use

[15:24] category. The city has also established a precedent of establishing a cap uh

[15:30] with of building usage for con for commercial recreation uses through the conditional use permit process. That is

[15:37] what is being requested this evening, which would be to cap the proposed pickle ball use within this building at

[15:44] 22,000 square ft unless an amended conditional use permit is approved by

[15:49] council in the future. So, it could be modified in the future, but it would be back in front of both the planning commission and city council prior to

[15:56] that uh any additional commercial recreation uses moving forward. Uh the guidelines for a conditional use permit

[16:03] are identified in code section 24-43. In the council packet are the findings

[16:08] of fact for the conditional use permit. I will not go through those individual findings of fact um or the resolution as

[16:15] part of my presentation, but happy to answer any questions council may have. Access to the site is located off of the

[16:22] two existing access points off of Commerce Drive and off of Rivertown

[16:27] Drive. Both of those are full access points with turn lanes to access the site. Last piece that is generally

[16:34] looked at as part of these types of commercial recreation uses is the available parking. The existing site has

[16:41] 171 parking spaces. The pickable use uh is required to have 73 parking stalls

[16:46] based on our historic commercial recreation parking ratio of one stall per 300 square ft. The applicant in

[16:54] front of you this evening, SNF Corporation, has indicated they will occupy the remaining uh approximately

[16:59] 43,000 square feet of the building to be used as office and warehouse uses. There

[17:04] is ample parking for that use as well. The planning commission reviewed this application at their June 30th meeting

[17:11] and John Jarrett is present with the liaison report. Great. Thank you. John, do you want to

[17:17] share your report?

[17:22] Mayor Council. Uh yes. So we uh did not have a whole

[17:28] lot of uh discussion about this uh project. This building was actually uh a

[17:34] very nice uh mixed uh purpose building. It had offices and warehouse. The

[17:41] previous use was a Telkom Quest I believe was up there. Sentry Link. Um,

[17:47] so in the back part, it was actually designed as a truck uh warehouse and the front part was uh uh office space

[17:55] already built out as an office space and there's a locker and bathroom space in there. Um,

[18:03] like Eric said, there's going to be a 34 uh% uh recreational use cap on this

[18:08] building. uh if there was any additional use uh maybe somebody wanted to have a gym or something else in this space they

[18:15] would have to come back through to uh planning and and to the council for approval. Um Commissioner uh John Colum

[18:24] uh his uh questions about this were uh what the additional or what the rest of

[18:30] the space would be used for. Um the applicant said that it is going to be kind of an uh office suite uh develop or

[18:40] uh purpose where people will rent the offices individually. Uh and uh he felt

[18:47] that that was a a good use for this this building especially in this business park. Uh Commissioner Kennedy uh asked

[18:55] about a definition of what the uh co-working or office space meant. Uh

[19:01] basically it means that each one of those offices could be rented out individually.

[19:07] Uh Commissioner Swanson uh asked about bus parking. Uh some of the drop off. Uh

[19:14] the applicant said that they are not going to be having tournaments or any kind of school use. So they there really

[19:20] isn't going to be any concern about turnarounds for buses or anything like that. Uh, I personally thought that this

[19:28] is a really good We've looked at some other pickle ball park uh, concepts in

[19:35] warehouses. This actually is a very good use for this building. Uh, it has the warehouse

[19:41] space already in it. It has the office space in the front. uh you don't have to

[19:46] worry about semi-truckss and some kind of a you know motor court uh configuration that's competing with the

[19:53] regular car traffic. So I actually really like this use. Uh Tom Harrington

[20:00] uh Commissioner Harrington felt that the cap, the square foot cap or the 34%

[20:06] is just kind of arbitrary. He doesn't really think it's necessary anymore. Uh

[20:11] but overall he liked the plan and uh Commissioner Shaw thought that uh the

[20:17] building security needed to be addressed. Uh the applicant said he's going to be having keypads uh with a

[20:23] code, not a card. Um and Chair Olsen had absolutely no questions and we voted all

[20:30] in favor. Okay. Okay. Great. Thank you.

[20:37] Um I don't have any green sheets. Are there anything online? Is the applicant

[20:42] here that wants to say anything in particular? No.

[20:47] Okay, no worries. Um, I make a motion that we close the hearing. Second motion in a second. I'm sorry.

[20:54] You close the So, we already I'm in. Sorry. Did I I'm doing this so fast I'm paying

[21:00] attention. My mind already. Okay. All in favor? I I

[21:07] Okay, the hearing's now closed. I'll open this up to council members uh for questions, comments, or u putting forth

[21:12] a motion. Eric, could you help me understand that 34 the the cap on the on the rec space

[21:17] because this is the second or third time I think that we've seen this. You just help remind refresh my memory of why we do that.

[21:23] Yeah, the the zoning ordinance identifies commercial recreation uses above 5,000

[21:29] square feet are a conditional use permit. So even if there was no cap, it would be back in front of the planning commission and council for a conditional

[21:34] use permit. However, there is a possibility for commercial recreation uses under 5,000 ft² that would then by

[21:41] code be identified as a permitted use. So, by placing the condition of approval or the cap, that would require any

[21:47] future commercial recreation uses to be back in front of planning commission and council so that you couldn't have a a

[21:54] 2,000 foot gym or a 3,000 foot play space be in without further city review.

[22:01] So, that's really the the intent of the cap. The intent for that is that as the building was designed for a certain use

[22:07] when it was built, you know, infrastructure, support, ing, ingress, egress, parking, etc. All those needs to

[22:14] be reviewed. So by putting this in a condition, it allows us the opportunity to look at a particular use

[22:21] long beyond its original intended use. Am I paraphrasing? I think that's correct. The other we have seen some

[22:27] commercial recreation uses. Gyms are a good example where there is noise and other issues that can arise that the

[22:34] conditional use permit process can be a good vehicle for us to add reasonable conditions so that businessto business

[22:40] harmony can be achieved. Yeah. I mean, other than the mayor's aggressive u as a former teammate of of

[22:48] mayor on in a pickle ball game, other than the the aggression that was experienced by her teammate

[22:53] for missing a shot or 10 or 50, it's a nice sport.

[23:00] Well, and that's actually that segus because my question was going to be so the potential sort of office use some of

[23:07] it affiliated with the applicant but some seems like it's this notion of sort of um sort of temp or like um work from

[23:17] you know thank you shared space because my question was going to be about noise that

[23:23] the applicant is still determining how to use ultimately that space they have a space in close proximity committee SNF

[23:30] Corporation has um holdings just to the west in an alternate building. So they they're made east. Sorry, thank you. I

[23:39] should know that east versus west. That's kind of an important thing for a plan. Um they they do have uh space in close

[23:46] proximity. Um in our conversations with the applicant, they may utilize it for their purposes. They may utilize it for

[23:52] a you know flex office space, both of which are permitted uses under the code. As it relates to noise, there is

[24:00] separation, okay, between there are hallway spaces and other areas. We do not anticipate noise related issues with

[24:05] the with the pickle ball use. My other quick question just with regards to this, so the applicant is SNF

[24:13] corporation, but the permit seems like it's getting issued to the indoor pickle

[24:19] ball club, right? They would be the uh owner of the spa or the lease of the space. But it's

[24:26] important to note that conditional use permits run with the land. So if they were to change in the future, that

[24:33] permit can be updated. The actual use is issued with the building or the land, not the applicant.

[24:39] Okay. Can you just clarify this interior

[24:46] space? So the office space that's already built out is what might be turned into shared office space or

[24:51] that's in use currently? That is existing space. The existing layout.

[24:56] That's existing layout. But is that space currently being used as office space or is that the space that might

[25:03] get leased out? That is the space that might get leased out. Okay. And then all of this other open space is what

[25:10] would be future off warehouse use. Okay. It's currently I mean it'll be blocked off. I mean is this like

[25:16] literally a separate room? Is it Yep. There would be there would be um separate space creating the two.

[25:23] Okay. Like literally with a wall. That's correct. Okay. Cuz I've been in other pickle wall places where they attempt to separate

[25:29] space by tarps hanging and all that is not. This is a this is a wall. Correct. Okay. Got it. That helps me visualize

[25:36] it. Okay. Is this a is this a club that requires a membership a membership or are you just

[25:43] paying court fees? And then based on information received at the planning commission meeting, it would be

[25:48] both membership based but also open for a drop in play. Okay. And I think you said keypad with a

[25:56] code, not a card. So it won't be staffed then. That is correct. And what are the hours of operation?

[26:03] Like many of the pickle ball facilities, they may be open 24 hours a day. Um, that is a very real possibility.

[26:10] Is there a big call for 2 am pickle ball? Yes,

[26:16] because you can get a court. I was going to say if it's the only time you can play possibly

[26:21] practice. What's a Is this That's interesting with 24-hour

[26:26] operation. There's no residential around there. Is are there lights in the parking lot?

[26:33] The planning commission added a a staff review of lighting as part of the conditions. There are existing parking

[26:39] lot lights, but we will do an evaluation to make sure that they're sufficient for good entrance lighting and things like that because there because it is um it

[26:46] would be kind of a desolate at 2 in the morning here. So, I just want to

[26:54] no food and beverage in this space. Not at this time. Does it require an additional permit or

[27:01] a condition of the conditional use? Is that an allowable use within this? Not not unless it it became larger than

[27:08] an accessory to the to the commercial recreation use. So small snack bar would be very common within this type of use.

[27:16] It would be viewed as an accessory use. If they move to have a standalone restaurant type use that serves it, that

[27:22] would likely take an amendment. Yeah, that's different. But

[27:30] any other questions or comments? Would someone like to put forth a motion?

[27:38] I'll move to approve the conditional use permit via resolution 25-139, a

[27:43] resolution adopting findings of fact that second. Motion second. Any further discussion?

[27:49] Hearing none. The roll call, please. Council member Stafford, I. Council member Wilson, I.

[27:54] Council member Morris, I. Council member Santini. I. Mayor Bert.

[27:59] I. That resolution is approved. I'll move to adopt a motion approving the indoor pickle ball club. Maybe is that

[28:07] what that's supposed to be on there? Um project number 03- uh 2025-0000581

[28:13] subject to the following conditions as outlined in council letter 25-180. Second.

[28:19] Motion is second. What for the actual pickle ball club for the the permit for that? Is there any is

[28:26] there any what what do the four of you all think about the 24-hour up?

[28:32] I don't we have other clubs that are 24hour and how have they been going? I have not received any

[28:38] understood that there's any complaints. I really don't think there's a big demand for two in the morning. But

[28:45] no, but you know how I think worst possible scenario. Um that within if we

[28:50] start getting complaints would how does that work within a complaint of

[28:57] excessive noise at 2 a.m. or or bad, you know, bad behavior, etc. public safety

[29:03] starts getting whatever. What what's our tool? Um certainly in the noise ordinance u nuisance ordinance would be

[29:09] the easiest to enforce under if there was any violations exterior noise that u

[29:15] that's a a very standard-based enforcement tool. It's based on the distance from where where the noise is

[29:21] occurring from the from the business. There's 100 foot 100 foot maximum under code that's the easiest to to enforce.

[29:28] Uh activities unruly behavior things of that nature while not anticipated. Um, likely if

[29:35] there was any sort of criminal behavior, public safety staff would be the lead agency to take care of that.

[29:42] I would imagine there's indoor cameras as well in use by I was just going to ask the owner. Yeah, it's the unstaffed 24-hour portion

[29:48] that gives me pause. But like, doesn't any wasn't Anytime Fitness? Yes. Anytime Fitness is a 24 hour snap.

[29:55] Anytime Fitness, it's an unstaffed workout 24/7. That's true. Right.

[30:01] It's true. Mhm. And that's got heavy weights. I don't know what you could do in there.

[30:08] You were gonna say something. I was going to ask if it was staffed 24 hours or what the staffing hours were. I

[30:15] don't remember from planning commission if they indicated the hours of staffing. The applicant is on hand that may be

[30:21] able to the applicant. John, do you know the answer to that? Yes, I do. You want to answer that? Referring back

[30:26] to my notes, um, actually the, uh, use of the pickle ball park was going to be

[30:31] 6:00 a.m. to midnight. The office suites were going to be open 24 hours a day for

[30:37] access of the renters, right? So, if you wanted to go do your report at 2 a.m., you could access the

[30:43] building. Um, and that was in part why we had uh I believe it was uh

[30:49] Commissioner Shaw had questioned the security and if it was a badge or a

[30:54] actual keypad and all of that. Um, and

[31:00] one note that I'd like to make, we have other businesses that have gyms in the

[31:06] business itself in the office, handball courts and so forth. Um, so it's really

[31:11] not any different use than what we already have. Um,

[31:16] the only difference is that there's a lot more people with access and key codes than, you know, one one occupant

[31:24] that has however many employees that have use of the of the facility.

[31:30] Okay. So, I'm good. Thank you. So, Commissioner Jarrett, 6:00 a.m. to midnight is the pickle ball access and 24hour is the um office suites.

[31:37] Correct. Feel better? I do. Okay. Good. We have a motion and a second.

[31:44] Motion second. That was discussion. Yeah. Okay. Um then no further discussion.

[31:49] Then roll call, please. Council member Wilson. I. Council member Morris. Hi. Council member Santini.

[31:55] I. Council member Stafford. I. Mayor Bert. I. That passes. All right. Good luck on

[32:00] your project. I know you'll be making a lot of pickle ballers happy because there's just never enough cords in the winter.

[32:06] When will when's the expected opening? You need that? The uh our understanding is the purchase agreement for the

[32:13] building was contingent upon this additional use. So the it likely will be several months before the pickle ball

[32:19] use would be underway. Great. Terrific. Thank you. Okay. We'll

[32:24] now move on to 4255 Woodlane Drive concept plan unit development. And the

[32:30] hearing is now open. Eric, back to you. Thank you again, Mayor and Councel.

[32:35] On behalf of Jed Schmidt, Land and Resource Consulting has submitted an application for a concept plan unit

[32:42] development for a nine lot subdivision. The property is located at 4255

[32:48] Woodlane Drive on the southeast corner of Woodlane Drive and Hargus Parkway. The property is currently zoned R2

[32:54] Single Family District and is guided as a role estate on the land use plan.

[33:00] Section 24207 of the city code identifies the concept planned unit development process uh as shown on the

[33:08] screen. It does identify that this is a process that was designed to give an opportunity for applicants to get

[33:15] general information or feedback from both the neighborhood, the planning commission, and the city council in

[33:21] advance of incurring the cost of a development application. Um we'll talk about it later, but it's really

[33:27] important to reiterate that the the findings and the comments that are made this evening are not binding on the

[33:33] city. Uh that the comments from the planning commission or are not binding nor are the staff comments. However, it

[33:40] is an important part of this process is to provide the applicant guidance on initial perspectives as they will be

[33:47] making bis a business decision uh following the activities this evening.

[33:54] The concept plan again is not used very frequently. Janelle and I have had conversations. We think the only time it

[34:00] was used was around 1999 that we are aware of. So it's been over 25 years

[34:06] since this process has been used, but again it's been in code for quite a while. The purpose uh of this concept PD

[34:14] is to get feedback on three core areas. Um it the application would require an

[34:21] amendment to the comprehensive plan from rural estate which is our one lot per 3 acres to an urban estate. It would

[34:28] request a reduction in minimum lot size from 3 acres to just under or just over

[34:33] 3/4 of an acre and then also a reduction in minimum lot width from the 160 foot

[34:39] to 135 in the R2 district. Again,

[34:44] may I ask a quick question on the to do the amendment on the comp plan? Is that a majority vote or is that a four four

[34:51] to one vote or I mean superity? That would be a majority vote because it is not moving to places to work.

[34:57] Okay. For from places to work. Okay. Access to the site is provided off of

[35:03] Hargus Parkway. The proposed lot configuration is two culde-sacs. The culde-sac on the west side is designed

[35:10] to be uh able to be extended if development were to occur in the future to the south.

[35:17] One of the key driving factors is the development of the Arbor Ridge development which is located uh to the

[35:24] east of the subject site. The development um two significant events

[35:30] occurred that changed in staff's opinion the highest and best use for the adjacent land or this subject property.

[35:36] The first was the extension of Hargus Parkway. Uh that was not contemplated when the when the comprehensive plan was

[35:43] adopted, the 2040 comprehensive plan. So the extension of Hargus Parkway in this location extended city sewer and city

[35:50] water to the subject property. The second event was the construction of a municipal drinking supply well in the

[35:57] area pointed out in red on the screen. Due to the close proximity to this well,

[36:02] additional private water wells would should be greatly minimized to limit

[36:07] possible draw down or contamination risks on the municipal drinking water. Again, this property is zoned R2. Right

[36:14] now, that is a 3acre minimum lot size that's contemplated to have private well and private septic. So, one of the ways

[36:21] to avoid that by right uh subdivision would be to change the land use to allow

[36:27] for municipal services. Um it is it's not an allow, it's a require.

[36:35] It would change it from a required municipal. That's correct.

[36:40] It doesn't allow it. It requires it. That's correct. The uh as identified in the staff report

[36:47] uh it is important for transparency purposes to identify the staff would identify that likely in the 2050

[36:53] comprehensive plan process the land use of this property would be evaluated

[36:58] because of the presence of municipal utilities. The options during that

[37:03] process that would likely be evaluated would be either to move this to the urban estate which is in which is the

[37:09] proposal that is at the very early stages in front of you this evening which is the one unit per acre. The

[37:17] second is our more standard urban residential development which is the 3 and 1/2 units per acre that and that is

[37:23] uh would equate to 35 units versus the 10 unit maximum that could be built

[37:28] under an urban estate. Again, just for clarity purposes, the application that's being requested for initial feedback

[37:35] would be a 9 unitit subdivision.

[37:40] This is a an early review and a unique process. So, it's important to identify what the future reviews will include.

[37:47] They'll include full storm water evaluation, tree preservation, evaluation of of landscaping

[37:52] requirements, pedestrian infrastructure. Currently, as you can see on the site plan, there is a proposal to add a trail

[37:59] along the south side of Hargus Parkway that would extend from the existing trail that's lo extend the existing

[38:05] trail located to the east to connect with Wood Lane. So, there's some

[38:10] Is that a plan that's a city cost or would that be this development cost? That would be on the development.

[38:16] Okay. that is a part of the development proposal and then also final designs of the sanitary sewer system as well as the

[38:23] water. Much like the last application, this was also reviewed by the planning commission on June 30th and again

[38:31] commissioner Jared is here for the liaison report. Welcome commissioner again.

[38:39] All right. Um, so we had at a previous uh meeting a

[38:47] kind of a bumpin culde-sac uh development like this in the far

[38:53] southwestern corner of Woodbury right up against Newport Cottage Grove.

[38:59] Are we talking Cherry Meadows? Cherry Meadows. Yes. And we had a lot of referral back to that. Um, uh,

[39:05] Commissioner, uh, Column was asking, uh, what the neighborhood meeting, uh, what

[39:11] the response to that, uh, Cherry Meadows, uh, design was. And, uh, staff

[39:17] said that actually, I believe Eric said that it has been very positive. Uh, I

[39:22] think part of the concern is that, uh, it was a very close vote on that that development for planning. Uh, I think

[39:30] there was three to four. I think it was three nos and three to four four yeses.

[39:36] Um so John uh column commissioner column was asking why nine lots on this on this

[39:44] site? Why just make why not just make it eight and they're all one acre? Uh why

[39:49] go for the setback variance and all of that? And the applicant said that uh

[39:55] nine lots just made sense at about 3/4 acres each. uh the layout worked better

[40:01] because of the the odd shape in the pond and maybe they could, you know, uh in

[40:06] the end make the pond a little bit uh smaller so they they'd eek out a little bit more room. Um and the applicant uh

[40:15] said this is a really good transition between the larger 3acre uh development

[40:21] lot lot you know developments with larger lots and on the other side where they have a smaller more traditional you

[40:28] know maybe third or halfacre lots um and they said there's a huge demand in

[40:34] Woodbury for larger lots so uh Commissioner Kennedy had uh

[40:40] concerns about the tree preservation on this site. There are some mature trees

[40:46] uh in it. Stephanie Swanson uh was also a no on the previous uh development.

[40:56] Uh she did a lot of math and uh felt that if we tweaked the lot sizes here a

[41:02] little bit that it would actually work. it would be closer to being compliant

[41:07] and uh you know it would maybe fit in uh into that kind of uh long shape along

[41:15] Harusgus Parkway better. Uh she actually did some math and a little sketch for the applicant which I thought was great

[41:22] that she did that. Um, I also think that

[41:28] if you tink tinker with that plan, you could maybe get a path between lots four

[41:34] and six and five and seven so that if there was development to the south, that

[41:39] neighborhood could actually connect by trail to the rest of the fabric of the area. Uh part of why I did not like the

[41:48] uh Cherry Meadows development was when we saw that plan, it did not have a path

[41:53] or any kind of sidewalk. It didn't have any interconnection. Uh and I I I just

[41:58] kept seeing, you know, kids standing out on the bus waiting for a bus on Century Avenue with uh you know, where are they

[42:05] going to be in a ditch? Um this is actually better proposed with the sidewalk on both sides. And I think if

[42:12] you tinkered with the lot size, it would this would definitely be a good project.

[42:17] Uh we had uh Tom Harrington uh Commissioner Harrington thought that

[42:23] they were just too small. He really did not he didn't like this configuration.

[42:29] Uh Chair Olsen actually loved it. Said she doesn't like associations. She

[42:35] doesn't like monuments. She doesn't like uh knowing your neighbor. You know, wants privacy. and she said, "Go for

[42:42] it." She loves all her neighbors, though. Yes. She she she apologized to all of her neighbors.

[42:48] Said, "If you are watching, close your ears. I'm I'm sorry." But, uh, uh,

[42:56] Commissioner Shaw actually, uh, had some questions about the potential, uh, uh,

[43:03] development to the south and, uh, if there was only going to be access

[43:08] through that, uh, left Culdeac and actually there would be two um, access

[43:14] points to uh, to that development and that was it. It was actually a very

[43:20] favorable uh recommendation and of course we did not have to take a vote.

[43:26] Just guidance, right? Okay. Terrific. Thank you, Commissioner.

[43:32] I don't have any green sheets on it unless somebody wanted to put forth one. And Ashley, anybody online?

[43:37] Right. Did I make a motion that we close the hearing? Second. Motion a second. Any further discussion? I have a question. Thank you. Thank you.

[43:43] Before we close it, um Well, you still get to speak. I know. But before we officially close it, I

[43:49] just wanted to understand what are we're closing the hearing on because we've not ever done this.

[43:54] And so if we close this hearing, does it do do people not get the opportunity? Yeah, this is what I'm concerned about.

[44:01] That's a fair question. This is only a hearing for the concept PUD. If this application moves forward for a

[44:07] preliminary plat, a future comprehensive plan, it would start a new process with a full neighborhood

[44:14] meeting with all of that information, a new public hearing where public would be invited to be able to testify.

[44:19] Thank you. All right. Great. Okay. So, all in favor of closing the hearing, I I Okay, the hearing is now closed.

[44:29] I have some questions. First of all, um I love the bigger lots. Um I think

[44:34] there's a demand for it. I um I've been pushing for that for

[44:40] over four years, but we are making a change then to our comprehensive plan.

[44:45] And I remember, you know, at the beginning of my first term, it was one of those things where I had questioned

[44:52] if we could change the comprehensive plan and I was told like this is a lot of work. If we go to change the

[44:57] comprehensive plan, we have to submit it and there's it's too much work and we don't like to do it. And now I know

[45:02] we've done it a number of times and here we are again. Um so why don't how much work is it and um

[45:11] I guess I'm confused on what's happening. So the the dependent on the type of

[45:18] amendment that's being proposed. It can be varying levels of work. This

[45:24] application and many of the other amendments to the comprehensive plan that have been proposed are smaller in

[45:30] nature. So you are not looking at systemwide evaluations when you look at broad changes in the

[45:37] comprehensive plan development patterns regulations where you have to restudy all of the impacts to the entire

[45:44] development approach. That is a significant amount of work on the

[45:50] smaller scale on a 10acre parcel of land. There is analysis that needs to be

[45:56] done and and information submitted to the metropolitan council that looks at the sewer flows, the water flows, but

[46:02] that is a very manageable amount of work and it's a very tangible exercise to know what the impacts of this change

[46:09] are. In reality, the in this application, the change would be instead

[46:14] of if this project were to move forward with nine units, because this property

[46:19] is 10 acres in size by right under the R2 zoning, they could do a very

[46:24] straightforward plat, which would which would equal three units, but those three units would be protrusions into our

[46:31] aquifer through private well systems. That's really one of the things that

[46:37] staff would encourage council to think about is if we don't allow a change in the comprehensive plan. Now, the

[46:43] unintended consequence could be additional risk to our aquifer because the applicant does have the property

[46:49] owner would have a right to pursue a subdivision that meets the zoning which would be threeacre minimum lot size.

[46:56] And this would be different. I always think of it like sort of like the from a grading standpoint. It' be different if

[47:02] we were proposing to go from R2 to like a commercial district, you know? So, to

[47:08] me, it's like if you're staying within sort of the the level of land use.

[47:13] So, so that's a little bit to council member Wilson's question. I think for for me, the argument that I make against

[47:20] in the most recent state legislative session against the housing bill was the

[47:26] development by right in a in a in an area that was not zoned. was zoned for

[47:32] one lot per whatever our number is and now we're going to let four. So that's you're you're multiplying by three the

[47:38] the burden on the infrastructure sewer, water, roads, etc. And so that burden

[47:44] and the comp plan change is not is not envisioned in the comprehensive plan

[47:49] because they we zone it or we we we plan for this to be urban reserve.

[47:56] What's the density increase and what's the size of the parcel? I think is where my mind is going and this is not a

[48:02] commercial use going to residential use which is a significant change. This is not a a single family going to a quad.

[48:09] This is etc. So what is what's that burden on the size of Thank you for this right of of the parcel of where that

[48:16] burden is going to do. So if we were going to by right go at three three units it's going to nine. Um is that a

[48:23] jump from here to here right or is it a jump from here to here? It's the it's the mid jump. And so that when

[48:30] when I was thinking the same thing of it's comp plan change and those are there's a lot of there's a lot going to

[48:36] that but I wasn't necessarily for once thinking unintended consequence. I'm thinking of

[48:42] I think in staff report it said highest and best use. I also liked the larger lots. like this is not a significant

[48:50] change that I would really have to think super hard about because it's not a 200 acre, you know, plot that's being that's

[48:58] coming to us because that would be an entirely different conversation, but I I had very similar thoughts, Kim.

[49:04] Um, Cherry Meadows was higher density, wasn't it? It wasn't. Yeah, that's that's a big It's also I think the Cherry Meadow

[49:10] Sure. I'm going Well, sorry because and I was on the leazison for that conversation from

[49:15] planning commission. I think what our commissioners struggled with a little bit was they had a really hard time sort

[49:21] of taking away Newport's plan across the way and that's where you know that heart

[49:28] of like okay you're putting these properties here and this is a proposal here. Personally I thought it was a good

[49:36] sort of gradual step between the two because behind Cherry Meadows is sort of even then those larger lots but I think

[49:42] that was sort of the harder piece. I don't think it was that much more dense. It's the same density.

[49:48] Yeah. Than this. It is. Okay. I agree that. I think it was the the Century Road that was causing the

[49:54] issue. It was the what, Kim? The Century uh the Century Road and the expand and there's no there were no

[49:59] trails. There was no Yeah. That kind of access on that was a big thing. So this So this will have a trail going

[50:06] down it, but I'm noticing that the widths of these streets, correct me if I'm wrong, are what? So the the what's

[50:14] shown on the screen is the right ofway width. The streets themselves would be 26 feet. Okay.

[50:19] Um because just to get in a little into the final design aspect on the east

[50:25] culde-sac that's showing as a 60oot rightway. Code would allow that to be a 50ft ride ofway because it does not

[50:30] extend. Okay. Are we um so on the potential through culdesac are we going to put a

[50:38] trail on it right now? And so it's a whole lot easier to do it now and sell it than to go back in and take over

[50:44] property. Right. Right. Say that again. Right. Engineer Hartzel. Say that again. I said, "Is it are we going to say put a

[50:50] trail in on the potential through culde-sac?" Because it's a whole lot easier to put a trail in now.

[50:56] A sidewalk or a trail? Sidewalk. Well, well, could be either, but Well, this is to me this is

[51:03] not the This is not a sidewalk issue. This because those are big lots. someone's to I mean that would be uh I was thinking

[51:10] trail there's trail out on Hargus and because these are that would

[51:16] potentially be a through street it would be a trail not a sidewalk

[51:21] from a policy standpoint the culde-sac length that requires pedestrian

[51:27] infrastructure is 900 ft. So when we looked at it from a from the surrounding

[51:33] properties, multiple properties would need to subdivide in order to require that connection. As the the part of the

[51:41] planning commission review, there was a dialogue whether that's a trail or sidewalk along the street or is there a

[51:48] a trail connection in the back of the lots that are appropriate. Those are comments that have not been weighed into

[51:55] from a staff standpoint, but that was information that was provided as part of the the the planning commission review

[52:01] was to contemplate whether pedestrian access for those to the south should be not on road but should be off road to

[52:07] connect. Yeah. My only concern would be they would be walking to Bailey and as elementary or uh Bailey Elementary as

[52:15] walkers. Am I correct? Yes, that is correct. Trail there. Yeah. And so I'm thinking future

[52:22] development and it is not fun to go back and say hello we are now taking over

[52:27] 15 feet of the easement. The other staff evaluation that we would look at is again there is this stub

[52:33] street. I don't recall whether there's a sidewalk stubbed in this location.

[52:40] if there is or maybe it's retrofitted after the fact. It does not appear, but that that's

[52:46] another option that could be looked at to provide access back for these areas

[52:51] to go back to the system to get to Bailey. Oh, back through.

[52:56] I'm going to push back on that a tad bit. No, no kid is going to walk backwards to go to school.

[53:02] There's there's no way. I would I would agree with that. Okay. But we've got I mean we just talked about there's a trail there's a

[53:09] trail on the going to be put on the south side of Hargus Parkway. That's your access to get to Bailey. Correct.

[53:14] What I'm saying is is you have a culde-sac here that is potentially the culde-sac on the west is going to be

[53:20] your through street to the future development to to the south. Are we going to put in a trail along this

[53:27] culde-sac now or are we going to do it after development comes in and then go

[53:32] into these people's yards and say we're now putting in a trail? Is it is it easier to do it when you purchase the

[53:39] property and know that it's there? Yes. Well, I would argue that it's not a trail that it would be a sidewalk, but

[53:44] that I mean I was going to raise it's not that big of an acreage. I mean that's

[53:49] 77 is not that big. It's not that big. It's not like 3 acre. It's not that big. But that would be my thing, Eric, is that depending on what

[53:56] happens south in the next plot south and is that neighborhood connected over should there be thought given to will

[54:02] this eventually have sidewalks on it. So that'd be that'd be a comment to the developer. I have a question about lot

[54:09] one. Lot one currently has a home on it and that access is out to Woodlane. Is

[54:15] that correct? And that would remain That is correct. That is the existing homestead on the property. The access

[54:20] and home would remain as part of this subdivision. Okay. And if I don't know if it's an older home or what, but if that were

[54:25] ever taken down, the access can remain on Woodlane and not not ever connect to Hargus at that point because we really

[54:32] don't have driveway access on Hargus anywhere. Correct. Correct. That is correct. Okay. So, that would be a stipulation

[54:38] going forward that that the access remains on Wood Lane for lot one. That was actually I wrote that down. I actually like that there's no driveway

[54:45] access on Marcus. Right. Right. So with that, can I raise this might be throwing a lot of

[54:51] wrenches, but I was just curious if it was ever broached about

[54:56] taking in between four and six and five and seven and making one access point

[55:02] because I guess my thought is too didn't we just wasn't it just um decided that

[55:07] at Arbor and Hargus are you talking about pedestrian? Nope. one car accident access because

[55:14] didn't are we putting in Arbor Drive in Hargus a stop sign?

[55:19] Yes, it's a it's a four-way though. It is a four-way two-way. It's a two-way. It's a two-way.

[55:25] Southbound would be a Yeah, but it's a it's a intersection like this, correct? But yes,

[55:31] but part of that I think is because of the traffic volume starting on Hargus a

[55:36] little bit more. And so, and again, I know that it's not a ton of homes, but having sort of one entry point into this

[55:45] division versus two that are relatively close. And so having sort of a road that comes

[55:52] in and then comes out when you get south of four and six.

[55:57] A through street, your street through street is and then you're branching off. I understand what you're saying. So you

[56:03] only have one access in and out of this versus two that are relatively close to

[56:08] then these two other roads given. So I'm again I know that this is just this is my feedback.

[56:13] This is a feedback night. It's feedback night. All this is so um that's I never thought of that.

[56:19] It's a good idea especially considering Hargus is only going to get more busy as we continue to develop.

[56:24] And that was Yeah. I I I think that there is an ability to modify, but for

[56:31] council to contemplate that would likely change the lot sizes to more consistent

[56:37] R4 lot sizes because if you were to connect those into one access point. So

[56:43] there there's pros and cons to that. If you're looking at this through the lens of housing diversity, larger lots, the

[56:50] culde-sac formation that you're seeing here is the way to likely do that. But are you adding are you would you be

[56:56] taking away the lots in that scenario? You would be giving more because you instead of having two streets you have

[57:01] just one. Well that's not true. You're having two. So mayor members in there. You're right.

[57:08] You know the issue with this is a long linear parcel. So if you put a 60 foot road rightaway

[57:13] in setbacks what you get is long skinny parcels that aren't conducive to development of this size.

[57:20] Okay. Thank you. I appreciate all the creative thinking. I think I'll just share overall I think

[57:25] this is a great concept plan. Um I like it. I think it makes sense. It it it

[57:31] merges the larger lots with the smaller lots. We've got city utility access. I

[57:36] think it makes sense. So I'm generally good with it. I know you planners tweak it all and figure all the details out as

[57:43] best you can. Is there is there a reason and I'm not you know I I I noticed that public works

[57:49] isn't here to but they're but but I think we've all ridden in a plow truck. They're going to hate this uh well going

[57:55] to say they hate it. They're going to dislike this um short stubs in the culde-sacs and they're going to have to

[58:00] plow from a plowing standpoint. Why are these not just regular streets? Why do they have to be culde-sacs?

[58:10] Well, maybe I'll answer for Eric here. Um, part of it is is you got to have someplace to store the snow, right? So,

[58:16] I mean, I know you can push it off to the the the end of the culde-sac, but you also need the ability for fire

[58:22] trucks to get in and out. And so, uh, if you just have a straight through road with a dead end,

[58:28] you're not going to be able to actually circulate uh, fire access. So, yeah, the the public works

[58:34] perspective, garbage trucks, school buses, the whole works. That's why they're the engineers. 100% white, right? I sell sticker bars

[58:41] for a living. All right, we talked about this. Okay. Okay.

[58:47] Um I have a couple more questions. Um woodlane expansion. I'm assuming that

[58:53] road is going to expand um south of uh Bailey. Tell me what's in the plan for

[59:00] that. How does that lot one get affected by that? Um, you know, I don't I always

[59:06] get a little nervous after we build and then um take

[59:11] Chris, do you want to answer the timing question and I'll answer the impact to the lot question?

[59:18] Eric, I'm uncertain of the timing. It's far enough out there where it's not going to happen in the next five years.

[59:25] Um because there's well sorry to interrupt but there because there's a few other parcels down below this that are all

[59:32] single that are entry and exit right exit onto lane as it is at this time I believe the configuration

[59:38] of the road meets the the capacity for the average daily traffic. I guess I'm worried I'm concerned

[59:44] because woodlane south of Bailey could turn into a wood lane like north of

[59:49] Bailey and we don't like driveway access out onto these main roads. We don't want them on to Hargus. We don't want them

[59:55] out onto Woodlane and now we're giving driveway access out to Wood Lane. Well, but the comp plan has everything

[1:00:01] south of this as R4 as the the large lot. So to your point of development

[1:00:07] applications that would come would also require a comp plan change and and then we'd have to talk about road access.

[1:00:13] Then we're getting to a capacity issue concern. But everything everything south of us in fact this parcel itself is part

[1:00:20] of the conversation but everything else and I because I pulled up the comp plan while we were sitting here and

[1:00:25] everything south and southwest of us is all R4. Yep. And I'd have to verify but I think in

[1:00:32] this section the roadway width is appropriate for the ultimate roadway section according to the comp plan. Not

[1:00:39] sure to the south of this when it gets more into the rural area, but it's all it's all gray.

[1:00:44] As part of the the plat activity, we would acquire or require the dedication

[1:00:51] of adequate right of way to provide future space for a trail and other urban

[1:00:59] amenities to prepare for the future. Although it's not currently identified within the CIP, there would be space

[1:01:07] reserved for the that type of roadway section and that has been communicated

[1:01:12] to the applicant. So, are we going to put a stipulation on how close that driveway can be to Hargus

[1:01:18] then? Are we going to start doing something like that? Because to have a that

[1:01:23] it's an existing driveway today, so it's not proposed to be modified. Um it's something we can look at on whether

[1:01:29] there would be a recommendation to remove that move that access point. Um

[1:01:36] but it is an existing home and that's you know the challenging part. Um removing the home doesn't seem like the

[1:01:44] right use of resources either. So we have is the is is lot one lot one that's the

[1:01:50] existing house and so that's just going to remain there. That's right. I see what you're saying. That's we're

[1:01:55] not the developer isn't taking lot one taking the house and building a new

[1:02:01] house there. The existing home would remain on site. I understand the existing owners would remain. Of course not. Then we're not going to

[1:02:07] Yeah, I understand that then. Well, and I definitely think it would be difficult to move the driveway to Hargus because of the formation of the turn

[1:02:14] lanes, right? And we don't want driveways out on Harus and it's too close to the intersection and all those things. So,

[1:02:20] those were the that was my feedback on that. I I was under the understand I missed that part that the existing house

[1:02:25] was going to stay. My is lot one on city water now. No. Would we make that part of the

[1:02:30] condition? Yes. That would be part of this development requirement is that they we abandon that

[1:02:36] wall though the the construction activities would require it even if we did not. Okay.

[1:02:41] The septic system would be interrupted. The septic field. I thought we gave the rural lots an

[1:02:46] option. We we do we we have in the past in this case the construction the grading and other to create lot two and

[1:02:54] lot three and the storm water ponding is going to take out their septic fields. I see. Okay. Um

[1:03:02] when uh private wells don't go down as deep as our city wells, do they? They do not.

[1:03:08] Yeah. Okay. Any other feedback?

[1:03:14] I just have one quick question. is I appreciate the applicant looking for feedback from planning and from the

[1:03:22] council before they move ahead but have provided a lot of information for us. Do

[1:03:28] they have a time frame in mind of of when they would like to move with this?

[1:03:34] It's our understanding that following the public hearing tonight, they will take

[1:03:40] the information, make a business decision, they'll finalize all of their purchase agreements for the properties

[1:03:45] and begin an application process for the subdivision. Um, that would likely mean

[1:03:51] construction activity likely won't be until 2026, but hypothetically, if it moved quickly,

[1:03:58] you could have some fall construction pending city approvals. But that does that not violate the order that we the

[1:04:06] what what did we put in? I I don't want to use the wrong pause. The pause. Thank you. That's the word I was looking for.

[1:04:11] The pause that we have in place. The these properties are not within our phasing plan. So the council would have

[1:04:17] discretion and not be inconsistent with the phasing discussions. I thought we said anything within the

[1:04:23] Musa we would but outside of the Musa we wouldn't. outside the phasing plan

[1:04:29] phasing plan there's a little there is a nuance there I would

[1:04:35] well I like this I just maybe am not in favor of the timing then uh if because I

[1:04:40] because I feel like although I doubt six or eight lots are going to have nine if

[1:04:47] we count the new house the existing home on there it's not going to have that big

[1:04:52] of an impact on our infrastructure and water usage but nonetheless us if we

[1:04:57] start giving yes to this then pretty soon it opens us up to we have a pause

[1:05:02] in place and and maybe that's something I feel like we did not that long ago just talk a

[1:05:08] little bit about this at a workshop about discussing about when we're going to start to reopen some phasing just maybe

[1:05:16] that's something that with everybody's approval of having staff give us an update again about just

[1:05:22] remind us about sort of timing because even if we did even if it came before us and then approval, you know, when it

[1:05:29] actually would be completed. Sure. Where does that fall within our timing of it? What our original expectations

[1:05:35] were with the pause?

[1:05:41] Okay. Since this hasn't been done since 1999, is this the only feedback we have to do like vote? This is the process.

[1:05:49] There's the feedback. I like it. I I'm surprised that it doesn't get used more. I guess

[1:05:55] I Yeah, it is. I agree. What a nice concept. So that someone a developer or whoever can come in and get some early

[1:06:01] feedback. It's a nice process that we have. I like it too. So they're not they're

[1:06:06] not um blindsided with my comments. Yeah. No. Right. We've had many conversations as staff

[1:06:13] about the process. This is one of the first to utilize it. Great. Right. I'll move some history if you

[1:06:19] don't mind just on the the first one Steve was the where your old offices were. So when that building was built

[1:06:26] was one of the first buildings in the Tamarack interchange area and they're the ones that came in with that first

[1:06:31] concept to kind of understand what that future might look like. So

[1:06:38] okay. Uh no discussion items. We'll move on to staff reports. And um Ashley, I think you're gonna give us a little update.

[1:06:44] Thank you, Mayor. So, um I'll just be very brief. Um we have just a couple upcoming items. Um the July 30th, um

[1:06:53] council workshop meeting, there are three items on that agenda at this point. Uh public safety strategic

[1:06:59] initiative is the first item. Environmental stewardship initiative and fiber to the home and franchise

[1:07:05] agreements are the three items. Um and then it does look like a neighborhood meeting will be here in council chambers

[1:07:11] on July 21st. Um, I'm not sure if I'm pronouncing this correctly. Alma Flora.

[1:07:17] Alma Flora. Llama. Llama Flora. All right, that's everything.

[1:07:22] Great. Thank you. Anything any questions for Ashley? If not, I make a motion that we close that the meeting is adjourned.

[1:07:29] Second. Motion a second. All in favor? I I We are adjourned.

[1:07:34] Thank you, Eric. You nailed it. 8:30. Well, three minutes over. It's pretty

Was this story helpful?